JPH02197619A - Formation of banking - Google Patents

Formation of banking

Info

Publication number
JPH02197619A
JPH02197619A JP1516889A JP1516889A JPH02197619A JP H02197619 A JPH02197619 A JP H02197619A JP 1516889 A JP1516889 A JP 1516889A JP 1516889 A JP1516889 A JP 1516889A JP H02197619 A JPH02197619 A JP H02197619A
Authority
JP
Japan
Prior art keywords
banking
bag
embankment
reinforcing sheet
bag body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1516889A
Other languages
Japanese (ja)
Other versions
JP2599293B2 (en
Inventor
Satoru Nishioka
哲 西岡
Yoichi Otaka
大高 陽一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP1516889A priority Critical patent/JP2599293B2/en
Publication of JPH02197619A publication Critical patent/JPH02197619A/en
Application granted granted Critical
Publication of JP2599293B2 publication Critical patent/JP2599293B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To quickly form a stable banking by a method in which a banking is formed on one side plane of a soil bag formed by packing a filler into a bag incorporated into the housing part of a reinforcing sheet constituting the housing part and the plane part, and the other side plane is connected to a rigid wall. CONSTITUTION:A looped housing part 4, one side plane part 3 for banking, and the outer side plane part 31 for connection are formed of a water-permeable reinforcing sheet. Sand, etc., is packed into a bag 1 housed in the part 4, and the reinforcing sheet is placed on the ground where banking is to be formed. A banking material 6 is repeatedly charged onto the part 3 to form a banking up to the height of the part 4 to construct the banking of a given height. The end portions of the part 31 are connected to vertical and horizontal reinforcing bars 81 and 82 set along the edge of the banking, and concrete is placed into formworks on both sides of the bars 81 and 82 to form a rigid wall 8, where a drain material 9 is packed into the space between the wall 8 and the part 4. The falling-down on the soil bags can thus be prevented and the banking can thus be stabilized.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は盛土の築造方法に関するものである。[Detailed description of the invention] <Industrial application field> The present invention relates to a method for constructing an embankment.

〈従来の技術〉 鉄道や道路等を地面より高い所に敷設する場合には、土
等を盛り上げて盛土を築造し、その盛土の上面に鉄道や
道路等を敷設する場合がある。
<Conventional Technology> When constructing a railway, road, etc. at a location higher than the ground, an embankment is constructed by heaping up soil, etc., and the railway, road, etc. is sometimes laid on top of the embankment.

この盛土の築造方法には、間隔をおいて土嚢を積み上げ
て壁体を構築し、その土嚢壁間に土などを盛り上げて築
造する方法が存在する。
There is a method of constructing this embankment by stacking sandbags at intervals to construct a wall, and then mounding soil between the walls of the sandbags.

〈本発明が解決しようとする問題点〉 従来の土嚢は、袋体に人力で砂等の充填材を充填して行
っている。
<Problems to be Solved by the Present Invention> In conventional sandbags, the bag body is manually filled with filler such as sand.

そのため、土嚢の成形に多大の時間と労力を必要とする
Therefore, forming sandbags requires a lot of time and effort.

また、土嚢を積み上げて壁体を構築するだけでは、土嚢
壁間に投入した土圧によって土嚢壁が倒れて、盛土が崩
壊するおそれがある。
Furthermore, if a wall is simply constructed by piling up sandbags, the earth pressure applied between the sandbag walls may cause the sandbag walls to topple, causing the embankment to collapse.

〈本発明の目的〉 本発明は上記のような問題点を解決するためになされた
もので、容易かつ迅速に土嚢を成形でき、しかも安定し
た盛土を築造することができる盛土の築造方法を提供す
ることを目的とする。
<Objective of the present invention> The present invention was made to solve the above-mentioned problems, and provides a method for constructing an embankment that can easily and quickly form sandbags and can also construct a stable embankment. The purpose is to

〈本発明の構成〉 以下、図面を参照しながら本発明の一実施例について説
明する。
<Configuration of the Present Invention> An embodiment of the present invention will be described below with reference to the drawings.

〈イ〉袋体の形成(第2図) 袋体1は、少なくとも通気性を有する撓性のシート状体
、例えば布等によって形成する。
<A> Formation of bag body (FIG. 2) The bag body 1 is formed from a flexible sheet-like body having at least air permeability, such as cloth.

袋体1の形状及び大きさは、盛土の規模等に応じて選択
するが、本実施例は長い杭状の袋体1を成形する場合で
ある。
The shape and size of the bag 1 are selected depending on the scale of the embankment, etc., but in this example, a long pile-shaped bag 1 is formed.

この袋体1は閉塞されており、内部には砂等の充填材を
充填する部屋が形成される。
This bag body 1 is closed, and a chamber is formed inside to be filled with a filler such as sand.

また、袋体1には、砂等の充填材の注入口11を一つま
たは複数設ける。
The bag body 1 is also provided with one or more inlets 11 for filling a filler such as sand.

この注入口11はポケット状になっており、砂等を注入
するホース2が挿入可能である。
The injection port 11 has a pocket shape into which a hose 2 for injecting sand or the like can be inserted.

そして、砂等を充填して、ホース2を引き抜くと、注入
口11は自然に閉じるようになっている。
When the hose 2 is filled with sand or the like and the hose 2 is pulled out, the inlet 11 closes naturally.

〈口〉補強シート(第3図) 補強シートは、通水性を有する撓性のシート状体である
<Opening> Reinforcement Sheet (Figure 3) The reinforcement sheet is a flexible sheet-like body that has water permeability.

この補強シートを用いて、平面部と、その平面部の途上
にループ状の収納部4とを形成する。
Using this reinforcing sheet, a flat part and a loop-shaped storage part 4 are formed in the middle of the flat part.

平面部(裏、収納部4を挟んで一方を盛土平面部3とし
、他方を連結平面部31とする。
Plane section (on the back side, with the storage section 4 in between, one is the embankment plane section 3 and the other is the connecting plane section 31.

収納部は、補強シートをループ状に折り曲げて、その両
端部を止金41によって平面部に固定して形成する。
The storage section is formed by bending a reinforcing sheet into a loop shape and fixing both ends of the reinforcing sheet to a flat surface using clasps 41.

そして、袋体1を収納部4内に収納する。Then, the bag 1 is stored in the storage section 4.

〈ハ〉充填材の圧送(第2図) 袋体1内に充填する充填材には、砂5等を使用する。<C> Pressure feeding of filling material (Fig. 2) Sand 5 or the like is used as a filler to be filled into the bag body 1.

充填材の圧送装置は、例えば第2図に示すように、充填
ホース2を有する圧送機21に、コンプレッサー22を
連結したものが考えられる。
For example, as shown in FIG. 2, a pressure feeding device for the filling material may be one in which a pressure feeding machine 21 having a filling hose 2 is connected to a compressor 22.

先ず、ホース2の先端を袋体1の注入口11内に差し込
む。
First, the tip of the hose 2 is inserted into the injection port 11 of the bag body 1.

次に、圧送機21及びコンプレッサー22を作動させ、
砂5を圧送機21内にベルトコンベヤー等で投入し、ホ
ース2内に圧送する。
Next, the pressure feeder 21 and the compressor 22 are operated,
Sand 5 is put into a pressure feeder 21 using a belt conveyor or the like, and is forced into the hose 2.

すると、ホース2の先端より袋体1内に砂5が勢いよく
噴出され1機械の圧送力によって即座に袋体1内に砂5
を充填することができる。
Then, the sand 5 is forcefully ejected into the bag body 1 from the tip of the hose 2, and the sand 5 is immediately poured into the bag body 1 by the pressure feeding force of the machine 1.
can be filled.

このとき、袋体1は通気性を有するため、空気は袋体1
から外部に抜け、砂5のみが袋体1内に充填される。
At this time, since the bag 1 has breathability, the air flows through the bag 1.
The sand 5 escapes to the outside, and only the sand 5 is filled into the bag body 1.

砂5の充填完了後、圧送機21及びコンプレッサー22
を停止し、ホース2を袋体1内より引き抜(。
After filling the sand 5, the pressure feeder 21 and compressor 22
, and pull out the hose 2 from inside the bag 1 (.

このとき注入口11は、ホース2を引き抜(と、自然に
閉じるように構成されているため、注入口11の閉塞作
業の手間が省ける。
At this time, since the injection port 11 is configured to close naturally when the hose 2 is pulled out, the effort of closing the injection port 11 can be saved.

充填材のその他の圧送方法としては、ピストン等を用い
て、袋体1内に充填材を押し込む方法も考えられる。
Another possible method for pumping the filler is to push the filler into the bag body 1 using a piston or the like.

〈二〉盛土の築造(第1図) 盛土予定地盤上に、上記土嚢入り補強シートを載置する
<2> Construction of embankment (Figure 1) Place the reinforcement sheet containing sandbags on the ground where the embankment is planned.

補強シートの盛土平面部3上に土等の盛土材料6を投入
し、ローラー7によって盛土材料6を転圧し、収納部4
の高さまで盛土を行う。
Filling material 6 such as soil is placed on the flat surface portion 3 of the reinforcing sheet, and the roller 7 rolls the filling material 6 into the storage portion 4.
The embankment will be carried out to a height of .

そして、同じ要領で複数段に土嚢入り補強シートを積み
上げて盛土材料6を投入し、所定の高さの盛土を築造す
る。
Then, in the same manner, reinforcing sheets containing sandbags are piled up in multiple stages and embankment material 6 is introduced to construct an embankment of a predetermined height.

〈ホ〉配筋(第1.4図) 上記のように築造した盛土の縁部に沿って剛体壁8を構
築する。
<E> Reinforcement arrangement (Fig. 1.4) A rigid wall 8 is constructed along the edge of the embankment constructed as described above.

先ず、第4図に示すように、盛土の縁部に沿って縦鉄筋
81と横鉄筋82を格子状に配筋する。
First, as shown in FIG. 4, vertical reinforcing bars 81 and horizontal reinforcing bars 82 are arranged in a grid along the edge of the embankment.

このとき、縦横鉄筋81.82と補強シートの収納部4
との間には間隔を設けてお(。
At this time, the vertical and horizontal reinforcing bars 81 and 82 and the storage section 4 of the reinforcing sheet
Leave a space between (.

〈へ〉補強シートと鉄筋の連結(第1.4図)次に、縦
横鉄筋81,82に補強シートの連結平面部31の端部
を直接連結する。
<F> Connection of reinforcing sheet and reinforcing bars (Fig. 1.4) Next, the ends of the connecting plane portions 31 of the reinforcing sheet are directly connected to the vertical and horizontal reinforcing bars 81 and 82.

この場合、連結平面部31の端部を、縦鉄筋81と横鉄
筋82の交差部に針金等で結び付けるとよい。
In this case, it is preferable to connect the end of the connecting plane portion 31 to the intersection of the vertical reinforcing bars 81 and the horizontal reinforcing bars 82 with a wire or the like.

〈ト〉型枠の組立 型枠は、縦横鉄筋81.82の両側に、補強シートを上
下に挟むようにして組み立てる。
<G> Assembly of the formwork The formwork is assembled by sandwiching reinforcing sheets vertically on both sides of vertical and horizontal reinforcing bars 81 and 82.

そして、型枠内にコンクリートを打設して、第1図に示
すような剛体壁8を構築する。
Then, concrete is poured into the formwork to construct a rigid wall 8 as shown in FIG.

〈チ〉排水材の充填(第1図) 剛体壁8と補強シートの収納部4との間には、予め間隔
が設けられている。
<H> Filling with drainage material (FIG. 1) A gap is provided in advance between the rigid wall 8 and the reinforcing sheet storage section 4.

この間に砂利等の排水材9を充填する。During this time, a drainage material 9 such as gravel is filled.

これによって、剛体壁8の背面の排水を可能にし、剛体
壁8が浸水によって脆弱になったり、水圧で崩壊するな
どのおそれがなくなる。
This makes it possible to drain water from the rear surface of the rigid wall 8, and there is no fear that the rigid wall 8 will become brittle due to water intrusion or collapse under water pressure.

〈その他の実施例1〉 上記実施例の補強シートの連結平面部31は、盛土平面
部3と一体の一枚状のものを使用したが、その他の実施
例として、別途に形成した連結平面部31を、盛土平面
部3または収納部4に連結してもよい。
<Other Examples 1> Although the connecting plane part 31 of the reinforcing sheet in the above embodiment was a single piece integrated with the embankment plane part 3, as another example, a connecting plane part formed separately could be used. 31 may be connected to the embankment plane part 3 or the storage part 4.

また、連結平面部31は一枚状のものでなく、帯状のも
のを複数取り付けてもよい。
Further, the connecting plane portion 31 is not in the form of a single piece, but may include a plurality of belt-like pieces.

要は、盛土部と剛体壁8を確実に連結できる強度を有し
ていればよい。
In short, it is sufficient as long as it has the strength to reliably connect the embankment and the rigid wall 8.

〈その他の実施例2〉 さらにその他の実施例として、袋体1内を複数の部屋に
分割する場合がある。
<Other Embodiments 2> As yet another embodiment, the inside of the bag 1 may be divided into a plurality of rooms.

この場合には、袋体1を形成するシート状体と同質の通
気性を有するシート状体によって、袋体1内を仕切ると
よい。
In this case, the inside of the bag 1 may be partitioned by a sheet-like body having the same quality of air permeability as the sheet-like body forming the bag 1.

例えば第5図に示すように、シート状体の長手方向の端
部を内側に折り込んで、その端縁部を止金12によって
固定する方法によれば、容易に分割することができる。
For example, as shown in FIG. 5, by folding the longitudinal ends of the sheet-like body inward and fixing the end edges with clasps 12, the sheet-like body can be easily divided.

このように袋体1内を分割することによって、袋体1の
設置安定性を向上させることができる。
By dividing the inside of the bag 1 in this manner, the installation stability of the bag 1 can be improved.

〈本発明の効果〉 本発明は以上説明したようになるので、次のような効果
を期待することができる。
<Effects of the Present Invention> Since the present invention has been described above, the following effects can be expected.

〈イ〉従来のように、土嚢を積み上げて壁体を構築する
だけでは、土嚢壁間に投入した土圧によって土嚢壁が倒
れて、盛土が崩壊するおそれがある。
(a) If a wall is simply built by piling up sandbags as in the past, there is a risk that the sandbag walls will topple due to the pressure of the earth injected between the sandbag walls, causing the embankment to collapse.

それに対して本発明は、土嚢に補強シートを取り付け、
その補強シート上に盛土材料を投入する構造である。
In contrast, the present invention attaches a reinforcing sheet to the sandbag,
The structure is such that embankment materials are placed on top of the reinforcing sheet.

即ち、盛土材料内に補強シートが埋設されるため、摩擦
抵抗によって補強シートが盛土材料内に定着される。
That is, since the reinforcing sheet is buried within the embankment material, the reinforcing sheet is fixed within the embankment material due to frictional resistance.

従って、補強シートが引き抜けることがないため、土嚢
が倒れるのを防止することができ、安定した盛土を築造
することができる。
Therefore, since the reinforcing sheet cannot be pulled out, the sandbags can be prevented from falling over, and a stable embankment can be constructed.

さらに、剛体壁と補強シートとを直接連結することによ
り、より一層盛土の安定性を向上することができる。
Furthermore, by directly connecting the rigid wall and the reinforcing sheet, the stability of the embankment can be further improved.

〈口〉剛体壁と土嚢部との間には、砂利等の排水材を充
填する。
<Exit> Fill the space between the rigid wall and the sandbag with drainage material such as gravel.

そのため、剛体壁背面の排水を可能にすることができる
Therefore, it is possible to drain water from the rear surface of the rigid wall.

従って、剛体壁が浸水によって脆弱になったり、水圧で
崩壊するなどのおそれがない。
Therefore, there is no risk that the rigid wall will become brittle due to water intrusion or collapse due to water pressure.

〈ハ〉従来の土嚢は、袋体に人力で砂等の充填材を充填
して行っているため、土嚢の成形に多大の時間と労力を
必要とした。
<C> Conventional sandbags are made by manually filling the bag with filler such as sand, which requires a great deal of time and effort to form the sandbag.

それに対して本発明は、通気性を有する袋体内に、機械
の圧送力によって砂等の充填材を効率よく充填するもの
である。
In contrast, the present invention efficiently fills the air-permeable bag with a filler such as sand using the pumping force of a machine.

そのため、従来の人力による場合と比較すると、非常に
迅速かつ容易に土嚢を成形することができる。
Therefore, sandbags can be formed very quickly and easily compared to conventional manual methods.

〈二〉本発明は、機械の圧送力によって砂等の充填材を
効率よく充填できるため、大容量の土嚢でも短時間で成
形することができる。
<2> In the present invention, sandbags and other fillers can be efficiently filled using the pumping force of the machine, so even large-capacity sandbags can be formed in a short time.

〈ホ〉土嚢の内部を複数の部屋に分割した場合には、土
嚢の設置安定性が向上し、盛土全体の安定性の向上を図
ることができる。
<E> When the inside of the sandbag is divided into a plurality of rooms, the installation stability of the sandbag is improved, and the stability of the entire embankment can be improved.

〈へ〉本発明の土嚢に設けた充填材の注入口は、充填材
の噴出ホースを引き抜くと、自然に閉じるように構成さ
れている。
<F> The filler injection port provided in the sandbag of the present invention is configured to close naturally when the filler spouting hose is pulled out.

そのため、注入口の閉塞作業の手間が省ける。Therefore, the trouble of closing the injection port can be saved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図二本発明の一実施例の説明図 第2図:袋体の説明図 第3図:補強シートの説明図 第4図:鉄筋と補強シートとの連結説明図第5図:その
他の実施例2の説明図
Fig. 1 2 An explanatory diagram of one embodiment of the present invention Fig. 2: An explanatory diagram of the bag Fig. 3: An explanatory diagram of the reinforcing sheet Fig. 4: An explanatory diagram of the connection between the reinforcing bars and the reinforcing sheet Fig. 5: Other illustrations Explanatory diagram of Example 2

Claims (2)

【特許請求の範囲】[Claims] (1)通水性を有する撓性のシート状体によって、平面
部と、その平面部の途上にループ状の収納部とを形成し
、 少なくとも通気性を有する撓性のシート状体で、閉塞し
た袋体を形成し、 この袋体を前記収納部内に設置し、 袋体に設けた注入口から袋体内に充填材を圧送して土嚢
を成形し、 この土嚢を挟んだ一方の側の前記平面部上に盛土を行い
、 また他方の側の平面部の端部を、土嚢に沿って構築した
剛体壁に直結したことを特徴とする、盛土の築造方法。
(1) A planar part and a loop-shaped storage part are formed in the middle of the planar part using a flexible sheet-like body that has water permeability, and is closed with at least a flexible sheet-like body that has air permeability. forming a bag body, placing the bag body in the storage section, pressurizing a filler into the bag body from an injection port provided in the bag body to form a sandbag, and forming the sandbag on one side of the flat surface with the sandbag sandwiched therebetween; A method of constructing an embankment, which is characterized by embanking one part of the earth, and directly connecting the end of the flat part on the other side to a rigid wall constructed along the sandbags.
(2)特許請求の範囲第1項記載の盛土の築造方法にお
いて、 シート状体のループ状部内に設置する袋体の内部を複数
の部屋に分割した、盛土の築造方法。
(2) The method for constructing an embankment according to claim 1, wherein the inside of a bag body installed in a loop-shaped portion of a sheet-like body is divided into a plurality of chambers.
JP1516889A 1989-01-26 1989-01-26 Construction method of embankment Expired - Fee Related JP2599293B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1516889A JP2599293B2 (en) 1989-01-26 1989-01-26 Construction method of embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1516889A JP2599293B2 (en) 1989-01-26 1989-01-26 Construction method of embankment

Publications (2)

Publication Number Publication Date
JPH02197619A true JPH02197619A (en) 1990-08-06
JP2599293B2 JP2599293B2 (en) 1997-04-09

Family

ID=11881275

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1516889A Expired - Fee Related JP2599293B2 (en) 1989-01-26 1989-01-26 Construction method of embankment

Country Status (1)

Country Link
JP (1) JP2599293B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100765494B1 (en) * 2006-08-11 2007-10-10 김학기 Naturalflow barrier and the method for construction
JP2012144938A (en) * 2011-01-14 2012-08-02 Railway Technical Research Institute Banking-reinforcing soil wall construction method using integral wall surface construction with high rigidity
JP2015232241A (en) * 2014-06-10 2015-12-24 前田工繊株式会社 Structure of back fill for existing structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100765494B1 (en) * 2006-08-11 2007-10-10 김학기 Naturalflow barrier and the method for construction
JP2012144938A (en) * 2011-01-14 2012-08-02 Railway Technical Research Institute Banking-reinforcing soil wall construction method using integral wall surface construction with high rigidity
JP2015232241A (en) * 2014-06-10 2015-12-24 前田工繊株式会社 Structure of back fill for existing structure

Also Published As

Publication number Publication date
JP2599293B2 (en) 1997-04-09

Similar Documents

Publication Publication Date Title
US3441140A (en) Drain filter
KR100924933B1 (en) Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof
US20120230766A1 (en) Flood wall protection system
JP3509744B2 (en) Ground injection method and injection pipe device
JPH02197619A (en) Formation of banking
JPS58529A (en) Method and apparatus for producing concrete casting structure
JP2649077B2 (en) Construction method of embankment
JPH02164920A (en) Constructing method for embankment
JPH02164921A (en) Constructing method for embankment
JPH02164924A (en) Constructing method for embankment
JPH02190518A (en) Formation of soil bag
KR102203188B1 (en) Frame apparatus for making soil back
JP3729169B2 (en) Surface treatment method for soft ground
JPH04108917A (en) Construction method for reinforced banking body
JPH02164925A (en) Constructing method for embankment
JP3458174B2 (en) Construction method of reinforced soil retaining wall
KR20190142927A (en) Breast wall structure
JPH0359221A (en) Steep slope banking
JP7022428B2 (en) Earth retaining method
TWI558887B (en) Construction methods and filling methods for weak sites and sites with liquefaction concerns, as well as structural bags
JPH0480432A (en) Water permeable temporary sheathing material and concrete wall construction method
JP2000319884A (en) Reinforced mud wall structure
JP3177723B2 (en) Embankment method
JP3807801B2 (en) Slope greening method
JPS6347418A (en) Reinforcing structure of banking ground

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees