JPH02164925A - Constructing method for embankment - Google Patents

Constructing method for embankment

Info

Publication number
JPH02164925A
JPH02164925A JP31844588A JP31844588A JPH02164925A JP H02164925 A JPH02164925 A JP H02164925A JP 31844588 A JP31844588 A JP 31844588A JP 31844588 A JP31844588 A JP 31844588A JP H02164925 A JPH02164925 A JP H02164925A
Authority
JP
Japan
Prior art keywords
sheet
embankment
sandbag
shaped
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP31844588A
Other languages
Japanese (ja)
Inventor
Satoru Nishioka
哲 西岡
Yoichi Otaka
大高 陽一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP31844588A priority Critical patent/JPH02164925A/en
Publication of JPH02164925A publication Critical patent/JPH02164925A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To construct a stable embankment by installing a bag body made of a sheet-shaped body with air permeability in a loop-shaped section provided at the end section of the sheet-shaped body, filling a filler into the bag body to form a sandbag, and filling soil on the flat section of the sheet-shaped body. CONSTITUTION:The end section of a reinforcing sheet 3 made of a flexible sheet-shaped body with water permeability is folded in a loop shape to form a loop-shaped section 32, and a bag body 1 made of a flexible sheet-shaped body with air permeability is stored in the loop-shaped section 32. Sand or the like is filled in the bag body 1 to form a reinforcing sheet with a sandbag. The reinforcing sheet with a sandbag is mounted on the ground, soil 5 is put and rolled on the flat section 33 of the sheet 3, then reinforcing sheets with a sandbag are stacked in multiple stages to construct an embankment. A wall body is constructed with a precast panel 7 along the edge section of the embankment, and a tensile material 71 is tightened to introduce a pre-stress. Hooks of hooked steel bars 82 of a connecting metal are hooked on sandbags, and steel bars 83 on the other end are fixed to the wall body.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は盛土の築造方法に関するものである。[Detailed description of the invention] <Industrial application field> The present invention relates to a method for constructing an embankment.

〈従来の技術〉 鉄道や道路等を地面より高い所に敷設する場合には、土
等を盛り」−げて盛土を築造し、その盛土の上面に鉄道
や道路等を敷設する場合がある。
<Prior Art> When constructing a railway, road, etc. at a location higher than the ground, an embankment is constructed by mounding earth, etc., and the railway, road, etc. is sometimes constructed on top of the embankment.

この盛土の築造方法には、間隔をおいて=J:’117
を積み上げて壁体を構築し、その土嚢壁間に−になとを
盛り上げて築造する方法が存在する。
This embankment construction method requires intervals = J:'117
There is a method of building a wall by piling up sandbags, and then piling up -nato between the sandbag walls.

〈本発明か解決しようとする問題点〉 従来の土嚢は、袋体に人力で砂等の充填材を充填して行
っている。
<Problems to be Solved by the Present Invention> In conventional sandbags, the bag body is manually filled with a filler material such as sand.

そのため、土嚢の成形に多大の時間と労力を必要とする
Therefore, forming sandbags requires a lot of time and effort.

また、土嚢を積み上げて壁体を構築するだけてま、ト嚢
壁間に投入した」川によって土嚢壁が倒れて、盛土か崩
壊するおそれがある。
In addition, even if the wall is built by piling up sandbags, there is a risk that the sandbag wall will fall down due to the river and the embankment will collapse.

く本発明の1」的S 本発明は」−記のよ・うな間」点を解決するためになさ
れたもので、容易かつ迅速に土嚢を成形でき、しかも安
定した盛土を築造することができる盛土の築造方法を提
供することを目的とする。
1 of the present invention The present invention has been made to solve the problems mentioned above, and it is possible to form sandbags easily and quickly, and also to build stable embankments. The purpose is to provide a method for constructing embankments.

く本発明の(14成\ 以下、図面を参照しながら本発明の一実施例について説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

〈イ〉袋体の形成(第2図) 袋体1は、少なくとも通気性を有する撓性のシ=1・状
体、例えば布等によって形成する。
<A> Formation of bag body (FIG. 2) The bag body 1 is formed from a flexible sheet-shaped body having at least air permeability, for example, cloth.

袋体1の形状及び大きさは、盛−1−の規模等に応じて
選択するか、本実施例は長い林状の袋体1を成形する場
合である。
The shape and size of the bag 1 may be selected depending on the scale of the plate 1, etc., or this embodiment is a case where a long forest-like bag 1 is formed.

この袋体1は閉塞されており、内部には砂3の充填材を
充填する部屋が形成される1、また、袋体1には、砂等
の充填材の注入口11を一つまたは複数設ける6、 この注入口11はポゲット状になっており、砕刃を注入
するホース2が挿入可能である。
This bag body 1 is closed, and a chamber 1 is formed inside to fill with a filler material such as sand 3. The bag body 1 also has one or more inlets 11 for filling a filler material such as sand. Provided 6. This injection port 11 has a pogget shape, into which a hose 2 for injecting the crushing blade can be inserted.

そして、砂等を充填して、ホース2を引き抜くと、注入
口11は自然に閉しるようになっている。
When the hose 2 is filled with sand or the like and the hose 2 is pulled out, the inlet 11 closes naturally.

〈口)補強シート(第3図〉 補強シート3は、通水性を有する撓性のシーI・状体で
ある。
<Opening> Reinforcement Sheet (Fig. 3) The reinforcement sheet 3 is a flexible sheet I-shaped body having water permeability.

この補強シー1〜3の端部は、第3図に示すようにルー
プ状に折り返し、その折り返し端縁部を止金31によっ
て固定して、ループ状部32を形成する。
The ends of the reinforcing sheets 1 to 3 are folded back into a loop shape, as shown in FIG.

」:た、)1−ブ状部32以外の平面部分は平面部33
とする。
”:T,) 1-The planar portion other than the tube-shaped portion 32 is the planar portion 33.
shall be.

補強シート3のrl−] i;i、袋体1の長手方向の
長さとほぼ同し長さて、また補強シート3の長手方向の
長さは、所定の盛土強度を得ることができる長さに形成
する。
rl-] of the reinforcing sheet 3 i; i, the length in the longitudinal direction of the bag body 1 is approximately the same, and the length in the longitudinal direction of the reinforcing sheet 3 is set to a length that can obtain a predetermined embankment strength. Form.

そして、袋体1を補強シート3のループ状部32内に収
納する。
Then, the bag 1 is stored in the loop-shaped portion 32 of the reinforcing sheet 3.

・、I\〉充填材の圧送く第2図) 袋体1内に充填する充填材には、砂4等を使用する。・、I\〉Fig. 2 Pressure feeding of filling material) Sand 4 or the like is used as a filler to be filled into the bag body 1.

充填材の圧送装置は、例えば第2図に示すように、充填
ホース2を有Jる圧送機21に、コンブレッーリ−22
を連結したものが考えられる。
For example, as shown in FIG.
A concatenation of the following can be considered.

先J’、ホース2の先端を袋体1の注入し111内にジ
クし込む5、 次に、圧送機21及びコンプレツサー22を作動さぜ、
砂4を圧送機21内にへ几トコンベヤー等で投入し、ポ
ース2内に圧送する。
Step J': Insert the tip of the hose 2 into the injector 111 of the bag 1 5. Next, operate the pressure feeder 21 and compressor 22.
Sand 4 is put into a pressure feeder 21 using a conveyor or the like, and is forced into the port 2.

−4ろと、ホー−42の先端、」二り袋体1内に砂4が
勢いよく噴出され、機械の圧送力によって即座に袋体1
内に砂4を充填することができる。
-4 slot, the tip of the hoe 42, the sand 4 is forcefully ejected into the bag body 1, and the bag body 1 is immediately
Sand 4 can be filled inside.

このとき、袋体1は通気性を有するため、空気は袋体1
から外部に抜()、砂4のみが袋体】内に充填される。
At this time, since the bag 1 has breathability, the air flows through the bag 1.
The sand 4 is removed from the bag to the outside, and only the sand 4 is filled into the bag.

砂4の充填完了後、圧送機21及びコンブレッーリ−2
2を停止し、ホース2を袋体1内より引き抜く。
After filling the sand 4, the pressure feeder 21 and the combiner 2
2 and pull out the hose 2 from inside the bag body 1.

このとき注入口11は、ポース2を引き抜(と、自然に
閉じるように構成されているため、注入口11の閉塞作
業の手間が省ける。
At this time, since the injection port 11 is configured to close naturally when the port 2 is pulled out, the effort of closing the injection port 11 can be saved.

充填材のぞの他の圧送方法としては、ピストン等を用い
て、袋体1内に充填材を押し込む方法が考えられる。
Another possible method for pumping the filler is to push the filler into the bag body 1 using a piston or the like.

〈二〉盛土の築造(第4図) 盛土予定地盤上に、」―肥土貴人り補強シート3を載置
する。
<2> Construction of the embankment (Figure 4) Place the Hito Takahito reinforcing sheet 3 on the ground where the embankment is planned.

このとき、補強シート3の平面部33は、盛土側に位置
するように敷設する。
At this time, the reinforcing sheet 3 is laid so that the flat part 33 is located on the embankment side.

次に、平面部33+に土等の盛土+a料5を投入し、I
−トーシーC)によって盛土材料5を転圧し、几−ブ臥
部32の高さよて盛土・を?iう、3そして、同し要領
で複数段に土嚢入り補強シート3を積み1げて盛土材料
5を投入し、所定の高さの盛」−を築造する。
Next, filling material such as soil + a material 5 is put into the flat part 33+, and
- Compact the embankment material 5 with the toss C) and make the embankment according to the height of the recessed part 32. 3. Then, in the same manner, the reinforcing sheets 3 containing sandbags are stacked in multiple tiers, and the embankment material 5 is put in to build an embankment of a predetermined height.

・ホ\壁体の(・I4築(第1図) F記のように築造した盛t、の縁部に沿って、予め製造
した」ンクリート製等のプレキャストバネν[7によっ
て壁体を構築する。
・Construct the wall using the pre-fabricated concrete springs ν [7] along the edge of the wall (・I4 construction (Figure 1)) do.

この壁体には剛性を持たせるために、ブレスI・レスを
導入−4る。
In order to provide rigidity to this wall, Breath I/Res is introduced-4.

例えば第1図に示すように、上下方向に積み上J゛た各
ブし・・1−ヤ、4トバネ717内に引張材71を貴通
させ、この引張材71を緊張し、てプレストレスを導入
する。
For example, as shown in Fig. 1, in each of the vertically stacked bushes, a tension member 71 is passed through the four springs 717, and the tension member 71 is tensed and prestressed. will be introduced.

壁体の構築の際には、壁体と補強シート3の月−ブ状部
32との間には間隙を設けておく、1、へ\壁体と土嚢
の連結(第5.6図)次に、壁体と1−嚢を連結金具8
によって連結する、。
When constructing the wall, a gap should be provided between the wall and the moon-shaped portion 32 of the reinforcing sheet 3. 1. Connecting the wall and sandbags (Figure 5.6) Next, connect the wall body and the 1-bag with the metal fitting 8
Concatenate by.

連結金具8は、一端には複数のフックを冶し、他端は棒
状体より形成される。
The connecting fitting 8 has a plurality of hooks at one end and a rod-shaped body at the other end.

例えば第5.6図に示すように、連結板81の一方の側
に、−・端にフックを有するフック(=t m棒82を
複数本取りイ・Jける。
For example, as shown in FIG. 5.6, on one side of the connecting plate 81, take a plurality of hooks (=t m rods 82) having hooks at the ends.

取りイ1ける場合には、フック(1鋼棒82のフックの
ない方の端部を連結板81に取り付ける。
If a hook is required, attach the end of the steel bar 82 without the hook to the connecting plate 81.

また、連結板81の他方の側には、鋼棒83の一端を取
り付(jる。
Further, one end of a steel rod 83 is attached to the other side of the connecting plate 81.

フック(マjm俸82と鋼棒83とは、雨音の軸線か平
行になるように覆る。
The hook 82 and the steel rod 83 are covered so that they are parallel to the axis of the rain sound.

そして、複数のフックイ」鋼棒82のフックを」−嚢の
補強シート3に引っ掛け、鋼棒83の自由端部を壁体に
定着して壁体と土嚢を連結]る。
Then, the hooks of the steel rods 82 are hooked onto the reinforcing sheet 3 of the sandbag, and the free ends of the steel rods 83 are fixed to the wall to connect the wall and the sandbag.

鋼棒83の壁体への定着は、ねじ込み式または埋め込み
式等によって行う。
The steel rod 83 is fixed to the wall by screwing or embedding.

また、連結金具8の取りイ・j()数は、盛土体の規模
に応じて、壁体上土嚢を強固に連結できるように、上下
あるいは横方向に所要数取り付ける。
In addition, the required number of connecting fittings 8 are installed vertically or horizontally depending on the scale of the embankment so that the sandbags on the wall can be firmly connected.

〈1・5排水材の充填(第1図) 壁体と補強シート3の几−ブ状部32との間には、予め
間隙部が設けられている。
<1.5 Filling with drainage material (Fig. 1) A gap is provided in advance between the wall and the hollow-shaped portion 32 of the reinforcing sheet 3.

この間隙部には、砂利等の排水材9を充填する。This gap is filled with a drainage material 9 such as gravel.

これによって、壁体の背面の排水を可能にし、壁体が浸
水によって脆弱になったり、水圧で崩壊ずろなとのおそ
れかなくなる。
This allows water to drain from the back of the wall and eliminates the risk of the wall becoming brittle due to water intrusion or collapsing under water pressure.

・、その他の実施例N その他の実施例として、袋体l内を複数の部屋に分割”
4る場合がある。
・Other Examples N As another example, the inside of the bag is divided into multiple rooms.
4 may occur.

この場合には、袋体1を形成するシート状体と同質の通
気1テ1−を有ずろシート状体によって、袋体1内を仕
切るとよい。
In this case, it is preferable to partition the inside of the bag 1 by a sheet-like body having ventilation holes 1-1- of the same quality as the sheet-like body forming the bag 1.

例えば第7図に示1ように、シート状体の長手方向の端
部を内側に折り込んで、その端縁部を止金12によって
固定する方法によれば、容易に分割することができる。
For example, as shown in FIG. 7, the longitudinal ends of the sheet-like body are folded inward and the end edges are fixed with the clasps 12, whereby the sheet-like body can be easily divided.

このように袋体1内を分割することによって、袋体1の
設置安定性を同士さゼるこ乏がてきろ。
By dividing the inside of the bag 1 in this manner, the installation stability of the bag 1 can be improved.

く本発明の効果〉 本発明は辺土説明したようになるので、次のような効果
を期待することかできる。
Effects of the Present Invention> Since the present invention is as described above, the following effects can be expected.

〈イ〉従来のように、土嚢を績み」二げて壁体を構築す
るだけては、土嚢壁間に投入した土庄によって土嚢壁が
倒れて、盛土が崩壊するおそれがある。
(a) If the walls are constructed by simply stacking sandbags as in the past, there is a risk that the sandbag walls will topple due to the soil thrown between the sandbag walls and the embankment will collapse.

それに対して本発明は、土嚢に補強シートを取り付(J
、その補強シート+に盛土材料を投入する構造である。
In contrast, the present invention attaches a reinforcing sheet to the sandbag (J
, the structure is such that embankment material is put into the reinforcement sheet +.

即ち、盛土拐科内に補強シーI・か埋設されるため、摩
擦抵抗によって補強シートか盛土H科内に定着される。
That is, since the reinforcing sheet I is buried within the embankment, the reinforcing sheet is fixed within the embankment H due to frictional resistance.

従って、補強シートが引き抜けることがないため、土嚢
が倒れるのを防止することができ、安定した盛土を築造
することができる。
Therefore, since the reinforcing sheet cannot be pulled out, the sandbags can be prevented from falling over, and a stable embankment can be constructed.

さらに、プレキャストパネルにプレスI・レスを導入し
て構築した壁体と、補強シートとを連結金具によって結
合することにより、より一層盛土の安定性を向」ニする
ことができる。
Furthermore, the stability of the embankment can be further improved by connecting the reinforcing sheet to the wall constructed by introducing Press I/Less into the precast panel using connecting fittings.

く口〉壁体と補強シートの結合を、特殊なリンク結合と
することにより、盛土部の沈下変形による補強シートの
切断を防11−することができる。
By connecting the wall and the reinforcing sheet with a special link connection, it is possible to prevent the reinforcing sheet from being cut due to sinking deformation of the embankment.

〈ノイ壁体と土嚢部との間には、砂利等の排水材を充填
する。
<Fill drainage material such as gravel between the Neu wall and the sandbag section.

そのため、壁体背面の排水を可能にすることができる。Therefore, it is possible to drain water from the back of the wall.

(にって、壁体が浸水によ−って脆弱になったり、水圧
で崩壊するなどのおそれがない。
(Thus, there is no risk that the walls will become brittle due to flooding or collapse under water pressure.

、ニハ従宋の土嚢は、袋体に人力で砂等の充填材を充填
して行っているため、土嚢の成形に多大の時間と労力を
必要とした。。
The sandbags of the Japanese Congolese Dynasty were made by manually filling the bag with filler such as sand, which required a great deal of time and effort. .

それに対して本発明は、通気性を有する袋体内に、機械
の圧送力によって砂等の充填材を効率、よく充填するら
のである。
In contrast, the present invention efficiently fills the air-permeable bag with a filler such as sand using the pumping force of a machine.

そのため、従来の人力による場合と比較すると、J1常
に迅速か一つ容易に土嚢を成形することができろ、。
Therefore, compared to conventional manual methods, J1 can form sandbags quickly and easily.

\ポへ本発明は、機械の圧送力によ−、て砂等の充填材
を効率よく充填できるため、大容量の土嚢を短時間で成
!F片J−ることかてきる。
The present invention uses the pumping power of the machine to efficiently fill sand and other fillers, making it possible to create large-capacity sandbags in a short time! F-piece J- can be said.

〈へ〉土嚢の内部を複数の部屋に分割した場合には、土
嚢の設置安定性を向上することができ、盛土全体の安定
性の向上を図ることができる。
<F> When the inside of the sandbag is divided into a plurality of rooms, the installation stability of the sandbag can be improved, and the stability of the entire embankment can be improved.

〈ト〉本発明の土嚢に設けた充填材の注入口は、充填材
の噴出ホースを引き抜(と、自然に閉しるように構成さ
れている。
<G> The filler injection port provided in the sandbag of the present invention is configured so that it closes naturally when the filler spouting hose is pulled out.

そのため、注入に]の閉塞作業の手間が省ける。Therefore, the trouble of occlusion work during injection can be saved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図 本発明の一実施例の説明図 節2園二袋体の説明図 第3図 補強シートの説明図 第4図、盛土の築造方法の説明図 第5.6図・連結金具の説明図 第7図:その他の実施例の説明図 Figure 1: Explanatory diagram of one embodiment of the present invention Explanatory diagram of Setsu 2 Garden Nibukuro body Figure 3: Explanatory diagram of reinforcing sheet Figure 4: Explanatory diagram of the embankment construction method Figure 5.6・Explanatory diagram of connecting fittings Figure 7: Explanatory diagram of other embodiments

Claims (2)

【特許請求の範囲】[Claims] (1)通水性を有する撓性のシート状体の平面部の端部
を折り返してループ状部を形成し、 少なくとも通気性を有する撓性のシート状体で、閉塞し
た袋体を形成し、 この袋体を前記ループ状部内に設置し、 袋体に設けた注入口から袋体内に充填材を圧送により充
填して土嚢を成形し、 この土嚢の前記シート状体平面部上に盛土を行い、 この盛土部の縁部に沿ってプレキャストパネルによって
壁体を構築し、 この壁体にプレストレスを導入し、 一端には複数のフックを有し、他端は棒状体より形成さ
れる連結金具を用いて、 この連結金具の複数のフックを土嚢に引っ掛け、他端の
棒状体を前記壁体に定着して壁体と土嚢を連結した、 盛土の築造方法。
(1) forming a loop-shaped part by folding back the end of the planar part of a flexible sheet-like body that has water permeability, and forming a closed bag with at least the flexible sheet-like body that has air permeability; This bag body is installed in the loop-shaped part, and a filler material is filled into the bag body by force-feeding from an injection port provided in the bag body to form a sandbag, and embankment is performed on the flat surface of the sheet-shaped body of this sandbag. , A wall is constructed using precast panels along the edge of this embankment, prestress is introduced into this wall, and a connecting metal fitting has multiple hooks at one end and a rod-shaped body at the other end. A method for constructing an embankment, in which the plurality of hooks of the connecting fitting are hooked onto the sandbag, and the rod-shaped body at the other end is fixed to the wall to connect the wall and the sandbag.
(2)特許請求の範囲第1項記載の盛土の築造方法にお
いて、 シート状体のループ状部内に設置する袋体の内部を複数
の部屋に分割した、盛土の築造方法。
(2) The method for constructing an embankment according to claim 1, wherein the inside of a bag body installed in a loop-shaped portion of a sheet-like body is divided into a plurality of chambers.
JP31844588A 1988-12-19 1988-12-19 Constructing method for embankment Pending JPH02164925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31844588A JPH02164925A (en) 1988-12-19 1988-12-19 Constructing method for embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31844588A JPH02164925A (en) 1988-12-19 1988-12-19 Constructing method for embankment

Publications (1)

Publication Number Publication Date
JPH02164925A true JPH02164925A (en) 1990-06-25

Family

ID=18099210

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31844588A Pending JPH02164925A (en) 1988-12-19 1988-12-19 Constructing method for embankment

Country Status (1)

Country Link
JP (1) JPH02164925A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8088117B2 (en) 2005-10-25 2012-01-03 Nicolon Corporation Fill port for a flexible container for relieving or distributing stresses at the fill port

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8088117B2 (en) 2005-10-25 2012-01-03 Nicolon Corporation Fill port for a flexible container for relieving or distributing stresses at the fill port

Similar Documents

Publication Publication Date Title
US5531547A (en) Reinforced earth construction
US4728227A (en) Retaining wall structure
KR100924933B1 (en) Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof
US20160251814A1 (en) Flood wall protection system
US20070036615A1 (en) Freestanding wall structures made using sandbags
JP3714885B2 (en) Protection structures for slopes, walls, shores, etc.
JPS58529A (en) Method and apparatus for producing concrete casting structure
US20030168575A1 (en) Concrete wall forming system using fabric
JPH02164925A (en) Constructing method for embankment
KR102194293B1 (en) Breast wall structure
KR101787366B1 (en) A Retaining wall using Precast pile and Construction method thereof
JP2836489B2 (en) Cut slope stabilization method
JP2599293B2 (en) Construction method of embankment
KR100467234B1 (en) Retaining wall and its construction method of steel panel
JPH02164924A (en) Constructing method for embankment
JPH02164923A (en) Constructing method for embankment
JP2022126280A (en) Flask material for concrete block molding, flask set for concrete block molding and concrete block molding method
JPH04108916A (en) Construction method for reinforced banking body
JPH02164920A (en) Constructing method for embankment
JP3458174B2 (en) Construction method of reinforced soil retaining wall
JPH02164921A (en) Constructing method for embankment
JPS6351527A (en) Slope stabilization work
JPH05214703A (en) Method of constructing structure by foamed resin block
JPH0359221A (en) Steep slope banking
JPH0480432A (en) Water permeable temporary sheathing material and concrete wall construction method