JPH02164923A - Constructing method for embankment - Google Patents

Constructing method for embankment

Info

Publication number
JPH02164923A
JPH02164923A JP31844388A JP31844388A JPH02164923A JP H02164923 A JPH02164923 A JP H02164923A JP 31844388 A JP31844388 A JP 31844388A JP 31844388 A JP31844388 A JP 31844388A JP H02164923 A JPH02164923 A JP H02164923A
Authority
JP
Japan
Prior art keywords
embankment
sheet
section
wall
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP31844388A
Other languages
Japanese (ja)
Other versions
JP2649077B2 (en
Inventor
Satoru Nishioka
哲 西岡
Yoichi Otaka
大高 陽一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP31844388A priority Critical patent/JP2649077B2/en
Publication of JPH02164923A publication Critical patent/JPH02164923A/en
Application granted granted Critical
Publication of JP2649077B2 publication Critical patent/JP2649077B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To construct a stable embankment by filling a filler in a bag body installed in the loop-shaped section at the end section of a sheet-shaped body to form a sandbag, soil is filled on the flat section of the sheet-shaped body, and constructing a wall body along the end section of the embankment section. CONSTITUTION:The end section of a reinforcing sheet made of a flexible sheet- shaped body with water permeability is folded in a loop shape to provide a loop-shaped section 32, and a bag body 1 made of a flexible sheet-shaped body with air permeability is stored in the loop-shaped section 32. Sand or the like is filled in the bag body 1 to form a reinforcing sheet 3 with a sandbag. The sheet 3 is mounted on the ground, soil 5 is put on a flat section 33 and rolled, then sheets 3 are likewise stacked in multiple stages to construct an embankment. A wall body is constructed with a precast panel 7 along the edge section of the embankment, and a tensile material 71 is stretched to introduce a pre- stress. Hooks of hooked connecting bars 8 are hooked on sandbags, and the other ends are fixed to the wall body.

Description

【発明の詳細な説明】 〈産業」二の利用分野〉 本発明は盛土の築造方法に関するものである。[Detailed description of the invention] 〈Industry〉Second field of use〉 The present invention relates to a method of constructing an embankment.

〈従来の技術〉 鉄道や道路等を地面より高い所に敷設する場合には、土
等を盛り上げて盛土を築造し、その盛土の上面に鉄道や
道路等を敷設する場合かある。
<Conventional Technology> When constructing a railway, road, etc. at a location higher than the ground, there is a case where an embankment is built by heaping up soil, etc., and the railway, road, etc. is laid on top of the embankment.

この盛土の築造方法には、間隔をおいて土嚢を精み上げ
て壁体を構築し、その土嚢壁間に土なとを盛り」二げて
築造する方法が存在する。
There is a method for constructing this embankment, in which walls are constructed by stacking sandbags at intervals, and soil is piled up between the walls of the sandbags.

〈本発明が解決しようとする問題点〉 従来の土嚢は、袋体に人力で砂等の充填材を充填して行
っている。
<Problems to be Solved by the Present Invention> In conventional sandbags, the bag body is manually filled with filler such as sand.

そのため、土嚢の成形に多大の時間と労力を必要とする
Therefore, forming sandbags requires a lot of time and effort.

また、土嚢を積み上げて壁体を構築するだけては、土嚢
壁間に投入した土庄によってに嚢壁が倒れて、盛土が崩
壊するおそれがある。
Furthermore, if the wall is simply built up by piling up sandbags, there is a risk that the sandbag wall will collapse due to the soil thrown between the sandbag walls, causing the embankment to collapse.

〈本発明の目的〉 本発明は上記のような問題点を解決するためになされた
もので、容易かつ迅速に土嚢を成形でき、しかも安定し
た盛土を築造することができる盛土の築造方法を提供す
ることを目的と4る。
<Objective of the present invention> The present invention was made to solve the above-mentioned problems, and provides a method for constructing an embankment that can easily and quickly form sandbags and can also construct a stable embankment. The purpose is to do 4.

く本発明の構成\ 以下、図面を参照しながら本発明の一実施例について説
明する。
Configuration of the Present Invention\ Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

\イ)袋体の形成〈第2図) 袋体1は、少なくとも通気性を有する撓性のシート状体
、例えば布等によって形成する。
\A) Formation of bag body (Fig. 2) The bag body 1 is formed from a flexible sheet-like body having at least air permeability, such as cloth.

袋体1の形状及び大きさは、盛土の規模等に応して選択
するが、本実施例は長い柱状の袋体1を成形する場合で
ある。
The shape and size of the bag 1 are selected depending on the scale of the embankment, etc., but in this example, a long columnar bag 1 is formed.

この袋体1は閉塞されており、内部には砂等の充填材を
充填する部屋が形成される。
This bag body 1 is closed, and a chamber is formed inside to be filled with a filler such as sand.

また、袋体1には、砂等の充填材の注入[コ11を−・
つまたは複数設ける。
In addition, a filler such as sand is injected into the bag body 1.
Provide one or more.

この注入口11はポケット状になっており、砂等を注入
するホース2が挿入可能である。
The injection port 11 has a pocket shape into which a hose 2 for injecting sand or the like can be inserted.

そして、砂等を充填して、ポース2を引き抜くと、注入
口11は自然に閉しるようになっている。
Then, when the port 2 is filled with sand or the like and pulled out, the injection port 11 closes naturally.

〈口〉補強シート(第3図) 補強シート3は、通水性を有する撓性のシート状体であ
る。
<Opening> Reinforcement Sheet (Fig. 3) The reinforcement sheet 3 is a flexible sheet-like body having water permeability.

この補強シート3の端部は、第3図に示すようにループ
状に折り返し、その折り返し端縁部を重金31によって
固定して、几−ブ状部32を形成する。
The end portion of this reinforcing sheet 3 is folded back into a loop shape as shown in FIG. 3, and the folded end edge portion is fixed with a heavy metal 31 to form a hollow portion 32.

また、几−ブ状部32以外のT面部分は平面部33とす
る。
Further, the T-plane portion other than the hollow portion 32 is a flat portion 33.

補強シー1〜3の巾は、袋体1の長手方向の長さとほぼ
同じ長さて、また補強シート3の長手方向の長さは、所
定の盛土強度を行ることができる長さに形成する。
The widths of the reinforcing sheets 1 to 3 are approximately the same length as the length in the longitudinal direction of the bag body 1, and the length in the longitudinal direction of the reinforcing sheets 3 is formed to a length that can provide a predetermined embankment strength. .

ぞして、袋体1を補強シート3のループ状部32内に収
納する。
Then, the bag 1 is stored in the loop-shaped portion 32 of the reinforcing sheet 3.

〈ハ〉充填材の圧送(第2図) 袋体1内に充填する充填材には、砂4等を使用する。<C> Pressure feeding of filling material (Fig. 2) Sand 4 or the like is used as a filler to be filled into the bag body 1.

充填材の圧送装置は、例えば第2図に示すように、充填
ホース2を有する圧送機21に、コンプレツサー22を
連結したものが考えられる。
For example, as shown in FIG. 2, the filling material pressure feeding device may be one in which a compressor 22 is connected to a pressure feeding machine 21 having a filling hose 2.

先ず、ホース2の先端を袋体1の注入口11内に差し込
む。
First, the tip of the hose 2 is inserted into the injection port 11 of the bag body 1.

次に、圧送機21及びコンプレツサー22を作動さゼ、
砂4を圧送機2]内にヘルドコンヘヤー等で投入し、ホ
ース2内に圧送する。
Next, operate the pressure feeder 21 and compressor 22,
The sand 4 is put into the pressure feeder 2 using a heald conveyor or the like, and is forced into the hose 2.

ずろ、と、ホース2の先端、より袋体1内に砂4が勢い
よく噴出され、機械の圧送力によって即座に袋体1内に
砂4を充填することかできろ。
Suddenly, the sand 4 is ejected into the bag 1 from the tip of the hose 2, and the bag 1 is immediately filled with sand 4 by the force of the machine.

このとき、袋体]は通気性を有するため、空気は袋体1
から外部に抜(J、砂4のみが袋体1内に充填される。
At this time, since the bag] has breathability, the air flows into the bag 1.
(J) Only the sand 4 is filled into the bag body 1.

砂4の充填完了後、圧送機21及びコンプレツサー22
を停止し、ホース2を袋体1内より引き抜く。
After filling the sand 4, the pressure feeder 21 and compressor 22
, and pull out the hose 2 from inside the bag body 1.

このとき注入口11は、ポース2を引き抜くと、自然に
閉しるように構成されているため、注入口J1の閉塞作
業の手間が省ける。
At this time, since the injection port 11 is configured to close naturally when the port 2 is pulled out, the effort of closing the injection port J1 can be saved.

充填材のその他の圧送方法としては、ピストン等を用い
て、充填材を袋体1内に押し込む方法も考えられる。
Another possible method for pumping the filler is to push the filler into the bag 1 using a piston or the like.

〈二〉盛土の築造(第4図〉 盛土予定地盤上に、上記土嚢入り補強シート3を載置す
る。
<2> Construction of embankment (Figure 4) The sandbag-containing reinforcing sheet 3 is placed on the planned embankment ground.

このとき、補強シート3の平面部33は、盛土側に位置
するように敷設する。
At this time, the reinforcing sheet 3 is laid so that the flat part 33 is located on the embankment side.

次に、平面部33上に土等の盛土材料5を投入し、ロー
ラー6によって盛土材料5を転圧し、ループ状部32の
高さまて盛土を行う。
Next, an embankment material 5 such as soil is placed on the flat part 33 , and the embankment material 5 is compacted by the rollers 6 to perform embankment up to the height of the loop-shaped part 32 .

ぞし、で、同し要領で複数段にに貴人り補強シート3を
積み上げて盛土材料5を投入し、所定の高さの盛土を築
造A−る。
Then, in the same manner, the reinforcement sheets 3 are piled up in multiple tiers, and the embankment material 5 is put in to build an embankment of a predetermined height.

\ホ\壁体の構築(第1図) 上記の、よ・)に築造した盛土の縁部に沿って、予め製
造したコンクリ−I−製等のプレキャストパネル7によ
って壁体を構築する。
Construction of the wall (Fig. 1) Along the edge of the embankment constructed in step 1 above, a wall is constructed using precast panels 7 made of concrete I- or the like manufactured in advance.

この壁体には剛性を持たせるために、プレストしXを導
入する。
In order to give this wall rigidity, it is prestressed and X is introduced.

例えば第1図に示すように、上下方向に情み」二けた各
プレ(−ヤストパネ几7内に引張材71を1通さ(、こ
の引張材71を緊張してプレストレスを導入する。
For example, as shown in FIG. 1, one tensile member 71 is passed through each double-digit prestress in the vertical direction (-) and the tension member 71 is tensed to introduce prestress.

壁体の構築の際には、壁体と補強シート3のループ状部
32との間には間隙を設けておく。
When constructing the wall, a gap is provided between the wall and the loop-shaped portion 32 of the reinforcing sheet 3.

〈へ〉土嚢と壁体の連結(第5.6図)次に、壁体7と
二I嚢をフッタ付連♀、I、(奉8によって連結する。
<Go> Connecting sandbags and walls (Fig. 5.6) Next, connect the wall 7 and the two I bags with the footer connections ♀, I, (bonding 8).

フッシイ・1連結捧8は、第6図に示すような一端にフ
ックをfiする銅捧笠である このフック付連結棒8のフックを、土嚢の補強シート3
に引っ掛け、他端を壁体7に定着して壁体7と土嚢を連
結することができる。
The hook 1 connecting rod 8 is a copper rod with a hook attached to one end as shown in FIG.
The sandbag can be connected to the wall 7 by hooking it onto the wall and fixing the other end to the wall 7.

フック付連結棒8の壁体7への定着は、ねじ込み式また
は埋め込み式等によって行う。
The hooked connecting rod 8 is fixed to the wall 7 by screwing or embedding.

また、フックイ;1連結棒8の取り(=jけ数は、盛」
−体の規模に応じて、壁体7と土嚢を強固に連結てきる
ように、上下あるいは横方向に所要数取り付ける。
Also, hooky; 1 connecting rod 8 (=j number is sakura)
- Depending on the scale of the body, install the required number of sandbags vertically or horizontally to firmly connect the wall 7 and sandbags.

〈ト〉排水材の充填(第1図) 壁体7と補強シート3の几−ブ状部32との間には、予
め間隙部が設けられている。
<G> Filling with drainage material (FIG. 1) A gap is provided in advance between the wall 7 and the hollow-shaped portion 32 of the reinforcing sheet 3.

この間隙部には、砂利等の排水材9を充填する。This gap is filled with a drainage material 9 such as gravel.

これによって、壁体7の背面の排水を可能にし、壁体7
が浸水によって脆弱になったり、水圧で崩壊するなとの
おそれかなくなる。
This allows drainage on the back side of the wall 7 and
There is no need to worry about the building becoming fragile due to flooding or collapsing under water pressure.

〈その他の実施例〉 その他の実施例として、袋体1内を複数の部屋に分割ず
ろ場合かある。
<Other Embodiments> As other embodiments, the inside of the bag 1 may be divided into a plurality of rooms.

−の場合には、袋体1を形成するシーI・状体と同質の
通気性を有するシート状体によって、袋体1内を仕切る
とよい。
In the case of -, the inside of the bag 1 may be partitioned off by a sheet-like body having the same breathability as the sheet-like body forming the bag 1.

例えば第7図に示すように、シート状体の長手方向の端
部を内側に折り込んで、その端縁部を止金12によ−、
て固定する方法によれば、容易に分割することができる
For example, as illustrated in FIG.
According to the method of fixing the parts, the parts can be easily divided.

このように袋体1内を分割することによって、袋体1の
設置安定性を白土させることがてきる。
By dividing the interior of the bag 1 in this manner, the installation stability of the bag 1 can be improved.

、本発明の効果\ 本発明は辺土説明したようになるので、次のような効果
を期待することかできる。
, Effects of the present invention\ Since the present invention is as explained above, the following effects can be expected.

・、イ\(W来のように、土嚢を積み−1−げて壁体を
構築Aろだけては、二1−嚢壁間に投入した土圧によっ
て十嚢壁か倒れて、盛土が崩壊するおそれがある。
・、I\(W) If the wall is built by stacking sandbags as before, the ten-bag wall will collapse due to the earth pressure applied between the two-bag walls, and the embankment will collapse. There is a risk of collapse.

それに対して本発明は、土嚢に補強シートを取り(=j
 iJ、その補強シート上に盛土材料を投入する構造で
ある。
On the other hand, in the present invention, a reinforcing sheet is added to the sandbag (=j
iJ is a structure in which embankment material is placed on top of the reinforcing sheet.

即ち、盛土材料内に補強シートが埋設されるため、摩擦
抵抗に、よって補強シートが盛土材料内に定着される。
That is, since the reinforcing sheet is embedded within the embankment material, the reinforcing sheet is fixed within the embankment material due to frictional resistance.

従って、補強シートが引き抜けることがないため、土嚢
が倒れるのを防止する5−とができ、安定した盛土を築
造することができる。
Therefore, since the reinforcing sheet cannot be pulled out, it is possible to prevent the sandbag from falling over, and a stable embankment can be constructed.

さらに、プレキャストパネルにプレストレスを導入して
構築した壁体と土嚢部を、フッタイマ1連結棒によって
結合することにより、より一層盛土の安定1r[を向」
二することができる。
Furthermore, by connecting the wall constructed by introducing prestress into the precast panel and the sandbag section using the foot timer 1 connecting rod, the embankment is further stabilized.
Two can be done.

〈口〉壁体と補強シートの結合を、特殊なリンク結合と
することにより、盛土部の沈下変形による補強シートの
切断を防止することができる。
<Opening> By connecting the wall body and the reinforcing sheet with a special link connection, it is possible to prevent the reinforcing sheet from being cut due to subsidence deformation of the embankment.

〈ハ〉壁体と土嚢部との間には、砂利等のせ水祠を充填
する。
<C> Fill the space between the wall and the sandbag with gravel or other water.

そのため、壁体背面の排水を可能にすることかできる。Therefore, it is possible to drain water from the back of the wall.

従って、壁体か浸水によって脆弱になったり、水圧で崩
壊するなどのおそれかない。
Therefore, there is no risk that the wall will become brittle due to water intrusion or collapse due to water pressure.

〈二〉従来の土嚢は、袋体に人力で砂等の充填材を充填
して行っているため、土嚢の成形に多大の時間と労力を
必要とした。
(2) Conventional sandbags require a lot of time and effort to form sandbags because the bag body is manually filled with filler such as sand.

それに対して本発明は、通慨性を有する袋体内に、機械
の圧送力によって砂等の充填材を効率よ(充填するもの
である。
In contrast, the present invention efficiently (fills) a filler material such as sand into a permeable bag using the pumping force of a machine.

そのため、従来の人力に、よる場合と比較すると、月、
常に迅速かつ容易に土嚢を成形することができろ。
Therefore, compared to the conventional case of relying on human power,
Always be able to form sandbags quickly and easily.

〈]1い本発明は、機械の圧送力によって砂等の充填材
を効率よ(充填できるため、大容量の土嚢ても短a)間
て成形ずろこ七がてきる。
〈〈〈〈〈〈〈〈〈〈〈〈〈〈〈〈〈〈Since it is possible to efficiently fill the filler material such as sand with the pumping force of the machine, even large-capacity sandbags can be formed into sandbags in a short period of time.

〈へ\土嚢の内部を複数の部屋に分割した場合には、ト
、嚢の設置安定11−が向上し、盛土全体の安定1テ1
の向上を図ることができる。
〈\If the inside of the sandbag is divided into multiple rooms, the installation stability of the bag will be improved, and the stability of the entire embankment will be improved.
It is possible to improve the

〈)δ本発明の土嚢に設けた充填材の注入口は、充填材
の噴出ポースを引き抜くと、自然に閉じるように構成さ
れている。
<)δ The filler injection port provided in the sandbag of the present invention is configured to close naturally when the filler spout port is pulled out.

そのため、注入「1の閉塞作業の手間が省ける。Therefore, the trouble of occlusion work in injection "1" can be saved.

第1図・本発明の一実施例の説明同 第2園二袋体の説明図 第3図:補強シートの説明図 第4図・盛土の築造方法の説明図 第5.6図・フック付連結棒の説明図 第7図 その他の実施例の説明図Figure 1 - Explanation of one embodiment of the present invention Explanatory diagram of the second garden two bags Figure 3: Explanatory diagram of reinforcing sheet Figure 4: Explanatory diagram of the embankment construction method Figure 5.6 - Explanation diagram of connecting rod with hook Figure 7: Explanatory diagram of other embodiments

Claims (2)

【特許請求の範囲】[Claims] (1)通水性を有する撓性のシート状体の平面部の端部
を折り返してループ状部を形成し、 少なくとも通気性を有する撓性のシート状体で、閉塞し
た袋体を形成し、 この袋体を前記ループ状部内に設置し、 袋体に設けた注入口から袋体内に充填材を圧送により充
填して土嚢を成形し、 この土嚢の前記シート状体平面部上に盛土を行い、 この盛土部の縁部に沿ってプレキャストパネルによって
壁体を構築し、 この壁体にプレストレスを導入し、 一端にフックを有する連結棒を用い、 この連結棒のフックを土嚢に引っ掛け、他端を壁体に定
着して壁体と土嚢を連結した、 盛土の築造方法。
(1) forming a loop-shaped part by folding back the end of the planar part of a flexible sheet-like body that has water permeability, and forming a closed bag with at least the flexible sheet-like body that has air permeability; This bag body is installed in the loop-shaped part, and a filler material is filled into the bag body by force-feeding from an injection port provided in the bag body to form a sandbag, and embankment is performed on the flat surface of the sheet-shaped body of this sandbag. , A wall is constructed with precast panels along the edge of this embankment, prestress is introduced into this wall, a connecting rod with a hook at one end is used, and the hook of this connecting rod is hooked to a sandbag, and the other A method of constructing embankments in which the ends are anchored to the wall and the wall and sandbags are connected.
(2)特許請求の範囲第1項記載の盛土の築造方法にお
いて、 シート状体のループ状部内に設置する袋体の内部を複数
の部屋に分割した、盛土の築造方法。
(2) The method for constructing an embankment according to claim 1, wherein the inside of a bag body installed in a loop-shaped portion of a sheet-like body is divided into a plurality of chambers.
JP31844388A 1988-12-19 1988-12-19 Construction method of embankment Expired - Fee Related JP2649077B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31844388A JP2649077B2 (en) 1988-12-19 1988-12-19 Construction method of embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31844388A JP2649077B2 (en) 1988-12-19 1988-12-19 Construction method of embankment

Publications (2)

Publication Number Publication Date
JPH02164923A true JPH02164923A (en) 1990-06-25
JP2649077B2 JP2649077B2 (en) 1997-09-03

Family

ID=18099188

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31844388A Expired - Fee Related JP2649077B2 (en) 1988-12-19 1988-12-19 Construction method of embankment

Country Status (1)

Country Link
JP (1) JP2649077B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015232241A (en) * 2014-06-10 2015-12-24 前田工繊株式会社 Structure of back fill for existing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015232241A (en) * 2014-06-10 2015-12-24 前田工繊株式会社 Structure of back fill for existing structure

Also Published As

Publication number Publication date
JP2649077B2 (en) 1997-09-03

Similar Documents

Publication Publication Date Title
US5028172A (en) Retaining wall structure
JP2014505186A (en) Flood wall protection system
JP3714885B2 (en) Protection structures for slopes, walls, shores, etc.
US20030168575A1 (en) Concrete wall forming system using fabric
CN209873814U (en) A construction structures for handling foundation ditch inter-pile soil collapses
GB2167794A (en) Improvements in and relating to stabilised soil structures
JPH02164923A (en) Constructing method for embankment
JP2599293B2 (en) Construction method of embankment
JP6676462B2 (en) Embankment reinforcement method
JPH04108916A (en) Construction method for reinforced banking body
JP2001311172A (en) Reinforced earth retaining wall constituted of mutually and complementarily combined thinnings and geogrid
US11180897B2 (en) Rigid retaining bag
JPH02164924A (en) Constructing method for embankment
JPH02164925A (en) Constructing method for embankment
JP3458174B2 (en) Construction method of reinforced soil retaining wall
JP2649076B2 (en) Construction method of embankment
JP3556607B2 (en) How to build a retaining wall
JPH04108914A (en) Structure for reinforced banking body
JPH04108917A (en) Construction method for reinforced banking body
JPH0359221A (en) Steep slope banking
JP2000319884A (en) Reinforced mud wall structure
JPH02164920A (en) Constructing method for embankment
JPH0351426A (en) Lightweight banking structure
JPS6347418A (en) Reinforcing structure of banking ground
JPS6351527A (en) Slope stabilization work

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees