JPH01315520A - Underground outer wall constructing method for superstructure - Google Patents

Underground outer wall constructing method for superstructure

Info

Publication number
JPH01315520A
JPH01315520A JP14769888A JP14769888A JPH01315520A JP H01315520 A JPH01315520 A JP H01315520A JP 14769888 A JP14769888 A JP 14769888A JP 14769888 A JP14769888 A JP 14769888A JP H01315520 A JPH01315520 A JP H01315520A
Authority
JP
Japan
Prior art keywords
wall
soil concrete
building
underground
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14769888A
Other languages
Japanese (ja)
Other versions
JPH0663227B2 (en
Inventor
Masaaki Tannai
丹内 正明
Yoji Moroi
陽児 諸井
Takatoshi Ueno
高敏 上野
Nobuhiro Okuyama
信博 奥山
Michiharu Shimada
島田 道晴
Nobuaki Miura
三浦 宣明
Masami Hashimoto
橋元 正美
Toshiaki Uchiyama
内山 敏昭
Mamoru Nasu
守 那須
Hajime Nakajima
肇 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP63147698A priority Critical patent/JPH0663227B2/en
Publication of JPH01315520A publication Critical patent/JPH01315520A/en
Publication of JPH0663227B2 publication Critical patent/JPH0663227B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To use soil concrete for a permanent outer wall and make it connectible to a beam or the like by reinforcing a soil concrete wall with a steel member as in unitization, and installing a fold plate structural recess groove in a superstructure inner surface side faceplate. CONSTITUTION:A soil concrete wall is constructed from the ground, and a steel subject member 3 is inserted into soil concrete, forming each unit for the wall. In this subject member 3, there are provided with plural members of recess grooves 34 in side plates 31, 31. To connect a superstructure internal structural body of a beam or the like to the side plate, a reinforcing end of the body is anchored in the recess groove 34 when the body is made of concrete, and when it is made of steelwork, a gusset plate or a stud or the like is attached to the side plate 31, thus connection can be done.

Description

【発明の詳細な説明】 [産業上の利用分野コ 本発明は建築物の地下部分の外壁等の構築方法に係り、
とくに、ソイルコンクリートによって土留擁壁を構築す
る場合に、その擁壁を本設の地下外壁として成立させ、
構造体に採用するときの地下壁の構築工法に関するもの
である。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a method of constructing an outer wall, etc. of an underground part of a building,
In particular, when constructing an earth retaining wall using soil concrete, the retaining wall is established as a permanent underground external wall.
This relates to construction methods for underground walls when used in structures.

[従来の技術] 建築物の地下部分に地中連続壁を構築し、これを地下部
分の構築用の擁壁として使用し、そのまま建築物の地下
外壁とすることが多く行なわれている。地中連続壁工法
の基本は、壁体を構築する位置に連続して溝孔を掘削し
、その内部に泥水を満たしたうえ、水中コンクリートを
打設し、鉄筋篭を配して鉄筋コンクリート壁体を構築し
ながらこれを連設するものであり、この工法の基本的な
構成はよく知られており、建築物の内部の構造躯体との
接続は、壁体内の鉄筋をはつり出して、鋼材の接続によ
って構成している6 一方、比較的軽微な建築物にあっては、ソイルコンクリ
ートによって仮設の擁壁を構築し、その内部を掘削して
、その底部から建築物を構築する。
[Prior Art] A continuous underground wall is often constructed in the underground part of a building, used as a retaining wall for constructing the underground part, and used as an underground outer wall of the building. The basics of the underground continuous wall construction method is to excavate a continuous trench at the location where the wall is to be constructed, fill it with muddy water, pour underwater concrete, and place a reinforcing bar cage to construct the reinforced concrete wall. The basic structure of this construction method is well known, and the connection with the internal structural frame of the building is made by protruding the reinforcing bars inside the wall and connecting the steel. On the other hand, for relatively light buildings, a temporary retaining wall is constructed using soil concrete, the inside of which is excavated, and the building is constructed from the bottom.

ソイルコンクリートは、土壌を解き崩して粗骨材と細骨
材とし、セメントと水とを混練してコンクリートとする
もので、掘削と同時に施工する打設工法が知られている
Soil concrete is made by breaking down soil into coarse and fine aggregates, mixing them with cement and water, and is known for its pouring method, in which it is constructed at the same time as excavation.

[発明が解決しようとする課題] 従来の地中連続壁では、鉄筋コンクリートの壁体は自体
が優れた構造体であるが、掘削、泥水中でのコンクリー
トの打設、内蔵鉄筋の接続等、工程が複雑であり、従っ
て、工費にかなり影響し、建築物のコストが上昇するこ
とが免れない。また、掘削残土の処理を要し、泥水の管
理も容易ではなかった6 ソイルコンクリート造の壁体は、地上から直接杭の連続
体として土中に構築され、連続手段も開発されているが
、ソイルコンクリート自体は水密性が低く、建築物の地
下外壁として完全な止水ができず1強度が低くて信頼性
に劣っているため、ソイルコンクリートで形成した壁体
では、軽微な構造物の仮設工事用の擁壁に使用するに止
まり、構造体としての外壁にそのまま採用することは行
なわれていない。また、ソイルコンクリートの補強のた
めに鋼材を挿入する必要があるが、鉄筋篭等の挿入に適
さず、H型鋼等の線材を挿入することになるため、安定
した寸法精度を得ることができない、さらに、ソイルコ
ンクリートの構造体では、建築物の躯体を構成する内部
の鉄筋コンクリート構造体との接続手段がなく、応力を
伝達する方法が開発されていない。従って、ソイルコン
クリートは、結局仮設材以上に構造体として使用するこ
とが許されず、地下構造体への適用が課題になっていた
[Problems to be solved by the invention] In conventional underground continuous walls, the reinforced concrete wall itself is an excellent structure, but it is difficult to carry out processes such as excavation, pouring concrete in muddy water, and connecting built-in reinforcing bars. The structure is complex and therefore has a considerable impact on construction costs, inevitably increasing the cost of the building. In addition, it was necessary to dispose of excavated soil, and it was not easy to manage muddy water.6 Soil concrete walls are built directly from the ground into the soil as a series of piles, and continuous methods have also been developed. Soil concrete itself has low watertightness and cannot completely stop water as an underground outer wall of a building, has low strength and is inferior in reliability, so walls made of soil concrete are not suitable for temporary construction of minor structures. It is only used for retaining walls for construction purposes, and is not used as is for external walls as structures. In addition, it is necessary to insert steel materials to reinforce soil concrete, but it is not suitable for inserting reinforcing bar cages, etc., and because it requires inserting wire rods such as H-beam steel, stable dimensional accuracy cannot be obtained. Furthermore, soil concrete structures have no means of connection with the internal reinforced concrete structure that constitutes the building frame, and no method for transmitting stress has been developed. Therefore, soil concrete is not allowed to be used as a structure any more than a temporary material, and its application to underground structures has been an issue.

[課題を解決するための手段] 本発明は、上述のような課題の解決を図ることを目的と
して開発されたものであって、ソイルコンクリート造の
壁体を鋼製の部材によって補強してユニットを形成し、
この鋼製部材を介してユニットを接続することによって
本設の構造体にし、内部構造躯体との接続を可能にする
ことを要旨としている。そして本発明は、建築物の地下
外壁の構築工法において、とくに、建築物の外壁位置に
多連のソイルコンクリート抗体による壁体を構築する工
程、ソイルコンクリート壁体内に外殻形成用の主体部材
を挿入してユニットを形成する工程、各ユニットを順次
に接続する工程を含み、主体部材は、少なくとも建築物
の内面側に、折板構造の凹溝を形成した面板を有してい
ることを特徴とし、また、建築物の内部構造躯体との接
続工法をも提案している。これによって、本発明の地下
壁は基本的にはソイルコンクリート造の壁体でありなが
ら、その要部を鋼製の部材に囲繞されて構造耐力を具備
し、本設構造体として、地下外壁に採用することができ
、あわせて、建築物の地下躯体部分との接続構造を可能
にし、地中連続壁工法における構造、工費上の不利を回
避することに成功したものである。
[Means for Solving the Problems] The present invention was developed with the aim of solving the above-mentioned problems, and is a unit in which walls made of soil concrete are reinforced with steel members. form,
The gist of the project is to connect the units through these steel members to create a permanent structure that can be connected to the internal structural framework. The present invention relates to a method of constructing an underground external wall of a building, and particularly relates to a step of constructing a wall made of multiple soil concrete antibodies at the external wall position of a building, and a step of constructing a main member for forming an outer shell within the soil concrete wall. The main component includes a step of inserting the unit to form a unit, and a step of sequentially connecting each unit, and is characterized in that the main member has a face plate in which a concave groove of a folded plate structure is formed at least on the inner surface of the building. We also propose a method for connecting it to the internal structure of a building. As a result, although the underground wall of the present invention is basically a wall made of soil concrete, its main part is surrounded by steel members to provide structural strength, and as a permanent structure, it can be attached to the underground outer wall. In addition, it enabled a connection structure with the underground framework of the building, and succeeded in avoiding the disadvantages in terms of structure and construction cost of the underground continuous wall construction method.

[作 用] 本発明を、建築物の地下部分の構築に適用した場合の作
用は、建築物の地下部分の構築に際して、まず、建築物
の外壁位置に地上から多連のソイルコンクリート抗体に
よる壁体を構築する。この工法は、螺旋形のスクリュー
を有する中空軸のオーガーを使用し、地表面から直接セ
メントミルクを注入しながら掘削した土壌と混練してソ
イルコンクリートを形成する周知の方法で行なわれ、そ
のとき、多連のオーガーを使用すると、オーガーの回転
掘削断面を連続して重ね合い、ソイルコンクリート壁体
が形成される。ついで、未硬化のソイルコンクリート内
に、主体部材を挿入して壁体のユニットを形成す゛る。
[Function] When the present invention is applied to the construction of the underground part of a building, the function is that when constructing the underground part of the building, first, a wall made of multiple soil concrete antibodies is installed from above ground at the outer wall position of the building. Build your body. This construction method uses a hollow-shaft auger with a helical screw, and is carried out using the well-known method of injecting cement milk directly from the ground surface and mixing it with excavated soil to form soil concrete. When multiple augers are used, the rotary excavation sections of the augers are successively overlapped to form a soil concrete wall. Next, the main body member is inserted into the uncured soil concrete to form a wall unit.

この主体部材は、ソイルコンクリートの壁体の有効厚さ
に対応して、2枚の側板を対向させ、その側板は折板構
造で外面に複数の縦の凹溝を形成してあり、その端部近
くで結合板によって結合して箱形に形成するか、少なく
とも建築物の内面側にそのような側板を有するように形
成したものであって、上記の側板を、建築物の内部構造
躯体との接続手段とし、併せて、この凹溝をも使用する
ことができる。このようにして構成された壁体のソイル
コンクリートが硬化したのち、建築物の内部側の掘削が
行なわれ、各主体部材の端部を接続し、内面から鋼板を
溶接すると、壁体の全体の施工が完了する。
This main member has two side plates facing each other corresponding to the effective thickness of the soil concrete wall, and the side plates have a folded plate structure and have a plurality of vertical grooves formed on the outer surface. It is formed into a box shape by being connected by a connecting plate near the parts, or at least has such a side plate on the inner surface of the building, and the side plate is connected to the internal structural frame of the building. This concave groove can also be used as a connection means. After the soil concrete of the wall constructed in this way has hardened, excavation is carried out on the inside of the building, the ends of each main body member are connected, and steel plates are welded from the inside. Construction is completed.

[実施例コ 本発明を採用して構築した地下外壁を図面に示す一実施
例に基づいて詳細に説明する。第1図は地下外壁の一部
で示す本発明を採用した外壁の水平断面図であって、第
1図中の1は外壁の全体、2はソイルコンクリート、3
は鋼板製の主体部材、4は主体部材3ごとに形成される
ユニットであり、IAは建築物の外部側、1Bは内部側
である。
[Embodiment] An underground outer wall constructed using the present invention will be described in detail based on an embodiment shown in the drawings. Fig. 1 is a horizontal sectional view of an external wall adopting the present invention, showing a part of the underground external wall, in which 1 is the entire external wall, 2 is soil concrete, 3 is
is a main body member made of a steel plate, 4 is a unit formed for each main body member 3, IA is the outside side of the building, and 1B is the inside side.

ソイルコンクリート2は、地上から所定の深さに直接土
中に形成される杭単体21の杭列を、多連式のオーガー
によってその場の土壌とセメントとによって混練して形
成したもので、図示のものは4連のオーガーを壁体の厚
さaとなるように形成しである。
Soil concrete 2 is formed by mixing pile rows of single piles 21 directly into the soil at a predetermined depth from the ground level with the soil and cement on the spot using a multiple auger, as shown in the figure. In this case, four augers are formed so that the wall thickness is a.

第2図a図、b図には主体部材3の詳細を示しである。Figures 2a and 2b show details of the main body member 3.

主体部材3は、ソイルコンクリート2が形成する壁体の
厚さaに対応して対向間隔を保持し、水平方向の幅をソ
イルコンクリート2の単位長さに対応させた、2枚の平
行な側板31.31と、それらの両端部32から内方に
寄せて1両側板31を離隔して結合し、主体部材3を平
行柱状に形成する結合板33.33とからなっており、
側板31には主体部材3の長手方向に、複数の凹溝34
を形成しである。この凹溝34は断面が内部で拡大する
鳩尾状になっており、その外面には突起34aを設けて
ソイルコンクリート2との上下方向の付着を改善させて
いる。。両端部32には、接続用のフランジ35を折曲
して形成しである。上記結合板33は、b図に示すよう
に、両端部に係着用の挾持部36を有し、凹溝34の背
面に形成される突条に上下端2か所以上で係着固定させ
、両側板31を等間隔に結合している。各部を構成する
鋼材は、誇張して図示されているが、座屈を生ぜず、溶
接が可能なだけの厚さでよい。
The main member 3 is made up of two parallel side plates that maintain a facing interval corresponding to the thickness a of the wall formed by the soil concrete 2 and whose horizontal width corresponds to the unit length of the soil concrete 2. 31.31, and a connecting plate 33.33 which joins one side plate 31 inwardly from both end portions 32 and forms the main body member 3 into a parallel column shape,
A plurality of grooves 34 are formed in the side plate 31 in the longitudinal direction of the main body member 3.
It is formed. The groove 34 has a dovetail cross section that expands inside, and a protrusion 34a is provided on its outer surface to improve adhesion to the soil concrete 2 in the vertical direction. . At both ends 32, flanges 35 for connection are formed by bending. As shown in Fig. b, the coupling plate 33 has clamping portions 36 for attachment at both ends, and is attached and fixed to protrusions formed on the back surface of the groove 34 at two or more upper and lower ends. Both side plates 31 are joined at equal intervals. Although the steel materials constituting each part are illustrated in an exaggerated manner, they only need to be thick enough to allow welding without buckling.

主体部材3の高さは、建築物の内面側の側板31がソイ
ルコンクリート2の深さ全長に一連に延びて、ソイルコ
ンクリート2中に挿入して埋設しである。
The height of the main body member 3 is such that the side plate 31 on the inner surface side of the building extends continuously over the entire depth of the soil concrete 2, and is inserted and buried in the soil concrete 2.

外壁1の外部側IAでは、第3図a図の平面図、b図の
垂直断面図に示すように、主体部材3は建築物の地下各
階の構造躯体(例えば梁)5に対応する高さの位置だけ
に側板31を設け、その他の中間部分では内部側IBの
みとすることができる。
On the external side IA of the exterior wall 1, as shown in the plan view in Figure 3a and the vertical sectional view in Figure 3b, the main member 3 has a height corresponding to the structural frame (for example, beam) 5 of each underground floor of the building. The side plate 31 can be provided only at the position, and only the inner side IB can be provided at the other intermediate portions.

従って、この部分には結合板33が存在せず、外部[I
Aの離間した側板31は、連結材6によって連結させて
おく。
Therefore, the coupling plate 33 does not exist in this part, and the external [I
The separated side plates 31 of A are connected by connecting members 6.

上記の地下の外壁1の施工を第4図の工程図によって説
明する。a図では、地上からのソイルコンクリート2の
杭列の打設が行なわれ、b図では、ソイルコンクリート
2の未硬化の時期に、主体部材3に傾斜計7を取付けて
吊上げ、ソイルコンクリート2中に正確に挿入してユニ
ット4を形成する。外部側IAの側板31は結合板33
に結合され、連結材6に支持されて、一体連続に形成し
た内部側IBの側板31の降下に伴って、ソイルコンク
リート2中に挿入される。
The construction of the above-mentioned underground outer wall 1 will be explained with reference to the process diagram shown in FIG. 4. In figure a, the pile rows of soil concrete 2 are being driven from the ground, and in figure b, when the soil concrete 2 is still uncured, an inclinometer 7 is attached to the main body member 3 and it is lifted. to form unit 4. The side plate 31 of the external side IA is a connecting plate 33
It is inserted into the soil concrete 2 as the side plate 31 of the inner side IB, which is connected to and supported by the connecting member 6 and is integrally and continuously formed, is lowered.

ついで、第1図に示すように、建築物の地下部分の内部
側IBの掘削が行なわれ、このときソイルコンクリート
2の内部側IBの断面円弧部分すも除去される。外壁1
の内面が露出する段階で。
Next, as shown in FIG. 1, the inner side IB of the underground part of the building is excavated, and at this time, the arcuate section of the inner side IB of the soil concrete 2 is also removed. Outer wall 1
At the stage when the inner side of the person is exposed.

各ユニット4はフランジ35と、別体の接続板37との
溶接によって、次位のユニット4と接合され、同時にソ
イルコンクリート2からの透水を遮断し、その硬化を経
て、連続した地下外壁1を形成し、工事を完了する。
Each unit 4 is connected to the next unit 4 by welding a flange 35 and a separate connection plate 37, and at the same time blocks water permeation from the soil concrete 2, and after hardening, a continuous underground external wall 1 is formed. form and complete the construction.

次に、建築物の内部構造躯体(梁)5との接続を第5図
によって説明する。第5図は外壁1の垂直断面図であり
、外壁1に梁5が接続されている。
Next, the connection with the internal structural frame (beam) 5 of the building will be explained with reference to FIG. FIG. 5 is a vertical sectional view of the outer wall 1, to which a beam 5 is connected.

この例では、内部側IBの側板31に、梁5のコンクリ
ートとの結合を一層改善するために、切起こしの接続手
段38が上方に向けて設けられており、ソイルコンクリ
ート2の一部がコツター22を形成している。そして、
梁5の位置によっては、梁5の鉄筋51の端部が側板3
1の凹溝34内にアンカーされる。梁5のコンクリート
が打設され、躯体を形成すると、外壁1が受ける土庄が
梁5に圧縮力として作用し、コツター22は有効に働く
In this example, a cut-and-raise connection means 38 is provided upward on the side plate 31 of the inner side IB in order to further improve the connection of the beam 5 with the concrete, and a part of the soil concrete 2 is 22 is formed. and,
Depending on the position of the beam 5, the end of the reinforcing bar 51 of the beam 5 may be connected to the side plate 3.
It is anchored in the concave groove 34 of 1. When the concrete for the beams 5 is poured to form the frame, the soil applied to the outer wall 1 acts on the beams 5 as a compressive force, and the concrete blocks 22 work effectively.

しかも、切起こし38は側板31のソイルコンクリート
2中への挿入に抵抗を生じない。躯体が鉄骨造であると
きには、前記の側板31を利用してガセットプレートま
たはスタッド等を取付けることで接合を行なうことがで
きる。
Furthermore, the cut and raised portions 38 do not create any resistance when the side plate 31 is inserted into the soil concrete 2. When the frame is a steel frame structure, the side plates 31 can be used to attach gusset plates, studs, etc. for connection.

[発明の効果] 本発明は、地下外壁部分にソイルコンクリート壁を連設
する地下壁の構築工法において、建築物の外壁位置に多
連のソイルコンクリート抗体による壁体を構築する工程
、ソイルコンクリート壁体内に外殻形成用の主体部材を
挿入してユニットを形成する工程、各ユニットを順次に
接続する工程を含み、主体部材は、少なくとも建築物の
内面側に、折板構造の凹溝を形成した面板を有して実施
されるものであるから、まず、ソイルコンクリートを主
材として構成される壁体でありながら、主体部材によっ
て拘束されて強度のある4R造体が形成され、信頼性が
向上して、地下外壁を構造耐力のある壁体として形成す
ることができ、併せて、その内面が鋼板製であることか
ら、建築物内部の構造躯体との接続、結合が確実でかつ
容易となる。
[Effects of the Invention] The present invention provides a method for constructing an underground wall in which a soil concrete wall is connected to an external underground wall portion, a step of constructing a wall body using multiple soil concrete antibodies at an external wall position of a building, and a method for constructing a soil concrete wall. The method includes a step of inserting a main member for forming an outer shell into the body to form a unit, and a step of sequentially connecting each unit, and the main member forms a groove with a folded plate structure at least on the inner surface of the building. Firstly, although the wall is mainly made of soil concrete, it is constrained by the main material to form a strong 4R structure, which increases reliability. The underground outer wall can be formed as a wall body with structural strength, and since its inner surface is made of steel plates, it can be easily and reliably connected to the structural frame inside the building. Become.

一方、その構築は、地中連続壁の構築に要する複雑な工
程ならびに工費を大幅に削減することができる利点を有
している。また、ソイルコンクリートの打設はもちろん
、未硬化段階での鋼製主体部材の挿入も常法によるもの
であり、格別の技術や装備を必要とせず、しかも、地中
連続壁に必須の掘削残土の処理や、泥水の管理が不要で
ある。さらに1本発明は、主体部材の接続手段の構成に
よって、主として施工精度が向上するだけでなく。
On the other hand, its construction has the advantage of being able to significantly reduce the complicated process and construction costs required for constructing a diaphragm wall. In addition to pouring soil concrete, inserting the main steel members in the uncured stage is done using conventional methods, and does not require any special technology or equipment. There is no need to process water or manage muddy water. Furthermore, the present invention not only improves construction accuracy mainly due to the configuration of the connecting means of the main body member.

溶接による一体化によって構造上、防水上優れているな
ど、地下外壁の構築工法の改善に画期的効果をもたらす
発明というべきである。
This invention can be said to have a groundbreaking effect on improving construction methods for underground external walls, such as its superior structure and waterproofing due to its integration through welding.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の建築物の地下外壁構築工法を採用した実
施例を示す図面であって、第1図は本発明の実施例の水
平断面図、第2図のa図は主体部材の斜視図、b図は主
体部材の要部の水平断面図、第3図は主体部材の他の実
施例を示し、a図は平面図、b図はその垂直断面図、第
4図のa図およびb図は本発明の施工工程を説明する概
略の垂直断面図、第5図は主体部材と内部躯体との接続
を説明する断面図である。 1・・・外壁、2・・・ソイルコンクリート、3・・・
主体部材、4・・・ユニット、5・・・躯体部、梁、6
・・・連結材、21・・・杭単体、22・・・コツター
、31・・・側板、32・・・端部、33・・・結合板
、34・・・凹溝、35・・・フランジ、36・・・挾
持部、37・・・接続板、38・・・切起こし、51・
・・鉄筋、a・・・壁体の厚さ、b・・・円弧部分。 第1図 第2図 第4図 5′+旧
The drawings are drawings showing an embodiment in which the method of constructing an underground outer wall of a building according to the present invention is adopted, and FIG. 1 is a horizontal sectional view of the embodiment of the present invention, and FIG. , b is a horizontal sectional view of the main part of the main body member, FIG. 3 shows another embodiment of the main body member, a is a plan view, b is a vertical sectional view thereof, and a and b in FIGS. The figure is a schematic vertical cross-sectional view for explaining the construction process of the present invention, and FIG. 5 is a cross-sectional view for explaining the connection between the main body member and the internal frame. 1... Exterior wall, 2... Soil concrete, 3...
Main member, 4... Unit, 5... Body part, beam, 6
...Connecting material, 21...Single pile, 22...Cotter, 31...Side plate, 32...End portion, 33...Connecting plate, 34...Concave groove, 35... Flange, 36... Holding part, 37... Connection plate, 38... Cut and raise, 51.
...Reinforcement bar, a...thickness of wall, b...circular part. Figure 1 Figure 2 Figure 4 Figure 5'+ Old

Claims (2)

【特許請求の範囲】[Claims] (1)地下外壁部分にソイルコンクリート壁を連設する
地下外壁の構築工法において、建築物の外壁位置に多連
のソイルコンクリート抗体による壁体を構築する工程、
ソイルコンクリート壁体内に外殻形成用の主体部材を挿
入してユニットを形成する工程、各ユニットを順次に接
続する工程を含み、主体部材は、少なくとも建築物の内
部側に、折板構造の凹溝を形成した側板を有しているこ
とを特徴とする建築物の地下外壁構築工法。
(1) In an underground exterior wall construction method in which a soil concrete wall is connected to an underground exterior wall portion, a step of constructing a wall made of multiple soil concrete antibodies at the exterior wall position of a building;
The steps include a step of inserting a main member for forming an outer shell into a soil concrete wall to form a unit, and a step of sequentially connecting each unit. A construction method for an underground exterior wall of a building, characterized by having side plates with grooves formed therein.
(2)主体部材の側板または側板に形成された凹溝を併
せ使用して、建築物の内部構造躯体と接続することを特
徴とする請求項1記載の建築物の地下外壁構築工法。
(2) The method for constructing an underground external wall of a building according to claim 1, wherein the side plate of the main member or a groove formed in the side plate is used to connect to the internal structural frame of the building.
JP63147698A 1988-06-14 1988-06-14 Construction method for underground wall of building Expired - Fee Related JPH0663227B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63147698A JPH0663227B2 (en) 1988-06-14 1988-06-14 Construction method for underground wall of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63147698A JPH0663227B2 (en) 1988-06-14 1988-06-14 Construction method for underground wall of building

Publications (2)

Publication Number Publication Date
JPH01315520A true JPH01315520A (en) 1989-12-20
JPH0663227B2 JPH0663227B2 (en) 1994-08-22

Family

ID=15436239

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63147698A Expired - Fee Related JPH0663227B2 (en) 1988-06-14 1988-06-14 Construction method for underground wall of building

Country Status (1)

Country Link
JP (1) JPH0663227B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03125832U (en) * 1990-03-30 1991-12-19
KR101705719B1 (en) * 2016-07-01 2017-02-14 장성훈 Underground wall having improved earthquake-resistant
CN113957879A (en) * 2021-11-16 2022-01-21 青岛海大建科岩土工程有限公司 Assembled type steel-inserted underground continuous wall
CN113969574A (en) * 2021-11-16 2022-01-25 青岛海大建科岩土工程有限公司 Construction method of assembled type steel-inserted underground continuous wall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101842239B1 (en) * 2017-10-13 2018-03-26 주식회사 엠베스텍 Non-removing Mold with Improved Earthquake Resistance Strength

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198817A (en) * 1984-10-19 1986-05-17 Asuku Kenkyusho:Kk Method of forming concrete wall of underground structure employing composite sheet pile and composite sheet pile as weir panel
JPS61122320A (en) * 1984-11-15 1986-06-10 Penta Ocean Constr Co Ltd Method of coupling continuous underground wall with underground structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198817A (en) * 1984-10-19 1986-05-17 Asuku Kenkyusho:Kk Method of forming concrete wall of underground structure employing composite sheet pile and composite sheet pile as weir panel
JPS61122320A (en) * 1984-11-15 1986-06-10 Penta Ocean Constr Co Ltd Method of coupling continuous underground wall with underground structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03125832U (en) * 1990-03-30 1991-12-19
KR101705719B1 (en) * 2016-07-01 2017-02-14 장성훈 Underground wall having improved earthquake-resistant
CN113957879A (en) * 2021-11-16 2022-01-21 青岛海大建科岩土工程有限公司 Assembled type steel-inserted underground continuous wall
CN113969574A (en) * 2021-11-16 2022-01-25 青岛海大建科岩土工程有限公司 Construction method of assembled type steel-inserted underground continuous wall

Also Published As

Publication number Publication date
JPH0663227B2 (en) 1994-08-22

Similar Documents

Publication Publication Date Title
KR102208793B1 (en) Under ground structure using column wall and construction method thereof
KR20210119861A (en) Slurry wall, construction method for the same and wire mesh assembly
JP2000265484A (en) CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
JP2000265458A (en) Floor slab connecting structure for underground structure with precast pile underground wall
JPH08284159A (en) Connection structure of pile head
JP2000352296A (en) Method o constructing passage just under underground structure
JP5480744B2 (en) Foundation for structure and its construction method
JPH01315520A (en) Underground outer wall constructing method for superstructure
KR20220065461A (en) WIRE STRUCTURE FOR STAGGERED LAPPING IN SLURRY WALL, SLURRY WALL and CONSTRUCTION METHOD FOR THE SAME
JP2003027462A (en) Construction method of underground continuous wall, and construction method of underground structure
KR20090042395A (en) Retainning wall and its construction method
JP2973815B2 (en) Construction method of pressure-resistant wall under the building
JP2554507B2 (en) Underground space construction method
JPH0721196B2 (en) Reverse construction method of underground structure
JP3082054B2 (en) Large-scale, deep steel continuous basement wall and method of constructing the same
JPH0654016B2 (en) Underground space construction method
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
JP2558414B2 (en) Construction method of the main retaining wall and the retaining wall
JPH041811B2 (en)
JP2555796B2 (en) Underground construction method using hollow PC columns
JPS5841227Y2 (en) Element for mountain retainer
JP2565452B2 (en) Construction method of self-supporting retaining wall
JPH0781274B2 (en) How to build a beam on an underground wall
JPS5853321Y2 (en) Element for mountain retainer
JPH055970B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees