Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP1988054464UpriorityCriticalpatent/JPH081219Y2/ja
Publication of JPH01159625UpublicationCriticalpatent/JPH01159625U/ja
Application grantedgrantedCritical
Publication of JPH081219Y2publicationCriticalpatent/JPH081219Y2/ja
Vorrichtung, verschiebbar auf zwei einander kreuzenden, durch einen hoehenunterschied getrennten rollenbahnen, wie eine eisenbahn und ein rangiergleis auf einem bahnsteig.
Special fractographic techniques for failure analysis(Electron fractographic techniques for failure analysis, examining fracture direction, differentiation between hydrogen embrittlement and stress corrosion in steels and cyclic stress)