JPH0113751Y2 - - Google Patents

Info

Publication number
JPH0113751Y2
JPH0113751Y2 JP3451982U JP3451982U JPH0113751Y2 JP H0113751 Y2 JPH0113751 Y2 JP H0113751Y2 JP 3451982 U JP3451982 U JP 3451982U JP 3451982 U JP3451982 U JP 3451982U JP H0113751 Y2 JPH0113751 Y2 JP H0113751Y2
Authority
JP
Japan
Prior art keywords
gate
base
connecting plate
auxiliary formwork
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP3451982U
Other languages
Japanese (ja)
Other versions
JPS58137793U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP3451982U priority Critical patent/JPS58137793U/en
Publication of JPS58137793U publication Critical patent/JPS58137793U/en
Application granted granted Critical
Publication of JPH0113751Y2 publication Critical patent/JPH0113751Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Gates (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案は、組立用門の支柱固定具に関するもの
である。
[Detailed Description of the Invention] (Industrial Application Field) The present invention relates to a post fixing device for an assembly gate.

(従来の技術) 従来より、この種の組立門は地中に埋設する基
礎部とその上に構築する屋根と柱の門柱部とが一
体構造であつた。このため運搬梱包時において、
手間と慎重な輸送作業が要求された。またこのよ
うな一体構造であるため据付時において、支柱間
の平衡や地表面との水平を出すのに熟練された技
能が必要であつた。従つて、実開昭53−75930号
の公開公報に開示されるように地中埋設基礎部と
この上に構築する門柱構造部とが二分割に分離施
工することが一般的になつた。しかし、分割され
ているため相当重量がかかる門柱部を支持する基
礎部は、控え柱等の副木部(補強用そえ木)を要
するもので、不要な作業や控え柱設置のスペース
を必要とした。
(Prior Art) Conventionally, this type of assembled gate has had an integral structure including a foundation part buried underground, a roof built on the foundation part, and a gate post part of a pillar. For this reason, during transportation and packaging,
It required a lot of effort and careful transportation. Also, because of this integral structure, skilled skills were required to maintain balance between the supports and level them with the ground surface during installation. Therefore, it has become common practice to separate the underground foundation and the gatepost structure built thereon into two parts, as disclosed in Japanese Utility Model Application Publication No. 53-75930. However, the foundation that supports the gateposts, which are divided and therefore subject to considerable weight, requires splints such as buttresses (reinforcing braces), which requires unnecessary work and space for installing the buttresses. did.

(考案が解決しようとする問題点) この種の門は、家屋の正面に象徴的に位置する
ものであるから施工作業も短時間に行ない、また
門柱周りに不要な造作物があつてはならず、さら
にまた埋設基礎部の腐蝕予防も簡便であることが
必要である。
(Problems that the invention aims to solve) Since this type of gate is symbolically located at the front of the house, construction work can be done in a short time, and there should be no unnecessary features around the gateposts. Furthermore, it is necessary to easily prevent corrosion of the buried foundation.

(問題を解決するための手段) 本考案に係る門の基礎部にあたる支柱固定具
は、補助型枠2と支柱側面を固定する連結板4と
基台1とから構成されるものであつて、さらに詳
しくは、門を支持する左右それぞれの支柱10,
10の下部を、水平に支持して埋設される基礎構
造において、門正面に向かつて前後方向に平行に
配設された補助型枠2の外側に予め複数のボルト
孔41を穿設した支柱用連結板4を上方垂直に立
設するとともに、内側に支柱10下端面を載置す
るようにした断面エ型な基台1を設けて、補助型
枠2と連結板4と基台1とが一体となるように固
定されて、外観的に略逆T字状に構成された一対
の固定具A,Aが、それぞれの支柱下部を受ける
とともに、支柱下方の外側面を連結板4を介在し
て連結固定して使用することを特徴とする支柱固
定具である。
(Means for solving the problem) The pillar fixing device, which is the foundation of the gate according to the present invention, is composed of an auxiliary formwork 2, a connecting plate 4 for fixing the side of the pillar, and a base 1. More specifically, the left and right pillars 10 supporting the gate,
In a foundation structure in which the lower part of the frame 10 is horizontally supported and buried, a plurality of bolt holes 41 are pre-drilled on the outside of the auxiliary formwork 2, which is arranged parallel to the front and back direction facing the front of the gate. The connecting plate 4 is erected vertically upward, and a base 1 having an E-shaped cross section on which the lower end surface of the support column 10 is placed inside is provided, so that the auxiliary formwork 2, the connecting plate 4, and the base 1 are connected to each other. A pair of fixtures A, A, which are fixed integrally and have a substantially inverted T-shape in appearance, receive the lower part of each pillar, and connect the outer surface of the lower part of the pillar with a connecting plate 4 interposed therebetween. This is a column fixing device that is characterized in that it is used by connecting and fixing it.

(実施例) 本考案に開示される支柱固定具Aは、断面C型
な鋼材からなる補助型枠2と予め複数のボルト孔
41を穿設した帯状な支柱用連結板4と断面エ型
な基台1とからなり、全体として略逆T字状に溶
接した構成された固定具Aである。
(Example) The pillar fixing device A disclosed in the present invention consists of an auxiliary formwork 2 made of steel material with a C-shaped cross section, a belt-shaped connecting plate 4 for the pillar in which a plurality of bolt holes 41 are pre-drilled, and an E-shaped cross-section. This fixture A consists of a base 1 and is welded in a substantially inverted T-shape as a whole.

前述構成手段の項で開示される通り、この固定
具A,Aを相対向してそれぞれの支柱下部を前記
基台上に水平に載置するとともに、支柱の下方外
側面に沿つて前記連結板4を介在してボルト51
締結して、門G全体を安全に固定して使用する。
As disclosed in the section of the above-mentioned constituent means, the fixing devices A and A are placed opposite each other so that the lower part of each column is placed horizontally on the base, and the connecting plate is placed along the lower outer surface of the column. 4 through the bolt 51
After tightening, the entire gate G is safely fixed and used.

従つて、門の据付地において、予め補助型枠2
寸法の1の溝及び基台1高さが埋設されるまで、
掘削しておく。軟弱な場所であれば、溝内にコン
クリート等を流し込んで地固めしておくと良い。
Therefore, the auxiliary formwork 2 must be installed in advance at the gate installation site.
Until the groove of dimension 1 and the height of the base 1 are buried,
Keep digging. If the area is soft, it is a good idea to pour concrete or other material into the trench to solidify the ground.

次いで、前述構成からなる基礎固定具を前記掘
削内の所定位置にアンカーボルト等によつて打設
固定する。もちろん、門柱幅によつて適当な間隔
で、互いに向い合うよう平行に、且つ水平に固定
されるものである。
Next, the foundation fixing device constructed as described above is driven and fixed at a predetermined position within the excavation using anchor bolts or the like. Of course, they are fixed parallel to each other and horizontally at appropriate intervals depending on the width of the gateposts.

そして、門Gの左右両支柱10,10を基台1
の支柱受け部1aに水平に載置され、さらにそれ
ぞれの支柱下方の外側面に沿つて補助型枠2より
突出する連結板4を介在して複数本の締結ボルト
51,51にて各支柱を連結する。
Then, place the left and right pillars 10, 10 of the gate G on the base 1.
Each column is mounted horizontally on the column receiving portion 1a of the column, and is connected to each column using a plurality of fastening bolts 51, 51 via a connecting plate 4 that protrudes from the auxiliary formwork 2 along the lower outer surface of each column. Link.

このように据付られた門の基礎部分は、コンク
リート等によつて基台上面まで埋設固化されてな
る。
The foundation of the gate installed in this way is buried and hardened with concrete or the like up to the top surface of the base.

一方、門の重量または設置場所の地盤によつて
は、補助型枠2と支柱連結板4との当接個所をさ
らに補強連結板3にて溶接補強しても良い。
On the other hand, depending on the weight of the gate or the ground of the installation location, the contact portion between the auxiliary formwork 2 and the supporting column connecting plate 4 may be further reinforced by welding with a reinforcing connecting plate 3.

このような組立門は、支柱の左右外側面に連続
して土塀、ブロツク塀等の塀Wが連設されること
が多く有り、支柱と塀との密接状態が永年のうち
に離間して隙間を生じるものである。然して、前
述連結板4に締結するボルト頭部を幾分外方(塀
方向)突出して、塀内に連設して、例えばコンク
リート固めする施工法を採用すれば隙間の防止も
できるものである。このボルトは頭部をカギ状に
変形した特殊な締結具を使用すれば、なお隙間防
止も完壁となる。
In such assembly gates, a wall W such as an earthen wall or block wall is often installed continuously on the left and right outer sides of the support, and the close contact between the support and the fence may cause them to separate over a long period of time and create a gap. It is something that occurs. However, if a construction method is adopted in which the head of the bolt fastened to the connecting plate 4 is slightly protruded outward (in the direction of the wall) and installed in the wall, for example, concrete is hardened, gaps can be prevented. . If you use a special fastener with the head of this bolt shaped like a key, you will be able to completely prevent gaps.

(効果) このような構成は、門柱本体部と基礎部(固定
具)とにそれぞれ工場内で製作可能であるから、
運搬梱包も容易に行なわれやすい。そして、据付
施工作業も短時間で行なうことが出来る。なお、
基礎部分が鋼材で製作されていれば、腐蝕の心配
も少なく、門柱下部を防虫薬剤等でその都度予防
処置を施すだけでよい。さらにまた、門と併用し
た塀との連結は、支柱連結板を兼用した複数本の
締結ボルトにて密閉状態を維持することができる
ものである。
(Effects) With this kind of configuration, both the main body of the gatepost and the base (fixing device) can be manufactured in the factory, so
It is also easy to transport and pack. Additionally, installation work can be completed in a short time. In addition,
If the foundation is made of steel, there is less worry about corrosion, and all you need to do is apply preventative treatment to the bottom of the gateposts each time using insect repellent. Furthermore, the connection between the gate and the fence can be maintained in an airtight state using a plurality of fastening bolts that also serve as support connecting plates.

この支柱固定具を使用した組立門は、昨今のよ
うに敷地スペースの狭い場所や階段若しくは傾斜
を伴う玄関の間口形態であつても、控え柱等の門
に係る補強を必要とせず、極めてスツキリとした
組立門の施工を図ることができる利点がある。
Assembled gates using this post fixing device do not require reinforcements for gates such as buttresses, and are extremely stable, even in narrow site spaces or entrances with stairs or slopes. This has the advantage that the construction of the assembled gate can be carried out with

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案に係る門の支柱固定具の斜視
図、第2図イは第1図の一部切欠した背面観察の
斜視図、同図ロ及びハは同様他の実施例を示す斜
視図、第3図は要部実施例を示す斜視図である。
第4図は実施例を示す組立門の説明図である。 図中番号1は基台、2は補助型枠、3は補強連
結板、4は連結板、5は連結孔を示し、記号Aは
支柱固定具全体、Gは門、Wは塀をそれぞれ示
す。
Fig. 1 is a perspective view of a gate post fixing device according to the present invention, Fig. 2 A is a partially cutaway perspective view of the rear view of Fig. 1, and B and C are perspective views showing other embodiments. FIG. 3 is a perspective view showing the main part of the embodiment.
FIG. 4 is an explanatory diagram of an assembly gate showing an embodiment. In the figure, number 1 is the base, 2 is the auxiliary formwork, 3 is the reinforcing connecting plate, 4 is the connecting plate, 5 is the connecting hole, the symbol A is the entire support fixture, G is the gate, and W is the fence. .

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 門の左右両支柱の下部を、水平に支持して埋設
される基礎構造において、門正面に向い前後方向
に平行に配設された補助型枠2の外側に、予め複
数のボルト孔41を穿設した支柱用連結板4を上
方垂直に立設するとともに、内側に支柱10下端
面を載置するようにした断面エ型な基台1を設け
て、補助型枠2と連結板4と基台1とが一体とな
るように固定されて、外観的に略逆T字状に構成
された一対の固定具A,Aが、それぞれの支柱下
部を受け、且つ両支柱の左右外側面に沿つて連結
してなることを特徴とする門の支柱固定具。
A plurality of bolt holes 41 are pre-drilled on the outside of the auxiliary formwork 2, which faces the front of the gate and is arranged in parallel in the front-rear direction, in a foundation structure that is buried while horizontally supporting the lower parts of both the left and right pillars of the gate. The supporting column connecting plate 4 is vertically placed upward, and a base 1 having an E-shaped cross section on which the lower end surface of the supporting column 10 is placed inside is provided, and the auxiliary formwork 2, the connecting plate 4, and the base are installed vertically upward. A pair of fixtures A, A, which are fixed integrally with the base 1 and have an approximately inverted T-shape in appearance, receive the lower part of each pillar and extend along the left and right outer surfaces of both pillars. A gate support fixture characterized by being connected to each other.
JP3451982U 1982-03-11 1982-03-11 gate post fixings Granted JPS58137793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3451982U JPS58137793U (en) 1982-03-11 1982-03-11 gate post fixings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3451982U JPS58137793U (en) 1982-03-11 1982-03-11 gate post fixings

Publications (2)

Publication Number Publication Date
JPS58137793U JPS58137793U (en) 1983-09-16
JPH0113751Y2 true JPH0113751Y2 (en) 1989-04-21

Family

ID=30046004

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3451982U Granted JPS58137793U (en) 1982-03-11 1982-03-11 gate post fixings

Country Status (1)

Country Link
JP (1) JPS58137793U (en)

Also Published As

Publication number Publication date
JPS58137793U (en) 1983-09-16

Similar Documents

Publication Publication Date Title
US2664740A (en) Panel wall joint
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP3682588B2 (en) Building member connection structure of H-shaped steel continuous foundation beam
JPH0113751Y2 (en)
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JP2860490B2 (en) Building Steel Foundation
JPH04254646A (en) Steel framed reinforced concrete beam
JP2860501B2 (en) Concrete foundation
JP2577973B2 (en) How to build a building with a basement
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
JPH02296915A (en) Construction method for steel pipe pile head connection part
JPH05195539A (en) Steel-framed column base
KR102585526B1 (en) Composite frame with end-buried girder joint
JPH0881918A (en) Pipe and construction method thereof
JP2869764B2 (en) Reservoir construction method
JP2784450B2 (en) Reinforced concrete foundation
JPS637649Y2 (en)
JP2784449B2 (en) Steel reinforced concrete foundation
JP2540375B2 (en) Basic structure of building
JPH06299591A (en) Storm water storage tank
JPS6278333A (en) High building
JPS605748B2 (en) Construction method for walls using unit steel formwork
SU1038422A1 (en) Pillar foundation
JPH06129102A (en) Pillar form
JP3232487B2 (en) Construction method of column base and column base structure