JP7492446B2 - TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM - Google Patents

TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM Download PDF

Info

Publication number
JP7492446B2
JP7492446B2 JP2020197200A JP2020197200A JP7492446B2 JP 7492446 B2 JP7492446 B2 JP 7492446B2 JP 2020197200 A JP2020197200 A JP 2020197200A JP 2020197200 A JP2020197200 A JP 2020197200A JP 7492446 B2 JP7492446 B2 JP 7492446B2
Authority
JP
Japan
Prior art keywords
deadline
screen
task
status
item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020197200A
Other languages
Japanese (ja)
Other versions
JP2021144691A (en
Inventor
隆憲 森
拓也 佐本
貴裕 橋野
晃弘 二村
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Publication of JP2021144691A publication Critical patent/JP2021144691A/en
Application granted granted Critical
Publication of JP7492446B2 publication Critical patent/JP7492446B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、タスク管理装置、タスク管理方法およびタスク管理プログラムに関する。 The present invention relates to a task management device, a task management method, and a task management program.

展開している事業やサービスごとで発生するタスク(例えば、お金の支払い、定期メンテナンスなど、設定された期日までに行う必要がある業務全般)の期日を管理する際、期日に紐づく様々な属性情報(例えば、タスクにかかる負荷、金額の受払、人件費、サービスの種別など)は、当該管理から切り離されており、表計算ソフトにより個別に管理されていた。 When managing deadlines for tasks that arise for each business or service being developed (for example, payments, regular maintenance, or any other work that needs to be done by a set date), various attribute information linked to the deadlines (for example, the workload of the task, payments and receipts, labor costs, type of service, etc.) was separated from the management and managed separately in a spreadsheet software.

特許文献1には、タスクの期日に人材配置に関する属性を組み合わせて、計画策定、タスクに対する要員の割当、及び、タスク実施段階の監視・制御を支援することができる方法について記載されている。 Patent document 1 describes a method that can combine attributes related to personnel allocation with task due dates to assist in planning, the allocation of personnel to tasks, and the monitoring and control of the task execution phase.

特開2019-032785号公報JP 2019-032785 A

しかしながら、期日と期日以外の属性情報を切り離して管理すると、収益予想や人材配置などを行う際、期日と期日以外の属性情報を組み合わせるための二重入力が発生してしまい、余計な手間がかかるという問題点があった。 However, if deadlines and other attribute information were managed separately, double entry would be required to combine deadlines and other attribute information when making revenue forecasts or allocating personnel, resulting in unnecessary work.

本発明は、上記に鑑みてなされたものであって、汎用的な任意の属性項目をタスクの期日と紐付けて管理することができるタスク管理装置、タスク管理方法およびタスク管理プログラムを提供することを目的とする。 The present invention has been made in consideration of the above, and aims to provide a task management device, a task management method, and a task management program that can link any general-purpose attribute item to a task's due date and manage it.

上述した課題を解決し、目的を達成するために、本発明に係るタスク管理装置は、制御部を備えるタスク管理装置であって、前記制御部は、一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御手段と、管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御手段と、所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成手段と、を備えること、を特徴とする。 In order to solve the above-mentioned problems and achieve the object, the task management device according to the present invention is a task management device having a control unit, and the control unit is characterized by comprising: a first screen control means for displaying a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, the categories to which the tasks belong, and all of the multiple deadlines to be managed; a second screen control means for acquiring items associated with the categories set on the first screen from a master that manages the items to be managed by category, and displaying a second screen on which the first deadline specified by the deadline specification information set on the first screen and the acquired items are displayed and on which the status regarding the implementation of the task and the item value of each item can be set; and a generation means for generating management data including the tasks set on the first screen, the item values set on the second screen, part of the deadline specification information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen when a specified event occurs and the status of not being implemented is set on the second screen, for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen.

また、本発明に係るタスク管理装置において、前記生成手段は、前記所定のイベントが発生した場合において、前記第二画面に実施済または実施中止のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、前記第二画面に表示されている期日、および当該設定されているステータスを含む管理データを生成し、前記第二画面制御手段は、前記所定のイベントが発生した場合において、前記第二画面に実施済または実施中止のステータスが設定されているときは、前記第二画面に表示されている期日を、前記第一画面に設定された期日特定情報で特定される次回の期日に変更すると共に、当該設定されているステータスを未実施のステータスに変更すること、を特徴とする。 In the task management device according to the present invention, when the specified event occurs and a status of completed or canceled is set on the second screen, the generation means generates management data including the task set on the first screen, the item value set on the second screen, part of the deadline specification information set on the first screen, the deadline displayed on the second screen, and the set status, and when the specified event occurs and a status of completed or canceled is set on the second screen, the second screen control means changes the deadline displayed on the second screen to the next deadline specified by the deadline specification information set on the first screen and changes the set status to a status of not completed.

また、本発明に係るタスク管理装置において、前記マスタは、管理対象とする項目と項目値の入力可否設定とをカテゴリ別に管理し、前記第二画面制御手段は、前記マスタから、前記第一画面に設定されたカテゴリに紐付く入力可否設定をさらに取得し、各項目の項目値の入力可否が当該取得した入力可否設定に応じて制御された前記第二画面を表示させること、を特徴とする。 In the task management device according to the present invention, the master manages the items to be managed and the input availability settings of the item values by category, and the second screen control means further acquires from the master the input availability settings linked to the categories set on the first screen, and displays the second screen in which the input availability of the item values of each item is controlled according to the acquired input availability settings.

また、本発明に係るタスク管理装置において、前記制御部は、未実施のステータスを含む前記管理データを対象に、現日付が、前記管理データに含まれる期日からタスクに応じて設定された日数分前の日付から、当該期日の直前の日付までの期間に該当する場合は、警告の通知を行い、現日付が当該期日である場合は、期日当日である旨の通知を行い、現日付が当該期日の直後の日付以降の日付である場合は、期日超過である旨の通知を行う通知手段をさらに備えること、を特徴とする。 In the task management device according to the present invention, the control unit is further characterized by having a notification means for notifying the user of the management data including an unexecuted status when the current date falls within the period from the date before the deadline included in the management data by the number of days set according to the task to the date immediately prior to the deadline, notifying the user that the deadline is approaching if the current date is the deadline, and notifying the user that the deadline has passed if the current date is a date after the date immediately following the deadline.

また、本発明に係るタスク管理装置において、前記制御部は、前記管理データを基に分析処理を実行する分析手段をさらに備えること、を特徴とする。 In the task management device according to the present invention, the control unit is further characterized by having an analysis means for performing an analysis process based on the management data.

また、本発明に係るタスク管理装置において、前記管理データは、項目値としてタスクに対する業務負荷とタスクの担当者を含み、前記分析処理は、業務負荷を担当者別且つ期日別に分析する処理であること、を特徴とする。 Furthermore, in the task management device according to the present invention, the management data includes, as item values, the workload for a task and the person in charge of the task, and the analysis process is a process of analyzing the workload by person in charge and by deadline.

また、本発明に係るタスク管理装置において、前記管理データは、項目値としてタスクによる収入または支出を含み、前記分析処理は、収入または支出を期日別に分析する処理であること、を特徴とする。 Furthermore, in the task management device according to the present invention, the management data includes income or expenditure by task as an item value, and the analysis process is a process of analyzing income or expenditure by due date.

また、本発明に係るタスク管理装置において、前記管理データは、項目値としてタスクで取り扱う商品または役務、タスクによる収益、タスクによる支払金額、およびタスクに対する業務負荷を含み、前記分析処理は、収益、支払金額、および業務負荷を商品または役務別に分析する処理であること、を特徴とする。 Furthermore, in the task management device according to the present invention, the management data includes, as item values, the product or service handled in the task, the revenue from the task, the payment amount from the task, and the workload for the task, and the analysis process is a process of analyzing the revenue, the payment amount, and the workload for each product or service.

また、本発明に係るタスク管理装置において、前記管理データは、項目値としてタスクに対する業務負荷およびタスクによる収益を含み、前記分析処理は、業務負荷および収益をタスク別に分析する処理であること、を特徴とする。 Furthermore, in the task management device according to the present invention, the management data includes, as item values, the workload for a task and the revenue from the task, and the analysis process is a process of analyzing the workload and revenue by task.

また、本発明に係るタスク管理装置において、前記管理データは、項目値としてタスクに対する業務負荷、タスクによる収益、および派遣先企業を含み、前記分析処理は、負荷および収益を派遣先企業別且つ期日別に分析する処理であること、を特徴とする。 Furthermore, in the task management device according to the present invention, the management data includes, as item values, the workload for a task, the revenue from the task, and the client company, and the analysis process is a process for analyzing the workload and revenue by client company and by deadline.

また、本発明に係るタスク管理方法は、制御部を備える情報処理装置で実行されるタスク管理方法であって、前記制御部で実行される、一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御ステップと、管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御ステップと、所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成ステップと、を含むこと、を特徴とする。 The task management method according to the present invention is a task management method executed by an information processing device having a control unit, and is characterized by including: a first screen control step executed by the control unit to display a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, the category to which the tasks belong, and all of a plurality of deadlines to be managed; a second screen control step to acquire items associated with the category set on the first screen from a master that manages items to be managed by category, and display a second screen on which the first deadline specified by the deadline specification information set on the first screen and the acquired items are displayed and on which the status regarding the implementation of the task and the item value of each item can be set; and a generation step to generate management data including the tasks set on the first screen, the item values set on the second screen, part of the deadline specification information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen when a specified event occurs and the status of not being implemented is set on the second screen, for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen.

また、本発明に係るタスク管理プログラムは、制御部を備える情報処理装置に実行させるためのタスク管理プログラムであって、前記制御部に実行させるための、一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御ステップと、管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御ステップと、所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成ステップと、を含むこと、を特徴とする。 The task management program according to the present invention is a task management program to be executed by an information processing device having a control unit, and is characterized in that it includes a first screen control step for displaying a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, the category to which the tasks belong, and all of a plurality of deadlines to be managed, which is executed by the control unit; a second screen control step for acquiring items associated with the category set on the first screen from a master that manages items to be managed by category, and displaying a second screen on which the first deadline specified by the deadline specification information set on the first screen and the acquired items are displayed and on which the status regarding the implementation of the task and the item value of each item can be set; and a generation step for generating management data including the tasks set on the first screen, the item values set on the second screen, part of the deadline specification information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen, for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen, for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specification information set on the first screen.

本発明によれば、汎用的な任意の属性項目をタスクの期日と紐付けて管理することができるという効果を奏する。 The present invention has the advantage that any generic attribute item can be linked to a task's due date and managed.

図1は、本実施形態の概要を示す図である。FIG. 1 is a diagram showing an outline of this embodiment. 図2は、タスク管理装置100の構成の一例を示すブロック図である。FIG. 2 is a block diagram showing an example of the configuration of the task management device 100. As shown in FIG. 図3は、期日マスタメンテ画面MAの一例を示す図である。FIG. 3 is a diagram showing an example of a due date master maintenance screen MA. 図4は、タスク管理装置100で実行される画面制御処理およびデータ生成処理に関するフローチャートの一例を示す図である。FIG. 4 is a diagram showing an example of a flowchart relating to the screen control process and data generation process executed by the task management device 100. As shown in FIG. 図5は、期日設定画面MBの一例を示す図である。FIG. 5 is a diagram showing an example of the deadline setting screen MB. 図6は、期日管理画面MCの一例を示す図である。FIG. 6 is a diagram showing an example of the due date management screen MC. 図7は、期日管理データ106bの一例を示す図である。FIG. 7 is a diagram showing an example of the deadline management data 106b. 図8は、期日管理画面MCの画面制御処理の一例を示す図である。FIG. 8 is a diagram showing an example of the screen control process of the due date management screen MC. 図9は、タスク管理装置100で実行される分析処理に関するフローチャートの一例を示す図である。FIG. 9 is a diagram illustrating an example of a flowchart relating to the analysis process executed by the task management device 100. 図10は、第一分析データ106cの一例を示す図である。FIG. 10 is a diagram showing an example of the first analysis data 106c. 図11は、第二分析データ106dの一例を示す図である。FIG. 11 is a diagram showing an example of second analysis data 106d. 図12は、第三分析データ106eの一例を示す図である。FIG. 12 is a diagram showing an example of the third analysis data 106e. 図13は、第四分析データ106fの一例を示す図である。FIG. 13 is a diagram showing an example of the fourth analysis data 106f. 図14は、第五分析データ106gの一例を示す図である。FIG. 14 is a diagram showing an example of the fifth analysis data 106g.

以下に、本発明に係るタスク管理装置、タスク管理方法およびタスク管理プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態により本発明が限定されるものではない。 Below, an embodiment of a task management device, a task management method, and a task management program according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the present embodiment.

[1.概要]
ここでは、本実施形態の概要について、図1を参照して説明する。
[1. Overview]
Here, an overview of this embodiment will be described with reference to FIG.

図1は、本実施形態の概要を示す図である。本実施形態では、期日管理の仕組みに汎用的な属性項目(本発明の「管理対象とする項目」に相当)を保持することができる。 Figure 1 is a diagram showing an overview of this embodiment. In this embodiment, the deadline management mechanism can hold general-purpose attribute items (corresponding to the "items to be managed" of the present invention).

オペレータが、期日設定画面(本発明の第一画面に相当)で期日や期日内容(本発明のタスクに相当)などの情報を入力すると、図1に示すような期日管理画面(本発明の第二画面に相当)が表示される。属性項目の具体的な内容を表す属性情報と期日内容の実施状況(本発明の「タスクの実施に関するステータス」に相当)を期日管理画面に入力することで、期日管理データ(本発明の管理データに相当)に属性情報を保持することができる。どの期日管理にどの属性項目を保持させるかについては期日マスタ(本発明のマスタに相当)に予め登録されており、期日設定画面に入力された情報と期日マスタを基にして、入力できる属性項目が自動的にナビゲーションされた期日管理画面が表示される。属性項目として固定項目と任意項目を定義してもよい。固定項目は、例えば(1)金額、(2)負荷、および(3)担当の3つで、これらの項目名は変更できない。任意項目は、項目名を変更して期日マスタに登録することができる。また、期日管理画面の入力制御方式(本発明の入力可否設定に相当)を期日マスタに登録可能であり、これにより、期日管理画面内の使用できない属性情報に入力不可制御をかけることができる。なお、期日設定画面、期日管理画面、期日管理データ、および期日マスタについての詳しい説明は後述する。 When an operator inputs information such as a deadline and deadline contents (corresponding to a task in this invention) on a deadline setting screen (corresponding to a first screen in this invention), a deadline management screen (corresponding to a second screen in this invention) as shown in FIG. 1 is displayed. By inputting attribute information that indicates the specific contents of the attribute items and the implementation status of the deadline contents (corresponding to the "status of task implementation" in this invention) on the deadline management screen, the attribute information can be stored in the deadline management data (corresponding to the management data in this invention). The attribute items to be stored in which deadline management are preregistered in the deadline master (corresponding to the master in this invention), and the deadline management screen is displayed with automatic navigation of the attribute items that can be entered based on the information entered on the deadline setting screen and the deadline master. Fixed items and optional items may be defined as attribute items. Fixed items are, for example, (1) amount, (2) load, and (3) person in charge, and the names of these items cannot be changed. Optional items can be registered in the deadline master by changing the item name. In addition, the input control method for the deadline management screen (corresponding to the input enable/disable setting of the present invention) can be registered in the deadline master, which makes it possible to apply input disable control to attribute information that cannot be used in the deadline management screen. A detailed explanation of the deadline setting screen, deadline management screen, deadline management data, and deadline master will be provided later.

[2.構成]
ここでは、本実施形態に係るタスク管理装置100の構成の一例について、図2等を参照して説明する。図2は、タスク管理装置100の構成の一例を示すブロック図である。
2. Configuration
Here, an example of the configuration of the task management device 100 according to the present embodiment will be described with reference to Fig. 2 etc. Fig. 2 is a block diagram showing an example of the configuration of the task management device 100.

タスク管理装置100は、市販のデスクトップ型パーソナルコンピュータを基に構築したものである。なお、タスク管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The task management device 100 is constructed based on a commercially available desktop personal computer. Note that the task management device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

タスク管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。タスク管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The task management device 100 includes a control unit 102, a communication interface unit 104, a memory unit 106, and an input/output interface unit 108. Each unit included in the task management device 100 is connected to each other so as to be able to communicate with each other via any communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、タスク管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、タスク管理装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、記憶部106に格納されるデータは、例えばサーバ200に格納されてもよい。 The communication interface unit 104 communicatively connects the task management device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the task management device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). The data stored in the memory unit 106 may be stored in the server 200, for example.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that works with a mouse to provide a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

記憶部106には、各種のデータベース、テーブルおよびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs that work in cooperation with the OS (Operating System) to give instructions to the CPU (Central Processing Unit) to perform various processes. The storage unit 106 can be, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, or the like.

記憶部106には、例えば、期日マスタ106a、期日管理データ106b、第一分析データ106c、第二分析データ106d、第三分析データ106e、第四分析データ106f、および第五分析データ106gなどが格納される。 The memory unit 106 stores, for example, a deadline master 106a, deadline management data 106b, first analysis data 106c, second analysis data 106d, third analysis data 106e, fourth analysis data 106f, and fifth analysis data 106g.

図3は、期日マスタメンテ画面MAの一例を示す図である。期日マスタ106a(図示せず)は、期日マスタメンテ画面MAに入力された情報を基に作成され、期日管理に保持させる属性項目と期日管理画面MCにおける属性項目の入力制御方式(例えば、任意項目の入力欄を全角入力可能な「文字型」、カンマ区切り可能な「数値型」、および少数以下の入力が可能な「少数数値型」など)を、例えばカテゴリのコード番号やカテゴリの名称などの期日カテゴリ(本発明の「タスクが属するカテゴリ」に相当)別に管理する。上述した任意項目の項目名は、期日マスタメンテ画面MA上で変更できる。 Figure 3 is a diagram showing an example of a deadline master maintenance screen MA. Deadline master 106a (not shown) is created based on information entered on the deadline master maintenance screen MA, and manages attribute items to be stored in deadline management and the input control method for attribute items on the deadline management screen MC (for example, "text type" that allows full-width input in the input field for optional items, "number type" that allows comma delimiters, and "decimal number type" that allows input of decimals or less) by deadline category (corresponding to the "category to which the task belongs" in the present invention), such as the category code number or category name. The item names of the optional items mentioned above can be changed on the deadline master maintenance screen MA.

図7は、期日管理データ106bの一例を示す図である。期日管理データ106bは、期日管理に保持する属性情報(例えば、期日内容に伴う具体的な金額、負荷の数値、商品の名称など、属性項目の具体的な内容)と期日内容の実施状況を期日内容識別情報(例えば、期日内容の名称など)別且つ期日別に管理する。ここで、本実施形態では「商品」を一例として挙げて説明するが、「役務(サービズ)」でも同様に実施可能である。すなわち、本明細書および図面には、「商品」に対応する実施形態だけでなく、「役務(サービス)」に対応する実施形態も記載されている。 Figure 7 is a diagram showing an example of deadline management data 106b. Deadline management data 106b manages attribute information (e.g., specific content of attribute items such as specific amounts associated with deadline content, load values, and product names) held in deadline management and the implementation status of deadline content by deadline content identification information (e.g., name of deadline content) and by deadline. Here, this embodiment will be described using a "product" as an example, but the same implementation can be implemented for "services." In other words, this specification and drawings describe not only embodiments corresponding to "products," but also embodiments corresponding to "services."

図10から図14は、それぞれ第一分析データ106c(106c1および/または106c2)、第二分析データ106d(106d1および/または106d2)、第三分析データ106e、第四分析データ106f(106f1および/または106f2)、および第五分析データ106g(106g1および/または106g2)の一例を示す図である。これらの詳しい説明は後述する。 Figures 10 to 14 are diagrams showing examples of the first analytical data 106c (106c1 and/or 106c2), the second analytical data 106d (106d1 and/or 106d2), the third analytical data 106e, the fourth analytical data 106f (106f1 and/or 106f2), and the fifth analytical data 106g (106g1 and/or 106g2), respectively. These will be described in detail later.

図2に戻り、制御部102は、タスク管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。 Returning to FIG. 2, the control unit 102 is a CPU or the like that performs overall control of the task management device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing operations based on these stored programs.

制御部102は、機能概念的に、マスタメンテ部102aと、本発明の第一画面制御手段と第二画面制御手段を含む画面制御部102bと、本発明の生成手段に相当する生成部102cと、本発明の通知手段に相当する通知部102dと、本発明の分析手段に相当する分析部102eと、などを備える。 The control unit 102, in terms of its functional concept, comprises a master maintenance unit 102a, a screen control unit 102b including a first screen control means and a second screen control means of the present invention, a generation unit 102c corresponding to the generation means of the present invention, a notification unit 102d corresponding to the notification means of the present invention, and an analysis unit 102e corresponding to the analysis means of the present invention.

マスタメンテ部102aは、期日マスタ106aに、期日マスタメンテ画面MA(図3参照)に入力された情報を格納する。 The master maintenance unit 102a stores the information entered on the deadline master maintenance screen MA (see Figure 3) in the deadline master 106a.

画面制御部102bは、一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための期日設定画面MB(図5参照)を表示させる。 The screen control unit 102b displays a deadline setting screen MB (see FIG. 5) for setting deadline specification information for specifying tasks whose deadlines occur at regular intervals, the category to which the tasks belong, and all of the multiple deadlines to be managed.

画面制御部102bは、期日マスタ106aから、期日設定画面MBに設定されたカテゴリに紐付く項目を取得し、期日設定画面MBに設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な期日管理画面MC(図6参照)を表示させる。具体的には、画面制御部102bは、期日設定画面MBに各情報(具体的には、期日内容識別情報、期日、サイクル識別情報(例えば、月次、隔月、四半期、半期、および年次などのサイクルの範囲や、サイクルとなる日など)、および期日終了日)が入力されると、期日マスタ106aから、入力された期日カテゴリに紐づく属性項目と入力制御方式を取得し、入力された各情報と期日マスタから取得した属性項目が含まれて且つ期日マスタ106aから取得した入力制御方式が反映された期日管理画面MCを表示する。 The screen control unit 102b acquires items linked to the category set in the deadline setting screen MB from the deadline master 106a, and displays the deadline management screen MC (see FIG. 6) on which the first deadline specified by the deadline specification information set in the deadline setting screen MB and the acquired items are displayed and the status of task implementation and the item value of each item can be set. Specifically, when each information (specifically, deadline content identification information, deadline, cycle identification information (e.g., the range of the cycle such as monthly, bimonthly, quarterly, half-yearly, and annual, the day of the cycle, etc.), and the deadline end date) is input to the deadline setting screen MB, the screen control unit 102b acquires attribute items and input control methods linked to the input deadline category from the deadline master 106a, and displays the deadline management screen MC that includes each input information and the attribute items acquired from the deadline master and reflects the input control method acquired from the deadline master 106a.

なお、画面制御部102bは、所定のイベント(例えば期日管理画面MCに設けられている登録ボタンの押下など)が発生した場合において、期日管理画面MCに実施済または実施中止のステータスが設定されているときは、期日管理画面MCに表示されている期日を、期日設定画面MBに設定された期日特定情報で特定される次回の期日に変更すると共に、当該設定されているステータスを未実施のステータスに変更してもよい。また、画面制御部102bは、期日マスタ106aから、期日設定画面MBに設定されたカテゴリに紐付く入力可否設定をさらに取得し、各項目の項目値の入力可否が当該取得した入力可否設定に応じて制御された期日管理画面MCを表示させてもよい。 When a specific event (such as pressing a registration button on the deadline management screen MC) occurs and a status of completed or canceled is set on the deadline management screen MC, the screen control unit 102b may change the deadline displayed on the deadline management screen MC to the next deadline specified by the deadline specification information set on the deadline setting screen MB, and may change the set status to a status of not completed. The screen control unit 102b may further acquire from the deadline master 106a an input availability setting linked to the category set on the deadline setting screen MB, and display a deadline management screen MC in which the input availability of the item value of each item is controlled according to the acquired input availability setting.

生成部102cは、所定のイベント(例えば期日管理画面MCに設けられている登録ボタンの押下など)が発生した場合において、期日管理画面MCに未実施のステータスが設定されているときは、期日設定画面MBに設定されたタスク、期日管理画面MCに設定された項目値、期日設定画面MBに設定された期日特定情報の一部、期日、および当該設定されているステータスを含む期日管理データ106bを、期日管理画面MCに表示されている期日から期日設定画面MBに設定された期日特定情報で特定される最後の期日までの各期日別に生成する。具体的には、生成部102cは、期日管理画面MCに属性情報と「未実施」の実施状況が入力されると、期日管理画面MCに表示されている期日内容識別情報および期日管理画面MCに表示されている期日から期日管理画面MCに表示されている期日終了日(期日内容の最後の期日のこと)までの全ての期日に紐づけて期日管理データ106bに当該属性情報と当該実施状況を展開して格納する展開処理を実行する。 When a predetermined event (such as pressing a registration button on the deadline management screen MC) occurs and a status of "not done" is set on the deadline management screen MC, the generation unit 102c generates deadline management data 106b including the tasks set on the deadline setting screen MB, the item values set on the deadline management screen MC, part of the deadline specification information set on the deadline setting screen MB, the deadline, and the set status for each deadline from the deadline displayed on the deadline management screen MC to the last deadline specified by the deadline specification information set on the deadline setting screen MB. Specifically, when attribute information and the implementation status of "not done" are input to the deadline management screen MC, the generation unit 102c executes an expansion process that expands and stores the attribute information and the implementation status in the deadline management data 106b by linking them to the deadline content identification information displayed on the deadline management screen MC and all deadlines from the deadline displayed on the deadline management screen MC to the deadline end date (the last deadline of the deadline content) displayed on the deadline management screen MC.

なお、生成部102cは、所定のイベントが発生した場合において、期日管理画面MCに実施済または実施中止のステータスが設定されているときは、期日設定画面MBに設定されたタスク、期日管理画面MCに設定された項目値、期日設定画面MBに設定された期日特定情報の一部、期日管理画面MCに表示されている期日、および当該設定されているステータスを含む期日管理データ106bを生成してもよい。具体的には、生成部102cは、期日管理画面MCに属性情報と「未実施」以外の実施状況が入力されると、期日管理画面MCに表示されている期日内容識別情報および期日に紐づけて期日管理データ106bに当該属性情報と当該実施状況を格納してもよい。 When a specified event occurs and a status of completed or canceled is set on the deadline management screen MC, the generating unit 102c may generate deadline management data 106b including the tasks set on the deadline setting screen MB, the item values set on the deadline management screen MC, part of the deadline specific information set on the deadline setting screen MB, the deadline displayed on the deadline management screen MC, and the set status. Specifically, when attribute information and an implementation status other than "not completed" are input on the deadline management screen MC, the generating unit 102c may store the attribute information and the implementation status in the deadline management data 106b in association with the deadline content identification information and the deadline displayed on the deadline management screen MC.

通知部102dは、未実施のステータスを含む期日管理データ106bを対象に、現日付(例えば、当該通知部の動作時が属する日付など)が、期日管理データ106bに含まれる期日からタスクに応じて設定された日数分前の日付から、当該期日の直前の日付までの期間に該当する場合は、警告の通知を行い、現日付が当該期日である場合は、期日当日である旨の通知を行い、現日付が当該期日の直後の日付以降の日付である場合は、期日超過である旨の通知を行う。具体的には、通知部102dは、期日管理データ106bに実施状況が未実施であるレコードが存在する場合、当該レコードに格納されている期日と期日内容識別情報を基に、当該期日内容識別情報で識別される期日の内容が未実施である旨の警告をメールとして送信する。このような処理を実行することで、オペレータに対して未実施の期日内容を期日までに実施するように促すことができる。 The notification unit 102d issues a warning to deadline management data 106b including an incomplete status if the current date (e.g., the date when the notification unit is operating) falls within the period from the date before the deadline included in the deadline management data 106b by the number of days set according to the task to the date immediately before the deadline, issues a notification that it is the deadline if the current date is the deadline, and issues a notification that the deadline has passed if the current date is the date immediately after the deadline or later. Specifically, if there is a record in the deadline management data 106b with an incomplete implementation status, the notification unit 102d sends an email warning that the deadline content identified by the deadline content identification information is incomplete, based on the deadline and deadline content identification information stored in the record. By executing such a process, the operator can be prompted to implement the incomplete deadline content by the deadline.

分析部102eは、期日管理データ106bを基に分析処理を実行する。なお、期日管理データ106bに、項目値としてタスクに対する業務負荷とタスクの担当者が含まれる場合、分析処理は、業務負荷を担当者別且つ期日別に分析する処理でもよい。また、期日管理データ106bに、項目値としてタスクによる収入または支出が含まれる場合、分析処理は、収入または支出を期日別に分析する処理でもよい。また、期日管理データ106bに、項目値としてタスクで取り扱う商品、タスクによる収益、タスクによる支払金額、およびタスクに対する業務負荷が含まれる場合、分析処理は、収益、支払金額、および業務負荷を商品別に分析する処理でもよい。また、期日管理データ106bに、項目値としてタスクに対する業務負荷およびタスクによる収益が含まれる場合、分析処理は、業務負荷および収益をタスク別に分析する処理でもよい。また、期日管理データ106bに、項目値としてタスクに対する業務負荷、タスクによる収益、および派遣先企業が含まれる場合、分析処理は、負荷および収益を派遣先企業別且つ期日別に分析する処理でもよい。 The analysis unit 102e executes an analysis process based on the deadline management data 106b. If the deadline management data 106b includes the workload for a task and the person in charge of the task as item values, the analysis process may be a process of analyzing the workload by person in charge and by deadline. If the deadline management data 106b includes income or expenditure by task as item values, the analysis process may be a process of analyzing income or expenditure by deadline. If the deadline management data 106b includes the product handled by the task, the revenue by the task, the payment amount by the task, and the workload for the task as item values, the analysis process may be a process of analyzing the revenue, the payment amount, and the workload by product. If the deadline management data 106b includes the workload for a task and the revenue by task as item values, the analysis process may be a process of analyzing the workload and revenue by task. Furthermore, if the deadline management data 106b includes the task workload, task revenue, and client company as item values, the analysis process may analyze the workload and revenue by client company and by deadline.

制御部102を構成する各処理部が実行する処理の具体例については、以下に詳細に説明する。 Specific examples of the processing performed by each processing unit constituting the control unit 102 are described in detail below.

[3.処理の具体例]
ここでは、タスク管理装置100で実行される処理の具体例について説明する。なお、本説明では、事前に、図3に示す期日マスタメンテ画面MAへの入力から期日マスタ106aの作成が完了しているものとする。
3. Specific examples of processing
Here, a specific example of the process executed by the task management device 100 will be described. Note that in this description, it is assumed that the creation of the deadline master 106a has been completed in advance by inputting data into the deadline master maintenance screen MA shown in FIG.

[画面制御処理およびデータ生成処理]
まず、タスク管理装置100で実行される画面制御処理およびデータ生成処理の具体例について図4等を参照して説明する。
[Screen control process and data generation process]
First, a specific example of the screen control process and data generation process executed by the task management device 100 will be described with reference to FIG.

まず、オペレータは、期日管理がしたい期日内容と期日を期日設定画面MBに入力する。図5は、期日設定画面MBの一例を示す図である。本説明では、図5右側の入力イメージのように入力されたものとする。 First, the operator inputs the deadline content and deadline for which they wish to manage deadlines into the deadline setting screen MB. Figure 5 shows an example of the deadline setting screen MB. In this explanation, it is assumed that the input is as shown in the input image on the right side of Figure 5.

次に、期日設定画面MBに各情報が入力されると、画面制御部102bは、期日マスタ106aから、属性項目と入力制御方式を取得する(ステップSA1)。具体的には、図3右側の期日マスタメンテ画面MAの入力イメージのように入力されて期日マスタ106aに格納された属性項目と入力制御方式を、期日マスタ106aから取得する。 Next, when each piece of information is entered on the deadline setting screen MB, the screen control unit 102b acquires attribute items and input control methods from the deadline master 106a (step SA1). Specifically, the attribute items and input control methods that are entered as shown in the input image of the deadline master maintenance screen MA on the right side of Figure 3 and stored in the deadline master 106a are acquired from the deadline master 106a.

次に、画面制御部102bは、期日設定画面MBに入力された情報と期日マスタ106aから取得した属性項目が含まれて且つ期日マスタ106aから取得した入力制御方式が反映された期日管理画面MCを表示する(ステップSA2)。図6は、期日管理画面MCの一例を示す図である。本説明では、図6左側に示す期日管理画面MCが表示される。 Next, the screen control unit 102b displays a deadline management screen MC that includes the information entered on the deadline setting screen MB and the attribute items obtained from the deadline master 106a and reflects the input control method obtained from the deadline master 106a (step SA2). Figure 6 is a diagram showing an example of the deadline management screen MC. In this explanation, the deadline management screen MC shown on the left side of Figure 6 is displayed.

次に、オペレータは、図6左側に示す期日管理画面MCに属性情報と実施状況を入力する。本説明では、図6右側の入力イメージのように入力されたものとする。 Next, the operator inputs attribute information and implementation status into the deadline management screen MC shown on the left side of Figure 6. In this explanation, it is assumed that the information is input as shown in the input image on the right side of Figure 6.

次に、期日管理画面MCに各情報が入力されると、生成部102cは、実施状況が「未実施」と入力されているかどうかを確認し、実施状況が「未実施」と入力されていた場合(ステップSA3、Yes)、期日管理データ106bに展開処理を実行する(ステップSA4)。具体的には、まず、図6右側に示す期日管理画面MCに表示されている期日「2020/1/20」に紐づけて、図6右側に示す期日管理画面MCに表示されている各属性情報と実施状況「未実施」を期日管理データ106bに格納する。次に、紐づける期日を期日「2020/1/20」より後の全ての期日(2020/2/20、2020/3/20、・・・、2022/1/20)に展開し、図6右側に示す期日管理画面MCに表示されている各属性情報と実施状況「未実施」を期日管理データ106bに格納する。図7は、期日管理データ106bの一例を示す図である。本説明では、図7に示すように各属性情報と実施状況が期日管理データ106bに格納される。 Next, when each piece of information is input to the deadline management screen MC, the generation unit 102c checks whether the implementation status is "not implemented" and, if the implementation status is "not implemented" (step SA3, Yes), executes an expansion process to the deadline management data 106b (step SA4). Specifically, first, the attribute information displayed on the deadline management screen MC shown on the right side of FIG. 6 and the implementation status "not implemented" are linked to the deadline "2020/1/20" displayed on the deadline management screen MC shown on the right side of FIG. 6, and are stored in the deadline management data 106b. Next, the linked deadline is expanded to all deadlines after the deadline "2020/1/20" (2020/2/20, 2020/3/20, ..., 2022/1/20), and the attribute information displayed on the deadline management screen MC shown on the right side of FIG. 6 and the implementation status "not implemented" are stored in the deadline management data 106b. FIG. 7 is a diagram showing an example of deadline management data 106b. In this description, each attribute information and implementation status is stored in deadline management data 106b as shown in FIG. 7.

一方、生成部102cは、実施状況に「未実施」以外(例えば「実施」または「中止」など)が入力されていた場合(ステップSA3、No)、期日管理データ106bに格納処理を実行する(ステップSA5)。具体的には、図6右側に示す期日管理画面MCに表示されている実施状況が「未実施」ではなく「実施」と入力されていた場合、図6右側に示す期日管理画面MCに表示されている期日「2020/1/20」に紐づけて、図6右側に示す期日管理画面MCに表示されている各属性情報と実施状況「実施」を期日管理データ106bに格納する。この場合、図7上側に示す期日管理データ106bの実施状況は「未実施」ではなく「実施」で格納され、他の期日への展開処理は実行されない。 On the other hand, if a status other than "not implemented" (for example, "implemented" or "cancelled") is entered in the implementation status (step SA3, No), the generation unit 102c executes a storage process in the deadline management data 106b (step SA5). Specifically, if the implementation status displayed in the deadline management screen MC shown on the right side of FIG. 6 is entered as "implemented" instead of "not implemented", each attribute information displayed in the deadline management screen MC shown on the right side of FIG. 6 and the implementation status "implemented" are linked to the deadline "2020/1/20" displayed in the deadline management screen MC shown on the right side of FIG. 6 and stored in the deadline management data 106b. In this case, the implementation status of the deadline management data 106b shown in the upper part of FIG. 7 is stored as "implemented" instead of "not implemented", and the process of expanding to other deadlines is not executed.

また、ステップSA5において、画面制御部102bは、期日管理画面MCに表示されている期日を次の期日に変更すると共に、実施状況を「未実施」に変更する。 In addition, in step SA5, the screen control unit 102b changes the deadline displayed on the deadline management screen MC to the next deadline and changes the implementation status to "not implemented."

図8は、期日管理画面MCの画面制御処理の一例を示す図である。画面制御部102bは、期日管理画面MCを図8左側の状態から図8右側の状態に変更(洗替)して表示する。このような画面制御処理を実行することで、未実施かそれ以外の実施状況かをオペレータに意識させながら期日管理データ106bの登録を行うことができる。 Figure 8 is a diagram showing an example of screen control processing for the deadline management screen MC. The screen control unit 102b changes (refreshes) the deadline management screen MC from the state shown on the left side of Figure 8 to the state shown on the right side of Figure 8 and displays it. By executing such screen control processing, it is possible to register deadline management data 106b while making the operator aware of whether the implementation status is not implemented or is otherwise.

[分析処理]
ここでは、タスク管理装置100で実行される分析処理の具体例について図9等を参照して説明する。分析部102eは、期日管理データ106bを基に分析処理を実行する(ステップSB1)。
[Analysis Processing]
Here, a specific example of the analysis process executed by the task management device 100 will be described with reference to Fig. 9 etc. The analysis unit 102e executes the analysis process based on the deadline management data 106b (step SB1).

図10は、第一分析データ106cの一例を示す図である。分析部102eは、期日管理データ106bを基に、図10に示すような第一分析データ106c(106c1および/または106c2)を作成する。第一分析データ106cは、担当者A、Bの2名が担当したそれぞれの期日内容と、それに伴う担当者の負荷を期日別にまとめたデータである。このように、期日管理に負荷と担当者を組み合わせることで、将来にわたる期日を伴うタスクの担当者別の負荷を把握することが可能となり、急に負荷が増えている部分があれば、別の担当者を充てるなどの対応を事前に行うことが可能である。 Figure 10 is a diagram showing an example of first analysis data 106c. Based on deadline management data 106b, analysis unit 102e creates first analysis data 106c (106c1 and/or 106c2) as shown in Figure 10. First analysis data 106c is data that summarizes the deadline content for each of two people, people A and B, and the associated load on the people by deadline. In this way, by combining load and people in charge with deadline management, it is possible to understand the load for each person in charge of tasks with future deadlines, and if there is an area where the load has suddenly increased, it is possible to take measures in advance, such as assigning a different person in charge.

図11は、第二分析データ106dの一例を示す図である。分析部102eは、期日管理データ106bを基に、図11に示すような第二分析データ106d(106d1および/または106d2)を作成する。第二分析データ106dは、期日内容と、それに伴う収入または支払いの金額を期日別にまとめたデータである。このように、期日管理に金額を組み合わせることで、将来にわたる収支を把握することが可能である。 Figure 11 is a diagram showing an example of second analysis data 106d. Based on the due date management data 106b, the analysis unit 102e creates second analysis data 106d (106d1 and/or 106d2) as shown in Figure 11. The second analysis data 106d is data that summarizes due date details and the associated income or payment amounts by due date. In this way, by combining due date management with amounts, it is possible to grasp income and expenditure into the future.

図12は、第三分析データ106eの一例を示す図である。分析部102eは、期日管理データ106bを基に、図12に示すような第三分析データ106eを作成する。第三分析データ106eは、期日内容と、それに伴う金額、商品、および負荷を組み合わせて、過去10年から未来10年の合計20年における商品状況をまとめたデータである。このように、期日管理に金額、商品、および負荷を組み合わせることで、現状の商品の収支と負荷の関係を分析し、商品の廃止や新商品の設計を行うことが可能である。 Figure 12 is a diagram showing an example of third analysis data 106e. The analysis unit 102e creates third analysis data 106e as shown in Figure 12 based on the due date management data 106b. The third analysis data 106e is data summarizing the product status for a total of 20 years, from the past 10 years to the future 10 years, by combining due date details and the associated amounts, products, and loads. In this way, by combining due date management with amounts, products, and loads, it is possible to analyze the relationship between the current balance of products and loads, and to discontinue products or design new products.

図13は、第四分析データ106fの一例を示す図である。分析部102eは、期日管理データ106bを基に、図13に示すような第四分析データ106f(106f1および/または106f2)を作成する。第四分析データ106fは、各定期メンテナンスの負荷と収益を期日別にまとめて、期日内容ごとに集計したデータである。このように、期日管理に負荷と収益を組み合わせることで、定期メンテナンスの将来予想を行うことが可能である。 Figure 13 is a diagram showing an example of fourth analysis data 106f. The analysis unit 102e creates fourth analysis data 106f (106f1 and/or 106f2) as shown in Figure 13 based on the due date management data 106b. The fourth analysis data 106f is data in which the load and revenue of each scheduled maintenance is compiled by due date and aggregated by due date content. In this way, by combining due date management with the load and revenue, it is possible to make future predictions for scheduled maintenance.

図14は、第五分析データ106gの一例を示す図である。分析部102eは、期日管理データ106bを基に、図14に示すような第五分析データ106g(106g1および/または106g2)を作成する。第五分析データ106gは、派遣業における人員負荷と収益を期日別にまとめて、期日内容ごとに集計したデータである。このように、期日管理に負荷、収益、および派遣先企業を組み合わせることで、派遣先企業の収益効率を比較し、収益効率が落ちている企業があれば、他企業に切り替えるなどの対応を行うことが可能である。 Figure 14 is a diagram showing an example of the fifth analysis data 106g. The analysis unit 102e creates the fifth analysis data 106g (106g1 and/or 106g2) as shown in Figure 14 based on the deadline management data 106b. The fifth analysis data 106g is data that summarizes the personnel load and revenue in the dispatch business by deadline and aggregates it by deadline content. In this way, by combining the load, revenue, and client companies with deadline management, it is possible to compare the profit efficiency of client companies and take measures such as switching to another company if there is a company with a declining profit efficiency.

以上の分析処理により、組み合わせた属性項目に応じて、把握したい指標を視覚化して分析することができる。 The above analysis process allows you to visualize and analyze the indicators you want to understand based on the combined attribute items.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
4. Other embodiments
The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

また、タスク管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Furthermore, with regard to the task management device 100, each component shown in the figure is a functional concept, and does not necessarily have to be physically configured as shown in the figure.

例えば、タスク管理装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じてタスク管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions of the task management device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded on a non-transient computer-readable recording medium that contains programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the task management device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into RAM, and cooperates with the CPU to form the control unit.

また、このコンピュータプログラムは、タスク管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 This computer program may also be stored in an application program server connected to the task management device 100 via any network, and all or part of it may be downloaded as needed.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 In addition, the program for executing the processing described in this embodiment may be stored in a non-transitory computer-readable recording medium, and may also be configured as a program product. Here, the term "recording medium" refers to a memory card, a USB (Universal Serial Bus) memory, a SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), an EEPROM (registered trademark) (Electrically Erasable and Programmable Read Only Memory), a CD-ROM (Compact Disk Read Only Memory), an MO (Magneto-Optical disk), a DVD (Digital Versatile This includes any "portable physical media" such as a Blu-ray (registered trademark) Disc, and a Blu-ray (registered trademark) Disc.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 A "program" is a data processing method written in any language or description method, and may be in any format, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration consisting of multiple modules or libraries, and a program that works in conjunction with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, can use well-known configurations and procedures.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、及び、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、及び、ウェブページ用ファイル等を格納する。 The various databases stored in the memory unit are storage devices such as RAM, ROM, etc., fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files used for various processes and providing websites.

また、タスク管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、タスク管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 The task management device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The task management device 100 may be realized by implementing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the figures, and all or part of them can be functionally or physically distributed and integrated in any unit depending on various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively.

本発明は、特に、期日タスク管理を行う全業界において有用である。 The present invention is particularly useful in all industries where deadline task management is performed.

100 タスク管理装置
102 制御部
102a マスタメンテ部
102b 画面制御部
102c 生成部
102d 通知部
102e 分析部
104 通信インターフェース部
106 記憶部
106a 期日マスタ
106b 期日管理データ
106c 第一分析データ
106d 第二分析データ
106e 第三分析データ
106f 第四分析データ
106g 第五分析データ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Task management device 102 Control unit
102a Master Maintenance Department
102b Screen control unit
102c Generation unit
102d Notification section
102e Analysis unit 104 Communication interface unit 106 Storage unit
106a Due date master
106b Date management data
106c First analysis data
106d Second analysis data
106e Third Analysis Data
106f Fourth Analysis Data
106g Fifth analysis data 108 Input/output interface unit 112 Input device 114 Output device 200 Server 300 Network

Claims (12)

制御部を備えるタスク管理装置であって、
前記制御部は、
一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御手段と、
管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御手段と、
所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成手段と、
を備えること、
を特徴とするタスク管理装置。
A task management device including a control unit,
The control unit is
a first screen control means for displaying a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, categories to which the tasks belong, and all of a plurality of deadlines to be managed;
a second screen control means for acquiring items associated with the categories set on the first screen from a master that manages items to be managed by category, and displaying a second screen on which the initial deadline specified by deadline specification information set on the first screen and the acquired items are displayed and on which a status regarding the implementation of a task and an item value of each item can be set;
a generating means for generating management data including the tasks set on the first screen, the item values set on the second screen, a part of the deadline specifying information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specifying information set on the first screen when a predetermined event occurs and an "unexecuted" status is set on the second screen;
To have
A task management device comprising:
前記生成手段は、前記所定のイベントが発生した場合において、前記第二画面に実施済または実施中止のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、前記第二画面に表示されている期日、および当該設定されているステータスを含む管理データを生成し、
前記第二画面制御手段は、前記所定のイベントが発生した場合において、前記第二画面に実施済または実施中止のステータスが設定されているときは、前記第二画面に表示されている期日を、前記第一画面に設定された期日特定情報で特定される次回の期日に変更すると共に、当該設定されているステータスを未実施のステータスに変更すること、
を特徴とする請求項1に記載のタスク管理装置。
said generating means, when the predetermined event occurs and a status of "completed" or "cancelled" is set on said second screen, generates management data including the task set on said first screen, the item value set on said second screen, a part of the deadline specifying information set on said first screen, the deadline displayed on said second screen, and the set status;
said second screen control means, when said predetermined event occurs and a status of "implemented" or "cancelled" is set on said second screen, changes the due date displayed on said second screen to the next due date specified by the due date specifying information set on said first screen, and changes said set status to a status of "not implemented";
2. The task management device according to claim 1, wherein:
前記マスタは、管理対象とする項目と項目値の入力可否設定とをカテゴリ別に管理し、
前記第二画面制御手段は、前記マスタから、前記第一画面に設定されたカテゴリに紐付く入力可否設定をさらに取得し、各項目の項目値の入力可否が当該取得した入力可否設定に応じて制御された前記第二画面を表示させること、
を特徴とする請求項1または2に記載のタスク管理装置。
The master manages the items to be managed and the input availability settings of the item values by category,
the second screen control means further acquires, from the master, an input availability setting associated with a category set on the first screen, and displays the second screen in which the input availability of an item value of each item is controlled in accordance with the acquired input availability setting;
3. The task management device according to claim 1, wherein:
前記制御部は、
未実施のステータスを含む前記管理データを対象に、現日付が、前記管理データに含まれる期日からタスクに応じて設定された日数分前の日付から、当該期日の直前の日付までの期間に該当する場合は、警告の通知を行い、現日付が当該期日である場合は、期日当日である旨の通知を行い、現日付が当該期日の直後の日付以降の日付である場合は、期日超過である旨の通知を行う通知手段
をさらに備えること、
を特徴とする請求項1から3のいずれか1つに記載のタスク管理装置。
The control unit is
a notification means for notifying a warning when the current date of the management data including an unexecuted status falls within a period from a date before a deadline included in the management data by a number of days set according to a task to a date immediately prior to the deadline, for notifying a fact that the deadline is reached when the current date is the deadline, and for notifying a fact that the deadline has passed when the current date is a date immediately following the deadline or later;
4. The task management device according to claim 1, wherein:
前記制御部は、
前記管理データを基に分析処理を実行する分析手段
をさらに備えること、
を特徴とする請求項1から4のいずれか1つに記載のタスク管理装置。
The control unit is
further comprising an analysis means for performing an analysis process based on the management data;
5. The task management device according to claim 1, wherein:
前記管理データは、項目値としてタスクに対する業務負荷とタスクの担当者を含み、
前記分析処理は、業務負荷を担当者別且つ期日別に分析する処理であること、
を特徴とする請求項5に記載のタスク管理装置。
The management data includes, as item values, a workload for a task and a person in charge of the task;
The analysis process is a process of analyzing the workload by person in charge and by deadline;
6. The task management device according to claim 5,
前記管理データは、項目値としてタスクによる収入または支出を含み、
前記分析処理は、収入または支出を期日別に分析する処理であること、
を特徴とする請求項5に記載のタスク管理装置。
The management data includes income or expenditure by a task as an item value,
The analysis process is a process of analyzing income or expenditure by due date;
6. The task management device according to claim 5,
前記管理データは、項目値としてタスクで取り扱う商品または役務、タスクによる収益、タスクによる支払金額、およびタスクに対する業務負荷を含み、
前記分析処理は、収益、支払金額、および業務負荷を商品または役務別に分析する処理であること、
を特徴とする請求項5に記載のタスク管理装置。
The management data includes, as item values, the goods or services handled in the task, the revenue from the task, the amount of payment for the task, and the workload for the task;
The analysis process is a process of analyzing revenue, payment amount, and workload by product or service;
6. The task management device according to claim 5,
前記管理データは、項目値としてタスクに対する業務負荷およびタスクによる収益を含み、
前記分析処理は、業務負荷および収益をタスク別に分析する処理であること、
を特徴とする請求項5に記載のタスク管理装置。
The management data includes, as item values, a workload for a task and a revenue from the task;
The analysis process is a process of analyzing workload and revenue by task;
6. The task management device according to claim 5,
前記管理データは、項目値としてタスクに対する業務負荷、タスクによる収益、および派遣先企業を含み、
前記分析処理は、負荷および収益を派遣先企業別且つ期日別に分析する処理であること、
を特徴とする請求項5に記載のタスク管理装置。
The management data includes, as item values, the workload for a task, the revenue from the task, and the dispatching company;
The analysis process is a process of analyzing workload and profits by client company and by deadline;
6. The task management device according to claim 5,
制御部を備える情報処理装置で実行されるタスク管理方法であって、
前記制御部で実行される、
一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御ステップと、
管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御ステップと、
所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成ステップと、
を含むこと、
を特徴とするタスク管理方法。
A task management method executed in an information processing device having a control unit,
Executed by the control unit,
a first screen control step of displaying a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, categories to which the tasks belong, and all of a plurality of deadlines to be managed;
a second screen control step of acquiring items associated with the categories set on the first screen from a master that manages items to be managed by category, and displaying a second screen on which the initial deadline specified by deadline specification information set on the first screen and the acquired items are displayed and on which a status regarding the implementation of the task and an item value of each item can be set;
a generating step of generating management data including the task set on the first screen, the item value set on the second screen, a part of the deadline specifying information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specifying information set on the first screen when a predetermined event occurs and an "unexecuted" status is set on the second screen;
containing,
A task management method comprising:
制御部を備える情報処理装置に実行させるためのタスク管理プログラムであって、
前記制御部に実行させるための、
一定の間隔で期日が到来するタスク、タスクが属するカテゴリ、および管理対象とする複数の期日全てを特定するための期日特定情報を設定するための第一画面を表示させる第一画面制御ステップと、
管理対象とする項目をカテゴリ別に管理するマスタから、前記第一画面に設定されたカテゴリに紐付く項目を取得し、前記第一画面に設定された期日特定情報で特定される初回の期日および当該取得した項目が表示されており且つタスクの実施に関するステータスおよび各項目の項目値が設定可能な第二画面を表示させる第二画面制御ステップと、
所定のイベントが発生した場合において、前記第二画面に未実施のステータスが設定されているときは、前記第一画面に設定されたタスク、前記第二画面に設定された項目値、前記第一画面に設定された期日特定情報の一部、期日、および当該設定されているステータスを含む管理データを、前記第二画面に表示されている期日から前記第一画面に設定された期日特定情報で特定される最後の期日までの各期日別に生成する生成ステップと、
を含むこと、
を特徴とするタスク管理プログラム。
A task management program to be executed by an information processing device having a control unit,
To cause the control unit to execute
a first screen control step of displaying a first screen for setting deadline specification information for specifying tasks whose deadlines arrive at regular intervals, categories to which the tasks belong, and all of a plurality of deadlines to be managed;
a second screen control step of acquiring items associated with the categories set on the first screen from a master that manages items to be managed by category, and displaying a second screen on which the initial deadline specified by deadline specification information set on the first screen and the acquired items are displayed and on which a status regarding the implementation of the task and an item value of each item can be set;
a generating step of generating management data including the tasks set on the first screen, the item values set on the second screen, a part of the deadline specifying information set on the first screen, the deadline, and the set status for each deadline from the deadline displayed on the second screen to the last deadline specified by the deadline specifying information set on the first screen when a predetermined event occurs and an "unexecuted" status is set on the second screen;
containing,
A task management program that features:
JP2020197200A 2020-03-12 2020-11-27 TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM Active JP7492446B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020042997 2020-03-12
JP2020042997 2020-03-12

Publications (2)

Publication Number Publication Date
JP2021144691A JP2021144691A (en) 2021-09-24
JP7492446B2 true JP7492446B2 (en) 2024-05-29

Family

ID=77766890

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020197200A Active JP7492446B2 (en) 2020-03-12 2020-11-27 TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM

Country Status (1)

Country Link
JP (1) JP7492446B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092515A (en) 2000-09-18 2002-03-29 Honda Motor Co Ltd Lease management system
JP2015005208A (en) 2013-06-21 2015-01-08 株式会社日立システムズ Office work support device, method, and program

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092515A (en) 2000-09-18 2002-03-29 Honda Motor Co Ltd Lease management system
JP2015005208A (en) 2013-06-21 2015-01-08 株式会社日立システムズ Office work support device, method, and program

Also Published As

Publication number Publication date
JP2021144691A (en) 2021-09-24

Similar Documents

Publication Publication Date Title
JP7079673B2 (en) Cost-bearing department setting device, cost-bearing department setting method and cost-bearing department setting program
JP7389849B2 (en) Information processing device, information processing method, and information processing program
JP7492446B2 (en) TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM
JP2020194397A (en) Journal approval work support device, journal approval work support method and journal approval work support program
JP7170801B2 (en) Project management device, project management method, and project management program
JP6830835B2 (en) Personnel cost allocation device, personnel cost allocation method and personnel cost allocation program
JP2020004213A (en) Sales transfer classification apparatus, sales transfer classification method and sales transfer classification program
JP7104817B2 (en) Voucher registration control device, voucher registration control method, and voucher registration control program
JP7220041B2 (en) Sales management device, sales management method, and sales management program
JP7470000B2 (en) Profit and Loss Management Simulation Device, Profit and Loss Management Simulation Method, and Profit and Loss Management Simulation Program
JP7324162B2 (en) Cost output device, cost output method, and cost output program
JP7461853B2 (en) Information processing device, information processing method, and information processing program
JP7499171B2 (en) Apparatus for managing work results by job responsibilities, method for managing work results by job responsibilities, and program for managing work results by job responsibilities
JP7406464B2 (en) Inspection date data generation device, inspection date data generation method, and inspection date data generation program
JP7394716B2 (en) Inspection schedule data generation device, inspection schedule data generation method, and inspection schedule data generation program
JP7514776B2 (en) Logistics cost management system, logistics cost management method, and logistics cost management program
JP7248752B2 (en) Accounting device, accounting method and accounting program
JP7492450B2 (en) Sales planning support device, sales planning support method, and sales planning support program
JP6747668B2 (en) Business application construction support system and program
JP7428608B2 (en) Project management device, project management method, and project management program
JP7499150B2 (en) Business support device, business support method, and program
JP7481193B2 (en) Procurement management device, procurement management method, and procurement management program
JP6850162B2 (en) Business data change check device, business data change check method, and business data change check program
JP2018112988A (en) Journaling preparation device, journaling preparation method, and journaling preparation program
JP2022041261A (en) Analysis code based balance management system, analysis cade based balance management method, and analysis code based balance management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231108

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240423

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240517

R150 Certificate of patent or registration of utility model

Ref document number: 7492446

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150