JP7492407B2 - Business Support System - Google Patents

Business Support System Download PDF

Info

Publication number
JP7492407B2
JP7492407B2 JP2020138516A JP2020138516A JP7492407B2 JP 7492407 B2 JP7492407 B2 JP 7492407B2 JP 2020138516 A JP2020138516 A JP 2020138516A JP 2020138516 A JP2020138516 A JP 2020138516A JP 7492407 B2 JP7492407 B2 JP 7492407B2
Authority
JP
Japan
Prior art keywords
past
prediction
support system
business support
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020138516A
Other languages
Japanese (ja)
Other versions
JP2022034697A (en
Inventor
晃治 陰山
智裕 山本
秀之 田所
茂寿 崎村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2020138516A priority Critical patent/JP7492407B2/en
Priority to PCT/JP2021/015986 priority patent/WO2022038832A1/en
Publication of JP2022034697A publication Critical patent/JP2022034697A/en
Application granted granted Critical
Publication of JP7492407B2 publication Critical patent/JP7492407B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、機械学習の予測値に基づき業務計画を策定する管理者を支援する業務支援システム及び業務支援方法に関する。 The present invention relates to a business support system and a business support method that support managers who formulate business plans based on machine learning predictions.

機械学習であるニューラルネットワークやディープラーニング、重回帰分析など統計的な予測モデルを用いて予測値を求める予測システムが、様々な分野において実用化されつつある。これらの予測モデルは、あらかじめ学習段階に入力項目と出力項目の値が揃った学習データを与え、予測モデルの計算値ができるだけ合致するように予測モデル内のパラメータの値を適切な値に調節する。その後、予測段階ではこの予測モデルに入力項目の値を与え、予測値を計算する。 Prediction systems that use machine learning neural networks, deep learning, multiple regression analysis, and other statistical prediction models to obtain predicted values are being put into practical use in a variety of fields. These prediction models are first given training data with complete values for input and output items in the learning stage, and the parameter values in the prediction model are adjusted to appropriate values so that the calculated values of the prediction model match as closely as possible. Then, in the prediction stage, the values of the input items are given to this prediction model and the predicted value is calculated.

予測モデルは学習段階に与えた学習データとできるだけ合致するように同定されるが、予測値は必ずしも正確ではない。これは、学習データの質や量が十分でない場合などには顕著となる。したがって、予測値を参考にして業務計画を策定する管理者は、予測値をどの程度信頼して良いかを判断することが困難である。また、予測値がどの程度ずれるか予測誤差をおおよそ推測できる場合であっても、それに応じてリソースをどのように配分するかなど業務計画をすぐには立案できない場合もある。 Although the predictive model is identified so as to match the training data provided in the training phase as closely as possible, the predicted values are not always accurate. This is particularly noticeable when the quality or quantity of the training data is insufficient. Therefore, managers who use the predicted values as a reference to formulate business plans find it difficult to determine how much to trust the predicted values. Even if it is possible to roughly estimate the prediction error, or how much the predicted values will deviate, there are cases in which it is not possible to immediately formulate business plans, such as how to allocate resources accordingly.

本技術分野の背景技術として、例えば、特許文献1のような技術がある。特許文献1の下水流入量予測装置では、構成要素として、予測値と予測誤差を記憶する記憶部と、予測ステップ幅決定部とを備える。この構成により、現在の時刻から下水流入量を予測しようとする未来の時刻までの時間長を任意に変化させられるとしている。 As background technology in this technical field, there is, for example, technology such as that described in Patent Document 1. The sewage inflow prediction device in Patent Document 1 comprises, as components, a storage unit that stores predicted values and prediction errors, and a prediction step width determination unit. With this configuration, it is said that it is possible to arbitrarily change the length of time from the current time to the future time at which the sewage inflow is to be predicted.

また、特許文献2の電力予測方法、装置、及びプログラムでは、地点毎の電力データの多数組の乱数データあるいは一地点の時間帯毎の電力データや2時間帯間の相関係数値を再現する多数組の乱数データを発生させ、それらに基づく予測値を度数分布として纏めることが記されている。これにより、電力系統の運用者は、地域の合計発電出力の予測される範囲と確度とを得ることができるとしている。 The power forecasting method, device, and program in Patent Document 2 describe generating multiple sets of random number data for power data for each location, or multiple sets of random number data that reproduces power data for each time period at a location, or correlation coefficient values between two time periods, and compiling predicted values based on these as a frequency distribution. This allows power system operators to obtain the predicted range and accuracy of the total power generation output in the region.

また、特許文献3には、回帰モデルやニューラルネットなどを用いた従来の予測方法において、将来の予測値の誤差を評価するために、エラーバーや標準偏差などを用いることが示されている。(図13等) Patent Document 3 also shows that in conventional prediction methods using regression models and neural networks, error bars and standard deviations are used to evaluate the error of future predicted values (Figure 13, etc.).

特開2016-211877号公報JP 2016-211877 A 特開2014-54048号公報JP 2014-54048 A 特開2010-20442号公報JP 2010-20442 A

しかしながら、上記特許文献1には予測誤差がどの程度であったかをユーザーへ示す機能に関して記載されていない。予測誤差の統計値も示されないため、ユーザーは予測値がどの程度外れる可能性が高いか分からない。 However, the above-mentioned Patent Document 1 does not mention a function for showing the user the extent of the prediction error. Since the statistical values of the prediction error are not shown, the user does not know how likely it is that the predicted value will be off.

また、上記特許文献2は予測値の度数分布であり、誤差の度数分布ではないため、ユーザーは予測値がどの程度外れる可能性が高いかが分からない。 In addition, the above-mentioned Patent Document 2 is a frequency distribution of predicted values, not a frequency distribution of errors, so the user does not know how likely the predicted values are to be off.

また、上記特許文献3のように最大最小や3σを示すエラーバーを用いた場合でも、予測誤差が偏った分布となる可能性があり、ユーザーは予測値がどの程度外れるのか正確に把握することができない。 Even when error bars showing maximum, minimum, or 3σ are used as in Patent Document 3, the distribution of prediction errors may be biased, and users cannot accurately grasp how far the predicted values are off.

したがって、これらの特許文献の技術を用いても、業務計画を策定する管理者は予測値をどの程度信頼して良いか判断できない。まして、リソースを今後どのように配分するかなど業務計画を予測値に基づいてすぐに立案できない。 Therefore, even if the techniques described in these patent documents are used, the manager who formulates the business plan cannot determine the degree to which the predicted values can be trusted. Furthermore, it is not possible to immediately formulate a business plan, such as how to allocate resources in the future, based on the predicted values.

そこで、本発明の目的は、機械学習の予測値に基づく業務計画の策定を支援する業務支援システム及び業務支援方法において、業務計画を策定する管理者が予測値をどの程度信頼して良いかを正確に判断することができ、なおかつ、迅速な業務計画の立案が可能な業務支援システム及び業務支援方法を提供することにある。 The object of the present invention is to provide a business support system and method that supports the formulation of business plans based on machine learning predictions, in which the manager formulating the business plan can accurately determine the degree to which the predictions can be trusted, and in which the business plan can be formulated quickly.

上記課題を解決するために、本発明は、業務計画の策定を支援する業務支援システムにおいて、過去の予測値と過去の実績値、或いは過去の予測値と過去の実績値から算出された過去の予測誤差を記憶する記憶部と、過去の予測誤差を統計処理し、予測誤差統計処理結果を求める統計解析部と、前記統計解析部で求めた予測誤差統計処理結果を将来の予測値に加減算して予測誤差反映予測値を求める予測誤差反映予測値計算部と、前記予測誤差反映予測値計算部で求めた予測誤差反映予測値を表示する表示部と、前記表示部において上下へ移動可能であるとともにユーザの推測値を示す図形を重畳表示し、前記図形の位置に応じて将来の業務計画を自動計算する業務計画自動計算部と、前記業務計画自動計算部で自動計算された将来の業務計画を表示する画面と、を備え、前記業務計画自動計算部で自動計算された将来の業務計画により影響を受けるデータを前記表示部に表示することを特徴とする。 In order to achieve the above object, the present invention provides a business support system for supporting the formulation of business plans, comprising: a memory unit for storing past predicted values and past actual values, or past prediction errors calculated from past predicted values and past actual values; a statistical analysis unit for statistically processing past prediction errors to obtain a prediction error statistical processing result; a prediction error reflected prediction value calculation unit for adding/subtracting the prediction error statistical processing result obtained by the statistical analysis unit to/from a future predicted value to obtain a prediction error reflected prediction value; a display unit for displaying the prediction error reflected prediction value obtained by the prediction error reflected prediction value calculation unit ; an automatic business plan calculation unit for superimposing a figure that is vertically movable on the display unit and indicates a user's estimated value and automatically calculates a future business plan in accordance with the position of the figure; and a screen for displaying the future business plan automatically calculated by the automatic business plan calculation unit, wherein data that will be affected by the future business plan automatically calculated by the automatic business plan calculation unit is displayed on the display unit .

本発明によれば、機械学習の予測値に基づく業務計画の策定を支援する業務支援システム及び業務支援方法において、業務計画を策定する管理者が予測値をどの程度信頼して良いかを正確に判断することができ、なおかつ、迅速な業務計画の立案が可能な業務支援システム及び業務支援方法を実現することができる。 According to the present invention, in a business support system and a business support method that support the formulation of business plans based on machine learning prediction values, a manager who formulates the business plan can accurately determine the degree to which the predicted values can be trusted, and a business support system and a business support method that enable rapid formulation of business plans can be realized.

上記した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。 Problems, configurations, and advantages other than those described above will become clear from the description of the embodiments below.

本発明の実施例1に係る業務支援システムの機能ブロック図である。1 is a functional block diagram of a task support system according to a first embodiment of the present invention; 予測誤差のヒストグラムを予測値とともに表示した表示部の例である。13 is an example of a display showing a histogram of prediction errors together with predicted values. 1日における予測誤差の度数(頻度)をヒストグラムで表示した例である。13 is an example of a histogram showing the frequency of forecast errors in one day. 度数分布を示す表示例である。13 is a display example showing a frequency distribution. 本発明の実施例2に係る業務支援システムの機能ブロック図である。FIG. 11 is a functional block diagram of a task support system according to a second embodiment of the present invention. 上下へ自由に移動できる図形(正方形)を重畳表示した表示部の例である。This is an example of a display unit that displays a superimposed figure (square) that can be freely moved up and down. 自動計算された将来の業務計画を表示した表示部の例である。13 is an example of a display unit showing an automatically calculated future business plan. 自動計算された将来の業務計画により影響を受けるデータを表示した表示部の例である。1 is an example of a display showing data that is affected by an automatically calculated future business plan.

以下、図面を用いて本発明の実施例を説明する。各図面において同一の構成については同一の符号を付し、重複する部分についてはその詳細な説明は省略する。 Below, an embodiment of the present invention will be described with reference to the drawings. In each drawing, the same components are given the same reference numerals, and detailed descriptions of overlapping parts will be omitted.

なお、本発明の業務支援システムが支援する対象の業務は、具体的には貨物の配送業務、プラントや装置の運転業務などが挙げられるが、予測値を参考にして将来の業務計画を決定する業務であればこれらに限定されない。 The tasks that the business support system of the present invention can support include, specifically, cargo delivery tasks and plant and equipment operation tasks, but are not limited to these as long as they involve determining future business plans based on predicted values.

図1から図4を参照して、本発明の実施例1に係る業務支援システム及び業務支援方法について説明する。 The business support system and business support method according to the first embodiment of the present invention will be described with reference to Figures 1 to 4.

図1は、本実施例の業務支援システムの全体構成を示す図である。先ず、記憶部10に記憶されていた過去の予測誤差12は統計解析部14に与えられる。また、過去に機械学習などの手法で学習を実施した際の日時データを記憶している学習時期記憶部32からは、予測モデルの学習時期34が特定期間設定部28に与えられる。 Figure 1 is a diagram showing the overall configuration of the business support system of this embodiment. First, the past prediction errors 12 stored in the memory unit 10 are provided to the statistical analysis unit 14. In addition, the learning time memory unit 32, which stores date and time data when learning was performed in the past using a method such as machine learning, provides the learning time 34 of the prediction model to the specific period setting unit 28.

特定期間設定部28には予測モデルの学習時期34が表示されるとともに、それを参考にして管理者が特定期間設定入力値30を入力できる画面が表示される。入力した特定期間設定入力値30は統計解析部14に与えられる。 The specific period setting unit 28 displays the learning time 34 of the prediction model, and also displays a screen on which the administrator can refer to and input the specific period setting input value 30. The input specific period setting input value 30 is provided to the statistical analysis unit 14.

統計解析部14は、特定期間設定入力値30に対応する時期のデータを過去の予測誤差12の中から取り出して統計解析する。その結果として得られた予測誤差統計処理結果16は予測誤差反映予測値計算部18に与えられる。予測誤差反映予測値計算部18には、予測部26で予測された将来の予測値20も与えられる。予測部26は基準となる時刻より将来の予測値を出力する。 The statistical analysis unit 14 extracts data for a period corresponding to the specific period setting input value 30 from the past prediction errors 12 and performs statistical analysis. The resulting prediction error statistical processing result 16 is provided to the prediction error reflected prediction value calculation unit 18. The prediction error reflected prediction value calculation unit 18 is also provided with the future prediction value 20 predicted by the prediction unit 26. The prediction unit 26 outputs a future prediction value from a reference time.

予測誤差反映予測値計算部18では、将来の予測値20に予測誤差統計処理結果16を加減算して予測誤差反映予測値22を求め、表示部24に与える。表示部24では、予測誤差反映予測値22を画面に表示する。例えば、一方の軸が時間(日数)であり、他方の軸が将来の予測誤差反映予測値22であるグラフを表示する。これにより、管理者は過去の予測誤差の統計値を加味した予測値を知ることができ、業務計画をより的確に策定することができる。 The forecast error reflected forecast value calculation unit 18 adds/subtracts the forecast error statistical processing result 16 to/from the future forecast value 20 to obtain the forecast error reflected forecast value 22, which is provided to the display unit 24. The display unit 24 displays the forecast error reflected forecast value 22 on the screen. For example, a graph is displayed in which one axis is time (number of days) and the other axis is the future forecast error reflected forecast value 22. This allows the manager to know the forecast value that takes into account the statistical value of past forecast errors, enabling more accurate formulation of business plans.

また、表示部24には将来の予測値20も与えられ、予測誤差反映予測値計算部18で加減算される前の将来の予測値20も表示する。これにより、管理者は予測誤差がどの程度であったかを知ることができ、予測値をどの程度信頼して良いかを正確に判断することができる。 The display unit 24 is also provided with a future forecast value 20, and also displays the future forecast value 20 before it is added or subtracted by the forecast error reflected forecast value calculation unit 18. This allows the manager to know the extent of the forecast error, and to accurately determine the degree to which the forecast value can be trusted.

上述の例では記憶部10から過去の予測誤差12を統計解析部14に与えてそのまま用いたが、記憶部10には過去の予測値と過去の実績値が記憶されていても良く、その場合には統計解析部14では前処理として過去の予測誤差12を過去の予測値と過去の実績値に基づいて計算し、それを統計解析することでも良い。 In the above example, the past prediction error 12 was provided from the memory unit 10 to the statistical analysis unit 14 and used as is, but the memory unit 10 may store past predicted values and past actual values. In that case, the statistical analysis unit 14 may calculate the past prediction error 12 based on the past predicted values and past actual values as preprocessing, and perform statistical analysis on the calculated value.

実績値記憶部43に記憶されている過去の時点での実績値45も表示部24に与えられる。また、予測値記憶部42に記憶されている過去の時点での予測値36も表示部24に与えられる。表示部24には過去の時点での実績値45と過去の時点での予測値36を表示する。これにより、これまで過去にどの程度の精度で将来の予測値20が正しかったかを知ることができる。 Past actual values 45 stored in the actual value storage unit 43 are also provided to the display unit 24. Past predicted values 36 stored in the predicted value storage unit 42 are also provided to the display unit 24. Past actual values 45 and past predicted values 36 are displayed on the display unit 24. This allows the user to know how accurately future predicted values 20 have been correct in the past.

過去の時点での予測値36は、同じ過去の時点であってもどの程度先を予測したかによって複数存在する場合がある。例えば、時間長として10分、20分、30分の3期間の将来の予測値20を予測する予測部26がある場合、昨日12時00分の段階では12時10分、12時20分、12時30分の3つの将来の予測値20が得られたことになる。その10分後の12時10分には、12時20分、12時30分、12時40分の3つの将来の予測値20が得られたことになる。 There may be multiple predicted values 36 for the same past point in time, depending on how far into the future the prediction is made. For example, if there is a prediction unit 26 that predicts future predicted values 20 for three time periods of 10 minutes, 20 minutes, and 30 minutes, then at 12:00 yesterday, three future predicted values 20 were obtained: 12:10, 12:20, and 12:30. Ten minutes later, at 12:10, three future predicted values 20 were obtained: 12:20, 12:30, and 12:40.

これらの将来の予測値20をすべて表示部24に表示すると画面が煩雑となるため、一部の情報のみに絞って表示するのも良い。これにより、情報の把握が容易になると同時に、勘違いや見誤り発生のリスクを低減できる。情報の絞り方の一つとして以下に時間長を一定とする方法について述べるが、絞り方はこれのみに限定されない。 Displaying all of these future forecast values 20 on the display unit 24 would make the screen cluttered, so it is also a good idea to limit the information to only a portion of the information. This makes it easier to understand the information and reduces the risk of misunderstandings or misreadings. One way to limit the information is to keep the time length constant, as described below, but this is not the only way to narrow it down.

一定の時間長50を設定するのが、対象データ時間長設定部48である。対象データ時間長設定部48で設定された時間長50は表示部24に与えられる。例えば時間長50を10分と設定すると、表示部24で昨日12時30分の箇所には12時20分に10分後を予測した将来の予測値20を表示し、12時10分に20分後を予測した将来の予測値20や12時00分に30分後を予測した将来の予測値20があっても画面には表示しない。 The target data time length setting unit 48 sets a fixed time length 50. The time length 50 set by the target data time length setting unit 48 is given to the display unit 24. For example, if the time length 50 is set to 10 minutes, the display unit 24 will display a future predicted value 20 predicted for 10 minutes from now at 12:20 in the location of 12:30 yesterday, but will not display a future predicted value 20 predicted for 20 minutes from now at 12:10 or a future predicted value 20 predicted for 30 minutes from now at 12:00 on the screen.

予測誤差統計処理結果記憶部38が記憶している過去の時点での予測誤差統計処理結果40は過去時点予測誤差反映予測値計算部44に与えられる。過去時点予測誤差反映予測値計算部44には予測値記憶部42から過去の時点での予測値36も与えられる。過去時点予測誤差反映予測値計算部44では過去の時点での予測値36に過去の時点での予測誤差統計処理結果40を加減算することによって過去時点予測誤差反映予測値46を求め、表示部24に与える。表示部24では、この過去時点予測誤差反映予測値46を画面上に表示する。これにより、過去の時点での過去時点予測誤差反映予測値46がどのように推移したかを知ることができる。 The prediction error statistical processing results 40 at past times stored in the prediction error statistical processing result storage unit 38 are provided to the past prediction error reflected predicted value calculation unit 44. The past prediction error reflected predicted value calculation unit 44 is also provided with the predicted value 36 at the past time from the predicted value storage unit 42. The past prediction error reflected predicted value calculation unit 44 calculates the past prediction error reflected predicted value 46 by adding or subtracting the prediction error statistical processing results 40 at the past time to the predicted value 36 at the past time, and provides this to the display unit 24. The display unit 24 displays this past prediction error reflected predicted value 46 on the screen. This makes it possible to know how the past prediction error reflected predicted value 46 has changed at past times.

ここで、過去時点予測誤差反映予測値計算部44に与えられる過去の時点での予測誤差統計処理結果40は実績値記憶部43に記憶されている過去の時点での実績値45と予測値記憶部42に記憶されている過去の時点での予測値36を統計処理した結果でも良い。 Here, the past prediction error statistical processing result 40 given to the past prediction error reflected prediction value calculation unit 44 may be the result of statistical processing of the past actual value 45 stored in the actual value storage unit 43 and the past predicted value 36 stored in the predicted value storage unit 42.

図2は表示部24の表示画面の一例である。図中上部の下向きの黒塗り三角形が横軸(日数)=0日を示しており、ここが現在の時点を示している。横軸(日数)の0日以降、4日にかけて点線の折れ線で将来の予測値20が表示されている。予測誤差反映予測値22は横軸(日数)の1日、2日、3日、4日の箇所に90度だけ左回転したヒストグラムで表示されている。一方、横軸(日数)が負の値である-4日から0日までの箇所には過去から現在の推移が折れ線で示されており、実線が過去の時点での実績値45、点線が過去の時点での予測値36である。 Figure 2 is an example of the display screen of the display unit 24. The downward black triangle at the top of the figure indicates the horizontal axis (number of days) = 0 days, which indicates the current time point. Future forecast values 20 are displayed as dotted lines from 0 days on the horizontal axis (number of days) to 4 days. Forecast error-reflecting forecast values 22 are displayed as a histogram rotated 90 degrees left at the 1st, 2nd, 3rd, and 4th days on the horizontal axis (number of days). Meanwhile, in the area of the horizontal axis (number of days) from -4 days to 0 days, where the horizontal axis (number of days) has negative values, the trend from the past to the present is shown as a line, with the solid line indicating the actual value at the past point in time 45 and the dotted line indicating the forecast value at the past point in time 36.

この図2においては、横軸(日数)の1日、2日、3日、4日の箇所に表示されたヒストグラムは多くの点が将来の予測値20を示す点線よりも下にある。これは、これまでの過去に得られた実績値が予測モデル(予測部26)で求めた将来の予測値20に比べて低かったことを意味している。 In FIG. 2, many of the histogram points displayed on the horizontal axis (number of days) for 1, 2, 3, and 4 days are below the dotted line indicating the future predicted value 20. This means that the actual values obtained in the past have been lower than the future predicted value 20 calculated by the prediction model (prediction unit 26).

図2中に表示されているヒストグラムは、次の手順で求める。 The histogram shown in Figure 2 is obtained using the following steps:

(1)先ず、ヒストグラムとして描く統計処理の対象となるデータを決める。そのために、特定期間設定部28で特定期間設定入力値30を入力する。ここで解析対象とするデータの期間を設定する。特定期間設定部28には予測モデルの学習時期34が表示される。例えば、前回の予測モデルの学習時期34は3か月前、前々回の予測モデルの学習時期34は1年3か月前、さらにその前の予測モデルの学習時期34は2年6か月前、のように表示される。 (1) First, the data to be subjected to statistical processing and drawn as a histogram is determined. To do this, a specific period setting input value 30 is input in the specific period setting unit 28. Here, the period of the data to be analyzed is set. The specific period setting unit 28 displays the learning period 34 of the prediction model. For example, the learning period 34 of the previous prediction model is displayed as 3 months ago, the learning period 34 of the prediction model before that as 1 year and 3 months ago, and the learning period 34 of the prediction model before that as 2 years and 6 months ago.

管理者はこの情報を参考にして、ヒストグラムの対象となるデータをいつからいつまでのデータとするか特定期間設定部28で入力する。例えば、過去2か月前から1か月前のように期間を設定すると、前回の予測モデルの学習時期34より後の1か月の期間を解析対象と設定できる。 The administrator refers to this information and inputs the period of data to be the subject of the histogram in the specific period setting unit 28. For example, by setting the period from two months ago to one month ago, the one-month period after the previous learning time 34 of the prediction model can be set as the subject of analysis.

(2)統計解析部14では、(1)で設定した特定期間設定入力値30の期間の過去の予測誤差12に対して統計解析を実施する。例えば図2の横軸(日数)が「1日」の箇所に表示されるヒストグラムは、現在から時間長として1日だけ将来を予測した過去の予測誤差12を用いる。過去の予測誤差12の度数分布データの例を表1に示す。 (2) The statistical analysis unit 14 performs statistical analysis on the past prediction errors 12 for the period of the specific period setting input value 30 set in (1). For example, the histogram displayed at "1 day" on the horizontal axis (number of days) in Figure 2 uses past prediction errors 12 predicted for a time length of just one day into the future from the present. An example of frequency distribution data for past prediction errors 12 is shown in Table 1.

Figure 0007492407000001
Figure 0007492407000001

また、表1のデータをヒストグラムとして表示した結果を図3に示す。図3を見ると、貨物数の予測誤差のデータ範囲の最小値は-50[個/日]、最大値は-10[個/日]であることが分かる。予測誤差は平均で-30[個/日]程度でありその周辺の度数が高いため、1日だけ将来の予測値20も-30[個/日]程度だけ将来の予測値20から外れる可能性が高いと推測できる。図2の横軸(日数)が1日の箇所で点線により示された予測値は235[個/日]であるため、実績値は235-30=205[個/日]程度となる可能性が高いと推測できる。このように予測値と図3があれば、将来の予測値20が実際にはどの程度の値となる可能性が高いかを把握することができる。 Figure 3 shows the results of displaying the data in Table 1 as a histogram. Figure 3 shows that the minimum value of the data range for the forecast error of the number of cargoes is -50 [units/day] and the maximum value is -10 [units/day]. Since the forecast error is about -30 [units/day] on average and the frequency around this is high, it can be inferred that the future forecast value 20 is likely to deviate from the future forecast value 20 by about -30 [units/day] for just one day. Since the forecast value indicated by the dotted line at the 1st day on the horizontal axis (number of days) in Figure 2 is 235 [units/day], it can be inferred that the actual value is likely to be about 235-30=205 [units/day]. In this way, with the forecast value and Figure 3, it is possible to understand what the future forecast value 20 is likely to be.

別々の図ではなくこれを一目で把握できるよう、図3のヒストグラムを90度左方向に回転させ、予測誤差のデータ区間の値を将来の予測値20を加えた位置へ配置したのが図2中の横向きのヒストグラムである。 To make it easier to understand at a glance, rather than as separate graphs, the histogram in Figure 3 has been rotated 90 degrees left and the value of the data interval for the prediction error has been placed at a position where 20 future prediction values have been added, resulting in the horizontal histogram in Figure 2.

図3のヒストグラムで最も度数が高い-25[個/日]~-35[個/日]の部分は、図2の中では縦軸(貨物数)が210(=235-25)[個/日]~200(=235-35)[個/日]の位置に表示される。同様に、度数が低い-10[個/日]~-15[個/日]の部分は、図2の縦軸(貨物数)が225(=235-10)[個/日]~220(=235-15)[個/日]の位置に表示される。 The part of the histogram in Figure 3 with the highest frequency, -25 [pieces/day] to -35 [pieces/day], is displayed in Figure 2 at the vertical axis (number of cargoes) position of 210 (= 235-25) [pieces/day] to 200 (= 235-35) [pieces/day]. Similarly, the part with the lowest frequency, -10 [pieces/day] to -15 [pieces/day], is displayed in Figure 2 at the vertical axis (number of cargoes) position of 225 (= 235-10) [pieces/day] to 220 (= 235-15) [pieces/day].

このように90度左方向に回転させたヒストグラムを表示することで、横軸(日数)が1日の箇所では貨物数が205(=235-30)[個/日]程度となる可能性が高いことを一目で把握することができる。 By displaying a histogram rotated 90 degrees left like this, you can see at a glance that where the horizontal axis (number of days) is 1 day, the number of cargoes is likely to be around 205 (= 235 - 30) [pieces/day].

予測誤差のヒストグラムは必ずしも図3で示したような左右対称にはならず、例えば横軸(日数)=4日の箇所で示されるように、度数の高いデータ区間が中央ではなく一方に偏っている場合がある。特許文献3のように、単にエラーバーで予測誤差を表示するとこのような偏りを全く認識ができず、判断を誤る可能性がある。そこで、図2に示すように、ヒストグラムで表示することにより、過去に度数の高かった値が明確となり、より適切な判断が可能となる。 Histograms of forecast errors are not necessarily symmetrical as shown in Figure 3. For example, as shown at the point where the horizontal axis (number of days) is 4 days, the data section with high frequency may be biased to one side rather than in the center. If forecast errors are simply displayed using error bars, as in Patent Document 3, such bias cannot be recognized at all, and there is a risk of making an erroneous judgment. Therefore, by displaying the prediction errors in a histogram as shown in Figure 2, values with high frequency in the past become clear, allowing for a more appropriate judgment.

不十分な量や質の学習データで学習した予測モデルは一般的に精度が低いため、図2で示したヒストグラムの縦方向(予測誤差)の幅は大きく、将来の予測値20からのズレも大きい。時間の経過とともにデータが徐々に増え、それも含めた学習データで再学習を繰り返すと精度が上がり、図2に横向きで示したヒストグラムの幅は小さくなり、将来の予測値20からのズレも小さくなる。 Prediction models trained with training data of insufficient quantity or quality generally have low accuracy, so the vertical width (prediction error) of the histogram shown in Figure 2 is large, and the deviation from the future predicted value of 20 is also large. As time passes, the amount of data gradually increases, and re-learning is repeated using training data that includes this data, resulting in increased accuracy, the width of the histogram shown horizontally in Figure 2 becoming smaller, and the deviation from the future predicted value of 20 becoming smaller.

特定期間設定入力値30を前回の学習後、前々回の学習後、前々回より前の学習後、のように切り替えてヒストグラムの形状やその位置を確認することで、管理者は学習データが蓄積されて学習が進み、どの程度精度が向上しているかを確認することが可能となる。 By checking the shape and position of the histogram by switching the specific period setting input value 30 between after the previous learning, after the learning before last, and after the learning before that, the administrator can check how much accuracy has improved as learning data is accumulated and learning progresses.

図2の横軸(日数)が負の値である-4日から0日までの期間において、実線で示されているのが過去の時点での実績値45、点線で示されているのが過去の時点での予測値36である。過去の時点での予測値36は、例えばそれぞれの時点において時間長として1日だけ将来を予測した値である。この図では、-4日から0日まで過去の時点での実績値45が過去の時点での予測値36よりも小さかったことを示している。 In Figure 2, in the period from -4 to 0 days, where the horizontal axis (number of days) is a negative value, the solid line indicates actual values 45 at past times, and the dotted line indicates predicted values 36 at past times. The predicted values 36 at past times are values predicted for a time length of just one day at each time point. This figure shows that the actual values 45 at past times from -4 to 0 days were smaller than the predicted values 36 at past times.

これら実線と点線で示される折れ線に加え、図2の横軸(日数)が負の値である-4日から0日までに関しては、横軸(日数)が1日から4日までと同様に横向きのヒストグラムで過去時点予測誤差反映予測値46を重畳して表示しても良い。これにより、過去の時点での予測値36に対し、過去の時点での過去時点予測誤差反映予測値46がどのように推移したかを知ることができる。 In addition to the solid and dotted broken lines, for the period from -4 to 0 days when the horizontal axis (number of days) in Figure 2 is a negative value, the past forecast error reflected forecast value 46 may be superimposed and displayed as a horizontal histogram, just as for the period from 1 to 4 days when the horizontal axis (number of days) is a negative value. This makes it possible to see how the past forecast error reflected forecast value 46 at a past point in time has changed compared to the forecast value 36 at a past point in time.

統計解析部14での統計解析としては、上述したヒストグラム以外にも、過去の予測誤差12を対象とするものであれば最大値、最小値、平均値、最頻値、中央値、標準偏差を求める方法でも良い。いずれについても、将来の予測値20に加減算して図2の図中で表示する。最大値と最小値であれば、エラーバーとして表示する。平均値や最頻値、中央値であれば1点あるいは短い1本の線として表示する。標準偏差を使う場合には、平均値から標準偏差の定数倍を減算した値及び平均値に標準偏差の定数倍を加算した値をエラーバーとして表示する。これらのヒストグラム、エラーバー、1点あるいは短い1本の線の表示はいずれも別々にではなく、重複して同時に表示しても良い。 As for the statistical analysis in the statistical analysis unit 14, in addition to the histograms mentioned above, methods of calculating maximum, minimum, average, mode, median, and standard deviation may be used if the past prediction errors 12 are the subject of the analysis. In either case, the results are added to or subtracted from the future prediction value 20 and displayed in the diagram in FIG. 2. In the case of maximum and minimum values, they are displayed as error bars. In the case of average, mode, and median, they are displayed as a single point or a single short line. When standard deviation is used, the value obtained by subtracting a constant multiple of the standard deviation from the average value and the value obtained by adding a constant multiple of the standard deviation to the average value are displayed as error bars. These histograms, error bars, single points, and single short lines may be displayed simultaneously, overlapping each other, rather than separately.

表示部24で表示する度数分布を示す図としては、図4に示すように、例えばヒストグラム、色、色の濃淡、幅の大小、長さの長短、折れ線グラフ、曲線、包絡線などによって表示しても良い。 The frequency distribution displayed on the display unit 24 may be displayed, for example, as a histogram, color, color shading, width, length, line graph, curve, envelope, etc., as shown in FIG. 4.

なお、図1の予測部26は、ニューラルネットワーク、ディープラーニング、重回帰計算のうち少なくとも一つを備えるが、学習データを用いて機械学習する計算手法であればこれらのみには限らない。 Note that the prediction unit 26 in FIG. 1 includes at least one of a neural network, deep learning, and multiple regression calculation, but is not limited to these as long as it is a calculation method that uses machine learning using training data.

以上説明したように、本実施例の業務支援システムは、過去の予測値(過去の時点での予測値36)と過去の実績値(過去の時点での実績値45)、或いは過去の予測値と過去の実績値から算出された過去の予測誤差12を記憶する記憶部(記憶部10,予測値記憶部42,実績値記憶部43)と、過去の予測誤差12を統計処理し、予測誤差統計処理結果16を求める統計解析部14と、統計解析部14で求めた予測誤差統計処理結果16を将来の予測値20に加減算して予測誤差反映予測値22を求める予測誤差反映予測値計算部18と、予測誤差反映予測値計算部18で求めた予測誤差反映予測値22を表示する表示部24を備えている。 As described above, the business support system of this embodiment includes a memory unit (memory unit 10, forecast value memory unit 42, actual value memory unit 43) that stores past forecast values (forecast values at past times 36) and past actual values (actual values at past times 45), or past forecast errors 12 calculated from past forecast values and past actual values, a statistical analysis unit 14 that performs statistical processing on the past forecast errors 12 to obtain a forecast error statistical processing result 16, a forecast error reflected forecast value calculation unit 18 that adds/subtracts the forecast error statistical processing result 16 obtained by the statistical analysis unit 14 to/from a future forecast value 20 to obtain a forecast error reflected forecast value 22, and a display unit 24 that displays the forecast error reflected forecast value 22 obtained by the forecast error reflected forecast value calculation unit 18.

また、本実施例の業務支援方法は、(a)過去の予測値(過去の時点での予測値36)と過去の実績値(過去の時点での実績値45)から過去の予測誤差12を算出するステップと、(b)(a)ステップで算出した過去の予測誤差12を統計処理し、予測誤差統計処理結果16を求めるステップと、(c)(b)ステップで求めた予測誤差統計処理結果16を将来の予測値20に加減算して予測誤差反映予測値22を求めるステップと、(d)(c)ステップで求めた予測誤差反映予測値22を表示部24に表示するステップを有している。 The business support method of this embodiment also includes the steps of (a) calculating past prediction errors 12 from past predicted values (predicted values at past times 36) and past actual values (actual values at past times 45), (b) statistically processing the past prediction errors 12 calculated in step (a) to obtain a prediction error statistical processing result 16, (c) adding or subtracting the prediction error statistical processing result 16 obtained in step (b) to a future predicted value 20 to obtain a prediction error-reflected prediction value 22, and (d) displaying the prediction error-reflected prediction value 22 obtained in step (c) on the display unit 24.

これにより、業務計画を策定する管理者は過去の実績に基づく予測部の予測誤差を把握したうえで、将来の予測値がどの程度の値となるかを容易に推測でき、より適切な業務計画の策定に活用できる。 This allows managers who create business plans to easily estimate what future forecast values will be after understanding the prediction error of the forecasting section based on past performance, allowing them to use this information to create more appropriate business plans.

さらに、管理者は自身で推測した値を図形の移動で設定することで対話的に将来の業務計画を自動計算できるため、業務計画を短時間に策定することができる。 In addition, managers can interactively calculate future business plans by moving shapes to set their own estimated values, allowing them to quickly formulate business plans.

図5から図8を参照して、本発明の実施例2に係る業務支援システム及び業務支援方法について説明する。 The business support system and business support method according to the second embodiment of the present invention will be described with reference to Figures 5 to 8.

図5は、本実施例の業務支援システムの全体構成を示す図である。図5に示す本実施例の業務支援システムは、実施例1(図1)で示した構成要素に、図形位置情報52、業務計画自動計算部54、業務計画56、影響を受けるデータ58が加わっている。その他の構成は、実施例1(図1)と同様である。このうち図形位置情報52について図6を用いて説明する。 Figure 5 is a diagram showing the overall configuration of the business support system of this embodiment. The business support system of this embodiment shown in Figure 5 adds graphic position information 52, automatic business plan calculation unit 54, business plan 56, and affected data 58 to the components shown in Example 1 (Figure 1). The other configurations are the same as those of Example 1 (Figure 1). Of these, graphic position information 52 will be explained using Figure 6.

図6では、横軸(日数)として1日、2日、3日、4日の箇所に正方形が表示されている。この図形は管理者が推測した貨物数を示しており、マウスやキーボード、タッチパネルなどの操作により、それぞれの日において表示部24で上下に移動することができる。図形の形状は正方形には限定されず、異なる形状であっても良い。移動した図形の縦軸(貨物数)の値が図形位置情報52となる。 In FIG. 6, squares are displayed on the horizontal axis (number of days) at the 1st, 2nd, 3rd, and 4th days. This figure shows the number of cargoes estimated by the manager, and can be moved up and down on the display unit 24 for each day by operating the mouse, keyboard, touch panel, etc. The shape of the figure is not limited to a square, and may be a different shape. The value on the vertical axis (number of cargoes) of the moved figure becomes the figure position information 52.

図5に示すように、図形位置情報52は表示部24から業務計画自動計算部54に与えられる。業務計画自動計算部54では図形位置情報52に基づいて業務計画56を計算して表示部24に与える。また、業務計画56によって影響を受けるデータ58も表示部24に与えられて表示される。 As shown in FIG. 5, the graphic position information 52 is provided from the display unit 24 to the automatic business plan calculation unit 54. The automatic business plan calculation unit 54 calculates a business plan 56 based on the graphic position information 52 and provides it to the display unit 24. In addition, data 58 that is affected by the business plan 56 is also provided to the display unit 24 and displayed.

表示部24に表示される業務計画56の例を図7に示す。立案する業務計画56はこの例では稼働させるトラックの運転台数である。図6で示した貨物数に対し、それを配送するトラックが何台必要かを示したものがこの図7である。横軸(日数)として-4日~0日まではトラック運転台数に関する本日を含む過去の実績値が表示されており、横軸(日数)として1日~4日までが将来の業務計画56に相当する。 An example of the business plan 56 displayed on the display unit 24 is shown in Figure 7. In this example, the business plan 56 to be drawn up is the number of trucks to be operated. Figure 7 shows how many trucks are required to deliver the amount of cargo shown in Figure 6. On the horizontal axis (number of days), from -4 days to 0 days, past actual values for the number of trucks in operation, including today, are displayed, and on the horizontal axis (number of days), from 1st to 4th days, corresponds to the future business plan 56.

業務計画56の計算方法にはさまざまな方法があるが、一つの単純な方法としては図形位置情報52によって設定された貨物数をトラック1台あたりの輸送能力で除算し、その値を切り上げて整数化する。図6と図7は同一画面内で同時に表示されることが望ましく、図6中の図形(正方形)を上下へ移動させる操作に応じて図7の業務計画56の表示がリアルタイムで変化することが望ましい。 There are various methods for calculating the business plan 56, but one simple method is to divide the cargo quantity set by the graphic position information 52 by the transport capacity per truck and round up the value to an integer. It is desirable for Figures 6 and 7 to be displayed simultaneously on the same screen, and it is desirable for the display of the business plan 56 in Figure 7 to change in real time in response to the operation of moving the graphic (square) in Figure 6 up and down.

業務計画を策定する管理者は、貨物数の将来の予測値20やその予測値に過去の予測誤差の度数分布を加減算した予測誤差反映予測値22を図6で確認しながら貨物数を推測し、推測数が変わればトラック運転台数が何台になるかを対話的に容易に把握できる。 The manager who formulates the business plan can estimate the number of cargoes while checking the future predicted value 20 of the number of cargoes and the prediction error reflected prediction value 22, which is obtained by adding or subtracting the frequency distribution of past prediction errors to that predicted value, in Figure 6, and can easily understand interactively how many trucks will be in operation if the estimated number changes.

トラックの運転台数が少ないことが望ましい場合、推測数をわずかに小さくすることでトラック運転台数を1台減らすことができるのであれば、推測数を減らした条件での計画を容易に策定できる。逆に、推測数をわずかに大きくすることでトラック運転台数が1台増えるのであれば、リスクを考えて推測数を増やした条件での計画を策定することも可能である。 If it is desirable to have fewer trucks in operation, then if the number of trucks in operation can be reduced by one by slightly reducing the guess number, then it is easy to formulate a plan under the reduced guess number. Conversely, if the number of trucks in operation can be increased by one by slightly increasing the guess number, then it is possible to formulate a plan under the increased guess number, taking into account the risks.

自動計算された将来の業務計画により影響を受けるデータ58の表示例を図8に示す。将来の業務計画により影響を受けるデータ58として、倉庫内在庫貨物の数の推移が折れ線グラフで表示されている。図7と同様に、横軸(日数)として-4日~0日までは倉庫内在庫貨物の本日を含む過去の実績値が表示されている。横軸(日数)として1日~4日までが将来の業務計画56により影響を受けるデータ58である。影響を受けるデータ58の計算方法にはさまざまな方法があるが、単純な方法としては図6の貨物数から図7のトラック運転台数にトラック1台あたりの輸送能力を乗じた値を減算した結果に、その前時刻までの倉庫内在庫貨物を加算した値として計算できる。 Figure 8 shows an example of automatically calculated data 58 affected by future business plans. As data 58 affected by future business plans, the trend in the number of cargo in stock in the warehouse is displayed in a line graph. As in Figure 7, the horizontal axis (number of days) shows past actual values of cargo in stock in the warehouse, including today, from -4 to 0 days. As in Figure 7, the horizontal axis (number of days) shows data 58 affected by future business plans 56 from 1 to 4 days. There are various methods for calculating affected data 58, but a simple method is to subtract the value obtained by multiplying the number of trucks in operation in Figure 7 by the transport capacity per truck from the number of cargo in Figure 6, and then add the cargo in stock in the warehouse up to the previous time.

図8も図6と同一画面内で同時に表示されることが望ましく、図6の図形(正方形)を上下に移動させる操作に応じて図8の影響を受けるデータ58の表示がリアルタイムで変化することが望ましい。 It is desirable that FIG. 8 is also displayed simultaneously with FIG. 6 on the same screen, and that the display of data 58 affected by FIG. 8 changes in real time in response to the operation of moving the figure (square) in FIG. 6 up and down.

影響を受けるデータ58が一項目ではなく複数項目ある場合には、それぞれの項目に関する影響を受けるデータ58のトレンドグラフも同時に同一画面に表示されることが良い。図8の例では倉庫内在庫貨物が表示されているが、業務計画を策定する管理者は図6中の図形(正方形)を上下に移動させながら倉庫内在庫貨物の数の変化を見ることで、倉庫容量の上限値を念頭においたうえで倉庫内在庫貨物の数が適正な水準となるよう、トラック運転台数の計画を策定できる。 When there is not one item but multiple items of affected data 58, it is advisable to simultaneously display trend graphs of the affected data 58 for each item on the same screen. In the example of Figure 8, the cargo stock in the warehouse is displayed, but the manager formulating the business plan can move the figure (square) in Figure 6 up and down to see the change in the number of cargo stock in the warehouse, and can formulate a plan for the number of trucks to be operated so that the number of cargo stock in the warehouse is at an appropriate level, while keeping in mind the upper limit of the warehouse capacity.

以上説明したように、本実施例によれば、自動計算した業務計画によって影響されるデータも表示されるため、実施例1の効果に加えて、表示される業務計画と影響されるデータとを確認しながら推測値を調整できる。 As described above, according to this embodiment, the data affected by the automatically calculated business plan is also displayed, so in addition to the effect of embodiment 1, the estimated value can be adjusted while checking the displayed business plan and the affected data.

なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記の実施例は本発明に対する理解を助けるために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。 The present invention is not limited to the above-described embodiments, but includes various modified examples. For example, the above-described embodiments have been described in detail to aid in understanding the present invention, and are not necessarily limited to those having all of the configurations described. It is also possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations.

10…記憶部
12…過去の予測誤差
14…統計解析部
16…予測誤差統計処理結果
18…予測誤差反映予測値計算部
20…将来の予測値
22…予測誤差反映予測値
24…表示部
26…予測部
28…特定期間設定部
30…特定期間設定入力値
32…学習時期記憶部
34…予測モデルの学習時期
36…過去の時点での予測値
38…予測誤差統計処理結果記憶部
40…過去の時点での予測誤差統計処理結果
42…予測値記憶部
43…実績値記憶部
44…過去時点予測誤差反映予測値計算部
45…過去の時点での実績値
46…過去時点予測誤差反映予測値
48…対象データ時間長設定部
50…時間長
52…図形位置情報
54…業務計画自動計算部
56…業務計画
58…影響を受けるデータ
SYMBOLS WITH SYMBOLS 10... MEMORY UNIT 12... PAST FORECAST ERROR 14... STATISTICAL ANALYSIS UNIT 16... FORECAST ERROR STATISTICAL PROCESSING RESULT 18... FORECAST ERROR REFLECTING FORECAST VALUE CALCULATION UNIT 20... FUTURE FORECAST VALUE 22... FORECAST ERROR REFLECTING FORECAST VALUE 24... DISPLAY UNIT 26... PREDICTION UNIT 28... SPECIFIC PERIOD SETTING UNIT 30... SPECIFIC PERIOD SETTING INPUT VALUE 32... LEARNING TIME MEMORY UNIT 34... LEARNING TIME OF PREDICTION MODEL 36... FORECAST VALUE AT PAST POINT 38... FORECAST ERROR STATISTICAL PROCESSING RESULT MEMORY UNIT 40... PAST FORECAST ERROR STATISTICAL PROCESSING RESULT 42... FORECAST VALUE MEMORY UNIT 43... ACCURACY VALUE MEMORY UNIT 44... PAST FORECAST ERROR REFLECTING FORECAST VALUE CALCULATION UNIT 45... ACCURACY VALUE AT PAST POINT 46... PAST FORECAST ERROR REFLECTING FORECAST VALUE 48... SUBJECT DATA TIME LENGTH SETTING UNIT 50... TIME LENGTH 52... GRAPH POSITION INFORMATION 54... WORK PLAN AUTOMATIC CALCULATION UNIT 56... WORK PLAN 58... AFFECTED DATA

Claims (12)

業務計画の策定を支援する業務支援システムにおいて、
過去の予測値と過去の実績値、或いは過去の予測値と過去の実績値から算出された過去の予測誤差を記憶する記憶部と、
過去の予測誤差を統計処理し、予測誤差統計処理結果を求める統計解析部と、
前記統計解析部で求めた予測誤差統計処理結果を将来の予測値に加減算して予測誤差反映予測値を求める予測誤差反映予測値計算部と、
前記予測誤差反映予測値計算部で求めた予測誤差反映予測値を表示する表示部と、
前記表示部において上下へ移動可能であるとともにユーザの推測値を示す図形を重畳表示し、前記図形の位置に応じて将来の業務計画を自動計算する業務計画自動計算部と、
前記業務計画自動計算部で自動計算された将来の業務計画を表示する画面と、
を備え、
前記業務計画自動計算部で自動計算された将来の業務計画により影響を受けるデータを前記表示部に表示することを特徴とする業務支援システム。
In a business support system that supports the formulation of business plans,
a storage unit that stores past predicted values and past actual values, or past prediction errors calculated from past predicted values and past actual values;
a statistical analysis unit that performs statistical processing of past prediction errors to obtain a prediction error statistical processing result;
a prediction error reflected prediction value calculation unit that calculates a prediction error reflected prediction value by adding/subtracting the prediction error statistical processing result obtained by the statistical analysis unit to/from a future prediction value;
a display unit that displays the prediction error reflected prediction value calculated by the prediction error reflected prediction value calculation unit;
an automatic work plan calculation unit that displays a graphic that is movable up and down on the display unit and indicates a user's estimated value in a superimposed manner and automatically calculates a future work plan according to the position of the graphic;
a screen displaying a future business plan automatically calculated by the business plan automatic calculation unit;
Equipped with
a task support system, characterized in that data that will be affected by the future task plan automatically calculated by said task plan automatic calculation unit is displayed on said display unit ;
請求項1に記載の業務支援システムにおいて、
基準時刻より将来の予測値を出力する予測部を備えることを特徴とする業務支援システム。
2. The business support system according to claim 1,
A business support system comprising a prediction unit that outputs a predicted value in the future from a reference time.
請求項2に記載の業務支援システムにおいて、
前記予測部は、ニューラルネットワーク、ディープラーニング、重回帰計算のうち少なくとも1つを備えることを特徴とする業務支援システム。
3. The business support system according to claim 2,
The business support system is characterized in that the prediction unit is equipped with at least one of a neural network, deep learning, and multiple regression calculation.
請求項1から3のいずれか1項に記載の業務支援システムにおいて、
前記表示部は、一方の軸が時間であり、他方の軸が将来の予測誤差反映予測値であるグラフを表示することを特徴とする業務支援システム。
4. The business support system according to claim 1,
The business support system, wherein the display unit displays a graph having one axis representing time and another axis representing a future forecast error-reflecting predicted value.
請求項1から4のいずれか1項に記載の業務支援システムにおいて、
前記統計解析部で統計処理の対象となる過去の予測誤差の期間を設定可能な特定期間設定部を備えることを特徴とする業務支援システム。
5. The business support system according to claim 1,
A business support system comprising a specific period setting unit capable of setting a period of past prediction errors to be subjected to statistical processing by the statistical analysis unit.
請求項5に記載の業務支援システムにおいて、
予測モデルが学習した時期である予測モデル学習時期を記憶する学習時期記憶部を備え、
前記学習時期記憶部から出力された予測モデル学習時期が前記特定期間設定部に表示されることを特徴とする業務支援システム。
6. The business support system according to claim 5,
A learning time storage unit is provided for storing a prediction model learning time, which is the time when the prediction model was learned;
A business support system, characterized in that the prediction model learning time output from the learning time storage unit is displayed on the specific period setting unit.
請求項1から6のいずれか1項に記載の業務支援システムにおいて、
前記予測誤差統計処理結果が度数分布を示す図であることを特徴とする業務支援システム。
7. The business support system according to claim 1,
A business support system, wherein the result of the prediction error statistical processing is a diagram showing a frequency distribution.
請求項7に記載の業務支援システムにおいて、
前記度数分布を示す図は、ヒストグラム、色、色の濃淡、幅の大小、長さの長短、折れ線グラフ、曲線、包絡線のうち、少なくともいずれかで示されることを特徴とする業務支援システム。
The business support system according to claim 7,
A business support system characterized in that the diagram showing the frequency distribution is displayed using at least one of a histogram, color, color shading, width, length, line graph, curve, and envelope.
請求項2に記載の業務支援システムにおいて、
前記表示部に、前記予測部から出力された将来の予測値を表示することを特徴とする業務支援システム。
3. The business support system according to claim 2,
A business support system, characterized in that the display unit displays future predicted values output from the prediction unit.
請求項1から9のいずれか1項に記載の業務支援システムにおいて、
前記記憶部は、過去の時点での予測値を記憶する予測値記憶部と、
過去の時点での実績値を記憶する実績値記憶部と、を備え、
前記予測値記憶部から出力された過去の時点での予測値と、前記実績値記憶部から出力された過去の時点での実績値とを前記表示部に表示することを特徴とする業務支援システム。
10. The business support system according to claim 1,
The storage unit includes a predicted value storage unit that stores a predicted value at a past time point;
A performance value storage unit that stores performance values at past times,
a display unit displaying the predicted value at a past time point output from the predicted value storage unit and the actual value at a past time point output from the actual value storage unit.
請求項10に記載の業務支援システムにおいて、
前記記憶部は、過去の時点での予測誤差統計処理結果を記憶する予測誤差統計処理結果記憶部と、
前記予測誤差統計処理結果記憶部に記憶された過去の時点での予測誤差統計処理結果と、前記予測値記憶部に記憶された過去の時点での予測値を加減算して過去時点予測誤差反映予測値を求める過去時点予測誤差反映予測値計算部と、を備え、
前記過去時点予測誤差反映予測値計算部で求めた過去時点予測誤差反映予測値を前記表示部に表示することを特徴とする業務支援システム。
The business support system according to claim 10,
The storage unit includes a prediction error statistical processing result storage unit that stores a prediction error statistical processing result at a past time point;
a past-time prediction error reflected predicted value calculation unit that calculates a past-time prediction error reflected predicted value by adding/subtracting the prediction error statistical processing result at the past time point stored in the prediction error statistical processing result storage unit and the predicted value at the past time point stored in the predicted value storage unit,
The business support system further comprises displaying on the display unit the past-time forecast error reflected predicted value calculated by the past-time forecast error reflected predicted value calculation unit.
請求項11に記載の業務支援システムにおいて、
予測対象の未来の時刻までの時間長が異なる複数の予測値があり、
前記過去時点予測誤差反映予測値計算部で用いる対象データの時間長を指定する対象データ時間長設定部を備えることを特徴とする業務支援システム。
The business support system according to claim 11,
There are multiple forecast values with different time lengths until the future time of the forecast target,
A task support system comprising a target data time length setting unit that specifies the time length of target data used in the past forecast error reflected forecast value calculation unit.
JP2020138516A 2020-08-19 2020-08-19 Business Support System Active JP7492407B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2020138516A JP7492407B2 (en) 2020-08-19 2020-08-19 Business Support System
PCT/JP2021/015986 WO2022038832A1 (en) 2020-08-19 2021-04-20 Business support system and business support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020138516A JP7492407B2 (en) 2020-08-19 2020-08-19 Business Support System

Publications (2)

Publication Number Publication Date
JP2022034697A JP2022034697A (en) 2022-03-04
JP7492407B2 true JP7492407B2 (en) 2024-05-29

Family

ID=80322708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020138516A Active JP7492407B2 (en) 2020-08-19 2020-08-19 Business Support System

Country Status (2)

Country Link
JP (1) JP7492407B2 (en)
WO (1) WO2022038832A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023223533A1 (en) * 2022-05-20 2023-11-23 日本電気株式会社 Estimation device, estimation method, and program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004336890A (en) 2003-05-08 2004-11-25 Hitachi Ltd Power purchase and sale support system
JP2010020442A (en) 2008-07-09 2010-01-28 Toshiba Corp Method and device for creating prediction scenario of future demand regarding transaction object
JP2014054048A (en) 2012-09-06 2014-03-20 Toshiba Corp Power prediction method, device, and program
JP2016211877A (en) 2015-04-30 2016-12-15 三菱電機株式会社 Flow-in amount of wastewater measuring device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5886407B1 (en) * 2014-12-05 2016-03-16 中国電力株式会社 Prediction device
JP6481468B2 (en) * 2015-03-31 2019-03-13 日本電気株式会社 Predictive distribution estimation system, predictive distribution estimation method, and predictive distribution estimation program
JP7253913B2 (en) * 2018-12-25 2023-04-07 株式会社日立製作所 Data processing device and data processing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004336890A (en) 2003-05-08 2004-11-25 Hitachi Ltd Power purchase and sale support system
JP2010020442A (en) 2008-07-09 2010-01-28 Toshiba Corp Method and device for creating prediction scenario of future demand regarding transaction object
JP2014054048A (en) 2012-09-06 2014-03-20 Toshiba Corp Power prediction method, device, and program
JP2016211877A (en) 2015-04-30 2016-12-15 三菱電機株式会社 Flow-in amount of wastewater measuring device

Also Published As

Publication number Publication date
WO2022038832A1 (en) 2022-02-24
JP2022034697A (en) 2022-03-04

Similar Documents

Publication Publication Date Title
Persson et al. Performance simulation of supply chain designs
US9123052B2 (en) Marketing model determination system
US20140310034A1 (en) Performance indicator analytical framework
US20090094007A1 (en) System for defining simulation model
CN103971023A (en) Automatic quality evaluating system and method in research and development process
CN110930248A (en) Credit risk prediction model construction method and system, storage medium and electronic equipment
JP7492407B2 (en) Business Support System
Gusnadi et al. Designing employee performance monitoring dashboard using key performance indicator (KPI)
Kannebley Jr Tests for the hysteresis hypothesis in Brazilian industrialized exports: a threshold cointegration analysis
Lehtonen et al. A methodology for data gathering and analysis in a logistics simulation project
CN115204501A (en) Enterprise evaluation method and device, computer equipment and storage medium
CN108960779A (en) Electricity power engineering management method
CN114238102A (en) Staged workload prediction method and system based on composite variable characteristics
Joshi et al. Fast sensitivity computations for Monte Carlo valuation of pension funds
EP3570226A1 (en) Method and system of obtaining audit evidence
JP2003108753A (en) Risk management system of banking facility and processing method using the same
JP5554674B2 (en) Breakeven point simulation system, method, and program
CN112884301A (en) Method, equipment and computer storage medium for enterprise risk analysis
Su et al. Profitability evaluation for newsboy-type product with normally distributed demand
CN112396430A (en) Processing method and system for enterprise evaluation
CN111565121A (en) Method and device for evaluating IT (information technology) support degree by personnel and technology
Kuzmina et al. Risk Analysis of the Company's Activities by Means of Simulation.
Wulandari The Implementation of Least Square Method on the Palm Shells Sales Forecasting Application.
US20220351112A1 (en) System and method for obtaining audit evidence
CN113362179B (en) Method, apparatus, device, storage medium and program product for predicting transaction data

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240517