JP7410697B2 - Construction method - Google Patents

Construction method Download PDF

Info

Publication number
JP7410697B2
JP7410697B2 JP2019216315A JP2019216315A JP7410697B2 JP 7410697 B2 JP7410697 B2 JP 7410697B2 JP 2019216315 A JP2019216315 A JP 2019216315A JP 2019216315 A JP2019216315 A JP 2019216315A JP 7410697 B2 JP7410697 B2 JP 7410697B2
Authority
JP
Japan
Prior art keywords
column
outer peripheral
curing unit
side curing
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019216315A
Other languages
Japanese (ja)
Other versions
JP2021085271A (en
Inventor
翼 小谷
宏和 川嶋
良憲 板東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2019216315A priority Critical patent/JP7410697B2/en
Publication of JP2021085271A publication Critical patent/JP2021085271A/en
Application granted granted Critical
Publication of JP7410697B2 publication Critical patent/JP7410697B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、柱と梁からなる架構を構築する建方工事を行うための建方工法に関する。 The present invention relates to a construction method for constructing a frame consisting of columns and beams.

建方工事の建物外周側では、外周柱の建方を行った後、その外周柱の左右に外周梁を継ぐことにより複数の外周柱が外周梁で接続された架構が構築され、その後、隣地等に溶接火花やボルト等が飛散しないように架構の外側に垂直なネット等の飛散防止膜が取り付けられて飛散養生が行われている。 On the outer periphery of the building during construction work, after erecting the outer peripheral columns, a frame is constructed in which multiple outer peripheral columns are connected by outer peripheral beams by joining outer peripheral beams on the left and right sides of the outer peripheral columns. To prevent welding sparks, bolts, etc. from scattering, a scattering prevention film such as a vertical net is attached to the outside of the frame to prevent scattering.

特開2000-160827号公報Japanese Patent Application Publication No. 2000-160827

しかしながら、外周柱の左右に外周梁を継ぐ際にも溶接火花やボルト等の飛散が全く生じないとは言えない。ちなみに、特許文献1には、隣接する2本の外周柱に支持されて飛散養生を行う養生兼用鉄骨建方足場を用いた建方工法が開示されているが、養生兼用鉄骨建方足場の取り付けのタイミングと、外周柱の左右に外周梁を継ぐタイミングとの関係については記載されていない。 However, it cannot be said that welding sparks, bolts, etc. will not be scattered even when joining the outer peripheral beams on the left and right sides of the outer peripheral column. Incidentally, Patent Document 1 discloses a construction method using a steel frame erection scaffold that also serves as curing and performs scattering curing by being supported by two adjacent outer peripheral columns. There is no description of the relationship between the timing and the timing of joining the outer peripheral beams on the left and right sides of the outer peripheral column.

本発明は上述の実情に鑑みてなされたものであって、その主たる課題は、外周柱と外周梁との継手部位の飛散養生を確実に行うことができる建方工法を提供する点にある。 The present invention has been made in view of the above-mentioned circumstances, and its main object is to provide a construction method that can reliably protect the joint portion between the outer peripheral column and the outer peripheral beam from scattering.

本発明の第1特徴構成は、外周柱の建方を行った後、その外周柱の左右に外周梁を継ぐ前のタイミングで、前記外周柱と左右の前記外周梁との継手部位の外側をカバーするだけの左右方向の幅を有する柱側養生ユニットを前記外周柱に取り付けて前記外周柱に支持させ
前記柱側養生ユニットの左右に配置されて前記外周梁に取り付けられる梁側養生ユニットが備えられ、
前記柱側養生ユニットに作業床が備えられ、前記梁側養生ユニットに作業床が備えられておらず、
前記柱側養生ユニットと前記梁側養生ユニットとの間を塞ぐ飛散防止膜が備えられている点にある。
The first characteristic configuration of the present invention is that after the outer peripheral column is erected, and before the outer peripheral beams are connected to the left and right sides of the outer peripheral column, the outer side of the joint portion between the outer peripheral column and the left and right outer peripheral beams is A column-side curing unit having a width in the left and right direction sufficient to cover the column is attached to the outer circumferential column and supported by the outer circumferential column ,
Beam-side curing units arranged on the left and right sides of the column-side curing unit and attached to the outer peripheral beam are provided,
The column-side curing unit is provided with a working floor, and the beam-side curing unit is not provided with a working floor,
The present invention is characterized in that a scattering prevention film is provided that closes the space between the pillar-side curing unit and the beam-side curing unit .

本構成によれば、外周柱の左右に外周梁を継ぐ前のタイミングで柱側養生ユニットを外周柱に支持させることができ、その外周柱と左右の外周梁との継手部位の飛散養生を確実に行うことができる。しかも、柱側養生ユニットの左右方向の幅は、1本の外周柱と左右の外周梁の継手部位をカバーするだけの幅であるので、柱側養生ユニットの小型化を図ることができ、取り付け作業の作業性も向上することができる。
更に、本構成によれば、柱側養生用ユニットに加えて、梁側養生ユニットを備えることで、外周梁での飛散養生も行うことができる。柱側養生ユニットに作業床が備えられているので、その作業床を利用して上下の外周柱の溶接等を行うことができ、溶接専用のコラムステージを不要とすることができる。梁側養生ユニットには作業床が備えられていないので、建物外周側からの突出量の小さい一層小型で軽量なユニットとすることができ、取り付け作業の作業性を向上することができる。そして、建物外周側からの突出量の異なる柱側養生ユニットと梁側養生ユニットとの間の隙間を飛散防止膜で塞ぐことで、建物外周側の飛散養生を一層確実に行うことができる。
According to this configuration, the column-side curing unit can be supported by the outer circumferential column at a timing before the outer circumferential beams are connected to the left and right sides of the outer circumferential column, and the scattering curing of the joint portion between the outer circumferential column and the left and right outer circumferential beams is ensured. can be done. Moreover, the width of the column side curing unit in the left and right direction is just enough to cover the joint area between one outer peripheral column and the left and right outer peripheral beams, so the column side curing unit can be downsized and installed. Work efficiency can also be improved.
Furthermore, according to this configuration, by providing a beam side curing unit in addition to the column side curing unit, scattering curing can also be performed on the outer peripheral beam. Since the column-side curing unit is equipped with a work floor, the work floor can be used to perform welding of the upper and lower outer peripheral columns, and a column stage dedicated to welding can be made unnecessary. Since the beam side curing unit is not equipped with a work floor, it can be made into a smaller and lighter unit with a smaller amount of protrusion from the outer periphery of the building, and the workability of the installation work can be improved. Then, by closing the gap between the column-side curing unit and the beam-side curing unit, which have different protruding amounts from the building's outer periphery, with the scattering prevention film, scattering curing on the building's outer periphery can be performed more reliably.

本発明の第2特徴構成は、前記柱側養生ユニットの左右方向の幅は、前記外周柱を中心として左右対称に設定されている点にある。 A second feature of the present invention is that the width of the pillar-side curing unit in the left-right direction is set symmetrically with respect to the outer peripheral pillar.

本構成によれば、柱側養生ユニットの左右方向の幅は、取り付けられる外周柱を中心として左右対称に設定されているので、1本の外周柱にバランス良く取り付けて1本の外周柱の左右の継手部位の飛散養生を良好に行うことができる。 According to this configuration, the width of the column side curing unit in the left and right direction is set symmetrically around the outer circumferential column to which it is attached, so that it can be attached to one outer circumferential column in a well-balanced manner. The joint part can be well protected against scattering.

建方工事中の建物の外周側を示す平面図Plan view showing the outer periphery of the building under construction (a)図1のIIa-IIa線断面図、(b)図1のIIb-IIb線断面図(a) Cross-sectional view taken along the line IIa-IIa in Figure 1, (b) Cross-sectional view taken along the IIb-IIb line in Figure 1 建方工法を示す平面図Floor plan showing construction method 建方工法を模式的に示す斜視図A perspective view schematically showing the construction method

本発明に係る建方工法の実施形態を図面に基づいて説明する。
図1に示すように、この建方工法は、建築中の建物Bの外側(隣地側)に配置されて外周柱1に取り付けられる柱側養生ユニット10と、その柱側養生ユニット10の左右に配置されて外周梁2に取り付けられる梁側養生ユニット20とを使用し、溶接火花やボルト等の隣地等への飛散防止を図りながら、建物Bの架構を構築する工法である。
Embodiments of the construction method according to the present invention will be described based on the drawings.
As shown in FIG. 1, this construction method includes a pillar-side curing unit 10 that is placed outside (neighboring land side) of building B under construction and attached to the outer peripheral pillar 1, and a pillar-side curing unit 10 on the left and right sides of the pillar-side curing unit 10. This construction method uses a beam-side curing unit 20 arranged and attached to the outer peripheral beam 2 to construct the frame of the building B while preventing welding sparks, bolts, etc. from scattering to neighboring areas.

図示例では、外周柱1が角型鋼管から複数階層分(本例では3層分)に亘る柱部材として構成され、外周梁2がH型鋼から構成される場合を示している。複数階層分に亘る外周柱1の各階層仕口部の側面に一体的に突出形成されたH型鋼からなる梁ブラケット1Dに外周梁2を継いで建物Bの架構が構築される。外周柱1の梁ブラケット1Dと外周梁2の接合部位が、外周柱1と外周梁2の継手部位3となる。
以下、柱側養生ユニット10、梁側養生ユニット20、建方工法の施工手順について説明を加える。
In the illustrated example, the outer peripheral column 1 is configured as a column member extending over multiple levels (three layers in this example) from a square steel pipe, and the outer peripheral beam 2 is configured from H-shaped steel. The frame of the building B is constructed by connecting the outer circumferential beam 2 to a beam bracket 1D made of H-shaped steel integrally formed on the side surface of the joint part of each floor of the outer circumferential column 1 extending over a plurality of floors. The joint portion between the beam bracket 1D of the outer circumferential column 1 and the outer circumferential beam 2 becomes the joint portion 3 between the outer circumferential column 1 and the outer circumferential beam 2.
Below, the construction procedures of the column side curing unit 10, the beam side curing unit 20, and the construction method will be explained.

まず、柱側養生ユニット10及び梁側養生ユニット20について説明する。
柱側養生ユニット10は、図1~図4に示すように、外周柱1の高さ寸法に対応して複数階層分(本例では3階層分)の外周柱1の外側をカバーするだけの高さ寸法(図2参照)を有し、且つ、外周柱1と左右の外周梁2との継手部位3の外側をカバーするだけの左右方向の幅L(図3(a)参照)を有する縦長のユニットとして構成される。
First, the column side curing unit 10 and the beam side curing unit 20 will be explained.
As shown in FIGS. 1 to 4, the pillar side curing unit 10 is designed to cover the outside of the peripheral pillar 1 for multiple floors (in this example, three floors) corresponding to the height dimension of the peripheral pillar 1. It has a height dimension (see FIG. 2), and a width L in the left-right direction (see FIG. 3(a)) that is sufficient to cover the outside of the joint part 3 between the outer peripheral column 1 and the left and right outer peripheral beams 2. Constructed as a vertically elongated unit.

柱側養生ユニット10の左右方向の幅Lは、図3(a)に示すように、当該柱側養生ユニット10を外周柱1に取り付けた状態で、その左右の両端部が当該外周柱1の左右の継手部位3よりも所定寸法Laだけ左右方向の外側に配置されるように設定される。例えば、所定寸法Laは、継手部位3から隣地側への飛散をより確実に防止するための余幅や、継手部位3の接合作業を行うための作業スペース等を考慮して設定することができる。 As shown in FIG. 3(a), the width L in the left-right direction of the pillar-side curing unit 10 is such that when the pillar-side curing unit 10 is attached to the outer peripheral pillar 1, both left and right ends of the pillar-side curing unit 10 are It is set to be disposed on the outer side of the left and right joint parts 3 by a predetermined dimension La in the left and right direction. For example, the predetermined dimension La can be set in consideration of the extra width to more reliably prevent scattering from the joint part 3 to the adjacent land, the work space for performing the joining work of the joint part 3, etc. .

図示例では、左右の継手部位3の外周柱1からの離れ寸法が同一であることに対応して、柱側養生ユニット10の左右方向の幅Lが、外周柱1を中心として左右対称に設定される。なお、左右の継手部位3の外周柱1からの離れ寸法が異なる場合には、両継手部位3の離れ寸法に対応して左右非対称に設定することができる。 In the illustrated example, the width L in the left-right direction of the column-side curing unit 10 is set to be symmetrical about the outer circumferential column 1, corresponding to the fact that the distance from the outer circumferential column 1 of the left and right joint parts 3 is the same. be done. In addition, when the separation dimensions of the left and right joint parts 3 from the outer peripheral column 1 are different, the left and right joint parts 3 can be set asymmetrically in accordance with the separation dimensions of both the joint parts 3.

柱側養生ユニット10は、図1及び図4に示すように、建物Bの外周面に沿って左右方向に延びる背面側被覆部位10Aと、その背面側被覆部位10Aの左右の両端部から建物B側に延びる左右の側面側被覆部位10Bとを一体的に備えて構成される。背面側被覆部位10A及び左右の側面側被覆部位10Bは、作業床16を有して略縦長直方体状に組み付けられた柱側ユニット枠体11の背面及び左右の両側面の全域を垂直なネットやシート等からなる飛散防止膜12で被覆して構成される。 As shown in FIGS. 1 and 4, the pillar-side curing unit 10 includes a back-side covering portion 10A that extends in the left-right direction along the outer peripheral surface of the building B, and a back-side covering portion 10A extending from both left and right ends of the back-side covering portion 10A to the building B. It is configured to integrally include left and right side side covering portions 10B extending laterally. The back side covering portion 10A and the left and right side side covering portions 10B cover the entire area of the back side and both left and right side surfaces of the column side unit frame 11, which has a work floor 16 and is assembled into a substantially vertically rectangular parallelepiped shape, with a vertical net or the like. It is constructed by being covered with a scattering prevention film 12 made of a sheet or the like.

作業床16は、図2及び図4に示すように、建物Bの階高等に対応したピッチで柱側ユニット枠体11の複数の高さ位置に備えられる。柱側ユニット枠体11に作業床16が備えられることで、その作業床16を利用して上下の外周柱1の溶接等も行うことができ、溶接専用のコラムステージ等を不要とすることができる。 As shown in FIGS. 2 and 4, the work floors 16 are provided at a plurality of height positions of the column-side unit frame 11 at pitches corresponding to the floor heights of the building B. By providing the work floor 16 on the column side unit frame 11, the work floor 16 can be used to perform welding of the upper and lower outer peripheral columns 1, thereby eliminating the need for a column stage etc. exclusively for welding. can.

柱側ユニット枠体11は、図1、図2及び図4に示すように、例えば、剛性の高い梁枠等からなる縦枠13、単管等からなる縦材14Aや横材(手摺を含む)14B、作業床設置用ブラケット15、足場板からなる作業床16、柱接続用ブラケット17等を組み付けて構成される。縦枠13は、平行に並ぶ縦姿勢の複数の単管を横姿勢の複数の繋ぎ材等で連結して構成される。 As shown in FIGS. 1, 2, and 4, the column side unit frame 11 includes, for example, a vertical frame 13 made of a highly rigid beam frame, vertical members 14A made of a single pipe, etc., and horizontal members (including handrails). ) 14B, a work floor installation bracket 15, a work floor 16 made of a scaffold board, a pillar connection bracket 17, etc. are assembled. The vertical frame 13 is constructed by connecting a plurality of vertically arranged single pipes arranged in parallel using a plurality of horizontally arranged connecting members or the like.

柱側ユニット枠体11の背面側に、左右方向に間隔を空けて複数本(本例では四本)の縦枠13が配置され、図2に示すように、その複数本の縦枠13の夫々に上下方向に間隔を空けて複数の作業床設置用ブラケット15が建物B側に突出する状態で取り付けられる。そして、上下方向の同じ位置に配置される複数の作業床設置用ブラケット15に亘って作業床16が設置される。 A plurality of vertical frames 13 (four in this example) are arranged at intervals in the left-right direction on the back side of the column-side unit frame 11, and as shown in FIG. A plurality of work floor installation brackets 15 are attached to each other at intervals in the vertical direction so as to protrude toward the building B side. Then, the work floor 16 is installed across a plurality of work floor installation brackets 15 arranged at the same position in the vertical direction.

また、左右方向の中央側の二本の縦枠13の夫々に、図1及び図4に示すように、上下方向に間隔を空けて複数の柱接続用ブラケット17が建物B側に突出する状態で取り付けられる。そして、上下方向の複数箇所の夫々で同じ高さ位置に配置される一組(本例では二つ)の柱接続用ブラケット17の先端部が、外周柱1の左右の両側面から側方に突出する鋼材等の被取付部位1Aの夫々にボルト等の固定手段で固定される。このようにして、柱側養生ユニット10が高さ位置の異なる複数組の柱接続用ブラケット17にて外周柱1に取り付けられる。 Also, as shown in FIGS. 1 and 4, a plurality of column connection brackets 17 protrude toward the building B side at intervals in the vertical direction from each of the two vertical frames 13 on the center side in the left and right direction. Can be installed with. Then, the tips of a pair (two in this example) of pillar connection brackets 17 arranged at the same height in each of a plurality of locations in the vertical direction extend laterally from both left and right sides of the outer peripheral pillar 1. It is fixed to each of the protruding parts 1A of steel or the like to be attached by fixing means such as bolts. In this way, the pillar-side curing unit 10 is attached to the outer peripheral pillar 1 using a plurality of sets of pillar connection brackets 17 at different height positions.

梁側養生ユニット20は、図1に示すように、柱側養生ユニット10と同等の高さ寸法(図示省略)を有し、且つ、単独又は複数で隣接する外周柱1に取り付けられる一対の柱側養生ユニット10の間をカバーするだけの左右方向の幅を有する縦長のユニットとして構成される。 As shown in FIG. 1, the beam side curing unit 20 has a height dimension (not shown) equivalent to that of the column side curing unit 10, and is a pair of pillars that are attached to the adjacent outer peripheral pillars 1 singly or in plurality. It is configured as a vertically long unit having a width in the left-right direction that is sufficient to cover the space between the side curing units 10.

梁側養生ユニット20は、建物Bの外周面に沿って左右方向に延びる背面側被覆部位20Aを備えて構成される。背面側被覆部位20Aは、平面視略Iの字状に組み付けられた梁側ユニット枠体21の背面の全域を垂直なネットやシート等からなる飛散防止膜22で被覆して構成される。梁側養生ユニット20は、作業床が備えられないことで、建物Bの外周面からの突出量の小さい一層小型で軽量なユニットとすることができ、取り付け作業の作業性を向上することができる。 The beam-side curing unit 20 is configured to include a back-side covering portion 20A extending in the left-right direction along the outer peripheral surface of the building B. The backside covering portion 20A is constructed by covering the entire backside of the beam side unit frame 21 assembled in a substantially I-shape in plan view with a scattering prevention film 22 made of a vertical net, sheet, or the like. Since the beam side curing unit 20 is not provided with a work floor, it can be made into a smaller and lighter unit with a smaller amount of protrusion from the outer peripheral surface of the building B, and the workability of the installation work can be improved. .

梁側ユニット枠体21は、例えば、剛性の高い梁枠等からなる縦枠23、単管等からなる横材24、梁接続用ブラケット25等を組み付けて構成される。縦枠23も、平行に並ぶ縦姿勢の複数の単管を横姿勢の複数の繋ぎ材等で連結して構成される。 The beam-side unit frame 21 is constructed by assembling, for example, a vertical frame 23 made of a highly rigid beam frame, a cross member 24 made of a single pipe, etc., a beam connection bracket 25, and the like. The vertical frame 23 is also constructed by connecting a plurality of vertically arranged single pipes arranged in parallel with a plurality of horizontally arranged connecting members or the like.

梁側ユニット枠体21の背面側に、左右方向に間隔を空けて複数本(本例では三本)の縦枠23が配置され、その複数本の縦枠23の夫々に上下方向に間隔を空けて複数の梁接続用ブラケット25が取り付けられる。そして、上下方向の同じ位置に配置される一組(本例では三つ)の梁接続用ブラケット25の先端部が、各階層の外周梁2の上面に備えられる鋼材等の被取付部位2Aの夫々にボルト等の固定手段で固定される。このようにして、梁側養生ユニット20が高さ位置の異なる複数組の梁接続用ブラケット25にて各階層の外周梁2に取り付けられる。 A plurality of vertical frames 23 (three in this example) are arranged on the back side of the beam-side unit frame 21 at intervals in the left-right direction, and each of the plurality of vertical frames 23 is arranged at intervals in the vertical direction. A plurality of beam connection brackets 25 are attached with gaps. Then, the tips of a set (three in this example) of beam connection brackets 25 arranged at the same position in the vertical direction are attached to the attached parts 2A of steel materials etc. provided on the upper surface of the outer circumferential beam 2 of each floor. They are each fixed with fixing means such as bolts. In this way, the beam-side curing unit 20 is attached to the outer circumferential beam 2 of each floor using a plurality of sets of beam connection brackets 25 at different height positions.

次に、上述の如く構成された柱側養生ユニット10及び梁側養生ユニット20を使用して行う建方工法の施工順序について説明する。 Next, the construction order of the construction method performed using the column side curing unit 10 and the beam side curing unit 20 configured as described above will be explained.

まず、外周柱1の建方を行い、その後、図4及び図3(a)に示すように、当該外周柱1の左右に外周梁2を継ぐ前のタイミングで、柱側養生ユニット10を外周柱1に取り付けて外周柱1に支持させる。 First, the outer peripheral column 1 is erected, and then, as shown in FIG. 4 and FIG. It is attached to the pillar 1 and supported by the outer peripheral pillar 1.

具体的には、図3(a)に示すように、柱側養生ユニット10をクレーン等で外周柱1の近傍まで吊り上げ、その状態で柱側養生ユニット10の複数組の柱接続用ブラケット17の先端部をボルト等の固定手段にて外周柱1の両側面の被取付部位1Aの夫々に固定する。更に、柱側養生ユニット10の上下方向の複数の位置で、左右方向の両端側の縦枠13と、外周柱1の左右の両側面に溶接等で固定された梁ブラケット1Dの上面部等とに亘って単管等からなる繋ぎ材19を取り付ける。
このようにして、当該外周柱1の左右に外周梁2を継ぐ前のタイミングで、柱側養生ユニット10にて外周柱1と左右の外周梁2との継手部位3の外側をカバーする状態で隣地側への飛散養生を行う。
Specifically, as shown in FIG. 3(a), the column-side curing unit 10 is lifted up to the vicinity of the outer peripheral column 1 using a crane or the like, and in that state, the plurality of sets of column-connecting brackets 17 of the column-side curing unit 10 are The tip portions are fixed to each of the attachment portions 1A on both sides of the outer peripheral column 1 using fixing means such as bolts. Further, at a plurality of positions in the vertical direction of the column side curing unit 10, the vertical frame 13 on both ends in the left and right direction, and the upper surface part of the beam bracket 1D fixed by welding or the like to both the left and right sides of the outer peripheral column 1. A connecting material 19 made of a single pipe or the like is attached over the area.
In this way, before the outer peripheral beams 2 are joined to the left and right sides of the outer peripheral column 1, the column side curing unit 10 covers the outside of the joint part 3 between the outer peripheral column 1 and the left and right outer peripheral beams 2. Perform scattering curing to the adjacent land.

そして、その状態で、図3(b)に示すように、外周柱1の各階層の左右の梁ブラケット1Dに各階層の外周梁2を接合して外周柱1に左右の外周梁2を継ぐ。図示は省略するが、例えば、梁ブラケット1Dの端面と外周梁2の端面とを突き合せた状態で梁ブラケット1Dと外周梁2とにスプライスプレートを亘らせ、そのスプライスプレートを梁ブラケット1Dと外周梁2の夫々にボルト等の固定手段で固定することで、外周柱1の梁ブラケット1Dに外周梁2を継ぐことができる。
この継ぎ作業中は、柱側養生ユニット10が、外周柱1と左右の外周梁2との継手部位3の外側をカバーしているので、ボルト等が隣地側に飛散するのを確実に防止することができる。
Then, in this state, as shown in FIG. 3(b), the outer circumferential beams 2 of each floor are joined to the left and right beam brackets 1D of each floor of the outer circumferential column 1, and the left and right outer circumferential beams 2 are connected to the outer circumferential column 1. . Although not shown in the drawings, for example, a splice plate is placed between the beam bracket 1D and the outer beam 2 with the end surfaces of the beam bracket 1D and the outer beam 2 abutting each other, and the splice plate is connected to the beam bracket 1D. By fixing to each of the outer circumferential beams 2 with fixing means such as bolts, the outer circumferential beams 2 can be connected to the beam brackets 1D of the outer circumferential columns 1.
During this joining work, the column-side curing unit 10 covers the outside of the joint part 3 between the outer peripheral column 1 and the left and right outer peripheral beams 2, thereby reliably preventing bolts etc. from scattering to the adjacent land. be able to.

外周柱1に左右の外周梁2を継いだ後、図3(b)に示すように、柱側養生ユニット10と外周柱1とに亘る繋ぎ材19の先端側(建物B側)の取付位置を左右方向の外方側の外周梁2に変更する。このようにすることで、柱側養生ユニット10の取り付け状態を一層安定させることができる。 After connecting the left and right outer peripheral beams 2 to the outer peripheral column 1, as shown in FIG. is changed to the outer peripheral beam 2 on the outer side in the left-right direction. By doing so, the installation state of the pillar-side curing unit 10 can be further stabilized.

そして、図1に示すように、梁側養生ユニット20を柱側養生ユニット10の左右に配置し、当該梁側養生ユニット20を外周梁2に取り付けて外周梁2に支持させる。具体的には、梁側養生ユニット20をクレーン等で外周梁2の近傍に吊り上げ、その状態で梁側養生ユニット20の複数組の梁接続用ブラケット25の先端部を各階層の外周梁2の上面の被取付部位2Aにボルト等の固定手段で固定する。更に、柱側養生ユニット10と梁側養生ユニット20との間の隙間を塞ぐ状態で、柱側養生ユニット10と梁側養生ユニット20とに亘って垂直なネットやシート等からなる飛散防止膜30を取り付けて、建方工事階における建物Bの外周側の飛散養生を完成させる。 As shown in FIG. 1, the beam side curing units 20 are arranged on the left and right sides of the column side curing unit 10, and the beam side curing units 20 are attached to the outer peripheral beam 2 and supported by the outer peripheral beam 2. Specifically, the beam side curing unit 20 is lifted up near the outer peripheral beam 2 by a crane or the like, and in that state, the tips of the plurality of beam connection brackets 25 of the beam side curing unit 20 are connected to the outer peripheral beam 2 of each floor. It is fixed to the attachment site 2A on the upper surface using fixing means such as bolts. Further, a scattering prevention film 30 made of a vertical net, sheet, etc. is applied over the column side curing unit 10 and the beam side curing unit 20 in a state where the gap between the column side curing unit 10 and the beam side curing unit 20 is closed. will be installed to complete the scattering protection on the outer periphery of Building B on the construction work floor.

その後、建方工事を上層側に順次に進めるに連れて、上述した順序で柱側養生ユニット10及び梁側養生ユニット20を上層側に移動(クライミング)させ、建方工事階の飛散養生を柱側養生ユニット10及び梁側養生ユニット20にて適切に図りながら、当該建物Bの架構を完成させる。 Thereafter, as the erection work progresses to the upper floors, the column side curing unit 10 and the beam side curing unit 20 are moved (climbed) to the upper floors in the order described above, and the scattered curing on the building work floor is carried out on the pillars. The frame of the building B is completed while appropriately using the side curing unit 10 and the beam side curing unit 20.

〔別実施形態〕
本発明の他の実施形態について説明する。尚、以下に説明する各実施形態の構成は、それぞれ単独で適用することに限らず、他の実施形態の構成と組み合わせて適用することも可能である。
[Another embodiment]
Other embodiments of the present invention will be described. Note that the configurations of each embodiment described below are not limited to being applied individually, but can also be applied in combination with the configurations of other embodiments.

前述の実施形態では、柱側養生ユニット10に作業床16が設けられることに対応して、左右の側面側被覆部位10Bが備えられていたが、作業床16が設けられない場合には側面側被覆部位10Bを省略することができる。 In the above-mentioned embodiment, the left and right side side covering portions 10B were provided in response to the provision of the work floor 16 in the column side curing unit 10, but when the work bed 16 is not provided, the side surface side covering portions 10B are provided. The covering portion 10B can be omitted.

1 外周柱
2 外周梁
3 継手部位
10 柱側養生ユニット
20 梁側養生ユニット
30 飛散防止膜

1 Peripheral column 2 Peripheral beam 3 Joint part 10 Column side curing unit 20 Beam side curing unit 30 Scattering prevention film

Claims (2)

外周柱の建方を行った後、その外周柱の左右に外周梁を継ぐ前のタイミングで、前記外周柱と左右の前記外周梁との継手部位の外側をカバーするだけの左右方向の幅を有する柱側養生ユニットを前記外周柱に取り付けて前記外周柱に支持させ
前記柱側養生ユニットの左右に配置されて前記外周梁に取り付けられる梁側養生ユニットが備えられ、
前記柱側養生ユニットに作業床が備えられ、前記梁側養生ユニットに作業床が備えられておらず、
前記柱側養生ユニットと前記梁側養生ユニットとの間を塞ぐ飛散防止膜が備えられている建方工法。
After the outer peripheral column is erected, and before the outer peripheral beams are connected to the left and right sides of the outer peripheral column, the width in the left and right direction is set to cover the outside of the joint area between the outer peripheral column and the left and right outer peripheral beams. A column-side curing unit having a structure is attached to the outer circumferential column and supported by the outer circumferential column ,
Beam-side curing units arranged on the left and right sides of the column-side curing unit and attached to the outer peripheral beam are provided,
The column-side curing unit is provided with a working floor, and the beam-side curing unit is not provided with a working floor,
A construction method comprising: a scattering prevention film that closes a space between the column-side curing unit and the beam-side curing unit .
前記柱側養生ユニットの左右方向の幅は、前記外周柱を中心として左右対称に設定されている請求項1記載の建方工法。 2. The construction method according to claim 1, wherein the width of the pillar-side curing unit in the left-right direction is set symmetrically with respect to the outer peripheral pillar.
JP2019216315A 2019-11-29 2019-11-29 Construction method Active JP7410697B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019216315A JP7410697B2 (en) 2019-11-29 2019-11-29 Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019216315A JP7410697B2 (en) 2019-11-29 2019-11-29 Construction method

Publications (2)

Publication Number Publication Date
JP2021085271A JP2021085271A (en) 2021-06-03
JP7410697B2 true JP7410697B2 (en) 2024-01-10

Family

ID=76087024

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019216315A Active JP7410697B2 (en) 2019-11-29 2019-11-29 Construction method

Country Status (1)

Country Link
JP (1) JP7410697B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162297A (en) 2002-11-11 2004-06-10 Toda Constr Co Ltd Welding-spark curing device and its re-banking method
JP2014141862A (en) 2013-01-23 2014-08-07 Yoshimitsu Ozawa Attachment fitting for protective net for high place work
JP2016211234A (en) 2015-05-11 2016-12-15 大成建設株式会社 Vertical net pre-installation method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533617Y2 (en) * 1987-09-17 1993-08-26
JP3498097B2 (en) * 1994-10-21 2004-02-16 東急建設株式会社 Curing net stretching apparatus and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162297A (en) 2002-11-11 2004-06-10 Toda Constr Co Ltd Welding-spark curing device and its re-banking method
JP2014141862A (en) 2013-01-23 2014-08-07 Yoshimitsu Ozawa Attachment fitting for protective net for high place work
JP2016211234A (en) 2015-05-11 2016-12-15 大成建設株式会社 Vertical net pre-installation method

Also Published As

Publication number Publication date
JP2021085271A (en) 2021-06-03

Similar Documents

Publication Publication Date Title
KR101009753B1 (en) Beam structural form
JP7410697B2 (en) Construction method
JP2007023495A (en) Joint structure of reinforced concrete column and steel framed beam and its construction method
JP5572100B2 (en) Paneling system and method
JP7193081B2 (en) stair structure
JP4964528B2 (en) Floor structure of steel structure building and construction method of floor structure
JP6690150B2 (en) Beam-column structure of plate-like apartment house
JP6265735B2 (en) Consolidated building
ES2257840T3 (en) METAL BRIDGE.
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JP5475054B2 (en) Seismic shelter reinforcement method and seismic shelter with high seismic strength
JP4479229B2 (en) Basic structure of the structure
JP6664208B2 (en) Joint structure of beam and column
JP5989597B2 (en) Temporary seismic structure and its construction method during construction of seismic isolation for existing frame
JP6368538B2 (en) Fireproof frame structure
JP4296548B2 (en) Exterior wall structure
JP7434067B2 (en) steel building
JP3873629B2 (en) Curtain wall support member and mounting method thereof
JP6712139B2 (en) Building structure having terraced floor and construction method thereof
JP7048003B2 (en) Vertically movable outer scaffolding for high-rise buildings with no vacant land next door
JP6875120B2 (en) Floor panels, floor structures, floor construction methods and building skeleton reuse methods
JP2021188273A (en) Column-beam frame
JP7155488B2 (en) Structural Seismic Reinforcement Structure
JP6696775B2 (en) Unit building
JP2009041242A (en) Earth retaining structure, and corrugated steel plate panel for use in it

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221014

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230726

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230802

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20231206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20231222

R150 Certificate of patent or registration of utility model

Ref document number: 7410697

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150