JP7361304B2 - Sleeper repair trolley and trolley set - Google Patents

Sleeper repair trolley and trolley set Download PDF

Info

Publication number
JP7361304B2
JP7361304B2 JP2019222749A JP2019222749A JP7361304B2 JP 7361304 B2 JP7361304 B2 JP 7361304B2 JP 2019222749 A JP2019222749 A JP 2019222749A JP 2019222749 A JP2019222749 A JP 2019222749A JP 7361304 B2 JP7361304 B2 JP 7361304B2
Authority
JP
Japan
Prior art keywords
truck
sleeper
repair
movable
drill machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019222749A
Other languages
Japanese (ja)
Other versions
JP2021092059A (en
Inventor
光司 横田
晃平 梅野
章 日永田
生喜 北野
泰孝 三園
尚 米谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Japan Railway Co
Original Assignee
West Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Japan Railway Co filed Critical West Japan Railway Co
Priority to JP2019222749A priority Critical patent/JP7361304B2/en
Publication of JP2021092059A publication Critical patent/JP2021092059A/en
Application granted granted Critical
Publication of JP7361304B2 publication Critical patent/JP7361304B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

特許法第30条第2項適用 1.2019年度施設関係業務研究発表会 西日本旅客鉄道株式会社近畿統括本部にて2019年8月7日公開 2.2019年度施設関係業務研究発表会 サード・プレイス弥生にて2019年8月30日公開 3.2019年度 広島支社 保線関係技能競技会 西日本旅客鉄道株式会社徳山駅施設管理センターにて2019年9月27日公開 4.第34回2019年度総合技術講演会 ホテルメトロポリタン池袋にて2019年10月23日から2019年10月24日公開 5.2019年度保線技能競技会 西日本旅客鉄道株式会社社員研修センターにて2019年11月15日公開 6.第6回鉄道技術展 幕張メッセにて2019年11月27日から2019年11月29日まで展示Application of Article 30, Paragraph 2 of the Patent Act 1. 2019 Facility-related Business Research Presentation Published on August 7, 2019 at the West Japan Railway Company Kinki Headquarters 2. 2019 Facility-related Business Research Presentation Third Place Yayoi Published on August 30, 2019 at 3. 2019 Hiroshima Branch Track Maintenance Skills Competition Published on September 27, 2019 at West Japan Railway Company Tokuyama Station Facility Management Center 4. 34th 2019 Comprehensive Technical Lecture Opened at Hotel Metropolitan Ikebukuro from October 23, 2019 to October 24, 2019 5. 2019 Track Maintenance Skills Competition November 2019 at West Japan Railway Company Employee Training Center Released on the 15th 6. The 6th Railway Technology Exhibition will be exhibited at Makuhari Messe from November 27, 2019 to November 29, 2019.

本発明は、まくらぎ補修用台車及び台車セットに関する。 The present invention relates to a sleeper repair truck and a truck set.

鉄道線路の保守において、コンクリート製まくらぎとレールとを締結するボルトを受ける埋込栓が、所定期間にわたる列車の通過による振動、気象条件(降雨、寒暖差)等により劣化する前に、埋込栓を取り替える必要がある。
図5(A)に示す締結ボルト31を抜いて、図5(B)の状態にした後、図5(C)に示すように(コンクリート製のまくらぎ20の表面をはつるように)板ばね32及び受栓33を除去し、図5(D)に示すように旧埋込栓7をドリルにより破砕、除去し、その後、図6(A)に示すように2液樹脂を注入し、図6(B)に示すように新埋込栓8を挿入する。ドリルにより切削された新しい孔9と新埋込栓8の隙間に樹脂が侵入、硬化して、新埋込栓8が固定される。
In the maintenance of railway tracks, embedded plugs that receive bolts that connect concrete sleepers and rails are installed before they deteriorate due to vibrations caused by passing trains over a specified period of time, weather conditions (rainfall, temperature differences), etc. The stopper needs to be replaced.
After removing the fastening bolts 31 shown in FIG. 5(A) and making the state shown in FIG. 5(B), the board is assembled as shown in FIG. The spring 32 and the plug 33 are removed, the old embedded plug 7 is crushed and removed with a drill as shown in FIG. 5(D), and then the two-component resin is injected as shown in FIG. 6(A). A new implant plug 8 is inserted as shown in FIG. 6(B). The resin enters the gap between the new hole 9 cut by the drill and the new embedded plug 8, hardens, and the new embedded plug 8 is fixed.

これらの工程において、従来問題となっていたのが、旧埋込栓7をドリル機のドリルにより破砕、除去して新埋込栓8を挿入する孔を切削する工程である。
このドリル機による作業は、ドリル機自体が重く、作業者が手でドリル機を保持して行っており、また旧埋込栓を破砕、除去するため、ドリル機を埋込栓長さ方向に正確に動かす必要があるため、作業が困難であり、作業効率が低いという問題もあった。両側のレールの左右の計4個の孔、つまり、1本のまくらぎが有する4個の旧埋込栓7をドリルにより破砕、除去するには、相当な時間と労力が必要であった。
In these steps, what has conventionally been a problem is the step of crushing and removing the old plug 7 with a drill of a drill machine and cutting a hole into which the new plug 8 is inserted.
The drill machine itself is heavy, and the operator has to hold it by hand during work using this drill machine.Also, in order to crush and remove the old embedded plug, the drill machine is moved in the length direction of the embedded plug. Since it is necessary to move accurately, the work is difficult and there is also the problem of low work efficiency. It took a considerable amount of time and effort to use a drill to crush and remove the four holes on the left and right sides of both rails, that is, the four old embedded plugs 7 of one sleeper.

そこで、本発明は、旧埋込栓をドリルにより破砕、除去して新埋込栓を挿入する孔を切削形成する作業を、身体の負担を軽減して、正確かつ能率的に行うことができるまくらぎ補修用台車及び台車セットを提供することを目的とする。 Therefore, the present invention enables the work of crushing and removing the old embedded plug using a drill and cutting and forming a hole for inserting the new embedded plug to be performed accurately and efficiently while reducing the burden on the body. The purpose is to provide a sleeper repair trolley and a trolley set.

本発明に係るまくらぎ補修用台車は、レールに直交する2本のガイド部材を平行に有すると共に、上記レールの上面を転動する少なくとも4個の走行輪を有する基枠部と、上記基枠部の上記ガイド部材に沿って左右移動自在として載置された可動台と、該可動台に立設された支柱と、上記支柱に上下動自在に取付けられたガイド機構と、コンクリート製のまくらぎに埋設されている旧埋込栓を切削除去しつつ新埋込栓が挿入される新しい孔を切削形成するために、上記ガイド機構に取付けられたドリル機と、を備え、上記可動台が、2本の上記レールのそれぞれの両側にある各2個の旧埋込栓への位置決め可能となるように、上記ガイド部材を、上記レールの外側へ延伸状に配設し、上記ドリル機の重量を軽減するためのスプリングバランサを、上記支柱に付設し、上記スプリングバランサが、渦巻バネ、及び、ワイヤを有し、該ワイヤを滑車を介して上記ガイド機構に接続し、上記ガイド機構ならびに該ガイド機構に取付けられたドリル機を吊り下げ、台車が上記レールから浮上ることを阻止する浮上り係止部材を、上記基枠部に付設したものである。 The sleeper repair truck according to the present invention includes a base frame portion having two parallel guide members orthogonal to the rails, and at least four running wheels rolling on the upper surface of the rails; A movable platform mounted so as to be movable left and right along the guide member of the section, a column erected on the movable platform, a guide mechanism attached to the column so as to be movable up and down, and a concrete sleeper. a drill machine attached to the guide mechanism in order to cut and form a new hole into which a new embedded plug is inserted while cutting and removing an old embedded plug buried in the movable base; The guide member is arranged to extend outward from the rail so that it can be positioned to the two old embedded plugs on both sides of each of the two rails. A spring balancer is attached to the support column to reduce the stress, and the spring balancer has a spiral spring and a wire, and the wire is connected to the guide mechanism via a pulley, and the spring balancer has a spiral spring and a wire, and the wire is connected to the guide mechanism through a pulley. A floating locking member is attached to the base frame portion for suspending the drill machine attached to the mechanism and preventing the cart from floating from the rail.

また、本発明に係るまくらぎ補修用台車セットは、レールに直交する2本のガイド部材を平行に有すると共に、上記レールの上面を転動する少なくとも4個の走行輪を有する基枠部と、上記基枠部の上記ガイド部材に沿って左右移動自在として載置された可動台と、該可動台に立設された支柱と、コンクリート製のまくらぎに埋設されている旧埋込栓を切削除去しつつ新埋込栓が挿入される新しい孔を切削形成するために、上記支柱に昇降自在として取付けられたドリル機と、を有するまくらぎ補修用台車を、備え、動力源と、逸走防止手段と、粉塵吸引除去装置とを備えた親台車を、可撓性ワイヤにて上記まくらぎ補修用台車に連結し、上記まくらぎ補修用台車の逸走を防止すると同時に、補修作業状態下でのレールに沿って上記まくらぎ補修用台車が必要な往復移動を許容するように構成したものである。 The sleeper repair trolley set according to the present invention also includes a base frame portion having two parallel guide members perpendicular to the rails and at least four running wheels rolling on the upper surface of the rails. , a movable platform mounted so as to be able to move left and right along the guide member of the base frame, a support column erected on the movable platform, and a former embedded plug buried in a concrete sleeper. In order to cut and remove a new hole into which a new plug will be inserted, a sleeper repair trolley is equipped with a drill machine that is attached to the pillar so that it can be raised and lowered, and a power source and a sleeper repair truck. A parent truck equipped with a prevention means and a dust suction and removal device is connected to the sleeper repair truck with flexible wires to prevent the sleeper repair truck from running away and at the same time prevent the sleeper repair truck from running away under repair work conditions. The sleeper repair truck is configured to allow necessary reciprocating movement along the rails.

また、上記ドリル機のドリルには、切削粉塵吸引用孔部が貫設され、可撓性ホースを介して、上記親台車の上記粉塵吸引除去装置に連通連結され、かつ、上記可撓性ホースが地面に接することを防ぐホース吊下手段を、上記親台車が具備するものである。 Further, the drill of the drill machine has a cutting dust suction hole provided through the drill, and is connected to the dust suction removal device of the parent truck through a flexible hose, and the flexible hose The parent truck is provided with a hose hanging means that prevents the hose from coming into contact with the ground.

本発明のまくらぎ補修用台車によれば、作業者の身体の負担を軽減でき、楽にドリル機を操作して、正確に効率よく旧埋込栓を破砕、除去して新埋込栓を挿入する孔を形成可能となる。
また、本発明のまくらぎ補修用台車セットによれば、レールに沿って不意にまくらぎ補修用台車が逸走する事故を防止できる。しかも、所定ピッチで配設された複数本のまくらぎを、親台車を停止した状態下で、まくらぎ補修用台車のみをレールに沿って小距離移動を繰返して、安全かつ迅速な作業ができる。さらに、粉塵の発生が著しく減少して、作業員の健康被害を防止できる。
According to the sleeper repair trolley of the present invention, it is possible to reduce the burden on the worker's body, easily operate the drill machine, accurately and efficiently crush and remove the old embedded plug, and insert the new embedded plug. It becomes possible to form holes that
Further, according to the sleeper repair truck set of the present invention, it is possible to prevent an accident in which the sleeper repair truck suddenly runs away along the rail. In addition, work can be done safely and quickly by repeatedly moving multiple sleepers arranged at a predetermined pitch over short distances along the rails while the main truck is stopped. . Furthermore, the generation of dust is significantly reduced, and health hazards to workers can be prevented.

本発明の台車の実施の一形態を示す平面図である。FIG. 1 is a plan view showing an embodiment of a truck of the present invention. 本発明の台車の実施の一形態を示す正面図である。FIG. 1 is a front view showing an embodiment of a truck of the present invention. 本発明の台車の実施の一形態を示す側面図である。FIG. 1 is a side view showing an embodiment of a truck of the present invention. 本発明の台車セットの実施の一形態を示す側面図である。FIG. 1 is a side view showing an embodiment of a cart set of the present invention. 埋込栓をドリルにより破砕、除去する作業工程の説明図である。It is an explanatory view of the work process of crushing and removing an embedded plug with a drill. 新埋込栓を挿入、固定する工程の説明図である。It is an explanatory view of the process of inserting and fixing a new implantable stopper.

以下、図示の実施の形態に基づき本発明を詳説する。
図1~図3に示した実施の形態に於て、本発明に係るまくらぎ補修用台車21は、レール1,1に直交する2本のガイド部材2,2を平行に有すると共に、上記レール1,1の上面を転動する少なくとも4個の走行輪3,3,3,3を有する基枠部4を具備する。まくらぎ補修用台車21は、鋼鉄製とする。あるいは、アルミニウム合金等の軽量の金属で構成される。
Hereinafter, the present invention will be explained in detail based on the illustrated embodiments.
In the embodiment shown in FIGS. 1 to 3, the sleeper repair truck 21 according to the present invention has two parallel guide members 2, 2 perpendicular to the rails 1, 1, and The base frame part 4 has at least four running wheels 3, 3, 3, 3 that roll on the upper surfaces of the wheels 1, 1. The sleeper repair trolley 21 is made of steel. Alternatively, it is made of a lightweight metal such as an aluminum alloy.

また、可動台5が、上記基枠部4の上記ガイド部材2、2に沿って左右移動自在として載置されている。可動台5には支柱6が立設され、支柱6には、ガイド機構16が上下動自在に、例えば、ラックとピニオンにより取付けられている。ガイド機構16は、上下動のための操作ハンドル17を有する。 Further, a movable table 5 is mounted so as to be movable left and right along the guide members 2, 2 of the base frame portion 4. A support 6 is erected on the movable base 5, and a guide mechanism 16 is attached to the support 6 so as to be vertically movable, for example, by a rack and pinion. The guide mechanism 16 has an operating handle 17 for vertical movement.

ドリル機10が、上記支柱6に昇降自在として取付けられている。より具体的には、ガイド機構16に対し、図示省略の結合部材により(着脱自在に)取付けられている。操作ハンドル17を操作して(ガイド機構16を介して)上下に動かし、ドリル機10によりコンクリート製のまくらぎに埋設されている旧埋込栓7を切削除去しつつ新埋込栓8が挿入される新しい孔9を切削形成する(図5参照)。ドリル機10のドリル11には、切削粉塵吸引用孔部12が貫設され、旧埋込栓7の切削除去と新しい孔9の切削形成により発生する粉塵を除去しながら速やかに作業できる。 A drill machine 10 is attached to the support column 6 so as to be able to move up and down. More specifically, it is attached (removably) to the guide mechanism 16 by a coupling member (not shown). By operating the operating handle 17 (via the guide mechanism 16) and moving it up and down, the drill machine 10 cuts out the old plug 7 buried in the concrete sleeper and inserts the new plug 8. A new hole 9 is cut and formed (see FIG. 5). The drill 11 of the drill machine 10 is provided with a hole 12 for suctioning cutting dust, so that the work can be carried out quickly while removing the dust generated by cutting and removing the old embedded plug 7 and cutting and forming the new hole 9.

また、ドリル機10の重量を軽減するためのスプリングバランサ15を、支柱6に付設している。スプリングバランサ15は、(図示省略の)渦巻バネ、及び、ワイヤ15Aを有し、このワイヤ15Aを滑車等を介してガイド機構16に接続し、ガイド機構16ならびにガイド機構16に取付けられたドリル機10を吊り下げることで、(単体で20kg程度の)重量が大であるドリル機10を扱いやすくしている。なお、図2と図3に示すように、台車がレール1から浮上ることを阻止する浮上り係止部材28,28を基枠部4に付設するのが望ましい。 Further, a spring balancer 15 is attached to the support column 6 to reduce the weight of the drill machine 10. The spring balancer 15 has a spiral spring (not shown) and a wire 15A, and the wire 15A is connected to the guide mechanism 16 via a pulley or the like, and the wire 15A is connected to the guide mechanism 16 and the drill machine attached to the guide mechanism 16. By suspending the drill machine 10, the heavy drill machine 10 (about 20 kg alone) is made easier to handle. Note that, as shown in FIGS. 2 and 3, it is desirable to attach floating locking members 28, 28 to the base frame portion 4 to prevent the truck from floating from the rail 1.

本発明のまくらぎ補修用台車21は、実際の作業において、親台車25と組み合わせたまくらぎ補修用台車セットとして使用される。
図4に示すように、親台車25は、動力源22と、逸走防止手段と、粉塵吸引除去装置24とを搭載している。
The sleeper repair truck 21 of the present invention is used in combination with the parent truck 25 as a sleeper repair truck set in actual work.
As shown in FIG. 4, the parent truck 25 is equipped with a power source 22, an escape prevention means, and a dust suction and removal device 24.

親台車25は、鋼鉄製、又は、アルミニウム合金等の軽量の金属フレームにより構成され、親台車25には、電磁ブレーキ等の逸走防止手段を備えている。可撓性ワイヤ26にて上記まくらぎ補修用台車21に連結し、上記まくらぎ補修用台車21の逸走を防止すると同時に、補修作業状態下でのレール1,1に沿って上記まくらぎ補修用台車21が必要な往復移動を許容するように構成している。 The parent truck 25 is constructed of a lightweight metal frame made of steel or aluminum alloy, and is equipped with escape prevention means such as an electromagnetic brake. It is connected to the sleeper repair trolley 21 with flexible wires 26 to prevent the sleeper repair trolley 21 from escaping, and at the same time to connect the sleeper repair trolley 21 along the rails 1, 1 under repair work conditions. The cart 21 is configured to allow necessary reciprocating movement.

動力源22は、例えば発電機であり、ドリル機10及び粉塵吸引除去装置24を作動させるために使用される。例として、18アンペア発電機を3台使用して、発電機2台でドリル機10を作動させ、発電機1台で粉塵吸引除去装置24を作動させる。 The power source 22 is, for example, a generator, and is used to operate the drill machine 10 and the dust suction and removal device 24. As an example, three 18 amp generators are used, with two generators operating the drill machine 10 and one generator operating the dust suction removal device 24.

粉塵吸引除去装置24は、ドリル機10の切削粉塵吸引用孔部12に連結され、旧埋込栓7の切削除去と新しい孔9の切削形成により発生する粉塵を除去するものである。粉塵吸引除去装置24を親台車25に搭載したことにより、まくらぎ補修用台車21を軽量化でき、速やかな作業が可能になる。 The dust suction and removal device 24 is connected to the cutting dust suction hole 12 of the drill machine 10 and removes dust generated by cutting and removing the old embedded plug 7 and cutting and forming the new hole 9. By mounting the dust suction and removal device 24 on the parent truck 25, the sleeper repair truck 21 can be made lighter and work can be carried out more quickly.

逸走防止手段(図示省略)は、親台車25の走行を制動して、レールの傾斜等により親台車25が不意に動きだすことを防止するものである。例えば、3段階に切替えが可能な制動装置が好ましい。前進、後進、静止(ブレーキ作動)の3段階に切替え可能とすることで、作業現場への移動中、及び作業中の安全を確保できる。このような逸走防止手段によって、親台車25は静止状態に固定され、この親台車25にワイヤ26にて連結された台車21の逸走も防止される。 The escape prevention means (not shown) brakes the running of the parent truck 25 to prevent the parent truck 25 from unexpectedly moving due to the inclination of the rails or the like. For example, a braking device that can be switched in three stages is preferable. By being able to switch between three stages: forward, backward, and stationary (brake activation), safety can be ensured while moving to the work site and during work. By such escape prevention means, the parent carriage 25 is fixed in a stationary state, and the escape of the carriage 21 connected to the parent carriage 25 by the wire 26 is also prevented.

本発明のまくらぎ補修用台車セットの使用方法を説明する。
まず、ボルトが抜き取られた旧埋込栓7上にドリル11を位置決めする。前後方向の位置決めは、台車21自体の位置を変更することで行い、左右方向の位置決めは、ガイド部材2,2に載置された可動台5をガイド部材2,2に沿ってスライドさせることで行う。このため、前後方向の位置決めを1度行えば、1本のまくらぎの4個の旧埋込栓7(2本のレール1,1のそれぞれの両側にある各2個の旧埋込栓7)への位置決めを可動台5のスライド動作のみで行うことができる。
A method of using the sleeper repair truck set of the present invention will be explained.
First, the drill 11 is positioned over the old embedded plug 7 from which the bolt has been removed. Positioning in the front-back direction is performed by changing the position of the cart 21 itself, and positioning in the left-right direction is performed by sliding the movable base 5 placed on the guide members 2, 2 along the guide members 2, 2. conduct. For this reason, once the longitudinal positioning is performed, the four old embedded plugs 7 of one sleeper (the two old embedded plugs 7 on each side of the two rails 1, 1) The positioning can be performed only by sliding the movable base 5.

次に、操作ハンドル17及びガイド機構16によって、ドリル機10は上下動自在であるので、ドリル機10によりコンクリート製のまくらぎに埋設されている旧埋込栓7を切削除去しつつ、新埋込栓8が挿入される新しい孔9を切削形成できる。ドリル機10のドリル11には、切削粉塵吸引用孔部12が貫設され、旧埋込栓7の切削除去と新しい孔9の切削形成により発生する粉塵を除去しながら速やかに作業できる。発生した粉塵は、可撓性ホース13を介して、親台車25が搭載する粉塵吸引除去装置24により吸引、収容される。なお、操作ハンドル17の操作に加え、ドリル11を旧埋込栓7に押しつける際には、ドリル機10を作業者の手で直接押し下げることが望ましい。 Next, since the drill machine 10 can be moved up and down by the operation handle 17 and the guide mechanism 16, the old plug 7 buried in the concrete sleeper is cut and removed while the new one is buried. A new hole 9 into which the plug 8 is inserted can be formed by cutting. The drill 11 of the drill machine 10 is provided with a hole 12 for suctioning cutting dust, so that the work can be carried out quickly while removing the dust generated by cutting and removing the old embedded plug 7 and cutting and forming the new hole 9. The generated dust is sucked and contained via the flexible hose 13 by a dust suction removal device 24 mounted on the parent truck 25. In addition to operating the operating handle 17, when pressing the drill 11 against the old embedded plug 7, it is desirable that the drill machine 10 be directly pushed down by the operator's hand.

新しい孔9を切削形成すると、可動台5をスライドさせ、次の旧埋込栓7上へと移動し、同様に切削形成作業を行う。
1本のまくらぎ上の4個の旧埋込栓7を切削除去し、4個の新しい孔9の切削形成を行った後、次のまくらぎ上にドリル11を位置決めするように台車21を移動させる。
After forming the new hole 9 by cutting, the movable base 5 is slid and moved to the next old embedded plug 7, and the cutting operation is performed in the same manner.
After cutting and removing the four old embedded plugs 7 on one sleeper and cutting and forming four new holes 9, the cart 21 is moved to position the drill 11 on the next sleeper. move it.

本発明は、上述の実施の形態に限らず、例えば、ガイド機構16の具体的構成は、支柱6に沿って上下動自在であれば、自由に選択できる。さらに、親台車25に搭載される動力源22と、逸走防止手段と、粉塵吸引除去装置24とは、それぞれに必要な上述の機能を果たす限り、具体的構成について自由に選択できる。また、図5に示される締結装置の構造に限定されるものではなく、埋込栓を有する全てのコンクリート製まくらぎに適用できるものである。 The present invention is not limited to the above-described embodiments. For example, the specific configuration of the guide mechanism 16 can be freely selected as long as it is movable up and down along the support column 6. Further , the specific configurations of the power source 22, the escape prevention means, and the dust suction and removal device 24 mounted on the parent truck 25 can be freely selected as long as they each fulfill the above-mentioned necessary functions. Further, the present invention is not limited to the structure of the fastening device shown in FIG. 5, and can be applied to all concrete sleepers having embedded plugs.

以上のように、本発明のまくらぎ補修用台車は、レール1,1に直交する2本のガイド部材2,2を平行に有すると共に、上記レール1,1の上面を転動する少なくとも4個の走行輪3,3,3,3を有する基枠部4と、上記基枠部4の上記ガイド部材2,2に沿って左右移動自在として載置された可動台5と、該可動台5に立設された支柱6と、コンクリート製のまくらぎ20に埋設されている旧埋込栓7を切削除去しつつ新埋込栓8が挿入される新しい孔9を切削形成するために、上記支柱6に昇降自在として取付けられたドリル機10と、を備えたので、正確に効率よく旧埋込栓7をドリル機10により破砕、除去して新埋込栓8を挿入する孔9を切削する作業を行うことができる。 As described above, the sleeper repair truck of the present invention has two parallel guide members 2, 2 perpendicular to the rails 1, 1, and at least four guide members 2, 2 that roll on the upper surface of the rails 1, 1. a base frame part 4 having running wheels 3, 3, 3, 3, a movable base 5 placed so as to be able to move left and right along the guide members 2, 2 of the base frame part 4, and the movable base 5. In order to cut and form a new hole 9 into which a new embedded plug 8 will be inserted while cutting and removing the erected pillar 6 and the old embedded plug 7 buried in the concrete sleeper 20, Since the drill machine 10 is attached to the support column 6 so as to be able to move up and down, the old plug 7 can be accurately and efficiently crushed and removed by the drill machine 10, and the hole 9 into which the new plug 8 will be inserted is cut. be able to perform tasks.

また、上記ドリル機10の重量を軽減するためのスプリングバランサ15を、上記支柱6に付設したので、作業者は、従来よりも小さな力をもって、楽にドリル機10を操作して、旧埋込栓7の除去及び新埋込栓8を挿入する孔9の切削作業を容易に行うことができる。 In addition, since a spring balancer 15 is attached to the support column 6 to reduce the weight of the drill machine 10, the operator can easily operate the drill machine 10 with less force than before and remove the old embedded plug. 7 and cutting of the hole 9 into which the new plug 8 is inserted can be easily performed.

また、本発明のまくらぎ補修用台車セットは、レール1,1に直交する2本のガイド部材2,2を平行に有すると共に、上記レール1,1の上面を転動する少なくとも4個の走行輪3,3,3,3を有する基枠部4と、上記基枠部4の上記ガイド部材2,2に沿って左右移動自在として載置された可動台5と、該可動台5に立設された支柱6と、コンクリート製のまくらぎ20に埋設されている旧埋込栓7を切削除去しつつ新埋込栓8が挿入される新しい孔9を切削形成するために、上記支柱6に昇降自在として取付けられたドリル機10と、を有するまくらぎ補修用台車21を、備え、動力源22と、逸走防止手段と、粉塵吸引除去装置24とを備えた親台車25を、可撓性ワイヤ26にて上記まくらぎ補修用台車21に連結し、上記まくらぎ補修用台車21の逸走を防止すると同時に、補修作業状態下でのレール1,1に沿って上記まくらぎ補修用台車21が必要な往復移動を許容するように構成したので、正確に効率よく旧埋込栓7をドリル機10により破砕、除去して新埋込栓8を挿入する孔9を切削する作業を行うことができる。また、まくらぎ補修用台車21の逸走を防止して、安全性を高めることができる。また、レール上での台車の位置合わせを容易に行うことができる。 Further, the sleeper repair trolley set of the present invention has two parallel guide members 2, 2 orthogonal to the rails 1, 1, and at least four running guide members 2, 2 that roll on the upper surface of the rails 1, 1. A base frame portion 4 having rings 3, 3, 3, 3, a movable table 5 mounted on the base frame portion 4 so as to be able to move left and right along the guide members 2, 2, and a stand on the movable table 5. In order to form a new hole 9 into which a new embedded plug 8 will be inserted while cutting and removing the installed support 6 and the old embedded plug 7 buried in the concrete sleeper 20, the above-mentioned support 6 is removed. A sleeper repair truck 21 is provided with a drill machine 10 that is attached to the drill machine so as to be able to be raised and lowered, and a parent truck 25 that is equipped with a power source 22, an escape prevention means, and a dust suction and removal device 24 is flexible. The sleeper repair trolley 21 is connected to the sleeper repair trolley 21 with a wire 26 to prevent the sleeper repair trolley 21 from escaping, and at the same time connect the sleeper repair trolley 21 along the rails 1, 1 under repair work conditions. Since the structure is configured to allow the necessary reciprocating movement, the old embedded plug 7 can be accurately and efficiently crushed and removed using a drill machine 10, and the hole 9 into which the new embedded plug 8 is inserted can be cut. Can be done. Furthermore, it is possible to prevent the sleeper repair truck 21 from running away, thereby increasing safety. Further, the positioning of the cart on the rail can be easily performed.

また、上記ドリル機10のドリル11には、切削粉塵吸引用孔部12が貫設され、可撓性ホース13を介して、上記親台車25の上記粉塵吸引除去装置24に連通連結され、かつ、上記可撓性ホース13が地面に接することを防ぐホース吊下手段14を、上記親台車25が具備するので、孔9の切削と切粉等の不要物の掃除を同時に行うことができる。また、粉塵吸引除去装置24は親台車25に載せられるため、作業用のまくらぎ補修用台車を軽量にでき、位置合わせ等の作業を容易にできる。また、可撓性ホース13が地面に接することなく、ホース13の台車下への巻き込み事故を防止できる。 Further, the drill 11 of the drill machine 10 is provided with a cutting dust suction hole 12 that is connected to the dust suction and removal device 24 of the parent truck 25 via a flexible hose 13, and Since the parent carriage 25 is equipped with a hose hanging means 14 that prevents the flexible hose 13 from coming into contact with the ground, the hole 9 can be cut and unnecessary materials such as chips can be cleaned at the same time. Furthermore, since the dust suction and removal device 24 is placed on the parent truck 25, the sleeper repair truck for work can be made lightweight, and operations such as positioning can be facilitated. In addition, the flexible hose 13 does not come into contact with the ground, thereby preventing the hose 13 from getting caught under the trolley.

1 レール
2 ガイド部材
3 走行輪
4 基枠部
5 可動台
6 支柱
7 旧埋込栓
8 新埋込栓
9 新しい孔
10 ドリル機
11 ドリル
12 切削粉塵吸引用孔部
13 可撓性ホース
14 ホース吊下手段
15 スプリングバランサ
15A ワイヤ
16 ガイド機構
20 まくらぎ
21 まくらぎ補修用台車
22 動力源
24 粉塵吸引除去装置
25 親台車
26 可撓性ワイヤ
28 浮上り係止部材
1 Rail 2 Guide member 3 Running wheel 4 Base frame 5 Movable base 6 Support 7 Old embedded plug 8 New embedded plug 9 New hole 10 Drill machine 11 Drill 12 Cutting dust suction hole 13 Flexible hose 14 Hose hanging Lower means 15 Spring balancer
15A wire
16 Guide mechanism
20 sleepers 21 sleeper repair trolley 22 power source 24 dust suction removal device 25 parent trolley 26 flexible wire
28 Floating locking member

Claims (3)

レールに直交する2本のガイド部材を平行に有すると共に、上記レールの上面を転動する少なくとも4個の走行輪を有する基枠部と、
上記基枠部の上記ガイド部材に沿って左右移動自在として載置された可動台と、
該可動台に立設された支柱と、
上記支柱に上下動自在に取付けられたガイド機構と、
コンクリート製のまくらぎに埋設されている旧埋込栓を切削除去しつつ新埋込栓が挿入される新しい孔を切削形成するために、上記ガイド機構に取付けられたドリル機と、
を備え
上記可動台が、2本の上記レールのそれぞれの両側にある各2個の旧埋込栓への位置決め可能となるように、上記ガイド部材を、上記レールの外側へ延伸状に配設し、
上記ドリル機の重量を軽減するためのスプリングバランサを、上記支柱に付設し、
上記スプリングバランサが、渦巻バネ、及び、ワイヤを有し、該ワイヤを滑車を介して上記ガイド機構に接続し、上記ガイド機構ならびに該ガイド機構に取付けられたドリル機を吊り下げ、
台車が上記レールから浮上ることを阻止する浮上り係止部材を、上記基枠部に付設したことを特徴とするまくらぎ補修用台車。
a base frame having two parallel guide members perpendicular to the rail and at least four running wheels rolling on the upper surface of the rail;
a movable table placed so as to be movable left and right along the guide member of the base frame;
A pillar erected on the movable platform;
A guide mechanism attached to the above-mentioned pillar so as to be movable up and down,
a drill machine attached to the guide mechanism for cutting and forming a new hole into which a new plug will be inserted while cutting and removing the old plug buried in the concrete sleeper;
Equipped with
The guide member is disposed in an extended manner to the outside of the rail so that the movable base can be positioned to each of the two old embedded plugs on both sides of each of the two rails,
A spring balancer is attached to the support column to reduce the weight of the drill machine.
The spring balancer has a spiral spring and a wire, the wire is connected to the guide mechanism via a pulley, and suspends the guide mechanism and the drill machine attached to the guide mechanism,
A sleeper repair truck, characterized in that a floating locking member for preventing the truck from floating from the rail is attached to the base frame .
レールに直交する2本のガイド部材を平行に有すると共に、上記レールの上面を転動する少なくとも4個の走行輪を有する基枠部と、a base frame having two parallel guide members perpendicular to the rail and at least four running wheels rolling on the upper surface of the rail;
上記基枠部の上記ガイド部材に沿って左右移動自在として載置された可動台と、a movable table placed so as to be movable left and right along the guide member of the base frame;
該可動台に立設された支柱と、A pillar erected on the movable platform;
コンクリート製のまくらぎに埋設されている旧埋込栓を切削除去しつつ新埋込栓が挿入される新しい孔を切削形成するために、上記支柱に昇降自在として取付けられたドリル機と、a drill machine that is movably mounted on the support column in order to cut and remove the old plug buried in the concrete sleeper and cut and form a new hole into which the new plug will be inserted;
を有するまくらぎ補修用台車を、備え、A sleeper repair trolley having a
動力源と、逸走防止手段と、粉塵吸引除去装置とを備えた親台車を、可撓性ワイヤにて上記まくらぎ補修用台車に連結し、上記まくらぎ補修用台車の逸走を防止すると同時に、補修作業状態下でのレールに沿って上記まくらぎ補修用台車が必要な往復移動を許容するように構成したことを特徴とするまくらぎ補修用台車セット。A parent truck equipped with a power source, an escape prevention means, and a dust suction removal device is connected to the sleeper repair truck by a flexible wire, and at the same time, the sleeper repair truck is prevented from running away; A sleeper repair trolley set, characterized in that the sleeper repair trolley is configured to allow necessary reciprocating movement along the rails during repair work.
上記ドリル機のドリルには、切削粉塵吸引用孔部が貫設され、可撓性ホースを介して、上記親台車の上記粉塵吸引除去装置に連通連結され、The drill of the drill machine is provided with a cutting dust suction hole, which is connected to the dust suction removal device of the parent truck through a flexible hose;
かつ、上記可撓性ホースが地面に接することを防ぐホース吊下手段を、上記親台車が具備する請求項2記載のまくらぎ補修用台車セット。3. The sleeper repair truck set according to claim 2, wherein the parent truck includes hose hanging means for preventing the flexible hose from coming into contact with the ground.
JP2019222749A 2019-12-10 2019-12-10 Sleeper repair trolley and trolley set Active JP7361304B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019222749A JP7361304B2 (en) 2019-12-10 2019-12-10 Sleeper repair trolley and trolley set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019222749A JP7361304B2 (en) 2019-12-10 2019-12-10 Sleeper repair trolley and trolley set

Publications (2)

Publication Number Publication Date
JP2021092059A JP2021092059A (en) 2021-06-17
JP7361304B2 true JP7361304B2 (en) 2023-10-16

Family

ID=76311961

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019222749A Active JP7361304B2 (en) 2019-12-10 2019-12-10 Sleeper repair trolley and trolley set

Country Status (1)

Country Link
JP (1) JP7361304B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113699843A (en) * 2021-08-27 2021-11-26 中铁五局集团第六工程有限责任公司 Sleeper grinding equipment device and using method thereof
CN116556121B (en) * 2023-05-25 2023-11-03 北京瀚明达科技有限公司 Longitudinal reinforcement vehicle for ballastless track slab of high-speed railway

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000220102A (en) 1999-01-29 2000-08-08 East Japan Railway Co Moving injection device for track line ballast filler
JP2006045832A (en) 2004-08-03 2006-02-16 Kintetsu Kido Engineering Kk Embedded plug repair carriage
JP2010070294A (en) 2008-09-17 2010-04-02 Toyota Auto Body Co Ltd Carriage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000220102A (en) 1999-01-29 2000-08-08 East Japan Railway Co Moving injection device for track line ballast filler
JP2006045832A (en) 2004-08-03 2006-02-16 Kintetsu Kido Engineering Kk Embedded plug repair carriage
JP2010070294A (en) 2008-09-17 2010-04-02 Toyota Auto Body Co Ltd Carriage

Also Published As

Publication number Publication date
JP2021092059A (en) 2021-06-17

Similar Documents

Publication Publication Date Title
JP7361304B2 (en) Sleeper repair trolley and trolley set
SU1101176A3 (en) Moable machine for butt resistance welding by rail flashing
US4236453A (en) Mobile rail welding machine
JP2017089302A (en) Floor slab removal method for composite girder
CN209066274U (en) A kind of bridge-collision-avoidance wall repairing is mobile trolley used
KR101878485B1 (en) A worktable carriage for railroad
JP4892015B2 (en) Wheel runaway prevention device
JP5406586B2 (en) Orbital tamping device
KR101458452B1 (en) removal apparatus of concrete bed track sleeper
US20090145324A1 (en) Movable crawler system for railroad equipment
JP2003268703A (en) Repair structure and repair device for bolt tightened part in railroad rail
JP7127820B2 (en) Sleeper replacement method
KR101262736B1 (en) A operating car for a constucting tunnel or safety diagnosis
JP5665174B2 (en) Vehicle workbench device
CN220028977U (en) Automatic broken bar and dismounting equipment of prestressed electric pole tensioning tool
JP2021080638A (en) Automatic switch device of set-off device and set-off device
KR102138669B1 (en) Removal apparatus of spring for repair and decomposition of railroad
KR20070011898A (en) Remte controllable mobile wire saw independent car
CN214022958U (en) Anchor flaring strengthening device
JP6715690B2 (en) Ground improvement method
JP2022011774A (en) Mobile scaffolding device for viaduct
KR200495433Y1 (en) Horizontality device for worktable
JP2021008718A (en) Concrete wall removing device and concrete wall removing method
CN217532839U (en) Simple ladder vehicle for unilateral aerial work in subway interval tunnel
CN216237920U (en) Subway track construction joint device

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20191210

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221003

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230519

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230803

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230901

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230922

R150 Certificate of patent or registration of utility model

Ref document number: 7361304

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150