JP7231297B2 - Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device - Google Patents

Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device Download PDF

Info

Publication number
JP7231297B2
JP7231297B2 JP2022149164A JP2022149164A JP7231297B2 JP 7231297 B2 JP7231297 B2 JP 7231297B2 JP 2022149164 A JP2022149164 A JP 2022149164A JP 2022149164 A JP2022149164 A JP 2022149164A JP 7231297 B2 JP7231297 B2 JP 7231297B2
Authority
JP
Japan
Prior art keywords
concrete formwork
concrete
constituent member
constituent
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022149164A
Other languages
Japanese (ja)
Other versions
JP2022172410A (en
Inventor
実 土田
Original Assignee
有限会社 伊藤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社 伊藤 filed Critical 有限会社 伊藤
Priority to JP2022149164A priority Critical patent/JP7231297B2/en
Publication of JP2022172410A publication Critical patent/JP2022172410A/en
Priority to JP2023017894A priority patent/JP7446018B1/en
Application granted granted Critical
Publication of JP7231297B2 publication Critical patent/JP7231297B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル覆工用コンクリートを成形するためのコンクリート型枠装置に関するものである。特に、本発明は、コンクリート型枠装置の構成部材用の起立台、コンクリート型枠装置の構成部材ユニットに関するものである。さらに、本発明は、コンクリート型枠装置の構成部材ユニットの搬送方法、コンクリート型枠装置の構築方法及びコンクリート型枠装置の解体方法に関するものである。 TECHNICAL FIELD The present invention relates to a concrete formwork apparatus for molding concrete for tunnel lining. In particular, the present invention relates to an erector for a component of a concrete forming machine, a component unit of a concrete forming machine. Furthermore, the present invention relates to a method for transporting a component unit of a concrete formwork apparatus, a method for constructing a concrete formwork apparatus, and a method for dismantling a concrete formwork apparatus.

特許文献1には、この種のコンクリート型枠装置が開示されている。
このようなコンクリート型枠装置においては、分解された状態の多数の部品が工場等からトラックの荷台に積載されてトンネル建設現場へ搬入される。そして、それらの部品がトンネル内で組立てられる。
Patent Literature 1 discloses this type of concrete formwork device.
In such a concrete formwork apparatus, a large number of disassembled parts are loaded from a factory or the like onto the bed of a truck and carried to a tunnel construction site. These parts are then assembled in a tunnel.

すなわち、図1及び図2は、コンクリート型枠装置11を示す。従来、このコンクリート型枠装置11を構成するとともに、各種の部品からなる構成部材は、大きいことに加えて、起立姿勢は不安定な形状である。このため、構成部材は、分解された多数の部品として、ワイヤ等によって結束された状態で前記のようにトラックの荷台に載せられて搬送される。 1 and 2 show a concrete formwork device 11. FIG. Conventionally, the constituent members comprising various parts that constitute the concrete formwork apparatus 11 are large and have an unstable standing posture. For this reason, the constituent members are bundled with wires or the like as a large number of disassembled parts, and then placed on the bed of the truck and transported as described above.

特開2014-5719号公報JP 2014-5719 A

従って、従来は、トンネルTNの建設現場の地面S上において、部品を組合せて構成部材を組立てる必要がある。このため、トンネルTN内の組立てに際しては、トンネルTN内の地面上に、多くの部品を仮置きしたり、並べたりするエリアが必要になるとともに、組立てにはクレーンも用いられる。これらのことから、トンネルTN内において構成部材の組立てのために広いスペースが占拠されることになる。一方、トンネルTN内には余分なスペースを確保することはないので、前記のように、広いスペースが占拠されると、その占拠期間は、トラックなどの車両移動や、他の作業の遂行ができなくなる。従って、トンネル建設の工期が長くなる原因となる。 Therefore, conventionally, it is necessary to assemble components by assembling parts on the ground S at the construction site of the tunnel TN. Therefore, when assembling in the tunnel TN, an area for temporarily placing and arranging many parts on the ground inside the tunnel TN is required, and a crane is also used for the assembling. As a result, a large amount of space is occupied in the tunnel TN for assembly of the components. On the other hand, since no extra space is secured in the tunnel TN, as described above, when a large space is occupied, it is not possible to move vehicles such as trucks or perform other work during the occupied period. Gone. As a result, the construction period for tunnel construction is lengthened.

本発明のコンクリート型枠装置の構成部材用の起立台においては、トンネルの覆工コンクリートを成形するためのコンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにしたことを特徴とする。
また、本発明のコンクリート型枠装置の構成部材用の起立台においては、台本体と、その台本体上に設けられ、前記構成部材の下端に対して着脱可能に取付けられるアダプタとよりなり、前記アダプタは、前記台本体と別体であって、前記台本体に対して着脱可能に固定されることを特徴とする。
また、本発明のコンクリート型枠装置の構成部材用の起立台においては、隣接する別の構成部材用の起立台と連結可能にした連結部を設けたことを特徴とする。
In the erector for the constituent members of the concrete form apparatus of the present invention, a mounting portion is provided which is detachable from the lower end of the constituent member of the concrete form apparatus for molding the tunnel lining concrete. It is characterized by functioning as a leg for standing up the component when the part is attached to the lower end of the component.
Further, the erecting table for the constituent members of the concrete formwork apparatus of the present invention comprises a table body and an adapter provided on the table body and detachably attached to the lower end of the constituent member, The adapter is separate from the base body, and is detachably fixed to the base body.
In addition, the erector for the constituent member of the concrete formwork apparatus of the present invention is characterized in that it is provided with a connecting portion that can be connected to the erector for another adjacent constituent member.

以上の構成においては、起立台によってコンクリート型枠装置の構成部材を起立状態に安定維持させることができる。従って、構成部材が起立状態で安定するため、その構成部材を複数の部品に分解にしなくても、トラック等によって搬送できる。よって、トンネル建設現場においては、前記構成部材の部品を仮置きしたり、その部品を組立てたりするスペースを省略できる。従って、トンネル内において、トラック等の移動や、他の作業が妨害されることがほとんどなくなるので、トンネル建設の工期を短くできる。 In the above configuration, the constituent members of the concrete formwork apparatus can be stably maintained in an upright state by the erector. Therefore, since the constituent member is stable in an upright state, it can be transported by a truck or the like without disassembling the constituent member into a plurality of parts. Therefore, at the tunnel construction site, it is possible to omit the space for temporarily placing the parts of the constituent members and for assembling the parts. Therefore, movement of trucks and other work in the tunnel is hardly hindered, so that the construction period of the tunnel can be shortened.

また、本発明のコンクリート型枠装置の構成部材ユニットにおいては、前記トンネルの覆工コンクリートを成形するためのコンクリート型枠装置において、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるための前記起立台を着脱可能に取付けたことを特徴とする。
また、本発明のコンクリート型枠装置の構成部材ユニットにおいては、前記台本体が前記構成部材の長手方向と直角をなす方向に延びることを特徴とする。
Further, in the structural member unit of the concrete formwork apparatus of the present invention, in the concrete formwork apparatus for forming the lining concrete of the tunnel, the lower end of the structural member extending in the extension direction of the tunnel is configured It is characterized in that the stand for standing the members is detachably attached.
Moreover, in the structural member unit of the concrete formwork apparatus of the present invention, the base body extends in a direction perpendicular to the longitudinal direction of the structural member.

従って、このコンクリート型枠装置の構成部材ユニットにおいては、前記のように、構成部材が安定するため、その構成部材を部品として分解状態にしなくても、トラック等によって搬送できる。従って、搬送後に部品をトンネル建設現場において組立てる必要がなくなる。 Therefore, in the constituent member unit of this concrete forming apparatus, since the constituent members are stabilized as described above, the constituent members can be transported by a truck or the like without being disassembled as parts. Therefore, it is no longer necessary to assemble the parts at the tunnel construction site after delivery.

さらに、本発明の前記トンネルの覆工コンクリートを成形するためのコンクリート型枠装置においては、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるための前記起立台を着脱可能に取付け、前記起立台を、台本体と、その台本体上に設けられ、前記構成部材の下端に対して着脱可能に取付けられるアダプタとによって構成したことを特徴とする。 Further, in the concrete formwork apparatus for forming the lining concrete of the tunnel of the present invention, the erector is provided for erecting the structural member with respect to the lower end of the structural member extending in the extension direction of the tunnel. The stand is detachably mounted, and the stand is composed of a base body and an adapter provided on the base body and detachably attached to the lower end of the component.

この構成においては、アダプタとして、形状や大きさの異なるものを複数用意すれば、各種の大きさや形状の異なる構成部材に対応できる。
さらに、コンクリート型枠装置の構成部材ユニットの搬送方法においては、トンネルの覆工コンクリートを成形するためのコンクリート型枠装置において、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるための起立台を着脱可能に取付けることによって、前記コンクリート型枠装置の構成部材ユニットを構成し、その構成部材ユニットを、その長手方向がトラックの荷台の前後方向に沿うように、前記構成部材用の起立台を脚として前記荷台上に積載するとともに、前記構成部材ユニットを搬送することを特徴とする。
In this configuration, by preparing a plurality of adapters having different shapes and sizes, it is possible to deal with structural members having different sizes and shapes.
Further, in the method of transporting the component unit of the concrete formwork apparatus, in the concrete formwork apparatus for forming the lining concrete of the tunnel, the component member is attached to the lower end of the component member extending in the extension direction of the tunnel. By detachably attaching a stand for standing up the concrete formwork apparatus, the constituent member unit of the concrete formwork apparatus is configured, and the constituent member unit is arranged so that its longitudinal direction is along the front-rear direction of the truck bed. It is characterized in that the constituent member unit is conveyed while the constituent member unit is loaded on the loading platform using a stand for the constituent member as a leg.

従って、前記のコンクリート型枠装置の構成部材ユニットの搬送方法においては、構成部材ユニットを、その長手方向がトラックの荷台の前後方向に沿うように、荷台上に積載する。このため、組立て状態の構成部材ユニットが、荷台の横からはみ出ることを回避できる。よって、構成部材を部品に分解して搬送する必要がなくなるので、トンネル建設現場においては、前記構成部材の部品を仮置きしたり、構成部材を組立てたりするスペースを省略できる。従って、トンネル建設の工期を短くできる。 Therefore, in the method of transporting the constituent member units of the concrete formwork apparatus described above, the constituent member units are loaded on the carrier of the truck so that the longitudinal direction thereof extends along the longitudinal direction of the carrier. Therefore, it is possible to prevent the component unit in the assembled state from protruding from the side of the loading platform. Therefore, since it is not necessary to disassemble the constituent members into parts and transport them, it is possible to omit the space for temporarily placing the constituent members and assembling the constituent members at the tunnel construction site. Therefore, the construction period for tunnel construction can be shortened.

また、本発明のコンクリート型枠装置の構築方法においては、トンネルの覆工コンクリートを成形するためのコンクリート型枠装置において、前記トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるための起立台を着脱可能に取付けて、コンクリート型枠装置の構成部材ユニットを構成し、その構成部材ユニットを前記コンクリート型枠装置の構築予定エリアの幅方向の側方に起立状態で仮置きした後に、前記起立台を取外して、前記構成部材により前記コンクリート型枠装置を構築することを特徴とする。 Further, in the method for constructing a concrete formwork apparatus of the present invention, in the concrete formwork apparatus for forming the lining concrete of a tunnel, the constituent member is attached to the lower end of the constituent member extending in the extension direction of the tunnel. By detachably attaching an erecting base for erecting the concrete form apparatus, a constituent member unit of the concrete form apparatus is constructed, and the constituent member unit is erected on the side in the width direction of the planned construction area of the concrete form apparatus. After the temporary placement, the stand is removed, and the concrete forming apparatus is constructed from the constituent members.

従って、このコンクリート型枠装置の構築方法においては、構成部材を分解状態にしなくても、トラック等によって搬送できる。従って、トンネル建設の工期を短くできる。しかも、構成部材ユニットから前記起立台を外せば、構成部材をそのままコンクリート型枠装置の構築に供することができるため、コンクリート型枠装置をスムーズに構築できる。また、構成部材ユニットはコンクリート型枠装置の構築予定エリアの幅方向の側方に起立状態で仮置きされる。このため、仮置きされた構成部材ユニットによってトンネルの中央部を通るトラックやフォークリフト等の車両の通行や物品の移動が妨げられることを回避できることになり、トンネル建設の工期短縮に資することができる。 Therefore, in this method for constructing a concrete formwork apparatus, the constituent members can be transported by a truck or the like without being disassembled. Therefore, the construction period for tunnel construction can be shortened. Moreover, since the constituent members can be used as they are for constructing the concrete form apparatus by removing the erector from the constituent member unit, the concrete form apparatus can be constructed smoothly. In addition, the constituent member units are temporarily placed in an upright state laterally in the width direction of the planned construction area of the concrete formwork apparatus. Therefore, it is possible to avoid obstruction of passage of vehicles such as trucks and forklifts passing through the central part of the tunnel and movement of goods by the temporarily placed component unit, which contributes to shortening the construction period of the tunnel.

さらに、本発明のコンクリート型枠装置の解体方法においては、前記コンクリート型枠装置の解体に際して、同コンクリート型枠装置から分解された構成部材の下端に対して起立台を着脱可能に取付けて、前記構成部材を前記起立台を脚として前記コンクリート型枠装置の設置位置の幅方向の側方に仮置きすることを特徴とする。 Further, in the dismantling method of the concrete formwork apparatus of the present invention, when dismantling the concrete formwork apparatus, an erector is detachably attached to the lower end of the component disassembled from the concrete formwork apparatus, and the It is characterized in that the constituent members are temporarily placed laterally in the width direction of the installation position of the concrete formwork apparatus using the standing base as a leg.

この解体方法においては、解体された構成部材を起立台においてコンクリート型枠装置の設置位置の幅方向の側方に起立状態で仮置きすることができる。従って、コンクリート型枠装置の解体に際して、構成部材を邪魔になることなく一時置きできることから、解体作業を効率よく行うことができる。また、構成部材を仮置き位置からトラックの荷台に移動させた後、起立状態ではみ出ることなく搬送できる。よって、トンネル建設の工期短縮に利することができる。 In this dismantling method, the dismantled constituent members can be temporarily placed in an upright state laterally in the width direction of the installation position of the concrete formwork apparatus on the erecting stand. Therefore, when dismantling the concrete formwork apparatus, the constituent members can be placed temporarily without being an obstacle, so that the dismantling work can be carried out efficiently. In addition, after the constituent members are moved from the temporary placement position to the bed of the truck, they can be transported in an upright state without sticking out. Therefore, it is possible to shorten the work period for tunnel construction.

本発明は、トンネル建設の工期を短縮できる効果を有する。 ADVANTAGE OF THE INVENTION This invention has the effect of being able to shorten the work period of tunnel construction.

コンクリート型枠装置の使用状態を示すトンネルの簡略断面図。A simplified cross-sectional view of a tunnel showing a usage state of a concrete formwork device. コンクリート型枠装置の構築途中を示すトンネルの簡略断面図。A simplified cross-sectional view of a tunnel showing a concrete formwork device in the middle of construction. 面板の張設状態を示すコンクリート型枠装置の簡略側面図。FIG. 2 is a simplified side view of the concrete formwork device showing the stretched state of the face plate. コンクリート型枠装置の構築途中を示す簡略側面図。The simplified side view which shows the construction halfway of the concrete formwork apparatus. 構成部材用の起立台の斜視図。1 is a perspective view of a component stand; FIG. 構成部材用の起立台の分解斜視図。1 is an exploded perspective view of an erector for a component; FIG. 構成部材用の起立台の断面図。FIG. 2 is a cross-sectional view of a component stand. 構成部材用の起立台の連結部分の断面図。FIG. 4 is a cross-sectional view of the connection portion of the component stand. 足場ユニットの折たたみ状態を示す斜視図。The perspective view which shows the folding state of a scaffolding unit. 上部足場の展開状態を示す側面図。The side view which shows the deployment state of an upper scaffold. 骨組材ユニットの折たたみ状態を示す斜視図。The perspective view which shows the folding state of a framework material unit. 骨組材ユニット,足場ユニット及びベース基枠のトラック搬送状態を示す斜視図。The perspective view which shows the track|truck conveyance state of a framework material unit, a scaffolding unit, and a base frame. 骨組材ユニット,足場ユニット及びベース基枠のトラック搬送状態を示す図12とは異なる方向から見た斜視図。FIG. 13 is a perspective view seen from a direction different from that of FIG. 12 showing the frame material unit, the scaffolding unit, and the base frame being transported by truck; 骨組材ユニット,足場ユニット及びベース基枠のトラック搬送状態を示す側面図。The side view which shows the track|truck conveyance state of a framework material unit, a scaffolding unit, and a base frame. 変更例を示す斜視図。The perspective view which shows the example of a change. 同じく変更例を示す斜視図。The perspective view which similarly shows the example of a change.

(実施形態)
以下、本発明を具体化した実施形態を図面に基づいて説明する。
〈コンクリート型枠装置11の構成及び覆工コンクリートCの打設方法〉
はじめに、図1~図4を中心に、前記コンクリート型枠装置11の構成及び覆工コンクリートCの打設方法を説明する。
(embodiment)
Embodiments embodying the present invention will be described below with reference to the drawings.
<Construction of Concrete Formwork Device 11 and Method of Casting Lining Concrete C>
First, the configuration of the concrete formwork device 11 and the method of placing the lining concrete C will be described with reference to FIGS. 1 to 4. FIG.

図1及び図2に示すように、トンネルTNの地面Sにおける一対の平行なレールR上には、覆工コンクリートCを成形するためのコンクリート型枠装置(以下、型枠装置という)11がトンネルTNの延長方向に沿って移動可能に支持される。 As shown in FIGS. 1 and 2, a concrete formwork device (hereinafter referred to as a formwork device) 11 for forming lining concrete C is placed on a pair of parallel rails R on the ground S of the tunnel TN. It is movably supported along the extension direction of TN.

図1に示すように、型枠装置11には左右一対のベース基枠12が設けられており、このベース基枠12のビーム12cの前後両端のスタンド12b(図12及び図13参照)の下端に前記レールR上を転動する車輪12aが設けられている。ベース基枠12のビーム12cはトンネルTNの延長方向(前後方向)に延在している。両ベース基枠12のビーム12c間には複数の支持架台13が架設状態で支持されており、各支持架台13はトンネルTNの延長方向に沿って相互間隔をおいて配置されている。 As shown in FIG. 1, a formwork device 11 is provided with a pair of left and right base frames 12, and the lower ends of stands 12b (see FIGS. 12 and 13) at both front and rear ends of beams 12c of the base frame 12. are provided with wheels 12a that roll on the rail R. The beam 12c of the base frame 12 extends in the extension direction (front-rear direction) of the tunnel TN. A plurality of support frames 13 are supported in an erected state between the beams 12c of both base frames 12, and the support frames 13 are arranged at intervals along the extension direction of the tunnel TN.

図1及び図4に示すように、支持架台13の上端には梁材14が設けられるとともに、その梁材14上には同梁材14の延長方向に沿って複数の支柱15が立設されている。支柱15の上端間には円弧状の複数本の骨組16aよりなる頂部骨組材16が架設されている。なお、頂部骨組材16の骨組16aは、一つおきのものが、図示しない支持架台13間に支持された通し材(図示しない)に支持される。 As shown in FIGS. 1 and 4, a beam member 14 is provided at the upper end of the support frame 13, and a plurality of columns 15 are erected on the beam member 14 along the extension direction of the beam member 14. ing. Between the upper ends of the pillars 15, a top frame member 16 consisting of a plurality of arc-shaped frames 16a is installed. It should be noted that every other frame 16a of the top frame member 16 is supported by through members (not shown) supported between the support bases 13 (not shown).

図1に示すように、各頂部骨組材16の骨組16aの両端には、側部骨組材17の骨組17aが連結固定されている。その各側部骨組材17の骨組17aの下端には下部骨組材18の骨組18aが連結固定されている。これらの側部骨組材17及び下部骨組材18は、図示しない棒状の連結部材を介して支持架台13に支持される。図1及び図3に示すように、各骨組材16,17,18の外側面にコンクリート成形用の複数枚の面板19が張設固定される。 As shown in FIG. 1, the frames 17a of the side frame members 17 are connected and fixed to both ends of the frame 16a of each top frame member 16. As shown in FIG. A frame 18a of a lower frame member 18 is connected and fixed to the lower end of the frame 17a of each side frame member 17. As shown in FIG. These side frame members 17 and lower frame members 18 are supported by the support frame 13 via rod-shaped connecting members (not shown). As shown in FIGS. 1 and 3, a plurality of face plates 19 for concrete molding are stretched and fixed to the outer surfaces of the frame members 16, 17, and 18, respectively.

そして、図1に示すように、トンネルTNの内壁と面板19との間に覆工コンクリートCが打設されるとともに、面板19によって覆工コンクリートCの内面が成形される。
〈コンクリート型枠装置11を構成する構成部材〉
次に、コンクリート型枠装置11を構成する構成部材について説明する。
Then, as shown in FIG. 1 , the lining concrete C is placed between the inner wall of the tunnel TN and the face plate 19 , and the inner surface of the lining concrete C is formed by the face plate 19 .
<Constituent members constituting the concrete formwork device 11>
Next, constituent members constituting the concrete formwork apparatus 11 will be described.

図1,図9及び図10に示すように、前記支持架台13の左右(トンネルTNの幅方向)両側面には構成部材としての上部足場21が支持されている。この上部足場21は、複数枚の支持枠側足場板22と骨組側足場板23とがヒンジ25を介して折たたみ可能に連結されて構成されており、全体としてトンネルTNの延長方向に延在している。 As shown in FIGS. 1, 9 and 10, upper scaffoldings 21 as constituent members are supported on both left and right sides (in the width direction of the tunnel TN) of the support frame 13 . The upper scaffolding 21 is constructed by connecting a plurality of support frame side scaffolding boards 22 and frame side scaffolding boards 23 via hinges 25 so as to be foldable, and as a whole extends in the extension direction of the tunnel TN. are doing.

図1及び図11に示すように、前記下部骨組材18の骨組18aの内側面には、ヒンジ27を介して複数枚の足場板28よりなる下部足場29が折たたみ可能に連結されている。下部骨組材18の骨組18aは、足場板28を介して相互に連結されている。下部骨組材18及び下部足場29は、全体としてトンネルTNの延長方向に延在している。この下部骨組材18及び下部足場29はトンネルTNの延長方向に延在する幅狭の構成部材を形成している。 As shown in FIGS. 1 and 11, a lower scaffolding 29 made up of a plurality of scaffolding boards 28 is connected via hinges 27 to the inner surface of the frame 18a of the lower frame member 18 so as to be foldable. The frameworks 18 a of the lower framework members 18 are interconnected via scaffolding boards 28 . The lower frame member 18 and the lower scaffolding 29 as a whole extend in the extension direction of the tunnel TN. The lower frame member 18 and the lower scaffolding 29 form a narrow structural member extending in the direction of extension of the tunnel TN.

〈起立台31〉
次に、構成部材用の起立台31について説明する。
図5~図8に示すように、起立台31は、一方向に長い台本体32と、取付部としてのアダプタ33とによって構成されている。台本体32は、ウェブ34及び一対のフランジ35よりなるH型鋼の両端に連結部としての端板36を固着して構成されている。アダプタ33は、ウェブ37及び一対のフランジ38よりなるH型鋼の両端に端板39を固着して構成されている。台本体32の一方のフランジ35,両端板36及びアダプタ33のフランジ38には、それぞれ複数のボルト挿通孔40が形成されている。そして、アダプタ33を台本体32のフランジ35の上面にフランジ38において立てた状態で、複数位置のボルト挿通孔40を通る図7に示すボルト41とナット42とより、アダプタ33が台本体32上に固定される。アダプタ33は、上部足場21の補強枠22aの下端及び下部骨組材18の骨組18aの下端に着脱可能に取付けられて固定される。また、図6に示すように、アダプタ33は、高さの異なるものが複数種類用意されている(図6においては、2種類)。
<Stand 31>
Next, the standing base 31 for the component will be described.
As shown in FIGS. 5 to 8, the stand 31 is composed of a stand body 32 elongated in one direction and an adapter 33 as a mounting portion. The base body 32 is constructed by fixing end plates 36 as connecting portions to both ends of an H-shaped steel comprising a web 34 and a pair of flanges 35 . The adapter 33 is constructed by fixing end plates 39 to both ends of an H-shaped steel comprising a web 37 and a pair of flanges 38 . A plurality of bolt insertion holes 40 are formed in one flange 35 of the base body 32, both end plates 36, and the flange 38 of the adapter 33, respectively. With the adapter 33 erected on the upper surface of the flange 35 of the base body 32 at the flange 38, the adapter 33 is mounted on the base body 32 by bolts 41 and nuts 42 shown in FIG. fixed to The adapter 33 is detachably attached and fixed to the lower end of the reinforcing frame 22a of the upper scaffolding 21 and the lower end of the frame 18a of the lower frame member 18 . As shown in FIG. 6, a plurality of types of adapters 33 with different heights are prepared (two types in FIG. 6).

図14に示すように、起立台31の台本体32は、折たたみ状態の上部足場21の左右幅(図14の左右方向)より長く形成されるとともに、折たたみ状態の骨組材18の左右幅とほぼ同じ長さに形成されている。 As shown in FIG. 14, the stand body 32 of the stand 31 is formed longer than the left-right width (left-right direction in FIG. 14) of the upper scaffolding 21 in the folded state, and the left-right width of the framework member 18 in the folded state. formed to approximately the same length as

〈下部骨組材18及び上部足場21の起立方法〉
次に、折たたみ状態の下部骨組材18及び上部足場21の起立方法について説明する。
図11に示すように、下部骨組材18及び上部足場21の起立に際しては、それらは折りたたみ状態にされる。このとき、図10,図12及び図14に示すように、上部足場21の支持枠側足場板22には型枠装置11の一部を構成する通し材45がボルト及びナット(図示しない)によって固定される。また、図11に示すように、下部骨組材18には、型枠装置11の一部を構成する別の通し材45がボルト及びナット(図示しない)によって固定される。これらの通し材45は、型枠装置11上においてトンネルTNの延長方向に延在するように組付けられて、型枠装置11の構成部材(図示しない)の支持や補強のために用いられる。
<How to raise the lower frame member 18 and the upper scaffolding 21>
Next, a method for erecting the folded lower frame member 18 and the upper scaffolding 21 will be described.
As shown in FIG. 11, when the lower frame 18 and upper scaffolding 21 are erected, they are folded. At this time, as shown in FIGS. 10, 12 and 14, through members 45 constituting part of the formwork device 11 are attached to the support frame side scaffolding board 22 of the upper scaffolding 21 by bolts and nuts (not shown). Fixed. Further, as shown in FIG. 11, another through member 45 constituting part of the formwork device 11 is fixed to the lower frame member 18 with bolts and nuts (not shown). These through members 45 are assembled on the formwork device 11 so as to extend in the extension direction of the tunnel TN, and are used to support and reinforce constituent members (not shown) of the formwork device 11 .

この状態において、適当位置の下部骨組材18の骨組18aの下端に対して、起立台31をアダプタ33において図7に示すようなボルト41及びナット42によって固定すればよい。このようにすれば、起立台31を脚として折たたみ状態の下部骨組材18を安定して起立させることができる。起立台31が取付けられた状態の下部骨組材18を構成部材ユニットとしての骨組材ユニット51とする。 In this state, the stand 31 can be fixed to the lower end of the frame 18a of the lower frame member 18 at an appropriate position with the bolt 41 and nut 42 shown in FIG. In this way, the lower frame member 18 in the folded state can be stably raised using the stand 31 as a leg. The lower frame member 18 to which the stand 31 is attached is referred to as a frame member unit 51 as a constituent member unit.

一方、図9に示すように、上部足場21は、前記のように、支持枠側足場板22と骨組側足場板23とを折りたたみ状態にする。この状態で、支持枠側足場板22の補強枠22aの下端に起立台31をそのアダプタ33において図7に示すようなボルト41及びナット42によって固定すれば、折たたみ状態の上部足場21を起立させることができる。起立台31が取付けられた状態の上部足場21を構成部材ユニットとしての足場ユニット52とする。 On the other hand, as shown in FIG. 9, the upper scaffolding 21 has the supporting frame side scaffolding board 22 and the framework side scaffolding board 23 folded as described above. In this state, if the stand 31 is fixed to the lower end of the reinforcing frame 22a of the support frame side scaffold board 22 with the bolt 41 and nut 42 as shown in FIG. can be made The upper scaffolding 21 to which the stand 31 is attached is referred to as a scaffolding unit 52 as a component unit.

そして、図14に示すように、骨組材ユニット51及び足場ユニット52においては、起立台31の台本体32がそれぞれ下部骨組材18及び上部足場21の長手方向と交差する直角方向に延びるように配置される。言い換えれば、台本体32は、下部骨組材18及び上部足場21の幅方向に延びるように配置される。 As shown in FIG. 14, in the framework unit 51 and the scaffold unit 52, the base body 32 of the stand 31 is arranged to extend in a direction perpendicular to the longitudinal direction of the lower framework member 18 and the upper scaffold 21, respectively. be done. In other words, the platform body 32 is arranged to extend in the width direction of the lower frame member 18 and the upper scaffolding 21 .

〈骨組材ユニット51、足場ユニット52等の搬送方法及び組付け方法〉
図8及び図14に示すように、型枠装置11においてトンネルTNの延長方向に沿って延在する骨組材ユニット51と、足場ユニット52とは、起立台31の台本体32の端板36どうしが突き合わされる。そして、この突き合わせ状態で、台本体32の端板36は相互にボルト41及びナット42によってトンネルTNの幅方向に沿って直列状に連結固定される。この状態で、両ユニット51,52はトラックTRの荷台L上に載置される。この状態においては、骨組材ユニット51及び足場ユニット52の長手方向がトラックTRの荷台Lの長手方向となるように、配置される。
<Method for transporting and assembling the framework unit 51, scaffolding unit 52, etc.>
As shown in FIGS. 8 and 14, the framework unit 51 and the scaffolding unit 52 extending along the extension direction of the tunnel TN in the formwork device 11 are connected to each other by the end plates 36 of the base body 32 of the stand 31. are matched. In this butted state, the end plates 36 of the base body 32 are connected and fixed together in series along the width direction of the tunnel TN by the bolts 41 and nuts 42 . In this state, both units 51 and 52 are placed on the bed L of the truck TR. In this state, the frame unit 51 and the scaffolding unit 52 are arranged so that the longitudinal direction is the longitudinal direction of the loading platform L of the truck TR.

また、ベース基枠12は、両ユニット51,52の長手方向と平行をなすとともに、両ユニット51,52と隣接された状態でトラックTRの荷台L上に載置される。
そして、図12~図14に示すように、起立台31が連結された骨組材ユニット51及び足場ユニット52とベース基枠12とは、それらの上端部間が複数箇所において連結部材53によって連結される。この連結部材53は、管材よりなる連結バー54と、その連結バー54の両端に固定されたクランプ55とによって構成されている。クランプ55は骨組材ユニット51,足場ユニット52及びベース基枠12の上端部の適当位置にクランプされる。
Further, the base frame 12 is parallel to the longitudinal direction of both units 51 and 52 and placed on the loading platform L of the truck TR while being adjacent to both units 51 and 52 .
As shown in FIGS. 12 to 14, the framework material unit 51 and the scaffolding unit 52 to which the stand 31 is connected and the base frame 12 are connected by connecting members 53 at a plurality of points between their upper end portions. be. The connecting member 53 is composed of a connecting bar 54 made of a tubular material and clamps 55 fixed to both ends of the connecting bar 54 . Clamps 55 are clamped in place on the frame unit 51 , scaffolding unit 52 and the upper ends of the base frame 12 .

なお、図14に示すように、ベース基枠12においては、車輪12aのユニット(図示しない)が外された状態のスタンド12bの上下方向の中間位置に、通し材45が金具61を介してボルト(図示しない)によって固定される。この通し材45は、ベース基枠12のビーム12cと平行に配置される。この通し材45は、型枠装置11の前記通し材45と同様な機能を有する。 As shown in FIG. 14, in the base frame 12, a through member 45 is bolted through a metal fitting 61 at an intermediate position in the vertical direction of the stand 12b with the wheel 12a unit (not shown) removed. (not shown). The through member 45 is arranged parallel to the beam 12c of the base frame 12. As shown in FIG. This threading member 45 has the same function as the threading member 45 of the formwork device 11 .

以上の状態で、骨組材ユニット51,足場ユニット52及びベース基枠12がトラックTRによってトンネル建設現場まで搬送される。この場合、起立台31の台本体32が下部骨組材18及び上部足場21の長手方向と直角をなす方向に延びるとともに、相互に連結されているため、骨組材ユニット51,足場ユニット52は安定状態を維持する。 In the above state, the framework unit 51, the scaffolding unit 52 and the base frame 12 are transported to the tunnel construction site by the truck TR. In this case, since the base body 32 of the stand 31 extends in a direction perpendicular to the longitudinal direction of the lower frame member 18 and the upper scaffolding 21 and is connected to each other, the frame member unit 51 and the scaffolding unit 52 are in a stable state. to maintain

〈型枠装置11の構築方法〉
次に、本発明を具体化した型枠装置11の構築方法について説明する。
トラックTRはトンネルTNの建設現場に進入される。そのトンネル建設において荷台L上の骨組材ユニット51,足場ユニット52及びベース基枠12の上部間を連結する連結部材53が取外される。これとともに、骨組材ユニット51及び足場ユニット52の起立台31の台本体32どうしのボルト41及びナット42による連結固定が解かれる。
<Construction method of the formwork device 11>
Next, a method for constructing the formwork device 11 embodying the present invention will be described.
A truck TR is driven into the construction site of a tunnel TN. In constructing the tunnel, the connecting member 53 connecting the frame unit 51 on the loading platform L, the scaffolding unit 52 and the upper part of the base frame 12 is removed. At the same time, the connection and fixation by the bolts 41 and the nuts 42 between the base bodies 32 of the standing bases 31 of the framework unit 51 and the scaffolding unit 52 are released.

次いで、クレーン(図示しない)を用いて、骨組材ユニット51及び足場ユニット52が、図2に示すように、型枠装置11の構築予定エリアにおける幅方向の両側方であるレールRの左右外側位置にそれぞれ運ばれて、その外側位置に降ろされる。また、ベース基枠12がレールR間の位置に降ろされて、その両側の通し材45が取外されるとともに、その位置で車輪12aを有する車輪ユニットが組付けられた後に、クレーンによってベース基枠12はレールR上に移行される。 Next, using a crane (not shown), the framework unit 51 and the scaffolding unit 52 are moved to the left and right outside positions of the rails R, which are both sides in the width direction of the planned construction area of the formwork device 11, as shown in FIG. respectively and lowered to its outer position. Also, after the base frame 12 is lowered to a position between the rails R, the through members 45 on both sides thereof are removed, and the wheel unit having the wheels 12a is assembled at that position, the base frame 12 is moved by a crane. The frame 12 is transferred onto the rails R.

その後、左右のベース基枠12上に支持架台13が組付けられる。そして、支持架台13上に頂部骨組材16が組付けられた後に、足場ユニット52から起立台31が取外される。次いで、図1に示すように、上部足場21が支持架台13に組付けられるとともに、折たたみ状態から展開されて、足場として機能できる状態になる。このとき、骨組側足場板23が展開されるため、上部足場21が作業用の足場として機能できる状態になる。そして、支持枠側足場板22から通し材45が外されて、所定位置に組付けられる。 After that, the support frames 13 are assembled on the left and right base frames 12 . After the top frame member 16 is assembled on the support frame 13 , the stand 31 is removed from the scaffolding unit 52 . Next, as shown in FIG. 1, the upper scaffolding 21 is attached to the support frame 13 and unfolded from the folded state so that it can function as a scaffolding. At this time, the frame-side scaffolding board 23 is deployed, so that the upper scaffolding 21 can function as a working scaffolding. Then, the through member 45 is removed from the support frame side scaffolding board 22 and assembled at a predetermined position.

次に、頂部骨組材16の下端に側部骨組材17が組付けられる。その後、骨組材ユニット51から起立台31が取外された後に、下部骨組材18が側部骨組材17の下端に組付けられる。そして、下部足場29が展開されて、作業用の足場として機能できるようになる。引き続き、その他の部材が組立てられる。最後に各骨組材16,17,18の外周面に面板19が張設される。 Next, the side frame member 17 is attached to the lower end of the top frame member 16 . Thereafter, after the stand 31 is removed from the frame member unit 51 , the lower frame member 18 is attached to the lower ends of the side frame members 17 . The lower scaffolding 29 is then unfolded so that it can function as a working scaffolding. Subsequently, other members are assembled. Finally, a face plate 19 is stretched on the outer peripheral surface of each frame member 16, 17, 18. As shown in FIG.

以上のようにして、コンクリート型枠装置11が構築される。
〈コンクリート型枠装置11の解体〉
コンクリート型枠装置11の解体は、構築時とはほぼ逆の手順で遂行される。
As described above, the concrete formwork device 11 is constructed.
<Dismantling of Concrete Formwork Device 11>
The dismantling of the concrete formwork device 11 is carried out in substantially the reverse order of the construction.

すなわち、上部足場21が支持架台13から分離されるとともに、下部骨組材18が側部骨組材17から分離される。そして、それらが、折りたたまれるとともに、上部足場21及び下部骨組材18の下端に対して構築時のように起立台31が着脱可能に取付けられる。このため、骨組材ユニット51及び足場ユニット52が構成される。そして、両ユニット51,52がコンクリート型枠装置11の両側方に仮置きされるとともに、両ユニット51,52の起立台31が直列状に連結される。このようにして、仮置き,すなわち一時置きされた骨組材ユニット51及び足場ユニット52は、クレーン等によって撤去される。 That is, the upper scaffolding 21 is separated from the support frame 13 and the lower frame members 18 are separated from the side frame members 17 . Then, they are folded, and the stand 31 is detachably attached to the lower ends of the upper scaffolding 21 and the lower frame member 18 as at the time of construction. For this reason, a framework unit 51 and a scaffolding unit 52 are constructed. Then, both units 51 and 52 are temporarily placed on both sides of the concrete formwork device 11, and the standing bases 31 of both units 51 and 52 are connected in series. In this way, the temporary placement, that is, the temporarily placed frame material unit 51 and scaffolding unit 52 are removed by a crane or the like.

(実施形態の効果)
本実施形態においては、以下の効果がある。
(1)起立台31が脚として機能するため、骨組材ユニット51や足場ユニット52をトラックTRの荷台Lから起立状態で横にはみ出ることなく搬送できる。このため、コンクリート型枠装置11の構成部材として下部骨組材18や上部足場21を分解状態で搬送する必要がない。また、トンネルTNの延長方向に延在して左右方向において幅狭の骨組材ユニット51や足場ユニット52を安定して起立させることができる。よって、トンネルTNの建設現場内において、下部骨組材18や上部足場21の解体状態の部品からの組立て必要がなくなって、組立てのためのスペースを確保することが不要になる。このため、トラック等の車両の通行が阻害されたり、物品の移動が邪魔されたりする期間が短くなって、トンネルTNの建設工期を短縮できる。
(Effect of Embodiment)
This embodiment has the following effects.
(1) Since the stand 31 functions as a leg, the framework unit 51 and the scaffolding unit 52 can be transported in an upright state without protruding laterally from the loading platform L of the truck TR. Therefore, it is not necessary to transport the lower frame member 18 and the upper scaffolding 21 in a disassembled state as constituent members of the concrete formwork device 11 . Further, the framework material unit 51 and the scaffolding unit 52 that extend in the extension direction of the tunnel TN and are narrow in the left-right direction can be stably erected. Therefore, at the construction site of the tunnel TN, there is no need to assemble the lower frame members 18 and the upper scaffolding 21 from dismantled parts, and there is no need to secure a space for assembling. Therefore, the period during which the passage of vehicles such as trucks is obstructed or the movement of goods is obstructed is shortened, and the construction period of the tunnel TN can be shortened.

(2)起立台31のアダプタ33は、台本体32とは別体である。このため、長さや大きさの異なるアダプタ33を複数種類用意しておけば、大きさや形状の異なる下部骨組材18や上部足場21に対応できる。 (2) The adapter 33 of the stand 31 is separate from the stand body 32 . Therefore, by preparing a plurality of types of adapters 33 having different lengths and sizes, it is possible to deal with lower frame members 18 and upper scaffolds 21 having different sizes and shapes.

(3)台本体32の端部には、別の台本体32の端部と直列状に連結可能にした連結部としての端板36が設けられている。このため、隣接する台本体32を直列状に連結すれば、隣接する骨組材ユニット51及び足場ユニット52の横幅が広くなる。従って、骨組材ユニット51及び足場ユニット52を安定して搬送することができる。 (3) An end plate 36 is provided at the end of the table main body 32 as a connection section that can be connected in series with the end of another table main body 32 . Therefore, if the adjacent platform bodies 32 are connected in series, the lateral widths of the adjacent frame material units 51 and scaffolding units 52 are increased. Therefore, the frame material unit 51 and the scaffolding unit 52 can be stably transported.

(4)起立台31によって起立された状態の骨組材ユニット51及び足場ユニット52は、その起立状態で下部骨組材18及び上部足場21の型枠装置11における左右の構築予定位置に仮置きされる。この状態では、上部足場21及び下部骨組材18は、その長手方向がトンネルTNの延長方向に沿う状態になって、型枠装置11に対して組付け姿勢と同方向になる。従って、上部足場21及び下部骨組材18をそのまま上昇させれば、上部足場21及び下部骨組材18を型枠装置11としてスムーズかつ容易に組付けられる。 (4) The framework unit 51 and the scaffolding unit 52 erected by the standing table 31 are temporarily placed at the left and right construction planned positions of the lower framework member 18 and the upper scaffolding 21 in the formwork device 11 in the erected state. . In this state, the longitudinal direction of the upper scaffolding 21 and the lower frame member 18 is aligned with the extension direction of the tunnel TN, and is in the same direction as the assembling posture with respect to the formwork device 11 . Therefore, if the upper scaffolding 21 and the lower frame member 18 are raised as they are, the upper scaffolding 21 and the lower frame member 18 can be smoothly and easily assembled as the formwork device 11 .

(5)前記のように、骨組材ユニット51及び足場ユニット52を、それらの長手方向がトラックTRの荷台Lの前後方向に沿うように、起立台31を脚として同荷台L上から横にはみ出ることなく積載できる。従って、上部足場21及び下部骨組材18を搬送に際して解体する必要がない。よって、上部足場21及び下部骨組材18の搬送に際して、その上部足場21及び下部骨組材18を構成する部品を結束する必要がなくなって、搬送の段取りが簡単になる。 (5) As described above, the framework unit 51 and the scaffolding unit 52 protrude laterally from the loading platform L of the truck TR so that their longitudinal directions extend along the front-rear direction of the loading platform L using the stand 31 as a leg. can be loaded without Therefore, it is not necessary to dismantle the upper scaffolding 21 and the lower frame member 18 for transportation. Therefore, when transporting the upper scaffolding 21 and the lower frame member 18, there is no need to bind the parts forming the upper scaffolding 21 and the lower frame member 18, and the transportation setup is simplified.

(6)型枠装置11の解体に際して、支持架台13から分解されるとともに、折りたたまれた下部骨組材18及び上部足場21に起立台31が取付けられることにより、骨組材ユニット51及び足場ユニット52が構成される。そして、これらの骨組材ユニット51及び足場ユニット52が支持架台13の両側方において起立台31を脚として仮置きされる。従って、骨組材ユニット51及び足場ユニット52を容易に撤去できるばかりでなく、その起立状態でトラックTRの荷台Lからはみ出ることなくユニット化されたままで搬送できる。従って、撤去及び搬送が簡便になるため、トンネル建設の工期短縮に利することができる。 (6) When the formwork device 11 is dismantled, the frame unit 51 and the scaffolding unit 52 are dismantled from the support frame 13 and the erector 31 is attached to the folded lower frame member 18 and upper scaffolding 21. Configured. These framework unit 51 and scaffolding unit 52 are temporarily placed on both sides of the support frame 13 using the standing bases 31 as legs. Therefore, not only can the framework unit 51 and the scaffolding unit 52 be easily removed, but also they can be transported as a unit without protruding from the loading platform L of the truck TR in the upright state. Therefore, removal and transportation are simplified, which is advantageous in shortening the work period for tunnel construction.

(変更例)
本発明は前記実施形態に限定されるものではなく、以下のような態様で具体化することも可能である。
(Change example)
The present invention is not limited to the above embodiments, and can be embodied in the following aspects.

・例えば、図15及び図16に示すように、起立台31として、アダプタ33を省略して、起立台31の台本体32のみを骨組材ユニット51や足場ユニット52の脚とすること。この構成においては、台本体32が骨組材ユニット51や足場ユニット52に取付けるためのボルト挿通孔40を有する取付部を構成する。 - For example, as shown in FIGS. 15 and 16, the adapter 33 is omitted from the stand 31, and only the base body 32 of the stand 31 is used as the legs of the frame unit 51 and the scaffold unit 52. In this configuration, the base body 32 constitutes an attachment portion having bolt insertion holes 40 for attachment to the framework unit 51 and the scaffolding unit 52 .

・起立台31の台本体32やアダプタ33をH型鋼以外の形状の型鋼,例えば、四角筒状の型鋼や、図15及び図16に示すL型鋼によって構成すること。
・ベース基枠12,骨組材ユニット51及び足場ユニット52の搬送に際して、起立台31の台本体32どうしを連結しないこと。あるいは、ベース基枠12,骨組材ユニット51及び足場ユニット52間の連結部材53を設けないこと。このような場合は、ベース基枠12,骨組材ユニット51及び足場ユニット52間をワイヤ等で結束する。
- The base body 32 and the adapter 33 of the standing base 31 can be made of shaped steel other than H-shaped steel, for example, square cylindrical shaped steel or L-shaped steel shown in FIGS.
- When transporting the base frame 12, the framework unit 51, and the scaffolding unit 52, the stand bodies 32 of the stand 31 should not be connected to each other. Alternatively, the connection member 53 between the base frame 12, the framework unit 51 and the scaffolding unit 52 should not be provided. In such a case, the base frame 12, the framework unit 51 and the scaffolding unit 52 are bound with wires or the like.

11…コンクリート型枠装置
31…起立台
32…台本体
33…アダプタ
C…覆工コンクリート
L…荷台
TN…トンネル
TR…トラック
DESCRIPTION OF SYMBOLS 11... Concrete formwork apparatus 31... Standing stand 32... Stand main body 33... Adapter C... Lining concrete L... Cargo platform TN... Tunnel TR... Truck

Claims (9)

トンネルの覆工コンクリートを成形するためのコンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにし、台本体と、その台本体上に設けられ、前記構成部材の下端に対して着脱可能に取付けられるアダプタとよりなり、前記アダプタは、前記台本体と別体であって、前記台本体に対して着脱可能に固定されるコンクリート型枠装置の構成部材用の起立台。 A mounting portion detachable from the lower end of a structural member of a concrete formwork apparatus for forming tunnel lining concrete is provided, and the structural member is erected in a state in which the mounting portion is attached to the lower end of the structural member. and a base body and an adapter provided on the base body and detachably attached to the lower end of the component member, the adapter being separate from the base body. A stand for a component of a concrete formwork apparatus , which is detachably fixed to the stand body . トンネルの覆工コンクリートを成形するためのコンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにし、隣接する別の構成部材用の起立台と連結可能にした連結部を設けたコンクリート型枠装置の構成部材用の起立台。 A mounting portion detachable from the lower end of a structural member of a concrete formwork apparatus for forming tunnel lining concrete is provided, and the structural member is erected in a state in which the mounting portion is attached to the lower end of the structural member. An erector for a component of a concrete forming apparatus provided with a joint adapted to act as a leg for a concrete forming apparatus and connectable to an erector for another adjacent component. 前記連結部は、隣接する構成部材用の起立台をトンネルの幅方向に沿って直列状に連結する請求項に記載のコンクリート型枠装置の構成部材用の起立台。 3. The erector for a component of a concrete form apparatus according to claim 2 , wherein said connecting portion connects the erector for an adjacent component in series along the width direction of the tunnel. 請求項1~3のうちのいずれか一項に記載のコンクリート型枠装置の構成部材用の起立台であって、かつ、前記コンクリート型枠装置において、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるためのコンクリート型枠装置の構成部材用の起立台を着脱可能に取付けたコンクリート型枠装置の構成部材ユニット。 An erector for a constituent member of the concrete formwork apparatus according to any one of claims 1 to 3, wherein the constituent member extends in the extension direction of the tunnel in the concrete formwork apparatus A constituent member unit of a concrete form apparatus, which is detachably attached with a stand for the constituent member of the concrete form apparatus for erecting the constituent member from the lower end of the unit. 請求項1に記載のコンクリート型枠装置の構成部材用の起立台であって、かつ、前記コンクリート型枠装置において、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるためのコンクリート型枠装置の構成部材用の起立台を着脱可能に取付け、前記台本体が前記構成部材の長手方向と直角をなす方向に延びるコンクリート型枠装置の構成部材ユニット。 2. The erector for a component of the concrete formwork apparatus according to claim 1, wherein the component is placed against the lower end of the component extending in the extension direction of the tunnel in the concrete formwork apparatus. A constituent member unit of a concrete form apparatus, wherein a stand for a constituent member of the concrete form apparatus for erecting is detachably attached, and the base body extends in a direction perpendicular to the longitudinal direction of the constituent member . トンネルの覆工コンクリートを成形するためのコンクリート型枠装置において、トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるためのコンクリート型枠装置の構成部材用の起立台であって、かつ、前記コンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにしたコンクリート型枠装置の構成部材用の起立台を着脱可能に取付けることによって、前記コンクリート型枠装置の構成部材ユニットを構成し、その構成部材ユニットを、その長手方向がトラックの荷台の前後方向に沿うように、前記構成部材用の起立台を脚として前記荷台上に積載するとともに、前記構成部材ユニットを搬送するコンクリート型枠装置の構成部材ユニットの搬送方法。 Concrete formwork apparatus for forming concrete lining of a tunnel, for erecting the constituent members of the concrete formwork apparatus for erecting the constituent members against the lower ends of the constituent members extending in the extension direction of the tunnel The platform is provided with a mounting portion that is detachable from the lower end of the constituent member of the concrete formwork apparatus, and for erecting the constituent member in a state in which the mounting portion is attached to the lower end of the constituent member. A constituent member unit of the concrete form apparatus is constructed by detachably attaching a stand for a constituent member of the concrete form apparatus that functions as a leg, and the constituent member unit is configured such that its longitudinal direction is a track. A method for transporting a constituent member unit of a concrete formwork apparatus, wherein the constituent member unit is loaded on the carrier along the front-rear direction of the carrier by using the erector for the constituent member as a leg, and the constituent member unit is conveyed. 複数の前記構成部材ユニットを積載するとともに、その構成部材ユニット間を連結する請求項に記載のコンクリート型枠装置の構成部材ユニットの搬送方法。 7. The method for conveying component units of a concrete formwork apparatus according to claim 6 , wherein a plurality of component units are loaded and the component units are connected. トンネルの覆工コンクリートを成形するためのコンクリート型枠装置において、前記トンネルの延長方向に延在する構成部材の下端に対してその構成部材を起立させるためのコンクリート型枠装置の構成部材用の起立台であって、かつ、前記コンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにしたコンクリート型枠装置の構成部材用の起立台を着脱可能に取付けることによって、前記コンクリート型枠装置の構成部材ユニットを構成し、その構成部材ユニットを前記コンクリート型枠装置の構築予定エリアの幅方向の側方に起立状態で仮置きした後に、前記起立台を取外して、前記構成部材ユニットにより前記コンクリート型枠装置を構築するコンクリート型枠装置の構築方法。 In a concrete formwork apparatus for forming lining concrete of a tunnel, a component for the concrete formwork apparatus for erecting the component member with respect to the lower end of the component member extending in the extension direction of the tunnel The stand is provided with a mounting portion that is detachable from the lower end of the structural member of the concrete formwork apparatus, and for erecting the structural member in a state in which the mounting portion is attached to the lower end of the structural member. A constituent member unit of the concrete form apparatus is configured by detachably attaching a stand for a constituent member of the concrete form apparatus, which functions as a leg of the concrete form apparatus. A method for constructing a concrete formwork apparatus in which the concrete formwork apparatus is constructed by removing the stand after temporarily placing it in an upright state laterally in the width direction of the area to be constructed in (1). トンネルの覆工コンクリートを成形するためのコンクリート型枠装置の構成部材の下端に対して着脱可能にした取付部を設け、その取付部の前記構成部材の下端に対する取付状態において前記構成部材を起立させるための脚として機能するようにしたコンクリート型枠装置の構成部材用の起立台を、コンクリート型枠装置の解体に際して、同コンクリート型枠装置から分解された構成部材の下端に対して着脱可能に取付けて、前記起立台を脚として前記コンクリート型枠装置の設置位置の幅方向の側方に前記構成部材を仮置きするコンクリート型枠装置の解体方法。 A mounting portion detachable from the lower end of a structural member of a concrete formwork apparatus for forming tunnel lining concrete is provided, and the structural member is erected in a state in which the mounting portion is attached to the lower end of the structural member. When dismantling the concrete formwork apparatus, the stand for the constituent members of the concrete formwork apparatus, which functions as a leg for the A method for dismantling a concrete formwork apparatus , wherein the constituent members are temporarily placed laterally in the width direction of an installation position of the concrete formwork apparatus by using the erector as a leg.
JP2022149164A 2022-09-20 2022-09-20 Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device Active JP7231297B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022149164A JP7231297B2 (en) 2022-09-20 2022-09-20 Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device
JP2023017894A JP7446018B1 (en) 2022-09-20 2023-02-08 Concrete formwork device component unit and concrete formwork device component unit transportation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022149164A JP7231297B2 (en) 2022-09-20 2022-09-20 Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2023017894A Division JP7446018B1 (en) 2022-09-20 2023-02-08 Concrete formwork device component unit and concrete formwork device component unit transportation method

Publications (2)

Publication Number Publication Date
JP2022172410A JP2022172410A (en) 2022-11-15
JP7231297B2 true JP7231297B2 (en) 2023-03-01

Family

ID=84040421

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2022149164A Active JP7231297B2 (en) 2022-09-20 2022-09-20 Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device
JP2023017894A Active JP7446018B1 (en) 2022-09-20 2023-02-08 Concrete formwork device component unit and concrete formwork device component unit transportation method

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2023017894A Active JP7446018B1 (en) 2022-09-20 2023-02-08 Concrete formwork device component unit and concrete formwork device component unit transportation method

Country Status (1)

Country Link
JP (2) JP7231297B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7297344B1 (en) * 2022-11-21 2023-06-26 島工業Hd株式会社 CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166312A (en) 2016-03-15 2017-09-21 有限会社 伊藤 Method for assembling form support device for molding tunnel lining concrete, and leg connector for form support device
JP2017186882A (en) 2016-03-30 2017-10-12 有限会社 伊藤 Assembling method of formwork support device for tunnel covering concrete formation, and net support tool

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3599902B2 (en) * 1996-06-20 2004-12-08 佐藤工業株式会社 Structure and method of constructing structure using the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166312A (en) 2016-03-15 2017-09-21 有限会社 伊藤 Method for assembling form support device for molding tunnel lining concrete, and leg connector for form support device
JP2017186882A (en) 2016-03-30 2017-10-12 有限会社 伊藤 Assembling method of formwork support device for tunnel covering concrete formation, and net support tool

Also Published As

Publication number Publication date
JP2024044970A (en) 2024-04-02
JP7446018B1 (en) 2024-03-08
JP2022172410A (en) 2022-11-15

Similar Documents

Publication Publication Date Title
JP3131896B2 (en) Shoring
JPH11241499A (en) Timbering
JP7231297B2 (en) Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device
JP6592449B2 (en) Container for framework elements
CN110733619A (en) Corner structure of scaffold device
CA2922782C (en) Overhead conveying device having support framework modules
JP3700952B2 (en) Support
EP1016766A1 (en) Frames and structures assembled by same
JPH10280669A (en) Scaffolding unit
JP7297344B1 (en) CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD
JP7217061B2 (en) Support frame for concrete formwork device, method for stacking support frame, and method for constructing support frame
JP2009121145A (en) Overhanging erection machine and overhang erection method
JP2024074456A (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP7292750B2 (en) How to assemble and dismantle the center
JP7137791B2 (en) Underground work trolley
JP2019094769A (en) Load receiving stage and mounting method thereof
JP7205893B2 (en) Mounting device for construction of arch-shaped member and construction method using the same
JP7182331B2 (en) Support frame stand for support frame of concrete formwork device, method for stacking support frame of concrete formwork device, and method for constructing concrete formwork device
JP2023059544A (en) scaffolding
JP7171052B2 (en) How to assemble the center
JPH09250235A (en) Collapsible scaffold
KR100606985B1 (en) Frames and structures assembled by same
JP5322216B2 (en) Steel frame reinforced concrete frame construction method
JP2024074755A (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP4183654B2 (en) Handrail support bracket, preceding handrail assembly set, frame scaffold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220929

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20220929

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221025

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230209

R150 Certificate of patent or registration of utility model

Ref document number: 7231297

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150