JP3700952B2 - Support - Google Patents
Support Download PDFInfo
- Publication number
- JP3700952B2 JP3700952B2 JP02731696A JP2731696A JP3700952B2 JP 3700952 B2 JP3700952 B2 JP 3700952B2 JP 02731696 A JP02731696 A JP 02731696A JP 2731696 A JP2731696 A JP 2731696A JP 3700952 B2 JP3700952 B2 JP 3700952B2
- Authority
- JP
- Japan
- Prior art keywords
- struts
- pair
- braces
- floor
- floor member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、橋梁工事,各種建築,土木工事において、例えば、橋桁,大トラス等の重量物を架設する場合に、これらの橋桁,大トラス等のブロックを支える支保工に関する。
【0002】
【従来の技術】
一般に、橋梁工事において橋桁を橋脚上に架設する場合、予め工場で任意の大きさに製作された橋桁ブロックを架設現場まで輸送し、次いでこのブロックをクレーンで吊り下げながら支保工上に受けさせ、この支保工上で仮受けされたブロックをさらに他のブロックと接合した後に、橋脚上に設置される。一方、橋桁が橋脚上に設置された後は、支保工は解体または撤去される。
【0003】
しかして、支保工を工事現場で組立,解体するための作業能率が悪く、作業経費などの点で経済性に劣る。このため、例えば、実開平7―8416号公報には折り畳み自在な支保工が提案され、輸送中はコンパクトに折り畳み、現場で使用する時には立方体状に展開して、いちいち組立,解体することなく、現場ごとに転用できるようになった。
【0004】
上記公報に開示された支保工は、図12に示すように、相対する一対の固定フレーム81,81と、各固定フレームの左右両端部に枢支された折り畳み可能な一対の補強フレーム82,82と、固定フレーム81,81の内側中間に回転自在に基端を枢着した床板とで構成されたものである。
【0005】
この場合、補強フレーム82は、固定フレーム81を構成する支柱83の上端間に枢着された折り畳み自在な手摺支柱84と、支柱83,83の中間に枢着された折り畳み自在な水平材85と、支柱83,83の上端と水平材85の中間に枢着されたブレス86,86と、手摺支柱84と水平材85の各中間に架設された垂直材87と、で構成され、使用中は、図示するように、立方体状に展開されるが、不使用時、例えば、輸送中は、ブレス86,86の下端を水平材85からはずし、前後方向から自重により圧縮すると補強フレーム82が折り畳まれ、全体がコンパクトになるものである。
【0006】
【発明が解決しようとする課題】
しかしながら、上記従来の支保工は、補強フレーム82が折り畳み構造であること、ブレス86が上方に二本あるのみで水平材85より下方には補強材が存在しないことに鑑み、矢印A,Bで示す縦方向,左右方向からの荷重に対しては固定フレーム81の存在によって耐久性があり、かつ強度があって変形される心配はないが、振動等によって矢印Cで示す前後方向からの荷重に対しては弱く、場合によって圧縮方向に変形するおそれがある。
【0007】
そこで、本発明の目的は、縦方向,左右方向のみならず前後方向からの荷重に対しても耐久性があり、かつ余分な作業をすることなく極めて簡単に折り畳みできる支保工を提供することである。
【0008】
【課題を解決するための手段】
上記の目的を達成するため、本発明にかかる支保工は、左右一対の前部支柱と、これらの前部支柱にそれぞれ対向する左右一対の後部支柱と、左側前部及び後部支柱間に架設した固定ブレスと、同じく右側前部及び後部支柱間に架設した固定ブレスと、左側前部及び後部支柱の下部にそれぞれ一端を枢着させると共に他端を右側前部及び後部支柱の上部にそれぞれ枢着させた前後一対の伸縮ブレスと、右側前部及び後部支柱の下部にそれぞれ一端を枢着させると共に他端を左側前部及び後部支柱の上部にそれぞれ枢着させた前後一対の伸縮ブレスと、各伸縮ブレスに設けられてこれらの設定伸長状態のロックおよびロック解除を可能にする伸長ロック部材と、左右の前部支柱の上部と左右の後部支柱の上部間にそれぞれ着脱自在に架設した前後一対の横杆と、左側前部及び後部支柱に一端側が枢支された第一の床部材と、右側前部及び後部支柱に一端側が枢支された第二の床部材と、上記第一の床部材の他端側および第二の床部材の他端側を連結するヒンジ部材と、上記第一の床部材および第二の床部材間に着脱自在に架設されて連結部材の脱抜により上記各床部材を上記ヒンジ部材を介して屈曲可能にする連結板とを備えたことを特徴とするものである。
【0009】
この場合、左右一対の前部支柱1,2間に架設された一対の前側伸縮ブレス18,19と左右一対の後部支柱3,4間に架設された一対の後部伸縮ブレス18,19をそれぞれ中央部付近で X 字状に交差させ、これら中央部付近で交差する上記伸縮ブレスの一方にブラケット29,29を設け、該ブラケット29,29と上記連結板42,42とを固定支持部材48,48によって着脱可能に固定支持するようにしても良い。
【0010】
同じく、伸縮ブレスは、アウターチューブと、該アウターチューブ内に出入自在に挿入されたインナーチューブと、で構成するのが好ましい。
【0011】
【発明の実施の形態】
以下、この発明の実施の一形態を図について説明する。図11は、この発明の支保工の基本形態を示す全体の斜視図、図2は、同じく正面図、図3は、同じく側面図である。
この実施の形態に係る支保工は、従来と同じく、左右一対の前部支柱1,2と、これらの前部支柱1,2にそれぞれ対向する左右一対の後部支柱3,4と、左側前部及び後部支柱1,3間に架設した固定ブレス56,57と、同じく右側前部及び後部支柱2,4間に架設した固定ブレス56,57とを備えている。
更に本発明では、左側前部及び後部支柱1、3の下部にそれぞれ一端を枢着させると共に他端を右側前部及び後部支柱2,4の上部にそれぞれ枢着させた前後一対の伸縮ブレス18,18と、右側前部及び後部支柱2,4の下部にそれぞれ一端を枢着させると共に他端を左側前部及び後部支柱1,3の上部にそれぞれ枢着させた前後一対の伸縮ブレス19,19と、各伸縮ブレスに設けられてこれらの設定伸長状態のロックおよびロック解除を可能にする伸長ロック部材26,26と、左右の前部支柱1,2の上部と左右の後部支柱3,4の上部間にそれぞれ着脱自在に架設した前後一対の横杆31,31と、左側前部及び後部支柱1,3に一端側が枢支された第一の床部材37と、右側前部及び後部支柱2,4に一端側が枢支された第二の床部材39と、上記第一の床部材37の他端側および第二の床部材39の他端側を連結するヒンジ部材41と、上記第一の床部材37および第二の床部材39間に着脱自在に架設されて連結部材45の脱抜により上記各床部材37,39を上記ヒンジ部材41を介して屈曲可能にする連結板42、42とを備えている。
更に、左右一対の前部支柱1,2間に架設された一対の前側伸縮ブレス18,19と左右一対の後部支柱3,4間に架設された一対の後部伸縮ブレス18,19をそれぞれ中央部付近で X 字状に交差させ、これら中央部付近で交差する上記伸縮ブレスの一方にブラケット29,29を設け、該ブラケット29,29と上記連結板42,42とを固定支持部材48,48によって着脱可能に固定支持するようにしている。
また、伸縮ブレス18,19は、アウターチューブと該アウターチューブ内に出入自在に挿入されたインナーチューブとで構成されている。
以下更に詳しく説明する。
【0012】
また、これらの各前部支柱1,2および各後部支柱は下端部にこれらより小径の連結棒1a,2a,3a,4aが突設され、上端部にはこれらの連結棒1a,2a,3a,4aの外径より僅か大きい径の連結孔1b,2b,3b,4bを持ったフランジ板1c,2c,3c,4cが取り付けられている。
【0013】
さらに、上記フランジ板1c,2c,3c,4cのそれぞれには、図4にフランジ板2cを代表させて示すように、同一円周上に複数(この図では8個)の取付孔5が穿設されている。
【0014】
6,7は、前部支柱1,2の上記フランジ板1c,2cに取り付けられた取付ブラケットで、図4に代表して示すように、このうち取付ブラケット7は上記フランジ板2cを上下面から挟むコ字状部8と、これに連設された垂直取付片9とからなる。
【0015】
そして、上記コ字状部8を形成する2片8a,8bには連結孔10が穿設されており、これらの連結孔10と上記フランジ板2cにおける複数の取付孔5のうち、前部支柱1のフランジ板1cに対向する側の取付孔5とにボルト11が挿通され、かつこのボルト11端にナット12が締め込まれることで、取付ブラケット7がフランジ板2cに着脱可能に固定される。
【0016】
また、上記垂直取付片9には上下方向に3個の取付孔13,14,15が形成されている。なお、前部支柱1上のフランジ板1cにも、上記取付ブラケット7と同一構成の上記取付ブラケット6が対称配置されている。そして、さらに、後部支柱3,4上のフランジ板3c,4cにもこれらと同等のブラケット6,7が対称配置されている。
【0017】
また、図1および図2において、16,17は、上記前部支柱1,2の下部に互いに対向するように突設された下部取付片であり、これらの下部取付片16,17には伸縮ブレス18,19の各一端がピン20,21で枢支されている。
【0018】
また、その伸縮ブレス18,19は、中央部付近で互いに交差されて、各他端が、図4に示すように、ボルト22a,23aおよびナット22b,23bにより各ブラケット7,6の各取付孔15に枢支されている。
【0019】
なお、これらの各伸縮ブレス18,19は、太径管部A内に小径管部Bを出入自在に装着したものからなり、これらを最伸長位置に伸ばしたとき、図5に示すように、これらを貫通するピン孔24相互に伸長ロック部材としてのピン26を嵌挿可能にしてあり、このピンの嵌挿により収縮不可能とされている。
【0020】
このピン26は、図5に示すように、先端部で軸27を中心に90度回転してピン孔24に対する抜止めがなされる抜止めキー28を有する。29は、中央部付近で交差する伸縮ブレス18,19のうち、一方の伸縮ブレス19の太径管部A外周に突設されたブラケットで、このブラケット29には、後述の床部材に設けられた連結板上の取付孔とともにボルトが挿通されて、ナットにより締め止めされるブラケット孔30が設けられている。
【0021】
そして、上記構成と同様の下部取付片16,17および伸縮ブレス18,19が左右の後部支柱3,4およびこれらの間に同様にしてそれぞれ架設される。
【0022】
また、2つの前部支柱1,2の取付ブラケット6,7および後部支柱3,4の取付ブラケット6,7の各中央にある図4に示すような取付孔14には、水平配置される横杆31の両端がボルト32およびナット33を用いて着脱自在に枢支されている。
【0023】
図1および図2において、34,35は、前部支柱1,2および後部支柱3,4の略中位レベル位置に突設された上下一対の補強フランジ片で、これらの間に垂直取付板36が連設されている。
【0024】
前部支柱1側および後部支柱3側の上記垂直取付板36には外形が矩形(長方形)の第一の床部材37の一端側がピン38によって枢支され、前部支柱2側および後部支柱4側の上記垂直取付片36には、同じく矩形の第二の床部材39の一端側がピン40によって枢支されている。なお、これらの床部材37,39は板状や枠状に形成される。
【0025】
そして、これらの第一の床部材37の他端側および第二の床部材39の他端側は互いに対向して、ここでヒンジ部材41によって屈曲自在に連結されている。
【0026】
また、これらの第一の床部材37の前後面側には、図5,図6に示すように、連結板42の一端部が溶接などによって固定され、これらの連結板42の床部材39の前後面と対向する位置に、その床部材39の前後面に貫通形成した取付孔43に連通可能な連通孔44が設けられている。
【0027】
そして、これらの各取付孔43および連通孔44に連結部材としてのボルト45を通してナット46をこれにねじ込むことで、第一の床部材37に対して第二の床部材39を同一平面位置に一体保持することができるようにしてある。
【0028】
また、47は、上記各連結板42の中央部に形成された床部材支持孔であり、この床部材支持孔47および上記ブラケット29上のブラケット孔30に対して、図5に示すように、固定支持部材としてのボルト48を挿入し、これにナット49を締め込むことで、各床部材37,39が伸縮ブレス19に固定支持可能とされる。
【0029】
また、これらの第一の床部材37および第二の床部材39の上部にはそれぞれ同一サイズの第一の床板50,第二の床板51が、図7および図8に示すように、着脱自在に取り付けることができる。
【0030】
一方、前部支柱1および後部支柱3に設けた上記フランジ板1c,3cの互いに対向する取付孔5と、前部支柱2および後部支柱4に設けた上記フランジ板2c,3cの互いに対向する取付孔5には、それぞれ図4に示したものと同様の取付ブラケット52,53が、図3に示すように取り付けられている。
【0031】
また、前部支柱1および後部支柱3の互いに対向する下部位置および前部支柱2および後部支柱4の互いに対向する下部位置には、それぞれ下部取付片54,55が突設されている。
【0032】
そして、これらの各下部取付片54,55には各一のブレス56,57の一端がピン58,59により支着されており、これらの各ブレス56,57は中程で互いに交差して、他端が上記取付ブラケット53,52の図4に示すような下方の取付孔を介してボルト61,60およびナット(図示せず)により連結されている。
【0033】
さらに、左右にある取付ブラケット52,53間には、図3に示すように、固定横杆62が水平に配置され、これらの固定横杆62の両端が、取付ブラケット52,53に形成された、図4に示したものと同様の上記中位にある取付孔に通してボルト63,64および図示しないナットにより連結されている。
【0034】
なお、図1,図3において、65は、各ブレス56,57の交差部に連結されて、これらを補強する補強板である。
【0035】
図9は、図1に示した支保工を二段積みしたものを示し、図1に示したものと同一の構成部分には同一符号を付して、その重複する説明を省略する。
【0036】
この二段積みの支保工は、上段の各支柱1,2,3,4の連結棒1a,2a,3a,4aを、下段の各支柱1,2,3,4のフランジ孔1b,2b,3b,4b内に差し入れて行われ、上下二段の各床部材70間と、床部材70および地上間には梯子71が架設され、各床部材70間への上り下りを容易にしている。なお、ここでは各床部材70上面の四周付近には、作業工具等の落下を防止する落下防止枠72が立設されている。
【0037】
また、図1に示した下段用の支保工に対して、上段の支保工では、各支柱1,2,3,4の下端部に下部取付片16,17,54,55が設けられておらず、従って、上段の各伸縮ブレス18,19の下端は、下段の取付ブラケット6,7,52,53の、図4に示すような上方の取付孔にボルト73およびナット74により連結される。
【0038】
なお、下段の支保工の各支柱1,2,3,4の下端には、地盤上に支保工全体を安定支持するフランジ76付きの筒状脚77が嵌挿される。
【0039】
かかる構成になる支保工は、前部支柱1,2および後部支柱3,4がそれぞれ全長に亘って互いに交差する伸縮ブレス18,19およびブレス56,57と、横杆31および固定横杆62によって、前後および左右の各方向および上下方向に支持されて、全体として力学上大きな剛体をなす。
【0040】
そこで、このような支保工を折り畳んで搬送または収納する場合には、図示しないクレーンのワイヤ端をフランジ板1c,2c,3c,4cのいずれかの取付孔5などに係止して、クレーンを操作して全体を持ち上げる。
【0041】
そして、ある程度地上より浮上した場合には、この支保工の全体を斜めおよび横に倒した状態にして、再び地上に降ろして寝かせる(図10参照)。
【0042】
次に、このワイヤによって吊り下げた状態のまま、上記各取付ブラケット6,7,間に架設した各横杆31を、ボルト32およびナット33を緩めることによって取り外し、続いて、各伸縮ブレス18,19のピン26を、キー28をピン26の径内に収めることで各ピン孔24から抜き取る。
【0043】
これにより、大径管部A内に小径管部Bが進入して各伸縮ブレス18,19の全長の短縮化を可能にする。
【0044】
図5に示すブラケット29のブラケット孔30および連結板42の床部材支柱孔47に挿入されているボルト48をナット49を緩めて抜き取り、更に連結板42からナット46を緩めてボルト45を抜き取り、第一の床部材37および第二の床部材39のヒンジ部材41を中心とする折曲を可能とする。
【0045】
そうした上で、次に上記ワイヤをさらに緩めると、上方の前部支柱1および後部支柱3などの自重によって、伸縮ブレス18,19の上記小径管部Bが上記大径管部A内に摺動しながら入り込んでいき、その各支柱1,3は、図10の2点鎖線で示すように降下していく。
【0046】
このとき、上記各床部材37,39は、上記各支柱1,3の自重を受けてヒンジ部材41を中心として屈曲していく。
【0047】
そして、上記ワイヤをさらに十分に緩めていくと、上記伸縮ブレス18,19および床部材37,39は、図11に示すように、前部支柱1および後部支柱3と、前部支柱2および後部支柱4との間に折り畳まれて、支保工全体の形状,容積を十分に小さく抑えられることとなる。この結果、出荷運搬や収納が容易となり、トラック上における占有空間を十分に小さく抑えることができる。
【0048】
一方、これを作業現場で組み立てる場合には、再びクレーンのワイヤ端を上記のようにフランジ板1c,2c,3c,4cの取付板5に係止して持ち上げ、図1や図10に示す状態に立ち上げ、各伸縮ブレス18,19を最大伸長させ、さらに床部材37,39をそれぞれ垂直になるように立ち上げる。
【0049】
そして、この状態にて、上記太径管部Aおよび小径管部Bの各ピン孔24にピン26を差し込んでキーロックさせ、さらにブラケット29のブラケット孔30および連結板42の床部材支持孔47にボルト48を通してナット49をねじ込むことで(図5参照)、支保工の組み立てが迅速,簡単に行える。
【0050】
また、かかる支保工では、上記のような起立状態において、各伸縮ブレス18,19および固定ブレス57,58が互いに交差して、各前部支柱1,2および後部支柱3,4をそれぞれ支えるため、簡単な構成であるにも拘らず、この支保工の全長に亘って、上下,左右,前後の各方向からの荷重負荷に対しても、十分な強度を確保できる。
【0051】
【発明の効果】
本発明の支保工は、左右一対の前部支柱1,2と、これらの前部支柱1,2にそれぞれ対向する左右一対の後部支柱3,4と、左側前部及び後部支柱1,3間に架設した固定ブレス56,57と、同じく右側前部及び後部支柱2,4間に架設した固定ブレス56,57と、左側前部及び後部支柱1、3の下部にそれぞれ一端を枢着させると共に他端を右側前部及び後部支柱2,4の上部にそれぞれ枢着させた前後一対の伸縮ブレス18,18と、右側前部及び後部支柱2,4の下部にそれぞれ一端を枢着させると共に他端を左側前部及び後部支柱1,3の上部にそれぞれ枢着させた前後一対の伸縮ブレス19,19と、各伸縮ブレスに設けられてこれらの設定伸長状態のロックおよびロック解除を可能にする伸長ロック部材26,26と、左右の前部支柱1,2の上部と左右の後部支柱3,4の上部間にそれぞれ着脱自在に架設した前後一対の横杆31,31と、左側前部及び後部支柱1,3に一端側が枢支された第一の床部材37と、右側前部及び後部支柱2,4に一端側が枢支された第二の床部材39と、上記第一の床部材37の他端側および第二の床部材39の他端側を連結するヒンジ部材41と、上記第一の床部材37および第二の床部材39間に着脱自在に架設されて連結部材45の脱抜により上記各床部材37,39を上記ヒンジ部材41を介して屈曲可能にする連結板42、42とを備えた構成にしている。
これにより、縦方向,左右方向のみならず前後方向からの荷重に対しても耐久性があり、かつ余分な作業をすることなく極めて簡単に折り畳みできる支保工を安価に得られる効果がある。
【0052】
また、請求項2の発明によれば中央部付近で交差する上記伸縮ブレスの一方にブラケットを設け、該ブラケットとを固定支持部材によって着脱可能に固着支持するように構成したので、伸縮ブレスによってヒンジ部材を中心として折れ曲がる床部材を強固かつ安全に水平支持できるという効果が得られる。
【0053】
そして、請求項3の発明によれば、伸縮ブレスの構造が簡単で加工性及び組付け性が向上する。
【図面の簡単な説明】
【図1】この発明の実施の一形態による支保工の基本構造を示す斜視図である。
【図2】図1における支保工の正面図である。
【図3】図1に示す支保工の左側面図である。
【図4】図1における取付ブラケットの取付構造を拡大して示す説明図である。
【図5】図1における伸縮ブレスの交差部付近を分解して示す斜視図である。
【図6】図1における連結板付近を分解して示す斜視図である。
【図7】図1における床部材上に床板を載せた状態を示す要部の斜視図である。
【図8】図7に示す床板除去時の床部材付近を示す斜視図である。
【図9】図1に示す支保工を二段積みしたものを示す斜視図である。
【図10】図9に示す支保工の折り畳み過程を示す説明図である。
【図11】図9に示す支保工の折り畳み完了状態を示す説明図である。
【図12】従来の支保工を示す概念図である。
【符号の説明】
1,2 前部支柱
3,4 後部支柱
18,19 伸縮ブレス
26 ピン(伸長ロック部材)
29 ブラケット
31 横杆
37 第一の床部材
39 第二の床部材
41 ヒンジ部材
42 連結板
45 ボルト(連結部材)
48 ボルト(固定支持部材)
56,57 固定ブレス[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a support work for supporting blocks such as bridge girders and large trusses when, for example, heavy objects such as bridge girders and large trusses are erected in bridge construction, various constructions, and civil engineering works.
[0002]
[Prior art]
In general, when installing a bridge girder on a bridge pier in bridge construction, transport the bridge girder block, which was manufactured in advance to an arbitrary size at the factory, to the construction site, and then receive this block on the support work while hanging it with a crane, After the block temporarily received on the support is joined to another block, it is installed on the pier. On the other hand, after the bridge girder is installed on the pier, the support work is dismantled or removed.
[0003]
Therefore, the work efficiency for assembling and dismantling the support work at the construction site is poor, and the cost is low in terms of work costs. Therefore, for example, Japanese Utility Model Laid-Open No. 7-8416 proposes a foldable support structure, which can be folded compactly during transportation, expanded into a cubic shape when used on site, without being assembled and disassembled one by one. Can be diverted at each site.
[0004]
As shown in FIG. 12 , the support disclosed in the above publication includes a pair of opposing
[0005]
In this case, the reinforcing
[0006]
[Problems to be solved by the invention]
However, the above conventional support works are indicated by arrows A and B in view of the fact that the reinforcing
[0007]
Accordingly, an object of the present invention is to provide a support that is durable against a load from the front and rear as well as the vertical and left and right directions and that can be folded very easily without extra work. is there.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, the support according to the present invention is constructed between a pair of left and right front struts, a pair of left and right rear struts respectively facing the front struts, and a left front and rear struts. Fixed brace, fixed brace erected between right front and rear struts, and one end pivotally attached to the lower part of left front and rear struts, and the other end pivoted to the upper part of right front and rear struts. A pair of front and rear stretch braces, and a pair of front and rear stretch braces each having one end pivotally attached to the lower part of the right front part and the rear post and the other end pivotally attached to the upper part of the left front part and the rear post, respectively. an elongate locking member to enable locking and unlocking of these settings tension provided stretch breath, between the upper portion of the upper left and right rear pillars of the left and right front pillars before the detachably bridged respectively A pair of transverse rods, a first floor member whose one end to the left front and rear supports are pivotally supported, and a second floor member whose one end is pivotally supported on the right front and rear supports, the first A hinge member that connects the other end side of the floor member and the other end side of the second floor member, and the first floor member and the second floor member are detachably installed between the first floor member and the second floor member. Each floor member is provided with a connecting plate that can be bent via the hinge member .
[0009]
In this case, a pair of front expansion /
[0010]
Similarly, it is preferable that the expansion / contraction brace is constituted by an outer tube and an inner tube inserted in the outer tube so as to freely enter and exit.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described below with reference to the drawings. FIG. 11 is an overall perspective view showing the basic form of the support work of the present invention, FIG. 2 is a front view, and FIG. 3 is a side view.
As in the prior art, the support according to this embodiment includes a pair of left and right
Further, in the present invention, a pair of front and rear
Further, a pair of front-side
The expansion /
This will be described in more detail below.
[0012]
Each of the
[0013]
Further, each of the
[0014]
[0015]
The two
[0016]
The
[0017]
1 and 2,
[0018]
The expansion / contraction braces 18 and 19 intersect each other in the vicinity of the central portion, and the other ends are attached to the mounting holes of the
[0019]
Each of these expansion / contraction braces 18 and 19 comprises a large-diameter pipe portion A in which a small-diameter pipe portion B is detachably attached. When these are extended to the maximum extension position, as shown in FIG. A
[0020]
As shown in FIG. 5, the
[0021]
And the
[0022]
Also, the mounting
[0023]
In FIG. 1 and FIG. 2, 34 and 35 are a pair of upper and lower reinforcing flange pieces projecting at substantially middle level positions of the front struts 1 and 2 and the rear struts 3 and 4, and a vertical mounting plate therebetween. 36 is continuously provided.
[0024]
One end side of a
[0025]
The other end side of the
[0026]
Further, as shown in FIGS. 5 and 6, one end portion of the connecting
[0027]
Then, the
[0028]
Further, 47 is a floor member support hole formed in the central portion of each of the connecting
[0029]
Further, the
[0030]
On the other hand, the mounting holes 5 of the
[0031]
Further, lower mounting
[0032]
One end of each one of the
[0033]
Further, as shown in FIG. 3, fixed
[0034]
In FIGS. 1 and 3,
[0035]
FIG. 9 shows a structure in which the support shown in FIG. 1 is stacked in two stages. The same components as those shown in FIG.
[0036]
This two-stage support is made by connecting the connecting
[0037]
Further, in contrast to the lower support shown in FIG. 1, in the upper support, lower mounting
[0038]
A
[0039]
The supporting structure having such a configuration is composed of the
[0040]
Therefore, when such a support is folded and transported or stored, the wire end of the crane (not shown) is locked to the mounting hole 5 of any of the
[0041]
And when it has surfaced from the ground to some extent, the whole of the support work is tilted and tilted sideways, then lowered to the ground and laid down again (see FIG. 10).
[0042]
Next, in the state of being suspended by the wire, the
[0043]
As a result, the small-diameter pipe portion B enters the large-diameter pipe portion A, thereby making it possible to shorten the overall length of each of the
[0044]
The
[0045]
Then, when the wire is further loosened, the small-diameter pipe portion B of the stretch braces 18 and 19 slides into the large-diameter pipe portion A due to the weight of the
[0046]
At this time, the
[0047]
When the wires are further loosened, the stretchable braces 18 and 19 and the
[0048]
On the other hand, when assembling this at the work site, the wire end of the crane is again locked to the mounting plate 5 of the
[0049]
In this state, the
[0050]
Further, in such a support work, in the standing state as described above, the stretchable braces 18 and 19 and the fixed braces 57 and 58 cross each other to support the front struts 1 and 2 and the rear struts 3 and 4, respectively. In spite of the simple structure, sufficient strength can be ensured over the entire length of the support, even with respect to load loads from the top, bottom, left and right and front and rear directions.
[0051]
【The invention's effect】
The support structure of the present invention includes a pair of left and right front struts 1 and 2, a pair of left and right rear struts 3 and 4 facing the front struts 1 and 2, and the left front and
Thereby, there is an effect that it is durable against a load from the front and rear direction as well as the vertical direction and the left and right direction, and that it is possible to obtain a support that can be folded very easily without extra work at low cost.
[0052]
According to the invention of
[0053]
And according to invention of
[Brief description of the drawings]
FIG. 1 is a perspective view showing a basic structure of a support work according to an embodiment of the present invention.
2 is a front view of the support work in FIG. 1. FIG.
FIG. 3 is a left side view of the support shown in FIG.
4 is an explanatory view showing an enlarged mounting structure of the mounting bracket in FIG. 1. FIG.
FIG. 5 is an exploded perspective view showing the vicinity of the intersection of the expansion and contraction brace in FIG. 1;
6 is an exploded perspective view showing the vicinity of a connecting plate in FIG. 1. FIG.
7 is a perspective view of a main part showing a state where a floor board is placed on the floor member in FIG. 1. FIG.
8 is a perspective view showing the vicinity of a floor member when the floor board shown in FIG. 7 is removed. FIG.
FIG. 9 is a perspective view showing two-stage stacking of the support shown in FIG.
10 is an explanatory view showing a folding process of the support shown in FIG. 9. FIG.
11 is an explanatory view showing a state where the support shown in FIG. 9 is completely folded.
FIG. 12 is a conceptual diagram showing a conventional support work.
[Explanation of symbols]
1, 2, Front struts 3, 4 Rear struts 18, 19
29
48 bolt (fixed support member)
56,57 fixed bracelet
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP02731696A JP3700952B2 (en) | 1996-01-22 | 1996-01-22 | Support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP02731696A JP3700952B2 (en) | 1996-01-22 | 1996-01-22 | Support |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH09195530A JPH09195530A (en) | 1997-07-29 |
JP3700952B2 true JP3700952B2 (en) | 2005-09-28 |
Family
ID=12217688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP02731696A Expired - Fee Related JP3700952B2 (en) | 1996-01-22 | 1996-01-22 | Support |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3700952B2 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100653378B1 (en) * | 2005-10-28 | 2006-12-04 | 반하선 | Assembly worktable |
KR100769552B1 (en) * | 2005-12-09 | 2007-10-23 | (주) 대산개발 | Method of bent construction for temporary bridge |
KR100769556B1 (en) * | 2007-07-23 | 2007-10-23 | (주) 대산개발 | Method of bent construction for temporary bridge |
DE202008007109U1 (en) * | 2008-05-27 | 2009-10-08 | Daas, Kamal | Lattice support structure |
JP2012001997A (en) * | 2010-06-18 | 2012-01-05 | Yokogawa Koji Kk | Foldable timbering |
CN109505424B (en) * | 2018-10-30 | 2020-07-17 | 重庆大学 | Large-span steel pipe truss unloading bracket capable of being accurately adjusted and using method thereof |
CN109440650A (en) * | 2018-11-22 | 2019-03-08 | 上海市基础工程集团有限公司 | Modular rack system and construction method suitable for urban viaduct Fast Installation |
CN109356035A (en) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | A kind of bracket, bridge pier and construction method |
CN110374356B (en) * | 2019-07-02 | 2022-05-10 | 广东筑龙建安工程有限公司 | Building engineering strutting arrangement |
CN112746734B (en) * | 2020-12-12 | 2022-12-30 | 重庆新久融工程机械设备有限公司 | Folding scaffold |
CN113294000A (en) * | 2021-05-27 | 2021-08-24 | 中建四局第六建设有限公司 | Assembled lifting steel truss ground assembly jig frame |
CN114197292B (en) * | 2021-12-14 | 2022-08-19 | 湖北省工业建筑集团有限公司 | Assembled bridge double-layer combined steel truss structure |
CN114214950B (en) * | 2021-12-21 | 2022-10-21 | 武汉市市政工程机械化施工有限公司 | Emergency road bridge supporting structure |
CN117967073B (en) * | 2024-04-01 | 2024-06-04 | 厦门合诚工程检测有限公司 | Large-scale steel construction support and extrusion detection equipment for venue construction |
-
1996
- 1996-01-22 JP JP02731696A patent/JP3700952B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH09195530A (en) | 1997-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3913360B2 (en) | Support work | |
JP3700952B2 (en) | Support | |
JP3131896B2 (en) | Shoring | |
US6450291B1 (en) | Frames and structures assembled by same | |
US5351843A (en) | Folding display frame for forming column-like structures | |
WO2008021980A2 (en) | Modular frame with parabolic top | |
EP0706599B1 (en) | Releasable joint for joining two construction elements and transportable construction comprising same | |
EP0653529B1 (en) | Folding scaffold for construction work | |
EP1016766A1 (en) | Frames and structures assembled by same | |
KR200187693Y1 (en) | Prefabricating erection bent | |
JP2813756B2 (en) | Folding scaffold | |
JP3700949B2 (en) | Support | |
JP3700950B2 (en) | Support | |
CN219887489U (en) | Height-adjustable integral folding scaffold | |
JPH09268754A (en) | Scaffolding device for construction and assembling method thereof | |
CN112610024B (en) | Temporary strutting arrangement is folded to assembled of light-duty steel construction | |
KR100636409B1 (en) | Scaffold | |
JP3691806B2 (en) | Chimney support tower and its support unit frame and division unit frame | |
JPH0249306Y2 (en) | ||
JPH09250235A (en) | Collapsible scaffold | |
KR100606985B1 (en) | Frames and structures assembled by same | |
JP3852039B2 (en) | Expandable frame structure | |
KR200355444Y1 (en) | Scaffold | |
JP2542018Y2 (en) | End support frame of stacked temporary support frame | |
KR20240000742U (en) | Workbench for disassembling the motor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050214 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050222 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050415 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050621 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050708 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080722 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090722 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100722 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100722 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110722 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120722 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120722 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130722 Year of fee payment: 8 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |