JP7217814B2 - Hoist adjustment device for machine room-less elevator and method of installing hoist - Google Patents

Hoist adjustment device for machine room-less elevator and method of installing hoist Download PDF

Info

Publication number
JP7217814B2
JP7217814B2 JP2021551075A JP2021551075A JP7217814B2 JP 7217814 B2 JP7217814 B2 JP 7217814B2 JP 2021551075 A JP2021551075 A JP 2021551075A JP 2021551075 A JP2021551075 A JP 2021551075A JP 7217814 B2 JP7217814 B2 JP 7217814B2
Authority
JP
Japan
Prior art keywords
hoist
fixed
machine
fixing member
hoisting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021551075A
Other languages
Japanese (ja)
Other versions
JPWO2021070362A1 (en
Inventor
裕介 近田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2021070362A1 publication Critical patent/JPWO2021070362A1/ja
Application granted granted Critical
Publication of JP7217814B2 publication Critical patent/JP7217814B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

この発明は、機械室レスエレベータの巻上機調整装置、及び巻上機据付方法に関するものである。 TECHNICAL FIELD The present invention relates to a hoisting machine adjusting device for a machine room-less elevator and a hoisting machine installation method.

従来のエレベータでは、複数の支持用弾性体を介して機械台上に巻上機ユニットが設置されている。各支持用弾性体は、ボルト及びナットによって機械台に固定されている(例えば、特許文献1参照)。 In a conventional elevator, a hoist unit is installed on a machine base via a plurality of supporting elastic bodies. Each supporting elastic body is fixed to the machine base with bolts and nuts (see, for example, Patent Document 1).

国際公開第2016/030943号WO2016/030943

上記のような従来のエレベータでは、狭い昇降路内において各ナットの締め込み量を調整することによって、巻上機ユニットの姿勢を調整する必要があり、調整作業が煩雑である。 In the conventional elevator as described above, it is necessary to adjust the attitude of the hoisting machine unit by adjusting the amount of tightening of each nut in the narrow hoistway, and the adjustment work is complicated.

この発明は、上記のような課題を解決するためになされたものであり、巻上機の姿勢を容易に調整することができる機械室レスエレベータの巻上機調整装置及び巻上機据付方法を得ることを目的とする。 SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and provides a hoist adjustment device and a hoist installation method for a machine room-less elevator that can easily adjust the attitude of the hoist. with the aim of obtaining

この発明に係る機械室レスエレベータの巻上機調整装置は、機械台上に緩衝部材を介して設置されている巻上機に固定され、巻上機から上方へ突出する固定体、及び固定体に設けられ、昇降路内における巻上機の上方に設置されている梁に対する固定体の位置を調整することによって、水平面に対する巻上機の角度を調整する角度調整体を備え、固定体は、巻上機に固定される第1の固定部材と、巻上機に固定される第2の固定部材とを有しており、第1の固定部材及び記2の固定部材は、巻上機に固定されることによって、梁を挟み込む
この発明に係る機械室レスエレベータの巻上機据付方法は、機械台上に緩衝部材を介して巻上機を設置するとともに、巻上機から上方へ突出する固定体を巻上機に固定する工程、固定体に設けられている角度調整体を操作し、昇降路内における巻上機の上方に設置されている梁に対する固定体の位置を調整することによって、水平面に対する巻上機の角度を調整する工程、及び緩衝部材を機械台に締結する締結具を締め込む工程を含み、固定体は、巻上機に固定される第1の固定部材と、巻上機に固定される第2の固定部材とを有しており、第1の固定部材及び第2の固定部材は、巻上機に固定されることによって、梁を挟み込む。
A hoisting machine adjusting device for a machine room-less elevator according to the present invention includes: a fixed body fixed to a hoisting machine installed on a machine base via a cushioning member, projecting upward from the hoisting machine; provided in the hoistway to adjust the angle of the hoisting machine with respect to the horizontal plane by adjusting the position of the fixed body with respect to the beam installed above the hoisting machine , and the fixed body is It has a first fixing member fixed to the hoisting machine and a second fixing member fixed to the hoisting machine, and the first fixing member and the second fixing member are fixed to the hoisting machine. By being fixed, the beam is sandwiched .
A method of installing a hoist for a machine room-less elevator according to the present invention includes installing a hoist on a machine table via a cushioning member, and fixing a fixed body protruding upward from the hoist to the hoist. The angle of the hoisting machine with respect to the horizontal plane is adjusted by operating the angle adjusting body provided on the fixed body and adjusting the position of the fixed body with respect to the beam installed above the hoisting machine in the hoistway. and a step of tightening a fastener that fastens the cushioning member to the machine base. The first fixing member and the second fixing member sandwich the beam by being fixed to the hoist.

この発明によれば、巻上機の姿勢を容易に調整することができる。 ADVANTAGE OF THE INVENTION According to this invention, the attitude|position of a winding machine can be adjusted easily.

実施の形態1による機械室レスエレベータの要部を示す正面図である。1 is a front view showing a main part of a machine room-less elevator according to Embodiment 1; FIG. 図1のII-II線に沿う断面図である。FIG. 2 is a cross-sectional view taken along line II-II of FIG. 1; 図2の前緩衝部材を示す断面図である。FIG. 3 is a cross-sectional view showing the front cushioning member of FIG. 2; 図2の後緩衝部材を示す断面図である。FIG. 3 is a cross-sectional view showing the rear cushioning member of FIG. 2; 図2の巻上機と、前緩衝部材及び一対の後緩衝部材との関係を示す平面図である。3 is a plan view showing the relationship between the hoist of FIG. 2, a front cushioning member, and a pair of rear cushioning members; FIG. 図1の機械室レスエレベータの据付途中の状態を示す正面図である。FIG. 2 is a front view showing a state in the middle of installation of the machine room-less elevator of FIG. 1; 図6のVII-VII線に沿う断面図である。FIG. 7 is a cross-sectional view along line VII-VII of FIG. 6; 図6の機械台上に巻上機を仮固定した状態を示す正面図である。FIG. 7 is a front view showing a state in which the hoist is temporarily fixed on the machine table shown in FIG. 6 ; 図8の機械台及び巻上機を示す平面図である。FIG. 9 is a plan view showing the machine table and the hoist of FIG. 8; 図2の巻上機に第1の固定部材と第2の固定部材とを取り付ける様子を示す図である。FIG. 3 is a diagram showing how a first fixing member and a second fixing member are attached to the hoist of FIG. 2 ;

以下、実施の形態について、図面を参照して説明する。
実施の形態1.
図1は、実施の形態1による機械室レスエレベータの要部を示す正面図であり、乗場側から昇降路内を見た図である。また、図2は、図1のII-II線に沿う断面図である。図において、昇降路1内には、一対のかごガイドレール2と、一対の釣合おもりガイドレール3とが設置されている。図1及び図2では、一対のかごガイドレール2のうちの一方のみを示している。
Embodiments will be described below with reference to the drawings.
Embodiment 1.
FIG. 1 is a front view showing a main part of the machine room-less elevator according to Embodiment 1, and is a view of the inside of the hoistway from the landing side. 2 is a cross-sectional view along line II-II of FIG. In the figure, a pair of car guide rails 2 and a pair of counterweight guide rails 3 are installed in a hoistway 1 . 1 and 2, only one of the pair of car guide rails 2 is shown.

一対のかごガイドレール2は、図示しないかごの昇降を案内する。一対の釣合おもりガイドレール3は、図示しない釣合おもりの昇降を案内する。 A pair of car guide rails 2 guides the elevation of the car (not shown). A pair of counterweight guide rails 3 guides the elevation of the counterweight (not shown).

一対の釣合おもりガイドレール3の上端面上には、機械台4が水平に支持されている。機械台4は、一対のかごガイドレール2のうちの一方と、一対の釣合おもりガイドレール3とに対して固定されている。 A machine base 4 is horizontally supported on the upper end surfaces of the pair of counterweight guide rails 3 . The machine base 4 is fixed to one of the pair of car guide rails 2 and the pair of counterweight guide rails 3 .

機械台4上には、巻上機5が設置されている。巻上機5は、昇降路1内の頂部に配置されている。 A hoist 5 is installed on the machine base 4 . The hoist 5 is arranged at the top of the hoistway 1 .

また、巻上機5は、巻上機本体6と駆動シーブ7とを有している。巻上機本体6は、図示しないモータと、図示しないブレーキとを有している。モータは、駆動シーブ7を回転させる。ブレーキは、駆動シーブ7の静止状態を保持する。また、ブレーキは、駆動シーブ7の回転を制動する。 The hoisting machine 5 also has a hoisting machine main body 6 and a drive sheave 7 . The hoist main body 6 has a motor (not shown) and a brake (not shown). The motor rotates the drive sheave 7 . The brake keeps the drive sheave 7 stationary. The brake also brakes the rotation of the drive sheave 7 .

駆動シーブ7には、図示しない懸架体が巻き掛けられる。懸架体としては、複数本のロープ、又は複数本のベルトが用いられる。かご及び釣合おもりは、懸架体により昇降路1内に吊り下げられる。また、かご及び釣合おもりは、駆動シーブ7を回転させることにより、昇降路1内を昇降する。 A suspension (not shown) is wound around the drive sheave 7 . A plurality of ropes or a plurality of belts are used as suspensions. The car and counterweight are suspended within the hoistway 1 by suspensions. Further, the car and the counterweight move up and down in the hoistway 1 by rotating the drive sheave 7 .

この例では、巻上機5として、薄形巻上機が用いられている。薄形巻上機は、軸方向の寸法が軸方向に直角の方向の寸法よりも小さい巻上機である。軸方向とは、駆動シーブ7の回転軸の軸心に沿う方向であり、図1の左右方向である。 In this example, a thin type hoist is used as the hoist 5 . A low-profile hoist is a hoist whose axial dimension is smaller than its dimension perpendicular to the axial direction. The axial direction is the direction along the axis of the rotation shaft of the drive sheave 7, which is the left-right direction in FIG.

巻上機5と機械台4との間には、防振部材としての複数の緩衝部材が介在している。即ち、巻上機5は、複数の緩衝部材を介して機械台4上に設置されている。複数の緩衝部材は、前緩衝部材8と、一対の後緩衝部材9とを含んでいる。 Between the hoisting machine 5 and the machine base 4, a plurality of cushioning members are interposed as vibration isolating members. That is, the hoisting machine 5 is installed on the machine base 4 via a plurality of cushioning members. The multiple cushioning members include a front cushioning member 8 and a pair of rear cushioning members 9 .

前緩衝部材8の材料及び一対の後緩衝部材9の材料としては、それぞれゴムが用いられている。 Rubber is used as the material of the front cushioning member 8 and the material of the pair of rear cushioning members 9 .

昇降路1内の頂部には、揚重梁14が水平に設置されている。揚重梁14は、昇降路1内における巻上機5の上方に設置されている梁である。また、揚重梁14は、建物に対して固定されている。揚重梁14としては、H型鋼が用いられている。 A lifting beam 14 is installed horizontally at the top of the hoistway 1 . The lifting beam 14 is a beam installed above the hoisting machine 5 in the hoistway 1 . Also, the lifting beam 14 is fixed to the building. H-shaped steel is used as the lifting beam 14 .

巻上機5と揚重梁14との間には、巻上機調整装置50が設けられている。巻上機調整装置50は、固定体10、第1のブラケット15、第2のブラケット16、角度調整体としての第1のジャッキボルト17、第1の当て板18、角度調整体としての第2のジャッキボルト19、及び第2の当て板20を有している。 A hoist adjusting device 50 is provided between the hoist 5 and the lifting beam 14 . A hoisting machine adjustment device 50 includes a fixed body 10, a first bracket 15, a second bracket 16, a first jack bolt 17 as an angle adjuster, a first backing plate 18, and a second bracket as an angle adjuster. , and a second backing plate 20 .

固定体10は、巻上機5に固定されており、巻上機5から上方へ突出している。また、固定体10は、第1の固定部材11と、第2の固定部材12と、平板状の連結部材13とを有している。 The fixed body 10 is fixed to the hoisting machine 5 and protrudes upward from the hoisting machine 5 . The fixed body 10 also has a first fixing member 11 , a second fixing member 12 , and a plate-like connecting member 13 .

第1の固定部材11は、平板状の第1の固定部11aと、平板状の第1の突出部11bとを有している。第1の固定部11aは、例えばボルト止めによって、巻上機本体6の上面に固定されている。 The first fixing member 11 has a flat plate-like first fixing portion 11a and a flat plate-like first projecting portion 11b. The first fixing portion 11a is fixed to the upper surface of the hoist main body 6 by, for example, bolting.

第1の突出部11bは、第1の固定部11aから直角に上方へ突出している。第1の突出部11bには、第1の切欠部11cが設けられている。第1の切欠部11cには、揚重梁14の下部フランジが挿入されている。 The first protruding portion 11b protrudes upward at right angles from the first fixing portion 11a. A first notch portion 11c is provided in the first projecting portion 11b. A lower flange of the lifting beam 14 is inserted into the first notch portion 11c.

第2の固定部材12は、平板状の第2の固定部12aと、平板状の第2の突出部12bとを有している。第2の固定部12aは、例えばボルト止めによって、巻上機本体6の上面に固定されている。 The second fixing member 12 has a flat plate-like second fixing portion 12a and a flat plate-like second projecting portion 12b. The second fixing portion 12a is fixed to the upper surface of the hoist main body 6 by, for example, bolting.

第2の突出部12bは、第2の固定部12aから直角に上方へ突出している。第2の突出部12bには、第2の切欠部12cが設けられている。第2の切欠部12cには、揚重梁14の下部フランジが挿入されている。 The second protruding portion 12b protrudes upward at right angles from the second fixing portion 12a. A second notch 12c is provided in the second projecting portion 12b. A lower flange of the lifting beam 14 is inserted into the second notch 12c.

第1の突出部11b及び第2の突出部12bは、巻上機本体6の厚さ方向の中央に配置されている。巻上機本体6の厚さ方向は、駆動シーブ7の回転軸の軸心に沿う方向であり、図1の左右方向である。 The first projecting portion 11b and the second projecting portion 12b are arranged at the center of the hoist body 6 in the thickness direction. The thickness direction of the hoist main body 6 is the direction along the axis of the rotation shaft of the drive sheave 7, which is the left-right direction in FIG.

第1の固定部材11及び第2の固定部材12は、巻上機5に固定されることによって、揚重梁14を挟み込んでいる。 The first fixing member 11 and the second fixing member 12 sandwich the lifting beam 14 by being fixed to the hoisting machine 5 .

連結部材13は、第1の固定部材11と第2の固定部材12とに固定されている。これにより、連結部材13は、第1の固定部材11と第2の固定部材12とを連結している。 The connecting member 13 is fixed to the first fixing member 11 and the second fixing member 12 . Thereby, the connecting member 13 connects the first fixing member 11 and the second fixing member 12 .

第1のブラケット15及び第2のブラケット16は、例えば、溶接又はボルト止めによって、揚重梁14に固定されている。第1のブラケット15の形状及び第2のブラケット16の形状は、平板状でも、L字形でもよい。 The first bracket 15 and the second bracket 16 are fixed to the lifting beam 14, for example by welding or bolting. The shape of the first bracket 15 and the shape of the second bracket 16 may be flat or L-shaped.

第1のブラケット15は、固定体10に対して、揚重梁14の長手方向に間隔をおいて配置されている。揚重梁14の長手方向は、巻上機本体6の厚さ方向に平行な方向であり、図1の左右方向である。 The first bracket 15 is spaced from the fixed body 10 in the longitudinal direction of the lifting beam 14 . The longitudinal direction of the lifting beam 14 is a direction parallel to the thickness direction of the hoist main body 6 and is the left-right direction in FIG.

第2のブラケット16は、固定体10に対して、揚重梁14の長手方向に間隔をおいて配置されている。また、第2のブラケット16は、固定体10に対して、第1のブラケット15とは反対側に配置されている。 The second bracket 16 is spaced apart from the fixed body 10 in the longitudinal direction of the lifting beam 14 . Also, the second bracket 16 is arranged on the side opposite to the first bracket 15 with respect to the fixed body 10 .

第1のブラケット15は、揚重梁14のウェブに対して、第1の突出部11bと同じ側に配置されている。これにより、第1のブラケット15は、第1の突出部11bに対向している。 The first bracket 15 is located on the same side of the web of the lifting beam 14 as the first protrusion 11b. Thereby, the first bracket 15 faces the first projecting portion 11b.

第2のブラケット16は、揚重梁14のウェブに対して、第2の突出部12bと同じ側に配置されている。これにより、第2のブラケット16は、第2の突出部12bに対向している。 The second bracket 16 is located on the same side of the web of the lifting beam 14 as the second protrusion 12b. Thereby, the second bracket 16 faces the second projecting portion 12b.

第1の突出部11bから第1のブラケット15までの距離は、第2の突出部12bから第2のブラケット16までの距離と同じである。 The distance from the first protrusion 11b to the first bracket 15 is the same as the distance from the second protrusion 12b to the second bracket 16. As shown in FIG.

第1のジャッキボルト17は、第1の突出部11bにねじ込まれている。第1のジャッキボルト17の先端は、第1の当て板18を介して、第1のブラケット15に当たっている。第1の当て板18は、接着又はねじ止めによって、第1のブラケット15に固定されている。 The first jack bolt 17 is screwed into the first protrusion 11b. The tip of the first jack bolt 17 contacts the first bracket 15 via the first backing plate 18 . The first backing plate 18 is fixed to the first bracket 15 by gluing or screwing.

第2のジャッキボルト19は、第2の突出部12bにねじ込まれている。第2のジャッキボルト19の先端は、第2の当て板20を介して、第2のブラケット16に当たっている。第2の当て板20は、接着又はねじ止めによって、第2のブラケット16に固定されている。第1の当て板18の材料及び第2の当て板20の材料としては、例えばゴムが用いられている。 A second jack bolt 19 is screwed into the second protrusion 12b. The tip of the second jack bolt 19 contacts the second bracket 16 via the second backing plate 20 . The second backing plate 20 is fixed to the second bracket 16 by gluing or screwing. Rubber, for example, is used as the material of the first backing plate 18 and the material of the second backing plate 20 .

第1のジャッキボルト17のねじ込み量及び第2のジャッキボルト19のねじ込み量を調整することによって、揚重梁14の長手方向について、揚重梁14に対する固定体10の位置が調整される。これにより、巻上機5の姿勢、即ち水平面に対する巻上機5の角度が調整される。 By adjusting the amount of screwing of the first jack bolt 17 and the amount of screwing of the second jack bolt 19, the position of the fixed body 10 with respect to the lifting beam 14 in the longitudinal direction of the lifting beam 14 is adjusted. Thereby, the posture of the hoisting machine 5, that is, the angle of the hoisting machine 5 with respect to the horizontal plane is adjusted.

図3は、図2の前緩衝部材8を示す断面図である。前緩衝部材8は、第1の緩衝部材本体21と、第1の上板22と、第1の下板23と、複数の第1の上ボルト24と、複数の第1の下ボルト25と、締結具である複数の第1の上ナット26と、複数の第1の下ナット27とを有している。 FIG. 3 is a sectional view showing the front cushioning member 8 of FIG. 2. As shown in FIG. The front cushioning member 8 includes a first cushioning member main body 21, a first upper plate 22, a first lower plate 23, a plurality of first upper bolts 24, and a plurality of first lower bolts 25. , a plurality of first upper nuts 26 and a plurality of first lower nuts 27, which are fasteners.

第1の緩衝部材本体21は、第1の上板22と第1の下板23との間に挟まれている。第1の緩衝部材本体21の形状は、直方体状である。第1の緩衝部材本体21の材料としては、ゴムが用いられている。 The first buffer member main body 21 is sandwiched between the first upper plate 22 and the first lower plate 23 . The shape of the first cushioning member main body 21 is a rectangular parallelepiped. Rubber is used as the material of the first cushioning member main body 21 .

複数の第1の上ボルト24の下端は、それぞれ第1の上板22に固定されている。また、複数の第1の上ボルト24は、それぞれ第1の上板22から上方へ直角に突出している。 Lower ends of the plurality of first upper bolts 24 are fixed to the first upper plate 22 respectively. A plurality of first upper bolts 24 protrude upward from the first upper plate 22 at a right angle.

巻上機本体6は、前緩衝部材8を取り付けるための第1の取付部6aを有している。複数の第1の上ボルト24は、それぞれ第1の取付部6aを貫通している。各第1の上ナット26は、対応する第1の上ボルト24に締め込まれている。 The hoist main body 6 has a first mounting portion 6a for mounting the front cushioning member 8 thereon. The plurality of first upper bolts 24 penetrate through the first mounting portion 6a. Each first upper nut 26 is screwed onto the corresponding first upper bolt 24 .

複数の第1の下ボルト25の上端は、それぞれ第1の下板23に固定されている。また、複数の第1の下ボルト25は、それぞれ第1の下板23から下方へ直角に突出している。 Upper ends of the plurality of first lower bolts 25 are fixed to the first lower plate 23 respectively. A plurality of first lower bolts 25 protrude downward from the first lower plate 23 at right angles.

複数の第1の下ボルト25は、それぞれ機械台4の上面部を貫通している。各第1の下ナット27は、対応する第1の下ボルト25に締め込まれている。 A plurality of first lower bolts 25 pass through the upper surface of the machine base 4, respectively. Each first lower nut 27 is screwed onto the corresponding first lower bolt 25 .

図4は、図2の後緩衝部材9を示す断面図である。各後緩衝部材9は、第2の緩衝部材本体28と、第2の上板29と、第2の下板30と、第2の上ボルト31と、第2の下ボルト32と、締結具である第2の上ナット33と、第2の下ナット34とを有している。 FIG. 4 is a sectional view showing the rear cushioning member 9 of FIG. Each rear cushioning member 9 includes a second cushioning member body 28, a second upper plate 29, a second lower plate 30, a second upper bolt 31, a second lower bolt 32, and a fastener. a second upper nut 33 and a second lower nut 34 .

第2の緩衝部材本体28は、第2の上板29と第2の下板30との間に挟まれている。第2の緩衝部材本体28の形状は、円柱状である。第2の緩衝部材本体28の材料としては、ゴムが用いられている。 The second cushioning member main body 28 is sandwiched between the second upper plate 29 and the second lower plate 30 . The shape of the second cushioning member main body 28 is cylindrical. Rubber is used as the material of the second cushioning member main body 28 .

第2の上ボルト31の下端は、第2の上板29に固定されている。また、第2の上ボルト31は、第2の上板29から上方へ直角に突出している。 A lower end of the second upper bolt 31 is fixed to the second upper plate 29 . The second upper bolt 31 protrudes upward from the second upper plate 29 at a right angle.

巻上機本体6は、一対の後緩衝部材9を取り付けるための第2の取付部6bを有している。第2の上ボルト31は、第2の取付部6bを貫通している。第2の上ナット33は、第2の上ボルト31に締め込まれている。 The hoist main body 6 has a second mounting portion 6b for mounting the pair of rear cushioning members 9 thereon. The second upper bolt 31 passes through the second mounting portion 6b. A second upper nut 33 is screwed onto the second upper bolt 31 .

第2の下ボルト32の上端は、第2の下板30に固定されている。また、第2の下ボルト32は、第2の下板30から下方へ直角に突出している。 The upper end of the second lower bolt 32 is fixed to the second lower plate 30 . The second lower bolt 32 protrudes downward from the second lower plate 30 at a right angle.

第2の下ボルト32は、機械台4の上面部を貫通している。第2の下ナット34は、第2の下ボルト32に締め込まれている。 The second lower bolt 32 penetrates the upper surface of the machine base 4 . A second lower nut 34 is screwed onto the second lower bolt 32 .

図5は、図2の巻上機5と、前緩衝部材8及び一対の後緩衝部材9との関係を示す平面図である。巻上機本体6において、駆動シーブ7が配置されている面を前面、前面とは反対側の面を背面とする。また、巻上機5を真上から見て、前面と背面とを繋ぐ一対の面をそれぞれ側面とする。 FIG. 5 is a plan view showing the relationship between the hoisting machine 5 of FIG. In the hoist body 6, the surface on which the drive sheave 7 is arranged is the front surface, and the surface opposite to the front surface is the rear surface. Moreover, when viewing the hoisting machine 5 from directly above, a pair of surfaces connecting the front surface and the rear surface are defined as side surfaces.

前緩衝部材8は、巻上機5を真上から見て、巻上機本体6の前面に隣接して、巻上機本体6の幅方向の中央に配置されている。巻上機本体6の幅方向は、巻上機5を真上から見て、駆動シーブ7の回転軸の軸心に直角の方向である。 The front cushioning member 8 is arranged adjacent to the front surface of the hoisting machine body 6 and at the center in the width direction of the hoisting machine body 6 when the hoisting machine 5 is viewed from directly above. The width direction of the hoist main body 6 is perpendicular to the axis of the rotation shaft of the drive sheave 7 when the hoist 5 is viewed from directly above.

一対の後緩衝部材9は、巻上機5を真上から見て、背面と一対の側面とがなす一対の隅部にそれぞれ配置されている。 The pair of rear cushioning members 9 are arranged at a pair of corners formed by the rear surface and the pair of side surfaces when the hoisting machine 5 is viewed from directly above.

次に、巻上機5の据付方法について説明する。機械室レスエレベータの据付時には、昇降路1内の頂部に揚重梁14が設置される。揚重梁14には、図示しない揚重装置が設置される。揚重装置は、機器を揚重する装置である。この状態から、一対のかごガイドレール2と、一対の釣合おもりガイドレール3とが、揚重され、昇降路1内に設置される。 Next, a method for installing the hoist 5 will be described. When installing the machine room-less elevator, a lifting beam 14 is installed at the top of the hoistway 1 . A lifting device (not shown) is installed on the lifting beam 14 . A lifting device is a device that lifts equipment. From this state, a pair of car guide rails 2 and a pair of counterweight guide rails 3 are lifted and installed in the hoistway 1 .

この後、図6及び図7に示すように、機械台4が、揚重され、一対の釣合おもりガイドレール3上に固定されるとともに、一方のかごガイドレール2に対して固定される。このとき、機械台4が水平になるように調整される。また、機械台4には、揚重前に、前緩衝部材8及び一対の後緩衝部材9が予め取り付けられている。 Thereafter, as shown in FIGS. 6 and 7, the machine base 4 is lifted and fixed on the pair of counterweight guide rails 3 and fixed to one of the car guide rails 2 . At this time, the machine base 4 is adjusted to be horizontal. A front cushioning member 8 and a pair of rear cushioning members 9 are attached in advance to the machine base 4 before lifting.

続いて、図8に示すように、巻上機5が、揚重され、前緩衝部材8及び一対の後緩衝部材9上に仮固定される。この時点では、巻上機5の全荷重が、前緩衝部材8及び一対の後緩衝部材9により支持されている。図9は、図8の機械台4及び巻上機5を示す平面図である。 Subsequently, as shown in FIG. 8 , the hoisting machine 5 is lifted and temporarily fixed on the front cushioning member 8 and the pair of rear cushioning members 9 . At this point, the entire load of the hoist 5 is supported by the front cushioning member 8 and the pair of rear cushioning members 9 . 9 is a plan view showing the machine base 4 and the hoist 5 of FIG. 8. FIG.

次に、第1のブラケット15及び第2のブラケット16が、揚重梁14に固定される。第1のブラケット15には、第1の当て板18が予め固定されている。第2のブラケット16には、第2の当て板20が予め固定されている。 The first bracket 15 and the second bracket 16 are then secured to the lifting beam 14 . A first backing plate 18 is fixed in advance to the first bracket 15 . A second backing plate 20 is fixed in advance to the second bracket 16 .

この後、図10に示すように、第1の固定部材11と第2の固定部材12とによって、揚重梁14が挟み込まれる。そして、第1の固定部材11及び第2の固定部材12が巻上機本体6上に固定される。 After that, as shown in FIG. 10 , the lifting beam 14 is sandwiched between the first fixing member 11 and the second fixing member 12 . Then, the first fixing member 11 and the second fixing member 12 are fixed on the hoist main body 6 .

続いて、連結部材13によって、第1の固定部材11と第2の固定部材12とが連結される。そして、第1の固定部材11に第1のジャッキボルト17が通され、第1のジャッキボルト17の先端が第1の当て板18に当てられる。また、第2の固定部材12に第2のジャッキボルト19が通され、第2のジャッキボルト19の先端が第2の当て板20に当てられる。 Subsequently, the connecting member 13 connects the first fixing member 11 and the second fixing member 12 . A first jack bolt 17 is passed through the first fixing member 11 , and the tip of the first jack bolt 17 is brought into contact with the first backing plate 18 . A second jack bolt 19 is passed through the second fixing member 12 , and the tip of the second jack bolt 19 is brought into contact with the second backing plate 20 .

この後、第1のジャッキボルト17のねじ込み量及び第2のジャッキボルト19のねじ込み量が調整され、巻上機5の前後方向への傾きが調整される。この状態では、巻上機5が前後方向へ傾こうとする荷重の一部が、巻上機調整装置50により支持される。 After that, the screwing amount of the first jack bolt 17 and the screwing amount of the second jack bolt 19 are adjusted, and the tilt of the hoisting machine 5 in the front-rear direction is adjusted. In this state, part of the load that causes the hoist 5 to tilt in the front-rear direction is supported by the hoist adjustment device 50 .

最後に、各第1の上ナット26及び各第2の上ナット33が締め込まれ、巻上機5が機械台4上に本固定される。 Finally, each first upper nut 26 and each second upper nut 33 are tightened to permanently fix the hoisting machine 5 on the machine base 4 .

このように、実施の形態1の巻上機5の据付方法は、第1、第2、及び第3の工程を含んでいる。第1の工程は、前緩衝部材8及び一対の後緩衝部材9を介して、機械台4上に巻上機5を設置するとともに、固定体10を巻上機5に固定する工程である。 Thus, the installation method of the hoist 5 of Embodiment 1 includes the first, second, and third steps. The first step is to install the hoisting machine 5 on the machine base 4 via the front cushioning member 8 and the pair of rear cushioning members 9 and to fix the fixed body 10 to the hoisting machine 5 .

第2の工程は、第1のジャッキボルト17及び第2のジャッキボルト19を操作し、揚重梁14に対する固定体10の位置を調整することによって、水平面に対する巻上機5の角度を調整する工程である。 The second step is to adjust the angle of the hoist 5 with respect to the horizontal plane by operating the first jack bolt 17 and the second jack bolt 19 to adjust the position of the fixed body 10 with respect to the lifting beam 14. It is a process.

第3の工程は、各第1の上ナット26及び各第2の上ナット33を締め込む工程である。 The third step is to tighten each first upper nut 26 and each second upper nut 33 .

このような巻上機調整装置50及び巻上機5の据付方法では、第1のジャッキボルト17及び第2のジャッキボルト19を操作することによって、水平面に対する巻上機5の角度が調整される。このため、巻上機5の姿勢を容易に調整することができる。 In such a method for installing the hoisting machine adjusting device 50 and the hoisting machine 5, the angle of the hoisting machine 5 with respect to the horizontal plane is adjusted by operating the first jack bolt 17 and the second jack bolt 19. . Therefore, the posture of the hoisting machine 5 can be easily adjusted.

また、巻上機5の姿勢を調整した後、各第1の上ナット26及び各第2の上ナット33は、単に締め込むだけでよく、巻上機5の据付作業が容易になる。即ち、各第1の上ナット26及び各第2の上ナット33の締め込み量の調整により巻上機5の姿勢を調整する必要がない。 Moreover, after adjusting the posture of the hoisting machine 5, the first upper nuts 26 and the second upper nuts 33 can be simply tightened, which facilitates the installation work of the hoisting machine 5. FIG. That is, it is not necessary to adjust the posture of the hoisting machine 5 by adjusting the amount of tightening of each first upper nut 26 and each second upper nut 33 .

また、固定体10は、第1の固定部材11と第2の固定部材12と分割されているため、固定体10の巻上機5への固定が容易である。 In addition, since the fixed body 10 is divided into the first fixed member 11 and the second fixed member 12, fixing the fixed body 10 to the hoisting machine 5 is easy.

また、第1の固定部材11と第2の固定部材12とによって、揚重梁14が挟み込まれるので、揚重梁14の両側に固定体10をバランス良く配置することができる。 Further, since the lifting beam 14 is sandwiched between the first fixing member 11 and the second fixing member 12, the fixed bodies 10 can be arranged on both sides of the lifting beam 14 with good balance.

また、第1の固定部材11と第2の固定部材12とが連結部材13によって連結されるので、揚重梁14に対して固定体10全体を一体で移動させることができる。 Further, since the first fixing member 11 and the second fixing member 12 are connected by the connecting member 13, the entire fixed body 10 can be moved integrally with respect to the lifting beam 14. FIG.

また、角度調整体として第1のジャッキボルト17及び第2のジャッキボルト19が用いられているので、簡単な構成により、巻上機5の姿勢を調整することができる。 Moreover, since the first jack bolt 17 and the second jack bolt 19 are used as the angle adjusters, the attitude of the hoisting machine 5 can be adjusted with a simple configuration.

なお、巻上機の上方に設置されている梁は、揚重梁以外の梁であってもよい。 Note that the beam installed above the hoist may be a beam other than the lifting beam.

また、巻上機調整装置は、巻上機の据付後に撤去してもよいし、支障にならなければ撤去しなくてもよい。 Further, the hoisting machine adjusting device may be removed after the hoisting machine is installed, or may not be removed if it does not interfere.

また、固定体は、第1の固定部材と第2の固定部材とに分割されていなくてもよい。 Also, the fixed body may not be divided into the first fixed member and the second fixed member.

また、角度調整体は、ジャッキボルトに限定されない。 Also, the angle adjuster is not limited to a jack bolt.

また、巻上機の前後方向へ巻上機の角度を調整できれば、角度調整体は1つであってもよい。 Further, if the angle of the hoist can be adjusted in the longitudinal direction of the hoist, the number of the angle adjusters may be one.

1 昇降路、4 機械台、5 巻上機、8 前緩衝部材、9 後緩衝部材、10 固定体、11 第1の固定部材、12 第2の固定部材、13 連結部材、14 揚重梁、17 第1のジャッキボルト(角度調整体)、19 第2のジャッキボルト(角度調整体)、26 第1の上ナット(締結具)、33 第2の上ナット(締結具)、50 巻上機調整装置。 1 hoistway 4 machine table 5 hoisting machine 8 front cushioning member 9 rear cushioning member 10 fixed body 11 first fixed member 12 second fixed member 13 connecting member 14 lifting beam 17 first jack bolt (angle adjuster), 19 second jack bolt (angle adjuster), 26 first upper nut (fastener), 33 second upper nut (fastener), 50 hoist regulator.

Claims (4)

機械台上に緩衝部材を介して設置されている巻上機に固定され、前記巻上機から上方へ突出する固定体、及び
前記固定体に設けられ、昇降路内における前記巻上機の上方に設置されている梁に対する前記固定体の位置を調整することによって、水平面に対する前記巻上機の角度を調整する角度調整体を備え
前記固定体は、前記巻上機に固定される第1の固定部材と、前記巻上機に固定される第2の固定部材とを有しており、
前記第1の固定部材及び前記第2の固定部材は、前記巻上機に固定されることによって、前記梁を挟み込む機械室レスエレベータの巻上機調整装置。
A fixed body that is fixed to a hoist installed on a machine bed via a cushioning member and protrudes upward from the hoist, and a fixed body that is provided on the fixed body and is above the hoist in the hoistway An angle adjusting body that adjusts the angle of the hoist with respect to the horizontal plane by adjusting the position of the fixed body with respect to the beam installed in the
The fixed body has a first fixed member fixed to the hoist and a second fixed member fixed to the hoist,
The hoist adjustment device for a machine room-less elevator , wherein the first fixing member and the second fixing member sandwich the beam by being fixed to the hoist.
前記固定体は、前記第1の固定部材と前記第2の固定部材とに固定され、前記第1の固定部材と前記第2の固定部材とを連結する連結部材をさらに有している請求項記載の機械室レスエレベータの巻上機調整装置。 The fixed body further comprises a connecting member fixed to the first fixing member and the second fixing member and connecting the first fixing member and the second fixing member. 2. A hoist adjusting device for a machine room-less elevator according to 1 above. 前記角度調整体は、ジャッキボルトである請求項1から請求項までのいずれか1項に記載の機械室レスエレベータの巻上機調整装置。 The hoist adjusting device for a machine room-less elevator according to any one of claims 1 to 2 , wherein the angle adjuster is a jack bolt. 機械台上に緩衝部材を介して巻上機を設置するとともに、前記巻上機から上方へ突出する固定体を前記巻上機に固定する工程、
前記固定体に設けられている角度調整体を操作し、昇降路内における前記巻上機の上方に設置されている梁に対する前記固定体の位置を調整することによって、水平面に対する前記巻上機の角度を調整する工程、及び
前記緩衝部材を前記機械台に締結する締結具を締め込む工程
を含み、
前記固定体は、前記巻上機に固定される第1の固定部材と、前記巻上機に固定される第2の固定部材とを有しており、
前記第1の固定部材及び前記第2の固定部材は、前記巻上機に固定されることによって、前記梁を挟み込む機械室レスエレベータの巻上機据付方法。
A step of installing a hoisting machine on a machine table via a buffer member, and fixing a fixed body protruding upward from the hoisting machine to the hoisting machine;
By operating an angle adjuster provided on the fixed body to adjust the position of the fixed body with respect to the beam installed above the hoisting machine in the hoistway, the hoisting machine is positioned relative to the horizontal plane. adjusting an angle; and tightening a fastener that fastens the cushioning member to the machine base ;
The fixed body has a first fixed member fixed to the hoist and a second fixed member fixed to the hoist,
A hoist installation method for a machine room-less elevator in which the first fixing member and the second fixing member are fixed to the hoist machine to sandwich the beam .
JP2021551075A 2019-10-11 2019-10-11 Hoist adjustment device for machine room-less elevator and method of installing hoist Active JP7217814B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/040242 WO2021070362A1 (en) 2019-10-11 2019-10-11 Hoist adjustment device and hoist installation method for machine-room-less elevator

Publications (2)

Publication Number Publication Date
JPWO2021070362A1 JPWO2021070362A1 (en) 2021-04-15
JP7217814B2 true JP7217814B2 (en) 2023-02-03

Family

ID=75438126

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021551075A Active JP7217814B2 (en) 2019-10-11 2019-10-11 Hoist adjustment device for machine room-less elevator and method of installing hoist

Country Status (3)

Country Link
JP (1) JP7217814B2 (en)
CN (1) CN114502497B (en)
WO (1) WO2021070362A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2024519859A (en) * 2021-05-19 2024-05-21 インベンテイオ・アクテイエンゲゼルシヤフト Drive system for an elevator installation, elevator installation and method for installing a drive on a supporting element of an elevator installation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001171953A (en) 1999-12-16 2001-06-26 Fujitec Co Ltd Means of supporting elevator driving device
JP2013047131A (en) 2011-08-29 2013-03-07 Hitachi Ltd Elevator
WO2016030943A1 (en) 2014-08-25 2016-03-03 三菱電機株式会社 Elevator hoist installing device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58136267U (en) * 1982-03-10 1983-09-13 株式会社東芝 Jig for elevator construction
JP4383579B2 (en) * 1999-04-30 2009-12-16 東芝エレベータ株式会社 Elevator equipment
CN205662205U (en) * 2016-06-02 2016-10-26 西继迅达(许昌)电梯有限公司 Traction machine fixing device
JP6714905B2 (en) * 2018-01-15 2020-07-01 フジテック株式会社 elevator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001171953A (en) 1999-12-16 2001-06-26 Fujitec Co Ltd Means of supporting elevator driving device
JP2013047131A (en) 2011-08-29 2013-03-07 Hitachi Ltd Elevator
WO2016030943A1 (en) 2014-08-25 2016-03-03 三菱電機株式会社 Elevator hoist installing device

Also Published As

Publication number Publication date
CN114502497A (en) 2022-05-13
WO2021070362A1 (en) 2021-04-15
JPWO2021070362A1 (en) 2021-04-15
CN114502497B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
US10589962B2 (en) Elevator hoisting machine mounting device
JP7217814B2 (en) Hoist adjustment device for machine room-less elevator and method of installing hoist
KR20140035496A (en) Support apparatus for elevator hoisting machine
JP5714345B2 (en) Elevator brake system
US6591944B2 (en) Method and apparatus for adjusting steering angle for elevator sheave
JP5554097B2 (en) Elevator rail fixing device
JP2018070317A (en) Guide rail supporting structure and rail clip for elevator
JP6345374B1 (en) Elevator equipment
JP6704339B2 (en) Elevators and brake equipment for elevators
JP5911041B2 (en) Elevator equipment
JP6738911B2 (en) Elevator equipment
WO2023233592A1 (en) Elevator device
WO2023053361A1 (en) Elevator guide rail device and installation method therefor
JP2016169070A (en) Elevator car and elevator device using the same
JP6716038B2 (en) Elevator counterweight device
JP7134366B2 (en) elevator counterweight device
JP7134335B2 (en) Shock absorber spring supports and elevator shock absorbers
CN110342370B (en) Elevator device
CN108657899B (en) Elevator device and position adjusting method of cable brake device
CN117068906A (en) Elevator device
JP2001080847A (en) Elevator guide device
JPH09100079A (en) Sway preventing device for balance chain of elevator
WO2012172671A1 (en) Elevator
JP2003238049A (en) Return pulley device for elevator
JP2018030657A (en) Elevator and rope support mechanism

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210909

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220906

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220907

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221227

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230124

R150 Certificate of patent or registration of utility model

Ref document number: 7217814

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150