JP7193273B2 - 砂防堰堤の計画支援装置、及び制御プログラム - Google Patents
砂防堰堤の計画支援装置、及び制御プログラム Download PDFInfo
- Publication number
- JP7193273B2 JP7193273B2 JP2018160880A JP2018160880A JP7193273B2 JP 7193273 B2 JP7193273 B2 JP 7193273B2 JP 2018160880 A JP2018160880 A JP 2018160880A JP 2018160880 A JP2018160880 A JP 2018160880A JP 7193273 B2 JP7193273 B2 JP 7193273B2
- Authority
- JP
- Japan
- Prior art keywords
- installation
- candidate
- data
- erosion control
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Landscapes
- Instructional Devices (AREA)
Description
図1は、計画支援装置1の概略構成の一例を示す図である。
図2(a)は、計画支援装置1の表示部13に表示される地図画面200の一例を示す図である。
図2(b)は、計画支援装置1の表示部13に表示される選択画面210の一例を示す図である。
図3(a)は、計画支援装置1の表示部13に表示される地図画面300の一例を示す図である。
図3(b)は、計画支援装置1の表示部13に表示される地図画面310の一例を示す図である。
複数の設置候補位置が算出されると、計画支援装置1によって推定堆砂域が算出される。以下、図4(a)及び(b)を参照して、推定堆砂域の一例について説明する。
図5(a)は、計画支援装置1の表示部13に表示される地図画面500の一例を示す図である。
図5(b)は、計画支援装置1の表示部13に表示される地図画面510の一例を示す図である。
図6は、計画支援装置1の表示部13に表示される地図画面600の一例を示す図である。
そして、設置条件を満たす推定堆砂域501c及び501dのうち、計画捕捉量が最大の推定堆砂域に対応する設置候補位置が、砂防堰堤の設置位置として決定する。以下、図7(a)及び(b)を参照して、計画捕捉量の算出方法の一例について説明する。
図8は、計画支援装置1の表示部13に表示される地図画面800の一例を示す図である。
図9(a)は、数値標高データのデータ構造の一例ある。
図9(b)は、設置条件データのデータ構造の一例である。
図10は、計画支援装置1の表示処理部141、取得部142、算出部143、及び判定部144による計画支援処理の動作フローの一例を示す図である。この計画支援処理は、予め記憶部11に記憶されている制御プログラムに基づいて、主に処理部14により、計画支援装置1の各要素と協働して実行される。
図11は、計画支援装置1の算出部143による推定堆砂域算出処理の動作フローの一例を示す図である。図11に示される推定堆砂域算出処理は、図10のステップS105において実行される。
なお、本発明は、本実施形態に限定されるものではない。例えば、算出部143は、選択画面210によって、「透過型」又は「部分透過型」が選択された場合、それぞれの種別に対応する計画捕捉量の算出手法に基づいて計画捕捉量を算出する。
また、判定部144は、推定堆砂域501が少なくとも一つの保護地物の形状の全てを含む場合に限り、砂防堰堤を設置するための設置条件が満たされていないと判定してもよい。この場合、推定堆砂域501が保護地物の形状の一部のみを含む場合、砂防堰堤を設置するための設置条件が満たされていると判定する。
11 記憶部
12 操作部
13 表示部
14 処理部
141 表示処理部
142 取得部
143 算出部
144 判定部
Claims (6)
- 表示部と、
所定エリア内の標高を示す数値標高データと砂防堰堤を設置するための設置条件に関する設置条件データとを記憶する記憶部と、
砂防堰堤を設置する位置の候補を示す、複数の設置候補位置に関する情報を取得する取得部と、
前記複数の設置候補位置のそれぞれについて、当該設置候補位置と前記数値標高データとに基づいて、前記砂防堰堤による堆積物の推定堆砂域を算出する算出部と、
前記複数の設置候補位置のそれぞれについて、前記推定堆砂域が前記設置条件を満たすか否かを判定し、前記設置条件を満たすと判定された前記設置候補位置のうち最大の計画捕捉量を有する設置候補位置を設置位置として判定する判定部と、
前記設置位置を前記表示部に表示する表示処理部と、
を備えることを特徴とする砂防堰堤の計画支援装置。 - 前記設置候補位置と、前記設置候補位置から最低河床線に沿った上流の地点の位置との第1勾配を取得し、
前記第1勾配に所定割合を乗算した第2勾配を取得し、
前記設置候補位置に設置された前記砂防堰堤の所定高さの位置からの前記第2勾配の平面を算出し、
前記数値標高データに基づく地表面と算出された前記平面とに基づいて、前記砂防堰堤による堆積物の前記推定堆砂域を算出する、算出部を更に備える、請求項1に記載の砂防堰堤の計画支援装置。 - 前記取得部は、
ユーザによって入力された前記最低河床線に関する情報を取得し、
前記最低河床線の最も下流側の地点を、最初の前記設置候補位置とし、
最初の設置候補位置から前記最低河床線上の上流側に向かって所定距離ごとに離れた地点を、それぞれ前記設置候補位置とする、請求項2に記載の砂防堰堤の計画支援装置。 - 前記設置条件データは、前記所定エリア内の保護地物の形状を示す形状データを含む、請求項1~3のいずれか一項に記載の砂防堰堤の計画支援装置。
- 前記判定部は、前記推定堆砂域を示す位置データと、前記設置条件データに含まれる各形状の位置データとに基づいて、前記推定堆砂域が前記各形状の少なくとも一部を含まないという前記設置条件を満たすか否かを判定する、請求項4に記載の砂防堰堤の計画支援装置。
- 記憶部及び表示部を備え、砂防堰堤の計画を支援するためのコンピュータを制御する制御プログラムであって、
所定エリア内の標高を示す数値標高データと砂防堰堤を設置するための設置条件に関する設置条件データとを前記記憶部に記憶し、
砂防堰堤を設置する位置の候補を示す、複数の設置候補位置に関する情報を取得し、
前記複数の設置候補位置のそれぞれについて、当該設置候補位置と前記数値標高データとに基づいて、前記砂防堰堤による堆積物の推定堆砂域を算出し、
前記複数の設置候補位置のそれぞれについて、前記推定堆砂域が前記設置条件を満たすか否かを判定し、前記設置条件を満たすと判定された前記設置候補位置のうち最大の計画捕捉量を有する設置候補位置を設置位置として判定し、
前記設置位置を前記表示部に表示する、
ことを前記コンピュータに実行させるための制御プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018160880A JP7193273B2 (ja) | 2018-08-29 | 2018-08-29 | 砂防堰堤の計画支援装置、及び制御プログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018160880A JP7193273B2 (ja) | 2018-08-29 | 2018-08-29 | 砂防堰堤の計画支援装置、及び制御プログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020034705A JP2020034705A (ja) | 2020-03-05 |
JP7193273B2 true JP7193273B2 (ja) | 2022-12-20 |
Family
ID=69667937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018160880A Active JP7193273B2 (ja) | 2018-08-29 | 2018-08-29 | 砂防堰堤の計画支援装置、及び制御プログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7193273B2 (ja) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7247407B1 (ja) | 2022-08-09 | 2023-03-28 | 株式会社パスコ | 推定装置、推定方法及び制御プログラム |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003296760A (ja) | 2002-04-02 | 2003-10-17 | Kokusai Kogyo Co Ltd | 画像処理装置およびプログラム |
JP2004272173A (ja) | 2003-03-12 | 2004-09-30 | Showa Chika Kogyo Kk | 地下ダムプロジェクトの技術支援システムとその支援システムに係る計画作成方法 |
JP2013210600A (ja) | 2012-02-27 | 2013-10-10 | Sabo Frontier Foundation | 土石流氾濫域高速シミュレーション方法及び土石流氾濫域高速シミュレーション装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101782559B1 (ko) * | 2016-02-18 | 2017-09-29 | 한국수자원공사 | 수치표고모델 기반 댐 건설 계획 방법, 이를 위한 장치, 및 이를 기록한 기록 매체 |
-
2018
- 2018-08-29 JP JP2018160880A patent/JP7193273B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003296760A (ja) | 2002-04-02 | 2003-10-17 | Kokusai Kogyo Co Ltd | 画像処理装置およびプログラム |
JP2004272173A (ja) | 2003-03-12 | 2004-09-30 | Showa Chika Kogyo Kk | 地下ダムプロジェクトの技術支援システムとその支援システムに係る計画作成方法 |
JP2013210600A (ja) | 2012-02-27 | 2013-10-10 | Sabo Frontier Foundation | 土石流氾濫域高速シミュレーション方法及び土石流氾濫域高速シミュレーション装置 |
Non-Patent Citations (1)
Title |
---|
砂防基本計画策定指針(土石流・流木対策編)解説,国土技術政策総合研究所資料,2016年04月,No. 904,40-51頁 |
Also Published As
Publication number | Publication date |
---|---|
JP2020034705A (ja) | 2020-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4082686B2 (ja) | リアルタイム動的氾濫シミュレーションシステム | |
EP1498864A1 (en) | Digital altimetric map drawing method and device | |
Tate et al. | Floodplain mapping using HEC-RAS and ArcView GIS | |
JP2005128838A (ja) | 簡易型洪水氾濫解析システム | |
JP4431545B2 (ja) | 氾濫シミュレーション装置及びプログラム | |
KR101724801B1 (ko) | 토지피복지도의 부분 갱신을 통한 gis기반의 연단위 비점오염부하량 산정용 주제도 제작 방법 | |
US20090094077A1 (en) | Site development planning | |
JP2007011582A (ja) | 洪水予測システム | |
JP6960168B2 (ja) | リアルタイム浸水ハザードマッピングのための現地情報同化装置及び方法並びにプログラム | |
JP6202809B2 (ja) | 土石流氾濫域高速シミュレーション方法及び土石流氾濫域高速シミュレーション装置 | |
JP2013195095A (ja) | 避難ルート出力装置、避難ルート出力方法、及びプログラム | |
JP2017201243A (ja) | 浸水度リアルタイム予測装置、浸水度リアルタイム予測方法及び浸水度リアルタイム予測プログラム並びにコンピュータで読み取り可能な記録媒体 | |
JP7193273B2 (ja) | 砂防堰堤の計画支援装置、及び制御プログラム | |
CN114722647A (zh) | 基于gis的多情景洪水淹没分析方法和装置 | |
JP7491779B2 (ja) | 浸水深推定装置及び方法 | |
JP2007220030A (ja) | 地理情報システムを用いた防災・災害復旧支援システム | |
JP7096129B2 (ja) | 砂防堰堤の堆積量算出装置、及び制御プログラム | |
JP5780413B2 (ja) | 堆積量推定方法、堆積量推定図、及び堆積量推定プログラム | |
JP6277018B2 (ja) | 洪水シミュレーション装置及び洪水シミュレーションプログラム | |
JP6774101B2 (ja) | 複数貯水池氾濫解析プログラム及びコンピュータで読み取り可能な記録媒体並びに記憶した機器、複数貯水池氾濫解析方法、複数貯水池氾濫解析装置 | |
JP7220276B1 (ja) | 浸水シミュレーション装置、浸水シミュレーション方法およびプログラム | |
JP7285678B2 (ja) | 情報処理装置、及び制御プログラム | |
Tennakoon | Parameterisation of 2D hydrodynamic models and flood hazard mapping for Naga city, Philippines | |
JP2005115701A (ja) | 地形と構造物の電子データを用いた数値解析条件の設定方法 | |
Roub et al. | Comparing a hydrodynamic model from fifth generation DTM data and a model from data modified by means of CroSolver tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210623 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20220526 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20220628 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220809 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20221122 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20221208 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7193273 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |