JP7180643B2 - Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake - Google Patents

Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake Download PDF

Info

Publication number
JP7180643B2
JP7180643B2 JP2020117955A JP2020117955A JP7180643B2 JP 7180643 B2 JP7180643 B2 JP 7180643B2 JP 2020117955 A JP2020117955 A JP 2020117955A JP 2020117955 A JP2020117955 A JP 2020117955A JP 7180643 B2 JP7180643 B2 JP 7180643B2
Authority
JP
Japan
Prior art keywords
hoisting machine
brake
strut
machine brake
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020117955A
Other languages
Japanese (ja)
Other versions
JP2022015245A (en
Inventor
和也 平田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORPORATION
Original Assignee
MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORPORATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORPORATION filed Critical MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORPORATION
Priority to JP2020117955A priority Critical patent/JP7180643B2/en
Publication of JP2022015245A publication Critical patent/JP2022015245A/en
Application granted granted Critical
Publication of JP7180643B2 publication Critical patent/JP7180643B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本開示は、エレベータの巻上機ブレーキの重装置、重装置の設置方法、及び巻上機ブレーキの交換方法に関する。 The present disclosure relates to a lifting device for an elevator hoisting machine brake, a method of installing the lifting device, and a method of replacing the hoisting machine brake.

特許文献1には、重量物の重装置に関する技術が開示されている。この技術では、レールが一対の支柱の上部に水平になるように固定される。レールにはトロリが設けられ、トロリにはチェーンブロックが設けられている。チェーンブロックによって吊り上げられた重量物は、レールに沿って水平方向に運搬される。 Patent Literature 1 discloses a technique related to a heavy object lifting device. In this technique, rails are fixed horizontally on top of a pair of stanchions. A trolley is provided on the rail, and a chain block is provided on the trolley. A heavy object lifted by the chain block is transported horizontally along the rail.

特開2019-210109号公報Japanese Patent Application Laid-Open No. 2019-210109

エレベータの巻上機は、大型の巻上機ブレーキを備えている。巻上機ブレーキは、定期的に交換される。ここで、上述した特許文献1の重装置を利用して巻上機ブレーキの交換作業を行うことを考える。巻上機が設置されている機械室は、交換作業に利用可能な空間に制約がある。このような制限空間では、特許文献1のような大型の重装置を最適位置に設置できないおそれがある。巻上機ブレーキの取り付け位置から横方向にずれた位置に重装置を設置した場合、取り外した巻上機ブレーキが振り子のように振られてしまい危険を伴うおそれがある。 The elevator hoist is equipped with a large hoist brake. Hoist brakes are replaced periodically. Here, it is considered that the hoisting machine brake is replaced by using the lifting device of Patent Document 1 described above. The machine room where the hoist is installed has a limited space available for replacement work. In such a limited space, there is a possibility that a large lifting device such as that disclosed in Patent Document 1 cannot be installed at an optimal position. If the lifting device is installed at a position that is laterally displaced from the installation position of the hoisting machine brake, the removed hoisting machine brake may swing like a pendulum, which is dangerous.

本開示は、上述のような課題を解決するためになされたもので、エレベータの巻上機ブレーキを安全に吊り上げて交換することのできるエレベータの巻上機ブレーキの重装置、重装置の設置方法、及び巻上機ブレーキの交換方法を提供することを目的とする。 The present disclosure has been made in order to solve the above problems, and a lifting device for an elevator hoisting machine brake that can safely lift and replace the hoisting machine brake of an elevator, and a lifting device. An object of the present invention is to provide an installation method and a replacement method for a hoist brake.

本開示のエレベータの巻上機ブレーキの揚重装置は、機械室に設置されたエレベータの巻上機に搭載された巻上機ブレーキを揚重するための揚重装置であって、機械室の機械室床面よりも高いエレベータの巻上機の基台上に固定された板材と、板材の上に設置された第一支柱と、機械室床面に設置され、第一支柱よりも長い第二支柱と、第一支柱の頭頂部と第二支柱の頭頂部とを掛け渡すように固定されたレールと、レールの上を移動可能に設置されたトロリと、トロリに設置されたホイストと、を備え、第一支柱及び第二支柱のうちの少なくとも一方は、レールが水平に近づくように支柱高さを調整可能に構成され、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置が決められ、第一支柱及び第二支柱は、下端部に固定された基底部をそれぞれ含み、第一支柱及び第二支柱の頭頂部は、基底部に対してそれぞれ回転自在に構成されているものである。 A lifting device for an elevator hoisting machine brake of the present disclosure is a lifting device for lifting a hoisting machine brake mounted on an elevator hoisting machine installed in a machine room. A plate fixed on the base of the hoisting machine of the elevator higher than the floor of the machine room, a first column installed on the plate, and a second column installed on the floor of the machine room and longer than the first column. Two pillars, a rail fixed so as to bridge the top of the first pillar and the top of the second pillar, a trolley installed movably on the rail, a hoist installed on the trolley, At least one of the first strut and the second strut is configured to be able to adjust the strut height so that the rail approaches the horizontal, and the rail passes directly above the mounting position of the hoisting machine brake, A first strut and a second strut are positioned, the first strut and the second strut each including a base fixed to a lower end, and the top of the first strut and the second strut are positioned relative to the base. are configured to be rotatable .

また、本開示の揚重装置の設置方法は、機械室に設置されたエレベータの巻上機ブレーキを揚重するための揚重装置の設置方法であって、機械室床面よりも高い位置であるエレベータの巻上機の基台上に板材を固定する第一ステップと、板材の上に第一支柱を設置し、第一支柱よりも長い第二支柱を機械室床面に設置し、第一支柱の頭頂部と第二支柱の頭頂部とを水平に掛け渡すようにレールを固定する第二ステップと、トロリをレールに移動可能に設置し、ホイストをトロリに設置する第三ステップと、を備え、第二ステップは、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置を決定するように構成され、第一支柱及び第二支柱は、下端部に固定された基底部をそれぞれ含み、第一支柱及び第二支柱の頭頂部は、基底部に対してそれぞれ回転自在に構成され、第二ステップは、第一支柱の頭頂部と第二支柱の頭頂部を回転させてレールを掛け渡すように固定するものである。
Further, the installation method of the lifting device of the present disclosure is a method of installing the lifting device for lifting the hoisting machine brake of the elevator installed in the machine room, and the lifting device is installed at a position higher than the floor surface of the machine room. The first step is to fix the plate on the base of the hoisting machine of a certain elevator, install the first support on the plate, install the second support that is longer than the first support on the machine room floor, and install the second support on the machine room floor. A second step of fixing the rail so as to horizontally span the top of the first strut and the top of the second strut, a third step of movably installing the trolley on the rail, and installing the hoist on the trolley; wherein the second step is configured to position the first and second struts so that the rail passes directly over the mounting position of the hoist brake , the first and second struts comprising: Each includes a base fixed to the lower end, the tops of the first strut and the second strut are rotatable with respect to the base, and the second step includes the top of the first strut and the second strut. Rotate the top of the column and fix it so that the rail is spanned .

さらに、本開示の巻上機ブレーキの交換方法は、本開示の重装置の設置方法によって設置された重装置を用いてエレベータの巻上機ブレーキを交換する交換方法であって、巻上機に取り付けられている旧巻上機ブレーキの搭載位置の直上にホイストを移動させ、ホイストによって旧巻上機ブレーキを吊るしながら旧巻上機ブレーキを取り外し、トロリによって旧巻上機ブレーキを作業スペースの直上に移動させ、旧巻上機ブレーキを作業スペースに降ろすように構成されるものである。 Furthermore, a method for replacing a hoisting machine brake of the present disclosure is a method of replacing a hoisting machine brake of an elevator using a lifting device installed by the method of installing a lifting device of the present disclosure, The hoist is moved directly above the installation position of the old hoisting machine brake attached to the hoist, and the old hoisting machine brake is removed while hanging the old hoisting machine brake by the hoist. and lower the old hoist brake into the work space.

本開示のエレベータの巻上機ブレーキの重装置によれば、機械室床面より高い位置である基台上に支柱を設置することができる。これにより、巻上機ブレーキの搭載位置の直上にレールを通すことができるので、限られたスペースにおいて、巻上機ブレーキを安全に吊り上げて交換することが可能となる。 According to the elevator hoisting machine brake lifting device of the present disclosure, the support can be installed on the base that is higher than the floor surface of the machine room. As a result, the rail can be passed directly above the mounting position of the hoisting machine brake, so that the hoisting machine brake can be safely lifted and replaced in a limited space.

エレベータの巻上機ブレーキの概要を説明するための図である。It is a figure for demonstrating the outline|summary of the hoisting machine brake of an elevator. 比較例としての巻上機ブレーキの重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting device of the hoisting machine brake as a comparative example. 比較例としての巻上機ブレーキの重装置の配置を説明するための図である。It is a figure for demonstrating arrangement|positioning of the lifting device of the hoisting machine brake as a comparative example. 比較例の重装置の課題を説明するための図である。It is a figure for demonstrating the subject of the lifting apparatus of a comparative example. 実施の形態の重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting apparatus of embodiment. 実施の形態の重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting apparatus of embodiment. 実施の形態の巻上機ブレーキの重装置の配置を説明するための図である。It is a figure for demonstrating arrangement|positioning of the lifting device of the hoisting machine brake of embodiment. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting apparatus installation process among the replacement|exchange procedures of a hoisting machine brake. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting apparatus installation process among the replacement|exchange procedures of a hoisting machine brake. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting apparatus installation process among the replacement|exchange procedures of a hoisting machine brake. 巻上機ブレーキ取外し工程において、巻上機ブレーキを作業スペースに降ろした様子を示す図である。FIG. 7 is a diagram showing a state in which the hoisting machine brake is lowered to the work space in the hoisting machine brake removing process;

以下、図面を参照して実施の形態について説明する。なお、各図において共通する要素には、同一の符号を付して、重複する説明を省略する。 Embodiments will be described below with reference to the drawings. In addition, the same code|symbol is attached|subjected to the element which is common in each figure, and the overlapping description is abbreviate|omitted.

実施の形態1.
1.エレベータの巻上機ブレーキの概要
図1は、エレベータの巻上機ブレーキの概要を説明するための図である。この図に示す巻上機10は、エレベータ用の大型巻上機である。巻上機10は、機械室2に設置される。より詳しくは、機械室2には、巻上機10を設置するための基台4が設置されている。基台4は、例えば機械室2の床面に平行に設置された一対のH鋼により構成される。巻上機10は、基台4の上、つまり機械室床面よりも高い位置に固定される。
Embodiment 1.
1. Overview of Elevator Hoisting Machine Brake FIG. 1 is a diagram for explaining an overview of an elevator hoisting machine brake. A hoisting machine 10 shown in this figure is a large hoisting machine for an elevator. The hoist 10 is installed in the machine room 2 . More specifically, the machine room 2 is provided with a base 4 on which the hoist 10 is installed. The base 4 is composed of, for example, a pair of H steels installed parallel to the floor of the machine room 2 . The hoist 10 is fixed on the base 4, that is, at a position higher than the machine room floor.

巻上機10は、大型の巻上機ブレーキを備える。この図の巻上機10には、2つの巻上機ブレーキ12,14が搭載されている。巻上機ブレーキ12,14は、定期的に交換される。但し、このような大型の巻上機ブレーキの交換作業は容易ではない。一般的に機械室2は狭く、交換作業のための十分なスペースを確保できないからである。このため、巻上機ブレーキの交換作業には、限られた作業スペースを有効に利用するための工夫が求められる。 The hoist 10 includes a large hoist brake. Two hoist brakes 12, 14 are mounted on the hoist 10 of this figure. The hoist brakes 12, 14 are periodically replaced. However, it is not easy to replace such a large hoist brake. This is because the machine room 2 is generally narrow and cannot secure a sufficient space for the replacement work. For this reason, it is necessary to devise ways to effectively use the limited working space in the hoisting machine brake replacement work.

巻上機ブレーキの交換作業は、重装置を用いて行われる。重装置は、巻上機ブレーキを吊して移動させるためのものである。以下、巻上機ブレーキ12,14のうち、巻上機ブレーキ12を交換する作業を例として、本実施の形態の重装置の構成について説明する。 Replacement work of the hoist brake is performed using a lifting device. The lifting device is for suspending and moving the hoist brake. Hereinafter, the construction of the lifting device of the present embodiment will be described by taking as an example the work of replacing the hoisting machine brake 12 among the hoisting machine brakes 12 and 14 .

2.巻上機ブレーキの重装置
2-1.比較例の重装置
本実施の形態の重装置の説明に先立って、比較例の重装置の構成について説明する。図2は、比較例としての巻上機ブレーキの重装置の構成を説明するための図である。図3は、比較例としての巻上機ブレーキの重装置の配置を説明するための図である。比較例の重装置50は、2本の支柱52と、レール54と、トロリ56と、ホイスト58と、を備えている。2本の支柱52は、レール54を高所で水平に支持するためのものである。レール54は、例えばH鋼で構成される。レール54の両端部は、支柱52の頭頂部にそれぞれ固定される。レール54にはトロリ56が取り付けられる。トロリ56は、レール54の上を移動可能に構成されている。トロリ56にはホイスト58が取り付けられる。ホイスト58は、チェーンブロックが例示される。
2. Lifting device for hoist brake 2-1. Lifting Apparatus of Comparative Example Prior to describing the lifting apparatus of the present embodiment, the configuration of a lifting apparatus of a comparative example will be described. FIG. 2 is a diagram for explaining the configuration of a lifting device for a hoisting machine brake as a comparative example. FIG. 3 is a diagram for explaining the arrangement of a lifting device of a hoisting machine brake as a comparative example. The lifting device 50 of the comparative example includes two struts 52 , rails 54 , trolleys 56 and hoists 58 . The two pillars 52 are for horizontally supporting the rail 54 at a high place. The rail 54 is made of H steel, for example. Both ends of the rail 54 are fixed to the tops of the pillars 52, respectively. A trolley 56 is attached to the rail 54 . The trolley 56 is configured to be movable on the rails 54 . A hoist 58 is attached to the trolley 56 . The hoist 58 is exemplified by a chain block.

図2及び図3に示すように、機械室2には、巻上機10の正面側に2つの調速機6,8が設置されている。このため、比較例の重装置50では、2本の支柱52の基底部を機械室床面に設置可能な配置として、機械室2の機械室壁に沿った配置が採用されている。 As shown in FIGS. 2 and 3 , two governors 6 and 8 are installed in front of the hoist 10 in the machine room 2 . Therefore, in the lifting device 50 of the comparative example, an arrangement along the machine room wall of the machine room 2 is adopted as an arrangement that allows the base portions of the two pillars 52 to be installed on the machine room floor.

このような比較例の重装置50の配置において、巻上機ブレーキ12を交換する場合、以下のような課題が生じる。図4は、比較例の重装置の課題を説明するための図である。比較例の重装置50では、交換対象である巻上機ブレーキ12の直上に重装置50のレール54が位置していない。このため、巻上機ブレーキ12のアイボルトにホイスト58を連結して吊り上げる場合、巻上機ブレーキ12の取り付けボルトを外した際に当該巻上機ブレーキ12が重装置50の側に大きく振られてしまい危険を伴うおそれがある。このように、比較例の重装置50では、2本の支柱52の基底部を機械室床面に確実に接地させる必要があるため、設置場所に対する制約が大きい。また、比較例の重装置50は、取り外した巻上機ブレーキ12が振られることを考慮した安全設計が必要となる。このことは、例えば装置の大型化を招くこととなる。 In such an arrangement of the lifting device 50 of the comparative example, when replacing the hoisting machine brake 12, the following problems occur. FIG. 4 is a diagram for explaining a problem of the lifting device of the comparative example. In the lifting device 50 of the comparative example, the rail 54 of the lifting device 50 is not positioned directly above the hoisting machine brake 12 to be replaced. Therefore, when the hoist 58 is connected to the eyebolt of the hoisting machine brake 12 and lifted, the hoisting machine brake 12 is swung largely toward the lifting device 50 when the mounting bolt of the hoisting machine brake 12 is removed. There is a danger that it will be damaged. As described above, in the lifting device 50 of the comparative example, since the bases of the two pillars 52 need to be securely grounded on the floor surface of the machine room, the installation location is greatly restricted. In addition, the lifting device 50 of the comparative example requires a safety design in consideration of the shake of the removed hoisting machine brake 12 . This causes, for example, an increase in the size of the apparatus.

2-2.本実施の形態の重装置
図5及び図6は、本実施の形態の重装置の構成を説明するための図である。図7は、本実施の形態の巻上機ブレーキの重装置の配置を説明するための図である。本実施の形態の重装置20は、第一支柱22と、第二支柱24と、レール26と、トロリ28と、ホイスト30と、板材40とを備えている。第一支柱22は、第二支柱24よりも支柱高さが低い。第一支柱22及び第二支柱24は、支柱高さを調整可能に構成された支柱部222,242と、支柱部222,242の下端部に固定された基底部224,244と、をそれぞれ含む。支柱部222,242の構成は、例えばパイプサポートが例示される。
2-2. Lifting Apparatus of the Present Embodiment FIGS. 5 and 6 are diagrams for explaining the configuration of the lifting apparatus of the present embodiment. FIG. 7 is a diagram for explaining the arrangement of the lifting device of the hoisting machine brake of the present embodiment. A lifting device 20 of the present embodiment includes a first strut 22 , a second strut 24 , a rail 26 , a trolley 28 , a hoist 30 and a plate member 40 . The first strut 22 has a lower strut height than the second strut 24 . The first strut 22 and the second strut 24 include struts 222 and 242 whose height is adjustable, and bases 224 and 244 fixed to the lower ends of the struts 222 and 242, respectively. . The structure of the struts 222 and 242 is exemplified by pipe supports, for example.

レール26は、例えばH鋼で構成される。レール26の両端部は、第一支柱22及び第二支柱24の頭頂部に固定される。第一支柱22及び第二支柱24の支柱高さを調整することによって、レール26は水平に固定される。 The rail 26 is made of H steel, for example. Both ends of the rail 26 are fixed to the tops of the first support 22 and the second support 24 . By adjusting the column heights of the first column 22 and the second column 24, the rail 26 is horizontally fixed.

レール26にはトロリ28が取り付けられる。トロリ28にはホイスト30が取り付けられる。ホイスト30は、チェーンブロックが例示される。 A trolley 28 is attached to the rail 26 . A hoist 30 is attached to the trolley 28 . The hoist 30 is exemplified by a chain block.

巻上機10と機械室2の機械室壁との間には、向かい合った基台4を掛け渡すように板材40が配置されている。第一支柱22は板材40の上に設置される。この際、第一支柱22は、設置安定性を考慮して、基底部224の長手方向がレール26の延在方向に対して垂直となるように設置されることが望ましい。また、板材40は、上記のように第一支柱22を配置した場合に、基底部224が板上の範囲に収まる幅を有していることが望ましい。一方、第二支柱24は、交換対象の巻上機ブレーキ12の搭載位置の直上をレール26が通るように、巻上機10の正面の機械室床面に設置される。この際、巻上機ブレーキ12を吊り上げ可能な高さにおいてレール26が水平になるように第一支柱22及び第二支柱24の支柱高さが調整される。 Between the hoisting machine 10 and the machine room wall of the machine room 2, a plate material 40 is arranged so as to span the facing bases 4. - 特許庁The first strut 22 is installed on the plate member 40 . At this time, it is desirable that the first support column 22 is installed such that the longitudinal direction of the base portion 224 is perpendicular to the extending direction of the rail 26 in consideration of installation stability. In addition, it is desirable that the plate member 40 have a width that allows the base portion 224 to fit within the range of the plate when the first struts 22 are arranged as described above. On the other hand, the second strut 24 is installed on the floor surface of the machine room in front of the hoisting machine 10 so that the rail 26 passes directly above the mounting position of the hoisting machine brake 12 to be replaced. At this time, the column heights of the first column 22 and the second column 24 are adjusted so that the rail 26 is horizontal at a height at which the hoisting machine brake 12 can be lifted.

また、巻上機10の正面の機械室床面は、取り外した旧巻上機ブレーキ及び取り付け予定の新巻上機ブレーキを仮置きするための作業スペースA1として利用できることが好ましい。そこで、本実施の形態の重装置20では、作業スペースA1を跨いで第二支柱24が設置されるように、レール26の長さが設定されている。以下の説明では、取り外した巻上機ブレーキ12を「旧巻上機ブレーキ121」とも表記し、取り付け予定の巻上機ブレーキ12を「新巻上機ブレーキ122」とも表記する。 Further, it is preferable that the machine room floor surface in front of the hoisting machine 10 can be used as a work space A1 for temporarily placing the removed old hoisting machine brake and the new hoisting machine brake to be installed. Therefore, in the lifting device 20 of the present embodiment, the length of the rail 26 is set so that the second strut 24 is installed across the working space A1. In the following description, the removed hoisting machine brake 12 is also referred to as "old hoisting machine brake 121", and the hoisting machine brake 12 to be installed is also referred to as "new hoisting machine brake 122".

以上のように構成された重装置20によれば、以下のような作用及び効果を奏する。 According to the lifting device 20 configured as described above, the following functions and effects are obtained.

重装置20は、交換対象の旧巻上機ブレーキ121の直上をレール26が通るように設置される。これにより、取り外した旧巻上機ブレーキ121が横方向に振られることを防ぐことができるので、交換作業の安全性を高めることができる。これにより、装置の小型化を図ることができる。 The lifting device 20 is installed so that the rail 26 passes right above the old hoisting machine brake 121 to be replaced. As a result, it is possible to prevent the removed old hoisting machine brake 121 from being shaken in the lateral direction, so that the safety of the replacement work can be enhanced. As a result, the size of the device can be reduced.

板材40を基台4の上に設置することにより、第一支柱22の設置自由度を高めることができる。これにより、様々な巻上機10の種類、機械室2の間取り、機器の配置に対しても、交換対象の巻上機ブレーキ12の直上をレール26が通るように、重装置20を設置することができる。 By installing the plate member 40 on the base 4, the degree of freedom in installing the first support column 22 can be increased. As a result, the lifting device 20 is installed so that the rail 26 passes directly above the hoisting machine brake 12 to be replaced, even for various types of hoisting machine 10, the layout of the machine room 2, and the arrangement of equipment . can do.

第二支柱24は、作業スペースA1を跨いだ位置に設置される。このような構成によれば、取り外した旧巻上機ブレーキ121を作業スペースA1に降ろす作業及び、新たな新巻上機ブレーキ122を吊り上げる作業を効率よく行うことができる。 The second strut 24 is installed at a position straddling the work space A1. According to such a configuration, the work of lowering the removed old hoisting machine brake 121 to the work space A1 and the work of lifting the new new hoisting machine brake 122 can be performed efficiently.

第一支柱22の支柱高さは、第二支柱24の支柱高さよりも低い。このような構成によれば、機械室床面よりも高い位置に設置された板材40の上に第一支柱22を設置したとしても、レール26を水平に近づけることが可能となる。また、第一支柱22及び第二支柱24は支柱高さを調整可能に構成されている。これにより、基台4の高さが異なる設備環境であっても、レール26を水平に近づけることが可能となる。 The column height of the first column 22 is lower than the column height of the second column 24 . According to such a configuration, even if the first strut 22 is installed on the plate member 40 installed at a position higher than the floor surface of the machine room, it is possible to bring the rail 26 closer to the horizontal. Further, the first strut 22 and the second strut 24 are configured so that the strut height can be adjusted. As a result, the rails 26 can be brought closer to the horizontal even in an installation environment in which the height of the base 4 is different.

3.巻上機ブレーキの交換手順
次に、重装置20を用いて巻上機10の巻上機ブレーキ12を交換する作業の手順について説明する。なお、ここでは巻上機ブレーキ12の交換手順について説明するが、巻上機ブレーキ14の交換についても同様の手順で行うことができる。
3. Replacement Procedure for the Hoisting Machine Brake Next, a procedure for replacing the hoisting machine brake 12 of the hoisting machine 10 using the lifting device 20 will be described. Although the replacement procedure for the hoisting machine brake 12 will be described here, the replacement of the hoisting machine brake 14 can be performed in the same procedure.

巻上機ブレーキ12を交換する作業では、重装置設置工程、巻上機ブレーキ取外し工程、及び巻上機ブレーキ取り付け工程が順に行われる。 In the work of replacing the hoisting machine brake 12, a lifting device installation step, a hoisting machine brake removing step, and a hoisting machine brake attaching step are sequentially performed.

重装置設置工程は、機械室2において重装置20を設置する工程である。図8から図10は、巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。重装置設置工程では、先ず、第一ステップでは、機械室壁と巻上機との間の空間において、板材40を一対の基台4に渡し掛けるように配置し、クランプで固定する。次の第二ステップでは、第一支柱22、第二支柱24及びレール26を準備する。板材40の上に第一支柱22を仮配置し、第二支柱24を機械室床面に仮配置する。第一支柱22及び第二支柱24の頭頂部にレール26を固定する。レール26が水平に近づくように、第一支柱22及び第二支柱24の支柱高さを調整する。この際、トロリ28及びホイスト30の吊り代を確保するため、取り付けられている巻上機ブレーキ12の最上部よりも予め定められた高さ、例えば800mm以上高くなる位置に設定する。 The lifting device installation step is a step of installing the lifting device 20 in the machine room 2 . 8 to 10 are diagrams for explaining the lifting device installation process in the hoisting machine brake replacement procedure. In the lifting device installation process, first, in the first step, the plate material 40 is arranged so as to span over the pair of bases 4 in the space between the machine room wall and the hoist, and is fixed with a clamp. In the next second step, the first strut 22, the second strut 24 and the rail 26 are prepared. The first support column 22 is temporarily arranged on the plate member 40, and the second support column 24 is temporarily arranged on the floor of the machine room. A rail 26 is fixed to the top of the first strut 22 and the second strut 24 . The pillar heights of the first pillar 22 and the second pillar 24 are adjusted so that the rail 26 approaches the horizontal. At this time, in order to secure a hanging margin for the trolley 28 and the hoist 30, the hoist brake 12 is set at a predetermined height, for example, 800 mm or more, higher than the top of the hoist brake 12 attached thereto.

第二ステップでは、更に、取り付けられている旧巻上機ブレーキ121の直上にレール26が位置するように第一支柱22及び第二支柱24の位置を調整する。また、この際、トロリ28の可動範囲であるレール26の直下に作業スペースA1を確保できるように第一支柱22及び第二支柱24の位置を調整する。ここでの作業スペースA1は、交換予定の新巻上機ブレーキ122と、取り外した旧巻上機ブレーキ121との両方を一度におくことのできるスペースである。作業スペースA1には、交換予定の新巻上機ブレーキ122を配置しておく。 In the second step, the positions of the first strut 22 and the second strut 24 are adjusted so that the rail 26 is positioned directly above the old hoisting machine brake 121 that is attached. Also, at this time, the positions of the first support 22 and the second support 24 are adjusted so that the work space A1 can be secured directly under the rail 26, which is the movable range of the trolley 28. FIG. The work space A1 here is a space in which both the new hoisting machine brake 122 to be replaced and the removed old hoisting machine brake 121 can be placed at once. A new hoisting machine brake 122 to be replaced is arranged in the work space A1.

次の第三ステップでは、レール26にトロリ28を取り付ける。次にトロリ28にホイスト30を取り付ける。 The next third step is to attach the trolley 28 to the rail 26 . Next, the hoist 30 is attached to the trolley 28 .

巻上機ブレーキ取外し工程は、重装置20を用いて旧巻上機ブレーキ121の取外し作業を行う工程である。巻上機ブレーキ取外し工程では、先ず、ホイスト30を旧巻上機ブレーキ121の直上に移動させる。旧巻上機ブレーキ121に取り付けた2本のアイボルトとホイスト30をベルト等で連結してテンションが掛かる程度に吊り上げる。次に、旧巻上機ブレーキ121に接続されているケーブル類とブレーキ取り付けボルトを取り外し、旧巻上機ブレーキ121を巻上機10から取り外す。この際、ホイスト30が巻上機ブレーキ12の直上に位置しているため、旧巻上機ブレーキ121を巻上機10から取り外した際に旧巻上機ブレーキ121が振られることが防止される。 The hoisting machine brake removing step is a step of removing the old hoisting machine brake 121 using the lifting device 20 . In the hoisting machine brake removing process, first, the hoist 30 is moved directly above the old hoisting machine brake 121 . Two eyebolts attached to the old hoisting machine brake 121 and the hoist 30 are connected with a belt or the like, and lifted to the extent that tension is applied. Next, cables and brake mounting bolts connected to the old hoisting machine brake 121 are removed, and the old hoisting machine brake 121 is removed from the hoisting machine 10 . At this time, since the hoist 30 is positioned directly above the hoisting machine brake 12, the old hoisting machine brake 121 is prevented from shaking when the old hoisting machine brake 121 is removed from the hoisting machine 10. .

吊り上げた旧巻上機ブレーキ121は、トロリ28によって作業スペースA1の直上までレール26に沿って移動させて降ろす。図11は、巻上機ブレーキ取外し工程において、巻上機ブレーキ12を作業スペースA1に降ろした様子を示している。このように、旧巻上機ブレーキ121の直下が作業スペースA1となるため、旧巻上機ブレーキ121を牽引しながら降ろす必要はない。 The lifted old hoisting machine brake 121 is moved by the trolley 28 along the rail 26 to just above the work space A1 and lowered. FIG. 11 shows how the hoisting machine brake 12 is lowered to the work space A1 in the hoisting machine brake removing process. In this way, since the work space A1 is directly below the old hoisting machine brake 121, it is not necessary to lower the old hoisting machine brake 121 while towing it.

新たな新巻上機ブレーキ122の取り付ける巻上機ブレーキ取り付け工程では、取外し工程の逆の作業手順が行われる。典型的には、先ず、作業スペースA1に置かれている新巻上機ブレーキ122の直上にホイスト30を移動させる。ホイスト30によって、新巻上機ブレーキ122を吊り上げて巻上機10における新巻上機ブレーキ122の取り付け位置の直上まで移動させる。そして、新巻上機ブレーキ122を巻上機10にブレーキ取り付けボルトで取り付けるとともに、ケーブル類を接続する。 In the hoisting machine brake mounting process for mounting the new hoisting machine brake 122, the work procedure reverse to the removing process is performed. Typically, first, the hoist 30 is moved directly above the new hoist brake 122 placed in the work space A1. The hoist 30 lifts the new hoisting machine brake 122 and moves it to a position directly above the installation position of the new hoisting machine brake 122 on the hoisting machine 10 . Then, the new hoisting machine brake 122 is attached to the hoisting machine 10 with a brake mounting bolt, and cables are connected.

以上のような重装置20の設置方法及び巻上機ブレーキの交換方法によれば、大型の巻上機ブレーキを安全に脱着して交換することが可能となる。 According to the installation method of the lifting device 20 and the replacement method of the hoisting machine brake as described above, it is possible to safely remove and replace the large hoisting machine brake.

4.巻上機ブレーキの重装置の変形例
実施の形態の重装置20は、以下のように変形した態様を適用してもよい。
4. Modified Example of Lifting Device for Hoist Brake The lifting device 20 of the embodiment may be modified as follows.

第一支柱22は、基底部224に対して支柱部222の頭頂部が柱の中心軸を中心とした回転方向に回転可能に構成されていてもよい。このような構成によれば、第一支柱22は、基底部224を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。これにより、例えば第一支柱22の設置スペース制限があり基底部224を理想の向きに配置できない場合であっても、レール26を所望の方向に向けて配置することが可能となる。このことは、第二支柱24についても同様であり、第二支柱24は、基底部244に対して支柱部242の頭頂部が柱の中心軸を中心とした回転方向に回転自在に構成されていてもよい。これにより、基底部244を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。 The first support 22 may be configured such that the top of the support 222 is rotatable with respect to the base 224 in a rotational direction about the central axis of the support. According to such a configuration, the first strut 22 can rotate the top of the strut 222 without moving the base 224, that is, the direction of the rail 26 fixed to the top of the head. As a result, even if the base portion 224 cannot be arranged in an ideal direction due to, for example, an installation space limitation of the first support 22, the rails 26 can be arranged in a desired direction. The same applies to the second strut 24. The second strut 24 is configured such that the top of the strut 242 is rotatable relative to the base 244 in the direction of rotation about the central axis of the strut. may As a result, the top of the support 222 , that is, the rail 26 fixed to the top of the head can be rotated without moving the base 244 .

支柱高さを調整する構成は、第一支柱22及び第二支柱24のうちの少なくとも一方が備えていればよい。 At least one of the first support 22 and the second support 24 should be provided with the structure for adjusting the support height.

2 機械室、 4 基台、 6,8 調速機、 10 巻上機、 12,14 巻上機ブレーキ、 20 重装置、 22 第一支柱、 24 第二支柱、 26 レール、 28 トロリ、 30 ホイスト、 40 板材、 50 重装置、 52 支柱、 54 レール、 56 トロリ、 58 ホイスト、 121 旧巻上機ブレーキ、 122 新巻上機ブレーキ、 222,242 支柱部、 224,244 基底部 2 machine room 4 base 6,8 speed governor 10 hoisting machine 12,14 hoisting machine brake 20 lifting device 22 first strut 24 second strut 26 rail 28 trolley 30 Hoist 40 Board material 50 Lifting device 52 Strut 54 Rail 56 Trolley 58 Hoist 121 Old hoisting machine brake 122 New hoisting machine brake 222,242 Strut part 224,244 Base part

Claims (7)

機械室に設置されたエレベータの巻上機に搭載された巻上機ブレーキを揚重するための揚重装置であって、
前記機械室の機械室床面よりも高いエレベータの巻上機の基台上に固定された板材と、
前記板材の上に設置された第一支柱と、
前記機械室床面に設置され、前記第一支柱よりも長い第二支柱と、
前記第一支柱の頭頂部と前記第二支柱の頭頂部とを掛け渡すように固定されたレールと、
前記レールの上を移動可能に設置されたトロリと、
前記トロリに設置されたホイストと、を備え、
前記第一支柱及び前記第二支柱のうちの少なくとも一方は、前記レールが水平に近づくように支柱高さを調整可能に構成され、
前記レールが前記巻上機ブレーキの搭載位置の直上を通るように、前記第一支柱及び前記第二支柱の位置が決められ
前記第一支柱及び前記第二支柱は、下端部に固定された基底部をそれぞれ含み、
前記第一支柱及び前記第二支柱の前記頭頂部は、前記基底部に対してそれぞれ回転自在に構成されているエレベータの巻上機ブレーキの揚重装置。
A lifting device for lifting a hoisting machine brake mounted on a hoisting machine of an elevator installed in a machine room,
A plate material fixed on the base of the hoisting machine of the elevator higher than the machine room floor surface of the machine room;
a first post installed on the plate;
a second post installed on the floor of the machine room and longer than the first post;
a rail fixed to bridge the top of the first support and the top of the second support;
a trolley installed movably on the rail;
a hoist mounted on the trolley;
At least one of the first support and the second support is configured so that the height of the support can be adjusted so that the rail approaches horizontal,
The positions of the first column and the second column are determined so that the rail passes directly above the mounting position of the hoisting machine brake ,
the first strut and the second strut each include a base fixed to a lower end;
A lifting device for a hoisting machine brake of an elevator, wherein the top portions of the first strut and the second strut are rotatable with respect to the base portion.
前記レールは、取り外した前記巻上機ブレーキを前記ホイストによって吊り上げた状態で前記第二支柱の側に移動させて前記機械室床面に降ろすための作業スペースが確保される長さに設定されている請求項1に記載のエレベータの巻上機ブレーキの揚重装置。 The rail is set to a length that secures a working space for moving the removed hoisting machine brake to the side of the second column in a state of being lifted by the hoist and lowering it onto the floor surface of the machine room. The lifting device of the hoisting machine brake of the elevator according to claim 1. 機械室に設置されたエレベータの巻上機ブレーキを揚重するための揚重装置の設置方法であって、
機械室床面よりも高い位置であるエレベータの巻上機の基台上に板材を固定する第一ステップと、
前記板材の上に第一支柱を設置し、前記第一支柱よりも長い第二支柱を前記機械室床面に設置し、前記第一支柱の頭頂部と前記第二支柱の頭頂部とを水平に掛け渡すようにレールを固定する第二ステップと、
トロリを前記レールに移動可能に設置し、ホイストを前記トロリに設置する第三ステップと、を備え、
前記第二ステップは、
前記レールが前記巻上機ブレーキの搭載位置の直上を通るように、前記第一支柱及び前記第二支柱の位置を決定する
ように構成され
前記第一支柱及び前記第二支柱は、下端部に固定された基底部をそれぞれ含み、
前記第一支柱及び前記第二支柱の前記頭頂部は、前記基底部に対してそれぞれ回転自在に構成され、
前記第二ステップは、前記第一支柱の頭頂部と前記第二支柱の頭頂部を回転させて前記レールを掛け渡すように固定する揚重装置の設置方法。
A method for installing a lifting device for lifting a hoisting machine brake of an elevator installed in a machine room, comprising:
A first step of fixing the plate material on the base of the hoisting machine of the elevator, which is higher than the floor surface of the machine room;
A first strut is installed on the plate material, a second strut longer than the first strut is installed on the floor of the machine room, and the top of the first strut and the top of the second strut are horizontal. a second step of fixing the rail so as to span over the
a third step of movably mounting a trolley on the rail and mounting a hoist on the trolley;
The second step is
configured to determine the positions of the first column and the second column so that the rail passes directly above the mounting position of the hoisting machine brake ,
the first strut and the second strut each include a base fixed to a lower end;
The tops of the first support and the second support are configured to be rotatable relative to the base,
In the second step, the method of installing a lifting device includes rotating the top portion of the first support and the top portion of the second support and fixing the rail so as to extend over the rail.
前記第一支柱及び前記第二支柱のうちの少なくとも一方は、支柱高さを調整可能に構成され、
前記第二ステップは、
前記レールが水平に近づくように前記第一支柱又は前記第二支柱の支柱高さを調整する
ように構成される請求項に記載の揚重装置の設置方法。
At least one of the first strut and the second strut is configured to be adjustable in strut height,
The second step is
4. The method of installing a lifting device according to claim 3 , wherein the rail is configured to adjust the column height of the first column or the second column so that the rail approaches horizontal.
前記機械室の機械室床面には、前記巻上機から取り外した旧巻上機ブレーキを降ろすとともに前記巻上機に新たに取り付ける新巻上機ブレーキを吊り上げるための作業スペースが設けられ、
前記第二ステップは、
前記レールが前記作業スペースの直上を通るように、前記第一支柱及び前記第二支柱の位置を決定する
ように構成される請求項又は請求項に記載の揚重装置の設置方法。
A work space for lowering the old hoisting machine brake removed from the hoisting machine and lifting the new hoisting machine brake newly attached to the hoisting machine is provided on the machine room floor of the machine room,
The second step is
5. The method of installing a lifting device according to claim 3 or 4, wherein the positions of the first column and the second column are determined such that the rail passes directly over the work space.
請求項に記載の設置方法によって設置された揚重装置を用いて前記エレベータの巻上機ブレーキを交換する交換方法であって、
前記巻上機に取り付けられている前記旧巻上機ブレーキの搭載位置の直上に前記ホイストを移動させ、
前記ホイストによって前記旧巻上機ブレーキを吊るしながら前記旧巻上機ブレーキを取り外し、
前記トロリによって前記旧巻上機ブレーキを作業スペースの直上に移動させ、
前記旧巻上機ブレーキを前記作業スペースに降ろす
ように構成される巻上機ブレーキの交換方法。
A replacement method for replacing the hoisting machine brake of the elevator using the lifting device installed by the installation method according to claim 5 ,
moving the hoist directly above the mounting position of the old hoist brake attached to the hoist,
removing the old hoisting machine brake while suspending the old hoisting machine brake by the hoist;
moving the old hoisting machine brake directly above the work space by the trolley;
A method for replacing a hoisting machine brake configured to lower the old hoisting machine brake to the work space.
前記作業スペースに置かれている前記新巻上機ブレーキの直上に前記ホイストを移動させ、
前記ホイストによって、前記新巻上機ブレーキを吊り上げて前記巻上機における前記新巻上機ブレーキの取り付け位置の直上に移動させ、
前記新巻上機ブレーキを前記巻上機に取り付ける
ように構成される請求項に記載の巻上機ブレーキの交換方法。
moving the hoist directly above the new hoist brake placed in the work space;
The hoist lifts the new hoisting machine brake and moves it to a position immediately above the mounting position of the new hoisting machine brake on the hoist,
The replacement method of the hoisting machine brake according to claim 6 , wherein the new hoisting machine brake is attached to the hoisting machine.
JP2020117955A 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake Active JP7180643B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020117955A JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020117955A JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Publications (2)

Publication Number Publication Date
JP2022015245A JP2022015245A (en) 2022-01-21
JP7180643B2 true JP7180643B2 (en) 2022-11-30

Family

ID=80121354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020117955A Active JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Country Status (1)

Country Link
JP (1) JP7180643B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016084199A (en) 2014-10-23 2016-05-19 株式会社日立ビルシステム Exchange equipment for elevator braking system
US20180044152A1 (en) 2016-08-11 2018-02-15 Donald Bruce Childress Portable lifting apparatus
JP2019206423A (en) 2018-05-30 2019-12-05 株式会社日立ビルシステム Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP2019210109A (en) 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5711191U (en) * 1980-06-23 1982-01-20
JPH0318088U (en) * 1989-07-04 1991-02-22

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016084199A (en) 2014-10-23 2016-05-19 株式会社日立ビルシステム Exchange equipment for elevator braking system
US20180044152A1 (en) 2016-08-11 2018-02-15 Donald Bruce Childress Portable lifting apparatus
JP2019206423A (en) 2018-05-30 2019-12-05 株式会社日立ビルシステム Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP2019210109A (en) 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method

Also Published As

Publication number Publication date
JP2022015245A (en) 2022-01-21

Similar Documents

Publication Publication Date Title
JP2587684B2 (en) Construction wall construction equipment
CN1989062B (en) Traction machine installing apparatus and installing method for traction machine
CN213038201U (en) Bridge construction hanging flower basket with adjustable landing leg
CN108462117B (en) High-rise building cable laying device and application method thereof
JP7180643B2 (en) Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake
JP5702640B2 (en) Bridge crane, bridge erection method, and bridge removal method
KR100522294B1 (en) Apparatus for adjusting position and maintaining function according to lifting the upper structure of bridge, and construction method for lifting up the upper structure
JP6605411B2 (en) Lifting bracket and hoist
JPH0812262A (en) Installing method for overhead traveller and its device
JP6218483B2 (en) Elevator main rope fixing device and elevator repair method
JP4118126B2 (en) Elevator equipment
JP2020059973A (en) Auxiliary device for replacing bridge sleeper and method for replacing bridge sleeper
JP2720339B2 (en) Cable laying method
JP2004263498A (en) Guard fence installation method and guard fence installation device
JP2008254834A (en) Main rope replacing method for hydraulic elevator and pulley tool for main rope replacement using the method
JP4389200B2 (en) Steel bracket and block mounting device for preventing falling bridges
CN114671330B (en) Lifting equipment and engineering machinery car combination method
JP3444816B2 (en) How to replace the main elevator cable
JP4312590B2 (en) Lower assembly method for elevator upper equipment
KR20180120529A (en) Sliding jig for mounting an elastic platform of a submarine using a pushing beam
KR200201613Y1 (en) Hight place working device for mount ing pier checking rail
JP2017190653A (en) Bridge removal method
JPH07145607A (en) Portable scaffold for maintenance and inspection of bridge
JP2022138334A (en) Slide-type turning device
JPH0781861A (en) Hoisting device for elevator

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210707

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210707

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220623

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221031

R150 Certificate of patent or registration of utility model

Ref document number: 7180643

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150