JP2022015245A - Lifting device for elevator hoist brake, method for installing lifting device, and method for replacing hoist brake - Google Patents

Lifting device for elevator hoist brake, method for installing lifting device, and method for replacing hoist brake Download PDF

Info

Publication number
JP2022015245A
JP2022015245A JP2020117955A JP2020117955A JP2022015245A JP 2022015245 A JP2022015245 A JP 2022015245A JP 2020117955 A JP2020117955 A JP 2020117955A JP 2020117955 A JP2020117955 A JP 2020117955A JP 2022015245 A JP2022015245 A JP 2022015245A
Authority
JP
Japan
Prior art keywords
hoist
brake
strut
rail
hoist brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020117955A
Other languages
Japanese (ja)
Other versions
JP7180643B2 (en
Inventor
和也 平田
Kazuya Hirata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2020117955A priority Critical patent/JP7180643B2/en
Publication of JP2022015245A publication Critical patent/JP2022015245A/en
Application granted granted Critical
Publication of JP7180643B2 publication Critical patent/JP7180643B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

To provide a lifting device for an elevator hoist brake and a method for replacing the elevator hoist brake, capable of safely lifting and replacing the elevator hoist brake.SOLUTION: This lifting device for lifting the hoist brake comprises: a plate material fixed on the base of an elevator hoist higher than a machine room floor surface; a first support pillar installed on the plate material; a second support pillar longer than the first support pillar and installed on the machine room floor surface; a rail fixed so as to lay the head top of the first support pillar and the head top of the second support pillar across; a trolley installed so as to be movable on the rail; and a hoist installed in the trolley. At least one of the first and second support pillars is configured so as to be adjustable in support pillar height so that the rail can become nearly lateral. The first and second support pillars are positioned so that the rail can pass directly above the mounted position of the hoist brake.SELECTED DRAWING: Figure 7

Description

本開示は、エレベータの巻上機ブレーキの楊重装置、楊重装置の設置方法、及び巻上機ブレーキの交換方法に関する。 The present disclosure relates to a load device for an elevator hoist brake, a method for installing the load device, and a method for replacing the hoist brake.

特許文献1には、重量物の楊重装置に関する技術が開示されている。この技術では、レールが一対の支柱の上部に水平になるように固定される。レールにはトロリが設けられ、トロリにはチェーンブロックが設けられている。チェーンブロックによって吊り上げられた重量物は、レールに沿って水平方向に運搬される。 Patent Document 1 discloses a technique relating to a heavy weight device. In this technique, the rails are fixed horizontally on top of a pair of stanchions. The rail is provided with a trolley, and the trolley is provided with a chain block. Heavy objects lifted by the chain block are transported horizontally along the rails.

特開2019-210109号公報Japanese Unexamined Patent Publication No. 2019-210109

エレベータの巻上機は、大型の巻上機ブレーキを備えている。巻上機ブレーキは、定期的に交換される。ここで、上述した特許文献1の楊重装置を利用して巻上機ブレーキの交換作業を行うことを考える。巻上機が設置されている機械室は、交換作業に利用可能な空間に制約がある。このような制限空間では、特許文献1のような大型の楊重装置を最適位置に設置できないおそれがある。巻上機ブレーキの取り付け位置から横方向にずれた位置に楊重装置を設置した場合、取り外した巻上機ブレーキが振り子のように振られてしまい危険を伴うおそれがある。 The elevator hoist is equipped with a large hoist brake. The hoist brake is replaced regularly. Here, it is considered that the hoisting machine brake is replaced by using the above-mentioned weighting device of Patent Document 1. In the machine room where the hoist is installed, there is a limit to the space available for replacement work. In such a restricted space, there is a possibility that a large-sized weighting device as in Patent Document 1 cannot be installed at an optimum position. If the load device is installed at a position laterally deviated from the mounting position of the hoist brake, the removed hoist brake may be shaken like a pendulum, which may be dangerous.

本開示は、上述のような課題を解決するためになされたもので、エレベータの巻上機ブレーキを安全に吊り上げて交換することのできるエレベータの巻上機ブレーキの楊重装置、楊重装置の設置方法、及び巻上機ブレーキの交換方法を提供することを目的とする。 The present disclosure has been made in order to solve the above-mentioned problems, and is a load device and a load device for an elevator hoist brake that can safely lift and replace the elevator hoist brake. It is an object of the present invention to provide an installation method and a method of replacing a hoist brake.

本開示のエレベータの巻上機ブレーキの楊重装置は、機械室に設置されたエレベータの巻上機に搭載された巻上機ブレーキを楊重するための楊重装置であって、機械室の機械室床面よりも高いエレベータの巻上機の基台上に固定された板材と、板材の上に設置された第一支柱と、機械室床面に設置され、第一支柱よりも長い第二支柱と、第一支柱の頭頂部と第二支柱の頭頂部とを掛け渡すように固定されたレールと、レールの上を移動可能に設置されたトロリと、トロリに設置されたホイストと、を備え、第一支柱及び第二支柱のうちの少なくとも一方は、レールが水平に近づくように支柱高さを調整可能に構成され、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置が決められるものである。 The weighting device for the elevator hoist brake of the present disclosure is a weighting device for hoisting the hoist brake mounted on the hoist of the elevator installed in the machine room, and is a weighting device for the machine room. The plate material fixed on the base of the elevator hoist, which is higher than the floor of the machine room, the first column installed on the plate material, and the first column installed on the floor of the machine room, which is longer than the first column. Two columns, a rail fixed so as to hang between the crown of the first column and the crown of the second column, a trolley installed movable on the rail, and a hoist installed on the trolley. At least one of the first and second stanchions is configured with adjustable stanchion height so that the rails are closer to horizontal so that the rails pass directly above the hoist brake mounting position. The positions of the first strut and the second strut are determined.

また、本開示の楊重装置の設置方法は、機械室に設置されたエレベータの巻上機ブレーキを楊重するための楊重装置の設置方法であって、機械室床面よりも高い位置であるエレベータの巻上機の基台上に板材を固定する第一ステップと、板材の上に第一支柱を設置し、第一支柱よりも長い第二支柱を機械室床面に設置し、第一支柱の頭頂部と第二支柱の頭頂部とを水平に掛け渡すようにレールを固定する第二ステップと、トロリをレールに移動可能に設置し、ホイストをトロリに設置する第三ステップと、を備え、第二ステップは、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置を決定するように構成されるものである。 Further, the method of installing the weighting device of the present disclosure is a method of installing the weighting device for hoisting the hoist brake of the elevator installed in the machine room, and is at a position higher than the floor surface of the machine room. The first step of fixing the plate material on the base of the hoist of an elevator, the first column is installed on the plate material, and the second column longer than the first column is installed on the floor of the machine room. The second step of fixing the rail so that the top of the head of one pillar and the top of the second pillar run horizontally, and the third step of installing the trolley movably on the rail and installing the hoist on the trolley. The second step is configured to determine the positions of the first strut and the second strut so that the rail passes directly above the mounting position of the hoist brake.

さらに、本開示の巻上機ブレーキの交換方法は、本開示の楊重装置の設置方法によって設置された楊重装置を用いてエレベータの巻上機ブレーキを交換する交換方法であって、巻上機に取り付けられている旧巻上機ブレーキの搭載位置の直上にホイストを移動させ、ホイストによって旧巻上機ブレーキを吊るしながら旧巻上機ブレーキを取り外し、トロリによって旧巻上機ブレーキを作業スペースの直上に移動させ、旧巻上機ブレーキを作業スペースに降ろすように構成されるものである。 Further, the method of replacing the hoist brake of the present disclosure is a method of replacing the hoist brake of the elevator by using the hoist device installed by the method of installing the hoist device of the present disclosure. Move the hoist directly above the mounting position of the old hoist brake attached to the machine, remove the old hoist brake while hanging the old hoist brake with the hoist, and use the trolley to move the old hoist brake to the work space. It is configured to move directly above the old hoist brake and lower it into the work space.

本開示のエレベータの巻上機ブレーキの楊重装置によれば、機械室床面より高い位置である基台上に支柱を設置することができる。これにより、巻上機ブレーキの搭載位置の直上にレールを通すことができるので、限られたスペースにおいて、巻上機ブレーキを安全に吊り上げて交換することが可能となる。 According to the weighting device of the elevator hoist brake of the present disclosure, the support can be installed on the base which is higher than the floor surface of the machine room. As a result, the rail can be passed directly above the mounting position of the hoist brake, so that the hoist brake can be safely lifted and replaced in a limited space.

エレベータの巻上機ブレーキの概要を説明するための図である。It is a figure for demonstrating the outline of the hoist brake of an elevator. 比較例としての巻上機ブレーキの楊重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the heaviness device of the hoist brake as a comparative example. 比較例としての巻上機ブレーキの楊重装置の配置を説明するための図である。It is a figure for demonstrating the arrangement of the heaviness device of a hoist brake as a comparative example. 比較例の楊重装置の課題を説明するための図である。It is a figure for demonstrating the problem of the Yang weight device of the comparative example. 実施の形態の楊重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the Yang weight device of embodiment. 実施の形態の楊重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the Yang weight device of embodiment. 実施の形態の巻上機ブレーキの楊重装置の配置を説明するための図である。It is a figure for demonstrating the arrangement of the heaviness device of the hoist brake of embodiment. 巻上機ブレーキの交換手順のうち楊重装置設置工程を説明するための図である。It is a figure for demonstrating the process of installing a heavy weight device in the procedure of exchanging a hoist brake. 巻上機ブレーキの交換手順のうち楊重装置設置工程を説明するための図である。It is a figure for demonstrating the process of installing a heavy weight device in the procedure of exchanging a hoist brake. 巻上機ブレーキの交換手順のうち楊重装置設置工程を説明するための図である。It is a figure for demonstrating the process of installing a heavy weight device in the procedure of exchanging a hoist brake. 巻上機ブレーキ取外し工程において、巻上機ブレーキを作業スペースに降ろした様子を示す図である。It is a figure which shows the state which the hoisting machine brake was lowered to the work space in the process of removing a hoisting machine brake.

以下、図面を参照して実施の形態について説明する。なお、各図において共通する要素には、同一の符号を付して、重複する説明を省略する。 Hereinafter, embodiments will be described with reference to the drawings. The elements common to each figure are designated by the same reference numerals, and duplicate description will be omitted.

実施の形態1.
1.エレベータの巻上機ブレーキの概要
図1は、エレベータの巻上機ブレーキの概要を説明するための図である。この図に示す巻上機10は、エレベータ用の大型巻上機である。巻上機10は、機械室2に設置される。より詳しくは、機械室2には、巻上機10を設置するための基台4が設置されている。基台4は、例えば機械室2の床面に平行に設置された一対のH鋼により構成される。巻上機10は、基台4の上、つまり機械室床面よりも高い位置に固定される。
Embodiment 1.
1. 1. Outline of Elevator Hoisting Machine Brake FIG. 1 is a diagram for explaining an outline of an elevator hoisting machine brake. The hoisting machine 10 shown in this figure is a large hoisting machine for elevators. The hoisting machine 10 is installed in the machine room 2. More specifically, in the machine room 2, a base 4 for installing the hoisting machine 10 is installed. The base 4 is composed of, for example, a pair of H steels installed parallel to the floor surface of the machine room 2. The hoisting machine 10 is fixed on the base 4, that is, at a position higher than the floor surface of the machine room.

巻上機10は、大型の巻上機ブレーキを備える。この図の巻上機10には、2つの巻上機ブレーキ12,14が搭載されている。巻上機ブレーキ12,14は、定期的に交換される。但し、このような大型の巻上機ブレーキの交換作業は容易ではない。一般的に機械室2は狭く、交換作業のための十分なスペースを確保できないからである。このため、巻上機ブレーキの交換作業には、限られた作業スペースを有効に利用するための工夫が求められる。 The hoisting machine 10 includes a large hoisting machine brake. The hoisting machine 10 in this figure is equipped with two hoisting machine brakes 12 and 14. The hoist brakes 12 and 14 are replaced regularly. However, it is not easy to replace such a large hoist brake. This is because the machine room 2 is generally small and cannot secure sufficient space for replacement work. For this reason, it is necessary to devise ways to effectively utilize the limited work space for the replacement work of the hoist brake.

巻上機ブレーキの交換作業は、楊重装置を用いて行われる。楊重装置は、巻上機ブレーキを吊して移動させるためのものである。以下、巻上機ブレーキ12,14のうち、巻上機ブレーキ12を交換する作業を例として、本実施の形態の楊重装置の構成について説明する。 The hoisting machine brake replacement work is performed using a load device. The Yang weight device is for suspending and moving the hoist brake. Hereinafter, the configuration of the weighting device of the present embodiment will be described by taking as an example the work of replacing the hoisting machine brake 12 among the hoisting machine brakes 12 and 14.

2.巻上機ブレーキの楊重装置
2-1.比較例の楊重装置
本実施の形態の楊重装置の説明に先立って、比較例の楊重装置の構成について説明する。図2は、比較例としての巻上機ブレーキの楊重装置の構成を説明するための図である。図3は、比較例としての巻上機ブレーキの楊重装置の配置を説明するための図である。比較例の楊重装置50は、2本の支柱52と、レール54と、トロリ56と、ホイスト58と、を備えている。2本の支柱52は、レール54を高所で水平に支持するためのものである。レール54は、例えばH鋼で構成される。レール54の両端部は、支柱52の頭頂部にそれぞれ固定される。レール54にはトロリ56が取り付けられる。トロリ56は、レール54の上を移動可能に構成されている。トロリ56にはホイスト58が取り付けられる。ホイスト58は、チェーンブロックが例示される。
2. 2. Hoisting machine brake weighting device 2-1. Comparative Example of Yang Heavy Device Prior to the description of the Yang Heavy Device of the present embodiment, the configuration of the comparative example of the Yang Heavy Device will be described. FIG. 2 is a diagram for explaining a configuration of a load device for a hoist brake as a comparative example. FIG. 3 is a diagram for explaining the arrangement of the load device of the hoist brake as a comparative example. The Yang weight device 50 of the comparative example includes two columns 52, a rail 54, a trolley 56, and a hoist 58. The two columns 52 are for supporting the rail 54 horizontally at a high place. The rail 54 is made of, for example, H steel. Both ends of the rail 54 are fixed to the crowns of the columns 52, respectively. A trolley 56 is attached to the rail 54. The trolley 56 is configured to be movable on the rail 54. A hoist 58 is attached to the trolley 56. The hoist 58 is exemplified by a chain block.

図2及び図3に示すように、機械室2には、巻上機10の正面側に2つの調速機6,8が設置されている。このため、比較例の楊重装置50では、2本の支柱52の基底部を機械室床面に設置可能な配置として、機械室2の機械室壁に沿った配置が採用されている。 As shown in FIGS. 2 and 3, in the machine room 2, two speed governors 6 and 8 are installed on the front side of the hoisting machine 10. For this reason, in the Yang weight device 50 of the comparative example, an arrangement along the machine room wall of the machine room 2 is adopted as an arrangement in which the base portions of the two columns 52 can be installed on the floor surface of the machine room.

このような比較例の楊重装置50の配置において、巻上機ブレーキ12を交換する場合、以下のような課題が生じる。図4は、比較例の楊重装置の課題を説明するための図である。比較例の楊重装置50では、交換対象である巻上機ブレーキ12の直上に楊重装置50のレール54が位置していない。このため、巻上機ブレーキ12のアイボルトにホイスト58を連結して吊り上げる場合、巻上機ブレーキ12の取り付けボルトを外した際に当該巻上機ブレーキ12が楊重装置50の側に大きく振られてしまい危険を伴うおそれがある。このように、比較例の楊重装置50では、2本の支柱52の基底部を機械室床面に確実に接地させる必要があるため、設置場所に対する制約が大きい。また、比較例の楊重装置50は、取り外した巻上機ブレーキ12が振られることを考慮した安全設計が必要となる。このことは、例えば装置の大型化を招くこととなる。 In the arrangement of the heaviness device 50 of the comparative example, the following problems arise when the hoist brake 12 is replaced. FIG. 4 is a diagram for explaining a problem of a weighting device of a comparative example. In the Yang weight device 50 of the comparative example, the rail 54 of the Yang weight device 50 is not located directly above the hoist brake 12 to be replaced. Therefore, when the hoist 58 is connected to the eyebolt of the hoist brake 12 and lifted, the hoist brake 12 is greatly shaken toward the load device 50 when the mounting bolt of the hoist brake 12 is removed. It may be dangerous. As described above, in the Yang weight device 50 of the comparative example, since it is necessary to surely ground the base portions of the two columns 52 to the floor surface of the machine room, there is a great restriction on the installation location. Further, the Yang weight device 50 of the comparative example needs to be designed for safety in consideration of the fact that the removed hoisting machine brake 12 is shaken. This leads to, for example, an increase in the size of the device.

2-2.本実施の形態の楊重装置
図5及び図6は、本実施の形態の楊重装置の構成を説明するための図である。図7は、本実施の形態の巻上機ブレーキの楊重装置の配置を説明するための図である。本実施の形態の楊重装置20は、第一支柱22と、第二支柱24と、レール26と、トロリ28と、ホイスト30と、板材40とを備えている。第一支柱22は、第二支柱24よりも支柱高さが低い。第一支柱22及び第二支柱24は、支柱高さを調整可能に構成された支柱部222,242と、支柱部222,242の下端部に固定された基底部224,244と、をそれぞれ含む。支柱部222,242の構成は、例えばパイプサポートが例示される。
2-2. FIG. 5 and FIG. 6 are diagrams for explaining the configuration of the weighting device of the present embodiment. FIG. 7 is a diagram for explaining the arrangement of the weighting device of the hoist brake according to the present embodiment. The weighting device 20 of the present embodiment includes a first support column 22, a second support column 24, a rail 26, a trolley 28, a hoist 30, and a plate material 40. The height of the first support column 22 is lower than that of the second support column 24. The first strut 22 and the second strut 24 include a strut portion 222, 242 configured so that the strut height can be adjusted, and a base portion 224, 244 fixed to the lower end portion of the strut portion 222, 242, respectively. .. The configuration of the support columns 222 and 242 is exemplified by, for example, a pipe support.

レール26は、例えばH鋼で構成される。レール26の両端部は、第一支柱22及び第二支柱24の頭頂部に固定される。第一支柱22及び第二支柱24の支柱高さを調整することによって、レール26は水平に固定される。 The rail 26 is made of, for example, H steel. Both ends of the rail 26 are fixed to the crowns of the first strut 22 and the second strut 24. By adjusting the column heights of the first column 22 and the second column 24, the rail 26 is fixed horizontally.

レール26にはトロリ28が取り付けられる。トロリ28にはホイスト30が取り付けられる。ホイスト30は、チェーンブロックが例示される。 A trolley 28 is attached to the rail 26. A hoist 30 is attached to the trolley 28. The hoist 30 is exemplified by a chain block.

巻上機10と機械室2の機械室壁との間には、向かい合った基台4を掛け渡すように板材40が配置されている。第一支柱22は板材40の上に設置される。この際、第一支柱22は、設置安定性を考慮して、基底部224の長手方向がレール26の延在方向に対して垂直となるように設置されることが望ましい。また、板材40は、上記のように第一支柱22を配置した場合に、基底部224が板上の範囲に収まる幅を有していることが望ましい。一方、第二支柱24は、交換対象の巻上機ブレーキ12の搭載位置の直上をレール26が通るように、巻上機10の正面の機械室床面に設置される。この際、巻上機ブレーキ12を吊り上げ可能な高さにおいてレール26が水平になるように第一支柱22及び第二支柱24の支柱高さが調整される。 A plate material 40 is arranged between the hoisting machine 10 and the machine room wall of the machine room 2 so as to hang the bases 4 facing each other. The first support column 22 is installed on the plate material 40. At this time, it is desirable that the first support column 22 is installed so that the longitudinal direction of the base portion 224 is perpendicular to the extending direction of the rail 26 in consideration of installation stability. Further, it is desirable that the plate material 40 has a width in which the base portion 224 fits within the range on the plate when the first support column 22 is arranged as described above. On the other hand, the second support column 24 is installed on the floor surface of the machine room in front of the hoisting machine 10 so that the rail 26 passes directly above the mounting position of the hoisting machine brake 12 to be replaced. At this time, the column heights of the first column 22 and the second column 24 are adjusted so that the rail 26 is horizontal at a height at which the hoist brake 12 can be lifted.

また、巻上機10の正面の機械室床面は、取り外した旧巻上機ブレーキ及び取り付け予定の新巻上機ブレーキを仮置きするための作業スペースA1として利用できることが好ましい。そこで、本実施の形態の楊重装置20では、作業スペースA1を跨いで第二支柱24が設置されるように、レール26の長さが設定されている。以下の説明では、取り外した巻上機ブレーキ12を「旧巻上機ブレーキ121」とも表記し、取り付け予定の巻上機ブレーキ12を「新巻上機ブレーキ122」とも表記する。 Further, it is preferable that the floor surface of the machine room in front of the hoisting machine 10 can be used as a work space A1 for temporarily placing the removed old hoisting machine brake and the new hoisting machine brake to be installed. Therefore, in the weighting device 20 of the present embodiment, the length of the rail 26 is set so that the second support column 24 is installed across the work space A1. In the following description, the removed hoisting machine brake 12 is also referred to as "old hoisting machine brake 121", and the hoisting machine brake 12 to be installed is also referred to as "new hoisting machine brake 122".

以上のように構成された楊重装置20によれば、以下のような作用及び効果を奏する。 According to the Yang weight device 20 configured as described above, the following actions and effects are obtained.

楊重装置20は、交換対象の旧巻上機ブレーキ121の直上をレール26が通るように設置される。これにより、取り外した旧巻上機ブレーキ121が横方向に振られることを防ぐことができるので、交換作業の安全性を高めることができる。これにより、装置の小型化を図ることができる。 The Yang weight device 20 is installed so that the rail 26 passes directly above the old hoist brake 121 to be replaced. As a result, it is possible to prevent the removed old hoisting machine brake 121 from being shaken in the lateral direction, so that the safety of the replacement work can be enhanced. As a result, the size of the device can be reduced.

板材40を基台4の上に設置することにより、第一支柱22の設置自由度を高めることができる。これにより、様々な巻上機10の種類、機械室2の間取り、機器の配置に対しても、交換対象の巻上機ブレーキ12の直上をレール26が通るように、楊重装置20を設置することができる。 By installing the plate material 40 on the base 4, the degree of freedom in installing the first support column 22 can be increased. As a result, the load device 20 is installed so that the rail 26 passes directly above the hoist brake 12 to be replaced, even for various types of hoist 10, the floor plan of the machine room 2, and the arrangement of the equipment. can do.

第二支柱24は、作業スペースA1を跨いだ位置に設置される。このような構成によれば、取り外した旧巻上機ブレーキ121を作業スペースA1に降ろす作業及び、新たな新巻上機ブレーキ122を吊り上げる作業を効率よく行うことができる。 The second support column 24 is installed at a position straddling the work space A1. According to such a configuration, the work of lowering the removed old hoist brake 121 to the work space A1 and the work of lifting the new new hoist brake 122 can be efficiently performed.

第一支柱22の支柱高さは、第二支柱24の支柱高さよりも低い。このような構成によれば、機械室床面よりも高い位置に設置された板材40の上に第一支柱22を設置したとしても、レール26を水平に近づけることが可能となる。また、第一支柱22及び第二支柱24は支柱高さを調整可能に構成されている。これにより、基台4の高さが異なる設備環境であっても、レール26を水平に近づけることが可能となる。 The strut height of the first strut 22 is lower than the strut height of the second strut 24. According to such a configuration, even if the first support column 22 is installed on the plate material 40 installed at a position higher than the floor surface of the machine room, the rail 26 can be brought close to horizontal. Further, the first support column 22 and the second support column 24 are configured so that the height of the support column can be adjusted. As a result, the rail 26 can be brought closer to the horizontal even in the equipment environment where the heights of the bases 4 are different.

3.巻上機ブレーキの交換手順
次に、楊重装置20を用いて巻上機10の巻上機ブレーキ12を交換する作業の手順について説明する。なお、ここでは巻上機ブレーキ12の交換手順について説明するが、巻上機ブレーキ14の交換についても同様の手順で行うことができる。
3. 3. Procedure for Replacing the Hoisting Machine Brake Next, a procedure for replacing the hoisting machine brake 12 of the hoisting machine 10 by using the load device 20 will be described. Although the procedure for replacing the hoisting machine brake 12 will be described here, the procedure for replacing the hoisting machine brake 14 can also be performed in the same procedure.

巻上機ブレーキ12を交換する作業では、楊重装置設置工程、巻上機ブレーキ取外し工程、及び巻上機ブレーキ取り付け工程が順に行われる。 In the work of replacing the hoisting machine brake 12, the load device installation process, the hoisting machine brake removing step, and the hoisting machine brake mounting step are performed in order.

楊重装置設置工程は、機械室2において楊重装置20を設置する工程である。図8から図10は、巻上機ブレーキの交換手順のうち楊重装置設置工程を説明するための図である。楊重装置設置工程では、先ず、第一ステップでは、機械室壁と巻上機との間の空間において、板材40を一対の基台4に渡し掛けるように配置し、クランプで固定する。次の第二ステップでは、第一支柱22、第二支柱24及びレール26を準備する。板材40の上に第一支柱22を仮配置し、第二支柱24を機械室床面に仮配置する。第一支柱22及び第二支柱24の頭頂部にレール26を固定する。レール26が水平に近づくように、第一支柱22及び第二支柱24の支柱高さを調整する。この際、トロリ28及びホイスト30の吊り代を確保するため、取り付けられている巻上機ブレーキ12の最上部よりも予め定められた高さ、例えば800mm以上高くなる位置に設定する。 The weighting device installation process is a step of installing the weighting device 20 in the machine room 2. 8 to 10 are views for explaining the process of installing the load device in the procedure for replacing the hoist brake. In the process of installing the weighting device, first, in the first step, the plate material 40 is arranged so as to pass over the pair of bases 4 in the space between the machine room wall and the hoisting machine, and is fixed by a clamp. In the next second step, the first column 22, the second column 24, and the rail 26 are prepared. The first support column 22 is temporarily arranged on the plate material 40, and the second support column 24 is temporarily arranged on the floor surface of the machine room. The rail 26 is fixed to the crowns of the first strut 22 and the second strut 24. The heights of the first column 22 and the second column 24 are adjusted so that the rail 26 approaches the horizontal. At this time, in order to secure the suspension allowance for the trolley 28 and the hoist 30, the height is set to a predetermined height, for example, 800 mm or more higher than the uppermost portion of the attached hoist brake 12.

第二ステップでは、更に、取り付けられている旧巻上機ブレーキ121の直上にレール26が位置するように第一支柱22及び第二支柱24の位置を調整する。また、この際、トロリ28の可動範囲であるレール26の直下に作業スペースA1を確保できるように第一支柱22及び第二支柱24の位置を調整する。ここでの作業スペースA1は、交換予定の新巻上機ブレーキ122と、取り外した旧巻上機ブレーキ121との両方を一度におくことのできるスペースである。作業スペースA1には、交換予定の新巻上機ブレーキ122を配置しておく。 In the second step, the positions of the first column 22 and the second column 24 are further adjusted so that the rail 26 is located directly above the attached old hoist brake 121. At this time, the positions of the first support column 22 and the second support column 24 are adjusted so that the work space A1 can be secured directly under the rail 26 which is the movable range of the trolley 28. The work space A1 here is a space where both the new hoist brake 122 to be replaced and the removed old hoist brake 121 can be stored at the same time. A new hoist brake 122 to be replaced is arranged in the work space A1.

次の第三ステップでは、レール26にトロリ28を取り付ける。次にトロリ28にホイスト30を取り付ける。 In the next third step, the trolley 28 is attached to the rail 26. Next, the hoist 30 is attached to the trolley 28.

巻上機ブレーキ取外し工程は、楊重装置20を用いて旧巻上機ブレーキ121の取外し作業を行う工程である。巻上機ブレーキ取外し工程では、先ず、ホイスト30を旧巻上機ブレーキ121の直上に移動させる。旧巻上機ブレーキ121に取り付けた2本のアイボルトとホイスト30をベルト等で連結してテンションが掛かる程度に吊り上げる。次に、旧巻上機ブレーキ121に接続されているケーブル類とブレーキ取り付けボルトを取り外し、旧巻上機ブレーキ121を巻上機10から取り外す。この際、ホイスト30が巻上機ブレーキ12の直上に位置しているため、旧巻上機ブレーキ121を巻上機10から取り外した際に旧巻上機ブレーキ121が振られることが防止される。 The hoisting machine brake removing step is a step of removing the old hoisting machine brake 121 by using the load device 20. In the hoisting machine brake removing step, first, the hoist 30 is moved directly above the old hoisting machine brake 121. The two eyebolts attached to the old hoist brake 121 and the hoist 30 are connected by a belt or the like and lifted to the extent that tension is applied. Next, the cables and brake mounting bolts connected to the old hoist brake 121 are removed, and the old hoist brake 121 is removed from the hoist 10. At this time, since the hoist 30 is located directly above the hoist brake 12, the old hoist brake 121 is prevented from being shaken when the old hoist brake 121 is removed from the hoist 10. ..

吊り上げた旧巻上機ブレーキ121は、トロリ28によって作業スペースA1の直上までレール26に沿って移動させて降ろす。図11は、巻上機ブレーキ取外し工程において、巻上機ブレーキ12を作業スペースA1に降ろした様子を示している。このように、旧巻上機ブレーキ121の直下が作業スペースA1となるため、旧巻上機ブレーキ121を牽引しながら降ろす必要はない。 The lifted old hoist brake 121 is moved along the rail 26 to just above the work space A1 by the trolley 28 and lowered. FIG. 11 shows a state in which the hoisting machine brake 12 is lowered to the work space A1 in the hoisting machine brake removing process. In this way, since the work space A1 is directly below the old hoist brake 121, it is not necessary to pull down the old hoist brake 121 while pulling it.

新たな新巻上機ブレーキ122の取り付ける巻上機ブレーキ取り付け工程では、取外し工程の逆の作業手順が行われる。典型的には、先ず、作業スペースA1に置かれている新巻上機ブレーキ122の直上にホイスト30を移動させる。ホイスト30によって、新巻上機ブレーキ122を吊り上げて巻上機10における新巻上機ブレーキ122の取り付け位置の直上まで移動させる。そして、新巻上機ブレーキ122を巻上機10にブレーキ取り付けボルトで取り付けるとともに、ケーブル類を接続する。 In the hoisting machine brake mounting process for mounting the new new hoisting machine brake 122, the work procedure is the reverse of the removal step. Typically, first, the hoist 30 is moved directly above the new hoist brake 122 placed in the work space A1. The hoist 30 lifts the new hoist brake 122 and moves it to just above the mounting position of the new hoist brake 122 in the hoist 10. Then, the new hoisting machine brake 122 is attached to the hoisting machine 10 with a brake mounting bolt, and cables are connected.

以上のような楊重装置20の設置方法及び巻上機ブレーキの交換方法によれば、大型の巻上機ブレーキを安全に脱着して交換することが可能となる。 According to the method of installing the load device 20 and the method of replacing the hoist brake as described above, it is possible to safely attach / detach and replace the large hoist brake.

4.巻上機ブレーキの楊重装置の変形例
実施の形態の楊重装置20は、以下のように変形した態様を適用してもよい。
4. Deformation example of the weighting device of the hoisting machine brake The weighting device 20 of the embodiment may be modified as follows.

第一支柱22は、基底部224に対して支柱部222の頭頂部が柱の中心軸を中心とした回転方向に回転可能に構成されていてもよい。このような構成によれば、第一支柱22は、基底部224を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。これにより、例えば第一支柱22の設置スペース制限があり基底部224を理想の向きに配置できない場合であっても、レール26を所望の方向に向けて配置することが可能となる。このことは、第二支柱24についても同様であり、第二支柱24は、基底部244に対して支柱部242の頭頂部が柱の中心軸を中心とした回転方向に回転自在に構成されていてもよい。これにより、基底部244を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。 The first support column 22 may be configured such that the crown portion of the support column portion 222 is rotatable in the rotation direction about the central axis of the column with respect to the base portion 224. According to such a configuration, the first strut 22 can rotate the direction of the crown portion of the strut portion 222, that is, the rail 26 fixed to the crown portion, without moving the base portion 224. This makes it possible to arrange the rail 26 in a desired direction even when the base portion 224 cannot be arranged in the ideal direction due to the limitation of the installation space of the first support column 22, for example. This also applies to the second support column 24, and the second support column 24 is configured such that the crown portion of the support column portion 242 is rotatable in the rotational direction about the central axis of the column with respect to the base portion 244. You may. As a result, the direction of the crown of the support column 222, that is, the rail 26 fixed to the crown can be rotated without moving the base portion 244.

支柱高さを調整する構成は、第一支柱22及び第二支柱24のうちの少なくとも一方が備えていればよい。 The configuration for adjusting the height of the columns may be provided by at least one of the first column 22 and the second column 24.

2 機械室、 4 基台、 6,8 調速機、 10 巻上機、 12,14 巻上機ブレーキ、 20 楊重装置、 22 第一支柱、 24 第二支柱、 26 レール、 28 トロリ、 30 ホイスト、 40 板材、 50 楊重装置、 52 支柱、 54 レール、 56 トロリ、 58 ホイスト、 121 旧巻上機ブレーキ、 122 新巻上機ブレーキ、 222,242 支柱部、 224,244 基底部 2 Machine room, 4 bases, 6,8 governor, 10 hoist, 12,14 hoist brake, 20 hoist, 22 first strut, 24 second strut, 26 rail, 28 trolley, 30 Hoist, 40 plate material, 50 weighting device, 52 stanchion, 54 rail, 56 trolley, 58 hoist, 121 old hoist brake, 122 new hoist brake, 222,242 stanchion, 224,244 base

本開示は、エレベータの巻上機ブレーキの重装置、重装置の設置方法、及び巻上機ブレーキの交換方法に関する。 The present disclosure relates to a lifting device for an elevator hoisting machine brake, a method for installing the hoisting device, and a method for replacing the hoisting machine brake.

特許文献1には、重量物の重装置に関する技術が開示されている。この技術では、レールが一対の支柱の上部に水平になるように固定される。レールにはトロリが設けられ、トロリにはチェーンブロックが設けられている。チェーンブロックによって吊り上げられた重量物は、レールに沿って水平方向に運搬される。 Patent Document 1 discloses a technique relating to a lifting device for heavy objects. In this technique, the rails are fixed horizontally on top of a pair of stanchions. The rail is provided with a trolley, and the trolley is provided with a chain block. Heavy objects lifted by the chain block are transported horizontally along the rails.

特開2019-210109号公報Japanese Unexamined Patent Publication No. 2019-210109

エレベータの巻上機は、大型の巻上機ブレーキを備えている。巻上機ブレーキは、定期的に交換される。ここで、上述した特許文献1の重装置を利用して巻上機ブレーキの交換作業を行うことを考える。巻上機が設置されている機械室は、交換作業に利用可能な空間に制約がある。このような制限空間では、特許文献1のような大型の重装置を最適位置に設置できないおそれがある。巻上機ブレーキの取り付け位置から横方向にずれた位置に重装置を設置した場合、取り外した巻上機ブレーキが振り子のように振られてしまい危険を伴うおそれがある。 The elevator hoist is equipped with a large hoist brake. The hoist brake is replaced regularly. Here, it is considered that the hoisting machine brake is replaced by using the lifting device of Patent Document 1 described above. In the machine room where the hoist is installed, there is a limit to the space available for replacement work. In such a restricted space, there is a possibility that a large lifting device as in Patent Document 1 cannot be installed at an optimum position. If the lifting device is installed at a position laterally displaced from the mounting position of the hoisting machine brake, the removed hoisting machine brake may be shaken like a pendulum, which may be dangerous.

本開示は、上述のような課題を解決するためになされたもので、エレベータの巻上機ブレーキを安全に吊り上げて交換することのできるエレベータの巻上機ブレーキの重装置、重装置の設置方法、及び巻上機ブレーキの交換方法を提供することを目的とする。 The present disclosure has been made to solve the above-mentioned problems, and is a lifting device and a lifting device for an elevator hoist brake that can safely lift and replace the elevator hoist brake. It is an object of the present invention to provide an installation method and a method of replacing a hoist brake.

本開示のエレベータの巻上機ブレーキの重装置は、機械室に設置されたエレベータの巻上機に搭載された巻上機ブレーキを重するための重装置であって、機械室の機械室床面よりも高いエレベータの巻上機の基台上に固定された板材と、板材の上に設置された第一支柱と、機械室床面に設置され、第一支柱よりも長い第二支柱と、第一支柱の頭頂部と第二支柱の頭頂部とを掛け渡すように固定されたレールと、レールの上を移動可能に設置されたトロリと、トロリに設置されたホイストと、を備え、第一支柱及び第二支柱のうちの少なくとも一方は、レールが水平に近づくように支柱高さを調整可能に構成され、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置が決められるものである。 The elevator hoist brake lifting device of the present disclosure is a lifting device for lifting the hoist brake mounted on the elevator hoist installed in the machine room, and is a lifting device in the machine room. The plate material fixed on the base of the elevator hoist, which is higher than the floor of the machine room, the first column installed on the plate material, and the first column installed on the floor of the machine room, which is longer than the first column. Two columns, a rail fixed so as to hang between the crown of the first column and the crown of the second column, a trolley installed movable on the rail, and a hoist installed on the trolley. At least one of the first and second stanchions is configured with adjustable stanchion height so that the rails are closer to horizontal so that the rails pass directly above the hoist brake mounting position. The positions of the first strut and the second strut are determined.

また、本開示の重装置の設置方法は、機械室に設置されたエレベータの巻上機ブレーキを重するための重装置の設置方法であって、機械室床面よりも高い位置であるエレベータの巻上機の基台上に板材を固定する第一ステップと、板材の上に第一支柱を設置し、第一支柱よりも長い第二支柱を機械室床面に設置し、第一支柱の頭頂部と第二支柱の頭頂部とを水平に掛け渡すようにレールを固定する第二ステップと、トロリをレールに移動可能に設置し、ホイストをトロリに設置する第三ステップと、を備え、第二ステップは、レールが巻上機ブレーキの搭載位置の直上を通るように、第一支柱及び第二支柱の位置を決定するように構成されるものである。 Further, the method of installing the lifting device of the present disclosure is a method of installing a lifting device for lifting the hoist brake of an elevator installed in the machine room, at a position higher than the floor surface of the machine room. The first step of fixing the plate material on the base of the hoist of an elevator, the first column is installed on the plate material, and the second column longer than the first column is installed on the floor of the machine room. The second step of fixing the rail so that the top of the head of one pillar and the top of the second pillar run horizontally, and the third step of installing the trolley movably on the rail and installing the hoist on the trolley. The second step is configured to determine the positions of the first and second stanchions so that the rails pass directly above the hoist brake mounting position.

さらに、本開示の巻上機ブレーキの交換方法は、本開示の重装置の設置方法によって設置された重装置を用いてエレベータの巻上機ブレーキを交換する交換方法であって、巻上機に取り付けられている旧巻上機ブレーキの搭載位置の直上にホイストを移動させ、ホイストによって旧巻上機ブレーキを吊るしながら旧巻上機ブレーキを取り外し、トロリによって旧巻上機ブレーキを作業スペースの直上に移動させ、旧巻上機ブレーキを作業スペースに降ろすように構成されるものである。 Further, the hoist brake replacement method of the present disclosure is a replacement method of replacing the elevator hoist brake using the hoist installed by the hoist installation method of the present disclosure. Move the hoist directly above the mounting position of the old hoist brake attached to the machine, remove the old hoist brake while hanging the old hoist brake with the hoist, and use the trolley to move the old hoist brake to the work space. It is configured to move directly above the old hoist brake and lower it into the work space.

本開示のエレベータの巻上機ブレーキの重装置によれば、機械室床面より高い位置である基台上に支柱を設置することができる。これにより、巻上機ブレーキの搭載位置の直上にレールを通すことができるので、限られたスペースにおいて、巻上機ブレーキを安全に吊り上げて交換することが可能となる。 According to the lifting device of the elevator hoist brake of the present disclosure, the support can be installed on the base which is higher than the floor surface of the machine room. As a result, the rail can be passed directly above the mounting position of the hoist brake, so that the hoist brake can be safely lifted and replaced in a limited space.

エレベータの巻上機ブレーキの概要を説明するための図である。It is a figure for demonstrating the outline of the hoist brake of an elevator. 比較例としての巻上機ブレーキの重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting device of a hoist brake as a comparative example. 比較例としての巻上機ブレーキの重装置の配置を説明するための図である。It is a figure for demonstrating the arrangement of the lifting device of a hoist brake as a comparative example. 比較例の重装置の課題を説明するための図である。It is a figure for demonstrating the problem of the lifting apparatus of a comparative example. 実施の形態の重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting apparatus of embodiment. 実施の形態の重装置の構成を説明するための図である。It is a figure for demonstrating the structure of the lifting apparatus of embodiment. 実施の形態の巻上機ブレーキの重装置の配置を説明するための図である。It is a figure for demonstrating the arrangement of the lifting device of the hoist brake of an embodiment. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting device installation process in the replacement procedure of a hoist brake. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting device installation process in the replacement procedure of a hoist brake. 巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。It is a figure for demonstrating the lifting device installation process in the replacement procedure of a hoist brake. 巻上機ブレーキ取外し工程において、巻上機ブレーキを作業スペースに降ろした様子を示す図である。It is a figure which shows the state which the hoisting machine brake was lowered to the work space in the process of removing a hoisting machine brake.

以下、図面を参照して実施の形態について説明する。なお、各図において共通する要素には、同一の符号を付して、重複する説明を省略する。 Hereinafter, embodiments will be described with reference to the drawings. The elements common to each figure are designated by the same reference numerals, and duplicate description will be omitted.

実施の形態1.
1.エレベータの巻上機ブレーキの概要
図1は、エレベータの巻上機ブレーキの概要を説明するための図である。この図に示す巻上機10は、エレベータ用の大型巻上機である。巻上機10は、機械室2に設置される。より詳しくは、機械室2には、巻上機10を設置するための基台4が設置されている。基台4は、例えば機械室2の床面に平行に設置された一対のH鋼により構成される。巻上機10は、基台4の上、つまり機械室床面よりも高い位置に固定される。
Embodiment 1.
1. 1. Outline of Elevator Hoisting Machine Brake FIG. 1 is a diagram for explaining an outline of an elevator hoisting machine brake. The hoisting machine 10 shown in this figure is a large hoisting machine for elevators. The hoisting machine 10 is installed in the machine room 2. More specifically, in the machine room 2, a base 4 for installing the hoisting machine 10 is installed. The base 4 is composed of, for example, a pair of H steels installed parallel to the floor surface of the machine room 2. The hoisting machine 10 is fixed on the base 4, that is, at a position higher than the floor surface of the machine room.

巻上機10は、大型の巻上機ブレーキを備える。この図の巻上機10には、2つの巻上機ブレーキ12,14が搭載されている。巻上機ブレーキ12,14は、定期的に交換される。但し、このような大型の巻上機ブレーキの交換作業は容易ではない。一般的に機械室2は狭く、交換作業のための十分なスペースを確保できないからである。このため、巻上機ブレーキの交換作業には、限られた作業スペースを有効に利用するための工夫が求められる。 The hoisting machine 10 includes a large hoisting machine brake. The hoisting machine 10 in this figure is equipped with two hoisting machine brakes 12 and 14. The hoist brakes 12 and 14 are replaced regularly. However, it is not easy to replace such a large hoist brake. This is because the machine room 2 is generally small and cannot secure sufficient space for replacement work. For this reason, it is necessary to devise ways to effectively utilize the limited work space for the replacement work of the hoist brake.

巻上機ブレーキの交換作業は、重装置を用いて行われる。重装置は、巻上機ブレーキを吊して移動させるためのものである。以下、巻上機ブレーキ12,14のうち、巻上機ブレーキ12を交換する作業を例として、本実施の形態の重装置の構成について説明する。 The hoisting machine brake replacement work is performed using a lifting device. The lifting device is for suspending and moving the hoist brake. Hereinafter, the configuration of the lifting device according to the present embodiment will be described by taking as an example the work of replacing the hoisting machine brake 12 among the hoisting machine brakes 12 and 14.

2.巻上機ブレーキの重装置
2-1.比較例の重装置
本実施の形態の重装置の説明に先立って、比較例の重装置の構成について説明する。図2は、比較例としての巻上機ブレーキの重装置の構成を説明するための図である。図3は、比較例としての巻上機ブレーキの重装置の配置を説明するための図である。比較例の重装置50は、2本の支柱52と、レール54と、トロリ56と、ホイスト58と、を備えている。2本の支柱52は、レール54を高所で水平に支持するためのものである。レール54は、例えばH鋼で構成される。レール54の両端部は、支柱52の頭頂部にそれぞれ固定される。レール54にはトロリ56が取り付けられる。トロリ56は、レール54の上を移動可能に構成されている。トロリ56にはホイスト58が取り付けられる。ホイスト58は、チェーンブロックが例示される。
2. 2. Lifting device for hoist brake 2-1. Lifting device of comparative example Prior to the description of the lifting device of the present embodiment, the configuration of the lifting device of the comparative example will be described. FIG. 2 is a diagram for explaining a configuration of a hoisting machine brake lifting device as a comparative example. FIG. 3 is a diagram for explaining the arrangement of the lifting device of the hoist brake as a comparative example. The lifting device 50 of the comparative example includes two columns 52, a rail 54, a trolley 56, and a hoist 58. The two columns 52 are for supporting the rail 54 horizontally at a high place. The rail 54 is made of, for example, H steel. Both ends of the rail 54 are fixed to the crowns of the columns 52, respectively. A trolley 56 is attached to the rail 54. The trolley 56 is configured to be movable on the rail 54. A hoist 58 is attached to the trolley 56. The hoist 58 is exemplified by a chain block.

図2及び図3に示すように、機械室2には、巻上機10の正面側に2つの調速機6,8が設置されている。このため、比較例の重装置50では、2本の支柱52の基底部を機械室床面に設置可能な配置として、機械室2の機械室壁に沿った配置が採用されている。 As shown in FIGS. 2 and 3, in the machine room 2, two speed governors 6 and 8 are installed on the front side of the hoisting machine 10. Therefore, in the lifting device 50 of the comparative example, an arrangement along the machine room wall of the machine room 2 is adopted as an arrangement in which the base portions of the two columns 52 can be installed on the floor surface of the machine room.

このような比較例の重装置50の配置において、巻上機ブレーキ12を交換する場合、以下のような課題が生じる。図4は、比較例の重装置の課題を説明するための図である。比較例の重装置50では、交換対象である巻上機ブレーキ12の直上に重装置50のレール54が位置していない。このため、巻上機ブレーキ12のアイボルトにホイスト58を連結して吊り上げる場合、巻上機ブレーキ12の取り付けボルトを外した際に当該巻上機ブレーキ12が重装置50の側に大きく振られてしまい危険を伴うおそれがある。このように、比較例の重装置50では、2本の支柱52の基底部を機械室床面に確実に接地させる必要があるため、設置場所に対する制約が大きい。また、比較例の重装置50は、取り外した巻上機ブレーキ12が振られることを考慮した安全設計が必要となる。このことは、例えば装置の大型化を招くこととなる。 In the arrangement of the lifting device 50 of the comparative example, the following problems arise when the hoisting machine brake 12 is replaced. FIG. 4 is a diagram for explaining a problem of a lifting device of a comparative example. In the lifting device 50 of the comparative example, the rail 54 of the lifting device 50 is not located directly above the hoist brake 12 to be replaced. Therefore, when the hoist 58 is connected to the eyebolt of the hoist brake 12 and lifted, the hoist brake 12 is greatly shaken toward the lifting device 50 when the mounting bolt of the hoist brake 12 is removed. It may be dangerous. As described above, in the lifting device 50 of the comparative example, since it is necessary to surely ground the base portions of the two columns 52 to the floor surface of the machine room, there are many restrictions on the installation location. Further, the lifting device 50 of the comparative example needs to have a safety design in consideration of the fact that the removed hoisting machine brake 12 is shaken. This leads to, for example, an increase in the size of the device.

2-2.本実施の形態の重装置
図5及び図6は、本実施の形態の重装置の構成を説明するための図である。図7は、本実施の形態の巻上機ブレーキの重装置の配置を説明するための図である。本実施の形態の重装置20は、第一支柱22と、第二支柱24と、レール26と、トロリ28と、ホイスト30と、板材40とを備えている。第一支柱22は、第二支柱24よりも支柱高さが低い。第一支柱22及び第二支柱24は、支柱高さを調整可能に構成された支柱部222,242と、支柱部222,242の下端部に固定された基底部224,244と、をそれぞれ含む。支柱部222,242の構成は、例えばパイプサポートが例示される。
2-2. Lifting device of the present embodiment FIGS. 5 and 6 are diagrams for explaining the configuration of the lifting device of the present embodiment. FIG. 7 is a diagram for explaining the arrangement of the lifting device for the hoist brake according to the present embodiment. The lifting device 20 of the present embodiment includes a first support column 22, a second support column 24, a rail 26, a trolley 28, a hoist 30, and a plate material 40. The height of the first support column 22 is lower than that of the second support column 24. The first strut 22 and the second strut 24 include a strut portion 222, 242 configured so that the strut height can be adjusted, and a base portion 224, 244 fixed to the lower end portion of the strut portion 222, 242, respectively. .. The configuration of the support columns 222 and 242 is exemplified by, for example, a pipe support.

レール26は、例えばH鋼で構成される。レール26の両端部は、第一支柱22及び第二支柱24の頭頂部に固定される。第一支柱22及び第二支柱24の支柱高さを調整することによって、レール26は水平に固定される。 The rail 26 is made of, for example, H steel. Both ends of the rail 26 are fixed to the crowns of the first strut 22 and the second strut 24. By adjusting the column heights of the first column 22 and the second column 24, the rail 26 is fixed horizontally.

レール26にはトロリ28が取り付けられる。トロリ28にはホイスト30が取り付けられる。ホイスト30は、チェーンブロックが例示される。 A trolley 28 is attached to the rail 26. A hoist 30 is attached to the trolley 28. The hoist 30 is exemplified by a chain block.

巻上機10と機械室2の機械室壁との間には、向かい合った基台4を掛け渡すように板材40が配置されている。第一支柱22は板材40の上に設置される。この際、第一支柱22は、設置安定性を考慮して、基底部224の長手方向がレール26の延在方向に対して垂直となるように設置されることが望ましい。また、板材40は、上記のように第一支柱22を配置した場合に、基底部224が板上の範囲に収まる幅を有していることが望ましい。一方、第二支柱24は、交換対象の巻上機ブレーキ12の搭載位置の直上をレール26が通るように、巻上機10の正面の機械室床面に設置される。この際、巻上機ブレーキ12を吊り上げ可能な高さにおいてレール26が水平になるように第一支柱22及び第二支柱24の支柱高さが調整される。 A plate material 40 is arranged between the hoisting machine 10 and the machine room wall of the machine room 2 so as to hang the bases 4 facing each other. The first support column 22 is installed on the plate material 40. At this time, it is desirable that the first support column 22 is installed so that the longitudinal direction of the base portion 224 is perpendicular to the extending direction of the rail 26 in consideration of installation stability. Further, it is desirable that the plate material 40 has a width in which the base portion 224 fits within the range on the plate when the first support column 22 is arranged as described above. On the other hand, the second support column 24 is installed on the floor surface of the machine room in front of the hoisting machine 10 so that the rail 26 passes directly above the mounting position of the hoisting machine brake 12 to be replaced. At this time, the column heights of the first column 22 and the second column 24 are adjusted so that the rail 26 is horizontal at a height at which the hoist brake 12 can be lifted.

また、巻上機10の正面の機械室床面は、取り外した旧巻上機ブレーキ及び取り付け予定の新巻上機ブレーキを仮置きするための作業スペースA1として利用できることが好ましい。そこで、本実施の形態の重装置20では、作業スペースA1を跨いで第二支柱24が設置されるように、レール26の長さが設定されている。以下の説明では、取り外した巻上機ブレーキ12を「旧巻上機ブレーキ121」とも表記し、取り付け予定の巻上機ブレーキ12を「新巻上機ブレーキ122」とも表記する。 Further, it is preferable that the floor surface of the machine room in front of the hoisting machine 10 can be used as a work space A1 for temporarily placing the removed old hoisting machine brake and the new hoisting machine brake to be installed. Therefore, in the lifting device 20 of the present embodiment, the length of the rail 26 is set so that the second support column 24 is installed across the work space A1. In the following description, the removed hoisting machine brake 12 is also referred to as "old hoisting machine brake 121", and the hoisting machine brake 12 to be installed is also referred to as "new hoisting machine brake 122".

以上のように構成された重装置20によれば、以下のような作用及び効果を奏する。 According to the lifting device 20 configured as described above, the following actions and effects are obtained.

重装置20は、交換対象の旧巻上機ブレーキ121の直上をレール26が通るように設置される。これにより、取り外した旧巻上機ブレーキ121が横方向に振られることを防ぐことができるので、交換作業の安全性を高めることができる。これにより、装置の小型化を図ることができる。 The lifting device 20 is installed so that the rail 26 passes directly above the old hoisting machine brake 121 to be replaced. As a result, it is possible to prevent the removed old hoisting machine brake 121 from being shaken in the lateral direction, so that the safety of the replacement work can be enhanced. As a result, the size of the device can be reduced.

板材40を基台4の上に設置することにより、第一支柱22の設置自由度を高めることができる。これにより、様々な巻上機10の種類、機械室2の間取り、機器の配置に対しても、交換対象の巻上機ブレーキ12の直上をレール26が通るように、重装置20を設置することができる。 By installing the plate material 40 on the base 4, the degree of freedom in installing the first support column 22 can be increased. As a result, the lifting device 20 is installed so that the rail 26 passes directly above the hoisting machine brake 12 to be replaced, even for various types of hoisting machine 10, the floor plan of the machine room 2, and the arrangement of the equipment. can do.

第二支柱24は、作業スペースA1を跨いだ位置に設置される。このような構成によれば、取り外した旧巻上機ブレーキ121を作業スペースA1に降ろす作業及び、新たな新巻上機ブレーキ122を吊り上げる作業を効率よく行うことができる。 The second support column 24 is installed at a position straddling the work space A1. According to such a configuration, the work of lowering the removed old hoist brake 121 to the work space A1 and the work of lifting the new new hoist brake 122 can be efficiently performed.

第一支柱22の支柱高さは、第二支柱24の支柱高さよりも低い。このような構成によれば、機械室床面よりも高い位置に設置された板材40の上に第一支柱22を設置したとしても、レール26を水平に近づけることが可能となる。また、第一支柱22及び第二支柱24は支柱高さを調整可能に構成されている。これにより、基台4の高さが異なる設備環境であっても、レール26を水平に近づけることが可能となる。 The strut height of the first strut 22 is lower than the strut height of the second strut 24. According to such a configuration, even if the first support column 22 is installed on the plate material 40 installed at a position higher than the floor surface of the machine room, the rail 26 can be brought close to horizontal. Further, the first support column 22 and the second support column 24 are configured so that the height of the support column can be adjusted. As a result, the rail 26 can be brought closer to the horizontal even in the equipment environment where the heights of the bases 4 are different.

3.巻上機ブレーキの交換手順
次に、重装置20を用いて巻上機10の巻上機ブレーキ12を交換する作業の手順について説明する。なお、ここでは巻上機ブレーキ12の交換手順について説明するが、巻上機ブレーキ14の交換についても同様の手順で行うことができる。
3. 3. Procedure for Replacing the Hoisting Machine Brake Next, a procedure for replacing the hoisting machine brake 12 of the hoisting machine 10 using the lifting device 20 will be described. Although the procedure for replacing the hoisting machine brake 12 will be described here, the procedure for replacing the hoisting machine brake 14 can also be performed in the same procedure.

巻上機ブレーキ12を交換する作業では、重装置設置工程、巻上機ブレーキ取外し工程、及び巻上機ブレーキ取り付け工程が順に行われる。 In the work of replacing the hoisting machine brake 12, the lifting device installation step, the hoisting machine brake removing step, and the hoisting machine brake mounting step are performed in order.

重装置設置工程は、機械室2において重装置20を設置する工程である。図8から図10は、巻上機ブレーキの交換手順のうち重装置設置工程を説明するための図である。重装置設置工程では、先ず、第一ステップでは、機械室壁と巻上機との間の空間において、板材40を一対の基台4に渡し掛けるように配置し、クランプで固定する。次の第二ステップでは、第一支柱22、第二支柱24及びレール26を準備する。板材40の上に第一支柱22を仮配置し、第二支柱24を機械室床面に仮配置する。第一支柱22及び第二支柱24の頭頂部にレール26を固定する。レール26が水平に近づくように、第一支柱22及び第二支柱24の支柱高さを調整する。この際、トロリ28及びホイスト30の吊り代を確保するため、取り付けられている巻上機ブレーキ12の最上部よりも予め定められた高さ、例えば800mm以上高くなる位置に設定する。 The lifting device installation process is a step of installing the lifting device 20 in the machine room 2. 8 to 10 are views for explaining the lifting device installation process in the hoisting machine brake replacement procedure. In the lifting device installation step, first, in the first step, in the space between the machine room wall and the hoisting machine, the plate material 40 is arranged so as to pass over the pair of bases 4, and is fixed by a clamp. In the next second step, the first column 22, the second column 24, and the rail 26 are prepared. The first support column 22 is temporarily arranged on the plate material 40, and the second support column 24 is temporarily arranged on the floor surface of the machine room. The rail 26 is fixed to the crowns of the first strut 22 and the second strut 24. The heights of the first column 22 and the second column 24 are adjusted so that the rail 26 approaches the horizontal. At this time, in order to secure the suspension allowance for the trolley 28 and the hoist 30, the height is set to a predetermined height, for example, 800 mm or more higher than the uppermost portion of the attached hoist brake 12.

第二ステップでは、更に、取り付けられている旧巻上機ブレーキ121の直上にレール26が位置するように第一支柱22及び第二支柱24の位置を調整する。また、この際、トロリ28の可動範囲であるレール26の直下に作業スペースA1を確保できるように第一支柱22及び第二支柱24の位置を調整する。ここでの作業スペースA1は、交換予定の新巻上機ブレーキ122と、取り外した旧巻上機ブレーキ121との両方を一度におくことのできるスペースである。作業スペースA1には、交換予定の新巻上機ブレーキ122を配置しておく。 In the second step, the positions of the first column 22 and the second column 24 are further adjusted so that the rail 26 is located directly above the attached old hoist brake 121. At this time, the positions of the first support column 22 and the second support column 24 are adjusted so that the work space A1 can be secured directly under the rail 26 which is the movable range of the trolley 28. The work space A1 here is a space where both the new hoist brake 122 to be replaced and the removed old hoist brake 121 can be stored at the same time. A new hoist brake 122 to be replaced is arranged in the work space A1.

次の第三ステップでは、レール26にトロリ28を取り付ける。次にトロリ28にホイスト30を取り付ける。 In the next third step, the trolley 28 is attached to the rail 26. Next, the hoist 30 is attached to the trolley 28.

巻上機ブレーキ取外し工程は、重装置20を用いて旧巻上機ブレーキ121の取外し作業を行う工程である。巻上機ブレーキ取外し工程では、先ず、ホイスト30を旧巻上機ブレーキ121の直上に移動させる。旧巻上機ブレーキ121に取り付けた2本のアイボルトとホイスト30をベルト等で連結してテンションが掛かる程度に吊り上げる。次に、旧巻上機ブレーキ121に接続されているケーブル類とブレーキ取り付けボルトを取り外し、旧巻上機ブレーキ121を巻上機10から取り外す。この際、ホイスト30が巻上機ブレーキ12の直上に位置しているため、旧巻上機ブレーキ121を巻上機10から取り外した際に旧巻上機ブレーキ121が振られることが防止される。 The hoisting machine brake removing step is a step of removing the old hoisting machine brake 121 using the lifting device 20. In the hoisting machine brake removing step, first, the hoist 30 is moved directly above the old hoisting machine brake 121. The two eyebolts attached to the old hoist brake 121 and the hoist 30 are connected by a belt or the like and lifted to the extent that tension is applied. Next, the cables and brake mounting bolts connected to the old hoist brake 121 are removed, and the old hoist brake 121 is removed from the hoist 10. At this time, since the hoist 30 is located directly above the hoist brake 12, the old hoist brake 121 is prevented from being shaken when the old hoist brake 121 is removed from the hoist 10. ..

吊り上げた旧巻上機ブレーキ121は、トロリ28によって作業スペースA1の直上までレール26に沿って移動させて降ろす。図11は、巻上機ブレーキ取外し工程において、巻上機ブレーキ12を作業スペースA1に降ろした様子を示している。このように、旧巻上機ブレーキ121の直下が作業スペースA1となるため、旧巻上機ブレーキ121を牽引しながら降ろす必要はない。 The lifted old hoist brake 121 is moved along the rail 26 to just above the work space A1 by the trolley 28 and lowered. FIG. 11 shows a state in which the hoisting machine brake 12 is lowered to the work space A1 in the hoisting machine brake removing process. In this way, since the work space A1 is directly below the old hoist brake 121, it is not necessary to pull down the old hoist brake 121 while pulling it.

新たな新巻上機ブレーキ122の取り付ける巻上機ブレーキ取り付け工程では、取外し工程の逆の作業手順が行われる。典型的には、先ず、作業スペースA1に置かれている新巻上機ブレーキ122の直上にホイスト30を移動させる。ホイスト30によって、新巻上機ブレーキ122を吊り上げて巻上機10における新巻上機ブレーキ122の取り付け位置の直上まで移動させる。そして、新巻上機ブレーキ122を巻上機10にブレーキ取り付けボルトで取り付けるとともに、ケーブル類を接続する。 In the hoisting machine brake mounting process for mounting the new new hoisting machine brake 122, the work procedure is the reverse of the removal step. Typically, first, the hoist 30 is moved directly above the new hoist brake 122 placed in the work space A1. The hoist 30 lifts the new hoist brake 122 and moves it to just above the mounting position of the new hoist brake 122 in the hoist 10. Then, the new hoisting machine brake 122 is attached to the hoisting machine 10 with a brake mounting bolt, and cables are connected.

以上のような重装置20の設置方法及び巻上機ブレーキの交換方法によれば、大型の巻上機ブレーキを安全に脱着して交換することが可能となる。 According to the method of installing the lifting device 20 and the method of replacing the hoist brake as described above, it is possible to safely attach / detach and replace the large hoist brake.

4.巻上機ブレーキの重装置の変形例
実施の形態の重装置20は、以下のように変形した態様を適用してもよい。
4. Modification example of the lifting device of the hoisting machine brake The lifting device 20 of the embodiment may be modified as follows.

第一支柱22は、基底部224に対して支柱部222の頭頂部が柱の中心軸を中心とした回転方向に回転可能に構成されていてもよい。このような構成によれば、第一支柱22は、基底部224を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。これにより、例えば第一支柱22の設置スペース制限があり基底部224を理想の向きに配置できない場合であっても、レール26を所望の方向に向けて配置することが可能となる。このことは、第二支柱24についても同様であり、第二支柱24は、基底部244に対して支柱部242の頭頂部が柱の中心軸を中心とした回転方向に回転自在に構成されていてもよい。これにより、基底部244を動かすことなく支柱部222の頭頂部、すなわち頭頂部に固定されたレール26の向きを回転させることができる。 The first support column 22 may be configured such that the crown portion of the support column portion 222 is rotatable in the rotation direction about the central axis of the column with respect to the base portion 224. According to such a configuration, the first strut 22 can rotate the direction of the crown portion of the strut portion 222, that is, the rail 26 fixed to the crown portion, without moving the base portion 224. This makes it possible to arrange the rail 26 in a desired direction even when the base portion 224 cannot be arranged in the ideal direction due to the limitation of the installation space of the first support column 22, for example. This also applies to the second support column 24, and the second support column 24 is configured such that the crown portion of the support column portion 242 is rotatable in the rotational direction about the central axis of the column with respect to the base portion 244. You may. As a result, the direction of the crown of the support column 222, that is, the rail 26 fixed to the crown can be rotated without moving the base portion 244.

支柱高さを調整する構成は、第一支柱22及び第二支柱24のうちの少なくとも一方が備えていればよい。 The configuration for adjusting the height of the columns may be provided by at least one of the first column 22 and the second column 24.

2 機械室、 4 基台、 6,8 調速機、 10 巻上機、 12,14 巻上機ブレーキ、 20 重装置、 22 第一支柱、 24 第二支柱、 26 レール、 28 トロリ、 30 ホイスト、 40 板材、 50 重装置、 52 支柱、 54 レール、 56 トロリ、 58 ホイスト、 121 旧巻上機ブレーキ、 122 新巻上機ブレーキ、 222,242 支柱部、 224,244 基底部 2 Machine room, 4 bases, 6,8 governor, 10 hoist, 12,14 hoist brake, 20 hoist , 22 1st strut, 24 2nd strut, 26 rails, 28 trolley, 30 Hoist, 40 plates, 50 lifting device, 52 stanchions, 54 rails, 56 trolleys, 58 hoists, 121 old hoist brakes, 122 new hoist brakes, 222,242 stanchions, 224,244 bases

Claims (8)

機械室に設置されたエレベータの巻上機に搭載された巻上機ブレーキを楊重するための楊重装置であって、
前記機械室の機械室床面よりも高いエレベータの巻上機の基台上に固定された板材と、
前記板材の上に設置された第一支柱と、
前記機械室床面に設置され、前記第一支柱よりも長い第二支柱と、
前記第一支柱の頭頂部と前記第二支柱の頭頂部とを掛け渡すように固定されたレールと、
前記レールの上を移動可能に設置されたトロリと、
前記トロリに設置されたホイストと、を備え、
前記第一支柱及び前記第二支柱のうちの少なくとも一方は、前記レールが水平に近づくように支柱高さを調整可能に構成され、
前記レールが前記巻上機ブレーキの搭載位置の直上を通るように、前記第一支柱及び前記第二支柱の位置が決められるエレベータの巻上機ブレーキの楊重装置。
It is a weighting device for loading the hoisting machine brake mounted on the hoisting machine of the elevator installed in the machine room.
A plate material fixed on the base of the elevator hoisting machine higher than the machine room floor of the machine room, and
The first strut installed on the plate material and
A second strut, which is installed on the floor of the machine room and is longer than the first strut,
A rail fixed so as to hang between the crown of the first strut and the crown of the second strut,
A trolley installed so that it can move on the rail,
With a hoist installed in the trolley,
At least one of the first strut and the second strut is configured so that the strut height can be adjusted so that the rail approaches horizontally.
An elevator hoist brake load device in which the positions of the first strut and the second strut are determined so that the rail passes directly above the mounting position of the hoist brake.
前記レールは、取り外した前記巻上機ブレーキを前記ホイストによって吊り上げた状態で前記第二支柱の側に移動させて前記機械室床面に降ろすための作業スペースが確保される長さに設定されている請求項1に記載のエレベータの巻上機ブレーキの楊重装置。 The rail is set to a length that secures a work space for moving the removed hoist brake to the side of the second column in a state of being lifted by the hoist and lowering the brake to the floor of the machine room. The weighting device for an elevator hoist brake according to claim 1. 前記第一支柱及び前記第二支柱は、下端部に固定された基底部を含み、
前記第一支柱及び前記第二支柱の前記頭頂部は、前記基底部に対してそれぞれ回転自在に構成されている請求項1又は請求項2に記載のエレベータの巻上機ブレーキの楊重装置。
The first strut and the second strut include a base fixed to the lower end.
The weighting device for an elevator hoist brake according to claim 1 or 2, wherein the first strut and the crown portion of the second strut are rotatably configured with respect to the base portion, respectively.
機械室に設置されたエレベータの巻上機ブレーキを楊重するための楊重装置の設置方法であって、
機械室床面よりも高い位置であるエレベータの巻上機の基台上に板材を固定する第一ステップと、
前記板材の上に第一支柱を設置し、前記第一支柱よりも長い第二支柱を前記機械室床面に設置し、前記第一支柱の頭頂部と前記第二支柱の頭頂部とを水平に掛け渡すようにレールを固定する第二ステップと、
トロリを前記レールに移動可能に設置し、ホイストを前記トロリに設置する第三ステップと、を備え、
前記第二ステップは、
前記レールが前記巻上機ブレーキの搭載位置の直上を通るように、前記第一支柱及び前記第二支柱の位置を決定する
ように構成される楊重装置の設置方法。
It is a method of installing a weighting device for weighting the elevator hoist brake installed in the machine room.
The first step of fixing the plate material on the base of the elevator hoist, which is higher than the floor of the machine room,
The first strut is installed on the plate material, the second strut longer than the first strut is installed on the floor of the machine room, and the crown of the first strut and the crown of the second strut are horizontal. The second step of fixing the rail so that it can be hung on the
A third step of movably installing the trolley on the rail and installing the hoist on the trolley is provided.
The second step is
A method of installing a load device configured to determine the positions of the first strut and the second strut so that the rail passes directly above the mounting position of the hoist brake.
前記第一支柱及び前記第二支柱のうちの少なくとも一方は、支柱高さを調整可能に構成され、
前記第二ステップは、
前記レールが水平に近づくように前記第一支柱又は前記第二支柱の支柱高さを調整する
ように構成される請求項4に記載の楊重装置の設置方法。
At least one of the first strut and the second strut is configured to have adjustable strut height.
The second step is
The method for installing a weighting device according to claim 4, wherein the height of the first strut or the strut of the second strut is adjusted so that the rail approaches the horizontal.
前記機械室の機械室床面には、前記巻上機から取り外した旧巻上機ブレーキを降ろすとともに前記巻上機に新たに取り付ける新巻上機ブレーキを吊り上げるための作業スペースが設けられ、
前記第二ステップは、
前記レールが前記作業スペースの直上を通るように、前記第一支柱及び前記第二支柱の位置を決定する
ように構成される請求項4又は請求項5に記載の楊重装置の設置方法。
On the floor of the machine room of the machine room, a work space is provided for lowering the old hoist brake removed from the hoist and lifting the new hoist brake newly attached to the hoist.
The second step is
The method for installing a weighting device according to claim 4 or 5, wherein the positions of the first strut and the second strut are determined so that the rail passes directly above the work space.
請求項6に記載の設置方法によって設置された楊重装置を用いて前記エレベータの巻上機ブレーキを交換する交換方法であって、
前記巻上機に取り付けられている前記旧巻上機ブレーキの搭載位置の直上に前記ホイストを移動させ、
前記ホイストによって前記旧巻上機ブレーキを吊るしながら前記旧巻上機ブレーキを取り外し、
前記トロリによって前記旧巻上機ブレーキを作業スペースの直上に移動させ、
前記旧巻上機ブレーキを前記作業スペースに降ろす
ように構成される巻上機ブレーキの交換方法。
It is a replacement method for replacing the hoist brake of the elevator by using the Yang weight device installed by the installation method according to claim 6.
The hoist is moved directly above the mounting position of the old hoist brake mounted on the hoist.
The old hoist brake was removed while the old hoist brake was hung by the hoist.
The trolley moves the old hoist brake directly above the work space.
A method of replacing a hoist brake configured to lower the old hoist brake into the work space.
前記作業スペースに置かれている前記新巻上機ブレーキの直上に前記ホイストを移動させ、
前記ホイストによって、前記新巻上機ブレーキを吊り上げて前記巻上機における前記新巻上機ブレーキの取り付け位置の直上に移動させ、
前記新巻上機ブレーキを前記巻上機に取り付ける
ように構成される請求項7に記載の巻上機ブレーキの交換方法。
Move the hoist directly above the Aramaki-jake brake placed in the work space.
The hoist lifts the new hoist brake and moves it directly above the mounting position of the new hoist brake in the hoist.
The method for replacing a hoist brake according to claim 7, wherein the new hoist brake is attached to the hoist.
JP2020117955A 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake Active JP7180643B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020117955A JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020117955A JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Publications (2)

Publication Number Publication Date
JP2022015245A true JP2022015245A (en) 2022-01-21
JP7180643B2 JP7180643B2 (en) 2022-11-30

Family

ID=80121354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020117955A Active JP7180643B2 (en) 2020-07-08 2020-07-08 Lifting device for elevator hoisting machine brake, method for installing lifting device, and method for replacing hoisting machine brake

Country Status (1)

Country Link
JP (1) JP7180643B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5711191U (en) * 1980-06-23 1982-01-20
JPH0318088U (en) * 1989-07-04 1991-02-22
JP2016084199A (en) * 2014-10-23 2016-05-19 株式会社日立ビルシステム Exchange equipment for elevator braking system
US20180044152A1 (en) * 2016-08-11 2018-02-15 Donald Bruce Childress Portable lifting apparatus
JP2019206423A (en) * 2018-05-30 2019-12-05 株式会社日立ビルシステム Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP2019210109A (en) * 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5711191U (en) * 1980-06-23 1982-01-20
JPH0318088U (en) * 1989-07-04 1991-02-22
JP2016084199A (en) * 2014-10-23 2016-05-19 株式会社日立ビルシステム Exchange equipment for elevator braking system
US20180044152A1 (en) * 2016-08-11 2018-02-15 Donald Bruce Childress Portable lifting apparatus
JP2019206423A (en) * 2018-05-30 2019-12-05 株式会社日立ビルシステム Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP2019210109A (en) * 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method

Also Published As

Publication number Publication date
JP7180643B2 (en) 2022-11-30

Similar Documents

Publication Publication Date Title
CN109153539B (en) Elevator traction machine installation method
CN108462117B (en) High-rise building cable laying device and application method thereof
CN112533855B (en) Method for extending lift of construction elevator and rope descending auxiliary tool for elevator
CN110498321B (en) Compensation wire harness storage device, skip floor elevator and using method of skip floor elevator
JP2022015245A (en) Lifting device for elevator hoist brake, method for installing lifting device, and method for replacing hoist brake
JP2007297209A (en) Elevator device
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
JP3281168B2 (en) Lifting equipment for elevator cars
JP6605411B2 (en) Lifting bracket and hoist
JP3053547B2 (en) How to install heavy objects in the PCV
CN106365058B (en) A kind of gantry crane for weight 100T or more motor assembly
JP6336225B2 (en) Elevator equipment
JP2011068458A (en) Rail suspending device of elevator
JP4118126B2 (en) Elevator equipment
JPH0812262A (en) Installing method for overhead traveller and its device
JP3444816B2 (en) How to replace the main elevator cable
JP2003040575A (en) Container crane
CN218619990U (en) Anti-tipping device of suspension crane
CN217650696U (en) Hoisting equipment
CN111392586B (en) A crashproof bearing structure for dock hoisting equipment
CN114671330B (en) Lifting equipment and engineering machinery car combination method
JP4368656B2 (en) Elevator main rope support device
CN217650695U (en) Gallows assembly and have its handling equipment
CN219823441U (en) Viaduct prefabricated baffle lifting device
KR20180120529A (en) Sliding jig for mounting an elastic platform of a submarine using a pushing beam

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210707

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210707

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220623

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221031

R150 Certificate of patent or registration of utility model

Ref document number: 7180643

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150