Prior art keywords
tunnel
scaffolding
fixed
joist
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019000913A
Other languages
Japanese (ja)
Other versions
JP2020111874A (en
Inventor
豊 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2019000913A priority Critical patent/JP7178908B2/en
Publication of JP2020111874A publication Critical patent/JP2020111874A/en
Application granted granted Critical
Publication of JP7178908B2 publication Critical patent/JP7178908B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、建設工事に用いられるトンネル内の仮設作業足場に関する。 The present invention relates to temporary work scaffolding in tunnels used in construction work.

シールド工法におけるトンネル工事のうち、特に道路トンネルでは、緊急時の避難や点検を目的として、併設する上下線トンネルの一部を切開き、互いを横坑で接続するUターン路や連絡道等が施工される。これらは一般に、地中内を非開削で行われるため、薬液注入工法やパイプルーフ等の補助工法を併用して、トンネル間の止水及び支保を確保する。この場合、補助工法の施工に必要な推進装置や薬液注入装置といった設備類を仮置きする足場が必要になるが、こうした横坑は、トンネル工事区間内に所定の間隔で複数設けられるため、横坑工事に補助工法施工のための諸設備を仮置きするための仮設足場を先行して架設すると、トンネル内を走行可能な大型の仮設台車(例えば、鉄筋台車、型枠台車、床版設置台車等)を必要とする側壁や床版の設置工事の障害になり得る。
そこで従来は、このような台車が全て通過した後に、仮設足場を設置して施工を行ってきた。
特許文献1,2には、トンネル工事における移動足場が開示されているが、これらはいずれもトンネル下部に施工されたインバートもしくは枕木に設置されたレール上を走行する形態であり、前記の仮設台車との干渉は免れない。
Among the tunnel constructions in the shield tunneling method, especially road tunnels, for the purpose of evacuation and inspection in an emergency, cut open a part of the parallel tunnels for up and down lines, and connect them with horizontal tunnels such as U-turn roads and connecting roads. be constructed. Since these are generally carried out without excavation in the ground, supplementary construction methods such as chemical injection methods and pipe roofs are used together to ensure water stoppage and support between tunnels. In this case, scaffolding is required to temporarily place equipment such as propulsion equipment and chemical injection equipment required for construction of the auxiliary construction method. If temporary scaffolding is installed in advance to temporarily place various equipment for auxiliary construction method construction in the tunnel, a large temporary trolley that can travel in the tunnel (e.g., reinforcing bar trolley, formwork trolley, floor slab installation trolley etc.) can be an obstacle to the installation work of side walls and floor slabs.
Therefore, conventionally, temporary scaffolding has been installed and construction has been carried out after all such trolleys have passed.
Patent Documents 1 and 2 disclose mobile scaffolds in tunnel construction, but these are all in the form of running on rails installed on inverts or sleepers constructed at the bottom of the tunnel, and the above-mentioned temporary trolley. cannot avoid interference with

特開2001-48012号公報Japanese Patent Application Laid-Open No. 2001-48012 特開2008-38364号公報JP 2008-38364 A

本発明は、補助工法の施工を確保することを可能としたトンネル内仮設足場を提供することを課題とする。 SUMMARY OF THE INVENTION An object of the present invention is to provide a temporary scaffolding in a tunnel that can ensure the construction of an auxiliary construction method.

前記課題を解決するための本発明のトンネル内仮設足場は、複数のセグメントピースからなるトンネル内面の断面方向の両側それぞれ該トンネルの軸方向に向かって間隔を開けて配置された複数のブラケットからなる2列のブラケット群と、前記各列のブラケット群の複数のブラケット上面を架渡すように前記トンネルの軸方向に向かって配置され、該複数のブラケットに固定された根太材と、対向する前記根太材の上面に架渡されるように前記トンネルの断面方向に配置され、該根太材に固定された梁と、前記トンネル上部に取り付けられた前記梁の中間部を支持する吊材と、前記梁の上に敷設された足場材と、を備えたトンネル内足場であって、前記ブラケットは、前記セグメントピース内に埋設されたインサートにボルトを介して前記覆工内面に固定され、前記梁は前記トンネルの略中央で上下に隙間を開けて重なるように配置された梁上段材および梁下段材と、該隙間に介設され、該梁上段材と該梁下段材とを連結した高さ調整材と、からなることを特徴とするThe tunnel temporary scaffolding of the present invention for solving the above-mentioned problems comprises a plurality of brackets arranged on both sides in the cross-sectional direction of the inner surface of the tunnel made up of a plurality of segment pieces and spaced apart in the axial direction of the tunnel. and a joist material fixed to the plurality of brackets arranged in the axial direction of the tunnel so as to bridge the upper surfaces of the brackets of each row of the bracket group, and the joists facing the A beam arranged in the cross-sectional direction of the tunnel so as to span the upper surface of the joist material and fixed to the joist material, a suspension member that supports an intermediate portion of the beam attached to the upper part of the tunnel, and the beam scaffolding material laid on top of the bracket, wherein the bracket is fixed to the inner surface of the lining via a bolt to an insert embedded in the segment piece, and the beam is the An upper beam step member and a lower beam step member are arranged so as to overlap each other with a vertical gap in substantially the center of the tunnel, and a height adjustment member is interposed in the gap and connects the upper beam step member and the lower beam step member. and

本発明のトンネル内仮設足場をトンネルの上部に設けたことにより、簡易な構成で、かつ比較的安価に、補助工法の施工を確保することを可能にする。 By providing the in-tunnel temporary scaffolding of the present invention in the upper part of the tunnel, it is possible to secure the construction of the auxiliary construction method with a simple structure and at a relatively low cost.

薬液注入機材を載置した本発明のトンネル内仮設足場を示すトンネル断面図である。1 is a cross-sectional view of a tunnel showing a temporary scaffolding in a tunnel according to the present invention on which equipment for injecting chemical solutions is placed; FIG. パイプルーフ設置機材を載置した本発明のトンネル内仮設足場を示すトンネル断面図である。1 is a cross-sectional view of a tunnel showing a temporary scaffolding in a tunnel of the present invention on which pipe roof installation equipment is placed; FIG.

以下に、本発明の実施形態について、図面を参照しながら説明する。
図1に薬液注入機材を載置した本発明のトンネル内仮設足場を示す。
本実施形態におけるトンネル内仮設足場3は、地盤G内に構築された円形トンネルTの外殻を形成する複数のセグメントピースからなる覆工1内面の幅方向に横架するように架渡された梁材33と、梁材33の上面に敷き詰められた足場材35とによって構成され、梁材33の両端は覆工1の内面に固定されたブラケット31,31から支持され、梁材33の略中央部を覆工1の内面から吊り下ろされた吊材34に固定されている。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 shows the temporary scaffolding in the tunnel of the present invention on which chemical injection equipment is placed.
The in-tunnel temporary scaffolding 3 in this embodiment is constructed across the width direction of the inner surface of the lining 1 consisting of a plurality of segment pieces forming the outer shell of the circular tunnel T built in the ground G. It is composed of a beam 33 and scaffolding 35 spread over the upper surface of the beam 33, and both ends of the beam 33 are supported by brackets 31, 31 fixed to the inner surface of the lining 1. The central part is fixed to a suspending member 34 suspended from the inner surface of the lining 1. - 特許庁

ブラケット31は、複数のL形鋼材(アングル材)を組み合わせ、溶接により一体に加工されており、覆工1の内面の曲率に沿って密着する支持材と、該支持材の頂部に水平に覆工1の内面側に張出すようにその一端を固定された水平材と、該水平材の他端と該支持材の下方に固定された杖材とによってトラス形状に形成されており、山留支保工の腹起しを載置する際に用いるブラケットと同様の形態である。ブラケット31は、覆工1を形成するセグメントピース内に埋設されたインサートにボルトを介して覆工1に螺着、固定されている。
ブラケット31,31・・・は、トンネルTの軸方向に対しても、間隔を開けて配置され、ブラケット31,31・・・の上面を架渡すようにH形鋼材である側部根太材32がトンネル軸方向に載置され、固定されている。
The bracket 31 is formed by combining a plurality of L-shaped steel materials (angle materials) and integrally processing them by welding. It is formed in a truss shape by a horizontal member fixed at one end so as to protrude on the inner surface side of the work 1 and a cane member fixed at the other end of the horizontal member and below the support member. It has the same shape as the bracket used when placing the wale of the shoring. The bracket 31 is screwed and fixed to the lining 1 via bolts in inserts embedded in segment pieces forming the lining 1 .
The brackets 31, 31, . are placed and fixed in the direction of the tunnel axis.

次に、H形鋼材からなる梁材33は、左右の側部根太材32,32上面に架渡されるように、直交方向(トンネルTの断面方向)に配置され、側部根太材32,32間に固定されている。本実施形態における梁材33は、トンネルTの略中央で、2本の梁上段材331、梁下段材332が上下方向に重なるように配置されている。梁上段材331と梁下段材332は、H形鋼材からなる高さ調整材333を介して一体に固定されている。 Next, the beam member 33 made of H-shaped steel is arranged in the orthogonal direction (cross-sectional direction of the tunnel T) so as to span the upper surfaces of the left and right side joist members 32, 32. fixed in between. The beam member 33 in this embodiment is arranged substantially in the center of the tunnel T so that two upper beam step members 331 and two lower beam step members 332 overlap vertically. The upper beam step member 331 and the lower beam step member 332 are integrally fixed via a height adjusting member 333 made of H-shaped steel.

次に、H形鋼材から構成される吊材34は、孤材341と上部根太材342と柱材344及び下部根太材343を具備する。孤材341は、覆工1の上部略中央にトンネルTの断面方向に覆工1の内面に沿って密着するように、不図示のセグメントに埋設されたインサートにボルトで固定されている。孤材341,341・・・は、トンネルTの軸方向に所定の間隔を開けて複数設置されており、上部根太材342がトンネルTの軸方向に、孤材341,341・・・の下面に密着するように固定されている。トンネルTの平面視で上部根太材342に重なるように、下部根太材343が梁上段材331の上面に固定されている。また、鉛直に配置された柱材344は、上部根太材342の下面及び下部根太材343の上面に固定されている。 Next, the hanging members 34 made of H-shaped steel materials are provided with an isolated member 341 , an upper joist member 342 , a column member 344 and a lower joist member 343 . The single member 341 is fixed by bolts to inserts embedded in segments (not shown) so as to be in close contact with the inner surface of the lining 1 in the cross-sectional direction of the tunnel T at substantially the center of the upper portion of the lining 1 . A plurality of pieces 341, 341 . . . are installed at predetermined intervals in the axial direction of the tunnel T. It is fixed so that it is in close contact with the A lower joist member 343 is fixed to the upper surface of the beam upper step member 331 so as to overlap the upper joist member 342 in plan view of the tunnel T. As shown in FIG. The vertically arranged column members 344 are fixed to the lower surface of the upper joist member 342 and the upper surface of the lower joist member 343 .

さらに、足場板35は、梁材33の上面に敷き詰められ足場が形成される。
足場板35は、既成品として一般に流通している鋼製の足場板を主として用いるが、端部等に生じる隙間については、必要に応じて鋼板等を加工して養生する。
Further, the scaffolding boards 35 are spread over the upper surface of the beams 33 to form a scaffolding.
As the scaffolding board 35, a steel scaffolding board that is generally distributed as an off-the-shelf product is mainly used.

このトンネル内仮設足場構造3は、例えば、図示されるように覆工1のインバート部に形成された軌条設備2上をトンネルTの軸方向に走行する側壁型枠台車F等の大型台車の往来に干渉しないように、側壁型枠台車Fよりも高い位置に配置することで、トンネル内仮設足場3上で行われる作業と、トンネル足場構造3の下方で行われる作業を安全かつ確実に分離することが可能になる。これにより、トンネルT内で複数の作業を並行して行うことが可能になり、工事全体の工程短縮を図れる。
同図のトンネル内仮設足場3上では、間隔を開けて併設された別なトンネルとの接続工事のための止水用の薬液注入に必要な施工設備等Mを配置しながら、覆工1の内部から外部に向かって複数の薬液注入管R,R・・・を打設、注入作業をすることができる。
This in-tunnel temporary scaffolding structure 3, for example, as shown in the figure, is designed for the traffic of large trucks such as side wall form trucks F that run in the axial direction of the tunnel T on the track equipment 2 formed on the invert portion of the lining 1. work on the temporary scaffolding 3 in the tunnel and work on the bottom of the tunnel scaffolding structure 3 are separated safely and reliably becomes possible. As a result, it becomes possible to carry out a plurality of operations in parallel within the tunnel T, thereby shortening the entire construction process.
On the temporary scaffolding 3 in the tunnel in the same figure, the lining 1 is installed while the construction equipment M necessary for injecting the chemical solution for water stoppage is arranged for the connection work with another tunnel that is placed side by side with an interval. A plurality of chemical solution injection pipes R, R, .

図2にパイプルーフ設置機材を載置した本発明のトンネル内仮設足場を示す。図1の薬液注入と同様に、トンネル内仮設足場3上に設置したパイプルーフを設置するための推進装置等の施工設備等Mを用いて、覆工1の内部から併設された別なトンネルに向かって複数のパイプルーフP,P・・・が打設することができる。
トンネル内仮設足場3の形態は、その下方を通過する側壁型枠台車F等の大型台車の障害にならない範囲で、高さ等を変更することで、トンネル内仮設足場3上で行われる各種作業に必要な内空を確保することが可能になる。
FIG. 2 shows the temporary scaffolding in the tunnel of the present invention on which the pipe roof installation equipment is placed. In the same way as the chemical solution injection in FIG. A plurality of pipe roofs P, P . . .
The form of the temporary scaffolding 3 in the tunnel can be changed to the extent that it does not become an obstacle to the large trucks such as the side wall formwork truck F that passes under it. It becomes possible to secure the inner space necessary for

以上より、本実施形態に係るトンネル内仮設足場は構成が簡易であるので安価であり、係る足場の下方で行われる施工を止めることなく足場上部の補助工法の施工を可能にする。 As described above, the in-tunnel temporary scaffolding according to the present embodiment has a simple structure, is inexpensive, and enables the construction of the upper part of the scaffolding by the auxiliary construction method without stopping the construction performed under the scaffolding.

以上、本発明の実施形態について説明したが、本発明は前記の実施形態に限られず、本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
例えば、セグメントはコンクリート系ではなく鋼製セグメントでも良い。この場合、縦リブ等の仮設部材への溶接やボルト固定がインサートに代替される。また、上下段に分割された梁材を適用したが、1本ものでも良い。さらにトンネル形状は円形に係わらず、矩形や馬蹄形でも良い。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and can be modified as appropriate without departing from the scope of the present invention.
For example, the segments may be steel segments rather than concrete-based. In this case, welding and bolting to temporary members such as vertical ribs are replaced by inserts. Moreover, although the beam material divided|segmented into the upper and lower stages was applied, a single piece may be sufficient. Furthermore, the shape of the tunnel may be rectangular or horseshoe-shaped instead of circular.

以上、本発明の実施形態について説明したが、本発明は前記の実施形態に限られず、本発明の趣旨を逸脱しない範囲で適宜変更が可能である。 Although the embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and can be modified as appropriate without departing from the scope of the present invention.

G 地盤
T トンネル
F 側壁型枠台車
R 薬液注入管
P パイプルーフ
M 施工設備等
1 覆工
2 軌条設備
3 トンネル内仮設足場
31 ブラケット
32 側部根太材
33 梁材
331 梁上段材
332 梁下段材
333 高さ調整材
34 吊材
341 孤材
342 上部根太材
343 下部根太材
344 柱材
35 足場板
G Ground T Tunnel F Side wall formwork truck R Chemical injection pipe P Pipe roof M Construction equipment, etc. 1 Lining 2 Rail equipment 3 Tunnel temporary scaffolding 31 Bracket 32 Side joist material 33 Beam material 331 Beam upper step material 332 Beam lower step material 333 Height adjustment member 34 Suspension member 341 Single member 342 Upper joist member 343 Lower joist member 344 Column member 35 Scaffold board

Claims (1)

複数のセグメントピースからなるトンネル内面の断面方向の両側それぞれ該トンネルの軸方向に向かって間隔を開けて配置された複数のブラケットからなる2列のブラケット群と、
前記各列のブラケット群の複数のブラケット上面を架渡すように前記トンネルの軸方向に向かって配置され、該複数のブラケットに固定された根太材と、
対向する前記根太材の上面に架渡されるように前記トンネルの断面方向に配置され、該根太材に固定された梁と、
前記トンネル上部に取り付けられた前記梁の中間部を支持する吊材と、
前記梁の上に敷設された足場材と、を備えたトンネル内足場であって、
前記ブラケットは、前記セグメントピース内に埋設されたインサートにボルトを介して前記覆工内面に固定され、
前記梁は前記トンネルの略中央で上下に隙間を開けて重なるように配置された梁上段材および梁下段材と、該隙間に介設され、該梁上段材と該梁下段材とを連結した高さ調整材と、からなることを特徴とするトンネル内足場。
two rows of bracket groups each comprising a plurality of brackets arranged at intervals in the axial direction of the tunnel on both sides in the cross-sectional direction of the inner surface of the tunnel composed of a plurality of segment pieces;
a joist member arranged in the axial direction of the tunnel so as to span the upper surfaces of the brackets of the bracket group in each row and fixed to the brackets;
a beam arranged in the cross-sectional direction of the tunnel so as to span the upper surfaces of the facing joist members and fixed to the joist members ;
a hanging member for supporting an intermediate portion of the beam attached to the upper part of the tunnel;
A scaffolding in a tunnel comprising scaffolding materials laid on the beams,
The bracket is fixed to the inner surface of the lining via a bolt to an insert embedded in the segment piece,
The beam is an upper beam step member and a lower beam step member which are arranged so as to overlap each other with a vertical gap in the approximate center of the tunnel, and are interposed in the gap to connect the upper beam step member and the lower beam step member. A scaffolding in a tunnel characterized by comprising a height adjusting member .
JP2019000913A 2019-01-08 2019-01-08 Temporary scaffolding in a tunnel Active JP7178908B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019000913A JP7178908B2 (en) 2019-01-08 2019-01-08 Temporary scaffolding in a tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019000913A JP7178908B2 (en) 2019-01-08 2019-01-08 Temporary scaffolding in a tunnel

Publications (2)

Publication Number Publication Date
JP2020111874A JP2020111874A (en) 2020-07-27
JP7178908B2 true JP7178908B2 (en) 2022-11-28

Family

ID=71665859

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019000913A Active JP7178908B2 (en) 2019-01-08 2019-01-08 Temporary scaffolding in a tunnel

Country Status (1)

Country Link
JP (1) JP7178908B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014077283A (en) 2012-10-10 2014-05-01 Nippon Civic Engineering Consultant Co Ltd Widened part construction method of tunnel and structure of tunnel widened part
JP2016142098A (en) 2015-02-04 2016-08-08 株式会社大林組 Removal method for ceiling board
JP2018044392A (en) 2016-09-15 2018-03-22 サンオー産業株式会社 Length adjustment tool

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50623B1 (en) * 1969-04-26 1975-01-10
US3970200A (en) * 1975-01-16 1976-07-20 George Hyman Construction Co. Gantry
JPS5196141A (en) * 1975-02-03 1976-08-23
US4051682A (en) * 1976-07-15 1977-10-04 Lockwood Jr James L Method for installing ceiling panels in a tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014077283A (en) 2012-10-10 2014-05-01 Nippon Civic Engineering Consultant Co Ltd Widened part construction method of tunnel and structure of tunnel widened part
JP2016142098A (en) 2015-02-04 2016-08-08 株式会社大林組 Removal method for ceiling board
JP2018044392A (en) 2016-09-15 2018-03-22 サンオー産業株式会社 Length adjustment tool

Also Published As

Publication number Publication date
JP2020111874A (en) 2020-07-27

Similar Documents

Publication Publication Date Title
JP7229368B2 (en) High-speed construction structure and method for secondary lining in excavated tunnels with various cross-sections
JP5319216B2 (en) Bridge girder erection device and bridge girder erection method
CN111236254A (en) Foundation pit supporting structure close to subway and partition construction method
JP2018104972A (en) Floor slab erection method and floor slab erection device
JP2020002563A (en) Deck slab construction method
KR101844977B1 (en) Scaffolding frame for tunnel
CN111305221A (en) Method for replacing inner support of foundation pit
JP7178908B2 (en) Temporary scaffolding in a tunnel
CN105971110A (en) Construction method for fire control corridor steel structure supporting system
JP6644657B2 (en) Temporary sleepers for shield tunnel construction
JP7185567B2 (en) Bridge pier repair method
KR101653890B1 (en) Tunnel elephant foot reinforcement beam construction method for tunnel stabilizing
JP4880374B2 (en) How to build a bridge
CN110030005A (en) The light-duty guarantor's circle support system of shield tunnel and its construction method
CN102454298B (en) Large-sized reinforced concrete construction of frame beam method
JP2019173435A (en) Floor system replacement method and floor system replacement device
JP2003027404A (en) Method for constructing under-track structure
JP6740846B2 (en) Floor slab replacement structure and floor slab replacement construction method
JP7003376B2 (en) Construction method of structure
KR200432268Y1 (en) Cover Plate integrated with the Frame
JP2020133214A (en) Floor slab replacement method and vehicle going-over board
JP3665909B2 (en) Bridge reconstruction method
CN216663835U (en) Beam section sliding track system
JP7201449B2 (en) Fixing jig for temporary internal shoring
US683426A (en) Fireproof construction.

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220726

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221115

R150 Certificate of patent or registration of utility model

Ref document number: 7178908

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150