JP7119664B2 - 発電予備力測定装置及び発電予備力測定方法 - Google Patents
発電予備力測定装置及び発電予備力測定方法 Download PDFInfo
- Publication number
- JP7119664B2 JP7119664B2 JP2018129222A JP2018129222A JP7119664B2 JP 7119664 B2 JP7119664 B2 JP 7119664B2 JP 2018129222 A JP2018129222 A JP 2018129222A JP 2018129222 A JP2018129222 A JP 2018129222A JP 7119664 B2 JP7119664 B2 JP 7119664B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- reserve
- voltage
- solar panel
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Control Of Electrical Variables (AREA)
Description
11,11-1,11-2,11-3,11-n 太陽光発電部
12 電力系統
13 ネットワーク
14 外部サーバ
15 太陽光パネル
16 電力制御部
161 出力電圧測定部
162 出力電圧制御部
163 発電予備力算出部
164 発電予備力制御部
Claims (10)
- 光エネルギーにより発電する少なくとも1つの太陽光パネルを備えた太陽光発電部と、
電力系統に接続され、前記太陽光発電部の発電電力を制御する電力制御部とを具備し、
前記電力制御部は、前記太陽光パネルの出力電圧を変化させる出力電圧制御部と、
前記太陽光パネルの出力電圧に基づいて、前記太陽光発電部の発電予備力を算出する発電予備力算出部とを備え、
前記発電予備力算出部は、予め取得した前記太陽光パネルの第1電流電圧特性に基づいた第1最大電力と、前記出力電圧制御部により当該太陽光パネルの出力電圧を変化させて推定した前記太陽光パネルの第2電流電圧特性に基づいた第2最大電力とを対比して、前記太陽光パネルの発電予備力を算出し、
前記発電予備力算出部は、前記太陽光パネルに電流が流れ始める電圧と、他の電流電圧特性の曲線の形状と、に基づいて、前記第2電流電圧特性を推定することを特徴とする、発電予備力測定装置。 - 光エネルギーにより発電する少なくとも1つの太陽光パネルを備えた太陽光発電部と、
電力系統に接続され、前記太陽光発電部の発電電力を制御する電力制御部とを具備し、
前記電力制御部は、前記太陽光パネルの出力電圧を変化させる出力電圧制御部と、
前記太陽光パネルの出力電圧に基づいて、前記太陽光発電部の発電予備力を算出する発電予備力算出部とを備え、
前記発電予備力算出部は、予め取得した前記太陽光パネルの第1電流電圧特性に基づいた第1最大電力と、前記出力電圧制御部により当該太陽光パネルの出力電圧を変化させて推定した前記太陽光パネルの第2電流電圧特性に基づいた第2最大電力とを対比して、前記太陽光パネルの発電予備力を算出し、
前記出力電圧制御部は、前記太陽光パネルの出力電圧を開放電圧以上に変化させてから、前記太陽光パネルに電流が流れる測定電圧まで減少させ、
前記発電予備力算出部は、前記開放電圧に基づいて前記第1電流電圧特性を取得し、前記測定電圧に基づいて前記第2電流電圧特性を推定する、発電予備力測定装置。 - 前記発電予備力算出部は、前記出力電圧制御部により前記太陽光パネルの出力電圧を前記開放電圧以上に変化させる過程で、前記太陽光パネルの少なくとも1つの電流電圧特性を記憶し、記憶した当該太陽光パネルの少なくとも1つの電流電圧特性に基づいて前記第2電流電圧特性を推定する請求項2に記載の発電予備力測定装置。
- 前記太陽光発電部は、複数の前記太陽光パネルを備え、前記発電予備力算出部は、算出した少なくとも1つの前記太陽光パネルの前記発電予備力に基づいて、前記太陽光発電部の発電予備力を算出する、請求項1から請求項3のいずれか1項に記載の発電予備力測定装置。
- 前記太陽光発電部を複数備え、前記発電予備力算出部は、算出した少なくとも1つの前記太陽光パネルの前記発電予備力に基づいて、複数の前記太陽光発電部の発電予備力を算出する、請求項1から請求項4のいずれか1項に記載の発電予備力測定装置。
- 予め取得した太陽光パネルの第1電流電圧特性に基づいた第1最大電力と、前記太陽光パネルの電圧を変化させることによって推定した当該太陽光パネルの第2電流電圧特性に基づいた第2最大電力とを対比して、前記太陽光パネルの発電予備力を算出する発電予備力算出工程を含み、
前記発電予備力算出工程において、前記太陽光パネルに電流が流れ始める電圧と、他の電流電圧特性の曲線の形状と、に基づいて、前記第2電流電圧特性を推定する、発電予備力測定方法。 - 予め取得した太陽光パネルの第1電流電圧特性に基づいた第1最大電力と、前記太陽光パネルの電圧を変化させることによって推定した当該太陽光パネルの第2電流電圧特性に基づいた第2最大電力とを対比して、前記太陽光パネルの発電予備力を算出する発電予備力算出工程を含み、
前記発電予備力算出工程において、前記太陽光パネルの電圧値を開放電圧以上に変化させてから、前記太陽光パネルに電流が流れる測定電圧まで減少させ、
前記開放電圧に基づいて前記第1電流電圧特性を取得し、前記測定電圧に基づいて前記第2電流電圧特性を推定する、発電予備力測定方法。 - 前記太陽光パネルの電圧値を前記開放電圧以上に変化させる過程で、前記太陽光パネルの少なくとも1つの電流電圧特性を記憶し、記憶した当該太陽光パネルの少なくとも1つの電流電圧特性に基づいて前記第2電流電圧特性を推定する請求項7に記載の発電予備力測定方法。
- 前記太陽光パネルを複数有する太陽光発電部を備え、算出した少なくとも1つの前記太陽光パネルの前記発電予備力に基づいて、前記太陽光発電部の発電予備力を算出する、請求項6から請求項8のいずれか1項に記載の発電予備力測定方法。
- 少なくとも1つの前記太陽光パネルを有する太陽光発電部を複数備え、算出した少なくとも1つの前記太陽光パネルの前記発電予備力に基づいて、複数の前記太陽光発電部の発電予備力を算出する、請求項6から請求項9のいずれか1項に記載の発電予備力測定方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018129222A JP7119664B2 (ja) | 2018-07-06 | 2018-07-06 | 発電予備力測定装置及び発電予備力測定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018129222A JP7119664B2 (ja) | 2018-07-06 | 2018-07-06 | 発電予備力測定装置及び発電予備力測定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020009116A JP2020009116A (ja) | 2020-01-16 |
JP7119664B2 true JP7119664B2 (ja) | 2022-08-17 |
Family
ID=69151694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018129222A Active JP7119664B2 (ja) | 2018-07-06 | 2018-07-06 | 発電予備力測定装置及び発電予備力測定方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7119664B2 (ja) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013105318A (ja) | 2011-11-14 | 2013-05-30 | Panasonic Corp | 太陽光発電用パワーコンディショナ |
JP2017059122A (ja) | 2015-09-18 | 2017-03-23 | 田淵電機株式会社 | 太陽光発電システム、電源装置及び太陽光発電手段の診断方法 |
JP2017063550A (ja) | 2015-09-25 | 2017-03-30 | 東芝ライテック株式会社 | 情報出力システム |
-
2018
- 2018-07-06 JP JP2018129222A patent/JP7119664B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013105318A (ja) | 2011-11-14 | 2013-05-30 | Panasonic Corp | 太陽光発電用パワーコンディショナ |
JP2017059122A (ja) | 2015-09-18 | 2017-03-23 | 田淵電機株式会社 | 太陽光発電システム、電源装置及び太陽光発電手段の診断方法 |
JP2017063550A (ja) | 2015-09-25 | 2017-03-30 | 東芝ライテック株式会社 | 情報出力システム |
Also Published As
Publication number | Publication date |
---|---|
JP2020009116A (ja) | 2020-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019128037A1 (zh) | 光伏发电厂及其二次调频控制方法 | |
EP2328259B1 (en) | System and method for power management in a photovoltaic installation | |
JP4306760B2 (ja) | 分散型電源 | |
JP6450142B2 (ja) | 電力系統制御システム、電力系統制御方法、および電力変換装置 | |
WO2016074649A1 (zh) | 最大电力点追踪装置及太阳能电池模块的评估方法 | |
JP2016521538A (ja) | 電気供給ネットへの電力給電方法 | |
US20130030587A1 (en) | System and method for power curtailment in a power network | |
WO2011118766A1 (ja) | 電力供給システム、集中管理装置、系統安定化システム、集中管理装置の制御方法および集中管理装置の制御プログラム | |
JP5475632B2 (ja) | 熱電併給システム、熱電併給制御装置、熱電併給制御方法、及びプログラム | |
KR102264862B1 (ko) | 에너지 저장장치의 관성제어를 위한 장치 및 방법 | |
JP2017099148A (ja) | 電力管理システムおよび電力管理方法 | |
JP4749375B2 (ja) | マイクログリッドにおける電力の需給調整を行う制御装置 | |
JP6618659B1 (ja) | 電力変換システム及びその管理装置、並びに、分散電源装置 | |
Shvedov et al. | Impact of solar generation connected to 0.4 kV grid on the power losses and the shape factor of load curve | |
CN107134807B (zh) | 光伏发电系统的控制方法和装置、计算机设备和存储介质 | |
CN107785932B (zh) | 一种基于相变储热的能量实时平衡控制系统及其控制方法 | |
Mizuno et al. | Optimum facility design in large hospital using renewable energy | |
US9817424B2 (en) | Method and apparatus for maximum power point tracking for multi-input power converter | |
WO2020218191A1 (ja) | 電力制御装置、電力制御装置の制御方法、分散型発電システム | |
JP6584657B2 (ja) | 電流電圧制御装置 | |
JP7119664B2 (ja) | 発電予備力測定装置及び発電予備力測定方法 | |
US20170310114A1 (en) | Renewable energy load management and power balancing system and operation | |
JP7185178B2 (ja) | 発電予備力測定装置及び発電予備力測定方法 | |
KR20200136658A (ko) | 가상 저항 방식의 pcs 드룹 제어 장치 및 이를 이용한 에너지 저장 시스템 | |
JP6422682B2 (ja) | 電力制御装置および電力制御方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210611 |
|
RD07 | Notification of extinguishment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7427 Effective date: 20220204 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20220413 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20220420 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220524 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20220705 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220718 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7119664 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |