JP6974968B2 - Structure construction method - Google Patents

Structure construction method Download PDF

Info

Publication number
JP6974968B2
JP6974968B2 JP2017129115A JP2017129115A JP6974968B2 JP 6974968 B2 JP6974968 B2 JP 6974968B2 JP 2017129115 A JP2017129115 A JP 2017129115A JP 2017129115 A JP2017129115 A JP 2017129115A JP 6974968 B2 JP6974968 B2 JP 6974968B2
Authority
JP
Japan
Prior art keywords
fixed
floor
lower floor
upper floor
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017129115A
Other languages
Japanese (ja)
Other versions
JP2019011618A (en
Inventor
孝博 島袋
岳夫 金子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2017129115A priority Critical patent/JP6974968B2/en
Publication of JP2019011618A publication Critical patent/JP2019011618A/en
Application granted granted Critical
Publication of JP6974968B2 publication Critical patent/JP6974968B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、構造物構築方法に係り、特に、複数の階を有する構造物の各階において被固定体を固定部に固定して各階の被固定体が上下方向に並ぶように構造物を構築する構造物構築方法に関する。 The present invention relates to a structure construction method, and in particular, a fixed body is fixed to a fixed portion on each floor of a structure having a plurality of floors, and the structure is constructed so that the fixed bodies on each floor are lined up in the vertical direction. Regarding the structure construction method.

複数の階を有する構造物を構築する際に、各階において被固定体を固定部に固定し、各階の被固定体を上下方向に並べて配置することは、既に知られている。例えば、複数階建ての建物を建設する際に、外壁を構成する外壁パネルを階毎に水平方向に沿って複数並べて配置する。各階において列状に並ぶ複数の外壁パネルは、建物の躯体(より具体的には梁や柱)にセットされた取り付け金物に取り付けられることで、建物の躯体に固定される。ここで、取り付け金物は、外壁パネルと同様、各階において水平方向に沿って複数並べられる。 It is already known that when constructing a structure having a plurality of floors, the fixed body is fixed to the fixed portion on each floor, and the fixed bodies on each floor are arranged side by side in the vertical direction. For example, when constructing a multi-story building, a plurality of outer wall panels constituting the outer wall are arranged side by side in the horizontal direction for each floor. A plurality of outer wall panels arranged in a row on each floor are fixed to the building frame by being attached to mounting hardware set on the building frame (more specifically, beams and columns). Here, a plurality of mounting hardware are arranged along the horizontal direction on each floor, as in the case of the outer wall panel.

取り付け金物は、外壁パネルが固定される面(固定面)が取り付け金物間で揃うように位置決めされる。具体的には、特許文献1に記載された水糸張り装置などを利用して、複数の取り付け金物の各々の固定面が面一となるように各取り付け金物の位置が調整される。この結果、各階において水平方向に沿って並べられた複数の外壁パネルは、面一状に並んだ各取り付け金物の固定面に固定されることで適切に配置されるようになる。 The mounting hardware is positioned so that the surface (fixing surface) on which the outer wall panel is fixed is aligned between the mounting hardware. Specifically, the position of each mounting hardware is adjusted so that the fixing surfaces of the plurality of mounting hardware are flush with each other by using the water thread tensioning device described in Patent Document 1. As a result, the plurality of outer wall panels arranged in the horizontal direction on each floor can be appropriately arranged by being fixed to the fixed surface of each mounting hardware arranged in a plane.

特開2010−24741号公報Japanese Unexamined Patent Publication No. 2010-24741

しかしながら、特許文献1に記載の水糸張り装置を含め、従来の位置調整方法では、同じ階の取り付け金物の固定面については面一に揃えられるものの、互いに異なる階にある取り付け金物の固定面同士については、揃えることが困難であった。そのため、従来は、上階に配置される外壁パネルと下階に配置される外壁パネルとの間に段差が生じ、この段差の形成によって建物(具体的には外壁)の施工品質を損ねてしまう虞があった。 However, in the conventional position adjusting method including the water thread tensioning device described in Patent Document 1, although the fixing surfaces of the mounting hardware on the same floor are aligned flush with each other, the fixing surfaces of the mounting hardware on different floors are aligned with each other. It was difficult to arrange the items. Therefore, conventionally, a step is generated between the outer wall panel arranged on the upper floor and the outer wall panel arranged on the lower floor, and the formation of this step impairs the construction quality of the building (specifically, the outer wall). There was a risk.

そこで、本発明は、上記の課題に鑑みてなされたものであり、その目的とするところは、複数の階を有する構造物を構築する際に上階の被固定体と下階の被固定体とが良好に並ぶように各階にて被固定体を適切に固定することが可能な構造物構築方法を提供することである。 Therefore, the present invention has been made in view of the above problems, and an object thereof is an upper-floor fixed body and a lower-floor fixed body when constructing a structure having a plurality of floors. It is to provide a structure construction method which can appropriately fix a fixed body on each floor so that

前記課題は、本発明の構造物構築方法によれば、複数の階を有する構造物の各階において被固定体を該被固定体の厚み方向が所定方向に沿った状態で固定部に固定して、各階の前記被固定体が上下方向に並ぶように前記構造物を構築する構造物構築方法であって、上階の前記固定部及び下階の前記固定部を上下方向に並べて配置する工程と、前記所定方向において上階の前記固定部及び下階の前記固定部の各々を位置決めする工程と、位置決めされた上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程と、を有し、上下方向及び前記所定方向の両方向と交差する交差方向に複数の前記被固定体を並べて配置する工程を更に有し、上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程では、前記交差方向に並んだ複数の前記被固定体を固定し、前記交差方向に複数の前記被固定体を並べて配置する工程は、上階及び下階の各々において実施され、上階において複数の前記被固定体を前記交差方向に並べて配置する際には、上階の前記被固定体と下階の前記被固定体とが上下方向に並ぶように上階の前記被固定体を配置し、下階において複数の前記被固定体を前記交差方向に並べて配置する際には、前記交差方向において前記被固定体同士の間に下階隙間が形成されるように複数の前記被固定体を配置し、上階において複数の前記被固定体を前記交差方向に並べて配置するにあたり、前記交差方向における長さが調整可能な調整部を、該調整部の下側部分が前記下階隙間内に収容され、且つ、前記調整部の上側部分が前記下階隙間よりも上方に突出するように配置することと、前記交差方向における前記調整部の長さを、前記交差方向における前記下階隙間の長さと等しくなるように調整することと、を行い、上階において複数の前記被固定体を前記交差方向に並べて配置する際には、前記交差方向において前記調整部の上側部分と隣接する位置に前記被固定体を配置することで、前記交差方向において前記被固定体同士の間に、上下方向において前記下階隙間と連続する上階隙間が形成されるように複数の前記被固定体を配置することにより解決される。 The problem is that according to the structure construction method of the present invention, the fixed body is fixed to the fixed portion in a state where the thickness direction of the fixed body is along a predetermined direction on each floor of the structure having a plurality of floors. A structure construction method for constructing the structure so that the fixed objects on each floor are arranged in the vertical direction, wherein the fixed portion on the upper floor and the fixed portion on the lower floor are arranged side by side in the vertical direction. In the step of positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor in the predetermined direction, and the fixed body on each of the fixed portion on the upper floor and the fixed portion on the lower floor. It also has a step of fixing, and further has a step of arranging a plurality of the fixed objects side by side in an intersecting direction intersecting both the vertical direction and the predetermined direction, and the fixing portion on the upper floor and the said on the lower floor. In the step of fixing the fixed body to each of the fixing portions, the step of fixing the plurality of the fixed bodies arranged in the crossing direction and arranging the plurality of the fixed bodies side by side in the crossing direction is the upper floor. When a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the fixed body on the upper floor and the fixed body on the lower floor are arranged in the vertical direction. When the fixed objects on the upper floor are arranged side by side and a plurality of the fixed objects are arranged side by side in the crossing direction on the lower floor, a lower floor gap is provided between the fixed objects in the crossing direction. When arranging the plurality of fixed objects so as to form the above-mentioned fixed bodies and arranging the plurality of the fixed objects side by side in the crossing direction on the upper floor, an adjusting portion whose length in the crossing direction can be adjusted is provided. The lower portion of the adjusting portion is housed in the lower floor gap, and the upper portion of the adjusting portion is arranged so as to project above the lower floor gap, and the adjusting portion in the crossing direction. When the length is adjusted to be equal to the length of the lower floor gap in the crossing direction and a plurality of the fixed objects are arranged side by side in the crossing direction on the upper floor, the crossing is performed. By arranging the fixed body at a position adjacent to the upper portion of the adjusting portion in the direction, an upper floor gap continuous with the lower floor gap in the vertical direction is formed between the fixed bodies in the crossing direction. a plurality of the so formed is resolved by Rukoto to place the fixation member.

上記のように構成された本発明の構造物構築方法では、構造物の各階にて被固定体を固定部に固定するに際し、上階の固定部及び下階の固定部の各々を所定方向(被固定部の厚み方向が沿う方向)において位置決めする。このとき、上下方向に延出した当接面を有する治具の当該当接面を、上階の固定部及び下階の固定部の双方に当接される。これにより、上階の固定部及び下階の固定部の各々の位置が上記の所定方向において揃うようになる。その上で各階において被固定体を固定部に固定すると、上階の被固定体と下階の被固定体とが良好に並ぶようになる。
以上のように、本発明の構造物構築方法によれば、各階にて固定部を位置決めすることにより、各階の被固定体を適切な位置に固定することが可能となる。
また上記の方法によれば、下階において被固定体同士の間に隙間(下階隙間)が設けられるように複数の被固定体を配置した後、下階隙間内に調整部を収容し、調整部の横幅を下階隙間の横幅に揃える。その後、下階隙間の上方から突出した調整部の上側部分と隣接する位置に上階の被固定体を配置する。これにより、上階の被固定体同士の間に隙間(上階隙間)が設けられるようになり、当該上階隙間は、その横幅が下階隙間の横幅と揃った状態で下階隙間と連続するようになる。
以上のように、上記の方法であれば、下階及び上階において、上階隙間と下階隙間とが良好に連続するように複数の被固定体を並べて配置すること可能となる。
In the structure construction method of the present invention configured as described above, when the fixed body is fixed to the fixed portion on each floor of the structure, each of the fixed portion on the upper floor and the fixed portion on the lower floor is set in a predetermined direction ( Positioning is performed in the direction along the thickness direction of the fixed portion). At this time, the contact surface of the jig having the contact surface extending in the vertical direction is brought into contact with both the fixed portion on the upper floor and the fixed portion on the lower floor. As a result, the positions of the fixed portion on the upper floor and the fixed portion on the lower floor are aligned in the above-mentioned predetermined directions. Then, when the fixed body is fixed to the fixed portion on each floor, the fixed body on the upper floor and the fixed body on the lower floor are well aligned.
As described above, according to the structure construction method of the present invention, by positioning the fixed portion on each floor, the fixed body on each floor can be fixed at an appropriate position.
Further, according to the above method, after arranging a plurality of fixed objects so that a gap (lower floor gap) is provided between the fixed objects on the lower floor, the adjusting portion is housed in the lower floor gap. Align the width of the adjustment part with the width of the lower floor gap. After that, the fixed body on the upper floor is arranged at a position adjacent to the upper portion of the adjusting portion protruding from above the gap on the lower floor. As a result, a gap (upper floor gap) is provided between the objects to be fixed on the upper floor, and the upper floor gap is continuous with the lower floor gap with the width aligned with the width of the lower floor gap. Will come to do.
As described above, according to the above method, it is possible to arrange a plurality of fixed objects side by side on the lower floor and the upper floor so that the upper floor gap and the lower floor gap are well continuous.

また、上記の構造物構築方法に関して、上階の前記固定部及び下階の前記固定部の各々を位置決めする工程では、上下方向に延出した当接面を有する治具の前記当接面の法線方向が前記所定方向に沿った状態で、前記当接面を上階の前記固定部及び下階の前記固定部の双方に同時に当接させることとし、上階の前記固定部及び下階の前記固定部の各々を位置決めする工程の後であって、上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程の前に、前記治具を取り外す工程を更に有していると、好適である。
また、上記の構造物構築方法に関して、上階の前記固定部及び下階の前記固定部を配置する工程では、前記構造物の角部分に設けられる上階の前記固定部及び下階の前記固定部を配置し、上階の前記固定部及び下階の前記固定部の各々を位置決めする工程では、前記治具の前記当接面を前記角部分に設けられる上階の前記固定部及び下階の前記固定部の双方に同時に当接させると、好適である。
上記の方法によれば、構造物の角部分に設けられる上階の固定部及び下階の固定部の各々に対して位置決めを行う。これにより、角部分における各階の固定部の位置が、上記の所定方向において揃えられるようになる。そして、各階において、角部分に設けられた固定部の位置を基準にして、他の部分に設けられた固定部の位置を調整する。この結果、上階にあるすべての固定部の位置と、下階にあるすべての固定部の位置と、を上記の所定方向において揃えることが可能となる。
Further, regarding the above-mentioned structure construction method, in the step of positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor, the contact surface of the jig having the contact surface extending in the vertical direction is used. With the normal direction along the predetermined direction, the contact surface is brought into contact with both the fixed portion on the upper floor and the fixed portion on the lower floor at the same time, and the fixed portion and the lower floor on the upper floor are brought into contact with each other at the same time. After the step of positioning each of the fixing portions of the above, and before the step of fixing the fixed body to each of the fixing portion on the upper floor and the fixing portion on the lower floor, the step of removing the jig. It is preferable to have more.
Further, regarding the above-mentioned structure construction method, in the step of arranging the fixed portion on the upper floor and the fixed portion on the lower floor, the fixed portion on the upper floor and the fixing portion on the lower floor provided at the corner portion of the structure. In the step of arranging the portions and positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor, the fixed portion and the lower floor on the upper floor are provided with the contact surface of the jig at the corner portion. It is preferable to bring them into contact with both of the fixing portions at the same time.
According to the above method, positioning is performed for each of the fixed portion on the upper floor and the fixed portion on the lower floor provided at the corner portion of the structure. As a result, the positions of the fixed portions on each floor at the corner portions are aligned in the predetermined directions described above. Then, on each floor, the position of the fixed portion provided in the other portion is adjusted with reference to the position of the fixed portion provided in the corner portion. As a result, the positions of all the fixed portions on the upper floor and the positions of all the fixed portions on the lower floor can be aligned in the above-mentioned predetermined directions.

また、上記の構造物構築方法に関して、記交差方向において複数の前記被固定体を並べて配置する工程では、前記所定方向において複数の前記被固定体の各々の端位置が揃うように複数の前記被固定体を配置すると、より好適である。
上記の方法によれば、各階にて列状に並ぶ複数の被固定体の各々の端位置が上記の所定方向において揃うように各被固定体を位置決めする。これにより、各階において複数の被固定体の各々の端位置が揃った状態で、各被固定体を固定部に固定することが可能となる。
With regard to the above structure construction method, before Symbol plurality of said in cross direction in the process of laying out the fixed body, a plurality of the so that the end position of each of the plurality of the fixed element in the predetermined direction is aligned It is more preferable to arrange the object to be fixed.
According to the above method, each fixed body is positioned so that the end positions of the plurality of fixed bodies arranged in a row on each floor are aligned in the above-mentioned predetermined direction. This makes it possible to fix each fixed body to the fixed portion in a state where the end positions of the plurality of fixed bodies are aligned on each floor.

また、上記の構造物構築方法に関して、階において複数の前記被固定体を前記交差方向に並べて配置する際には、上階の前記被固定体と下階の前記被固定体とが上下方向に並び、且つ前記所定方向において上階の前記被固定体の端位置と下階の前記被固定体の端位置が揃うように上階の前記被固定体を配置すると、さらに好適である。
上記の方法によれば、上階において複数の被固定体を並べて配置する際に上階の被固定体と下階の被固定体とが上下に並び、且つ上記の所定方向において上階の被固定体の端位置と下階の被固定体の端位置とが揃うように上階の被固定体を配置する。これにより、上階にて並んだ複数の被固定体、及び、下階にて並んだ複数の被固定体が面一な表面を構成するようになり、この結果、構造物が良好な美観を呈するようになる。
Further, regarding the above -mentioned structure construction method, when a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the fixed body on the upper floor and the fixed body on the lower floor are arranged in the vertical direction. It is more preferable to arrange the fixed body on the upper floor so that the end positions of the fixed body on the upper floor and the end positions of the fixed body on the lower floor are aligned in the predetermined direction.
According to the above method, when a plurality of fixed bodies are arranged side by side on the upper floor, the fixed body on the upper floor and the fixed body on the lower floor are arranged vertically, and the fixed body on the upper floor is covered in the above-mentioned predetermined direction. The fixed body on the upper floor is arranged so that the end position of the fixed body and the end position of the fixed body on the lower floor are aligned. As a result, the plurality of fixed objects arranged on the upper floor and the plurality of fixed objects arranged on the lower floor form a flush surface, and as a result, the structure has a good aesthetic appearance. Will be presented.

また、上記の構造物構築方法に関して、前記交差方向において複数の前記被固定体を並べて配置する工程は、前記交差方向に延出する組み付け部を、前記交差方向に並んだ複数の前記被固定体のうち、前記交差方向において互いに隣り合う第一被固定体及び第二被固定体の間に跨る位置に配置する工程と、前記所定方向において平板状の第一当接部を前記組み付け部の端及び前記第一被固定体の端に当接させる工程と、前記第一当接部が前記組み付け部の端及び前記第一被固定体の端に当接している間に、前記所定方向において平板状の第二当接部を前記組み付け部の端及び前記第二被固定体の端に当接させる工程と、前記交差方向において複数の前記被固定体の位置決めが完了した後、前記組み付け部を取り外す工程と、を有すると、より一層好適である。
上記の方法によれば、互いに隣り合う第一被固定体及び第二被固定体の間に跨る位置に組み付け部を配置し、上記の所定方向において組み付け部の端及び第一被固定体の端の双方に第一当接部を当接させる。その後、上記の所定方向において組み付け部の端及び第二被固定体の端の双方に第二当接部を当接させる。これにより、第一被固定体の端位置と第二被固定体の端位置とが揃うようになる。このような構成であれば、複数の被固定体の各々の端位置を比較的簡単な構成によって揃えることが可能となる。
Further, regarding the above-mentioned structure construction method, in the step of arranging a plurality of the fixed objects side by side in the crossing direction, the assembly portions extending in the crossing direction are arranged in the crossing direction. Among the steps, the step of arranging the first fixed body and the second fixed body adjacent to each other at a position straddling each other in the crossing direction, and the flat plate-shaped first contact portion in the predetermined direction are the ends of the assembled portion. And a flat plate in the predetermined direction while the step of contacting the end of the first fixed body and the first contact portion abuts on the end of the assembled portion and the end of the first fixed body. After the step of bringing the second contact portion into contact with the end of the assembled portion and the end of the second fixed body and the positioning of the plurality of fixed bodies in the crossing direction are completed, the assembled portion is attached. It is even more preferable to have a step of removing.
According to the above method, the assembly portion is arranged at a position straddling between the first fixed body and the second fixed body adjacent to each other, and the end of the assembly portion and the end of the first fixed body in the above-mentioned predetermined direction. The first contact portion is brought into contact with both of the above. After that, the second contact portion is brought into contact with both the end of the assembled portion and the end of the second fixed body in the above-mentioned predetermined direction. As a result, the end position of the first fixed body and the end position of the second fixed body are aligned. With such a configuration, it is possible to align the end positions of each of the plurality of objects to be fixed by a relatively simple configuration.

また、上記の構造物構築方法に関して、下階において前記交差方向に複数の前記被固定体を並べて配置した後に、上階において前記交差方向に複数の前記被固定体を並べて配置し、上階において前記交差方向に複数の前記被固定体を並べて配置する際には、前記所定方向において下階の前記第一被固定体の端、及び、下階の前記第一被固定体の直上位置に配置される上階の前記第一被固定体の端に前記第一当接部を当接させると共に、前記所定方向において下階の前記第二被固定体の端、及び、下階の前記第二被固定体の直上位置に配置される上階の前記第二被固定体の端に前記第二当接部を当接させると、尚一層好適である。
上記の方法によれば、上階の被固定体及び下階の被固定体の各々の端位置を揃える際、下階にて並べられた複数の被固定体の各々の端位置を揃えるために用いた第一当接部及び第二当接部を用いる。具体的には、下階の第一被固定体の端とその直上位置にある上階の第一被固定体の端に第一当接部を当接させると共に、下階の第二被固定体の端とその直上位置にある上階の第二被固定体の端に第二当接部を当接させる。このような構成であれば、各階において複数並んでいる被固定体の各々の端位置を揃えるための器具を、上下に並ぶ被固定体の各々の端位置を揃える際に兼用することが可能となる。
Further, regarding the above-mentioned structure construction method, after a plurality of the fixed bodies are arranged side by side in the crossing direction on the lower floor, a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor and arranged on the upper floor. When a plurality of the fixed bodies are arranged side by side in the crossing direction, they are arranged at the end of the first fixed body on the lower floor and directly above the first fixed body on the lower floor in the predetermined direction. The first contact portion is brought into contact with the end of the first fixed body on the upper floor, and the end of the second fixed body on the lower floor and the second on the lower floor in the predetermined direction. It is even more preferable to bring the second contact portion into contact with the end of the second fixed body on the upper floor arranged at a position directly above the fixed body.
According to the above method, when aligning the end positions of the fixed body on the upper floor and the fixed body on the lower floor, in order to align the end positions of the plurality of fixed bodies arranged on the lower floor. The first contact portion and the second contact portion used are used. Specifically, the first contact portion is brought into contact with the end of the first fixed body on the lower floor and the end of the first fixed body on the upper floor located directly above it, and the second fixed body on the lower floor is fixed. The second contact portion is brought into contact with the end of the body and the end of the second fixed body on the upper floor located directly above the end of the body. With such a configuration, it is possible to use an instrument for aligning the end positions of a plurality of fixed objects arranged on each floor when aligning the end positions of the fixed objects arranged vertically. Become.

また、上記の構造物構築方法に関して、前記調整部を配置する際には、前記交差方向に並んだ一対の板片を備える前記調整部を、前記一対の板片の各々の下側部分が前記下階隙間内に収容され、且つ、前記一対の板片の各々の上側部分が前記下階隙間よりも上方に突出するように配置し、前記調整部の長さを調整する際には、前記一対の板片の間の間隔を調整するために前記一対の板片に取り付けられた操作部を、前記間隔が前記交差方向における前記下階隙間の長さと等しくなるまで操作すると、一段と好適である。
上記の方法によれば、調整部の構成が比較的簡易なものとなり、調整部の配置や調整部の横幅の調整をより容易に行うことが可能となる。
Further, regarding the above-mentioned structure construction method, when the adjusting portion is arranged, the adjusting portion having the pair of plate pieces arranged in the crossing direction is provided, and the lower portion of each of the pair of plate pieces is the said. When the upper portion of each of the pair of plate pieces is arranged so as to be housed in the lower floor gap and protrudes upward from the lower floor gap, and the length of the adjusting portion is adjusted, the said It is more preferable to operate the operation unit attached to the pair of plate pieces to adjust the distance between the pair of plate pieces until the distance becomes equal to the length of the lower floor gap in the crossing direction. ..
According to the above method, the configuration of the adjusting unit becomes relatively simple, and it becomes possible to more easily arrange the adjusting unit and adjust the width of the adjusting unit.

さらに、上記の構造物構築方法に関して、複数の階を有する建物の各階において前記被固定体としての外壁パネルを、前記建物の躯体に取り付けられた前記固定部としての取り付け金物に固定して、各階の前記外壁パネルが上下方向に並ぶように前記建物を構築してもよい。
上記の方法であれば、建物の各階において、被固定体としての外壁パネルを取り付け金物(固定部)に固定する場合において、上階の外壁パネルと下階の外壁パネルとが上下方向に良好に並ぶように各階の外壁パネルを固定することが可能となる。
Further, regarding the above-mentioned structure construction method, the outer wall panel as the fixed body is fixed to the mounting hardware as the fixing portion attached to the skeleton of the building on each floor of the building having a plurality of floors, and each floor. The building may be constructed so that the outer wall panels of the above are arranged in the vertical direction.
According to the above method, when the outer wall panel as a fixed body is attached to the hardware (fixed part) on each floor of the building, the outer wall panel on the upper floor and the outer wall panel on the lower floor are well aligned in the vertical direction. It is possible to fix the outer wall panels on each floor so that they are lined up.

本発明の構造物構築方法によれば、上下方向に延出した当接面を有する治具の当該当接面を、上階の固定部及び下階の固定部の双方に当接することで、上階の固定部及び下階の固定部の各々を所定方向(被固定部の厚み方向が沿う方向)において位置決めする。これにより、各階の被固定体を適切な位置にて固定することが可能になる。 According to the structure construction method of the present invention, the contact surface of the jig having the contact surface extending in the vertical direction is brought into contact with both the fixed portion on the upper floor and the fixed portion on the lower floor. Each of the fixed portion on the upper floor and the fixed portion on the lower floor is positioned in a predetermined direction (direction along the thickness direction of the fixed portion). This makes it possible to fix the fixed body on each floor at an appropriate position.

建物の外壁を正面から見た図である。It is the figure which looked at the outer wall of a building from the front. 外壁パネルと位置決め部材とを示す斜視図である。It is a perspective view which shows the outer wall panel and a positioning member. 外壁パネルの取り付け構造を示す図である。It is a figure which shows the mounting structure of the outer wall panel. 取り付け金物の位置調整についての説明図である。It is explanatory drawing about the position adjustment of the mounting hardware. 治具を用いて固定部を位置決めする手順についての説明図である(その1)。It is explanatory drawing of the procedure of positioning a fixed part using a jig (the 1). 治具を用いて固定部を位置決めする手順についての説明図である(その2)。It is explanatory drawing of the procedure of positioning a fixed part using a jig (the 2). 外壁工事の手順を示す図である。It is a figure which shows the procedure of the outer wall construction. 固定部の位置決めに用いられる治具の一例を示す図である。It is a figure which shows an example of the jig used for positioning of a fixed part. 外壁パネルを配置する手順を示す図である。It is a figure which shows the procedure which arranges the outer wall panel. 調整部の平面図である。It is a top view of the adjustment part. 調整部の側面図である。It is a side view of the adjustment part. 外壁パネルに取り付けられた状態の位置決め部材を示す図である。It is a figure which shows the positioning member in the state attached to the outer wall panel. 位置決め部材による外壁パネルの位置決め方法に関する説明図である。It is explanatory drawing about the positioning method of the outer wall panel by the positioning member. 所定方向において外壁パネルを位置決めする手順を示す図である。It is a figure which shows the procedure of positioning an outer wall panel in a predetermined direction. 所定方向において位置決めされた状態の外壁パネルを上方から見た図である。It is a figure which looked at the outer wall panel in the state of being positioned in a predetermined direction from above. 所定方向において下階の外壁パネルの端位置と上階の外壁パネルの端位置とを揃える様子を示す図である。It is a figure which shows the state that the edge position of the outer wall panel of the lower floor and the edge position of the outer wall panel of the upper floor are aligned in a predetermined direction. 上階の外壁パネルの間の隙間を調整する手順を示す図である。It is a figure which shows the procedure which adjusts the gap between the outer wall panels of the upper floor. 調整部をセットした状態を示す図である。It is a figure which shows the state which set the adjustment part. 調整部によって上階の外壁パネルの間の隙間を調整する様子を示す図である。It is a figure which shows the mode that the gap between the outer wall panels of the upper floor is adjusted by the adjustment part.

以下、本発明の一実施形態(以下、本実施形態)の構造物構築方法について、具体例を挙げて説明する。ただし、下記の実施形態は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。すなわち、本発明は、その趣旨を逸脱することなく、変更、改良され得る。また、当然ながら本発明にはその等価物が含まれ得る。 Hereinafter, a method for constructing a structure according to an embodiment of the present invention (hereinafter referred to as the present embodiment) will be described with reference to specific examples. However, the following embodiments are for facilitating the understanding of the present invention and do not limit the present invention. That is, the present invention can be modified or improved without departing from the spirit of the present invention. Further, as a matter of course, the present invention may include an equivalent thereof.

なお、以下では、外壁を有する建物(住宅、店舗、建屋等)を構造物の一例として挙げて説明する。つまり、以下では、本発明の構造物構築方法を用いて建物を建設するケースについて説明することとする。ただし、建物は、あくまでも構造物の一例に過ぎず、本発明の構造物構築方法は、建物以外の構造物、例えば、太陽光パネルとフレームからなる太陽光発電設備、セグメントを連ねて構築されるシールド工法式のトンネル、あるいは船体ブロックを組み立てて構築される船体を構築する際にも利用可能である。 In the following, a building having an outer wall (house, store, building, etc.) will be described as an example of a structure. That is, in the following, a case where a building is constructed by using the structure construction method of the present invention will be described. However, the building is merely an example of a structure, and the structure construction method of the present invention is constructed by connecting a structure other than the building, for example, a photovoltaic power generation facility consisting of a solar panel and a frame, and a segment. It can also be used when constructing a shielded tunnel or a hull constructed by assembling hull blocks.

<<建物及び外壁工事の概要>>
本実施形態に係る構造物構築方法について説明するにあたり、建物及び建物の外壁工事について説明する。なお、以下の説明において、水平方向とは、建物の梁間方向若しくは桁行方向のことであり、上下方向とは、鉛直方向のことである。また、以下の説明中、建物の各構成部品(建材)の位置や向きについては、特に断る場合を除き、完成した建物における位置や向きを述べることとする。
<< Overview of building and exterior wall construction >>
In explaining the structure construction method according to the present embodiment, the building and the outer wall construction of the building will be described. In the following description, the horizontal direction is the beam-to-beam direction or the girder direction of the building, and the vertical direction is the vertical direction. In addition, in the following explanation, the position and orientation of each component (building material) of the building will be described in the completed building unless otherwise specified.

本実施形態に係る建物は、複数階建ての建物である。ここで、「階」とは、建物内部を上下方向において複数の空間に区画する際の単位である。また、建物には図1に図示の外壁1が設けられている。外壁1は、水平方向及び上下方向の各方向に外壁パネル2を敷き詰めることにより構成されている。図1は、建物の外壁1を正面から見た図である。 The building according to this embodiment is a multi-story building. Here, the "floor" is a unit for dividing the inside of a building into a plurality of spaces in the vertical direction. Further, the building is provided with the outer wall 1 shown in FIG. 1. The outer wall 1 is configured by laying the outer wall panel 2 in each of the horizontal direction and the vertical direction. FIG. 1 is a front view of the outer wall 1 of a building.

より具体的に説明すると、本実施形態では、建物の各階において外壁パネル2を当該外壁パネル2の厚み方向が出入方向に沿った状態で建物の躯体に固定し、各階の外壁パネル2が上下方向に沿って列状に並ぶように建物を構築する。 More specifically, in the present embodiment, the outer wall panel 2 is fixed to the building frame in a state where the thickness direction of the outer wall panel 2 is along the entrance / exit direction on each floor of the building, and the outer wall panel 2 on each floor is in the vertical direction. Build the building so that it is lined up in a row along the line.

ここで、「出入方向」とは、本発明の所定方向に相当し、具体的には外壁パネル2の取り付け方向であり、換言すると、後述する取り付け金物3の固定面3aを貫く方向(すなわち、固定面3aの法線方向)である。より具体的に説明すると、例えば、梁間方向に沿って並んだ複数の外壁パネル2から見たときには、桁行方向が出入方向に相当し、桁行方向に沿って並んだ複数の外壁パネル2から見たときには、梁間方向が出入方向に相当する。
なお、以下では、出入方向において建物の躯体(厳密には、取り付け金物3)により近い側を「屋内側」と呼び、躯体(厳密には、取り付け金物3)からより離れている側を「屋外側」と呼ぶこととする。
Here, the "entrance / exit direction" corresponds to a predetermined direction of the present invention, specifically, a mounting direction of the outer wall panel 2, in other words, a direction penetrating the fixed surface 3a of the mounting hardware 3 described later (that is,). (Direction to the normal of the fixed surface 3a). More specifically, for example, when viewed from a plurality of outer wall panels 2 arranged along the beam-to-beam direction, the girder direction corresponds to the entry / exit direction, and the girder direction is viewed from the plurality of outer wall panels 2 arranged along the girder direction. Occasionally, the beam-to-beam direction corresponds to the entry / exit direction.
In the following, the side closer to the building frame (strictly speaking, mounting hardware 3) in the direction of entry and exit is referred to as the "indoor side", and the side farther from the building frame (strictly speaking, mounting hardware 3) is referred to as "ya". We will call it "outside".

外壁パネル2の構成について説明すると、外壁パネル2は、被固定体に相当し、公知の外壁パネルと略同様の構造となっている。具体的に説明すると、外壁パネル2は、図2に示すように屋外側に面する仕上材2aと、外壁パネル2の厚み方向において仕上材2aと隣接しており仕上材2aよりも屋内側に位置するパネル本体2bと、を有する。図2は、外壁パネルと後述する位置決め部材とを示す斜視図である。パネル本体2bは、略矩形状に成形されたフレーム2c内に不図示の断熱材を充填し、その周りをアルミ蒸着フィルム2dで覆うことで構成されている。 Explaining the configuration of the outer wall panel 2, the outer wall panel 2 corresponds to a fixed body and has substantially the same structure as a known outer wall panel. Specifically, as shown in FIG. 2, the outer wall panel 2 is adjacent to the finishing material 2a facing the outdoor side and the finishing material 2a in the thickness direction of the outer wall panel 2, and is closer to the indoor side than the finishing material 2a. It has a panel body 2b to be located. FIG. 2 is a perspective view showing an outer wall panel and a positioning member described later. The panel main body 2b is configured by filling a frame 2c formed in a substantially rectangular shape with a heat insulating material (not shown) and covering the periphery thereof with an aluminum vapor-deposited film 2d.

上記のように構成された外壁パネル2は、建物の各階において、図1に示すように水平方向において列状に並べられた状態で複数配置される。ここで、水平方向は、上下方向及び出入方向の両方向と交差する交差方向に相当する。 A plurality of outer wall panels 2 configured as described above are arranged on each floor of the building in a state of being arranged in a row in the horizontal direction as shown in FIG. Here, the horizontal direction corresponds to an intersection direction that intersects both the vertical direction and the entry / exit direction.

列状に並ぶ複数の外壁パネル2の各々は、図3に示すように取り付け金物3を介して建物の躯体(具体的には、梁4や柱5)に固定される。図3は、外壁パネル2の取り付け構造を示す平面図である。ここで、取り付け金物3において屋外側に面する面は、外壁パネル2が固定される固定面3aに相当する。外壁パネル2は、その裏面(屋内側を向く面)を固定面3aに当接させた状態で取り付け金物3を介して梁4や柱5に固定される。 As shown in FIG. 3, each of the plurality of outer wall panels 2 arranged in a row is fixed to the building frame (specifically, the beam 4 and the pillar 5) via the mounting hardware 3. FIG. 3 is a plan view showing the mounting structure of the outer wall panel 2. Here, the surface of the mounting hardware 3 facing the outdoor side corresponds to the fixed surface 3a to which the outer wall panel 2 is fixed. The outer wall panel 2 is fixed to the beam 4 or the pillar 5 via the mounting hardware 3 in a state where the back surface (the surface facing the indoor side) is in contact with the fixing surface 3a.

取り付け金物3は、固定部に相当し、建物の各階において、水平方向に沿って並べられた状態で複数設けられている。各取り付け金物3は、梁4や柱5にボルト留めあるいは溶接にて固定されている。また、外壁1を構成する外壁パネル2のうち、同じ向きに面する外壁パネル2を固定するために用いられる複数の取り付け金物3は、それぞれの固定面3aが出入方向において揃えられるように位置決めされる。 A plurality of mounting hardware 3 correspond to fixed portions, and are provided on each floor of the building in a state of being arranged in a horizontal direction. Each mounting hardware 3 is fixed to a beam 4 or a pillar 5 by bolting or welding. Further, among the outer wall panels 2 constituting the outer wall 1, a plurality of mounting hardware 3 used for fixing the outer wall panels 2 facing in the same direction are positioned so that the respective fixing surfaces 3a are aligned in the in-out direction. NS.

具体的に説明すると、建物中の各階において水平方向に沿って並べられた複数の取り付け金物3のうち、建物の角部分(具体的には、入隅部や出隅部)に設けられた取り付け金物3を基準として、残りの取り付け金物3の各々の位置を出入方向において調整する。より詳しく説明すると、図4Aに示すように、建物の水平方向一端側にある角部分に設けられた取り付け金物3と、水平方向他端側にある角部分に設けられた取り付け金物3と、の間に水糸8を架設する。厳密には、水平方向一端側の取り付け金物3の固定面3aから、水平方向他端側の取り付け金物3の固定面3aまで水糸8を張る。図4Aは、取り付け金物3の位置調整についての説明図であり、取り付け金物3周辺を上方から見た図(平面図)である。 Specifically, among the plurality of mounting hardware 3 arranged along the horizontal direction on each floor in the building, the mounting provided at the corner portion (specifically, the inside corner portion and the outside corner portion) of the building. With reference to the hardware 3, the positions of the remaining mounting hardware 3 are adjusted in the entry / exit direction. More specifically, as shown in FIG. 4A, the mounting hardware 3 provided at the corner portion on one end side in the horizontal direction of the building and the mounting hardware 3 provided at the corner portion on the other end side in the horizontal direction. A horizontal thread 8 is erected between them. Strictly speaking, the water thread 8 is stretched from the fixed surface 3a of the mounting hardware 3 on the one end side in the horizontal direction to the fixing surface 3a of the mounting hardware 3 on the other end side in the horizontal direction. FIG. 4A is an explanatory diagram for adjusting the position of the mounting hardware 3, and is a view (plan view) of the periphery of the mounting hardware 3 as viewed from above.

そして、水平方向において角部分の間に位置する取り付け金物3は、その固定面3aが出入方向において上記の如く張られた水糸8に接するように位置決めされる。この結果、各階において水平方向に沿って複数並べられる取り付け金物3の各々の固定面3aが、出入方向において揃うようになる。なお、上記手順による取り付け金物3の位置調整は、建物の階数に応じた回数だけ繰り返し実施される。 Then, the mounting hardware 3 located between the corner portions in the horizontal direction is positioned so that the fixing surface 3a is in contact with the water thread 8 stretched as described above in the in-out direction. As a result, the fixed surfaces 3a of each of the plurality of mounting hardware 3 arranged in the horizontal direction on each floor are aligned in the in / out direction. The position adjustment of the mounting hardware 3 according to the above procedure is repeated as many times as the number of floors of the building.

上記の如く位置決めされた取り付け金物3には外壁パネル2が固定される。このとき、外壁パネル2は、水平方向及び上下方向の両方向において外壁パネル2同士の間に間隔を開けながら並んだ状態で配置される。これにより、外壁1には、図1に示すように外壁パネル2同士の間の隙間が連なった目地が形成される。より具体的に説明すると、水平方向において互いに隣り合う一対の外壁パネル2の間の隙間が鉛直方向に連続することで縦目地6が形成されている。また、上下に隣り合う一対の外壁パネル2の間の隙間が水平方向に連続することで横目地7が形成されている。 The outer wall panel 2 is fixed to the mounting hardware 3 positioned as described above. At this time, the outer wall panels 2 are arranged side by side with a gap between the outer wall panels 2 in both the horizontal direction and the vertical direction. As a result, as shown in FIG. 1, joints in which gaps between the outer wall panels 2 are connected are formed on the outer wall 1. More specifically, the vertical joint 6 is formed by the gaps between the pair of outer wall panels 2 adjacent to each other in the horizontal direction are continuous in the vertical direction. Further, the horizontal joint 7 is formed by the gaps between the pair of outer wall panels 2 adjacent to each other on the upper and lower sides being continuous in the horizontal direction.

ここで、縦目地6を構成する外壁パネル2同士の隙間、すなわち、水平方向において互いに隣り合う一対の外壁パネル2同士の間の隙間を以降、「縦の隙間」と呼ぶこととする。なお、上下方向において互いに隣接する二つの階のうち、より下階に位置する縦の隙間は、「下階隙間」に相当し、より上階に位置する縦の隙間は、「上階隙間」に相当する。下階隙間と上階隙間とは、互いに連続する(つまり、同じ縦目地6に属する)位置関係にある。 Here, the gap between the outer wall panels 2 constituting the vertical joint 6, that is, the gap between the pair of outer wall panels 2 adjacent to each other in the horizontal direction will be hereinafter referred to as "vertical gap". Of the two floors adjacent to each other in the vertical direction, the vertical gap located on the lower floor corresponds to the "lower floor gap", and the vertical gap located on the higher floor is the "upper floor gap". Corresponds to. The lower floor gap and the upper floor gap are in a positional relationship that is continuous with each other (that is, belongs to the same vertical joint 6).

次に、外壁1を構築する工事(外壁工事)について説明すると、外壁工事は図5に図示の手順に従って進められる。図5は、外壁工事の手順を示す図である。具体的に説明すると、外壁工事は、取り付け金物3の設置(S001)、取り付け金物3の位置決め(S002)、外壁パネル2の配置(S003)、外壁パネル2の固定(S004)の順に行われる。 Next, the work for constructing the outer wall 1 (outer wall work) will be described. The outer wall work proceeds according to the procedure shown in FIG. FIG. 5 is a diagram showing a procedure of outer wall construction. Specifically, the outer wall construction is performed in the order of installation of the mounting hardware 3 (S001), positioning of the mounting hardware 3 (S002), arrangement of the outer wall panel 2 (S003), and fixing of the outer wall panel 2 (S004).

取り付け金物3を設置する工程S001では、各階において取り付け金物3を設置位置に配置する。このとき、上階の取り付け金物3及び下階の取り付け金物3を上下方向に並べて配置する。より詳しく説明すると、本工程S001では、取り付け金物3を梁4や柱5に対してセットし、その時点での位置にて仮留めしておく。なお、各階において取り付け金物3を設置する際には、建物の角部分を含む建物の各箇所に取り付け金物3を配置するが、このとき、建物の角部分に在る取り付け金物3については、図4Aに示すように柱5の外表面に取り付ける。 In the step S001 of installing the mounting hardware 3, the mounting hardware 3 is arranged at the installation position on each floor. At this time, the mounting hardware 3 on the upper floor and the mounting hardware 3 on the lower floor are arranged side by side in the vertical direction. More specifically, in this step S001, the mounting hardware 3 is set with respect to the beam 4 and the pillar 5, and temporarily fastened at the position at that time. When installing the mounting hardware 3 on each floor, the mounting hardware 3 is placed at each location of the building including the corners of the building. At this time, the mounting hardware 3 at the corners of the building is shown in the figure. It is attached to the outer surface of the pillar 5 as shown in 4A.

取り付け金物3を位置決めする工程S002では、前述した水糸8等を用いて、仮留めされた各階の取り付け金物3の位置を出入方向において調整して位置決めする。これにより、同じ向きに面する外壁パネル2を固定するために用いられる複数の取り付け金物3の各々の固定面3aの位置が、出入方向において揃うようになる。なお、取り付け金物3を位置決めする工程S002については、後に詳しく説明する。 In the step S002 of positioning the mounting hardware 3, the position of the temporarily fastened mounting hardware 3 on each floor is adjusted and positioned in the entry / exit direction by using the water thread 8 or the like described above. As a result, the positions of the fixing surfaces 3a of the plurality of mounting hardware 3 used for fixing the outer wall panels 2 facing in the same direction are aligned in the in-out direction. The step S002 for positioning the mounting hardware 3 will be described in detail later.

外壁パネル2を配置する工程S003では、各階において複数の外壁パネル2を水平方向に並ぶように配置する。本工程S003は、各階別に行われ、詳しくは下階から順に行われる。より具体的に説明すると、下階において複数の外壁パネル2を水平方向に並べて配置した後に、その直上階において複数の外壁パネル2を水平方向に並べて配置する。 In the step S003 for arranging the outer wall panels 2, a plurality of outer wall panels 2 are arranged so as to be arranged in the horizontal direction on each floor. This step S003 is performed for each floor, and in detail, it is performed in order from the lower floor. More specifically, after a plurality of outer wall panels 2 are arranged horizontally side by side on the lower floor, a plurality of outer wall panels 2 are arranged horizontally side by side on the floor immediately above the outer wall panels 2.

外壁パネル2を配置する際の具体的な手順について概説すると、水平方向に沿って並ぶ複数の外壁パネル2をクレーン等によって同時に吊り上げる。ここで、同時に吊り上げられる複数の外壁パネル2のうち、水平方向において互いに隣り合う二つの外壁パネル2の一方は、第一被固定体に該当し、以下では「第一パネル2M」と呼ぶこととし、他方は、第二被固定体に該当し、以下では「第二パネル2N」と呼ぶこととする。 To outline the specific procedure for arranging the outer wall panels 2, a plurality of outer wall panels 2 arranged in the horizontal direction are simultaneously lifted by a crane or the like. Here, of the plurality of outer wall panels 2 that are simultaneously lifted, one of the two outer wall panels 2 that are adjacent to each other in the horizontal direction corresponds to the first object to be fixed, and will be referred to as "first panel 2M" below. The other corresponds to the second object to be fixed, and will be referred to as "second panel 2N" below.

吊り上げられた各外壁パネル2は、吊り上げられた状態のまま、出入方向において取り付け金物3の固定面3aの手前位置に配置される。そして、各外壁パネル2は、取り付け金物3の固定面3aの手前位置に至った状態では、当該外壁パネル2の厚み方向が出入方向に沿った姿勢にて吊られている。 Each of the lifted outer wall panels 2 is arranged at a position in front of the fixed surface 3a of the mounting hardware 3 in the in-out direction while being lifted. When each outer wall panel 2 reaches a position in front of the fixed surface 3a of the mounting hardware 3, the outer wall panel 2 is suspended in a posture in which the thickness direction of the outer wall panel 2 is along the entry / exit direction.

また、本実施形態では、建物の各階において複数の外壁パネル2を水平方向に並べて配置する際、水平方向において外壁パネル2同士の間に隙間(厳密には、縦の隙間)が形成されるように複数の外壁パネル2を配置する。 Further, in the present embodiment, when a plurality of outer wall panels 2 are arranged side by side in the horizontal direction on each floor of the building, a gap (strictly speaking, a vertical gap) is formed between the outer wall panels 2 in the horizontal direction. A plurality of outer wall panels 2 are arranged in the room.

また、各外壁パネル2を配置するに際し、吊り込まれた状態にある複数の外壁パネル2の各々の端位置(厳密には、各外壁パネル2の裏面の位置)が出入方向において揃うように各外壁パネル2を位置決めする。具体的に説明すると、第一パネル2Mの裏面と第二パネル2Nの裏面とが面一となるように、第一パネル2Mに対して第二パネル2Nの位置を調整する。 Further, when arranging each outer wall panel 2, each end position (strictly speaking, the position of the back surface of each outer wall panel 2) of the plurality of suspended outer wall panels 2 is aligned in the in / out direction. Position the outer wall panel 2. Specifically, the position of the second panel 2N is adjusted with respect to the first panel 2M so that the back surface of the first panel 2M and the back surface of the second panel 2N are flush with each other.

上述した外壁パネル2の位置決めは、各階別に行われる。つまり、下階にて水平方向に並べられる複数の外壁パネル2の各々の端位置が揃うように下階の各外壁パネル2が位置決めされた後、上階にて水平方向に並べられる複数の外壁パネル2の各々の端位置が揃うように上階の各外壁パネル2が位置決めされる。 The positioning of the outer wall panel 2 described above is performed for each floor. That is, after each outer wall panel 2 on the lower floor is positioned so that the end positions of the plurality of outer wall panels 2 arranged horizontally on the lower floor are aligned, the plurality of outer walls arranged horizontally on the upper floor. Each outer wall panel 2 on the upper floor is positioned so that the respective end positions of the panel 2 are aligned.

また、上階の外壁パネル2を位置決めする際には、出入方向において上階の外壁パネル2の端位置とその直下に位置する下階の外壁パネル2の端位置とが揃うように、上階の各外壁パネル2を位置決めする。具体的に説明すると、出入方向において下階の第一パネル2Mの裏面と、その直上位置に配置される上階の第一パネル2Mの裏面とが面一となり、且つ、下階の第二パネル2Nの裏面と、その直上位置に配置される上階の第二パネル2Nの裏面とが面一となるように、上階の第一パネル2M及び第二パネル2Nの各々を位置決めする。 Further, when positioning the outer wall panel 2 on the upper floor, the upper floor is aligned so that the end position of the outer wall panel 2 on the upper floor and the end position of the outer wall panel 2 on the lower floor located immediately below the outer wall panel 2 are aligned in the entry / exit direction. Each outer wall panel 2 of the above is positioned. Specifically, the back surface of the first panel 2M on the lower floor and the back surface of the first panel 2M on the upper floor arranged directly above it are flush with each other in the entry / exit direction, and the second panel on the lower floor is flush with each other. Each of the first panel 2M and the second panel 2N on the upper floor is positioned so that the back surface of the 2N and the back surface of the second panel 2N on the upper floor arranged immediately above the back surface are flush with each other.

さらに、2階以上の階の外壁パネル2については、出入方向において位置決めすると共に、外壁パネル2同士間の隙間(厳密には、縦の隙間)の調整を行うことになっている。この隙間調整により、上階の外壁パネル2の間に形成される縦の隙間の横幅が、下階の外壁パネル2の間に形成される縦の隙間の横幅と揃うようになる。この結果、上階の外壁パネル2の間に形成される縦の隙間と、下階の外壁パネル2の間に形成される縦の隙間とが良好に連続し、外壁1において直線状に延びた縦目地6が形成されるようになる。
なお、外壁パネル2を配置する工程S003については、後に詳しく説明する。
Further, the outer wall panels 2 on the second and higher floors are positioned in the entrance / exit direction, and the gaps (strictly speaking, vertical gaps) between the outer wall panels 2 are adjusted. By this gap adjustment, the width of the vertical gap formed between the outer wall panels 2 on the upper floor is aligned with the width of the vertical gap formed between the outer wall panels 2 on the lower floor. As a result, the vertical gap formed between the outer wall panels 2 on the upper floor and the vertical gap formed between the outer wall panels 2 on the lower floor are well continuous and extend linearly on the outer wall 1. The vertical joint 6 will be formed.
The step S003 for arranging the outer wall panel 2 will be described in detail later.

外壁パネル2を固定する工程S004では、各階において、上記の如く位置決めされた外壁パネル2の各々を、その前の工程S002において位置決めされた取り付け金物3の各々に固定する。つまり、本工程S004は、位置決めされた上階の取り付け金物3及び下階の取り付け金物3の各々に対して、位置決めされた各外壁パネル2を固定する工程である。 In the step S004 for fixing the outer wall panel 2, each of the outer wall panels 2 positioned as described above is fixed to each of the mounting hardware 3 positioned in the previous step S002 on each floor. That is, this step S004 is a step of fixing each of the positioned outer wall panels 2 to each of the positioned upper floor mounting hardware 3 and the lower floor mounting hardware 3.

なお、各階において水平方向に並ぶ複数の外壁パネル2の各々は、外壁パネル2間に隙間(厳密には、縦の隙間)を開けながら取り付け金物3に固定される。そして、各階において外壁パネル2の固定が完了すると、一面分の外壁1が構築され、当該外壁1では、縦目地6が上端から下端まで略均一な幅で鉛直方向に沿って直線状に連続するように形成される。同様に、横目地7が水平方向一端から他端まで略均一な幅で水平方向に沿って直線状に連続するように形成される。 Each of the plurality of outer wall panels 2 arranged in the horizontal direction on each floor is fixed to the mounting hardware 3 while opening a gap (strictly speaking, a vertical gap) between the outer wall panels 2. Then, when the fixing of the outer wall panel 2 is completed on each floor, the outer wall 1 for one surface is constructed, and in the outer wall 1, the vertical joints 6 continue linearly along the vertical direction with a substantially uniform width from the upper end to the lower end. Is formed like this. Similarly, the horizontal joints 7 are formed so as to be continuous in a straight line along the horizontal direction with a substantially uniform width from one end to the other end in the horizontal direction.

<<取り付け金具を位置決めする工程について>>
次に、上述した外壁工事のうち、取り付け金物3を出入方向において位置決めする工程S002について、より詳細に説明する。
取り付け金物3を出入方向において位置決めする工程S002では、前述したように、各階において、水平方向に並ぶ複数の取り付け金物3の各々の固定面3aが出入方向において揃うように、水糸8等によって各取り付け金物3を位置決めする。
<< About the process of positioning the mounting bracket >>
Next, among the above-mentioned outer wall works, the step S002 for positioning the mounting hardware 3 in the entry / exit direction will be described in more detail.
In the step S002 of positioning the mounting hardware 3 in the entry / exit direction, as described above, on each floor, the fixing surfaces 3a of the plurality of mounting hardware 3 arranged in the horizontal direction are aligned by the water thread 8 or the like so as to be aligned in the entry / exit direction. Position the mounting hardware 3.

ところで、従来においても、各階の取り付け金物3の位置を水糸8等によって調整していた。しかし、従来の方法では、出入方向における取り付け金物3の位置決め後の位置が階毎に異なってしまう可能性があった。より詳しく説明すると、発明が解決しようとする課題の項で説明したように、水糸8を用いることで、同じ階の取り付け金物3の位置については揃えられるものの、互いに異なる階にある取り付け金物3の位置については、水糸8だけで揃えることが困難である。 By the way, even in the past, the position of the mounting hardware 3 on each floor was adjusted by a water thread 8 or the like. However, in the conventional method, there is a possibility that the position of the mounting hardware 3 in the entry / exit direction after positioning may differ from floor to floor. More specifically, as described in the section of the problem to be solved by the invention, by using the water thread 8, the positions of the mounting hardware 3 on the same floor can be aligned, but the mounting hardware 3 on different floors can be aligned. It is difficult to align the positions of with only the water thread 8.

これに対して、本実施形態では、図6に図示の治具(以下、調整治具30)を用いることで、上階の取り付け金物3及び下階の取り付け金物3の各々の固定面3aを出入方向において面一となるように揃えることが可能である。図6は、取り付け金物3の位置決めに用いられる調整治具30の一例を示す斜視図である。 On the other hand, in the present embodiment, by using the jig shown in FIG. 6 (hereinafter referred to as the adjustment jig 30), the fixed surfaces 3a of the mounting hardware 3 on the upper floor and the mounting hardware 3 on the lower floor can be obtained. It is possible to align them so that they are flush with each other in the direction of entry and exit. FIG. 6 is a perspective view showing an example of the adjustment jig 30 used for positioning the mounting hardware 3.

調整治具30について説明すると、調整治具30は、図6に示すように、比較的長く延出している長尺な鋼材からなり、より詳しくはL型のアングル材によって構成されている。この調整治具30の内側壁面には、取り付け金物3の位置決め時に取り付け金物3の固定面3aに当接する当接面31が設けられている。 Explaining the adjusting jig 30, as shown in FIG. 6, the adjusting jig 30 is made of a long steel material extending relatively long, and more specifically, it is made of an L-shaped angle material. The inner wall surface of the adjusting jig 30 is provided with a contact surface 31 that comes into contact with the fixed surface 3a of the mounting hardware 3 when the mounting hardware 3 is positioned.

以下、上記の調整治具30を用いて上階の取り付け金物3及び下階の取り付け金物3の各々を位置決めする手順について、図4B及び図4Cを参照しながら説明する。図4B及び図4Cは、調整治具30を用いて取り付け金物3を位置決めする手順についての説明図であり、図4Bは、取り付け金物3周辺を上方から見た図であり、図4Cは、取り付け金物3周辺を側方から見た図である。
なお、以下では、ある向きに面した外壁パネル2を固定するための取り付け金物3に対して位置決めを行うケースを想定して説明することとする。
Hereinafter, a procedure for positioning each of the mounting hardware 3 on the upper floor and the mounting hardware 3 on the lower floor using the adjustment jig 30 will be described with reference to FIGS. 4B and 4C. 4B and 4C are explanatory views of a procedure for positioning the mounting hardware 3 using the adjusting jig 30, FIG. 4B is a view of the periphery of the mounting hardware 3 from above, and FIG. 4C is a mounting. It is the figure which looked at the periphery of the hardware 3 from the side.
In the following, a case where positioning is performed with respect to the mounting hardware 3 for fixing the outer wall panel 2 facing in a certain direction will be described.

上階の取り付け金物3及び下階の取り付け金物3の各々を位置決めするにあたり、上階及び下階のそれぞれにおいて、水平方向に沿って並ぶ複数の取り付け金物3の各々を梁4や柱5に対して仮留めする。このとき、建物の角部分では、図4Bに示すように取り付け金物3を柱5の外表面に取り付ける。 In positioning each of the mounting hardware 3 on the upper floor and the mounting hardware 3 on the lower floor, each of the plurality of mounting hardware 3 arranged in the horizontal direction is placed on the beam 4 and the pillar 5 on each of the upper floor and the lower floor. Temporarily fasten. At this time, at the corner of the building, the mounting hardware 3 is mounted on the outer surface of the pillar 5 as shown in FIG. 4B.

取り付け金物3の仮留めが完了した後、調整治具30を準備し、その長手方向が上下方向に沿うように調整治具30を立てる。このとき、調整治具30の当接面31は、上下方向に延出した状態にある。そして、図4Cに示すように、当接面31が下階の取り付け金物3(図4C中、記号3tと表記)及び上階の取り付け金物3(図4C中、記号3uと表記)の双方に同時に当接するように調整治具30をセットする。 After the temporary fixing of the mounting hardware 3 is completed, the adjusting jig 30 is prepared, and the adjusting jig 30 is erected so that the longitudinal direction thereof is along the vertical direction. At this time, the contact surface 31 of the adjusting jig 30 is in a state of extending in the vertical direction. Then, as shown in FIG. 4C, the contact surface 31 is attached to both the mounting hardware 3 on the lower floor (denoted as the symbol 3t in FIG. 4C) and the mounting hardware 3 on the upper floor (denoted as the symbol 3u in FIG. 4C). The adjustment jig 30 is set so as to abut at the same time.

より詳しく説明すると、下階にて水平方向に並べられる複数の取り付け金物3のうち、建物の角部分に設けられた取り付け金物3の固定面3aに当接面31が当接するように調整治具30をセットする。このとき、調整治具30は、当接面31の法線方向が出入方向に沿った状態(厳密には出入方向と略平行な状態)にある。また、調整治具30には、図4Bや図4Cに示すように風防下げ振り40が取り付けられる。作業者は、風防下げ振り40によって調整治具30自体の鉛直度(分かり易くは、調整治具30の長手方向と上下方向との間の平行度)を確認し、調整治具30の長手方向が上下方向と略平行となるように調整治具30の姿勢を調整する。そして、調整治具30の長手方向が上下方向と略平行となると、当接面31の法線方向が出入方向と略平行になる。 More specifically, among the plurality of mounting hardware 3 arranged horizontally on the lower floor, the adjusting jig so that the contact surface 31 abuts on the fixed surface 3a of the mounting hardware 3 provided at the corner of the building. Set 30. At this time, the adjusting jig 30 is in a state in which the normal direction of the contact surface 31 is along the entry / exit direction (strictly speaking, a state substantially parallel to the entry / exit direction). Further, as shown in FIGS. 4B and 4C, a windshield plumb bob 40 is attached to the adjusting jig 30. The operator confirms the verticality of the adjusting jig 30 itself (for easy understanding, the parallelism between the longitudinal direction and the vertical direction of the adjusting jig 30) by the windshield lowering swing 40, and the longitudinal direction of the adjusting jig 30. Adjusts the posture of the adjusting jig 30 so that is substantially parallel to the vertical direction. When the longitudinal direction of the adjusting jig 30 is substantially parallel to the vertical direction, the normal direction of the contact surface 31 is substantially parallel to the entry / exit direction.

その後、当接面31に当接している下階の取り付け金物3の直上位置にある上階の取り付け金物3(すなわち、建物の角部分に設けられた上階の取り付け金物3)の固定面3aが当接面31に当接するように、上階の取り付け金物3の位置を調整する。 After that, the fixed surface 3a of the upper floor mounting hardware 3 (that is, the upper floor mounting hardware 3 provided at the corner of the building) located directly above the lower floor mounting hardware 3 in contact with the contact surface 31. Adjusts the position of the mounting hardware 3 on the upper floor so that the surface 31 abuts on the contact surface 31.

以上のように本実施形態では、取り付け金物3の位置決めを行うにあたり、当接面31の法線方向が出入方向と略平行になるように調整治具30をセットし、建物の角部分に設けられた下階の取り付け金物3及び上階の取り付け金物3の双方を当接面31に同時に当接させる。これにより、建物の角部分に設けられた下階の取り付け金物3及び上階の取り付け金物3の各々について、当該各々の固定面3aの位置が出入方向で揃えられる。 As described above, in the present embodiment, when positioning the mounting hardware 3, the adjustment jig 30 is set so that the normal direction of the contact surface 31 is substantially parallel to the entry / exit direction, and is provided at the corner portion of the building. Both the mounting hardware 3 on the lower floor and the mounting hardware 3 on the upper floor are brought into contact with the contact surface 31 at the same time. As a result, the positions of the fixed surfaces 3a of the lower floor mounting hardware 3 and the upper floor mounting hardware 3 provided at the corners of the building are aligned in the entry / exit direction.

その上で、下階及び上階の各階において、建物の角部分に設けられた取り付け金物3から水糸8を張り、この水糸8を用いて、各階にて水平方向に並べられた複数の取り付け金物3の各々を出入方向において位置決めする。これにより、上階にあるすべての取り付け金物3の位置と、下階にあるすべての取り付け金物3の位置と、が出入方向において揃えられるようになる。換言すると、下階にある各取り付け金物3の固定面3aと、上階にある各取り付け金物3の固定面3aと、が略面一となる。すなわち、ある向きに面した各外壁パネル2を固定するための固定面3aの、出入方向における位置が各階間で略同一となり、結果として、ある向きに面した外壁パネル2により構築される外壁1が良好な美観を呈するようになる。 On each of the lower and upper floors, a water thread 8 is stretched from the mounting hardware 3 provided at the corner of the building, and the water thread 8 is used to arrange a plurality of horizontal threads on each floor. Each of the mounting hardware 3 is positioned in the entry / exit direction. As a result, the positions of all the mounting hardware 3 on the upper floor and the positions of all the mounting hardware 3 on the lower floor are aligned in the entry / exit direction. In other words, the fixed surface 3a of each mounting hardware 3 on the lower floor and the fixed surface 3a of each mounting hardware 3 on the upper floor are substantially flush with each other. That is, the positions of the fixing surfaces 3a for fixing the outer wall panels 2 facing in a certain direction in the entrance / exit direction are substantially the same between the floors, and as a result, the outer wall 1 constructed by the outer wall panels 2 facing in a certain direction. Will show a good aesthetic.

なお、本実施形態において、下階の取り付け金物3(厳密には、取り付け金物3t)は、上下方向に離れた位置にて一対設けられている。同様に、上階の取り付け金物3(厳密には、取り付け金物3u)は、上下方向に離れた位置にて一対設けられている。本実施形態に係る調整治具30は、図4Cに示すように、上下一対設けられた下階の取り付け金物3tの各々と、上下一対設けられた上階の取り付け金物3uのうち、より下方に位置する方の取り付け金物3uと、に当接面31が当接するように配置される。 In this embodiment, a pair of mounting hardware 3 (strictly speaking, mounting hardware 3t) on the lower floor is provided at positions separated in the vertical direction. Similarly, a pair of mounting hardware 3 (strictly speaking, mounting hardware 3u) on the upper floor is provided at positions separated in the vertical direction. As shown in FIG. 4C, the adjusting jig 30 according to the present embodiment is located below each of the upper and lower pair of lower floor mounting hardware 3t and the upper and lower pair of upper floor mounting hardware 3u. The contact surface 31 is arranged so as to abut against the positioned mounting hardware 3u.

また、建物の角部分に設けられた取り付け金物3は、建物の角部分に配置された柱5に取り付けられている。本実施形態に係る調整治具30は、前述したようにL型のアングル材からなり、図4Bに示すように当該アングル材の直角部を上記柱5の直角部にフィットさせることで、当接面31を取り付け金物3に良好に当接させることが可能である。 Further, the mounting hardware 3 provided at the corner portion of the building is mounted on the pillar 5 arranged at the corner portion of the building. As described above, the adjusting jig 30 according to the present embodiment is made of an L-shaped angle material, and as shown in FIG. 4B, the right-angled portion of the angle material is fitted to the right-angled portion of the pillar 5 to abut. The surface 31 can be brought into good contact with the mounting hardware 3.

なお、柱5のうち、取り付け金物3が取り付けられている面と直交する面には、他の取り付け金物3xが取り付けられている。ここで、他の取り付け金物3xは、取り付け金物3に固定される外壁パネル2(すなわち、ある向きに面した外壁パネル2)の向きとは直交した向きを向く外壁パネル2を固定するために用いられる。そして、本実施形態に係る調整治具30は、図4Bに示すように、ある向きに面した外壁パネル2を固定するための取り付け金物3と当接する際に、上記他の取り付け金物3xにも当接する。これにより、調整治具30が取り付け金物3と当接している状態を、より安定させることが可能となる。 It should be noted that another mounting hardware 3x is mounted on the surface of the pillar 5 that is orthogonal to the surface on which the mounting hardware 3 is mounted. Here, the other mounting hardware 3x is used to fix the outer wall panel 2 facing in an direction orthogonal to the orientation of the outer wall panel 2 fixed to the mounting hardware 3 (that is, the outer wall panel 2 facing in a certain direction). Be done. Then, as shown in FIG. 4B, the adjusting jig 30 according to the present embodiment also applies to the other mounting hardware 3x when it comes into contact with the mounting hardware 3 for fixing the outer wall panel 2 facing in a certain direction. Contact. This makes it possible to further stabilize the state in which the adjusting jig 30 is in contact with the mounting hardware 3.

<<外壁パネルを配置する工程について>>
次に、上述した外壁工事のうち、外壁パネル2を配置する工程S003について、より詳細に説明する。
外壁パネル2を配置する工程S003では、前述したように、各階において複数の外壁パネル2を水平方向に並ぶように配置する。また、外壁パネル2を配置する工程S003では、出入方向において外壁パネル2を位置決めする。さらに、2階以上の階の外壁パネル2については、出入方向における位置決めと共に、外壁パネル2間の隙間調整も行う。
<< About the process of arranging the outer wall panel >>
Next, among the above-mentioned outer wall works, the step S003 for arranging the outer wall panel 2 will be described in more detail.
In the step S003 for arranging the outer wall panels 2, as described above, a plurality of outer wall panels 2 are arranged so as to be arranged in the horizontal direction on each floor. Further, in the step S003 for arranging the outer wall panel 2, the outer wall panel 2 is positioned in the entry / exit direction. Further, for the outer wall panels 2 on the second and higher floors, the clearance between the outer wall panels 2 is adjusted as well as the positioning in the entrance / exit direction.

外壁パネル2を配置する工程S003の手順について説明すると、本工程S003は、図7に図示の流れに従って進行する。図7は、外壁パネル2を配置する工程の流れを示す図である。具体的に説明すると、外壁パネル2を配置する工程S003では、先ず、外壁パネル2に所定の治具を取り付ける(S011)。当該治具が取り付けられた状態の外壁パネル2を吊り込んで取り付け金物3の固定面3aの手前位置まで搬送する(S012)。このとき、同じ階において水平方向に並ぶ複数の外壁パネル2は、同時に吊り込まれる。 Explaining the procedure of the step S003 for arranging the outer wall panel 2, the main step S003 proceeds according to the flow shown in FIG. 7. FIG. 7 is a diagram showing a flow of a process of arranging the outer wall panel 2. Specifically, in the step S003 for arranging the outer wall panel 2, a predetermined jig is first attached to the outer wall panel 2 (S011). The outer wall panel 2 in which the jig is attached is suspended and conveyed to a position in front of the fixed surface 3a of the attachment hardware 3 (S012). At this time, a plurality of outer wall panels 2 arranged horizontally on the same floor are suspended at the same time.

その後、吊り込んだ状態にある複数の外壁パネル2の各々に対して、出入方向における位置決めを行う(S015)。具体的には、出入方向において複数の外壁パネル2の各々の裏面が面一となるように各外壁パネル2を位置決めする。これにより、出入方向において複数の外壁パネル2の各々の端位置が揃った状態で各外壁パネル2が配置される。 After that, positioning is performed in the entry / exit direction for each of the plurality of outer wall panels 2 in the suspended state (S015). Specifically, each outer wall panel 2 is positioned so that the back surfaces of the plurality of outer wall panels 2 are flush with each other in the entry / exit direction. As a result, each outer wall panel 2 is arranged in a state where the end positions of the plurality of outer wall panels 2 are aligned in the entry / exit direction.

また、出入方向における各外壁パネル2の位置決めは、各階別に繰り返し実施される。さらに、上階において複数の外壁パネル2を水平方向に並べて配置する際には、上階の外壁パネル2と下階の外壁パネル2とが上下方向に並び、且つ出入方向において上階の外壁パネル2の端位置と下階の外壁パネル2の端位置が揃うように上階の各外壁パネル2を配置する。 Further, the positioning of each outer wall panel 2 in the entry / exit direction is repeatedly performed for each floor. Further, when a plurality of outer wall panels 2 are arranged side by side in the horizontal direction on the upper floor, the outer wall panel 2 on the upper floor and the outer wall panel 2 on the lower floor are arranged in the vertical direction, and the outer wall panel on the upper floor is arranged in the entrance / exit direction. Each outer wall panel 2 on the upper floor is arranged so that the end position of 2 and the end position of the outer wall panel 2 on the lower floor are aligned.

さらにまた、2階以上の外壁パネル2については(S013でYes)、前述したように、外壁パネル2の間に形成される隙間(厳密には、縦の隙間)の横幅が調整される(S014)。この隙間調整により、上階の外壁パネル2の間に形成される隙間の横幅が下階の外壁パネル2の間に形成される隙間の横幅と揃った状態で、上階の各外壁パネル2が配置されるようになる。 Furthermore, for the outer wall panel 2 on the second floor or higher (Yes in S013), as described above, the width of the gap (strictly speaking, the vertical gap) formed between the outer wall panels 2 is adjusted (S014). ). By this gap adjustment, each outer wall panel 2 on the upper floor is in a state where the width of the gap formed between the outer wall panels 2 on the upper floor is aligned with the width of the gap formed between the outer wall panels 2 on the lower floor. Will be placed.

ところで、本実施形態において外壁パネル2を位置決めする際には、図2に図示の位置決め部材10が利用される。また、上階の外壁パネル2の間の隙間を調整する際には、図8A及び図8Bに図示の隙間調整具50が利用される。図8A及び図8Bは、隙間調整具50を示す図であり、図8Aが隙間調整具50の平面図を示し、図8Bが隙間調整具50の側面図を示している。
以下では、位置決め部材10や隙間調整具50の構造について言及しつつ、外壁パネル2の位置決め方法について具体的に説明する。
By the way, when positioning the outer wall panel 2 in the present embodiment, the positioning member 10 shown in FIG. 2 is used. Further, when adjusting the gap between the outer wall panels 2 on the upper floor, the gap adjusting tool 50 shown in FIGS. 8A and 8B is used. 8A and 8B are views showing the gap adjuster 50, FIG. 8A shows a plan view of the gap adjuster 50, and FIG. 8B shows a side view of the gap adjuster 50.
Hereinafter, the positioning method of the outer wall panel 2 will be specifically described while referring to the structures of the positioning member 10 and the gap adjusting tool 50.

(位置決め部材について)
位置決め部材10は、各階において水平方向に沿って並ぶ複数の外壁パネル2の各々を、出入方向において位置決めする際に用いられる。位置決め部材10は、図2及び図9に示すように、組み付け部11、保持部12、位置調整部13及び二つの当接部(具体的には第一当接部15及び第二当接部18)によって構成されている。図9は、外壁パネル2に取り付けられた状態の位置決め部材10を示す図である。
(About positioning members)
The positioning member 10 is used for positioning each of the plurality of outer wall panels 2 arranged along the horizontal direction on each floor in the entry / exit direction. As shown in FIGS. 2 and 9, the positioning member 10 includes an assembly portion 11, a holding portion 12, a position adjusting portion 13, and two contact portions (specifically, a first contact portion 15 and a second contact portion). It is composed of 18). FIG. 9 is a diagram showing a positioning member 10 attached to the outer wall panel 2.

組み付け部11は、図2に示すように長尺なL型のアングル材によって構成されており、互いに略直交する水平部分11a及び突出部分11bを有する。組み付け部11は、外壁パネル2が吊り込まれている間、水平方向に沿って並ぶ複数の外壁パネル2の各々に組み付けられる。具体的には、図9に示すように、各外壁パネル2の上端面に水平部分11aが締結される。このとき、組み付け部11は、その長手方向が水平方向に沿っており(換言すると、水平方向に延出しており)、出入方向において突出部分11bの端が各外壁パネル2の端(裏面)と揃った状態にある。 As shown in FIG. 2, the assembly portion 11 is composed of a long L-shaped angle member, and has a horizontal portion 11a and a protruding portion 11b that are substantially orthogonal to each other. The assembly portion 11 is assembled to each of the plurality of outer wall panels 2 arranged along the horizontal direction while the outer wall panel 2 is suspended. Specifically, as shown in FIG. 9, the horizontal portion 11a is fastened to the upper end surface of each outer wall panel 2. At this time, the assembly portion 11 has a longitudinal direction along the horizontal direction (in other words, extends in the horizontal direction), and the end of the protruding portion 11b is the end (back surface) of each outer wall panel 2 in the ingress / egress direction. It is in a complete state.

保持部12は、外壁パネル2の位置決め中、出入方向において複数の外壁パネル2の一つの端位置(具体的には第一パネル2M)と組み付け部11の端位置とが揃った状態を保持するためのものである。保持部12は、図2に図示した下側第一治具14と上側第一治具16と第一押圧部21と第二押圧部22とを構成要素として備えている。これらは、平板状の第一当接部15と協働して、第一パネル2Mの端位置と組み付け部11の端位置とが揃った状態を保持する。 During the positioning of the outer wall panel 2, the holding portion 12 holds a state in which one end position (specifically, the first panel 2M) of the plurality of outer wall panels 2 and the end position of the assembling portion 11 are aligned in the entry / exit direction. Is for. The holding portion 12 includes a lower first jig 14, an upper first jig 16, a first pressing portion 21, and a second pressing portion 22 shown in FIG. 2 as constituent elements. These cooperate with the flat plate-shaped first contact portion 15 to maintain a state in which the end position of the first panel 2M and the end position of the assembly portion 11 are aligned.

第一当接部15は、略矩形状の鋼板からなり、外壁パネル2の位置決め中、図10に示すように、出入方向において組み付け部11の突出部分11b及び第一パネル2Mの端(裏面)と当接する位置に配置される。図10は、位置決め部材10による外壁パネル2の位置決め方法に関する説明図であり、位置決め部材10が取り付けられた状態の第一パネル2Mの側面図である。 The first contact portion 15 is made of a substantially rectangular steel plate, and during positioning of the outer wall panel 2, as shown in FIG. 10, the protruding portion 11b of the assembly portion 11 and the end (back surface) of the first panel 2M are formed. It is placed at the position where it comes into contact with. FIG. 10 is an explanatory view of a method of positioning the outer wall panel 2 by the positioning member 10, and is a side view of the first panel 2M in a state where the positioning member 10 is attached.

下側第一治具14は、図2に示すように側面視でコの字状に成形された金物であり、互いに対向しながら延出している一対の立設部14aと、立設部14a間を連結する連結部14bとを有する。一方の立設部14a(以下、屋内側の立設部14a)には第一押圧部21を取り付けるためのネジ孔(不図示)が形成されている。第一押圧部21は、図2に示すように第一ネジ体21a及び押圧キャップ21bを備えている。第一ネジ体21aは、下側第一治具14が有する屋内側の立設部14aに設けられたネジ孔に螺合しており、操作されて回転することで第一ネジ体21aの中心軸に沿って進退し、所定方向に回転した際には、その先端部が反対の立設部14a(以下、屋外側の立設部14a)に近付くように進行する。押圧キャップ21bは、第一ネジ体21aの先端部に取り付けられたゴム製のキャップである。 As shown in FIG. 2, the lower first jig 14 is a metal fitting shaped like a U in a side view, and has a pair of standing portions 14a extending while facing each other and a standing portion 14a. It has a connecting portion 14b for connecting the spaces. A screw hole (not shown) for attaching the first pressing portion 21 is formed in one of the standing portions 14a (hereinafter, the standing portion 14a on the indoor side). As shown in FIG. 2, the first pressing portion 21 includes a first screw body 21a and a pressing cap 21b. The first screw body 21a is screwed into a screw hole provided in an indoor standing portion 14a of the lower first jig 14, and is operated to rotate to the center of the first screw body 21a. When it advances and retreats along the axis and rotates in a predetermined direction, it advances so that its tip portion approaches the opposite standing portion 14a (hereinafter referred to as the outdoor side standing portion 14a). The pressing cap 21b is a rubber cap attached to the tip of the first screw body 21a.

上側第一治具16は、外観上、下側第一治具14と略同様の構造であり、図2及び図9に示すように、一対の立設部16aと、立設部16a間を連結する連結部16bとを有する。一方の立設部16a(以下、屋内側の立設部16a)には第二押圧部22を取り付けるためのネジ孔(不図示)が形成されている。第二押圧部22は、図2に示すように第二ネジ体22a及び押圧キャップ22bを備える。第二ネジ体22a及び押圧キャップ22bは、第一押圧部21が有する第一ネジ体21a及び押圧キャップ21bと同じ構造であり、使用方法についても同様である。 The upper first jig 16 has substantially the same structure as the lower first jig 14 in appearance, and as shown in FIGS. 2 and 9, the space between the pair of standing portions 16a and the standing portions 16a is provided. It has a connecting portion 16b to be connected. A screw hole (not shown) for attaching the second pressing portion 22 is formed in one of the standing portions 16a (hereinafter, the standing portion 16a on the indoor side). As shown in FIG. 2, the second pressing portion 22 includes a second screw body 22a and a pressing cap 22b. The second screw body 22a and the pressing cap 22b have the same structure as the first screw body 21a and the pressing cap 21b of the first pressing portion 21, and the usage method is also the same.

位置調整部13は、出入方向において第一パネル2Mの端位置が組み付け部11の端位置と揃っている間に、出入方向において組み付け部11の端位置と第二パネル2Nの端位置とが揃うように、組み付け部11に対する第二パネル2Nの位置を調整するためのものである。位置調整部13は、図2に示すように下側第二治具17と上側第二治具19と第三押圧部23と第四押圧部24とを構成要素として備えている。これらは、平板状の第二当接部18と協働して、組み付け部11に対する第二パネル2Nの位置を調整する。 In the position adjusting portion 13, the end position of the assembly portion 11 and the end position of the second panel 2N are aligned in the entry / exit direction while the end position of the first panel 2M is aligned with the end position of the assembly portion 11 in the entry / exit direction. As described above, the position of the second panel 2N with respect to the assembly portion 11 is adjusted. As shown in FIG. 2, the position adjusting portion 13 includes a lower second jig 17, an upper second jig 19, a third pressing portion 23, and a fourth pressing portion 24 as constituent elements. These cooperate with the flat plate-shaped second contact portion 18 to adjust the position of the second panel 2N with respect to the assembly portion 11.

第二当接部18は、略矩形状の鋼板からなり、出入方向において第一当接部15が突出部分11b及び第一パネル2Mの裏面と当接している間、突出部分11b及び第二パネル2Nの端(裏面)と当接する位置に配置される。 The second contact portion 18 is made of a substantially rectangular steel plate, and while the first contact portion 15 is in contact with the protruding portion 11b and the back surface of the first panel 2M in the entry / exit direction, the protruding portion 11b and the second panel It is arranged at a position where it comes into contact with the end (back surface) of 2N.

下側第二治具17は、下側第一治具14と同じ構造であり、図2に示すように一対の立設部17a及び連結部17bを有する。また、一方の立設部17a(以下、屋内側の立設部17a)には第三押圧部23を取り付けるためのネジ孔(不図示)が形成されている。第三押圧部23は、図2に示すように第三ネジ体23a及び押圧キャップ23bを備える。第三ネジ体23a及び押圧キャップ23bは、第一押圧部21が有する第一ネジ体21a及び押圧キャップ21bと同じ構造であり、使用方法についても同様である。 The lower second jig 17 has the same structure as the lower first jig 14, and has a pair of upright portions 17a and a connecting portion 17b as shown in FIG. Further, a screw hole (not shown) for attaching the third pressing portion 23 is formed in one of the standing portions 17a (hereinafter, the standing portion 17a on the indoor side). As shown in FIG. 2, the third pressing portion 23 includes a third screw body 23a and a pressing cap 23b. The third screw body 23a and the pressing cap 23b have the same structure as the first screw body 21a and the pressing cap 21b of the first pressing portion 21, and the usage method is also the same.

上側第二治具19は、上側第一治具16と同じ構造であり、図2に示すように一対の立設部19a及び連結部19bを有する。また、一方の立設部19a(以下、屋内側の立設部19a)には第四押圧部24を取り付けるためのネジ孔(不図示)が形成されている。第四押圧部24は、図2に示すように図2に示すように第四ネジ体24a及び押圧キャップ24bを有する。第四ネジ体24a及び押圧キャップ24bは、第一押圧部21が有する第一ネジ体21a及び押圧キャップ21bと同じ構造であり、使用方法についても同様である。 The upper second jig 19 has the same structure as the upper first jig 16, and has a pair of upright portions 19a and a connecting portion 19b as shown in FIG. Further, a screw hole (not shown) for attaching the fourth pressing portion 24 is formed in one of the standing portions 19a (hereinafter, the standing portion 19a on the indoor side). As shown in FIG. 2, the fourth pressing portion 24 has a fourth screw body 24a and a pressing cap 24b as shown in FIG. The fourth screw body 24a and the pressing cap 24b have the same structure as the first screw body 21a and the pressing cap 21b of the first pressing portion 21, and the usage method is also the same.

(出入方向における外壁パネルの位置決めについて)
以下、上述した位置決め部材10によって外壁パネル2を出入方向において位置決めする方法について説明する。
出入方向において外壁パネル2を位置決めするにあたり、水平方向に並ぶ複数の外壁パネル2(厳密には、同じ階に位置して水平方向に並べられる複数の外壁パネル2)の各々に、下側第一治具14や下側第二治具17に相当する治具を取り付ける。
(About the positioning of the outer wall panel in the entry / exit direction)
Hereinafter, a method of positioning the outer wall panel 2 in the entry / exit direction by the positioning member 10 described above will be described.
In positioning the outer wall panel 2 in the entry / exit direction, the lower first is applied to each of the plurality of outer wall panels 2 arranged in the horizontal direction (strictly speaking, the plurality of outer wall panels 2 located on the same floor and arranged in the horizontal direction). A jig corresponding to the jig 14 and the lower second jig 17 is attached.

当該治具の取り付け手順について、下側第一治具14を例に挙げて説明すると、外壁パネル2が有するパネル本体2bの裏面の上方部分には、図2に示すように、水平方向に沿ってアルミ蒸着フィルム2dを切ることで形成された切れ目(以下、上方切れ目M1)が設けられている。この上方切れ目M1に、下側第一治具14が有する一対の立設部14aのうち、屋外側の立設部14aを差し込む。上方切れ目M1に差し込まれた屋外側の立設部14aは、図10に示すように、パネル本体2b内部においてフレーム2cの上端部と係合し、当該フレーム2cの上端部と当接する。これにより、下側第一治具14が図9に示すように外壁パネル2の上端部に取り付けられる。
なお、下側第二治具17を外壁パネル2に取り付ける場合の手順は、上記の取り付け手順と同様であるため、説明を省略することとする。
The procedure for attaching the jig will be described by taking the lower first jig 14 as an example. As shown in FIG. 2, the upper portion of the back surface of the panel main body 2b of the outer wall panel 2 is along the horizontal direction. A cut (hereinafter referred to as an upper cut M1) formed by cutting the aluminum-deposited film 2d is provided. Of the pair of upright portions 14a of the lower first jig 14, the upright portion 14a on the outdoor side is inserted into the upper cut M1. As shown in FIG. 10, the outdoor side standing portion 14a inserted into the upper cut M1 engages with the upper end portion of the frame 2c inside the panel main body 2b and abuts on the upper end portion of the frame 2c. As a result, the lower first jig 14 is attached to the upper end portion of the outer wall panel 2 as shown in FIG.
Since the procedure for attaching the lower second jig 17 to the outer wall panel 2 is the same as the above-mentioned attachment procedure, the description thereof will be omitted.

その後、治具が取り付けられた複数の外壁パネル2を同時に吊り上げ、外壁1において最も水平方向一端側に位置する外壁パネル2を第一パネル2Mとし、これと隣り合う外壁パネル2を第二パネル2Nとして位置決めを開始する。出入方向における外壁パネル2の位置決めは、図11に図示の流れに沿って進められる。図11は、出入方向において外壁パネル2を位置決めする手順を示す図である。 After that, a plurality of outer wall panels 2 to which jigs are attached are simultaneously lifted, the outer wall panel 2 located on one end side in the horizontal direction of the outer wall 1 is designated as the first panel 2M, and the outer wall panel 2 adjacent to this is referred to as the second panel 2N. Start positioning as. Positioning of the outer wall panel 2 in the entry / exit direction proceeds along the flow shown in FIG. FIG. 11 is a diagram showing a procedure for positioning the outer wall panel 2 in the entry / exit direction.

出入方向において外壁パネル2を位置決めする工程では、先ず、水平方向において第一パネル2M及び第二パネル2Nの間に跨る位置に、組み付け部11を配置する(S021)。組み付け部11が上記の位置に配置された後、組み付け部11の水平部分11aを第一パネル2Mの上端面に締結して組み付け部11を第一パネル2Mに組み付ける(S022)。 In the step of positioning the outer wall panel 2 in the entry / exit direction, first, the assembly portion 11 is arranged at a position straddling between the first panel 2M and the second panel 2N in the horizontal direction (S021). After the assembly portion 11 is arranged at the above position, the horizontal portion 11a of the assembly portion 11 is fastened to the upper end surface of the first panel 2M to assemble the assembly portion 11 to the first panel 2M (S022).

その後、組み付け部11のうち、第一パネル2Mに組み付けられた部分に在る突出部分11bに上側第一治具16を取り付ける(S023)。具体的に説明すると、図10に示すように、組み付け部11のうち、第一パネル2Mに組み付けられた部分に在る突出部分11bを出入方向において一対の立設部16aの間に挟むように上側第一治具16を配置する。このとき、一対の立設部16aのうち、第二押圧部22が取り付けられる側とは反対側の立設部16a(屋外側の立設部16a)が突出部分11bと係合し、当該突出部分11bの屋外側の端面と当接する。これにより、上側第一治具16が組み付け部11の突出部分11bに取り付けられる。なお、本実施形態において、第一パネル2Mの上端部には下側第一治具14が取り付けられており、上側第一治具16は、第一パネル2Mに取り付けられた下側第一治具14の略直上位置に配置される。 After that, the upper first jig 16 is attached to the protruding portion 11b in the portion assembled to the first panel 2M in the assembled portion 11 (S023). Specifically, as shown in FIG. 10, the protruding portion 11b in the portion assembled to the first panel 2M of the assembled portions 11 is sandwiched between the pair of standing portions 16a in the entry / exit direction. The upper first jig 16 is arranged. At this time, of the pair of upright portions 16a, the upright portion 16a (outdoor side upright portion 16a) on the side opposite to the side to which the second pressing portion 22 is attached engages with the projecting portion 11b, and the projecting portion 16a. It abuts on the outdoor end face of the portion 11b. As a result, the upper first jig 16 is attached to the protruding portion 11b of the assembly portion 11. In the present embodiment, the lower first jig 14 is attached to the upper end of the first panel 2M, and the upper first jig 16 is the lower first jig attached to the first panel 2M. It is arranged at a position substantially directly above the tool 14.

上側第一治具16の取り付けが完了した後、下側第一治具14及び上側第一治具16の各々が有する一対の立設部14a、16aの間に第一当接部15を配置する(S024)。具体的には、図10に示すように、第一当接部15の下側部分が第一パネル2Mの裏面に対向し、第一当接部15の上側部分が突出部分11bの屋内側の端面に対向するように第一当接部15を配置する。 After the attachment of the upper first jig 16 is completed, the first contact portion 15 is arranged between the pair of standing portions 14a and 16a of each of the lower first jig 14 and the upper first jig 16. (S024). Specifically, as shown in FIG. 10, the lower portion of the first contact portion 15 faces the back surface of the first panel 2M, and the upper portion of the first contact portion 15 is on the indoor side of the protruding portion 11b. The first contact portion 15 is arranged so as to face the end face.

その後、下側第一治具14に取り付けられた第一押圧部21、及び、上側第一治具16に取り付けられた第二押圧部22をそれぞれ操作して、第一当接部15を、組み付け部11のうち、第一パネル2Mに組み付けられた部分に在る突出部分11b及び第一パネル2Mの裏面の双方に押し付ける(S025)。 After that, the first pressing portion 21 attached to the lower first jig 14 and the second pressing portion 22 attached to the upper first jig 16 are operated to move the first contact portion 15. Of the assembled portions 11, they are pressed against both the protruding portion 11b in the portion assembled to the first panel 2M and the back surface of the first panel 2M (S025).

具体的には、第一押圧部21の第一ネジ体21a及び第二押圧部22の第二ネジ体22aの各々を、その先端部に設けられた押圧キャップ21b、22bが第一当接部15に当接するように進行させる。このとき、出入方向において屋外側では、図10に示すように、下側第一治具14に備えられた屋外側の立設部14aが第一当接部15とは反対側で第一パネル2M(厳密にはフレーム2c)と当接する。また、上側第一治具16に備えられた屋外側の立設部16aが第一当接部15とは反対側で組み付け部11の突出部分11bと当接する。これにより、第一押圧部21及び第二押圧部22が第一当接部15を押圧する際の反力が確保され、各押圧部が第一当接部15を適切に押圧するようになる。 Specifically, the pressing caps 21b and 22b provided at the tips of the first screw body 21a of the first pressing portion 21 and the second screw body 22a of the second pressing portion 22 are the first contact portions. Proceed so as to come into contact with 15. At this time, on the outdoor side in the entry / exit direction, as shown in FIG. 10, the outdoor side upright portion 14a provided on the lower first jig 14 is on the opposite side of the first contact portion 15 and the first panel. It comes into contact with 2M (strictly speaking, the frame 2c). Further, the outdoor side standing portion 16a provided on the upper first jig 16 comes into contact with the protruding portion 11b of the assembled portion 11 on the opposite side of the first contact portion 15. As a result, the reaction force when the first pressing portion 21 and the second pressing portion 22 press the first contact portion 15 is secured, and each pressing portion appropriately presses the first contact portion 15. ..

そして、第一当接部15が組み付け部11の突出部分11b及び第一パネル2Mの裏面と当接することで、出入方向において組み付け部11の端位置が第一パネル2Mの端位置と揃うようになる。以降、外壁パネル2の位置決めが完了するまで間、出入方向において組み付け部11の端位置(突出部分11bの端位置)が第一パネル2Mの端位置と揃った状態が保持される。 Then, the first contact portion 15 comes into contact with the protruding portion 11b of the assembly portion 11 and the back surface of the first panel 2M so that the end position of the assembly portion 11 is aligned with the end position of the first panel 2M in the entry / exit direction. Become. After that, until the positioning of the outer wall panel 2 is completed, the state in which the end position of the assembled portion 11 (the end position of the protruding portion 11b) is aligned with the end position of the first panel 2M is maintained in the in-out direction.

以上までの工程が終了した時点において、組み付け部11は、第一パネル2Mの上端に取り付けられている。また、水平方向において第一パネル2Mと所定の隙間を隔てて隣り合う位置には、第二パネル2Nが配置されている。このとき、第二パネル2Nは、組み付け部11の水平部分11aの直下に位置している。かかる状態において、組み付け部11のうち、第二パネル2Nに組み付けられる部分に在る突出部分11bに対して上側第二治具19を取り付ける(S026)。上側第二治具19を突出部分11bに取り付ける要領は、上側第一治具16を突出部分11bに取り付ける際の要領と同様である。
なお、本実施形態において、第二パネル2Nの上端部には下側第二治具17が取り付けられており、上側第二治具19は、第二パネル2Nに取り付けられた下側第二治具17の略直上位置に配置される。
At the time when the above steps are completed, the assembly portion 11 is attached to the upper end of the first panel 2M. Further, the second panel 2N is arranged at a position adjacent to the first panel 2M with a predetermined gap in the horizontal direction. At this time, the second panel 2N is located directly below the horizontal portion 11a of the assembly portion 11. In such a state, the upper second jig 19 is attached to the protruding portion 11b in the portion of the assembled portion 11 to be assembled to the second panel 2N (S026). The procedure for attaching the upper second jig 19 to the projecting portion 11b is the same as the procedure for attaching the upper first jig 16 to the projecting portion 11b.
In the present embodiment, the lower second jig 17 is attached to the upper end of the second panel 2N, and the upper second jig 19 is the lower second jig attached to the second panel 2N. It is arranged at a position substantially directly above the tool 17.

その後、下側第二治具17及び上側第二治具19の各々が有する一対の17a、19aの間に第二当接部18を配置する(S027)。具体的には、第二当接部18の下側部分が第二パネル2Nの裏面に対向し、第二当接部18の上側部分が突出部分11bの屋内側の端面に対向するように第二当接部18を配置する。 After that, the second contact portion 18 is arranged between the pair of 17a and 19a of each of the lower second jig 17 and the upper second jig 19 (S027). Specifically, the lower portion of the second contact portion 18 faces the back surface of the second panel 2N, and the upper portion of the second contact portion 18 faces the end surface of the projecting portion 11b on the indoor side. (Ii) The contact portion 18 is arranged.

第二当接部18の配置後、下側第二治具17に取り付けられた第三押圧部23、及び、上側第二治具19に取り付けられた第四押圧部24をそれぞれ操作して、第二当接部18を、組み付け部11のうち、第二パネル2Nに組み付けられる部分に在る突出部分11b及び第二パネル2Nの裏面の双方に押し付ける(S028)。 After arranging the second contact portion 18, the third pressing portion 23 attached to the lower second jig 17 and the fourth pressing portion 24 attached to the upper second jig 19 are operated respectively. The second contact portion 18 is pressed against both the protruding portion 11b and the back surface of the second panel 2N in the portion of the assembled portion 11 to be assembled to the second panel 2N (S028).

具体的には、第三押圧部23の第三ネジ体23a及び第四押圧部24の第四ネジ体24aの各々を、その先端部に設けられた押圧キャップ23b、24bが第二当接部18に当接するように進行させる。このとき、出入方向において屋外側では、下側第二治具17に備えられた屋外側の立設部17aが第二当接部18とは反対側で第二パネル2N(厳密にはフレーム2c)と当接する。また、上側第二治具19に備えられた屋外側の立設部19aが第二当接部18とは反対側で組み付け部11の突出部分11bと当接する。これにより、第三押圧部23及び第四押圧部24が第二当接部18を押圧する際の反力が確保され、各押圧部が第二当接部18を適切に押圧するようになる。 Specifically, the pressing caps 23b and 24b provided at the tips of the third screw body 23a of the third pressing portion 23 and the fourth screw body 24a of the fourth pressing portion 24 are the second contact portions. Proceed so as to abut on 18. At this time, on the outdoor side in the entry / exit direction, the outdoor side standing portion 17a provided on the lower second jig 17 is on the opposite side of the second contact portion 18 and the second panel 2N (strictly speaking, the frame 2c). ). Further, the outdoor side standing portion 19a provided on the upper second jig 19 comes into contact with the protruding portion 11b of the assembled portion 11 on the opposite side of the second contact portion 18. As a result, the reaction force when the third pressing portion 23 and the fourth pressing portion 24 press the second contact portion 18 is secured, and each pressing portion appropriately presses the second contact portion 18. ..

そして、第二当接部18が組み付け部11の突出部分11b及び第二パネル2Nの裏面と当接することで、出入方向において組み付け部11の端位置が第二パネル2Nの端位置と揃うようになる。これにより、図12に示すように、出入方向において第一パネル2Mの裏面が第二パネル2Nの裏面と揃う(面一となる)ように、組み付け部11に対する第二パネル2Nの位置が調整される。図12は、出入方向において位置決めされた状態の外壁パネル2を上方から見た図である。 Then, the second contact portion 18 comes into contact with the protruding portion 11b of the assembly portion 11 and the back surface of the second panel 2N so that the end position of the assembly portion 11 is aligned with the end position of the second panel 2N in the entry / exit direction. Become. As a result, as shown in FIG. 12, the position of the second panel 2N with respect to the assembly portion 11 is adjusted so that the back surface of the first panel 2M is aligned with the back surface of the second panel 2N in the entry / exit direction. NS. FIG. 12 is a view of the outer wall panel 2 positioned in the entry / exit direction as viewed from above.

以上までの工程により、第二パネル2Nの位置が調整され、出入方向において第二パネル2Nの端位置が組み付け部11の突出部分11bの端位置と揃うようになる。すなわち、第二パネル2Nが組み付け部11に対して位置決めされる。その後、上記のように位置決めされた第二パネル2Nの上端面に組み付け部11の水平部分11aを締結し、組み付け部11を第二パネル2Nに組み付ける(S029)。この時点において、第二パネル2N一つ分の位置決めが終了する。 By the above steps, the position of the second panel 2N is adjusted so that the end position of the second panel 2N is aligned with the end position of the protruding portion 11b of the assembly portion 11 in the entry / exit direction. That is, the second panel 2N is positioned with respect to the assembly portion 11. After that, the horizontal portion 11a of the assembly portion 11 is fastened to the upper end surface of the second panel 2N positioned as described above, and the assembly portion 11 is assembled to the second panel 2N (S029). At this point, positioning for one second panel 2N is completed.

以後、それまで第二パネル2Nとして取り扱っていた外壁パネル2を第一パネル2Mとし、これと隣り合う外壁パネル2(厳密には、それまで第一パネル2Mとして取り扱っていた外壁パネル2とは反対側に位置する外壁パネル2)を第二パネル2Nとした上で、S022〜S029までの一連の工程を繰り返す。 After that, the outer wall panel 2 that was previously treated as the second panel 2N is referred to as the first panel 2M, and the outer wall panel 2 adjacent to this is the opposite of the outer wall panel 2 that was previously treated as the first panel 2M. After the outer wall panel 2) located on the side is set as the second panel 2N, a series of steps from S022 to S029 are repeated.

そして、同じ階に位置して水平方向に並べられる複数の外壁パネル2の各々について、上記一連の工程S022〜S029が繰り返されることで、組み付け部11が水平方向に沿って並ぶ複数の外壁パネル2のすべてに跨った状態で各外壁パネル2に組み付けられる。この結果、出入方向において複数の外壁パネル2の各々の端位置が揃うように各外壁パネル2が順次、位置決めされる。このとき、水平方向において一定間隔毎(例えば、2〜3枚分の外壁パネル2に相当する間隔毎)に風防下げ振り40等を外壁パネル2に取り付けて、各外壁パネル2の高さ方向が鉛直方向に対して略平行となっていることを適宜確認するのが望ましい。 Then, by repeating the series of steps S022 to S029 for each of the plurality of outer wall panels 2 located on the same floor and arranged in the horizontal direction, the plurality of outer wall panels 2 in which the assembly portions 11 are arranged in the horizontal direction are repeated. It is assembled to each outer wall panel 2 in a state of straddling all of the above. As a result, each outer wall panel 2 is sequentially positioned so that the end positions of the plurality of outer wall panels 2 are aligned in the entry / exit direction. At this time, the windshield plumb bob 40 and the like are attached to the outer wall panel 2 at regular intervals in the horizontal direction (for example, every interval corresponding to the outer wall panels 2 for 2 to 3 sheets), and the height direction of each outer wall panel 2 is changed. It is desirable to appropriately confirm that they are substantially parallel to the vertical direction.

そして、複数の外壁パネル2の各々について位置決めが完了した後、各外壁パネル2が取り付け金物3の固定面3aに固定される。その後、各外壁パネル2に組み付けられていた組み付け部11が取り外される。取り外された組み付け部11は、次回以降の位置決めに(具体的には、上階の外壁パネル2を位置決めする際に)再利用される。 Then, after the positioning of each of the plurality of outer wall panels 2 is completed, each outer wall panel 2 is fixed to the fixing surface 3a of the mounting hardware 3. After that, the assembly portion 11 attached to each outer wall panel 2 is removed. The removed assembly portion 11 is reused for subsequent positioning (specifically, when positioning the outer wall panel 2 on the upper floor).

また、本実施形態では、ある階において水平方向に並ぶ複数の外壁パネル2の各々が位置決めされて取り付け金物3に固定された後、その直上階において水平方向に並ぶ複数の外壁パネル2の各々について、出入方向における位置決めが行われる。出入方向において上階の外壁パネル2を位置決めする際には、前述した工程S021〜S029を行うと共に、上階の外壁パネル2の端位置と下階の外壁パネル2の端位置とを揃える工程(以下、階間位置揃え工程)を更に実施する。 Further, in the present embodiment, after each of the plurality of outer wall panels 2 arranged in the horizontal direction on a certain floor is positioned and fixed to the mounting hardware 3, each of the plurality of outer wall panels 2 arranged in the horizontal direction on the floor immediately above the mounting hardware 3 is provided. , Positioning in the entry / exit direction is performed. When positioning the outer wall panel 2 on the upper floor in the entry / exit direction, the above-mentioned steps S021 to S029 are performed, and the end positions of the outer wall panel 2 on the upper floor and the end positions of the outer wall panel 2 on the lower floor are aligned ( Hereinafter, the inter-floor alignment process) will be further carried out.

階間位置揃え工程では、水平方向において同じ位置に位置し、且つ上下方向において互いに隣り合う外壁パネル2同士の端位置(裏面の位置)を揃える。ここで、下階において水平方向に並ぶ複数の外壁パネル2のうちの一つを「下階の第一パネル2M」としたとき、その直上階において水平方向に並ぶ複数の外壁パネル2のうち、下階の第一パネル2Mの直上位置に配置される外壁パネル2を「上階の第一パネル2M」と呼ぶこととする。また、下階の第一パネル2Mと水平方向において隣り合う外壁パネル2を「下階の第二パネル2N」としたとき、当該下階の第二パネル2Nの直上位置に配置される外壁パネル2を「上階の第二パネル2N」と呼ぶこととする。 In the inter-floor alignment step, the end positions (backside positions) of the outer wall panels 2 that are located at the same position in the horizontal direction and are adjacent to each other in the vertical direction are aligned. Here, when one of the plurality of outer wall panels 2 arranged horizontally on the lower floor is referred to as "the first panel 2M on the lower floor", among the plurality of outer wall panels 2 arranged horizontally on the floor immediately above the floor, among the plurality of outer wall panels 2 arranged horizontally. The outer wall panel 2 arranged at a position directly above the first panel 2M on the lower floor is referred to as "first panel 2M on the upper floor". Further, when the outer wall panel 2 adjacent to the first panel 2M on the lower floor in the horizontal direction is referred to as the "second panel 2N on the lower floor", the outer wall panel 2 arranged at a position directly above the second panel 2N on the lower floor. Will be referred to as "second panel 2N on the upper floor".

階間位置揃え工程では、出入方向において下階の第一パネル2Mの端位置と上階の第一パネル2Mの端位置とを揃えるために、図13に示すように、下階の第一パネル2Mの上端部に下側第一治具14を取り付け、上階の第一パネル2Mの下端部に上側第一治具16を取り付ける。図13は、出入方向において下階の外壁パネル2の端位置と上階の外壁パネル2の端位置とを揃える様子を示す図であり、下階の第一パネル2M及び上階の第一パネル2Mを側方から見た図である。 In the inter-floor alignment process, as shown in FIG. 13, in order to align the end position of the first panel 2M on the lower floor and the end position of the first panel 2M on the upper floor in the entry / exit direction, the first panel on the lower floor is aligned. The lower first jig 14 is attached to the upper end of the 2M, and the upper first jig 16 is attached to the lower end of the first panel 2M on the upper floor. FIG. 13 is a diagram showing how the edge positions of the outer wall panel 2 on the lower floor and the edge positions of the outer wall panel 2 on the upper floor are aligned in the entrance / exit direction, and the first panel 2M on the lower floor and the first panel on the upper floor are aligned. It is the figure which looked at 2M from the side.

下階の第一パネル2Mの上端部に取り付けられる下側第一治具14は、下階の外壁パネル2を位置決めする際に利用した下側第一治具14を、そのまま利用する。すなわち、下側第一治具14は、下階の外壁パネル2を位置決めしてから上階の外壁パネル2を位置決めするまでの間(厳密には、階間位置揃え工程が完了するまでの間)、下階の第一パネル2Mの上端部に取り付けられたままの状態で利用される。
他方、上階の第一パネル2Mの下端部に取り付けられる上側第一治具16は、下階の外壁パネル2を位置決めする際に組み付け部11の突出部分11bに取り付けられていた上側第一治具16を取り外すことで用意される。
As the lower first jig 14 attached to the upper end portion of the first panel 2M on the lower floor, the lower first jig 14 used for positioning the outer wall panel 2 on the lower floor is used as it is. That is, the lower first jig 14 is used between the positioning of the outer wall panel 2 on the lower floor and the positioning of the outer wall panel 2 on the upper floor (strictly speaking, until the inter-floor alignment process is completed). ), It is used as it is attached to the upper end of the first panel 2M on the lower floor.
On the other hand, the upper first jig 16 attached to the lower end of the first panel 2M on the upper floor was attached to the protruding portion 11b of the assembly portion 11 when positioning the outer wall panel 2 on the lower floor. It is prepared by removing the tool 16.

上階の第一パネル2Mの下端部に上側第一治具16を取り付ける手順について説明すると、第一パネル2Mが有するパネル本体2bの裏面の下方部分には、図2に示すように、上方切れ目M1と同様の切れ目(以下、下方切れ目M2)が設けられている。この下方切れ目M2に、上側第一治具16が有する一対の立設部16aのうち、屋外側の立設部16aを差し込む。下方切れ目M2に差し込まれた屋外側の立設部16aは、図13に示すように、パネル本体2b内部においてフレーム2cの下端部と係合し、当該フレーム2cの下端部と当接する。これにより、上側第一治具16が上階の第一パネル2Mの下端部に取り付けられる。 The procedure for attaching the upper first jig 16 to the lower end of the first panel 2M on the upper floor will be described. As shown in FIG. 2, an upper cut is formed in the lower portion of the back surface of the panel body 2b of the first panel 2M. A cut similar to that of M1 (hereinafter referred to as a lower cut M2) is provided. Of the pair of upright portions 16a of the upper first jig 16, the upright portion 16a on the outdoor side is inserted into the lower cut M2. As shown in FIG. 13, the outdoor side standing portion 16a inserted into the lower cut M2 engages with the lower end portion of the frame 2c inside the panel main body 2b and abuts on the lower end portion of the frame 2c. As a result, the upper first jig 16 is attached to the lower end portion of the first panel 2M on the upper floor.

その後、図13に示すように、下側第一治具14及び上側第一治具16の各々が有する一対の立設部14a、16aの間に第一当接部15を配置する。具体的には、同図に示すように、第一当接部15の下端部が下階の第一パネル2Mの裏面に対向し、第一当接部15の上端部が上階の第一パネル2Mの裏面に対向するように第一当接部15を配置する。 After that, as shown in FIG. 13, the first contact portion 15 is arranged between the pair of standing portions 14a and 16a of each of the lower first jig 14 and the upper first jig 16. Specifically, as shown in the figure, the lower end of the first contact portion 15 faces the back surface of the first panel 2M on the lower floor, and the upper end of the first contact portion 15 is the first on the upper floor. The first contact portion 15 is arranged so as to face the back surface of the panel 2M.

第一当接部15を上記位置に配置した後、下側第一治具14に取り付けられた第一押圧部21、及び、上側第一治具16に取り付けられた第二押圧部22をそれぞれ操作する。具体的には、第一押圧部21の第一ネジ体21a及び第二押圧部22の第二ネジ体22aの各々を、その先端部に設けられた押圧キャップ21b、22bが第一当接部15に当接するように進行させる。これにより、第一当接部15が、下階の第一パネル2Mの裏面及び上階の第一パネル2Mの裏面の双方に押し当たる。 After arranging the first contact portion 15 at the above position, the first pressing portion 21 attached to the lower first jig 14 and the second pressing portion 22 attached to the upper first jig 16 are respectively. Manipulate. Specifically, the pressing caps 21b and 22b provided at the tips of the first screw body 21a of the first pressing portion 21 and the second screw body 22a of the second pressing portion 22 are the first contact portions. Proceed so as to come into contact with 15. As a result, the first contact portion 15 abuts against both the back surface of the first panel 2M on the lower floor and the back surface of the first panel 2M on the upper floor.

そして、第一当接部15が下階の第一パネル2Mの裏面及び上階の第一パネル2Mの裏面と当接することで、出入方向において下階の第一パネル2Mの端位置が上階の第一パネル2Mの端位置と揃うようになる。 Then, the first contact portion 15 comes into contact with the back surface of the first panel 2M on the lower floor and the back surface of the first panel 2M on the upper floor, so that the end position of the first panel 2M on the lower floor is on the upper floor in the entry / exit direction. It comes to be aligned with the end position of the first panel 2M of.

また、階間位置揃え工程では、上記と同様の手順にて、出入方向において下階の第二パネル2Nの端位置と上階の第二パネル2Nの端位置とを揃える。具体的には、下階の第二パネル2Nの上端部に下側第二治具17を取り付け、上階の第二パネル2Nの下端部に上側第二治具19を取り付ける。ここで、下側第二治具17は、下側第一治具14と同様に、下階の外壁パネル2を位置決めしてから上階の外壁パネル2を位置決めするまでの間(厳密には、階間位置揃え工程が完了するまでの間)、下階の第二パネル2Nの上端部に取り付けられたままの状態で利用される。他方、上階の第二パネル2Nの下端部に取り付けられる上側第二治具19は、下階の外壁パネル2を位置決めする際に組み付け部11の突出部分11bに取り付けられていた上側第二治具19を取り外すことで用意される。 Further, in the inter-floor alignment step, the end positions of the second panel 2N on the lower floor and the end positions of the second panel 2N on the upper floor are aligned in the same procedure as above. Specifically, the lower second jig 17 is attached to the upper end of the second panel 2N on the lower floor, and the upper second jig 19 is attached to the lower end of the second panel 2N on the upper floor. Here, the lower second jig 17 is the same as the lower first jig 14 from the positioning of the outer wall panel 2 on the lower floor to the positioning of the outer wall panel 2 on the upper floor (strictly speaking). Until the inter-floor alignment process is completed), it will be used as it is attached to the upper end of the second panel 2N on the lower floor. On the other hand, the upper second jig 19 attached to the lower end of the second panel 2N on the upper floor is attached to the protruding portion 11b of the assembly portion 11 when positioning the outer wall panel 2 on the lower floor. It is prepared by removing the tool 19.

下階の第二パネル2Nに下側第二治具17を取り付け、上階の第二パネル2Nに上側第二治具19を取り付けた後には、下側第二治具17及び上側第二治具19の各々が有する一対の立設部17a、19aの間に第二当接部18を配置する。具体的には、第二当接部18の下端部が下階の第二パネル2Nの裏面に対向し、第二当接部18の上端部が上階の第二パネル2Nの裏面に対向するように第二当接部18を配置する。 After attaching the lower second jig 17 to the second panel 2N on the lower floor and attaching the upper second jig 19 to the second panel 2N on the upper floor, the lower second jig 17 and the upper second jig 17 are attached. The second contact portion 18 is arranged between the pair of standing portions 17a and 19a of each of the tools 19. Specifically, the lower end of the second contact portion 18 faces the back surface of the second panel 2N on the lower floor, and the upper end of the second contact portion 18 faces the back surface of the second panel 2N on the upper floor. The second contact portion 18 is arranged so as to be so.

第二当接部18の配置後、下側第二治具17に取り付けられた第三押圧部23、及び、上側第二治具19に取り付けられた第四押圧部24をそれぞれ操作し、第二当接部18を、下階の第二パネル2Nの裏面及び上階の第二パネル2Nの裏面の双方に押し当てる。これにより、出入方向において下階の第二パネル2Nの端位置が上階の第二パネル2Nの端位置と揃うようになる。 After arranging the second contact portion 18, the third pressing portion 23 attached to the lower second jig 17 and the fourth pressing portion 24 attached to the upper second jig 19 are operated, respectively, to obtain a second. (2) The contact portion 18 is pressed against both the back surface of the second panel 2N on the lower floor and the back surface of the second panel 2N on the upper floor. As a result, the end position of the second panel 2N on the lower floor is aligned with the end position of the second panel 2N on the upper floor in the entry / exit direction.

以上のように本実施形態では、下階にて水平方向に並ぶ複数の外壁パネル2の各々の端位置を揃えるために用いた器具(具体的には、下側第一治具14、上側第一治具16、下側第二治具17、上側第二治具19、第一当接部15及び第二当接部18)を、階間位置揃え工程に用いる。すなわち、本実施形態では、下階にて水平方向に並ぶ複数の外壁パネル2の各々を出入方向において位置決めするために用いた器具を、上階の外壁パネル2及び下階の外壁パネル2の各々の端位置を出入方向において揃える際にも利用する。 As described above, in the present embodiment, the instruments used for aligning the end positions of the plurality of outer wall panels 2 arranged horizontally on the lower floor (specifically, the lower first jig 14 and the upper first). (1) Jig 16, lower second jig 17, upper second jig 19, first contact portion 15 and second contact portion 18) are used in the inter-floor alignment step. That is, in the present embodiment, the equipment used for positioning each of the plurality of outer wall panels 2 arranged horizontally on the lower floor in the entrance / exit direction is used for the outer wall panel 2 on the upper floor and the outer wall panel 2 on the lower floor, respectively. It is also used when aligning the end positions of the above in the direction of entry and exit.

(隙間調整具について)
隙間調整具50について図8A及び図8Bを参照しながら説明する。隙間調整具50は、調整部に相当し、上階の外壁パネル2を下階の外壁パネル2の直上位置に配置する際に、上階の外壁パネル2の間に形成される縦の隙間の横幅を下階の外壁パネル2の間に形成される縦の隙間の横幅と揃えるために用いられる。隙間調整具50は、図8A及び図8Bに示すように、一対の板片51と、板片51を連結する連結軸52と、板片51間の間隔を調整するために操作される操作部53と、を有する。
(About the gap adjuster)
The gap adjuster 50 will be described with reference to FIGS. 8A and 8B. The gap adjuster 50 corresponds to an adjustment portion, and is a vertical gap formed between the outer wall panels 2 on the upper floor when the outer wall panel 2 on the upper floor is arranged at a position directly above the outer wall panel 2 on the lower floor. It is used to align the width with the width of the vertical gap formed between the outer wall panels 2 on the lower floor. As shown in FIGS. 8A and 8B, the gap adjuster 50 is an operation unit operated to adjust the distance between the pair of plate pieces 51, the connecting shaft 52 connecting the plate pieces 51, and the plate pieces 51. 53 and.

一対の板片51は、隙間調整具50の本体部分をなす部分である。隙間調整具50は、一対の板片51が水平方向に並んだ状態で用いられる。各板片51は、図8Bに示すように側方視で略L字状に成形された鋼板からなり、より背が高い前方部(以下、板片前方部51a)と、より背が低い後方部(以下、板片後方部51b)とを有する。また、各板片51は、板片前方部51aと板片後方部51bとの間で屈曲しており、詳しくは、図8Aに示すように板片前方部51aと板片後方部51bとの間に鈍角が形成されるように屈曲している。 The pair of plate pieces 51 are portions forming the main body portion of the gap adjuster 50. The gap adjuster 50 is used in a state where a pair of plate pieces 51 are lined up in the horizontal direction. As shown in FIG. 8B, each plate piece 51 is made of a steel plate formed in a substantially L shape in a lateral view, and has a taller front portion (hereinafter referred to as a plate piece front portion 51a) and a shorter rear portion. It has a portion (hereinafter referred to as a plate piece rear portion 51b). Further, each plate piece 51 is bent between the plate piece front portion 51a and the plate piece rear portion 51b, and more specifically, as shown in FIG. 8A, the plate piece front portion 51a and the plate piece rear portion 51b It is bent so that an obtuse angle is formed between them.

通常時の隙間調整具50では、図8Aに示すように、一対の板片51の板片前方部51a同士が互いに平行であり、板片後方部51b同士が上面視で逆さV字をなした状態にある。換言すると、通常時の隙間調整具50において、一対の板片51間の間隔の長さは、前方側では一定となっており、後方側では、後端に向かう程長くなっている。 In the normal clearance adjuster 50, as shown in FIG. 8A, the front portions 51a of the pair of plate pieces 51 are parallel to each other, and the rear portions 51b of the plate pieces form an inverted V shape when viewed from above. It is in a state. In other words, in the gap adjuster 50 in the normal state, the length of the gap between the pair of plate pieces 51 is constant on the front side, and becomes longer toward the rear end on the rear side.

連結軸52は、一対の板片51の間、厳密には板片後方部51b同士の間を連結するピンやネジである。本実施形態において、連結軸52は、各板片51において板片前方部51aと板片後方部51bとの境界位置よりも若干後方に位置する部分を貫通するように設けられている。 The connecting shaft 52 is a pin or a screw that connects between the pair of plate pieces 51, strictly speaking, between the plate piece rear portions 51b. In the present embodiment, the connecting shaft 52 is provided so as to penetrate a portion of each plate piece 51 that is located slightly behind the boundary position between the plate piece front portion 51a and the plate piece rear portion 51b.

操作部53は、一対の板片51に取り付けられており、本実施形態では、各板片51において連結軸52よりも幾分後方に位置する部分を貫通するように取り付けられた蝶ボルトである。操作部53の一端部にはナット54が取り付けられており、当該ナット54は、図8Aに示すように一方の板片51の板片後方部51bの外側面に係止されている。 The operation unit 53 is attached to a pair of plate pieces 51, and in the present embodiment, it is a wing bolt attached so as to penetrate a portion of each plate piece 51 located slightly behind the connecting shaft 52. .. A nut 54 is attached to one end of the operation unit 53, and the nut 54 is locked to the outer surface of the plate piece rear portion 51b of one plate piece 51 as shown in FIG. 8A.

そして、操作部53の頂部(ナット54とは反対側の端部)を操作すると、一対の板片51の各々が、板片前方部51aと板片後方部51bとの境界位置を支点として動く。かかる動作により、板片後方部51b同士の間の間隔が狭まる一方で、板片前方部51a同士の間の間隔(厳密には、板片51の前端同士の間の隙間)が広げられる。このようにして一対の板片51の間の間隔が調整される。換言すると、操作部53を操作することで、水平方向における隙間調整具50の長さを調整することが可能である。 Then, when the top portion of the operation portion 53 (the end portion opposite to the nut 54) is operated, each of the pair of plate pieces 51 moves with the boundary position between the plate piece front portion 51a and the plate piece rear portion 51b as a fulcrum. .. By such an operation, the distance between the rear portions 51b of the plate pieces is narrowed, while the distance between the front portions 51a of the plate pieces (strictly speaking, the gap between the front ends of the plate pieces 51) is widened. In this way, the distance between the pair of plate pieces 51 is adjusted. In other words, by operating the operation unit 53, it is possible to adjust the length of the gap adjuster 50 in the horizontal direction.

(上階の外壁パネル間の隙間調整について)
以下、上述した隙間調整具50によって、上階の外壁パネル2の間の隙間(縦の隙間)を調整する方法について説明する。
隙間調整を行うにあたっては、下階において複数の外壁パネル2が水平方向に並べて配置される。このとき、下階の外壁パネル2の間の隙間(縦の隙間)が規定の長さとなるように調整される。その上で、下階の各外壁パネル2が下階の取り付け金物3に固定される。その後、上階の外壁パネル2が吊り込まれて下階の外壁パネル2の直上位置に配置される。このときに上階の外壁パネル2間の隙間調整が行われる。
(Regarding the adjustment of the gap between the outer wall panels on the upper floor)
Hereinafter, a method of adjusting the gap (vertical gap) between the outer wall panels 2 on the upper floor by using the gap adjuster 50 described above will be described.
When adjusting the gap, a plurality of outer wall panels 2 are arranged side by side in the horizontal direction on the lower floor. At this time, the gap (vertical gap) between the outer wall panels 2 on the lower floor is adjusted to have a specified length. On top of that, each outer wall panel 2 on the lower floor is fixed to the mounting hardware 3 on the lower floor. After that, the outer wall panel 2 on the upper floor is suspended and arranged at a position directly above the outer wall panel 2 on the lower floor. At this time, the gap between the outer wall panels 2 on the upper floor is adjusted.

上階の外壁パネル2間の隙間調整は、図14に図示の流れに沿って進められる。図14は、上階の外壁パネル2間の隙間を調整する手順を示す図である。同図に示すように、上階の外壁パネル2間の隙間調整では、上階の外壁パネル2を下階の外壁パネル2の直上位置に配置するにあたり(S033)、隙間調整具50のセット及び操作を行う(S031、S032)。 The clearance adjustment between the outer wall panels 2 on the upper floor proceeds according to the flow shown in FIG. FIG. 14 is a diagram showing a procedure for adjusting the gap between the outer wall panels 2 on the upper floor. As shown in the figure, in the gap adjustment between the outer wall panels 2 on the upper floor, when the outer wall panel 2 on the upper floor is arranged at a position directly above the outer wall panel 2 on the lower floor (S033), the set of the gap adjuster 50 and the gap adjustment tool 50 are arranged. Perform the operation (S031, S032).

具体的に説明すると、上階の外壁パネル2間の隙間調整では、先ず、下階の外壁パネル2の間の隙間内に一対の板片51の各々の板片前方部51aを差し込んで、隙間調整具50をセットする(S031)。この際、図15に示すように、各板片51における板片前方部51aの下側部分が下階の外壁パネル2の間の隙間内に収容され、且つ、板片前方部51aの上側部分が下階の外壁パネル2の間の隙間よりも上方に突出するように隙間調整具50を配置する。図15は、隙間調整具50をセットした状態を示す図であり、当該隙間調整具50を下階の外壁パネル2の正面から見た図である。
なお、このとき、各板片51における板片後方部51bは、下階の外壁パネル2の間の隙間よりも手前(出入方向において屋外側)に位置している。
Specifically, in adjusting the gap between the outer wall panels 2 on the upper floor, first, the front portion 51a of each of the pair of plate pieces 51 is inserted into the gap between the outer wall panels 2 on the lower floor to form a gap. Set the adjuster 50 (S031). At this time, as shown in FIG. 15, the lower portion of the plate piece front portion 51a in each plate piece 51 is housed in the gap between the outer wall panels 2 on the lower floor, and the upper portion of the plate piece front portion 51a. The gap adjuster 50 is arranged so as to project above the gap between the outer wall panels 2 on the lower floor. FIG. 15 is a view showing a state in which the gap adjusting tool 50 is set, and is a view of the gap adjusting tool 50 as viewed from the front of the outer wall panel 2 on the lower floor.
At this time, the plate piece rear portion 51b of each plate piece 51 is located in front of the gap between the outer wall panels 2 on the lower floor (outdoor side in the entry / exit direction).

隙間調整具50のセット後、隙間調整具50の操作部53を操作して隙間調整具50の長さ(厳密には、水平方向における長さ)を調整する(S032)。より詳しく説明すると、操作部53である蝶ネジを回すことにより、板片前方部51a同士の間の間隔を広げて隙間調整具50の長さを長くする。そして、板片前方部51a同士の間の間隔が下階の外壁パネル2の間の隙間と等しくなるまで操作部53を操作する。これにより、各板片51の板片前方部51aが、隙間を挟む下階の外壁パネル2の側端(隙間に面している側の端)に当接するようになる。換言すると、隙間調整具50の長さ(厳密には、板片前方部51a同士の間の間隔の長さ)が、下階の外壁パネル2の間の隙間と等しくなるように調整される。 After setting the gap adjusting tool 50, the operation unit 53 of the gap adjusting tool 50 is operated to adjust the length (strictly speaking, the length in the horizontal direction) of the gap adjusting tool 50 (S032). More specifically, by turning the thumbscrew which is the operation portion 53, the distance between the front portions 51a of the plate pieces is widened and the length of the gap adjuster 50 is lengthened. Then, the operation unit 53 is operated until the distance between the plate piece front portions 51a becomes equal to the gap between the outer wall panels 2 on the lower floor. As a result, the plate piece front portion 51a of each plate piece 51 comes into contact with the side end (the end on the side facing the gap) of the outer wall panel 2 on the lower floor that sandwiches the gap. In other words, the length of the gap adjuster 50 (strictly speaking, the length of the gap between the front portions 51a of the plate pieces) is adjusted to be equal to the gap between the outer wall panels 2 on the lower floor.

その後、上階の外壁パネル2を下階の外壁パネル2の直上位置に配置する。より厳密には、上階の外壁パネル2の間の隙間と下階の外壁パネル2の間の隙間とが上下に連続するように上階の各外壁パネル2を配置する(S033)。このとき、隙間調整具50が有する一対の板片51の板片前方部51aのうち、下階の外壁パネル2の間の隙間よりも上方に突出した部分(以下、突出部分)をガイドとして上階の外壁パネル2を配置する。より詳しく説明すると、図16に示すように、水平方向において突出部分と隣接する位置に上階の外壁パネル2を配置する。図16は、隙間調整具50によって上階の外壁パネル2の間の隙間を調整する様子を示す図であり、当該隙間調整具50を上階及び下階の各々の外壁パネル2の正面から見た図である。 After that, the outer wall panel 2 on the upper floor is arranged at a position directly above the outer wall panel 2 on the lower floor. More strictly, each outer wall panel 2 on the upper floor is arranged so that the gap between the outer wall panels 2 on the upper floor and the gap between the outer wall panels 2 on the lower floor are continuous vertically (S033). At this time, of the plate piece front portion 51a of the pair of plate pieces 51 of the gap adjuster 50, the portion protruding upward from the gap between the outer wall panels 2 on the lower floor (hereinafter referred to as the protruding portion) is used as a guide. The outer wall panel 2 on the floor is arranged. More specifically, as shown in FIG. 16, the outer wall panel 2 on the upper floor is arranged at a position adjacent to the protruding portion in the horizontal direction. FIG. 16 is a diagram showing how the gap adjuster 50 adjusts the gap between the outer wall panels 2 on the upper floor, and the gap adjuster 50 is viewed from the front of each of the outer wall panels 2 on the upper floor and the lower floor. It is a figure.

そして、上階の外壁パネル2が突出部分によってガイドされながら下階の外壁パネル2の直上位置に配置されることにより、上階の外壁パネル2の間には、下階の外壁パネル2の間の隙間と上下方向に連続した隙間(縦の隙間)が形成されるようになる。また、上階の外壁パネル2同士の間に形成される隙間の横幅は、下階の外壁パネル2同士の間に形成される隙間の横幅と揃うようになる。 Then, the outer wall panel 2 on the upper floor is arranged at a position directly above the outer wall panel 2 on the lower floor while being guided by the protruding portion, so that the outer wall panel 2 on the upper floor is between the outer wall panels 2 on the lower floor. A gap (vertical gap) that is continuous in the vertical direction is formed with the gap between the two. Further, the width of the gap formed between the outer wall panels 2 on the upper floor is equal to the width of the gap formed between the outer wall panels 2 on the lower floor.

以上のように、本実施形態では、上階において複数の外壁パネル2を水平方向に並べて配置する際に、隙間調整具50を用いて上階の外壁パネル2の間の隙間を調整することで、当該隙間が上下方向において下階の外壁パネル2の間の隙間と良好に連続するように上階の各外壁パネル2を配置することが可能である。 As described above, in the present embodiment, when a plurality of outer wall panels 2 are arranged side by side in the horizontal direction on the upper floor, the gap between the outer wall panels 2 on the upper floor is adjusted by using the gap adjuster 50. It is possible to arrange each outer wall panel 2 on the upper floor so that the gap is well continuous with the gap between the outer wall panels 2 on the lower floor in the vertical direction.

<<その他の実施形態>>
以上までに本発明の構造物構築方法について具体例を挙げて説明してきたが、上記の実施形態は、あくまでも一例に過ぎず、他の実施形態も考えられる。例えば、上記の実施形態では、建物の角部分に在る取り付け金物3を出入方向において位置決めする際、上下に隣り合う二つの階の各々に配置された取り付け金物3に、長尺な調整治具30の当接面31を同時に当接させることとした。ただし、これに限定されるものではなく、上下に連続する三つ以上の階の各々に配置された取り付け金物3に調整治具30の当接面31を同時に当接させてもよい。
<< Other Embodiments >>
Although the structure construction method of the present invention has been described above with specific examples, the above embodiment is merely an example, and other embodiments are also conceivable. For example, in the above embodiment, when positioning the mounting hardware 3 at the corner of the building in the entrance / exit direction, a long adjusting jig is attached to the mounting hardware 3 arranged on each of the two floors adjacent to each other above and below. It was decided that the contact surfaces 31 of 30 were brought into contact with each other at the same time. However, the present invention is not limited to this, and the contact surface 31 of the adjusting jig 30 may be brought into contact with the mounting hardware 3 arranged on each of the three or more consecutive floors above and below at the same time.

また、上記の実施形態では、建物の角部分に在る取り付け金物3に対して、調整治具30による出入方向の位置決めを行うこととした。ただし、これに限定されるものではなく、建物の角部以外に設けられる取り付け金物3に対して、調整治具30に相当する治具による位置決めを行ってもよい。 Further, in the above embodiment, the adjusting jig 30 is used to position the mounting hardware 3 at the corner of the building in the in-and-out direction. However, the present invention is not limited to this, and the mounting hardware 3 provided outside the corners of the building may be positioned by a jig corresponding to the adjusting jig 30.

また、上記の実施形態では、L型のアングル材によって構成された調整治具30を用いることとしたが、これに限定されるものではない。例えば、長尺な平板や棒体若しくは角材によって構成される調整治具30を用いてもよい。 Further, in the above embodiment, the adjusting jig 30 made of an L-shaped angle material is used, but the present invention is not limited to this. For example, an adjusting jig 30 made of a long flat plate, a rod, or a square lumber may be used.

また、上記の実施形態では、本発明の構造物構築方法の適用例として、複数の外壁パネル2によって構成される外壁1を有する建物を建設するケースについて説明したが、これに限定されるものではない。複数の階を有し、各階においてパネル体やブロック体(例えば、ALC板、コイルブロック、フェンス、タイル及び仮囲い材)を固定部に固定することで建物を建設する場合にも、本発明の構造物構築方法は利用可能である。 Further, in the above embodiment, as an application example of the structure construction method of the present invention, a case of constructing a building having an outer wall 1 composed of a plurality of outer wall panels 2 has been described, but the present invention is not limited thereto. No. The present invention is also used when a building is constructed by having a plurality of floors and fixing a panel body or a block body (for example, an ALC plate, a coil block, a fence, a tile, and a temporary enclosure) to a fixed portion on each floor. Structure construction methods are available.

1 外壁
2 外壁パネル(被固定体)
2a 仕上材
2b パネル本体
2c フレーム
2d アルミ蒸着フィルム
2M 第一パネル(第一被固定体)
2N 第二パネル(第二被固定体)
3 取り付け金物(固定部)
3a 固定面
3u,3t 取り付け金物(固定部)
4 梁
5 柱
6 縦目地
7 横目地
8 水糸
10 位置決め部材
11 組み付け部
11a 水平部分
11b 突出部分
12 保持部
13 位置調整部
14 下側第一治具
14a 立設部
14b 連結部
15 第一当接部
16 上側第一治具
16a 立設部
16b 連結部
17 下側第二治具
17a 立設部
17b 連結部
18 第二当接部
19 上側第二治具
19a 立設部
19b 連結部
21 第一押圧部
21a 第一ネジ体
21b 押圧キャップ
22 第二押圧部
22a 第二ネジ体
22b 押圧キャップ
23 第三押圧部
23a 第三ネジ体
23b 押圧キャップ
24 第四押圧部
24a 第四ネジ体
24b 押圧キャップ
30 調整治具(治具)
31 当接面
40 風防下げ振り
50 隙間調整具(調整部)
51 板片
51a 板片前方部
51b 板片後方部
52 連結軸
53 操作部
54 ナット
M1 上方切れ目
M2 下方切れ目
1 Outer wall 2 Outer wall panel (fixed body)
2a Finishing material 2b Panel body 2c Frame 2d Aluminum thin-film film 2M First panel (first object to be fixed)
2N 2nd panel (2nd fixed body)
3 Mounting hardware (fixed part)
3a Fixed surface 3u, 3t Mounting hardware (fixed part)
4 Beam 5 Pillar 6 Vertical joint 7 Horizontal joint 8 Water thread 10 Positioning member 11 Assembly part 11a Horizontal part 11b Protruding part 12 Holding part 13 Position adjustment part 14 Lower first jig 14a Standing part 14b Connecting part 15 First hit Contact part 16 Upper first jig 16a Standing part 16b Connecting part 17 Lower second jig 17a Standing part 17b Connecting part 18 Second contact part 19 Upper second jig 19a Standing part 19b Connecting part 21 No. 1 Pressing part 21a 1st screw body 21b Pressing cap 22 2nd pressing part 22a 2nd screw body 22b Pressing cap 23 3rd pressing part 23a 3rd screw body 23b Pressing cap 24 4th pressing part 24a 4th screw body 24b Pressing cap 30 Adjustment jig (jig)
31 Contact surface 40 Windshield plumb bob 50 Gap adjuster (adjustment part)
51 Plate piece 51a Plate piece front part 51b Plate piece rear part 52 Connecting shaft 53 Operation part 54 Nut M1 Upper cut M2 Lower cut

Claims (9)

複数の階を有する構造物の各階において被固定体を該被固定体の厚み方向が所定方向に沿った状態で固定部に固定して、各階の前記被固定体が上下方向に並ぶように前記構造物を構築する構造物構築方法であって、
上階の前記固定部及び下階の前記固定部を上下方向に並べて配置する工程と、
前記所定方向において上階の前記固定部及び下階の前記固定部の各々を位置決めする工程と、
位置決めされた上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程と、を有し、
上下方向及び前記所定方向の両方向と交差する交差方向に複数の前記被固定体を並べて配置する工程を更に有し、
上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程では、前記交差方向に並んだ複数の前記被固定体を固定し、
前記交差方向に複数の前記被固定体を並べて配置する工程は、上階及び下階の各々において実施され、
上階において複数の前記被固定体を前記交差方向に並べて配置する際には、上階の前記被固定体と下階の前記被固定体とが上下方向に並ぶように上階の前記被固定体を配置し、
下階において複数の前記被固定体を前記交差方向に並べて配置する際には、前記交差方向において前記被固定体同士の間に下階隙間が形成されるように複数の前記被固定体を配置し、
上階において複数の前記被固定体を前記交差方向に並べて配置するにあたり、
前記交差方向における長さが調整可能な調整部を、該調整部の下側部分が前記下階隙間内に収容され、且つ、前記調整部の上側部分が前記下階隙間よりも上方に突出するように配置することと、
前記交差方向における前記調整部の長さを、前記交差方向における前記下階隙間の長さと等しくなるように調整することと、を行い、
上階において複数の前記被固定体を前記交差方向に並べて配置する際には、前記交差方向において前記調整部の上側部分と隣接する位置に前記被固定体を配置することで、前記交差方向において前記被固定体同士の間に、上下方向において前記下階隙間と連続する上階隙間が形成されるように複数の前記被固定体を配置することを特徴とする構造物構築方法。
On each floor of a structure having a plurality of floors, the fixed body is fixed to the fixed portion in a state where the thickness direction of the fixed body is along a predetermined direction, and the fixed body on each floor is arranged in the vertical direction. It is a structure construction method to construct a structure,
The process of arranging the fixed part on the upper floor and the fixed part on the lower floor side by side in the vertical direction, and
A step of positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor in the predetermined direction.
It has a step of fixing the fixed body to each of the fixed portion on the upper floor and the fixed portion on the lower floor, which are positioned.
Further comprising a step of arranging a plurality of the fixed objects side by side in an intersecting direction intersecting both the vertical direction and the predetermined direction.
In the step of fixing the fixed body to each of the fixed portion on the upper floor and the fixed portion on the lower floor, a plurality of the fixed bodies arranged in the crossing direction are fixed.
The step of arranging the plurality of fixed objects side by side in the crossing direction is carried out on each of the upper floor and the lower floor.
When a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the fixed body on the upper floor and the fixed body on the lower floor are arranged in the vertical direction. Place the body,
When a plurality of the fixed bodies are arranged side by side in the crossing direction on the lower floor, the plurality of fixed bodies are arranged so that a lower floor gap is formed between the fixed bodies in the crossing direction. death,
In arranging the plurality of fixed objects side by side in the crossing direction on the upper floor,
The lower portion of the adjusting portion whose length can be adjusted in the crossing direction is housed in the lower floor gap, and the upper portion of the adjusting portion projects upward from the lower floor gap. And to arrange it like
The length of the adjusting portion in the crossing direction is adjusted to be equal to the length of the lower floor gap in the crossing direction.
When a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the fixed bodies are arranged at positions adjacent to the upper portion of the adjusting portion in the crossing direction in the crossing direction. wherein between the adjacent the fixed element, structure construction wherein that you place a plurality of the fixed element so upstairs gap continuous with the lower floor clearance in the vertical direction is formed.
上階の前記固定部及び下階の前記固定部の各々を位置決めする工程では、上下方向に延出した当接面を有する治具の前記当接面の法線方向が前記所定方向に沿った状態で、前記当接面を上階の前記固定部及び下階の前記固定部の双方に同時に当接させることとし、
上階の前記固定部及び下階の前記固定部の各々を位置決めする工程の後であって、上階の前記固定部及び下階の前記固定部の各々に前記被固定体を固定する工程の前に、前記治具を取り外す工程を更に有していることを特徴とする請求項1に記載の構造物構築方法。
In the step of positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor, the normal direction of the contact surface of the jig having the contact surface extending in the vertical direction is along the predetermined direction. In this state, the contact surface is brought into contact with both the fixed portion on the upper floor and the fixed portion on the lower floor at the same time.
After the step of positioning each of the fixed portion on the upper floor and the fixed portion on the lower floor, the step of fixing the fixed body to each of the fixed portion on the upper floor and the fixed portion on the lower floor. The structure construction method according to claim 1, further comprising a step of removing the jig.
上階の前記固定部及び下階の前記固定部を配置する工程では、前記構造物の角部分に設けられる上階の前記固定部及び下階の前記固定部を配置し、
上階の前記固定部及び下階の前記固定部の各々を位置決めする工程では、前記治具の前記当接面を前記角部分に設けられる上階の前記固定部及び下階の前記固定部の双方に同時に当接させることを特徴とする請求項に記載の構造物構築方法。
In the step of arranging the fixed portion on the upper floor and the fixed portion on the lower floor, the fixed portion on the upper floor and the fixed portion on the lower floor provided at the corners of the structure are arranged.
In the step of positioning each of the fixing portion on the upper floor and the fixing portion on the lower floor, the fixing portion on the upper floor and the fixing portion on the lower floor are provided with the contact surface of the jig at the corner portion. The structure construction method according to claim 2 , wherein the two are brought into contact with each other at the same time.
記交差方向において複数の前記被固定体を並べて配置する工程では、前記所定方向において複数の前記被固定体の各々の端位置が揃うように複数の前記被固定体を配置することを特徴とする請求項1乃至3のいずれか一項に記載の構造物構築方法。 In the step of arranging side by side a plurality of the the fixed element before Symbol cross direction, and wherein placing the plurality of the the fixed element each end position a plurality of such aligned in the fixed element in the predetermined direction The structure construction method according to any one of claims 1 to 3. 階において複数の前記被固定体を前記交差方向に並べて配置する際には、上階の前記被固定体と下階の前記被固定体とが上下方向に並び、且つ前記所定方向において上階の前記被固定体の端位置と下階の前記被固定体の端位置が揃うように上階の前記被固定体を配置することを特徴とする請求項に記載の構造物構築方法。 When a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the fixed body on the upper floor and the fixed body on the lower floor are arranged in the vertical direction, and the upper floor is arranged in the predetermined direction. The structure construction method according to claim 4 , wherein the fixed body on the upper floor is arranged so that the end position of the fixed body on the lower floor is aligned with the end position of the fixed body on the lower floor. 前記交差方向において複数の前記被固定体を並べて配置する工程は、
前記交差方向に延出する組み付け部を、前記交差方向に並んだ複数の前記被固定体のうち、前記交差方向において互いに隣り合う第一被固定体及び第二被固定体の間に跨る位置に配置する工程と、
前記所定方向において平板状の第一当接部を前記組み付け部の端及び前記第一被固定体の端に当接させる工程と、
前記第一当接部が前記組み付け部の端及び前記第一被固定体の端に当接している間に、前記所定方向において平板状の第二当接部を前記組み付け部の端及び前記第二被固定体の端に当接させる工程と、
前記交差方向において複数の前記被固定体の位置決めが完了した後、前記組み付け部を取り外す工程と、を有することを特徴とする請求項に記載の構造物構築方法。
The step of arranging the plurality of fixed objects side by side in the crossing direction is
The assembly portion extending in the crossing direction is placed at a position straddling between the first fixed body and the second fixed body adjacent to each other in the crossing direction among the plurality of fixed bodies arranged in the crossing direction. The process of arranging and
A step of bringing the flat plate-shaped first contact portion into contact with the end of the assembled portion and the end of the first fixed body in the predetermined direction.
While the first contact portion is in contact with the end of the assembled portion and the end of the first fixed body, the flat plate-shaped second contact portion is formed in the predetermined direction at the end of the assembled portion and the first. (Ii) The process of contacting the end of the object to be fixed and
The structure construction method according to claim 5 , further comprising a step of removing the assembled portion after the positioning of the plurality of objects to be fixed is completed in the crossing direction.
下階において前記交差方向に複数の前記被固定体を並べて配置した後に、上階において前記交差方向に複数の前記被固定体を並べて配置し、
上階において前記交差方向に複数の前記被固定体を並べて配置する際には、前記所定方向において下階の前記第一被固定体の端、及び、下階の前記第一被固定体の直上位置に配置される上階の前記第一被固定体の端に前記第一当接部を当接させると共に、前記所定方向において下階の前記第二被固定体の端、及び、下階の前記第二被固定体の直上位置に配置される上階の前記第二被固定体の端に前記第二当接部を当接させることを特徴とする請求項に記載の構造物構築方法。
After arranging the plurality of the fixed bodies side by side in the crossing direction on the lower floor, the plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor.
When a plurality of the fixed bodies are arranged side by side in the crossing direction on the upper floor, the end of the first fixed body on the lower floor and directly above the first fixed body on the lower floor in the predetermined direction. The first contact portion is brought into contact with the end of the first fixed body on the upper floor arranged at the position, and the end of the second fixed body on the lower floor and the lower floor in the predetermined direction. The structure construction method according to claim 6 , wherein the second contact portion is brought into contact with the end of the second fixed body on the upper floor arranged at a position directly above the second fixed body. ..
前記調整部を配置する際には、前記交差方向に並んだ一対の板片を備える前記調整部を、前記一対の板片の各々の下側部分が前記下階隙間内に収容され、且つ、前記一対の板片の各々の上側部分が前記下階隙間よりも上方に突出するように配置し、
前記調整部の長さを調整する際には、前記一対の板片の間の間隔を調整するために前記一対の板片に取り付けられた操作部を、前記間隔が前記交差方向における前記下階隙間の長さと等しくなるまで操作することを特徴とする請求項1乃至7のいずれか一項に記載の構造物構築方法。
When arranging the adjusting portion, the adjusting portion including the pair of plate pieces arranged in the crossing direction is accommodated in the lower floor gap with the lower portion of each of the pair of plate pieces accommodated in the lower floor gap. The upper part of each of the pair of plate pieces is arranged so as to project above the lower floor gap.
When adjusting the length of the adjusting portion, the operation unit attached to the pair of plate pieces in order to adjust the distance between the pair of plate pieces is provided with the lower floor where the distance is in the crossing direction. The structure construction method according to any one of claims 1 to 7, wherein the operation is performed until the length of the gap becomes equal to the length of the gap.
複数の階を有する建物の各階において前記被固定体としての外壁パネルを、前記建物の躯体に取り付けられた前記固定部としての取り付け金物に固定して、各階の前記外壁パネルが上下方向に並ぶように前記建物を構築することを特徴とする請求項1乃至8のいずれか一項に記載の構造物構築方法。 On each floor of a building having a plurality of floors, the outer wall panel as the fixed body is fixed to the mounting hardware as the fixing portion attached to the frame of the building so that the outer wall panels on each floor are arranged in the vertical direction. The structure construction method according to any one of claims 1 to 8, wherein the building is constructed.
JP2017129115A 2017-06-30 2017-06-30 Structure construction method Active JP6974968B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017129115A JP6974968B2 (en) 2017-06-30 2017-06-30 Structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017129115A JP6974968B2 (en) 2017-06-30 2017-06-30 Structure construction method

Publications (2)

Publication Number Publication Date
JP2019011618A JP2019011618A (en) 2019-01-24
JP6974968B2 true JP6974968B2 (en) 2021-12-01

Family

ID=65226813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017129115A Active JP6974968B2 (en) 2017-06-30 2017-06-30 Structure construction method

Country Status (1)

Country Link
JP (1) JP6974968B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3030315B2 (en) * 1996-10-28 2000-04-10 日本イトン工業株式会社 Panel mounting device
JP2001032422A (en) * 1999-07-23 2001-02-06 Sumitomo Metal Mining Co Ltd Alc corner panel and installing structure therefor
JP2002276148A (en) * 2001-03-21 2002-09-25 National House Industrial Co Ltd Modesty panel mounting jig and modesty panel mounting method
JP2003064815A (en) * 2001-08-29 2003-03-05 Panahome Corp Attaching structure for curtain wall unit
JP4520225B2 (en) * 2004-06-22 2010-08-04 大和ハウス工業株式会社 Method for forming water-stop structure of outer wall joint
JP6271399B2 (en) * 2014-11-17 2018-01-31 株式会社フジタ Exterior wall panel mounting structure

Also Published As

Publication number Publication date
JP2019011618A (en) 2019-01-24

Similar Documents

Publication Publication Date Title
BRPI0618035A2 (en) new type of construction, process and means for its realization
KR101948307B1 (en) Construction method of building outer wall
CA3013892C (en) Building framework and method for constructing same
KR100968216B1 (en) Assembly type roof structure
JP6974968B2 (en) Structure construction method
JP6946079B2 (en) Positioning member
TWM641999U (en) Steel structure and wall positioning assembly structure
US11021866B2 (en) Building and construction method for same
CN212613770U (en) Template fixing assembly and installation combination mode thereof
JP6919480B2 (en) Jig tool and laminated beam structure, and construction method of laminated beam structure
JP6444094B2 (en) Architectural panel joint structure and building
JP6943567B2 (en) Mounting structure of decorative cover material to structural material
JP6883317B2 (en) Fence structure, fence material and how to build a fence
JP6755102B2 (en) Construction method of the outer wall panel base and outer wall material
TWI811182B (en) Steel structure and wall positioning assembly structure
JP6666812B2 (en) How to attach ceiling panels to building units
JPH1046668A (en) Unit substance mounting construction of unit building
JP2007063764A (en) Roof truss member assembling method
JP3210878B2 (en) Method and apparatus for installing horizontal structural members
JP3450231B2 (en) Construction method of roof eaves
JP3051197U (en) Wall panel for wooden frame construction method
JPH08291579A (en) Pitching roof construction method of concrete house and jig to be used in its construction method
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
JP3930356B2 (en) Outer corner panel
JP4810493B2 (en) Window frame installation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210608

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210806

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211012

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211105

R150 Certificate of patent or registration of utility model

Ref document number: 6974968

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150