JP6936096B2 - Power management device and power management method - Google Patents

Power management device and power management method Download PDF

Info

Publication number
JP6936096B2
JP6936096B2 JP2017188720A JP2017188720A JP6936096B2 JP 6936096 B2 JP6936096 B2 JP 6936096B2 JP 2017188720 A JP2017188720 A JP 2017188720A JP 2017188720 A JP2017188720 A JP 2017188720A JP 6936096 B2 JP6936096 B2 JP 6936096B2
Authority
JP
Japan
Prior art keywords
power
storage battery
selection order
group
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017188720A
Other languages
Japanese (ja)
Other versions
JP2019068512A (en
Inventor
伸浩 森
伸浩 森
章太 上西
章太 上西
尚 梅岡
尚 梅岡
弘嗣 判谷
弘嗣 判谷
純一 松崎
純一 松崎
安宅 元晴
元晴 安宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2017188720A priority Critical patent/JP6936096B2/en
Publication of JP2019068512A publication Critical patent/JP2019068512A/en
Application granted granted Critical
Publication of JP6936096B2 publication Critical patent/JP6936096B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Description

本発明は、電力管理装置および電力管理方法に関する。 The present invention relates to a power management device and a power management method.

特許文献1には、デマンドレスポンスへの対応に際し、契約電流値の最大値に応じて各需要家で削減すべき削減電力量を決定する電力管理システムが記載されている。ここで、デマンドレスポンス(DR:DemandResponse)とは、卸市場価格の高騰時または系統信頼性の低下時において、電気料金価格の設定またはインセンティブの支払に応じて、需要家側が電力の使用を抑制するよう電力消費パターンを変化させること、と定義されている。 Patent Document 1 describes a power management system that determines the amount of power reduction to be reduced by each consumer according to the maximum contract current value when responding to demand response. Here, the demand response (DR: Demand Response) means that the consumer side suppresses the use of electric power in response to the setting of the electricity rate price or the payment of the incentive when the wholesale market price rises or the grid reliability declines. It is defined as changing the power consumption pattern.

従来より、工場、ビル等、消費電力が大きい大口需要家では需要抑制、蓄電池制御等により、電力消費ピーク時のデマンドレスポンスが行われてきた。例えば、冷房運転時期において、需要ピーク時に需要抑制の要求があった場合、空調設定温度を上げたり、照明等の各種機器のうち重要度が低い機器を停止したりすることで需要を抑制する。また、蓄電池を用いた需要抑制方法では、大型の蓄電池に予め充電しておき、需要抑制の指定時間において放電し、その間にける購入電力が一定時間抑制される。 Conventionally, large consumers such as factories and buildings, which consume a large amount of power, have been performing demand response during peak power consumption by controlling demand, controlling storage batteries, and the like. For example, in the cooling operation period, when there is a request to suppress demand at the peak of demand, the demand is suppressed by raising the set temperature of the air conditioner or stopping the less important equipment such as lighting. Further, in the demand suppression method using a storage battery, a large storage battery is charged in advance and discharged at a designated time of demand suppression, and the purchased power during that period is suppressed for a certain period of time.

一方、一般住宅等の需要家においては、消費電力が大きくないため、需要を抑制できる範囲が小さい。そのため、一般住宅における需要を抑制したとしても、需要抑制の十分な効果は見込めない。これに対し、近年、アグリゲータと複数の需要家の間の契約に基づき、電気事業者(小売電気事業者および系統運用者を含む)等からの要請に応じて行った電力の需要削減の量や容量を取引する取組が検討されている。ここで、アグリゲータ(DRアグリゲータともいう)とは、複数の需要家を束ねてDRによる需要削減量を電気事業者と取引する事業者である。 On the other hand, for consumers such as ordinary houses, the range in which demand can be suppressed is small because the power consumption is not large. Therefore, even if the demand in general housing is suppressed, the sufficient effect of the demand suppression cannot be expected. On the other hand, in recent years, based on contracts between aggregators and multiple consumers, the amount of power demand reductions made in response to requests from electric power companies (including retail electric power companies and grid operators), etc. Efforts to trade capacity are being considered. Here, an aggregator (also referred to as a DR aggregator) is a business operator that bundles a plurality of consumers and trades the amount of demand reduction by DR with an electric power company.

また、太陽光発電設備等、再生可能エネルギを利用した発電設備の導入拡大に伴い、デマンドレスポンスにおける電力消費パターンの変化に、需要削減に加え、需要増加を含ませることが考えられている。すなわち、電力の供給過剰状態が発生した場合に、需要家に対し電力の消費増加を促すことで、配電系統における電気の品質安定化を図ることが検討されている。 In addition, with the expansion of the introduction of power generation equipment using renewable energy such as solar power generation equipment, it is considered that the change in the power consumption pattern in the demand response includes an increase in demand in addition to a reduction in demand. That is, it is being studied to stabilize the quality of electricity in the distribution system by encouraging consumers to increase the consumption of electric power when an oversupply of electric power occurs.

特許第5922138号公報Japanese Patent No. 5922138

ところで、一般住宅等の需要家においては、再生可能エネルギを使用した発電設備の導入とともに、蓄電池の導入が進められている。蓄電池の充放電は、電力の需要削減や需要増加に資するものと考えられ、一般住宅等の複数の需要家が有する複数の蓄電池の充放電を効果的に管理する装置や方法が求められている。 By the way, in consumers such as general houses, the introduction of storage batteries is being promoted along with the introduction of power generation facilities using renewable energy. Charging and discharging of storage batteries is considered to contribute to reducing and increasing demand for electric power, and there is a demand for devices and methods for effectively managing the charging and discharging of multiple storage batteries owned by multiple consumers such as ordinary houses. ..

本発明は、上記事情に鑑みてなされたもので、その目的は、複数の蓄電池の充放電を効果的に管理することがきる電力管理装置および電力管理方法を提供することにある。 The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a power management device and a power management method capable of effectively managing the charge and discharge of a plurality of storage batteries.

上記課題を解決するため、本発明の一態様は、蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する装置であって、親アグリゲータからの所定の要請時間における電力調整の要請を受信する受信部と、前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定する選択順位決定部と、前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示する制御部とを備える電力管理装置である。 In order to solve the above problems, one aspect of the present invention is a device that manages the charge and discharge of each storage battery in a plurality of consumer facilities each having a storage battery, and power adjustment at a predetermined requested time from a parent aggregator. A receiving unit that receives the request, and a selection order determining unit that determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline in response to the request received by the receiving unit. One or a plurality of the storage batteries are selected based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and the charging / discharging of the selected storage batteries is applied to the customer facilities. It is a power management device including a control unit for instructing.

また、本発明の一態様は、上記電力管理装置であって、前記選択順位決定部が、複数の前記単位時間毎に電力調整に係る所定の実測値に基づき必要に応じて前記選択順位を変更する。 Further, one aspect of the present invention is the power management device, in which the selection order determination unit changes the selection order as necessary based on a predetermined measured value related to power adjustment for each of a plurality of the unit times. do.

また、本発明の一態様は、上記電力管理装置であって、前記選択順位決定部が、前記要請を満たすように、1または複数の前記蓄電池からなる群を設定し、設定した前記群毎に前記選択順位を決定する。 Further, one aspect of the present invention is the power management device, in which the selection order determining unit sets a group consisting of one or a plurality of the storage batteries so as to satisfy the request, and for each set group. The selection order is determined.

また、本発明の一態様は、上記電力管理装置であって、前記選択順位決定部は、前記要請を満たさない前記群が確認された場合、前記群のいずれにも割り当てられていない前記蓄電池を当該群に割り当てることで前記群を再設定する。 Further, one aspect of the present invention is the power management device, and when the group that does not satisfy the request is confirmed, the selection order determination unit uses the storage battery that is not assigned to any of the groups. By assigning to the group, the group is reset.

また、本発明の一態様は、上記電力管理装置であって、前記選択順位決定部は、前記要請を満たさない前記群が確認された場合、前記群のいずれかを解体し、前記群を再設定する。 Further, one aspect of the present invention is the power management device, and when the group that does not satisfy the request is confirmed, the selection order determination unit disassembles any of the groups and re-uses the group. Set.

また、本発明の一態様は、上記電力管理装置であって、前記制御部は、前記選択した前記各蓄電池の定格電力による充放電を前記各需要家施設に対して指示する。 Further, one aspect of the present invention is the power management device, in which the control unit instructs each consumer facility to charge / discharge with the rated power of each of the selected storage batteries.

また、本発明の一態様は、上記電力管理装置であって、前記蓄電状態が利用可能量であり、前記選択順位決定部が、ベースラインにおける各前記蓄電状態に応じて前記各蓄電池の前記選択順位を決定するとともに、前記単位時間毎に前記蓄電状態の各推定値に基づき前記選択順位を更新する。 Further, one aspect of the present invention is the power management device in which the power storage state is the available amount, and the selection order determination unit selects the storage battery according to the power storage state at the baseline. The order is determined, and the selection order is updated every unit time based on each estimated value of the electricity storage state.

また、本発明の一態様は、上記電力管理装置であって、前記蓄電状態が充電率であり、前記選択順位決定部が、ベースラインにおける各前記蓄電状態に応じて前記各蓄電池の前記選択順位を決定するとともに、前記単位時間毎に前記蓄電状態の各推定値に基づき前記選択順位を更新する。 Further, one aspect of the present invention is the power management device, in which the power storage state is the charge rate, and the selection order determination unit determines the selection order of each storage battery according to each of the power storage states at the baseline. Is determined, and the selection order is updated every unit time based on each estimated value of the power storage state.

また、本発明の一態様は、蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する方法であって、受信部によって、親アグリゲータからの所定の要請時間における電力調整の要請を受信し、選択順位決定部によって、前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定し、制御部によって、前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示する電力管理方法である。 Further, one aspect of the present invention is a method of managing the charge / discharge of each storage battery in a plurality of consumer facilities each having a storage battery, and the receiving unit adjusts the power at a predetermined requested time from the parent aggregator. Upon receiving the request, the selection order determination unit determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline in response to the request received by the reception unit, and the control unit determines the selection order. , One or a plurality of the storage batteries are selected based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and the charging / discharging of the selected storage batteries is sent to the customer facilities. It is a power management method that gives instructions to the user.

本発明によれば、複数の蓄電池の充放電を効果的に管理することがきる。 According to the present invention, it is possible to effectively manage the charge and discharge of a plurality of storage batteries.

本発明の一実施形態に係る蓄電池群管理システムの構成例を示す模式図である。It is a schematic diagram which shows the structural example of the storage battery group management system which concerns on one Embodiment of this invention. 図1に示す電力管理装置10と需要家施設20の構成例を示すブロック図である。It is a block diagram which shows the configuration example of the electric power management apparatus 10 and the consumer facility 20 shown in FIG. 図2に示す制御装置12の動作例を示すフローチャートである。It is a flowchart which shows the operation example of the control device 12 shown in FIG. 図3に示す制御装置12の動作例を説明するための模式図である。It is a schematic diagram for demonstrating the operation example of the control device 12 shown in FIG. 図2に示す制御装置12の他の動作例を示すフローチャートである。It is a flowchart which shows the other operation example of the control device 12 shown in FIG. 図5に示す制御装置12の動作例を説明するための説明図である。It is explanatory drawing for demonstrating the operation example of the control device 12 shown in FIG. 図2に示す制御装置12のさらに他の動作例を示すフローチャートである。It is a flowchart which shows still another operation example of the control device 12 shown in FIG. 図3、図5および図7に示す動作例を比較するための説明図である。It is explanatory drawing for comparison of the operation example shown in FIG. 3, FIG. 5 and FIG.

以下、図面を参照して本発明の実施形態について説明する。本発明の一実施形態に係る蓄電池群管理システムの構成例を示す模式図である。図1に示す蓄電池群管理システム1は、電力管理装置10と、一般家庭等の複数の需要家施設20と、大口の需要家施設30を備える。複数の需要家施設20は、それぞれ蓄電池21を有する。需要家施設30は、蓄電池31を有する。なお、需要家施設30の個数は、0個または複数個としてもよい。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. It is a schematic diagram which shows the structural example of the storage battery group management system which concerns on one Embodiment of this invention. The storage battery group management system 1 shown in FIG. 1 includes a power management device 10, a plurality of consumer facilities 20 such as general households, and a large-scale consumer facility 30. Each of the plurality of consumer facilities 20 has a storage battery 21. The consumer facility 30 has a storage battery 31. The number of customer facilities 30 may be 0 or a plurality.

電力管理装置10は、複数の需要家(複数の需要家施設20および需要家施設30)を束ねてDRによる需要削減または需要増加(まとめて需要変化ともいう)を、電気事業者等の親アグリゲータと取引する事業者(アグリゲータ)が運用するサーバ等のコンピュータである。電力管理装置10は、電力会社等(親アグリゲータ)が運用する上位制御システム50(サーバ等のコンピュータ)から複数の需要家施設20や需要施設30における電力調整の要請(電力調整の依頼)を通信回線60を介して受信する。また、電力管理装置10は、受信した電力調整の要請に応じて、1または複数の蓄電池21または蓄電池31を選択し、選択した各蓄電池21または蓄電池31を有する各需要家施設20または需要家施設30へ充放電指令を通信回線40を介して送信し、選択した各蓄電池21または蓄電池31における充放電を制御する。 The electric power management device 10 bundles a plurality of consumers (a plurality of consumer facilities 20 and a consumer facility 30) to reduce or increase demand by DR (collectively referred to as a change in demand) as a parent aggregator of an electric power company or the like. It is a computer such as a server operated by a business operator (aggregator) that deals with. The power management device 10 communicates a request for power adjustment (request for power adjustment) in a plurality of customer facilities 20 and demand facilities 30 from a higher-level control system 50 (computer such as a server) operated by an electric power company or the like (parent aggregator). Receive via line 60. Further, the power management device 10 selects one or a plurality of storage batteries 21 or storage batteries 31 in response to the received power adjustment request, and each consumer facility 20 or consumer facility having each selected storage battery 21 or storage battery 31. A charge / discharge command is transmitted to 30 via the communication line 40 to control charge / discharge in each selected storage battery 21 or storage battery 31.

なお、本実施形態において、電力調整の要請は、電力管理装置10が管理する複数の需要家施設20および需要施設30全体としての需要削減の要請と需要増加の要請を含む。また、需要削減の要請は、潮流電力の削減の要請と、逆潮流電力の増加の要請を含む。また、電力調整の要請は、蓄電池21または蓄電池31における充放電電力、放電電力や充電電力の変化を直接指示する内容を含んでいてもよい。 In the present embodiment, the request for power adjustment includes a request for reducing demand and a request for increasing demand for the plurality of consumer facilities 20 and the demand facility 30 as a whole managed by the power management device 10. In addition, the request for demand reduction includes a request for reduction of power flow power and a request for increase of reverse power flow power. Further, the request for power adjustment may include a content that directly indicates a change in charge / discharge power, discharge power, or charge power in the storage battery 21 or the storage battery 31.

また、蓄電池群管理システム1は、例えばTEMS(Town Energy Management System)やCEMS(Community Energy Management System)等の電力管理システムに含まれる形態で(例えば一つの機能として)構成することができる。また、電力管理装置10は、TEMSやCEMS等の電力管理システムにおける管理装置(管理サーバ)に含まれる形態で(例えば一つの機能として)構成することができる。ここで、TEMSやCEMSは、例えば、所定の地域範囲における住宅、商業施設、産業施設等の複数の需要家施設20および需要家施設30における電力を一括して管理するシステムである。この場合、電力管理装置10は、複数の需要家施設20および需要施設30が有する複数の蓄電池21および蓄電池31の充放電電力の管理(予測や制御)のほか、例えば、発電設備の発電電力の管理(予測や制御)、負荷設備の消費電力の管理(予測や制御)を行う装置として構成することができる。また、電力管理装置10が管理する需要家施設には、蓄電池を有していない需要家施設が含まれていてもよい。なお、本実施形態において、所定の地域範囲は、1つの地域範囲によって形成されていてもよいし、地理的に離散している複数の地域範囲によって形成されていてもよい。 Further, the storage battery group management system 1 can be configured in a form (for example, as one function) included in a power management system such as TEMS (Town Energy Management System) or CEMS (Community Energy Management System). Further, the power management device 10 can be configured (for example, as one function) in a form included in a management device (management server) in a power management system such as TEMS or CEMS. Here, TEMS and CEMS are systems that collectively manage electric power in a plurality of consumer facilities 20 and consumer facilities 30 such as residential, commercial facilities, and industrial facilities in a predetermined area, for example. In this case, the power management device 10 manages (predicts and controls) the charge / discharge power of the plurality of storage batteries 21 and the storage batteries 31 of the plurality of consumer facilities 20 and the demand facilities 30, and also, for example, the generated power of the power generation facility. It can be configured as a device for management (prediction and control) and management (prediction and control) of power consumption of load equipment. Further, the consumer facility managed by the power management device 10 may include a consumer facility that does not have a storage battery. In addition, in this embodiment, a predetermined area range may be formed by one area range, or may be formed by a plurality of geographically discrete area ranges.

図2は、図1に示す電力管理装置10と需要家施設20の構成例を示すブロック図である。図2に示す構成例において、需要家施設20は、通信部24、制御装置22、分電盤23、蓄電池21、発電設備25、電力負荷設備26および電力メータ28を備える。 FIG. 2 is a block diagram showing a configuration example of the power management device 10 and the consumer facility 20 shown in FIG. In the configuration example shown in FIG. 2, the consumer facility 20 includes a communication unit 24, a control device 22, a distribution board 23, a storage battery 21, a power generation facility 25, a power load facility 26, and a power meter 28.

通信部24は、通信回線40を介して、電力管理装置10との間で所定の情報を送受信する。通信回線40は、通信回線43、インターネット等のネットワーク41、および通信回線42から構成されている。 The communication unit 24 transmits and receives predetermined information to and from the power management device 10 via the communication line 40. The communication line 40 is composed of a communication line 43, a network 41 such as the Internet, and a communication line 42.

制御装置22は、需要家施設20における電気設備(発電設備25、蓄電池21、電力負荷設備26および通信部24等)を制御する。また、制御装置22は、電力メータ28にて測定される消費電力の情報を入力し、入力された消費電力の情報を各種制御に利用することができる。 The control device 22 controls the electric equipment (power generation equipment 25, storage battery 21, power load equipment 26, communication unit 24, etc.) in the consumer facility 20. Further, the control device 22 can input the power consumption information measured by the power meter 28 and use the input power consumption information for various controls.

なお、本実施形態では、需要家施設20が備える蓄電池21、発電設備25および電力負荷設備26のうち、例えば制御装置22を介して電力管理装置10が制御可能なものを電力設備と呼ぶ。本実施形態において、蓄電池21の充電電力と放電電力は電力管理装置10によって制御される。また、発電設備25の一部または全部は、電力管理装置10によって発電電力が制御可能であってもよい。また、電力負荷設備26の一部または全部は、電力管理装置10によって消費電力が制御可能であってもよい。すなわち、蓄電池21と、電力管理装置10が制御可能な発電設備25および電力負荷設備26は、電力設備である。 In the present embodiment, among the storage battery 21, the power generation facility 25, and the power load facility 26 included in the consumer facility 20, those that can be controlled by the power management device 10 via, for example, the control device 22 are referred to as power facilities. In the present embodiment, the charging power and the discharging power of the storage battery 21 are controlled by the power management device 10. Further, the generated power of a part or all of the power generation facility 25 may be controllable by the power management device 10. Further, the power consumption of a part or all of the power load equipment 26 may be controllable by the power management device 10. That is, the storage battery 21, the power generation facility 25 and the power load facility 26 that can be controlled by the power management device 10 are power facilities.

制御装置22は、電力管理装置10から受信した指示に従い、需要家施設20が備える電力設備の充放電電力、発電電力、消費電力等を制御する。その際、制御装置22は、電力管理装置10から受信した充放電指令に従い、蓄電池21の充放電電力を制御する。 The control device 22 controls the charge / discharge power, the generated power, the power consumption, and the like of the power equipment provided in the consumer facility 20 according to the instruction received from the power management device 10. At that time, the control device 22 controls the charge / discharge power of the storage battery 21 according to the charge / discharge command received from the power management device 10.

制御装置22は、また、需要家施設20における電力関連の情報を収集する。制御装置22は、例えば、電力メータ28にて測定された需給電力の情報を収集することができる。また、制御装置22は、発電設備25が発電する電力、蓄電池21の残容量(蓄積電力)や充放電電力、電力負荷設備26等による負荷電力(消費電力)等を収集することができる。制御装置22は、また、収集した発電電力、充放電電力、需要電力、需給電力等の情報を、例えば所定の時間間隔であるいは電力管理装置10からの要求に応じて、通信部24から電力管理装置10へ送信する。 The control device 22 also collects power-related information in the consumer facility 20. The control device 22 can collect information on the supply and demand power measured by the power meter 28, for example. Further, the control device 22 can collect the power generated by the power generation facility 25, the remaining capacity (stored power) and charge / discharge power of the storage battery 21, the load power (power consumption) of the power load facility 26 and the like. The control device 22 also manages the collected information such as generated power, charge / discharge power, demand power, supply / supply power, etc. from the communication unit 24 at predetermined time intervals or in response to a request from the power management device 10. It is transmitted to the device 10.

分電盤23は、電力メータ28経由で引込線71から供給された電力を、蓄電池21や電力負荷設備26等に配線27を介して分配して供給する。引込線71は、一般送配電事業者側の配電系統の構成要素である。また、分電盤23は、発電設備25等から出力された電力を逆潮流のために電力メータ28経由で引込線71に出力させることができる。 The distribution board 23 distributes the electric power supplied from the service line 71 via the electric power meter 28 to the storage battery 21, the electric power load facility 26, and the like via the wiring 27 and supplies the electric power. The drop line 71 is a component of the distribution system on the general power transmission and distribution business operator side. Further, the distribution board 23 can output the electric power output from the power generation facility 25 or the like to the service line 71 via the electric power meter 28 due to reverse power flow.

蓄電池21は、充電のために入力される電力を蓄積し、また、蓄積した電力を放電して出力する設備である。蓄電池21は、例えば二次電池とインバータを備える。蓄電池21は電力の蓄積(充電)と蓄積された電力の出力(放電)を行う。インバータは、二次電池に充電するための電力を交流から直流に変換し、二次電池から放電により出力される電力を直流から交流に変換する。つまり、インバータは、二次電池が入出力する電力の双方向変換を行う。蓄電池21の充放電電力は制御装置22によって制御される。 The storage battery 21 is a facility that stores electric power input for charging and discharges and outputs the stored electric power. The storage battery 21 includes, for example, a secondary battery and an inverter. The storage battery 21 stores (charges) electric power and outputs (discharges) the stored electric power. The inverter converts the electric power for charging the secondary battery from alternating current to direct current, and converts the electric power output from the secondary battery by discharge from direct current to alternating current. That is, the inverter performs bidirectional conversion of the power input / output from the secondary battery. The charge / discharge power of the storage battery 21 is controlled by the control device 22.

蓄電池21は、分電盤23を介して供給される商用電源の電力を入力して充電することができる。また、蓄電池21は、発電設備25により発電された電力を入力して充電することができる。また、蓄電池21は、蓄積された電力を電力負荷設備26の電源として供給することができる。また、蓄電池21は、蓄積された電力を分電盤23から電力メータ28を経由して引込線71に出力することで逆潮流させることができる。 The storage battery 21 can be charged by inputting the electric power of the commercial power supply supplied through the distribution board 23. Further, the storage battery 21 can be charged by inputting the electric power generated by the power generation facility 25. Further, the storage battery 21 can supply the stored electric power as a power source for the electric power load facility 26. Further, the storage battery 21 can reverse power flow by outputting the stored electric power from the distribution board 23 to the service line 71 via the electric power meter 28.

発電設備25は、例えば太陽光を受けて発電を行う設備である。発電設備25は、例えば太陽電池とPCS(Power Conditioning System)を備える。発電設備25は、太陽光を受けて発電し、発電により得られた電力をPCSにより交流に変換して出力する。 The power generation facility 25 is, for example, a facility that receives sunlight to generate power. The power generation facility 25 includes, for example, a solar cell and a PCS (Power Conditioning System). The power generation facility 25 receives sunlight to generate power, converts the power obtained by the power generation into alternating current by PCS, and outputs the power.

発電設備25にて発電された電力は、電力負荷設備26の電源として供給することができる。また、発電設備25にて発電された電力は、蓄電池21に充電することができる。また、発電設備25にて発電された電力は、分電盤23から電力メータ28を経由して引込線71に出力することで逆潮流させることができる。 The electric power generated by the power generation facility 25 can be supplied as a power source for the power load facility 26. Further, the electric power generated by the power generation facility 25 can be charged to the storage battery 21. Further, the electric power generated by the power generation facility 25 can be reverse-flowed by being output from the distribution board 23 to the drop line 71 via the electric power meter 28.

なお、発電設備25と蓄電池21は、電力変換回路等の構成を一体化したものであってもよい。 The power generation facility 25 and the storage battery 21 may have an integrated configuration such as a power conversion circuit.

電力負荷設備26は、需要家施設20において自己の動作のために電力を消費する1または複数の所定の機器や設備等を一括して示したものである。なお、各需要家施設20が備える負荷としての機器や設備等の種類および数等はそれぞれ異なっていて構わない。電力負荷設備26は、分電盤23から供給される商用電源を入力して動作することができる。また、電力負荷設備26は、発電設備25により発電された電力を入力して動作することができる。また、電力負荷設備26は、蓄電池21から出力された電力を入力して動作することができる。 The electric power load facility 26 collectively indicates one or a plurality of predetermined devices and facilities that consume electric power for their own operation in the consumer facility 20. The type and number of devices, equipment, and the like as loads provided by each consumer facility 20 may be different. The power load equipment 26 can operate by inputting the commercial power supply supplied from the distribution board 23. Further, the electric power load facility 26 can operate by inputting the electric power generated by the power generation facility 25. Further, the power load equipment 26 can operate by inputting the power output from the storage battery 21.

また、電力負荷設備26は、貯湯式給湯器、蓄熱型空調機、衣類乾燥機、食器乾燥機、蓄電池(充電対象としての負荷)等、制御装置22等によって消費電力をコントロールできる負荷を含んでいてもよい。 Further, the power load equipment 26 includes a load whose power consumption can be controlled by a control device 22 or the like, such as a hot water storage type water heater, a heat storage type air conditioner, a clothes dryer, a dish dryer, a storage battery (load as a charging target), and the like. You may.

電力メータ28は、需要電力と発電電力とを測定する。すなわち、電力メータ28は、需給電力を測定する。需給電力は、例えば需要電力と発電電力との差分である。需要家施設20において、引込線71から分電盤23に供給される電力が需要電力である。一方、蓄電池21や発電設備25から出力され、分電盤23から電力メータ28を経由して引込線71に供給される電力が発電電力である。需要電力に対応する順潮流を正方向とした場合、順潮流に対応する需要電力に対して逆潮流に対応する発電電力が小さければ、需給電力は正の値として測定され、需要電力に対して発電電力が大きければ需給電力は負の値として測定される。電力メータ28は、例えば、1つの需要家施設20において使用される需要電力を測定する需要メータと、1つの需要家施設20において太陽光発電装置等の自然エネルギを利用した発電設備25等によって発電された発電電力を測定する発電メータとを備える。 The watt-hour meter 28 measures the demand power and the generated power. That is, the watt-hour meter 28 measures the supply and demand power. The supply and demand power is, for example, the difference between the demand power and the generated power. In the consumer facility 20, the electric power supplied from the drop line 71 to the distribution board 23 is the demand electric power. On the other hand, the electric power output from the storage battery 21 and the power generation facility 25 and supplied from the distribution board 23 to the service line 71 via the electric power meter 28 is the generated electric power. When the forward power flow corresponding to the demand power is set to the positive direction, if the generated power corresponding to the reverse power flow is smaller than the demand power corresponding to the forward power flow, the supply and demand power is measured as a positive value and is relative to the demand power. If the generated power is large, the supply and demand power is measured as a negative value. The watt-hour meter 28 is generated by, for example, a demand meter that measures the demand power used in one consumer facility 20, and a power generation facility 25 or the like that uses natural energy such as a solar power generator in one consumer facility 20. It is equipped with a power generation meter that measures the generated power generation.

なお、電力メータ28は、例えばスマートメータとして、ネットワーク41等を経由して、測定した需給電力の情報を電力管理装置10に送信できるようにしてもよい。この場合、制御装置22は、電力メータ28により測定された需給電力を収集しなくてもよい。 The power meter 28 may be used as a smart meter, for example, so that the measured power supply and demand information can be transmitted to the power management device 10 via the network 41 or the like. In this case, the control device 22 does not have to collect the supply and demand power measured by the power meter 28.

なお、需要家施設20には、蓄電池21と発電設備25のいずれか一方を備えるものがあってよい。また、需要家施設20には、蓄電池21と発電設備25のいずれも備えないものがあってよい。また、発電設備25は、太陽電池を用いるものに限らず、風力発電、地熱発電等、他の再生可能エネルギを利用して発電を行う発電装置あるいはそれらの組み合わせであってもよい。 The consumer facility 20 may include either a storage battery 21 or a power generation facility 25. Further, the consumer facility 20 may be provided with neither the storage battery 21 nor the power generation facility 25. Further, the power generation facility 25 is not limited to one using a solar cell, and may be a power generation device that generates power using other renewable energies such as wind power generation and geothermal power generation, or a combination thereof.

また、需要家施設20が備える蓄電池21や発電設備25は、商用電源と系統連系されている。これにより、蓄電池21または発電設備25を備える需要家施設20は、発電設備25が発電して出力する電力または蓄電池21が放電により出力する電力を商用電源の電力系統(配電網)に逆潮流させて、電力系統を通して売電することができる。 Further, the storage battery 21 and the power generation facility 25 included in the consumer facility 20 are grid-connected to the commercial power source. As a result, the consumer facility 20 provided with the storage battery 21 or the power generation facility 25 causes the power generated and output by the power generation facility 25 or the power output by the storage battery 21 to be discharged back to the power system (distribution network) of the commercial power source. And can be sold through the power system.

なお、需要家施設30は、需要家施設20と基本的な構成が同一である。すなわち、需要家施設30では、電力管理装置10から受信した指示に従い、需要家施設30が備える電力設備の充放電電力、発電電力、消費電力等が制御される。その際、需要家施設30では、電力管理装置10から受信した充放電指令に従い、蓄電池31の充放電電力が制御される。ただし、一般的に、需要家施設20へは、配電系統の高圧配電線に接続された柱上変圧器、路上変圧器等から低圧配電線を介して商用電力が配電されるが、需要家施設30へは、例えば高圧配電線から直接、商用電力が配電される。 The consumer facility 30 has the same basic configuration as the consumer facility 20. That is, in the consumer facility 30, the charge / discharge power, the generated power, the power consumption, and the like of the power equipment included in the consumer facility 30 are controlled according to the instruction received from the power management device 10. At that time, in the consumer facility 30, the charge / discharge power of the storage battery 31 is controlled according to the charge / discharge command received from the power management device 10. However, in general, commercial power is distributed to the consumer facility 20 from a pillar transformer, a road transformer, etc. connected to the high voltage distribution line of the distribution system via the low voltage distribution line, but the consumer facility Commercial power is distributed directly to 30, for example, from a high-voltage distribution line.

一方、電力管理装置10は、通信部11、制御装置12、および記憶部13を備える。制御装置12は、例えば、CPU(中央処理装置)、主記憶装置、補助記憶装置、入出力装置等のハードウェアと、CPUが実行する所定のプログラムとの組み合わせから構成することができる。 On the other hand, the power management device 10 includes a communication unit 11, a control device 12, and a storage unit 13. The control device 12 can be composed of, for example, a combination of hardware such as a CPU (central processing unit), a main storage device, an auxiliary storage device, and an input / output device, and a predetermined program executed by the CPU.

本実施形態において、電力管理装置10は、例えば計画値同時同量制度に対応させて、各需要家施設20および需要家施設30における電力の需給を管理する。つまり、電力管理装置10の運用者は、各需要家施設20および需要家施設30全体として、電力需給計画を所定の単位計画時間(例えば、30分)ごとに策定し、策定された電力需給計画を一般送配電事業者に提出する。そのうえで、各需要家施設20および需要家施設30全体における電力需給の実績が電力需給計画に対して過不足(インバランス)を生じた場合には、電気事業者と一般送配電事業者との間でインバランスに対応する精算(インバランス精算)が行われる。 In the present embodiment, the electric power management device 10 manages the supply and demand of electric power in each customer facility 20 and the consumer facility 30 in accordance with, for example, the planned value simultaneous equal amount system. That is, the operator of the electric power management device 10 formulates the electric power supply and demand plan for each consumer facility 20 and the consumer facility 30 as a whole for each predetermined unit planning time (for example, 30 minutes), and the electric power supply and demand plan is formulated. To the general power transmission and distribution business operator. In addition, if the actual power supply and demand in each consumer facility 20 and the entire consumer facility 30 becomes excessive or deficient (imbalance) with respect to the power supply and demand plan, it will be between the electric power company and the general power transmission and distribution business operator. Settlement corresponding to imbalance (imbalance settlement) is performed at.

本実施形態における電力需給計画は、発電計画と需要計画とを含む。発電計画は、配電網に逆潮流させる電力についての各需要家施設20および需要家施設30全体としての計画値や、需要家施設20や需要家施設30の個別の計画値があり得る。需要計画は、配電網から順潮流で購入する電力についての各需要家施設20および需要家施設30全体としての計画値や、需要家施設20の個別の計画値があり得る。 The power supply and demand plan in this embodiment includes a power generation plan and a demand plan. The power generation plan may have a planned value of each consumer facility 20 and the consumer facility 30 as a whole, or an individual planned value of the consumer facility 20 and the consumer facility 30 for the electric power to be reverse-flowed to the distribution network. The demand plan may have a planned value of each consumer facility 20 and the consumer facility 30 as a whole for electric power purchased from the distribution network in a forward flow, or an individual planned value of the consumer facility 20.

本実施形態が対応する計画値同時同量制度のもとでは、発電計画と需要計画とのそれぞれについて実績が計画通りに達成されることが求められる。つまり、本実施形態が対応する計画値同時同量制度では、各需要家施設20および需要家施設30全体から逆潮流される電力の実績が発電計画に対して過不足のないことが求められるとともに、各需要家施設20および需要家施設30全体として順潮流を受ける電力の実績が需要計画に対して過不足のないことが求められる。なお、本実施形態において、発電電力とは配電網に逆潮流させる電力をいう。また、需要電力とは配電網から順潮流させる電力をいう。なお、本実施形態において、発電電力は、発電設備25が発電した電力と蓄電池21が放電した電力を含む。 Under the planned value simultaneous equal amount system corresponding to this embodiment, it is required that the actual results for each of the power generation plan and the demand plan are achieved as planned. That is, in the planned value simultaneous equal amount system corresponding to this embodiment, it is required that the actual power flowed backward from each customer facility 20 and the entire customer facility 30 is not excessive or deficient with respect to the power generation plan. It is required that the actual power generated by each consumer facility 20 and the consumer facility 30 as a whole is not excessive or deficient with respect to the demand plan. In the present embodiment, the generated power means the power to be reverse power flowed to the distribution network. In addition, the demand power refers to the power that flows forward from the distribution network. In the present embodiment, the generated power includes the power generated by the power generation facility 25 and the power discharged by the storage battery 21.

電力管理装置10は、各需要家施設20および需要家施設30全体における電力設備を対象として電力制御を実行する。電力管理装置10は、インターネット等のネットワーク41、通信回線42および通信回線43から構成される通信回線40を介して需要家施設20および需要家施設30の各々と相互に通信が可能なように接続されている。これにより、電力管理装置10は、需要家施設20と需要家施設30が備える電力設備の運転を制御することができる。また、電力管理装置10は、通信回線60を介して、上位制御システム50と相互に通信が可能なように接続されている。 The power management device 10 executes power control for the power equipment in each customer facility 20 and the entire consumer facility 30. The power management device 10 is connected so as to be able to communicate with each of the consumer facility 20 and the consumer facility 30 via a communication line 40 composed of a network 41 such as the Internet, a communication line 42, and a communication line 43. Has been done. As a result, the electric power management device 10 can control the operation of the electric power equipment included in the consumer facility 20 and the consumer facility 30. Further, the power management device 10 is connected to the host control system 50 via a communication line 60 so as to be able to communicate with each other.

通信部11は、通信回線40経由で需要家施設20内の制御装置22と通信を行う。また、通信部11は、通信回線60経由で上位制御システム50と通信を行う。なお、通信回線60も、通信回線40と同様、インターネット等のネットワーク41を介して構成されるものであってもよい。 The communication unit 11 communicates with the control device 22 in the consumer facility 20 via the communication line 40. Further, the communication unit 11 communicates with the host control system 50 via the communication line 60. The communication line 60 may also be configured via a network 41 such as the Internet, like the communication line 40.

記憶部13は、電力管理にあたって制御装置12が利用する情報を記憶する。本実施形態の記憶部13は、発電計画情報131、需要計画情報132、および需要家施設基本情報133を記憶する。 The storage unit 13 stores information used by the control device 12 for power management. The storage unit 13 of the present embodiment stores the power generation plan information 131, the demand plan information 132, and the consumer facility basic information 133.

発電計画情報131は、策定された発電計画による発電電力を示す情報である。需要計画情報132は、策定された需要計画による需要電力を示す情報である。需要家施設基本情報133は、各需要家施設20および需要家施設30についての基本的な情報を含む。例えば、1つの需要家施設20に対応する需要家施設基本情報には、当該需要家施設20を一意に示す需要家施設ID(識別符号)、需要家施設20の契約電力の値、発電設備25の定格出力の値、蓄電池21の定格電力(定格出力)の値(定格充放電電力の値、定格放電電力の値や定格充電電力の値)および容量、当該需要家施設20が備える電力負荷設備26に関する情報、当該需要家施設20が備える通信部24や制御装置22のアドレス等の情報が含まれる。 The power generation plan information 131 is information indicating the power generated by the formulated power generation plan. The demand plan information 132 is information indicating the demand power according to the formulated demand plan. The consumer facility basic information 133 includes basic information about each consumer facility 20 and the consumer facility 30. For example, the basic information of the customer facility corresponding to one customer facility 20 includes the customer facility ID (identification code) uniquely indicating the customer facility 20, the value of the contracted power of the customer facility 20, and the power generation facility 25. Rated output value, rated power (rated output) value (rated charge / discharge power value, rated discharge power value and rated charge power value) and capacity of the storage battery 21, power load equipment provided in the consumer facility 20 Information about the 26 and information such as the address of the communication unit 24 and the control device 22 included in the consumer facility 20 are included.

制御装置12は、電力制御部121、受信部122、選択順位決定部123および蓄電池制御部124を備える。 The control device 12 includes a power control unit 121, a reception unit 122, a selection order determination unit 123, and a storage battery control unit 124.

電力制御部121は、記憶部13が記憶している発電計画情報131および需要計画情報132と、各需要家施設20および需要家施設30における電力需給の実績値(実測値)に基づき、各需要家施設20および需要家施設30における電力設備を制御する。 The power control unit 121 receives each demand based on the power generation plan information 131 and the demand plan information 132 stored in the storage unit 13 and the actual value (actual measurement value) of the power supply and demand in each customer facility 20 and the consumer facility 30. It controls the electric power equipment in the house facility 20 and the consumer facility 30.

受信部122は、親アグリゲータである電力会社等が運用する上位制御システム50からの所定の要請時間における電力調整の要請を通信部11を介して受信する。所定の要請時間は、電力調整すなわち需要削減または需要増加が要請される時間であり、例えば、開始時刻と終了時刻または開始時刻と継続時間で定義される。電力調整の要請は、DRによる要請に対応し、電力調整の要請時間と、需要削減または需要増加が要請される電力の値、電力量の値等を示す情報を含む。 The receiving unit 122 receives a request for power adjustment at a predetermined request time from the upper control system 50 operated by the electric power company or the like, which is a parent aggregator, via the communication unit 11. The predetermined requested time is the time when the power adjustment, that is, the demand reduction or the demand increase is requested, and is defined by, for example, the start time and the end time or the start time and the duration. The request for electric power adjustment includes information indicating the requested time for electric power adjustment, the value of electric power for which demand reduction or demand increase is requested, the value of electric energy, etc. in response to the request by DR.

選択順位決定部123は、受信部122が受信した電力調整の要請に応じて、ベースラインにおける複数の蓄電池21および蓄電池31の各蓄電状態に基づき、要請に応じて充放電電力を変化させる際の各蓄電池21と蓄電池31の選択順位を決定する。ここで、ベースラインは、電力調整の要請がなかった場合に想定される電力消費量である。ベースラインは、計画値同時同量制度のもとでは、発電計画と需要計画から求めることができる。あるいは、本実勢形態においてベースラインは、発電電力の実績値と需要計画の実績値を基準として求めてもよい。本実施形態において蓄電状態とは、要請時間において想定されるベースラインを基準とした充電または放電の余力の程度を表す情報である。蓄電状態は、例えば、蓄電池21または蓄電池31の定格電力(最大充電電力あるいは最大放電電力)とベースラインにおける充電電力あるいは放電電力との差や比率、利用可能量や充電率で表すことができる。また、選択順位は、複数の蓄電池21と蓄電池31の全部ではなく一部で充放電電力を変化させることで要請された電力や電力量の削減や増加を満たすことができる場合に、各蓄電池21および蓄電池31の全体から充放電電力を変化させる一部の蓄電池21と蓄電池31を選択する際の各蓄電池21および蓄電池31の選択の順番である。本実施形態において選択順位は、各蓄電池21あるいは蓄電池31毎に設定したり、複数の蓄電池21あるいは蓄電池31からなる群(グループ)毎に設定したりすることができる。すなわち、本実施形態において、選択順位決定部123は、電力調整の要請がなかった場合の複数の蓄電池21および蓄電池31各々の充放電電力や残容量の計画値(あるいは実績値)を基準として、要請時間において想定される充放電電力の余力の程度に基づき、各蓄電池21および蓄電池31の選択の順番を、各蓄電池21および蓄電池31毎または所定の群毎に決定する。 The selection order determination unit 123 changes the charge / discharge power in response to the request for power adjustment received by the reception unit 122, based on the storage states of the plurality of storage batteries 21 and the storage batteries 31 at the baseline. The selection order of each storage battery 21 and the storage battery 31 is determined. Here, the baseline is the power consumption assumed when there is no request for power adjustment. The baseline can be obtained from the power generation plan and the demand plan under the planned value simultaneous equal amount system. Alternatively, in this actual mode, the baseline may be obtained based on the actual value of the generated power and the actual value of the demand plan. In the present embodiment, the power storage state is information indicating the degree of remaining charge or discharge capacity based on the baseline assumed at the requested time. The storage state can be expressed by, for example, the difference or ratio between the rated power (maximum charge power or maximum discharge power) of the storage battery 21 or the storage battery 31 and the charge power or discharge power at the baseline, the available amount, or the charge rate. In addition, the selection order is that each storage battery 21 can satisfy the requested reduction or increase in power or electric energy by changing the charge / discharge power in a part of the plurality of storage batteries 21 and the storage battery 31 instead of all of them. This is the order of selection of each storage battery 21 and storage battery 31 when selecting a part of the storage battery 21 and the storage battery 31 that change the charge / discharge power from the entire storage battery 31. In the present embodiment, the selection order can be set for each storage battery 21 or storage battery 31, or for each group consisting of a plurality of storage batteries 21 or storage batteries 31. That is, in the present embodiment, the selection order determination unit 123 uses the planned value (or actual value) of the charge / discharge power and the remaining capacity of each of the plurality of storage batteries 21 and the storage batteries 31 when there is no request for power adjustment as a reference. The order of selection of each storage battery 21 and storage battery 31 is determined for each storage battery 21 and each storage battery 31 or for each predetermined group based on the degree of surplus capacity of charge / discharge power assumed at the requested time.

蓄電池制御部(制御部)124は、要請時間より短い所定の単位時間毎に、選択順位決定部123が決定した選択順位に基づき一または複数の蓄電池21または蓄電池31を選択し、選択した各蓄電池21または蓄電池31へ充放電指令を送信し、選択した各蓄電池21または蓄電池31における充放電電力の制御を各需要家施設20または需要家施設30に対して指示する。ここで、充放電指令は、例えば、対象の単位時間を指示する情報と、当該単位時間における平均の放電電力の目標値または平均の充電電力の目標値を示す情報あるいは当該単位時間における放電電力量の目標値または充電電力量の目標値を示す情報等を含む。 The storage battery control unit (control unit) 124 selects one or more storage batteries 21 or storage batteries 31 based on the selection order determined by the selection order determination unit 123 for each predetermined unit time shorter than the requested time, and each selected storage battery. A charge / discharge command is transmitted to the 21 or the storage battery 31, and the control of the charge / discharge power in each of the selected storage batteries 21 or the storage battery 31 is instructed to the consumer facility 20 or the consumer facility 30. Here, the charge / discharge command is, for example, information indicating a target unit time, information indicating an average discharge power target value or an average charge power target value in the unit time, or a discharge power amount in the unit time. Includes information indicating the target value of or the target value of the charging power amount.

なお、選択順位決定部123は、複数の単位時間毎に電力調整に係る所定の実測値に基づき必要に応じて選択順位を変更するようにしてもよい。ここで、電力調整に係る所定の実測値とは、例えば、実際に発生させることができた需要削減または需要増加の値である。この場合、各蓄電池21もしくは蓄電池31における充放電電力の実測値あるいは各需要家施設20もしくは需要家施設30における需給電力の実測値と、ベースラインとの差分に基づいて算出することができる。あるいは、電力調整に係る所定の実測値とは、例えば、充放電された電力の実測値、蓄電容量の実測値等であってもよい。また、複数の単位時間毎とは、1単位時間毎ではなく、複数の単位時間を単位とする、ということである。 The selection order determination unit 123 may change the selection order as necessary based on a predetermined measured value related to the power adjustment for each of a plurality of unit times. Here, the predetermined measured value related to the power adjustment is, for example, a value of demand reduction or demand increase that can be actually generated. In this case, it can be calculated based on the difference between the measured value of the charge / discharge power in each storage battery 21 or the storage battery 31 or the measured value of the supply / supply power in each customer facility 20 or the consumer facility 30 and the baseline. Alternatively, the predetermined measured value related to the power adjustment may be, for example, an actually measured value of the charged / discharged power, an actually measured value of the stored capacity, or the like. Further, each of a plurality of unit times means that a plurality of unit times are used as a unit, not every one unit time.

次に、図3および図4を参照して、図2に示す制御装置12の動作例について説明する。図3は、図2に示す制御装置12の動作例を示すフローチャートである。図4は、図3に示す制御装置12の動作例を説明するための模式図である。図3に示す動作例は、図2に示す受信部122が電力調整の要請を受信した場合に、要請された需要電力(あるいは需要電力量)の増減を、複数の蓄電池21または蓄電池31からの充放電によって対応するときの動作の一例である。また、この動作例では、選択順位決定部123による選択順位の決定の仕方が、郡単位(郡単位順)である。図4は、12台の蓄電池21を「1」〜「12」にナンバリングし、群分けして(グループ分けして)、群毎に充電または放電制御する例を模式的に示す。図3に示す処理は、繰り返し実行される。以下、図4に示す12台の蓄電池21を制御対象とする場合を例として動作例を説明する。 Next, an operation example of the control device 12 shown in FIG. 2 will be described with reference to FIGS. 3 and 4. FIG. 3 is a flowchart showing an operation example of the control device 12 shown in FIG. FIG. 4 is a schematic diagram for explaining an operation example of the control device 12 shown in FIG. In the operation example shown in FIG. 3, when the receiving unit 122 shown in FIG. 2 receives the request for power adjustment, the requested power demand (or power demand amount) is increased or decreased from the plurality of storage batteries 21 or the storage batteries 31. This is an example of the operation when responding by charging / discharging. Further, in this operation example, the method of determining the selection order by the selection order determination unit 123 is the county unit (county unit order). FIG. 4 schematically shows an example in which 12 storage batteries 21 are numbered “1” to “12”, grouped (grouped), and charged or discharged in each group. The process shown in FIG. 3 is repeatedly executed. Hereinafter, an operation example will be described by taking as an example the case where the 12 storage batteries 21 shown in FIG. 4 are controlled.

図3に示す処理において、受信部122が上位制御システム50から電力調整の要請を受信すると(ステップS101で「YES」)、蓄電池制御部124(あるいは選択順位決定部123)は、調整開始時刻になるまで待機する(ステップS102で「NO」の繰り返し)。調整開始時刻になると(ステップS102で「YES」)、選択順位決定部123が、群の個数を決定する(ステップS103)。 In the process shown in FIG. 3, when the receiving unit 122 receives the power adjustment request from the host control system 50 (“YES” in step S101), the storage battery control unit 124 (or the selection order determination unit 123) sets the adjustment start time. Wait until it becomes (repeated "NO" in step S102). When the adjustment start time is reached (“YES” in step S102), the selection order determination unit 123 determines the number of groups (step S103).

例えば、受信部122が受信した電力調整の要請が、XkW(Xキロワット)の需要削減または需要増加の要請であるとする。また、図2に示す12台の蓄電池21は、ベースラインを基準として、需要削減の余力の合計または需要増加の余力の合計がYkW(Yキロワット)であるとする。 For example, suppose that the power adjustment request received by the receiving unit 122 is a request for reducing or increasing the demand for XkW (X kW). Further, it is assumed that the total of the reserve capacity for reducing demand or the total reserve capacity for increasing demand is YkW (Y kW) for the 12 storage batteries 21 shown in FIG. 2 with reference to the baseline.

需要削減の余力は、ベースラインを基準として増加可能な蓄電池21からの放電電力と減少可能な蓄電池21への充電電力に対応する。需要増加の余力は、ベースラインを基準として減少可能な蓄電池21からの放電電力と増加可能な蓄電池21への充電電力に対応する。 The reserve capacity for demand reduction corresponds to the discharge power from the storage battery 21 that can be increased and the charge power to the storage battery 21 that can be reduced with reference to the baseline. The reserve capacity for increasing demand corresponds to the discharge power from the storage battery 21 that can be reduced and the charge power to the storage battery 21 that can be increased with reference to the baseline.

本実施形態において、需要削減の余力は、12台の蓄電池21から定格放電電力(最大電力)で放電した場合にベースラインを基準として削減が予想される需要電力の合計である。すなわち、需要削減の余力は、ベースラインにおいて充放電を行っていない蓄電池21から放電可能な電力(=定格放電電力)、ベースラインにおいて充電中の蓄電池21の充電電力に当該蓄電池21から放電可能な電力(=定格放電電力)を加えた電力、および、ベースラインにおいて放電中の蓄電池21からさらに放電可能な電力(=定格放電電力から放電中の電力を除いた電力)を合計したものである。 In the present embodiment, the reserve capacity for demand reduction is the total power demand that is expected to be reduced with reference to the baseline when discharged from the 12 storage batteries 21 at the rated discharge power (maximum power). That is, the remaining capacity for demand reduction is the power that can be discharged from the storage battery 21 that is not charged / discharged at the baseline (= rated discharge power), and the charging power of the storage battery 21 that is being charged at the baseline can be discharged from the storage battery 21. It is the sum of the power to which the power (= rated discharge power) is added and the power that can be further discharged from the storage battery 21 being discharged at the baseline (= power obtained by subtracting the power being discharged from the rated discharge power).

また、本実施形態において、需要増加の余力は、12台の蓄電池21へ定格充電電力(最大電力)で充電した場合にベースラインを基準として増加が予想される需要電力の合計である。すなわち、需要増加の余力は、充放電を行っていない蓄電池21へ充電可能な電力(=定格充電電力)、放電中の蓄電池21の放電電力に当該蓄電池21へ充電可能な電力(=定格充電電力)を加えた電力、および、充電中の蓄電池21へさらに充電可能な電力(=定格充電電力から充電中の電力を除いた電力)を合計したものである。 Further, in the present embodiment, the surplus capacity for increasing the demand is the total of the demand power that is expected to increase with reference to the baseline when the 12 storage batteries 21 are charged with the rated charging power (maximum power). That is, the surplus capacity for increasing demand is the power that can be charged to the storage battery 21 that has not been charged / discharged (= rated charging power), and the power that can be charged to the storage battery 21 (= rated charging power) to the discharging power of the storage battery 21 that is being discharged. ), And the power that can be further charged to the charging storage battery 21 (= the power obtained by subtracting the charging power from the rated charging power).

以下、受信部122が受信した電力調整の要請が、需要削減の要請であるとして説明する。この場合、ステップS103において、需要削減が要請された電力をXkW、需要削減の余力をYkWとして、選択順位決定部123は、YをXで除したY/Xの整数部を群の個数とする。例えば、例えば、需要削減の要請電力Xが7kW、12台の蓄電池21全体として需要削減の余力Yが24kWの場合、Y/X=24/7=約3.4なので、選択順位決定部123は、群の個数をY/Xの整数部である「3」に決定する。 Hereinafter, the request for power adjustment received by the receiving unit 122 will be described as a request for demand reduction. In this case, in step S103, the power for which demand reduction is requested is XkW, the reserve capacity for demand reduction is YkW, and the selection order determination unit 123 uses the integer part of Y / X obtained by dividing Y by X as the number of groups. .. For example, when the requested power X for demand reduction is 7 kW and the remaining capacity Y for demand reduction is 24 kW for the 12 storage batteries 21 as a whole, Y / X = 24/7 = about 3.4, so the selection order determination unit 123 , The number of groups is determined to be "3" which is an integer part of Y / X.

次に、選択順位決定部123が、12個の蓄電池21にナンバリングする(ステップS104)。図4の例では、図4(a)に示すように、左から順に「1」〜「12」の番号が12台の蓄電池21に振られている。この番号が、各蓄電池21を各群に割り振る際の割り振りの順序となる。番号は、例えば、各回異なるようにランダムに振り分けたり、番号が順次1だけ繰り上がるあるいは繰り下がるように(例えば、番号が「1」の蓄電池21に次に設定される番号が「12」、番号が「2」の蓄電池21に次に設定される番号が「1」というように)振り付けたりすることができる。 Next, the selection order determination unit 123 numbers the 12 storage batteries 21 (step S104). In the example of FIG. 4, as shown in FIG. 4A, the numbers “1” to “12” are assigned to the 12 storage batteries 21 in order from the left. This number is the order of allocation when allocating each storage battery 21 to each group. The numbers are, for example, randomly distributed so as to be different each time, or the numbers are sequentially moved up or down by 1 (for example, the number set next to the storage battery 21 having the number "1" is "12", and the number is a number. Can be choreographed (for example, the number set next to the storage battery 21 of "2" is "1").

次に、選択順位決定部123が、12個の蓄電池21を番号順で、1番目の群80−1、2番目の群80−2、または3番目の群80−3のいずれかへ群分けする(ステップS105)。その際、選択順位決定部123は、群毎の需要削減の余力が、需要削減が要請された電力XkWを越えるように群分けする(ステップS105)。 Next, the selection order determination unit 123 groups the 12 storage batteries 21 into either the first group 80-1, the second group 80-2, or the third group 80-3 in numerical order. (Step S105). At that time, the selection order determination unit 123 groups the groups so that the remaining capacity for demand reduction for each group exceeds the power XkW requested for demand reduction (step S105).

図4(a)に示す例では、番号「1」〜「3」の3台の蓄電池21が1番目の群80−1に振り分けられている。この場合、番号「1」〜「3」の3台の蓄電池21合計の需要削減の余力がXkWを越えていることを意味する。また、番号「4」〜「7」の4台の蓄電池21が2番目の群80−2に振り分けられている。この場合、番号「4」〜「7」の4台の蓄電池21合計の需要削減の余力がXkWを越えていることを意味する。また、番号「8」〜「10」の3台の蓄電池21が3番目の群80−3に振り分けられている。この場合、番号「8」〜「10」の3台の蓄電池21合計の需要削減の余力がXkWを越えていることを意味する。そして、番号「11」および「12」の2台の蓄電池21は、いずれの群にも振り分けられていない。いずれの群にも所属していない番号「11」および「12」の2台の蓄電池21に対しては、電力調整の要請に対応する制御は行われない。 In the example shown in FIG. 4A, the three storage batteries 21 of the numbers "1" to "3" are assigned to the first group 80-1. In this case, it means that the total demand reduction capacity of the three storage batteries 21 of the numbers "1" to "3" exceeds XkW. Further, the four storage batteries 21 of the numbers "4" to "7" are assigned to the second group 80-2. In this case, it means that the total demand reduction capacity of the four storage batteries 21 of the numbers "4" to "7" exceeds XkW. Further, the three storage batteries 21 of the numbers "8" to "10" are assigned to the third group 80-3. In this case, it means that the total demand reduction capacity of the three storage batteries 21 of the numbers "8" to "10" exceeds XkW. The two storage batteries 21 of the numbers "11" and "12" are not assigned to any of the groups. The two storage batteries 21 having the numbers "11" and "12", which do not belong to any of the groups, are not controlled in response to the request for power adjustment.

次に、蓄電池制御部124が、充放電制御する群を選択する(ステップS106)。図4に示す例では、蓄電池制御部124が、1番目の群80−1を選択する。 Next, the storage battery control unit 124 selects a group for charge / discharge control (step S106). In the example shown in FIG. 4, the storage battery control unit 124 selects the first group 80-1.

次に、蓄電池制御部124が、選択した群の充放電制御を実行する(ステップS107)。図4に示す例では、蓄電池制御部124が、選択した1番目の群80−1に属する番号「1」〜「3」の各蓄電池21を備える各需要家施設20に対して、それぞれ各蓄電池21から定格電力(最大電力)で放電するよう指示する充放電指令を送信する。番号「1」〜「3」の各蓄電池21を備える各需要家施設20では、受信した充放電指令に基づき、指示された単位時間において、定格電力を目標として放電電力が制御される。なお、各需要家施設20では、指示された単位時間が経過した後は、充放電指令が無い場合の計画値に基づいて充放電電力が制御される。また、各需要家施設20では、指示された単位時間において蓄電池21の充放電電力や需要家施設20の需給電力が計測され、計測された充放電電力や需給電力の実測値が電力管理装置10へ送信される。 Next, the storage battery control unit 124 executes charge / discharge control of the selected group (step S107). In the example shown in FIG. 4, the storage battery control unit 124 has each storage battery for each consumer facility 20 including each storage battery 21 of the numbers "1" to "3" belonging to the selected first group 80-1. A charge / discharge command instructing to discharge at the rated power (maximum power) is transmitted from 21. In each consumer facility 20 provided with the storage batteries 21 of the numbers "1" to "3", the discharge power is controlled with the rated power as the target in the instructed unit time based on the received charge / discharge command. In each consumer facility 20, after the instructed unit time has elapsed, the charge / discharge power is controlled based on the planned value when there is no charge / discharge command. Further, at each consumer facility 20, the charge / discharge power of the storage battery 21 and the supply / discharge power of the consumer facility 20 are measured in the instructed unit time, and the measured values of the measured charge / discharge power and supply / discharge power are the power management device 10. Will be sent to.

次に、蓄電池制御部124が、調整終了時刻に到達したか否かを判断する(ステップS108)。調整終了時刻に到達した場合(ステップS108で「YES」)、制御装置12は、図3に示す処理を一旦終了し、再度、図3に示す処理を開始する。一方、調整終了時刻に到達していない場合(ステップS108で「NO」)、蓄電池制御部124は、単位時間が経過したか否かを判断する(ステップS109)。単位時間は、1つの群が担当する要請に応じた充放電制御の時間である。単位時間が経過していない場合(ステップS109で「NO」)、蓄電池制御部124は、再度、調整終了時刻に到達したか否かを判断する(ステップS108)。 Next, the storage battery control unit 124 determines whether or not the adjustment end time has been reached (step S108). When the adjustment end time is reached (“YES” in step S108), the control device 12 temporarily ends the process shown in FIG. 3 and starts the process shown in FIG. 3 again. On the other hand, when the adjustment end time has not been reached (“NO” in step S108), the storage battery control unit 124 determines whether or not the unit time has elapsed (step S109). The unit time is the charge / discharge control time according to the request in charge of one group. If the unit time has not elapsed (“NO” in step S109), the storage battery control unit 124 again determines whether or not the adjustment end time has been reached (step S108).

なお、図3に示す処理において、電力調整の要請時間は、例えば30分〜数時間である。一方、単位時間は、例えば3分〜10分とすることができる。 In the process shown in FIG. 3, the power adjustment request time is, for example, 30 minutes to several hours. On the other hand, the unit time can be, for example, 3 to 10 minutes.

単位時間が経過した場合(ステップS109で「YES」)、蓄電池制御部124は、次の群を充放電制御の対象として選択する(ステップS110)。図4の例では、図4(b)に示すように、蓄電池制御部124が、2番目の群80−2を選択する。 When the unit time has elapsed (“YES” in step S109), the storage battery control unit 124 selects the next group as the target of charge / discharge control (step S110). In the example of FIG. 4, as shown in FIG. 4 (b), the storage battery control unit 124 selects the second group 80-2.

次に、蓄電池制御部124は、ステップS110で選択した群が、最初の群であるか否かを判断する(ステップS111)。最初の群とは、ステップS106で蓄電池制御部124が選択した群である。図4(b)の例では、最初の群は、群80−1である。 Next, the storage battery control unit 124 determines whether or not the group selected in step S110 is the first group (step S111). The first group is the group selected by the storage battery control unit 124 in step S106. In the example of FIG. 4B, the first group is group 80-1.

最初の群でない場合(ステップS111で「NO」)、蓄電池制御部124は、選択した群(この場合、群80−2)の充放電制御を実行する(ステップS107)。図4(b)に示す例では、蓄電池制御部124が、選択した2番目の群80−2に属する番号「4」〜「7」の各蓄電池21を備える各需要家施設20に対して、それぞれ各蓄電池21から定格電力(最大電力)で放電するよう指示する充放電指令を送信する。番号「4」〜「7」の各蓄電池21を備える各需要家施設20では、受信した充放電指令に基づき、指示された単位時間において、定格電力を目標として放電電力が制御される。なお、各需要家施設20では、指示された単位時間が経過した後は、充放電指令が無い場合の計画値に基づいて充放電電力が制御される。また、各需要家施設20では、指示された単位時間において蓄電池21の充放電電力や需要家施設20の需給電力が計測され、計測された充放電電力や需給電力の実測値が電力管理装置10へ送信される。 If it is not the first group (“NO” in step S111), the storage battery control unit 124 executes charge / discharge control of the selected group (in this case, group 80-2) (step S107). In the example shown in FIG. 4B, the storage battery control unit 124 refers to each consumer facility 20 including the storage batteries 21 of the numbers "4" to "7" belonging to the selected second group 80-2. Each storage battery 21 transmits a charge / discharge command instructing the battery to discharge at the rated power (maximum power). In each consumer facility 20 provided with the storage batteries 21 of the numbers "4" to "7", the discharge power is controlled with the rated power as the target in the instructed unit time based on the received charge / discharge command. In each consumer facility 20, after the instructed unit time has elapsed, the charge / discharge power is controlled based on the planned value when there is no charge / discharge command. Further, at each consumer facility 20, the charge / discharge power of the storage battery 21 and the supply / discharge power of the consumer facility 20 are measured in the instructed unit time, and the measured values of the measured charge / discharge power and supply / discharge power are the power management device 10. Will be sent to.

次に、蓄電池制御部124が調整終了時刻に到達したか否かを判断する(ステップS108)。調整終了時刻に到達していない場合(ステップS108で「NO」)、蓄電池制御部124は、単位時間が経過したか否かを判断する(ステップS109)。単位時間が経過した場合(ステップS109で「YES」)、蓄電池制御部124は、次の群を充放電制御の対象として選択する(ステップS110)。図4の例では、図4(b)に示すように、蓄電池制御部124が、3番目の群80−3を選択する。 Next, the storage battery control unit 124 determines whether or not the adjustment end time has been reached (step S108). When the adjustment end time has not been reached (“NO” in step S108), the storage battery control unit 124 determines whether or not the unit time has elapsed (step S109). When the unit time has elapsed (“YES” in step S109), the storage battery control unit 124 selects the next group as the target of charge / discharge control (step S110). In the example of FIG. 4, as shown in FIG. 4 (b), the storage battery control unit 124 selects the third group 80-3.

次に、蓄電池制御部124は、ステップS110で選択した群が、最初の群であるか否かを判断する(ステップS111)。最初の群でない場合(ステップS111で「NO」)、蓄電池制御部124は、選択した群(この場合、群80−3)の充放電制御を実行する(ステップS107)。図4(b)に示す例では、蓄電池制御部124が、選択した3番目の群80−3に属する番号「8」〜「10」の各蓄電池21を備える各需要家施設20に対して、それぞれ各蓄電池21から定格電力(最大出力)で放電するよう指示する充放電指令を送信する。番号「8」〜「10」の各蓄電池21を備える各需要家施設20では、受信した充放電指令に基づき、対象の単位時間において、定格電力を目標として放電電力が制御される。なお、各需要家施設20では、対象の単位時間が経過した後は、充放電指令が無い場合の計画値に基づいて充放電電力が制御される。また、各需要家施設20では、指示された単位時間において蓄電池21の充放電電力や需要家施設20の需給電力が計測され、計測された充放電電力や需給電力の実測値が電力管理装置10へ送信される。 Next, the storage battery control unit 124 determines whether or not the group selected in step S110 is the first group (step S111). If it is not the first group (“NO” in step S111), the storage battery control unit 124 executes charge / discharge control of the selected group (in this case, group 80-3) (step S107). In the example shown in FIG. 4B, the storage battery control unit 124 refers to each consumer facility 20 including the storage batteries 21 of the numbers "8" to "10" belonging to the selected third group 80-3. Each storage battery 21 transmits a charge / discharge command instructing the battery to discharge at the rated power (maximum output). In each consumer facility 20 provided with the storage batteries 21 of the numbers "8" to "10", the discharge power is controlled with the rated power as the target in the target unit time based on the received charge / discharge command. In each consumer facility 20, after the target unit time has elapsed, the charge / discharge power is controlled based on the planned value when there is no charge / discharge command. Further, at each consumer facility 20, the charge / discharge power of the storage battery 21 and the supply / discharge power of the consumer facility 20 are measured in the instructed unit time, and the measured values of the measured charge / discharge power and supply / discharge power are the power management device 10. Will be sent to.

次に、蓄電池制御部124が調整終了時刻に到達したか否かを判断する(ステップS108)。調整終了時刻に到達していない場合(ステップS108で「NO」)、蓄電池制御部124は、単位時間が経過したか否かを判断する(ステップS109)。単位時間が経過した場合(ステップS109で「YES」)、蓄電池制御部124は、次の群を充放電制御の対象として選択する(ステップS110)。図4の例では、図4(b)に示すように、現在選択している群80−3が最後の群なので(すなわち、4番目の群が設定されていないので)、蓄電池制御部124は、最初に戻り、1番目の群80−1を選択する。 Next, the storage battery control unit 124 determines whether or not the adjustment end time has been reached (step S108). When the adjustment end time has not been reached (“NO” in step S108), the storage battery control unit 124 determines whether or not the unit time has elapsed (step S109). When the unit time has elapsed (“YES” in step S109), the storage battery control unit 124 selects the next group as the target of charge / discharge control (step S110). In the example of FIG. 4, as shown in FIG. 4 (b), since the currently selected group 80-3 is the last group (that is, the fourth group is not set), the storage battery control unit 124 is set. , Go back to the beginning and select the first group 80-1.

次に、蓄電池制御部124は、ステップS110で選択した群(群80−1)が最初の群なので(ステップS111で「YES」)、各蓄電池21の充放電制御の制御結果を確認する(ステップS112)。ステップS112において蓄電池制御部124は、充放電制御の制御結果の確認として、ステップS107で群毎に実行された充放電制御が要請された電力XkWを満たすものであったか否かを判断する。すなわち、ステップS112において蓄電池制御部124は、群毎に実行された充放電制御による需要削減または需要増加の実測値(電力調整に係る所定の実測値の一例)が、要請された電力XkWを満たす値であったか否かを判断する。 Next, since the group (group 80-1) selected in step S110 is the first group (“YES” in step S111), the storage battery control unit 124 confirms the control result of the charge / discharge control of each storage battery 21 (step). S112). In step S112, the storage battery control unit 124 determines, as confirmation of the control result of the charge / discharge control, whether or not the charge / discharge control executed for each group in step S107 satisfies the requested power XkW. That is, in step S112, the storage battery control unit 124 satisfies the requested power XkW by the measured value of the demand reduction or the demand increase by the charge / discharge control executed for each group (an example of the predetermined measured value related to the power adjustment). Determine if it was a value.

例えば、ステップS112において蓄電池制御部124は、ステップS107で充放電制御された各蓄電池21の充放電電力の実測値に基づき、群毎に、ベースラインを基準とする充放電電力の変化分が、要請された電力XkWに対して所定の範囲内に収まっているか否かを判断する。あるいは、例えば、ステップS112において蓄電池制御部124は、ステップS107で充放電制御された各蓄電池21を備える各需要家施設20の需給電力の実測値に基づき、群毎に、ベースラインを基準とする需給電力の変化分が、要請された電力XkWに対して所定の範囲内に収まっているか否かを判断する。あるいは、ステップS112において蓄電池制御部124は、例えば、ステップS107で充放電制御された各蓄電池21の充放電電力の実測値に基づき、各蓄電池21が定格電力(最大電力)で充放電(この例では放電)できたか否か、できなかった場合には定格電力に対する充放電電力(この例では放電電力)の比率または差分が所定の範囲内に収まっているか否かを判断する。 For example, in step S112, the storage battery control unit 124 determines the change in charge / discharge power with respect to the baseline for each group based on the measured value of the charge / discharge power of each storage battery 21 whose charge / discharge control is controlled in step S107. It is determined whether or not the requested power XkW is within a predetermined range. Alternatively, for example, in step S112, the storage battery control unit 124 uses the baseline as a reference for each group based on the measured value of the supply and demand power of each consumer facility 20 including each storage battery 21 whose charge / discharge control is controlled in step S107. It is determined whether or not the change in the supply and demand power is within a predetermined range with respect to the requested power XkW. Alternatively, in step S112, the storage battery control unit 124 charges / discharges each storage battery 21 at the rated power (maximum power) based on the measured value of the charge / discharge power of each storage battery 21 whose charge / discharge control is controlled in step S107 (this example). If not, it is determined whether or not the ratio or difference of the charge / discharge power (discharge power in this example) to the rated power is within a predetermined range.

次に、選択順位決定部123が、ステップS112での蓄電池制御部124による制御結果の確認結果に基づき、群分けを再構成する必要があるか否かを判断する(ステップS113)。ステップS113において、選択順位決定部123は、ステップS112での確認結果において、要請された電力XkWを所定の範囲内で満たすことができない群があったと確認された場合、再構成が必要であると判断し、無かったと確認された場合、再構成が必要ないと判断する。 Next, the selection order determination unit 123 determines whether or not it is necessary to reconfigure the grouping based on the confirmation result of the control result by the storage battery control unit 124 in step S112 (step S113). In step S113, the selection order determination unit 123 determines that reconstruction is necessary when it is confirmed in the confirmation result in step S112 that there is a group in which the requested power XkW cannot be satisfied within a predetermined range. Judging, if it is confirmed that there was none, it is judged that reconstruction is not necessary.

選択順位決定部123が再構成が必要ないと判断した場合(ステップS113で「NO」)、蓄電池制御部124が、上記と同様に、選択した群(この場合、群80−1)の充放電制御を実行する(ステップS107)。 When the selection order determination unit 123 determines that reconstruction is not necessary (“NO” in step S113), the storage battery control unit 124 charges and discharges the selected group (in this case, group 80-1) in the same manner as described above. Control is executed (step S107).

一方、選択順位決定部123が再構成が必要であると判断した場合(ステップS113で「YES」)、選択順位決定部123は、要請された電力XkWを所定の範囲内で満たすことができない1または複数の群に対して、電力XkWを越えるように、群に非所属の蓄電池21を追加する(ステップS114)。ただし、ステップS114において、群に非所属の蓄電池21が存在しなくなった場合あるいは初めから存在しない場合、選択順位決定部123は蓄電池21の追加を行わない。 On the other hand, when the selection order determination unit 123 determines that reconstruction is necessary (“YES” in step S113), the selection order determination unit 123 cannot satisfy the requested power XkW within a predetermined range1. Alternatively, a storage battery 21 that does not belong to the group is added to the plurality of groups so that the electric power exceeds X kW (step S114). However, in step S114, if the storage battery 21 that does not belong to the group no longer exists or does not exist from the beginning, the selection order determination unit 123 does not add the storage battery 21.

例えば、図4(c)に示すように、網掛けして示す番号「6」の蓄電池21と番号「7」の蓄電池21の残容量が不足し、群80−2の充放電制御の際、要請された電力XkWを所定の範囲内で満足する放電電力が確保できなかったとする。この場合、ステップS114で選択順位決定部123は、図4(d)に示すように、群80−1〜80−3に属していない番号「11」の蓄電池21と番号「12」の蓄電池21の一方または両方を電力XkWを越えるように当該群80−2に追加する。図4(e)に示す例では、2番目の群80−2に、番号「11」の蓄電池21と番号「12」の蓄電池21の両方が追加されている。この場合、群に所属していない蓄電池21はなくなる。また、この場合、番号「11」の蓄電池21と番号「12」の蓄電池21の選択順位は、群80−3に所属している番号「8」〜「10」の各蓄電池21の選択順位より高くなるように変更されたことになる。 For example, as shown in FIG. 4C, the remaining capacity of the shaded storage battery 21 of the number "6" and the storage battery 21 of the number "7" is insufficient, and when the charge / discharge control of the group 80-2 is performed, It is assumed that the discharge power that satisfies the requested power XkW within a predetermined range cannot be secured. In this case, in step S114, as shown in FIG. 4D, the selection order determination unit 123 has the storage battery 21 of the number "11" and the storage battery 21 of the number "12" that do not belong to the groups 80-1 to 80-3. One or both are added to the group 80-2 so as to exceed the power XkW. In the example shown in FIG. 4 (e), both the storage battery 21 of the number "11" and the storage battery 21 of the number "12" are added to the second group 80-2. In this case, the storage battery 21 that does not belong to the group disappears. Further, in this case, the selection order of the storage battery 21 of the number "11" and the storage battery 21 of the number "12" is based on the selection order of the storage batteries 21 of the numbers "8" to "10" belonging to the group 80-3. It has been changed to be higher.

次に、選択順位決定部123は、各群の需要削減または需要増加(この例では需要削減)の余力が、要請された電力XkWを所定の範囲内(所定の誤差範囲)で満足するか否かを判断する(ステップS115)。選択順位決定部123がすべての群が満足すると判断した場合(ステップS115で「YES」)、蓄電池制御部124は、上記と同様に、選択した群(この場合、群80−1)の充放電制御を実行する(ステップS107)。 Next, the selection order determination unit 123 determines whether or not the remaining capacity of demand reduction or demand increase (demand reduction in this example) of each group satisfies the requested power XkW within a predetermined range (predetermined error range). (Step S115). When the selection order determination unit 123 determines that all the groups are satisfied (“YES” in step S115), the storage battery control unit 124 charges and discharges the selected group (in this case, group 80-1) in the same manner as described above. Control is executed (step S107).

一方、選択順位決定部123は、いずれかの群が満足しないと判断した場合(ステップS115で「NO」)、現在の群の個数が2以上であるか否かを判断する(ステップS116)。2以上でない場合(ステップS116「NO」)、蓄電池制御部124は、上記と同様に、選択した群(この場合、群80−1)の充放電制御を実行する(ステップS107)。他方、2以上の場合(ステップS116で「YES」)、選択順位決定部123は、最後の群を解体し、最後の群に属していた蓄電池21を群に非所属の蓄電池21として(ステップS117)、上記と同様に、要請された電力XkWを所定の範囲内で満たすことができない1または複数の群に対して、電力XkWを越えるように、群に非所属の蓄電池21を追加する(ステップS114)。図4(f)は、群80−3が解体されて、番号「8」〜「10」の各蓄電池21が群に非所属となった状態を示す。 On the other hand, when it is determined that any of the groups is not satisfied (“NO” in step S115), the selection order determination unit 123 determines whether or not the current number of groups is 2 or more (step S116). If it is not 2 or more (step S116 “NO”), the storage battery control unit 124 executes charge / discharge control of the selected group (in this case, group 80-1) in the same manner as described above (step S107). On the other hand, in the case of two or more (“YES” in step S116), the selection order determination unit 123 disassembles the last group and sets the storage battery 21 belonging to the last group as the storage battery 21 not belonging to the group (step S117). ), Similar to the above, for one or more groups that cannot satisfy the requested power XkW within a predetermined range, a storage battery 21 that does not belong to the group is added so as to exceed the power XkW (step). S114). FIG. 4 (f) shows a state in which the groups 80-3 are disassembled and the storage batteries 21 of the numbers "8" to "10" are not affiliated with the group.

以上の処理によって、電力調整の要請を受信した場合に、選択順位決定部123が、要請を満たすように、1または複数の蓄電池からなる群を設定し、設定した群毎に選択順位を決定する。例えば、図4に示す例では、蓄電池毎の選択順位が番号「1」〜「12」の順であり、群毎の選択順位が、群80−1、群80−2、および群80−3の順である。この動作例では、適切な選択順位で制御対象の蓄電池を選択することができるので、複数の蓄電池の充放電を効果的に管理することがきる。 By the above processing, when a request for power adjustment is received, the selection order determination unit 123 sets a group consisting of one or a plurality of storage batteries so as to satisfy the request, and determines the selection order for each set group. .. For example, in the example shown in FIG. 4, the selection order for each storage battery is in the order of numbers "1" to "12", and the selection order for each group is group 80-1, group 80-2, and group 80-3. In that order. In this operation example, the storage batteries to be controlled can be selected in an appropriate selection order, so that the charging / discharging of a plurality of storage batteries can be effectively managed.

また、選択順位決定部123が、複数の単位時間毎に電力調整に係る所定の実測値に基づき必要に応じて選択順位を変更するので、精度良く電力制御を実行することができる。 Further, since the selection order determination unit 123 changes the selection order as necessary based on a predetermined measured value related to the power adjustment for each of a plurality of unit times, the power control can be executed with high accuracy.

また、選択順位決定部123は、要請を満たさない群が確認された場合、群のいずれにも割り当てられていない蓄電池を当該群に割り当てることで群を再設定する。よって、精度良く電力制御を実行することができる。 Further, when a group that does not satisfy the request is confirmed, the selection order determination unit 123 resets the group by allocating a storage battery that is not assigned to any of the groups to the group. Therefore, the power control can be executed with high accuracy.

また、選択順位決定部123は、要請を満たさない群が確認された場合、群のいずれかを解体し、群を再設定する。よって、精度良く電力制御を実行することができる。 Further, when a group that does not satisfy the request is confirmed, the selection order determination unit 123 disassembles one of the groups and resets the group. Therefore, the power control can be executed with high accuracy.

また、蓄電池制御部124は、選択した各蓄電池の定格電力による充放電を各需要家施設に対して指示する。よって、蓄電池21または蓄電池31の充放電効率を容易に高めることができる。 Further, the storage battery control unit 124 instructs each consumer facility to charge / discharge with the rated power of each selected storage battery. Therefore, the charge / discharge efficiency of the storage battery 21 or the storage battery 31 can be easily increased.

なお、図3に示す動作例では、制御結果の確認と確認結果に基づく群の再構成を、各群の充放電制御が一巡したところで行っているが、例えば二巡以上の複数巡したところで制御結果の確認や群の再構成をしてもよい。また、群分けを、要請された電力XkWを越えるように行っているが、例えば、さらに所定の余裕をもたせるようにしてもよい。 In the operation example shown in FIG. 3, the control result is confirmed and the group is reconstructed based on the confirmation result when the charge / discharge control of each group makes one cycle. The results may be confirmed and the group may be reconstructed. Further, although the grouping is performed so as to exceed the requested electric power XkW, for example, a predetermined margin may be further provided.

次に、図5および図6を参照して、図2に示す制御装置12の他の動作例について説明する。図5は、図2に示す制御装置12の他の動作例を示すフローチャートである。図6は、図5に示す制御装置12の他の動作例を説明するための図表である。図5に示す動作例は、図2に示す受信部122が電力調整の要請を受信した場合に、要請された需要電力(あるいは需要電力量)の増減を、複数の蓄電池21または蓄電池31からの充放電によって対応するときの動作の他の例である。また、この動作例では、選択順位決定部123による選択順位の決定が、蓄電池毎、かつ、利用可能量順である。利用可能量は、需要削減の要請に対しては放電可能な容量であり、需要増加の要請に対しては充電可能な容量である。図5に示す処理は、繰り返し実行される。なお、この動作例の説明では、蓄電池21のみを例として用いる。また、この動作例では、図6(a)に示す5台の蓄電池21を管理対象として電力調整の要請に応じることとする。また、受信部122が受信した電力調整の要請は、要請時間が4時間で、要請電力が5kWの需要削減(放電)の要請であるとする。また、ベースラインにおいて各蓄電池21は充放電していないものとする。 Next, another operation example of the control device 12 shown in FIG. 2 will be described with reference to FIGS. 5 and 6. FIG. 5 is a flowchart showing another operation example of the control device 12 shown in FIG. FIG. 6 is a chart for explaining another operation example of the control device 12 shown in FIG. In the operation example shown in FIG. 5, when the receiving unit 122 shown in FIG. 2 receives the request for power adjustment, the requested power demand (or power demand amount) is increased or decreased from the plurality of storage batteries 21 or the storage batteries 31. This is another example of the operation when responding by charging / discharging. Further, in this operation example, the selection order is determined by the selection order determination unit 123 for each storage battery and in the order of available quantity. The usable amount is the capacity that can be discharged in response to a request for reduction in demand and the capacity that can be charged in response to a request for increase in demand. The process shown in FIG. 5 is repeatedly executed. In the description of this operation example, only the storage battery 21 is used as an example. Further, in this operation example, the five storage batteries 21 shown in FIG. 6A are managed and the request for power adjustment is responded to. Further, it is assumed that the request for power adjustment received by the receiving unit 122 is a request for demand reduction (discharge) with a requested power of 4 hours and a requested power of 5 kW. Further, it is assumed that each storage battery 21 is not charged or discharged at the baseline.

図6は、電力調整の要請が需要削減の要請である場合に、需要家施設IDが「A」〜「E」である5台の蓄電池21を充放電制御する例を示す。図6(a)は電力調整の要請に応じた充放電制御が実行される前の(すなわちベースラインにおける)利用可能な出力(kW)と容量(kWh)を示す。ここで、出力(kW)は出力可能な最大放電電力であり、容量(kWh)は残容量である。図6(b)は、図6(a)に示す5台の蓄電池21を利用可能量(蓄電池充放電可能容量)が多い順にソートした場合の選択順位を示す。図6(b)では、図表の上から下に選択順位が上位から下位へと下がる。また、図6(c)は、調整開始から30分後の各蓄電池21の出力(kW)と容量(kWh)の推測値を示す。 FIG. 6 shows an example of charging / discharging control of five storage batteries 21 having consumer facility IDs “A” to “E” when the request for power adjustment is a request for demand reduction. FIG. 6A shows the available output (kW) and capacitance (kWh) before (ie, at baseline) charge / discharge control is performed in response to a request for power adjustment. Here, the output (kW) is the maximum discharge power that can be output, and the capacity (kWh) is the remaining capacity. FIG. 6B shows the selection order when the five storage batteries 21 shown in FIG. 6A are sorted in descending order of available amount (storage battery charge / discharge capacity). In FIG. 6B, the selection order is lowered from the top to the bottom of the chart. Further, FIG. 6C shows estimated values of the output (kW) and the capacity (kWh) of each storage battery 21 30 minutes after the start of adjustment.

図5に示す処理において、受信部122が上位制御システム50から電力調整の要請を受信すると(ステップS201で「YES」)、蓄電池制御部124(あるいは選択順位決定部123)は、調整開始時刻になるまで待機する(ステップS202で「NO」の繰り返し)。調整開始時刻になると(ステップS202で「YES」)、選択順位決定部123が、各蓄電池21または蓄電池31の蓄電状態(残容量等)を取得する(ステップS203)。 In the process shown in FIG. 5, when the receiving unit 122 receives the power adjustment request from the host control system 50 (“YES” in step S201), the storage battery control unit 124 (or the selection order determination unit 123) sets the adjustment start time. Wait until it becomes (repeated "NO" in step S202). When the adjustment start time is reached (“YES” in step S202), the selection order determination unit 123 acquires the storage state (remaining capacity, etc.) of each storage battery 21 or storage battery 31 (step S203).

次に、選択順位決定部123が、図6(a)に示す各蓄電池21を利用可能量(容量(kWh))が多い順にソートする(ステップS204)。図6に示す例では、図6(b)に示すように、需要家施設ID「E」、「D」、「A」、「B」および「C」の順で各蓄電池21がソートされる。 Next, the selection order determination unit 123 sorts each storage battery 21 shown in FIG. 6A in descending order of available amount (capacity (kWh)) (step S204). In the example shown in FIG. 6, as shown in FIG. 6B, each storage battery 21 is sorted in the order of the consumer facility IDs “E”, “D”, “A”, “B” and “C”. ..

次に、蓄電池制御部124が、ソート順に上位から要請電力(5kW)を越えるように蓄電池21を選択する(ステップS205)。この例では、ステップS205で蓄電池制御部124が、図6(b)に示す需要家施設ID「E」の蓄電池21と「D」の蓄電池21を選択する。 Next, the storage battery control unit 124 selects the storage battery 21 so as to exceed the requested power (5 kW) from the top in the sort order (step S205). In this example, in step S205, the storage battery control unit 124 selects the storage battery 21 of the consumer facility ID “E” and the storage battery 21 of “D” shown in FIG. 6 (b).

次に、蓄電池制御部124が、選択した蓄電池21の充放電制御を実行する(ステップS206)。この例では、蓄電池制御部124が、選択した1番目の需要家施設ID「E」の需要家施設20に対して所定の単位時間、3kWで放電するよう指示する充放電指令を送信するとともに、2番目の需要家施設ID「D」の需要家施設20に対して所定の単位時間、2kWで放電するよう指示する充放電指令を送信する。この動作例において、単位時間は、各蓄電池21をソートし直す時間間隔であり、また、蓄電池制御部124が充放電指令を送信する間隔である。単位時間は、要請時間より短い時間に設定される。この動作例では、単位時間が30分であるとする。 Next, the storage battery control unit 124 executes charge / discharge control of the selected storage battery 21 (step S206). In this example, the storage battery control unit 124 transmits a charge / discharge command instructing the consumer facility 20 of the selected first consumer facility ID “E” to discharge at a predetermined unit time of 3 kW, and also transmits a charge / discharge command. A charge / discharge command instructing the consumer facility 20 having the second consumer facility ID “D” to discharge at a predetermined unit time of 2 kW is transmitted. In this operation example, the unit time is an interval at which each storage battery 21 is re-sorted, and an interval at which the storage battery control unit 124 transmits a charge / discharge command. The unit time is set to a time shorter than the requested time. In this operation example, it is assumed that the unit time is 30 minutes.

次に、蓄電池制御部124が、調整終了時刻に到達したか否かを判断する(ステップS207)。調整終了時刻に到達した場合(ステップS207で「YES」)、制御装置12は、図5に示す処理を一旦終了し、再度、図5に示す処理を開始する。一方、調整終了時刻に到達していない場合(ステップS207で「NO」)、蓄電池制御部124は、単位時間が経過したか否かを判断する(ステップS208)。単位時間が経過していない場合(ステップS208で「NO」)、蓄電池制御部124は、再度、調整終了時刻に到達したか否かを判断する(ステップS207)。 Next, the storage battery control unit 124 determines whether or not the adjustment end time has been reached (step S207). When the adjustment end time is reached (“YES” in step S207), the control device 12 temporarily ends the process shown in FIG. 5, and starts the process shown in FIG. 5 again. On the other hand, when the adjustment end time has not been reached (“NO” in step S207), the storage battery control unit 124 determines whether or not the unit time has elapsed (step S208). If the unit time has not elapsed (“NO” in step S208), the storage battery control unit 124 again determines whether or not the adjustment end time has been reached (step S207).

単位時間が経過した場合(ステップS208で「YES」)、蓄電池制御部124は、所定時間が経過したか否かを判断する(ステップS209)。ステップS209で判断される所定時間は、ステップS203で各蓄電池21の状態を取得する時間間隔に対応する。この所定時間は、ステップS208で判断される単位時間より長く設定される。 When the unit time has elapsed (“YES” in step S208), the storage battery control unit 124 determines whether or not the predetermined time has elapsed (step S209). The predetermined time determined in step S209 corresponds to the time interval for acquiring the state of each storage battery 21 in step S203. This predetermined time is set longer than the unit time determined in step S208.

蓄電池制御部124が所定時間が経過したと判断した場合(ステップS209で「YES」)、選択順位決定部123が、各蓄電池21または蓄電池31の蓄電状態(残容量等)(電力調整に係る所定の実測値の一例)を取得する(ステップS203)。そして、選択順位決定部123が、各蓄電池21を利用可能量(容量(kWh))が多い順にソートする(ステップS204)。その後、上記と同様に、蓄電池制御部124が、ステップS205以降の処理を実行する。 When the storage battery control unit 124 determines that the predetermined time has elapsed (“YES” in step S209), the selection order determination unit 123 determines the storage state (remaining capacity, etc.) of each storage battery 21 or storage battery 31 (predetermined power adjustment). (Example of the measured value of) is acquired (step S203). Then, the selection order determination unit 123 sorts each storage battery 21 in descending order of available amount (capacity (kWh)) (step S204). After that, in the same manner as described above, the storage battery control unit 124 executes the processes after step S205.

一方、蓄電池制御部124が所定時間が経過していないと判断した場合(ステップS209で「NO」)、選択順位決定部123が、各蓄電池21の蓄電状態(残容量等)を推定する(ステップS210)。図6(c)は推定結果の例を示す。図6(c)は、図6(b)の蓄電状態から、単位時間(この例では30分)が経過した後の蓄電状態を推定した結果の一例である。需要家施設ID「E」の蓄電池21の容量は3kWを30分放電することで9kWhから7.5kWhに変化している。需要家施設ID「D」の蓄電池21の容量は2kWを30分放電することで6kWhから5kWhに変化している。 On the other hand, when the storage battery control unit 124 determines that the predetermined time has not elapsed (“NO” in step S209), the selection order determination unit 123 estimates the storage state (remaining capacity, etc.) of each storage battery 21 (step). S210). FIG. 6C shows an example of the estimation result. FIG. 6C is an example of the result of estimating the electricity storage state after a unit time (30 minutes in this example) has elapsed from the electricity storage state of FIG. 6B. The capacity of the storage battery 21 of the consumer facility ID "E" has changed from 9 kWh to 7.5 kWh by discharging 3 kW for 30 minutes. The capacity of the storage battery 21 of the consumer facility ID "D" has changed from 6 kWh to 5 kWh by discharging 2 kW for 30 minutes.

ステップS210の処理の後、選択順位決定部123は、ステップS210で推定した利用可能量(容量(kWh))が多い順に各蓄電池21をソートする(ステップS204)。その後、上記と同様に、蓄電池制御部124が、ステップS205以降の処理を実行する。 After the process of step S210, the selection order determination unit 123 sorts each storage battery 21 in descending order of the available amount (capacity (kWh)) estimated in step S210 (step S204). After that, in the same manner as described above, the storage battery control unit 124 executes the processes after step S205.

以上の処理によって、電力調整の要請を受信した場合に、選択順位決定部123が、ベースラインにおける各蓄電状態(利用可能量)に応じて各蓄電池の選択順位を決定するとともに、単位時間毎に蓄電状態(利用可能量)の各推定値に基づき選択順位を更新する。また、選択順位決定部123が決定した選択順位に基づき、蓄電池制御部124が、要請を満たすように1または複数の蓄電池に選択して充放電制御する。したがって、この動作例では、適切な選択順位で制御対象の蓄電池を選択することができるので、複数の蓄電池の充放電を効果的に管理することがきる。 Through the above processing, when the power adjustment request is received, the selection order determination unit 123 determines the selection order of each storage battery according to each storage state (usable amount) at the baseline, and at every unit time. The selection order is updated based on each estimated value of the storage state (usable amount). Further, based on the selection order determined by the selection order determination unit 123, the storage battery control unit 124 selects one or a plurality of storage batteries to perform charge / discharge control so as to satisfy the request. Therefore, in this operation example, the storage batteries to be controlled can be selected in an appropriate selection order, so that the charging / discharging of a plurality of storage batteries can be effectively managed.

次に、図7を参照して、図2に示す制御装置12の他の動作例について説明する。図7は、図2に示す制御装置12の他の動作例を示すフローチャートである。なお、図7に示すフローチャートは、図5に示すフローチャートの一部を変更したものである。すなわち、図5に示すステップS204の処理が、図7に示すステップS204aの処理に変更されている。他のステップの処理は同一である。図6に示す動作例では、ステップS204において選択順位決定部123が各蓄電池を利用可能量(容量(kWh))が多い順にソートする。これに対し、図7に示す動作例では、ステップS204aにおいて選択順位決定部123が各蓄電池をSOC(State Of Charge;充電率)に基づいてソートする。ステップS204aにおいて、選択順位決定部123は、電力調整の要請が需要削減の要請である場合にはSOCが多い順にソートし、需要増加の要請である場合にはSOCが少ない順にソートする。このソートの結果、上位に位置する蓄電池の選択順位が上位となる。すなわち、図7に示す動作例では、選択順位決定部123による選択順位の決定が、蓄電池毎、かつ、SOC順である。ステップS204aの処理以外の動作は、図5を参照して説明した動作例と同一である。 Next, another operation example of the control device 12 shown in FIG. 2 will be described with reference to FIG. 7. FIG. 7 is a flowchart showing another operation example of the control device 12 shown in FIG. The flowchart shown in FIG. 7 is a modification of a part of the flowchart shown in FIG. That is, the process of step S204 shown in FIG. 5 is changed to the process of step S204a shown in FIG. 7. The processing of the other steps is the same. In the operation example shown in FIG. 6, in step S204, the selection order determination unit 123 sorts each storage battery in descending order of available amount (capacity (kWh)). On the other hand, in the operation example shown in FIG. 7, in step S204a, the selection order determination unit 123 sorts each storage battery based on the SOC (State Of Charge; charge rate). In step S204a, the selection order determination unit 123 sorts in descending order of SOC when the power adjustment request is a demand reduction request, and sorts in ascending order of demand increase request. As a result of this sorting, the selection order of the storage battery located at the top is high. That is, in the operation example shown in FIG. 7, the selection order is determined by the selection order determination unit 123 for each storage battery and in the SOC order. The operations other than the processing in step S204a are the same as the operation examples described with reference to FIG.

以上の処理によって、電力調整の要請を受信した場合に、選択順位決定部123が、ベースラインにおける各蓄電状態(充電率)に応じて各蓄電池の選択順位を決定するとともに、単位時間毎に蓄電状態(充電率)の各推定値に基づき選択順位を更新する。また、選択順位決定部123が決定した選択順位に基づき、蓄電池制御部124が、要請を満たすように1または複数の蓄電池に選択して充放電制御する。この動作例では、適切な選択順位で制御対象の蓄電池を選択することができるので、複数の蓄電池の充放電を効果的に管理することがきる。 Through the above processing, when the power adjustment request is received, the selection order determination unit 123 determines the selection order of each storage battery according to each storage state (charge rate) at the baseline, and stores electricity every unit time. The selection order is updated based on each estimated value of the state (charge rate). Further, based on the selection order determined by the selection order determination unit 123, the storage battery control unit 124 selects one or a plurality of storage batteries to perform charge / discharge control so as to satisfy the request. In this operation example, the storage batteries to be controlled can be selected in an appropriate selection order, so that the charging / discharging of a plurality of storage batteries can be effectively managed.

次に、図8を参照して、上述した3種類の選択順位の決定の仕方についてメリットとデメリットを比較する。図8は、3種類の選択順位の決定の仕方(郡単位順(図3)、利用可能量順(図5)およびSOC順(図7))についてメリットとデメリットをまとめて示す。ただし、デメリットとして示す内容も3種類を比較した場合の相対的な短所であり、処理量は若干多くなるものの、短所を打ち消すような処理を追加することが可能である。 Next, with reference to FIG. 8, the advantages and disadvantages of the above-mentioned three types of selection order determination methods are compared. FIG. 8 summarizes the advantages and disadvantages of how to determine the three types of selection order (county unit order (Fig. 3), available amount order (Fig. 5), and SOC order (Fig. 7)). However, the content shown as a demerit is also a relative disadvantage when comparing the three types, and although the amount of processing is slightly larger, it is possible to add a process that cancels the disadvantage.

郡単位順には、「全部の蓄電池を使える」、「公平感が高い」および「計算量少」というメリットがあり、「上位との約束(出力/時間)を守れない可能性あり」および「蓄電池容量をすべて使うことができない可能性あり」というデメリットがある。 In order of county unit, there are merits of "use all storage batteries", "high fairness" and "small amount of calculation", "may not keep promises (output / time) with higher ranks" and "storage batteries". It may not be possible to use all the capacity. "

利用可能量順には、「容量の計算がしやすい」というメリットがあり、「一部の大容量蓄電池に偏る可能性あり」および「ソート計算必要」というデメリットがある。 In order of available quantity, there is an advantage that "capacity calculation is easy", and there are disadvantages that "there is a possibility of being biased toward some large capacity storage batteries" and "sort calculation is required".

SOC順には、「全部の蓄電池が使える可能性が高い」というメリットがあり、「小容量品は単位時間によっては、必要容量確保できない可能性あり」および「ソート計算必要」というデメリットがある。 In order of SOC, there is a merit that "all storage batteries are likely to be usable", and there are demerits that "small capacity products may not be able to secure the required capacity depending on the unit time" and "sort calculation is required".

以上のように、本実施形態によれば、複数の蓄電池を束ねて電力の需要変化に対応することができ、さらに、動作させる蓄電池を適切な順位で選択することができるので、複数の蓄電池の充放電を効果的に管理することがきる。 As described above, according to the present embodiment, a plurality of storage batteries can be bundled to respond to changes in power demand, and the storage batteries to be operated can be selected in an appropriate order. Therefore, a plurality of storage batteries can be used. It is possible to effectively manage charging and discharging.

以上、この発明の実施形態を図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。 Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and the design and the like within a range not deviating from the gist of the present invention are also included.

1:蓄電池群管理システム、10:電力管理装置、20、30:需要家施設、21、31:蓄電池、12:制御装置、121:電力制御部、122:受信部、123:選択順位決定部、124:蓄電池制御部(制御部) 1: Storage battery group management system, 10: Power management device, 20, 30: Consumer facility, 21, 31: Storage battery, 12: Control device, 121: Power control unit, 122: Receiver unit, 123: Selection order determination unit, 124: Storage battery control unit (control unit)

Claims (6)

蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する装置であって、
親アグリゲータからの所定の要請時間における電力調整の要請を受信する受信部と、
前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定する選択順位決定部と、
前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示する制御部とを備え
前記選択順位決定部が、前記要請を満たすように、1または複数の前記蓄電池からなる群を設定し、設定した前記群毎に前記選択順位を決定し、前記要請を満たさない前記群が確認された場合、前記群のいずれにも割り当てられていない前記蓄電池を当該群に割り当てることで前記群を再設定する
電力管理装置。
A device that manages the charge and discharge of each storage battery in a plurality of consumer facilities each having a storage battery.
A receiver that receives a power adjustment request from the parent aggregator at a predetermined request time, and a receiver.
In response to the request received by the receiving unit, a selection order determining unit that determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline.
One or a plurality of the storage batteries are selected based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and the charging / discharging of the selected storage batteries is applied to each customer facility. and a control unit for instructing Te,
The selection order determination unit sets a group consisting of one or a plurality of the storage batteries so as to satisfy the request, determines the selection order for each set group, and confirms the group that does not satisfy the request. In this case, a power management device that resets the group by allocating the storage battery that is not assigned to any of the groups to the group.
蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する装置であって、A device that manages the charge and discharge of each storage battery in a plurality of consumer facilities each having a storage battery.
親アグリゲータからの所定の要請時間における電力調整の要請を受信する受信部と、 A receiver that receives a power adjustment request from the parent aggregator at a predetermined request time, and a receiver.
前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定する選択順位決定部と、 In response to the request received by the receiving unit, a selection order determining unit that determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline.
前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示する制御部とを備え、 One or a plurality of the storage batteries are selected based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and the charging / discharging of the selected storage batteries is applied to each customer facility. Equipped with a control unit to instruct
前記選択順位決定部が、前記要請を満たすように、1または複数の前記蓄電池からなる群を設定し、設定した前記群毎に前記選択順位を決定し、前記要請を満たさない前記群が確認された場合、前記群のいずれかを解体し、前記群を再設定する The selection order determination unit sets a group consisting of one or a plurality of the storage batteries so as to satisfy the request, determines the selection order for each set group, and confirms the group that does not satisfy the request. If so, dismantle one of the groups and reconfigure the group.
電力管理装置。 Power management device.
前記選択順位決定部が、複数の前記単位時間毎に電力調整に係る所定の実測値に基づき必要に応じて前記選択順位を変更する
請求項1または2に記載の電力管理装置。
The power management device according to claim 1 or 2 , wherein the selection order determination unit changes the selection order as necessary based on a predetermined measured value related to power adjustment for each of the plurality of unit times.
前記制御部は、前記選択した前記各蓄電池の定格電力による充放電を前記各需要家施設に対して指示する
請求項1からのいずれか1項に記載の電力管理装置。
The power management device according to any one of claims 1 to 3 , wherein the control unit instructs each consumer facility to charge / discharge with the rated power of each of the selected storage batteries.
蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する方法であって、
受信部によって、親アグリゲータからの所定の要請時間における電力調整の要請を受信し、
選択順位決定部によって、前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定し、
制御部によって、前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示し、
前記選択順位決定部が、前記要請を満たすように、1または複数の前記蓄電池からなる群を設定し、設定した前記群毎に前記選択順位を決定し、前記要請を満たさない前記群が確認された場合、前記群のいずれにも割り当てられていない前記蓄電池を当該群に割り当てることで前記群を再設定する
電力管理方法。
It is a method of managing the charge / discharge of each storage battery in a plurality of consumer facilities each having a storage battery.
The receiver receives the power adjustment request from the parent aggregator at the specified request time, and receives the request for power adjustment.
The selection order determination unit determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline in response to the request received by the reception unit.
The control unit selects one or more of the storage batteries based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and charges and discharges the selected storage batteries to each demand. Instruct the home facility ,
The selection order determination unit sets a group consisting of one or a plurality of the storage batteries so as to satisfy the request, determines the selection order for each set group, and confirms the group that does not satisfy the request. In this case, a power management method for resetting the group by allocating the storage battery that is not assigned to any of the groups to the group.
蓄電池をそれぞれが有する複数の需要家施設における前記各蓄電池の充放電を管理する方法であって、It is a method of managing the charge / discharge of each storage battery in a plurality of consumer facilities each having a storage battery.
受信部によって、親アグリゲータからの所定の要請時間における電力調整の要請を受信し、 The receiver receives the power adjustment request from the parent aggregator at the specified request time, and receives the request for power adjustment.
選択順位決定部によって、前記受信部が受信した前記要請に応じて、ベースラインにおける前記複数の蓄電池の各蓄電状態に基づき、前記各蓄電池の選択順位を決定し、 The selection order determination unit determines the selection order of each storage battery based on each storage state of the plurality of storage batteries at the baseline in response to the request received by the reception unit.
制御部によって、前記要請時間より短い所定の単位時間毎に、前記選択順位決定部が決定した選択順位に基づき一または複数の前記蓄電池を選択し、選択した前記各蓄電池の充放電を前記各需要家施設に対して指示し、 The control unit selects one or more of the storage batteries based on the selection order determined by the selection order determination unit for each predetermined unit time shorter than the requested time, and charges and discharges the selected storage batteries to each demand. Instruct the home facility,
前記選択順位決定部が、前記要請を満たすように、1または複数の前記蓄電池からなる群を設定し、設定した前記群毎に前記選択順位を決定し、前記要請を満たさない前記群が確認された場合、前記群のいずれかを解体し、前記群を再設定する The selection order determination unit sets a group consisting of one or a plurality of the storage batteries so as to satisfy the request, determines the selection order for each set group, and confirms the group that does not satisfy the request. If so, dismantle one of the groups and reconfigure the group.
電力管理方法。 Power management method.
JP2017188720A 2017-09-28 2017-09-28 Power management device and power management method Active JP6936096B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017188720A JP6936096B2 (en) 2017-09-28 2017-09-28 Power management device and power management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017188720A JP6936096B2 (en) 2017-09-28 2017-09-28 Power management device and power management method

Publications (2)

Publication Number Publication Date
JP2019068512A JP2019068512A (en) 2019-04-25
JP6936096B2 true JP6936096B2 (en) 2021-09-15

Family

ID=66340778

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017188720A Active JP6936096B2 (en) 2017-09-28 2017-09-28 Power management device and power management method

Country Status (1)

Country Link
JP (1) JP6936096B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11379937B2 (en) * 2017-11-29 2022-07-05 Kyocera Corporation Power management server and power management method
JP7221131B2 (en) * 2019-05-24 2023-02-13 株式会社日立パワーソリューションズ Renewable energy generator command controller and renewable energy generator system with storage battery
JP7319838B2 (en) * 2019-06-24 2023-08-02 積水化学工業株式会社 Power management device and power management method
JP7356922B2 (en) 2020-01-30 2023-10-05 東京瓦斯株式会社 Distributed power systems and distributed power supplies
JP7229955B2 (en) * 2020-02-04 2023-02-28 Kddi株式会社 Program, device and method for grouping members with multiple attribute values
WO2023026676A1 (en) * 2021-08-25 2023-03-02 住友電気工業株式会社 Electric power adjustment device, electric power adjustment system, base location adjustment device, control method, computer program, and data structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012130106A (en) * 2010-12-13 2012-07-05 Tokyo Electric Power Co Inc:The Power storage device managing device, power storage device managing method, and power supply system
JP6516156B2 (en) * 2015-08-06 2019-05-22 パナソニックIpマネジメント株式会社 Relay management device, storage system
JP6560603B2 (en) * 2015-12-08 2019-08-14 積水化学工業株式会社 Power management system and power management method

Also Published As

Publication number Publication date
JP2019068512A (en) 2019-04-25

Similar Documents

Publication Publication Date Title
JP6936096B2 (en) Power management device and power management method
US10727784B2 (en) Aggregation system, control method thereof, and control apparatus
CN102598454B (en) Control device and control method
TWI544712B (en) Energy consumption management
JP6249895B2 (en) Power control system, method, and power control apparatus
JP6578050B2 (en) Power management system, power management method and program
JP6587336B2 (en) Renewable energy storage system
JP6560603B2 (en) Power management system and power management method
JP7103925B2 (en) Power management method and power management system
WO2016166836A1 (en) Equipment management apparatus, equipment management system, equipment management method, and program
Roche et al. A multi-agent model and strategy for residential demand response coordination
CN104272548A (en) Device, system, and method for managing power
JP2019097375A (en) Power management device and program
EP3116081B1 (en) Received electrical power control method, received electrical power control device, and electrical instrument
JP6956015B2 (en) Power management system and power management method
JP2013093981A (en) Electric vehicle charging/discharging system
JP6989364B2 (en) Power management equipment, power management methods and programs
JP7063749B2 (en) Power control device and power control method
Guo et al. Stochastic optimization for distributed energy resources in smart grids
JP2017195752A (en) Electric power control system and power control method
JP2020048370A (en) Power management method and power management system
JP6936097B2 (en) Power management device and power management method
JP7007202B2 (en) Power management system and power management method
JP2021069236A (en) Electric power management system, electric power management device, electric power management method, and program
JP7249166B2 (en) Power management device, power management method and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210409

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210420

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210610

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210803

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210826

R151 Written notification of patent or utility model registration

Ref document number: 6936096

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151