JP6956015B2 - Power management system and power management method - Google Patents

Power management system and power management method Download PDF

Info

Publication number
JP6956015B2
JP6956015B2 JP2018004626A JP2018004626A JP6956015B2 JP 6956015 B2 JP6956015 B2 JP 6956015B2 JP 2018004626 A JP2018004626 A JP 2018004626A JP 2018004626 A JP2018004626 A JP 2018004626A JP 6956015 B2 JP6956015 B2 JP 6956015B2
Authority
JP
Japan
Prior art keywords
power
facility
consumer
reverse
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018004626A
Other languages
Japanese (ja)
Other versions
JP2019126157A (en
Inventor
章太 上西
章太 上西
尚 梅岡
尚 梅岡
弘嗣 判谷
弘嗣 判谷
純一 松崎
純一 松崎
伸浩 森
伸浩 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2018004626A priority Critical patent/JP6956015B2/en
Publication of JP2019126157A publication Critical patent/JP2019126157A/en
Application granted granted Critical
Publication of JP6956015B2 publication Critical patent/JP6956015B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/50Energy storage in industry with an added climate change mitigation effect
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力管理システムおよび電力管理方法に関する。 The present invention relates to a power management system and a power management method.

特許文献1に記載されている電力管理システムは、工場に対して電力供給可能な蓄電池システムと太陽光発電システムを用いて、工場を対象とする電力管理を行う。その際、この電力管理システムでは、発電量予測、生産計画等に基づき工場の電力需要が予測され、予測された電力需要に応じて生産計画が調整される。そして、調整後の電力需要が目標値を越えないように蓄電池システムの放電計画が調整される。 The electric power management system described in Patent Document 1 manages electric power for a factory by using a storage battery system and a photovoltaic power generation system that can supply electric power to the factory. At that time, in this power management system, the power demand of the factory is predicted based on the power generation amount prediction, the production plan, etc., and the production plan is adjusted according to the predicted power demand. Then, the discharge plan of the storage battery system is adjusted so that the adjusted power demand does not exceed the target value.

特開2014−85981号公報Japanese Unexamined Patent Publication No. 2014-85981

特許文献1には、工場に対して電力を供給する蓄電池システム、太陽光発電システム等が工場内部に設けられてもよいし、外部に設けられてもよいとの記載はある。しかし、外部に設ける場合の電力の供給の仕方は記載されていない。例えば、工場外部の複数の住宅が備える複数の蓄電池や複数の発電設備から工場へ電力を供給する場合に、各住宅が接続された配電系統を介して電力を供給するときには、配電系統における逆潮流電力に係る制約を満たさなければならないという課題がある。 Patent Document 1 describes that a storage battery system, a solar power generation system, or the like that supplies electric power to a factory may be provided inside the factory or may be provided outside. However, there is no description of how to supply power when it is installed externally. For example, when power is supplied to a factory from a plurality of storage batteries or a plurality of power generation facilities provided in a plurality of houses outside the factory, when power is supplied through the distribution system to which each house is connected, reverse power flow in the distribution system There is a problem that the constraint on electric power must be satisfied.

本発明は、上記事情に鑑みてなされたものであり、外部から工場への電力供給の管理と配電系統への逆潮流電力の管理を容易に行うことができる電力管理システムおよび電力管理方法を提供することを目的とする。 The present invention has been made in view of the above circumstances, and provides a power management system and a power management method capable of easily managing the power supply from the outside to the factory and the reverse power flow to the distribution system. The purpose is to do.

上記課題を解決するため、本発明の一態様は、所定の配電系統に接続された複数の需要家施設による電力の需給を管理するシステムであって、前記複数の需要家施設は、蓄電設備または発電設備の少なくとも一方を有する複数の第1需要家施設と、電力を利用して物品を生産する施設である1または複数の第2需要家施設とを含み、前記生産の計画に基づく時間毎の前記生産に係る電力の需要予測に応じて、前記複数の需要家施設から前記配電系統へ逆潮流させる逆潮流電力量の計画値を前記時間毎に決定する逆潮流電力量決定部と、前記逆潮流電力量決定部が決定した前記逆潮流電力量の計画値を、前記複数の需要家施設に対して個別に割り当てる割当部と、を備える電力管理システムである。 In order to solve the above problems, one aspect of the present invention is a system for managing the supply and demand of electric power by a plurality of consumer facilities connected to a predetermined distribution system, wherein the plurality of consumer facilities are power storage facilities or Hourly, including a plurality of first consumer facilities having at least one of the power generation facilities and one or more second consumer facilities which are facilities for producing goods using electric power, based on the production plan. A reverse power flow power amount determination unit that determines a planned value of the reverse power flow power amount to be reverse power flow from the plurality of consumer facilities to the distribution system according to the power demand forecast related to the production for each time, and the reverse It is a power management system including an allocation unit that individually allocates a planned value of the reverse power flow power amount determined by the power flow power amount determination unit to the plurality of consumer facilities.

また、本発明の一態様は、上記電力管理システムであって、前記生産の計画が、前記複数の需要家施設から前記配電系統へ逆潮流される電力量の予測値に基づいて決定されたものである。 Further, one aspect of the present invention is the power management system, in which the production plan is determined based on a predicted value of the amount of power that is reversely flowed from the plurality of consumer facilities to the distribution system. Is.

また、本発明の一態様は、上記電力管理システムであって前記蓄電設備を有する前記需要家施設が、前記割当部による前記割り当ての結果に基づき前記蓄電設備の充放電電力量を制御する充放電制御部を備える。 Further, one aspect of the present invention is a charge / discharge system in which the consumer facility having the power storage facility controls the charge / discharge power amount of the power storage facility based on the result of the allocation by the allocation unit. It has a control unit.

また、本発明の一態様は、上記電力管理システムであって前記割当部が、前記配電系統の逆潮流に係る所定の条件を満たすように、前記各需要家施設への前記逆潮流電力量の計画値の割り当てを調整する。 Further, one aspect of the present invention is the power management system in which the amount of reverse power flow to each consumer facility is increased so that the allocation unit satisfies a predetermined condition relating to the reverse power flow of the distribution system. Adjust the allocation of planned values.

また、本発明の一態様は、所定の配電系統に接続された複数の需要家施設による電力の需給を管理する方法であって、前記複数の需要家施設は、蓄電設備または発電設備の少なくとも一方を有する複数の第1需要家施設と、電力を利用して物品を生産する施設である1または複数の第2需要家施設とを含み、逆潮流電力量決定部によって、前記生産の計画に基づく時間毎の前記生産に係る電力の需要予測に応じて、前記複数の需要家施設から前記配電系統へ逆潮流させる逆潮流電力量の計画値を前記時間毎に決定し、割当部によって、前記逆潮流電力量決定部が決定した前記逆潮流電力量の計画値を、前記複数の需要家施設に対して個別に割り当てる電力管理方法である。 Further, one aspect of the present invention is a method of managing the supply and demand of electric power by a plurality of consumer facilities connected to a predetermined distribution system, wherein the plurality of consumer facilities are at least one of a power storage facility and a power generation facility. Based on the production plan by the reverse power flow determination unit, including a plurality of first consumer facilities having the above and one or a plurality of second consumer facilities which are facilities for producing goods by using electric power. According to the hourly power demand forecast for the production, the planned value of the amount of reverse power flow power to be reverse power flowed from the plurality of consumer facilities to the distribution system is determined for each hour, and the reverse flow is determined by the allocation unit. This is a power management method in which a planned value of the reverse power flow power amount determined by the power flow power amount determination unit is individually assigned to the plurality of consumer facilities.

本発明によれば、外部から工場等の第2需要家施設への電力供給の管理と配電系統への逆潮流電力の管理を容易に行うことができる。 According to the present invention, it is possible to easily manage the power supply from the outside to the second consumer facility such as a factory and the reverse power flow to the distribution system.

本発明の一実施形態に係る電力管理システムの構成例を示す模式図である。It is a schematic diagram which shows the structural example of the electric power management system which concerns on one Embodiment of this invention. 図1に示す電力管理装置10と需要家施設20−1〜20−7と需要家施設30−1の構成例を説明するためのブロック図である。It is a block diagram for demonstrating the configuration example of the electric power management apparatus 10, the consumer facility 20-1 to 20-7, and the consumer facility 30-1 shown in FIG. 図1に需要家施設20−1〜20−7と需要家施設30−1の送配電系統への接続例を示す模式図である。FIG. 1 is a schematic diagram showing an example of connection between the consumer facility 20-1 to 20-7 and the consumer facility 30-1 to the power transmission and distribution system. 図1および図2に示す電力管理システム1の動作例を示すフローチャートである。It is a flowchart which shows the operation example of the power management system 1 shown in FIG. 1 and FIG. 図1および図2に示す電力管理システム1の動作例を説明するための模式図である。It is a schematic diagram for demonstrating the operation example of the power management system 1 shown in FIG. 1 and FIG.

以下、図面を参照して本発明の実施形態について説明する。図1は、本発明の一実施形態に係る電力管理システムの構成例を示す模式図である。図1に示す電力管理システム1は、電力管理装置10と、複数の需要家施設20−1、20−2、20−3、…、20−7、…(第1需要家施設)と、複数の需要家施設30−1、…(第2需要家施設)を備える。需要家施設20−1、20−2、20−3、…、20−7、…は、例えば、一般家庭の住宅等であり、低圧需要家等に対応する。需要家施設30−1、…は、例えば、工場等であり、電力を利用して物品を生産する施設であって、例えば、小口需要家、大口需要家等に対応する。また、複数の需要家施設20−1、20−2、20−3、…、20−7、…は、それぞれ蓄電池21−1、21−2、21−3、…、21−7、…を有する。需要家施設30−1、…は、蓄電池31−1、…を有する。以下、複数の需要家施設20−1、20−2、20−3、…、20−7、…を各需要家施設20(または1個の場合は需要家施設20)と記す場合がある。同様に、蓄電池21−1、21−2、21−3、…、21−7、…を蓄電池21と総称する場合がある。また、複数の需要家施設30−1、…を各需要家施設30(または1個の場合は需要家施設30)と記す。同様に、蓄電池31−1、…を蓄電池31と総称する場合がある。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a schematic diagram showing a configuration example of a power management system according to an embodiment of the present invention. The power management system 1 shown in FIG. 1 includes a power management device 10 and a plurality of consumer facilities 20-1, 20-2, 20-3, ..., 20-7, ... (First consumer facility). The customer facility 30-1, ... (second customer facility) is provided. The consumer facilities 20-1, 20-2, 20-3, ..., 20-7, ... Are, for example, ordinary household houses and the like, and correspond to low-voltage consumers and the like. Consumer facilities 30-1, ... Are, for example, factories and the like, facilities that produce goods using electric power, and correspond to, for example, small-lot consumers, large-lot consumers, and the like. In addition, a plurality of consumer facilities 20-1, 20-2, 20-3, ..., 20-7, ... Have storage batteries 21-1, 21-2, 21-3, ..., 21-7, ..., Respectively. Have. The consumer facility 30-1, ... Has a storage battery 31-1, ... Hereinafter, a plurality of consumer facilities 20-1, 20-2, 20-3, ..., 20-7, ... may be referred to as each consumer facility 20 (or, in the case of one, the consumer facility 20). Similarly, the storage batteries 21-1, 21-2, 21-3, ..., 21-7, ... May be collectively referred to as the storage battery 21. Further, a plurality of consumer facilities 30-1, ... Are referred to as each consumer facility 30 (or, in the case of one, the consumer facility 30). Similarly, the storage batteries 31-1, ... May be collectively referred to as the storage battery 31.

また、図2は、図1に示す電力管理装置10と需要家施設20と需要家施設30の構成例を説明するためのブロック図である。 Further, FIG. 2 is a block diagram for explaining a configuration example of the power management device 10, the consumer facility 20, and the consumer facility 30 shown in FIG.

本実施形態において、電力管理装置10は、例えば、電力会社、電気事業者等の親アグリゲータと取引する事業者(アグリゲータ)が運用するサーバ等のコンピュータである。電力管理装置10は、例えば計画値同時同量制度に対応させて、各需要家施設20および各需要家施設30における電力の需給を管理するために用いられる。この場合、電力管理装置10の運用者は、各需要家施設20および各需要家施設30全体として、電力需給計画を所定の単位計画時間(例えば、30分)ごとに策定し、策定された電力需給計画を一般送配電事業者に提出する。そのうえで、各需要家施設20および各需要家施設30全体における電力需給の実績が電力需給計画に対して過不足(インバランス)を生じた場合には、電気事業者と一般送配電事業者との間でインバランスに対応する精算(インバランス精算)が行われる。 In the present embodiment, the electric power management device 10 is, for example, a computer such as a server operated by a business operator (aggregator) that trades with a parent aggregator such as an electric power company or an electric power company. The electric power management device 10 is used to manage the supply and demand of electric power in each consumer facility 20 and each consumer facility 30, for example, in correspondence with the planned value simultaneous equal amount system. In this case, the operator of the electric power management device 10 formulates a power supply and demand plan for each customer facility 20 and each customer facility 30 as a whole for each predetermined unit planning time (for example, 30 minutes), and the formulated electric power. Submit the supply and demand plan to the general power transmission and distribution business operator. In addition, if the actual power supply and demand in each customer facility 20 and each customer facility 30 as a whole causes an excess or deficiency (imbalance) with respect to the power supply and demand plan, the electric power company and the general power transmission and distribution business operator Settlement corresponding to imbalance (imbalance settlement) is performed between them.

本実施形態における電力需給計画は、逆潮流計画と需要計画とを含む。なお、「逆潮流計画」は一般に「発電計画」と呼ばれている。本実施形態では太陽光発電システム等の発電設備による発電の計画(発電の予測)との区別のため文言「逆潮流計画」を用いる。逆潮流計画は、配電系統に逆潮流させる電力についての各需要家施設20および各需要家施設30全体としての計画値や、需要家施設20や需要家施設30の個別の計画値があり得る。需要計画は、配電系統から順潮流で購入する電力についての各需要家施設20および各需要家施設30全体としての計画値や、需要家施設20の個別の計画値があり得る。 The power supply and demand plan in this embodiment includes a reverse power flow plan and a demand plan. The "reverse power flow plan" is generally called a "power generation plan". In this embodiment, the wording "reverse power flow plan" is used to distinguish it from a power generation plan (prediction of power generation) by a power generation facility such as a photovoltaic power generation system. The reverse power flow plan may have a planned value of each consumer facility 20 and each consumer facility 30 as a whole, or an individual planned value of the consumer facility 20 and the consumer facility 30 for the electric power to be reverse power flowed to the distribution system. The demand plan may have a planned value of each consumer facility 20 and each consumer facility 30 as a whole for electric power purchased from the distribution system in a forward flow, or an individual planned value of the consumer facility 20.

本実施形態が対応する計画値同時同量制度のもとでは、逆潮流計画と需要計画とのそれぞれについて実績が計画通りに達成されることが求められる。つまり、本実施形態が対応する計画値同時同量制度では、例えば、各需要家施設20および各需要家施設30全体から配電系統へ逆潮流される電力の実績が逆潮流計画に対して過不足のないことが求められるとともに、各需要家施設20および各需要家施設30全体として順潮流を受ける電力の実績が需要計画に対して過不足のないことが求められる。なお、本実施形態において、逆潮流電力とは配電系統に逆潮流させる電力をいう。また、需要電力とは配電系統から順潮流させる電力をいう。なお、本実施形態において、逆潮流電力は、発電設備25が発電した電力と蓄電池21が放電した電力を含み、また、発電設備35が発電した電力と蓄電池31が放電した電力を含む(図2)。 Under the planned value simultaneous equal amount system corresponding to this embodiment, it is required that the actual results for each of the reverse power flow plan and the demand plan are achieved as planned. That is, in the planned value simultaneous equal amount system corresponding to this embodiment, for example, the actual power flowed back to the distribution system from each customer facility 20 and each customer facility 30 is excessive or insufficient with respect to the reverse power flow plan. It is required that there is no excess or deficiency with respect to the demand plan, as well as the fact that each consumer facility 20 and each consumer facility 30 as a whole receives the forward power flow. In the present embodiment, the reverse power flow power means the power to be reverse power flowed to the distribution system. In addition, the demand power refers to the power that flows forward from the distribution system. In the present embodiment, the reverse power flow power includes the power generated by the power generation facility 25 and the power discharged by the storage battery 21, and also includes the power generated by the power generation facility 35 and the power discharged by the storage battery 31 (FIG. 2). ).

電力管理装置10は、逆潮流計画と需要計画に基づき、各需要家施設20および各需要家施設30全体における電力設備を対象として電力制御を実行する。電力管理装置10は、通信回線40を介して各需要家施設20および各需要家施設30の各々と相互に通信が可能なように接続されている。これにより、電力管理装置10は、電力設備制御指令401を送信し、各需要家施設20と各需要家施設30が備える電力設備の運転を制御することができる。 The electric power management device 10 executes electric power control for the electric power facilities in each consumer facility 20 and each consumer facility 30 as a whole based on the reverse power flow plan and the demand plan. The power management device 10 is connected to each of the consumer facilities 20 and the consumer facilities 30 via a communication line 40 so as to be able to communicate with each other. As a result, the power management device 10 can transmit the power equipment control command 401 and control the operation of the power equipment included in each customer facility 20 and each customer facility 30.

また、電力管理装置10は、各需要家施設30における生産計画を策定し、策定した生産計画を示す生産計画情報402を各需要家施設30へ送信する。生産計画は、例えば、将来の所定の時間毎の物品の生産量、物品の仕様、生産順序、生産日時、消費電力量等を示す情報である。電力管理装置10は、各需要家施設30に対して供給可能な時間毎の逆潮流電力量の予測値に基づき、例えば、各需要家施設30において時間毎に物品の生産に際して消費される電力量が、その予測値の範囲内となるように、あるいはその予測値から所定値の範囲内となるように、生産計画を決定することができる。電力管理装置10は、また、決定した生産計画を、生産計画情報133として記憶部13に記憶する。 Further, the power management device 10 formulates a production plan for each consumer facility 30, and transmits the production plan information 402 indicating the formulated production plan to each consumer facility 30. The production plan is, for example, information indicating a future production amount of goods, specifications of goods, production order, date and time of production, power consumption, and the like at predetermined time intervals. The power management device 10 is based on the predicted value of the hourly reverse power flow electric energy that can be supplied to each consumer facility 30, for example, the amount of electric power consumed in the production of goods at each consumer facility 30 every hour. However, the production plan can be determined so as to be within the range of the predicted value or within the range of the predetermined value from the predicted value. The power management device 10 also stores the determined production plan in the storage unit 13 as the production plan information 133.

また、電力管理装置10は、各需要家施設30における生産計画に基づく時間毎の生産に係る電力の需要予測に応じて、各需要家施設20および各需要家施設30から配電系統へ逆潮流させる逆潮流電力量の計画値を時間毎に決定する。そして、電力管理装置10は、決定した逆潮流電力量の計画値を、各需要家施設20および各需要家施設30に対して個別に割り当てる。電力管理装置10は、この割り当ての結果である時間毎の逆潮流電力量計画値(指令値)を、電力設備制御指令401の1要素として、各需要家施設20および各需要家施設30へ送信する。 Further, the electric power management device 10 reverse-feeds the electric power from each consumer facility 20 and each consumer facility 30 to the distribution system according to the demand forecast of the electric power related to the hourly production based on the production plan in each consumer facility 30. Determine the planned value of reverse power flow power amount every hour. Then, the power management device 10 individually allocates the determined reverse power flow electric energy planned value to each customer facility 20 and each customer facility 30. The power management device 10 transmits the hourly reverse power flow electric energy plan value (command value) as a result of this allocation to each customer facility 20 and each customer facility 30 as one element of the power equipment control command 401. do.

また、電力管理装置10は、通信回線60を介して、上位制御システム50と相互に通信が可能なように接続されている。電力管理装置10は、上位制御システム50から、例えば、各需要家施設20と各需要家施設30が接続されている配電系統の逆潮流に係る所定の条件を示す情報を受信する。配電系統の逆潮流に係る所定の条件とは、例えば、所定の時間毎の配電系統の所定の範囲毎の逆潮流可能な電力あるいは電力量の制限値である。所定の範囲は、例えば、配電系統の構成要素である配電線、トランス、変電所等に対応づけて設定することができる。電力管理装置10は、例えば、配電系統の逆潮流に係る所定の条件を満たすように、各需要家施設20および各需要家施設30から配電系統へ逆潮流される電力量の計画値を調整する。 Further, the power management device 10 is connected to the host control system 50 via a communication line 60 so as to be able to communicate with each other. The power management device 10 receives from the host control system 50, for example, information indicating a predetermined condition relating to reverse power flow of the distribution system to which each consumer facility 20 and each consumer facility 30 are connected. The predetermined condition relating to the reverse power flow of the distribution system is, for example, the power or the limit value of the amount of power that can be reverse power flow for each predetermined range of the distribution system for each predetermined time. The predetermined range can be set, for example, in association with distribution lines, transformers, substations, etc., which are components of the distribution system. The power management device 10 adjusts, for example, a planned value of the amount of power that is reverse power flowed from each customer facility 20 and each customer facility 30 to the distribution system so as to satisfy a predetermined condition relating to reverse power flow of the distribution system. ..

また、本実施形態における電力管理装置10は、複数の需要家(各需要家施設20および各需要家施設30)を束ねてDR(DemandResponse;デマンドレスポンス)による需要削減または需要増加(まとめて需要変化ともいう)を管理するために用いられる。DRは、卸市場価格の高騰時または系統信頼性の低下時において、電気料金価格の設定またはインセンティブの支払に応じて、需要家側が電力の使用を抑制するよう電力消費パターンを変化させること、と定義されている。この場合、電力管理装置10は、親アグリゲータが運用する上位制御システム50(サーバ等のコンピュータ)から各需要家施設20や各需要家施設30における電力調整の要請(電力調整の依頼)を通信回線60を介して受信する。例えば、電力管理装置10は、受信した電力調整の要請に応じて、1または複数の蓄電池21または蓄電池31を選択し、選択した各蓄電池21または蓄電池31を有する各需要家施設20または各需要家施設30へ所定の電力設備制御指令401を通信回線40を介して送信し、選択した各蓄電池21または蓄電池31における充放電を制御する。 Further, the power management device 10 in the present embodiment bundles a plurality of consumers (each consumer facility 20 and each consumer facility 30) to reduce demand or increase demand by DR (Demand Response) (collectively, demand change). Also called) is used to manage. DR is to change the power consumption pattern so that consumers can curb the use of electricity in response to the setting of electricity price or the payment of incentives when the wholesale market price rises or the grid reliability declines. It is defined. In this case, the power management device 10 makes a request for power adjustment (request for power adjustment) at each customer facility 20 or each customer facility 30 from the upper control system 50 (computer such as a server) operated by the parent aggregator. Receive via 60. For example, the power management device 10 selects one or more storage batteries 21 or storage batteries 31 in response to a received power adjustment request, and each customer facility 20 or each customer having each selected storage battery 21 or storage battery 31. A predetermined power equipment control command 401 is transmitted to the facility 30 via the communication line 40 to control charging / discharging in each selected storage battery 21 or storage battery 31.

なお、本実施形態において、電力調整の要請は、電力管理装置10が管理する各需要家施設20および各需要家施設30全体としての需要削減の要請と需要増加の要請を含む。また、需要削減の要請は、潮流電力の削減の要請と、逆潮流電力の増加の要請を含む。また、電力調整の要請は、蓄電池21または蓄電池31における充放電電力、放電電力や充電電力の変化を直接指示する内容を含んでいてもよい。 In the present embodiment, the request for power adjustment includes a request for reducing demand and a request for increasing demand for each customer facility 20 and each customer facility 30 managed by the power management device 10. In addition, the request for demand reduction includes a request for reduction of power flow power and a request for increase of reverse power flow power. Further, the request for power adjustment may include a content that directly indicates a change in charge / discharge power, discharge power, or charge power in the storage battery 21 or the storage battery 31.

また、電力管理システム1は、例えばTEMS(Town Energy Management System)やCEMS(Community Energy Management System)等の電力管理システムに含まれる形態で(例えば一つの機能として)構成することができる。また、電力管理装置10は、TEMSやCEMS等の電力管理システムにおける管理装置(管理サーバ)に含まれる形態で(例えば一つの機能として)構成することができる。ここで、TEMSやCEMSは、例えば、所定の地域範囲における住宅、商業施設、産業施設等の各需要家施設20および各需要家施設30における電力を一括して管理するシステムである。この場合、電力管理装置10は、各需要家施設20および各需要家施設30が有する複数の蓄電池21および蓄電池31の充放電電力の管理(予測や制御)のほか、例えば、発電設備の発電電力の管理(予測や制御)、負荷設備の消費電力の管理(予測や制御)を行う装置として構成することができる。また、電力管理装置10が管理する需要家施設20や需要家施設30には、蓄電池を有していない需要家施設が含まれていてもよい。なお、本実施形態において、所定の地域範囲は、1つの地域範囲によって形成されていてもよいし、地理的に離散している複数の地域範囲によって形成されていてもよい。 Further, the power management system 1 can be configured in a form (for example, as one function) included in a power management system such as TEMS (Town Energy Management System) or CEMS (Community Energy Management System). Further, the power management device 10 can be configured (for example, as one function) in a form included in a management device (management server) in a power management system such as TEMS or CEMS. Here, TEMS and CEMS are systems that collectively manage electric power in each consumer facility 20 such as a residential, commercial facility, and industrial facility and each consumer facility 30 in a predetermined area range, for example. In this case, the power management device 10 manages (predicts and controls) the charge / discharge power of the plurality of storage batteries 21 and the storage batteries 31 of each customer facility 20 and each customer facility 30, and also, for example, the power generated by the power generation facility. It can be configured as a device that manages (prediction and control) and manages the power consumption of load equipment (prediction and control). Further, the consumer facility 20 and the consumer facility 30 managed by the power management device 10 may include a consumer facility that does not have a storage battery. In addition, in this embodiment, a predetermined area range may be formed by one area range, or may be formed by a plurality of geographically discrete area ranges.

一方、図2に示す構成例において、需要家施設20は、通信部24、制御装置22、分電盤23、蓄電池21、発電設備25、電力負荷設備26および電力メータ28を備える。 On the other hand, in the configuration example shown in FIG. 2, the consumer facility 20 includes a communication unit 24, a control device 22, a distribution board 23, a storage battery 21, a power generation facility 25, a power load facility 26, and a power meter 28.

通信部24は、通信回線40を介して、電力管理装置10との間で所定の情報を送受信する。通信回線40は、通信回線43、インターネット等のネットワーク41、ならびに通信回線42および通信回線44から構成されている。 The communication unit 24 transmits and receives predetermined information to and from the power management device 10 via the communication line 40. The communication line 40 is composed of a communication line 43, a network 41 such as the Internet, and a communication line 42 and a communication line 44.

制御装置22は、コンピュータであり、所定のプログラムを実行することで、機能ブロックである電力制御部221と充放電制御部222を構成する。電力制御部221は、電気設備(発電設備25、蓄電池21、電力負荷設備26および通信部24等)を制御する。また、電力制御部221は、例えば、電力メータ28にて測定される消費電力の情報を入力し、入力された消費電力の情報を各種制御に利用することができる。充放電制御部222は、電力管理装置10によって当該需要家施設20に割り当てられた時間毎の逆潮流電力量計画値(指令値)(電力設備制御指令401に含まれる情報)に基づき、発電設備25の発電予測や電力負荷設備26の電力消費予測に応じて、蓄電池21の充放電電力量を決定し、電力制御部221に指示を出すことで蓄電池21の充放電電力量を制御する。 The control device 22 is a computer, and by executing a predetermined program, it constitutes a power control unit 221 and a charge / discharge control unit 222, which are functional blocks. The power control unit 221 controls electrical equipment (power generation equipment 25, storage battery 21, power load equipment 26, communication unit 24, etc.). Further, the power control unit 221 can input the power consumption information measured by the power meter 28, for example, and use the input power consumption information for various controls. The charge / discharge control unit 222 is a power generation facility based on the hourly reverse power flow electric energy planned value (command value) (information included in the power facility control command 401) assigned to the consumer facility 20 by the power management device 10. The charge / discharge electric energy of the storage battery 21 is determined according to the power generation prediction of the 25 and the power consumption forecast of the power load facility 26, and the charge / discharge electric energy of the storage battery 21 is controlled by issuing an instruction to the power control unit 221.

なお、本実施形態では、需要家施設20が備える蓄電池21、発電設備25および電力負荷設備26のうち、例えば制御装置22を介して電力管理装置10が制御可能なものを電力設備と呼ぶ。本実施形態において、蓄電池21の充電電力と放電電力は電力管理装置10によって制御される。また、発電設備25の一部または全部は、電力管理装置10によって発電電力が制御可能であってもよい。また、電力負荷設備26の一部または全部は、電力管理装置10によって消費電力が制御可能であってもよい。すなわち、蓄電池21と、電力管理装置10が制御可能な発電設備25および電力負荷設備26は、電力設備である。制御装置22は、電力管理装置10から受信した電力設備制御指令401に従い、需要家施設20が備える電力設備の充放電電力、発電電力、消費電力等を制御する。 In the present embodiment, among the storage battery 21, the power generation facility 25, and the power load facility 26 included in the consumer facility 20, those that can be controlled by the power management device 10 via, for example, the control device 22 are referred to as power facilities. In the present embodiment, the charging power and the discharging power of the storage battery 21 are controlled by the power management device 10. Further, the generated power of a part or all of the power generation facility 25 may be controllable by the power management device 10. Further, the power consumption of a part or all of the power load equipment 26 may be controllable by the power management device 10. That is, the storage battery 21, the power generation facility 25 and the power load facility 26 that can be controlled by the power management device 10 are power facilities. The control device 22 controls the charge / discharge power, the generated power, the power consumption, and the like of the power equipment provided in the consumer facility 20 in accordance with the power equipment control command 401 received from the power management device 10.

制御装置22は、また、需要家施設20における電力関連の情報を収集する。制御装置22は、例えば、電力メータ28にて測定された需給電力の情報を収集することができる。また、制御装置22は、発電設備25が発電する電力、蓄電池21の残容量(蓄積電力)や充放電電力、電力負荷設備26等による負荷電力(消費電力)等を収集することができる。制御装置22は、また、収集した発電電力、充放電電力、需要電力、需給電力等の情報を、例えば所定の時間間隔であるいは電力管理装置10からの要求に応じて、通信部24から電力管理装置10へ送信する。 The control device 22 also collects power-related information in the consumer facility 20. The control device 22 can collect information on the supply and demand power measured by the power meter 28, for example. Further, the control device 22 can collect the power generated by the power generation facility 25, the remaining capacity (stored power) and charge / discharge power of the storage battery 21, the load power (power consumption) by the power load facility 26 and the like. The control device 22 also manages the collected information such as generated power, charge / discharge power, demand power, supply / supply power, etc. from the communication unit 24 at predetermined time intervals or in response to a request from the power management device 10. It is transmitted to the device 10.

分電盤23は、電力メータ28経由で引込線71から供給された電力を、蓄電池21や電力負荷設備26等に配線27を介して分配して供給する。引込線71は、一般送配電事業者側の配電系統の構成要素である。また、分電盤23は、発電設備25等から出力された電力を逆潮流のために電力メータ28経由で引込線71に出力させることができる。 The distribution board 23 distributes the electric power supplied from the service line 71 via the electric power meter 28 to the storage battery 21, the electric load equipment 26, and the like via the wiring 27 and supplies the electric power. The drop line 71 is a component of the distribution system on the general power transmission and distribution business operator side. Further, the distribution board 23 can output the electric power output from the power generation facility 25 or the like to the service line 71 via the electric power meter 28 due to reverse power flow.

蓄電池21は、充電のために入力される電力を蓄積し、また、蓄積した電力を放電して出力する蓄電設備である。蓄電池21は、例えば二次電池とインバータを備える。蓄電池21は電力の蓄積(充電)と蓄積された電力の出力(放電)を行う。インバータは、二次電池に充電するための電力を交流から直流に変換し、二次電池から放電により出力される電力を直流から交流に変換する。つまり、インバータは、二次電池が入出力する電力の双方向変換を行う。蓄電池21の充放電電力は制御装置22によって制御される。 The storage battery 21 is a power storage facility that stores electric power input for charging and discharges and outputs the stored electric power. The storage battery 21 includes, for example, a secondary battery and an inverter. The storage battery 21 stores (charges) electric power and outputs (discharges) the stored electric power. The inverter converts the electric power for charging the secondary battery from alternating current to direct current, and converts the electric power output from the secondary battery by discharge from direct current to alternating current. That is, the inverter performs bidirectional conversion of the power input / output of the secondary battery. The charge / discharge power of the storage battery 21 is controlled by the control device 22.

蓄電池21は、分電盤23を介して供給される商用電源の電力を入力して充電することができる。また、蓄電池21は、発電設備25により発電された電力を入力して充電することができる。また、蓄電池21は、蓄積された電力を電力負荷設備26の電源として供給することができる。また、蓄電池21は、蓄積された電力を分電盤23から電力メータ28を経由して引込線71に出力することで逆潮流させることができる。 The storage battery 21 can be charged by inputting the electric power of the commercial power supply supplied through the distribution board 23. Further, the storage battery 21 can be charged by inputting the electric power generated by the power generation facility 25. Further, the storage battery 21 can supply the stored electric power as a power source for the power load equipment 26. Further, the storage battery 21 can reverse power flow by outputting the stored electric power from the distribution board 23 to the service line 71 via the electric power meter 28.

発電設備25は、例えば太陽光を受けて発電を行う設備である。発電設備25は、例えば太陽電池とPCS(Power Conditioning System)を備える。発電設備25は、太陽光を受けて発電し、発電により得られた電力をPCSにより交流に変換して出力する。 The power generation facility 25 is, for example, a facility that receives sunlight to generate power. The power generation facility 25 includes, for example, a solar cell and a PCS (Power Conditioning System). The power generation facility 25 receives sunlight to generate power, converts the power obtained by the power generation into alternating current by PCS, and outputs the power.

発電設備25にて発電された電力は、電力負荷設備26の電源として供給することができる。また、発電設備25にて発電された電力は、蓄電池21に充電することができる。また、発電設備25にて発電された電力は、分電盤23から電力メータ28を経由して引込線71に出力することで逆潮流させることができる。 The electric power generated by the power generation facility 25 can be supplied as a power source for the power load facility 26. Further, the electric power generated by the power generation facility 25 can be charged to the storage battery 21. Further, the electric power generated by the power generation facility 25 can be reverse-flowed by being output from the distribution board 23 to the drop line 71 via the electric power meter 28.

なお、発電設備25と蓄電池21は、電力変換回路等の構成を一体化したものであってもよい。 The power generation facility 25 and the storage battery 21 may have an integrated configuration such as a power conversion circuit.

電力負荷設備26は、需要家施設20において自己の動作のために電力を消費する1または複数の所定の機器や設備等を一括して示したものである。なお、各需要家施設20が備える負荷としての機器や設備等の種類および数等はそれぞれ異なっていて構わない。電力負荷設備26は、分電盤23から供給される商用電源を入力して動作することができる。また、電力負荷設備26は、発電設備25により発電された電力を入力して動作することができる。また、電力負荷設備26は、蓄電池21から出力された電力を入力して動作することができる。 The electric power load facility 26 collectively indicates one or a plurality of predetermined devices and facilities that consume electric power for their own operation in the consumer facility 20. The type and number of devices, equipment, and the like as loads provided by each consumer facility 20 may be different. The power load equipment 26 can operate by inputting the commercial power supply supplied from the distribution board 23. Further, the electric power load facility 26 can operate by inputting the electric power generated by the power generation facility 25. Further, the power load equipment 26 can operate by inputting the power output from the storage battery 21.

また、電力負荷設備26は、貯湯式給湯器、蓄熱型空調機、衣類乾燥機、食器乾燥機、蓄電池(充電対象としての負荷)等、制御装置22等によって消費電力をコントロールできる負荷を含んでいてもよい。 Further, the power load equipment 26 includes a load whose power consumption can be controlled by a control device 22 or the like, such as a hot water storage type water heater, a heat storage type air conditioner, a clothes dryer, a dish dryer, a storage battery (load as a charging target), and the like. You may.

電力メータ28は、需要電力と逆潮流電力を測定する。すなわち、電力メータ28は、需給電力を測定する。需給電力は、例えば需要電力と逆潮流電力との差分である。需要家施設20において、引込線71から分電盤23に供給される電力が需要電力である。一方、蓄電池21や発電設備25から出力され、分電盤23から電力メータ28を経由して引込線71に供給される電力が逆潮流電力である。需要電力に対応する順潮流を正方向とした場合、順潮流に対応する需要電力に対して逆潮流に対応する逆潮流電力が小さければ、需給電力は正の値として測定され、需要電力に対して逆潮流電力が大きければ需給電力は負の値として測定される。また、電力メータ28は、例えば、1つの需要家施設20において使用される需要電力を測定する需要メータと、1つの需要家施設20において太陽光発電装置等の自然エネルギを利用した発電設備25等によって発電された発電電力を測定する発電メータとを備える。 The watt-hour meter 28 measures the demand power and the reverse power flow power. That is, the watt-hour meter 28 measures the supply and demand power. The supply and demand power is, for example, the difference between the demand power and the reverse power flow power. In the consumer facility 20, the electric power supplied from the drop line 71 to the distribution board 23 is the demand electric power. On the other hand, the power output from the storage battery 21 and the power generation facility 25 and supplied from the distribution board 23 to the service line 71 via the power meter 28 is reverse power flow power. When the forward power flow corresponding to the demand power is set to the positive direction, if the reverse power flow corresponding to the reverse power flow is smaller than the demand power corresponding to the forward power flow, the supply and demand power is measured as a positive value and is relative to the demand power. If the reverse power flow is large, the supply and demand power is measured as a negative value. Further, the watt-hour meter 28 includes, for example, a demand meter that measures the demand power used in one consumer facility 20, and a power generation facility 25 that uses natural energy such as a solar power generation device in one consumer facility 20. It is equipped with a power generation meter that measures the generated power generated by.

なお、電力メータ28は、例えばスマートメータとして、ネットワーク41等を経由して、測定した需給電力の情報を電力管理装置10に送信できるようにしてもよい。この場合、制御装置22は、電力メータ28により測定された需給電力を収集しなくてもよい。 The power meter 28 may be used as a smart meter, for example, so that the measured power supply and demand information can be transmitted to the power management device 10 via the network 41 or the like. In this case, the control device 22 does not have to collect the supply and demand power measured by the power meter 28.

なお、需要家施設20には、蓄電池21と発電設備25のいずれか一方を備えるものがあってよい。また、需要家施設20には、蓄電池21と発電設備25のいずれも備えないものがあってよい。また、発電設備25は、太陽電池を用いるものに限らず、風力発電、地熱発電等、他の再生可能エネルギ(自然エネルギ)を利用して発電を行う発電装置あるいはそれらの組み合わせであってもよい。 The consumer facility 20 may include either a storage battery 21 or a power generation facility 25. Further, the consumer facility 20 may be provided with neither the storage battery 21 nor the power generation facility 25. Further, the power generation facility 25 is not limited to one using a solar cell, and may be a power generation device that generates power by using other renewable energy (natural energy) such as wind power generation and geothermal power generation, or a combination thereof. ..

また、需要家施設20が備える蓄電池21や発電設備25は、商用電源と系統連系されている。これにより、蓄電池21または発電設備25を備える需要家施設20は、発電設備25が発電して出力する電力または蓄電池21が放電により出力する電力を商用電源の電力系統(送電系統および配電系統を含む)に逆潮流させて、電力系統を通して売電することができる。 Further, the storage battery 21 and the power generation facility 25 included in the consumer facility 20 are grid-connected to the commercial power source. As a result, the consumer facility 20 provided with the storage battery 21 or the power generation facility 25 outputs the power generated and output by the power generation facility 25 or the power output by the storage battery 21 by discharging to the power system (including the transmission system and the distribution system) of the commercial power source. ) Can be reverse-powered and sold through the power system.

一方、需要家施設30は、通信部34、制御装置32、分電盤33、蓄電池31、発電設備35、電力負荷設備36および電力メータ38を備える。電力負荷設備36は、生産設備361と電気機器362を含む。生産設備361は、電力を利用して物品を生産する設備であり、1または複数の製造設備や製造工具等を含む。生産設備361が消費する電力量は、例えば、物品の生産量、生産設備361の稼働時間等の物品の生産状況に応じて変化する。電気機器362は、例えば、照明機器、空調機器、コンピュータ等の複数種類の電気機器を含む。 On the other hand, the consumer facility 30 includes a communication unit 34, a control device 32, a distribution board 33, a storage battery 31, a power generation facility 35, a power load facility 36, and a power meter 38. The power load facility 36 includes a production facility 361 and an electrical device 362. The production facility 361 is a facility for producing an article by using electric power, and includes one or a plurality of manufacturing facilities, manufacturing tools, and the like. The amount of electric power consumed by the production equipment 361 changes depending on, for example, the production amount of the goods, the operating time of the production equipment 361, and the production status of the goods. The electric device 362 includes a plurality of types of electric devices such as lighting devices, air conditioners, and computers.

通信部34は、通信回線44、ネットワーク41および通信回線42を介して、電力管理装置10との間で所定の情報を送受信する。 The communication unit 34 transmits and receives predetermined information to and from the power management device 10 via the communication line 44, the network 41, and the communication line 42.

制御装置32は、コンピュータであり、所定のプログラムを実行することで、機能ブロックである生産管理部321と電力制御部322と充放電制御部323を構成する。生産管理部321は、生産設備361を使用した物品の生産計画を管理する。生産計画は、例えば、電力管理装置10において策定され、生産計画情報402として電力管理装置10から各制御装置32へ送信される。生産管理部321は、例えば、生産計画と生産実績を比較したり、その比較結果等を電力管理装置10へ送信したり、生産計画に基づいて所定の制御信号を生産設備361との間で送受信したりする。 The control device 32 is a computer, and by executing a predetermined program, it constitutes a production control unit 321 which is a functional block, a power control unit 322, and a charge / discharge control unit 323. The production control unit 321 manages the production plan of the goods using the production facility 361. The production plan is formulated in, for example, the power management device 10, and is transmitted from the power management device 10 to each control device 32 as production plan information 402. The production control unit 321 compares, for example, the production plan and the production record, transmits the comparison result and the like to the power management device 10, and transmits and receives a predetermined control signal to and from the production facility 361 based on the production plan. To do.

電力制御部322は、電気設備(発電設備35、蓄電池31、電力負荷設備36の全部または一部、通信部24等)を制御する。また、電力制御部322は、例えば、電力メータ38にて測定される消費電力の情報を入力し、入力された消費電力の情報を各種制御に利用することができる。充放電制御部323は、電力管理装置10によって当該需要家施設30に割り当てられた時間毎の逆潮流電力量計画値に基づき、発電設備35の発電予測や電力負荷設備36の電力消費予測に応じて、蓄電池31の充放電電力量を決定し、電力制御部322に指示を出すことで蓄電池31の充放電電力量を制御する。 The power control unit 322 controls electrical equipment (power generation equipment 35, storage battery 31, all or part of power load equipment 36, communication unit 24, etc.). Further, the power control unit 322 can input information on the power consumption measured by the power meter 38, for example, and use the input power consumption information for various controls. The charge / discharge control unit 323 responds to the power generation prediction of the power generation facility 35 and the power consumption prediction of the power load facility 36 based on the hourly reverse power flow electric energy planned value assigned to the consumer facility 30 by the power management device 10. The charge / discharge electric energy of the storage battery 31 is determined, and an instruction is given to the power control unit 322 to control the charge / discharge electric energy of the storage battery 31.

なお、本実施形態では、需要家施設30が備える蓄電池31、発電設備35および電力負荷設備36の電気機器362のうち、例えば制御装置32を介して電力管理装置10が制御可能なものを電力設備と呼ぶ。本実施形態において、蓄電池31の充電電力と放電電力は電力管理装置10あるいは制御装置32によって制御される。また、発電設備25の一部または全部は、電力管理装置10によって発電電力が制御可能であってもよい。また、電力負荷設備36の電気機器362の一部または全部は、電力管理装置10によって消費電力が制御可能であってもよい。すなわち、蓄電池31と、電力管理装置10が制御可能な発電設備35および電力負荷設備36は、電力設備である。制御装置32は、電力管理装置10から受信した電力設備制御指令401に従い、需要家施設30が備える電力設備の充放電電力、発電電力、消費電力等を制御する。 In the present embodiment, among the electric devices 362 of the storage battery 31, the power generation facility 35, and the power load facility 36 provided in the consumer facility 30, those that can be controlled by the power management device 10 via, for example, the control device 32 are the power facilities. Called. In the present embodiment, the charging power and the discharging power of the storage battery 31 are controlled by the power management device 10 or the control device 32. Further, the generated power of a part or all of the power generation facility 25 may be controllable by the power management device 10. Further, the power consumption of a part or all of the electric equipment 362 of the power load equipment 36 may be controllable by the power management device 10. That is, the storage battery 31, the power generation facility 35 and the power load facility 36 that can be controlled by the power management device 10 are power facilities. The control device 32 controls the charge / discharge power, the generated power, the power consumption, and the like of the power equipment provided in the consumer facility 30 in accordance with the power equipment control command 401 received from the power management device 10.

制御装置32は、また、需要家施設30における電力関連の情報を収集する。制御装置32は、例えば、電力メータ38にて測定された需給電力の情報を収集することができる。また、制御装置32は、発電設備35が発電する電力、蓄電池31の残容量(蓄積電力)や充放電電力、電力負荷設備36等による負荷電力(消費電力)等を収集することができる。制御装置32は、また、収集した発電電力、充放電電力、需要電力、需給電力等の情報を、例えば所定の時間間隔であるいは電力管理装置10からの要求に応じて、通信部34から電力管理装置10へ送信する。 The control device 32 also collects power-related information in the consumer facility 30. The control device 32 can collect information on the supply and demand power measured by the power meter 38, for example. Further, the control device 32 can collect the power generated by the power generation facility 35, the remaining capacity (stored power) and charge / discharge power of the storage battery 31, the load power (power consumption) of the power load facility 36 and the like. The control device 32 also manages the collected information such as generated power, charge / discharge power, demand power, supply / supply power, etc. from the communication unit 34 at predetermined time intervals or in response to a request from the power management device 10. It is transmitted to the device 10.

分電盤33は、電力メータ38、図示していない変圧器や開閉器等を介して、配電線(あるいは引込線)72から供給された電力を、蓄電池31や電力負荷設備36等に配線37を介して分配して供給する。配電線72は、一般送配電事業者側の配電系統の構成要素である。また、分電盤33は、発電設備35等から出力された電力を逆潮流のために電力メータ38経由で配電線72に出力させることができる。 The distribution board 33 connects the electric power supplied from the distribution line (or drop line) 72 to the storage battery 31, the power load facility 36, and the like via the power meter 38, a transformer, a switch, and the like (not shown). Distribute and supply through. The distribution line 72 is a component of the distribution system on the general power transmission and distribution business operator side. Further, the distribution board 33 can output the electric power output from the power generation facility 35 or the like to the distribution line 72 via the electric power meter 38 due to reverse power flow.

蓄電池31、発電設備35、電力メータ38は、需要家施設20が備える蓄電池21、発電設備25、電力メータ28と同等の構成であり、説明を省略する。 The storage battery 31, the power generation facility 35, and the power meter 38 have the same configurations as the storage battery 21, the power generation facility 25, and the power meter 28 included in the consumer facility 20, and description thereof will be omitted.

なお、需要家施設30には、蓄電池31と発電設備35のいずれか一方を備えるものがあってよい。また、需要家施設30には、蓄電池31と発電設備35のいずれも備えないものがあってよい。また、発電設備35は、太陽電池を用いるものに限らず、風力発電、地熱発電等、他の再生可能エネルギを利用して発電を行う発電装置あるいはそれらの組み合わせであってもよい。 The consumer facility 30 may include either a storage battery 31 or a power generation facility 35. Further, the consumer facility 30 may be provided with neither the storage battery 31 nor the power generation facility 35. Further, the power generation facility 35 is not limited to one using a solar cell, and may be a power generation device that generates power using other renewable energies such as wind power generation and geothermal power generation, or a combination thereof.

また、一般的に、需要家施設20へは、配電系統の高圧配電線に接続された柱上変圧器、路上変圧器等から低圧配電線を介して商用電力が配電されるが、需要家施設30へは、例えば高圧配電線から直接、商用電力が配電される。 In general, commercial power is distributed to the consumer facility 20 from a pillar transformer, a road transformer, or the like connected to the high-voltage distribution line of the distribution system via the low-voltage distribution line. Commercial power is distributed directly to 30, for example, from a high-voltage distribution line.

他方、電力管理装置10は、通信部11、制御装置12、および記憶部13を備える。 On the other hand, the power management device 10 includes a communication unit 11, a control device 12, and a storage unit 13.

通信部11は、通信回線40経由で需要家施設20内の制御装置22や需要家施設30内の制御装置32と通信を行う。また、通信部11は、通信回線60経由で上位制御システム50(図1)と通信を行う。なお、通信回線60も、通信回線40と同様、インターネット等のネットワーク41を介して構成されるものであってもよい。 The communication unit 11 communicates with the control device 22 in the consumer facility 20 and the control device 32 in the consumer facility 30 via the communication line 40. Further, the communication unit 11 communicates with the host control system 50 (FIG. 1) via the communication line 60. The communication line 60 may also be configured via a network 41 such as the Internet, like the communication line 40.

記憶部13は、電力管理にあたって制御装置12が利用する情報を記憶する。本実施形態の記憶部13は、逆潮流計画情報131、需要計画情報132、生産計画情報133、需要家施設基本情報134、および配電系統接続情報135を記憶する。 The storage unit 13 stores information used by the control device 12 for power management. The storage unit 13 of the present embodiment stores reverse power flow plan information 131, demand plan information 132, production plan information 133, consumer facility basic information 134, and distribution system connection information 135.

逆潮流計画情報131は、逆潮流計画による時間毎の逆潮流電力量を示す情報である。需要計画情報132は、需要計画による時間毎の需要電力量を示す情報である。生産計画情報133は、各需要家施設における時間毎の生産量を示す情報である。 The reverse power flow plan information 131 is information indicating the amount of reverse power flow power for each hour according to the reverse power flow plan. The demand plan information 132 is information indicating the amount of power demanded for each hour according to the demand plan. The production plan information 133 is information indicating the hourly production amount at each customer facility.

需要家施設基本情報134は、各需要家施設20および各需要家施設30についての基本的な情報を含む。例えば、1つの需要家施設20に対応する需要家施設基本情報には、当該需要家施設20を一意に示す需要家施設ID(識別符号)、需要家施設20の契約電力の値、発電設備25の定格出力の値、蓄電池21の定格電力(定格出力)の値(定格充放電電力の値、定格放電電力の値や定格充電電力の値)および容量、当該需要家施設20が備える電力負荷設備26に関する情報、当該需要家施設20が備える通信部24や制御装置22のアドレス等の情報が含まれる。需要家施設基本情報134は、各需要家施設30については、各需要家施設20と同様な情報のほか、例えば、生産量と消費電力の関係、物品の生産予定量、物品の仕様、生産順序、生産日時、消費電力量等を示す情報を含む。需要家施設基本情報134は、例えば需要家施設30からの要求に応じて適宜更新される。 The consumer facility basic information 134 includes basic information about each consumer facility 20 and each consumer facility 30. For example, the basic information of the customer facility corresponding to one customer facility 20 includes the customer facility ID (identification code) uniquely indicating the customer facility 20, the value of the contracted power of the customer facility 20, and the power generation facility 25. Rated output value, rated power (rated output) value (rated charge / discharge power value, rated discharge power value and rated charge power value) and capacity of the storage battery 21, power load equipment provided in the consumer facility 20 Information about the 26 and information such as the address of the communication unit 24 and the control device 22 included in the consumer facility 20 are included. Regarding the consumer facility basic information 134, for each consumer facility 30, in addition to the same information as each consumer facility 20, for example, the relationship between the production amount and the power consumption, the planned production amount of the goods, the specifications of the goods, and the production order. , Production date and time, power consumption, etc. are included. The consumer facility basic information 134 is appropriately updated in response to a request from the consumer facility 30, for example.

配電系統接続情報135は、各需要家施設20および各需要家施設30が接続される配電系統の位置または構成要素を示す情報を表す。配電系統の構成要素とは、例えば、配電変電所、配電変電所におけるバンク、特高配電線、高圧配電線または低圧配電線、変圧器(柱上変圧器、路上変圧器等)、遮断器、引込線等を含む。これらの配電系統の構成要素は、土地に定着した構造物あるいはその構造物に設置されている。したがって、構成要素を特定する情報は、配電系統における一定の地域や地点(すなわち位置)を特定する情報とすることができる。なお、配電系統の位置は、座標系における座標情報や地番を示す情報等によって表してもよい。この場合、配電系統の構成要素の座標情報や地番と突き合わせることで接続されている構成要素を特定することができる。なお、配電系統接続情報135は、1または複数の構成要素を示す情報を含むことができる。ここで、図3を参照して、配電系統接続情報135の構成例について説明する。図3は、図1に示す需要家施設20−1、…と需要家施設30−1、…の配電系統への接続例を示す模式図である。 The distribution system connection information 135 represents information indicating the position or component of the distribution system to which each consumer facility 20 and each consumer facility 30 are connected. The components of the distribution system are, for example, distribution substations, banks in distribution substations, extra-high distribution lines, high-voltage distribution lines or low-voltage distribution lines, transformers (pole transformers, road transformers, etc.), breakers, drop lines. Etc. are included. The components of these distribution systems are installed in or on land-based structures. Therefore, the information that identifies the component can be the information that identifies a certain area or point (that is, position) in the distribution system. The position of the distribution system may be represented by coordinate information in the coordinate system, information indicating a lot number, or the like. In this case, the connected components can be specified by matching the coordinate information and lot number of the components of the distribution system. The distribution system connection information 135 may include information indicating one or more components. Here, a configuration example of the distribution system connection information 135 will be described with reference to FIG. FIG. 3 is a schematic diagram showing an example of connection of the consumer facility 20-1, ... And the consumer facility 30-1, ... Shown in FIG. 1 to the distribution system.

図3に示す送配電系統700は、送電系統7−1と配電系統70−1と配電系統70−2を備える。送電系統7−1は、複数の発電所と複数の配電用変電所間を接続する複数系統の送電線等を備える。配電系統70−1は、送電系統7−1に接続されている配電用変電所や中間変電所、複数系統の配電線、複数の遮断器、複数の変圧器、複数の引込線等の構成要素を備える。配電系統70−2は、送電系統7−1に接続されている配電用変電所や中間変電所、複数系統の配電線、複数の遮断器、複数の変圧器、複数の引込線等の構成要素を備える。配電系統接続情報135は、例えば、需要家施設20−1、20−2、20−3、および20−4と、配電系統70−1または配電系統70−1の構成要素である送電系統7−1に接続されている配電用変電所や中間変電所、複数系統の配電線、複数の遮断器、複数の変圧器、複数の引込線等とを対応づける情報を含む。また、配電系統接続情報135は、例えば、需要家施設20−5、20−6、および20−7、ならびに需要家施設30−1と、配電系統70−2または配電系統70−2の構成要素である送電系統7−1に接続されている配電用変電所や中間変電所、複数系統の配電線、複数の遮断器、複数の変圧器、複数の引込線等とを対応づける情報を含む。 The power transmission / distribution system 700 shown in FIG. 3 includes a power transmission system 7-1, a power distribution system 70-1, and a power distribution system 70-2. The power transmission system 7-1 includes a plurality of power transmission lines connecting a plurality of power plants and a plurality of distribution substations. The distribution system 70-1 includes components such as a distribution substation and an intermediate substation connected to the transmission system 7-1, a plurality of distribution lines, a plurality of circuit breakers, a plurality of transformers, and a plurality of service lines. Be prepared. The distribution system 70-2 includes components such as distribution substations and intermediate substations connected to the transmission system 7-1, multiple distribution lines, multiple circuit breakers, multiple transformers, and multiple drop lines. Be prepared. The distribution system connection information 135 is, for example, the consumer facilities 20-1, 20-2, 20-3, and 20-4, and the transmission system 7- which is a component of the distribution system 70-1 or the distribution system 70-1. Includes information that associates distribution substations and intermediate substations connected to 1, multiple distribution lines, multiple circuit breakers, multiple transformers, multiple drop lines, and the like. Further, the distribution system connection information 135 includes, for example, the consumer facilities 20-5, 20-6, and 20-7, the consumer facility 30-1, and the components of the distribution system 70-2 or the distribution system 70-2. It includes information for associating distribution substations and intermediate substations connected to the power transmission system 7-1, distribution lines of a plurality of systems, a plurality of circuit breakers, a plurality of transformers, a plurality of service lines, and the like.

なお、配電系統接続情報135は、需要家施設基本情報134に含まれる形態で構成されていてもよいし、あるいは一部を共用化する形態で構成されていてもよい。 The distribution system connection information 135 may be configured in a form included in the consumer facility basic information 134, or may be configured in a form in which a part is shared.

一方、制御装置12は、コンピュータであり、所定のプログラムを実行することで、機能ブロックである電力制御部121、受信部122、逆潮流電力量決定部123および割当部124を構成する。 On the other hand, the control device 12 is a computer, and by executing a predetermined program, it constitutes a power control unit 121, a reception unit 122, a reverse power flow power amount determination unit 123, and an allocation unit 124, which are functional blocks.

電力制御部121は、記憶部13が記憶している逆潮流計画情報131および需要計画情報132と、各需要家施設20および各需要家施設30における電力需給の実績値(実測値)に基づき、各需要家施設20および各需要家施設30に対する各電力設備制御指令401を生成して、生成した各電力設備制御指令401を各需要家施設20および各需要家施設30に送信し、各需要家施設20および各需要家施設30における電力設備を制御する。 The electric power control unit 121 is based on the reverse power flow plan information 131 and the demand plan information 132 stored in the storage unit 13 and the actual value (actual measurement value) of the electric power supply and demand in each customer facility 20 and each customer facility 30. Each electric power equipment control command 401 for each customer facility 20 and each customer facility 30 is generated, and each generated electric power equipment control command 401 is transmitted to each customer facility 20 and each customer facility 30, and each customer. It controls the electric power equipment in the facility 20 and each consumer facility 30.

受信部122は、親アグリゲータである電力会社等が運用する上位制御システム50からの所定の要請時間における電力調整の要請や配電系統の逆潮流に係る所定の条件を示す情報を通信部11を介して受信する。所定の要請時間は、電力調整すなわち需要削減または需要増加が要請される時間であり、例えば、開始時刻と終了時刻または開始時刻と継続時間で定義される。電力調整の要請は、DRによる要請に対応し、電力調整の要請時間と、需要削減または需要増加が要請される電力の値、電力量の値等を示す情報を含む。 The receiving unit 122 transmits information indicating a request for power adjustment at a predetermined request time from the upper control system 50 operated by a power company or the like, which is a parent aggregator, and a predetermined condition related to reverse power flow of the distribution system via the communication unit 11. To receive. The predetermined requested time is the time when the power adjustment, that is, the demand reduction or the demand increase is requested, and is defined by, for example, the start time and the end time or the start time and the duration. The request for electric power adjustment includes information indicating the requested time for electric power adjustment, the value of electric power for which demand reduction or demand increase is requested, the value of electric energy, etc. in response to the request by DR.

逆潮流電力量決定部123は、例えば、逆潮流計画情報131、過去の実績、天気予報等に基づき、ある1日(例えば翌日)の各需要家施設20および各需要家施設30からの各逆潮流電力量の合計値の1日分の総計値を予測する。ここで、合計値は、ある所定の時間の各需要家施設20および各需要家施設30からの各逆潮流電力量を合計した値である。また、総計値は、各時間の合計値を1日分総計した値である。逆潮流電力量決定部123は、次に、逆潮流電力量の合計値の予測値の1日分の総計値に基づいて、各需要家施設30の1日分の生産量の計画値を決定する。次に、逆潮流電力量決定部123は、需要家施設30毎に、1日の生産量の計画値に基づいて、所定の時間毎の生産量を決定する。この所定の時間毎の生産量が生産計画である。逆潮流電力量決定部123は、例えば、昼休憩の時間帯を除く、生産開始時刻から生産終了時刻までの各所定の時間毎に生産量を割り当てる。逆潮流電力量決定部123は、決定した生産計画を生産計画情報133として記憶部13に記憶する。 The reverse power flow electric energy determination unit 123 is, for example, based on the reverse power flow plan information 131, past results, weather forecast, etc., and each reverse from each customer facility 20 and each customer facility 30 on a certain day (for example, the next day). Predict the total value for one day of the total value of power flow power. Here, the total value is a value obtained by totaling the amount of reverse power flow from each customer facility 20 and each customer facility 30 at a predetermined time. In addition, the total value is a value obtained by totaling the total value of each time for one day. Next, the reverse power flow power amount determination unit 123 determines the planned value of the daily production amount of each consumer facility 30 based on the total value for one day of the predicted value of the total value of the reverse power flow power amount. do. Next, the reverse power flow electric energy determination unit 123 determines the production amount for each predetermined time for each customer facility 30 based on the planned value of the daily production amount. The production amount for each predetermined time is the production plan. The reverse power flow electric energy determination unit 123 allocates the production amount for each predetermined time from the production start time to the production end time, excluding the time zone of the lunch break, for example. The reverse power flow electric energy determination unit 123 stores the determined production plan as production plan information 133 in the storage unit 13.

また、逆潮流電力量決定部123は、生産計画情報133を参照し、各需要家施設30の生産の計画に基づく時間毎の生産に係る電力の需要予測に応じて、複数の需要家施設20や1または複数の需要家施設30から配電系統へ逆潮流させる逆潮流電力量の計画値を時間毎に決定する。例えば、逆潮流電力量決定部123は、各時間の逆潮流電力量の予測値の各需要家施設20および各需要家施設30の合計値を、各時間の生産に係る電力の需要予測に対応するように、各時間に分配することで各時間の逆潮流電力量の計画値を決定する。例えば、逆潮流電力量決定部123は、昼休憩などで、稼働率が上がらない時間帯は平均逆潮流電力を60%などに設定し、他の時間を100%などに設定する。すなわち、逆潮流電力量決定部123は、例えば、生産量が減少する場合、時間当たりの平均逆潮流電力が減るように計画値を決定する。 Further, the reverse power flow electric energy determination unit 123 refers to the production plan information 133, and according to the demand forecast of the electric power related to the hourly production based on the production plan of each consumer facility 30, a plurality of consumer facilities 20 The planned value of the amount of reverse power flow power to be reverse power flowed from one or a plurality of consumer facilities 30 to the distribution system is determined for each hour. For example, the reverse power flow electric energy determination unit 123 corresponds to the total value of each customer facility 20 and each customer facility 30 of the predicted value of the reverse power flow electric energy at each time, corresponding to the electric power demand prediction related to the production at each time. By distributing the power to each time, the planned value of the reverse power flow amount for each time is determined. For example, the reverse power flow power amount determination unit 123 sets the average reverse power flow power to 60% or the like during the time zone when the operating rate does not increase due to a lunch break or the like, and sets the other time to 100% or the like. That is, the reverse power flow power amount determination unit 123 determines the planned value so that the average reverse power flow power per hour decreases, for example, when the production amount decreases.

なお、逆潮流電力量決定部123は、例えば、各需要家施設20で予測される時間毎の逆潮流電力量を、各発電設備25による発電電力量の予測値から各需要家施設20で消費される電力量の予測値を減じることで算出することができる。あるいは、逆潮流電力量決定部123は、例えば、各需要家施設20において、電力負荷設備26等で消費される電力を、系統からの順潮流電力(買電電力)でまかなうことを前提として、各需要家施設20で予測される時間毎の逆潮流電力量を、各発電設備25による発電電力量の予測値とすることができる。 The reverse power flow power amount determination unit 123 consumes, for example, the hourly reverse power flow power amount predicted by each customer facility 20 at each customer facility 20 from the predicted value of the power generation amount generated by each power generation facility 25. It can be calculated by subtracting the predicted value of the electric energy to be generated. Alternatively, the reverse power flow electric energy determination unit 123 is based on the premise that, for example, the power consumed by the power load facility 26 or the like in each consumer facility 20 is covered by the forward power flow power (power purchase power) from the grid. The hourly reverse power flow power amount predicted at each consumer facility 20 can be used as the predicted value of the power generation amount generated by each power generation facility 25.

また、逆潮流電力量決定部123は、例えば、各需要家施設30で予測される時間毎の逆潮流電力量を、各発電設備35による発電電力量の予測値から各需要家施設30の各電気機器362等の生産設備361以外の負荷で消費される電力量の予測値を減じることで算出することができる。あるいは、逆潮流電力量決定部123は、例えば、各需要家施設30において、各電気機器362等の生産設備361以外の負荷で消費される電力を系統からの順潮流電力(買電電力)でまかなうことを前提として、各需要家施設30で予測される時間毎の逆潮流電力量を、各発電設備35による発電電力量の予測値とすることができる。 Further, the reverse power flow power amount determination unit 123, for example, determines the hourly reverse power flow power amount predicted by each customer facility 30 from the predicted value of the power generation amount generated by each power generation facility 35, respectively. It can be calculated by subtracting the predicted value of the amount of electric energy consumed by a load other than the production equipment 361 such as the electric device 362. Alternatively, the reverse power flow electric energy determination unit 123 uses, for example, the forward power flow power (power purchase power) from the grid to be consumed by a load other than the production equipment 361 such as each electric device 362 in each consumer facility 30. On the premise that it can be covered, the hourly reverse power flow electric energy predicted by each consumer facility 30 can be used as the predicted value of the electric energy generated by each power generation facility 35.

割当部124は、逆潮流電力量決定部123が決定した逆潮流電力量の計画値を、複数の各需要家施設20と各需要家施設30に対して個別に割り当てる。割当部124は、例えば、各需要家施設20に対して各時間の平均逆潮流電力を均等に割り当てることができる。また、割当部124は、逆潮流電力量の割り当てに際して、各発電設備25や各発電設備35による発電予測や、各需要家施設20と各需要家施設30での需要予測を行い、予測結果に基づいて割り当て率や割り当て量を調整してもよい。また、割当部124は、設備容量比、天候予測、需要実績等を参考に配分を決定してもよい。 The allocation unit 124 individually allocates the planned value of the reverse power flow power amount determined by the reverse power flow power amount determination unit 123 to each of the plurality of customer facilities 20 and each customer facility 30. The allocation unit 124 can, for example, evenly allocate the average reverse power flow power for each time to each customer facility 20. Further, when allocating the reverse power flow amount, the allocation unit 124 makes a power generation prediction by each power generation facility 25 and each power generation facility 35, and a demand prediction at each customer facility 20 and each customer facility 30, and obtains the prediction result. The allocation rate and the allocation amount may be adjusted based on the above. Further, the allocation unit 124 may determine the allocation with reference to the installed capacity ratio, the weather forecast, the actual demand, and the like.

なお、各需要家施設20は、例えば、個々に割り当てられた各時間の逆潮流電力量の計画値を、各時間に配電系統へ逆潮流させることが求められる。一方、各需要家施設30は、個々に割り当てられた各時間の逆潮流電力量の計画値が、例えば、当該需要家施設30で計画された生産に係る電力量を越えた場合に、その越えた分の電力量を配電系統へ逆潮流させることが求められる。割当部124は、例えば、逆潮流電力量決定部123が決定した時間毎の逆潮流電力量の計画値(各需要家施設20および各需要家施設30の合計値)に基づき、各需要家施設20および各需要家施設30に割り当てる時間毎の逆潮流電力量計画値を決定する。この時間毎の逆潮流電力量計画値は、電力設備制御指令401に含まれる情報として、電力制御部121から通信部11を介して、逆潮流電流が割り当てられた各需要家施設20および各需要家施設30に送信される。また、時間毎の逆潮流電力量計画値は、逆潮流計画情報131として記憶部13に記憶される。 In addition, each consumer facility 20 is required to, for example, reverse power flow the planned value of the reverse power flow electric energy of each time individually allocated to the distribution system at each time. On the other hand, in each consumer facility 30, when the planned value of the reverse power flow power amount for each time individually allocated exceeds, for example, the power amount related to the production planned in the consumer facility 30, the excess is exceeded. It is required to reverse the amount of electric power to the distribution system. The allocation unit 124, for example, is based on the planned value of the reverse power flow electric energy for each hour determined by the reverse power flow electric energy determination unit 123 (the total value of each customer facility 20 and each consumer facility 30). The planned value of reverse power flow electric energy for each hour allocated to 20 and each customer facility 30 is determined. This hourly reverse power flow electric energy plan value is used as information included in the power equipment control command 401 from the power control unit 121 via the communication unit 11 to each customer facility 20 to which the reverse power flow current is assigned and each demand. It is transmitted to the house facility 30. Further, the reverse power flow electric energy planned value for each hour is stored in the storage unit 13 as the reverse power flow planning information 131.

なお、割当部124は、割り当ての際に、配電系統の逆潮流に係る所定の条件を満たすように、各需要家施設20や各需要家施設30への逆潮流電力量の計画値の割り当てを調整することができる。例えば、割当部124は、逆潮流電力の許容値が比較的大きい配電系統の範囲に接続されている各需要家施設20や各需要家施設30への逆潮電力量の計画値の割り当てが、逆潮流電力の許容値が比較的小さい配電系統の範囲に接続されている各需要家施設20や各需要家施設30への逆潮電力量の計画値の割り当てより大きくなるように調整することができる。 At the time of allocation, the allocation unit 124 allocates the planned value of the reverse power flow amount to each customer facility 20 and each customer facility 30 so as to satisfy a predetermined condition relating to the reverse power flow of the distribution system. Can be adjusted. For example, the allocation unit 124 allocates the planned value of the reverse power supply amount to each customer facility 20 and each customer facility 30 connected to the range of the distribution system having a relatively large allowable value of reverse power flow power. It is possible to adjust so that the allowable value of reverse power flow is larger than the allocation of the planned value of the amount of reverse power power to each customer facility 20 and each customer facility 30 connected to the range of the distribution system where the allowable value is relatively small. can.

次に、図4および図5を参照して、図1〜図3を参照して説明した電力管理システム1の動作例について説明する。図4は、図1および図2に示す電力管理システム1において、各需要家施設30の生産で消費される電力を、電力管理装置10が管理する複数の需要家施設20の各発電設備25が発電した電力と1または複数の需要家施設30の各発電設備35が発電した電力で賄う場合の動作例を示す。ただし、図4に示す動作例では、1または複数の需要家施設30は、同一の物品を生産する工場であり、生産量と生産に係る電力量とは比例するものとする。また、図5は、図4に示す動作例を説明する際に用いる模式図であり、ある1日の8時から18時までの1時間毎の逆潮流電力量予測値(図5(a))、生産計画値(図5(b))、および逆潮流電力量計画値(図5(c))の変化を示す。図5において、横軸は時刻であり、縦軸は線形の任意単位である。図5(b)に示す生産計画値は、生産量である。なお、0時から8時までと18時から24時までの各値はいずれも零であるとする。 Next, an operation example of the power management system 1 described with reference to FIGS. 1 to 3 will be described with reference to FIGS. 4 and 5. FIG. 4 shows, in the power management system 1 shown in FIGS. 1 and 2, each power generation facility 25 of the plurality of consumer facilities 20 in which the power management device 10 manages the electric power consumed in the production of each consumer facility 30. An operation example is shown in the case where the generated electric power and the electric power generated by each power generation facility 35 of one or a plurality of consumer facilities 30 are used. However, in the operation example shown in FIG. 4, one or more consumer facilities 30 are factories that produce the same goods, and the production amount and the electric power amount related to the production are proportional to each other. Further, FIG. 5 is a schematic diagram used when explaining the operation example shown in FIG. 4, and is an hourly reverse power flow electric energy predicted value from 8:00 to 18:00 on a certain day (FIG. 5 (a)). ), The production planned value (FIG. 5 (b)), and the reverse power flow electric energy planned value (FIG. 5 (c)) are shown. In FIG. 5, the horizontal axis is time and the vertical axis is a linear arbitrary unit. The production plan value shown in FIG. 5B is the production amount. It is assumed that each value from 0:00 to 8:00 and from 18:00 to 24:00 is zero.

図4に示す処理は、例えば、所定の時間間隔で繰り返し実行される。図4に示す処理では、まず、電力管理装置10で、逆潮流電力量決定部123が、例えば、逆潮流計画情報131、過去の実績、天気予報等に基づき、ある1日(例えば翌日)の各需要家施設20および各需要家施設30の全体での時間あたりの逆潮流電力量を予測する(ステップS1)。ステップS1では、例えば図5(a)に示すように、各時間帯(この例では1時間毎の各時間帯)の逆潮流電力量(各需要家施設20と各需要家施設30の合計値)が予測される。 The process shown in FIG. 4 is repeatedly executed, for example, at predetermined time intervals. In the process shown in FIG. 4, first, in the power management device 10, the reverse power flow electric energy determination unit 123 performs one day (for example, the next day) based on, for example, reverse power flow plan information 131, past results, weather forecast, and the like. The amount of reverse power flow per hour for each customer facility 20 and each customer facility 30 is predicted (step S1). In step S1, for example, as shown in FIG. 5A, the amount of reverse power flow (total value of each customer facility 20 and each customer facility 30) in each time zone (each time zone every hour in this example). ) Is expected.

次に、逆潮流電力量決定部123は、各需要家施設20および各需要家施設30の時間あたりの逆潮流電力量の予測値の1日の総計から、各需要家施設30が1日で生産できる総生産量を決定する(ステップS2)。次に、逆潮流電力量決定部123は、決定した総生産量から、時間あたりの各需要家施設30(工場)での生産量を決定し、生産計画を立てる(ステップS3)。ステップS3では、例えば図5(b)に示すように、各時間帯の生産量が決定される。図5(b)に示す例では、9時から12時までと13時から17時までの時間に生産が行われる。この場合、図5(a)に示す8時から9時までと12時から13時までの逆潮流電力量予測値は、図5(b)で網掛けして示す9時から10時までと14時から17時までの生産量に割り当てられている。 Next, the reverse power flow power amount determination unit 123 determines each customer facility 30 in one day from the daily total of the predicted values of the reverse power flow power amount per hour of each customer facility 20 and each customer facility 30. The total production amount that can be produced is determined (step S2). Next, the reverse power flow electric energy determination unit 123 determines the production amount at each consumer facility 30 (factory) per hour from the determined total production amount, and makes a production plan (step S3). In step S3, for example, as shown in FIG. 5B, the production amount in each time zone is determined. In the example shown in FIG. 5B, production is carried out from 9:00 to 12:00 and from 13:00 to 17:00. In this case, the predicted values of reverse power flow from 8:00 to 9:00 and from 12:00 to 13:00 shown in FIG. 5 (a) are shaded from 9:00 to 10:00 in FIG. 5 (b). It is allocated to the production volume from 14:00 to 17:00.

次に、逆潮流電力量決定部123は、ステップS3で策定した生産計画から、時間あたりの逆潮流電力量計画値を決定する(ステップS4)。ステップS4では、例えば図5(c)に示すように、各時間帯の逆潮流電力量計画値が決定される。図5(c)に示す例では、9時から12時までと13時から17時までの時間の逆潮流電力量計画値が、図5(b)に示す生産量に対応するように決定されている。この場合、図5(a)に示す8時から9時までと12時から13時までの逆潮流電力量予測値は、図5(c)で網掛けして示す9時から10時までと14時から17時までの逆潮流電力量計画値に割り当てられている。 Next, the reverse power flow electric energy determination unit 123 determines the reverse power flow electric energy planned value per hour from the production plan formulated in step S3 (step S4). In step S4, for example, as shown in FIG. 5C, the reverse power flow power amount planned value for each time zone is determined. In the example shown in FIG. 5 (c), the planned reverse power flow power amount for the time from 9:00 to 12:00 and from 13:00 to 17:00 is determined so as to correspond to the production amount shown in FIG. 5 (b). ing. In this case, the predicted values of reverse power flow from 8:00 to 9:00 and from 12:00 to 13:00 shown in FIG. 5 (a) are shaded from 9:00 to 10:00 in FIG. 5 (c). It is assigned to the reverse power flow planned value from 14:00 to 17:00.

次に、割当部124は、ステップS4で逆潮流電力量決定部123が決定した逆潮流電力量計画値を時間毎に各需要家施設20と各需要家施設30に割り当てる(ステップS5)。この割当部124が時間毎に各需要家施設20と各需要家施設30に割り当てた逆潮流電力量計画値は、電力設備制御指令401に含まれる情報として、電力制御部121から通信部11を介して、各需要家施設20と各需要家施設30に送信される。 Next, the allocation unit 124 allocates the reverse power flow electric energy planned value determined by the reverse power flow electric energy determination unit 123 in step S4 to each customer facility 20 and each consumer facility 30 every hour (step S5). The reverse power flow electric energy planned value assigned to each customer facility 20 and each customer facility 30 by the allocation unit 124 for each hour is the information included in the power equipment control command 401 from the power control unit 121 to the communication unit 11. It is transmitted to each customer facility 20 and each customer facility 30 via.

次に、各需要家施設20および各需要家施設30は、時間毎に、割り当てられた逆潮流電力量計画値に応じて、例えば、太陽光発電の発電電力量等の各発電設備25および各発電設備35の発電電力量と、各需要家施設20および各需要家施設30における所定の需要電力量をもとに各蓄電池21および各蓄電池31からの充放電をそれぞれ制御する(ステップS6)。 Next, each customer facility 20 and each customer facility 30 have each power generation facility 25 and each power generation facility 25 such as, for example, the amount of power generated by solar power generation, according to the allocated reverse current power amount planned value for each hour. The charge / discharge from each storage battery 21 and each storage battery 31 is controlled based on the amount of power generated by the power generation facility 35 and the predetermined amount of power required by each customer facility 20 and each customer facility 30 (step S6).

以上のように、本実施形態では、工場の生産計画に応じて各需要家施設からの逆潮流電力量の計画値を管理して、外部の各需要家施設から配電系統を介して工場へ電力を供給するので、外部から工場への電力供給の管理と配電系統への逆潮流電力の管理を容易に行うことができる。 As described above, in the present embodiment, the planned value of the reverse power flow amount from each customer facility is managed according to the production plan of the factory, and the power is transmitted from each external customer facility to the factory via the distribution system. Therefore, it is possible to easily manage the power supply from the outside to the factory and the reverse power flow to the distribution system.

また、工場等の需要家施設30での生産に必要な電力量を十分満たすことができるように、再生可能エネルギを利用した発電設備と蓄電池の少なくとも1つを備える複数の需要家施設20と1または複数の需要家施設30とを適切に組み合わせることで、再生可能エネルギでの生産を担保することができる。例えば、再生可能エネルギ100%の再生物の供給を行うことができ、また、グリーン電力の利活用を進めることができる。 In addition, a plurality of consumer facilities 20 and 1 provided with at least one of a power generation facility using renewable energy and a storage battery so that the amount of electric energy required for production at the consumer facility 30 such as a factory can be sufficiently satisfied. Alternatively, by appropriately combining a plurality of consumer facilities 30, production with renewable energy can be guaranteed. For example, it is possible to supply a recycled material having 100% renewable energy, and it is possible to promote the utilization of green power.

なお、例えば、各需要家施設20では、需要家の要望によって自家使用を優先し、余剰のみを逆潮流の対象としてもよい。すなわち、例えば、各蓄電池21の充電率等に応じて発電設備25からの発電電力を優先的に充電電力としたり、各蓄電池21の放電電力を系統からの買電電力を減らすために用いたりしてもよい。 For example, in each consumer facility 20, private use may be prioritized at the request of the consumer, and only the surplus may be subject to reverse power flow. That is, for example, the power generated from the power generation facility 25 is preferentially used as the charging power according to the charging rate of each storage battery 21, or the discharging power of each storage battery 21 is used to reduce the power purchased from the grid. You may.

なお、需要家施設30における生産設備361が消費する電力量は、例えば生産量や稼働時間等に応じて算出することができる。ただし、これらに限らず、例えば、物品の生産に溶接工程が含まれる場合、生産に係る電力量は、例えばユニットのスポット溶接電力量などの消費電力量で算出することができる。例えば12箇所の場合、溶接の平均的な値として、例えば溶接電圧24Vの場合、24×22000A×12箇所×秒数/3600(Wh)として算出したり、特開2008−142773号公報に記載されているような方法から算出したりしてもよい。 The amount of electric power consumed by the production facility 361 in the consumer facility 30 can be calculated according to, for example, the production amount, the operating time, and the like. However, the present invention is not limited to these, and for example, when the production of an article includes a welding process, the electric energy related to the production can be calculated by the electric energy consumption such as the spot welding electric energy of the unit. For example, in the case of 12 points, it is calculated as an average value of welding, for example, in the case of a welding voltage of 24 V, it is calculated as 24 × 22000 A × 12 points × number of seconds / 3600 (Wh), or described in JP-A-2008-142773. It may be calculated from the method described above.

なお、大規模な生産装置を持つ工場などでは、大型蓄電池を有し、全体の変動を吸収させることで、太陽光発電や、需要の増減による、逆潮流電力量の増減を蓄電池で吸収することで、再エネによる生産を安定的に行うことができる。 In factories with large-scale production equipment, large storage batteries are used to absorb changes in the total amount of fluctuations, so that the storage batteries can absorb changes in the amount of reverse power flow due to changes in solar power generation and demand. Therefore, stable production by renewable energy can be performed.

以上のように、本実施形態の電力管理システム1は、所定の配電系統70−1、70−2等に接続された複数の需要家施設20および各需要家施設30による電力の需給を管理するシステムである。電力管理システム1において、複数の需要家施設20および30は、蓄電池21(蓄電設備)または発電設備25の少なくとも一方を有する複数の需要家施設20(第1需要家施設)と、電力を利用して物品を生産する施設である1または複数の需要家施設30(第2需要家施設)とを含む。また、電力管理システム1は、逆潮流電力量決定部123と、割当部124を備える。逆潮流電力量決定部123は、生産の計画に基づく時間毎の生産に係る電力の需要予測に応じて、複数の需要家施設20や需要家施設30から配電系統70−1、70−2等へ逆潮流させる逆潮流電力量の計画値を時間毎に決定する。また、割当部124は、逆潮流電力量決定部123が決定した逆潮流電力量の計画値を、複数の需要家施設20や需要家施設30に対して個別に割り当てる。 As described above, the electric power management system 1 of the present embodiment manages the supply and demand of electric power by the plurality of consumer facilities 20 and each consumer facility 30 connected to the predetermined distribution systems 70-1, 70-2 and the like. It is a system. In the electric power management system 1, the plurality of consumer facilities 20 and 30 utilize electric power with the plurality of consumer facilities 20 (first consumer facility) having at least one of the storage battery 21 (storage facility) and the power generation facility 25. This includes one or more consumer facilities 30 (second consumer facilities), which are facilities for producing goods. Further, the power management system 1 includes a reverse power flow electric energy determination unit 123 and an allocation unit 124. The reverse power flow electric energy determination unit 123 receives power distribution systems 70-1, 70-2, etc. from a plurality of consumer facilities 20 and 30 according to the demand forecast of electric power related to hourly production based on the production plan. Determine the planned value of the amount of reverse power flow power to be reverse power flow every hour. Further, the allocation unit 124 individually allocates the planned value of the reverse power flow electric energy determined by the reverse power flow electric energy determination unit 123 to the plurality of consumer facilities 20 and the consumer facilities 30.

本実施形態では、工場等の需要家施設30の生産計画に応じて各需要家施設20や需要家施設30からの逆潮流電力量の計画値を管理することで、各需要家施設20や需要家施設30から配電系統70−1、70−2等を介して工場等の需要家施設30へ電力を供給する。したがって、外部から工場への電力供給の管理と配電系統への逆潮流電力の管理を容易に行うことができる。 In the present embodiment, each customer facility 20 and demand are managed by managing the planned value of the reverse power flow amount from each customer facility 20 and the customer facility 30 according to the production plan of the customer facility 30 such as a factory. Power is supplied from the house facility 30 to the consumer facility 30 such as a factory via the distribution systems 70-1, 70-2 and the like. Therefore, it is possible to easily manage the power supply from the outside to the factory and the reverse power flow to the distribution system.

なお、本実施形態では、生産の計画が、複数の需要家施設20や需要家施設30から配電系統70−1、70−2等へ逆潮流される電力量の予測値に基づいて決定される。この構成によれば、生産計画と逆潮流電力量の対応関係をより精度良く管理することができ、例えば、生産に係る電力量を太陽光発電システム等の発電設備25や発電設備35の発電電力量以下とするような管理を容易に行うことができる。 In the present embodiment, the production plan is determined based on the predicted value of the amount of power that is reversely flowed from the plurality of consumer facilities 20 and the consumer facilities 30 to the distribution systems 70-1, 70-2, and the like. .. According to this configuration, it is possible to more accurately manage the correspondence between the production plan and the reverse power flow amount. It is possible to easily manage the amount to be less than or equal to the amount.

また、蓄電池21や蓄電池31を有する需要家施設20や需要家施設30が、割当部124による割り当ての結果に基づき蓄電池21や蓄電池31の充放電電力量を制御する充放電制御部222や充放電制御部323を備えている。この構成によれば、需要家施設20や需要家施設30において充放電電力を制御できるので、発電設備の発電量や電力負荷設備の消費電力の変化に応じて充放電電力を応答性良く制御することができる。 Further, the charge / discharge control unit 222 and the charge / discharge control unit 222 and the consumer facility 30 having the storage battery 21 and the storage battery 31 control the charge / discharge electric energy of the storage battery 21 and the storage battery 31 based on the result of the allocation by the allocation unit 124. It includes a control unit 323. According to this configuration, the charge / discharge power can be controlled in the consumer facility 20 and the consumer facility 30, so that the charge / discharge power is responsively controlled according to changes in the amount of power generated by the power generation facility and the power consumption of the power load facility. be able to.

また、割当部124は、配電系統70−1、70−2等の逆潮流に係る所定の条件を満たすように、各需要家施設20や各需要家施設30への逆潮流電力量の計画値の割り当てを調整することができる。このように、逆潮流に係る所定の条件に応じて逆潮流電力量の計画値を調整した場合、逆潮流に係る所定の条件を容易に満たすことができる。 Further, the allocation unit 124 has a planned value of the amount of reverse power flow to each customer facility 20 and each customer facility 30 so as to satisfy a predetermined condition related to reverse power flow of the distribution systems 70-1 and 70-2. You can adjust the allocation of. As described above, when the planned value of the reverse power flow amount is adjusted according to the predetermined condition related to the reverse power flow, the predetermined condition related to the reverse power flow can be easily satisfied.

以上、この発明の実施形態を図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。例えば、各予測値や各計画値を算出する処理は、電力管理装置10、制御装置32、制御装置22のいずれで実行してもよいし、情報を送受信しながら処理を分散して実行してもよい。 Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and the design and the like within a range not deviating from the gist of the present invention are also included. For example, the process of calculating each predicted value or each planned value may be executed by any of the power management device 10, the control device 32, and the control device 22, and the processes are distributed and executed while transmitting and receiving information. May be good.

1:電力管理システム、10:電力管理装置、20、30:需要家施設、21、31:蓄電池、12、22、32:制御装置、121:電力制御部、122:受信部、123:逆潮流電力量決定部、124:割当部、361:生産設備 1: Power management system, 10: Power management device, 20, 30: Consumer facility, 21, 31: Storage battery, 12, 22, 32: Control device, 121: Power control unit, 122: Receiver unit, 123: Reverse power flow Electric energy determination unit, 124: Allocation unit, 361: Production equipment

Claims (5)

所定の配電系統に接続された複数の需要家施設による電力の需給を管理するシステムであって、
前記複数の需要家施設は、蓄電設備または発電設備の少なくとも一方を有する複数の第1需要家施設と、電力を利用して物品を生産する施設である1または複数の第2需要家施設とを含み、
前記生産の計画に基づく時間毎の前記生産に係る電力の需要予測に応じて、前記複数の需要家施設から前記配電系統へ逆潮流させる逆潮流電力量の計画値を前記時間毎に決定する逆潮流電力量決定部と、
前記逆潮流電力量決定部が決定した前記逆潮流電力量の計画値を、前記複数の需要家施設に対して個別に割り当てる割当部と、
を備える電力管理システム。
A system that manages the supply and demand of electric power by multiple consumer facilities connected to a predetermined distribution system.
The plurality of consumer facilities include a plurality of first consumer facilities having at least one of a power storage facility or a power generation facility, and one or a plurality of second consumer facilities which are facilities for producing goods by using electric power. Including
Inversely, the planned value of the amount of reverse power flow power to be reverse power flowed from the plurality of consumer facilities to the distribution system is determined for each time according to the demand forecast of the electric power related to the production for each hour based on the production plan. Power flow power determination unit and
An allocation unit that individually allocates the planned value of the reverse power flow power amount determined by the reverse power flow power amount determination unit to the plurality of consumer facilities, and
Power management system with.
前記生産の計画が、前記複数の需要家施設から前記配電系統へ逆潮流される電力量の予測値に基づいて決定されたものである
請求項1に記載の電力管理システム。
The power management system according to claim 1, wherein the production plan is determined based on a predicted value of the amount of power that is reversely flowed from the plurality of consumer facilities to the distribution system.
前記蓄電設備を有する前記需要家施設が、前記割当部による前記割り当ての結果に基づき前記蓄電設備の充放電電力量を制御する充放電制御部を備える
請求項1または2に記載の電力管理システム。
The power management system according to claim 1 or 2, wherein the consumer facility having the power storage facility includes a charge / discharge control unit that controls the charge / discharge power amount of the power storage facility based on the result of the allocation by the allocation unit.
前記割当部が、前記配電系統の逆潮流に係る所定の条件を満たすように、前記各需要家施設への前記逆潮流電力量の計画値の割り当てを調整する
請求項1から3のいずれか1項に記載の電力管理システム。
Any one of claims 1 to 3 that adjusts the allocation of the planned value of the reverse power flow amount to each customer facility so that the allocation unit satisfies a predetermined condition relating to the reverse power flow of the distribution system. The power management system described in the section.
所定の配電系統に接続された複数の需要家施設による電力の需給を管理する方法であって、
前記複数の需要家施設は、蓄電設備または発電設備の少なくとも一方を有する複数の第1需要家施設と、電力を利用して物品を生産する施設である1または複数の第2需要家施設とを含み、
逆潮流電力量決定部によって、前記生産の計画に基づく時間毎の前記生産に係る電力の需要予測に応じて、前記複数の需要家施設から前記配電系統へ逆潮流させる逆潮流電力量の計画値を前記時間毎に決定し、
割当部によって、前記逆潮流電力量決定部が決定した前記逆潮流電力量の計画値を、前記複数の需要家施設に対して個別に割り当てる
電力管理方法。
It is a method of managing the supply and demand of electric power by multiple consumer facilities connected to a predetermined distribution system.
The plurality of consumer facilities include a plurality of first consumer facilities having at least one of a power storage facility or a power generation facility, and one or a plurality of second consumer facilities which are facilities for producing goods by using electric power. Including
The planned value of the reverse power flow amount to be reverse power flowed from the plurality of consumer facilities to the distribution system according to the hourly power demand forecast for the production based on the production plan by the reverse power flow power amount determination unit. Is determined for each time mentioned above,
A power management method in which a planned value of the reverse power flow power amount determined by the reverse power flow power amount determination unit is individually assigned to the plurality of consumer facilities by the allocation unit.
JP2018004626A 2018-01-16 2018-01-16 Power management system and power management method Active JP6956015B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018004626A JP6956015B2 (en) 2018-01-16 2018-01-16 Power management system and power management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018004626A JP6956015B2 (en) 2018-01-16 2018-01-16 Power management system and power management method

Publications (2)

Publication Number Publication Date
JP2019126157A JP2019126157A (en) 2019-07-25
JP6956015B2 true JP6956015B2 (en) 2021-10-27

Family

ID=67399209

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018004626A Active JP6956015B2 (en) 2018-01-16 2018-01-16 Power management system and power management method

Country Status (1)

Country Link
JP (1) JP6956015B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4383499A1 (en) * 2022-12-07 2024-06-12 Hager-Electro Sas Method and arrangement to manage a local low-voltage electrical power grid

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7213783B2 (en) * 2019-09-25 2023-01-27 京セラ株式会社 Consignment system and consignment method
JP7417072B2 (en) 2020-02-12 2024-01-18 日新電機株式会社 Supply and demand control system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5576498B2 (en) * 2010-11-17 2014-08-20 株式会社日立製作所 Power management system and power management method
JP6178045B2 (en) * 2012-04-16 2017-08-09 株式会社東芝 Energy management system, energy management method, program, and server device
JP6114532B2 (en) * 2012-10-26 2017-04-12 株式会社日立製作所 Energy management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4383499A1 (en) * 2022-12-07 2024-06-12 Hager-Electro Sas Method and arrangement to manage a local low-voltage electrical power grid

Also Published As

Publication number Publication date
JP2019126157A (en) 2019-07-25

Similar Documents

Publication Publication Date Title
US10727784B2 (en) Aggregation system, control method thereof, and control apparatus
US9946237B2 (en) Energy management device, energy management system, and energy management method
JP2024074822A (en) Power supply system and power supply method
JP6936096B2 (en) Power management device and power management method
JP6578050B2 (en) Power management system, power management method and program
WO2016002347A1 (en) Power control system, method, and power control device
US11982544B2 (en) Distributed control of energy storage device charging and grid stability
JP6956015B2 (en) Power management system and power management method
JP6587336B2 (en) Renewable energy storage system
CN107359642B (en) Micro-grid region energy control system and control method
JP2013143815A (en) Power supply system, power supply control device, power supply method and program
JP6560603B2 (en) Power management system and power management method
JP7103925B2 (en) Power management method and power management system
JP2015211516A (en) Charge/discharge control system for power storage device
WO2013179809A1 (en) Device, system, and method for managing power
JP6989364B2 (en) Power management equipment, power management methods and programs
JP7063749B2 (en) Power control device and power control method
KR101496187B1 (en) Apparatus for virtual power plant service and method therefor
JP6936097B2 (en) Power management device and power management method
Reihani et al. Scheduling of price-sensitive residential storage devices and loads with thermal inertia in distribution grid
JP7007202B2 (en) Power management system and power management method
JP6128999B2 (en) Power accommodation system and control procedure determination apparatus for the power accommodation system
JPWO2018078802A1 (en) POWER MANAGEMENT SYSTEM, CONTROL DEVICE, AND POWER MANAGEMENT METHOD
JP2020048370A (en) Power management method and power management system
JP7328803B2 (en) Power management system and power management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201027

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210831

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211004

R151 Written notification of patent or utility model registration

Ref document number: 6956015

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151