JP6789483B1 - Railway sleeper automatic laying device - Google Patents

Railway sleeper automatic laying device Download PDF

Info

Publication number
JP6789483B1
JP6789483B1 JP2020037786A JP2020037786A JP6789483B1 JP 6789483 B1 JP6789483 B1 JP 6789483B1 JP 2020037786 A JP2020037786 A JP 2020037786A JP 2020037786 A JP2020037786 A JP 2020037786A JP 6789483 B1 JP6789483 B1 JP 6789483B1
Authority
JP
Japan
Prior art keywords
laying
space
pulley
shaft
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020037786A
Other languages
Japanese (ja)
Other versions
JP2021088914A (en
Inventor
李祖輝
Original Assignee
臨海科雅智能科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 臨海科雅智能科技有限公司 filed Critical 臨海科雅智能科技有限公司
Application granted granted Critical
Publication of JP6789483B1 publication Critical patent/JP6789483B1/en
Publication of JP2021088914A publication Critical patent/JP2021088914A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

【課題】本発明は鉄道枕木自動敷設装置を開示した。【解決手段】ボディーを含み、前記ボディーの上側には動力空間が設けられ、前記ボディーの下側にはメインボディーが固定的に設けられ、前記メインボディーの中には敷設空間が設けられ、前記メインボディーの下側には前進空間が設けられ、前記動力空間の中には動力を提供できる動力装置が設けられ、前記動力装置は前記動力空間の左側壁に固定的に取り付けられた主モーターを含み、前記主モーターにはモーター軸が伝動できるように設けられ、前記モーター軸には第一傘歯車が固定的に設けられ、前記動力空間の後側壁には第一傘歯車軸が回転できるように連結され、前記第一傘歯車軸には前記第一傘歯車と噛合している第二傘歯車が固定的に設けられ、前記第二傘歯車の前側には前記第一傘歯車軸に固定的に連結された第一プーリーが設けられ、前記動力空間の前後側壁には第一輪軸が回転できるように連結されている。【選択図】図1PROBLEM TO BE SOLVED: To disclose an automatic railroad tie laying device. SOLUTION: The body is included, a power space is provided on the upper side of the body, a main body is fixedly provided on the lower side of the body, and a laying space is provided in the main body. A forward space is provided under the main body, a power device capable of providing power is provided in the power space, and the power device is a main motor fixedly attached to the left wall of the power space. Including, the main motor is provided so that the motor shaft can be transmitted, the first bevel gear is fixedly provided on the motor shaft, and the first bevel gear shaft can be rotated on the rear side wall of the power space. A second umbrella gear that is connected to and meshes with the first umbrella gear is fixedly provided on the first umbrella gear shaft, and is fixed to the first umbrella gear shaft on the front side of the second umbrella gear. A first pulley is provided so as to be connected to the front and rear side walls of the power space so that the first wheel shaft can rotate. [Selection diagram] Fig. 1

Description

本願発明は鉄道分野に関わり、具体的には鉄道枕木自動敷設装置である。 The invention of the present application relates to the field of railways, and specifically is an automatic laying device for railway sleepers.

現在、社会の発展と交通の急速な発展に伴い、鉄道の建設量は大幅に増加しており、その中で、レールに枕木を敷設することは重要な部分である。現在では、一般的に大型鉄道機械によって鉄道を完全的に敷設しており、レール敷設も枕木敷設も含まれている。しかし、このような機械は大きすぎるため、敷設速度が遅く、敷設作業を順調にするには、多数の作業者が同時に作業する必要がある。また、ほとんどの鉄道敷設は人力で行われており、効率が低い一方、コストも高く、力と時間が多くかかり、敷設距離も不均一であり、敷設品質を保証できない。 Currently, with the development of society and the rapid development of transportation, the amount of railway construction is increasing significantly, and laying sleepers on rails is an important part of this. Nowadays, railroads are generally completely laid by large railroad machines, including rail laying and sleeper laying. However, since such a machine is too large, the laying speed is slow, and a large number of workers need to work at the same time in order for the laying work to proceed smoothly. In addition, most railway laying is done manually, and while efficiency is low, the cost is high, it takes a lot of power and time, the laying distance is uneven, and the laying quality cannot be guaranteed.

中国特許出願公開第102080349号明細書Publication No. 102080349 of Chinese Patent Application

本願発明の目的は鉄道枕木自動敷設装置を提供し、それは上記の現在の技術中の問題を解決できる。 An object of the present invention is to provide an automatic railroad tie laying device, which can solve the problems in the present technology described above.

ボディーを含み、前記ボディーの上側には動力空間が設けられ、前記ボディーの下側にはメインボディーが固定的に設けられ、前記メインボディーの中には敷設空間が設けられ、前記メインボディーの下側には前進空間が設けられ、前記動力空間の中には動力を提供できる動力装置が設けられ、
前記動力装置は前記動力空間の左側壁に固定的に取り付けられた主モーターを含み、前記主モーターにはモーター軸が伝動できるように設けられ、前記モーター軸には第一傘歯車が固定的に設けられ、前記動力空間の後側壁には第一傘歯車軸が回転できるように連結され、前記第一傘歯車軸には前記第一傘歯車と噛合している第二傘歯車が固定的に設けられ、前記第二傘歯車の前側には前記第一傘歯車軸に固定的に連結された第一プーリーが設けられ、前記動力空間の前後側壁には第一輪軸が回転できるように連結され、前記第一輪軸には前方から後方まで順に第四プーリーと第一副輪と第三プーリーと第二プーリーとが固定的に設けられ、前記第一副輪と前記第一プーリーとの間には第一ベルトが連結され、前記動力空間と前記敷設空間との間には複数の連通口が設けられ、前記敷設空間の中には枕木を敷設する敷設装置が設けられ、前記前進空間の中には鉄道枕木自動敷設装置を移動させる前進装置が設けられ、前記敷設空間の左側が外部と連通している。
A power space is provided on the upper side of the body including the body, a main body is fixedly provided on the lower side of the body, a laying space is provided in the main body, and a space under the main body is provided. A forward space is provided on the side, and a power device capable of providing power is provided in the power space.
The power unit includes a main motor fixedly attached to the left wall of the power space, the main motor is provided so that a motor shaft can be transmitted, and a first umbrella gear is fixedly attached to the motor shaft. It is provided and is connected to the rear side wall of the power space so that the first umbrella gear shaft can rotate, and the second umbrella gear meshing with the first umbrella gear is fixedly connected to the first umbrella gear shaft. A first pulley is provided on the front side of the second bevel gear and is fixedly connected to the first bevel gear shaft, and is connected to the front and rear side walls of the power space so that the first wheel shaft can rotate. A fourth pulley, a first auxiliary wheel, a third pulley, and a second pulley are fixedly provided on the first wheel shaft in this order from the front to the rear, and between the first auxiliary wheel and the first pulley. Is connected with a first belt, a plurality of communication ports are provided between the power space and the laying space, and a laying device for laying pillows is provided in the laying space, and in the forward space. Is provided with a forward device for moving the automatic railroad pillow laying device, and the left side of the laying space communicates with the outside.

前記敷設空間の前後側壁には第二輪軸が回転できるように連結され、前記第二輪軸の後側には第二副輪が固定的に設けられ、前記第二副輪と前記第二プーリーとの間には第二ベルトが連結され、前記敷設空間の後側壁には第三輪軸が回転できるように連結され、前記第三輪軸には第一歯車が固定的に設けられ、前記第一歯車の前側には前記第三輪軸に固定的に連結された第三副輪が設けられ、前記第三副輪と前記第三プーリーとの間には第三ベルトが連結されている。 The front and rear side walls of the laying space are connected so that the second wheel axle can rotate, and the second auxiliary wheel is fixedly provided on the rear side of the second wheel axle, and the second auxiliary wheel and the second pulley A second belt is connected between them, and a third wheel axle is connected to the rear side wall of the laying space so that the third wheel axle can rotate. A first gear is fixedly provided on the third wheel axle, and the first gear A third auxiliary wheel fixedly connected to the third wheel axle is provided on the front side of the vehicle, and a third belt is connected between the third auxiliary wheel and the third pulley.

前記敷設装置は、前記敷設空間の前後側壁に回転できるように取り付けられた第二長軸を含み、前記第二長軸の前側には第四副輪が固定的に設けられ、前記第四副輪と前記第四プーリーとの間には第四ベルトが連結され、前記第二長軸には第五プーリーが固定的に前後対称に設けられ、前記敷設空間の上側壁には固定連結棒が前後対称に固定的に設けられ、各前記固定連結棒の下側には連結板が固定的に設けられ、前記第二副輪の前側には前記第二輪軸に固定的に連結された大回転輪が設けられ、前記大回転輪の中には四つの等間隔に配列された短支持板と長支持板とがスライドできるように連結され、前記短支持板と前記大回転輪との間と、前記長支持板と前記大回転輪との間にはいずれも圧縮ばねが連結され、前記敷設空間の前後側壁には第一長軸が固定的に設けられ、前記第一長軸には第五副輪が回転できるように且つ前後対称に設けられ、前記第五副輪と前記第五プーリーとの間には第五ベルトが連結され、前記敷設空間の下側壁には案内板が前後対称にかつ固定的に設けられ、前記敷設空間の上側壁には支持棒が固定的に設けられ、前記支持棒には置き板が固定的に設けられ、前記敷設空間の前後側壁には第三長軸が回転できるように連結され、前記第三長軸には前記第一歯車と噛み合っている第二歯車が固定的に設けられ、前記第二歯車の前側には前記第三長軸に固定的に連結された上プーリーが設けられ、前記敷設空間の前後側壁には下回転軸が回転できるように連結され、前記下回転軸には下プーリーが固定的に設けられ、前記上プーリーと前記下プーリーとの間には曲がりベルトが連結され、前記敷設空間の前後側壁にはそれぞれ前記曲がりベルトを曲げることのできる曲げブロックが二つ設けられ、前記曲げベルトには複数の固定溝ブロックが固定的に設けられ、前記固定溝ブロックの中には押圧棒がスライドできるように連結され、前記押圧棒と前記固定溝ブロックとの間には押圧ばねが連結され、前記押圧棒には押圧ブロックが固定的に設けられている。 The laying device includes a second major shaft attached to the front and rear side walls of the laying space so as to be rotatable, and a fourth auxiliary wheel is fixedly provided on the front side of the second major shaft, and the fourth secondary is provided. A fourth belt is connected between the ring and the fourth pulley, a fifth pulley is fixedly provided symmetrically in the front-rear direction on the second long axis, and a fixed connecting rod is provided on the upper side wall of the laying space. A large rotary wheel fixedly provided symmetrically in the front-rear direction, a connecting plate fixedly provided under each of the fixed connecting rods, and fixedly connected to the second wheel shaft on the front side of the second auxiliary wheel. Is provided, and four short support plates and long support plates arranged at equal intervals are connected so as to be slidable in the large rotary wheel, and between the short support plate and the large rotary wheel and the length. A compression spring is connected between the support plate and the large rotary wheel, the first major axis is fixedly provided on the front and rear side walls of the laying space, and the fifth auxiliary wheel is provided on the first major axis. It is provided so that it can rotate and symmetrically in the front-rear direction, a fifth belt is connected between the fifth auxiliary wheel and the fifth pulley, and a guide plate is symmetrically and fixedly attached to the lower side wall of the laying space. A support rod is fixedly provided on the upper side wall of the laying space, a placing plate is fixedly provided on the support rod, and a third major axis can rotate on the front and rear side walls of the laying space. A second gear that meshes with the first gear is fixedly provided on the third major shaft, and is fixedly connected to the third major shaft on the front side of the second gear. An upper pulley is provided, and a lower rotating shaft is connected to the front and rear side walls of the laying space so that the lower rotating shaft can rotate, and a lower pulley is fixedly provided on the lower rotating shaft, and between the upper pulley and the lower pulley. A bending belt is connected to the vehicle, two bending blocks capable of bending the bending belt are provided on the front and rear side walls of the laying space, and a plurality of fixing groove blocks are fixedly provided on the bending belt. A pressing rod is connected so as to be slidable in the fixed groove block, a pressing spring is connected between the pressing rod and the fixing groove block, and the pressing block is fixedly provided on the pressing rod. ing.

前記前進装置は、前記メインボディーの中に固定的に取り付けられた副モーターを含み、前記副モーターには副モーター軸が伝動できるように連結され、前記副モーター軸には第三傘歯車が固定的に設けられ、前記前進空間の前後側壁には第二傘歯車軸が回転できるように連結され、前記第二傘歯車軸には前記第三傘歯車と噛合している第四傘歯車が固定的に設けられ、前記第二傘歯車の前後側にはそれぞれ後外輪が固定的に設けられ、前記敷設空間の前後側壁には前輪軸が回転できるように連結され、前記前輪軸の前後側にはそれぞれ前外輪が固定的に設けられている。 The advancing device includes an auxiliary motor fixedly mounted in the main body, is connected to the auxiliary motor so that the auxiliary motor shaft can be transmitted, and a third bevel gear is fixed to the auxiliary motor shaft. The second umbrella gear shaft is connected to the front and rear side walls of the forward space so as to be rotatable, and the fourth umbrella gear that meshes with the third umbrella gear is fixed to the second umbrella gear shaft. The rear outer ring is fixedly provided on the front and rear sides of the second bevel gear, and is connected to the front and rear side walls of the laying space so that the front wheel shaft can rotate, and is connected to the front and rear sides of the front wheel shaft. Each has a fixed front outer ring.

本願発明は自動的に高効率に鉄道の枕木を敷設でき、動力装置は敷設装置に動力を提供し、レール敷設を完成でき、敷設装置は自動的にレールをきちんと道床に敷設でき、前進装置は本願発明全体を自動的に前進させ、枕木を連続的に敷設でき、また、敷設装置と協働して前進速度を調整し、異なる枕木間隔を調整し、レールの敷設要求を満たすことができ、本願発明は少数の作業員を必要とし、敷設速度が速く、枕木敷設作業の全体的な効率が高く、敷設品質も保証できる。 The invention of the present application can automatically lay railroad ties with high efficiency, the power unit can provide power to the laying device and complete the rail laying, the laying device can automatically lay the rail properly on the trackbed, and the forward device The entire invention of the present application can be automatically advanced and sleepers can be laid continuously, and the advance speed can be adjusted in cooperation with the laying device, different sleeper intervals can be adjusted, and rail laying requirements can be satisfied. The invention of the present application requires a small number of workers, the laying speed is high, the overall efficiency of the sleeper laying work is high, and the laying quality can be guaranteed.

下記に図1〜4をあわせて本願発明について詳しく説明し、便利に説明するために、下記の方向を以下のように規定する:図1は本願発明装置の正面図であり、以下に述べる上下左右前後の方向と図1の自身投影関係の上下左右前後の方向とが一致である。 In order to explain the invention of the present application in detail with reference to FIGS. 1 to 4 below and to explain it conveniently, the following directions are defined as follows: FIG. 1 is a front view of the device of the present invention, and is described above and below. The left-right front-back direction and the up-down, left-right front-back direction of the self-projection relationship in FIG.

図1は本願発明の正面構成略図FIG. 1 is a schematic front view of the present invention. 図2は図1のA―A方向の断面図FIG. 2 is a cross-sectional view of FIG. 1 in the AA direction. 図3は図1のB―B方向の断面図FIG. 3 is a cross-sectional view of FIG. 1 in the BB direction. 図4は図1のCの部分拡大図FIG. 4 is a partially enlarged view of C in FIG.

本願発明である鉄道枕木自動敷設装置は、ボディー10を含み、前記ボディー10の上側には動力空間70が設けられ、前記ボディー10の下側にはメインボディー25が固定的に設けられ、前記メインボディー25の中には敷設空間71が設けられ、前記メインボディー25の下側には前進空間72が設けられ、前記動力空間70の中には動力を提供できる動力装置73が設けられ、前記動力装置73は前記動力空間70の左側壁に固定的に取り付けられた主モーター11を含み、前記主モーター11にはモーター軸12が伝動できるように設けられ、前記モーター軸12には第一傘歯車13が固定的に設けられ、前記動力空間70の後側壁には第一傘歯車軸14が回転できるように連結され、前記第一傘歯車軸14には前記第一傘歯車13と噛合している第二傘歯車15が固定的に設けられ、前記第二傘歯車15の前側には前記第一傘歯車軸14に固定的に連結された第一プーリー16が設けられ、前記動力空間70の前後側壁には第一輪軸18が回転できるように連結され、前記第一輪軸18には前方から後方まで順に第四プーリー22と第一副輪19と第三プーリー21と第二プーリー20とが固定的に設けられ、前記第一副輪19と前記第一プーリー16との間には第一ベルト17が連結され、前記動力空間70と前記敷設空間71との間には複数の連通口が設けられ、前記敷設空間71の中には枕木を敷設する敷設装置74が設けられ、前記前進空間72の中には鉄道枕木自動敷設装置を移動させる前進装置75が設けられ、前記敷設空間71の左側が外部と連通している。 The railway pillow automatic laying device according to the present invention includes a body 10, a power space 70 is provided above the body 10, and a main body 25 is fixedly provided below the body 10. A laying space 71 is provided in the body 25, a forward space 72 is provided under the main body 25, and a power device 73 capable of providing power is provided in the power space 70. The device 73 includes a main motor 11 fixedly attached to the left wall of the power space 70, the main motor 11 is provided so that a motor shaft 12 can be transmitted, and the motor shaft 12 is provided with a first bevel gear. 13 is fixedly provided, and the first bevel gear shaft 14 is connected to the rear side wall of the power space 70 so as to be rotatable, and the first bevel gear shaft 14 is meshed with the first bead gear 13. The second cap gear 15 is fixedly provided, and the first pulley 16 fixedly connected to the first cap gear shaft 14 is provided on the front side of the second cap gear 15 to provide the power space 70. The first wheel shaft 18 is connected to the front and rear side walls so that the first wheel shaft 18 can rotate, and the fourth pulley 22, the first auxiliary wheel 19, the third pulley 21, and the second pulley 20 are connected to the first wheel shaft 18 in order from the front to the rear. It is fixedly provided, a first belt 17 is connected between the first auxiliary wheel 19 and the first pulley 16, and a plurality of communication ports are provided between the power space 70 and the laying space 71. A laying device 74 for laying a pillow tree is provided in the laying space 71, and a forward device 75 for moving a railway pillow automatic laying device is provided in the forward space 72, and the laying space 71 is provided. The left side communicates with the outside.

前記敷設空間71の前後側壁には第二輪軸30が回転できるように連結され、前記第二輪軸30の後側には第二副輪37が固定的に設けられ、前記第二副輪37と前記第二プーリー20との間には第二ベルト52が連結され、前記敷設空間71の後側壁には第三輪軸31が回転できるように連結され、前記第三輪軸31には第一歯車34が固定的に設けられ、前記第一歯車34の前側には前記第三輪軸31に固定的に連結された第三副輪36が設けられ、前記第三副輪36と前記第三プーリー21との間には第三ベルト23が連結され、
前記主モーター11を起動し、前記モーター軸12が回転し前記第一傘歯車13を回転させ、これによって前記第二傘歯車15と前記第一プーリー16が回転し、前記第一副輪19が前記第一ベルト17に駆動されて回転し、前記第四プーリー22と前記第三プーリー21と前記第二プーリー20とが回転する。
The second wheel axle 30 is connected to the front and rear side walls of the laying space 71 so as to be rotatable, and the second auxiliary wheel 37 is fixedly provided on the rear side of the second wheel axle 30 with the second auxiliary wheel 37. A second belt 52 is connected to the second pulley 20 and is connected to the rear side wall of the laying space 71 so that the third wheel axle 31 can rotate, and the first gear 34 is connected to the third wheel axle 31. Is fixedly provided, and a third auxiliary wheel 36 fixedly connected to the third wheel axle 31 is provided on the front side of the first gear 34, and the third auxiliary wheel 36 and the third pulley 21 are provided. A third belt 23 is connected between them,
The main motor 11 is started, the motor shaft 12 rotates, and the first bevel gear 13 is rotated, whereby the second bead gear 15 and the first pulley 16 are rotated, and the first auxiliary wheel 19 is rotated. It is driven by the first belt 17 and rotates, and the fourth pulley 22, the third pulley 21, and the second pulley 20 rotate.

前記敷設装置74は、前記敷設空間71の前後側壁に回転できるように取り付けられた第二長軸28を含み、前記第二長軸28の前側には第四副輪51が固定的に設けられ、前記第四副輪51と前記第四プーリー22との間には第四ベルト24が連結され、前記第二長軸28には第五プーリー54が固定的に前後対称に設けられ、前記敷設空間71の上側壁には固定連結棒64が前後対称に固定的に設けられ、各前記固定連結棒53の下側には連結板38が固定的に設けられ、前記第二副輪37の前側には前記第二輪軸30に固定的に連結された大回転輪39が設けられ、前記大回転輪39の中には四つの等間隔に配列された短支持板46と長支持板47とがスライドできるように連結され、前記短支持板46と前記大回転輪39との間と、前記長支持板47と前記大回転輪39との間にはいずれも圧縮ばね45が連結され、前記敷設空間71の前後側壁には第一長軸26が固定的に設けられ、前記第一長軸26には第五副輪55が回転できるように且つ前後対称に設けられ、前記第五副輪55と前記第五プーリー54との間には第五ベルト29が連結され、前記敷設空間71の下側壁には案内板27が前後対称にかつ固定的に設けられ、前記敷設空間71の上側壁には支持棒35が固定的に設けられ、前記支持棒35には置き板63が固定的に設けられ、前記敷設空間71の前後側壁には第三長軸32が回転できるように連結され、前記第三長軸32には前記第一歯車34と噛み合っている第二歯車33が固定的に設けられ、前記第二歯車33の前側には前記第三長軸32に固定的に連結された上プーリー50が設けられ、前記敷設空間71の前後側壁には下回転軸48が回転できるように連結され、前記下回転軸48には下プーリー49が固定的に設けられ、前記上プーリー50と前記下プーリー49との間には曲がりベルト40が連結され、前記敷設空間71の前後側壁にはそれぞれ前記曲がりベルト40を曲げることのできる曲げブロック62が二つ設けられ、前記曲げベルト40には複数の固定溝ブロック44が固定的に設けられ、前記固定溝ブロック44の中には押圧棒42がスライドできるように連結され、前記押圧棒42と前記固定溝ブロック44との間には押圧ばね43が連結され、前記押圧棒42には押圧ブロック41が固定的に設けられ、
枕木を前記置き板63から入れ、枕木が前記第五ベルト29までスライドし、前記第四ベルト24が前記第五プーリー54を回転させて枕木を前記連結板38に送ると同時に、前記第二ベルト52が前記第二副輪37と前記大回転輪39を回転させ、前記長支持板47が回転し枕木を引っ張り、枕木が前記短支持板46と前記長支持板47の間に前記圧縮ばね45を圧縮すると同時に、前記第三ベルト23が前記第三副輪36を回転させて前記上プーリー50を逆方向へ回転させ、前記曲がりベルト40が前記曲げブロック62の中で移動し前記押圧棒42と前記押圧ブロック41を移動させ、前記押圧ブロック41が前記短支持板46と前記長支持板47と向き合い、前記押圧ブロック41が前記短支持板46あるいは前記長支持板47と同期に回転し、枕木が回転するとき、前記押圧ブロック41が枕木を押圧し前記短支持板46と前記長支持板47との間に固定し、前記短支持板46と前記長支持板47が前記大回転輪39の下側に回転したとき、枕木が地面に落ち、枕木敷設作業が完了する。
The laying device 74 includes a second major shaft 28 attached to the front and rear side walls of the laying space 71 so as to be rotatable, and a fourth auxiliary wheel 51 is fixedly provided on the front side of the second major shaft 28. A fourth belt 24 is connected between the fourth auxiliary wheel 51 and the fourth pulley 22, and a fifth pulley 54 is fixedly provided on the second major shaft 28 in a front-rear symmetrical manner. A fixed connecting rod 64 is fixedly provided on the upper side wall of the space 71 symmetrically in the front-rear direction, and a connecting plate 38 is fixedly provided on the lower side of each of the fixed connecting rods 53, and the front side of the second auxiliary wheel 37 is provided. Is provided with a large rotary wheel 39 fixedly connected to the second wheel shaft 30, and four short support plates 46 and a long support plate 47 arranged at equal intervals can slide in the large rotary wheel 39. A compression spring 45 is connected between the short support plate 46 and the large rotary wheel 39, and between the long support plate 47 and the large rotary wheel 39, and the front and rear of the laying space 71 are connected. The first major shaft 26 is fixedly provided on the side wall, and the fifth auxiliary wheel 55 is provided on the first major shaft 26 so as to be rotatable and symmetrically in the front-rear direction, and the fifth auxiliary wheel 55 and the fifth auxiliary wheel 55 are provided. A fifth belt 29 is connected to the pulley 54, a guide plate 27 is provided symmetrically and fixedly on the lower side wall of the laying space 71, and a support rod 35 is provided on the upper side wall of the laying space 71. Is fixedly provided, a placing plate 63 is fixedly provided on the support rod 35, and the third major shaft 32 is connected to the front and rear side walls of the laying space 71 so as to be rotatable. A second gear 33 that meshes with the first gear 34 is fixedly provided on the 32, and an upper pulley 50 that is fixedly connected to the third major shaft 32 is provided on the front side of the second gear 33. The lower rotating shaft 48 is connected to the front and rear side walls of the laying space 71 so as to be rotatable, and the lower pulley 49 is fixedly provided on the lower rotating shaft 48, and the upper pulley 50 and the lower pulley 49 A bending belt 40 is connected between them, and two bending blocks 62 capable of bending the bending belt 40 are provided on the front and rear side walls of the laying space 71, respectively, and the bending belt 40 is provided with a plurality of fixing groove blocks. 44 is fixedly provided, a pressing rod 42 is connected so as to be slidable in the fixed groove block 44, and a pressing spring 43 is connected between the pressing rod 42 and the fixed groove block 44. A pressing block 41 is fixedly provided on the pressing rod 42.
The sleepers are inserted from the placing plate 63, the sleepers slide to the fifth belt 29, and the fourth belt 24 rotates the fifth pulley 54 to send the sleepers to the connecting plate 38, and at the same time, the second belt. 52 rotates the second auxiliary wheel 37 and the large rotary wheel 39, the long support plate 47 rotates and pulls the sleepers, and the sleepers put the compression spring 45 between the short support plate 46 and the long support plate 47. At the same time as the compression, the third belt 23 rotates the third auxiliary wheel 36 to rotate the upper pulley 50 in the opposite direction, and the bending belt 40 moves in the bending block 62 to move with the pressing rod 42. The pressing block 41 is moved, the pressing block 41 faces the short support plate 46 and the long support plate 47, and the pressing block 41 rotates synchronously with the short support plate 46 or the long support plate 47, and sleepers. The pressing block 41 presses the sleepers and fixes them between the short support plate 46 and the long support plate 47, and the short support plate 46 and the long support plate 47 are under the large rotating wheel 39. When rotated to the side, the sleepers fall to the ground and the sleeper laying work is completed.

前記前進装置75は、前記メインボディー25の中に固定的に取り付けられた副モーター56を含み、前記副モーター56には副モーター軸57が伝動できるように連結され、前記副モーター軸57には第三傘歯車58が固定的に設けられ、前記前進空間72の前後側壁には第二傘歯車軸60が回転できるように連結され、前記第二傘歯車軸60には前記第三傘歯車58と噛合している第四傘歯車59が固定的に設けられ、前記第二傘歯車60の前後側にはそれぞれ後外輪61が固定的に設けられ、前記敷設空間71の前後側壁には前輪軸64が回転できるように連結され、前記前輪軸64の前後側にはそれぞれ前外輪65が固定的に設けられ、
枕木を敷設すると同時に、前記副モーター56を起動し、前記副モーター軸57が回転し前記第三傘歯車58を回転させて前記第四傘歯車59を回転させ、これによって前記後外輪61が回転し前記鉄道枕木自動敷設装置を前進させ、前記副モーター56の回転速度は枕木敷設に合わせて調節できるため、敷設時の枕木間隔をコントロールできる。
The advancing device 75 includes an auxiliary motor 56 fixedly mounted in the main body 25, is connected to the auxiliary motor 56 so that the auxiliary motor shaft 57 can be transmitted, and is connected to the auxiliary motor shaft 57. The third bevel gear 58 is fixedly provided, and the second bevel gear shaft 60 is connected to the front and rear side walls of the forward space 72 so as to be rotatable, and the third bead gear 58 is connected to the second bevel gear shaft 60. The fourth bevel gear 59 is fixedly provided, the rear outer ring 61 is fixedly provided on the front and rear sides of the second bead gear 60, and the front wheel shaft is fixedly provided on the front and rear side walls of the laying space 71. The 64s are connected so as to be rotatable, and front outer rings 65 are fixedly provided on the front and rear sides of the front wheel shaft 64, respectively.
At the same time as laying the sleepers, the sub motor 56 is started, the sub motor shaft 57 is rotated, the third umbrella gear 58 is rotated, and the fourth umbrella gear 59 is rotated, whereby the rear outer ring 61 is rotated. Since the railway sleeper automatic laying device is advanced and the rotation speed of the sub motor 56 can be adjusted according to the sleeper laying, the sleeper interval at the time of laying can be controlled.

初期状態に、前記主モーター11と前記副モーター56が作動していなく、本願発明全体が静止状態にある。 In the initial state, the main motor 11 and the sub motor 56 are not operating, and the entire invention of the present application is in a stationary state.

枕木を敷設するとき、主モーター11を起動し、モーター軸12が回転し第一傘歯車13を回転させ、これによって第二傘歯車15と第一プーリー16が回転し、第一副輪19が第一ベルト17に駆動されて回転し、第四プーリー22と第三プーリー21と第二プーリー20とが回転し、枕木を置き板63から入れ、枕木が第五ベルト29までスライドし、第四ベルト24が第五プーリー54を回転させて枕木を連結板38に送ると同時に、第二ベルト52が第二副輪37と大回転輪39を回転させ、長支持板47が回転し枕木を引っ張り、枕木が短支持板46と長支持板47の間に圧縮ばね45を圧縮すると同時に、第三ベルト23が第三副輪36を回転させて上プーリー50を逆方向へ回転させ、曲がりベルト40が曲げブロック62の中で移動し押圧棒42と押圧ブロック41を移動させ、押圧ブロック41が短支持板46と長支持板47と向き合い、押圧ブロック41が短支持板46あるいは長支持板47と同期に回転し、枕木が回転するとき、押圧ブロック41が枕木を押圧し短支持板46と長支持板47との間に固定し、短支持板46と長支持板47が大回転輪39の下側に回転したとき、枕木が地面に落ち、枕木敷設作業が完了し、枕木を敷設すると同時に、副モーター56を起動し、副モーター軸57が回転し第三傘歯車58を回転させて第四傘歯車59を回転させ、これによって後外輪61が回転し前記鉄道枕木自動敷設装置を前進させ、副モーター56の回転速度は枕木敷設に合わせて調節できるため、敷設時の枕木間隔をコントロールできる。 When laying sleepers, the main motor 11 is started, the motor shaft 12 is rotated to rotate the first umbrella gear 13, whereby the second umbrella gear 15 and the first pulley 16 are rotated, and the first auxiliary wheel 19 is moved. Driven by the first belt 17 to rotate, the fourth pulley 22, the third pulley 21 and the second pulley 20 rotate, the sleepers are put in from the placing plate 63, the sleepers slide to the fifth belt 29, and the fourth At the same time that the belt 24 rotates the fifth pulley 54 to send the sleepers to the connecting plate 38, the second belt 52 rotates the second auxiliary wheel 37 and the large rotating wheel 39, and the long support plate 47 rotates to pull the sleepers. The sleepers compress the compression spring 45 between the short support plate 46 and the long support plate 47, and at the same time, the third belt 23 rotates the third auxiliary wheel 36 to rotate the upper pulley 50 in the opposite direction, and the bending belt 40 The pressing rod 42 and the pressing block 41 are moved in the bending block 62, the pressing block 41 faces the short support plate 46 and the long support plate 47, and the pressing block 41 is synchronized with the short support plate 46 or the long support plate 47. When the sleepers rotate, the pressing block 41 presses the sleepers and fixes them between the short support plate 46 and the long support plate 47, and the short support plate 46 and the long support plate 47 are on the lower side of the large rotating wheel 39. When it was rotated to, the sleepers fell to the ground, the sleeper laying work was completed, and at the same time as the sleepers were laid, the sub motor 56 was started, the sub motor shaft 57 was rotated, and the third umbrella gear 58 was rotated to rotate the fourth umbrella. Since the gear 59 is rotated, the rear outer ring 61 is rotated to advance the railway sleeper automatic laying device, and the rotation speed of the sub motor 56 can be adjusted according to the sleeper laying, the sleeper interval at the time of laying can be controlled.

本分野の技術者が明確できるのは、本発明の総体精神や発想から離脱しない場合で、以上の実施例に各種な変形ができ、それらの変形がすべて本発明の保護範囲にある。本発明の保護方案は本発明の権利要求書を標準とすべきである。


Engineers in this field can clarify that they do not depart from the general spirit and ideas of the present invention, and various modifications can be made to the above examples, all of which are within the scope of protection of the present invention. The protection plan of the present invention should be standardized on the claim of the present invention.


Claims (1)

ボディーを含み、前記ボディーの上側には動力空間が設けられ、前記ボディーの下側にはメインボディーが固定的に設けられ、前記メインボディーの中には敷設空間が設けられ、前記メインボディーの下側には前進空間が設けられ、前記動力空間の中には動力を提供できる動力装置が設けられ、
前記動力装置は前記動力空間の左側壁に固定的に取り付けられた主モーターを含み、前記主モーターにはモーター軸が伝動できるように設けられ、前記モーター軸には第一傘歯車が固定的に設けられ、前記動力空間の後側壁には第一傘歯車軸が回転できるように連結され、前記第一傘歯車軸には前記第一傘歯車と噛合している第二傘歯車が固定的に設けられ、前記第二傘歯車の前側には前記第一傘歯車軸に固定的に連結された第一プーリーが設けられ、前記動力空間の前後側壁には第一輪軸が回転できるように連結され、前記第一輪軸には前方から後方まで順に第四プーリーと第一副輪と第三プーリーと第二プーリーとが固定的に設けられ、前記第一副輪と前記第一プーリーとの間には第一ベルトが連結され、前記動力空間と前記敷設空間との間には複数の連通口が設けられ、前記敷設空間の中には枕木を敷設する敷設装置が設けられ、前記前進空間の中には鉄道枕木自動敷設装置を移動させる前進装置が設けられ、前記敷設空間の左側が外部と連通しており、
前記敷設空間の前後側壁には第二輪軸が回転できるように連結され、前記第二輪軸の後側には第二副輪が固定的に設けられ、前記第二副輪と前記第二プーリーとの間には第二ベルトが連結され、前記敷設空間の後側壁には第三輪軸が回転できるように連結され、前記第三輪軸には第一歯車が固定的に設けられ、前記第一歯車の前側には前記第三輪軸に固定的に連結された第三副輪が設けられ、前記第三副輪と前記第三プーリーとの間には第三ベルトが連結され、
前記敷設装置は、前記敷設空間の前後側壁に回転できるように取り付けられた第二長軸を含み、前記第二長軸の前側には第四副輪が固定的に設けられ、前記第四副輪と前記第四プーリーとの間には第四ベルトが連結され、前記第二長軸には第五プーリーが固定的に前後対称に設けられ、前記敷設空間の上側壁には固定連結棒が前後対称に固定的に設けられ、各前記固定連結棒の下側には連結板が固定的に設けられ、前記第二副輪の前側には前記第二輪軸に固定的に連結された大回転輪が設けられ、前記大回転輪の中には四つの等間隔に配列された短支持板と長支持板とがスライドできるように連結され、前記短支持板と前記大回転輪との間と、前記長支持板と前記大回転輪との間にはいずれも圧縮ばねが連結され、前記敷設空間の前後側壁には第一長軸が固定的に設けられ、前記第一長軸には第五副輪が回転できるように且つ前後対称に設けられ、前記第五副輪と前記第五プーリーとの間には第五ベルトが連結され、前記敷設空間の下側壁には案内板が前後対称にかつ固定的に設けられ、前記敷設空間の上側壁には支持棒が固定的に設けられ、前記支持棒には置き板が固定的に設けられ、前記敷設空間の前後側壁には第三長軸が回転できるように連結され、前記第三長軸には前記第一歯車と噛み合っている第二歯車が固定的に設けられ、前記第二歯車の前側には前記第三長軸に固定的に連結された上プーリーが設けられ、前記敷設空間の前後側壁には下回転軸が回転できるように連結され、前記下回転軸には下プーリーが固定的に設けられ、前記上プーリーと前記下プーリーとの間には曲がりベルトが連結され、前記敷設空間の前後側壁にはそれぞれ前記曲がりベルトを曲げることのできる曲げブロックが二つ設けられ、前記曲げベルトには複数の固定溝ブロックが固定的に設けられ、前記固定溝ブロックの中には押圧棒がスライドできるように連結され、前記押圧棒と前記固定溝ブロックとの間には押圧ばねが連結され、前記押圧棒には押圧ブロックが固定的に設けられ、
前記前進装置は、前記メインボディーの中に固定的に取り付けられた副モーターを含み、前記副モーターには副モーター軸が伝動できるように連結され、前記副モーター軸には第三傘歯車が固定的に設けられ、前記前進空間の前後側壁には第二傘歯車軸が回転できるように連結され、前記第二傘歯車軸には前記第三傘歯車と噛合している第四傘歯車が固定的に設けられ、前記第二傘歯車の前後側にはそれぞれ後外輪が固定的に設けられ、前記敷設空間の前後側壁には前輪軸が回転できるように連結され、前記前輪軸の前後側にはそれぞれ前外輪が固定的に設けられ、
枕木を敷設するとき、前記主モーターを起動し、前記モーター軸が回転し前記第一傘歯車を回転させ、これによって前記第二傘歯車と前記第一プーリーが回転し、前記第一副輪が前記第一ベルトに駆動されて回転し、前記第四プーリーと前記第三プーリーと前記第二プーリーとが回転し、枕木を前記置き板から入れ、枕木が前記第五ベルトまでスライドし、前記第四ベルトが前記第五プーリーを回転させて枕木を前記連結板に送ると同時に、前記第二ベルトが前記第二副輪と前記大回転輪を回転させ、前記長支持板が回転し枕木を引っ張り、枕木が前記短支持板と前記長支持板の間に前記圧縮ばねを圧縮すると同時に、前記第三ベルトが前記第三副輪を回転させて前記上プーリーを逆方向へ回転させ、前記曲がりベルトが前記曲げブロックの中で移動し前記押圧棒と前記押圧ブロックを移動させ、前記押圧ブロックが前記短支持板と前記長支持板と向き合い、前記押圧ブロックが前記短支持板あるいは前記長支持板と同期に回転し、枕木が回転するとき、前記押圧ブロックが枕木を押圧し前記短支持板と前記長支持板との間に固定し、前記短支持板と前記長支持板が前記大回転輪の下側に回転したとき、枕木が地面に落ち、枕木敷設作業が完了し、枕木を敷設すると同時に、前記副モーターを起動し、前記副モーター軸が回転し前記第三傘歯車を回転させて前記第四傘歯車を回転させ、これによって前記後外輪が回転し前記鉄道枕木自動敷設装置を前進させ、前記副モーターの回転速度は枕木敷設に合わせて調節できるため、敷設時の枕木間隔をコントロールできることを特徴とする鉄道枕木自動敷設装置。
A power space is provided on the upper side of the body including the body, a main body is fixedly provided on the lower side of the body, a laying space is provided in the main body, and a space under the main body is provided. A forward space is provided on the side, and a power device capable of providing power is provided in the power space.
The power unit includes a main motor fixedly attached to the left wall of the power space, the main motor is provided so that a motor shaft can be transmitted, and a first umbrella gear is fixedly attached to the motor shaft. It is provided and is connected to the rear side wall of the power space so that the first umbrella gear shaft can rotate, and the second umbrella gear meshing with the first umbrella gear is fixedly connected to the first umbrella gear shaft. A first pulley is provided on the front side of the second bevel gear and is fixedly connected to the first bevel gear shaft, and is connected to the front and rear side walls of the power space so that the first wheel shaft can rotate. A fourth pulley, a first auxiliary wheel, a third pulley, and a second pulley are fixedly provided on the first wheel shaft in this order from the front to the rear, and between the first auxiliary wheel and the first pulley. Is connected with a first belt, a plurality of communication ports are provided between the power space and the laying space, and a laying device for laying pillows is provided in the laying space, and in the forward space. Is equipped with a forward device that moves the automatic railroad pillow laying device, and the left side of the laying space communicates with the outside .
The front and rear side walls of the laying space are connected so that the second wheel axle can rotate, and the second auxiliary wheel is fixedly provided on the rear side of the second wheel axle, and the second auxiliary wheel and the second pulley A second belt is connected between them, and a third wheel axle is connected to the rear side wall of the laying space so that the third wheel axle can rotate. The first gear is fixedly provided on the third wheel axle, and the first gear is provided. A third auxiliary wheel fixedly connected to the third wheel axle is provided on the front side of the vehicle, and a third belt is connected between the third auxiliary wheel and the third pulley .
The laying device includes a second major shaft attached to the front and rear side walls of the laying space so as to be rotatable, and a fourth auxiliary wheel is fixedly provided on the front side of the second major shaft, and the fourth secondary is provided. A fourth belt is connected between the ring and the fourth pulley, a fifth pulley is fixedly provided symmetrically in the front-rear direction on the second long axis, and a fixed connecting rod is provided on the upper side wall of the laying space. A large rotary wheel fixedly provided symmetrically in the front-rear direction, a connecting plate fixedly provided under each of the fixed connecting rods, and fixedly connected to the second wheel shaft on the front side of the second auxiliary wheel. Is provided, and four short support plates and long support plates arranged at equal intervals are connected so as to be slidable in the large rotary wheel, and between the short support plate and the large rotary wheel and the length. A compression spring is connected between the support plate and the large rotary wheel, the first major axis is fixedly provided on the front and rear side walls of the laying space, and the fifth auxiliary wheel is provided on the first major axis. It is provided so that it can rotate and symmetrically in the front-rear direction, a fifth belt is connected between the fifth auxiliary wheel and the fifth pulley, and a guide plate is symmetrically and fixedly attached to the lower side wall of the laying space. A support rod is fixedly provided on the upper side wall of the laying space, a placing plate is fixedly provided on the support rod, and a third major axis can rotate on the front and rear side walls of the laying space. A second gear that meshes with the first gear is fixedly provided on the third major shaft, and is fixedly connected to the third major shaft on the front side of the second gear. An upper pulley is provided, and a lower rotating shaft is connected to the front and rear side walls of the laying space so that the lower rotating shaft can rotate, and a lower pulley is fixedly provided on the lower rotating shaft, and between the upper pulley and the lower pulley. A bending belt is connected to the vehicle, two bending blocks capable of bending the bending belt are provided on the front and rear side walls of the laying space, and a plurality of fixing groove blocks are fixedly provided on the bending belt. A pressing rod is connected so as to be slidable in the fixed groove block, a pressing spring is connected between the pressing rod and the fixing groove block, and the pressing block is fixedly provided on the pressing rod. ,
The advancing device includes an auxiliary motor fixedly mounted in the main body, is connected to the auxiliary motor so that the auxiliary motor shaft can be transmitted, and a third bevel gear is fixed to the auxiliary motor shaft. The second umbrella gear shaft is connected to the front and rear side walls of the forward space so as to be rotatable, and the fourth umbrella gear that meshes with the third umbrella gear is fixed to the second umbrella gear shaft. The rear outer ring is fixedly provided on the front and rear sides of the second bevel gear, and is connected to the front and rear side walls of the laying space so that the front wheel shaft can rotate, and is connected to the front and rear sides of the front wheel shaft. The front outer ring is fixedly provided for each
When laying sleepers, the main motor is activated, the motor shaft rotates to rotate the first umbrella gear, whereby the second umbrella gear and the first pulley rotate, and the first auxiliary wheel Driven by the first belt to rotate, the fourth pulley, the third pulley and the second pulley rotate, the sleepers are inserted from the placing plate, the sleepers slide to the fifth belt, and the first At the same time that the four belts rotate the fifth pulley to send the sleepers to the connecting plate, the second belt rotates the second auxiliary wheel and the large rotating wheel, and the long support plate rotates to pull the sleepers. At the same time that the sleepers compress the compression spring between the short support plate and the long support plate, the third belt rotates the third auxiliary wheel to rotate the upper pulley in the opposite direction, and the bending belt bends the bending. The pressing rod and the pressing block are moved in the block, the pressing block faces the short support plate and the long support plate, and the pressing block rotates in synchronization with the short support plate or the long support plate. Then, when the sleepers rotate, the pressing block presses the sleepers and fixes them between the short support plate and the long support plate, and the short support plate and the long support plate rotate under the large rotating wheel. At that time, the sleepers fell to the ground, the sleeper laying work was completed, and at the same time as the sleepers were laid, the sub motor was started, the sub motor shaft was rotated, and the third umbrella gear was rotated to rotate the fourth umbrella gear. The rear outer ring rotates to advance the railway sleeper automatic laying device, and the rotation speed of the sub motor can be adjusted according to the sleeper laying, so that the sleeper interval at the time of laying can be controlled. Railroad tie automatic laying device.
JP2020037786A 2019-12-02 2020-03-05 Railway sleeper automatic laying device Active JP6789483B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201911216495.0A CN110804909B (en) 2019-12-02 2019-12-02 Automatic laying device for railway sleeper
CN201911216495.0 2019-12-02

Publications (2)

Publication Number Publication Date
JP6789483B1 true JP6789483B1 (en) 2020-11-25
JP2021088914A JP2021088914A (en) 2021-06-10

Family

ID=69492302

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020037786A Active JP6789483B1 (en) 2019-12-02 2020-03-05 Railway sleeper automatic laying device

Country Status (2)

Country Link
JP (1) JP6789483B1 (en)
CN (1) CN110804909B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117867905A (en) * 2024-03-13 2024-04-12 中铁十九局集团第六工程有限公司 Rail laying machine for tunnel railway construction

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608036B (en) * 2020-06-05 2020-12-18 闽清紫扬信息技术有限公司 Equipment for automatically replacing railway sleeper

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT359539B (en) * 1978-06-14 1980-11-10 Plasser Bahnbaumasch Franz MOBILE THRESHOLD INSTALLATION DEVICE
CN202369874U (en) * 2011-12-19 2012-08-08 株洲旭阳机电科技开发有限公司 Vertical rail bearing distribution device of track laying machine
CN207684404U (en) * 2017-12-19 2018-08-03 天津微视博特科技有限公司 A kind of bottle handling device on production line
CN108824287A (en) * 2018-06-30 2018-11-16 广东知识城运营服务有限公司 A kind of refuse cleaner
CN109281237B (en) * 2018-10-09 2020-05-29 胡佳威 Automatic sleeper laying robot for railway emergency rescue and disaster relief
CN209128822U (en) * 2018-10-31 2019-07-19 辽宁铁道职业技术学院 Concrete sleeper laying vehicle
CN109914207B (en) * 2019-04-19 2021-06-15 重庆市安山建筑工程有限公司 Pavement paving machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117867905A (en) * 2024-03-13 2024-04-12 中铁十九局集团第六工程有限公司 Rail laying machine for tunnel railway construction

Also Published As

Publication number Publication date
JP2021088914A (en) 2021-06-10
CN110804909A (en) 2020-02-18
CN110804909B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
JP6789483B1 (en) Railway sleeper automatic laying device
CN103966770A (en) Automatic free-ironing pocket patching machine
CN206781383U (en) Multifunctional numerical control cuts engraving machine
GB1204134A (en) Railway-track ballast tamping and lateral aligning machine
JPS5418644B2 (en)
CN202878505U (en) Full-automatic veneering plasterboard cutting machine
CN104458137B (en) A kind of indexing type valve seal pilot system
CN201950381U (en) Section bar cutting production line
CN207027116U (en) Milling cutter grinder
CN103707407B (en) A kind of have the light-duty steel reinforced concrete prefabricated panel of shaping light filling thing to build forming machine
CN207027117U (en) The automatic blanking device of milling cutter grinder
CN107204559A (en) A kind of USB connector joint kludge
CN202519446U (en) Electronic numerical control sewing machine for pattern plates
GB1265575A (en)
CN209647290U (en) A kind of production of lithium-ion-power cell is with packing aluminium sheet apparatus for bending
CN206811711U (en) Wire rod blanking device
CN203917551U (en) A kind of open type plate spinning machine
CN208880840U (en) A kind of cutting machine suitable for a variety of nonmetallic materials
CN107444863B (en) Quick positioning system and method
CN206154142U (en) Fibre piece gets superhard grinding wheel production line of putting device and using device
CN105563867A (en) Improved beverage can compressing equipment
CN206029406U (en) Many head gear of machinery moving type chamfer device
CN202333065U (en) Automatic carbon bag putting equipment
CN206334983U (en) A kind of mould automatic positioning mechanism of die-sinking machine
CN205999728U (en) A kind of Construction at ports track laying car

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200603

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20200603

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20200623

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200625

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200728

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200827

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20200907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200907

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20200909

R150 Certificate of patent or registration of utility model

Ref document number: 6789483

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150