JP6761558B1 - Boiler tube group adhering ash removal system - Google Patents

Boiler tube group adhering ash removal system Download PDF

Info

Publication number
JP6761558B1
JP6761558B1 JP2020096658A JP2020096658A JP6761558B1 JP 6761558 B1 JP6761558 B1 JP 6761558B1 JP 2020096658 A JP2020096658 A JP 2020096658A JP 2020096658 A JP2020096658 A JP 2020096658A JP 6761558 B1 JP6761558 B1 JP 6761558B1
Authority
JP
Japan
Prior art keywords
soot blower
tube group
control device
ash
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020096658A
Other languages
Japanese (ja)
Other versions
JP2021188859A (en
Inventor
泰治 内田
泰治 内田
健太 森
健太 森
一晃 加倉田
一晃 加倉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Original Assignee
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd filed Critical Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Priority to JP2020096658A priority Critical patent/JP6761558B1/en
Application granted granted Critical
Publication of JP6761558B1 publication Critical patent/JP6761558B1/en
Priority to TW110117219A priority patent/TWI774366B/en
Priority to PCT/JP2021/018936 priority patent/WO2021246173A1/en
Priority to KR1020227043281A priority patent/KR20230009953A/en
Priority to CN202180039468.XA priority patent/CN115803563A/en
Publication of JP2021188859A publication Critical patent/JP2021188859A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/02Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
    • F22B1/18Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines
    • F22B1/1861Waste heat boilers with supplementary firing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/007Control systems for waste heat boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/56Boiler cleaning control devices, e.g. for ascertaining proper duration of boiler blow-down
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J3/00Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Incineration Of Waste (AREA)
  • Cleaning In General (AREA)

Abstract

【課題】経済性を担保しつつ早期かつ適切に管群の付着灰を除去するボイラ管群付着灰除去システムを提供する。【解決手段】ボイラ管群付着灰除去システムは、複数の管群の間に配置されたスートブロワと、管群の下流で排ガスを誘引する誘引送風機と、スートブロアを制御し、ボイラの熱貫流率を演算する制御装置とを有する。制御装置は、熱貫流率Kが所定値以上の場合に所定のインターバルを置いてスートブロワを1回起動させ、熱貫流率が所定値未満の場合に付着灰判定処理を実行し、その結果に応じてスートブロワを連続起動させる。付着灰判定処理は、管群の主蒸気量、排ガスの圧力差、誘引送風機の回転数、炉に供給される燃焼空気総量の4つの条件のうちの少なくとも1つの条件を含んで実行される。【選択図】図1PROBLEM TO BE SOLVED: To provide a boiler tube group adhering ash removing system for quickly and appropriately removing adhering ash of a tube group while ensuring economic efficiency. SOLUTION: A boiler tube group adhering ash removal system controls a soot blower arranged between a plurality of tube groups, an attracting blower that attracts exhaust gas downstream of the tube group, and a soot blower to control the heat transmission coefficient of the boiler. It has a control device for calculating. The control device activates the soot blower once at a predetermined interval when the heat transmission coefficient K is equal to or higher than the predetermined value, executes the adhesion ash determination process when the heat transmission coefficient is less than the predetermined value, and responds to the result. And start the soot blower continuously. The adhering ash determination process is executed including at least one of four conditions: the main steam amount of the pipe group, the pressure difference of the exhaust gas, the rotation speed of the attracting blower, and the total amount of combustion air supplied to the furnace. [Selection diagram] Fig. 1

Description

本発明は、ボイラ管群付着灰除去システムに関する。 The present invention relates to a boiler tube group adhering ash removal system.

石炭炊きボイラを備えた火力発電所、または、発電を行うために廃熱ボイラを備えたごみ焼却炉やガス化溶融炉などのプラントにおいては、石炭やごみの燃焼により発生した排ガスに含まれる焼却灰が管群(ボイラのスクリーン管、過熱管、蒸発管、エコノマイザの水管等で構成される管群)に付着して堆積しやすい。焼却灰が管群に堆積すると、管群が腐食する恐れがあるほか、発電効率の悪化を招くこととなる。このため、一般的に、所定の時間間隔(一定周期)で、蒸気式やショックパルス式のスートブロワを起動し、管群に堆積した灰(以下、「付着灰」という)を除去、すなわち、「付着灰除去」している。
しかし、付着灰の管群への堆積量が少ない場合、スートブロワを起動しても除去される付着灰の量が少ないため、スートブロワで消費または利用する電力、蒸気、またはガスの費用に対する付着灰除去の効果が少ない。一方、付着灰の管群への堆積量が多い場合、上記一定周期ごとのスートブロワの起動では十分に付着灰除去ができず、除去されずに管群に残置された付着灰が、次回のスートブロワの起動までに固化してしまい、スートブロワによる付着灰除去が困難となる恐れがある。
そこで、スートブロワを用いて管群の付着灰を適切に除去すべく、種々のボイラ管群付着灰除去システムが開発されてきた。
In a thermal power plant equipped with a coal-cooking boiler, or in a plant such as a waste incinerator or a gasification melting furnace equipped with a waste heat boiler to generate power, incineration contained in exhaust gas generated by combustion of coal or waste. Ash easily adheres to and accumulates on a group of tubes (a group of tubes composed of a boiler screen tube, a heating tube, an evaporative tube, an economizer water tube, etc.). If the incineration ash accumulates on the pipe group, the pipe group may be corroded and the power generation efficiency may be deteriorated. For this reason, in general, a steam type or shock pulse type soot blower is activated at a predetermined time interval (constant cycle) to remove ash accumulated in the pipe group (hereinafter referred to as "adhered ash"), that is, ""Removes attached ash".
However, if the amount of adhering ash deposited on the tube group is small, the amount of adhering ash removed even when the sootblower is started is small, so the amount of attached ash removed for the cost of electricity, steam, or gas consumed or used by the sootblower. The effect of is small. On the other hand, when the amount of accumulated ash deposited on the tube group is large, the attached ash cannot be sufficiently removed by starting the soot blower at regular intervals, and the attached ash left in the tube group without being removed is the next soot blower. It may solidify by the time it is started, making it difficult to remove the adhering ash with a soot blower.
Therefore, various boiler tube group adhering ash removal systems have been developed in order to appropriately remove the adhering ash of the tube group using a soot blower.

例えば、特許文献1には、管群の汚れの度合い、すなわち管群への付着灰の堆積の度合いに応じて、上記周期を変えるシステムが開示されている。また、特許文献2には、管群の汚れの度合い以外の条件も加味してスートブロワを起動するシステムが開示されている。また、特許文献3には、管群を流れる排ガスの上流及び下流の圧力をそれぞれ測定し、これらの圧力の差が所定値以上となった場合にスートブロワを起動するシステムが開示されている。 For example, Patent Document 1 discloses a system that changes the cycle according to the degree of contamination of the pipe group, that is, the degree of accumulation of attached ash on the pipe group. Further, Patent Document 2 discloses a system for activating the soot blower in consideration of conditions other than the degree of contamination of the tube group. Further, Patent Document 3 discloses a system in which the pressures upstream and downstream of the exhaust gas flowing through the pipe group are measured, and the soot blower is activated when the difference between these pressures becomes a predetermined value or more.

なお、スートブロワは、蒸気式が主に使用されてきたが、近年、蒸気を使用しないショックパルス式が開発され、市場導入されている。
蒸気式スートブロワは、起動されると所定時間だけ蒸気を噴射し続け、当該所定時間が経過すると蒸気の噴射を停止する。
一方、ショックパルス式スートブロワは、圧力波式または衝撃波式スートブロワや、ショックパルスジェネレータ(SPG:Shock Pulse Generator)とも呼ばれ、起動されると、スートブロワ内部に充填した可燃性ガスが爆発し、ショックパルス(「衝撃波」または「圧力波」ともいう)が発射される。なお、ショックパルス式スートブロワは、一度起動すると、次回の起動のために当該ガスを再度充填する必要がある。当該充填には、一般的に1分間から10分間程度の時間を要する。
The steam type has been mainly used for the soot blower, but in recent years, a shock pulse type that does not use steam has been developed and introduced to the market.
When the steam type soot blower is started, it continues to inject steam for a predetermined time, and when the predetermined time elapses, the steam injection is stopped.
On the other hand, the shock pulse type soot blower is also called a pressure wave type or shock wave type soot blower or a shock pulse generator (SPG), and when it is started, the flammable gas filled inside the soot blower explodes and shock pulse. (Also called "shock wave" or "pressure wave") is emitted. Once the shock pulse type soot blower is started, it is necessary to refill the gas for the next start. The filling generally takes about 1 to 10 minutes.

特開昭62−210316号公報Japanese Unexamined Patent Publication No. 62-210316 特開昭63−286609号公報Japanese Unexamined Patent Publication No. 63-286609 特開2017−181007号公報Japanese Unexamined Patent Publication No. 2017-181007

特許文献1乃至3に開示の技術はいずれも、上記周期の到来など、所定条件の成立後に、スートブロワを1回だけ起動している。
しかし、上述したように、付着灰の堆積量によっては、スートブロワを1回起動しただけで十分に付着灰除去ができるとは限らない。このため、スートブロワを起動したにもかかわらず効果的に付着灰が除去されない場合、特許文献1乃至3に開示の技術では、次回の周期の到来など、改めて所定条件が成立した後のスートブロワの再度の起動を待つ必要がある。従って、これらの技術では、1回のスートブロワの起動で付着灰除去が十分になされない場合、ボイラの熱交換性能を早期に回復することができない。
そこで、スートブロワを起動する際に、1回だけではなく連続的に複数回起動することが考えられる。
しかしながら、1回のスートブロワの起動で付着灰除去が十分になされる場合があるにもかかわらず、上記所定条件が成立した際、毎回、スートブロワを複数回起動することは不経済である。
In each of the techniques disclosed in Patent Documents 1 to 3, the soot blower is activated only once after a predetermined condition such as the arrival of the above cycle is satisfied.
However, as described above, depending on the amount of deposited ash deposited, it is not always possible to sufficiently remove the adhered ash by starting the soot blower once. Therefore, if the adhered ash is not effectively removed even though the soot blower is started, the technique disclosed in Patent Documents 1 to 3 re-establishes the soot blower after a predetermined condition is satisfied, such as the arrival of the next cycle. You have to wait for it to start. Therefore, with these techniques, the heat exchange performance of the boiler cannot be restored at an early stage if the adhered ash is not sufficiently removed by starting the soot blower once.
Therefore, when starting the soot blower, it is conceivable to start it not only once but continuously a plurality of times.
However, although the adhered ash may be sufficiently removed by starting the soot blower once, it is uneconomical to start the soot blower a plurality of times each time when the above predetermined conditions are satisfied.

そこで、本発明は、経済性を担保しつつ、早期かつ適切に付着灰除去を行うボイラ管群付着灰除去システムを提供することを目的とする。 Therefore, an object of the present invention is to provide a boiler tube group adhering ash removing system that removes adhering ash quickly and appropriately while ensuring economic efficiency.

本発明のボイラ管群付着灰除去システムは、炉で発生する排ガスから熱回収するボイラの複数の管群の付着灰を除去するボイラ管群付着灰除去システムであって、前記複数の管群の間に配置されたスートブロワと、前記複数の管群の下流に配置され、前記排ガスを誘引する誘引送風機と、前記スートブロワの起動を制御する制御装置とを有する。
前記制御装置は、前記ボイラの熱貫流率を演算し、演算した前記熱貫流率が所定値以上の場合、所定のインターバルを置いて前記スートブロワを1回だけ起動し、その後再び前記所定のインターバル又はこれと異なるインターバルを置く1回起動を実行し、演算した前記熱貫流率が前記所定値未満の場合、第一判定及び第二判定のいずれか一方を択一的に判定する付着灰判定処理を実行し、前記付着灰判定処理で前記第一判定が得られた場合、前記所定のインターバルを置かずに前記スートブロワを連続的に複数回起動する連続起動を実行し、前記付着灰判定処理で前記第二判定が得られた場合、前記1回起動を実行する。
前記付着灰判定処理は、前記複数の管群の主蒸気量が第一閾値以上であるという第一条件、前記複数の管群の入口と出口における前記排ガスの圧力差が第二閾値以上であるという第二条件、前記誘引送風機の回転数が第三閾値以上であるという第三条件、及び前記炉に供給される燃焼空気総量が第四閾値以上であるという第四条件のうちの少なくとも1つの条件を含んで実行される。
前記付着灰判定処理が4つの前記条件のうちのいずれか1つの条件のみに基づいて実行される場合、前記1つの条件が成立したときに前記第一判定が得られ、前記1つの条件が不成立のときに前記第二判定が得られ、前記付着灰判定処理が前記4つの条件のうちのいずれか2つ、3つ、または4つの条件を含んで実行される場合、前記2つ、3つ、または4つの条件を含むすべての条件が共に成立したときに前記第一判定が得られ、前記2つ、3つ、または4つの条件を含むいずれかの条件が不成立のときに前記第二判定が得られることを特徴とする。
The boiler tube group adhering ash removing system of the present invention is a boiler tube group adhering ash removing system for removing the adhering ash of a plurality of boiler tube groups that recover heat from the exhaust gas generated in the furnace, and is a boiler tube group adhering ash removing system of the plurality of tube groups. It has a soot blower arranged between them, an attraction blower arranged downstream of the plurality of pipe groups to attract the exhaust gas, and a control device for controlling the activation of the soot blower.
The control device calculates the heat transmission coefficient of the boiler, and when the calculated heat transmission coefficient is equal to or higher than a predetermined value, the soot blower is started only once at a predetermined interval, and then again at the predetermined interval or When the heat transmission coefficient calculated is less than the predetermined value by executing one start with an interval different from this, the adhered ash determination process for selectively determining either the first determination or the second determination is performed. When the first determination is obtained by the adhered ash determination process, the soot blower is continuously activated a plurality of times without setting the predetermined interval, and the adhered ash determination process is performed. When the second determination is obtained, the above-mentioned one-time activation is executed.
In the adhering ash determination process, the first condition is that the main steam amount of the plurality of pipe groups is equal to or higher than the first threshold value, and the pressure difference between the exhaust gas at the inlet and outlet of the plurality of pipe groups is equal to or higher than the second threshold value. At least one of the second condition that the rotation speed of the attracting blower is equal to or higher than the third threshold, and the fourth condition that the total amount of combustion air supplied to the furnace is equal to or higher than the fourth threshold. Executed with conditions.
When the adhering ash determination process is executed based on only one of the four conditions, the first determination is obtained when the one condition is satisfied, and the one condition is not satisfied. When the second determination is obtained and the adhesion ash determination process is executed including any two, three, or four conditions among the four conditions, the two, three , Or the first determination is obtained when all the conditions including the four conditions are satisfied, and the second determination is obtained when any of the conditions including the two, three, or four conditions is not satisfied. Is obtained.

本発明のボイラ管群付着灰除去システムによれば、熱貫流率に基づいて1回起動と連続起動とを使い分ける。さらに、熱貫流率が所定値未満である場合には付着灰判定処理を実行し、スートブロワを連続起動とするか否かを適切に判定できるため、経済性を担保しつつ早期かつ適切に付着灰除去を行うことができる。 According to the boiler tube group adhering ash removal system of the present invention, one-time activation and continuous activation are used properly based on the heat transmission coefficient. Furthermore, if the heat transmission coefficient is less than the predetermined value, the attached ash determination process can be executed to appropriately determine whether or not the soot blower is to be continuously activated. Therefore, the attached ash can be quickly and appropriately determined while ensuring economic efficiency. Removal can be done.

実施形態及び第一変形例に係るボイラ管群付着灰除去システムの概略構成図である。It is a schematic block diagram of the boiler pipe group adherent ash removal system which concerns on embodiment and 1st modification. ボイラ管群付着灰除去システムがスートブロワを起動する制御を説明するフローチャート例である。It is an example of a flowchart explaining the control that the boiler tube group adhering ash removal system activates a soot blower. (a)〜(d)は、図2におけるステップS16(付着灰判定処理)の具体的な処理フローの例である。(A) to (d) are examples of a specific processing flow of step S16 (adhesion ash determination processing) in FIG. (a)〜(c)は第二変形例に係るボイラ管群付着灰除去システムの一部を示す概略構成図である。(A) to (c) are schematic block diagrams showing a part of the boiler tube group adherent ash removal system which concerns on the 2nd modification. 第三変形例に係るボイラ管群付着灰除去システムの概略構成図である。It is a schematic block diagram of the boiler tube group adherent ash removal system which concerns on the 3rd modification. 第四変形例に係るボイラ管群付着灰除去システムの概略構成図である。It is a schematic block diagram of the boiler tube group adherent ash removal system which concerns on the 4th modification.

以下、図面を参照して、実施形態並びに変形例としてのボイラ管群付着灰除去システムについて説明する。以下に示す構成等はあくまでも例示に過ぎず、明示しない種々の変形や技術の適用を排除する意図はない。以下に示す構成等は、それらの趣旨を逸脱しない範囲で種々変形して実施することができる。また、必要に応じて取捨選択することができ、あるいは適宜組み合わせることができる。 Hereinafter, an embodiment and a boiler tube group adhering ash removal system as a modified example will be described with reference to the drawings. The configurations shown below are merely examples, and there is no intention to exclude the application of various modifications and techniques that are not specified. The configurations and the like shown below can be variously modified and implemented without departing from their purpose. In addition, it can be selected as needed, or can be combined as appropriate.

[1.ボイラ管群付着灰除去システムの概要]
図1は、本実施形態のボイラ管群付着灰除去システム1(以下「除去システム1」という)の概略構成図である。なお、図1は、後述する第一変形例(除去システム1′)を示す図も兼ねる。
図1及び後述する図4〜図6では、X軸、Y軸からなる直交座標系を図示して説明する。X軸は水平方向であり、Y軸は鉛直方向である。また、Y軸の矢印方向は、鉛直方向且つ上方に向かう方向である。
[1. Overview of boiler tube group adhering ash removal system]
FIG. 1 is a schematic configuration diagram of the boiler tube group adhering ash removal system 1 (hereinafter referred to as “removal system 1”) of the present embodiment. Note that FIG. 1 also serves as a diagram showing a first modification (removal system 1') described later.
In FIGS. 1 and 4 to 6, which will be described later, an orthogonal coordinate system including an X-axis and a Y-axis will be illustrated and described. The X-axis is horizontal and the Y-axis is vertical. The direction of the arrow on the Y-axis is a vertical direction and an upward direction.

本実施形態では、一例として、発電を行うためのボイラを備えたごみ焼却炉のプラントに適用された除去システム1を説明する。もちろん、火力発電所、ガス化溶融炉など、他のプラントに、本発明のボイラ管群付着灰除去システムを適用することもできる。
ボイラは、蒸気ドラム及び水ドラムを備えた2ドラム式(two drum type)と、蒸気ドラムを備えた1ドラム式(one drum type)とに大別されるが、除去システム1は、いずれのボイラを用いてもよい。なお、図1では、蒸気ドラムの図示を省略しているが、1ドラム式のボイラを備えたごみ焼却炉のプラントを例示する。
In this embodiment, as an example, a removal system 1 applied to a waste incinerator plant equipped with a boiler for generating electricity will be described. Of course, the boiler tube group adhering ash removal system of the present invention can also be applied to other plants such as thermal power plants and gasification melting furnaces.
Boilers are roughly classified into a two drum type equipped with a steam drum and a water drum and a one drum type equipped with a steam drum. The removal system 1 is any of the boilers. May be used. Although the steam drum is not shown in FIG. 1, a waste incinerator plant equipped with a one-drum type boiler is illustrated.

除去システム1は、炉で発生する排ガスから熱回収するボイラの複数の管群2の付着灰を除去するシステムであって、複数の管群2の間に配置されたスートブロワ3と、複数の管群2の下流に配置され、排ガスを誘引する誘引送風機13と、スートブロワ3の起動を制御する制御装置4とを有する。 The removal system 1 is a system for removing adhering ash from a plurality of pipe groups 2 of a boiler that recovers heat from exhaust gas generated in a furnace, and is a soot blower 3 arranged between the plurality of pipe groups 2 and a plurality of pipes. It is arranged downstream of the group 2 and has an attracting blower 13 for attracting exhaust gas and a control device 4 for controlling the activation of the soot blower 3.

後で詳述するが、制御装置4は、ボイラの熱貫流率Kを演算し、この熱貫流率Kが所定値α1以上の場合、所定のインターバルを置いてスートブロワ3を1回だけ起動し、再び当該所定のインターバル又はこれと異なるインターバルを置く「1回起動」を実行する。
また、制御装置4は、演算した熱貫流率Kが所定値α1未満の場合、且つ、所定値α2未満の場合、第一判定及び第二判定のいずれか一方を択一的に判定する付着灰判定処理を実行する。付着灰判定処理で第一判定が得られた場合、制御装置4は、原則として、所定のインターバルを置かずにスートブロワ3を連続的に複数回起動する「連続起動」を実行し、付着灰判定処理で第二判定が得られた場合、「1回起動」を実行する。
As will be described in detail later, the control device 4 calculates the heat transmission coefficient K of the boiler, and when the heat transmission coefficient K is a predetermined value α1 or more, the soot blower 3 is started only once at a predetermined interval. The "one-time activation" is executed again with the predetermined interval or an interval different from the predetermined interval.
Further, the control device 4 selectively determines either the first determination or the second determination when the calculated heat transmission coefficient K is less than the predetermined value α1 and less than the predetermined value α2. Execute the judgment process. When the first determination is obtained in the adhered ash determination process, the control device 4, in principle, executes "continuous activation" in which the soot blower 3 is continuously activated a plurality of times without setting a predetermined interval, and the adhered ash determination is made. If the second determination is obtained in the process, "start once" is executed.

付着灰判定処理は、下記の第一条件乃至第四条件のうちの少なくとも1つの条件を含んで実行される。
第一条件:管群2の主蒸気量Qsが第一閾値以上である
第二条件:管群2の入口と出口における排ガスの圧力差ΔPgが第二閾値以上である
第三条件:誘引送風機13の回転数Qrが第三閾値以上である
第四条件:炉に供給される燃焼空気総量Qcが第四閾値以上である
これら4つの条件の各々は、発明者の経験から、各条件が成立した場合、管群2に付着灰が多量に堆積している可能性が高いため、スートブロワ3の「連続起動」をするのが望ましいと考えられる条件である。
The adhering ash determination process is executed including at least one of the following first to fourth conditions.
First condition: The main steam amount Qs of the pipe group 2 is equal to or higher than the first threshold value. Second condition: The pressure difference ΔPg of the exhaust gas at the inlet and outlet of the pipe group 2 is equal to or higher than the second threshold value. Third condition: Attracting blower 13 Fourth condition: The total amount of combustion air Qc supplied to the furnace is equal to or more than the fourth threshold value. From the experience of the inventor, each condition was satisfied for each of these four conditions. In this case, since there is a high possibility that a large amount of adhered ash is accumulated in the tube group 2, it is a condition that it is considered desirable to perform "continuous activation" of the soot blower 3.

後で詳述する図3では、一例として、上記の4つの条件(第一条件、第二条件、第三条件、第四条件)のみを用いて説明するが、設計に応じて、これら4つの条件に他の条件(例えば、第五条件、第六条件、第七条件、第八条件、…など)が追加されてもよい。
当該他の条件、例えば第五条件としては、後述の出口蒸気温度測定装置24bで測定される「管群2の主蒸気の温度が第五閾値未満である」、例えば第六条件としては、「過熱低減器17(後述)の噴霧する水量が第六閾値未満である」、例えば第七条件としては、後述のガス温度測定装置15b(出口ガス温度測定装置)で測定される「管群2の出口における排ガスのガス温度が第七閾値以上である」がありうる。
また、図示はしないが、ごみ焼却炉のプラントでは、除塵装置11の下流の排ガスの一部をストーカ7近傍へ循環させる排ガス再循環技術(Exhaust Gas Recirculation(EGR))が採用される場合がありうる。この場合、当該他の条件として、例えば第八条件として、後述のガス流量測定装置16a、16bとは別個に、当該循環される排ガス(循環排ガス)のガス流量を測定するガス流量測定装置を設置し、当該ガス流量測定装置で測定される「循環排ガスのガス流量が第八閾値以上である」が追加されてもよい。
なお、これら他の条件も、第一条件乃至第四条件と同様、評価式に基づき、二分岐する。具体的には、これら他の条件は、評価式の条件が成立した場合、管群2に付着灰が多量に堆積している可能性が高いため、スートブロワ3の「連続起動」をするのが望ましく、評価式の条件が不成立の場合、スートブロワ3の「連続起動」は不用である(よって、「1回起動」でよい)といえる条件が選定される。
付着灰判定処理は、上記の第一条件乃至第四条件の4つの条件のうちのいずれか1つの条件のみに基づいて実行される場合、当該1つの条件が成立したときに第一判定が得られる。そして、当該1つの条件が不成立のときに第二判定が得られる。
また、付着灰判定処理は、上記4つの条件のうちのいずれか2つ、3つ、または4つの条件を含んで実行される場合(上記第五条件等が追加される場合がある)、当該2つ、3つ、または4つの条件を含むすべての条件が共に成立したときに第一判定が得られる。そして、当該2つ、3つ、または4つの条件を含むすべての条件のいずれかが不成立のときに第二判定が得られる。
In FIG. 3, which will be described in detail later, only the above four conditions (first condition, second condition, third condition, and fourth condition) will be described as an example, but these four conditions may be used depending on the design. Other conditions (eg, fifth condition, sixth condition, seventh condition, eighth condition, ...) may be added to the condition.
The other condition, for example, the fifth condition is "the temperature of the main steam of the tube group 2 is less than the fifth threshold" measured by the outlet steam temperature measuring device 24b described later, for example, the sixth condition is ". The amount of water sprayed by the overheat reducer 17 (described later) is less than the sixth threshold value. ”For example, as the seventh condition,“ the tube group 2 measured by the gas temperature measuring device 15b (outlet gas temperature measuring device) described later). The gas temperature of the exhaust gas at the outlet is above the seventh threshold. "
Although not shown, the exhaust gas recirculation technology (Exhaust Gas Recirculation (EGR)) that circulates a part of the exhaust gas downstream of the dust remover 11 to the vicinity of the stoker 7 may be adopted in the waste incinerator plant. sell. In this case, as the other condition, for example, as the eighth condition, a gas flow rate measuring device for measuring the gas flow rate of the circulated exhaust gas (circulated exhaust gas) is installed separately from the gas flow rate measuring devices 16a and 16b described later. Then, "the gas flow rate of the circulating exhaust gas is equal to or higher than the eighth threshold value" measured by the gas flow rate measuring device may be added.
As with the first to fourth conditions, these other conditions also branch into two based on the evaluation formula. Specifically, under these other conditions, if the conditions of the evaluation formula are satisfied, there is a high possibility that a large amount of adhered ash has accumulated in the tube group 2, so it is recommended to perform "continuous activation" of the soot blower 3. Desirably, when the condition of the evaluation formula is not satisfied, the condition that can be said that "continuous activation" of the soot blower 3 is unnecessary (hence, "single activation" is sufficient) is selected.
When the adhered ash determination process is executed based on only one of the four conditions of the first to fourth conditions described above, the first determination is obtained when the one condition is satisfied. Be done. Then, when the one condition is not satisfied, the second determination is obtained.
Further, when the adhering ash determination process is executed including any two, three, or four conditions out of the above four conditions (the above fifth condition or the like may be added), the said The first decision is obtained when all the conditions including two, three, or four conditions are satisfied. Then, a second determination is obtained when any of all the conditions including the two, three, or four conditions is not satisfied.

以下、除去システム1が少なくとも有する上記構成に加え、他の構成について説明する。そして、構成の説明後に、スートブロワ3の起動に関する制御(付着灰判定処理を含む)について詳述する。 Hereinafter, in addition to the above-mentioned configuration that the removal system 1 has at least, other configurations will be described. Then, after the description of the configuration, the control (including the adhesion ash determination process) relating to the activation of the soot blower 3 will be described in detail.

[2.システム構成]
図1に示すように、除去システム1は、ごみ等の被焼却物を貯留するホッパ5と、ホッパ5の下方(Y軸方向且つ下方)からホッパ5が貯留した被焼却物を押し出すフィーダ6と、フィーダ6に押し出された被焼却物を搬送しながら焼却するストーカ7と、ストーカ7で焼却された残渣が排出される灰シュート8とを備える。
[2. System configuration]
As shown in FIG. 1, the removal system 1 includes a hopper 5 for storing incinerated materials such as dust, and a feeder 6 for pushing out the incinerated material stored in the hopper 5 from below the hopper 5 (in the Y-axis direction and below). A stoker 7 for incinerating the incinerated material extruded to the feeder 6 while being conveyed, and an ash chute 8 for discharging the residue incinerated by the stoker 7 are provided.

また、除去システム1は、ストーカ7で被焼却物を焼却することで発生する飛灰を含んだ排ガスの熱を、各管群2及びその下流に配置されたエコノマイザ9(管群の一種であり、「節炭器」ともいわれる)で熱交換する。そして、除去システム1は、当該熱交換された排ガスを冷却する減温塔10、さらに、当該冷却された排ガスの煤塵を除塵する除塵装置11(例えば、バグフィルタ)を経由して、当該除塵された排ガスを煙突12から大気へ排出する。 Further, the removal system 1 is an economizer 9 (a type of tube group) arranged in each tube group 2 and downstream thereof for the heat of the exhaust gas containing fly ash generated by incinerating the incinerated object with the stoker 7. , Also called "economizer") to exchange heat. Then, the removal system 1 is dust-removed via a heat-reducing tower 10 that cools the heat-exchanged exhaust gas, and a dust-removing device 11 (for example, a bag filter) that removes soot and dust from the cooled exhaust gas. Exhaust gas is discharged from the chimney 12 to the atmosphere.

ストーカ7から煙突12の開口までの排ガスの経路は、水冷壁やダクトなどで形成されて、実質的に密閉される。当該経路のうち、ストーカ7の直上からY軸方向且つ上方に延びる経路は「1パス」(「パス」は英語で「pass」を意味する)、1パスの上方の端部で折れ曲がり、1パスに隣接してY軸方向且つ下方に延びる経路は「2パス」、2パスの下方の端部で折れ曲がり、2パスに隣接してY軸方向且つ上方に延びる経路は「3パス」と呼ばれる。ストーカ7で発生した排ガスは、図1に矢印で流れを示す通り、1パスを上昇し、2パスを下降し、3パスを上昇するように流れる。なお、排ガスの流れを1パスから煙突12に向けて誘引するため、除塵装置11と煙突12の間の当該経路には、誘引送風機13が配置される。 The exhaust gas path from the stoker 7 to the opening of the chimney 12 is formed by a water cooling wall, a duct, or the like, and is substantially sealed. Of the routes, the route extending from directly above the stalker 7 in the Y-axis direction and upward is "1 pass" ("pass" means "pass" in English), and it bends at the upper end of 1 pass and 1 pass. The path adjacent to the Y-axis and extending downward is called "2 pass", and the path adjacent to the 2 pass and extending downward in the Y-axis direction is called "3 pass". The exhaust gas generated by the stoker 7 flows so as to go up 1 pass, go down 2 passes, and go up 3 passes, as shown by the arrows in FIG. In addition, in order to attract the flow of the exhaust gas from one pass toward the chimney 12, the attracting blower 13 is arranged in the path between the dust removing device 11 and the chimney 12.

除去システム1は、1パスに配置されて排ガスの圧力を測定する圧力測定装置14a(入口圧力測定装置)と、エコノマイザ9と減温塔10の間の排ガスの経路に配置されて排ガスの圧力を測定する圧力測定装置14b(出口圧力測定装置)とを備える。 The removal system 1 is arranged in one pass and is arranged in the pressure measuring device 14a (inlet pressure measuring device) for measuring the pressure of the exhaust gas and the exhaust gas path between the economizer 9 and the temperature reducing tower 10 to measure the pressure of the exhaust gas. It is provided with a pressure measuring device 14b (outlet pressure measuring device) for measuring.

なお、各圧力測定装置14a、14bの配置はこれらに限定されない。プラントの設計に応じて、入口圧力測定装置14aは、排ガスの経路中、付着灰除去の対象となる複数の管群2のうち最上流に配置された管群2の上流の任意の場所、すなわち「複数の管群2の入口」に配置されればよく、出口圧力測定装置14bは、排ガスの経路中、付着灰除去の対象となる複数の管群2のうち最下流に配置された管群2の下流の任意の場所、すなわち「複数の管群2の出口」に配置されればよい。ただし、これら任意の場所は、付着灰除去の対象となる複数の管群2にできるだけ近い場所が望ましい。 The arrangement of the pressure measuring devices 14a and 14b is not limited to these. Depending on the design of the plant, the inlet pressure measuring device 14a may be installed at any location upstream of the pipe group 2 arranged at the uppermost stream among the plurality of pipe groups 2 to be removed from the adhering ash in the exhaust gas path, that is, It suffices to be arranged at the “inlet of a plurality of pipe groups 2”, and the outlet pressure measuring device 14b is a pipe group arranged at the most downstream of the plurality of pipe groups 2 to be removed of adhering ash in the exhaust gas path. It may be arranged at any place downstream of 2, that is, at the "exhaust of a plurality of pipe groups 2". However, it is desirable that these arbitrary locations are as close as possible to the plurality of pipe groups 2 to be removed from the adhered ash.

除去システム1は、3パスに配置されている付着灰除去の対象となる複数の管群2のうち最上流(下方)に位置する管群21の下方に配置されて排ガスの温度を測定するガス温度測定装置15a(入口ガス温度測定装置)と、3パスに配置されている当該複数の管群2のうち最下流(上方)に位置する管群22cとエコノマイザ9との間の排ガスの経路に配置されて排ガスの温度を測定するガス温度測定装置15b(出口ガス温度測定装置)とを備える。 The removal system 1 is a gas arranged below the pipe group 21 located at the uppermost stream (lower side) of the plurality of pipe groups 2 to be removed from the adhering ash arranged in 3 passes and measuring the temperature of the exhaust gas. In the exhaust gas path between the temperature measuring device 15a (inlet gas temperature measuring device) and the tube group 22c located at the most downstream (upper side) of the plurality of tube groups 2 arranged in 3 paths and the economizer 9. It is provided with a gas temperature measuring device 15b (outlet gas temperature measuring device) that is arranged to measure the temperature of the exhaust gas.

なお、各ガス温度測定装置15a、15bの配置はこれらに限定されない。プラントの設計に応じて、入口ガス温度測定装置15aは、排ガスの経路中、付着灰除去の対象となる複数の管群2のうち最上流に配置された管群2の上流の任意の場所、すなわち「複数の管群2の入口」に配置されればよく、出口ガス温度測定装置15bは、排ガスの経路中、付着灰除去の対象となる複数の管群2のうち最下流に配置された管群2の下流の任意の場所、すなわち「複数の管群2の出口」に配置されればよい。ただし、これら任意の場所は、付着灰除去の対象となる複数の管群2にできるだけ近い場所が望ましい。 The arrangement of the gas temperature measuring devices 15a and 15b is not limited to these. Depending on the design of the plant, the inlet gas temperature measuring device 15a may be installed at any location upstream of the pipe group 2 arranged at the uppermost stream among the plurality of pipe groups 2 to be removed from the adhering ash in the exhaust gas path. That is, it may be arranged at the "inlet of the plurality of pipe groups 2", and the outlet gas temperature measuring device 15b is arranged at the most downstream of the plurality of pipe groups 2 to be removed from the adhering ash in the exhaust gas path. It may be arranged at an arbitrary place downstream of the tube group 2, that is, at "the outlets of a plurality of tube groups 2". However, it is desirable that these arbitrary locations are as close as possible to the plurality of pipe groups 2 to be removed from the adhered ash.

言い換えると、本実施形態および後述の変形例で、付着灰除去の対象となる「複数の管群2」とは、2つの圧力測定装置14a、14bの間、かつ、2つのガス温度測定装置15a、15bの間に配置されている管群を意味する。
図1では、一例として、複数の管群2が3パスに配置された構成を示す。なお、エコノマイザ9も管群(図6参照)を備えているが、図1の構成では複数の管群2の出口よりも下流、すなわち出口ガス温度測定装置15bよりも下流にエコノマイザ9が配置されているので、本実施形態ではエコノマイザ9が備える管群を付着灰除去の対象となる管群として考慮しない。なお、後述するが、エコノマイザ9が備える管群も「複数の管群2」として考慮する例は、本実施形態の第四変形例である。
In other words, in the present embodiment and the modified examples described later, the "plurality of pipe groups 2" to be removed from the adhered ash is between the two pressure measuring devices 14a and 14b, and the two gas temperature measuring devices 15a. , 15b means a group of tubes arranged between.
FIG. 1 shows, as an example, a configuration in which a plurality of tube groups 2 are arranged in three paths. The economizer 9 also has a pipe group (see FIG. 6), but in the configuration of FIG. 1, the economizer 9 is arranged downstream of the outlets of the plurality of pipe groups 2, that is, downstream of the outlet gas temperature measuring device 15b. Therefore, in the present embodiment, the tube group included in the economizer 9 is not considered as the tube group to be removed from the adhered ash. As will be described later, an example in which the tube group included in the economizer 9 is also considered as a "plurality of tube groups 2" is a fourth modification of the present embodiment.

3パスには、排ガスの流れの最上流(Y軸方向で最下方)に吊下管(スクリーン管)21で構成された管群2が配置され、当該管群21から下流(Y軸方向で上方)に向かって、順次、過熱管(スーパーヒータ)22a、22b、22cのそれぞれで構成された管群2が配置される。 In the 3rd pass, a pipe group 2 composed of a hanging pipe (screen pipe) 21 is arranged at the uppermost flow (lowermost in the Y-axis direction) of the exhaust gas flow, and is downstream from the pipe group 21 (in the Y-axis direction). The tube group 2 composed of each of the superheater tubes (super heaters) 22a, 22b, and 22c is sequentially arranged toward the upper side).

図1では、一例として、スートブロワ3(3a)が同一種類の複数の管群2の間に配置された構成を示す。すなわち、過熱管で構成された管群のうち、最上流に位置する過熱管22aで構成された管群2と、当該管群2の下流に当該管群2と隣り合って配置された管群2(過熱管22bで構成された管群2)の間にスートブロワ3aが配置される。なお、スートブロワ3(3a)の配置はこれに限られず、異なる種類の管群2、例えば、ボイラのスクリーン管、過熱管、蒸発管、エコノマイザの水管等で構成される管群のうち、隣り合って配置された異なる種類の管群の間にスートブロワ3が配置されてもよい。スートブロワ3は、蒸気式でもショックパルス式でもよいが、ここでは、ショックパルス式スートブロワであるとして説明を進める。 FIG. 1 shows, as an example, a configuration in which the soot blower 3 (3a) is arranged between a plurality of tube groups 2 of the same type. That is, among the tube groups composed of superheated tubes, the tube group 2 composed of the superheated tube 22a located at the uppermost stream and the tube group arranged adjacent to the tube group 2 downstream of the tube group 2. The soot blower 3a is arranged between 2 (tube group 2 composed of superheated tubes 22b). The arrangement of the soot blower 3 (3a) is not limited to this, and among the pipe groups 2 composed of different types of pipe groups 2, for example, boiler screen pipes, superheat pipes, evaporation pipes, economizer water pipes, etc., they are adjacent to each other. The soot blower 3 may be arranged between different types of tubes arranged in the same manner. The soot blower 3 may be a steam type or a shock pulse type, but here, the description will proceed assuming that it is a shock pulse type soot blower.

除去システム1は、2パスに配置されて排ガスの流量を測定するガス流量測定装置16aと、除塵装置11と誘引送風機13の間の排ガスの経路に配置されて排ガスの流量を測定するガス流量測定装置16bのいずれか一方を少なくとも備える。上述したように、ストーカ7から煙突12の開口までの排ガスの経路は、実質的に密閉されているので、ガス流量測定装置が1つ設置されることで、後述の熱貫流率Kの演算に必要な排ガスのガス流量の情報を得ることができる。 The removal system 1 is a gas flow rate measuring device 16a arranged in two paths to measure the flow rate of the exhaust gas, and a gas flow rate measuring device arranged in the exhaust gas path between the dust removing device 11 and the attracting blower 13 to measure the flow rate of the exhaust gas. At least one of the devices 16b is provided. As described above, the exhaust gas path from the stoker 7 to the opening of the chimney 12 is substantially sealed. Therefore, by installing one gas flow rate measuring device, the heat transmission coefficient K described later can be calculated. Information on the gas flow rate of the required exhaust gas can be obtained.

なお、各ガス流量測定装置16a、16bの配置はこれらに限定されない。排ガスの経路において少なくとも1つ設置されればよい。ガス流量測定装置の清掃頻度を低減する観点からは、除塵装置11より下流にガス流量測定装置を配置するのが望ましい。すなわち、ガス流量測定装置16a、16bのいずれか一方を選択する場合、ガス流量測定装置16bを設置するのが望ましい。
また、ガス流量測定装置16aを設置する代わりに、2パスにおける排ガスのガス流量を演算で算出し、後述の熱貫流率Kの演算に使用してもよい。
The arrangement of the gas flow rate measuring devices 16a and 16b is not limited to these. At least one may be installed in the exhaust gas path. From the viewpoint of reducing the cleaning frequency of the gas flow rate measuring device, it is desirable to arrange the gas flow rate measuring device downstream from the dust removing device 11. That is, when selecting either one of the gas flow rate measuring devices 16a and 16b, it is desirable to install the gas flow rate measuring device 16b.
Further, instead of installing the gas flow rate measuring device 16a, the gas flow rate of the exhaust gas in the two passes may be calculated by calculation and used for the calculation of the heat transmission coefficient K described later.

除去システム1は、過熱管で構成される管群2の内部を通過する蒸気を適宜冷却するために、当該過熱管の内部に水を噴霧する過熱低減器(デスーパーヒータ)17を備える。図1では、3パスに配置された四つの管群2のうち、最下流に配置される過熱管22cで構成された管群2に過熱低減器17が配置される。過熱低減器17が噴霧する水の量は、噴霧水量測定装置18で測定される。 The removal system 1 includes a superheat reducer (desuperheater) 17 that sprays water into the superheated pipe in order to appropriately cool the steam passing through the inside of the pipe group 2 composed of the superheated pipe. In FIG. 1, the superheat reducer 17 is arranged in the tube group 2 composed of the superheat tube 22c arranged at the most downstream of the four tube groups 2 arranged in the three paths. The amount of water sprayed by the overheat reducer 17 is measured by the spray water amount measuring device 18.

除去システム1は、付着灰除去の対象となる複数の管群2に含まれる過熱管のうち、最上流に位置する過熱管22aの内部に配置されて蒸気の温度を測定する蒸気温度測定装置24a(入口蒸気温度測定装置)と、最下流に位置する過熱管22cの内部に配置されて蒸気の温度を測定する蒸気温度測定装置24b(出口蒸気温度測定装置)とを備える。蒸気温度測定装置24a、24bは、複数の管群2のうち、過熱管に設置される。 The removal system 1 is a steam temperature measuring device 24a that is arranged inside the superheating pipe 22a located at the uppermost stream among the superheating pipes included in the plurality of pipe groups 2 to be removed from the adhering ash and measures the steam temperature. (Inlet steam temperature measuring device) and a steam temperature measuring device 24b (outlet steam temperature measuring device) arranged inside the heating tube 22c located at the most downstream side and measuring the temperature of steam are provided. The steam temperature measuring devices 24a and 24b are installed in the superheated pipe among the plurality of pipe groups 2.

除去システム1は、過熱管の内部を流れる主蒸気量を測定する主蒸気量測定装置25を備える。ここでは、主蒸気量測定装置25は、複数の管群2に含まれる過熱管のうち、最上流に位置する過熱管22aの内部に配置される。
除去システム1は、ストーカ7の下方に位置する一次空気供給装置26と、ストーカ7の上方の1パスに位置する二次空気供給装置27と、これらの空気供給装置26、27から排ガスの経路に供給される一次空気及び二次空気の総量(燃焼空気総量)を測定する燃焼空気量測定装置28とを備える。
The removal system 1 includes a main steam amount measuring device 25 for measuring the amount of main steam flowing inside the superheater tube. Here, the main steam amount measuring device 25 is arranged inside the superheated pipe 22a located at the uppermost stream among the superheated pipes included in the plurality of pipe groups 2.
The removal system 1 includes a primary air supply device 26 located below the stoker 7, a secondary air supply device 27 located one path above the stoker 7, and these air supply devices 26, 27 to the exhaust gas path. It is provided with a combustion air amount measuring device 28 for measuring the total amount of the supplied primary air and secondary air (total amount of combustion air).

各圧力測定装置14a、14b、各ガス温度測定装置15a、15b、ガス流量測定装置16a、16b、噴霧水量測定装置18、各蒸気温度測定装置24a、24b、主蒸気量測定装置25、燃焼空気量測定装置28で測定された各種情報は、制御装置4に入力される。制御装置4は、除去システム1が有する電子制御装置(コンピューター)であり、クロックで動作するプロセッサやタイマー、並びに記憶装置(いずれも図示略)を搭載している。 Each pressure measuring device 14a, 14b, each gas temperature measuring device 15a, 15b, gas flow rate measuring device 16a, 16b, sprayed water amount measuring device 18, each steam temperature measuring device 24a, 24b, main steam amount measuring device 25, combustion air amount. Various information measured by the measuring device 28 is input to the control device 4. The control device 4 is an electronic control device (computer) included in the removal system 1, and is equipped with a processor and a timer that operate with a clock, and a storage device (all not shown).

[3.制御構成(フローチャート)]
上述したように、制御装置4は、ボイラの熱貫流率Kを演算し、この熱貫流率Kに応じて、適宜に付着灰判定処理を実行しつつ、スートブロワ3を「1回起動」または「連続起動」させる。
以下、図2及び図3(a)〜(d)に示すフローチャートを用いて、スートブロワ3の起動に関する制御(付着灰判定処理を含む)について詳述する。なお、ここでは除塵装置11はバグフィルタであるとして説明を進める。
[3. Control configuration (flow chart)]
As described above, the control device 4 calculates the heat transmission coefficient K of the boiler, and in accordance with the heat transmission coefficient K, appropriately executes the adhesion ash determination process while starting the soot blower 3 "once" or ". "Continuous start".
Hereinafter, control (including adhesion ash determination processing) relating to activation of the soot blower 3 will be described in detail with reference to the flowcharts shown in FIGS. 2 and 3 (a) to 3 (d). Here, the dust removing device 11 will be described as a bug filter.

まず、オペレータが、起動スイッチや制御盤など(図示せず)を操作することにより、焼却炉などのプラントの運転が開始されると共に、除去システム1も起動し、図2に示すフローチャートの「開始」以降の各処理が、制御装置4によって実行される。
なお、本フローチャートに登場する時間t1、Tmin、Tmax、並びにΔtの初期値、ダーティ熱貫流率Kdの初期値、フラグFの初期値、各所定値α1、α2、及び回復閾値Rは次のよう設定され、本フローチャートの「開始」以前に、記憶装置に予め記憶される。
クリーン熱貫流率Kcは、除去システム1が起動して最初に演算される熱貫流率の値が初期値となるので、本フローチャートの「開始」以前に予め設定する必要はない。
First, when the operator operates the start switch, control panel, etc. (not shown), the operation of the plant such as the incinerator is started, and the removal system 1 is also started, and the “start” of the flowchart shown in FIG. Each subsequent process is executed by the control device 4.
The initial values of time t1, Tmin, Tmax, and Δt, the initial value of dirty heat transmission coefficient Kd, the initial value of flag F, the predetermined values α1, α2, and the recovery threshold value R appearing in this flowchart are as follows. It is set and stored in the storage device in advance before the "start" of this flowchart.
Since the initial value of the clean heat transmission coefficient Kc is the value of the heat transmission coefficient calculated first when the removal system 1 is started, it is not necessary to set it in advance before the "start" of this flowchart.

時間t1は、タイマーをカウントダウンさせるときの最初の時間(タイマーの残り時間)であり、スートブロワ3を「1回起動」させるときのインターバルに相当する。時間t1の初期値は、「0<Tmin<t1≦Tmax」の関係を満たす所定値である。Tminはスートブロワ3の起動させるインターバルの最小値(最短インターバル)であり、例えば1時間に設定される。また、Tmaxはスートブロワ3を起動させるインターバルの最大値(最長インターバル)であり、例えば3時間に設定される。
時間t1の初期値は、例えば「2/3×Tmax−Δt(例えば、Δtは0.5時間)」で求められる時間に設定される。なお、説明の簡便のため、ここでは、Tmin、Tmaxの値は、それぞれΔtの整数倍に設定される。また、時間t1は、その後、後述のステップS7、S19により、初期値から変更される。
The time t1 is the first time when the timer is counted down (the remaining time of the timer), and corresponds to the interval when the soot blower 3 is "started once". The initial value of the time t1 is a predetermined value that satisfies the relationship of “0 <Tmin <t1 ≦ Tmax”. Tmin is the minimum value (shortest interval) of the interval at which the soot blower 3 is activated, and is set to, for example, one hour. Further, Tmax is the maximum value (maximum interval) of the interval for activating the soot blower 3, and is set to, for example, 3 hours.
The initial value of the time t1 is set to the time obtained by, for example, "2/3 x Tmax-Δt (for example, Δt is 0.5 hours)". For the sake of simplicity, the values of Tmin and Tmax are set to integer multiples of Δt, respectively. Further, the time t1 is then changed from the initial value by steps S7 and S19 described later.

ダーティ熱貫流率Kdは、付着灰除去の対象となる管群2に付着灰が堆積等して汚れた状態であると考えられる場合の熱貫流率である。
ダーティ熱貫流率Kdの初期値は、「0<Kd<α2」の関係を満たす所定の値(例えば、Kd=0.5)に設定される。なお、ダーティ熱貫流率Kdは、その後、後述のステップS3により、初期値から変更される。
フラグFの初期値はF=0(第一の値)に設定される。なお、フラグFは、その後、後述のステップS9、S20、S14により、F=0(第一の値)、F=1(第二の値)、F=2(第三の値)のいずれかに変更される。
The dirty heat transmission coefficient Kd is a heat transmission coefficient when it is considered that the attached ash is deposited and contaminated on the pipe group 2 to be removed.
The initial value of the dirty heat transmission coefficient Kd is set to a predetermined value (for example, Kd = 0.5) that satisfies the relationship of “0 <Kd <α2”. The dirty heat transmission coefficient Kd is then changed from the initial value by step S3 described later.
The initial value of the flag F is set to F = 0 (first value). After that, the flag F is set to any one of F = 0 (first value), F = 1 (second value), and F = 2 (third value) according to steps S9, S20, and S14 described later. Is changed to.

第一所定値α1及び第二所定値α2は、それぞれ後述のステップS5、ステップS15の各々において、熱貫流率K(クリーン熱貫流率Kc)と比較して、スートブロワ3を「1回起動」とするか否かの判定閾値である。また、第二所定値α2は、後述のステップS15において、熱貫流率K(クリーン熱貫流率Kc)と比較して、付着灰判定処理を実行するか否かの判定閾値でもある。「0<α2<α1」の関係を満たす。ここでは、説明の簡便のため、「0<α2<1<α1」の関係を満たすとして説明を続ける。
なお、クリーン熱貫流率Kcは、スートブロワ3の起動直後に演算された熱貫流率である。言い換えれば、クリーン熱貫流率Kcは、スートブロワ3が起動された直後であるので管群2の付着灰は幾分除去され、熱交換率が改善した状態であると考えられる場合の熱貫流率である。
第一所定値α1は、α1以上のクリーン熱貫流率Kcであれば管群2の熱交換が明らかに良好で、付着灰の堆積はない又は付着灰の堆積が極めて少ないといえる値に設定される。ここでは、説明の簡便のため、第一所定値α1は、後述のステップS20でフラグFがF=2に変更された直後においては、スートブロワの「1回起動」のみ、すなわちスートブロワの単発の起動だけでは、クリーン熱貫流率Kcがα1以上となることはなく、「連続起動」として少なくとも2回以上連続のスートブロワ3の起動をすることで初めて達成されうる値に設定される。例えば、第一所定値α1は、α1=1.2(W/mK)に設定される。
また、第二所定値α2は、α2以上α1未満のクリーン熱貫流率Kcであれば、管群2の熱交換が明らかに良好とはいえないまでも、付着灰の堆積はプラントの運転にまだ大きな影響を及ぼすものではないので、スートブロワの「1回起動」が実行されれば十分であるといえる値に設定される。言い換えれば、α2未満のクリーン熱貫流率Kcであれば後述の付着灰判定処理が必要となる値に設定される。第二所定値α2も、ここでは説明の簡便のため、後述のステップS20でフラグFがF=2に変更された直後、スートブロワ3の「1回起動」のみ、すなわちスートブロワの単発の起動だけでは、クリーン熱貫流率Kcがα2以上となることはなく、「連続起動」として少なくとも2回以上連続のスートブロワ3の起動をすることで初めて達成される値に設定される。例えば、第二所定値α2は、α2=0.8(W/mK)に設定される。
このため、後述する図2のフローチャートでは、フラグFが、一旦、後述のステップS20でF=2に変更された場合、後述の付着灰判定処理で第二判定とならない限り、原則として、制御装置4により、スートブロワ3は少なくとも2回連続の「連続起動」がなされる。
ここでは説明の簡便のため、「0<α2<1<α1」の関係を満たすとしてα1、α2の値を上述のように設定するが、「0<α2<α1」の関係を満たす限り、設計に応じて、α1、α2の値を適宜設定してよい。この場合には、後述のステップS20でフラグFがF=2に変更された直後、スートブロワ3は原則的に「連続起動」されるが、必ず「連続起動」されるとは限らず、「1回起動」される場合もありうる。
回復閾値Rは、回復率(Kc/Kd)と比較して、付着灰除去の効果(熱貫流率Kの改善の度合い)を判定する閾値であり、その初期値は「1≦R」の関係を満たす所定の値(例えば、R=1)に設定される。ここで、回復率は、スートブロワ3の起動前後で熱貫流率Kがどの程度回復(改善)したのかを示す変数であり、クリーン熱貫流率Kcをダーティ熱貫流率Kdで除した値である。
なお、第一所定値α1、第二所定値α2、及び、回復閾値Rの各々は、設計に応じて適宜設定されたそれぞれの初期値から変更されることのない定数である。また、先述のTmin、Tmax、並びにΔtの各々も、設計に応じて適宜設定されたそれぞれの初期値から変更されることのない定数である。
The first predetermined value α1 and the second predetermined value α2 indicate that the soot blower 3 is “started once” in each of steps S5 and S15 described later, as compared with the heat transmission coefficient K (clean heat transmission coefficient Kc). It is a judgment threshold of whether or not to do. Further, the second predetermined value α2 is also a determination threshold value for whether or not to execute the adhesion ash determination process in comparison with the heat transmission coefficient K (clean heat transmission coefficient Kc) in step S15 described later. The relationship of "0 <α2 <α1" is satisfied. Here, for the sake of simplicity, the description will be continued assuming that the relationship of "0 <α2 <1 <α1" is satisfied.
The clean heat transmission coefficient Kc is a heat transmission coefficient calculated immediately after the start of the soot blower 3. In other words, the clean heat transmission coefficient Kc is the heat transmission coefficient when it is considered that the heat exchange rate has been improved by removing the attached ash of the tube group 2 to some extent because the soot blower 3 has just been activated. is there.
The first predetermined value α1 is set to a value at which it can be said that the heat exchange of the tube group 2 is clearly good and there is no deposit of adhered ash or the deposit of adhered ash is extremely small if the clean heat transmission coefficient is Kc of α1 or more. To. Here, for the sake of simplicity, the first predetermined value α1 is set to only “one-time activation” of the soot blower, that is, single-shot activation of the soot blower immediately after the flag F is changed to F = 2 in step S20 described later. The clean heat transmission coefficient Kc does not become α1 or more only by itself, and is set to a value that can be achieved only by activating the soot blower 3 continuously at least twice or more as "continuous activation". For example, the first predetermined value α1 is set to α1 = 1.2 (W / m 2 K).
Further, if the second predetermined value α2 is a clean heat transmission coefficient Kc of α2 or more and less than α1, the heat exchange of the tube group 2 is clearly not good, but the accumulation of adhered ash is still in the operation of the plant. Since it does not have a large effect, it is set to a value that can be said to be sufficient if the soot blower is "started once". In other words, if the clean heat transmission coefficient Kc is less than α2, it is set to a value that requires the adhesion ash determination process described later. For the sake of simplicity of explanation here, the second predetermined value α2 is not limited to “one-time activation” of the soot blower 3, that is, only one-shot activation of the soot blower immediately after the flag F is changed to F = 2 in step S20 described later. The clean heat transmission coefficient Kc never becomes α2 or more, and is set to a value achieved only by starting the soot blower 3 continuously at least twice or more as “continuous start”. For example, the second predetermined value α2 is set to α2 = 0.8 (W / m 2 K).
Therefore, in the flowchart of FIG. 2 described later, once the flag F is changed to F = 2 in step S20 described later, as a general rule, the control device unless the second determination is made in the adhesion ash determination process described later. According to 4, the soot blower 3 is "continuously activated" at least twice in a row.
Here, for the sake of simplicity of explanation, the values of α1 and α2 are set as described above assuming that the relationship of “0 <α2 <1 <α1” is satisfied, but as long as the relationship of “0 <α2 <α1” is satisfied, the design is performed. Therefore, the values of α1 and α2 may be set as appropriate. In this case, immediately after the flag F is changed to F = 2 in step S20 described later, the soot blower 3 is basically "continuously activated", but it is not always "continuously activated", and "1". It may be "started twice".
The recovery threshold value R is a threshold value for determining the effect of removing the adhered ash (the degree of improvement of the heat transmission coefficient K) as compared with the recovery rate (Kc / Kd), and the initial value thereof is the relationship of “1 ≦ R”. It is set to a predetermined value (for example, R = 1) that satisfies. Here, the recovery rate is a variable indicating how much the heat transmission coefficient K has recovered (improved) before and after the activation of the soot blower 3, and is a value obtained by dividing the clean heat transmission coefficient Kc by the dirty heat transmission coefficient Kd.
Each of the first predetermined value α1, the second predetermined value α2, and the recovery threshold value R is a constant that is not changed from the respective initial values appropriately set according to the design. Further, each of the above-mentioned Tmin, Tmax, and Δt is also a constant that is not changed from the respective initial values appropriately set according to the design.

制御装置4は、ステップS1において、プラント(例えば焼却炉)の運転開始後に所定時間が経過したか否かを判定する。これは、プラントの運転が開始されてから所定時間が経過しなければ、プラント内の環境に関する条件(例えば、温度、圧力など)が安定しないからである。制御装置4は、プラントの運転が開始されてから当該所定時間が経過するまではステップS1の処理を繰り返し実行し、当該所定時間が経過したときにステップS2の処理を実行する。 In step S1, the control device 4 determines whether or not a predetermined time has elapsed after the start of operation of the plant (for example, an incinerator). This is because the environmental conditions (for example, temperature, pressure, etc.) in the plant are not stable until a predetermined time has passed since the operation of the plant was started. The control device 4 repeatedly executes the process of step S1 from the start of the operation of the plant until the predetermined time elapses, and executes the process of step S2 when the predetermined time elapses.

制御装置4は、ステップS2において、温度情報及び流量情報に基づき、熱貫流率Kを演算する。そして、熱貫流率Kを演算した後、制御装置4は、ステップS3の処理を実行する。
熱貫流率Kは、以下の(式1)で表される。
In step S2, the control device 4 calculates the heat transmission coefficient K based on the temperature information and the flow rate information. Then, after calculating the heat transmission coefficient K, the control device 4 executes the process of step S3.
The heat transmission coefficient K is represented by the following (Equation 1).

温度情報及び流量情報は次のように測定されて制御装置4に送信される。すなわち、過熱器入口ガス温度Tginは入口ガス温度測定装置15aで測定され、過熱器出口ガス温度Tgoutは出口ガス温度測定装置15bで測定される。過熱器入口蒸気温度Tsinは入口蒸気温度測定装置24aで測定され、過熱器出口蒸気温度Tsoutは出口蒸気温度測定装置24bで測定される。また、ガス流量Wgはガス流量測定装置16a、16bのいずれか一方で測定され、または演算により取得される。なお、ガス比熱Cpgは、排ガスの比熱であって、排ガスの成分に対応した定数である。また、伝熱面積Aは、複数の管群2のうち、過熱器の伝熱面積の総和である。 The temperature information and the flow rate information are measured as follows and transmitted to the control device 4. That is, the superheater inlet gas temperature Tgin is measured by the inlet gas temperature measuring device 15a, and the superheater outlet gas temperature Tgout is measured by the outlet gas temperature measuring device 15b. The superheater inlet steam temperature Tsin is measured by the inlet steam temperature measuring device 24a, and the superheater outlet steam temperature Tsout is measured by the outlet steam temperature measuring device 24b. Further, the gas flow rate Wg is measured by either one of the gas flow rate measuring devices 16a and 16b, or is acquired by calculation. The gas specific heat Cpg is the specific heat of the exhaust gas and is a constant corresponding to the components of the exhaust gas. Further, the heat transfer area A is the total heat transfer area of the superheater among the plurality of tube groups 2.

制御装置4は、ステップS3において、ステップS2で演算した熱貫流率Kを、ステップS3の処理の時点でのフラグFの値に応じて、クリーン熱貫流率Kcまたはダーティ熱貫流率Kdのいずれか一方として記憶装置(図示略)に記憶する。
具体的には、制御装置4は、フラグFが第一の値、ここではF=0の場合はKc=Kとし、フラグFが第二の値、ここではF=1の場合はKd=Kとし、フラグFが第三の値、ここではF=2の場合はKd=Kとして、記憶装置に記憶する。
本フローチャートを開始した直後は、フラグFは初期値、すなわちF=0であるため、制御装置4は、直前に演算した熱貫流率Kをクリーン熱貫流率Kcとして記憶装置に記憶する(すなわち、Kc=K)。
そして、制御装置4は、ステップS4の処理を実行する。
In step S3, the control device 4 sets the heat transmission coefficient K calculated in step S2 to either a clean heat transmission coefficient Kc or a dirty heat transmission coefficient Kd according to the value of the flag F at the time of processing in step S3. On the other hand, it is stored in a storage device (not shown).
Specifically, the control device 4 sets Kc = K when the flag F is the first value, here F = 0, and Kd = K when the flag F is the second value, here F = 1. Then, when the flag F is a third value, here F = 2, Kd = K is set and stored in the storage device.
Immediately after starting this flowchart, the flag F is an initial value, that is, F = 0, so that the control device 4 stores the heat transmission coefficient K calculated immediately before as a clean heat transmission coefficient Kc in the storage device (that is,). Kc = K).
Then, the control device 4 executes the process of step S4.

制御装置4は、ステップS4において、フラグFがF=0であるか否かを判定する。フラグFがF=0の場合、すなわち、本フローチャートの「開始」直後である場合、または、後述のステップS13のスートブロワ3の起動直後である場合、制御装置4はステップS5の処理を実行する。
フラグFがF=0でない場合(F=1、F=2の場合)、後述のステップS13のスートブロワ3の起動に向けて処理フローを進めるため、制御装置4はステップS10の処理を実行する。
In step S4, the control device 4 determines whether or not the flag F is F = 0. When the flag F is F = 0, that is, immediately after the "start" of this flowchart, or immediately after the activation of the soot blower 3 in step S13 described later, the control device 4 executes the process of step S5.
When the flag F is not F = 0 (when F = 1 and F = 2), the control device 4 executes the process of step S10 in order to proceed with the processing flow toward the activation of the soot blower 3 in step S13 described later.

制御装置4は、ステップS5において、上記記憶装置に記憶されたクリーン熱貫流率Kcの値が第一所定値α1以上であるか否かを判定する。
クリーン熱貫流率Kcの値が第一所定値α1以上の場合、管群2の熱交換が明らかに良好で、付着灰の堆積はない又は極めて少ないと考えられる。従って、制御装置4は、スートブロワ3の起動のインターバルを長く変更する処理に向けて処理フローを進めるため、ステップS6の処理を実行する。
クリーン熱貫流率Kcの値がα1未満の場合、管群2の熱交換が必ずしも良好とはいえないため、制御装置4は、ステップS15の処理を実行する。
In step S5, the control device 4 determines whether or not the value of the clean heat transmission coefficient Kc stored in the storage device is equal to or higher than the first predetermined value α1.
When the value of the clean heat transmission coefficient Kc is equal to or higher than the first predetermined value α1, it is considered that the heat exchange of the tube group 2 is clearly good, and there is no or extremely little adhesion ash. Therefore, the control device 4 executes the process of step S6 in order to advance the process flow toward the process of changing the activation interval of the soot blower 3 for a long time.
When the value of the clean heat transmission coefficient Kc is less than α1, the heat exchange of the tube group 2 is not always good, so the control device 4 executes the process of step S15.

制御装置4は、ステップS6において、時間t1が最長インターバルであるTmax未満であるか否かを判定する。
時間t1の値がTmax(ここでは、3時間)未満の場合、制御装置4は、時間t1の値を大きく(時間t1を長く)変更するため、ステップS7の処理を実行する。
時間t1の値がTmaxである場合、時間t1をこれ以上大きく変更できないため、制御装置4は、時間t1の値を変更せずに(ステップS7をスキップして)、ステップS8の処理を実行する。
In step S6, the control device 4 determines whether or not the time t1 is less than Tmax, which is the longest interval.
When the value of the time t1 is less than Tmax (here, 3 hours), the control device 4 executes the process of step S7 in order to greatly change the value of the time t1 (longer the time t1).
When the value of the time t1 is Tmax, the time t1 cannot be changed any more. Therefore, the control device 4 executes the process of step S8 without changing the value of the time t1 (skipping step S7). ..

制御装置4は、ステップS7において、時間t1の値を「t1+Δt」の値に変更する。言い換えれば、制御装置4は、t1=t1+Δtとして、上記の記憶装置のt1の値を変更し、当該記憶装置に再記憶する。すなわち、制御装置4は、インターバルを直前に設定されていた値よりも長く再設定する。
クリーン熱貫流率Kcが第一所定値α1以上の場合、現時点のインターバルでは過度にスートブロワ3を起動することになり、費用対効果の観点から望ましくないことから、従前よりも長いインターバルでスートブロワ3の「1回起動」を行うためである。
そして、制御装置4は、ステップS8の処理を実行する。
In step S7, the control device 4 changes the value of time t1 to the value of “t1 + Δt”. In other words, the control device 4 changes the value of t1 of the above storage device with t1 = t1 + Δt, and re-stores it in the storage device. That is, the control device 4 resets the interval longer than the value set immediately before.
If the clean heat transmission coefficient Kc is equal to or greater than the first predetermined value α1, the soot blower 3 will be activated excessively at the current interval, which is not desirable from the viewpoint of cost effectiveness. Therefore, the soot blower 3 has a longer interval than before. This is to perform "start once".
Then, the control device 4 executes the process of step S8.

制御装置4は、ステップS8において、タイマー(カウンター)をスタートする。スタートされたタイマーは、カウント値が時間t1から0に向かって、制御装置4が備えるクロックに応じてカウントダウンする。例えば、スタートした時点の時間t1が2時間であった場合、2時間(7200秒)をカウントし、カウント値が0になったところで、タイマーが停止する。タイマーが停止した後、制御装置4は、ステップS9の処理を実行する。 The control device 4 starts the timer (counter) in step S8. The started timer counts down from the time t1 to 0 according to the clock provided in the control device 4. For example, if the time t1 at the time of starting is 2 hours, 2 hours (7200 seconds) are counted, and the timer is stopped when the count value becomes 0. After the timer is stopped, the control device 4 executes the process of step S9.

制御装置4は、ステップS9において、上記の記憶装置に記憶されたフラグFの値を、F=1に変更し、当該記憶装置に再記憶する。そして、制御装置4は、ステップS2に処理フローを戻し、ステップS2の処理を再び実行する。
ステップS2、ステップS3、ステップS4の処理は既に説明したので、ステップS4から次のステップとしてステップS10の処理に至るまで、簡略化して以下に説明する。
つまり、制御装置4は、タイマーによりインターバルを置いたのちの熱貫流率Kを演算し(ステップS2)、次のステップS3では、フラグFがF=1のため、直前に演算した熱貫流率Kをダーティ熱貫流率Kdとして上記記憶装置に記憶する(すなわち、Kd=K)。そして、制御装置4は、現時点でフラグFがF=1のため、ステップS4でフラグFがF=0でないと判定し、次の処理としてステップS10の処理を実行する。
In step S9, the control device 4 changes the value of the flag F stored in the storage device to F = 1 and re-stores it in the storage device. Then, the control device 4 returns the processing flow to step S2, and executes the processing of step S2 again.
Since the processes of step S2, step S3, and step S4 have already been described, the processes from step S4 to the process of step S10 as the next step will be briefly described below.
That is, the control device 4 calculates the heat transmission coefficient K after setting an interval by the timer (step S2), and in the next step S3, since the flag F is F = 1, the heat transmission coefficient K calculated immediately before is calculated. Is stored in the above storage device as a dirty heat transmission coefficient Kd (that is, Kd = K). Then, since the flag F is F = 1 at the present time, the control device 4 determines that the flag F is not F = 0 in step S4, and executes the process of step S10 as the next process.

制御装置4は、ステップS10において、除塵装置11であるバグフィルタが逆洗中か否かを判定する。制御装置4は、バグフィルタの「逆洗」の実行を制御するため、バグフィルタが逆洗中であるか否かを判定することができる。
制御装置4は、バグフィルタの逆洗中であると判定した場合にはステップS10の処理を繰り返し実行し、バグフィルタが逆洗中でないと判定した場合にステップS11の処理を実行する。これにより、制御装置4は、バグフィルタの逆洗が実行されている間はスートブロワ3を起動せず、逆洗の終了を待ってスートブロワ3を起動することができる。
In step S10, the control device 4 determines whether or not the bug filter, which is the dust removing device 11, is backwashing. Since the control device 4 controls the execution of the "backwash" of the bug filter, it is possible to determine whether or not the bug filter is in the backwash.
When it is determined that the bug filter is being backwashed, the control device 4 repeatedly executes the process of step S10, and when it is determined that the bug filter is not being backwashed, the control device 4 executes the process of step S11. As a result, the control device 4 can start the soot blower 3 after waiting for the end of the back wash without starting the soot blower 3 while the backwash of the bug filter is being executed.

なお、バグフィルタが逆洗中であると判定した場合に、制御装置4がステップS10の処理を繰り返す理由は次の通りである。
バグフィルタの逆洗は、通常、排ガスの流れを止めて行われる。従って、バグフィルタの逆洗中にショックパルス式のスートブロワ3を起動すると、排ガスが流れる煙道となるダクトの内部の圧力が著しく上昇し、プラントに故障が発生するおそれがある。しかしながら、除去システム1においては、制御装置4が、バグフィルタの逆洗中にスートブロワ3を起動せず、逆洗の終了を待ってスートブロワ3を起動するため、上記故障の発生を防止できる。
ここでは、スートブロワ3がショックパルス式であるとして説明をしているため、ステップS10を設けているが、スートブロワ3が蒸気式の場合は、ステップS10を省略することができる。従って、この場合、ステップS4の次のステップはステップS11となる。
The reason why the control device 4 repeats the process of step S10 when it is determined that the bug filter is in the process of backwashing is as follows.
Backwashing of the bug filter is usually done by stopping the flow of exhaust gas. Therefore, if the shock pulse type soot blower 3 is activated during the backwashing of the bag filter, the pressure inside the duct serving as the flue through which the exhaust gas flows increases remarkably, which may cause a failure in the plant. However, in the removal system 1, the control device 4 does not start the soot blower 3 during the backwashing of the bug filter, but waits for the end of the backwash to start the sootblower 3, so that the above-mentioned failure can be prevented.
Here, since the soot blower 3 is described as being of the shock pulse type, step S10 is provided, but when the soot blower 3 is of the steam type, step S10 can be omitted. Therefore, in this case, the step next to step S4 is step S11.

制御装置4は、ステップS11において、上記の記憶装置に記憶されたフラグFの値が、F=1であるか否かを判定する。フラグFがF=1の場合、制御装置4は、ステップS12の処理を実行する。また、フラグFがF=1でない場合、すなわち、F=2の場合、制御装置4は、ステップS13の処理を実行する。
ここでは、現時点でフラグFがF=1であることから、制御装置4はステップS12の処理を実行する。制御装置4は、ステップS12において、タイマーのカウント値を時間t1に復帰、すなわちリセットする。次いで、制御装置4は、ステップS13の処理を実行する。
制御装置4は、ステップ13において、スートブロワ3を1回だけ起動する。
そして、制御装置4は、ステップS14の処理を実行する。
なお、ステップS11において、フラグFがF=1でない場合、すなわち、F=2の場合、制御装置4は、ステップS12をスキップしてステップS13の処理を実行するので、タイマーのカウント値はリセットされない。F=2の場合は、制御装置4は、クリーン熱貫流率Kcが第二所定値α2以上になるまで、原則としてスートブロワ3の「連続起動」を実行するが、このとき、処理を1つでも省いて、スートブロワ3をより高速に連続的に起動するためである。
In step S11, the control device 4 determines whether or not the value of the flag F stored in the storage device is F = 1. When the flag F is F = 1, the control device 4 executes the process of step S12. Further, when the flag F is not F = 1, that is, when F = 2, the control device 4 executes the process of step S13.
Here, since the flag F is F = 1 at the present time, the control device 4 executes the process of step S12. In step S12, the control device 4 returns the count value of the timer to the time t1, that is, resets it. Next, the control device 4 executes the process of step S13.
The control device 4 activates the soot blower 3 only once in step 13.
Then, the control device 4 executes the process of step S14.
In step S11, when the flag F is not F = 1, that is, when F = 2, the control device 4 skips step S12 and executes the process of step S13, so that the timer count value is not reset. .. In the case of F = 2, the control device 4 generally executes "continuous activation" of the soot blower 3 until the clean heat transmission coefficient Kc becomes the second predetermined value α2 or more, but at this time, even one process is performed. This is because the soot blower 3 is started continuously at a higher speed.

制御装置4は、ステップS14において、上記の記憶装置に記憶されたフラグFの値を、F=0に変更し、当該記憶装置に再記憶する。これは、次のステップS2の処理で演算する熱貫流率Kが、スートブロワ3の起動直後の値であるため、この値を、さらに次のステップS3の処理において、クリーン熱貫流率Kcとして上記の記憶装置に記憶するためである。
そして、制御装置4は、ステップS2に処理フローを戻し、ステップS2の処理を実行する。ステップS2、ステップS3、ステップS4、ステップS5の処理は既に説明したので、再度の説明は省略する。
In step S14, the control device 4 changes the value of the flag F stored in the storage device to F = 0 and re-stores it in the storage device. This is because the heat transmission coefficient K calculated in the process of the next step S2 is the value immediately after the start of the soot blower 3, so this value is used as the clean heat transmission coefficient Kc in the process of the next step S3 as described above. This is to store in a storage device.
Then, the control device 4 returns the processing flow to step S2 and executes the processing of step S2. Since the processes of step S2, step S3, step S4, and step S5 have already been described, the description thereof will be omitted again.

これより、ステップS5の次のステップとしてステップS15の処理が制御装置4に実行される場合(ステップS5においてクリーン熱貫流率Kcの値がα1未満の場合)の説明を行う。
制御装置4は、ステップS15において、上記の記憶装置に記憶されたクリーン熱貫流率Kcの値が、第二所定値α2未満であるか否かを判定する。
クリーン熱貫流率Kcの値が第二所定値α2未満でない、すなわち、α2≦Kc<α1の場合、管群2の熱伝導が明らかに良好とはいえないまでも、付着灰の堆積はプラントの運転にまだ大きな影響を及ぼすものではないと考えられるため、インターバルを置いてスートブロワ3を起動する処理フローに進めるべく、制御装置4は、先述のステップS8の処理を実行する。
クリーン熱貫流率Kcの値が第二所定値α2未満の場合、付着灰が原因でクリーン熱貫流率Kcの値が低くなったか否かを判定すべく、制御装置4は、ステップS16の処理、すなわち付着灰判定処理を実行する。
From this, a case where the process of step S15 is executed by the control device 4 as the next step of step S5 (when the value of the clean heat transmission coefficient Kc is less than α1 in step S5) will be described.
In step S15, the control device 4 determines whether or not the value of the clean heat transmission coefficient Kc stored in the storage device is less than the second predetermined value α2.
When the value of the clean heat transmission coefficient Kc is not less than the second predetermined value α2, that is, when α2 ≦ Kc <α1, the heat conduction of the tube group 2 is not clearly good, but the deposition of adhered ash is caused by the plant. Since it is considered that the operation is not significantly affected yet, the control device 4 executes the process of step S8 described above in order to proceed to the process flow for activating the soot blower 3 at intervals.
When the value of the clean heat transmission coefficient Kc is less than the second predetermined value α2, the control device 4 performs the process of step S16 in order to determine whether or not the value of the clean heat transmission coefficient Kc is lowered due to the adhered ash. That is, the adhered ash determination process is executed.

制御装置4は、ステップS16において、付着灰判定処理を実行する。付着灰判定処理における具体的な処理の例については、図3を用いて後述する。
付着灰判定処理は、「複数の管群2に堆積した付着灰の量が多く、排ガスとボイラとの熱交換が十分に行われていない状況である」(第一判定)、または「付着灰の量は少なく、熱交換に悪影響を及ぼすものではないにもかかわらず、プラントの運転環境または運転の諸条件によってクリーン熱貫流率Kcが第二所定値α2未満に算出されている状況である」(第二判定)のいずれか一方を択一的に選択し判定する処理である。
付着灰判定処理で第一判定が得られた場合は、回復率(Kc/Kd)に応じてスートブロワ3を連続起動すべく、制御装置4は、ステップS17の処理を実行する。
付着灰判定処理で第二判定が得られた場合は、プラントの状態確認またはプラント停止要否の判断を行うべく、制御装置4は、ステップS21の処理を実行する。
The control device 4 executes the adhesion ash determination process in step S16. An example of a specific treatment in the adhesion ash determination treatment will be described later with reference to FIG.
In the adhering ash determination process, "the amount of adhering ash deposited on the plurality of pipe groups 2 is large, and the heat exchange between the exhaust gas and the boiler is not sufficiently performed" (first judgment), or "adhered ash". Although the amount of heat exchange is small and does not adversely affect heat exchange, the clean heat transmission coefficient Kc is calculated to be less than the second predetermined value α2 depending on the operating environment of the plant or various operating conditions. " This is a process of selectively selecting and judging one of (second judgment).
When the first determination is obtained in the adhered ash determination process, the control device 4 executes the process of step S17 in order to continuously activate the soot blower 3 according to the recovery rate (Kc / Kd).
When the second determination is obtained in the adhered ash determination process, the control device 4 executes the process of step S21 in order to confirm the state of the plant or determine whether or not the plant should be stopped.

制御装置4は、ステップS17において、上記の記憶装置に記憶されたクリーン熱貫流率Kcとダーティ熱貫流率Kdとから回復率(Kc/Kd)を演算し、この回復率が、上記の記憶装置に記憶された回復閾値R以上であるか否かを判定する。
回復率が回復閾値R未満の場合は、スートブロワ3をこれ以上起動しても熱貫流率Kが改善する可能性が低いため、制御装置4は、ステップS21の処理を実行する。
回復率が回復閾値R以上の場合は、スートブロワ3の起動により付着灰除去の効果が期待できることから、早期に付着灰を除去すべく、スートブロワ3の「連続起動」を行う処理に向けて処理フローを進めるために、制御装置4は、ステップS18の処理を実行する。
In step S17, the control device 4 calculates a recovery rate (Kc / Kd) from the clean heat transmission coefficient Kc and the dirty heat transmission coefficient Kd stored in the storage device, and this recovery rate is the storage device described above. It is determined whether or not it is equal to or higher than the recovery threshold value R stored in.
If the recovery rate is less than the recovery threshold value R, it is unlikely that the heat transmission coefficient K will improve even if the soot blower 3 is started any more. Therefore, the control device 4 executes the process of step S21.
When the recovery rate is equal to or higher than the recovery threshold value R, the effect of removing the adhering ash can be expected by activating the soot blower 3. In order to proceed, the control device 4 executes the process of step S18.

制御装置4は、ステップS18において、時間t1が最短インターバルであるTminよりも大きいか否かを判定する。
時間t1がTminよりも大きい場合、スートブロワ3を「1回起動」する際のインターバルを短縮すべく、制御装置4は、ステップS19の処理を実行する。灰の性状により当初の「1回起動」のインターバルでは付着灰を効果的に除去できなかったため、付着灰判定処理で第一判定が得られたことを鑑み、「連続起動」が終了した後に、制御装置4がスートブロワ3を「1回起動」する際、従前よりも短いインターバルで(言い換えれば、従前よりも早いタイミングで)、スートブロワ3の「1回起動」を行うためである。
制御装置4は、ステップS19において、時間t1の値を「t1−Δt」の値に変更する。言い換えれば、制御装置4は、t1=t1−Δtとして、上記の記憶装置のt1の値を変更し、当該記憶装置に再記憶する。そして、制御装置4は、ステップS20の処理を実行する。
時間t1がTminの場合、時間t1をこれ以上小さく変更できないため、制御装置4は、時間t1の値を変更せずに(ステップS19をスキップして)、ステップS20の処理を実行する。
In step S18, the control device 4 determines whether or not the time t1 is larger than Tmin, which is the shortest interval.
When the time t1 is larger than Tmin, the control device 4 executes the process of step S19 in order to shorten the interval when the soot blower 3 is "started once". Due to the nature of the ash, the attached ash could not be effectively removed in the initial "one-time start" interval. Therefore, in view of the fact that the first judgment was obtained in the attached ash judgment process, after the "continuous start" was completed, This is because when the control device 4 "starts" the soot blower 3 "once", the soot blower 3 is "started once" at a shorter interval than before (in other words, at a timing earlier than before).
In step S19, the control device 4 changes the value of time t1 to the value of “t1-Δt”. In other words, the control device 4 changes the value of t1 of the above storage device with t1 = t1-Δt, and re-stores it in the storage device. Then, the control device 4 executes the process of step S20.
When the time t1 is Tmin, the time t1 cannot be changed any more. Therefore, the control device 4 executes the process of step S20 without changing the value of the time t1 (skipping step S19).

制御装置4は、ステップS20において、上記の記憶装置に記憶されたフラグFの値を、F=2に変更し、当該記憶装置に再記憶する。そして、制御装置4は、ステップS2に処理フローを戻して、ステップS2の処理を実行する。
ステップS2、ステップS3、ステップS4の処理は既に説明したので、ステップS4から次のステップとしてステップS10の処理に至るまで、簡略化して以下に説明する。
つまり、制御装置4は、回復率が回復閾値R以上のときの熱貫流率Kを演算し(ステップS2)、次のステップS3では、フラグFがF=2のため、直前に演算した熱貫流率Kをダーティ熱貫流率Kdとして上記の記憶装置に記憶する(すなわち、Kd=K)。そして、次のステップS4では、現時点においてフラグFがF=2であることから、制御装置4は、フラグFがF=0でないと判定し、次のステップS10を実行する。そして、ステップS10において、制御装置4は、バグフィルタが逆洗中でないと判定した場合にステップS11の処理を実行する。ステップS11において、現時点でフラグFがF=2のため、制御装置4は、ステップS12をスキップしてステップS13の処理を実行する。
すなわち、フラグFがF=2の場合、タイマーをリセットすることなく、直ちにスートブロワ3を起動すべく、制御装置4は、ステップS13の処理を実行する。
In step S20, the control device 4 changes the value of the flag F stored in the storage device to F = 2 and re-stores it in the storage device. Then, the control device 4 returns the processing flow to step S2 and executes the processing of step S2.
Since the processes of step S2, step S3, and step S4 have already been described, the processes from step S4 to the process of step S10 as the next step will be briefly described below.
That is, the control device 4 calculates the heat transmission coefficient K when the recovery rate is equal to or higher than the recovery threshold value R (step S2), and in the next step S3, since the flag F is F = 2, the heat transmission flow calculated immediately before is calculated. The rate K is stored in the above storage device as a dirty heat transmission coefficient Kd (that is, Kd = K). Then, in the next step S4, since the flag F is F = 2 at the present time, the control device 4 determines that the flag F is not F = 0, and executes the next step S10. Then, in step S10, the control device 4 executes the process of step S11 when it is determined that the bug filter is not in the backwash. In step S11, since the flag F is F = 2 at the present time, the control device 4 skips step S12 and executes the process of step S13.
That is, when the flag F is F = 2, the control device 4 executes the process of step S13 in order to immediately start the soot blower 3 without resetting the timer.

ステップS13でスートブロワ3を起動したのち、先述のとおり、制御装置4は、ステップS14においてフラグFをF=0に変更し、再びステップS2に処理フローを戻す。
ここで、次の処理フローにおいて、再び、ステップS2、ステップS3、ステップS4、ステップS5、ステップS15、ステップS16、ステップS17、ステップS18、ステップS19(場合によってはスキップされる)、ステップS20と、順次、制御装置4が処理を進めた場合は、その後、制御装置4は、ステップS2、ステップS3、ステップS4、ステップS10、ステップS11、ステップS13と処理を進める。
従って、この場合は、ステップS8のタイマースタートを経由せずにステップS13を実行する処理フローとなるため、スートブロワ3の「連続起動」となる。
After activating the soot blower 3 in step S13, as described above, the control device 4 changes the flag F to F = 0 in step S14, and returns the processing flow to step S2 again.
Here, in the next processing flow, step S2, step S3, step S4, step S5, step S15, step S16, step S17, step S18, step S19 (which is skipped in some cases), step S20, and so on. When the control device 4 proceeds with the process in sequence, the control device 4 then proceeds with the processes of step S2, step S3, step S4, step S10, step S11, and step S13.
Therefore, in this case, since the processing flow is such that step S13 is executed without going through the timer start of step S8, the soot blower 3 is "continuously started".

では、図2のフローチャートの説明として、最後に、ステップS16の付着灰判定処理で第二判定が得られた場合、または、ステップS17で回復率が回復閾値R未満の場合に、制御装置4が実行するステップS21について説明する。
制御装置4は、ステップS21において、オペレータまたは作業員によって、プラントの状態確認またはプラントの運転を停止するための作業(例えば、制御盤の操作)が開始されたか否かを判定する。制御装置4は、プラントに配置された種々の装置の動作を制御するので、当該作業が開始されたか否かを判定することができる。
制御装置4は、当該作業は開始されていないと判定した場合、ステップS8の処理を実行する。すなわち、この場合は、ステップS17においてスートブロワ3を起動しても効果的な付着灰除去はできないことが判明しているため、費用対効果の観点からスートブロワ3の「連続起動」は行わないが、管群2へのこれ以上の灰の堆積を低減すべくスートブロワ3の「1回起動」を実行する処理フローを進める。
一方、制御装置4は、当該作業が開始されたと判定した場合、その後、ステップS1〜S20のいずれの処理も実行せず、別途の当該作業に必要な処理を実行する。その後、制御装置4を含む除去システム1全体の動作が終了、すなわちプラントの運転が休止する。
Then, as an explanation of the flowchart of FIG. 2, finally, when the second determination is obtained by the adhesion ash determination process in step S16, or when the recovery rate is less than the recovery threshold value R in step S17, the control device 4 The step S21 to be executed will be described.
In step S21, the control device 4 determines whether or not the operator or worker has started the work for checking the state of the plant or stopping the operation of the plant (for example, operating the control panel). Since the control device 4 controls the operation of various devices arranged in the plant, it is possible to determine whether or not the work has been started.
When the control device 4 determines that the work has not been started, the control device 4 executes the process of step S8. That is, in this case, since it has been found that the soot blower 3 cannot be effectively removed even if the soot blower 3 is started in step S17, the soot blower 3 is not "continuously started" from the viewpoint of cost effectiveness. In order to reduce the further accumulation of ash on the tube group 2, the process flow for executing the "one-time activation" of the soot blower 3 is advanced.
On the other hand, when it is determined that the work has been started, the control device 4 does not execute any of the processes of steps S1 to S20, and then executes another process necessary for the work. After that, the operation of the entire removal system 1 including the control device 4 is completed, that is, the operation of the plant is stopped.

本フローチャートによれば、タイマーによるインターバルを置くスートブロワ3の「1回起動」の際は、クリーン熱貫流率Kcが第一所定値α1以上の場合は、従前のインターバルよりもインターバルを長くし、クリーン熱貫流率Kcが第一所定値α1未満の場合は、インターバルを従前のインターバルから変更しないか、または、従前のインターバルからインターバルを短く変更する。
さらに、本フローチャートによれば、タイマーによるインターバルを置かないスートブロワ3の「連続起動」の場合であっても、スートブロワ3を起動する度に、熱貫流率Kの演算を行う。そして、制御装置4は、演算された熱貫流率K(クリーン熱貫流率Kc、ダーティ熱貫流率Kd)に基づく回復率Rの値が上昇する限り、クリーン熱貫流率Kcが第二所定値α2以上となるまで、スートブロワ3の「連続起動」を実行する。
すなわち、「連続起動」におけるスートブロワ3の起動の回数は可変であり、回復率Rの値の上昇速度の値が大きければ(上昇速度が速ければ)、自動的に当該回数が少なくなり、当該上昇速度の値が小さければ(上昇速度が遅ければ)、自動的に当該回数が多くなる。
当該上昇速度は、制御装置4が、ステップS17を実行する度に演算する回復率の値と演算した時点の時間情報を、上記の記憶装置に順次記憶し、現時点で演算した回復率の値と直近の回復率の値と、両者の2つの時間情報の差(時間的間隔または時間差)の値を用いて、演算して得ることができる。具体的には、制御装置4は、式 [{(現時点で演算した回復率)−(直近の回復率)}/(当該時間差)]により、当該上昇速度を演算する。ショックパルス式スートブロワのガスの再充填時間が例えば3分間(3 min)未満とすると、当該上昇速度が速い場合とは、例えば、「連続起動」の回数が2回(6 min未満)または3回 (9 min未満)で終了する上昇速度が0.04(/min)以上の場合であり、当該上昇速度が遅い場合とは、例えば、当該回数が、4回以上(12 min 以上)を要する上昇速度が0.04(/min)未満の場合である。
According to this flowchart, when the soot blower 3 that sets the interval by the timer is "started once", if the clean heat transmission coefficient Kc is equal to or more than the first predetermined value α1, the interval is made longer than the previous interval to clean. When the heat transmission coefficient Kc is less than the first predetermined value α1, the interval is not changed from the previous interval, or the interval is shortened from the previous interval.
Further, according to this flowchart, even in the case of "continuous activation" of the soot blower 3 without an interval by the timer, the heat transmission coefficient K is calculated every time the soot blower 3 is activated. Then, in the control device 4, as long as the value of the recovery rate R based on the calculated heat transmission coefficient K (clean heat transmission coefficient Kc, dirty heat transmission coefficient Kd) increases, the clean heat transmission coefficient Kc becomes the second predetermined value α2. Until the above is reached, the "continuous activation" of the soot blower 3 is executed.
That is, the number of activations of the soot blower 3 in "continuous activation" is variable, and if the value of the recovery rate R ascending speed is large (if the ascending speed is fast), the number of times is automatically reduced and the ascending is performed. If the speed value is small (the climbing speed is slow), the number of times is automatically increased.
The ascending speed is the value of the recovery rate calculated each time the control device 4 executes step S17 and the time information at the time of calculation are sequentially stored in the above storage device, and the value of the recovery rate calculated at the present time is used. It can be obtained by calculation using the value of the latest recovery rate and the value of the difference (time interval or time difference) between the two time information. Specifically, the control device 4 calculates the ascending speed by the equation [{(recovery rate calculated at present time)-(recent recovery rate)} / (time difference)]. If the gas refill time of the shock pulse type soot blower is, for example, less than 3 minutes (3 min), the ascending speed is high, for example, the number of "continuous activations" is 2 times (less than 6 min) or 3 times. When the ascending speed ending in (less than 9 min) is 0.04 (/ min) or more, and the ascending speed is slow, for example, the number of ascending times requires 4 times or more (12 min or more). This is the case when the speed is less than 0.04 (/ min).

次に、付着灰判定処理、すなわちステップS16の詳細について、図3(a)〜(d)を用いて処理流れを説明する。
ここでは、発明者の経験に基づいて、上述した4つの条件のみを対象とし、これらのうちいくつの条件を使用するかで以下の4つのパターンに分けて説明する。しかし、先述のとおり、上述した4つの条件に加え、設計に応じて、他の条件を追加してもよい。
なお、以下の説明では、図2のステップS15の次の処理として、制御装置4は、ステップS161の処理を実行するとして、説明を行う。
では、図3(a)から、順次、説明を行う。
図3(a)は、付着灰判定処理が上述した4つの条件すべてに基づいて実行される処理フロー(パターン1)である。制御装置4は、ステップS161において、主蒸気量測定装置25により測定された主蒸気量Qsが、プラントの運転で許容される下限の主蒸気量qsmin(第一閾値)以上であるか否かを判定する。主蒸気量Qsがqsmin未満の場合、制御装置4は、「第二判定」が得られたとして、次に図2のステップS21の処理を実行する。主蒸気量Qsがqsmin以上の場合、制御装置4は、次のステップ、ここではステップS162の処理を実行する。
Next, the details of the adhered ash determination process, that is, step S16, will be described with reference to FIGS. 3 (a) to 3 (d).
Here, based on the experience of the inventor, only the above-mentioned four conditions are targeted, and the following four patterns will be described according to how many of these conditions are used. However, as described above, in addition to the above four conditions, other conditions may be added depending on the design.
In the following description, it is assumed that the control device 4 executes the process of step S161 as the next process of step S15 of FIG.
Then, explanations will be given sequentially from FIG. 3A.
FIG. 3A is a processing flow (pattern 1) in which the adhering ash determination processing is executed based on all the four conditions described above. The control device 4 determines whether or not the main steam amount Qs measured by the main steam amount measuring device 25 in step S161 is equal to or greater than the lower limit main steam amount qsmin (first threshold value) allowed in the operation of the plant. judge. When the main steam amount Qs is less than qsmin, the control device 4 assumes that the "second determination" is obtained, and then executes the process of step S21 of FIG. When the main steam amount Qs is qsmin or more, the control device 4 executes the process of the next step, here, step S162.

制御装置4は、ステップS162において、圧力測定装置14a、14bにより測定された圧力の情報を用いて、複数の管群2の入口と出口における排ガスの圧力差、すなわち炉内ガス差圧ΔPgを算出し、炉内ガス差圧ΔPgが、プラントの運転で許容される下限の炉内ガス差圧pgmin(第二閾値)以上であるか否かを判定する。炉内ガス差圧ΔPgがpgmin未満の場合、制御装置4は、「第二判定」が得られたとして、次に図2のステップS21の処理を実行する。炉内ガス差圧ΔPgがpgmin以上の場合、制御装置4は、次のステップ、ここではステップS163の処理を実行する。 The control device 4 calculates the pressure difference of the exhaust gas at the inlet and outlet of the plurality of pipe groups 2, that is, the gas differential pressure ΔPg in the furnace, using the pressure information measured by the pressure measuring devices 14a and 14b in step S162. Then, it is determined whether or not the gas differential pressure ΔPg in the furnace is equal to or higher than the lower limit gas differential pressure pgmin (second threshold) allowed in the operation of the plant. When the gas differential pressure ΔPg in the furnace is less than pgmin, the control device 4 assumes that the “second determination” is obtained, and then executes the process of step S21 in FIG. When the gas differential pressure ΔPg in the furnace is pgmin or more, the control device 4 executes the process of the next step, here, step S163.

制御装置4は、ステップS163において、誘引送風機13の回転数Qrが、プラントの運転で許容される下限の回転数qrmin(第三閾値)以上であるか否かを判定する。回転数Qrがqrmin未満の場合、制御装置4は、「第二判定」が得られたとして、次に図2のステップS21の処理を実行する。回転数Qrがqrmin以上の場合、制御装置4は、次のステップ、ここではステップS164の処理を実行する。なお、制御装置4は、誘引送風機13の回転数Qrを制御しているので、回転数Qrを把握している。 In step S163, the control device 4 determines whether or not the rotation speed Qr of the induction blower 13 is equal to or higher than the lower limit rotation speed qrmin (third threshold value) allowed in the operation of the plant. When the rotation speed Qr is less than qrmin, the control device 4 assumes that the "second determination" is obtained, and then executes the process of step S21 of FIG. When the rotation speed Qr is qrmin or more, the control device 4 executes the process of the next step, here, step S164. Since the control device 4 controls the rotation speed Qr of the attracting blower 13, the rotation speed Qr is grasped.

制御装置4は、ステップS164において、燃焼空気量測定装置28により測定された燃焼空気総量Qcが、プラントの運転で許容される下限の燃焼空気総量qcmin(第四閾値)以上であるか否かを判定する。燃焼空気総量Qcがqcmin未満の場合、制御装置4は、「第二判定」が得られたとして、次に図2のステップS21の処理を実行する。燃焼空気総量Qcがqcmin以上の場合、制御装置4は、次のステップの処理を実行する。ここでは、「第一判定」が得られたとして、次の図2のステップS17の処理を実行する。
なお、ステップS161〜S164の四つの処理の処理フローの順番はこれに限らず、適宜、入れ替えてもよい。
The control device 4 determines whether or not the total amount of combustion air Qc measured by the combustion air amount measuring device 28 in step S164 is equal to or greater than the lower limit of the total amount of combustion air qcmin (fourth threshold value) allowed in the operation of the plant. judge. When the total amount of combustion air Qc is less than qcmin, the control device 4 assumes that the "second determination" is obtained, and then executes the process of step S21 of FIG. When the total amount of combustion air Qc is qcmin or more, the control device 4 executes the process of the next step. Here, assuming that the "first determination" is obtained, the process of step S17 of FIG. 2 is executed next.
The order of the processing flows of the four processes of steps S161 to S164 is not limited to this, and may be changed as appropriate.

図3(b)の処理フロー(パターン2)は、図3(a)の処理フローに含まれる四つの判定要素のうち、ステップS161〜S163の3つの判定要素を実行するものである。図3(b)は、付着灰判定処理が上述した4つの条件のうちのいずれか3つに基づいて実行されるフローチャートの一例であり、ステップS161〜S164の4つの判定要素のいずれの3つを使用してもよいし、処理の順番はいずれが先であってもよい。 The processing flow (pattern 2) of FIG. 3B executes the three determination elements of steps S161 to S163 among the four determination elements included in the processing flow of FIG. 3A. FIG. 3B is an example of a flowchart in which the adhesion ash determination process is executed based on any three of the above four conditions, and any three of the four determination elements in steps S161 to S164 are used. May be used, and the order of processing may come first.

図3(c)の処理フロー(パターン3)は、図3(a)の処理フローに含まれる四つの判定要素のうち、ステップS161及びS162の2つの判定要素を実行するものである。図3(c)は、付着灰判定処理が上述した4つの条件のうちのいずれか2つに基づいて実行される処理フローの一例であり、ステップS161〜S164の4つの判定要素のいずれの2つを使用してもよいし、判定の順番はいずれが先であってもよい。 The processing flow (pattern 3) of FIG. 3C executes two determination elements of steps S161 and S162 among the four determination elements included in the processing flow of FIG. 3A. FIG. 3C is an example of a processing flow in which the adhering ash determination processing is executed based on any two of the above four conditions, and is any two of the four determination elements of steps S161 to S164. One may be used, and the order of determination may be first.

図3(d)の処理フロー(パターン4)は、図3(a)の処理フローに含まれる四つの判定要素のうち、ステップS161の判定要素のみを実行するものである。図3(d)は、付着灰判定処理が上述した4つの条件のうちのいずれか1つに基づいて実行されるフローチャートの一例であり、ステップS161〜S164の四つの判定要素のいずれの1つを使用してもよい。
なお、上記のパターン1〜パターン4のいずれの場合でも、熱貫流率Kの演算に使用しない主蒸気量Qsの情報を用いるステップS161を含めることが好ましい。
The processing flow (pattern 4) of FIG. 3D executes only the determination element of step S161 among the four determination elements included in the processing flow of FIG. 3A. FIG. 3D is an example of a flowchart in which the adhesion ash determination process is executed based on any one of the above four conditions, and is one of the four determination elements in steps S161 to S164. May be used.
In any of the above patterns 1 to 4, it is preferable to include step S161 that uses the information of the main steam amount Qs that is not used in the calculation of the heat transmission coefficient K.

[4.効果]
以上のとおり、除去システム1においては、制御装置4が、演算した熱貫流率Kに基づいてスートブロワ3の「1回起動」と「連続起動」とを使い分けるため、経済性を担保しつつ早期かつ適切に付着灰除去を行うことができる。
[4. effect]
As described above, in the removal system 1, the control device 4 properly uses the “one-time activation” and the “continuous activation” of the soot blower 3 based on the calculated heat transmission coefficient K, so that the efficiency can be ensured at an early stage. Adhering ash can be removed appropriately.

付着灰判定処理は、発明者の経験に基づく条件、すなわち主蒸気量Qc、炉内ガス差圧ΔPg、誘引送風機13の回転数Qr、及び燃焼空気総量Qcの少なくとも1つに基づく条件を含んで実行されるので、管群2に対する付着灰の堆積の状態を適切に判定することができる。 The adhering ash determination process includes conditions based on the inventor's experience, that is, conditions based on at least one of the main steam amount Qc, the gas differential pressure ΔPg in the furnace, the rotation speed Qr of the attracting blower 13, and the total combustion air amount Qc. Since it is executed, the state of accumulation of attached ash on the tube group 2 can be appropriately determined.

除去システム1では、付着灰判定処理で第一判定が得られた場合、ダーティ熱貫流率Kdとクリーン熱貫流率Kcとから回復率を演算し、回復率が回復閾値R以上である場合はスートブロワ3を「連続起動」することで、早期に付着灰を除去することができる。
また、除去システム1では、制御装置4は、回復率の上昇速度が大きい場合、「連続起動」におけるスートブロワ3の起動の回数を自動的に減少し、回復率の上昇速度が小さい場合、当該回数を自動的に増加する。従って、付着灰の状況に応じて、制御装置4は「連続起動」におけるスートブロワ3の起動の回数を適切に増減して制御するので、当該回数が固定値の場合に比べ、付着灰を効果的に除去できるとともに、経済性も担保できる。
In the removal system 1, when the first judgment is obtained by the adhesion ash judgment process, the recovery rate is calculated from the dirty heat transmission rate Kd and the clean heat transmission rate Kc, and when the recovery rate is equal to or higher than the recovery threshold value R, the soot blower Adhering ash can be removed at an early stage by "continuously starting" 3.
Further, in the removal system 1, the control device 4 automatically reduces the number of activations of the soot blower 3 in "continuous activation" when the increase rate of the recovery rate is large, and the number of times when the increase rate of the recovery rate is small. Is automatically increased. Therefore, the control device 4 appropriately increases or decreases the number of activations of the soot blower 3 in the "continuous activation" according to the condition of the adhered ash, so that the adhered ash is more effective than the case where the number of times is a fixed value. It can be removed and economic efficiency can be guaranteed.

除去システム1によれば、クリーン熱貫流率Kcが第一所定値α以上の場合、管群2の熱伝導が極めて良好(付着灰の堆積はない又は極めて少ない)と制御装置4が判断し、「1回起動」のインターバルを長く再設定するため、スートブロワ3の過度な起動を回避することができ、結果として経済性をより担保できる。一方、回復率が回復閾値R以上の場合には、「連続起動」が終了した後に続く「1回起動」のインターバルを短く再設定するため、「連続起動」が必要となるほど付着性の強い灰の性状であっても、短いインターバルでスートブロワ3を「1回起動」するので、管群2に灰が分厚く堆積する前に付着灰を除去できる。従って、「連続起動」を頻繁に行う必要がなくなるので、結果として経済性をより担保できる。 According to the removal system 1, when the clean heat transmission coefficient Kc is equal to or higher than the first predetermined value α, the control device 4 determines that the heat conduction of the tube group 2 is extremely good (no or very little adhered ash is accumulated). Since the interval of "one-time activation" is reset to a long time, it is possible to avoid excessive activation of the soot blower 3, and as a result, the economic efficiency can be further secured. On the other hand, when the recovery rate is equal to or higher than the recovery threshold value R, the interval of the "single start" following the end of the "continuous start" is reset short, so that the ash is so adherent that "continuous start" is required. Even with the above properties, since the soot blower 3 is "started once" at short intervals, the attached ash can be removed before the ash is thickly deposited on the tube group 2. Therefore, it is not necessary to frequently perform "continuous activation", and as a result, economic efficiency can be further secured.

除去システム1によれば、制御装置4は、除塵装置11としてのバグフィルタの逆洗が実行されている間はスートブロワ3を起動せず、逆洗の終了を待ってスートブロワ3を起動することから、プラントに故障が発生することを回避できる。 According to the removal system 1, the control device 4 does not start the soot blower 3 while the backwash of the bug filter as the dust remover 11 is being executed, but waits for the end of the backwash to start the sootblower 3. , It is possible to avoid the failure of the plant.

スートブロワ3は、蒸気式、ショックパルス式のいずれであってもよい。ただし、蒸気式スートブロワは、排ガスとボイラとが熱交換して生成した蒸気を使用するため、ボイラが発電のためにタービンへ供給する蒸気の量が減少し、結果として、プラントにおける発電量が減少しうる。このため、プラントの発電量を重視する場合には、蒸気を使用しないショックパルス式スートブロワを配置するのが望ましい。 The soot blower 3 may be either a steam type or a shock pulse type. However, since the steam type soot blower uses steam generated by heat exchange between the exhaust gas and the boiler, the amount of steam supplied by the boiler to the turbine for power generation is reduced, and as a result, the amount of power generated in the plant is reduced. Can be done. Therefore, when the amount of power generated by the plant is important, it is desirable to arrange a shock pulse type soot blower that does not use steam.

スートブロワ3は、通常、排ガスの経路を形成するダクトなどの壁面に設置される。従って、図1のスートブロワ3が蒸気式である場合、スートブロワ3の噴射ノズルが伸縮する方向は、X軸を含み、Y軸に直交する平面上の方向であり、当該噴射ノズルからY軸方向へ蒸気を噴射する。
一方、スートブロワ3がショックパルス式である場合、ショックパルスの射出方向は、X軸を含み、Y軸に直交する平面上の方向である。
従って、ショックパルス式スートブロワ3を備えた除去システム1の場合、図1において、3パスと2パスの間の壁面に向けてショックパルスを射出すれば、当該壁面を振動させて、管群2の付着灰だけでなく、当該壁面に付着した灰も除去することができる。
The soot blower 3 is usually installed on a wall surface such as a duct forming a path for exhaust gas. Therefore, when the soot blower 3 of FIG. 1 is a steam type, the direction in which the injection nozzle of the soot blower 3 expands and contracts is a direction on a plane including the X axis and orthogonal to the Y axis, and from the injection nozzle to the Y axis direction. Inject steam.
On the other hand, when the soot blower 3 is of the shock pulse type, the injection direction of the shock pulse is a direction on a plane including the X axis and orthogonal to the Y axis.
Therefore, in the case of the removal system 1 provided with the shock pulse type soot blower 3, if a shock pulse is emitted toward the wall surface between the 3rd pass and the 2nd pass in FIG. 1, the wall surface is vibrated and the tube group 2 Not only the adhered ash but also the ash adhering to the wall surface can be removed.

[5.変形例]
以下、複数のスートブロワ3を有する除去システム1の変形例について説明する。第一変形例は、図1において、点線で示す符号3′、符号3″で示すスートブロワを使用した例である。第二変形例は、図4(a)〜(c)で示すように、図1の3パスに配置する管群2の数が図1より多い場合の例である。第三変形例は、図5で示すように、プラントのボイラ構造がテールエンド型の例である。第四変形例は、図6で示すように、プラントのボイラ構造が、2ドラム式のボイラの例である。
以下の説明では、上述した図1の除去システム1と同一の要素には同一の符号を付し、重複する説明は省略する。なお、図5及び図6では、図1に示した制御装置4と、制御装置4に入力され又は制御装置4から出力される信号線(細い実線)の図示を省略している。
[5. Modification example]
Hereinafter, a modified example of the removal system 1 having a plurality of soot blowers 3 will be described. The first modification is an example in which the soot blower indicated by the dotted line 3'and the reference 3 "is used in FIG. 1. The second modification is an example as shown in FIGS. 4 (a) to 4 (c). This is an example in which the number of pipe groups 2 arranged in the three paths of FIG. 1 is larger than that of FIG. 1. The third modification is an example in which the boiler structure of the plant is a tail end type as shown in FIG. In the fourth modification, as shown in FIG. 6, the boiler structure of the plant is an example of a two-drum type boiler.
In the following description, the same elements as the removal system 1 of FIG. 1 described above are designated by the same reference numerals, and duplicate description will be omitted. Note that in FIGS. 5 and 6, the control device 4 shown in FIG. 1 and the signal line (thin solid line) input to or output from the control device 4 are not shown.

[5−1.第一変形例]
図1では、実施形態としてスートブロワ3が1つだけ配置された除去システム1を説明したが、管群2の数またはプラントの設計に応じて、複数のスートブロワ3が配置された除去システム1′とすることも可能である。
スートブロワ3は、一般的に、それに近接して配置された管群2の付着灰を効果的に除去する。このため、除去システム1の構成では、スートブロワ3aに近接して2つの管群2(過熱管22a、22bのそれぞれで構成された管群2)の付着灰が効果的に除去されることになる。しかし、最下流に位置する過熱管22cで構成された管群2がスートブロワ3aから離れた位置に配置されるため、この管群2(22c)の付着灰の除去が不十分となる可能性がある。
[5-1. First modification]
In FIG. 1, a removal system 1 in which only one soot blower 3 is arranged has been described as an embodiment, but a removal system 1 ′ in which a plurality of soot blowers 3 are arranged depends on the number of pipe groups 2 or the design of the plant. It is also possible to do.
The soot blower 3 generally effectively removes the adhering ash of the tube group 2 placed in close proximity to it. Therefore, in the configuration of the removal system 1, the attached ash of the two pipe groups 2 (the pipe group 2 composed of the superheated pipes 22a and 22b) in the vicinity of the soot blower 3a is effectively removed. .. However, since the tube group 2 composed of the superheated tube 22c located at the most downstream position is arranged at a position away from the soot blower 3a, there is a possibility that the removal of the adhered ash of the tube group 2 (22c) is insufficient. is there.

そこで、図1中に点線で示すように、除去システム1′では、スートブロワ3aに加え、管群2(22c)の後流の位置〔この管群2(22c)の隣、且つ、Y軸方向直上〕に、スートブロワ3′を別個に配置することで、管群2(22c)の付着灰を効果的に除去することができる。
なお、このとき、スートブロワ3aと別個に配置するスートブロワがショックパルス式スートブロワである場合は、符号3′で示すスートブロワに代わり、または符号3′で示すスートブロワと共に、符号3″で示す位置にスートブロワを配置してもよい。図1中に破線で示すスートブロワ3″は、3パスの天井の壁面近傍に設置されるスートブロワを示しており、Y軸方向かつ下方へショックパルスを射出するように配置すれば、管群2(22c)のみならず、その上流に配置された管群2(22b)の付着灰もより効果的に除去することが可能となる。
Therefore, as shown by the dotted line in FIG. 1, in the removal system 1', in addition to the soot blower 3a, the position of the wake of the tube group 2 (22c) [next to the tube group 2 (22c) and in the Y-axis direction. By separately arranging the soot blower 3'on the above], the attached ash of the tube group 2 (22c) can be effectively removed.
At this time, if the soot blower arranged separately from the soot blower 3a is a shock pulse type soot blower, the soot blower is placed at the position indicated by the reference numeral 3 "in place of the soot blower indicated by the reference numeral 3'or together with the soot blower indicated by the reference numeral 3'. It may be arranged. The soot blower 3 ″ shown by the broken line in FIG. 1 indicates a soot blower installed near the wall surface of the ceiling of 3 passes, and is arranged so as to emit a shock pulse in the Y-axis direction and downward. For example, not only the tube group 2 (22c) but also the adhered ash of the tube group 2 (22b) arranged upstream thereof can be removed more effectively.

除去システム1′に、複数のスートブロワ3、3′、3″を配置した場合であっても、1つのスートブロワ3のみを配置した上述した構成と同様に、制御装置4は、各スートブロワに対して、図2の処理を実行する。
ただし、ステップS13の処理において、制御装置4は、各スートブロワ3、3′、3″の配置に応じて、それぞれの起動のタイミングをずらし、1つずつ順番に起動する。すなわち、制御装置4は、当該複数のスートブロワ3、3′、3″を同時に起動しない。
蒸気式スートブロワが複数配置され、これらが同時に起動された場合、ボイラからタービンに供給される蒸気が大幅に減少するので、発電量が大幅に減少し、安定的な送電が困難となる。また、ショックパルス式スートブロワが複数配置され、これらが同時に起動された場合、炉内の圧力やダクト内部の圧力が著しく上昇し、プラントに故障が発生するおそれがある。
そこで、除去システム1′では、これらのスートブロワ3の起動を時間的にずらして順次起動する。
制御装置4が、複数のスートブロワ3を順次起動する順番は、後述の図4で示す第二変形例と同様であるので、説明を省略する。
Even when a plurality of soot blowers 3, 3', 3 "are arranged in the removal system 1', the control device 4 is used for each soot blower as in the above-described configuration in which only one soot blower 3 is arranged. , The process of FIG. 2 is executed.
However, in the process of step S13, the control device 4 shifts the start timing of each of the soot blowers 3, 3 ′, and 3 ″, and starts them one by one in order. That is, the control device 4 starts. , Do not start the plurality of soot blowers 3, 3', 3 "at the same time.
When a plurality of steam type soot blowers are arranged and started at the same time, the steam supplied from the boiler to the turbine is significantly reduced, so that the amount of power generation is significantly reduced and stable power transmission becomes difficult. In addition, if a plurality of shock pulse type soot blowers are arranged and started at the same time, the pressure inside the furnace and the pressure inside the duct may rise remarkably, and a failure may occur in the plant.
Therefore, in the removal system 1', the activation of these soot blowers 3 is staggered in time and sequentially activated.
Since the order in which the control device 4 sequentially activates the plurality of soot blowers 3 is the same as that of the second modification shown in FIG. 4 described later, the description thereof will be omitted.

[5−2.第二変形例]
図4(a)〜(c)に示す第二変形例の除去システム1A〜1Cは、除去システム1に対し、管群2の数とスートブロワ3の数と出口蒸気温度測定装置24bの配置とが異なる。第二変形例では、Y軸方向、すなわち鉛直方向に複数の管群2が配置され、且つ、複数のスートブロワ3が配置される。図4(a)は、図1の3パスに、過熱管22で構成された管群2が4つ配置された除去システム1Aである。図4(b)は、図1の3パスに、過熱管22で構成された管群2が5つ配置された除去システム1Bである。図4(c)は、図1の3パスに、過熱管22で構成された管群2が6つ配置された除去システム1Cである。
第二変形例においても、第一変形例と同様に、制御装置4は、複数の各スートブロワに対して、図2の処理を実行する。
[5-2. Second variant]
In the removal systems 1A to 1C of the second modification shown in FIGS. 4A to 4C, the number of tube groups 2, the number of soot blowers 3, and the arrangement of the outlet steam temperature measuring device 24b are different from those of the removal system 1. different. In the second modification, a plurality of pipe groups 2 are arranged in the Y-axis direction, that is, in the vertical direction, and a plurality of soot blowers 3 are arranged. FIG. 4A is a removal system 1A in which four tube groups 2 composed of superheated tubes 22 are arranged in the three paths of FIG. FIG. 4B is a removal system 1B in which five tube groups 2 composed of superheated tubes 22 are arranged in the three paths of FIG. FIG. 4C is a removal system 1C in which six tube groups 2 composed of superheated tubes 22 are arranged in the three paths of FIG.
In the second modification as well, as in the first modification, the control device 4 executes the process of FIG. 2 for each of the plurality of soot blowers.

図4(a)に示す除去システム1Aにおいては、図1の構成に加え、過熱管22cで構成された管群2の下流(Y軸方向かつ上方)にこれに隣り合って配置され、過熱管22dで構成された管群2が配置される。また、過熱管22cで構成された管群2と過熱管22dで構成された管群2との間に、スートブロワ3bが配置される。
図4(c)に示す除去システム1Cにおいては、図4(a)の構成に加え、過熱管22dで構成された管群2の下流にこれに隣り合って配置され、過熱管22eで構成された管群2と、この下流(Y軸方向かつ上方)にこれに隣り合って配置され、過熱管22fで構成された管群2とがさらに配置される。また、過熱管22eで構成された管群2と過熱管22fで構成された管群2との間にスートブロワ3dが配置される。
図4(a)及び図4(c)に示すように、スートブロワ3で付着灰除去する管群2(ここでは、過熱管22で構成された管群2)の数が、複数かつ偶数の場合、当該対象の管群2の間の全てにスートブロワ3を配置することはしない。付着灰除去の費用対効果を鑑みて、当該対象の管群2のうち、上流の管群2から順に2つの管群2で一組のユニットを構成し、1つのユニットに1つのスートブロワ3を配置する。従って、配置される複数のスートブロワ3の数は、当該対象の管群2の数の半数となる。
In the removal system 1A shown in FIG. 4A, in addition to the configuration of FIG. 1, the superheated pipes are arranged adjacent to each other downstream (in the Y-axis direction and upward) of the pipe group 2 composed of the superheated pipes 22c. The tube group 2 composed of 22d is arranged. Further, the soot blower 3b is arranged between the tube group 2 composed of the superheated tube 22c and the tube group 2 composed of the superheated tube 22d.
In the removal system 1C shown in FIG. 4 (c), in addition to the configuration of FIG. 4 (a), the removal system 1C is arranged adjacent to the pipe group 2 composed of the superheat pipe 22d and is composed of the superheat pipe 22e. The tube group 2 and the tube group 2 arranged adjacent to the tube group 2 downstream of the tube group 2 (in the Y-axis direction and above) and composed of the superheated tube 22f are further arranged. Further, the soot blower 3d is arranged between the tube group 2 composed of the superheated tube 22e and the tube group 2 composed of the superheated tube 22f.
As shown in FIGS. 4 (a) and 4 (c), when the number of tube groups 2 (here, tube group 2 composed of superheated tubes 22) for removing adhering ash with the soot blower 3 is plural and even. , The soot blower 3 is not placed in all of the pipe groups 2 of the target. In consideration of the cost-effectiveness of removing the adhering ash, a set of two pipe groups 2 in order from the upstream pipe group 2 of the target pipe group 2 is formed, and one soot blower 3 is provided for each unit. Deploy. Therefore, the number of the plurality of soot blowers 3 to be arranged is half of the number of the target tube group 2.

一方、図4(b)に示す除去システム1Bにおいては、図4(c)と異なり、過熱管22dで構成された管群2の下流(Y軸方向かつ上方)にこれに隣り合って配置され、過熱管22eで構成された管群2だけが、図4(a)の構成に追加される。従って、図4(b)においては、スートブロワ3で付着灰除去する管群2(過熱管22で構成された管群2)の数が、複数かつ奇数となる。この場合、上述の「ユニット」を作ることができない管群2が生じる。図4(b)では、過熱管22eで構成された管群2については、上述の「ユニット」を作ることができない。
しかしながら、過熱管22eで構成された管群2の付着灰も看過できない場合、当該管群2の下流にスートブロワ3cを配置する。
On the other hand, in the removal system 1B shown in FIG. 4B, unlike FIG. 4C, the removal system 1B is arranged adjacent to the downstream (Y-axis direction and upward) of the tube group 2 composed of the superheated tubes 22d. , Only the tube group 2 composed of the superheated tube 22e is added to the configuration of FIG. 4A. Therefore, in FIG. 4B, the number of tube groups 2 (tube group 2 composed of superheated tubes 22) from which the adhering ash is removed by the soot blower 3 is plural and odd. In this case, a tube group 2 in which the above-mentioned "unit" cannot be formed is generated. In FIG. 4B, the above-mentioned "unit" cannot be formed for the tube group 2 composed of the superheated tube 22e.
However, if the adhered ash of the tube group 2 composed of the superheated tube 22e cannot be overlooked, the soot blower 3c is arranged downstream of the tube group 2.

以上の第二変形例においては、鉛直方向(Y軸方向)に付着灰除去の対象となる管群2が整列して配置されている。そして、最下流に位置する管群2を構成する過熱管22の内部に、出口蒸気温度測定装置24bが配置される。
あるスートブロワ3を起動して付着灰が除去された場合、除去された付着灰の移動については、[1]重力で鉛直方向かつ下方に落下する場合と、[2]排ガスの流れが強く、排ガスの流れに乗って後流に移動する場合の2つの状況が考えられる。
そこで、[1]の場合、制御装置4は、スートブロア3を「1回起動」または「連続起動」する際、最下流に配置されたスートブロワ3から上流に配置されたスートブロワ3に向かって、タイミングをずらして順番に起動する。すなわち、図4(a)の場合には、スートブロワ3bを起動した後、スートブロワ3aを起動する。また、図4(b)の場合には、スートブロワ3cを起動した後、スートブロワ3bを起動し、スートブロワ3bを起動した後、スートブロワ3aを起動する。同様に、図4(c)の場合には、スートブロワ3dを起動した後、スートブロワ3bを起動し、スートブロワ3bを起動した後、スートブロワ3aを起動する。
この順序で各スートブロワ3を起動することにより、ある管群2においてスートブロワ3で除去された付着灰が重力で下方に落下しつつ、上流に配置された別の管群に再付着した場合においても、再付着した付着灰を含め、確実に除去することができる。
一方、[2]の場合、制御装置4は、スートブロア3を「1回起動」または「連続起動」する際、最上流に配置されたスートブロワ3から下流に配置されたスートブロワ3に向かって、タイミングをずらして順番に起動する。すなわち、図4(a)の場合には、スートブロワ3aを起動した後、スートブロワ3bを起動する。また、図4(b)の場合には、スートブロワ3aを起動した後、スートブロワ3bを起動し、スートブロワ3bを起動した後、スートブロワ3cを起動する。同様に、図4(c)の場合には、スートブロワ3aを起動した後、スートブロワ3bを起動し、スートブロワ3bを起動した後、スートブロワ3dを起動する。
この順序で各スートブロワ3を起動することにより、ある管群2においてスートブロワ3で除去された付着灰が排ガスの流れに乗って下流に移動しつつ、下流に配置された別の管群に再付着した場合においても、再付着した付着灰も含め、確実に除去することができる。
In the above second modification, the tube group 2 to be removed from the adhered ash is arranged in the vertical direction (Y-axis direction). Then, the outlet steam temperature measuring device 24b is arranged inside the superheated pipe 22 constituting the pipe group 2 located at the most downstream side.
When a certain soot blower 3 is activated and the attached ash is removed, the movement of the removed attached ash is as follows: [1] when it falls vertically and downward due to gravity, and [2] the flow of exhaust gas is strong and the exhaust gas is exhausted. There are two possible situations when moving to the wake along the flow of.
Therefore, in the case of [1], when the control device 4 “starts once” or “continuously starts” the soot blower 3, the timing is directed from the soot blower 3 arranged at the most downstream toward the soot blower 3 arranged at the upstream. Start in order by shifting. That is, in the case of FIG. 4A, the soot blower 3a is started after the soot blower 3b is started. Further, in the case of FIG. 4B, after starting the soot blower 3c, the soot blower 3b is started, the soot blower 3b is started, and then the soot blower 3a is started. Similarly, in the case of FIG. 4C, the soot blower 3d is started, then the soot blower 3b is started, the soot blower 3b is started, and then the soot blower 3a is started.
By activating each soot blower 3 in this order, even when the attached ash removed by the soot blower 3 in a certain tube group 2 falls downward due to gravity and reattaches to another tube group arranged upstream. , The adhering ash that has reattached can be reliably removed.
On the other hand, in the case of [2], when the control device 4 “starts once” or “continuously starts” the soot blower 3, the timing is directed from the soot blower 3 arranged at the uppermost stream toward the soot blower 3 arranged downstream. Start in order by shifting. That is, in the case of FIG. 4A, after starting the soot blower 3a, the soot blower 3b is started. Further, in the case of FIG. 4B, after starting the soot blower 3a, the soot blower 3b is started, the soot blower 3b is started, and then the soot blower 3c is started. Similarly, in the case of FIG. 4C, the soot blower 3a is started, then the soot blower 3b is started, the soot blower 3b is started, and then the soot blower 3d is started.
By activating each soot blower 3 in this order, the adhering ash removed by the soot blower 3 in one tube group 2 moves downstream along with the flow of exhaust gas and reattaches to another tube group arranged downstream. Even in such a case, the adhering ash that has reattached can be reliably removed.

なお、第二変形例において、本願の請求項6における第一管群、第二管群、第三管群、第四管群、第一スートブロワ、第二スートブロワに相当する構成は、次のとおりである。
すなわち、図4(a)および図4(b)では、過熱管22aで構成された管群2が第一管群、過熱管22bで構成された管群2が第二管群、過熱管22cで構成された管群2が第三管群、過熱管22dで構成された管群2が第四管群に相当する。また、スートブロワ3aが第一スートブロワ、スートブロワ3bが第二スートブロワに相当する。図4(c)では、図4(a)および図4(b)と同じ場合のほか、過熱管22cで構成された管群2が第一管群、過熱管22dで構成された管群2が第二管群、過熱管22eで構成された管群2が第三管群、過熱管22fで構成された管群2が第四管群、スートブロワ3bが第一スートブロワ、スートブロワ3dが第二スートブロワに相当する場合もある。
In the second modification, the configurations corresponding to the first tube group, the second tube group, the third tube group, the fourth tube group, the first soot blower, and the second soot blower in claim 6 of the present application are as follows. Is.
That is, in FIGS. 4 (a) and 4 (b), the tube group 2 composed of the superheated tube 22a is the first tube group, the tube group 2 composed of the superheated tube 22b is the second tube group, and the superheated tube 22c. The tube group 2 composed of is corresponding to the third tube group, and the tube group 2 composed of the superheated tube 22d corresponds to the fourth tube group. Further, the soot blower 3a corresponds to the first soot blower, and the soot blower 3b corresponds to the second soot blower. In FIG. 4 (c), in addition to the same cases as in FIGS. 4 (a) and 4 (b), the tube group 2 composed of the superheated tube 22c is the first tube group, and the tube group 2 composed of the superheated tube 22d. Is the second tube group, the tube group 2 composed of the superheated tube 22e is the third tube group, the tube group 2 composed of the superheated tube 22f is the fourth tube group, the soot blower 3b is the first soot blower, and the soot blower 3d is the second. It may correspond to a soot blower.

[5−3.第三変形例]
次に、第三変形例につき、図5を用いて説明する。
第三変形例の除去システム1Dでは、図1の3パスとエコノマイザ9との間に、水平方向(X軸方向)に延びる排ガスの流路が追加され、当該水平方向の流路にも、複数の管群2が配置され、且つ、複数のスートブロワ3が配置される。第三変形例のプラントのボイラ構造は、テールエンド型といわれる。そして、最下流に位置する管群2を構成する過熱管22fの内部に、出口蒸気温度測定装置24bが配置される。
第三変形例は、第二変形例の一つである図4(c)の構成において、過熱管22cで構成された管群2から過熱管22fで構成された管群2までを、スートブロワ3b、3dを含んで、これらの上流から下流までの順序を変更することなく、水平方向に配置した構成である。なお、ここでは、過熱管22bで構成された管群2と過熱管22cで構成された管群2とが、第二変形例と同様に、互いに隣り合って配置されていると考える。
従って、第三変形例には、鉛直方向で上流(Y軸方向且つ下方)から下流(Y軸方向且つ上方)に向かって順次配置された複数の管群2と、水平方向で一方向(X軸方向)に向かって順次配置された複数の管群2とが存在する。
なお、第三変形例においても、第一変形例及び第二変形例と同様に、制御装置4は、複数の各スートブロワに対して、図2の処理を実行する。
[5-3. Third variant]
Next, a third modification will be described with reference to FIG.
In the removal system 1D of the third modification, an exhaust gas flow path extending in the horizontal direction (X-axis direction) is added between the three paths in FIG. 1 and the economizer 9, and a plurality of flow paths in the horizontal direction are also added. The tube group 2 of the above is arranged, and a plurality of soot blowers 3 are arranged. The boiler structure of the plant in the third modification is called the tail end type. Then, the outlet steam temperature measuring device 24b is arranged inside the superheated pipe 22f constituting the pipe group 2 located at the most downstream side.
In the third modification, in the configuration of FIG. 4C, which is one of the second modifications, the soot blower 3b covers the tube group 2 composed of the superheated tube 22c to the tube group 2 composed of the superheated tube 22f. 3d is included, and the configuration is arranged in the horizontal direction without changing the order from upstream to downstream. Here, it is considered that the tube group 2 composed of the superheated tube 22b and the tube group 2 composed of the superheated tube 22c are arranged adjacent to each other as in the second modification.
Therefore, in the third modification, a plurality of pipe groups 2 sequentially arranged from upstream (Y-axis direction and downward) to downstream (Y-axis direction and upward) in the vertical direction and one direction (X) in the horizontal direction. There are a plurality of tube groups 2 sequentially arranged in the axial direction).
In the third modification as well, the control device 4 executes the process of FIG. 2 for each of the plurality of soot blowers, as in the first modification and the second modification.

ここで、水平方向で一方向(X軸方向)に向かって順次配置された複数の管群2、すなわち、図5における過熱管22cで構成された管群2、過熱管22dで構成された管群2、過熱管22eで構成された管群2、過熱管22fで構成された管群2に着目した場合、スートブロワ3b又は3dを起動して付着灰が除去されると、除去された付着灰は、排ガスの流れに乗って後流に移動する可能性が高い。
そこで、制御装置4は、スートブロア3を「1回起動」または「連続起動」する際、最上流に配置されたスートブロワ3から下流に配置されたスートブロワ3に向かって、タイミングをずらして順番に起動する。すなわち、制御装置4は、スートブロワ3bを起動した後、スートブロワ3dを起動する。
この順序で各スートブロワ3を起動することにより、ある管群2においてスートブロワ3で除去された付着灰が排ガスの流れに乗って下流に移動しつつ、下流に配置された別の管群に再付着した場合においても、再付着した付着灰も含め、確実に除去することができる。
Here, a plurality of tube groups 2 sequentially arranged in one direction (X-axis direction) in the horizontal direction, that is, the tube group 2 composed of the superheated tube 22c in FIG. 5 and the tube composed of the superheated tube 22d. Focusing on the group 2, the tube group 2 composed of the superheated tube 22e, and the tube group 2 composed of the superheated tube 22f, when the soot blower 3b or 3d is started to remove the adhering ash, the adhering ash is removed. Is likely to move to the wake along the flow of exhaust gas.
Therefore, when the soot blower 3 is "started once" or "continuously started", the control device 4 is started in order from the soot blower 3 arranged at the uppermost stream toward the soot blower 3 arranged downstream. To do. That is, the control device 4 activates the soot blower 3d and then activates the soot blower 3d.
By activating each soot blower 3 in this order, the adhering ash removed by the soot blower 3 in one tube group 2 moves downstream along with the flow of exhaust gas and reattaches to another tube group arranged downstream. Even in such a case, the adhering ash that has reattached can be reliably removed.

また、図5において、水平方向に配置された複数の管群2と鉛直方向に配置された複数の管群2とを総合的に鑑みた場合、第二変形例で説明した[2]の場合がありうることから、制御装置4は、スートブロア3を「1回起動」または「連続起動」する際、最上流に配置されたスートブロワ3から下流に配置されたスートブロワ3に向かって、タイミングをずらして順番に起動する。すなわち、制御装置4は、スートブロワ3aを起動した後、スートブロワ3bを起動し、スートブロワ3bを起動した後、スートブロワ3dを起動する。
この順序で各スートブロワ3を起動することにより、ある管群2においてスートブロワ3で除去された付着灰が排ガスの流れに乗って下流に移動しつつ、下流に配置された別の管群に再付着した場合においても、再付着した付着灰も含め、確実に除去することができる。
Further, in FIG. 5, when the plurality of pipe groups 2 arranged in the horizontal direction and the plurality of pipe groups 2 arranged in the vertical direction are comprehensively considered, the case of [2] described in the second modification is described. Therefore, when the soot blower 3 is "started once" or "continuously started", the control device 4 shifts the timing from the soot blower 3 arranged at the uppermost stream toward the soot blower 3 arranged downstream. And start in order. That is, the control device 4 activates the soot blower 3a, then activates the soot blower 3b, activates the soot blower 3b, and then activates the soot blower 3d.
By activating each soot blower 3 in this order, the adhering ash removed by the soot blower 3 in one tube group 2 moves downstream along with the flow of exhaust gas and reattaches to another tube group arranged downstream. Even in such a case, the adhering ash that has reattached can be reliably removed.

なお、第三変形例において、本願の請求項6における第一管群、第二管群、第三管群、第四管群、第一スートブロワ、第二スートブロワに相当する構成は、次のとおりである。
すなわち、水平方向に配置された複数の管群2に着目した場合は、過熱管22cで構成された管群2が第一管群、過熱管22dで構成された管群2が第二管群、過熱管22eで構成された管群2が第三管群、過熱管22fで構成された管群2が第四管群、スートブロワ3bが第一スートブロワ、スートブロワ3dが第二スートブロワに相当する。
また、水平方向に配置された複数の管群2と鉛直方向に配置された複数の管群2とを総合的に鑑みた場合は、図5では、過熱管22aで構成された管群2が第一管群、過熱管22bで構成された管群2が第二管群、過熱管22cで構成された管群2が第三管群、過熱管22dで構成された管群2が第四管群、スートブロワ3aが第一スートブロワ、スートブロワ3bが第二スートブロワに相当する。
第三変形例の除去システム1Dによれば、上記実施形態で得られる効果に加え、再付着した付着灰を含め、確実に付着灰を除去することができる。
In the third modification, the configurations corresponding to the first tube group, the second tube group, the third tube group, the fourth tube group, the first soot blower, and the second soot blower in claim 6 of the present application are as follows. Is.
That is, when focusing on a plurality of tube groups 2 arranged in the horizontal direction, the tube group 2 composed of the superheated tube 22c is the first tube group, and the tube group 2 composed of the superheated tube 22d is the second tube group. The tube group 2 composed of the superheated tube 22e corresponds to the third tube group, the tube group 2 composed of the superheated tube 22f corresponds to the fourth tube group, the soot blower 3b corresponds to the first soot blower, and the soot blower 3d corresponds to the second soot blower.
Further, when comprehensively considering the plurality of pipe groups 2 arranged in the horizontal direction and the plurality of pipe groups 2 arranged in the vertical direction, in FIG. 5, the pipe group 2 composed of the superheated pipe 22a is The first tube group, the tube group 2 composed of the superheated tube 22b is the second tube group, the tube group 2 composed of the superheated tube 22c is the third tube group, and the tube group 2 composed of the superheated tube 22d is the fourth tube group. The tube group, the soot blower 3a corresponds to the first soot blower, and the soot blower 3b corresponds to the second soot blower.
According to the removal system 1D of the third modification, in addition to the effect obtained in the above embodiment, the adhered ash including the reattached adhered ash can be reliably removed.

[5−4.第四変形例]
次に、第四変形例につき、図6を用いて説明する。
第四変形例の除去システム1Eは、第三変形例において、3パスとエコノマイザ9との間の水平方向に延びる排ガスの流路を取り除いた代わりに、3パスとエコノマイザ9との間に蒸気ドラム19及び水ドラム20を備えた2ドラム式のボイラを設置した構成である。当該流路を取り除くので、第三変形例で当該流路内に配置された管群2(22c〜22f)及びスートブロワ3(3b、3d)も取り除かれる。
また、第四変形例では、第三変形例の吊下管21及びスートブロワ3aを取り除き、過熱管22a、22bを3パスの天井に吊り下げて配置した上、過熱管22aの上流に過熱管22aと隣り合ってスートブロワ3(3e)を配置する。
さらに、図1では、エコノマイザ9の管群2を付着灰除去の対象となる管群として考慮していなかったが、第四変形例では、エコノマイザ9の複数の管群2も付着灰除去の対象とする。従って、エコノマイザ9の内部で鉛直方向(Y軸方向)に配置された複数の管群2、すなわち、水管23aで構成された管群2と、当該管群2に隣り合ってその下流に配置され且つ水管23bで構成された管群2との間にスートブロワ3fを設置している。
なお、この場合においても、上述したとおり、付着灰除去の対象となる「複数の管群2」は、2つの圧力測定装置14a、14bの間、かつ、2つのガス温度測定装置15a、15bの間に配置されている。
図6では、付着灰除去の対象となる管群2は、異なる種類の管群2、すなわち、過熱管22で構成された管群2と、水管23で構成された管群2とを含む。なお、過熱管22(22b)で構成された管群2と水管23(23a)で構成された管群2との間には、排ガスの流れの抵抗となる別の管群2は配置されていない。
そして、図1と異なり、複数の管群2の「出口」の排ガスの温度を測定する温度測定装置15bは、付着灰除去の対象である複数の管群2の中で最も下流に配置された水管23bで構成された管群2の下流に配置される。図6では、温度測定装置15bは、図1の圧力測定装置14bと実質的に同一の位置に配置される。そして、過熱管22のうち、最下流に位置する過熱管22bの内部に、出口蒸気温度測定装置24bが配置される。
なお、第四変形例においても、第一変形例乃至第三変形例と同様に、制御装置4は、複数の各スートブロワに対して、図2の処理を実行する。
[5-4. Fourth variant]
Next, the fourth modification will be described with reference to FIG.
In the third modification, the removal system 1E of the fourth modification removes the exhaust gas flow path extending in the horizontal direction between the three paths and the economizer 9, but instead removes the steam drum between the three paths and the economizer 9. It is a configuration in which a two-drum type boiler equipped with 19 and a water drum 20 is installed. Since the flow path is removed, the pipe groups 2 (22c to 22f) and the soot blower 3 (3b, 3d) arranged in the flow path in the third modification are also removed.
Further, in the fourth modification, the suspension pipe 21 and the soot blower 3a of the third modification are removed, the superheat pipes 22a and 22b are suspended from the ceiling of three passes, and the superheat pipe 22a is arranged upstream of the superheat pipe 22a. The soot blower 3 (3e) is placed adjacent to the.
Further, in FIG. 1, the tube group 2 of the economizer 9 was not considered as the tube group to be removed from the attached ash, but in the fourth modification, the plurality of tube groups 2 of the economizer 9 are also to be removed from the attached ash. And. Therefore, a plurality of pipe groups 2 arranged in the vertical direction (Y-axis direction) inside the economizer 9, that is, the pipe group 2 composed of the water pipe 23a and the pipe group 2 adjacent to the pipe group 2 and arranged downstream thereof. Moreover, the soot blower 3f is installed between the pipe group 2 and the water pipe 23b.
In this case as well, as described above, the "plurality of tube groups 2" to be removed from the adhering ash is between the two pressure measuring devices 14a and 14b and between the two gas temperature measuring devices 15a and 15b. It is placed in between.
In FIG. 6, the pipe group 2 to be removed from the adhered ash includes a different type of pipe group 2, that is, a pipe group 2 composed of a superheated pipe 22, and a pipe group 2 composed of a water pipe 23. Another pipe group 2 that acts as a resistance to the flow of exhaust gas is arranged between the pipe group 2 composed of the superheated pipe 22 (22b) and the pipe group 2 composed of the water pipe 23 (23a). Absent.
Then, unlike FIG. 1, the temperature measuring device 15b for measuring the temperature of the exhaust gas at the “outlet” of the plurality of pipe groups 2 is arranged most downstream among the plurality of pipe groups 2 to be removed from the adhering ash. It is arranged downstream of the pipe group 2 composed of the water pipe 23b. In FIG. 6, the temperature measuring device 15b is arranged at substantially the same position as the pressure measuring device 14b of FIG. Then, the outlet steam temperature measuring device 24b is arranged inside the superheating pipe 22b located at the most downstream side of the superheating pipe 22.
In the fourth modification as well, the control device 4 executes the process of FIG. 2 for each of the plurality of soot blowers, as in the first modification to the third modification.

第四変形例では、制御装置4は、スートブロア3を「1回起動」または「連続起動」する際、最上流に配置されたスートブロワ3から下流に配置されたスートブロワ3に向かって、時間的にタイミングをずらして順番に起動する。すなわち、制御装置4は、スートブロワ3eを起動した後、スートブロワ3fを起動する。
この順序で各スートブロワ3を起動することにより、上流に配置された管群2においてスートブロワ3で除去された付着灰が排ガスの流れに乗って下流に移動しつつ、下流に配置された別の管群に再付着した場合においても、再付着した付着灰も含め、確実に除去することができる。
In the fourth modification, when the soot blower 3 is "started once" or "continuously started", the control device 4 temporally moves from the soot blower 3 arranged at the uppermost stream toward the soot blower 3 arranged downstream. Start in order with the timing shifted. That is, the control device 4 activates the soot blower 3f and then activates the soot blower 3f.
By activating each soot blower 3 in this order, the adhering ash removed by the soot blower 3 in the pipe group 2 arranged upstream moves downstream along with the flow of exhaust gas, and another pipe arranged downstream. Even when reattached to the group, the reattached ash can be reliably removed.

なお、第四変形例において、本願の請求項7における第一管群、第二管群、第三管群、第四管群、第一スートブロワ、第二スートブロワに相当する構成は、次のとおりである。
すなわち、過熱管22aで構成された管群2が第一管群、過熱管22bで構成された管群2が第二管群、水管23aで構成された管群2が第三管群、水管23bで構成された管群2が第四管群、スートブロワ3eが第一スートブロワ、スートブロワ3fが第二スートブロワに相当する。
第四変形例の除去システム1Eによれば、上記実施形態で得られる効果に加え、再付着した付着灰を含め、確実に付着灰を除去することができる。
In the fourth modification, the configurations corresponding to the first tube group, the second tube group, the third tube group, the fourth tube group, the first soot blower, and the second soot blower in claim 7 of the present application are as follows. Is.
That is, the tube group 2 composed of the superheated tube 22a is the first tube group, the tube group 2 composed of the superheated tube 22b is the second tube group, the tube group 2 composed of the water tube 23a is the third tube group, and the water tube. The tube group 2 composed of 23b corresponds to the fourth tube group, the soot blower 3e corresponds to the first soot blower, and the soot blower 3f corresponds to the second soot blower.
According to the removal system 1E of the fourth modification, in addition to the effect obtained in the above embodiment, the adhered ash including the reattached adhered ash can be reliably removed.

以上、本発明の実施形態および変形例を説明したが、本発明の技術範囲は実施形態または変形例に限られるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。 Although the embodiments and modifications of the present invention have been described above, the technical scope of the present invention is not limited to the embodiments or modifications, and various modifications can be made without departing from the spirit of the present invention. Is.

1、1′、1A〜1E ボイラ管群付着灰除去システム(除去システム)
2 管群
3、3′、3″、3a〜3f スートブロワ
4 制御装置
5 ホッパ
6 フィーダ
7 ストーカ
8 灰シュート
9 エコノマイザ(管群の一種)
10 減温塔
11 除塵装置(バグフィルタ)
12 煙突
13 誘引送風機
14a、14b 圧力測定装置
15a、15b ガス温度測定装置
16a、16b ガス流量測定装置
17 過熱低減器
18 噴霧水量測定装置
19 蒸気ドラム
20 水ドラム
21 吊下管(スクリーン管)
22a〜22f 過熱管(スーパーヒータ)
23a、23b 水管
24a、24b 蒸気温度測定装置
25 主蒸気量測定装置
26 一次空気供給装置
27 二次空気供給装置
28 燃焼空気量測定装置
K 熱貫流率
Kc クリーン熱貫流率
Kd ダーティ熱貫流率
Kc/Kd 回復率
ΔPg 差圧
pgmin 第二閾値
Qc 燃焼空気総量
qcmin 第四閾値
Qr 誘引送風機の回転数
qrrmin 第三閾値
Qs 主蒸気量
qsmin 第一閾値
R 回復閾値
α1 第一所定値
α2 第二所定値
1,1', 1A-1E Boiler tube group adhering ash removal system (removal system)
2 Tube group 3, 3'3 ″, 3a to 3f Soot blower 4 Control device 5 Hopper 6 Feeder 7 Stalker 8 Ash chute 9 Economizer (a type of tube group)
10 Heat reducing tower 11 Dust remover (bug filter)
12 Chimney 13 Attracting blower 14a, 14b Pressure measuring device 15a, 15b Gas temperature measuring device 16a, 16b Gas flow measuring device 17 Overheat reducing device 18 Sprayed water amount measuring device 19 Steam drum 20 Water drum 21 Suspended pipe (screen tube)
22a-22f Superheater tube (super heater)
23a, 23b Water pipe 24a, 24b Steam temperature measuring device 25 Main steam amount measuring device 26 Primary air supply device 27 Secondary air supply device 28 Combustion air amount measuring device K Heat transmission rate Kc Clean heat transmission rate Kd Dirty heat transmission rate Kc / Kd Recovery rate ΔPg Differential pressure pgmin Second threshold Qc Total amount of combustion air qcmin Fourth threshold Qr Number of rotations of induced blower qrrmin Third threshold Qs Main steam amount qsmin First threshold R Recovery threshold α1 First predetermined value α2 Second predetermined value

Claims (8)

炉で発生する排ガスから熱回収するボイラの複数の管群の付着灰を除去するボイラ管群付着灰除去システムであって、
前記複数の管群の間に配置されたスートブロワと、
前記複数の管群の下流に配置され、前記排ガスを誘引する誘引送風機と、
前記スートブロワの起動を制御する制御装置と
を有し、
前記制御装置は、
前記ボイラの熱貫流率を演算し、
演算した前記熱貫流率が所定値以上の場合、所定のインターバルを置いて前記スートブロワを1回だけ起動し、その後再び前記所定のインターバル又はこれと異なるインターバルを置く1回起動を実行し、
演算した前記熱貫流率が前記所定値未満の場合、第一判定及び第二判定のいずれか一方を択一的に判定する付着灰判定処理を実行し、
前記付着灰判定処理で前記第一判定が得られた場合、前記インターバルを置かずに前記スートブロワを連続的に複数回起動する連続起動を実行し、
前記付着灰判定処理で前記第二判定が得られた場合、前記1回起動を実行するものであり、
前記付着灰判定処理は、前記複数の管群の主蒸気量が第一閾値以上であるという第一条件、前記複数の管群の入口と出口における前記排ガスの圧力差が第二閾値以上であるという第二条件、前記誘引送風機の回転数が第三閾値以上であるという第三条件、及び前記炉に供給される燃焼空気総量が第四閾値以上であるという第四条件のうちの少なくとも1つの条件を含んで実行されるものであり、
前記付着灰判定処理が4つの前記条件のうちのいずれか1つの条件のみに基づいて実行される場合、前記1つの条件が成立したときに前記第一判定が得られ、前記1つの条件が不成立のときに前記第二判定が得られ、
前記付着灰判定処理が前記4つの条件のうちのいずれか2つ、3つ、または4つの条件を含んで実行される場合、前記2つ、3つ、または4つの条件を含むすべての条件が共に成立したときに前記第一判定が得られ、前記2つ、3つ、または4つの条件を含むいずれかの条件が不成立のときに前記第二判定が得られること
を特徴とするボイラ管群付着灰除去システム。
A boiler tube group adhering ash removal system that removes adhering ash from multiple boiler tube groups that recover heat from the exhaust gas generated in the furnace.
With a soot blower placed between the plurality of tube groups,
An attracting blower arranged downstream of the plurality of pipe groups to attract the exhaust gas,
It has a control device that controls the activation of the soot blower.
The control device is
Calculate the heat transmission coefficient of the boiler and calculate
When the calculated heat transmission coefficient is equal to or greater than a predetermined value, the soot blower is activated only once at a predetermined interval, and then once again at the predetermined interval or an interval different from the predetermined interval.
When the calculated heat transmission coefficient is less than the predetermined value, an adhering ash determination process for selectively determining either the first determination or the second determination is executed.
When the first determination is obtained by the adhered ash determination process, the soot blower is continuously activated a plurality of times without the interval, and continuous activation is executed.
When the second determination is obtained by the adhesion ash determination process, the one-time activation is executed.
In the adhering ash determination process, the first condition is that the main steam amount of the plurality of pipe groups is equal to or higher than the first threshold value, and the pressure difference between the exhaust gas at the inlet and outlet of the plurality of pipe groups is equal to or higher than the second threshold value. At least one of the second condition that the rotation speed of the attracting blower is equal to or higher than the third threshold, and the fourth condition that the total amount of combustion air supplied to the furnace is equal to or higher than the fourth threshold. It is executed with conditions,
When the adhering ash determination process is executed based on only one of the four conditions, the first determination is obtained when the one condition is satisfied, and the one condition is not satisfied. The second judgment is obtained at the time of
When the adhering ash determination process is executed including any two, three, or four conditions of the four conditions, all the conditions including the two, three, or four conditions are satisfied. The boiler tube group is characterized in that the first determination is obtained when both are satisfied, and the second determination is obtained when any of the two, three, or four conditions is not satisfied. Adhesive ash removal system.
前記制御装置は、
前記付着灰判定処理で前記第一判定が得られた場合、前記スートブロワを起動する前に演算した前記熱貫流率を示すダーティ熱貫流率と、前記スートブロワを起動した後に演算した前記熱貫流率を示すクリーン熱貫流率とから回復率を演算し、
前記回復率が回復閾値以上の場合、前記連続起動を実行し、
前記回復率が前記回復閾値未満の場合、前記1回起動を実行すること
を特徴とする請求項1に記載のボイラ管群付着灰除去システム。
The control device is
When the first determination is obtained by the adhered ash determination process, the dirty heat transmission coefficient indicating the heat transmission coefficient calculated before starting the soot blower and the heat transmission coefficient calculated after starting the soot blower are calculated. Calculate the recovery rate from the clean heat transmission coefficient shown and
When the recovery rate is equal to or higher than the recovery threshold value, the continuous activation is executed.
The boiler tube group adhering ash removal system according to claim 1, wherein when the recovery rate is less than the recovery threshold value, the one-time activation is performed.
前記制御装置は、前記クリーン熱貫流率が前記所定値以上の場合、前記所定のインターバルを直前に設定されていた値よりも長く再設定し、前記回復率が回復閾値以上の場合、前記所定のインターバルを直前に設定されていた値よりも短く再設定すること
を特徴とする請求項2に記載のボイラ管群付着灰除去システム。
When the clean heat transmission coefficient is equal to or higher than the predetermined value, the control device resets the predetermined interval longer than the value set immediately before, and when the recovery rate is equal to or higher than the recovery threshold value, the predetermined interval is set. The boiler tube group adhering ash removal system according to claim 2, wherein the interval is reset to a value shorter than the value set immediately before.
前記制御装置は、前記連続起動の際、前記回復率の上昇速度が大きい場合には前記連続起動における起動の回数を少なくし、前記回復率の上昇速度が小さい場合には前記連続起動の回数を多くすること
を特徴とする請求項3に記載のボイラ管群付着灰除去システム。
At the time of the continuous activation, the control device reduces the number of activations in the continuous activation when the increase rate of the recovery rate is large, and reduces the number of activations in the continuous activation when the increase rate of the recovery rate is small. The boiler tube group adhering ash removing system according to claim 3, characterized in that the number is increased.
前記複数の管群の下流に配置されて前記排ガスの煤塵を除去するバグフィルタをさらに有し、
前記制御装置は、前記バグフィルタの逆洗が実行されている間は、前記スートブロワを起動せず、前記逆洗の終了を待って前記スートブロワを起動すること
を特徴とする請求項4に記載のボイラ管群付着灰除去システム。
Further having a bug filter arranged downstream of the plurality of pipe groups to remove soot and dust from the exhaust gas.
The fourth aspect of claim 4, wherein the control device does not activate the soot blower while the backwash of the bug filter is being executed, and waits for the completion of the backwash to start the sootblower. Boiler tube group adhering ash removal system.
前記複数の管群は、第一管群と、前記第一管群の下流に前記第一管群と隣り合って配置された第二管群と、前記第二管群の下流に前記第二管群と隣り合って配置された第三管群と、前記第三管群の下流に前記第三管群と隣り合って配置された第四管群とを備え、
前記スートブロワは、前記第一管群と前記第二管群との間に配置された第一スートブロワと、前記第三管群と前記第四管群との間に配置された第二スートブロワとを備え、
前記制御装置は、前記第一スートブロワ及び前記第二スートブロワを前記1回起動または前記連続起動する際、
鉛直方向で下方から上方に向かって前記第一管群乃至前記第四管群が順次配置される場合には、前記第二スートブロワを起動した後、前記第一スートブロワを起動し、または、前記第一スートブロワを起動した後、前記第二スートブロワを起動し、
水平方向で一方向に向かって前記第一管群乃至前記第四管群が順次配置される場合には、前記第一スートブロワを起動した後、前記第二スートブロワを起動し、
鉛直方向で下方から上方に向かって前記第一管群及び前記第二管群が順次配置され、かつ、水平方向で一方向に向かって前記第三管群及び前記第四管群が順次配置される場合には、前記第一スートブロワを起動した後、前記第二スートブロワを起動すること
を特徴とする請求項5に記載のボイラ管群付着灰除去システム。
The plurality of tube groups include a first tube group, a second tube group arranged adjacent to the first tube group downstream of the first tube group, and the second tube group downstream of the second tube group. It is provided with a third tube group arranged adjacent to the tube group and a fourth tube group arranged adjacent to the third tube group downstream of the third tube group.
The soot blower includes a first soot blower arranged between the first tube group and the second tube group, and a second soot blower arranged between the third tube group and the fourth tube group. Prepare,
When the first soot blower and the second soot blower are started once or continuously, the control device is used.
When the first pipe group to the fourth pipe group are sequentially arranged from the lower side to the upper side in the vertical direction, the first soot blower is started after the second soot blower is started, or the first soot blower is started. After starting the first soot blower, start the second soot blower,
When the first tube group to the fourth tube group are sequentially arranged in one direction in the horizontal direction, the first soot blower is started, and then the second soot blower is started.
The first pipe group and the second pipe group are sequentially arranged from the lower side to the upper side in the vertical direction, and the third pipe group and the fourth pipe group are sequentially arranged in the horizontal direction in one direction. In this case, the boiler tube group adhering ash removing system according to claim 5, wherein the first soot blower is started and then the second soot blower is started.
前記複数の管群は、第一管群と、前記第一管群の下流に前記第一管群と隣り合って配置された第二管群と、前記第二管群の下流に配置された第三管群と、前記第三管群の下流に前記第三管群と隣り合って配置された第四管群とを備え、
前記スートブロワは、前記第一管群の上流に前記第一管群と隣り合って配置された第一スートブロワと、前記第三管群と前記第四管群との間に配置された第二スートブロワとを備え、
前記制御装置は、前記第一スートブロワ及び前記第二スートブロワを前記1回起動または前記連続起動する際、前記第一スートブロワを起動した後、前記第二スートブロワを起動すること
を特徴とする請求項5に記載のボイラ管群付着灰除去システム。
The plurality of tube groups were arranged in the first tube group, the second tube group arranged adjacent to the first tube group downstream of the first tube group, and downstream of the second tube group. It is provided with a third pipe group and a fourth pipe group arranged adjacent to the third pipe group downstream of the third pipe group.
The soot blower is a first soot blower arranged adjacent to the first tube group upstream of the first tube group, and a second soot blower arranged between the third tube group and the fourth tube group. With and
5. The control device is characterized in that, when the first soot blower and the second soot blower are started once or continuously, the second soot blower is started after the first soot blower is started. Boiler tube group adhering ash removal system described in.
前記スートブロワは、ガスを爆発させることで圧力波を発生する圧力波式スートブロワであること
を特徴とする請求項1から請求項7のいずれか一項に記載のボイラ管群付着灰除去システム。
The boiler tube group adhering ash removing system according to any one of claims 1 to 7, wherein the soot blower is a pressure wave type soot blower that generates a pressure wave by exploding a gas.
JP2020096658A 2020-06-03 2020-06-03 Boiler tube group adhering ash removal system Active JP6761558B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2020096658A JP6761558B1 (en) 2020-06-03 2020-06-03 Boiler tube group adhering ash removal system
TW110117219A TWI774366B (en) 2020-06-03 2021-05-13 System for removing ash adhering to pipe groups of boiler
PCT/JP2021/018936 WO2021246173A1 (en) 2020-06-03 2021-05-19 System for removing adhered ash from boiler pipe group
KR1020227043281A KR20230009953A (en) 2020-06-03 2021-05-19 Boiler pipe group adhesive removal system
CN202180039468.XA CN115803563A (en) 2020-06-03 2021-05-19 Boiler tube group attached ash removing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020096658A JP6761558B1 (en) 2020-06-03 2020-06-03 Boiler tube group adhering ash removal system

Publications (2)

Publication Number Publication Date
JP6761558B1 true JP6761558B1 (en) 2020-09-23
JP2021188859A JP2021188859A (en) 2021-12-13

Family

ID=72517916

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020096658A Active JP6761558B1 (en) 2020-06-03 2020-06-03 Boiler tube group adhering ash removal system

Country Status (5)

Country Link
JP (1) JP6761558B1 (en)
KR (1) KR20230009953A (en)
CN (1) CN115803563A (en)
TW (1) TWI774366B (en)
WO (1) WO2021246173A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117339327A (en) * 2023-12-06 2024-01-05 天津滨环化学工程技术研究院有限公司 Gas treatment device for straw combustion

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62210316A (en) * 1986-03-11 1987-09-16 Babcock Hitachi Kk Soot blower controller of recovery boiler
JPS63286609A (en) * 1987-05-20 1988-11-24 Babcock Hitachi Kk Control of soot blower
JPH01181013A (en) * 1988-01-13 1989-07-19 Babcock Hitachi Kk Air preheater performance diagnostic method
JP2000320998A (en) * 1999-05-06 2000-11-24 Mitsubishi Heavy Ind Ltd Dust removing method
US20060283406A1 (en) * 2005-06-06 2006-12-21 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for controlling soot blowing using statistical process control
JP2008014590A (en) * 2006-07-07 2008-01-24 Babcock Hitachi Kk Boiler device
JP2008039224A (en) * 2006-08-02 2008-02-21 Babcock Hitachi Kk Structure of constant pressure once-through boiler and operating method therefor
JP2017181007A (en) * 2016-03-31 2017-10-05 Jfeエンジニアリング株式会社 Blockage suppression device and blockage suppression method for boiler
JP2019138517A (en) * 2018-02-08 2019-08-22 三菱日立パワーシステムズ株式会社 Apparatus of determining condition controlling depositing amount of ash in combustion furnace, combustion system, and method of determining condition controlling depositing amount of ash

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS582521A (en) * 1981-06-30 1983-01-08 Babcock Hitachi Kk Controlling method for soot blower
JP4110442B2 (en) * 2001-05-14 2008-07-02 横河電機株式会社 Electromagnetic flow meter
JP2019132515A (en) * 2018-01-31 2019-08-08 三菱日立パワーシステムズ株式会社 Suit blower operation control device, suit blower operation control method, and combustion system
CN111207382A (en) * 2018-11-22 2020-05-29 苏州知瑞光电材料科技有限公司 Explosion-proof industrial boiler with flue gas purification function
JP6735890B1 (en) * 2019-09-06 2020-08-05 三菱重工環境・化学エンジニアリング株式会社 Boiler tube bank ash removal system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62210316A (en) * 1986-03-11 1987-09-16 Babcock Hitachi Kk Soot blower controller of recovery boiler
JPS63286609A (en) * 1987-05-20 1988-11-24 Babcock Hitachi Kk Control of soot blower
JPH01181013A (en) * 1988-01-13 1989-07-19 Babcock Hitachi Kk Air preheater performance diagnostic method
JP2000320998A (en) * 1999-05-06 2000-11-24 Mitsubishi Heavy Ind Ltd Dust removing method
US20060283406A1 (en) * 2005-06-06 2006-12-21 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for controlling soot blowing using statistical process control
JP2008014590A (en) * 2006-07-07 2008-01-24 Babcock Hitachi Kk Boiler device
JP2008039224A (en) * 2006-08-02 2008-02-21 Babcock Hitachi Kk Structure of constant pressure once-through boiler and operating method therefor
JP2017181007A (en) * 2016-03-31 2017-10-05 Jfeエンジニアリング株式会社 Blockage suppression device and blockage suppression method for boiler
JP2019138517A (en) * 2018-02-08 2019-08-22 三菱日立パワーシステムズ株式会社 Apparatus of determining condition controlling depositing amount of ash in combustion furnace, combustion system, and method of determining condition controlling depositing amount of ash

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117339327A (en) * 2023-12-06 2024-01-05 天津滨环化学工程技术研究院有限公司 Gas treatment device for straw combustion

Also Published As

Publication number Publication date
CN115803563A (en) 2023-03-14
JP2021188859A (en) 2021-12-13
TWI774366B (en) 2022-08-11
KR20230009953A (en) 2023-01-17
TW202200933A (en) 2022-01-01
WO2021246173A1 (en) 2021-12-09

Similar Documents

Publication Publication Date Title
JP5201729B2 (en) Waste heat recovery power plant of lime calcining plant
RU2468291C2 (en) Method for determining efficiency of individual sootblower, and corresponding boiler system
JP6735890B1 (en) Boiler tube bank ash removal system
JP6761558B1 (en) Boiler tube group adhering ash removal system
US20130192541A1 (en) Method and device for controlling the temperature of steam in a boiler
JP6956727B2 (en) Arrangement of heat recovery surface of recovery boiler
JP5234948B2 (en) Vertical heat exchanger
JP2005513395A (en) Steam superheater composed of shield tube
US20060185624A1 (en) Tower boiler including a stationary supporting structure
EP3712498A1 (en) Incineration plant for solid material
JP2004347145A (en) Aluminum deposition preventing method for rpf fired circulation fluidized bed boiler
JP7495876B2 (en) Boiler and method for inhibiting corrosion of boiler
JP6785046B2 (en) How to remove exhaust ducts, boilers and solid particles
JP5209952B2 (en) High dust exhaust gas heat recovery treatment equipment
DK2737273T3 (en) METHOD FOR INCREASING THE IMPACT DEGREE IN INCINERATION PLANTS IN PARTICULAR a waste OR BIOMASS POWER PLANT
JP2023018550A (en) Deposit removal system and deposit removal method
JP4868924B2 (en) Chimney and waste heat recovery boiler
US4838212A (en) Superheater unit of a steam generating system
JP6809625B1 (en) Dust removal equipment for boiler heat exchange equipment and boiler heat exchange equipment
JP2020046138A (en) Combined cycle power generation facility and operation method for the combined cycle power generation facility
RU192700U1 (en) WATER BOILER
JP2019105393A (en) Method for suppressing blockage and corrosion in waste incinerator boiler
JP2018132279A (en) Waste heat recovery boiler and scattering matter recovery method therefor
JP3828366B2 (en) Regenerative heat exchanger
JP5583786B2 (en) Molten salt detection device, fluidized bed boiler and stoker furnace, molten salt detection method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200610

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20200610

TRDD Decision of grant or rejection written
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20200827

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200901

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200904

R150 Certificate of patent or registration of utility model

Ref document number: 6761558

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150