JP6310362B2 - A hanging bracket that fixes the floor slab formwork to the main girder. - Google Patents

A hanging bracket that fixes the floor slab formwork to the main girder. Download PDF

Info

Publication number
JP6310362B2
JP6310362B2 JP2014166400A JP2014166400A JP6310362B2 JP 6310362 B2 JP6310362 B2 JP 6310362B2 JP 2014166400 A JP2014166400 A JP 2014166400A JP 2014166400 A JP2014166400 A JP 2014166400A JP 6310362 B2 JP6310362 B2 JP 6310362B2
Authority
JP
Japan
Prior art keywords
main girder
floor slab
flat bar
formwork
screwed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014166400A
Other languages
Japanese (ja)
Other versions
JP2016041887A (en
Inventor
誠 竹口
誠 竹口
高橋 勲
勲 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takahashi Seisakusho KK
Original Assignee
Takahashi Seisakusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takahashi Seisakusho KK filed Critical Takahashi Seisakusho KK
Priority to JP2014166400A priority Critical patent/JP6310362B2/en
Publication of JP2016041887A publication Critical patent/JP2016041887A/en
Application granted granted Critical
Publication of JP6310362B2 publication Critical patent/JP6310362B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋梁のコンクリート床版を形成するための型枠を支持する支持具に関し、特に、コンクリート床版の下側型枠をI型主桁に保持させるため吊下げ型金具に関する。   The present invention relates to a support for supporting a formwork for forming a concrete floor slab of a bridge, and more particularly to a hanging mold for holding a lower formwork of a concrete floor slab on an I-type main girder.

一般に、橋梁のコンクリート床版は、橋脚の支持面に所定の間隔を隔てて設置した複数のI型の主桁同士間に床版用型枠を配置し、型枠上に鉄筋を配筋してコンクリート打設すること形成している。
In general, the concrete slab of the bridges, a slab mold frame arranged between the main girder between a plurality of type I was installed at prescribed intervals on the support surface of the pier, the rebar reinforcement Mr on formwork It is formed by casting concrete.

この場合、床版用型枠を固定する方式として、床版用型枠をビーム材等の支持材で受け止め、このビーム材をパイプサポートなどの支保材で保持するようにする支保工方式と、I型主桁の上側フランジに溶着した吊りボルト受け金具と、この吊りボルト受け金具から垂下させた吊りボルトでビーム材等の型枠支持材を保持して型枠保持材を吊持する方式(特許文献1)がある。   In this case, as a method of fixing the floor slab formwork, the floor slab formwork is received by a support material such as a beam material, and the beam material is supported by a support material such as a pipe support, A suspension bolt holder that is welded to the upper flange of the I-type main girder, and a method of suspending the mold holder by holding a mold support such as a beam material with the suspension bolt suspended from the suspension bolt receiver ( There exists patent document 1).

特開2008−291606号公報JP 2008-291606 A

支保工方式の型枠支持では、橋梁下側の空間内に型枠支持材や支保材が多数配置される上、支保材を繋ぐ根がらみが必要となり、支保材以外の単管パイプやクランプ等、型枠支持のためな必要な使用材料が多く、また、作業量も多くなるという問題がある。   In support method formwork support, a large number of formwork support materials and support materials are placed in the space under the bridge, and roots are required to connect the support materials. However, there is a problem that a large amount of material is required for supporting the formwork and the amount of work increases.

一方、吊りボルトでビーム材等の型枠支持材を保持して型枠保持材を吊持するものにあっては、橋梁の重要な構造部材である主桁のフランジ部分に吊りボルト受け金具を溶接固着することから、桁材に入熱による悪影響が出る懸念がある上、設計仕様で溶接できない材質の部材が指定されることがある。   On the other hand, in the case of holding a formwork support material such as a beam material with a suspension bolt, the suspension bolt support bracket is attached to the flange portion of the main girder, which is an important structural member of the bridge. Since welding is fixed, there is a concern that the girders may be adversely affected by heat input, and members of a material that cannot be welded may be specified by design specifications.

本発明は、このような点に鑑み提案されたもので、桁材などの構造材に悪影響を及ぼすことなく少ない工数で橋梁の床版型枠を施工することのできる床版用型枠を主桁に相対固定する吊下げ型金具を提供することを目的とする。   The present invention has been proposed in view of the above points, and mainly uses a floor slab form capable of constructing a bridge floor slab form with less man-hours without adversely affecting structural members such as girders. An object of the present invention is to provide a hanging bracket that is relatively fixed to a girder.

上述の目的を達成するために、請求項1に開示の発明は、橋脚上面に設置した複数の主桁間に床版用型枠を固定保持して、主桁の上面にコンクリート床版を形成するに当たり、床版用型枠を保持するビーム材を主桁に吊下げ保持する吊下げ金具であって、
長手方向端部に透設したボルト挿通孔の上面開口部を取り囲む状態で開口周縁部に袋ナットを溶着してなるフラットバーと、
記ボルト挿通孔を貫通してフラットバーに溶着されている袋ナットに一端が螺合されるねじロッドと、
このねじロッドの他端側に螺合されるナットとからなり、
前記フラットバーに螺着されているねじロツドはビーム材の爪部に形成したボルト挿通孔を貫通してビーム材の下側に突出し、このねじロツドの突出部にナットを螺合して床版用型枠とビーム材とを所定の位置に確りと固定し、
I型材で構成した主桁の上側フランジの上面にその長手方向に沿って配置されているアンカー材で固定される段取り筋と前記フラットバーとが点溶接で固定されていることを特徴としている。
In order to achieve the above-mentioned object, the invention disclosed in claim 1 forms a concrete floor slab on the upper surface of the main girder by fixing and fixing the formwork for the floor slab between a plurality of main girders installed on the upper surface of the pier. In doing so, it is a hanging bracket that suspends and holds the beam material holding the floor slab formwork on the main girder,
A flat bar formed by welding a cap nut to the peripheral edge of the opening in a state of surrounding the upper surface opening of the bolt insertion hole provided through the longitudinal end;
A threaded rod having one end screwed to the cap nut through the pre Symbol bolt insertion hole is welded to the flat bar,
It consists of a nut that is screwed to the other end of this threaded rod,
The screw rod screwed to the flat bar passes through a bolt insertion hole formed in the claw portion of the beam material and protrudes to the lower side of the beam material. A nut is screwed into the protruding portion of the screw rod and the floor slab is inserted. Securely fix the formwork and beam material in place,
Wherein the setup muscles that are anchored member arranged along the longitudinal direction on the upper surface of the main girder of the upper flange configured in type I material and the flat bar is characterized in that it is fixed by spot welding.

また、請求項2に開示の本発明は、請求項1の構成に加えて、フラットバーの下面にスペーサブロックの受部が設置してあることを特徴としている。   Further, the present invention disclosed in claim 2 is characterized in that, in addition to the structure of claim 1, a receiving portion of the spacer block is installed on the lower surface of the flat bar.

本発明では、主桁の上側フランジ上面にアンカー材で段取り筋を固定し、端部にボルト挿通孔が透設されるとともに、そのボルト挿通孔に対応して袋ナットが溶着されているフラットバーを前記段取り筋に点溶接して主桁に対してフラットバーを相対固定しているので、型枠用のビーム材を吊下げ保持するためのフラットバーを固定する場合に、構造材である主桁に対する熱影響がほとんどなく、橋梁強度を低下させることがなくなる。
In the present invention, a set bar is fixed to the upper surface of the upper flange of the main girder with an anchor material, a bolt insertion hole is formed through the end portion, and a cap nut is welded corresponding to the bolt insertion hole. Since the flat bar is fixed relative to the main girder by spot welding to the set-up bars, the main material which is a structural material is used when fixing the flat bar for suspending and holding the beam material for the formwork. There is almost no thermal effect on the girder and the bridge strength is not reduced.

また、フラットバーの下面にスペーサブロックの受部を形成した場合には、主桁とフラットバーとの間隔を十分保持することができるので、コンクリートのかぶり寸法を確保することができる。
Further, in the case of forming a receiving portion of the spacer blocks to the lower surface of the flat bar, because the distance between the main beam and the flat bar can be sufficiently maintained, it is possible to secure the head size of the concrete.

コンクリート床版の形成時を示す要部の取り出し断面図である。It is an extraction sectional view of the important section showing at the time of formation of a concrete floor slab. 型枠支持ビームを主桁に支持させた状態での取り出し斜視図である。It is an extraction perspective view in the state where the formwork support beam was supported by the main girder. 吊下げ型金具の一実施形態を示す斜視図である。It is a perspective view which shows one Embodiment of a hanging type | mold metal fitting. 吊下げ型金具の別実施形態を示す斜視図である。It is a perspective view which shows another embodiment of a hanging type | mold metal fitting.

橋梁におけるコンクリート床版は、図1に示すように、図示を省略した橋脚上に設置したI型鋼材で形成した複数の主桁(1)に、床版用型枠(2)をビーム材(3)で相対的に固定保持し、床版用型枠(2)の上面に鉄筋を配筋後に、コンクリートを打設することで、主桁の上部フランジ(1a)を取り込む状態に形成される。   As shown in Fig. 1, the concrete floor slab in the bridge is composed of a plurality of main girders (1) made of I-type steel installed on the pier (not shown) and a floor slab form (2) as a beam material ( 3) It is formed in a state in which the upper flange (1a) of the main girder is taken in by fixing and holding relatively, and placing concrete after placing reinforcing bars on the upper surface of the floor slab formwork (2). .

この床版用型枠(2)は、ハンチ部を形成するように端部を下り傾斜状に形成した合板パネル(2a)と、合板パネル(2a)の平面性を維持するために、合板パネル(2a)の裏面に平行に配置した複数本の単管(2b)とを有しており、端部に形成した下り傾斜部分の合板パネル(2a)を主桁(1)の上部フランジ(1a)に下側から当接するように配置される。   This floor slab formwork (2) is composed of a plywood panel (2a) having an end inclined downwardly to form a haunch part, and a plywood panel (2a) in order to maintain the flatness of the plywood panel (2a). (2a) having a plurality of single tubes (2b) arranged in parallel to the back surface, and a downwardly inclined portion of the plywood panel (2a) formed at the end portion of the upper flange (1a) of the main girder (1) ) To contact from below.

床版用型枠(2)を保持するビーム材(3)は、外ビームと内ビームとで構成されたビティビームであり、その端部に形成した爪部(3c)を後述する吊り下げ金具(5)で吊り下げ支持することで床版用型枠(2)を主桁(1)に相対的に固定保持できるようにしてある。
The beam material (3) holding the floor slab formwork (2) is a bite beam composed of an outer beam and an inner beam, and a claw portion (3c) formed at the end of the beam material (3) is a hanging metal fitting (described later). The floor slab form (2) can be fixed and held relatively to the main girder (1) by being suspended and supported in 5).

吊り下げ金具(5)は、両端部にボルト挿通孔(6)を透設するとともにそのボルト挿通孔(6)の上面側開口の周縁部に袋ナット(7)が溶着されている鋼製フラットバー(8)と、該袋ナット(7)に螺合されるとともに、前記ビーム材(3)の爪部(3c)に形成したボルト挿通孔(9)を貫通するねじロツド(10)と、前記ビーム材(3)の爪部(3c)の下側で該ねじロツド(10)に螺合するワッシャ(11)及びナット(12)で構成されている。   The hanging metal fitting (5) is a steel flat in which a bolt insertion hole (6) is formed through both ends and a cap nut (7) is welded to the peripheral edge of the upper surface side opening of the bolt insertion hole (6). A screw rod (10) that passes through a bolt insertion hole (9) that is screwed into the bar (8) and the cap nut (7) and formed in the claw portion (3c) of the beam member (3); The beam member (3) includes a washer (11) and a nut (12) screwed into the screw rod (10) below the claw portion (3c).

また、この吊り下げ金具(5)を構成しているフラットバー(8)の下面に丸鋼製の二対の短片(13)がフラットバー(8)の長軸側端辺に沿って突設してあり、短軸方向で対向している短片(13)でスペーサブロック(14)の受部(15)を形成している。   In addition, two pairs of round steel short pieces (13) project along the long axis side edge of the flat bar (8) on the lower surface of the flat bar (8) constituting the hanging metal fitting (5). The receiving portion (15) of the spacer block (14) is formed by the short pieces (13) opposed in the short axis direction.

上述の構成からなる吊り下げ金具(5)は、主桁(1)の上側フランジ(1a)の上面に所定ピッチで長手方向に配置されているアンカー材(16)とで係着されることで主桁(1)の上面に支持されている段取り筋(17)に吊り下げ金具(5)のフラットバー(8)を点溶接で固着し、受部(15)の形成位置で、フラットバー(8)の下面と主桁(1)の上側フランジ(1a)の上面との間にスペーサブロック(14)を挿入して主桁(1)の上側フランジ(1a)の上面でのカブリ寸法を確保するようにしてある。   The hanging metal fitting (5) having the above-described structure is engaged with an anchor member (16) arranged in the longitudinal direction at a predetermined pitch on the upper surface of the upper flange (1a) of the main girder (1). The flat bar (8) of the hanging bracket (5) is fixed to the set-up bar (17) supported on the upper surface of the main girder (1) by spot welding, and the flat bar ( Insert the spacer block (14) between the lower surface of 8) and the upper surface of the upper flange (1a) of the main girder (1) to ensure the fog size on the upper surface of the upper flange (1a) of the main girder (1). I have to do it.

吊り下げ金具(5)を構成しているフラットバー(8)を段取り筋(17)を介して主桁(1)に保持した状態で、隣り合う主桁(1)同士間に、床版用型枠(2)と、この床版用型枠(2)を保持するビーム材(3)とを配置し、ビーム材(3)の爪部(3c)に形成したボルト挿通孔(9)にねじロツド(10)を挿入し、その上端部をフラットバー(8)に形成されているボルト挿通孔(6)を通して袋ナット(7)に螺合するとともに、ビーム材(3)の爪部(3c)の下側に連出しているねじロツド(10)にワッシャ(11)とナット(12)を装着して、ナット(12)を操作して床版用型枠(2)とビーム材(3)とを確りと所定の位置に固定する。このとき、ねじロツド(10)でのフラットバー(8)とビーム材(3)の爪部(3c)との間に位置する部分に合成樹脂製チューブ(図示略)を套嵌して、コンクリートがねじロツド(10)に付着するのを防止する。   For the floor slab between the adjacent main girders (1) with the flat bar (8) constituting the hanging bracket (5) held by the main girders (1) via the setup bars (17) The formwork (2) and the beam material (3) for holding the formwork for floor slab (2) are arranged, and the bolt insertion hole (9) formed in the claw portion (3c) of the beam material (3) is disposed. The screw rod (10) is inserted, and the upper end of the screw rod (10) is screwed into the cap nut (7) through the bolt insertion hole (6) formed in the flat bar (8), and the claw portion of the beam member (3) ( 3c) Attach the washer (11) and nut (12) to the screw rod (10) that continues to the lower side, and operate the nut (12) to form the slab formwork (2) and beam material ( 3) is firmly fixed at a predetermined position. At this time, a synthetic resin tube (not shown) is fitted into the portion located between the flat bar (8) of the screw rod (10) and the claw portion (3c) of the beam member (3), and concrete Is prevented from adhering to the screw rod (10).

図4は異なる実施態様の吊り下げ金具(5)を示し、これは主桁(1)の片側に床版用型枠(2)を支持する場合に使用するもので、袋ナット(7)がその上面開口部周縁部に溶着されているボルト挿通孔(6)をフラットバー(8)の片側に形成したものである。   FIG. 4 shows a hanging metal fitting (5) of a different embodiment, which is used when a floor slab form (2) is supported on one side of a main girder (1), and a cap nut (7) is provided. A bolt insertion hole (6) welded to the peripheral edge of the upper surface opening is formed on one side of the flat bar (8).

上述の構成からなる吊り下げ金具(5)では、主桁(1)の上側フランジ上面にアンカー材(16)で支持されている段取り筋(17)に吊下げ具(5)を構成しているフラットバー(8)を点溶接で固定することで、主要構造材である主桁に対する溶接による熱影響をほとんどなくすことができ橋梁強度を低下させることがなくなる。またフラットバー(8)にボルト挿通孔(9)を透設するとともに、袋ナット(7)を溶着固定し、この袋ナット(7)に螺解可能な状態で螺合させたねじロツド(10)で型枠支持用のビーム材(3)吊下げ保持して、床版用型枠(2)を保持するようにしてあることから、橋梁下側の空間内が簡素化し、各種支保材の配置が簡略化されて、型枠設置作業や、型枠バラシ作業の作業性を高めることができることになる。   In the hanging metal fitting (5) having the above-described structure, the hanging tool (5) is formed on the set-up bar (17) supported by the anchor material (16) on the upper surface of the upper flange of the main girder (1). By fixing the flat bar (8) by spot welding, it is possible to almost eliminate the thermal effect of welding on the main girder, which is the main structural material, and the bridge strength is not lowered. Further, a bolt insertion hole (9) is formed through the flat bar (8), a cap nut (7) is welded and fixed, and a screw rod (10 ) Beam material for supporting the formwork (3) is suspended and held to hold the formwork for floor slab (2), thus simplifying the space under the bridge and providing various support materials. Arrangement is simplified, and the workability of formwork installation work and formwork work can be improved.

本発明は、橋梁の床版を現場で製作する際に最適である。   The present invention is most suitable when a bridge deck is manufactured on-site.

1…主桁、2…床版用型枠、3…型枠保持用ビーム材、5…吊下げ金具、6…ポルト挿通孔、7…袋ナット、8…フラットバー、10…ねじロッド、12…ナット、14…スペーサブロック、15…スペーサブロックの受部、16…アンカー材、17…段取り筋。   DESCRIPTION OF SYMBOLS 1 ... Main girder, 2 ... Formwork for floor slabs, 3 ... Beam material for formwork holding, 5 ... Hanging metal fitting, 6 ... Port insertion hole, 7 ... Cap nut, 8 ... Flat bar, 10 ... Screw rod, 12 ... Nut, 14 ... Spacer block, 15 ... Spacer block receiving part, 16 ... Anchor material, 17 ... Setup line.

Claims (2)

橋脚上面に設置した複数の主桁(1)間に床版用型枠(2)を固定保持して、主桁(1)の上面にコンクリート床版を形成するに当たり、床版用型枠(2)を保持するビーム材(3)を主桁(1)に吊下げ保持する吊下げ金具(5)であって、
長手方向端部に透設したボルト挿通孔(6)の上面開口部を取り囲む状態で開口周縁部に袋ナット(7)を溶着してなるフラットバー(8)と、
前記ボルト挿通孔()を貫通してフラットバー(8)に溶着されている袋ナット(7)に一端が螺合されるねじロッド(10)と、
このねじロッド(10)の他端側に螺合されるナット(12)とからなり、
前記フラットバー(8)に螺着されているねじロッド(10)はビーム材(3)の爪部(3c)に形成したボルト挿通孔()を貫通してビーム材(3)の下側に突出し、このねじロッド(10)の突出部にナット(12)を螺合して床版用型枠(2)とビーム材(3)とを所定の位置に確りと固定し、
I型材で構成した主桁(1)の上側フランジの上面にその長手方向に沿って配置されているアンカー材(16)で固定される段取り筋(17)と前記フラットバー(8)とが点溶接で固定されていることを特徴とする床版用型枠を主桁に相対固定する吊下げ型金具。
The floor slab formwork (2) is fixedly held between the main girder (1) installed on the pier upper surface, and the concrete slab is formed on the upper surface of the main girder (1). 2) a hanging bracket (5) for suspending and holding the beam member (3) for holding the main beam (1),
A flat bar (8) formed by welding a cap nut (7) to the peripheral edge of the opening in a state of surrounding the upper surface opening of the bolt insertion hole (6) provided through the longitudinal end;
A screw rod (10) having one end screwed into a cap nut (7) welded to the flat bar (8) through the bolt insertion hole ( 6 );
It consists of a nut (12) screwed to the other end of this threaded rod (10),
The screw rod (10) screwed to the flat bar (8) passes through the bolt insertion hole ( 9 ) formed in the claw portion (3c) of the beam material (3), and is below the beam material (3). And the nut (12) is screwed into the protruding portion of the threaded rod (10) to securely fix the floor slab form (2) and the beam material (3) in place,
The setup bar (17) fixed by the anchor material (16) arranged along the longitudinal direction on the upper surface of the upper flange of the main girder (1) made of I-shaped material and the flat bar ( 8) A hanging type metal fitting for fixing a floor slab form to a main girder, which is fixed by welding.
フラットバー(8)の下面にスペーサブロック(14)の受部(15)が設置してある請求項1に記載した床版用型枠を主桁に相対固定する吊下げ型金具。   2. A hanging metal fitting for fixing a floor slab form frame to a main girder according to claim 1, wherein a receiving portion (15) of a spacer block (14) is installed on the lower surface of the flat bar (8).
JP2014166400A 2014-08-19 2014-08-19 A hanging bracket that fixes the floor slab formwork to the main girder. Expired - Fee Related JP6310362B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014166400A JP6310362B2 (en) 2014-08-19 2014-08-19 A hanging bracket that fixes the floor slab formwork to the main girder.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014166400A JP6310362B2 (en) 2014-08-19 2014-08-19 A hanging bracket that fixes the floor slab formwork to the main girder.

Publications (2)

Publication Number Publication Date
JP2016041887A JP2016041887A (en) 2016-03-31
JP6310362B2 true JP6310362B2 (en) 2018-04-11

Family

ID=55591764

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014166400A Expired - Fee Related JP6310362B2 (en) 2014-08-19 2014-08-19 A hanging bracket that fixes the floor slab formwork to the main girder.

Country Status (1)

Country Link
JP (1) JP6310362B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505447B (en) * 2018-04-28 2019-02-01 江苏拓科集团有限公司 A kind of Cast-in-place Bent Cap construction method
CN114232502B (en) * 2022-01-18 2023-09-29 中铁十四局集团第三工程有限公司 Self-propelled sliding template truss and use method thereof
KR102430436B1 (en) * 2022-01-20 2022-08-08 주식회사 누리플랜 Worktable fixing apparatus for constructing slab of bridge

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0541157Y2 (en) * 1987-07-24 1993-10-19
JP2010189918A (en) * 2009-02-18 2010-09-02 Aen:Kk Form for floor slab and floor slab construction method
JP2013002193A (en) * 2011-06-20 2013-01-07 Zen Giken Kk Tie bolt for suspending floor board-receiving beam in concrete construction of bridge girder, and installation method of tie bolt for suspending floor board-receiving beam in concrete construction of bridge girder

Also Published As

Publication number Publication date
JP2016041887A (en) 2016-03-31

Similar Documents

Publication Publication Date Title
KR101107300B1 (en) Steel plate shear wall
JP6379045B2 (en) Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method
JP5968846B2 (en) Concrete wall railing mounting structure
US10017942B2 (en) Rebar wall set-up bar
JP2010007365A (en) Form timbering apparatus and form apparatus
JP6310362B2 (en) A hanging bracket that fixes the floor slab formwork to the main girder.
KR20170072080A (en) Cantilever part for bridge and constructing method thereof
JP2016061045A (en) Widening pc floor slab structure, and widening method for existing pc floor slab
KR100926750B1 (en) Construction method for crossbeam mold
JP2008063736A (en) Concrete void slab
KR100952931B1 (en) Shear force reinforcing apparatus of concrete filled steel tube column-reinforced concrete flat slab joint
JP6821853B1 (en) Formwork support structure
JP2008266910A (en) Projection structure of anchorage or deviator of tendon, and construction method therefor
JP5023404B1 (en) Method for reinforcing corroded part of steel pipe support
JP3140560U (en) Concrete inflow prevention structure used when placing different kinds of concrete
JP2014190116A (en) Construction method of concrete slab
KR100991017B1 (en) Thedeck plate
KR20100057446A (en) Apparatus for preventing vertical structure from falling sideward
KR20100123405A (en) Structure for filling-up a steel reinforced concrete on h shaped section steel in slab bridge
KR100840190B1 (en) I-beam segment connection method equipped with prestress steel synthetic concrete upper flange for continuous bridge
CN109184199A (en) Collar tie beam antitorque Shear Strengthening method when 3m stressed arch-bar cast-in-place construction
JP2016217013A (en) Jig and method for forming hole part
KR102269140B1 (en) Support Structure for Construction of RC Beam Mold, And Method for Construction of RC Beam
KR101303547B1 (en) Arrangement apparatus make straight the lower part of aluminium form for revetment
JP2009097197A (en) Method of constructing pillar head

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170927

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171121

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180130

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180316

R150 Certificate of patent or registration of utility model

Ref document number: 6310362

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees