KR102430436B1 - Worktable fixing apparatus for constructing slab of bridge - Google Patents

Worktable fixing apparatus for constructing slab of bridge Download PDF

Info

Publication number
KR102430436B1
KR102430436B1 KR1020220008363A KR20220008363A KR102430436B1 KR 102430436 B1 KR102430436 B1 KR 102430436B1 KR 1020220008363 A KR1020220008363 A KR 1020220008363A KR 20220008363 A KR20220008363 A KR 20220008363A KR 102430436 B1 KR102430436 B1 KR 102430436B1
Authority
KR
South Korea
Prior art keywords
connection part
connector
slab
wall
fastening member
Prior art date
Application number
KR1020220008363A
Other languages
Korean (ko)
Inventor
이상우
Original Assignee
주식회사 누리플랜
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 누리플랜 filed Critical 주식회사 누리플랜
Priority to KR1020220008363A priority Critical patent/KR102430436B1/en
Application granted granted Critical
Publication of KR102430436B1 publication Critical patent/KR102430436B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

According to the present invention, provided is a temporary worktable fixing device for constructing a slab of a bridge, comprising: a connector having one end mounted on the upper surface of one side of a slab of a pier; a first connection part protruding and extending with a predetermined height from one side of the upper surface of the connector and coupled to and having a gap maintained from the temporary worktable fixing device mounted on the upper surface of the other side of the slab of the pier by allowing a tension beam and a first coupling member to pressurize an inner side surface; a second connection part protruding and extending with a predetermined height from the other side of the upper surface of the connector to face the first connection part to fix one side of a temporary worktable using a coupling beam and a second coupling member and placing the temporary worktable on one end of the slab of the pier; a reinforcement part protruding and extending while connecting the first connection part and the second connection part to the upper surface of the connector with a predetermined height to distribute a load exerted on the first connection part and the second connection part and to reinforce the rigidity of the connector; and an outer side connection part protruding and extending with a predetermined height from one side of the upper surface of the connector to be placed on an outer side of the first connection part and coupled to and having a gap maintained from the temporary worktable fixing device mounted on the upper surface of the other side of the slab of the pier by placing the tension beam and the first coupling member on the outer side surface of the first connection part instead of placing the tension beam and the first coupling member in a space between the first connection part and the second connection part and allowing the first coupling member coupled to the tension beam to pressurize the outer side surface of the first connection part. Therefore, provided is a temporary worktable fixing device for constructing a slab of a bridge, wherein a temporary worktable can be prevented from moving in vertical and horizontal directions, thereby ensuring the safety of workers.

Description

교량 슬래브 타설용 가설작업대 고정장치{Worktable fixing apparatus for constructing slab of bridge}Worktable fixing apparatus for constructing slab of bridge

본 발명은 교량 슬래브 타설용 가설작업대 고정장치에 관한 것으로서, 보다 상세하게는, 교각의 슬래브 양측면에 각각 가설작업대들이 임시로 거치되도록 복수개의 고정장치 중 상호간 대향 위치된 고정장치들이 텐션빔을 통해 서로간의 간격이 고정적으로 결합 유지되도록 하여 가설작업대가 상하 및 수평방향으로 유동되지 않아 작업자의 안전성을 확보하도록 할 수 있는 교량 슬래브 타설용 가설작업대 고정장치에 관한 것이다. The present invention relates to a device for fixing a temporary workbench for pouring a bridge slab, and more particularly, a plurality of fixing devices facing each other so that the temporary workbenches are temporarily mounted on both sides of a slab of a pier through a tension beam. It relates to a fixing device for a temporary workbench for placing a bridge slab that can secure the safety of workers by preventing the temporary workbench from flowing in the vertical and horizontal directions by maintaining the fixed distance between them.

일반적으로 교량 또는 도로의 육교부분을 건설할 때 교각을 세우고 교각의 상부에 피씨 빔(prestressed concrete girder)이나 철제 또는 콘크리트로 만든 거더(girder) 등과 같은 가설작업대를 교각 사이에 걸치고 가설작업대의 상부에 콘크리트를 타설하여 도로면을 만든다.In general, when constructing a bridge or an overpass part of a road, build a pier and put a temporary workbench such as a PC beam or a girder made of iron or concrete on the upper part of the pier and put a temporary workbench between the piers and put it on the upper part of the temporary workbench. Concrete is poured to create a road surface.

여기서, 작업자가 여러 작업 구간으로 이동되도록 하는 가설작업대는 작업자에 의해 현장에 설치되며, 등록특허 10-2300271 등에 개시된 바 있는, 별도의 가설작업대 고장장치를 통해 교각의 슬래브에 고정적으로 설치 구성된다.Here, the temporary workbench that allows the worker to move to various work sections is installed in the field by the worker, and is fixedly installed on the slab of the pier through a separate temporary workbench failure device, which is disclosed in Korean Patent No. 10-2300271 and the like.

종래의 가설작업대 고정장치(10)는, 도 1 내지 도 3에 도시된 바와 같이, 교각(1)의 슬래브(2) 폭 방향 양단에 위치되는 한 쌍의 가설작업대(3)들을 상호간 결합시키기 위한 것으로서, 슬래브(2)의 폭 방향 상면에 안착되는 연결구(11), 연결구(11)의 일측 상부로 돌출된 제1연결부(12) 및 연결구(11)의 타측에 상하로 관통 형성되는 제2연결부(13) 등을 포함하고, 제2연결부(13)에 가설작업대(3)의 일측에 하단이 고정된 체결빔(4) 상단이 관통된 후 제2체결부재(5)를 통해 고정 결합되고, 슬래브(2)의 폭방향 양단에 위치된 한 쌍의 제1연결부(12)에 텐션빔(6)의 양단이 관통된 후 제1체결부재(7)를 통해 고정 결합되며, 이때, 텐션빔(6)의 텐션 조정을 통하여 슬래브(2)의 폭방향 양단에 위치된 한 쌍의 연결구(11)들 간의 간격이 고정 유지되어 슬래브(2)의 폭방향 양단에 가설작업대(3)가 상하 및 수평 방향으로 유동되지 않도록 고정 설치되어 작업자의 안전성을 확보할 수 있다.The conventional temporary workbench fixing device 10, as shown in Figs. As one, the connector 11 seated on the upper surface in the width direction of the slab 2, the first connector 12 protruding from one side of the connector 11 to the upper part, and the second connector formed vertically through the other side of the connector 11 (13) and the like, and after the upper end of the fastening beam 4, the lower end of which is fixed to one side of the temporary workbench 3, passes through the second connecting part 13, it is fixedly coupled through the second fastening member 5, After both ends of the tension beam 6 are penetrated through the pair of first connection parts 12 located at both ends in the width direction of the slab 2, they are fixedly coupled through the first fastening member 7, and at this time, the tension beam ( 6), the distance between the pair of connectors 11 located at both ends of the slab 2 in the width direction is fixed and maintained, so that the temporary work table 3 is installed at both ends of the slab 2 in the width direction up and down and horizontally. It is fixedly installed so that it does not flow in the direction of flow, so the safety of the operator can be secured.

그러나 종래의 가설작업대 고정장치(10)는, 연결구(11)의 양측에 제1연결부(12)와 제2연결부(13)만 돌출 구성되는 구조를 가지기 때문에, 각각에 텐션빔(6)과 제1체결부재(7) 및 체결빔(4)과 제2체결부재(5)가 결합된 상태에서 슬래브(2)의 양단에 연결되는 경우 제1연결부(12)와 제2연결부(13)에 많은 부하가 작용되어 연결구(11)가 파단되는 문제점이 있다.However, since the conventional temporary workbench fixing device 10 has a structure in which only the first connection part 12 and the second connection part 13 protrude on both sides of the connector 11, the tension beam 6 and the second connection part 13 respectively. When the first fastening member 7 and the fastening beam 4 and the second fastening member 5 are connected to both ends of the slab 2 in a coupled state, the first connecting part 12 and the second connecting part 13 have many There is a problem in that the load is applied and the connector 11 is broken.

또한, 슬래브(2)의 양단에 가설작업대(3)가 연결된 상태로 위치된 가설작업대 고정장치(10)들의 제1연결부(12)들이 텐션빔(6)과 제1체결부재(7)를 통해 상호간 연결시 제1체결부재(7)의 걸림판, 와셔 및 너트가 제1연결부(12)와 제2연결부(13) 사이의 협소한 공간에서 텐션빔(6)의 일단에 관통된 상태에서 제1연결부(12)에 밀착되는 조임 작업이 이루어져야 하기 때문에, 조임용 도구를 이용한 작업 반경이 확보되지 않아 작업성이 저하되는 문제점이 있다.In addition, the first connection parts 12 of the temporary work bench fixing devices 10 positioned in a state in which the temporary work table 3 is connected to both ends of the slab 2 through the tension beam 6 and the first fastening member 7 When connecting to each other, the first fastening member 7 has a locking plate, a washer and a nut penetrated through one end of the tension beam 6 in a narrow space between the first connecting part 12 and the second connecting part 13. Since the tightening operation in close contact with the first connection part 12 has to be made, there is a problem in that the working radius using the tightening tool is not secured, so that the workability is deteriorated.

또한, 제1체결부재(7)가 걸림판, 와셔 및 너트의 복수개의 구성부를 가짐에 따라 협소한 공간에서 복수개의 구성부를 이용하여 가설작업대 고정장치(10)들이 텐션빔(6)을 통해 연결되도록 하는 작업에 많은 시간이 소요되는 문제점이 있다.In addition, as the first fastening member 7 has a plurality of components of a locking plate, a washer and a nut, the temporary workbench fixing devices 10 are connected through a tension beam 6 using a plurality of components in a narrow space. There is a problem in that it takes a lot of time to make it possible.

따라서 본 발명의 목적은 교각의 슬래브 상면 일측에 제1연결부가 연결되고 어느 하나의 가설작업대에 제2연결부가 결합된 어느 하나의 가설작업대 고정장치와 교각의 슬래브 상면 타측에 제1연결부가 연결되고 다른 하나의 가설작업대에 제2연결부에 결합된 다른 하나의 가설작업대 고정장치가 상기 제1연결부들이 텐션빔에 의해 고정적으로 결합 유지되도록 하여 가설작업대가 상하 및 수평방향으로 유동되지 않아 작업자의 안전성을 확보하도록 할 수 있는 교량 슬래브 타설용 가설작업대 고정장치를 제공하는 것이다.Therefore, an object of the present invention is to connect any one temporary workbench fixing device in which the first connection part is connected to one side of the slab upper surface of the pier and the second connection part to any one temporary workbench, and the first connection part is connected to the other side of the slab upper surface of the pier, The other temporary workbench fixing device coupled to the second connection part to the other temporary workbench ensures that the first connecting parts are fixedly coupled and maintained by the tension beam, so that the temporary workbench does not flow in the vertical and horizontal directions to increase the safety of the worker. It is to provide a temporary workbench fixing device for bridge slab casting that can be secured.

또한, 본 발명의 목적은 제1연결부와 제2연결부 사이에 보강부가 보강 구성되어 제1연결부와 제2연결부에 큰 부하가 작용되어도 제1연결부와 제2연결부가 구성되는 연결구가 파단되는 것을 방지할 수 있는 교량 슬래브 타설용 가설작업대 고정장치를 제공하는 것이다.In addition, it is an object of the present invention to prevent breakage of the connector including the first connecting part and the second connecting part even when a large load is applied to the first connecting part and the second connecting part by reinforcing the reinforcing part between the first connecting part and the second connecting part It is to provide a temporary workbench fixing device for pouring bridge slabs that can be done.

또한, 본 발명의 목적은 가설작업대 고정장치들이 텐션빔과 제1체결부재를 통하여 결합시 제1연결부와 제2연결부의 사이가 아닌 제1연결부의 외측에 구성된 외측연결부를 통해 결합되도록 하여 텐션빔의 결합 작업이 고장장치의 외측에서 이루어지도록 하여 작업성을 향상시킬 수 있는 교량 슬래브 타설용 가설작업대 고정장치를 제공하는 것이다.In addition, it is an object of the present invention so that when the temporary workbench fixing devices are coupled through the tension beam and the first fastening member, the tension beam is coupled through the outer connecting part configured outside the first connecting part, not between the first connecting part and the second connecting part. It is to provide a fixing device for a temporary workbench for bridge slab pouring that can improve workability by allowing the bonding work of the slab to be performed on the outside of the faulty device.

또한, 본 발명의 목적은 가설작업대 고정장치들을 텐션빔을 통해 결합시키는 제1체결부재가 걸림판이 너트에 일체로 고정된 구성을 가지도록 하여 와셔의 구성을 생략하고 조임 작업을 보다 간편히 하도록 할 수 있는 교량 슬래브 타설용 가설작업대 고정장치를 제공하는 것이다.In addition, an object of the present invention is to omit the configuration of the washer and simplify the tightening operation by making the first fastening member for coupling the temporary work bench fixing devices through the tension beam to have a configuration in which the locking plate is integrally fixed to the nut. It is to provide a fixture for a temporary workbench for pouring bridge slabs.

한편, 본 발명의 목적은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 다른 목적들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.On the other hand, the object of the present invention is not limited to the object mentioned above, and other objects not mentioned will be clearly understood by those skilled in the art from the following description.

이를 위하여, 본 발명에 의하면, 교각의 슬래브 일측 상면에 일단부가 거치되는 연결구; 연결구의 상면 일측에 소정의 높이를 가지면서 돌출 연장되고 텐션빔과 제1체결부재가 내측면을 가압하는 것을 통해 교각의 슬래브 타측 상면에 거치된 가설작업대 고정장치에 결합 및 간격이 유지되도록 하는 제1연결부; 제1연결부에 대향되도록 연결구의 상면 타측에 소정의 높이를 가지면서 돌출 연장되어 체결빔과 제2체결부재를 통해 가설작업대의 일측이 고정되도록 하고 교각의 슬래브 일단에 가설작업대가 위치되도록 하는 제2연결부; 소정의 높이를 가지고 연결구의 상면에 제1연결부와 제2연결부까지 연결하면서 돌출 연장되어 제1연결부와 제2연결부에 가해지는 부하를 분산시키고 연결구의 강성을 보강하는 보강부; 및 제1연결부의 외측에 위치되도록 연결구의 상면 일측에 소정의 높이를 가지면서 돌출 연장되고 제1연결부와 제2연결부 사이의 공간에 텐션빔과 제1체결부재가 위치되도록 하는 대신에 제1연결부의 외측면에 텐션빔과 제1체결부재가 위치되도록 한 후 텐션빔에 체결된 제1체결부재가 제1연결부의 외측면을 가압하는 것을 통해 교각의 슬래브 타측 상면에 거치된 가설작업대 고정장치에 결합 및 간격이 유지되도록 하는 외측연결부을 포함하는 교량 슬래브 타설용 가설작업대 고정장치가 제공된다.To this end, according to the present invention, a connector having one end mounted on the upper surface of one side of the slab of the pier; A method that protrudes while having a predetermined height on one side of the upper surface of the connector, and the tension beam and the first fastening member press the inner surface of the connecting member to the fixing device of the temporary workbench mounted on the other upper surface of the slab of the pier so that the coupling and spacing are maintained 1 connection part; A second that protrudes while having a predetermined height on the other side of the upper surface of the connector so as to be opposed to the first connector so that one side of the temporary workbench is fixed through the fastening beam and the second fastening member, and the temporary workbench is positioned at one end of the slab of the pier connection; a reinforcing part having a predetermined height and extending protrudingly while connecting to the first and second connectors on the upper surface of the connector to distribute the load applied to the first and second connectors and to reinforce the rigidity of the connector; and a first connection part instead of allowing the tension beam and the first fastening member to be positioned in the space between the first connection part and the second connection part and protrude while having a predetermined height on one side of the upper surface of the connector so as to be located outside the first connection part After the tension beam and the first fastening member are positioned on the outer surface of the There is provided a temporary workbench fixing device for casting a bridge slab including an outer connecting part for maintaining the coupling and spacing.

여기서, 연결구는, 베이스; 베이스의 일측 제1연결부의 내측에 천공 형성되는 누설공; 및 베이스의 하면에 요철 구조로 형성되는 보강트러스를 포함하는 것이 바람직하다.Here, the connector includes a base; A leak hole formed in the inner side of the first connection part of the base; and a reinforcing truss formed in a concave-convex structure on the lower surface of the base.

또한, 제1연결부는, 텐션빔의 일단이 관통되는 관통공이 상단 개구된 상태로 형성되고 관통공에 관통된 텐션빔의 일단에 체결된 제1체결부재에 의해 내측면과 외측면이 선택적으로 가압되는 가압벽과; 가압벽의 관통공 내측면 상단에 가압벽에 대하여 수직하여 연장 형성되어 제1체결부재가 가압벽의 내측면에 가압시 가압벽의 내측면에 걸림 지지되도록 하는 걸림단을 포함하는 것이 바람직하다.In addition, the first connection portion is formed in a state in which a through hole through which one end of the tension beam is penetrated is opened at the top, and the inner and outer surfaces are selectively pressed by the first fastening member fastened to one end of the tension beam passing through the through hole. a pressurized wall; It is preferable to include a locking end at the upper end of the inner surface of the through hole of the pressure wall to extend perpendicularly to the pressure wall so that the first fastening member is caught and supported by the inner surface of the pressure wall when the first fastening member is pressed against the inner surface of the pressure wall.

또한, 제2연결부는, 체결빔의 상단이 삽입되는 삽입공이 형성되고 삽입공에 삽입된 체결빔의 상단에 체결된 제2체결부재에 의해 체결빔이 고정되는 원통 형상의 소켓과; 소켓의 외면으로부터 제1연결부를 향하는 방향으로 베이스의 중간부까지 삼각형상을 가지면서 보강 형성되어 소켓에 가해지는 부하를 분산시켜 소켓의 강성을 보강하는 보강패널을 포함하는 것이 바람직하다.In addition, the second connection portion, the insertion hole into which the upper end of the fastening beam is inserted, and a cylindrical socket to which the fastening beam is fixed by the second fastening member fastened to the upper end of the fastening beam inserted into the insertion hole; It is preferable to include a reinforcing panel for reinforcing the rigidity of the socket by dispersing the load applied to the socket by being reinforced while having a triangular shape from the outer surface of the socket to the middle portion of the base in the direction toward the first connection part.

또한, 소켓의 삽입공 내주면에 나사산이 형성되는 것이 바람직하다.In addition, it is preferable that a thread is formed on the inner circumferential surface of the insertion hole of the socket.

또한, 보강부는, 가압벽과 소켓의 높이에 대응되는 높이를 가지면서 가압벽으로부터 소켓까지 연장 구성되는 보강벽을 포함하고, 보강벽은, 가압벽의 일측단에서부터 시작하여 소켓을 감싼 후 다시 가압벽의 타측단까지 연장되는 것이 바람직하다.In addition, the reinforcing part includes a reinforcing wall configured to extend from the pressure wall to the socket while having a height corresponding to the height of the pressure wall and the socket, and the reinforcing wall starts from one end of the pressure wall and surrounds the socket and then presses again It is preferable to extend to the other end of the wall.

또한, 외측연결부는, 가압벽의 외측에 위치되는 끼움벽; 끼움벽에 관통공에 연통되도록 형성되고 상단이 개구된 상태를 가지며 텐션빔의 일단이 관통 거치되는 거치공; 및 거치공의 하부에 요홈 형상으로 형성되고 거치공에 거치된 텐션빔의 일단에 체결된 제1체결부재의 일부가 끼움벽의 내측에 끼워진 상태에서 가압벽의 외측면을 가압하도록 하여 텐션빔의 텐션이 유지되도록 하는 끼움홈을 포함하는 것이 바람직하다.In addition, the outer connection portion, the fitting wall located on the outside of the pressing wall; a through hole formed in the fitting wall to communicate with the through hole and having an open upper end, and through which one end of the tension beam is mounted; and a portion of the first fastening member formed in a concave shape at the lower portion of the mounting hole and fastened to one end of the tension beam mounted on the mounting hole to press the outer surface of the pressing wall while being fitted inside the fitting wall, It is preferable to include a fitting groove for maintaining the tension.

또한, 제1체결부재는, 텐션빔의 일단이 관통 결합되고 가압벽의 외측면에 끼움홈을 통해 끼움벽에 출입 및 지지되는 걸림판과 프렌치너트가 일체로 구성되는 것이 바람직하다.In addition, the first fastening member, it is preferable that one end of the tension beam is coupled through and the French nut is integrally formed with a locking plate that enters and leaves the fitting wall through a fitting groove on the outer surface of the pressure wall.

따라서 본 발명에 의하면, 교각의 슬래브 상면 일측에 제1연결부가 연결되고 어느 하나의 가설작업대에 제2연결부가 결합된 어느 하나의 고정장치와 교각의 슬래브 상면 타측에 제1연결부가 연결되고 다른 하나의 가설작업대에 제2연결부가 결합된 다른 하나의 고정장치가 상기 제1연결부들이 텐션빔에 의해 고정적으로 결합 유지되는 것을 통하여 가설작업대가 상하 및 수평방향으로 유동되지 않아 작업자의 안전성을 확보할 수 있다.Therefore, according to the present invention, the first connection part is connected to one side of the slab upper surface of the pier and the first connection part is connected to the other side of the slab upper surface of the pier and any one fixing device in which the second connection part is coupled to any one temporary workbench The other fixing device coupled with the second connection part to the temporary workbench of have.

또한, 제1연결부와 제2연결부 사이에 보강부가 보강 구성되어 제1연결부와 제2연결부에 큰 부하가 작용되어도 제1연결부와 제2연결부가 구성되는 연결구가 파단되는 것을 방지할 수 있다.In addition, since the reinforcing part is formed between the first connection part and the second connection part, even if a large load is applied to the first connection part and the second connection part, it is possible to prevent the connector including the first connection part and the second connection part from being broken.

또한, 가설작업대 고정장치들이 텐션빔과 제1체결부재를 통하여 결합시 제1연결부와 제2연결부의 사이가 아닌 제1연결부의 외측에 구성된 외측연결부를 통해 결합되도록 하여 텐션빔의 결합 작업이 고장장치의 외측에서 이루어지도록 하여 작업성을 향상시킬 수 있다.In addition, when the temporary workbench fixing devices are coupled through the tension beam and the first fastening member, the coupling operation of the tension beam is broken by making them coupled through the outer connecting part configured outside the first connecting part, not between the first connecting part and the second connecting part. It is possible to improve workability by making it happen outside the device.

또한, 가설작업대 고정장치들을 텐션빔을 통해 결합시키는 제1체결부재가 걸림판이 너트에 일체로 고정된 구성을 가지도록 하여 와셔의 구성을 생략하고 조임 작업을 보다 간편히 하도록 할 수 있다.In addition, the first fastening member for coupling the temporary work bench fixing devices through the tension beam has a configuration in which the locking plate is integrally fixed to the nut, thereby omitting the configuration of the washer and making the tightening operation simpler.

한편, 본 발명의 효과는 이상에서 언급한 효과로 제한되지 않으며, 언급되지 않은 다른 효과들은 청구범위의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.On the other hand, the effects of the present invention are not limited to the above-mentioned effects, and other effects not mentioned will be clearly understood by those skilled in the art from the description of the claims.

도 1 내지 도 3은 종래의 교량 슬래브 타설용 가설작업대 고정장치를 나타낸 도면;
도 4와 도 5는 본 발명의 바람직한 실시예에 따른 교량 슬래브 타설용 가설작업대 고정장치를 나타낸 평면 및 저면 사시도;
도 6 내지 도 8은 도 4의 가설작업대 고정장치를 나타낸 평면도, 정면도 및 측단면도;
도 9는 도 4의 가설작업대 고정장치에 의해 교량 슬래브에 가설작업대가 결합된 모습을 나타낸 도면;
도 10과 도 11은 도 9의 결합 과정을 나타낸 도면이다.
1 to 3 are views showing a conventional temporary workbench fixing device for pouring bridge slabs;
4 and 5 are a plan view and a bottom perspective view showing a temporary workbench fixing device for pouring bridge slabs according to a preferred embodiment of the present invention;
6 to 8 are a plan view, a front view, and a side cross-sectional view showing the temporary workbench fixing device of FIG. 4;
9 is a view showing a state in which the temporary workbench is coupled to the bridge slab by the temporary workbench fixing device of FIG. 4;
10 and 11 are diagrams illustrating the coupling process of FIG. 9 .

이하, 첨부된 도면을 참조하면서 본 발명의 바람직한 실시예에 대하여 상세히 설명하기로 한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 4 내지 도 11에 도시된 바와 같이, 본 발명의 바람직한 실시예에 따른 교량 슬래브 타설용 가설작업대 고정장치(100)는, 소정의 길이와 두께를 가지고 교각(1)의 슬래브(2) 일측 상면에 일단부가 거치되는 연결구(110), 연결구(110)의 상면 일측에 소정의 높이와 두께를 가지면서 돌출 연장되고 텐션빔(6)과 제1체결부재(7)가 내측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 제1연결부(120), 제1연결부(120)에 대향되도록 연결구(110)의 상면 타측에 소정의 높이와 두께를 가지면서 돌출 연장되어 체결빔(4)과 제2체결부재(5)를 통해 가설작업대(3)의 일측이 고정되도록 하고 교각(1)의 슬래브(2) 일단에 가설작업대(3)가 위치되도록 하는 제2연결부(130), 소정의 높이와 소정의 두께를 가지고 연결구(110)의 상면에 제1연결부(120)와 제2연결부(130)까지 연결하면서 돌출 연장되어 제1연결부(120)와 제2연결부(130)에 가해지는 부하를 분산시키고 연결구(110)의 강성을 보강하는 보강부(140) 및 제1연결부(120)의 외측에 위치되도록 연결구(110)의 상면 일측에 소정의 높이와 두께를 가지면서 돌출 연장되고 제1연결부(120)의 내측면에 텐션빔(6)과 제1체결부재(7)가 위치되도록 하는 대신에 제1연결부(120)의 외측면에 텐션빔(6)과 제1체결부재(7)가 위치되도록 한 후 텐션빔(6)과 제1체결부재(7)가 제1연결부(120)의 외측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 외측연결부(150) 등을 포함한다.4 to 11, the temporary workbench fixing device 100 for pouring bridge slabs according to a preferred embodiment of the present invention has a predetermined length and thickness, and the upper surface of one side of the slab (2) of the pier (1) The connector 110, on which one end is mounted, protrudes while having a predetermined height and thickness on one side of the upper surface of the connector 110, and the tension beam 6 and the first fastening member 7 press the inner surface through The first connection part 120 that is coupled to the temporary workbench fixing device 100 ′ mounted on the upper surface of the other side of the slab 2 of the pier 1 and the gap is maintained, and the connector 110 so as to be opposed to the first connection part 120 The slab (2) of the pier (1) is protruded and extended with a predetermined height and thickness on the other side of the upper surface of the pier (1) so that one side of the temporary work table (3) is fixed through the fastening beam (4) and the second fastening member (5) The second connecting portion 130 for positioning the temporary workbench 3 at one end, the first connecting portion 120 and the second connecting portion 130 to the upper surface of the connector 110 having a predetermined height and a predetermined thickness while connecting The connector so as to be located outside the reinforcing part 140 and the first connector 120 that protrude and extend to distribute the load applied to the first connector 120 and the second connector 130 and reinforce the rigidity of the connector 110 . Instead of allowing the tension beam 6 and the first fastening member 7 to be positioned on the inner surface of the first connecting part 120 and protruding while having a predetermined height and thickness on one side of the upper surface of the 110, the first connecting part After the tension beam 6 and the first fastening member 7 are positioned on the outer surface of the 120 , the tension beam 6 and the first fastening member 7 press the outer surface of the first connecting part 120 . It includes an outer connection part 150 and the like that is coupled to the temporary workbench fixing device 100 ′ mounted on the upper surface of the other side of the slab 2 of the pier 1 and the gap is maintained.

여기서, 연결구(110), 제1연결부(120), 제2연결부(130), 보강부(140) 및 외측연결부(150)는, 소정의 강성을 위하여 금속재질을 가지는 것이 바람직하다.Here, the connector 110 , the first connector 120 , the second connector 130 , the reinforcing part 140 , and the outer connector 150 preferably have a metal material for predetermined rigidity.

연결구(110)는, 소정의 길이와 두께를 가지고 교각(1)의 슬래브(2) 일측 상면에 일단부가 거치되는 수단으로서, 소정 두께의 타원 형상을 가지는 베이스(111), 베이스(111)의 일측 제1연결부(120)의 내측에 천공 형성되어 콘크리트 타설시 시멘트가 교각(1)의 슬래브(2)에 유입되도록 하여 베이스(111)와 슬래브(2)의 결합력을 향상시키는 누설공(112) 및 베이스(111)의 하면에 요철 구조로 형성되어 베이스(111)의 강성을 증대시키고 콘크리트 타설시 누설공(112)을 통해 유입된 시멘트가 교각(1)의 슬래브(2)에 넓은 면적으로 접촉되도록 하는 보강트러스(113) 등을 포함한다. The connector 110 has a predetermined length and thickness and one end is mounted on the upper surface of one side of the slab 2 of the pier 1, and the base 111 having an oval shape of a predetermined thickness, one side of the base 111 A leak hole 112 that is formed in the inner side of the first connection part 120 so that cement flows into the slab 2 of the pier 1 during concrete pouring to improve the bonding force between the base 111 and the slab 2, and It is formed in a concave-convex structure on the lower surface of the base 111 so that the rigidity of the base 111 is increased and the cement introduced through the leak hole 112 during concrete pouring is in contact with the slab 2 of the pier 1 in a large area. and a reinforcing truss 113 and the like.

따라서 연결구(110)에 의하면, 누설공(112)을 통하여 시멘트가 슬래브(2)에 접착될 수 있으며, 이에 연결구(110)와 슬래브(2)의 결합력이 향상될 수 있다.Therefore, according to the connector 110 , the cement can be adhered to the slab 2 through the leak hole 112 , thereby improving the bonding force between the connector 110 and the slab 2 .

제1연결부(120)는, 연결구(110)의 상면 일측에 소정의 높이와 두께를 가지면서 돌출 연장되고 텐션빔(6)과 제1체결부재(7)가 내측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 수단으로서, 텐션빔(6)의 일단이 관통되는 관통공(121)이 상단 개구된 상태로 형성되고 관통공(121)에 관통된 텐션빔(6)의 일단에 체결된 제1체결부재(7)에 의해 내측면과 외측면이 선택적으로 가압되는 가압벽(122)과, 가압벽(122)의 관통공(121) 내측면 상단에 가압벽(122)에 대하여 수직하여 연장 형성되어 제1체결부재(7)가 가압벽(122)의 내측면에 가압시 가압벽(122)의 내측면에 걸림 지지되도록 하는 걸림단(123) 등을 포함한다.The first connection part 120 protrudes while having a predetermined height and thickness on one side of the upper surface of the connector 110, and the tension beam 6 and the first fastening member 7 press the inner surface of the pier ( As a means for maintaining the coupling and spacing to the temporary workbench fixing device 100' mounted on the upper surface of the other side of the slab 2 of 1), a through hole 121 through which one end of the tension beam 6 is penetrated is opened at the top. A pressure wall 122 formed in a state of being and the inner surface and the outer surface of which are selectively pressed by the first fastening member 7 fastened to one end of the tension beam 6 penetrating through the through hole 121, and the pressure wall; When the first fastening member 7 is pressed against the inner surface of the pressure wall 122 by extending perpendicularly to the pressure wall 122 at the upper end of the inner surface of the through hole 121 of the pressure wall 122 of the pressure wall 122 It includes a locking end 123 and the like to be supported on the inner surface.

여기서, 텐션빔(6)은, 슬래브(2) 양측에 거치되는 가설작업대 고정장치(100,100')들의 제1연결부를 상호간 연결시키는 것으로서, 일정 강성과 소정 길이를 제공하는 금속재질의 장선볼트인 것이 바람직하고, 제1체결부재(7)가 나사결합되는 나사산이 양단에 형성되는 것이 좋다.Here, the tension beam 6 connects the first connection parts of the temporary work bench fixing devices 100 and 100' mounted on both sides of the slab 2 to each other, and it is a metal joist bolt that provides a certain rigidity and a predetermined length. Preferably, the threads to which the first fastening member 7 is screwed are formed at both ends.

또한, 제1체결부재(7)는, 텐션빔(6)의 일단이 관통 결합되고 가압벽(122)의 내측면에 걸림단(123)을 통해 걸림 지지되는 걸림판(7a)과 프렌치너트(7b)가 일체로 구성되며, 텐션빔(6)의 일단이 관통 결합된 후 프렌치너트(7b)가 스패너 등의 조임 도구를 통해 조임시 걸림판(7a)이 가압벽(122)의 내측면을 가압하여 텐션빔(6)이 강한 텐션을 유지하도록 하며, 이에, 텐션빔(6)을 통해 슬래브(2)의 양측에 걸쳐진 가설작업대 고정장치(100,100')들이 상호간 연결된 상태를 가지도록 하는 것이 좋다.In addition, the first fastening member 7 includes a locking plate 7a and a French nut ( 7b) is integrally formed, and after one end of the tension beam 6 is through-coupled, the French nut 7b is tightened through a fastening tool such as a spanner when the locking plate 7a is pressed against the inner surface of the pressing wall 122. It is good to pressurize the tension beam 6 to maintain a strong tension, so that the temporary workbench fixing devices 100 and 100 ′ spanned on both sides of the slab 2 through the tension beam 6 are connected to each other. .

따라서 제1연결부(120)에 의하면, 연결구(110)의 일측에 관통공(121)을 가지는 가압벽(122)이 돌출 구성됨에 따라 텐션빔(6)의 일단이 가압벽(122)의 관통공(121)에 관통된 상태에서 제1체결부재(7)가 텐션빔(6)의 일단에 나사결합되면서 가압벽(122)의 내측면에 가압되는 것을 통하여 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')의 제1연결부에 결합 및 간격이 유지되도록 하여 슬래브(2)의 양측에 걸쳐진 가설작업대 고정장치(100,100')들이 상호간 연결된 상태를 가질 수 있다.Therefore, according to the first connection part 120 , the pressure wall 122 having the through hole 121 on one side of the connector 110 is configured to protrude, so that one end of the tension beam 6 is a through hole of the pressure wall 122 . The other side of the slab 2 of the pier 1 through the first fastening member 7 being pressed to the inner surface of the pressing wall 122 while being screwed to one end of the tension beam 6 in a state penetrating through the pier (121). The temporary work bench fixing devices 100 and 100 ′ spanned on both sides of the slab 2 may have a mutually connected state by coupling and maintaining the gap to the first connection part of the temporary work bench fixing device 100 ′ mounted on the upper surface.

제2연결부(130)는, 제1연결부(120)에 대향되도록 연결구(110)의 상면 타측에 소정의 높이와 두께를 가지면서 돌출 연장되어 체결빔(4)과 제2체결부재(5)를 통해 가설작업대(3)의 일측이 고정되도록 하고 교각(1)의 슬래브(2) 일단에 가설작업대(3)가 위치되도록 하는 수단으로서, 체결빔(4)의 상단이 삽입되는 삽입공(131)이 형성되고 삽입공(131)에 삽입된 체결빔(4)의 상단에 체결된 제2체결부재(5)에 의해 체결빔(4)이 고정되는 원통 형상의 소켓(132)과, 소켓(132)의 외면으로부터 제1연결부(120)를 향하는 방향으로 베이스(111)의 중간부까지 삼각형상을 가지면서 보강 형성되어 소켓(132)에 가해지는 부하를 분산시켜 소켓(132)의 강성을 보강하는 보강패널(133) 등을 포함한다.The second connection part 130 protrudes while having a predetermined height and thickness on the other side of the upper surface of the connector 110 so as to face the first connection part 120 to connect the fastening beam 4 and the second fastening member 5 . As a means for fixing one side of the temporary workbench 3 through and allowing the temporary workbench 3 to be positioned at one end of the slab 2 of the pier 1, the insertion hole 131 into which the upper end of the fastening beam 4 is inserted. The cylindrical socket 132 and the socket 132 in which the fastening beam 4 is fixed by the second fastening member 5 fastened to the upper end of the fastening beam 4 inserted into the insertion hole 131 and ) from the outer surface of the first connection part 120 in the direction toward the middle part of the base 111 while having a reinforcing formation having a triangular shape to distribute the load applied to the socket 132 to reinforce the rigidity of the socket 132 and a reinforcing panel 133 and the like.

여기서, 체결빔(4)은, 가설작업대(3)의 일측에 하단이 고정 결합된 상태에서 상단이 소켓(132)의 삽입공(131)에 삽입되어 가설작업대(3)가 가설작업대 고정장치(100)에 고정 결합되도록 하는 수단으로서, 일정 강성과 소정 길이를 제공하는 금속재질의 볼트인 것이 바람직하고, 제2체결부재(5)가 나사결합되는 나사산이 상단에 형성되는 것이 좋다.Here, the fastening beam 4 is inserted into the insertion hole 131 of the socket 132 in a state in which the lower end is fixedly coupled to one side of the temporary workbench 3, so that the temporary workbench 3 is fixed to the temporary workbench fixing device ( As a means to be fixedly coupled to 100), it is preferable that a bolt of a metal material that provides a certain rigidity and a predetermined length is preferable, and a thread to which the second fastening member 5 is screwed is preferably formed at the upper end.

또한, 제2체결부재(5)는, 체결빔(4)의 상단이 관통 결합되고 소켓(132)의 상단에 걸림 지지되는 고정너트를 포함하며, 체결빔(4)의 상단이 관통 결합된 후 고정너트가 스패너 등의 조임 도구를 통해 조임시 소켓(132)의 상단을 가압하여 체결빔(4)이 강한 텐션을 유지하도록 하며, 이에, 체결빔(4)을 통해 가설작업대(3)의 일측이 가설작업대 고정장치(100)에 결합된 상태를 가지도록 하는 것이 좋다.In addition, the second fastening member 5 includes a fixing nut through which the upper end of the fastening beam 4 is through-coupled and caught on the upper end of the socket 132 , and after the upper end of the fastening beam 4 is through-coupled When the fixing nut is tightened through a tightening tool such as a spanner, the upper end of the socket 132 is pressed so that the fastening beam 4 maintains strong tension, and thus, one side of the temporary workbench 3 through the fastening beam 4 It is preferable to have a state coupled to the temporary workbench fixing device 100 .

따라서 제2연결부(130)에 의하면, 연결구(110)의 타측에 삽입공(131)을 가지는 소켓(132)이 돌출 구성됨에 따라 체결빔(4)의 상단이 소켓(132)의 삽입공(131)에 관통된 상태에서 제2체결부재(5)가 체결빔(4)의 상단에 나사결합되면서 소켓(132)의 상단에 가압되는 것을 통하여 가설작업대(3)의 일측이 교각(1)의 슬래브(2) 일측에 수평하게 위치되도록 할 수 있다.Therefore, according to the second connection part 130 , as the socket 132 having the insertion hole 131 on the other side of the connector 110 is configured to protrude, the upper end of the fastening beam 4 is the insertion hole 131 of the socket 132 . ), the second fastening member 5 is screwed to the upper end of the fastening beam 4 and pressed to the upper end of the socket 132, so that one side of the temporary workbench 3 is the slab of the pier 1 (2) It can be positioned horizontally on one side.

한편, 본 발명에 의하면, 소켓(132)의 삽입공(131) 내주면에 나사산이 형성되도록 할 수 있으며, 이 경우, 제2체결부재(5)의 구성을 생략하고 이에 따른 공수를 감소시켜 비용을 절감하고 작업성도 향상시킬 수 있다.On the other hand, according to the present invention, it is possible to form a thread on the inner circumferential surface of the insertion hole 131 of the socket 132. In this case, the configuration of the second fastening member 5 is omitted and the man-hours are reduced accordingly, thereby reducing the cost. It can save money and improve workability.

보강부(140)는, 소정의 높이와 소정의 두께를 가지고 연결구(110)의 상면에 제1연결부(120)와 제2연결부(130)까지 연결하면서 돌출 연장되어 제1연결부(120)와 제2연결부(130)에 가해지는 부하를 분산시키고 연결구(110)의 강성을 보강하는 수단으로서, 베이스(111)의 상면 가장자리로부터 가압벽(122)과 소켓(132)의 높이에 대응되는 높이를 가지면서 가압벽(122)으로부터 소켓(132)까지 연장 구성되는 한 쌍의 보강벽(141)을 포함한다.The reinforcing part 140 has a predetermined height and a predetermined thickness, is connected to the first connection part 120 and the second connection part 130 on the upper surface of the connector 110 , and protrudes to extend to the first connection part 120 and the second connection part 120 . 2 As a means of dispersing the load applied to the connection part 130 and reinforcing the rigidity of the connector 110 , it has a height corresponding to the height of the pressing wall 122 and the socket 132 from the upper edge of the base 111 . It includes a pair of reinforcing walls 141 configured to extend from the pressing wall 122 to the socket 132 while being pressed.

여기서, 보강벽(141)은, 보다 바람직하게는, 가압벽(122)의 일측단에서부터 시작하여 소켓(132)을 감싼 후 다시 가압벽(122)의 타측단까지 연장되는 것을 통하여, 보강패널(133)이 연장되지 않은 소켓(132)의 해당 부분을 보다 보강하는 것을 통하여, 베이스(111), 가압벽(122) 및 소켓(132) 전체의 강성을 보강하는 것이 좋다.Here, the reinforcing wall 141, more preferably, starts from one end of the pressure wall 122, wraps the socket 132, and extends again to the other end of the pressure wall 122, through which the reinforcing panel ( It is good to reinforce the rigidity of the base 111 , the pressure wall 122 and the socket 132 as a whole by further reinforcing the corresponding portion of the socket 132 in which the 133 is not extended.

또한, 보강벽(141)은, 가압벽(122)과 소켓(132)의 높이에 대응되는 높이를 가짐으로써, 가압벽(122)과 소켓(132) 사이에 소정의 공간을 제공할 수 있으며, 이에, 콘크리트 타설시 시멘트가 충전되도록 하여 슬래브(2)와 가설작업대 고정장치(100)의 결합력을 보다 향상시킬 수 있다.In addition, the reinforcing wall 141 has a height corresponding to the height of the pressing wall 122 and the socket 132, thereby providing a predetermined space between the pressing wall 122 and the socket 132, Accordingly, it is possible to further improve the bonding force between the slab 2 and the temporary workbench fixing device 100 by filling the cement during concrete pouring.

따라서 보강부(140)에 의하면, 베이스(111), 가압벽(122) 및 소켓(132) 전체의 강성이 증대되도록 할 수 있고 콘크리트 타설시 슬래브(2)와의 결합력을 향상시킬 수 있다.Therefore, according to the reinforcing part 140, the rigidity of the base 111, the pressure wall 122, and the socket 132 as a whole can be increased, and the bonding force with the slab 2 can be improved during concrete pouring.

외측연결부(150)는, 제1연결부(120)의 외측에 위치되도록 연결구(110)의 상면 일측에 소정의 높이와 두께를 가지면서 돌출 연장되고 제1연결부(120)의 내측면에 텐션빔(6)과 제1체결부재(7)가 위치되도록 하는 대신에 제1연결부(120)의 외측면에 텐션빔(6)과 제1체결부재(7)가 위치되도록 한 후 텐션빔(6)과 제1체결부재(7)가 제1연결부(120)의 외측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 수단으로서, 가압벽(122)의 외측에 위치되는 끼움벽(151), 끼움벽(151)에 관통공(121)에 연통되도록 형성되고 상단이 개구된 상태를 가지며 텐션빔(6)의 일단이 관통 거치되는 거치공(152) 및 거치공(152)의 하부에 요홈 형상으로 형성되고 거치공(152)에 거치된 텐션빔(6)의 일단에 체결된 제1체결부재(7)의 일부가 끼움벽(151)의 내측에 끼워진 상태에서 가압벽(122)의 외측면을 가압하도록 하여 텐션빔(6)의 텐션이 유지되도록 하는 끼움홈(153) 등을 포함한다.The outer connection part 150 protrudes while having a predetermined height and thickness on one side of the upper surface of the connector 110 so as to be located on the outside of the first connection part 120, and a tension beam on the inner surface of the first connection part 120 ( 6) and the first fastening member 7 are positioned on the outer surface of the first connecting part 120 instead of the tension beam 6 and the first fastening member 7 being positioned, and then the tension beam 6 and The first fastening member 7 presses the outer surface of the first connection part 120 to maintain the coupling and spacing to the temporary workbench fixing device 100 ′ mounted on the other upper surface of the slab 2 of the pier 1 . As a means to make it possible, the fitting wall 151 positioned on the outside of the pressing wall 122, the fitting wall 151 is formed to communicate with the through hole 121 and has an open upper end of the tension beam (6). The first fastening member 7 is formed in a groove shape in the lower portion of the holding hole 152 and the mounting hole 152 through which one end is mounted and fastened to one end of the tension beam 6 mounted in the mounting hole 152. It includes a fitting groove 153 for maintaining the tension of the tension beam 6 by pressing the outer surface of the pressure wall 122 in a state where a part is fitted inside the fitting wall 151 .

여기서, 제1체결부재(7)는, 텐션빔(6)의 일단이 관통 결합되고 가압벽(122)의 외측면에 끼움홈(153)을 통해 끼움벽(151)에 출입 및 지지되는 걸림판(7a)과 프렌치너트(7b)가 일체로 구성되며, 텐션빔(6)의 일단이 관통 결합된 후 프렌치너트(7b)가 스패너 등의 조임 도구를 통해 조임시 걸림판(7a)이 가압벽(122)의 외측면을 가압하여 텐션빔(6)이 강한 텐션을 유지하도록 하며, 이에, 텐션빔(6)을 통해 슬래브(2)의 양측에 걸쳐진 가설작업대 고정장치(100,100')들이 상호간 연결된 상태를 가지도록 하는 것이 좋다.Here, in the first fastening member 7, one end of the tension beam 6 is through-coupled, and through the fitting groove 153 on the outer surface of the pressing wall 122, a locking plate that enters and exits the fitting wall 151 and is supported. (7a) and the French nut (7b) are integrally configured, and after the one end of the tension beam (6) is through-coupled, the French nut (7b) is tightened through a fastening tool such as a spanner when the locking plate (7a) is pressed against the wall. The outer surface of the 122 is pressed so that the tension beam 6 maintains a strong tension, and thus, the temporary workbench fixing devices 100 and 100 ′ spanned on both sides of the slab 2 through the tension beam 6 are interconnected. It's good to have status.

따라서 외측연결부(150)에 의하면, 연결구(110)의 일측 제1연결부(120) 외측에 거치공(152)과 끼움홈(153)을 가지는 끼움벽(151)이 돌출 구성됨에 따라 텐션빔(6)의 일단이 끼움벽(151)의 거치공(152)에 관통된 상태에서 제1체결부재(7)가 제2연결부(130)의 외측에서 텐션빔(6)의 일단에 나사결합되면서 끼움벽(151)의 끼움홈(153)에 출입 및 끼워진 후 가압벽(122)의 외측면에 가압되는 것을 통하여 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')의 제1연결부에 결합 및 간격이 유지되도록 하여 슬래브(2)의 양측에 걸쳐진 가설작업대 고정장치(100,100')들이 상호간 연결된 상태를 가질 수 있다.Therefore, according to the outer connection part 150, as the fitting wall 151 having the mounting hole 152 and the fitting groove 153 on the outside of the first connection part 120 on one side of the connector 110 is configured to protrude, the tension beam 6 ) while the first fastening member 7 is screwed to one end of the tension beam 6 from the outside of the second connection part 130 in a state where one end is penetrated through the mounting hole 152 of the fitting wall 151, the fitting wall After entering and fitting into the fitting groove 153 of the 151, the temporary workbench fixing device 100' mounted on the upper surface of the other side of the slab 2 of the pier 1 through the pressure on the outer surface of the pressure wall 122. The temporary workbench fixing devices 100 and 100 ′ spanned on both sides of the slab 2 may have a state in which they are connected to each other so that the coupling and spacing are maintained at the first connection part.

또한, 외측연결부(150)에 의하면, 제1체결부재(7)가 연결구(110)의 제1연결부(120)와 제2연결부(130) 사이의 좁은 공간에 위치되는 것이 아니고, 제1연결부(120)의 외측에 위치된 상태에서 제1연결부(120)의 외측에 조임 결합되도록 함으로써, 조임 도구를 이용한 제1체결부재(7)의 조임 작업이 보다 간편히 이루어지도록 하고 이에, 작업성이 전반적으로 향상될 수 있다.In addition, according to the outer connection part 150, the first fastening member 7 is not located in a narrow space between the first connection part 120 and the second connection part 130 of the connector 110, but the first connection part ( By allowing the fastening to be coupled to the outside of the first connection part 120 in a state located on the outside of the 120), the tightening operation of the first fastening member 7 using a tightening tool is made more easily, and thus, the workability is generally can be improved

이하, 상술한 바와 같은 구성을 가지는 교량 슬래브 타설용 가설작업대 고정장치의 작용에 대해 설명하면 다음과 같다.Hereinafter, the operation of the temporary workbench fixing device for pouring bridge slabs having the configuration as described above will be described as follows.

먼저, 가설작업대(3)의 일측에 체결빔(4)의 하단이 공지의 방법을 통해 고정 결합된다.First, the lower end of the fastening beam 4 to one side of the temporary workbench 3 is fixedly coupled through a known method.

이후, 가설작업대 고정장치(100)의 제2연결부(130)의 소켓(132)에 체결빔(4)의 상단이 관통된 후 제2체결부재(5)를 통해 고정 결합된다.Thereafter, the upper end of the fastening beam 4 passes through the socket 132 of the second connection part 130 of the temporary workbench fixing device 100 and is then fixedly coupled through the second fastening member 5 .

이후, 교각(1)의 슬래브(2) 일측단에 가설작업대 고정장치(100)의 연결구(110)가 안착된다.Thereafter, the connector 110 of the temporary workbench fixing device 100 is seated at one end of the slab 2 of the pier 1 .

이후, 교각(1)의 슬래브(2) 타측단에 가설작업대(3)의 일측이 고정 결합된 가설작업대 고정장치(100')의 연결구(110)가 안착된다.Thereafter, the connector 110 of the temporary workbench fixing device 100' to which one side of the temporary workbench 3 is fixedly coupled to the other end of the slab 2 of the pier 1 is seated.

이후, 교각(1)의 슬래브(2) 일측단에 안착된 가설작업대 고정장치(100)의 제1연결부(120) 또는 외측연결부(150)에 텐션빔(6)의 일단이 관통된 후 제1체결부재(7)를 통해 고정 결합된다.After that, one end of the tension beam 6 is passed through the first connecting part 120 or the outer connecting part 150 of the temporary workbench fixing device 100 seated at one end of the slab 2 of the pier 1, after the first It is fixedly coupled through the fastening member (7).

이후, 교각(1)의 슬래브(2) 타측단에 안착된 가설작업대 고정장치(100')의 제1연결부(120) 또는 외측연결부(150)에 텐션빔(6)의 타단이 관통된 후 제1체결부재(7)를 통해 고정 결합된다.Thereafter, after the other end of the tension beam 6 is penetrated through the first connecting part 120 or the outer connecting part 150 of the temporary workbench fixing device 100 ′ seated on the other end of the slab 2 of the pier 1 , the second end It is fixedly coupled through one fastening member (7).

이후, 제1체결부재(7)를 이용한 텐션빔(6) 양단의 텐션이 조절되는 것을 통해 슬래브(2)의 양측단에 위치된 가설작업대(3)들이 상호간 견인력을 유지하면서 슬래브(2)에 밀착된 상태로 위치된다.Thereafter, through the tension of both ends of the tension beam 6 using the first fastening member 7 is adjusted, the temporary work tables 3 located at both ends of the slab 2 are attached to the slab 2 while maintaining mutual traction. placed in close contact.

이후, 교각(1)의 슬래브(2)와 가설작업대(3)의 상부에 콘크리트가 일정 두께로 타설되어 콘크리트층이 시공된다.Thereafter, concrete is poured to a certain thickness on the slab 2 of the pier 1 and the temporary workbench 3 to construct a concrete layer.

따라서 본 발명에 의하면, 교각(1)의 슬래브(2) 일측에 제1연결부(120)가 연결되고 어느 하나의 가설작업대(3)에 제2연결부(130)가 결합된 어느 하나의 가설작업대 고정장치(100)와 교각(1)의 슬래브(2) 타측에 제1연결부(120)가 연결되고 다른 하나의 가설작업대(3)에 제2연결부(130)가 결합된 다른 하나의 가설작업대 고정장치(100')가 제1연결부(120)들이 텐션빔(6)에 의해 고정적으로 결합 유지되는 것을 통해 가설작업대(3)가 상하 및 수평방향으로 유동되지 않아 작업자의 안전성을 확보할 수 있다.Therefore, according to the present invention, the first connection part 120 is connected to one side of the slab 2 of the pier 1 and the second connection part 130 is coupled to any one temporary work bench 3 is fixed. Another temporary workbench fixing device in which the first connection part 120 is connected to the other side of the slab 2 of the device 100 and the pier 1 and the second connection part 130 is coupled to the other temporary workbench 3 . (100 ') through the first connection portion 120 is fixedly coupled and maintained by the tension beam 6, the temporary workbench 3 does not flow in the vertical and horizontal directions, it is possible to secure the safety of the operator.

또한, 제1연결부(120)와 제2연결부(130) 사이에 보강부(140)가 보강 구성되어 제1연결부(120)와 제2연결부(130)에 큰 부하가 작용되어도 제1연결부(120)와 제2연결부(130)가 구성되는 연결구(110)가 파단되는 것을 방지할 수 있다.In addition, since the reinforcing part 140 is reinforced between the first connection part 120 and the second connection part 130 , even when a large load is applied to the first connection part 120 and the second connection part 130 , the first connection part 120 . ) and the connector 110 including the second connector 130 can be prevented from breaking.

또한, 가설작업대 고정장치(100,100'들이 텐션빔(6)과 제1체결부재(7)를 통하여 결합시 제1연결부(120)와 제2연결부(130)의 사이가 아닌 제1연결부(120)의 외측에 구성된 외측연결부(150)를 통해 결합되도록 하여 텐션빔(6)의 결합 작업이 고장장치의 외측에서 이루어지도록 하여 작업성을 향상시킬 수 있다.In addition, when the temporary workbench fixing devices 100 and 100' are coupled through the tension beam 6 and the first fastening member 7, the first connecting part 120 is not between the first connecting part 120 and the second connecting part 130. It is possible to improve workability by allowing the coupling operation of the tension beam 6 to be performed from the outside of the malfunctioning device by being coupled through the outer connection part 150 configured on the outside of the .

또한, 가설작업대 고정장치(100,100')들을 텐션빔(6)을 통해 결합시키는 제1체결부재(7)가 걸림판(7a)이 프렌치너트(7b)에 일체로 고정된 구성을 가지도록 하여 와셔의 구성을 생략하고 조임 작업을 보다 간편히 하도록 할 수 있다.In addition, the first fastening member 7 for coupling the temporary work bench fixing devices 100 and 100 ′ through the tension beam 6 has a washer so that the holding plate 7a is integrally fixed to the French nut 7b. It is possible to omit the configuration and make the tightening operation easier.

상술한 본 발명에서는 구체적인 실시예에 관해 설명하였으나, 여러 가지 변형이 본 발명의 범위에서 벗어나지 않고 실시될 수 있다. 따라서 발명의 범위는 설명된 실시예에 의하여 정할 것이 아니고 청구 범위와 청구 범위의 균등한 것에 의해 정해져야 한다.Although the present invention described above has been described with respect to specific embodiments, various modifications may be made without departing from the scope of the present invention. Therefore, the scope of the invention should not be defined by the described embodiments, but should be defined by the claims and equivalents of the claims.

Claims (8)

교각(1)의 슬래브(2) 일측 상면에 일단부가 거치되는 연결구(110); 연결구(110)의 상면 일측에 소정의 높이를 가지면서 돌출 연장되고 텐션빔(6)과 제1체결부재(7)가 내측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 제1연결부(120); 제1연결부(120)에 대향되도록 연결구(110)의 상면 타측에 소정의 높이를 가지면서 돌출 연장되어 체결빔(4)과 제2체결부재(5)를 통해 가설작업대(3)의 일측이 고정되도록 하고 교각(1)의 슬래브(2) 일단에 가설작업대(3)가 위치되도록 하는 제2연결부(130); 소정의 높이를 가지고 연결구(110)의 상면에 제1연결부(120)와 제2연결부(130)까지 연결하면서 돌출 연장되어 제1연결부(120)와 제2연결부(130)에 가해지는 부하를 분산시키고 연결구(110)의 강성을 보강하는 보강부(140); 및 제1연결부(120)의 외측에 위치되도록 연결구(110)의 상면 일측에 소정의 높이를 가지면서 돌출 연장되고 제1연결부(120)와 제2연결부(130) 사이의 공간에 텐션빔(6)과 제1체결부재(7)가 위치되도록 하는 대신에 제1연결부(120)의 외측면에 텐션빔(6)과 제1체결부재(7)가 위치되도록 한 후 텐션빔(6)에 체결된 제1체결부재(7)가 제1연결부(120)의 외측면을 가압하는 것을 통해 교각(1)의 슬래브(2) 타측 상면에 거치된 가설작업대 고정장치(100')에 결합 및 간격이 유지되도록 하는 외측연결부(150)을 포함하는 교량 슬래브 타설용 가설작업대 고정장치에 있어서,
연결구(110)는,
베이스(111); 베이스(111)의 일측 제1연결부(120)의 내측에 천공 형성되는 누설공(112); 및 베이스(111)의 하면에 요철 구조로 형성되는 보강트러스(113)를 포함하며,
제1연결부(120)는,
텐션빔(6)의 일단이 관통되는 관통공(121)이 상단 개구된 상태로 형성되고 관통공(121)에 관통된 텐션빔(6)의 일단에 체결된 제1체결부재(7)에 의해 내측면과 외측면이 선택적으로 가압되는 가압벽(122)과; 가압벽(122)의 관통공(121) 내측면 상단에 가압벽(122)에 대하여 수직하여 연장 형성되어 제1체결부재(7)가 가압벽(122)의 내측면에 가압시 가압벽(122)의 내측면에 걸림 지지되도록 하는 걸림단(123)을 포함하고,
외측연결부(150)는,
가압벽(122)의 외측에 위치되는 끼움벽(151); 끼움벽(151)에 관통공(121)에 연통되도록 형성되고 상단이 개구된 상태를 가지며 텐션빔(6)의 일단이 관통 거치되는 거치공(152); 및 거치공(152)의 하부에 요홈 형상으로 형성되고 거치공(152)에 거치된 텐션빔(6)의 일단에 체결된 제1체결부재(7)의 일부가 끼움벽(151)의 내측에 끼워진 상태에서 가압벽(122)의 외측면을 가압하도록 하여 텐션빔(6)의 텐션이 유지되도록 하는 끼움홈(153)을 포함하는 것을 특징으로 하는 교량 슬래브 타설용 가설작업대 고정장치.
a connector 110 having one end mounted on the upper surface of one side of the slab (2) of the pier (1); It protrudes while having a predetermined height on one side of the upper surface of the connector 110, and through the tension beam 6 and the first fastening member 7 pressing the inner surface, the slab 2 of the pier 1 is on the upper surface of the other side. a first connection part 120 that is coupled to and spaced from the mounted temporary workbench fixing device 100'; One side of the temporary workbench 3 is fixed through the fastening beam 4 and the second fastening member 5 by protruding and extending while having a predetermined height on the other side of the upper surface of the connector 110 to face the first connector 120 . a second connection part 130 to allow a temporary workbench (3) to be positioned at one end of the slab (2) of the pier (1); It has a predetermined height and protrudes while connecting to the first connector 120 and the second connector 130 on the upper surface of the connector 110 to distribute the load applied to the first connector 120 and the second connector 130 . and a reinforcing part 140 for reinforcing the rigidity of the connector 110; and a tension beam 6 in the space between the first connection part 120 and the second connection part 130 and protrudingly extending while having a predetermined height on one side of the upper surface of the connector 110 so as to be located outside the first connector 120 . ) and the first fastening member 7 are positioned on the outer surface of the first connecting part 120 instead of the tension beam 6 and the first fastening member 7 being positioned on the outer surface of the first connecting part 120 and then fastened to the tension beam 6 The first fastening member 7 is coupled to the temporary workbench fixing device 100 ′ mounted on the upper surface of the other side of the slab 2 of the pier 1 through pressing the outer surface of the first connection part 120 . In the temporary workbench fixing device for bridge slab pouring comprising an outer connection part 150 to be maintained,
The connector 110 is
base 111; Leakage hole 112 perforated on the inner side of the first connection part 120 on one side of the base 111; and a reinforcing truss 113 formed in a concave-convex structure on the lower surface of the base 111,
The first connection part 120 is
A through hole 121 through which one end of the tension beam 6 is penetrated is formed in a state in which the upper end is opened, and by the first fastening member 7 fastened to one end of the tension beam 6 penetrating through the through hole 121 a pressing wall 122 to which the inner and outer surfaces are selectively pressed; The pressure wall 122 is formed extending perpendicularly to the pressure wall 122 at the upper end of the inner surface of the through hole 121 of the pressure wall 122 so that the first fastening member 7 is pressed against the inner surface of the pressure wall 122 when the pressure wall 122 is pressed. ) includes a locking end 123 to be supported on the inner surface of the
The outer connection part 150,
Fitting wall 151 located on the outside of the pressure wall 122; a mounting hole 152 formed to communicate with the through hole 121 in the fitting wall 151 and having an open upper end, and through which one end of the tension beam 6 is mounted; And a portion of the first fastening member 7 formed in a groove shape at the lower portion of the mounting hole 152 and fastened to one end of the tension beam 6 mounted on the mounting hole 152 is inside the fitting wall 151 . Temporary workbench fixing device for pouring bridge slab, characterized in that it includes a fitting groove 153 for maintaining the tension of the tension beam 6 by pressing the outer surface of the pressing wall 122 in the fitted state.
삭제delete 삭제delete 제1항에 있어서, 제2연결부(130)는,
체결빔(4)의 상단이 삽입되는 삽입공(131)이 형성되고 삽입공(131)에 삽입된 체결빔(4)의 상단에 체결된 제2체결부재(5)에 의해 체결빔(4)이 고정되는 원통 형상의 소켓(132)과;
소켓(132)의 외면으로부터 제1연결부(120)를 향하는 방향으로 베이스(111)의 중간부까지 삼각형상을 가지면서 보강 형성되어 소켓(132)에 가해지는 부하를 분산시켜 소켓(132)의 강성을 보강하는 보강패널(133)을 포함하는 것을 특징으로 하는 교량 슬래브 타설용 가설작업대 고정장치.
According to claim 1, The second connection portion 130,
The insertion hole 131 into which the upper end of the fastening beam 4 is inserted is formed, and the fastening beam 4 is formed by the second fastening member 5 fastened to the upper end of the fastening beam 4 inserted into the insertion hole 131 . The fixed cylindrical socket 132 and;
The socket 132 is reinforced while having a triangular shape from the outer surface of the socket 132 to the middle part of the base 111 in the direction toward the first connection part 120 to distribute the load applied to the socket 132 to the rigidity of the socket 132 . Temporary workbench fixing device for bridge slab casting, characterized in that it comprises a reinforcement panel 133 for reinforcing the.
제4항에 있어서,
소켓(132)의 삽입공(131) 내주면에 나사산이 형성되는 것을 특징으로 하는 교량 슬래브 타설용 가설작업대 고정장치.
5. The method of claim 4,
Temporary workbench fixing device for pouring bridge slabs, characterized in that a thread is formed on the inner circumferential surface of the insertion hole 131 of the socket 132.
제4항에 있어서, 보강부(140)는,
가압벽(122)과 소켓(132)의 높이에 대응되는 높이를 가지면서 가압벽(122)으로부터 소켓(132)까지 연장 구성되는 보강벽(141)을 포함하고,
보강벽(141)은,
가압벽(122)의 일측단에서부터 시작하여 소켓(132)을 감싼 후 다시 가압벽(122)의 타측단까지 연장되는 것을 특징으로 하는 교량 슬래브 타설용 가설작업대 고정장치.
According to claim 4, Reinforcement portion 140,
and a reinforcing wall 141 extending from the pressing wall 122 to the socket 132 while having a height corresponding to the height of the pressing wall 122 and the socket 132,
The reinforcing wall 141 is
Temporary workbench fixing device for pouring bridge slabs, characterized in that starting from one end of the pressing wall 122 and extending to the other end of the pressing wall 122 again after the socket 132 is wrapped.
삭제delete 제1항에 있어서, 제1체결부재(7)는,
텐션빔(6)의 일단이 관통 결합되고 가압벽(122)의 외측면에 끼움홈(153)을 통해 끼움벽(151)에 출입 및 지지되는 걸림판(7a)과 프렌치너트(7b)가 일체로 구성되는 것을 특징으로 하는 교량 슬래브 타설용 가설작업대 고정장치.
According to claim 1, wherein the first fastening member (7),
One end of the tension beam 6 is through-coupled and the locking plate 7a and the French nut 7b, which are entered and supported in and out of the fitting wall 151 through the fitting groove 153 on the outer surface of the pressure wall 122, are integrated. Temporary workbench fixing device for bridge slab casting, characterized in that it consists of.
KR1020220008363A 2022-01-20 2022-01-20 Worktable fixing apparatus for constructing slab of bridge KR102430436B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220008363A KR102430436B1 (en) 2022-01-20 2022-01-20 Worktable fixing apparatus for constructing slab of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220008363A KR102430436B1 (en) 2022-01-20 2022-01-20 Worktable fixing apparatus for constructing slab of bridge

Publications (1)

Publication Number Publication Date
KR102430436B1 true KR102430436B1 (en) 2022-08-08

Family

ID=82845458

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220008363A KR102430436B1 (en) 2022-01-20 2022-01-20 Worktable fixing apparatus for constructing slab of bridge

Country Status (1)

Country Link
KR (1) KR102430436B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200347093Y1 (en) * 2003-12-24 2004-04-09 한국스틸폼주식회사 Mold system for slab concrete of bridge
KR20040038522A (en) * 2002-11-01 2004-05-08 노윤근 Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus
JP2016041887A (en) * 2014-08-19 2016-03-31 株式会社Take Suspension type metal fitting for oppositely fixing mold form for floor slab to main girder
KR20160091475A (en) * 2015-01-23 2016-08-03 서울시립대학교 산학협력단 Tendon fixing system of long span fire resistance deck strained at beam and construction method of the same
KR20180051164A (en) * 2016-11-08 2018-05-16 위덕대학교 산학협력단 Strengthening apparatus and method of lightweight steel truss members by external prestressing
KR20190124615A (en) * 2018-05-30 2019-11-05 주식회사 신원알피씨 Foundation of girder for bridge cantilever bracket construction Magnetic type jig for bolt installation and method of making girder using the jig
KR102300271B1 (en) * 2019-08-20 2021-09-09 주식회사 누리플랜 Worktable fixation device for constructing bridge

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040038522A (en) * 2002-11-01 2004-05-08 노윤근 Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus
KR200347093Y1 (en) * 2003-12-24 2004-04-09 한국스틸폼주식회사 Mold system for slab concrete of bridge
JP2016041887A (en) * 2014-08-19 2016-03-31 株式会社Take Suspension type metal fitting for oppositely fixing mold form for floor slab to main girder
KR20160091475A (en) * 2015-01-23 2016-08-03 서울시립대학교 산학협력단 Tendon fixing system of long span fire resistance deck strained at beam and construction method of the same
KR20180051164A (en) * 2016-11-08 2018-05-16 위덕대학교 산학협력단 Strengthening apparatus and method of lightweight steel truss members by external prestressing
KR20190124615A (en) * 2018-05-30 2019-11-05 주식회사 신원알피씨 Foundation of girder for bridge cantilever bracket construction Magnetic type jig for bolt installation and method of making girder using the jig
KR102300271B1 (en) * 2019-08-20 2021-09-09 주식회사 누리플랜 Worktable fixation device for constructing bridge

Similar Documents

Publication Publication Date Title
KR20180122151A (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
JP2759755B2 (en) Prestressed bridge reinforcement method using lower cable
KR102489814B1 (en) A beam for a precast concrete structure and the precast concrete structure with the beam
KR101995497B1 (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR102430436B1 (en) Worktable fixing apparatus for constructing slab of bridge
KR200226626Y1 (en) Bracket for Supporting Flooring Slab Form of Bridge
CN219825702U (en) Prefabricated building unit module
KR101646866B1 (en) Tendon fixing system of long span fire resistance deck strained at deck end and construction method of the same
KR20200123654A (en) Moment connection structure between cft column and pc girder
KR200222611Y1 (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
KR101803487B1 (en) Reinforcement for Connecting formwork
JP3828641B2 (en) Column and beam connection structure
KR20210022327A (en) Worktable fixation device for constructing bridge
KR100840279B1 (en) Suspension hanger for slab form
KR100773410B1 (en) I-shape steel girder with reinforcement
KR200285281Y1 (en) Supporting structure for concrete wall
KR102489817B1 (en) A beam for a precast concrete structure and the precast concrete structure with the beam
KR102489821B1 (en) A strong connector for precast concrete structure
KR19980022313A (en) Connection structure of ready-made concrete girder and steel beam and construction method
JP4091706B2 (en) Unit building
JPH053527Y2 (en)
KR101074171B1 (en) multi notch-plate.
JP7385064B2 (en) Precast concrete plate fittings
KR200252592Y1 (en) Apparatus to reinforced upper structure of bridge
JP3622947B2 (en) Clean room floor structure

Legal Events

Date Code Title Description
GRNT Written decision to grant