- prevention fence
- avalanche prevention
- snow
- avalanche
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
本発明は、雪崩を防止するための技術に関する。より詳細には、本発明は雪崩予防柵を設置する方法に関する。 The present invention relates to a technique for preventing an avalanche. More particularly, the present invention relates to a method for installing an avalanche prevention fence.
雪崩を防止するために、雪崩予防柵が従来から種々提案されている。
図4及び図5は、従来の雪崩予防柵の一例を示している。図4、図5において、符号1は法面を示し、符号Rは道路(路面)を示している。
図4、図5で例示する従来の雪崩予防柵10は、3本の杭部材11と複数の横桟部材12を備えている。
法面1の上下方向(斜面)に沿った方向については所定のピッチP(図5参照)にて、また、横方向(水平方向)については隣接する雪崩予防柵10間に隙間W(図4参照)を隔てて、複数の雪崩予防柵10が配置されている。
In order to prevent avalanches, various avalanche prevention fences have been conventionally proposed.
4 and 5 show an example of a conventional avalanche prevention fence. 4 and 5,
The conventional
The direction along the vertical direction (slope) of the
しかし、図4、図5で示す従来の雪崩予防柵においては、地山(法面)1上の積雪20が雪崩予防柵10で分断されてしまう(図5のL2の領域)。そのため、雪崩予防柵10を設けない場合(積雪が一定の深さで地山1を被覆している:図示せず)に比較して、積雪20が地山(法面)1に接触する面積(接地面積:図5の符号L1で示す領域の面積)が減少する。
また、積雪20と地山1の摩擦力が低下すると、積雪20を支持する力が低下し、雪崩が発生する可能性が高くなってしまう。
However, in the conventional avalanche prevention fence shown in FIGS. 4 and 5, the
Further, when the frictional force between the
また、図4、図5で従来の雪崩予防柵においては、短時間で大量の新雪が降った場合には、図6で示すように、乾雪表層雪崩が雪崩予防柵10の横桟部材12間をすり抜けて下方に流下してしまう(乾雪表層雪崩のすり抜け)。そして、雪崩予防柵10の下方の領域に堆積した積雪20に覆い被さり、当該領域における雪の崩落を惹起して、最下段柵下からの全層雪崩を誘発する可能性がある。
乾雪表層雪崩のすり抜けを防止するため、図7で示すように、雪崩予防柵10に鋼製メッシュ13を張設する対策が採られている。
In the conventional avalanche prevention fence shown in FIGS. 4 and 5, when a large amount of fresh snow falls in a short time, as shown in FIG. 6, the dry snow surface avalanche becomes a
In order to prevent the dry snow surface avalanche from slipping through, as shown in FIG. 7, measures are taken to stretch a
しかし、網目の細かいメッシュ13を張設すれば、当該メッシュが小規模なスラフ(点発生表層雪崩)を全て細くしてしまう為、短時間で雪が溜まり、雪崩予防柵10の堆雪容量をオーバーしてしまう、という問題が存在する。
また、最下段柵下からの全層雪崩という問題については、人力や重機による雪の除去を行って対処しているのが現状である。
However, if the
In addition, the current situation is that the avalanche from the bottom of the lowermost fence is dealt with by removing snow with human power and heavy machinery.
さらに、例えば図5で示すように、雪崩予防柵10の上部には庇状の雪塊(いわゆる「巻き垂れ」)21が形成されてしまう。当該庇状の雪塊(いわゆる「巻き垂れ」)21が崩れ落ちると、雪崩を惹起する恐れがある。係る巻き垂れ21は、道路維持管理の現場では、管理者の負担となっている。そして、雪崩予防柵10の高さ寸法が必要以上に高いことが、巻き垂れ21の発達を促進している可能性がある。
従来の雪崩予防柵10は、係る巻き垂れ21の形成を抑制することは開示されておらず、巻き垂れ21が崩れ落ちて雪崩を惹起することを抑制することも開示していない。
Furthermore, for example, as shown in FIG. 5, a bowl-shaped snow mass (so-called “dripping”) 21 is formed on the upper part of the
The conventional
さらに、図5で示す様に従来の雪崩予防柵10では地山(法面)1上の積雪20を分断してしまうので、雪が滑り落ちて地表が露出した領域が発生する(図5において符号L2で示す領域)。
従来の雪崩予防柵10が庇の様に作用して雪が積もらず、地表が露出した領域L2においては、積雪による保温効果が喪失するので、当該領域L2における凍上(地面内部が凍り、地表面が盛り上がる現象)という問題を生じる場合がある。
Further, as shown in FIG. 5, the conventional
In the area L2 where the conventional
その他の従来技術としては、例えば、雪崩予防柵の上方にグライド抑止柵を設置して、雪崩予防柵が負荷する積雪の荷重を軽減する技術が提案されている(特許文献1参照)。
しかし、係る従来技術(特許文献1)においても、積雪量が一定の限界を超えてしまうと、堆雪容量をオーバーして雪崩予防柵を越えて雪崩が発生してしまう。
As another conventional technique, for example, a technique has been proposed in which a glide suppression fence is installed above an avalanche prevention fence to reduce the load of snow that the avalanche prevention fence loads (see Patent Document 1).
However, even in the related art (Patent Document 1), when the amount of snow accumulation exceeds a certain limit, the snow accumulation capacity is exceeded and the avalanche occurs beyond the avalanche prevention fence.
本発明は上述した従来技術の問題点に鑑みて提案されたものであり、積雪の接地面積を一定に維持することが出来て、積雪が堆雪容量をオーバーしてしまう事態を未然に防止することが出来る雪崩予防柵設置方法の提供を目的としている。 The present invention has been proposed in view of the above-described problems of the prior art, and can maintain a constant contact area of the snow cover, thereby preventing a situation where the snow cover exceeds the snow accumulation capacity. The purpose is to provide an avalanche prevention fence installation method.
本発明の雪崩予防柵設置方法は、雪崩を予防するべき法面(1)の上下方向の複数段に複数の雪崩予防柵(10)を設置し、
前記雪崩予防柵(10)の各々は杭部材(11)及び直線状に延在する複数の横桟部材(12)を備え、
直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)を水平方向に対して傾斜して配置し、
法面(1)上方の直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)の延長線(Lc1、Lc2)上に法面下方の雪崩予防柵(10)を上方の雪崩予防柵(10)と逆方向に傾斜して配置し、前記法面(1)下方の雪崩予防柵(10)は法面(1)上方の直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)の傾斜した延長線(Lc)に対して所定の角度で傾斜して配置することを特徴としている。
ここで、前記「所定の角度」は、法面(1)の角度、設置する雪崩予防柵(10)の間隔、予想降雪量等の条件により、ケース・バイ・ケースで設定される。これ等の条件により、雪の滑り落ちる力が変化するためである。
また、前記「所定の角度」は、一定の角度に限定されるのではなく、個々の雪崩予防柵(10)で異なる場合(ランダムに変更する場合も含む)を包含する趣旨である。
The avalanche prevention fence installation method of this invention installs a plurality of avalanche prevention fences (10) on a plurality of steps in the vertical direction of the slope (1) to prevent an avalanche,
Each of the avalanche prevention fence (10) includes a pile member (11) and a plurality of crosspiece members (12) extending linearly,
The avalanche prevention fence (10) provided with a plurality of crosspiece members (12) extending in a straight line is arranged to be inclined with respect to the horizontal direction,
Slope (1) An avalanche prevention fence (10 below the slope) on the extension lines (Lc1, Lc2) of the avalanche prevention fence (10) provided with a plurality of crosspiece members (12) extending linearly above the slope (1). ) Is inclined in the opposite direction to the upper avalanche prevention fence (10), and the avalanche prevention fence (10) below the slope (1) has a plurality of straight lines extending above the slope (1). The avalanche prevention fence (10) provided with the horizontal beam member (12) is arranged to be inclined at a predetermined angle with respect to the inclined extension line (Lc) .
Here, the “predetermined angle” is set on a case-by-case basis according to conditions such as the angle of the slope (1), the interval between the avalanche prevention fences (10) to be installed, and the expected snowfall. This is because the snow sliding force changes depending on these conditions.
In addition, the “predetermined angle” is not limited to a certain angle, but includes a case where each avalanche prevention fence (10) is different (including a case where it is randomly changed).
本発明において、法面(1)の最下段(道路R近傍)の雪崩予防柵(10B)を、水平に配置することが可能である。その場合、法面(1)の最下段(道路R近傍)の雪崩予防柵(10B)を除いた雪崩予防柵(10)を、水平方向(図1の矢印H方向)に対して所定の角度(傾斜角度θにて)傾斜させることになる。
或いは、水平に配置した雪崩予防柵(10B)を省略しても良い。
In the present invention, it is possible to horizontally arrange the avalanche prevention fence (10B) at the bottom of the slope (1) (near the road R). In that case, the avalanche prevention fence (10) excluding the avalanche prevention fence (10B) at the bottom of the slope (1) (near the road R) is set at a predetermined angle with respect to the horizontal direction (the direction of arrow H in FIG. 1). It is inclined (at an inclination angle θ).
Alternatively, the avalanche prevention fence (10B) arranged horizontally may be omitted.
上述する構成を具備する本発明によれば、法面全体に堆積した雪が均等になり、雪崩予防柵(10)下方の雪が積もり難い場所に雪を行き渡らせることが出来る。そして、雪崩予防柵(10)の傾斜により、雪崩予防柵(10)の上方で小規模な雪崩を発生し易くせしめ、堆雪量が超過することを抑止することが出来る。さらに、雪崩予防柵(10)が傾斜しているので、雪崩予防柵(10)下方の領域にも雪が移動し易く堆雪し易くなる。
本発明では雪崩予防柵(10)は水平方向(図1の矢印H方向)に対して(傾斜角度θにて)傾斜しているので、雪崩予防柵(10)の法面(1)上方に堆積している雪(20)は当該雪崩予防柵(10)により移動が阻止されることは無く、雪崩予防柵(10)に沿って斜め下方に移動する。
そのため、雪崩予防柵(10)の法面(1)上方に堆積している雪(20)は地山(法面1)に対して接地している状態が常に維持され、雪(20)が移動する速度が減少し、一部の雪が崩落して雪崩が発生する可能性が減少する。
換言すれば、法面下方(下段)の雪崩予防柵(10)は法面上方(上段)の雪崩予防柵(10)の傾斜した延長線(Lc)に対して所定の角度で配置されることにより、雪が接地している面積が増大して、雪崩が発生する可能性を減少せしめている。前記「所定の角度」が一定の角度ではなく、個々の雪崩予防柵(10)で異なる場合(ランダムに変更する場合を含む)も同様である。
According to the present invention having the above-described configuration, the snow accumulated on the entire slope becomes uniform, and the snow can be distributed to a place where the snow below the avalanche prevention fence (10) is difficult to accumulate. And by the inclination of the avalanche prevention fence (10), it is easy to generate a small avalanche above the avalanche prevention fence (10), and it can suppress that the amount of snow accumulation exceeds. Furthermore, since the avalanche prevention fence (10) is inclined, it is easy for snow to move to the area below the avalanche prevention fence (10) and to accumulate snow.
In the present invention, since the avalanche prevention fence (10) is inclined (at an inclination angle θ) with respect to the horizontal direction (in the direction of arrow H in FIG. 1), the avalanche prevention fence (10) is above the slope (1). The accumulated snow (20) is not blocked by the avalanche prevention fence (10), and moves obliquely downward along the avalanche prevention fence (10).
Therefore, the snow (20) accumulated above the slope (1) of the avalanche prevention fence (10) is always kept in contact with the ground (slope 1), and the snow (20) The speed of movement decreases, and the possibility of avalanches due to some snow collapses decreases.
In other words, the avalanche prevention fence (10) below the slope (lower) is arranged at a predetermined angle with respect to the inclined extension line (Lc) of the avalanche prevention fence (10) above the slope (upper). As a result, the area where the snow is in contact with the ground increases, reducing the possibility of avalanches. The same applies to the case where the “predetermined angle” is not a fixed angle but is different for each avalanche prevention fence (10) (including a case where it is randomly changed).
そして、雪崩予防柵(10)の法面(1)上方に堆積している雪(20)は雪崩予防柵(10)に沿って斜め下方に移動するため、雪崩予防柵(10)にメッシュ(金網)を張って乾燥した雪のすり抜け防止対策を施しても、堆積した雪(20)は斜め下方に移動するので雪崩予防柵(10)が堆積した雪の荷重を全て負荷することは無い。そのため、堆雪容量をオーバーしてしまうこともない。
さらに本発明によれば、雪(20)が接地した状態に維持されるので、雪崩予防柵(10)の下方の領域における凍上が防止される。
And since the snow (20) accumulated above the slope (1) of the avalanche prevention fence (10) moves diagonally downward along the avalanche prevention fence (10), a mesh ( Even if measures are taken to prevent slipping of dry snow by placing a wire mesh), the accumulated snow (20) moves obliquely downward, so the avalanche prevention fence (10) does not apply all the load of the accumulated snow. Therefore, the snow accumulation capacity is not exceeded.
Furthermore, according to the present invention, since the snow (20) is maintained in a grounded state, frost heave in the region below the avalanche prevention fence (10) is prevented.
ここで、地山下方(次段)の雪崩予防柵(10)は、上方の雪崩予防柵(10)の傾斜した延長線(Lc)に対して所定の角度で配置されているので、上方の雪崩予防柵(10)に沿って斜め下方に移動した雪は、下方に配置されている次段の雪崩予防柵(10)に当接して、進行方向が所定の角度で転進して、さらに下方の雪崩予防柵(10)に向って移動する。
その結果、(上方の)雪崩予防柵(10)の法面上方に堆積した雪(20)は、法面下方に向って、所定の角度を付けてジグザグに転進しながら、折曲がった経路(C)を進行する。雪崩予防柵(10)は当該折れ曲った経路(雪が進行する経路C)を遮断しないので、雪(20)はその下方の領域が常に接地した状態が維持される。
Here, since the avalanche prevention fence (10) below the natural ground is arranged at a predetermined angle with respect to the inclined extension line (Lc) of the upper avalanche prevention fence (10), The snow that has moved obliquely downward along the avalanche prevention fence (10) abuts on the next-stage avalanche prevention fence (10), moves forward at a predetermined angle, and further downwards. Move toward the avalanche prevention fence (10).
As a result, the snow (20) accumulated above the slope of the (above) avalanche prevention fence (10) is bent down (in a downward direction) while turning to a zigzag at a predetermined angle. Proceed with C). Since the avalanche prevention fence (10) does not block the folded path (path C where the snow travels), the snow (20) is always maintained in a state where the area below it is grounded.
また、雪崩予防柵(10)の法面上方に堆積した雪(20)は、法面下方の雪崩予防柵(10)に向い、雪崩予防柵で所定の角度を付けてジグザグに転進しながら折曲がって進行するので、当該雪(20)が進行する経路(C)は、崩落して雪崩が生じた場合の経路(雪が法面下方に一直線に移動する経路)に比較して長い。そして、雪崩予防柵(10)において所定の角度を付けてジグザグに転進する度に、雪の移動速度が遅くなる。
そのため本発明によれば、雪(20)が法面下方の領域(例えば道路R)に到達するのに費やす時間が長くなる。従って、積雪が法面下方の道路に乗り上げて交通を阻害するのに長時間が必要となり、その間に降雪が止み、除雪を行うことが出来れば、法面を下降する雪による交通の阻害が未然に防止される。
Moreover, the snow (20) accumulated above the slope of the avalanche prevention fence (10) faces the avalanche prevention fence (10) below the slope and is folded while turning to a zigzag at a predetermined angle by the avalanche prevention fence. Since the curve (C) travels in a curved manner, the path (C) along which the snow (20) travels is longer than the path when the avalanche occurs due to the collapse (snow travels in a straight line below the slope). Then, every time the avalanche prevention fence (10) rolls in a zigzag with a predetermined angle, the moving speed of the snow becomes slow.
Therefore, according to the present invention, it takes a long time for the snow (20) to reach the area below the slope (for example, the road R). Therefore, it takes a long time for snow to ride on the road below the slope and hinder traffic. If the snow stops and snow can be removed in the meantime, the traffic will be hindered by the snow descending the slope. To be prevented.
以下、添付図面を参照して、本発明の実施形態について説明する。
図1及び図2において、道路Rの上方に存在する法面1には、雪崩予防柵10(10B)が法面1の上方から、符号ST1〜ST4で示す4段に分けて配置されている。
Embodiments of the present invention will be described below with reference to the accompanying drawings.
In FIG.1 and FIG.2, the avalanche prevention fence 10 (10B) is divided into four steps shown by code | symbol ST1-ST4 from the upper side of the
最上段ST1から3段目ST3における雪崩予防柵10は、水平方向(図1の符号H方向:横方向)に対して、所定角度θだけ下方に傾斜させて配置されている。
ここで、所定角度θは、例えば15°〜45°の範囲が好ましい。ただし、傾斜角度θは、法面1の傾斜角度と、雪崩予防柵における雪の量(降雪量に比例)により、大きな影響を受ける。その意味で、雪崩予防柵10の水平方向に対する傾斜角度θは、15°未満となる場合もあり、45°より大きくなる場合も存在する。
ここで、雪崩予防柵10の傾斜角度θは一定の角度に限定されるものではなく、雪崩予防柵10毎に当該傾斜角度θが異なる場合(傾斜角度θがランダムに変更する場合を含む)も包含する。例えば、最上段ST1における雪崩予防柵10の傾斜角度θを45°、2段目ST2における雪崩予防柵10の傾斜角度θを30°、3段目ST3における雪崩予防柵10の傾斜角度θを20°に設定する場合もある。或いは、最上段ST1における雪崩予防柵10の傾斜角度θを20°、2段目ST2における雪崩予防柵10の傾斜角度θを30°、3段目ST3における雪崩予防柵10の傾斜角度θを45°に設定することも出来る。
そして傾斜角度θを適宜設定することにより、雪が移動する速度を調整することが可能である。
The
Here, the predetermined angle θ is preferably in the range of 15 ° to 45 °, for example. However, the inclination angle θ is greatly affected by the inclination angle of the
Here, the inclination angle θ of the
The speed at which the snow moves can be adjusted by appropriately setting the inclination angle θ.
係る所定角度θは、雪崩予防柵10に作用する雪の重量と、雪崩予防柵10の山側(上方)を移動する雪の摩擦力等を用いて算出することが可能である。
しかし、雪崩予防柵10の設置間隔、設計積雪深、法面1の傾斜角度αにより、雪崩予防柵10の傾斜角度θは変動する。
The predetermined angle θ can be calculated using the weight of snow acting on the
However, the inclination angle θ of the
2段目ST2の雪崩予防柵10は、最上段ST1の雪崩予防柵10の法面下方への延長線Lc1(仮想線)に対して所定の角度を為す位置に設けられている。当該「所定の角度」は、図1、図2では90°となっているが、上述した傾斜角度θと同様に、雪崩予防柵10に作用する雪の重量、雪崩予防柵10の山側(上方)を移動する雪の摩擦力、雪崩予防柵10の設置間隔、設計積雪深、法面1の傾斜角度αにより、変動する。
また、当該「所定の角度」(法面上方の雪崩予防柵10の法面下方への延長線Lc1に対して法面下方の雪崩予防柵10が為す角度)は、図1〜図3では90°で一定であるが、雪崩予防柵10毎に当該「所定の角度」が異る様に設定する(当該「所定の角度」がランダム変更する)ことも可能である。
さらに、3段目ST3の雪崩予防柵10は、2段目ST2の雪崩予防柵10の法面下方への延長線Lc2と所定の角度を為す位置に配置されている。
ここで、法面1の水平方向(図1の符号H方向:横方向)における位置については、3段目ST1における雪崩予防柵10の配置(配列)は、最上段ST1における雪崩予防柵10の配置(配列)と同様(な配置)になる。
The
Further, the “predetermined angle” (an angle formed by the
Further, the
Here, regarding the position of the
図1、図2で示す実施形態によれば、雪崩予防柵10を、水平方向(図1の符号H方向)に対して傾斜角度θで傾斜しているので、雪崩予防柵10の法面上方に堆積している雪20(図2参照)は、当該雪崩予防柵10により係る様にして留まる訳ではない。
雪崩予防柵10の法面上方に堆積している雪20は、雪崩予防柵10により移動が阻止されてしまうことは無く、雪崩予防柵10に沿って斜め下方に移動することが出来る。換言すれば、図示の実施形態において、水平方向(図1の符号H方向)に対して傾斜している雪崩予防柵10は、その上方の積雪20を斜め下方に移動するように案内する作用を奏する。
そのため、雪崩予防柵10は、その上方に堆積した雪20の荷重を全て負荷することは無く、堆雪容量をオーバーしてしまうことが防止される。
雪崩予防柵10にメッシュ(金網)を張設して乾いた雪のすり抜け防止対策を施して場合においても、堆積した雪20が雪崩予防柵10の斜め下方に誘導されるので、堆雪容量をオーバーしてしまうこともない。
According to the embodiment shown in FIGS. 1 and 2, the
The
Therefore, the
Even when the
上述したように上方の雪崩予防柵10の延長線と所定の角度を為す様に、次段の雪崩予防柵10が位置している。図4においては、最上段ST1の延長線Lc1と所定の角度を為す様に2段目ST2の雪崩予防柵10が配置されており、2段目ST2の延長線Lc2と所定の角度を為す様に3段目ST3の雪崩予防柵10が配置されている。
そのため、上方の雪崩予防柵10に沿って斜め下方に移動した積雪20(図2参照)は、上方の雪崩予防柵10の延長線(仮想線)と所定の角度を為す様に配置されている次段の雪崩予防柵10に当接する。そして、当接した段の雪崩予防柵10において、積雪20の進行方向が所定の角度を付けてジグザグに転進して、当該次段の雪崩予防柵10の延長線(仮想線)方向へ移動する。
そして、進行方向が所定の角度を付けて転進した積雪20は、さらに斜め下方へ進行する。
As described above, the next-stage
Therefore, the snow cover 20 (see FIG. 2) that has moved obliquely downward along the upper
Then, the
すなわち、雪崩予防柵10の法面上方に堆積した積雪20は、法面下方に向って、所定の角度を付けてジグザグに転進しながら、折曲がった経路(図1の符号C)を進行する。雪崩予防柵10は当該折れ曲った経路(雪が進行する経路C)を遮断しないので、進行する積雪20はその下方の領域が常に接地した状態が維持される。
積雪20が接地した状態に維持されるので、移動する積雪20と地山(法面)1との間に抵抗力が作用して、積雪20が移動する速度が減少する。
そして、積雪20が接地した状態に維持されるので、一部の積雪20が崩落して雪崩を起こす恐れが減少する。
That is, the
Since the
And since the
ここで、雪崩予防柵10の法面上方に堆積した積雪20が進行する経路「C」、すなわち、法面下方の雪崩予防柵10に向い、雪崩予防柵10で所定の角度をつけてジグザグに転進しながら折曲がって進行する経路「C」は、崩落して雪崩が生じた場合の経路(積雪20が法面下方に一直線に移動する経路)に比較して長い。そして、雪崩予防柵10で所定の角度だけ転進する度に移動速度が遅くなる。
そのため、図示の実施形態によれば、積雪20が法面下方(図1の下方)の領域(例えば道路R)に到達するのに費やす時間が長くなる。従って、積雪20が法面下方の道路に乗り上げて交通を阻害するのに長時間が必要となり、その間に降雪が止み、除雪を行うことが出来れば、法面1を下降する積雪による交通の阻害が未然に防止される。
所定の角度を付けてジグザグに転進して移動した積雪20が仮に道路R上に乗り上げてしまっても、進行速度が遅いため、一度に大量の雪が道路Rに乗り上げることは無く、車両の通行への影響が最小限で済み、道路Rに乗り上げた雪を除去する時間も確保することが出来る。
Here, the path “C” along which the
Therefore, according to the illustrated embodiment, the time spent for the
Even if the
ここで、図1の「D」で示す直線(法面1の上方から下方に向う直線)上には、雪崩予防柵10が存在しない。
しかし、図1において、雪が経路Cに沿って移動する様に雪崩予防柵10が設けられているので、直線「D」上に雪崩予防柵10が設けられていなくても、直線「D」に沿って雪が崩落してしまうことが防止される。
Here, the
However, in FIG. 1, the
雪崩予防柵10が少ない場合には、図1において符号「D」で示す直線のように雪崩予防柵10が存在しない領域における幅(図1における矢印H方向の幅)が広くなり過ぎて、(直線Dで示す領域において)法面1の上方から下方に向う方向に雪が崩落する恐れがある。
これに対して、雪崩予防柵10の数を多くすれば、法面1の上方から下方に向う方向について雪崩予防柵10が存在しない領域(直線Dで示す領域)の幅は小さくなり、雪の崩落の可能性は減少する。しかし、雪崩予防柵10を多く設置すると、導入コストが増加する。
雪崩予防柵10の設置間隔は、降雪量と、法面1の上方から下方に向う方向における雪の崩落防止効率に基づいて決定することが出来る。
図示の実施形態によれば、法面1の上方から下方に向う方向について雪崩予防柵10が存在しない領域(直線Dで示す領域)に、雪崩予防柵10の延長線に沿って積雪20が移動するので、直線Dで示す領域で仮に雪が崩落しても、積雪20の移動により、雪崩の発生は防止される。
When the
On the other hand, if the number of
The installation interval of the
According to the illustrated embodiment, the
なお、法面1下方(図1の下方)における(最下段の)雪崩予防柵10Bは、水平方向(図1の符号H方向)に設置されている。道路Rに積雪20が乗り上げることを防止する必要があることによる。
In addition, the avalanche prevention fence 10B (lowermost stage) below the slope 1 (downward in FIG. 1) is installed in the horizontal direction (indicated by reference sign H in FIG. 1). This is because it is necessary to prevent the
図1で示す実施形態では、全ての流れ防止柵10が傾斜しているが、図3で示すように、法面1の道路Rに最も近い領域(図3では4段目)の雪崩予防柵10Bを水平に(或いは道路Rと平行に)配置することが可能である。隣接する雪崩予防柵10B間は、間隔W(所定の間隔)を空けて配置されている。
雪崩防止柵10により上方から下方へ移動する雪が、道路R上に乗り上げてしまうことを防止するためである。
ここで、所定の間隔Wは、最上段と2段目の配置関係及び2段目と3段目の配置により、ケース・バイ・ケースで設定される。
In the embodiment shown in FIG. 1, all the
This is to prevent the snow moving from above to below by the
Here, the predetermined interval W is set on a case-by-case basis by the arrangement relationship between the uppermost stage and the second stage and the arrangement of the second and third stages.
図示の実施形態はあくまでも例示であり、本発明の技術的範囲を限定する趣旨の記述ではないことを付記する。 It should be noted that the illustrated embodiment is merely an example, and is not a description to limit the technical scope of the present invention.
1・・・法面
10・・・雪崩予防柵
20・・・積雪
R・・・道路
DESCRIPTION OF
Claims (1)
前記雪崩予防柵(10)の各々は杭部材(11)及び直線状に延在する複数の横桟部材(12)を備え、
直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)を水平方向に対して傾斜して配置し、
法面(1)上方の直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)の延長線(Lc1、Lc2)上に法面下方の雪崩予防柵(10)を上方の雪崩予防柵(10)と逆方向に傾斜して配置し、前記法面(1)下方の雪崩予防柵(10)は法面(1)上方の直線状に延在する複数の横桟部材(12)を備えた前記雪崩予防柵(10)の傾斜した延長線(Lc)に対して所定の角度で傾斜して配置することを特徴とする雪崩予防柵設置方法。
A plurality of stages in the vertical direction of the slope to prevent avalanche (1) to install a plurality of avalanche prevention fence (10),
Each of the avalanche prevention fence (10) includes a pile member (11) and a plurality of crosspiece members (12) extending linearly,
The avalanche prevention fence (10) provided with a plurality of crosspiece members (12) extending in a straight line is arranged to be inclined with respect to the horizontal direction ,
Slope (1) extension line of the avalanche prevention fence having a plurality of transverse beam member extending above the linearly (12) (10) (Lc1, Lc2) Homen lower avalanche prevention fence on (10 ) above the avalanche preventing fence (10) and inclined in opposite directions are arranged, the slope face (1) below the avalanche preventing fence (10) is slope (1) a plurality of upwardly extending straight avalanche prevention fence installation method characterized that you disposed inclined at a predetermined angle with respect to the inclined extension of the avalanche prevention fence having horizontal crosspiece member of (12) (10) (Lc ).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013206475A JP6241921B2 (en) | 2013-10-01 | 2013-10-01 | Avalanche prevention fence installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013206475A JP6241921B2 (en) | 2013-10-01 | 2013-10-01 | Avalanche prevention fence installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015068156A JP2015068156A (en) | 2015-04-13 |
JP6241921B2 true JP6241921B2 (en) | 2017-12-06 |
Family
ID=52835111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013206475A Active JP6241921B2 (en) | 2013-10-01 | 2013-10-01 | Avalanche prevention fence installation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6241921B2 (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3866544B2 (en) * | 2001-07-31 | 2007-01-10 | 東京製綱株式会社 | Suspension frame for avalanche prevention |
EP1921210B1 (en) * | 2006-11-10 | 2015-05-13 | Betonform S.r.l. | Avalanche and the like protection element |
JP5442187B2 (en) * | 2007-07-22 | 2014-03-12 | 東京製綱株式会社 | Anchor for sloped structure |
-
2013
- 2013-10-01 JP JP2013206475A patent/JP6241921B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2015068156A (en) | 2015-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE521966C3 (en) | side rail | |
CN103088791B (en) | Energy dissipation type debris flow check dam combined draining and guiding and blocking | |
CN202298575U (en) | Water and stone separation system for debris flow | |
JP6241921B2 (en) | Avalanche prevention fence installation method | |
CN105256730A (en) | Active and passive combined trailing high-performance protective screen | |
CN104878730B (en) | Solar energy micro power automatically cleaning irrigation canal trash rack | |
JP5579208B2 (en) | Windbreak snow fence | |
JP5885341B2 (en) | Masonry wall reinforcement structure and masonry wall reinforcement method | |
JP5793633B1 (en) | Protective fence | |
CN104963277A (en) | Crosswind guiding device | |
CN212772012U (en) | Falling stone buffering flexible protection system | |
CN108265627B (en) | Rope strand saddle entering restraint device suitable for suspension bridge main cable deep saddle groove | |
CN107059670A (en) | Flexibility point guiding systems | |
JP3717915B2 (en) | Dust remover for waterways | |
WO2005071174A1 (en) | Collecting structure and drainage structure using the collecting structure | |
JP2017025560A (en) | Net lifting device | |
CN206887971U (en) | slope drainage structure | |
JP3172245U (en) | Avalanche prevention fence | |
JP7022630B2 (en) | Driftwood capture facility | |
KR101101230B1 (en) | Drain grating | |
JP6113474B2 (en) | Suspended protective fence | |
JP2006177142A (en) | Highly efficient fence for preventing snow from scattering | |
CN110318347B (en) | Wave combination formula snow wall | |
JP2012144077A (en) | Tire washing device and drainboard unit for this device | |
JP6994235B2 (en) | Avalanche prevention fence and its installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160913 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170714 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170719 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170914 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20171102 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20171102 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6241921 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|