JP6994235B2 - Avalanche prevention fence and its installation method - Google Patents

Avalanche prevention fence and its installation method Download PDF

Info

Publication number
JP6994235B2
JP6994235B2 JP2017202910A JP2017202910A JP6994235B2 JP 6994235 B2 JP6994235 B2 JP 6994235B2 JP 2017202910 A JP2017202910 A JP 2017202910A JP 2017202910 A JP2017202910 A JP 2017202910A JP 6994235 B2 JP6994235 B2 JP 6994235B2
Authority
JP
Japan
Prior art keywords
avalanche
valley
mountain
snow
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017202910A
Other languages
Japanese (ja)
Other versions
JP2019077985A (en
Inventor
健二 入江
Original Assignee
北海道ガソン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北海道ガソン株式会社 filed Critical 北海道ガソン株式会社
Priority to JP2017202910A priority Critical patent/JP6994235B2/en
Publication of JP2019077985A publication Critical patent/JP2019077985A/en
Application granted granted Critical
Publication of JP6994235B2 publication Critical patent/JP6994235B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

本発明は、降雪地域の傾斜地で発生する雪崩を予防し、人家や交通の安全を確保するための雪崩予防柵に関し、殊に雪崩を誘発する雪庇の形成を抑止できるようにした雪崩予防柵及びその設置方法に関する。 The present invention relates to an avalanche prevention fence for preventing avalanches occurring on slopes in snowfall areas and ensuring the safety of houses and traffic, and in particular, an avalanche prevention fence capable of suppressing the formation of a cornice that induces an avalanche. Regarding the installation method.

降雪地域や豪雪地域では傾斜地で雪崩が発生すると、落下した雪塊によって道路、鉄道の交通が遮断されるだけでなく、人災事故にもなっている。そこで、道路や鉄道に面する傾斜地に雪崩の発生を予防するための複数の雪崩予防柵を立設し、雪崩による道路の閉鎖や人家の被害を予防している。 In snowfall areas and heavy snowfall areas, when an avalanche occurs on a slope, not only is the fallen snow mass blocking road and railroad traffic, but it is also a man-made accident. Therefore, multiple avalanche prevention fences have been erected on slopes facing roads and railroads to prevent avalanches from closing roads and damaging houses.

図3及び図10乃至図12に従来の雪崩予防柵21(以下、予防柵21と称する。)を示す。該予防柵21は、斜面Gに立設する一対の支柱22、22と、該各支柱22の下端側と斜面Gとの間に設けた転倒防止体23と、該支柱22、22間に鋼管からなる横梁材24A、24A、・・・を縦方向に離間して横架し、Uボルト・ナットからなる締着具24Bで固定することにより支柱22の上端から下端までの全長に亘って略平面状に形成した雪止め部24と、該雪止め部24に対面して支柱22、22にX字状に設けたブレース25と、支柱22及び転倒防止体23に固着して支える基板26と、斜面Gの上方から支持ワイヤー等により支持する予防柵支持機構27とから大略構成してある。
同様の構成の雪崩予防柵が特許文献1の図5に示されている。
3 and 10 to 12 show a conventional avalanche prevention fence 21 (hereinafter referred to as a prevention fence 21). The preventive fence 21 is a pair of columns 22 and 22 erected on the slope G, a fall prevention body 23 provided between the lower end side of each column 22 and the slope G, and a steel pipe between the columns 22 and 22. The cross beam members 24A, 24A, ... A flat snow stopper 24, an X-shaped brace 25 on the columns 22 and 22 facing the snow stopper 24, and a substrate 26 fixed to and supported by the column 22 and the fall prevention body 23. It is roughly composed of a preventive fence support mechanism 27 that is supported by a support wire or the like from above the slope G.
An avalanche prevention fence having a similar configuration is shown in FIG. 5 of Patent Document 1.

特許第6113474号公報Japanese Patent No. 6113474

上述した予防柵21においては、図10に示すように、支柱22の上端から下端にかけて雪止め部24を平面状に形成し、斜面Gに対して略垂直に設置した構成であるので、斜面Gと雪止め部24とで形成される縦断面略V字状の雪止め領域Xには雪が容易に堆積するため、積雪量が累積するのに伴って重量も増加して雪密度も高くなり、更に積雪が沈降して下方に雪圧が掛ることから積雪層の雪密度が一層高くなる。また、斜面G上を下方に滑動して来る積雪層による雪圧が加わることで、雪止め領域Xでは雪密度が高く、固く締まった堆雪層が形成される。 As shown in FIG. 10, the above-mentioned preventive fence 21 has a structure in which the snow stopper portion 24 is formed in a flat shape from the upper end to the lower end of the support column 22 and installed substantially perpendicular to the slope G. Since snow is easily deposited in the snow-stopping region X having a substantially V-shaped vertical cross section formed by the snow-stopping portion 24, the weight increases and the snow density increases as the amount of snowfall accumulates. Furthermore, the snow density of the snow layer becomes higher because the snow settles and the snow pressure is applied downward. Further, by applying the snow pressure due to the snow layer sliding downward on the slope G, the snow density is high in the snow stop region X, and a tightly packed snow layer is formed.

更に、図11に示す積雪モデルと図12に示す積雪状況から雪庇が形成される原理を説明する。図11において、予防柵21を設置していない状態で一点鎖線Lで示す高さにまで堆雪する斜面Gにおいて、予防柵21を設置した場合、予防柵21の背面(谷側面)側では堆雪層Sの形成が予防柵21によって遮られ、予防柵21の前面(山側面)側に堆積し、堆雪層Sが形成される。そして、予防柵21の前面側での堆雪層Sは2倍の積雪量になることから、降雪が続くことにより、図12に示すように、堆雪層Sが予防柵21を越える高さにまでなって雪庇が形成される。
この状態から積雪が更に続くと雪庇は一層成長し、終には予防柵21の上端から谷側に巻き込む状態の巻きだれになる。
Further, the principle of forming a cornice from the snow model shown in FIG. 11 and the snow condition shown in FIG. 12 will be described. In FIG. 11, when the preventive fence 21 is installed on the slope G where the snow is deposited up to the height indicated by the alternate long and short dash line L without the preventive fence 21 installed, the preventive fence 21 is deposited on the back surface (valley side surface) side. The formation of the snow layer S1 is blocked by the preventive fence 21 and is deposited on the front surface (mountain side surface) side of the preventive fence 21 to form the snow layer S2. Since the snow layer S 2 on the front side of the preventive fence 21 has twice the amount of snow, as the snowfall continues, the snow layer S 2 exceeds the preventive fence 21 as shown in FIG. A cornice is formed up to the height.
If the snow continues to accumulate from this state, the cornice will grow further, and eventually it will become a curl in a state of being caught in the valley side from the upper end of the preventive fence 21.

形成された雪庇や巻きだれは成長して重量が増すことで落下し、道路や鉄道線路上まで達して交通障害の原因になり、また斜面G上の積雪層の雪崩を誘発するといった問題を生じている。
この問題を未然に防ぐためには雪庇、巻きだれを早期に除去することが必要であるが、作業環境が傾斜地であるために機械による作業は難しく、人力に頼ることになるので作業員の確保、短い作業期間の要請等から除雪費用が嵩むという問題がある。
The formed cornice and rolls grow and fall due to their weight increase, reach the roads and railroad tracks, cause traffic obstacles, and cause problems such as inducing avalanches in the snow layer on slope G. ing.
In order to prevent this problem, it is necessary to remove the cornice and rolls at an early stage. There is a problem that the snow removal cost increases due to the request for a short work period.

本発明は上述した従来技術の問題点に鑑みなされたもので、斜面と雪崩予防柵との間に堆積される積雪量を分散し、また積雪の一部を流出させることにより大きな積雪層が形成されるのを抑制して雪庇や巻きだれの形成、成長を抑止し、雪庇、巻きだれの落下による雪崩の発生といった雪害を予防するための雪崩予防柵及びその設置方法を提供することを目的とする。 The present invention has been made in view of the above-mentioned problems of the prior art, and a large snow layer is formed by dispersing the amount of snow accumulated between the slope and the avalanche prevention fence and causing a part of the snow to flow out. The purpose is to provide an avalanche prevention fence and its installation method to prevent snow damage such as cornice and avalanche formation and growth, and to prevent avalanche damage caused by falling cornice and cornice. do.

(1)上述した課題を解決するために構成した請求項1に係る本発明の手段は、谷側雪崩予防体と山側雪崩予防体とを備える雪崩予防柵であって、前記谷側雪崩予防体は、斜面に横方向に離間して立設する一対の谷側支柱と、該一対の谷側支柱の上部側に複数本の横梁材を横設して形成する谷側雪止め部と、該谷側雪止め部の下側に形成する開口部とから構成し、前記山側雪崩予防体は、前記斜面に横方向に離間して立設する一対の山側支柱と、該一対の山側支柱に複数本の横梁材を横設して形成する山側雪止め部とから構成し、前記山側雪崩予防体は、該山側雪止め部を前記開口部に対向させた状態で前記谷側雪崩予防体に対して前記斜面の上方に離間させて配置したことにある。
(2)そして、前記山側雪崩予防体は、前記谷側雪崩予防体に対し前記谷側支柱の高さの半分の長さに相当する間隔を存して前記斜面上方に配置するとよい。
(3)また、前記谷側雪崩予防体は、前記斜面に設置済の既設の雪崩予防柵の構成の一部を利用したものであるとよい。
(4)更に、請求項4に係る本発明を構成する手段は、斜面に横方向に離間して一対の谷側支柱を立設し、該一対の谷側支柱の上部側に横梁材を横設して谷側雪止め部を形成することにより、該谷側雪止め部の下部側は開口部とする工程により谷側雪崩予防体を設置し、前記谷側雪崩予防体より前記斜面の上方に位置して横方向に離間して一対の山側支柱を立設し、該一対の山側支柱に複数本の横梁材を横設して山側雪止め部を形成する工程により山側雪崩予防体を設置し、前記山側雪止め部を前記開口部に対向させた状態で該山側雪崩予防体を前記谷側雪崩予防体に対して前記斜面の上方に離間させて配置する工程からなる。
(1) The means of the present invention according to claim 1 configured to solve the above-mentioned problems is an avalanche prevention fence provided with a valley-side avalanche preventive body and a mountain-side avalanche preventive body, and the valley-side avalanche preventive body. Is a pair of valley-side columns that are erected laterally apart on a slope, and a valley-side avalanche portion that is formed by horizontally arranging a plurality of cross beam members on the upper side of the pair of valley-side columns. The mountain-side avalanche preventive body is composed of an opening formed on the lower side of the valley-side snow stopper, and the mountain-side avalanche preventive body includes a pair of mountain-side columns standing laterally separated on the slope and a plurality of mountain-side columns on the pair of mountain-side columns. The mountain-side avalanche preventive body is composed of a mountain-side avalanche preventive body formed by horizontally arranging the cross beam material of the book, and the mountain-side avalanche preventive body is opposed to the valley-side avalanche preventive body in a state where the mountain-side snow stop portion faces the opening. It is located above the slope so as to be separated from each other.
(2) Then, the mountain-side avalanche preventive body may be arranged above the slope with an interval corresponding to half the height of the valley-side support with respect to the valley-side avalanche preventive body.
(3) Further, it is preferable that the valley-side avalanche prevention body utilizes a part of the structure of the existing avalanche prevention fence already installed on the slope.
(4) Further, in the means constituting the present invention according to claim 4, a pair of valley-side columns are erected laterally apart on the slope, and a cross beam member is laterally placed on the upper side of the pair of valley-side columns. A valley-side avalanche preventive body is installed by the process of forming an opening on the lower side of the valley-side snow stop portion by forming a valley-side snow stop portion, and above the slope above the valley-side avalanche preventive body. A pair of mountain-side columns are erected at a distance from each other in the lateral direction, and a mountain-side avalanche prevention body is installed by the process of horizontally arranging multiple cross beam members on the pair of mountain-side columns to form a mountain-side snow stopper. The process comprises a step of arranging the mountain-side avalanche preventive body at a distance above the slope with respect to the valley-side avalanche preventive body in a state where the mountain-side snow stop portion faces the opening.

本発明は上述の如く構成したから、下記の諸効果を奏する。
(1)雪崩予防柵は、下部側に開口部を設けた谷側雪崩予防体と斜面の上方に離間する山側雪崩予防体に二分して構成し、積雪量を分散させるようにしたから、雪庇が形成される積雪状態を抑制して雪庇の形成を抑止できる。
(2)山側雪崩予防体は、谷側雪崩予防体に対し谷側支柱の高さの半分の長さに相当する間隔を存して斜面上方に配置したから、積雪量を効果的に分散して雪庇の形成を抑止することができる。
(3)谷側雪崩予防体は下部側に開口部を形成し、山側雪崩予防体との間の積雪の一部は谷側に流出させるようにしたから、谷側雪崩予防体と山側雪崩予防体との間に大きな積雪層が形成されるのを防止でき、谷側雪崩予防体に雪庇が形成されるのを抑止できる。
(4)谷側雪崩予防体は、斜面に設置済の既設の雪崩予防柵の構成の一部を利用することにより、斜面上での設置作業を容易に行うことができるし、工期、設置費を節減することができる。
Since the present invention is configured as described above, it has the following effects.
(1) The avalanche prevention fence is divided into a valley-side avalanche prevention body with an opening on the lower side and a mountain-side avalanche prevention body separated above the slope to disperse the amount of snow. It is possible to suppress the formation of snow cornice by suppressing the snow accumulation condition in which the formation of snow is formed.
(2) Since the mountain-side avalanche preventive body was placed above the slope with an interval corresponding to half the height of the valley-side support with respect to the valley-side avalanche preventive body, the amount of snow accumulated was effectively dispersed. It is possible to suppress the formation of avalanches.
(3) The valley-side avalanche preventive body has an opening on the lower side so that part of the snow accumulated between the valley-side avalanche preventive body and the mountain-side avalanche preventive body flows out to the valley side. It is possible to prevent the formation of a large snow layer between the body and the avalanche prevention body on the valley side, and it is possible to prevent the formation of a cornice.
(4) The valley-side avalanche prevention body can be easily installed on the slope by using a part of the existing avalanche prevention fence that has already been installed on the slope, and the construction period and installation cost. Can be saved.

図1乃至図9は本発明の実施の形態に係り、図1は雪崩予防柵の全体構成を示す斜視図である。1 to 9 relate to an embodiment of the present invention, and FIG. 1 is a perspective view showing an overall configuration of an avalanche prevention fence. 雪崩予防柵の側面図である。It is a side view of an avalanche prevention fence. 図3乃至図6は既設の雪崩予防柵から実施の形態に係る雪崩予防柵を作成する工程を示し、図3は既設の雪崩予防柵から雪止め部の一部及び転倒防止体を外す説明図である。FIGS. 3 to 6 show a process of creating an avalanche prevention fence according to an embodiment from an existing avalanche prevention fence, and FIG. 3 is an explanatory diagram for removing a part of a snow stopper and a fall prevention body from the existing avalanche prevention fence. Is. 谷側雪崩予防体に間隔形成体を組付ける説明図である。It is explanatory drawing which attaches the interval forming body to the valley side avalanche prevention body. 山側支柱を設けた間隔形成体の斜視図である。It is a perspective view of the space forming body provided with the mountain side support. 山側支柱に横梁材を組付ける説明図である。It is explanatory drawing which attaches the cross beam material to the mountain side support. 雪庇形成を抑止する原理の説明図である。It is explanatory drawing of the principle which suppresses the formation of a cornice. 雪崩予防柵による積雪モデルの説明図である。It is explanatory drawing of the snow accumulation model by an avalanche prevention fence. 雪崩予防柵による積雪状況の説明図である。It is explanatory drawing of the snow accumulation situation by an avalanche prevention fence. 図10乃至図12は従来技術に係り、図10は雪崩予防柵による雪庇形成原理の説明図である。10 to 12 relate to the prior art, and FIG. 10 is an explanatory diagram of the principle of forming a cornice by an avalanche prevention fence. 雪崩予防柵による積雪モデルの説明図である。It is explanatory drawing of the snow accumulation model by an avalanche prevention fence. 雪崩予防柵による積雪状況の説明図である。It is explanatory drawing of the snow accumulation situation by an avalanche prevention fence.

以下、本発明の実施の形態を図1乃至図9を参照しつつ詳述する。図において、1は斜面Gに設置した雪崩予防柵、2は該雪崩予防柵1を構成する谷側雪崩予防体を示す。3、3は該谷側雪崩予防体2を構成する左右一対の谷側支柱を示し、該一対の谷側支柱3,3は長さが約1,500mmのH形鋼材からなり、一側リブ3Aには縦方向に所定の間隔で複数個のボルト穴3B、3B、・・・(図示せず。)が穿設してある。 Hereinafter, embodiments of the present invention will be described in detail with reference to FIGS. 1 to 9. In the figure, 1 is an avalanche prevention fence installed on the slope G, and 2 is a valley-side avalanche prevention body constituting the avalanche prevention fence 1. Reference numerals 3 and 3 indicate a pair of left and right valley-side columns constituting the valley-side avalanche prevention body 2, and the pair of valley-side columns 3 and 3 are made of H-shaped steel material having a length of about 1,500 mm and are ribbed on one side. A plurality of bolt holes 3B, 3B, ... (Not shown) are bored in 3A at predetermined intervals in the vertical direction.

4は前記一対の谷側支柱3、3間に架設した谷側雪止め部で、該谷側雪止め部4は谷側支柱3、3の上部側に縦方向に離間して鋼管からなる3本の横梁材4A,4A、4Aを横設し、前記ボルト穴3Bに挿嵌したU字ボルトにナットを螺合する締着具4Bで両端側を谷側支柱3に締着して形成してある。
そして、一対の谷側支柱3、3の上部側にのみ谷側雪止め部4を設置することにより、谷側雪崩予防体2は下部側に谷側雪止め部4と略同じ面積からなる開口部5が形成してある。
Reference numeral 4 denotes a valley-side snow stopper erected between the pair of valley-side columns 3 and 3, and the valley-side snow stopper 4 is composed of steel pipes vertically separated from the valley-side columns 3 and 3 on the upper side. The cross beam members 4A, 4A, and 4A of the book are horizontally installed, and both ends are fastened to the valley side column 3 with a fastener 4B for screwing a nut into a U-shaped bolt inserted into the bolt hole 3B. There is.
By installing the valley-side snow stopper 4 only on the upper side of the pair of valley-side columns 3 and 3, the valley-side avalanche prevention body 2 has an opening on the lower side having substantially the same area as the valley-side snow stopper 4. The part 5 is formed.

6は前記谷側雪崩予防体2から山側に離間して設置した山側雪崩予防体を示す。7、7は該山側雪崩予防体6を構成する一対の山側支柱で、該各山側支柱7は長さが約750mmのH形鋼材からなり、図5に示すように各山側支柱7の一側リブ7Aには複数のボルト穴7B、7B、・・・が穿設してある。 Reference numeral 6 indicates a mountain-side avalanche preventive body installed away from the valley-side avalanche preventive body 2 on the mountain side. 7 and 7 are a pair of mountain-side columns constituting the mountain-side avalanche prevention body 6, and each mountain-side column 7 is made of H-shaped steel material having a length of about 750 mm, and as shown in FIG. 5, one side of each mountain-side column 7. A plurality of bolt holes 7B, 7B, ... Are bored in the rib 7A.

8は山側雪崩予防体6を構成し、前記一対の山側支柱7、7間に設けた山側雪止め部で、該山側雪止め部8は山側支柱7、7に縦方向に離間して鋼管材からなる3本の横梁材8A,8A、8Aを横設し、前記ボルト穴7Bに挿嵌したU字ボルトにナットを螺合する締着具8Bで両端側を山側支柱7、7に締着して形成してある。そして、一対の谷側支柱3、3間には雪止め部4と対面して上部側にブレース9を張設して強度性を持たせてある。 8 constitutes a mountain-side avalanche prevention body 6 and is a mountain-side snow stopper provided between the pair of mountain-side columns 7 and 7. The mountain-side snow stopper 8 is vertically separated from the mountain-side columns 7 and 7 and is a steel pipe material. Three cross beam members 8A, 8A, 8A made of the above are horizontally installed, and both ends are fastened to the mountain side columns 7 and 7 with a fastener 8B for screwing a nut into a U-shaped bolt inserted into the bolt hole 7B. Is formed. A brace 9 is stretched on the upper side facing the snow stopper 4 between the pair of valley-side columns 3 and 3 to provide strength.

10、10は山側雪崩予防体6を谷側雪崩予防体2に対して斜面Gの上方に離間させて配置するための左右一対の間隔形成体を示す。該各間隔形成体10はH形鋼材からなり、一側端に山側支柱7を溶接手段により固着する上支持材10A及び下支持材10Bと、T型鋼材からなり、該上支持材10A及び下支持材10Bの他端側に溶接手段により固着し、谷側支柱3にボルト・ナットで締着する連結板10Cと、下支持材10Bの両側に下端側を突出した状態で固着した溝型鋼材からなる一対の脚材10D、10Dとから構成してある。 Reference numerals 10 and 10 indicate a pair of left and right spacing forming bodies for arranging the mountain-side avalanche prevention body 6 at a distance above the slope G with respect to the valley-side avalanche prevention body 2. Each of the interval forming bodies 10 is made of an H-shaped steel material, and is made of an upper support material 10A and a lower support material 10B to which a mountain side support 7 is fixed to one side end by a welding means, and a T-shaped steel material, and the upper support material 10A and the lower side. A channel steel material fixed to the other end side of the support material 10B by welding means and fastened to the valley side column 3 with bolts and nuts, and a grooved steel material fixed to both sides of the lower support material 10B with the lower end side protruding. It is composed of a pair of leg members 10D and 10D.

そして、山側雪崩予防体6は、谷側雪崩予防体2に対し谷側支柱3の高さの半分の長さに相当する間隔を存して斜面G上方に配置するのが積雪量を分散させるのに好適であることから、本実施の形態では、上、下支持材10A、10Bの長さを約641mmに設定し、高さ1,500mmの谷側支柱3の後面から山側支柱7の後面までの間隔、即ち谷側雪止め部4と山側雪止め部8の間隔を約750mmにしてある。 The mountain-side avalanche preventive body 6 is arranged above the slope G with an interval corresponding to half the height of the valley-side support 3 with respect to the valley-side avalanche preventive body 2 to disperse the amount of snow. In the present embodiment, the lengths of the upper and lower support members 10A and 10B are set to about 641 mm, and the height is 1,500 mm from the rear surface of the valley side column 3 to the rear surface of the mountain side column 7. That is, the distance between the valley side snow stopper 4 and the mountain side snow stopper 8 is set to about 750 mm.

11は谷側雪崩予防体2、間隔形成体10及び山側雪崩予防体6を斜面G上に一体に設置するための鋼板製の基板で、該基板11は長方形の平板からなり、長手方向両端側11A、11Aを斜め上方に起立させることにより、斜面Gへの設置を容易にしている。そして、基板11は谷側支柱3、脚材10D、10Dの下端を溶接手段により固着することで、谷側雪崩予防体2及び山側雪崩予防体6を下部側で一体に支持することにより強度性と安定性を持たせてある。 Reference numeral 11 is a steel plate substrate for integrally installing the valley-side avalanche preventive body 2, the interval forming body 10, and the mountain-side avalanche preventive body 6 on the slope G. By erecting 11A and 11A diagonally upward, installation on the slope G is facilitated. The substrate 11 has strength by integrally supporting the valley side avalanche prevention body 2 and the mountain side avalanche prevention body 6 on the lower side by fixing the lower ends of the valley side support 3 and the leg members 10D and 10D by welding means. And has stability.

12、12は斜面G上で雪崩予防柵1を略垂直状態に支持する左右一対の予防柵支持機構を示す。13は該各予防柵支持機構12を構成する下側牽引具で、該下側牽引具13は谷側支柱3の下端側に固着したブラケットに設けたワイヤー係止ピン13Aと、該ワイヤー係止ピン13Aに一端側を係着し、他端側に環状連結部13Bを設けた下側支持ワイヤー13とから構成してある。 12 and 12 show a pair of left and right preventive fence support mechanisms that support the avalanche preventive fence 1 in a substantially vertical state on the slope G. Reference numeral 13 is a lower traction tool constituting each of the preventive fence support mechanisms 12, and the lower traction tool 13 includes a wire locking pin 13A provided on a bracket fixed to the lower end side of the valley side column 3 and the wire locking. It is composed of a lower support wire 13 having one end side engaged with the pin 13A and an annular connecting portion 13B provided on the other end side.

14は予防柵支持機構12を構成する上側牽引具で、該上側牽引具14は谷側支柱3の上部側に固着したブラケットに設けたワイヤー係止ピン14Aと、該ワイヤー係止ピン14Aに一端側を係着し、他端側を前記下側支持ワイヤー13Bの他端側に連結した上側支持ワイヤー14Bとから構成してある。
そして、上述の構成からなる予防柵支持機構12は、上端側を地盤にアンカーで固定し、下端側は前記下側支持ワイヤー13の他端側に連結し、支持索15の長さを調整することにより、雪崩予防柵1は斜面Gに略垂直状態に設置してある。
Reference numeral 14 denotes an upper traction tool constituting the preventive fence support mechanism 12, and the upper traction tool 14 has a wire locking pin 14A provided on a bracket fixed to the upper side of the valley side support 3 and one end to the wire locking pin 14A. It is composed of an upper support wire 14B in which the side is engaged and the other end side is connected to the other end side of the lower support wire 13B.
Then, in the preventive fence support mechanism 12 having the above configuration, the upper end side is fixed to the ground with an anchor, the lower end side is connected to the other end side of the lower support wire 13, and the length of the support rope 15 is adjusted. As a result, the avalanche prevention fence 1 is installed substantially perpendicular to the slope G.

本実施の形態に係る雪崩予防柵1は上述の構成からなる新規の製品であるから、谷側雪崩予防体2、山側雪崩予防体6及び間隔形成体10を新規に作成して設置することになるが、資材の有効活用、工期の短縮及び費用の節減を図る観点から、既設の雪崩予防柵を活用する着想に至った。図2乃至図5を参照して、以下にその改造工程について詳述する。 Since the avalanche prevention fence 1 according to the present embodiment is a new product having the above-mentioned configuration, the valley side avalanche prevention body 2, the mountain side avalanche prevention body 6 and the interval forming body 10 are newly created and installed. However, from the viewpoint of effective use of materials, shortening of construction period and cost reduction, we came up with the idea of utilizing the existing avalanche prevention fence. The modification process will be described in detail below with reference to FIGS. 2 to 5.

斜面Gに設置してある既設の雪崩予防柵21は、段落0003で説明した構成からなるもので、一対の支柱22、22は長さが約1,500mmのH形鋼材からなり、下端側に転倒防止体23を固着し、縦方向に離間して一対の支柱22、22間に6本の鋼管からなる横梁材24A、24A、・・・を横設することにより雪止め部24を形成し、X字状にブレース25を架設し、支柱22と転倒防止部材23を固着した基板26を吊下げ式の予防柵支持機構27で支持することにより、斜面G上に略垂直状態に設置してある。 The existing avalanche prevention fence 21 installed on the slope G has the configuration described in paragraph 0003, and the pair of columns 22 and 22 are made of H-shaped steel material having a length of about 1,500 mm on the lower end side. A snow stopper 24 is formed by fixing the fall prevention body 23 and horizontally arranging the cross beam members 24A, 24A, ... , The brace 25 is erected in an X shape, and the substrate 26 to which the support column 22 and the fall prevention member 23 are fixed is supported by the hanging type preventive fence support mechanism 27, so that the brace 25 is installed in a substantially vertical state on the slope G. be.

上述の構成からなる既設の雪崩予防柵21は、転倒防止部材23を撤去した後、雪止め部24を構成する下側の3本の横梁材24A、24A、24Aは締着具24Bを外して支柱22、22から取外し、近傍の斜面G上に仮置きする。また、ブレース25を支柱22から取外す。このようにして、一対の支柱22、22は上部側に谷側雪止め部4を有し、下部側が開口部5になった実施の形態の谷側雪崩予防体2に改変する。谷側雪止め部4に対応して一対の谷側支柱3、3にブレース9を架設する。 In the existing avalanche prevention fence 21 having the above configuration, after the fall prevention member 23 is removed, the lower three cross beam members 24A, 24A, 24A constituting the snow stopper 24 are removed from the fastener 24B. It is removed from the columns 22 and 22 and temporarily placed on the nearby slope G. Also, the brace 25 is removed from the support column 22. In this way, the pair of columns 22 and 22 is modified into the valley-side avalanche preventive body 2 of the embodiment in which the valley-side snow stopper 4 is provided on the upper side and the lower portion is the opening 5. A brace 9 is erected on a pair of valley-side columns 3 and 3 corresponding to the valley-side snow stopper 4.

次に、図4に示すように、予め制作しておいた間隔形成体10を各谷側支柱3の下端側にボルト・ナットで締着して取付け、脚材10Dを基板11に溶接する。間隔形成体10には予め山側支柱7を取付けておくことにより、現場での作業量を少なくすることができる。しかる後、仮置きしておいた3本の横梁材24A、24A、24Aを山側支柱7に締着具8Bにより取着して山側雪止め部8を形成する。
このようにして、上部側に谷側雪止め部4を、下部側に開口部5を有する谷側雪崩予防体2に対し、斜面Gの上方で750mm離間させた位置に、開口部5に対向させて山側雪崩予防体6を配置することにより本実施の形態に係る雪崩予防柵1の設置が完了する。谷側雪崩予防体2と山側雪崩予防体6に掛る総荷重は変わらないから、予防柵支持機構12は既設の支持機構27をそのまま使用できる。
このようにして、本実施の形態では、既設の雪崩予防柵21の構成の一部を活用して雪崩予防柵1を構成するようにしたから、斜面G上での設置作業の工数を削減することができるので、工期、設置費を節減することができる。
Next, as shown in FIG. 4, the interval forming body 10 produced in advance is fastened and attached to the lower end side of each valley side column 3 with bolts and nuts, and the leg member 10D is welded to the substrate 11. By attaching the mountain side support 7 to the space forming body 10 in advance, the amount of work at the site can be reduced. After that, the three temporarily placed cross beam members 24A, 24A, and 24A are attached to the mountain side column 7 by the fastener 8B to form the mountain side snow stopper 8.
In this way, the valley-side snow stopper 4 is opposed to the opening 5 at a position 750 mm above the slope G with respect to the valley-side avalanche preventive body 2 having the valley-side snow stopper 4 on the upper side and the opening 5 on the lower side. By arranging the avalanche prevention body 6 on the mountain side, the installation of the avalanche prevention fence 1 according to the present embodiment is completed. Since the total load applied to the valley side avalanche preventive body 2 and the mountain side avalanche preventive body 6 does not change, the existing support mechanism 27 can be used as it is for the preventive fence support mechanism 12.
In this way, in the present embodiment, since the avalanche prevention fence 1 is configured by utilizing a part of the configuration of the existing avalanche prevention fence 21, the man-hours for the installation work on the slope G are reduced. Therefore, the construction period and installation cost can be reduced.

次に、雪崩予防柵1の作用について図7乃至図9を参照して詳述する。谷側雪崩予防体2は下部側に開口部5を設け、雪崩予防体2の前面側(山側)の積雪は開口部5から下方に流出させる構成にしたので、谷側雪崩予防体2と斜面Gとの間の空間領域Y、即ち左右の間隔形成体10、10の間の領域Yに積雪層が高く形成することが無く、積雪層Sが谷側雪崩予防体2を超えて雪庇が形成されるまでには至らない。また、積雪量も小さいから沈降により上方から空間領域Yの積雪層に加わる雪圧も小さい。
そして、斜面Gの上方から滑動する積雪層Sの雪圧は山側雪崩予防体6が支承することにより空間領域Yの積雪層Sに雪圧が加わる事態を防止する。
Next, the operation of the avalanche prevention fence 1 will be described in detail with reference to FIGS. 7 to 9. The valley-side avalanche preventive body 2 has an opening 5 on the lower side, and the snow on the front side (mountain side) of the avalanche preventive body 2 is configured to flow downward from the opening 5, so that the valley-side avalanche preventive body 2 and the slope The snow layer does not form high in the space area Y between G and the area Y between the left and right space forming bodies 10 and 10, and the snow layer S 3 exceeds the valley side avalanche prevention body 2 and the cornice is formed. It does not reach the point of being formed. Further, since the amount of snow is small, the snow pressure applied to the snow layer in the space region Y from above due to subsidence is also small.
Then , the snow pressure of the snow layer S4 sliding from above the slope G is supported by the mountain side avalanche preventive body 6 to prevent the snow pressure from being applied to the snow layer S3 of the space region Y.

また、山側雪崩予防体6の雪止め部8と斜面Gとで縦断面略V字状の雪止め領域Zが形成されるが、山側雪崩予防体6は谷側雪崩予防体2の略半分の高さと面積であるから、雪止め領域Zに堆積する積雪量も既設の雪崩予防柵21の雪止め領域Sの半分の量であるから、雪止め領域Zに堆雪の雪密度もさほど大きくならない。 Further, a snow stop region Z having a substantially V-shaped vertical cross section is formed by the snow stop portion 8 of the mountain side avalanche prevention body 6 and the slope G, but the mountain side avalanche prevention body 6 is approximately half of the valley side avalanche prevention body 2. Since the height and area, the amount of snow accumulated in the snow stop area Z is half the amount of the snow stop area S of the existing avalanche prevention fence 21, so the snow density of the snow cover in the snow stop area Z does not increase so much. ..

かくして、本願発明は、斜面G上での積雪による雪圧や上方から滑落する積雪層の雪圧を谷側雪崩予防体2と山側雪崩予防体6とで分担し、かつ谷側雪崩予防体2では開口部5から雪を流出させることにより、積雪量が嵩む現象を解消して雪庇の形成を抑止し、雪庇の落下による雪崩の誘発を防止する。 Thus, in the present invention, the snow pressure due to the snow on the slope G and the snow pressure of the snow layer sliding down from above are shared by the valley-side avalanche preventive body 2 and the mountain-side avalanche preventive body 6, and the valley-side avalanche preventive body 2 Then, by letting the snow flow out from the opening 5, the phenomenon that the amount of snow is increased is eliminated, the formation of the cornice is suppressed, and the induction of an avalanche due to the fall of the cornice is prevented.

この雪庇の形成を抑止する原理を図8及び図9に基いて説明する。図8に示すように、予防柵1の背面側(谷側)には雪が堆積しないが、前面(山側)には塞き止められることにより平均的積雪量の倍の積雪量がある。しかし、谷側雪崩予防体3は従来技術における予防柵21の略半分の面積からなるので、平均的積雪量Lに累積する積雪量も略半分であり、かつ開口部5から降雪の一部は流出するので、谷側雪崩予防体2による堆雪量Sは従来技術の予防体21の略半分になる。 The principle of suppressing the formation of the cornice will be described with reference to FIGS. 8 and 9. As shown in FIG. 8, snow does not accumulate on the back side (valley side) of the preventive fence 1, but the front surface (mountain side) is blocked so that the amount of snow is twice the average amount of snow. However, since the valley-side avalanche preventive body 3 has approximately half the area of the preventive fence 21 in the prior art, the amount of snow accumulated in the average amount of snow L is also approximately half, and part of the snowfall from the opening 5 is. Since the outflow occurs, the amount of snow accumulated S3 by the valley-side avalanche preventive body 2 is approximately half that of the conventional preventive body 21.

また、山側雪崩予防体6と斜面Gとで縦断面略V字状の雪止め領域Zが形成されることでこの領域Zに堆雪するが、山側雪崩予防体6は従来技術の予防体21の略半分の高さと面積の構成からなり、かつ谷側雪崩予防体2と共働することで予防体2、6のいずれか1か所に積雪が集中することがないので、前後2段に雪丘を形成し、予防体2、6を超える高さにまで積雪が達することがなく、雪庇が形成されるのを抑止することができる。 Further, the mountain side avalanche preventive body 6 and the slope G form a snow stop region Z having a substantially V-shaped vertical cross section, so that snow is deposited in this region Z. The mountain side avalanche preventive body 6 is a conventional preventive body 21. It consists of about half the height and area of the above, and by cooperating with the valley side avalanche preventive body 2, snow does not concentrate on any one of the preventive bodies 2 and 6, so there are two steps before and after. It forms a snow hill, and the snow does not reach a height exceeding the preventive bodies 2 and 6, and it is possible to prevent the formation of an avalanche.

なお、雪崩予防柵1の柵高さ1,500mm、斜面角度40度の条件で、間隔形成体10の前後長を750mmに設定した実験で得られた雪庇の形成抑止効果が最も顕著であった。他に、約1,000mmの前後長に設定した間隔形成体を用いた実験では、予防体2、6が離れ過ぎることで前後の縁が切れて共働現象が有効に働かないことが確認された。 The effect of suppressing the formation of cornice obtained in the experiment in which the anteroposterior length of the interval forming body 10 was set to 750 mm under the conditions of the avalanche prevention fence 1 having a fence height of 1,500 mm and a slope angle of 40 degrees was most remarkable. .. In addition, in an experiment using an interval forming body set to a front-back length of about 1,000 mm, it was confirmed that the front-back edges were cut off when the preventive bodies 2 and 6 were too far apart, and the synergistic phenomenon did not work effectively. rice field.

また、本実施の形態では、既設の雪崩予防柵21の一部を改変して雪崩予防柵1を構成したが、雪崩予防柵1は新規に構成して設置してもよいことは勿論である。 Further, in the present embodiment, a part of the existing avalanche prevention fence 21 is modified to form the avalanche prevention fence 1, but it goes without saying that the avalanche prevention fence 1 may be newly configured and installed. ..

また、本実施の形態において、谷側雪崩予防体2は2本一対の谷側支柱3、3で構成したが、この構成を前提に中間に谷側支柱3を付加した構成にしてもよい。 Further, in the present embodiment, the valley-side avalanche prevention body 2 is composed of two pairs of valley-side columns 3, 3, but a valley-side column 3 may be added in the middle on the premise of this configuration.

更に、本実施の形態において、谷側雪崩予防体2を構成する谷側支柱3は基板11に立設し、基板11は予防柵支持機構12で斜面上方から支持する構成にしたが、谷側支柱3は下端側を斜面Gに埋設して立設してもよいものである。 Further, in the present embodiment, the valley side support 3 constituting the valley side avalanche prevention body 2 is erected on the substrate 11, and the substrate 11 is supported from above the slope by the prevention fence support mechanism 12, but the valley side. The support column 3 may be erected by burying the lower end side in the slope G.

1 雪崩予防柵
2 谷側雪崩予防体
3 谷側支柱
4 谷側雪止め部
4A 横梁材
5 開口部
6 山側雪崩予防体
7 山側支柱
8 山側雪止め部
8A 横梁材
G 斜面
1 Avalanche prevention fence 2 Valley side avalanche prevention body 3 Valley side support 4 Valley side snow stop 4A Cross beam 5 Opening 6 Mountain side avalanche prevention body 7 Mountain side support 8 Mountain side support 8A Cross beam G slope

Claims (4)

谷側雪崩予防体と山側雪崩予防体とを備える雪崩予防柵であって、前記谷側雪崩予防体は、斜面に横方向に離間して立設する一対の谷側支柱と、該一対の谷側支柱の上部側に複数本の横梁材を横設して形成する谷側雪止め部と、該谷側雪止め部の下側に形成する開口部とから構成し、前記山側雪崩予防体は、前記斜面に横方向に離間して立設する一対の山側支柱と、該一対の山側支柱に複数本の横梁材を横設して形成する山側雪止め部とから構成し、前記山側雪崩予防体は、該山側雪止め部を前記開口部に対向させた状態で前記谷側雪崩予防体に対して前記斜面の上方に離間させて配置してなる雪崩予防柵。 An avalanche prevention fence including a valley-side avalanche preventive body and a mountain-side avalanche preventive body, wherein the valley-side avalanche preventive body includes a pair of valley-side struts and a pair of valley-side columns that are erected laterally apart on a slope. The mountain-side avalanche preventive body is composed of a valley-side snow stopper formed by horizontally arranging a plurality of cross beam members on the upper side of the side column and an opening formed below the valley-side snow stopper. It is composed of a pair of mountain-side columns that are erected laterally apart on the slope and a mountain-side avalanche portion that is formed by horizontally arranging a plurality of cross beam members on the pair of mountain-side columns to prevent the mountain-side avalanche. The body is an avalanche prevention fence arranged so that the mountain-side snow stopper is opposed to the opening and is spaced above the slope with respect to the valley-side avalanche prevention body. 前記山側雪崩予防体は、前記谷側雪崩予防体に対し前記谷側支柱の高さの半分の長さに相当する間隔を存して前記斜面上方に配置してあることを特徴とする請求項1記載の雪崩予防柵。 The claim is characterized in that the mountain-side avalanche preventive body is arranged above the slope with an interval corresponding to a length of half the height of the valley-side support with respect to the valley-side avalanche preventive body. 1 Avalanche prevention fence described. 前記谷側雪崩予防体は、前記斜面に設置済の既設の雪崩予防柵の構成の一部を利用したものである請求項1記載の雪崩予防柵。 The avalanche prevention fence according to claim 1, wherein the valley-side avalanche prevention body utilizes a part of the structure of the existing avalanche prevention fence already installed on the slope. 斜面に横方向に離間して一対の谷側支柱を立設し、該一対の谷側支柱の上部側に横梁材を横設して谷側雪止め部を形成することにより、該谷側雪止め部の下部側は開口部とする工程により谷側雪崩予防体を設置し、前記谷側雪崩予防体より前記斜面の上方に位置して横方向に離間して一対の山側支柱を立設し、該一対の山側支柱に複数本の横梁材を横設して山側雪止め部を形成する工程により山側雪崩予防体を設置し、前記山側雪止め部を前記開口部に対向させた状態で該山側雪崩予防体を前記谷側雪崩予防体に対して前記斜面の上方に離間させて配置する工程からなる雪崩予防柵の設置方法。 A pair of valley-side struts are erected on the slope laterally apart, and a cross beam member is laid horizontally on the upper side of the pair of valley-side struts to form a valley-side avalanche, thereby forming the valley-side snow. A valley-side avalanche prevention body is installed on the lower side of the stop by an opening process, and a pair of mountain-side columns are erected at a position above the slope above the valley-side avalanche prevention body and laterally separated from each other. A mountain-side avalanche preventive body is installed by a step of horizontally arranging a plurality of cross beam members on the pair of mountain-side columns to form a mountain-side snow stopper, and the mountain-side snow stopper is opposed to the opening. A method of installing an avalanche prevention fence comprising a step of arranging a mountain-side avalanche preventive body at a distance above the slope with respect to the valley-side avalanche preventive body.
JP2017202910A 2017-10-19 2017-10-19 Avalanche prevention fence and its installation method Active JP6994235B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017202910A JP6994235B2 (en) 2017-10-19 2017-10-19 Avalanche prevention fence and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017202910A JP6994235B2 (en) 2017-10-19 2017-10-19 Avalanche prevention fence and its installation method

Publications (2)

Publication Number Publication Date
JP2019077985A JP2019077985A (en) 2019-05-23
JP6994235B2 true JP6994235B2 (en) 2022-01-14

Family

ID=66628608

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017202910A Active JP6994235B2 (en) 2017-10-19 2017-10-19 Avalanche prevention fence and its installation method

Country Status (1)

Country Link
JP (1) JP6994235B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070224021A1 (en) 2006-03-27 2007-09-27 G. S.R.L. Rapid-assembly earth retaining device
JP2013104214A (en) 2011-11-14 2013-05-30 Shinko Kenzai Ltd Avalanche prevention method and avalanche prevention system used for the same
JP2017179999A (en) 2016-03-31 2017-10-05 日鐵住金建材株式会社 Guard fence

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02128005A (en) * 1988-11-07 1990-05-16 Nippon Kikai Kogyo Kk Snow fence

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070224021A1 (en) 2006-03-27 2007-09-27 G. S.R.L. Rapid-assembly earth retaining device
JP2013104214A (en) 2011-11-14 2013-05-30 Shinko Kenzai Ltd Avalanche prevention method and avalanche prevention system used for the same
JP2017179999A (en) 2016-03-31 2017-10-05 日鐵住金建材株式会社 Guard fence

Also Published As

Publication number Publication date
JP2019077985A (en) 2019-05-23

Similar Documents

Publication Publication Date Title
US3390865A (en) Safety fences
KR101678849B1 (en) Cable Bridge and Constructing Method thereof
KR101082429B1 (en) Widening and supporting structure for architecture and civil engineering structure and bridge widening method using the same
KR101682624B1 (en) Shock absorption and pressure type prevention net for falling stone and construction method
KR101283689B1 (en) Structure of reinforcement supporter for traffic safety facility
JP2003213972A (en) Fence structural body
JP6994235B2 (en) Avalanche prevention fence and its installation method
KR101171041B1 (en) Bikeway using longitudinal girder with different height and pile and construction method therefor
WO2005071174A1 (en) Collecting structure and drainage structure using the collecting structure
JP5051324B1 (en) Sidewalk concrete plate, its installation method and temporary sidewalk structure using this concrete plate
JP6113473B2 (en) Protective fence
US2750157A (en) Cattle guard
JP2001008604A (en) Fence for protecting against beast and fence body therefor
KR101054741B1 (en) Bikeway construction method using two point support by lateral support member and slab
JP2006177142A (en) Highly efficient fence for preventing snow from scattering
JP4122027B2 (en) Construction method of avalanche prevention fence
JP2019203372A (en) Temporary guard fence and construction method thereof
JP3134480U (en) Avalanche prevention fence
JP6113474B2 (en) Suspended protective fence
JP2019044469A (en) Guard for median strip
KR101049404B1 (en) A guard rail
JP2014043755A (en) Concrete slab for sidewalk, installation method for the same concrete slab, and temporary sidewalk structure using the same concrete slab
KR101498190B1 (en) the Infrastructure of Rockfall protection post
Ross Jr et al. Safety treatment of roadside drainage structures
EP2894257B1 (en) Protection system for avoiding obstacles in roadside trenches

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200703

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210608

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210806

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211206

R150 Certificate of patent or registration of utility model

Ref document number: 6994235

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150