JP5919659B2 - Fixing bracket and solar cell unit - Google Patents

Fixing bracket and solar cell unit Download PDF

Info

Publication number
JP5919659B2
JP5919659B2 JP2011141880A JP2011141880A JP5919659B2 JP 5919659 B2 JP5919659 B2 JP 5919659B2 JP 2011141880 A JP2011141880 A JP 2011141880A JP 2011141880 A JP2011141880 A JP 2011141880A JP 5919659 B2 JP5919659 B2 JP 5919659B2
Authority
JP
Japan
Prior art keywords
top plate
solar cell
cell module
presser
metal fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011141880A
Other languages
Japanese (ja)
Other versions
JP2013007237A (en
JP2013007237A5 (en
Inventor
道盛 厚司
厚司 道盛
博夫 坂本
博夫 坂本
治彦 角谷
治彦 角谷
米澤 宏敏
宏敏 米澤
良夫 市田
良夫 市田
渡辺 教弘
教弘 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2011141880A priority Critical patent/JP5919659B2/en
Publication of JP2013007237A publication Critical patent/JP2013007237A/en
Publication of JP2013007237A5 publication Critical patent/JP2013007237A5/ja
Application granted granted Critical
Publication of JP5919659B2 publication Critical patent/JP5919659B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Photovoltaic Devices (AREA)

Description

この発明は、太陽電池モジュールの取付け構造に関するものであり、特に折板屋根の山部へ太陽電池モジュールを固定する金具の構造に関するものである。   The present invention relates to a solar cell module mounting structure, and more particularly to a metal fitting structure for fixing a solar cell module to a mountain portion of a folded plate roof.

特許文献1には屋根固定金具が開示されている。屋根固定金具の金具本体は、一対の側壁部を有しており、ボルト軸部を有している。一対の側壁部は折り曲げ成形されている。一方の側壁部には、固定用ボルトを介して補助金具が取り付けられている。他方の側壁部および補助金具が折板屋根の山部を側面から挟む。これにより屋根固定金具は、屋根に固定される。金具本体は上方に突出するボルト軸部を有している。太陽電池モジュールはこのボルト軸部に固定される。   Patent Document 1 discloses a roof fixing bracket. The metal fitting body of the roof fixing metal fitting has a pair of side wall portions and a bolt shaft portion. The pair of side wall portions are bent. An auxiliary metal fitting is attached to one side wall portion via a fixing bolt. The other side wall portion and the auxiliary metal fitting sandwich the mountain portion of the folded plate roof from the side surface. Thereby, the roof fixing bracket is fixed to the roof. The metal fitting body has a bolt shaft portion protruding upward. The solar cell module is fixed to the bolt shaft portion.

特許文献2には他の屋根固定金具が開示されている。固定ベースは天板および左右一対の側板で構成される。各側板にはボルトが取り付けられている。このボルトが折板屋根の山部に設けられた凹部を両側から挟む。これにより固定ベースは屋根に固定される。天板には取付けボルトが上方に突出している。太陽電池モジュールはこの取付けボルトに固定される。   Patent Document 2 discloses another roof fixing bracket. The fixed base is composed of a top plate and a pair of left and right side plates. Bolts are attached to each side plate. This bolt sandwiches a recess provided in the mountain portion of the folded plate roof from both sides. As a result, the fixed base is fixed to the roof. A mounting bolt projects upward from the top plate. The solar cell module is fixed to this mounting bolt.

特開2001−193231号公報(段落0030−0033、第6図)JP 2001-193231 (paragraphs 0030-0033, FIG. 6) 特開2001−303724号公報(段落0013−0014、第7図)Japanese Patent Laying-Open No. 2001-303724 (paragraphs 0013-0014, FIG. 7)

特許文献1および特許文献2に記載された屋根固定金具は、2本以上のボルトを用いて太陽電池モジュールを屋根に固定している。1本のボルトは太陽電池モジュールを固定金具に固定するために用いる。他のボルトは固定金具を屋根に取り付けるために用いる。太陽電池モジュールは上方に突出したボルトを用いて屋根固定金具に固定される。屋根固定金具を屋根に固定する作業は、屋根固定金具の側面からボルトを締めて行う。   The roof fixing metal fittings described in Patent Document 1 and Patent Document 2 fix the solar cell module to the roof using two or more bolts. One bolt is used to fix the solar cell module to the fixture. Other bolts are used to attach the fixture to the roof. The solar cell module is fixed to the roof fixing bracket using a bolt protruding upward. The work of fixing the roof fixing bracket to the roof is performed by tightening bolts from the side of the roof fixing bracket.

太陽電池モジュールは屋根の上に複数のモジュールが配置されることが一般的である。工場の屋根に設置する場合、数百枚の太陽電池モジュールが屋根の上に設置される。固定金具が所定の位置に固定されていない場合、太陽電池モジュールを取り外して、固定金具の位置を再調整する。固定金具の位置の再調整は、側面のボルトを緩めてから行う。このように太陽電池モジュールを屋根に固定する作業は煩雑となる。   As for a solar cell module, it is common that a plurality of modules are arranged on a roof. When installed on the roof of a factory, several hundred solar cell modules are installed on the roof. If the fixture is not fixed in place, the solar cell module is removed and the position of the fixture is readjusted. Readjust the fixing bracket position after loosening the bolts on the side. Thus, the operation | work which fixes a solar cell module to a roof becomes complicated.

この発明は、上記の課題を解決するためになされたものである。この発明は、太陽電池モジュールの屋根への設置作業の作業性を改善した太陽電池モジュールの固定金具を提供することを目的とする。   The present invention has been made to solve the above problems. It is an object of the present invention to provide a solar cell module fixing bracket with improved workability for installation work of a solar cell module on a roof.

本願に係る固定金具は、太陽電池モジュールに対して略平行に配置される天板部の両端に前記天板部に対して前記太陽電池モジュールと反対側に屈曲する屈曲部を介して接続された一対の側板部を有し、前記側板部の先端部に互いに間隔が狭くなる方向に屈曲して接続された一対の挟持部をさらに有する金具と、前記天板部に対して前記太陽電池モジュール側に配置される押え具と、前記天板部及び前記押え具を接続する接続具とを備え、前記屈曲部は、前記太陽電池モジュールの方向に突出する突部を有し、前記天板部が前記接続具にガイドされて前記押え具に近づく際に、前記屈曲部が前記押え具に接して前記天板部を変形させて、前記一対の挟持部の間隔を狭くするものである。

The fixing bracket according to the present application is connected to both ends of a top plate portion arranged substantially parallel to the solar cell module via a bent portion that is bent to the opposite side of the solar cell module with respect to the top plate portion. A bracket having a pair of side plate portions, and further having a pair of sandwiching portions that are bent and connected to the front end portions of the side plate portions in a direction in which the distance between the side plate portions becomes narrow, and the solar cell module side with respect to the top plate portion And a connecting tool for connecting the top plate and the presser, the bent portion has a protrusion protruding in the direction of the solar cell module, and the top plate is When the guide is approached by the connecting tool and approaches the presser, the bent portion comes into contact with the presser and deforms the top plate, thereby narrowing the distance between the pair of holding parts .

この発明は、固定金具の屋根への固定が上方からの締着作業で可能となる。また、太陽電池モジュールの固定金具への固定も上方からの締着作業で可能となる。このように太陽電池モジュールの屋根への設置作業の作業性に優れた固定金具を提供できる。   According to the present invention, the fixing bracket can be fixed to the roof by fastening work from above. In addition, the solar cell module can be fixed to the fixture by a fastening operation from above. In this way, it is possible to provide a fixing metal fitting that is excellent in workability for installing the solar cell module on the roof.

この発明の実施の形態1に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting which concerns on Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具の構成を示す分解斜視図である。It is a disassembled perspective view which shows the structure of the fixing metal fitting concerning Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具の動作を示す構成図である。It is a block diagram which shows operation | movement of the fixing metal fitting which concerns on Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具の動作を示す構成図である。It is a block diagram which shows operation | movement of the fixing metal fitting which concerns on Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具、太陽電池モジュールおよびボルトの位置関係を示す斜視図である。It is a perspective view which shows the positional relationship of the fixing metal fitting, solar cell module, and volt | bolt which concern on Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具の構成を示す分解斜視図である。It is a disassembled perspective view which shows the structure of the fixing metal fitting concerning Embodiment 1 of this invention. この発明の実施の形態1に係る固定金具を用いた太陽電池モジュールの設置状態を示す斜視図である。It is a perspective view which shows the installation state of the solar cell module using the fixing metal fitting which concerns on Embodiment 1 of this invention. この発明の実施の形態2に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting concerning Embodiment 2 of this invention. この発明の実施の形態2に係る固定金具の動作を示す構成図である。It is a block diagram which shows the operation | movement of the fixing metal fitting concerning Embodiment 2 of this invention. この発明の実施の形態3に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting concerning Embodiment 3 of this invention. この発明の実施の形態3に係る固定金具の動作を示す構成図である。It is a block diagram which shows the operation | movement of the fixing metal fitting which concerns on Embodiment 3 of this invention. この発明の実施の形態4に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting concerning Embodiment 4 of this invention. この発明の実施の形態4に係る固定金具の動作を示す構成図である。It is a block diagram which shows operation | movement of the fixing metal fitting which concerns on Embodiment 4 of this invention. この発明の実施の形態5に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting concerning Embodiment 5 of this invention. この発明の実施の形態5に係る固定金具の動作を示す構成図である。It is a block diagram which shows operation | movement of the fixing metal fitting which concerns on Embodiment 5 of this invention. この発明の実施の形態6に係る固定金具の構成を示す分解構成図である。It is a disassembled block diagram which shows the structure of the fixing metal fitting concerning Embodiment 6 of this invention. この発明の実施の形態6に係る固定金具の動作を示す構成図である。It is a block diagram which shows the operation | movement of the fixing metal fitting concerning Embodiment 6 of this invention.

実施の形態1.
図1は、太陽電池モジュールの固定金具100を折板屋根60に固定する前の状態を示す分解構成である。図2は太陽電池モジュールの固定金具100を折板屋根60に固定する前の状態を示す分解斜視図である。
Embodiment 1 FIG.
FIG. 1 is an exploded configuration showing a state before the fixing bracket 100 of the solar cell module is fixed to the folded plate roof 60. FIG. 2 is an exploded perspective view showing a state before the fixing bracket 100 of the solar cell module is fixed to the folded plate roof 60.

金具1は、天板部11、側板部12,13および挟持部14,15を有している。図1中、天板部11は、左右端部に上方へ隆起した突部51,52を有する。天板部11は第1の天板部である。突部51,52は、太陽電池モジュール301の受け部としての機能を有する。側板部12は、天板部11の右側の端部から屈曲した後に下方に延びている部分である。側板部13は、天板部11の左側の端部から屈曲した後に下方に延びている部分である。挟持部14は、側板部12の下端から内側に屈曲した後に下方に延びている。挟持部15は、側板部13の下端から内側に屈曲した後に下方に延びている。   The metal fitting 1 has a top plate portion 11, side plate portions 12 and 13, and clamping portions 14 and 15. In FIG. 1, the top plate 11 has protrusions 51 and 52 protruding upward at the left and right ends. The top plate portion 11 is a first top plate portion. The protrusions 51 and 52 have a function as a receiving part of the solar cell module 301. The side plate portion 12 is a portion that extends downward after being bent from the right end portion of the top plate portion 11. The side plate portion 13 is a portion that extends downward after being bent from the left end portion of the top plate portion 11. The clamping part 14 extends downward after being bent inward from the lower end of the side plate part 12. The sandwiching portion 15 extends downward after being bent inward from the lower end of the side plate portion 13.

ここで上側とは、図中の上側で、固定金具100に対して太陽電池モジュール301側である。また、下側とは、固定金具100に対して太陽電池モジュール301と反対側である。なお、上方は上側と同じ意味であり、下方は下側と同じ意味である。   Here, the upper side is the upper side in the figure and is the solar cell module 301 side with respect to the fixture 100. Further, the lower side is a side opposite to the solar cell module 301 with respect to the fixture 100. The upper part has the same meaning as the upper side, and the lower part has the same meaning as the lower side.

金具1は、1枚の弾性を有する板材を曲げ加工して形成されている。ボルト31はねじ部分を上方へ突出して天板部11の略中央に固定されている。穴18は天板部11の略中央に形成されている。穴18は第1の穴である。ボルト31は穴18を貫通している。ボルト31は締結部品である。ボルト31は固定具として機能している。   The metal fitting 1 is formed by bending a single plate having elasticity. The bolt 31 protrudes upward from the screw portion and is fixed to the approximate center of the top plate portion 11. The hole 18 is formed in the approximate center of the top plate portion 11. The hole 18 is a first hole. The bolt 31 passes through the hole 18. The bolt 31 is a fastening part. The bolt 31 functions as a fixture.

ボルト31は、穴18を貫通した後、接着剤や溶接などで天板部11に固定される。これにより、ボルト31は金具1に固定される。そしてボルト31は軸まわりに回転しない。   The bolt 31 passes through the hole 18 and is then fixed to the top plate 11 by an adhesive or welding. Thereby, the bolt 31 is fixed to the metal fitting 1. The bolt 31 does not rotate around the axis.

初期の状態において、側板部12と側板部13との間隔は上方から下方へ行くに連れて広くなっている。側板部12,13の下端部の間隔は最大間隔Bから側板部12,13の板厚を引いた値である。また、初期の状態において、側板部12と側板部13との最も離れた部分の間隔は最大間隔Bである。また、挟持部14と挟持部15との最も狭い部分の間隔は間隔Aである。間隔Aは折板屋根60のはぜ部601の首部602の幅Wよりも大きい。金具1は折板屋根60のはぜ部601に取り付けられる。はぜ部601は設置部としで機能している。   In the initial state, the distance between the side plate portion 12 and the side plate portion 13 becomes wider from the upper side to the lower side. The interval between the lower end portions of the side plate portions 12 and 13 is a value obtained by subtracting the plate thickness of the side plate portions 12 and 13 from the maximum interval B. In the initial state, the distance between the farthest portions of the side plate portion 12 and the side plate portion 13 is the maximum interval B. Further, the interval between the narrowest portions of the clamping unit 14 and the clamping unit 15 is an interval A. The interval A is larger than the width W of the neck portion 602 of the hull portion 601 of the folded plate roof 60. The metal fitting 1 is attached to the hull portion 601 of the folded plate roof 60. The hull portion 601 functions as an installation portion.

押え具61は、押え具61の上面で太陽電池モジュール301を受ける。押え具61は、第1の押え具である。押え具3は、太陽電池モジュール301を上方から押える。押え具3は、第2の押え具である。第1のナット41はボルト31に締めつけて固定される。第1のナット41は押え具61を金具1に固定する。第2のナット42はボルト31に締めつけて固定される。第2のナット42は、押え具3を介して太陽電池モジュール301を押え具61に固定する。つまり、太陽電池モジュール301は、押え具61と押え具3とに挟まれて金具1に固定される。固定金具100は、金具1、ボルト31、ナット41、押え具61、押え具3およびナット42で構成されている。   The presser 61 receives the solar cell module 301 on the upper surface of the presser 61. The presser 61 is a first presser. The presser 3 presses the solar cell module 301 from above. The presser 3 is a second presser. The first nut 41 is fastened and fixed to the bolt 31. The first nut 41 fixes the presser 61 to the metal fitting 1. The second nut 42 is fastened and fixed to the bolt 31. The second nut 42 fixes the solar cell module 301 to the presser 61 via the presser 3. That is, the solar cell module 301 is fixed to the metal fitting 1 by being sandwiched between the presser 61 and the presser 3. The fixing bracket 100 includes the bracket 1, the bolt 31, the nut 41, the presser 61, the presser 3, and the nut 42.

次に太陽電池モジュール301の取り付け操作について説明する。図3は実施の形態1における太陽電池モジュール301を折板屋根60に固定した状態を示す構成図である。図1に示すように、作業者は、金具1の挟持部14,15ではぜ部601の首部602を挟んで固定金具100を折板屋根60に取り付ける。はぜ部601は折板屋根60の山部603の頂点に形成されている。はぜ部601の断面は、上側が円形をしている。そして、円形の下側の首部602は細い直線状である。首部602は山部603につながっている。   Next, the mounting operation of the solar cell module 301 will be described. FIG. 3 is a configuration diagram showing a state in which the solar cell module 301 in Embodiment 1 is fixed to the folded plate roof 60. As shown in FIG. 1, the operator attaches the fixing metal fitting 100 to the folded plate roof 60 with the holding portions 14 and 15 of the metal fitting 1 sandwiching the neck portion 602 of the shell portion 601. The hull portion 601 is formed at the apex of the peak portion 603 of the folded plate roof 60. The cross section of the hull portion 601 has a circular shape on the upper side. The circular lower neck 602 is a thin straight line. The neck portion 602 is connected to the mountain portion 603.

次にボルト31に第1のナット41を締めつける。押え具61は下方に下がり、押え具61が突部51,52に接する。押え具61は、例えば、金具1よりも板厚が厚く剛性が高い。ナット41の締め付けに連れて、天板部11は中央部分が引き上げられて撓む。この撓みに応じて側板部12は、突部51を支点として図中矢印Pの方向(時計回り)に回転する。また、側板部13は、突部52を支点として図中矢印Q方向(反時計回り)に回転する。   Next, the first nut 41 is fastened to the bolt 31. The presser 61 is lowered and the presser 61 comes into contact with the protrusions 51 and 52. The presser 61 is, for example, thicker and more rigid than the metal fitting 1. As the nut 41 is tightened, the center portion of the top plate portion 11 is pulled up and bent. In response to this bending, the side plate portion 12 rotates in the direction of the arrow P (clockwise) in the figure with the protrusion 51 as a fulcrum. Further, the side plate portion 13 rotates in the arrow Q direction (counterclockwise) in the figure with the protrusion 52 as a fulcrum.

ナット41の締め付けを継続すると、図3に示すように、やがて間隔Aは幅Wと等しくなる。幅Wは、折板屋根60のはぜ部61の根元の首部602の幅である。間隔Aが幅Wと等しくなった以後、ナット41の締め付けを継続すると、挟持部14,15は、はぜ部601を挟み込む。つまり、挟持部14および挟持部15は、所定の力で折板屋根60の首部602を挟持する。ここで、挟持するとは、挟んだ状態でささえ持つことを意味する。つまり、挟持部14および挟持部15は、折板屋根60の首部602を挟んだ状態でささえ持つ。   When tightening of the nut 41 is continued, the interval A eventually becomes equal to the width W as shown in FIG. The width W is the width of the neck portion 602 at the base of the hull portion 61 of the folded plate roof 60. When the tightening of the nut 41 is continued after the interval A becomes equal to the width W, the sandwiching portions 14 and 15 sandwich the hull portion 601. That is, the clamping part 14 and the clamping part 15 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force. Here, “to pinch” means to hold in a pinched state. That is, the sandwiching portion 14 and the sandwiching portion 15 are held in a state where the neck portion 602 of the folded plate roof 60 is sandwiched.

さらにナット41の締め付けを継続すると、図4の状態に至る。図4は固定金具100が板折屋根60に固定された状態を示す構成図である。図4に示すように、天板11は押え具61に引き付けられて密着する。これにより、固定金具100は折板屋根60に固定される。また、側板部12,13が内側向きに凸となってたわむことで、金具1は首部602を挟持する力を発生する。つまり、挟持部14および挟持部15は、所定の力で折板屋根60の首部602を挟持する。   When the tightening of the nut 41 is continued, the state shown in FIG. 4 is reached. FIG. 4 is a configuration diagram illustrating a state in which the fixing metal 100 is fixed to the folded plate roof 60. As shown in FIG. 4, the top plate 11 is attracted to and closely contacts the presser 61. Thereby, the fixture 100 is fixed to the folded plate roof 60. Further, the side plate portions 12 and 13 are bent inward so that the metal fitting 1 generates a force for clamping the neck portion 602. That is, the clamping part 14 and the clamping part 15 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force.

図5は、太陽電池モジュール301,311、ボルト31および押え具3の位置関係を示す斜視図である。太陽電池モジュール301,311は押え具61の上に置かれる。図3から分かるように、第1のナット41は、隣接する2つの太陽電池モジュール301,311の間に位置する。押え具3の略中央に空いた穴32にボルト31を通し、押え具3を取り付ける。穴32は第3の穴である。図5に示すように、押え具3は隣接する太陽電池モジュール301,311のボルト31側の端部を押える。第2のナット42をボルト31に締めつける。ナット42は押え具3を上方から下方に押す。押え具3は、隣接する2つの太陽電池モジュール301,311を押え具61に押し当てる。そして、押え具3は、この隣接する2つの太陽電池モジュール301,311を金具1に固定する。   FIG. 5 is a perspective view showing the positional relationship between the solar cell modules 301 and 311, the bolt 31, and the presser 3. The solar cell modules 301 and 311 are placed on the presser 61. As can be seen from FIG. 3, the first nut 41 is located between two adjacent solar cell modules 301 and 311. The bolt 31 is passed through the hole 32 vacated in the approximate center of the presser 3 and the presser 3 is attached. The hole 32 is a third hole. As shown in FIG. 5, the presser 3 presses the end of the adjacent solar cell modules 301 and 311 on the bolt 31 side. The second nut 42 is fastened to the bolt 31. The nut 42 pushes the presser 3 from above to below. The presser 3 presses two adjacent solar cell modules 301 and 311 against the presser 61. The presser 3 fixes the two adjacent solar cell modules 301 and 311 to the metal fitting 1.

図6は、太陽電池モジュール301を折板屋根60の上に並べた端の部分の固定金具100の構成を示す分解斜視図である。図6に示すように補助具33を押え具3の代わりに取り付ける。補助具33はL字状に折り曲げられた板金部品である。補助具33は、穴32が形成された面の端部で、太陽電池モジュール301を押え具61に押し当てる。   FIG. 6 is an exploded perspective view showing the configuration of the fixing bracket 100 at the end portion where the solar cell modules 301 are arranged on the folded plate roof 60. As shown in FIG. 6, the auxiliary tool 33 is attached instead of the presser 3. The auxiliary tool 33 is a sheet metal part bent in an L shape. The auxiliary tool 33 presses the solar cell module 301 against the presser 61 at the end of the surface where the hole 32 is formed.

図7は固定金具100を用いて複数の太陽電池モジュール301,302を設置した状態を示す斜視図である。図7で示す折板屋根60は地面に対して傾斜している屋根である。太陽電池ユニットは、このように複数の太陽電池モジュールが設置場所に設置されたものである。一般的に、最初に固定金具100,101が折板屋根60の山部603に固定される。その後、太陽電池モジュール301,302を固定金具100,101の上に置いて固定する。   FIG. 7 is a perspective view showing a state in which a plurality of solar cell modules 301 and 302 are installed using the fixture 100. The folded plate roof 60 shown in FIG. 7 is a roof inclined with respect to the ground. In this way, the solar cell unit is a unit in which a plurality of solar cell modules are installed at an installation location. In general, the fixing brackets 100 and 101 are first fixed to the peak portion 603 of the folded plate roof 60. Thereafter, the solar cell modules 301 and 302 are placed on the fixtures 100 and 101 and fixed.

従来の固定金具は、予め精度良く折板屋根60の上に位置決めされた後に固定されていた。従来の固定金具は、ピッチPで折板屋根60の上に並べられ、横向きのねじを締めて固定されていた。その後、太陽電池モジュールを固定金具の上方から設置して、固定用のボルトを締める。これらの作業によって太陽電池モジュールは折板屋根60に固定される。   The conventional fixing bracket is fixed after being positioned on the folded plate roof 60 with high accuracy in advance. Conventional fixing brackets are arranged on the folded plate roof 60 at a pitch P, and are fixed by tightening lateral screws. Thereafter, the solar cell module is installed from above the fixing bracket, and the fixing bolt is tightened. The solar cell module is fixed to the folded plate roof 60 by these operations.

本発明に係る固定金具100は、このような精度の良い位置決め作業を必要としない。まず、作業者は墨だし等により第一列目の基準線を折板屋根60の上に描く。墨出しとは、工事中に必要な線や位置などを床や壁などに表示する作業である。固定金具100はその基準線に沿って固定される。次に、第2列目の固定金具101は、おおよその位置に仮に固定される。第1列目の太陽電池モジュール301,302が固定金具100,101の上に置かれる。   The fixture 100 according to the present invention does not require such an accurate positioning operation. First, the operator draws the reference line of the first row on the folded roof 60 with ink brush or the like. Inking is an operation to display lines and positions necessary during construction on the floor or wall. The fixture 100 is fixed along the reference line. Next, the fixing metal fitting 101 in the second row is temporarily fixed at an approximate position. The solar cell modules 301 and 302 in the first row are placed on the fixtures 100 and 101.

この際、第2列目の固定金具101は、折板屋根60の上のおおよその位置に仮に固定されている。このため、太陽電池モジュール301,302の位置に合せて、第2列目の固定金具101の位置は微調整される。固定金具101は太陽電池モジュール301,302に沿う位置に移動して仮に固定される。   At this time, the fixing metal fitting 101 in the second row is temporarily fixed at an approximate position on the folded plate roof 60. For this reason, according to the position of the solar cell modules 301 and 302, the position of the fixing metal fitting 101 in the second row is finely adjusted. The fixture 101 is moved to a position along the solar cell modules 301 and 302 and temporarily fixed.

同様に第3列目の固定金具をおおよその位置に仮に固定する。第2列目の太陽電池モジュール311,312を第2列目の固定金具101と第3列目の固定金具の上に設置する。固定金具101のナット42を締めて太陽電池モジュール301,302を折板屋根60の上に固定する。一方、第3列目の固定金具は、太陽電池モジュール311,312の位置に合せて微調整される。   Similarly, the fixing metal fitting in the third row is temporarily fixed at an approximate position. The solar cell modules 311 and 312 in the second row are installed on the fixing bracket 101 in the second row and the fixing bracket in the third row. The solar battery modules 301 and 302 are fixed on the folded plate roof 60 by tightening the nut 42 of the fixing bracket 101. On the other hand, the fixtures in the third row are finely adjusted according to the positions of the solar cell modules 311 and 312.

上述の手順に従って、固定金具100は折板屋根60の上に固定されて、太陽電池モジュール301は設置される。なお、固定金具の符号は符号100を用いる。同一の図の中で、区別する場合に符号100以外の符号を用いる。同様に太陽電池モジュールの符号は符号301を用いる。同一の図の中で、区別する場合に符号301以外の符号を用いる。   According to the above-described procedure, the fixture 100 is fixed on the folded roof 60, and the solar cell module 301 is installed. In addition, the code | symbol 100 is used for the code | symbol of a fixing metal fitting. In the same figure, symbols other than 100 are used for distinction. Similarly, reference numeral 301 is used as the reference numeral of the solar cell module. In the same figure, when distinguishing, the code | symbol other than the code | symbol 301 is used.

このように、本実施の形態1に係る固定金具100は、ボルト31およびナット41を用いた上方からの締着作業で屋根に固定される。また、固定金具100は、ボルト31およびナット42を用いて上方からの締着作業で太陽電池モジュール301を固定金具100に固定できる。このため、固定金具100を折板屋根60の上に仮に固定した状態で、太陽電池モジュール301は、固定金具100の上に配置できる。事前に固定金具を折板屋根60の上に精度よく固定する必要が無い。また、太陽電池モジュールを取り外して、固定金具の位置を再調整する必要もなくなる。このように本実施の形態1に係る固定金具100は、太陽電池モジュールの屋根への設置作業の作業性に優れた固定金具100を提供できる。また、金具1を弾性板材の曲げ加工で一体的に形成したので、廉価な固定金具100を提供できる。   As described above, the fixture 100 according to the first embodiment is fixed to the roof by fastening work from above using the bolt 31 and the nut 41. In addition, the fixture 100 can fix the solar cell module 301 to the fixture 100 by fastening work from above using the bolt 31 and the nut 42. For this reason, the solar cell module 301 can be placed on the fixing metal 100 in a state where the fixing metal 100 is temporarily fixed on the folded plate roof 60. It is not necessary to fix the fixing bracket on the folded plate roof 60 with high accuracy in advance. Moreover, it is not necessary to remove the solar cell module and readjust the position of the fixing bracket. As described above, the fixture 100 according to the first embodiment can provide the fixture 100 having excellent workability in installing the solar cell module on the roof. Further, since the metal fitting 1 is integrally formed by bending the elastic plate material, an inexpensive fixing metal fitting 100 can be provided.

実施の形態2.
実施の形態1では、ボルト31は金具1の天板部11の下側から取り付けられている。つまり、ボルト31の頭は金具1の天板部11の下側に位置している。そして、太陽電池モジュール301を設置した後に、ナット42を締めて太陽電池モジュール301を固定金具100に固定している。本実施の形態2では、金具1の穴18に雌ねじの加工が施されている。太陽電池モジュール301を金具2の上に設置した後、上方よりボルト402で押え具3を介して太陽電池モジュール301を金具1に固定する。図8は、この発明の実施の形態2における太陽電池モジュール301の固定金具110の構成を示す分解構成図である。実施の形態1で説明した固定金具100の構成要素と同様の構成要素には、同一符号を付し、その説明を省略する。
Embodiment 2. FIG.
In the first embodiment, the bolt 31 is attached from the lower side of the top plate portion 11 of the metal fitting 1. That is, the head of the bolt 31 is located below the top plate portion 11 of the metal fitting 1. Then, after the solar cell module 301 is installed, the nut 42 is tightened to fix the solar cell module 301 to the fixture 100. In the second embodiment, the hole 18 of the metal fitting 1 is processed with a female screw. After the solar cell module 301 is installed on the metal fitting 2, the solar cell module 301 is fixed to the metal fitting 1 through the presser 3 with the bolt 402 from above. FIG. 8 is an exploded configuration diagram showing the configuration of the fixture 110 of the solar cell module 301 according to Embodiment 2 of the present invention. Constituent elements similar to those of the fixture 100 described in the first embodiment are given the same reference numerals, and descriptions thereof are omitted.

金具1の天板部11の略中央には雌ねじ401が形成されている。図8で示す金具1の雌ねじ401は、天板部11の略中央に下方に凸となるバーリング加工した後にタップ加工をして形成されている。この構成に限られず、天板11の略中央に穴18を設けて天板11の下側にナット等の雌ねじを溶接してもよい。また、天板11の下側に雌ねじを接着固定してもよい。固定金具110は、金具1、ボルト402、押え具61および押え具3で構成されている。   A female screw 401 is formed in the approximate center of the top plate portion 11 of the metal fitting 1. The female screw 401 of the metal fitting 1 shown in FIG. 8 is formed by tapping after burring processing that protrudes downward in the approximate center of the top plate portion 11. Without being limited to this configuration, a hole 18 may be provided in the approximate center of the top plate 11 and a female screw such as a nut may be welded to the lower side of the top plate 11. A female screw may be bonded and fixed to the lower side of the top plate 11. The fixing bracket 110 includes the bracket 1, the bolt 402, the presser 61 and the presser 3.

次に太陽電池モジュール301を取り付け操作について説明する。図9は実施の形態2における太陽電池モジュール301を折板屋根60に固定した状態を示す構成図である。図9に示すように、作業者は金具1の挟持部14,15ではぜ部601の首部602を挟んで固定金具110を折板屋根60に取り付ける。   Next, an operation for attaching the solar cell module 301 will be described. FIG. 9 is a configuration diagram showing a state in which the solar cell module 301 in Embodiment 2 is fixed to the folded plate roof 60. As shown in FIG. 9, the operator attaches the fixing bracket 110 to the folded plate roof 60 with the sandwiching portions 14 and 15 of the bracket 1 sandwiching the neck portion 602 of the shell portion 601.

はぜ部601は折板屋根60の山部603の頂点に形成されている。はぜ部601の断面は、上側が円形をしている。そして、円形の下側の首部602は細い直線状である。首部602は山部603につながっている。金具1の上側に押え具61を置く。太陽電池モジュール301,311は、押え具61の上側で、ボルト402が通る雌ねじ401を塞がないように設置される。さらに、押え具3を太陽電池モジュール301の上側に載せる。その後、押え具3の穴32にボルト402を上側から通す。ボルト402のねじ部は、太陽電池モジュール301,302の側面の近くを通り、押え具61の穴61を通る。ボルト402を雌ねじ401に通して締めつける。   The hull portion 601 is formed at the apex of the peak portion 603 of the folded plate roof 60. The cross section of the hull portion 601 has a circular shape on the upper side. The circular lower neck 602 is a thin straight line. The neck portion 602 is connected to the mountain portion 603. The presser 61 is placed on the upper side of the metal fitting 1. The solar cell modules 301 and 311 are installed above the presser 61 so as not to block the female screw 401 through which the bolt 402 passes. Further, the presser 3 is placed on the upper side of the solar cell module 301. Thereafter, the bolt 402 is passed through the hole 32 of the presser 3 from above. The threaded portion of the bolt 402 passes near the side surfaces of the solar cell modules 301 and 302 and passes through the hole 61 of the presser 61. The bolt 402 is passed through the female screw 401 and tightened.

押え具61は、例えば、金具1よりも板厚が厚く剛性が高い。ボルト402を締め付けると、両端部の突部51,52が押え具61に接しているために、天板部11は中央部が引き上げられて撓む。この撓みに応じて側板部12は、突部51を支点として図中矢印Pの方向(時計回り)に回転する。また、側板部13は、突部52を支点として図中矢印Q方向(反時計回り)に回転する。   The presser 61 is, for example, thicker and more rigid than the metal fitting 1. When the bolt 402 is tightened, since the protrusions 51 and 52 at both ends are in contact with the presser 61, the top portion 11 is bent at the center. In response to this bending, the side plate portion 12 rotates in the direction of the arrow P (clockwise) in the figure with the protrusion 51 as a fulcrum. Further, the side plate portion 13 rotates in the direction of arrow Q (counterclockwise) in the figure with the protrusion 52 as a fulcrum.

ボルト402の締め付けを継続すると、やがて間隔Aは幅Wと等しくなる。幅Wは、折板屋根60のはぜ部61の根元の首部602の幅である。間隔Aが幅Wと等しくなった以後、挟持部14,15は、はぜ部601を挟み込む。つまり、挟持部14および挟持部15は、所定の力で折板屋根60の首部602を挟持する。ここで、挟持するとは、挟んだ状態でささえ持つことを意味する。つまり、挟持部14および挟持部15は、折板屋根60の首部602を挟んだ状態でささえ持つ。   If the tightening of the bolt 402 is continued, the interval A eventually becomes equal to the width W. The width W is the width of the neck portion 602 at the base of the hull portion 61 of the folded plate roof 60. After the interval A becomes equal to the width W, the sandwiching portions 14 and 15 sandwich the hull portion 601. That is, the clamping part 14 and the clamping part 15 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force. Here, “to pinch” means to hold in a pinched state. That is, the sandwiching portion 14 and the sandwiching portion 15 are held in a state where the neck portion 602 of the folded plate roof 60 is sandwiched.

さらにボルト402の締め付けを継続すると、図9の状態に至る。図9は固定金具110が板折屋根60に固定された状態を示す構成図である。図9に示すように、天板11は押え具61に引き付けられて密着する。これにより、固定金具110は折板屋根60に固定される。また、ほぼ同じタイミングで、太陽電池モジュール301,311は、固定金具110に固定される。   When the bolt 402 is further tightened, the state shown in FIG. 9 is reached. FIG. 9 is a configuration diagram showing a state in which the fixture 110 is fixed to the folded roof 60. As shown in FIG. 9, the top plate 11 is attracted to and closely contacts the presser 61. Thereby, the fixing bracket 110 is fixed to the folded plate roof 60. Moreover, the solar cell modules 301 and 311 are fixed to the fixture 110 at substantially the same timing.

実施の形態1に示す固定金具100では、太陽電池モジュール301を折板屋根60に固定する際、2個のナット41,42を締める必要があった。実施の形態2に示す固定金具110では、1本のボルト402を締めるだけで太陽電池モジュール301を折板屋根60に固定することができる。これにより、太陽電池モジュール301の折板屋根60への取り付けが容易となる。   In the fixing metal fitting 100 shown in Embodiment 1, when fixing the solar cell module 301 to the folded plate roof 60, it was necessary to tighten the two nuts 41 and. In the fixture 110 shown in the second embodiment, the solar cell module 301 can be fixed to the folded plate roof 60 only by tightening one bolt 402. Thereby, attachment to the folded-plate roof 60 of the solar cell module 301 becomes easy.

実施の形態3.
実施の形態1および実施の形態2では、金具1は板材を曲げることで形成されていた。本実施の形態3では、金具1は例えばアルミニウムなどを押し出し加工することで作製される。図10は、この発明の実施の形態3における太陽電池モジュール301の固定金具120の構成を示す構成図である。図11は実施の形態3における太陽電池モジュール301を折板屋根60に固定した状態を示す構成図である。実施の形態2で説明した固定金具110の構成要素と同様の構成要素には、同一符号を付し、その説明を省略する。
Embodiment 3 FIG.
In the first embodiment and the second embodiment, the metal fitting 1 is formed by bending a plate material. In this Embodiment 3, the metal fitting 1 is produced by extruding aluminum etc., for example. FIG. 10 is a configuration diagram showing the configuration of the fixture 120 of the solar cell module 301 according to Embodiment 3 of the present invention. FIG. 11 is a configuration diagram showing a state in which the solar cell module 301 in the third embodiment is fixed to the folded roof 60. Constituent elements similar to those of the fixture 110 described in the second embodiment are given the same reference numerals, and the description thereof is omitted.

図10に示すように、固定金具120は、金具1、ボルト402、押え具61および押え具3で構成されている。金具1の天板部121の略中央には雌ねじ401が形成されている。突部132は、天板部121の右端部501から上方に延びている部分である。突部133は、天板部121の左端部502から上方に延びている部分である。側板部111は、端部501から下方に延びている部分である。側板部112は、端部502から下方に延びている部分である。挟持部114は、側板部111の下端から内側に屈曲した後に下方に延びている。挟持部115は、側板部112の下端から内側に屈曲した後に下方に延びている。   As shown in FIG. 10, the fixing bracket 120 includes the bracket 1, the bolt 402, the presser 61 and the presser 3. A female screw 401 is formed at the approximate center of the top plate 121 of the metal fitting 1. The protruding portion 132 is a portion extending upward from the right end portion 501 of the top plate portion 121. The protrusion 133 is a portion extending upward from the left end portion 502 of the top plate portion 121. The side plate portion 111 is a portion that extends downward from the end portion 501. The side plate portion 112 is a portion that extends downward from the end portion 502. The sandwiching portion 114 extends downward after being bent inward from the lower end of the side plate portion 111. The sandwiching portion 115 extends downward after being bent inward from the lower end of the side plate portion 112.

次に太陽電池モジュール301を取り付け操作について説明する。作業者は金具1の挟持部114,115ではぜ部601の首部602を挟んで固定金具120を折板屋根60に取り付ける。はぜ部601は折板屋根60の山部603の頂点に形成されている。金具1の突部132,133の上側に押え具61を乗せる。さらに、押え具61の上に太陽電池モジュール301,311を設置する。太陽電池モジュール301および太陽電池モジュール311は、雌ネジ401を挟むように、雌ネジ401の両脇に設置される。さらに、押え具3を太陽電池モジュール301,311の上側に載せる。押え具3の穴32にボルト402を通す。ボルト402を雌ねじ401に通して締めつける。   Next, an operation for attaching the solar cell module 301 will be described. An operator attaches the fixing bracket 120 to the folded plate roof 60 with the sandwiching portions 114 and 115 of the bracket 1 sandwiching the neck portion 602 of the flange portion 601. The hull portion 601 is formed at the apex of the peak portion 603 of the folded plate roof 60. The presser 61 is placed on the upper side of the protrusions 132 and 133 of the metal fitting 1. Further, the solar cell modules 301 and 311 are installed on the presser 61. The solar cell module 301 and the solar cell module 311 are installed on both sides of the female screw 401 so as to sandwich the female screw 401. Further, the presser 3 is placed on the upper side of the solar cell modules 301 and 311. The bolt 402 is passed through the hole 32 of the presser 3. The bolt 402 is passed through the female screw 401 and tightened.

押え具61は、例えば、金具1よりも板厚が厚く剛性が高い。ボルト402の締め付けに連れて、天板部121は中央部が引き上げられて撓む。この撓みに応じて側板部111は、右端部501を中心として図中矢印Pの方向(時計回り)に回転する。また、側板部112は、左端部502を中心として図中矢印Q方向(反時計回り)に回転する。   The presser 61 is, for example, thicker and more rigid than the metal fitting 1. As the bolt 402 is tightened, the center portion of the top plate 121 is pulled up and bent. In response to this bending, the side plate portion 111 rotates around the right end portion 501 in the direction of the arrow P (clockwise) in the figure. Further, the side plate portion 112 rotates around the left end portion 502 in the arrow Q direction (counterclockwise) in the figure.

ボルト402の締め付けを継続すると、図11に示すように、やがて間隔Aは幅Wと等しくなる。幅Wは、折板屋根60のはぜ部61の根元の首部602の幅である。間隔Aが幅Wと等しくなった以後、挟持部114,115は、はぜ部601を挟み込む。つまり、挟持部114および挟持部115は、所定の力で折板屋根60の首部602を挟持する。ここで、挟持するとは、挟んだ状態でささえ持つことを意味する。つまり、挟持部114および挟持部115は、折板屋根60の首部602を挟んだ状態でささえ持つ。これにより、固定金具120は折板屋根60に固定される。また、ほぼ同じタイミングで、太陽電池モジュール301,311は、固定金具120に固定される。挟持部114,115の挟持する力は、側板部111,112が内側に凸の形状でたわむことで発生する。   If the tightening of the bolt 402 is continued, the interval A eventually becomes equal to the width W as shown in FIG. The width W is the width of the neck portion 602 at the base of the hull portion 61 of the folded plate roof 60. After the interval A becomes equal to the width W, the sandwiching portions 114 and 115 sandwich the hull portion 601. That is, the clamping part 114 and the clamping part 115 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force. Here, “to pinch” means to hold in a pinched state. That is, the sandwiching portion 114 and the sandwiching portion 115 are held in a state where the neck portion 602 of the folded plate roof 60 is sandwiched. As a result, the fixing bracket 120 is fixed to the folded plate roof 60. Further, the solar cell modules 301 and 311 are fixed to the fixing bracket 120 at substantially the same timing. The clamping force of the clamping portions 114 and 115 is generated when the side plate portions 111 and 112 are bent inwardly in a convex shape.

実施の形態2に示す金具1では、天板部11の略中央に下方に凸となるバーリング加工した後にタップ加工をして雌ねじ401を形成されている。しかし、金具1の板厚が薄い場合には、タップ加工することができない。また、天板11の略中央に穴18を設けて天板11の下側にナット等の雌ねじを溶接或いは接着固定する場合もあり得る。しかし、この場合は、加工が複雑となるという欠点があり、また、接合箇所の剥離などの信頼性の問題もある。   In the metal fitting 1 shown in the second embodiment, the female screw 401 is formed by performing tapping after performing burring processing that protrudes downward in the approximate center of the top plate portion 11. However, when the metal plate 1 is thin, tapping cannot be performed. In addition, a hole 18 may be provided in the approximate center of the top plate 11 and a female screw such as a nut may be welded or bonded and fixed to the lower side of the top plate 11. However, in this case, there is a drawback that the processing becomes complicated, and there is also a problem of reliability such as peeling of the joint portion.

実施の形態3に示す金具1は、例えばアルミニウムなどを押し出し加工することで作製される。このため、天板部11の肉厚を自在に設計できるいので、雌ねじ401の設計が容易となる。ナットを溶接或いは接着固定する必要がないため、信頼性の問題のない固定金具130を提供することができる。   The metal fitting 1 shown in Embodiment 3 is manufactured by extruding aluminum or the like, for example. For this reason, since the thickness of the top plate part 11 can be designed freely, the design of the female screw 401 becomes easy. Since there is no need to weld or adhesively fix the nut, it is possible to provide the fixing bracket 130 that does not have a reliability problem.

実施の形態4.
実施の形態3では、天板部121の両端部501,502に上側に延びる突部132,133を設け、その上に押え具61を乗せる構成としていた。しかし、本実施の形態4では、突部132,133の先端部を連結した天板部160をさらに有する。天板部160は第2の天板部である。図12は、この発明の実施の形態4における太陽電池モジュール301の固定金具130の構成を示す構成図である。図13は実施の形態4における太陽電池モジュール301を折板屋根60に固定した状態を示す構成図である。実施の形態3で説明した固定金具120の構成要素と同様の構成要素には、同一符号を付し、その説明を省略する。
Embodiment 4 FIG.
In the third embodiment, the projecting portions 132 and 133 extending upward are provided on both end portions 501 and 502 of the top plate portion 121, and the presser 61 is placed thereon. However, the fourth embodiment further includes a top plate 160 that connects the tips of the protrusions 132 and 133. The top plate 160 is a second top plate. FIG. 12 is a configuration diagram showing the configuration of the fixture 130 of the solar cell module 301 according to Embodiment 4 of the present invention. FIG. 13 is a configuration diagram showing a state in which the solar cell module 301 in Embodiment 4 is fixed to the folded plate roof 60. Constituent elements similar to those of the fixing bracket 120 described in the third embodiment are denoted by the same reference numerals, and description thereof is omitted.

図12に示すように、固定金具130は、金具1、ボルト402および押え具3で構成されている。固定金具130は、押え具61を有さない。押え具61は、例えば図1で説明すると、太陽電池モジュール301を、突部51,52の全領域で均等に受けるという機能を有する。また、ナット41を締めた場合、金具1は変形して、突部51の頂点は図1中右方向に移動する。一方、突部52の頂点は図1中左方向に移動する。太陽電池モジュール301を直接突部51,52の上に置くと、金具1は変形して、突部51,52が図1中左右方向に移動する際に、太陽電池モジュール301の裏面を傷つける可能性がある。押え具61は、金具1によって太陽電池モジュール301の裏面を傷つけることを避けることができる。また、太陽電池モジュール301を直接突部51,52の上に置くと、金具1は変形して、突部51,52が図1中左右方向に移動する際に、太陽電池モジュール301が図1中右方向または左方向に移動する可能性がある。押え具61は、金具1によって太陽電池モジュール301が図1中右方向または左方向に移動することを避けることができる。固定金具130では、金具1の天板部160がその機能を有する。   As shown in FIG. 12, the fixing bracket 130 includes the bracket 1, the bolt 402, and the presser 3. The fixture 130 does not have the presser 61. For example, as shown in FIG. 1, the presser 61 has a function of receiving the solar cell module 301 evenly in the entire area of the protrusions 51 and 52. Further, when the nut 41 is tightened, the metal fitting 1 is deformed and the apex of the protrusion 51 moves to the right in FIG. On the other hand, the vertex of the protrusion 52 moves to the left in FIG. When the solar cell module 301 is placed directly on the protrusions 51 and 52, the metal fitting 1 is deformed, and the back surface of the solar cell module 301 can be damaged when the protrusions 51 and 52 move in the left-right direction in FIG. There is sex. The presser 61 can avoid damaging the back surface of the solar cell module 301 with the metal fitting 1. Further, when the solar cell module 301 is directly placed on the protrusions 51 and 52, the metal fitting 1 is deformed, and when the protrusions 51 and 52 move in the left-right direction in FIG. There is a possibility of moving in the middle right or left direction. The presser 61 can avoid the solar cell module 301 from moving in the right direction or the left direction in FIG. In the fixing bracket 130, the top plate portion 160 of the bracket 1 has the function.

金具1の最上面となる天板部160は、略中央に穴180を有する。側板部116は、天板部161の右側の端部から下方に延びている部分である。側板部117は、天板部161の左側の端部から下方に延びている部分である。挟持部114は、側板部116の下端から内側に屈曲した後に下方に延びている。挟持部115は、側板部117の下端から内側に屈曲した後に下方に延びている。天板部161の略中央には雌ねじ401が形成されている。天板部161の左右方向の長さはMである。天板部161の左右方向の長さは、側板部116の内側の面と側板部117の内側の面との最も短い距離と同一である。   The top plate 160 serving as the uppermost surface of the metal fitting 1 has a hole 180 in the approximate center. The side plate portion 116 is a portion extending downward from the right end portion of the top plate portion 161. The side plate portion 117 is a portion extending downward from the left end portion of the top plate portion 161. The sandwiching portion 114 extends downward after being bent inward from the lower end of the side plate portion 116. The sandwiching portion 115 extends downward after being bent inward from the lower end of the side plate portion 117. A female screw 401 is formed at substantially the center of the top plate portion 161. The length of the top plate portion 161 in the left-right direction is M. The length in the left-right direction of the top plate portion 161 is the same as the shortest distance between the inner surface of the side plate portion 116 and the inner surface of the side plate portion 117.

次に太陽電池モジュール301を取り付け操作について説明する。作業者は金具1の挟持部114,115で、はぜ部601の首部602を挟んで固定金具130を折板屋根60に取り付ける。はぜ部601は折板屋根60の山部603の頂点に形成されている。金具1の天板部160が平面を形成しているので、固定金具130は、押え具61を必要としない。太陽電池モジュール301,311は、天板部160の上側に直接設置される。太陽電池モジュール301および太陽電池モジュール311は、穴180を挟むように、穴180の両脇に設置される。さらに、押え具3を太陽電池モジュール301,311の上側に載せる。押え具3の穴32および天板部160に形成された穴180にボルト402を通す。ボルト402を雌ねじ401に通して締めつける。   Next, an operation for attaching the solar cell module 301 will be described. The operator attaches the fixing metal fitting 130 to the folded plate roof 60 with the sandwiching portions 114 and 115 of the metal fitting 1 sandwiching the neck portion 602 of the hull portion 601. The hull portion 601 is formed at the apex of the peak portion 603 of the folded plate roof 60. Since the top plate portion 160 of the metal fitting 1 forms a flat surface, the fixing metal fitting 130 does not require the presser 61. The solar cell modules 301 and 311 are directly installed on the upper side of the top plate portion 160. The solar cell module 301 and the solar cell module 311 are installed on both sides of the hole 180 so as to sandwich the hole 180. Further, the presser 3 is placed on the upper side of the solar cell modules 301 and 311. The bolt 402 is passed through the hole 32 of the presser 3 and the hole 180 formed in the top plate 160. The bolt 402 is passed through the female screw 401 and tightened.

ボルト402の締め付けに連れて、天板部161は中央部が引き上げられて撓む。この変形によって天板部161の両端部の距離はNとなる。天板部161の両端部とは、側板部116の内側の面と側板部117の内側の面との最も短い距離と同一である。距離Nは、寸法Mより小さい。これにより、この撓みに応じて側板部116は、右端部501を中心として図中矢印Pの方向(時計回り)に回転する。また、側板部117は、左端部502を中心として図中矢印Q方向(反時計回り)に回転する。   As the bolt 402 is tightened, the top portion 161 is bent at the center. Due to this deformation, the distance between both ends of the top plate 161 becomes N. Both end portions of the top plate portion 161 are the same as the shortest distance between the inner surface of the side plate portion 116 and the inner surface of the side plate portion 117. The distance N is smaller than the dimension M. As a result, the side plate portion 116 rotates in the direction of the arrow P (clockwise) in the drawing around the right end portion 501 in accordance with this bending. Further, the side plate portion 117 rotates around the left end portion 502 in the arrow Q direction (counterclockwise) in the figure.

ボルト402の締め付けを継続すると、図13に示すように、やがて間隔Aは幅Wと等しくなる。幅Wは、折板屋根60のはぜ部61の根元の首部602の幅である。間隔Aが幅Wと等しくなった以後、挟持部113,114は、はぜ部601を挟み込む。つまり、挟持部114および挟持部115は、所定の力で折板屋根60の首部602を挟持する。ここで、挟持するとは、挟んだ状態でささえ持つことを意味する。つまり、挟持部114および挟持部115は、折板屋根60の首部602を挟んだ状態でささえ持つ。これにより、固定金具130は折板屋根60に固定される。また、ほぼ同じタイミングで、太陽電池モジュール301,311は、固定金具130に固定される。   If the tightening of the bolt 402 is continued, the interval A eventually becomes equal to the width W as shown in FIG. The width W is the width of the neck portion 602 at the base of the hull portion 61 of the folded plate roof 60. After the interval A becomes equal to the width W, the sandwiching portions 113 and 114 sandwich the hull portion 601. That is, the clamping part 114 and the clamping part 115 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force. Here, “to pinch” means to hold in a pinched state. That is, the sandwiching portion 114 and the sandwiching portion 115 are held in a state where the neck portion 602 of the folded plate roof 60 is sandwiched. Thereby, the fixture 130 is fixed to the folded plate roof 60. Further, the solar cell modules 301 and 311 are fixed to the fixing metal 130 at substantially the same timing.

本実施の形態では、金具1が天板部160を有している。天板部160は金具1の最上側に位置している。そして、天板部160は太陽電池モジュール301の受け部としての機能を有する。このため、実施の形態1から実施の形態3のように押え具61を用いることなく、安定して太陽電池モジュール301を支持することができる。   In the present embodiment, the metal fitting 1 has a top plate portion 160. The top plate 160 is located on the uppermost side of the metal fitting 1. And the top plate part 160 has a function as a receiving part of the solar cell module 301. For this reason, the solar cell module 301 can be stably supported without using the presser 61 as in the first to third embodiments.

実施の形態5.
実施の形態4では、金具1の天板部161の略中央に雌ねじ401を形成した。しかし、本実施の形態5では、天板部160の略中央に雌ねじ401が形成されている。図14は、この発明の実施の形態5における太陽電池モジュール301の固定金具140の構成を示す構成図である。図15は実施の形態5における太陽電池モジュール301を折板屋根60に固定した状態を示す構成図である。実施の形態4で説明した固定金具130の構成要素と同様の構成要素には、同一符号を付し、その説明を省略する。
Embodiment 5 FIG.
In the fourth embodiment, the female screw 401 is formed in the approximate center of the top plate portion 161 of the metal fitting 1. However, in the fifth embodiment, a female screw 401 is formed at the approximate center of the top plate portion 160. FIG. 14 is a configuration diagram showing the configuration of the fixture 140 of the solar cell module 301 according to Embodiment 5 of the present invention. FIG. 15 is a configuration diagram showing a state in which the solar cell module 301 in the fifth embodiment is fixed to the folded plate roof 60. Constituent elements similar to those of the fixing metal fitting 130 described in the fourth embodiment are denoted by the same reference numerals, and the description thereof is omitted.

図14に示すように、固定金具140は、金具1、ボルト402および押え具3で構成されている。金具1の天板部160の略中央には雌ねじ401が形成されている。天板部161の板厚は、天板部160の板厚よりも薄く構成されている。このため、天板部161は、天板部160よりも撓みやすい。つまり、天板部160は、天板部161よりも剛性が高い。天板部161の左右方向の長さはMである。天板部161の左右方向の長さは、側板部116の内側の面と側板部117の内側の面との最も短い距離と同一である。   As shown in FIG. 14, the fixing bracket 140 includes the bracket 1, the bolt 402, and the presser 3. A female screw 401 is formed in the approximate center of the top plate portion 160 of the metal fitting 1. The plate thickness of the top plate portion 161 is configured to be thinner than the plate thickness of the top plate portion 160. For this reason, the top plate portion 161 is more easily bent than the top plate portion 160. That is, the top plate portion 160 has higher rigidity than the top plate portion 161. The length of the top plate portion 161 in the left-right direction is M. The length in the left-right direction of the top plate portion 161 is the same as the shortest distance between the inner surface of the side plate portion 116 and the inner surface of the side plate portion 117.

次に太陽電池モジュール301を取り付け操作について説明する。作業者は金具1の挟持部114,115で、はぜ部601の首部602を挟んで固定金具140を折板屋根60に取り付ける。はぜ部601は折板屋根60の山部603の頂点に形成されている。金具1の天板部160が平面を形成しているので、押え具61を必要としない。太陽電池モジュール301,311は、天板部160の上側に直接設置される。太陽電池モジュール301および太陽電池モジュール311は、穴180を挟むように、穴180の両脇に設置される。さらに、押え具3を太陽電池モジュール301,311の上側に載せる。押え具3の穴32および天板部160に形成された穴180にボルト402を通す。ボルト402を雌ねじ401に通して締めつける。   Next, an operation for attaching the solar cell module 301 will be described. The operator attaches the fixing bracket 140 to the folded plate roof 60 with the sandwiching portions 114 and 115 of the bracket 1 sandwiching the neck portion 602 of the hull portion 601. The hull portion 601 is formed at the apex of the peak portion 603 of the folded plate roof 60. Since the top plate portion 160 of the metal fitting 1 forms a flat surface, the presser 61 is not required. The solar cell modules 301 and 311 are directly installed on the upper side of the top plate portion 160. The solar cell module 301 and the solar cell module 311 are installed on both sides of the hole 180 so as to sandwich the hole 180. Further, the presser 3 is placed on the upper side of the solar cell modules 301 and 311. The bolt 402 is passed through the hole 32 of the presser 3 and the hole 180 formed in the top plate 160. The bolt 402 is passed through the female screw 401 and tightened.

ボルト402の締め付けに連れて、天板部161の中央部はボルト402によって下側に押される。このため、天板部161は下側が凸となる形状で撓む。この変形によって天板部161の両端部の距離はNとなる。天板部161の両端部とは、側板部116の内側の面と側板部117の内側の面との最も短い距離と同一である。距離Nは、寸法Mより小さい。これにより、この撓みに応じて側板部116は、図中矢印Pの方向に移動する。また、側板部117は、図中矢印Q方向に移動する。   As the bolt 402 is tightened, the central portion of the top plate 161 is pushed downward by the bolt 402. For this reason, the top plate part 161 bends in a shape in which the lower side is convex. Due to this deformation, the distance between both ends of the top plate 161 becomes N. Both end portions of the top plate portion 161 are the same as the shortest distance between the inner surface of the side plate portion 116 and the inner surface of the side plate portion 117. The distance N is smaller than the dimension M. As a result, the side plate portion 116 moves in the direction of the arrow P in the drawing according to this bending. Further, the side plate portion 117 moves in the arrow Q direction in the figure.

ボルト402の締め付けを継続すると、図15に示すように、やがて間隔Aは幅Wと等しくなる。幅Wは、折板屋根60のはぜ部61の根元の首部602の幅である。間隔Aが幅Wと等しくなった以後、挟持部114,115は、はぜ部601を挟み込む。つまり、挟持部114および挟持部115は、所定の力で折板屋根60の首部602を挟持する。ここで、挟持するとは、挟んだ状態でささえ持つことを意味する。つまり、挟持部114および挟持部115は、折板屋根60の首部602を挟んだ状態でささえ持つ。これにより、固定金具140は折板屋根60に固定される。また、ほぼ同じタイミングで、太陽電池モジュール301,311は、固定金具140に固定される。   When the tightening of the bolt 402 is continued, the interval A eventually becomes equal to the width W as shown in FIG. The width W is the width of the neck portion 602 at the base of the hull portion 61 of the folded plate roof 60. After the interval A becomes equal to the width W, the sandwiching portions 114 and 115 sandwich the hull portion 601. That is, the clamping part 114 and the clamping part 115 clamp the neck part 602 of the folded-plate roof 60 with a predetermined force. Here, “to pinch” means to hold in a pinched state. That is, the sandwiching portion 114 and the sandwiching portion 115 are held in a state where the neck portion 602 of the folded plate roof 60 is sandwiched. Thereby, the fixing bracket 140 is fixed to the folded plate roof 60. Further, the solar cell modules 301 and 311 are fixed to the fixing bracket 140 at substantially the same timing.

実施の形態6.
実施の形態1では、ボルト31は、金具1の穴18を貫通した後、接着剤や溶接などで天板部11に固定される。これにより、ボルト31は金具1に固定される。そしてボルト31は軸まわりに回転しない。同様の効果は、図16に示すように、ボルト31の頭を天板部11の上側の面に接着剤や溶接で固定することでも得られる。その際、天板11の左右端の突部51,52の高さXは、ボルト31の頭31aの高さYよりも高く設定される。
Embodiment 6 FIG.
In the first embodiment, the bolt 31 passes through the hole 18 of the metal fitting 1 and is then fixed to the top plate 11 by an adhesive or welding. Thereby, the bolt 31 is fixed to the metal fitting 1. The bolt 31 does not rotate around the axis. As shown in FIG. 16, the same effect can be obtained by fixing the head of the bolt 31 to the upper surface of the top plate portion 11 by an adhesive or welding. At this time, the height X of the left and right projections 51 and 52 of the top plate 11 is set to be higher than the height Y of the head 31 a of the bolt 31.

図17は、固定金具100と太陽電池モジュール301が、板折屋根60に固定された状態を示す構成図である。ナット41をボルト31に締め付けたとき、ボルト31の頭の根元側の面が押え具61の下側の面に接している。この状態では、挟持部14,15がはぜ部601の首部602を挟持している。   FIG. 17 is a configuration diagram illustrating a state in which the fixture 100 and the solar cell module 301 are fixed to the folded roof 60. When the nut 41 is fastened to the bolt 31, the base side surface of the bolt 31 is in contact with the lower surface of the presser 61. In this state, the sandwiching portions 14 and 15 sandwich the neck portion 602 of the hull portion 601.

太陽電池モジュール301の取り付け操作については、実施の形態1と同様であるので詳細な説明を省略する。太陽電池モジュール301の取り付け操作の説明とは、作業者が、金具1の挟持部14,15ではぜ部601の首部602を挟んで固定金具100を折板屋根60に取り付ける操作の説明である。また、それに伴う固定金具100の動作である。固定金具100の動作とは、ボルト31に第1のナット41を締めつけ、天板部11は中央部が引き上げられて撓み、側板部12,13が突部51,52を支点として回転する動作である。また、その結果、挟持部14,15が、はぜ部601を挟み込む動作である。   Since the mounting operation of the solar cell module 301 is the same as that of Embodiment 1, detailed description thereof is omitted. The description of the operation of attaching the solar cell module 301 is an operation of the operator attaching the fixing metal fitting 100 to the folded plate roof 60 with the sandwiching portions 14 and 15 of the metal fitting 1 sandwiching the neck portion 602 of the shell portion 601. Moreover, it is the operation | movement of the fixing metal fitting 100 accompanying it. The operation of the fixing bracket 100 is an operation in which the first nut 41 is fastened to the bolt 31, the top plate portion 11 is bent at the center, and the side plate portions 12 and 13 rotate with the projections 51 and 52 as fulcrums. is there. As a result, the sandwiching portions 14 and 15 are operations to sandwich the hull portion 601.

このように、本実施の形態1に係る固定金具100は、実施の形態1と同様に、ボルト31およびナット41を用いて上方からの締着作業で屋根に固定できる。また、固定金具100は、ボルト31およびナット42を用いて上方からの締着作業で太陽電池モジュール301を固定金具100に固定できる。このため、固定金具100を折板屋根60の上に仮に固定した状態で、太陽電池モジュール301は、固定金具100の上に配置できる。事前に固定金具を折板屋根60の上に精度よく固定する必要が無い。また、太陽電池モジュールを取り外して、固定金具の位置を再調整する必要もなくなる。このように本実施の形態1に係る固定金具100は、作業性に優れた固定金具100を提供できる。また、金具1を弾性板材の曲げ加工で一体的に形成したので、廉価な固定金具100を提供できる。また、実施の形態1に比べて、金具1に穴18を開ける必要が無いため、より強い挟持力を得やすい。ここで挟持力とは、挟持する力を意味する。   As described above, the fixture 100 according to the first embodiment can be fixed to the roof by fastening work from above using the bolts 31 and the nuts 41 as in the first embodiment. In addition, the fixture 100 can fix the solar cell module 301 to the fixture 100 by fastening work from above using the bolt 31 and the nut 42. For this reason, the solar cell module 301 can be placed on the fixing metal 100 in a state where the fixing metal 100 is temporarily fixed on the folded plate roof 60. It is not necessary to fix the fixing bracket on the folded plate roof 60 with high accuracy in advance. Moreover, it is not necessary to remove the solar cell module and readjust the position of the fixing bracket. Thus, the fixture 100 according to the first embodiment can provide the fixture 100 with excellent workability. Further, since the metal fitting 1 is integrally formed by bending the elastic plate material, an inexpensive fixing metal fitting 100 can be provided. Further, compared to the first embodiment, since it is not necessary to make the hole 18 in the metal fitting 1, it is easy to obtain a stronger clamping force. Here, the clamping force means a clamping force.

なお、上述の各実施の形態においては、「平行」や「垂直」などの部品間の位置関係もしくは部品の形状を示す用語を用いている場合がある。また、略正方形、略90度および略平行など「略」または「ほぼ」などの用語をつけた表現を用いている場合がある。これらは、製造上の公差や組立て上のばらつきなどを考慮した範囲を含むことを表している。このため、請求の範囲に例え「略」を記載しない場合であっても製造上の公差や組立て上のばらつきなどを考慮した範囲を含むものである。また、請求の範囲に「略」を記載した場合は製造上の公差や組立て上のばらつきなどを考慮した範囲を含むことを示している。   In each of the above-described embodiments, there are cases where terms such as “parallel” or “vertical” are used to indicate the positional relationship between components or the shape of the components. Further, there are cases where expressions with terms such as “substantially” or “substantially” such as substantially square, approximately 90 degrees, and approximately parallel are used. These represent that a range that takes into account manufacturing tolerances and assembly variations is included. For this reason, even if “abbreviation” is not described in the claims, it includes a range that takes into account manufacturing tolerances and assembly variations. In addition, when “substantially” is described in the claims, it indicates that a range in consideration of manufacturing tolerances, assembly variations, and the like is included.

1 金具、 11,160 天板部、 12,13,111,112,116,117 側板部、 14,15,114,115 挟持部、 18,32,62,180 穴、 3,61 押え具、 31,402 ボルト、 31a ボルトの頭、 33 補助具、 41,42 ナット、 401 雌ねじ、 51,52 突部、 501 右端部、 502 左端部、 60 折板屋根、 601 はぜ部、 602 首部、 603 山部、 100,101,110,120,130,140 固定金具、 132,133 突部、 301,311,312,302 太陽電池モジュール、 W 幅、 Y 突部の高さ、 X ボルトの頭の高さ。   1 bracket, 11,160 top plate portion, 12, 13, 111, 112, 116, 117 side plate portion, 14, 15, 114, 115 clamping portion, 18, 32, 62, 180 holes, 3, 61 presser, 31 , 402 bolt, 31a bolt head, 33 auxiliary tool, 41, 42 nut, 401 female thread, 51, 52 protrusion, 501 right end, 502 left end, 60 folded plate roof, 601 helix, 602 neck, 603 mountain Part, 100, 101, 110, 120, 130, 140 fixing bracket, 132, 133 protrusion, 301, 311, 312, 302 solar cell module, W width, Y protrusion height, X bolt head height .

Claims (7)

太陽電池モジュールに対して略平行に配置される天板部の両端に前記天板部に対して前記太陽電池モジュールと反対側に屈曲する屈曲部を介して接続された一対の側板部を有し、前記側板部の先端部に互いに間隔が狭くなる方向に屈曲して接続された一対の挟持部をさらに有する金具と、A pair of side plate portions connected to both ends of the top plate portion disposed substantially parallel to the solar cell module via a bent portion that bends to the opposite side of the solar cell module with respect to the top plate portion; A metal fitting further comprising a pair of sandwiching portions that are bent and connected to the front end portion of the side plate portion in a direction in which the interval is narrowed;
前記天板部に対して前記太陽電池モジュール側に配置される押え具と、A presser disposed on the solar cell module side with respect to the top plate, and
前記天板部及び前記押え具を接続する接続具とA connector for connecting the top plate and the presser;
を備え、With
前記屈曲部は、前記太陽電池モジュールの方向に突出する突部を有し、The bent portion has a protrusion protruding in the direction of the solar cell module,
前記天板部が前記接続具にガイドされて前記押え具に近づく際に、前記屈曲部が前記押え具に接して前記天板部を変形させて、前記一対の挟持部の間隔を狭くする固定金具。When the top plate portion is guided by the connecting tool and approaches the presser, the bending portion is in contact with the presser and deforms the top plate so as to narrow the interval between the pair of holding portions. Hardware.
前記突部は、前記押え具に接する請求項1に記載の固定金具。The fixing metal fitting according to claim 1, wherein the protrusion is in contact with the presser. 太陽電池モジュールに対して略平行に配置される第1の天板部の両端に前記第1の天板部に対して前記太陽電池モジュールと反対側に屈曲する屈曲部を介して接続された一対の側板部を有し、前記側板部の先端部に互いに間隔が狭くなる方向に屈曲して接続された一対の挟持部をさらに有し、A pair connected to both ends of a first top plate portion arranged substantially parallel to the solar cell module via a bent portion that is bent to the opposite side of the solar cell module with respect to the first top plate portion. A side plate portion, and a pair of sandwiching portions that are bent and connected to the front end portion of the side plate portion in a direction in which the interval becomes narrower.
前記屈曲部から前記太陽電池モジュールの方向に突出する突部に接続された第2の天板部をさらに有する金具と、A metal fitting further having a second top plate connected to a protrusion protruding in the direction of the solar cell module from the bent portion;
締めつけることで、前記第1の天板部を曲げる接続具とA connector that bends the first top plate by tightening;
を備え、With
前記側板部は、前記屈曲部で、前記突部に接続され、The side plate portion is connected to the protrusion at the bent portion,
前記接続具が前記第1の天板部を曲げる際に、前記第2の天板部の長さに対して一対の前記屈曲部の間隔が狭くなることで、前記一対の挟持部の間隔を狭くする固定金具。When the connecting tool bends the first top plate, the distance between the pair of bent portions is narrowed with respect to the length of the second top plate, thereby reducing the distance between the pair of sandwiching portions. Fixing bracket to narrow.
前記太陽電池モジュールに対して前記第2の天板部の反対側に配置される押え具を備え、A presser disposed on the opposite side of the second top plate portion with respect to the solar cell module;
前記接続具は、前記押え具と前記第1の天板部又は前記第2の天板部とを接続し、前記接続具を締めつける際に、前記第2の天板部と前記押え具とは、前記太陽電池モジュールを挟むことで、前記太陽電池モジュールを保持する請求項3に記載の固定金具。  When the connection tool connects the presser to the first top plate or the second top plate and tightens the connection tool, the second top plate and the presser The fixing bracket according to claim 3, wherein the solar cell module is held by sandwiching the solar cell module.
前記接続具は、雄ねじ部を有し、The connector has a male screw part,
前記第1の天板部には雌ねじ部が形成され、A female screw part is formed on the first top plate part,
前記雄ねじ部は、前記雌ねじ部に通されて締め付けられることで、前記第1の天板部を前記第2の天板部の側に曲げる請求項3又は4に記載の固定金具。The fixing bracket according to claim 3 or 4, wherein the male screw portion is passed through the female screw portion and tightened to bend the first top plate portion toward the second top plate portion.
前記接続具は、雄ねじ部を有し、The connector has a male screw part,
前記第2の天板部には雌ねじ部が形成され、An internal thread portion is formed on the second top plate portion,
前記雄ねじ部は、前記雌ねじ部に通されて締め付けられることで、前記接続具が、前記第1の天板部を前記第2の天板部と反対側に曲げる請求項3又は4に記載の固定金具。The said male screw part is passed through the said female screw part, and is tightened, The said connection tool bends the said 1st top plate part on the opposite side to the said 2nd top plate part, The Claim 3 or 4 securing bracket.
請求項1から6のいずれかに記載の固定金具を用いて複数の太陽電池モジュールを組み立てた太陽電池ユニット。The solar cell unit which assembled the several solar cell module using the fixing metal fitting in any one of Claim 1 to 6.
JP2011141880A 2011-06-27 2011-06-27 Fixing bracket and solar cell unit Expired - Fee Related JP5919659B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011141880A JP5919659B2 (en) 2011-06-27 2011-06-27 Fixing bracket and solar cell unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011141880A JP5919659B2 (en) 2011-06-27 2011-06-27 Fixing bracket and solar cell unit

Publications (3)

Publication Number Publication Date
JP2013007237A JP2013007237A (en) 2013-01-10
JP2013007237A5 JP2013007237A5 (en) 2014-08-07
JP5919659B2 true JP5919659B2 (en) 2016-05-18

Family

ID=47674798

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011141880A Expired - Fee Related JP5919659B2 (en) 2011-06-27 2011-06-27 Fixing bracket and solar cell unit

Country Status (1)

Country Link
JP (1) JP5919659B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5999771B2 (en) * 2013-05-21 2016-09-28 Jfe鋼板株式会社 Attachment for roof installation and method of attaching installation for roof using the attachment
JP6119467B2 (en) * 2013-07-04 2017-04-26 株式会社大林組 Solar panel scattering prevention device and solar panel installation structure
JP2015059365A (en) * 2013-09-19 2015-03-30 株式会社カネカ On-roof installation object-mounting bracket, on-roof installation object-mounting structure, solar battery module-mounting structure, roof structure, and on-roof installation object-mounting construction method
JP6249445B2 (en) * 2014-05-12 2017-12-20 Jfe鋼板株式会社 Attachment for roof installation and method of attaching installation for roof using the attachment

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61142242A (en) * 1984-12-17 1986-06-30 積水化学工業株式会社 Corrugated panel replacement apparatus
JPH0613299Y2 (en) * 1988-02-29 1994-04-06 株式会社淀川製鋼所 Metal plate thatched roof
JP2003096986A (en) * 2001-09-27 2003-04-03 Daiwa House Ind Co Ltd Structure for mounting solar battery module on folded plate roof
JP3149726U (en) * 2009-01-28 2009-04-09 株式会社佐野庄製作所 Roof mounting bracket for goby
JP5862005B2 (en) * 2010-11-04 2016-02-16 三菱電機株式会社 Solar cell module mounting structure and solar cell unit
JP2012177281A (en) * 2011-02-28 2012-09-13 Onoda Nail Co Ltd Metal fitting for equipment mounted on roof

Also Published As

Publication number Publication date
JP2013007237A (en) 2013-01-10

Similar Documents

Publication Publication Date Title
JP5862005B2 (en) Solar cell module mounting structure and solar cell unit
JP5919659B2 (en) Fixing bracket and solar cell unit
US20140299723A1 (en) Pipe mounting unit with grounding function
US20170089491A1 (en) Fuel supply apparatus
JP2018148213A (en) Bracket for fixing electronic device and electronic device fixing structure
US8276861B2 (en) Clips for mounting a panel to a vehicle
JP2013023881A (en) Metal fastener for solar cell module, and solar cell unit
JP2012177281A (en) Metal fitting for equipment mounted on roof
WO2012098638A1 (en) Mounting bracket for roof
JP5999771B2 (en) Attachment for roof installation and method of attaching installation for roof using the attachment
JP5200176B1 (en) Solar cell module mounting bracket and fixture
JP2017207118A (en) Frame fixing clamp
JP5920884B2 (en) Roof installation fixture
JP5615037B2 (en) Mounting bracket
JP4874036B2 (en) Transformer fixing structure and its mounting band
JP2014098275A (en) Metal fitting for on-roof mounted equipment
JP2017141632A (en) Rooftop installing metal fitting
JP2014156764A (en) Fixture of rooftop-mounting apparatus
JP2008303935A (en) Shim for adjusting gap
JP2007184209A (en) Terminal for bolt tightening
JP6022489B2 (en) Mounting bracket for installation on the roof
JP3179349U (en) Solar panel support structure
JP6353200B2 (en) Solar cell module installation structure on the roof
JP2013148168A (en) Clip nut
JP3190458U (en) Solar lightning panel mounting device

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20140326

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140625

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140625

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150324

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150520

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20151110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160204

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20160212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160315

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160328

R151 Written notification of patent or utility model registration

Ref document number: 5919659

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees