JP5866735B2 - Construction method of leaning type retaining wall - Google Patents

Construction method of leaning type retaining wall Download PDF

Info

Publication number
JP5866735B2
JP5866735B2 JP2013064495A JP2013064495A JP5866735B2 JP 5866735 B2 JP5866735 B2 JP 5866735B2 JP 2013064495 A JP2013064495 A JP 2013064495A JP 2013064495 A JP2013064495 A JP 2013064495A JP 5866735 B2 JP5866735 B2 JP 5866735B2
Authority
JP
Japan
Prior art keywords
retaining wall
slope
water
permeable mat
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013064495A
Other languages
Japanese (ja)
Other versions
JP2014189978A (en
JP2014189978A5 (en
Inventor
譲二 山下
譲二 山下
Original Assignee
譲二 山下
譲二 山下
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 譲二 山下, 譲二 山下 filed Critical 譲二 山下
Priority to JP2013064495A priority Critical patent/JP5866735B2/en
Publication of JP2014189978A publication Critical patent/JP2014189978A/en
Publication of JP2014189978A5 publication Critical patent/JP2014189978A5/ja
Application granted granted Critical
Publication of JP5866735B2 publication Critical patent/JP5866735B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)

Description

本発明は、切土、盛土の傾斜した法面に、残存型枠を立て並べ、その裏側に裏込めコンクリートを打設して構築するもたれ式擁壁の構築方法に関し、耐震性が向上するもたれ式擁壁の構築方法に関する。   The present invention relates to a method for constructing a leaning type retaining wall constructed by arranging remaining molds on sloped slopes of cut and embankment, and placing back-filled concrete on the back side thereof, with improved seismic resistance. The present invention relates to a method for constructing a retaining wall.

従来から、傾斜した法面に対して間知ブロックを組み積みするとともに、この間知ブロックの裏側に裏込めコンクリートを30〜50cm程度の所定高さで繰り返し打設して構築されるブロック積み擁壁工法が公知である。このブロック積み擁壁工法では、図5(a)に示すように、例えば、間知ブロック10を組み積みして構築した擁壁と法面Sとの間に40〜60cm程度の間隔を確保し、裏込めコンクリートCを繰り返し打設することと並行し、法面側から発生する水を排水する裏込め砕石(栗石)Dの層を設けることが行われている。しかし、地震によって裏込め砕石(栗石)Dの層及び法面表土は容易に崩壊するという問題が指摘されている。これに対し、下記特許文献1では、裏込め砕石(栗石)に代えて、多孔質コンクリートを打設することが提案されている。 Conventionally, a block stacking wall constructed by assembling a cognitive block on an inclined slope and repeatedly placing backfill concrete on the back side of the cochlear block at a predetermined height of about 30 to 50 cm. The construction method is known. In this block retaining wall construction method, as shown in FIG. 5A , for example, an interval of about 40 to 60 cm is secured between the retaining wall constructed by assembling the knowledge block 10 and the slope S. In parallel with the repeated placement of the backfill concrete C, a layer of backfill crushed stone (Kuriishi) D that drains water generated from the slope side is performed. However, a problem has been pointed out that the layer of backfilled crushed stone (Kuriishi) D and the slope topsoil easily collapse due to an earthquake. On the other hand, in the following Patent Document 1, it is proposed to place porous concrete instead of backfilled crushed stone (Kuriishi).

特開2002−194751号公報Japanese Patent Laid-Open No. 2002-194751

従来のブロック積み擁壁工法では強い地震が起きた場合に、上述のような裏込め砕石(栗石)の層及び法面表土に起因する問題とともに、裏込めコンクリートを繰り返し打継(コールドジョイント)して構築することに起因する問題等もあって、図5(b)〜(d)に示すように擁壁が崩落する恐れがある。 In the case of a strong earthquake in the conventional block-retaining wall method, the back-filled concrete is repeatedly transferred (cold joint) along with the problems caused by the back-filled crushed stone (Kuriishi) layer and slope surface soil as described above. There is also a problem caused by the construction, and the retaining wall may collapse as shown in FIGS. 5 (b) to 5 (d).

すなわち、ブロック積み擁壁工法で構築した擁壁に強い地震動が作用すると、図5(b)に示すように、擁壁が基礎部分Bを回転軸に、法面Sに対して前後方向に揺動することに伴って、擁壁の揺動の周期と地震動の周期とのずれから擁壁と法面Sとの間に隙間Pが発生する。さらに、図5(c)に示すように、この隙間Pに裏込め砕石(栗石)Dの層及び法面表土が崩落陥没するとともに、崩落したものが擁壁背面の下部で土楔となって作用し、法面Sとの間の隙間Pが拡大し、ついに擁壁背面の上部に大きな空部Qが形成されるようになる。その結果、図5(d)に示すように、擁壁の支持地盤が失われるとともに、擁壁自重による転倒曲げモーメントと地震慣性力による転倒曲げモーメントとが重なって擁壁が破壊され、崩落する。特に、繰り返し打継されることで、打ち継がれる部分に形成される裏込めコンクリートCの打継部C1が、コンクリートに含まれる不純物からなるレイタンス層を含んでコールドジョイントと呼ばれて構造的に強度が劣るため、擁壁は、この打継部C1から破壊していくことになる。 That is, when strong earthquake motion acts on the retaining wall constructed by the block-stacking retaining wall method, the retaining wall swings in the front-rear direction with respect to the slope S with the foundation portion B as the rotation axis, as shown in FIG. Along with the movement, a gap P is generated between the retaining wall and the slope S due to a shift between the period of rocking of the retaining wall and the period of the earthquake motion. Furthermore, as shown in FIG. 5 (c), the layer of backfilled crushed stone (Kuriishi) D and the slope surface soil collapse into this gap P, and the collapsed one becomes a soil wedge at the lower part of the retaining wall back. Acting, the gap P between the slope S is enlarged, and finally a large void Q is formed at the upper part of the rear surface of the retaining wall. As a result, as shown in FIG. 5 (d), the supporting ground of the retaining wall is lost, and the retaining wall is destroyed and collapses due to the overturning bending moment due to the retaining wall's own weight and the overturning bending moment due to the seismic inertia force. . In particular, the joint part C1 of the backfilled concrete C formed in the part to be jointed by being repeatedly handed over includes a latency layer made of impurities contained in the concrete and is called a cold joint structurally. Since the strength is inferior, the retaining wall is broken from the joint portion C1.

本発明は、上記実情に鑑み、切土、盛土の傾斜した法面に構築されるもたれ式擁壁の構築方法において、裏込め砕石(栗石)層を不要として、これに起因した擁壁の崩落を抑止して耐震性が向上し、裏込め砕石(栗石)層に代えて採用する透水性マットに法面の表土の崩壊を阻止する機能を付加して益々、耐震性が向上するもたれ式擁壁の構築方法を提供することを目的とする。   In view of the above circumstances, the present invention provides a lean type retaining wall constructed on an inclined slope of cut or embankment, eliminating the need for a backfill crushed stone (kuriishi) layer and causing the collapse of the retaining wall. The seismic resistance has been improved by adding a function to prevent the collapse of the slope topsoil to the water-permeable mat used instead of the back-filled crushed stone (Kuriishi) layer. An object is to provide a method for constructing a wall.

上記目的を達成するため、本発明は、耐震性が向上するもたれ式擁壁の構築方法であって、裏込め砕石層に代わる、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に垂直方向の透水係数が1.0×10-2(cm/sec)以上、かつ面内方向の透水性能が15cm 3 /sec/cm以上である透水性マットを予め法面の全体に、10cm以上の長さを有するアンカーで打ち付けて被覆し、前記透水性マットを被覆した前記法面の手前側に、前記法面の高さ方向に複数段の残存型枠を積み上げ、前記残存型枠の背面から前記透水性マットまで裏込めコンクリートを打設し、裏込め砕石を不要にして、前記擁壁、前記透水性マット及び前記裏込めコンクリートからなる擁壁躯体を構築し、前記アンカーの打ち付けによって前記透水性マットの被覆が前記法面から剥がれるようなことがなくなって、地震発生時に、前記透水性マットにより前記法面の表土が崩落するのが阻止されるとともに、前記擁壁躯体と前記法面との間に空部が形成されることが阻止され、かつ、前記法面から前記擁壁躯体の背面に伝達する地震力を前記透水性マットの緩衝によって吸収し、前記擁壁躯体が前後に揺動する振幅が減衰される構造として、前記擁壁躯体の崩落を抑止可能とすることを特徴とするもたれ式擁壁の構築方法である。 In order to achieve the above object, the present invention is a method for constructing a leaning type retaining wall with improved seismic resistance, having a thickness of 10 mm or more instead of a back-filled crushed stone layer, and having at least an elastic or buffering function. A water-permeable mat having a water permeability coefficient of 1.0 × 10 −2 (cm / sec) or more in the vertical direction and a water permeability of 15 cm 3 / sec / cm or more in the in- plane direction is previously applied to the entire slope by 10 cm or more. of coated nailed anchor having a length, wherein the front side of the slope face of the permeable mat coated, on up Masonry remaining formwork plurality of stages in a height direction of the slopes, the remaining formwork The back-filled concrete is cast from the back surface of the water-permeable mat to eliminate the need for back-filled crushed stone, the retaining wall, the water-permeable mat and the back-walled concrete made of the back-filled concrete are constructed, and the anchor is driven By the water permeability The covering of the mat is not peeled off from the slope, and in the event of an earthquake, the water-permeable mat prevents the slope soil from collapsing, and the retaining wall housing and the slope A space is prevented from being formed between them, and the seismic force transmitted from the slope to the back of the retaining wall housing is absorbed by the buffer of the water-permeable mat, and the retaining wall housing swings back and forth. The structure of the leaning type retaining wall is characterized in that, as a structure in which the amplitude of the retaining wall is attenuated, the retaining wall housing can be prevented from collapsing.

また、本発明に係る耐震性が向上するもたれ式擁壁の構築方法において、前記残存型枠の後方であって前記法面よりも手前側に、前記残存型枠を支持する柱材を設置した上で、前記擁壁の背面から前記透水性マットまで裏込めコンクリートを所定の打設高さで打継し、前記擁壁、前記柱材、前記透水性マット及び前記裏込めコンクリートからなる擁壁躯体を構築し、この擁壁躯体に、前記裏込めコンクリートの打継部が節となり、前記柱材が芯となって前記擁壁躯体を補強しつつ撓る緩衝機能部を形成することも特徴とする。   Moreover, in the construction method of the leaning type retaining wall according to the present invention in which the earthquake resistance is improved, a column material that supports the residual mold is provided behind the residual mold and in front of the slope. Above, the backfilling concrete is handed over from the back surface of the retaining wall to the water-permeable mat at a predetermined placement height, and the retaining wall is composed of the retaining wall, the pillar material, the water-permeable mat, and the backfilling concrete. It is also characterized in that a housing is constructed, and in this retaining wall housing, the back-filled concrete joint is a node, and the buffer material is bent while reinforcing the retaining wall housing with the pillar as a core. And

本発明に係るもたれ式擁壁の構築方法では、慣習的に採用されてきた排水用の裏込め砕石(栗石)に代えて、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に対して垂直方向の透水係数が1.0×10-2(cm/sec)以上である透水性マットを採用し、さらに、この透水性マットを法面の全体に、10cm以上の長さを有するアンカーで打ち付けて被覆した上で、法面の高さ方向に複数段の残存型枠を積み上げて擁壁を構築し、擁壁の背面から透水性マットまで裏込めコンクリートを打設し、裏込め砕石を不要にして、擁壁、透水性マット及び裏込めコンクリートからなる擁壁躯体を構築することにより、アンカーの打ち付けによって透水性マットの被覆が法面から剥がれるようなことがなくなって、地震発生時に、透水性マットにより法面の表土が崩落するのが阻止されるとともに、擁壁躯体と法面との間に空部が形成されることが阻止され、かつ、地震力が法面から擁壁躯体の背面に伝達するのを透水性マットの緩衝によって吸収し、擁壁躯体が前後に揺動する振幅が減衰される構造として擁壁躯体の崩落を抑止し、耐震性を向上させることができる。また、地震発生時に崩落陥没して擁壁の崩落の原因となっていた裏込め砕石(栗石)層を不要とすることができるので、これに起因した地震発生時の擁壁躯体の崩落を抑止して、益々耐震性を向上させることができる。 In the construction method of the leaning type retaining wall according to the present invention, instead of the conventionally used back-filled crushed stone (Kuriishi), the thickness is 10 mm or more and at least has an elastic or buffering function. In addition, a water-permeable mat having a water permeability coefficient of 1.0 × 10 −2 (cm / sec) or more in the vertical direction is adopted, and the water-permeable mat is an anchor having a length of 10 cm or more over the entire slope. After laying and covering with, build up a retaining wall by stacking multiple levels of residual formwork in the height direction of the slope, and cast back-filled concrete from the back of the retaining wall to the permeable mat, and back-filled crushed stone By constructing a retaining wall frame consisting of retaining walls, a permeable mat and backfilled concrete, the permeable mat coating will not be peeled off from the slope due to anchoring, and in the event of an earthquake , Water permeability The mat prevents the topsoil of the slope from collapsing, prevents the formation of an empty space between the retaining wall and the slope, and the seismic force from the slope to the back of the retaining wall It is absorbed by the buffer of the water-permeable mat, and the collapse of the retaining wall housing can be suppressed as the structure in which the amplitude of the retaining wall housing swinging back and forth is attenuated, and the earthquake resistance can be improved. In addition, since the back-filled crushed stone (Kuriishi) layer that collapsed and caused the collapse of the retaining wall at the time of the earthquake occurrence can be eliminated, the collapse of the retaining wall structure caused by the earthquake is prevented. Thus, the earthquake resistance can be further improved.

また、残存型枠の後方であって法面よりも手前側に、残存型枠を支持する柱材を設置した上で、法面の高さ方向に積み上げた複数段の残存型枠からなる擁壁の背面から透水性マットまで裏込めコンクリートを所定の打設高さで打継し、擁壁、柱材、透水性マット及び裏込めコンクリートからなる擁壁躯体を構築することにより、擁壁躯体に、裏込めコンクリート打継部が節となり、柱材が芯となって撓なる緩衝機能部が形成される構成となる。そうすると、緩衝機能部で擁壁躯体が前後に揺動する振幅が分散減衰されるとともに、緩衝機能部が法面の変位に追随して擁壁躯体と法面との間に空部が形成されることが阻止される構造となって、地震発生時に擁壁躯体の崩落を抑止することができ、さらに耐震性を向上させることができる。   In addition, a pillar material that supports the remaining mold is installed behind the remaining mold and in front of the slope, and is made up of a plurality of remaining molds stacked in the height direction of the slope. Retaining wall frame by constructing a retaining wall frame consisting of retaining wall, pillar material, water permeable mat and backed concrete by passing back-filled concrete from the back of the wall to the water-permeable mat at a predetermined placement height. In addition, the backfilled concrete joint portion becomes a node, and the buffer function portion that is bent with the pillar material serving as a core is formed. As a result, the amplitude at which the retaining wall housing swings back and forth in the buffer function portion is distributed and attenuated, and the buffer function portion follows the displacement of the slope and a void is formed between the retaining wall housing and the slope. It is possible to prevent the retaining wall from collapsing when an earthquake occurs, and to further improve the earthquake resistance.

本発明により構築されたもたれ式擁壁の概略構成を示した概略縦断面図である。It is the schematic longitudinal cross-sectional view which showed schematic structure of the leaning type retaining wall constructed | assembled by this invention. 本発明で採用される透水性マットにより法面の全体が被覆された状態を説明する説明図である。It is explanatory drawing explaining the state by which the whole slope was coat | covered with the water-permeable mat employ | adopted by this invention. 本発明によりもたれ式擁壁が構築されていく様子を説明する概略縦断面図であって、(a)は擁壁を構成する下段部の残存型枠を施工した段階を示した概略縦断面図、(b)は擁壁を構成する中段部の残存型枠を施工した段階を示した概略縦断面図、(c)は擁壁が完成した段階を示した概略縦断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a schematic longitudinal cross-sectional view explaining a mode that the leaning type retaining wall is constructed by this invention, Comprising: (a) The schematic longitudinal cross-sectional view which showed the step which constructed the residual formwork of the lower step part which comprises a retaining wall (B) is the schematic longitudinal cross-sectional view which showed the step which constructed the residual formwork of the middle step part which comprises a retaining wall, (c) is the schematic longitudinal cross-sectional view which showed the step which the retaining wall was completed. 本発明により構築された他のもたれ式擁壁の概略構成を示した概略縦断面図である。It is the schematic longitudinal cross-sectional view which showed schematic structure of the other leaning type retaining wall constructed | assembled by this invention. 従来のブロック積み擁壁工法により構築されたもたれ式擁壁の耐震性能を説明する説明図であって、(a)は平常時の擁壁を説明する概略縦断面図、(b)は地震動により揺れる擁壁の状態を説明する概略縦断面図、(c)は地震動により裏込め砕石層が崩壊した状態を説明する概略縦断面図、(d)は地震動により擁壁が崩壊した状態を説明する概略縦断面図である。It is explanatory drawing explaining the earthquake resistance performance of the leaning type retaining wall constructed by the conventional block pile retaining wall method, (a) is a schematic longitudinal cross-sectional view explaining the retaining wall of normal times, (b) is by earthquake motion (C) is a schematic longitudinal cross-sectional view explaining the state where the back-filled crushed stone layer has collapsed due to seismic motion, and (d) is a diagram illustrating the state where the retaining wall is collapsed due to seismic motion. It is a schematic longitudinal cross-sectional view.

以下、本発明に係るもたれ式擁壁の構築方法についての一実施形態を、図面を参照しつつ説明する。この一実施形態は、本発明の構成を具現化した例示に過ぎず、本発明は、特許請求の範囲に記載した事項を逸脱することがなければ、種々の設計変更を行うことができる。   Hereinafter, an embodiment of a method for constructing a leaning retaining wall according to the present invention will be described with reference to the drawings. This embodiment is merely an example embodying the configuration of the present invention, and various design changes can be made to the present invention without departing from the matters described in the claims.

本発明に係るもたれ式擁壁の構築方法により構築される擁壁は、図1に示すように、法面Sの手前側で、左右方向に立て並べられるとともに、法面Sの高さ方向に複数段積み上げられる矩形状で所定大の残存型枠1と、この残存型枠1の後方であって法面Sよりも手前側に設置され、残存型枠1を支持している柱材2と、法面Sの全体を被覆し、厚みが10mm以上で少なくとも弾性又は緩衝機能を有して、面に垂直方向の透水係数が1.0×10-2(cm/sec)以上である透水性マット3と、残存型枠1の背面から透水性マット3まで、例えば、30〜150cm程度で小刻みに継いで打設される裏込めコンクリートCの層とから構築されている。また、本発明に係るもたれ式擁壁の構築方法により構築される擁壁は、法面Sの高さ方向に複数段積み上げられた残存型枠1と、柱材2と、裏込めコンクリートCとが一体化されて構成される擁壁躯体Aが、全体が透水性マット3に覆われた法面Sに沿って構築された構成であるということができる。 As shown in FIG. 1, the retaining wall constructed by the leaning retaining wall construction method according to the present invention is arranged in the left-right direction on the front side of the slope S, and in the height direction of the slope S. A rectangular residual mold 1 that is stacked in a plurality of stages and has a predetermined size, and a column 2 that is installed behind the residual mold 1 and on the front side of the slope S and supports the residual mold 1. Water permeability which covers the whole slope S, has a thickness of 10 mm or more, has at least elasticity or a buffer function, and has a water permeability coefficient of 1.0 × 10 −2 (cm / sec) or more in the direction perpendicular to the surface. The mat 3 is constructed from the back surface of the remaining mold 1 to the water-permeable mat 3, for example, a layer of backfilled concrete C that is cast in small increments of about 30 to 150 cm. In addition, the retaining wall constructed by the leaning retaining wall construction method according to the present invention includes a residual mold 1 stacked in a plurality of stages in the height direction of the slope S, a column member 2, and backfilled concrete C. It can be said that the retaining wall housing A configured by integrating is constructed along the slope S covered with the water-permeable mat 3 as a whole.

裏込めコンクリートCは小刻みに継いで打設されるため、その層の境界に打継部C1が形成されている。打継部C1はコールドジョイントと呼ばれ、コンクリートに含まれる不純物が硬化とともに表面に浮かんで現れるレイタンス層を含んで、周りの裏込めコンクリートCよりも強度がやや劣る部位である。なお、小刻みに継ぐ高さは、30〜150cm程度の高さの範囲から適宜選択される。   Since the backfill concrete C is placed in small increments, a joint C1 is formed at the boundary between the layers. The joint portion C1 is called a cold joint and includes a latency layer in which impurities contained in the concrete float on the surface as it hardens, and is a portion that is slightly inferior in strength to the surrounding backfill concrete C. In addition, the height which succeeds to a small increment is suitably selected from the range of the height of about 30-150 cm.

透水性マット3は、例えば、厚みが10mm以上の少なくとも弾性又は緩衝機能を有する合成樹脂製のマットであり、法面Sの表土が地震発生時に崩落するのを透水性マット3で阻止可能となるように、法面Sに対して10cm以上の埋設可能な長さを有するアンカー4で打ち付けられている。透水性マット3は、被覆されない法面Sの箇所がないように、例えば、図2の道路建設等では、その斜面として形成される法面Sの全体にくまなく被覆されている。透水性マット3の性能として、面に垂直方向の透水係数が1.0×10-2(cm/sec)以上であるほか、面内方向の透水性能として15(cm3/sec/cm)以上であることが好ましい。また、裏込めコンクリートCが打設された後に、その厚さが8割以上保たれる厚さ保持率を有することがさらに好ましい。なお、求められる透水性能、厚みにおいて上限はない。しかしながら、経済性、弾性又は緩衝機能の観点から優れた値のものを適宜選択すればよく、例えば、宅地擁壁用透水マット等として市販されているものを使用することができる。 The water-permeable mat 3 is, for example, a synthetic resin mat having a thickness of 10 mm or more and having at least elasticity or a buffer function. The water-permeable mat 3 can prevent the topsoil of the slope S from collapsing when an earthquake occurs. As described above, the anchor 4 is struck with respect to the slope S with an embedding length of 10 cm or more. For example, in the road construction shown in FIG. 2, the water permeable mat 3 is covered all over the slope S formed as a slope in the road construction or the like of FIG. 2. As the performance of the water permeable mat 3, the water permeability coefficient in the direction perpendicular to the surface is 1.0 × 10 −2 (cm / sec) or more, and the water permeability performance in the in-plane direction is 15 (cm 3 / sec / cm) or more. It is preferable that Moreover, it is more preferable to have a thickness retention rate that keeps the thickness 80% or more after the backfill concrete C is placed. There is no upper limit for the required water permeability and thickness. However, what is necessary is just to select suitably the thing of the value excellent from the viewpoint of economical efficiency, elasticity, or a buffer function , for example, what is marketed as a water-permeable mat for residential land retaining walls etc. can be used.

図1に示すように、残存型枠1はコンクリート製で、例えば、縦30cm×横90cm×厚み3cm等と容易に手で持ち運ぶことのできる一定の大きさをした矩形状の型枠パネルであり、長手方向の端から1/4の位置であって背面の下側の左右と、背面の上側の左右とに金属製のフック11が設けられて構成される。このフック11を利用し、後述するようにして残存型枠1にセパレータ5が連結されるとともに、このセパレータ5が本実施形態のように固定具6で、又は溶接等によって柱材2に固定されることで、残存型枠1は柱材2から一定の間隔をもって設置され、柱材2に支持される。柱材2は、構築しようとする擁壁の高さに対応する長さのものが用いられる。柱材2の形状は、断面三角形状でも、断面矩形でも、断面円形でも、断面L字でも構わない。   As shown in FIG. 1, the remaining formwork 1 is made of concrete and is a rectangular formwork panel having a certain size that can be easily carried by hand, for example, 30 cm long x 90 cm wide x 3 cm thick. The metal hooks 11 are provided on the left and right sides on the lower side of the back surface and on the left and right sides on the upper side of the back surface at a position 1/4 of the longitudinal end. Using this hook 11, a separator 5 is connected to the remaining mold 1 as described later, and this separator 5 is fixed to the column member 2 by a fixing tool 6 or by welding or the like as in this embodiment. Thus, the remaining mold 1 is installed at a certain distance from the pillar material 2 and supported by the pillar material 2. The column material 2 has a length corresponding to the height of the retaining wall to be constructed. The shape of the pillar 2 may be triangular, cross-sectional, circular, or L-shaped.

また、積み上げられた残存型枠1と柱材2とは、その傾斜角が同一とされて平行関係にある。これにより、残存型枠1と、柱材2と、裏込めコンクリートCとから一体化されることで構成される擁壁躯体Aが、揺れによる破壊が起きにくいという耐震性能の観点から好ましい形態である。   Further, the stacked residual form 1 and the column member 2 have the same inclination angle and are in a parallel relationship. Thereby, in a preferable form from the viewpoint of seismic performance that the retaining wall housing A constituted by being integrated from the remaining formwork 1, the pillar material 2, and the backfilled concrete C is less likely to break due to shaking. is there.

本発明に係るもたれ式擁壁の構築方法は、図3に示すように、法面Sの全体に透水性マット3をアンカー4で地肌が露出しないようにしっかりと打ち付けて被覆するとともに、法面Sの手前側に形成された基礎部分Bに、大きさを調整した残存型枠1a及び所定大の残存型枠1から複数段、所定高さ(例えば、50cm程度)積み上げて構築し、この残存型枠1,1aの後方であって法面Sよりも手前側に、その一端を基礎部分Bに埋設させて柱材2を設置し、残存型枠1,1aの背面から法面Sまで裏込めコンクリートCを打設する下段部擁壁形成工程(図3(a)参照)と、下段部に積み上げた残存型枠1,1aの上段に、さらに残存型枠1を複数段、所定高さ(例えば、60cm程度)積み上げ、この上段の残存型枠1の背面から法面Sまで裏込めコンクリートCを打設する中段部擁壁形成工程及び、この中段部擁壁形成工程を繰り返す繰返工程(以上、図3(b)参照)と、法面Sの高さとレベルを合わせるように大きさを調整した残存型枠1bを設置し、この残存型枠1bの背面から法面Sまで裏込めコンクリートCを打設して擁壁を完成させる上段部擁壁形成工程(図3(c))とを有している。   As shown in FIG. 3, the construction method of the leaning type retaining wall according to the present invention covers the entire surface S by firmly hitting the water-permeable mat 3 with the anchor 4 so that the ground surface is not exposed. The base portion B formed on the front side of S is constructed by stacking a plurality of stages and a predetermined height (for example, about 50 cm) from the residual mold 1a having a size adjusted and the residual mold 1 having a predetermined size. A column 2 is installed behind one of the molds 1 and 1a and in front of the slope S, with one end embedded in the base portion B, and the back of the remaining molds 1 and 1a to the slope S. Lower step retaining wall forming step (see FIG. 3 (a)) for placing the embedded concrete C, and the remaining molds 1 and 1a stacked on the lower step, and a plurality of remaining molds 1 at a predetermined height (For example, about 60 cm) Stacked, the slope from the back of the upper left form 1 Match the height and level of the slope S with the middle step retaining wall forming step of placing the backfill concrete C until the middle step, the repeating step of repeating the middle step retaining wall forming step (see FIG. 3B). The upper mold retaining wall forming step (FIG. 3) in which the remaining mold 1b having the adjusted size is installed and the backfill concrete C is cast from the rear surface of the remaining mold 1b to the slope S to complete the retaining wall. (C)).

以下、図3を参照しつつ、具体的に説明する。道路の脇等で擁壁を構築する場合の本発明に係るもたれ式擁壁の構築方法を例示している。なお、各構成部品に付した符号については、図1に記載のものが明確であるので参照されたい。   Hereinafter, it demonstrates concretely, referring FIG. The construction method of the leaning type retaining wall according to the present invention in the case of constructing the retaining wall on the side of the road or the like is illustrated. In addition, about the code | symbol attached | subjected to each component, since the thing of FIG. 1 is clear, please refer.

まず、図3(a)に示すように、法面Sの全体に透水性マット3を、法面Sに対してアンカー4で地肌が露出しないように打ち付けて被覆する。特に、法面Sの表土が地震発生時に崩落するのを透水性マット3で阻止可能となるように、その打ち付け部を除いたアンカー4の10cm以上の長さ部分が法面Sに埋没するまで、アンカー4をしっかりと打ち付けて被覆する。さらに、道路の脇等でコンクリートを打設して基礎部分Bを構築し、この基礎部分Bに下段部の大きさを調整した残存型枠1aを左右に設置するとともに、この残存型枠1aから高さ方向に複数段、所定大の残存型枠1を積み上げて所定高さ(例えば、50cm程度)とし、この残存型枠1,1aから所定距離おいた後方位置に、その一端を基礎部分Bに埋設させて柱材2を、残存型枠1aの幅の間隔で立設する。具体的には、柱材2を2つのフック11の間に位置させて立設していく。その残存型枠1,1aの下側のフック11へ、セパレータ5が連結されている装着具7を挿入して取り付け、さらにセパレータ5の装着具7が連結していない側の端部に固定具6を連結し、この固定具6を柱材2に固定することで、残存型枠1をセパレータ5を介して柱材2に固定する。   First, as shown in FIG. 3A, the water-permeable mat 3 is applied to the entire slope surface S by hitting the slope S with the anchor 4 so that the background is not exposed. In particular, until the length of 10 cm or more of the anchor 4 excluding the striking portion is buried in the slope S so that the water-permeable mat 3 can prevent the top soil of the slope S from collapsing when an earthquake occurs. The anchor 4 is firmly struck and covered. Further, concrete is placed on the side of the road to construct the foundation part B, and the remaining formwork 1a with the size of the lower step is adjusted to the left and right of the foundation part B. A plurality of stages and a predetermined size of the remaining formwork 1 are stacked in the height direction to obtain a predetermined height (for example, about 50 cm), and one end of the base part B is located at a rear position at a predetermined distance from the remaining formwork 1 and 1a. The pillar material 2 is erected at intervals of the width of the remaining mold 1a. Specifically, the pillar material 2 is positioned between the two hooks 11 and is erected. A mounting tool 7 connected to the separator 5 is inserted and attached to the lower hook 11 of the remaining molds 1 and 1a, and a fixing tool is attached to the end of the separator 5 on the side to which the mounting tool 7 is not connected. 6, and the fixing tool 6 is fixed to the column member 2, whereby the remaining mold 1 is fixed to the column member 2 via the separator 5.

ここで、装着具7とセパレータ5との連結、セパレータ5と固定具6との連結、及び、固定具6の柱材2への固定は、それぞれ適宜の手段により達成される。例えば、装着具7とセパレータ5との連結は、装着具7に孔を設けるとともにセパレータ5の一端を折り曲げて引っ掛け部を形成し、この引っ掛け部を装着具7の孔に引っ掛けてこれらを連結することができる。   Here, the connection between the mounting tool 7 and the separator 5, the connection between the separator 5 and the fixing tool 6, and the fixing of the fixing tool 6 to the column member 2 are each achieved by appropriate means. For example, the attachment tool 7 and the separator 5 are connected by providing a hole in the attachment tool 7, bending one end of the separator 5 to form a hook portion, and hooking the hook portion into the hole of the attachment tool 7 to connect them. be able to.

また、セパレータ5と固定具6との連結及び、固定具6の柱材2への固定は、例えば、腕部と基部とからなるU字又はV字状の固定具6の2本の腕部に孔を設け、これら孔にセパレータ5の他端を通すことで連結することができ、セパレータ5と固定具6とで形成される略三角形状の枠に柱材2を貫通し、セパレータ5と柱材2との接点、及び、セパレータ5と固定具6の孔との接点の三箇所を支点としてセパレータ5を弓なり状に曲がるまで、固定具6の基部に設けたボルト61を推進させることでセパレータ5を柱材2に固定することができる。また、例えば、固定具に代えて、セパレータ5の他端を柱材2に溶接することでセパレータ5を柱材2へ固定することができる。   In addition, the connection between the separator 5 and the fixing tool 6 and the fixing of the fixing tool 6 to the pillar 2 are, for example, two arm parts of a U-shaped or V-shaped fixing tool 6 composed of an arm part and a base part. Holes can be connected to each other by passing the other ends of the separators 5 through the holes, and the pillars 2 are passed through a substantially triangular frame formed by the separators 5 and the fixtures 6. By propelling the bolt 61 provided at the base of the fixture 6 until the separator 5 is bent in a bow shape with the contact points with the column 2 and the contact points between the separator 5 and the holes of the fixture 6 as fulcrums. The separator 5 can be fixed to the pillar material 2. Further, for example, the separator 5 can be fixed to the column member 2 by welding the other end of the separator 5 to the column member 2 instead of the fixture.

そして、固定された下段部の残存型枠1,1aの背面から法面Sまで裏込めコンクリートCを残存型枠1とレベルを揃えて打設することで擁壁の下段部分が構築される。さらに、図3(b)に示すように、下段部に並べた残存型枠1,1aの上段に、さらに所定大の残存型枠1を複数段積み上げて所定高さ(例えば、60cm程度)とし、上述したのと同様な手順で残存型枠1をセパレータ5を介して柱材2に固定し、この上段の残存型枠1の背面から法面Sまで裏込めコンクリートCを打設し、このような工程を繰り返して擁壁の中段部分を構築する。最後に、図3(c)に示すように、法面Sの高さとレベルを合わせるように大きさを調整した別の残存型枠1bを設置し、この残存型枠1bの背面から法面Sまで裏込めコンクリートCを打設することで上段部分を構築し、擁壁が完成する。   Then, the lower part of the retaining wall is constructed by placing back-filled concrete C at the same level as the remaining mold 1 from the back surface of the remaining molds 1 and 1a of the fixed lower part to the slope S. Further, as shown in FIG. 3B, a predetermined height of a plurality of remaining molds 1 are stacked on the upper stage of the remaining molds 1 and 1a arranged in the lower part to obtain a predetermined height (for example, about 60 cm). The remaining mold 1 is fixed to the column 2 via the separator 5 in the same procedure as described above, and the backfill concrete C is cast from the back surface of the remaining mold 1 to the slope S. Repeat the above process to build the middle part of the retaining wall. Finally, as shown in FIG. 3C, another residual mold 1b whose size is adjusted so as to match the height and level of the slope S is installed, and the slope S from the back of the residual mold 1b is installed. By constructing backfill concrete C, the upper part is constructed and the retaining wall is completed.

本実施形態では、下段部擁壁形成工程、中段部擁壁形成工程、繰返工程及び上段部擁壁形成工程のそれぞれで、裏込めコンクリートCが打設されて擁壁が構築されるので、図1に示すように、複数段積み上がった残存型枠1、柱材2及び裏込めコンクリートCが一体化した擁壁躯体Aにおいて、レイタンス層を含んだコールドジョイントと呼ばれる打継部C1が裏込めコンクリートCの層に形成されている。また、柱材2が、この裏込めコンクリートCの層の芯として高さ方向に貫通するように埋設される形態となる。さらに、透水性マット3が法面Sの全体を被覆しているので、従来のブロック積み擁壁工法で慣習的に施工されていた排水用の裏込め砕石(栗石)層が不要とされている。   In this embodiment, since the back-filled concrete C is placed and the retaining wall is constructed in each of the lower-stage retaining wall forming process, the middle-stage retaining wall forming process, the repeating process, and the upper-stage retaining wall forming process, As shown in FIG. 1, in a retaining wall housing A in which a plurality of stacked residual molds 1, pillars 2, and backfill concrete C are integrated, a joint portion C <b> 1 called a cold joint including a latency layer is provided on the back side. It is formed in a layer of embedded concrete C. Moreover, it becomes the form by which the column material 2 is embed | buried so that it may penetrate in a height direction as a core of this back-filled concrete C layer. Further, since the water-permeable mat 3 covers the entire slope S, the drainage back-filled crushed stone (Kuriishi) layer, which is conventionally constructed by the conventional block-plying retaining wall method, is not required. .

本実施形態で構築した擁壁に強い地震動が作用すると、擁壁躯体Aが基礎部分Bを回転軸に、法面Sに対して前後方向に揺動し、擁壁の揺動の周期と地震動の周期とのずれから、擁壁躯体Aと法面Sとの間に隙間が発生する方向に力が働く。しかし、そのような力が働いたとしても、透水性マット3によって裏込め砕石(栗石)層を不要としているので、裏込め砕石(栗石)層が崩落陥没することがなくなる。地震力が法面Sから擁壁躯体Aの背面に伝達するのを透水性マット3の緩衝機能によって吸収し、擁壁躯体Aが前後に揺動する振幅を減衰させて、地震発生時に擁壁躯体Aの崩落を抑止することもできる。特に、アンカー4を法面Sにしっかりと打ち付けて、透水性マット3を法面Sの全面に被覆しているために、強い地震動によっても透水性マット3の被覆が法面Sから剥がれるようなことがなく、法面Sの表土が地震発生時に崩落するのを透水性マット3が阻止する。したがって、これらの作用によって、本実施形態で構築した擁壁の耐震性が向上する。 When strong earthquake motion acts on the retaining wall constructed in this embodiment, the retaining wall housing A swings in the front-rear direction with respect to the slope S about the foundation portion B as the rotation axis, and the period of the retaining wall swing and the earthquake motion A force acts in a direction in which a gap is generated between the retaining wall housing A and the slope S due to the deviation from the period. However, even if such a force is applied, the backfilled crushed stone (Kuriishi) layer is not required by the water-permeable mat 3, so that the backfilled crushed stone (Kuriishi) layer does not collapse. The seismic force transmitted from the slope S to the back of the retaining wall housing A is absorbed by the cushioning function of the water permeable mat 3, and the retaining wall housing A swings back and forth to reduce the amplitude so that the retaining wall can be used when an earthquake occurs. The collapse of the housing A can also be suppressed. In particular, since the anchor 4 is firmly struck to the slope S and the permeable mat 3 is entirely covered with the slope S, the coating of the permeable mat 3 may be peeled off from the slope S even by strong earthquake motion. The permeable mat 3 prevents the top soil of the slope S from collapsing when an earthquake occurs. Therefore, the seismic resistance of the retaining wall constructed in this embodiment is improved by these actions.

また、擁壁躯体Aにおいて柱材2及び周りの裏込めコンクリートCの打継部C1が周りの裏込めコンクリートCよりも強度が弱いために節となり、柱材2が軸となって撓る緩衝機能部が形成されるため、緩衝機能部で擁壁の前後方向の振幅が分散減衰されるとともに、緩衝機能部が撓って法面Sの変位(揺動)に追随し、擁壁躯体Aと法面Sとの間に、従来のブロック積み擁壁工法の擁壁で形成されるような空部が発生しなくなる。そうすると、空部が発生しないことにより、地震発生時に擁壁躯体Aが崩落することが抑止されて益々、耐震性が向上することになる。 Further, in the retaining wall case A, the joint portion C1 of the pillar material 2 and the surrounding backfill concrete C is weaker than the surrounding backfill concrete C, so that it becomes a node, and the buffer material that the pillar material 2 is bent as an axis is buffered. Since the function part is formed, the buffer function part scatters and attenuates the amplitude in the front-rear direction of the retaining wall, and the buffer function part bends to follow the displacement (swing) of the slope S, thereby retaining wall housing A Between the slope S and the slope S, there is no longer a void as formed by the retaining wall of the conventional block stacking retaining wall method. If it does so, since an empty part will not generate | occur | produce, it will be suppressed that the retaining wall case A collapses at the time of an earthquake occurrence, and earthquake resistance will improve more and more.

したがって、本発明に係るもたれ式擁壁の構築方法では、慣習的に施工されていた排水用の裏込め砕石(栗石)層に代えて、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に対して垂直方向の透水係数が1.0×10-2(cm/sec)以上である透水性マット3を採用し、さらに、この透水性マット3を法面Sの全体に、10cm以上の長さを有するアンカー4で打ち付けて被覆した上で、擁壁躯体Aを構築することにより、アンカー4の打ち付けによって透水性マット3の被覆が法面から剥がれるようなことがなくなって、地震発生時に、透水性マット3により法面Sの表土が崩落するのが阻止されるとともに、擁壁躯体Aと法面Sとの間に空部が形成されることが阻止され、かつ、透水性マット4の緩衝によって地震力を吸収し、擁壁躯体Aが前後に揺動する振幅が減衰される構造として擁壁躯体Aの崩落を抑止し、耐震性を向上させることができる。また、地震発生時に崩落陥没して擁壁の崩落の原因となっていた裏込め砕石(栗石)層を不要とすることができるので、これに起因した地震発生時の擁壁躯体の崩落を抑止し、益々耐震性を向上させることができる。 Therefore, in the construction method of the leaning type retaining wall according to the present invention, in place of the back-filled crushed stone (Kuriishi) layer for drainage that has been conventionally constructed, the thickness is at least 10 mm and has at least elasticity or a buffer function , A water permeable mat 3 having a water permeability coefficient of 1.0 × 10 −2 (cm / sec) or higher in the direction perpendicular to the surface is adopted, and the water permeable mat 3 is further applied to the entire slope S by 10 cm or more. By building the retaining wall housing A after being struck and covered with the anchor 4 having the length of, the permeable mat 3 is not peeled off from the slope by the anchor 4 and the occurrence of the earthquake Sometimes, the water-permeable mat 3 prevents the top soil of the slope S from collapsing, and the formation of a void between the retaining wall housing A and the slope S is prevented. Seismic force by 4 buffers Absorb, to suppress the collapse of Yokabemukurotai A as structures amplitude swings back and forth is attenuated Yokabemukurotai A, thereby improving the vibration resistance. In addition, since the back-filled crushed stone (Kuriishi) layer that collapsed and caused the collapse of the retaining wall at the time of the earthquake occurrence can be eliminated, the collapse of the retaining wall structure caused by the earthquake is prevented. In addition, the earthquake resistance can be further improved.

また、法面Sの高さ方向に積み上げた複数段の残存型枠1の後方に柱材2を設置した上で、裏込めコンクリートCを小刻みに打設することで擁壁を構築することにより、擁壁躯体Aにおいて地震発生時に裏込めコンクリートCの打継部C1が節となり、柱材2が軸となって撓なる緩衝機能部を形成することができる。この緩衝機能部は、擁壁躯体Aが前後に揺動する振幅を分散減衰させるとともに、法面Sの変位に追随し、法面Sとの間に空部が形成されることを阻止する構造を形成することができ、地震発生時に擁壁躯体Aの崩落を抑止して、耐震性を向上させた擁壁を構築ことができる。 In addition, by installing the pillar material 2 behind the plurality of remaining molds 1 stacked in the height direction of the slope S, and constructing the retaining wall by placing the backfill concrete C in small increments In the retaining wall body A, when the earthquake occurs, the joint portion C1 of the back-filled concrete C becomes a node, and the buffer function portion that is bent with the pillar material 2 as an axis can be formed. This buffer function part has a structure that disperses and attenuates the amplitude at which the retaining wall case A swings back and forth, follows the displacement of the slope S, and prevents a void from being formed between the slope S. It is possible to form a retaining wall with improved seismic resistance by preventing the retaining wall housing A from collapsing when an earthquake occurs.

ここで、上記実施形態では、積み上げる残存型枠として手で運搬することが可能な重さの矩形状で所定大の残存型枠1を用いた例を説明したが、従来から使用され、例えば、図4に示すような間知ブロック10を採用しても、本発明に係るもたれ式擁壁の構築方法を実施することができる。この場合も、法面Sの全体に透水性マット3をアンカー4で打ち付けて被覆したことにより、地震発生時に崩落陥没して擁壁の崩落の原因となっていた裏込め砕石(栗石)層を不要とし、法面Sの表土の崩落を阻止し、また、その緩衝機能によって擁壁躯体が前後に揺動する振幅を減衰させることができるからである。また、上記実施形態は、本発明について出願人が最良であると信じる実施形態であるので、地震発生時に裏込めコンクリートの打継部が節となり、柱材が軸となって撓なる緩衝機能部を形成する擁壁が構築される構成を追加した例を説明しているが、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に対して垂直方向の透水係数が1.0×10-2(cm/sec)以上である透水性マットを採用する構成であるかぎり、例えば、柱材を使用しないで緩衝機能部に軸が備わっていない形態であっても本発明に係るもたれ式擁壁の構築方法を実施することができる。 Here, in the above-described embodiment, an example in which the remaining formwork 1 having a rectangular shape with a weight that can be carried by hand as the remaining formwork to be stacked is used has been described. Even when the cognitive block 10 as shown in FIG. 4 is employed, the leaning type retaining wall construction method according to the present invention can be implemented. Also in this case, the back-filled crushed stone (Kuriishi) layer that collapsed and caused the collapse of the retaining wall at the time of the earthquake by covering the entire slope S with the permeable mat 3 with the anchor 4 was coated. This is because it is unnecessary and prevents the topsoil of the slope S from collapsing, and the buffering function can attenuate the amplitude at which the retaining wall frame swings back and forth. Moreover, since the said embodiment is an embodiment which the applicant believes is the best about this invention, the buffering function part which a joint part of backfill concrete becomes a node at the time of the occurrence of an earthquake becomes a node, and a columnar material becomes an axis | shaft, and bends Although the example which added the structure by which the retaining wall which forms is added is demonstrated, thickness has 10 mm or more, it has an elasticity or a buffer function at least , and the water permeability coefficient of the orthogonal | vertical direction is 1.0x10 with respect to a surface. -2 (cm / sec) or more, as long as the structure adopts a water permeable mat, for example, even if the cushioning function part is not equipped with a shaft without using a pillar material, A wall construction method can be implemented.

以上、本発明に係るもたれ式擁壁の構築方法を実施する一実施形態を詳述したが、本発明は、特許請求の範囲に記載された事項を逸脱することがなければ、上記実施形態に限定されることなく、種々の設計変更を行うことが可能である。例えば、透水性マットは、出願人が求める所定の効果(緩衝機能及び排水能)において、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に対して垂直方向の透水係数が1.0×10-2(cm/sec)以上であることを要件とする限りであって、経済性、弾性又は緩衝機能の観点から、面内方向の透水性能、厚さ保持率等のその他の性能は適宜として、本発明に係るもたれ式擁壁の構築方法に用いることができる。なお、透水性マットの好ましい形態は、面に対して垂直方向の透水係数が1.0×10-1(cm/sec)以上である。 As mentioned above, although one embodiment which implements the construction method of the leaning type retaining wall concerning the present invention was explained in full detail, the present invention is in the above-mentioned embodiment unless it deviates from the matter described in the claim. Without being limited, various design changes can be made. For example, the water-permeable mat has a predetermined effect ( buffer function and drainage capacity) required by the applicant and has a thickness of 10 mm or more and at least an elastic or buffer function, and has a water permeability coefficient of 1.0 in the direction perpendicular to the surface. As long as it is required to be at least 10 −2 (cm / sec), from the viewpoint of economy, elasticity or buffer function , other performances such as in-plane water permeability and thickness retention are As appropriate, it can be used in the construction method of the leaning type retaining wall according to the present invention. In addition, the preferable form of a water-permeable mat has a water permeability coefficient of 1.0 × 10 −1 (cm / sec) or more in a direction perpendicular to the surface.

また、透水性マットは、特許請求の範囲に記載された事項を逸脱することがなければ、無機材、有機材の別、合成樹脂、天然樹脂の別などを問わないで、様々な材質で構成されたものを使用することができる。   In addition, the water-permeable mat is composed of various materials regardless of whether it is an inorganic material, an organic material, a synthetic resin, or a natural resin, as long as it does not deviate from the matters described in the claims. Can be used.

1・・残存型枠
1a・残存型枠
1b・残存型枠
11・フック
10・間知ブロック
2・・柱材
3・・透水マット
4・・アンカー
5・・セパレータ
6・・固定具
61・ボルト
7・・連結具
A・・擁壁躯体
B・・基礎部分
C・・裏込めコンクリート
C1・打継部
D・・裏込め砕石(栗石)
P・・隙間
Q・・空部
S・・法面
1 ······················································································································· 10 · 7 ・ ・ Connector A ・ ・ Retaining wall body B ・ ・ Basic part C ・ ・ Backfill concrete C1 ・ Pasting part D ・ ・ Backfill crushed stone (Kuriishi)
P ・ ・ Gap Q ・ ・ Void S ・ ・ Slope

Claims (2)

耐震性が向上するもたれ式擁壁の構築方法であって、
裏込め砕石層に代わる、厚みが10mm以上で少なくとも弾性又は緩衝機能を有し、面に垂直方向の透水係数が1.0×10-2(cm/sec)以上、かつ面内方向の透水性能が15cm 3 /sec/cm以上である透水性マットを予め法面の全体に、10cm以上の長さを有するアンカーで打ち付けて被覆し、前記透水性マットを被覆した前記法面の手前側に、前記法面の高さ方向に複数段の残存型枠を積み上げ、前記残存型枠の背面から前記透水性マットまで裏込めコンクリートを打設し、裏込め砕石を不要にして、前記擁壁、前記透水性マット及び前記裏込めコンクリートからなる擁壁躯体を構築し、前記アンカーの打ち付けによって前記透水性マットの被覆が前記法面から剥がれるようなことがなくなって、地震発生時に、前記透水性マットにより前記法面の表土が崩落するのが阻止されるとともに、前記擁壁躯体と前記法面との間に空部が形成されることが阻止され、かつ、前記法面から前記擁壁躯体の背面に伝達する地震力を前記透水性マットの緩衝によって吸収し、前記擁壁躯体が前後に揺動する振幅が減衰される構造として、前記擁壁躯体の崩落を抑止可能とする、
ことを特徴とするもたれ式擁壁の構築方法。
A method of constructing a leaning retaining wall that improves earthquake resistance,
In place of the back-filled crushed stone layer, the thickness is 10 mm or more, it has at least elasticity or a buffer function, the permeability coefficient perpendicular to the surface is 1.0 × 10 −2 (cm / sec) or more , and the in-plane direction water permeability performance Is coated with an anchor having a length of 10 cm or more in advance and coated with a water-permeable mat having a thickness of 15 cm 3 / sec / cm or more , on the front side of the slope having the water-permeable mat covered, top up Masonry remaining formwork plurality of stages in a height direction of the slopes, and Da設the backfill concrete to said permeable mat from the back of the remaining mold, and the need for back-filling crushed stone, said retaining wall And constructing a retaining wall frame made of the water-permeable mat and the backfilled concrete, and the coating of the water-permeable mat is not peeled off from the slope by driving the anchor. The mat prevents the topsoil of the slope from collapsing and prevents a void from being formed between the retaining wall and the slope, and the retaining wall from the slope. As a structure that absorbs the seismic force transmitted to the back surface of the water permeable mat by the buffer of the water permeable mat and attenuates the amplitude of swinging the retaining wall housing back and forth, it is possible to suppress the collapse of the retaining wall housing.
The construction method of the leaning type retaining wall characterized by this.
前記残存型枠の後方であって前記法面よりも手前側に、前記残存型枠を支持する柱材を設置した上で、前記擁壁の背面から前記透水性マットまで裏込めコンクリートを所定の打設高さで打継し、前記擁壁、前記柱材、前記透水性マット及び前記裏込めコンクリートからなる擁壁躯体を構築し、この擁壁躯体に、前記裏込めコンクリートの打継部が節となり、前記柱材が芯となって前記擁壁躯体を補強しつつ撓る緩衝機能部を形成する、
ことを特徴とする請求項1に記載のもたれ式擁壁の構築方法。
A column material supporting the remaining mold is installed behind the remaining mold and in front of the slope, and backfill concrete is provided from the back of the retaining wall to the permeable mat. It is handed over at the placement height, and a retaining wall housing composed of the retaining wall, the pillar material, the water-permeable mat and the backfilled concrete is constructed, and the backfill concrete jointing portion is provided on the retaining wall housing. It becomes a node, and the columnar material serves as a core to form a buffer function part that bends while reinforcing the retaining wall housing,
The construction method of the leaning type retaining wall according to claim 1.
JP2013064495A 2013-03-26 2013-03-26 Construction method of leaning type retaining wall Active JP5866735B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013064495A JP5866735B2 (en) 2013-03-26 2013-03-26 Construction method of leaning type retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013064495A JP5866735B2 (en) 2013-03-26 2013-03-26 Construction method of leaning type retaining wall

Publications (3)

Publication Number Publication Date
JP2014189978A JP2014189978A (en) 2014-10-06
JP2014189978A5 JP2014189978A5 (en) 2015-01-15
JP5866735B2 true JP5866735B2 (en) 2016-02-17

Family

ID=51836528

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013064495A Active JP5866735B2 (en) 2013-03-26 2013-03-26 Construction method of leaning type retaining wall

Country Status (1)

Country Link
JP (1) JP5866735B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021179096A (en) * 2020-05-12 2021-11-18 喜央 山下 Wall surface panel and wall surface construction method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284341B (en) * 2016-08-21 2018-08-17 中国十九冶集团有限公司南京分公司 A kind of prestress anchorage cable hillside wall construction technology
CN108182338A (en) * 2018-03-19 2018-06-19 重庆大学 Non- rock slope horizontal ground motion amplification coefficient determines method and Seismic Design Method
CN114164843B (en) * 2021-11-10 2023-10-13 中交第四航务工程局有限公司 Construction method of high side slope excavation slope protection system
CN114605039B (en) * 2022-03-31 2022-12-13 中国科学技术大学 Permeable filtering reaction wall for water treatment

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62296015A (en) * 1986-06-13 1987-12-23 Nisshin Sangyo Kk Simple latticework construction work
JPH0547793Y2 (en) * 1988-01-21 1993-12-16
JPH06136771A (en) * 1992-10-28 1994-05-17 Randesu Kk Wall retaining panel installation method
JPH10317673A (en) * 1997-05-16 1998-12-02 Sato Kogyo Co Ltd Continuous placing method of concrete and its piping device
JP2001152666A (en) * 1999-11-29 2001-06-05 Daicel Huels Ltd Processing method of concrete joint face and joint method
JP2003003474A (en) * 2001-06-27 2003-01-08 Kyokado Eng Co Ltd Reinforcing earth structure and reinforcing earth block
JP2005002687A (en) * 2003-06-13 2005-01-06 Kikusui Chemical Industries Co Ltd Method of repairing reinforced concrete structure
JP2006037700A (en) * 2004-06-21 2006-02-09 Asurakku:Kk Block for retaining wall and retaining wall structure
JP4264431B2 (en) * 2005-08-29 2009-05-20 正栄建装株式会社 How to build a stone wall
JP2008150896A (en) * 2006-12-19 2008-07-03 Port & Airport Research Institute Method and structure of aseismic reinforcing backfill ground
JP5689357B2 (en) * 2011-05-02 2015-03-25 公益財団法人鉄道総合技術研究所 Integrated structure and integration method of concrete structure and reinforced ground

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021179096A (en) * 2020-05-12 2021-11-18 喜央 山下 Wall surface panel and wall surface construction method
JP7061150B2 (en) 2020-05-12 2022-04-27 喜央 山下 Wall panel and wall construction method

Also Published As

Publication number Publication date
JP2014189978A (en) 2014-10-06

Similar Documents

Publication Publication Date Title
JP5866735B2 (en) Construction method of leaning type retaining wall
JP4281567B2 (en) Reinforcement structure of existing pier foundation and reinforcement method of existing pier foundation
JP4190360B2 (en) Masonry wall reinforcement structure and method
JP2017210787A (en) Aseismatic structure of cut-and-cover tunnel
KR102220613B1 (en) Freestanding retaining wall construction method
JP7115817B2 (en) Reinforced soil wall using large sandbags and retaining method using large sandbags
JP2007170099A (en) Method for preventing differential settlement by reducing liquefaction of existing building foundation
JPH0988080A (en) Sheathing structure
JP2014189977A (en) Construction method of leaning type retaining wall
KR101544756B1 (en) Retaining wall block construction method using stone
JP6860895B2 (en) Retaining wall and its construction method
JP4544476B2 (en) Seismic isolation structure and base isolation pile
JP4316939B2 (en) Masonry wall reinforcement method
JP4264431B2 (en) How to build a stone wall
JP2014189977A5 (en)
JP2004027727A (en) Foundation pile and construction method for foundation pile
KR20170052317A (en) Reinforced earth-anchor structure for weakground
JP2017048647A (en) Reinforcement earth built-in type precast grid frame construction method
JP6347120B2 (en) Embankment reinforcement structure
JP2019206803A (en) Foundation structure for wind power generator
JP2019023394A (en) Foundation structure and foundation construction method
JP3227020U (en) Levee reinforcement device
JP7194626B2 (en) Station platform reinforcement structure
JP2004027775A (en) Wide-flange shape steel pile for temporary work
KR101070379B1 (en) A construction method and that of structure a breast wall using stone

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141106

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20141106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150728

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151218

R150 Certificate of patent or registration of utility model

Ref document number: 5866735

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250