KR101070379B1 - A construction method and that of structure a breast wall using stone - Google Patents

A construction method and that of structure a breast wall using stone Download PDF

Info

Publication number
KR101070379B1
KR101070379B1 KR1020090069984A KR20090069984A KR101070379B1 KR 101070379 B1 KR101070379 B1 KR 101070379B1 KR 1020090069984 A KR1020090069984 A KR 1020090069984A KR 20090069984 A KR20090069984 A KR 20090069984A KR 101070379 B1 KR101070379 B1 KR 101070379B1
Authority
KR
South Korea
Prior art keywords
fixed
natural stone
angle
concrete
vertical angle
Prior art date
Application number
KR1020090069984A
Other languages
Korean (ko)
Other versions
KR20110012308A (en
Inventor
차인회
이재용
Original Assignee
(주)삼미세계스톤
이재용
차인회
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)삼미세계스톤, 이재용, 차인회 filed Critical (주)삼미세계스톤
Priority to KR1020090069984A priority Critical patent/KR101070379B1/en
Publication of KR20110012308A publication Critical patent/KR20110012308A/en
Application granted granted Critical
Publication of KR101070379B1 publication Critical patent/KR101070379B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Abstract

본 발명은 터파기가 어려운 곳에 자연석 옹벽을 견고하게 형성하고, 자연석판이 떨어져 나가지 않도록 시공할 수 있는 자연석 옹벽의 시공구조 및 시공방법에 관한 것이며, 터파기가 힘든 언덕이나 절개지 전방의 지중에 형성되고, 내부에 수평앵글(12)이 철근(11)으로 연결되어 매립되는 기초콘크리트(10); 기초콘크리트(10)의 수평앵글(12)과 하단이 용접되어 수직으로 형성되는 수직앵글(20); 수직앵글(20)의 후방으로 거푸집 대신 수직으로 적층되는 벽돌층(25); 자연석을 사각 판체(31) 형상으로 성형되고, 판체(31)의 배면에 홀을 형성하여 앵커볼트(32)가 고정되며, 수직앵글(20)에 고정되는 자연석판(30); 수평부(41)와 수직부(42)가 ㄴ형상으로 이루어진 앵글의 수평부(41)가 두개의 인접한 자연석판(30) 배면에 고정된 앵커볼트(32)에 동시에 체결되고, 수직부(42)에 형성된 볼트홀에 고정철근(43) 일단부에 형성된 볼트부가 삽입되어 너트체결되어 고정되며, 고정철근(43)의 타단은 철근(21) 또는 수직앵글(20)에 고정되도록 구성된 고정브라켓(40); 고정된 자연석판(30)과 벽돌층(25) 사이에 타설되어 양생되는 콘크리트층(50); 으로 구성되는 것을 특징으로 한다.The present invention relates to the construction structure and construction method of the natural stone retaining wall that can be formed firmly to the hard-to-break place, the natural stone retaining wall does not fall off, is formed in the ground in front of a hill or incision difficult to break, Horizontal concrete 12 therein is connected to the reinforcing bar 11, the base concrete is embedded; A vertical angle 20 in which the horizontal angle 12 and the lower end of the basic concrete 10 are vertically welded; A brick layer 25 stacked vertically instead of formwork to the rear of the vertical angle 20; Natural stone is formed in the shape of a square plate body 31, a hole formed in the back surface of the plate 31 anchor bolt 32 is fixed, the natural stone plate 30 is fixed to the vertical angle (20); The horizontal portion 41 of the angle in which the horizontal portion 41 and the vertical portion 42 have a B-shape is simultaneously fastened to the anchor bolt 32 fixed to the rear surface of two adjacent natural stone slabs 30, and the vertical portion 42 The bolt portion formed at one end of the fixed reinforcing bar 43 is inserted into the bolt hole formed in the bolt hole and fixed to the nut, and the other end of the fixed reinforcing bar 43 is fixed to the reinforcing bar 21 or the vertical angle 20 ( 40); A concrete layer 50 that is poured and cured between the fixed natural slab 30 and the brick layer 25; Characterized in that consists of.

자연석판, 수직앵글, 수평앵글, 벽돌층 Natural Slab, Vertical Angle, Horizontal Angle, Brick Layer

Description

자연석 옹벽의 시공구조 및 시공방법{A construction method and that of structure a breast wall using stone}Construction method and that of structure a breast wall using stone

본 발명은 자연석 옹벽의 시공구조 및 시공방법에 관한 것으로서, 더욱 상세하게는 터파기가 어려운 곳에 자연석 옹벽을 견고하게 형성하고, 자연석판이 떨어져 나가지 않도록 시공할 수 있는 자연석 옹벽의 시공구조 및 시공방법에 관한 것이다.The present invention relates to a construction structure and a construction method of the natural stone retaining wall, and more particularly to the construction structure and construction method of the natural stone retaining wall that can be formed firmly in the place difficult to break, the natural stone retaining wall does not fall off It is about.

일반적으로 토목공사시 발생되는 절개지, 경사지 및 암반 등과 경계지의 전방에는 이들이 토압 또는 우수 등에 의해 붕괴되는 것을 방지할 수 있도록 옹벽 등과 같은 구조물이 구축되는 데, 이같은 종래의 옹벽은 주로 콘크리트에 의한 콘크리트 옹벽이 주를 이룬다.In general, structures such as retaining walls are constructed in front of cutouts, slopes, rocks, etc., which are generated during civil engineering, to prevent them from being collapsed by earth pressure or rainwater. Such conventional retaining walls are mainly made of concrete. This week.

그러나, 이같은 콘크리트 옹벽에 있어서는 그 절개지나 경사지 또는 암반 등과 같은 경계지의 형태에 대한 유연성 및 가변성이 부족하여 지지기반의 확보를 위해 설치 대상물로부터 비교적 멀리 떨어지도록 시공됨에 따라 넓은 작업공간의 확보는 물론 후작업 공정인 뒷채움작업이 많아지게 되어 오랜 공사기간의 소요될 뿐 만 아니라 그로 인한 공사비용이 상승되는 문제점도 발생하였다.However, in such a concrete retaining wall, the flexibility and variability of the shape of the cutout, slope or rock, etc., lacks flexibility and variability, so that it is constructed to be relatively far from the installation object to secure a support base, thereby securing a wide working space. As the backfilling work, which is a work process, has been increased, not only a long construction period is required but also a construction cost increases.

한편, 아파트나 주택단지 또는 도로 변에 시공되는 콘크리트 옹벽의 경우에는 그 콘크리트 구조물의 특성상 보는 이로 하여금 위압감을 느끼게 할 뿐만 아니라 주변 환경과 어울리지 못하는 상반된 환경을 조성하는 문제점을 가지고 있었다. 이러한 문제점을 해소하고자 근래에 들어서는 자연석이나 발파석을 가공한 가공자연석을 이용하여 자연친화적인 자연석 옹벽이 시공되고 있다.On the other hand, in the case of the concrete retaining wall to be built in the apartment, housing complex or road side, because of the characteristics of the concrete structure, the viewer not only feels a sense of pressure, but also has a problem of creating a contradictory environment that does not match the surrounding environment. In order to solve such a problem, a natural-friendly natural stone retaining wall is being constructed using a processed natural stone processed natural stone or blasting stone in recent years.

종래의 자연석 옹벽은 절개지의 전방 지면에 세우고자 하는 다수 개의 자연석 위치를 굴삭한 후 콘크리트 타설하여 전면이 노출되도록 자연석을 배열한 다음 상기 자연석의 후방으로 자연석과 자연석 사이와 삼각형상을 이룰 수 있도록 다수의 후방지지석을 경계지의 경계면과 지지되도록 구비한다.Conventional natural stone retaining wall is to excavate a number of natural stone positions to be placed on the front ground of the incision, and then place the natural stones so that the front surface is exposed by concrete placing, and then a plurality of natural stones can be formed between the natural stones and the natural stones to the rear of the natural stone. The rear support stone is provided to be supported with the boundary surface of the boundary.

그런 다음 상기 자연석의 후면과 지지석의 대응되는 위치에 각각의 고정홈을 형성하여 그 고정홈과 고정홈 사이에 지지축의 각 끝단을 접착재와 같이 삽입하여 지지될 수 있도록 고정한다.Then, each fixing groove is formed at a corresponding position of the back of the natural stone and the supporting stone, and each end of the support shaft is inserted between the fixing groove and the fixing groove to be supported by an adhesive material.

또한, 상기 자연석과 자연석 사이에는 작은 크기를 갖는 소석을 적재하여 자연석과 자연석 사이를 연결한 후 경계지 사이에 잡석과 토사 등으로 메워 자연친화적인 자연석 옹벽을 시공하였다.In addition, the natural stone and the natural stone was loaded between the natural stone and the natural stone is connected between the natural stone and natural stone filled with rubble and earth and sand between the boundaries to construct a natural friendly retaining wall.

또, 필요에 따라 상기 자연석의 지지력을 보강하기 위하여 상기 자연석의 전면에 전방지지석을 설치하였다. 이때, 상기 자연석과 전방지지석 또한 상기한 지지축과 같이 서로 대응되는 위치에 고정홈을 형성하여 작은 지지축을 삽입하여 고정하였다.In addition, in order to reinforce the bearing capacity of the natural stone as needed, the front support stone was installed on the front of the natural stone. At this time, the natural stone and the front support stone also formed a fixing groove in a position corresponding to each other, such as the support shaft was fixed by inserting a small support shaft.

한편, 상기와 같이 단층이 아니라 다층으로 시공하고자 할 경우에는 상기와 같은 방식으로 잡석과 토사 등으로 메운 후 그상부로 전술한 바와 같은 방식을 반복하여 시공하였다. 그러나, 이같은 방식에 있어서는 상기 자연석을 고정하기 위한 지지석과의 삼각형상으로 이루도록 하여 연결하는 방식이 상당히 번거러워 장시간의 작업시간이 소요될 뿐만 아니라 그로 인한 오랜 시공기간이 소요되었음은 물론 상기 자연석과 소석 사이로 메어진 토사가 흘러 배출되는 문제점도 발생하였다.On the other hand, if you want to install in a multi-layer rather than a single layer as described above, after filling the rubble and earth and sand in the same manner as described above was repeated to the construction as described above. However, in such a method, the method of connecting the natural stone to form a triangular shape with the support stone for fixing it is quite cumbersome, which takes a long time and not only a long construction period, but also between the natural stone and the stone. There was also a problem that the drained sediment flows out.

그리고 자연석이 중량이어서 견고하게 고정하기 힘들고, 대개 옹벽을 형성하는 곳에 기초가 될 터파기가 용이하지 않은 문제가 있었다.And since the natural stone is heavy, it is difficult to fix firmly, and there is a problem that it is not easy to dig a foundation to form a retaining wall.

본 발명은 전술한 바와 같은 문제를 해결하기 위하여 안출한 것으로서, 자연석 배면에 앵커볼트를 박고, 앵커볼트를 인접한 자연석판과 같이 동시에 고정브라켓에 고정시키며, 고정브라켓을 기초콘크리트에 고정된 수직앵글에 고정한 후 후방에 콘크리트를 타설하여 지지력을 증대시키는 자연석 옹벽의 시공구조 및 시공방법을 제공하고자 하는 목적이 있다.The present invention has been made in order to solve the problems as described above, and put the anchor bolt on the back of the natural stone, the anchor bolt is fixed to the fixing bracket at the same time as the adjacent natural stone, and the fixing bracket to the vertical angle fixed to the base concrete The purpose is to provide a construction structure and construction method of the natural stone retaining wall to increase the bearing capacity by placing concrete in the rear after fixing.

또한 터파기가 용이하지 못한 옹벽 시공구조에서 벽돌을 적층하여 거푸집을 대신해 작업 공간 협소를 해소하고자 하는 목적이 있다.In addition, there is a purpose to solve the narrow work space instead of the formwork by stacking bricks in the retaining wall construction structure is not easy to dig.

벽돌층에 의해 1차 절개지가 지지되고, 자연석은 기초콘크리트에 고정된 수직앵글에 지지되면서 벽돌층과 자연석 사이에 충진되는 콘크리트에 의해 견고하게 지지되도록 구성하고자 한다. The primary incision is supported by the brick layer, and the natural stone is intended to be firmly supported by the concrete filled between the brick layer and the natural stone while being supported by the vertical angle fixed to the foundation concrete.

본 발명은 전술한 목적을 달성하기 위하여 터파기가 힘든 언덕이나 절개지 전방의 지중에 형성되고, 내부에 수평앵글이 철근으로 연결되어 매립되는 기초콘크리트; 기초콘크리트의 수평앵글과 하단이 용접되어 수직으로 형성되는 수직앵글; 수직앵글의 후방으로 거푸집 대신 수직으로 적층되는 벽돌층; 자연석을 사각 판체 형상으로 성형되고, 판체의 배면에 홀을 형성하여 앵커볼트가 고정되며, 수직앵글에 고정되는 자연석판; 수평부와 수직부가 ㄴ형상으로 이루어진 앵글의 수평부가 두개의 인접한 자연석판 배면에 고정된 앵커볼트에 동시에 체결되고, 수직부에 형 성된 볼트홀에 고정철근 일단부에 형성된 볼트부가 삽입되어 너트체결되어 고정되며, 고정철근의 타단은 철근 또는 수직앵글에 고정되도록 구성된 고정브라켓; 고정된 자연석판과 벽돌층 사이에 타설되어 양생되는 콘크리트층; 로 구성되는 것을 특징으로 하는 자연석 옹벽의 시공구조 및 지면을 터파기 하여 기초콘크리트가 형성될 거푸집을 형성하고, 거푸집 내에 수평앵글을 철근으로 용접하여 일정 간격으로 고정하며, 수평앵글에 수직앵글의 하단을 용접하여 고정하고, 거푸집에 콘크리트를 타설하여 양생하는 수직앵글 형성단계; 수직앵글의 후방으로 거푸집 대신 벽돌을 적층하여 벽을 만드는 벽돌 적층 단계; 자연석 판체를 사각으로 성형하고, 자연석 판체 배면에 앵커볼트를 고정하며, 앵커볼트에 고정브라켓을 고정한 후 고정브라켓은 고정철근로 수직앵글에 고정하는 자연석 고정단계; 벽돌층과 자연석판 사이에 콘크리트를 타설하여 양생하는 콘크리트층 형성 단계; 가 순차적으로 이루어지는 것을 특징으로 하는 자연석 옹벽의 시공방법을 제공한다.The present invention is formed in the ground of a hill or incision in front of a hard to break in order to achieve the above object, the base concrete is connected to the horizontal angle is embedded in the reinforcement; A vertical angle formed vertically by welding the horizontal angle and the lower end of the basic concrete; A brick layer stacked vertically instead of formwork to the rear of the vertical angle; Natural stone is formed into a rectangular plate body shape, the anchor bolt is fixed by forming a hole on the back of the plate body, the natural stone plate is fixed to the vertical angle; The horizontal part of the angle part consisting of the horizontal part and the vertical part is simultaneously fastened to the anchor bolt fixed to the back of two adjacent natural slabs, and the bolt part formed at one end of the fixed reinforcing bar is inserted into the bolt hole formed at the vertical part to be nut-fastened. A fixed bracket configured to be fixed to the other end of the rebar or the vertical angle of the fixed rebar; A concrete layer cast and cured between the fixed natural slab and the brick layer; Forming the formwork to form the foundation concrete by digging the construction structure and ground of the natural stone retaining wall, characterized in that consisting of, and fixed in a fixed interval by welding the horizontal angle in the form with rebar, the bottom of the vertical angle to the horizontal angle Fixing by welding, the vertical angle forming step of curing by pouring concrete into the formwork; A brick laminating step of forming a wall by laminating bricks instead of formwork to the rear of the vertical angle; Forming a natural stone plate into a square, fixing the anchor bolt on the back of the natural stone plate, and fixing the fixing bracket to the anchor bolt, the fixing bracket fixing the natural stone to the vertical angle with the fixing rebar; A concrete layer forming step of curing by pouring concrete between the brick layer and the natural slab; It provides a construction method of natural stone retaining wall, characterized in that made sequentially.

이상과 같이 본 발명은 또한 터파기가 용이하지 못한 옹벽 시공구조에서 벽돌을 적층하여 거푸집을 대신하므로 편리하고, 벽돌층이 지지구조로 작용하므로 견고하게 지지되는 효과가 있고, 작업 공간 협소가 해소되는 효과가 있다.As described above, the present invention is also convenient because it replaces the formwork by stacking bricks in the retaining wall construction structure, which is not easy to dig, and the brick layer acts as a supporting structure, so that the effect of being firmly supported and the work space is eliminated. There is.

벽돌층에 의해 1차 절개지가 지지되고, 자연석은 기초콘크리트에 고정된 수직앵글에 지지되면서 벽돌층과 자연석 사이에 충진되는 콘크리트에 의해 견고하게 지지되는 효과가 있다. The primary incision is supported by the brick layer, and the natural stone is firmly supported by concrete filled between the brick layer and the natural stone while being supported by the vertical angle fixed to the foundation concrete.

거푸집을 형성하거나 종래와 같이 자연석을 고정하는데 많은 시간이 소요되지 않으므로 시공성이 뛰어난 효과가 있다.Since it does not take much time to form the form or to fix the natural stone as in the prior art has excellent workability.

이하, 본 발명의 구성 및 작용을 첨부된 도면에 의거하여 좀 더 구체적으로 설명한다. 본 발명을 설명함에 있어서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Hereinafter, the configuration and operation of the present invention will be described in more detail with reference to the accompanying drawings. In describing the present invention, the term or word used in the present specification and claims is based on the principle that the inventor can appropriately define the concept of the term in order to best describe the invention of his or her own. It should be interpreted as meanings and concepts corresponding to the technical idea of

본 발명의 자연석 옹벽은 터파기가 힘든 언덕이나 절개지 전방에 기초콘크리트(10)를 형성하고, 기초콘크리트(10)에 수직앵글(20)의 하단이 고정되도록 형성하며, 수직앵글(20)에 자연석판(30)을 고정브라켓(40)과 고정철근(43)로 고정하고, 수직앵글(20) 배면에 거푸집 대신 적층한 벽돌층(25)과 자연석판(30) 사이에 콘크리트층(50)을 형성하여 견고하게 지지되도록 한다.The natural stone retaining wall of the present invention forms a foundation concrete 10 in front of a hill or incision difficult to break, and formed so that the bottom of the vertical angle 20 to the foundation concrete 10 is fixed, natural stone slab on the vertical angle 20 (30) is fixed to the fixed bracket 40 and the fixed reinforcing bar 43, and the concrete layer 50 is formed between the brick layer 25 and the natural slab 30 laminated instead of the formwork on the back of the vertical angle (20) To be firmly supported.

기초콘크리트(10)는 터파기가 힘든 언덕이나 절개지 전방의 지면(1)을 파 지중에 형성되고, 기초콘크리트(10)의 내부에는 다수개의 수평앵글(12)이 철근(11)으로 연결된 상태에서 콘크리트가 타설되어 형성된다. 이때 기초콘크리트(10)의 수평앵글(12)과 수직앵글(20)의 하단이 용접되어 수직으로 형성되는데, 수직앵글(20)의 하단 또한 기초콘크리트(10)와 일체로 고정된다.The foundation concrete 10 is formed in the gripping the ground (1) in front of the hill or incision difficult to break, and the concrete inside the concrete concrete in a state in which a plurality of horizontal angles 12 are connected by reinforcing bars 11 Is formed by pouring. At this time, the horizontal angle 12 of the base concrete 10 and the lower end of the vertical angle 20 is welded to form a vertical, the lower end of the vertical angle 20 is also fixed integrally with the base concrete 10.

터파기를 많이 할 수 없는 곳에서는 거푸집을 형성하기도 용이하지 않으므로 수직앵글(20)의 후방으로 거푸집 대신 수직으로 벽돌을 적층하여 벽돌층(25)을 형성한다. 벽돌층(25)은 옹벽의 내부에 유지되어 지지층으로 작용하게 된다.Where it is not possible to dig a lot, since it is not easy to form the formwork to form a brick layer 25 by stacking bricks vertically instead of formwork to the rear of the vertical angle (20). The brick layer 25 is maintained inside the retaining wall to act as a support layer.

자연석판(30)은 자연석이 사각 판체(31) 형상으로 성형되고, 판체(31)의 배면에 홀을 형성하여 앵커볼트(32)의 단부가 고정된다. 앵커볼트(32)는 고정브라켓(40)과 고정철근(43)로 수직앵글(20)에 고정된다.Natural stone plate 30 is a natural stone is formed in the shape of a rectangular plate body 31, the hole formed in the back surface of the plate body 31 is fixed to the end of the anchor bolt (32). The anchor bolt 32 is fixed to the vertical angle 20 by the fixing bracket 40 and the fixing bar 43.

고정브라켓(40)은 수평부(41)와 수직부(42)가 ㄴ형상으로 이루어진 앵글의 수평부(41)가 두개의 인접한 자연석판(30) 배면에 고정된 앵커볼트(32)에 동시에 체결되어 두개의 자연석판(30)을 하나의 몸체로 고정시킨다. 그리고 수직부(42)에 형성된 볼트홀에 고정철근(43) 일단부에 형성된 볼트부가 삽입되어 너트체결되어 고정되고, 고정철근(43)의 타단은 철근(21) 또는 수직앵글(20)에 용접으로 고정된다.The fixing bracket 40 is simultaneously fastened to the anchor bolt 32 fixed to the back of two adjacent natural slabs 30 by the horizontal portion 41 of the angle in which the horizontal portion 41 and the vertical portion 42 have a B shape. The two natural slabs 30 are fixed to one body. In addition, the bolt part formed at one end of the fixed reinforcing bar 43 is inserted into the bolt hole formed in the vertical part 42 to be fastened by a nut, and the other end of the fixed reinforcing bar 43 is welded to the reinforcing bar 21 or the vertical angle 20. Is fixed.

콘크리트층(50)은 고정된 자연석판(30)과 벽돌층(25) 사이에 타설되어 양생되므로 자연석과 수직앵글, 벽돌층을 하나로 견고하게 고정시켜준다. 따라서 벽돌층(25)과 기초콘크리트(10)에 의하여 견고하게 자연석판(30)이 고정된다.Concrete layer 50 is placed between the fixed natural slab 30 and the brick layer 25 is cured, thereby fixing the natural stone and vertical angle, the brick layer firmly into one. Therefore, the natural slab 30 is firmly fixed by the brick layer 25 and the foundation concrete 10.

이상과 같은 구조의 자연석 옹벽을 형성하는 방법은 다음과 같다.The method of forming the natural stone retaining wall of the above structure is as follows.

수직앵글 형성단계에서, 지면(1)을 터파기 하여 기초콘크리트(10)를 형성할 거푸집을 형성하고, 거푸집 내에 수평앵글(12)을 철근(11)으로 용접하여 일정 간격으로 고정하며, 수평앵글(12)에 수직앵글(20)의 하단을 용접하여 고정하고, 거푸집에 콘크리트를 타설하여 양생한다. 그리고 다수개의 수직앵글(20)은 횡으로 철근(21)을 용접하여 양측으로 벌어짐을 방지한다.In the vertical angle forming step, the ground 1 is formed to form a form for forming the foundation concrete 10, and the horizontal angle 12 is welded to the reinforcing bars 11 in the form to fix at regular intervals, and the horizontal angle The lower end of the vertical angle 20 is fixed to 12, and the concrete is poured into the formwork to cure. And the plurality of vertical angles 20 to prevent the opening to both sides by welding the reinforcing bars 21 laterally.

따라서 수직앵글(20)은 기초콘크리트(10)에 의하여 견고하게 지지되므로 수직앵글(20)과 고정되는 자연석판(30) 또한 견고하게 지지된다.Therefore, since the vertical angle 20 is firmly supported by the foundation concrete 10, the natural stone plate 30 fixed with the vertical angle 20 is also firmly supported.

벽돌적층 단계에서, 수직앵글(20)의 후방으로 거푸집 대신 벽돌을 적층하여 벽을 만든다. 이때 벽돌층은 절개지와 밀착하도록 적층하는 것이 바람직하다.In the brick lamination step, a wall is formed by stacking bricks instead of formwork to the rear of the vertical angle 20. At this time, the brick layer is preferably laminated in close contact with the incision.

그 다음으로 자연석 고정단계에서, 자연석 판체(31)를 사각으로 성형하고, 자연석 판체(31) 배면에 앵커볼트(32)를 고정한다. 앵커볼트(32)는 일단이 벌어져 고정물과 고정되는 것을 사용하면 되고, 자연석 판체(31)의 배면에 홀을 형성하여 앵커볼트(32)를 삽입한 후 앵커볼트(32) 단부를 벌려 고정시키면 된다.Next, in the natural stone fixing step, the natural stone plate 31 is molded into a square, and the anchor bolt 32 is fixed to the back of the natural stone plate 31. One end of the anchor bolt 32 may be fixed and fixed to the fixture. A hole may be formed in the back surface of the natural stone plate 31 to insert the anchor bolt 32. The anchor bolt 32 may then be fixed by opening the end of the anchor bolt 32. .

그리고 인접한 자연석판(30)의 앵커볼트(32)와 같이 두개의 앵커볼트(32)에 고정브라켓(40)을 고정한 후 고정브라켓(40)은 고정철근(43)로 수직앵글(20)에 고정한다. 이때 고정철근(43)의 일단에 볼트부를 형성하여 고정브라켓(40)의 수직부에 형성된 홀에 삽입한 후 너트로 고정하고, 고정철근(43)의 타단은 철근(21) 또는 수직앵글(20)에 용접으로 고정한다. After fixing the fixing bracket 40 to the two anchor bolts 32, such as the anchor bolt 32 of the adjacent natural stone slab 30, the fixing bracket 40 is fixed to the vertical angle 20 by the fixing bar 43 do. At this time, a bolt portion is formed at one end of the fixing reinforcing bar 43 and inserted into a hole formed in the vertical part of the fixing bracket 40, and then fixed with a nut. Fix it by welding).

콘크리트층 형성단계는, 벽돌층(25)과 자연석판(30) 사이에 콘크리트를 타설하여 양생하여 이루어진다.Concrete layer forming step is made by placing concrete between the brick layer 25 and the natural slab 30 to cure.

도 1 내지 도 4는 본 발명의 자연석 옹벽의 시공 단계를 순차적으로 도시한 개략도.1 to 4 are schematic views sequentially showing the construction step of the natural stone retaining wall of the present invention.

도 5는 본 발명의 자연석 옹벽의 시공구조를 도시한 분해 사시도.5 is an exploded perspective view showing the construction structure of the natural stone retaining wall of the present invention.

< 도면의 주요 부분에 대한 부호의 간단한 설명 > BRIEF DESCRIPTION OF THE DRAWINGS FIG.

1 : 지면 10 : 기초콘크리트1: Ground 10: Foundation concrete

11 : 철근 12 : 수평앵글11: reinforcing bar 12: horizontal angle

20 : 수직앵글 21 : 철근20: vertical angle 21: rebar

25 : 벽돌층 30 : 자연석판25: brick layer 30: natural slab

31 : 판체 32 : 앵커볼트31: plate 32: anchor bolt

40 : 고정브라켓 41 : 수평부40: fixing bracket 41: horizontal portion

42 : 수직부 43 : 고정철근42: vertical part 43: fixed rebar

50 : 콘크리트층50: concrete layer

Claims (2)

터파기가 힘든 언덕이나 절개지 전방의 지중에 형성되고, 내부에 수평앵글(12)이 철근(11)으로 연결되어 매립되는 기초콘크리트(10);A foundation concrete 10 formed in the ground of a hill or an incision in front of a hard trench, and having a horizontal angle 12 connected to the reinforcing bars 11 to be embedded; 기초콘크리트(10)의 수평앵글(12)과 하단이 용접되어 수직으로 형성되는 수직앵글(20);A vertical angle 20 in which the horizontal angle 12 and the lower end of the basic concrete 10 are vertically welded; 수직앵글(20)의 후방으로 거푸집 대신 수직으로 적층되는 벽돌층(25);A brick layer 25 stacked vertically instead of formwork to the rear of the vertical angle 20; 자연석을 사각 판체(31) 형상으로 성형되고, 판체(31)의 배면에 홀을 형성하여 앵커볼트(32)가 고정되며, 수직앵글(20)에 고정되는 자연석판(30);Natural stone is formed in the shape of a square plate body 31, a hole formed in the back surface of the plate 31 anchor bolt 32 is fixed, the natural stone plate 30 is fixed to the vertical angle (20); 수평부(41)와 수직부(42)가 ㄴ형상으로 이루어진 앵글의 수평부(41)가 두개의 인접한 자연석판(30) 배면에 고정된 앵커볼트(32)에 동시에 체결되고, 수직부(42)에 형성된 볼트홀에 고정철근(43) 일단부에 형성된 볼트부가 삽입되어 너트체결되어 고정되며, 고정철근(43)의 타단은 철근(21) 또는 수직앵글(20)에 고정되도록 구성된 고정브라켓(40);The horizontal portion 41 of the angle in which the horizontal portion 41 and the vertical portion 42 have a B-shape is simultaneously fastened to the anchor bolt 32 fixed to the rear surface of two adjacent natural stone slabs 30, and the vertical portion 42 The bolt portion formed at one end of the fixed reinforcing bar 43 is inserted into the bolt hole formed in the bolt hole and fixed to the nut, and the other end of the fixed reinforcing bar 43 is fixed to the reinforcing bar 21 or the vertical angle 20 ( 40); 고정된 자연석판(30)과 벽돌층(25) 사이에 타설되어 양생되는 콘크리트층(50); 로 구성되는 것을 특징으로 하는 자연석 옹벽의 시공구조.A concrete layer 50 that is poured and cured between the fixed natural slab 30 and the brick layer 25; Construction structure of the natural stone retaining wall, characterized in that consisting of. 지면(1)을 터파기 하여 기초콘크리트(10)를 형성할 거푸집을 형성하고, 거푸집 내에 수평앵글(12)을 철근(11)으로 용접하여 일정 간격으로 고정하며, 수평앵 글(12)에 수직앵글(20)의 하단을 용접하여 고정하고, 거푸집에 콘크리트를 타설하여 양생하는 수직앵글 형성단계;Forming the formwork to form the foundation concrete 10 by digging the ground (1), welding the horizontal angle (12) with reinforcing bars 11 in the form and fixed at regular intervals, perpendicular to the horizontal angle (12) A vertical angle forming step of welding and fixing the lower end of the angle 20 and placing the concrete on the formwork for curing; 수직앵글(20)의 후방으로 거푸집 대신 벽돌을 적층하여 벽을 만드는 벽돌 적층 단계;Brick stacking step of making a wall by stacking bricks instead of formwork to the rear of the vertical angle (20); 자연석 판체(31)를 사각으로 성형하고, 자연석 판체(31) 배면에 앵커볼트(32)를 고정하며, 앵커볼트(32)에 고정브라켓(40)을 고정한 후 고정브라켓(40)은 고정철근(43)로 수직앵글(20)에 고정하는 자연석 고정단계;The natural stone plate 31 is molded into a square, and the anchor bolt 32 is fixed to the back of the natural stone plate 31, and the fixing bracket 40 is fixed to the anchor bolt 32, and then the fixing bracket 40 is fixed rebar ( 43) natural stone fixing step of fixing to the vertical angle (20); 벽돌층(25)과 자연석판(30) 사이에 콘크리트를 타설하여 양생하는 콘크리트층 형성 단계; 가 순차적으로 이루어지는 것을 특징으로 하는 자연석 옹벽의 시공방법.A concrete layer forming step of curing by pouring concrete between the brick layer 25 and the natural slab 30; Construction method of the natural stone retaining wall, characterized in that made sequentially.
KR1020090069984A 2009-07-30 2009-07-30 A construction method and that of structure a breast wall using stone KR101070379B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090069984A KR101070379B1 (en) 2009-07-30 2009-07-30 A construction method and that of structure a breast wall using stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090069984A KR101070379B1 (en) 2009-07-30 2009-07-30 A construction method and that of structure a breast wall using stone

Publications (2)

Publication Number Publication Date
KR20110012308A KR20110012308A (en) 2011-02-09
KR101070379B1 true KR101070379B1 (en) 2011-10-05

Family

ID=43772248

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090069984A KR101070379B1 (en) 2009-07-30 2009-07-30 A construction method and that of structure a breast wall using stone

Country Status (1)

Country Link
KR (1) KR101070379B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102414103B1 (en) * 2021-04-20 2022-06-28 주식회사 미담 Artificial hill structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027506A (en) 2001-07-12 2003-01-29 Sankyo Concrete Kk Construction method for concrete retaining wall and form panel used therein
KR100440091B1 (en) 2001-08-14 2004-07-14 홍지기술산업주식회사 Structure of Block type retaining wall and Construction Method thereof
KR100669198B1 (en) 2005-05-25 2007-01-15 권혁준 Wall structure unified the finish material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027506A (en) 2001-07-12 2003-01-29 Sankyo Concrete Kk Construction method for concrete retaining wall and form panel used therein
KR100440091B1 (en) 2001-08-14 2004-07-14 홍지기술산업주식회사 Structure of Block type retaining wall and Construction Method thereof
KR100669198B1 (en) 2005-05-25 2007-01-15 권혁준 Wall structure unified the finish material

Also Published As

Publication number Publication date
KR20110012308A (en) 2011-02-09

Similar Documents

Publication Publication Date Title
KR100890828B1 (en) Geosynthetic reinforced soil and reinforced concrete retaining wall
KR20080077721A (en) The method of constructing bloclk for wall
JP4190360B2 (en) Masonry wall reinforcement structure and method
KR101211469B1 (en) Retaining wall structure having prefabricated block and method for constructing retaining wall using the same
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
KR101070379B1 (en) A construction method and that of structure a breast wall using stone
JP5432814B2 (en) Construction method of concrete body for septic tank protection
JP6860895B2 (en) Retaining wall and its construction method
KR200413303Y1 (en) Stone stacked wall structure using steel beam
KR101045019B1 (en) Installation structure of block type breast wall and its construction method
JP2017155574A (en) Construction method of retaining wall
WO2020157715A1 (en) Floating foundation
JP2010116715A (en) Retaining wall construction method
JP4972499B2 (en) Construction method of foundation block for retaining wall
KR100648865B1 (en) Retaining wall construction natural stone panel and method for constructing retaining wall using the same
KR100976277B1 (en) Construction method of ecological Retaining wall using pipe anchor and precast block
KR20090084571A (en) Method for execution a wall engineering works construction concrete block structure
JP6445276B2 (en) Boundary block installation method
KR102197091B1 (en) Underground structure wall and underground structure and method construturing the same
JP7115817B2 (en) Reinforced soil wall using large sandbags and retaining method using large sandbags
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR20060134651A (en) Landscape facilities and constuction method thereof
JP6047397B2 (en) Embankment and natural ground composite reinforced earth wall structure and embankment and natural ground composite reinforced earth wall construction method
KR102263958B1 (en) the Method of Construction of Prefabricated Block for Retaining Wall Bulwark

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140926

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150803

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160928

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170926

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180928

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190930

Year of fee payment: 9