JP5742430B2 - Equipment transfer equipment - Google Patents

Equipment transfer equipment Download PDF

Info

Publication number
JP5742430B2
JP5742430B2 JP2011098834A JP2011098834A JP5742430B2 JP 5742430 B2 JP5742430 B2 JP 5742430B2 JP 2011098834 A JP2011098834 A JP 2011098834A JP 2011098834 A JP2011098834 A JP 2011098834A JP 5742430 B2 JP5742430 B2 JP 5742430B2
Authority
JP
Japan
Prior art keywords
work
transfer
storage means
rate
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011098834A
Other languages
Japanese (ja)
Other versions
JP2012229094A (en
Inventor
森 広幸
広幸 森
賢一 浮須
賢一 浮須
克則 清水
克則 清水
隆行 谷
隆行 谷
宏信 熊野
宏信 熊野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daifuku Co Ltd
Original Assignee
Daifuku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daifuku Co Ltd filed Critical Daifuku Co Ltd
Priority to JP2011098834A priority Critical patent/JP5742430B2/en
Publication of JP2012229094A publication Critical patent/JP2012229094A/en
Application granted granted Critical
Publication of JP5742430B2 publication Critical patent/JP5742430B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、物品の移載作業を行う物品移載設備に関する。 The present invention relates to an article transfer facility for performing an article transfer operation .

従来の物品移載設備が、例えば、特許文献1に開示されている。
特許文献1では、物品移載設備としてピッキング設備が開示されており、このピッキング設備では、仕分け先からの注文が割り付けられた集品容器(コンテナ)をコンベヤで連続的に搬送しながら、保管棚の各間口に種類ごとに保管された物品を、間口ごとに設けられた間口表示器(アイテム表示器)の表示に基づいて作業者が取り出して対象の集品容器に投入することにより、仕分け先からの注文ごとの物品の集品を行っている。
A conventional article transfer facility is disclosed in Patent Document 1, for example.
In Patent Document 1, a picking facility is disclosed as an article transfer facility, and in this picking facility, a collection shelf (container) assigned with an order from a sorting destination is continuously conveyed by a conveyor, and a storage shelf The goods stored for each type in the frontage are taken out by the worker based on the display on the frontage display (item display) provided for each frontage, and put into the target collection container. We collect goods for each order from.

また複数の間口ごとに、ピッキング作業の指示が行われる範囲を異ならせている複数の作業領域(ゾーン)が形成されており、各作業領域において、作業者はそれぞれ自分が処理を担当する作業領域の間口の間口表示器の表示に従って物品を取り出してコンベヤにより搬送される対象の集品容器に投入し、対象の集品容器に対して自分が処理を担当する作業領域における対象の全ての物品の投入が完了すると、作業領域に設けられた投入完了スイッチ(リセットスイッチ)を操作して、対象の集品容器に対する物品のピッキング作業が完了したことを通知し、次の対象の集品容器に対するピッキング作業を行う。   In addition, a plurality of work areas (zones) in which the range in which the picking work instruction is performed are different are formed for each of the plurality of frontages, and in each work area, the worker himself / herself is responsible for the processing. Take out the goods according to the indication on the frontage frontage and put them into the target collection container to be transported by the conveyor, and all the target goods in the work area where you are in charge of processing for the target collection container When the loading is completed, the loading completion switch (reset switch) provided in the work area is operated to notify that the picking operation of the article with respect to the target collection container is completed, and the next target collection container is picked. Do work.

特許第2799445号公報Japanese Patent No. 2799445

従来の物品移載設備では、作業領域における物品の移載作業の作業量はほぼ均一となるようにされているが、作業領域に配置される作業者の処理能力は人によってそれぞれ異なるため、実際には、作業を行わない手待ち時間が多く発生している作業領域があったりして、各作業領域間にバラつきが生じている。各作業領域間にバラつきが発生していると、全体として物品を移載する効率が低下する原因となる場合もあるため、各作業領域間のバラつきは適切に把握されていることが望ましい。
そこで、本発明は、全体として物品を移載する効率の向上を図るため、各作業領域間のバラつきを把握することができる物品移載設備および物品移載設備における作業能率の演算方法を提供することを目的としたものである。
In the conventional article transfer equipment, the work amount of the article transfer work in the work area is made almost uniform, but the processing capacity of the worker arranged in the work area differs depending on the person, so In some cases, there are work areas where there is a lot of waiting time during which work is not performed, and variations occur between the work areas. If there is a variation between the work areas, it may cause a decrease in the efficiency of transferring the article as a whole. Therefore, it is desirable that the variation between the work areas is properly grasped.
Therefore, the present invention provides an article transfer facility capable of grasping the variation between the respective work areas and a method for calculating the work efficiency in the article transfer facility in order to improve the efficiency of transferring the article as a whole. It is for the purpose.

この目的を達成するため本発明の物品移載設備によれば、物品の移載作業を行う複数の作業領域を設け、前記作業領域ごとに、物品を収納する第1の収納手段と、前記第1の収納手段から物品を移載される第2の収納手段と、前記第1の収納手段に、作業者に前記第1の収納手段から前記第2の収納手段への物品の移載作業を指示する移載指示手段と、前記第1の収納手段から前記第2の収納手段に対する物品の移載作業が完了したことを、作業者が制御手段に通知するための移載完了通知手段とを備えた物品移載設備において、前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段への移載作業の処理が完了した作業量を演算する処理作業量演算手段と、前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段に対する物品の移載作業を行う作業設定時間を演算する作業設定時間演算手段と、前記作業領域ごとに、前記移載指示手段による指示が開始されてから前記移載完了通知手段により移載作業が完了したことが通知されるまでの時間を、前記移載完了通知手段による通知動作について累積した時間である累積処理時間を演算する累積処理時間演算手段と、前記作業領域ごとに、前記作業量を前記累積処理時間で除算した値である処理率から、前記作業量を前記作業設定時間で除算した値である稼働率を減算した値である余裕率を演算する余裕率演算手段と、を備え、前記稼働率と、前記処理率と、前記余裕率と、前記累積処理時間と、を前記作業領域ごとに比較した結果に基づいて、物品移載作業の効率の改善を促す情報を表示することを特徴とするものである。
さらに、本発明の物品移載設備によれば、前記制御手段より前記作業領域ごとの前記余裕率を入力して表示する表示手段を備えたことが好適である。
さらに、本発明の物品移載設備によれば、前記表示手段が、前記作業領域ごとの前記余裕率をグラフにより表示することが好適である。
In order to achieve this object, according to the article transfer facility of the present invention, a plurality of work areas for transferring articles are provided, and a first storage means for storing articles for each of the work areas; The operator can transfer the article from the first storage means to the second storage means to the second storage means to which the articles are transferred from the first storage means and the first storage means. Transfer instruction means for instructing, and transfer completion notification means for the operator to notify the control means that the transfer operation of the article from the first storage means to the second storage means has been completed. In the article transfer facility provided, for each of the work areas, processing work amount calculation means for calculating the amount of work completed transfer processing from the first storage means to the second storage means, For each work area, the first storage means is connected to the second storage means. The work setting time calculating means for calculating the work setting time for performing the transfer work of the article to be transferred, and the transfer work by the transfer completion notifying means after the instruction by the transfer instruction means is started for each work area. Cumulative processing time calculation means for calculating a cumulative processing time, which is a time accumulated for the notification operation by the transfer completion notification means, and the amount of work for each work area. A margin rate calculating means for calculating a margin rate that is a value obtained by subtracting an operation rate that is a value obtained by dividing the work amount by the work setting time from a processing rate that is a value divided by the cumulative processing time; Displaying information prompting improvement of the efficiency of the article transfer work based on a result of comparing the operating rate, the processing rate, the margin rate, and the cumulative processing time for each work area. Features It is intended.
Furthermore, according to the article transfer facility of the present invention, it is preferable that the control means further includes a display means for inputting and displaying the margin ratio for each work area.
Furthermore, according to the article transfer facility of the present invention, it is preferable that the display means displays the margin rate for each work area in a graph .

さらに、本発明の物品移載設備における作業能率の演算方法によれば、物品の移載作業を行う複数の作業領域を設け、前記作業領域ごとに、物品を収納する第1の収納手段と、前記第1の収納手段から物品を移載される第2の収納手段と、前記第1の収納手段に、作業者に前記第1の収納手段から前記第2の収納手段への物品の移載作業を指示する移載指示手段と、前記第1の収納手段から前記第2の収納手段への物品の移載作業が完了したことを、作業者が制御手段に通知するための移載完了通知手段とを備えた物品移載設備における作業能率の演算方法であって、前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段への移載作業の処理が完了した作業量を演算し、前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段に対する物品の移載作業を行う作業設定時間を演算し、前記作業領域ごとに、前記移載指示手段による指示が開始されてから前記移載完了通知手段により移載作業が完了したことが通知されるまでの時間を、前記移載完了通知手段による通知動作について累積した時間である累積処理時間を演算し、前記作業領域ごとに、前記作業量を前記累積処理時間で除算した値である処理率から、前記作業量を前記作業設定時間で除算した値である稼働率を減算した値である余裕率を演算することを特徴とするものである。   Furthermore, according to the calculation method of the work efficiency in the article transfer facility of the present invention, there are provided a plurality of work areas for performing an article transfer work, and a first storage means for storing articles for each of the work areas; An article is transferred from the first storage means to the second storage means by an operator to the second storage means to which the articles are transferred from the first storage means, and the first storage means. Transfer instruction means for instructing work, and transfer completion notification for the operator to notify the control means that the transfer operation of the article from the first storage means to the second storage means has been completed. A method for calculating work efficiency in an article transfer facility comprising means for completing a transfer work process from the first storage means to the second storage means for each work area For each work area, from the first storage means to the second The operation setting time for performing the transfer work of the article to the delivery means is calculated, and the transfer work is completed by the transfer completion notification means after the instruction by the transfer instruction means is started for each work area. The time to be notified is a value obtained by calculating the accumulated processing time that is the time accumulated for the notification operation by the transfer completion notifying means, and dividing the work amount by the accumulated processing time for each work area. A margin rate that is a value obtained by subtracting an operation rate that is a value obtained by dividing the work amount by the work setting time is calculated from a processing rate.

本発明によると、作業領域ごとに、第1の収納手段から第2の収納手段への移載作業の処理が完了した作業量が演算され、作業領域ごとに、第1の収納手段から第2の収納手段に対する物品の移載作業を行う作業設定時間が演算され、作業領域ごとに、移載指示手段による指示が開始されてから移載完了通知手段により移載作業が完了したことが通知されるまでの時間が移載完了通知手段の通知動作について累積した時間である累積処理時間が演算され、作業領域ごとに、作業量を前記累積処理時間で除算した値である処理率から、作業量を作業設定時間で除算した値である稼働率を減算した値である余裕率が演算され、演算された余裕率により各作業領域間のバラつきを把握することができる。   According to the present invention, for each work area, the amount of work for which the processing of the transfer work from the first storage means to the second storage means has been completed is calculated, and for each work area, the second storage from the first storage means is calculated. The work setting time for transferring the article to the storage means is calculated, and the transfer completion notifying means notifies the completion of the transfer work for each work area after the instruction by the transfer instruction means is started. The accumulated processing time that is the accumulated time for the notification operation of the transfer completion notifying means is calculated, and the work amount is calculated for each work area from the processing rate that is a value obtained by dividing the work amount by the accumulated processing time. The margin ratio, which is a value obtained by subtracting the operation rate, which is a value obtained by dividing the above by the work setting time, is calculated, and the variation between the work areas can be grasped based on the calculated margin ratio.

物品移載設備を実施するための各ゾーンの作業状況を示す表示画面の一例を示す図である。It is a figure which shows an example of the display screen which shows the work condition of each zone for implementing goods transfer equipment. 同物品移載設備の全体構成図である。It is a whole block diagram of the goods transfer equipment. 同物品移載設備における作業能率の演算方法の制御に関する図であり、(a)は制御装置の構成図、(b)は余裕率演算手段に行われる処理を示す図である。It is a figure regarding control of the calculation method of the work efficiency in the article transfer equipment, (a) is a block diagram of a control apparatus, (b) is a figure which shows the process performed by a margin rate calculating means. 同物品移載設備の余裕率を演算するフローチャートである。It is a flowchart which calculates the margin rate of the goods transfer equipment. 同物品移載設備においてゾーンの作業状況に応じたメッセージの一覧を示す図である。It is a figure which shows the list of the messages according to the work condition of the zone in the goods transfer equipment.

以下、本発明の実施の形態について説明する。
図2は物品移載設備の一例であるピッキング設備の全体構成図である。このピッキング設備は、仕分け先からの注文が割り付けられた集品容器10に対してピッキングされる物品を収納する複数の間口12(第1の収納手段の一例;区画領域の一例)を有する物品保管手段Aと、物品保管手段Aに沿って配置され、複数の前記集品容器10を搬送する搬送手段Bが備えられている。
Embodiments of the present invention will be described below.
FIG. 2 is an overall configuration diagram of a picking facility which is an example of an article transfer facility. This picking facility has an article storage having a plurality of front doors 12 (an example of a first storage means; an example of a partition area) that stores articles to be picked into a collection container 10 to which an order from a sorting destination is assigned. Means A and transport means B arranged along the article storage means A and transporting the plurality of collection containers 10 are provided.

物品保管手段Aは、種類ごとに物品を保管する複数の間口12を有している。各間口12には、作業者Hに集品容器10へ投入する物品の取出し作業を表示する間口表示器13が設けられている。複数の間口12ごとに、ピッキング作業の指示が行われる範囲であるゾーンZ(作業領域の一例)が形成されている。図2では、ゾーンZごとに間口12と間口表示器13(移載指示手段の一例;区画領域表示手段の一例)を2つずつ示しているが、実際には、ゾーンZに収納する物品の種類ごとに設置され、さらに、取り出す物品の数量を数字により表示するように構成されている。また各ゾーンZには、ピッキング作業を行う作業者Hが配置されている。   The article storage means A has a plurality of front doors 12 for storing articles for each type. Each frontage 12 is provided with a frontage display 13 for displaying to the worker H the work of taking out articles to be put into the collection container 10. A zone Z (an example of a work area), which is a range in which a picking work instruction is performed, is formed for each of the plurality of front edges 12. In FIG. 2, for each zone Z, the frontage 12 and the frontage display 13 (one example of transfer instruction means; one example of the partition area display means) are shown. However, in reality, the articles stored in the zone Z are shown. It is installed for each type and is configured to display the quantity of articles to be taken out by numbers. In each zone Z, a worker H who performs picking work is arranged.

搬送手段Bは、物品保管手段Aに沿って、複数の集品容器10(第2の収納手段の一例)を連続的に搬送するものである。搬送手段Bでは、複数の間口12ごとに形成した前記ゾーンZごとに、それぞれ、搬送手段Bの所定範囲の部分が割り当てられている。搬送手段Bは、任意の位置で集品容器10の搬送と停止を行うことが可能なアキュムレーションコンベヤから構成されることが好ましい。また、ゾーンZの割り当てられている搬送手段Bの所定範囲の部分の集品容器10の搬送速度を、他のゾーンZに割り当てられている搬送手段Bの所定範囲の部分や、搬送手段BにおいてゾーンZが割り当てられていない部分とは独立して変更可能とする設定手段を設けることもできる。集品容器10ごとに、仕分け先からの注文が割付けられた固有の識別符号が書き込まれたデータキャリア18が設けられる。また集品容器10ごとに、例えば、集品容器10に取り付けられる等して、集品容器10に付随して共に移動される容器表示器14が設けられている。容器表示器14により、取り出した物品を投入する先の集品容器10が指示される。ゾーンZの作業者Hは、容器表示器14の表示が行われている集品容器10に取り出した物品11の投入作業(移載作業の一例)を行う。さらに、各ゾーンZには、集品容器10のデータキャリア18に書き込まれた前記固有の識別符号を読み取る読取手段17が配置されている。この読取手段17を配置する位置によって、各ゾーンZに搬送手段Bの所定範囲の部分が決定されている。さらに各ゾーンZには、対象の集品容器10に対する物品の投入作業が完了したことを、後述する制御装置19に作業者Hが操作により通知する投入完了スイッチ15(移載完了通知手段の一例;投入完了通知手段の一例)が配置されている。この投入完了スイッチ15としては、例えば、作業者Hの手により操作される長尺状のタッチセンサであるテープスイッチ、作業者Hの足により操作されるフットスイッチ、発行素子と受光素子からなり作業者が手や足等により発行素子から受光素子へと発せられる光を遮光することにより操作される光電式スイッチなどを利用することができる。   The transport unit B continuously transports a plurality of collection containers 10 (an example of a second storage unit) along the article storage unit A. In the transport unit B, a predetermined range portion of the transport unit B is assigned to each of the zones Z formed for each of the plurality of entrances 12. The conveying means B is preferably composed of an accumulation conveyor capable of conveying and stopping the collection container 10 at an arbitrary position. In addition, the conveyance speed of the collection container 10 in a predetermined range portion of the conveyance means B assigned to the zone Z is set to a predetermined range portion of the conveyance means B assigned to another zone Z or the conveyance means B. It is also possible to provide setting means that can be changed independently of the portion to which the zone Z is not assigned. Each collection container 10 is provided with a data carrier 18 in which a unique identification code assigned with an order from a sorting destination is written. For each collection container 10, for example, a container indicator 14 that is attached to the collection container 10 and moved together with the collection container 10 is provided. The container display unit 14 instructs the collection container 10 to which the taken-out article is to be put. The worker H in the zone Z performs a loading operation (an example of a transfer operation) of the article 11 taken out to the collection container 10 on which the container indicator 14 is displayed. Further, in each zone Z, reading means 17 for reading the unique identification code written on the data carrier 18 of the collection container 10 is arranged. Depending on the position where this reading means 17 is arranged, a predetermined range portion of the conveying means B is determined in each zone Z. Furthermore, in each zone Z, a loading completion switch 15 (an example of a transfer completion notification means) that notifies the control device 19 described later of the loading operation of the article to the target collection container 10 by the operation of the operator H. An example of the input completion notification means) is arranged. As this insertion completion switch 15, for example, a tape switch which is a long touch sensor operated by the hand of the worker H, a foot switch operated by the foot of the worker H, an issuing element and a light receiving element are used. It is possible to use a photoelectric switch or the like that is operated by a person blocking light emitted from the issuing element to the light receiving element with a hand or a foot.

そして、各ゾーンZのピッキング作業に関する情報を表示する表示装置16(表示手段の一例)が配置されている。また表示装置16に表示される各ゾーンZのピッキング作業に関する情報の管理を行う管理者Mが配置されている。   And the display apparatus 16 (an example of a display means) which displays the information regarding the picking work of each zone Z is arrange | positioned. An administrator M who manages information related to the picking work of each zone Z displayed on the display device 16 is arranged.

ピッキング設備の動作を制御する制御装置19が配置されている。図3(a)に示すように制御装置19は、ピッキング設備全体を総合的に制御する制御手段20と、ゾーンZにおいて処理が完了した作業量を演算する処理作業量演算手段21と、ゾーンZごとに、ゾーンZにおける作業設定時間(例えば、ピッキング設備の稼動の開始から停止までの長さの時間を用いることができる)を演算する作業設定時間演算手段22と、ゾーンZごとに、各間口表示器13による指示が開始されてから作業者Hが投入完了スイッチ15を操作することにより投入作業が完了したことが通知されるまでの時間を、投入完了スイッチ15による通知動作について累積した時間である累積処理時間を演算する累積処理時間演算手段23と、前記作業量を前記累積処理時間で除算した値である処理率から、作業量を作業設定時間で除算した値である稼動率を減算した値である余裕率を演算する余裕率演算手段24とを備えている。制御手段20は、具体的には、間口表示器13による取り出し指示を行うものであり、投入完了スイッチ15が操作されると、対象の集品容器10に対する物品の投入が完了したことがこの制御手段20に通知され、次の対象について、間口12の間口表示器13の表示および容器表示器14の表示を行う。また余裕率演算手段24は、各ゾーンZについて、処理作業量演算手段21より入力する作業量と作業設定時間演算手段22より入力する作業設定時間により稼働率26を演算し、累積処理時間演算手段23より入力する累積処理時間により処理率27を演算し、図3(b)に示すように、稼働率26から処理率27を減算して余裕率28を演算している。また図4に示すように、制御装置19により余裕率28を演算する工程は、まず、作業量を演算し(ステップ−1)、作業設定時間を演算し(ステップ−2)、累積処理時間を演算し(ステップ−3)、余裕率が演算される(ステップ−4)という流れになる。
ここで、稼働率26はゾーンZに要求されている処理の速度とみなすことができ、処理率27は実際にゾーンZで行われた処理の速度とみなすことができ、余裕率28はゾーンZに発生した手待ち時間とみなすことができる。
A control device 19 for controlling the operation of the picking facility is arranged. As shown in FIG. 3A, the control device 19 includes a control unit 20 that comprehensively controls the entire picking facility, a processing work amount calculating unit 21 that calculates a work amount that has been processed in the zone Z, and a zone Z For each zone Z, work setting time calculation means 22 for calculating the work setting time in the zone Z (for example, the length of time from the start to the stop of the picking equipment operation can be used) The time from when the instruction by the display unit 13 is started until the worker H is notified that the loading operation is completed by operating the loading completion switch 15 is the time accumulated for the notification operation by the loading completion switch 15. The work amount is set from the cumulative processing time calculation means 23 for calculating a certain cumulative processing time and the processing rate which is a value obtained by dividing the work amount by the cumulative processing time. And a margin calculating means 24 for calculating the margin is a value obtained by subtracting the operating ratio is a value obtained by dividing between. Specifically, the control means 20 instructs to take out by the frontage display 13, and when the input completion switch 15 is operated, it is determined that the input of the article into the target collection container 10 is completed. The means 20 is notified, and the display of the frontage display 13 of the frontage 12 and the display of the container display 14 are performed for the next target. Further, the margin rate calculating means 24 calculates the operating rate 26 for each zone Z based on the work amount input from the processing work amount calculating means 21 and the work setting time input from the work setting time calculating means 22, and the accumulated processing time calculating means. The processing rate 27 is calculated from the accumulated processing time input from 23, and the margin rate 28 is calculated by subtracting the processing rate 27 from the operating rate 26, as shown in FIG. As shown in FIG. 4, the process of calculating the margin rate 28 by the control device 19 first calculates the work amount (step-1), calculates the work setting time (step-2), and calculates the accumulated processing time. The calculation (step-3) and the margin ratio are calculated (step-4).
Here, the operation rate 26 can be regarded as the speed of processing required for the zone Z, the processing rate 27 can be regarded as the speed of processing actually performed in the zone Z, and the margin rate 28 is determined as the zone Z. Can be regarded as waiting time occurred.

ゾーンZにおけるピッキング作業を説明する。
まず、ゾーンZにおけるピッキング対象の集品容器10がゾーンZに搬入されてくると(ゾーンZにおけるピッキング対象の集品容器10のデータキャリア18がゾーンZの読取手段17により読み取られると)、ゾーンZの間口12のうち、対象の集品容器10に投入する物品を保管している間口12の間口表示器13に物品の取出し表示が行われ、同時に、対象の集品容器10の容器表示器14にゾーンZの間口12からの物品の投入作業を指示する表示が行われる。
A picking operation in the zone Z will be described.
First, when the collection container 10 to be picked in the zone Z is carried into the zone Z (when the data carrier 18 of the collection container 10 to be picked in the zone Z is read by the reading means 17 of the zone Z), the zone Of the frontage 12 of Z, the takeout display of the goods is performed on the frontage display 13 of the frontage 12 storing the articles to be put into the target collection container 10, and at the same time, the container display of the target collection container 10 14 is displayed to instruct the operation of loading articles from the zone Z slot 12.

ゾーンZの作業者Hは、間口表示器13の表示に基づいて間口12から物品の取り出し作業を行い、取り出した物品を、容器表示器14により指示されている集品容器10に投入する。対象の集品容器10に対するゾーンZにおける対象の全ての物品の投入が完了すると、ゾーンZの作業者Hは、ゾーンZの投入完了スイッチ15を操作して、対象の集品容器10に対する自分が処理を担当するゾーンZの物品のピッキング作業が終了したことを制御装置19に通知する。制御装置19は、ゾーンZの投入完了スイッチ15により投入作業が完了したことを通知されると、対象の集品容器10の容器表示器14による表示を解除し、当該ゾーンZの間口表示器13の表示を解除する。   The worker H in the zone Z takes out an article from the frontage 12 based on the display on the frontage display 13 and puts the taken-out article into the collection container 10 indicated by the container display 14. When all of the target articles in the zone Z are completely loaded into the target collection container 10, the operator H in the zone Z operates the zone Z loading completion switch 15 so that he / she with respect to the target collection container 10 can The control device 19 is notified that the picking operation of the article in the zone Z in charge of processing has been completed. When the control device 19 is notified by the input completion switch 15 of the zone Z that the input operation has been completed, the control device 19 cancels the display by the container indicator 14 of the target collection container 10 and the frontage indicator 13 of the zone Z concerned. Cancel the display.

そして、次の対象の集品容器10がゾーンZに搬送されてくると、同様にして、間口表示器13の表示と容器表示器14の表示が行われ(次の対象の集品容器10に対する作業指示が行われ)、次のピッキング作業が行われる。   Then, when the next target collection container 10 is transported to the zone Z, the frontage display 13 and the container display 14 are displayed in the same manner (for the next target collection container 10). The next picking operation is performed.

またゾーンZにおける対象の物品の投入作業が未完了の状態で、対象の集品容器10が、搬送手段BのゾーンZの所定範囲の部分の外に搬出されそうになると(集品容器10のデータキャリア18が次のゾーンZの読取手段17により読み取られると)、ゾーンZにおいて作業遅れが発生したことになり、搬送手段BのゾーンZの所定範囲の部分が停止され、集品容器10の搬送が中断される。このように作業遅れが生じた場合、対象の集品容器10にゾーンZの間口12の物品の投入作業が完了し、ゾーンZの作業者Hにより、ゾーンZの投入完了スイッチ15が操作されると、搬送手段BにおけるゾーンZが割り当てられた部分の停止は解除され、集品容器10の搬送が再開される。   If the target collection container 10 is in an uncompleted state in the zone Z and the target collection container 10 is about to be carried out of a predetermined range of the zone Z of the transport means B (the collection container 10 When the data carrier 18 is read by the reading means 17 of the next zone Z), a work delay has occurred in the zone Z, and a predetermined range portion of the zone Z of the conveying means B is stopped, and the collection container 10 Transport is interrupted. When the work delay occurs as described above, the work of loading the articles in the zone Z opening 12 into the target collection container 10 is completed, and the worker Z in the zone Z operates the zone Z loading completion switch 15. Then, the stop of the portion to which the zone Z is assigned in the transport means B is released, and the transport of the collection container 10 is resumed.

また各ゾーンZにおいて、搬送手段BのゾーンZの所定範囲の部分が停止されてから投入完了スイッチ15が操作され、搬送手段BのゾーンZの所定範囲の部分の停止が解除されるまでの時間が、停止時間とされる。   In each zone Z, the time from when the predetermined range portion of the zone Z of the transport means B is stopped to when the loading completion switch 15 is operated and the stop of the predetermined range portion of the zone Z of the transport means B is released. Is the stop time.

ここで、間口表示器13による表示が行われてから投入完了スイッチ15が操作されるまでの時間が、作業者Hが1つの集品容器10に対する作業時間となる。
投入完了スイッチ15が操作されてから次に間口表示器13による取り出し作業の指示の表示が行われるまでの時間が、作業者Hに作業指示が何ら与えられておらず、作業者Hが作業を行っていない手待ち時間となる。
表示装置16に表示される各ゾーンZのピッキング作業に関する情報を表示する(ゾーンZ別の詳細画面)について説明する。
Here, the time from when the display by the frontage display 13 is performed until the insertion completion switch 15 is operated is the work time for the worker H for one collection container 10.
There is no work instruction given to the worker H from the time when the loading completion switch 15 is operated until the next display of the instruction of the removal work by the frontage indicator 13 is performed. It will be a waiting time that has not been done.
A description will be given of displaying information related to the picking work of each zone Z displayed on the display device 16 (detailed screen for each zone Z).

図1はゾーンZ別の詳細表示画面であり、一例として20単位分のゾーンZの情報が表示されている。図1において、左側の縦軸は作業量を時間で除算した値を示し、右側の縦軸は累積停止時間の値を示し、下側の横軸は各ゾーンZの番号を示している。図1において斜線で示す棒グラフは各ゾーンZの処理率27を示し、白抜きで示す棒グラフは各ゾーンZの稼働率26を示し、折れ線グラフにおける黒丸は各ゾーンZの累積停止時間29を示している。ここで、作業量としては、例えば、仕分け先単位、集品容器単位、物品の種類単位、処理した物品の数量単位などを選択的に切り替えて表示することができる。   FIG. 1 is a detailed display screen for each zone Z. As an example, information of the zone Z for 20 units is displayed. In FIG. 1, the left vertical axis represents a value obtained by dividing the work amount by time, the right vertical axis represents the cumulative stop time value, and the lower horizontal axis represents the number of each zone Z. In FIG. 1, the bar graph indicated by diagonal lines indicates the processing rate 27 of each zone Z, the bar graph indicated by white lines indicates the operation rate 26 of each zone Z, and the black circle in the line graph indicates the accumulated stop time 29 of each zone Z. Yes. Here, as the work amount, for example, a sorting destination unit, a collection container unit, an article type unit, a processed article quantity unit, and the like can be selectively switched and displayed.

また図1では、ゾーンZごとに、処理率27と稼働率26を重ねて表示しており、処理率27から稼働率26を減算した値である余裕率28が直ちに把握できるようにされている。この余裕率28は、ゾーンZに発生した手待ち時間の指標として用いることができ、余裕率28の値が大きいほど、ゾーンZに発生した手待ち時間が多く作業に余裕があり、逆に余裕率28の値が小さいほど、ゾーンZに発生した手待ち時間が少なく作業に余裕がないことを示している。また図1では、点線により、全てのゾーンZの稼働率26の平均値である平均稼働率を示している。平均稼働率をひとつの指標として、設備全体の稼働時間辺りの作業量を見積もることが可能である。また平均稼働率を基準として、各ゾーンZの稼働率26が多いか少ないかを見積もることが可能である。また図1では、一点鎖線により、全てのゾーンZの処理率27を平均値である平均処理率を示している。平均処理率を指標として、設備全体の処理能力を見積もることができる。また平均処理率を基準として、各ゾーンZの処理率27が多いか少ないかを見積もることが可能である。   In FIG. 1, the processing rate 27 and the operation rate 26 are overlapped for each zone Z, and the margin rate 28 that is a value obtained by subtracting the operation rate 26 from the processing rate 27 can be immediately grasped. . This margin rate 28 can be used as an index of the waiting time occurring in the zone Z. The larger the margin rate 28 is, the more waiting time occurs in the zone Z, and there is room for work. The smaller the value of the rate 28, the smaller the waiting time generated in the zone Z, indicating that there is no room for work. Moreover, in FIG. 1, the average operation rate which is the average value of the operation rates 26 of all the zones Z is shown by the dotted line. Using the average operating rate as an index, it is possible to estimate the amount of work around the operating time of the entire facility. Further, it is possible to estimate whether the operation rate 26 of each zone Z is large or small on the basis of the average operation rate. Moreover, in FIG. 1, the average processing rate which is the average value of the processing rate 27 of all the zones Z is shown with the dashed-dotted line. Using the average processing rate as an index, the processing capacity of the entire facility can be estimated. In addition, it is possible to estimate whether the processing rate 27 of each zone Z is large or small on the basis of the average processing rate.

このゾーンZ別の詳細表示画面は、ピッキング設備の作業の進捗に応じて随時更新され、管理者Mは、余裕率により各作業領域のバラツキをリアルタイムで容易に把握することができ、ピッキング作業の効率を改善するための判断材料とすることができる。そして、管理者Mは、各ゾーンZにおける作業量のバラつき、手待ち時間のバラつき、作業遅れのバラつきを一括して把握可能とされる。
管理者Mは、余裕率28の大きいゾーンZと余裕率28の小さいゾーンZとの間で、作業負荷の大きい物品と作業負荷の小さい物品との配置を入れ替えることを計画したり、短時間に作業負荷が集中している部分について作業負荷を分散させることを計画したりして、各ゾーンZ間における余裕値28のバラつきに基づいて、全体のピッキング効率が最大となるように役立てることができる。
This detailed display screen for each zone Z is updated at any time according to the progress of the work of the picking equipment, and the manager M can easily grasp the variation of each work area in real time by the margin rate, and the picking work It can be used as a judgment material for improving efficiency. Then, the manager M can collectively grasp the work amount variation, the waiting time variation, and the work delay variation in each zone Z.
The manager M plans to replace the arrangement of the article having a large work load and the article having a low work load between the zone Z having a large margin ratio 28 and the zone Z having a small margin ratio 28, or in a short time. It is possible to plan to distribute the work load on the portion where the work load is concentrated, and to help the overall picking efficiency be maximized based on the variation of the margin value 28 between the zones Z. .

また管理者Mがよりピッキング作業の効率を改善するための判断材料を容易に得ることができるようにするために、表示装置16に、ゾーンZごとの余裕率に基づいて、ピッキング作業の効率を促す情報となるメッセージを表示するようにしてもよい。
この場合、例えば、図5に示すように、以下の各パターン(1)〜(8)に応じて、表示装置16にメッセージを表示する。
(1)稼働率26が相対的に大きく、余裕率28が相対的に大きく、累積停止時間29が相対的に大きいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に速い(処理能力が相対的に高い)と考えられるが、作業負荷が集中しているおそれがあるため、作業負荷を分散するように物品の割り当てを変更することが考えられる。また物品の割当てを増やすことが可能である。
(2)稼働率26が相対的に大きく、余裕率28が相対的に小さく、累積停止時間29が相対的に小さいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に速い(処理能力が相対的に高い)と考えられ、作業負荷が集中していることもない。したがって、物品の割当てを増やすことが可能である。
In addition, in order for the manager M to easily obtain the judgment material for improving the efficiency of the picking work, the efficiency of the picking work is set in the display device 16 based on the margin rate for each zone Z. A message serving as prompting information may be displayed.
In this case, for example, as shown in FIG. 5, messages are displayed on the display device 16 according to the following patterns (1) to (8).
(1) When the operation rate 26 is relatively large, the margin rate 28 is relatively large, and the cumulative stop time 29 is relatively large, the worker H arranged in the corresponding zone Z works in another zone Z It is considered that the work speed is relatively fast (the processing capacity is relatively high) compared to the person H, but since there is a possibility that the work load is concentrated, the allocation of articles so that the work load is distributed Can be considered. It is also possible to increase the allocation of articles.
(2) When the operation rate 26 is relatively large, the margin rate 28 is relatively small, and the cumulative stop time 29 is relatively small The worker H arranged in the corresponding zone Z works in another zone Z Compared with the person H, the work speed is considered to be relatively fast (the processing capability is relatively high), and the work load is not concentrated. Therefore, it is possible to increase the allocation of articles.

(3)稼働率26が相対的に大きく、余裕率28が相対的に小さく、累積停止時間29が相対的に大きいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に高い(処理能力が相対的に普通)と考えられるが、作業負荷が集中しているおそれがあるため、作業負荷を分散するように物品の割り当てを変更することが考えられる。
(4)稼働率26が相対的に大きく、余裕率28が相対的に小さく、累積停止時間29が相対的に小さいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に速い(処理能力が相対的に高い)と考えられ、作業負荷が集中していることもない。したがって、物品の割り当てを変更する必要はない。
(3) When the operation rate 26 is relatively large, the margin rate 28 is relatively small, and the cumulative stop time 29 is relatively large, the worker H arranged in the corresponding zone Z works in another zone Z It is considered that the work speed is relatively high compared to the worker H (the processing capability is relatively normal). However, since the work load may be concentrated, the assignment of articles so that the work load is distributed Can be considered.
(4) When the operation rate 26 is relatively large, the margin rate 28 is relatively small, and the cumulative stop time 29 is relatively small, the worker H arranged in the corresponding zone Z works in another zone Z Compared with the person H, the work speed is considered to be relatively fast (the processing capability is relatively high), and the work load is not concentrated. Therefore, it is not necessary to change the assignment of articles.

(5)稼働率26が相対的に小さく、余裕率28が相対的に大きく、累積停止時間29が相対的に大きいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度の速さは不明であるが、作業負荷が集中しているおそれがある。したがって、作業負荷を分散するように物品の割り当てを変更することが考えられる。
(6)稼働率26が相対的に小さく、余裕率28が相対的に大きく、累積停止時間29が相対的に小さいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度の速さは不明であるが、作業負荷が集中していることはない。したがって、物品の割り当てを増やすことが可能である。
(5) When the operation rate 26 is relatively small, the margin rate 28 is relatively large, and the cumulative stop time 29 is relatively large, the worker H arranged in the corresponding zone Z works in another zone Z Compared with the person H, the speed of the work speed is unknown, but the work load may be concentrated. Therefore, it is conceivable to change the assignment of articles so as to distribute the work load.
(6) When the operation rate 26 is relatively small, the margin rate 28 is relatively large, and the cumulative stop time 29 is relatively small The worker H arranged in the corresponding zone Z works in another zone Z Compared with the person H, the speed of the work speed is unknown, but the work load is not concentrated. Therefore, it is possible to increase the allocation of articles.

(7)稼働率26が相対的に小さく、余裕率28が相対的に小さく、累積停止時間29が相対的に大きいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に遅い(処理能力が相対的に低い)ことが考えられる。したがって、物品の割り当てを減らすことが考えられる。
(8)稼働率26が相対的に小さく、余裕率28が相対的に小さく、累積停止時間29が相対的に小さいとき
該当するゾーンZに配置された作業者Hは、他のゾーンZの作業者Hと比較して、作業速度が相対的に遅い(処理能力が相対的に低い)ことが考えられる。したがって、物品の割り当てを変更する必要はない。
(7) When the operation rate 26 is relatively small, the margin rate 28 is relatively small, and the cumulative stop time 29 is relatively large, the worker H arranged in the corresponding zone Z works in another zone Z It is conceivable that the work speed is relatively slow (the processing capability is relatively low) compared to the worker H. Therefore, it is conceivable to reduce the allocation of articles.
(8) When the operation rate 26 is relatively small, the margin rate 28 is relatively small, and the cumulative stop time 29 is relatively small, the worker H arranged in the corresponding zone Z works in another zone Z It is conceivable that the work speed is relatively slow (the processing capability is relatively low) compared to the worker H. Therefore, it is not necessary to change the assignment of articles.

また例えば、ピッキング設備の稼動が終了した時点で、管理者Mは表示装置16のゾーンZ別の詳細画面を確認して、各ゾーンZの稼働率26、処理率27、余裕率28、累積停止時間29を総合的に比較検討して、異なるゾーンZ間で、間口12に保管しておく物品の種類を取り替えたり、作業者Hの配置を入れ替えたりする等して、次の稼動の際に、平均稼働率が向上するように、すなわち、ピッキング作業の効率が向上されるように準備することができる。この際、各ゾーンZにおける累積停止時間29が多い場合は、短時間に作業負担が集中していることが考えられる。また物品の配置の入れ換えは、例えば、余裕率28が最小であったゾーンZにおける間口12に配置されているピッキング作業に時間を要する(荷取り扱い特性の悪い)物品と、余裕率28が最大であったゾーンZの間口12に配置されているピッキング時間に時間を要しない(荷取り扱い特性の良い)物品との間で配置を変更することにより行うことができる。   Further, for example, when the operation of the picking equipment is finished, the manager M confirms the detailed screen for each zone Z on the display device 16, and the operation rate 26, the processing rate 27, the margin rate 28, and the cumulative stop of each zone Z. Comparing and examining the time 29, the type of articles stored in the frontage 12 between different zones Z, the arrangement of the worker H, etc., etc. It can be prepared that the average operating rate is improved, that is, the efficiency of the picking work is improved. At this time, when the accumulated stop time 29 in each zone Z is large, it is considered that the work load is concentrated in a short time. In addition, the replacement of the arrangement of the articles is, for example, an article that requires time for picking work arranged in the frontage 12 in the zone Z in which the margin ratio 28 is the minimum (poor load handling characteristics) and the margin ratio 28 is the maximum. This can be done by changing the arrangement with the article that does not require time (good load handling characteristics) for the picking time arranged at the opening 12 of the zone Z.

以上に本発明の実施の形態を説明したが、本発明は上記実施の形態に限定されることはなく、種々の変形が可能である。例えば、ゾーンZ別の詳細表示画面は、表示装置16に表示するだけに限らず、必要な時に、プリンタ等に出力して印刷して利用することもできる。また例えば、ゾーンZ別のゾーンZが割り当てられた部分の累積停止時間29に代えて、ゾーンZ別のゾーンZが割り当てられた部分を停止した回数を表示するようにすることもできる。また複数のゾーンZを設けた領域をエリアとし、このようなエリアを複数配置して、エリアごとに平均稼働率の競争などを行って全体の作業効率の向上を図ることもできる。
また例えば、仕分け先からの注文が割り付けられた集品容器10に対してピッキングされる物品を収納する例について説明したが、集品容器10を用いずに、単に、搬送手段B上に仕分け先からの注文ごとの区画を設定して、各区画に対して物品の移載を行うようにすることもできる。
また物品移載設備の一例としてピッキング設備について説明したが、アソート設備にも本発明を適用することができる。
アソート設備は、物品の移載作業を行う複数のゾーンZ(作業領域の一例)を有し、各ゾーンZに、それぞれ、複数の仕分け先からの注文に含まれる物品が一旦集められたカート等(第1の収納手段の一例)が搬入され、カートに集めた物品を、仕分け先からの注文が割り当てられた収納区画(第2の収納手段の一例)に移載して、仕分けるものである。この場合、各ゾーンZには、それぞれ、カートから各収納区画に対する物品の移載作業を指示する移載指示手段が設けられ、またカート等から収納区画に対する移載作業が完了したことを通知する移載完了通知手段が設けられている。これにより、ゾーンZごとに、処理が完了した作業量と、作業設定時間と、累積処理時間とを演算することが可能であり、処理率、稼働率、余裕率を演算することが可能とされている。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications are possible. For example, the detailed display screen for each zone Z is not limited to being displayed on the display device 16, but can be output to a printer or the like for printing when necessary. Further, for example, instead of the cumulative stop time 29 of the portion to which the zone Z for each zone Z is assigned, the number of times that the portion to which the zone Z for each zone Z is assigned can be displayed. Further, an area provided with a plurality of zones Z can be defined as an area, and a plurality of such areas can be arranged to compete for an average operating rate for each area, thereby improving the overall work efficiency.
Also, for example, an example has been described in which an article to be picked is stored in a collection container 10 to which an order from a classification destination is assigned. However, without using the collection container 10, the sorting destination is simply placed on the transport unit B. It is also possible to set a section for each order from and to transfer articles to each section.
Although the picking facility has been described as an example of the article transfer facility, the present invention can be applied to an assorted facility.
The assortment facility has a plurality of zones Z (an example of a work area) for performing the transfer operation of articles, and carts or the like in which articles included in orders from a plurality of sorting destinations are once collected in each zone Z (Example of first storage means) is carried in, and the articles collected in the cart are transferred to a storage section (example of second storage means) to which an order from a sorting destination is assigned and sorted. . In this case, each zone Z is provided with transfer instruction means for instructing the transfer operation of articles from the cart to each storage compartment, and notifies the completion of the transfer operation from the cart or the like to the storage compartment. Transfer completion notification means is provided. Thereby, for each zone Z, it is possible to calculate the amount of work completed, the work setting time, and the accumulated processing time, and it is possible to calculate the processing rate, the operation rate, and the margin rate. ing.

A 物品保管手段
B 搬送手段
H 作業者
M 管理者
Z ゾーン
10 集品容器
12 間口
13 間口表示器
14 容器表示器
15 投入完了スイッチ
16 表示装置
17 読取手段
18 データキャリア
19 制御装置
20 制御手段
21 処理作業量演算手段
22 作業設定時間演算手段
23 累積処理時間演算手段
24 余裕率演算手段
26 稼働率
27 処理率
28 余裕率
29 累積停止時間
A article storage means B transport means H worker M manager Z zone 10 collection container 12 frontage 13 frontage display 14 container display 15 loading completion switch 16 display device 17 reading means 18 data carrier 19 control device 20 control means 21 processing Work amount calculating means 22 Work setting time calculating means 23 Cumulative processing time calculating means 24 Margin rate calculating means 26 Operating rate 27 Processing rate 28 Margin rate 29 Cumulative stop time

Claims (3)

物品の移載作業を行う複数の作業領域を設け、
前記作業領域ごとに、
物品を収納する第1の収納手段と、
前記第1の収納手段から物品を移載される第2の収納手段と、
前記第1の収納手段に、作業者に前記第1の収納手段から前記第2の収納手段への物品の移載作業を指示する移載指示手段と、
前記第1の収納手段から前記第2の収納手段に対する物品の移載作業が完了したことを、作業者が制御手段に通知するための移載完了通知手段とを備えた物品移載設備において、
前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段への移載作業の処理が完了した作業量を演算する処理作業量演算手段と、
前記作業領域ごとに、前記第1の収納手段から前記第2の収納手段に対する物品の移載作業を行う作業設定時間を演算する作業設定時間演算手段と、
前記作業領域ごとに、前記移載指示手段による指示が開始されてから前記移載完了通知手段により移載作業が完了したことが通知されるまでの時間を、前記移載完了通知手段による通知動作について累積した時間である累積処理時間を演算する累積処理時間演算手段と、
前記作業領域ごとに、前記作業量を前記累積処理時間で除算した値である処理率から、前記作業量を前記作業設定時間で除算した値である稼働率を減算した値である余裕率を演算する余裕率演算手段と、を備え、
前記稼働率と、前記処理率と、前記余裕率と、前記累積処理時間と、を前記作業領域ごとに比較した結果に基づいて、物品移載作業の効率の改善を促す情報を表示すること
を特徴とする物品移載設備。
Provide multiple work areas for transferring goods,
For each work area,
First storage means for storing articles;
Second storage means for transferring articles from the first storage means;
A transfer instruction means for instructing an operator to transfer an article from the first storage means to the second storage means to the first storage means;
In the article transfer facility provided with transfer completion notification means for the operator to notify the control means that the transfer operation of the article from the first storage means to the second storage means has been completed,
For each work area, a processing work amount calculation means for calculating a work amount for which the transfer work processing from the first storage means to the second storage means has been completed,
For each work area, work setting time calculating means for calculating a work setting time for performing an article transfer operation from the first storage means to the second storage means;
A notification operation by the transfer completion notifying unit for a time period from the start of the instruction by the transfer instructing unit to the notification of the completion of the transfer operation by the transfer completion notifying unit for each work area. Cumulative processing time calculating means for calculating a cumulative processing time that is a cumulative time for
For each work area, a margin rate that is a value obtained by subtracting an operation rate that is a value obtained by dividing the work amount by the work setting time from a processing rate that is a value obtained by dividing the work amount by the accumulated processing time. A margin rate calculating means for
Displaying information prompting improvement of the efficiency of the article transfer work based on a result of comparing the operating rate, the processing rate, the margin rate, and the cumulative processing time for each work area. Characteristic equipment transfer equipment.
前記制御手段より前記作業領域ごとの前記余裕率を入力して表示する表示手段を備えたこと
を特徴とする請求項1に記載の物品移載設備。
The article transfer facility according to claim 1, further comprising display means for inputting and displaying the margin rate for each work area from the control means.
前記表示手段が、前記作業領域ごとの前記余裕率をグラフにより表示すること
を特徴とする請求項2に記載の物品移載設備。
The article transfer facility according to claim 2, wherein the display unit displays the margin rate for each work area in a graph.
JP2011098834A 2011-04-27 2011-04-27 Equipment transfer equipment Active JP5742430B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011098834A JP5742430B2 (en) 2011-04-27 2011-04-27 Equipment transfer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011098834A JP5742430B2 (en) 2011-04-27 2011-04-27 Equipment transfer equipment

Publications (2)

Publication Number Publication Date
JP2012229094A JP2012229094A (en) 2012-11-22
JP5742430B2 true JP5742430B2 (en) 2015-07-01

Family

ID=47431014

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011098834A Active JP5742430B2 (en) 2011-04-27 2011-04-27 Equipment transfer equipment

Country Status (1)

Country Link
JP (1) JP5742430B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001019129A (en) * 1999-07-05 2001-01-23 Hitachi Ltd Picking commodity arranging method
JP2005255390A (en) * 2004-03-15 2005-09-22 Arkpia Kk Physical distribution control system
JP5051693B2 (en) * 2007-02-28 2012-10-17 パナソニック デバイスSunx株式会社 Picking sensor and picking system
JP5140614B2 (en) * 2009-01-29 2013-02-06 株式会社日立製作所 Picking work result display system, server, and display method

Also Published As

Publication number Publication date
JP2012229094A (en) 2012-11-22

Similar Documents

Publication Publication Date Title
JP5825348B2 (en) Picking and sorting system
JP5116366B2 (en) Article supply shelf assignment program, article supply shelf assignment method, and article supply shelf
JP6155970B2 (en) Goods storage facility
JP5338692B2 (en) Picking equipment
JP2011079619A (en) Picking system
JP6863335B2 (en) Picking system
JP5849844B2 (en) Picking equipment, aggregation shelf, and picking method
JP5742430B2 (en) Equipment transfer equipment
JP5626706B2 (en) Picking system
JP3937782B2 (en) Picking equipment
JP5600465B2 (en) Picking system
JP2008162747A (en) Picking facility
JP4026468B2 (en) Material handling equipment
JP5760925B2 (en) Picking system
JP6490511B2 (en) Picking system and cart
JP2009062142A (en) Sorting system and sorting method
JP5712967B2 (en) Sorting equipment and sorting method
JP6087007B2 (en) Picking system
JP3760750B2 (en) Shelf equipment
JP5652662B2 (en) Goods transport equipment
JP3760751B2 (en) Shelf equipment
JP2015020861A (en) Sorting facility
JP7160070B2 (en) Sorting machine control method, control device, and computer program
JP5482334B2 (en) Picking equipment
JP4329025B2 (en) Goods storage equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140407

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140826

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150407

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150420

R150 Certificate of patent or registration of utility model

Ref document number: 5742430

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250