JP5652662B2 - Goods transport equipment - Google Patents

Goods transport equipment Download PDF

Info

Publication number
JP5652662B2
JP5652662B2 JP2011194220A JP2011194220A JP5652662B2 JP 5652662 B2 JP5652662 B2 JP 5652662B2 JP 2011194220 A JP2011194220 A JP 2011194220A JP 2011194220 A JP2011194220 A JP 2011194220A JP 5652662 B2 JP5652662 B2 JP 5652662B2
Authority
JP
Japan
Prior art keywords
transfer
transport
conveyance
time
article
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011194220A
Other languages
Japanese (ja)
Other versions
JP2013052993A (en
Inventor
賢治 矢川
賢治 矢川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daifuku Co Ltd
Original Assignee
Daifuku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daifuku Co Ltd filed Critical Daifuku Co Ltd
Priority to JP2011194220A priority Critical patent/JP5652662B2/en
Publication of JP2013052993A publication Critical patent/JP2013052993A/en
Application granted granted Critical
Publication of JP5652662B2 publication Critical patent/JP5652662B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、供給元と供給先との間で物品を搬送する物品搬送手段と、前記物品搬送手段の作動を制御する搬送制御手段と、上位コントローラから搬送要求を受信して、当該搬送要求に基づいて物品を前記供給元から前記供給先まで前記物品搬送手段に搬送させるべく、前記搬送要求に基づく搬送指令情報を前記搬送制御手段に送信する搬送管理手段とが設けられ、前記搬送制御手段が、前記搬送管理手段からの前記搬送指令情報に基づいて、物品を前記供給元から前記供給先に搬送するべく前記物品搬送手段の作動を制御するように構成されている物品搬送設備に関する。   According to the present invention, an article transport unit that transports an article between a supply source and a supply destination, a transport control unit that controls the operation of the article transport unit, and a transport request received from a host controller, Based on the conveyance request, the conveyance control means is provided for conveying the article from the supply source to the supply destination to the article conveyance means, and the conveyance control means is provided. The present invention relates to an article conveyance facility configured to control the operation of the article conveyance means to convey an article from the supply source to the supply destination based on the conveyance command information from the conveyance management means.

かかる物品搬送設備は、上位コントローラからの搬送要求が搬送管理手段に送信されると、搬送管理手段は搬送要求に基づく搬送指令情報を搬送制御手段に送信し、この搬送指令情報に基づいて搬送制御手段が物品搬送手段の作動を制御して、物品搬送手段により供給元に位置する物品を供給先に搬送するものである。
そして、このような物品搬送設備において、従来では、物品搬送手段が運転している合計運転時間を算出して、その合計運転時間を表示手段に表示させるように構成されているものがある(例えば、特許文献1参照。)。
ちなみに、上記した従来の物品搬送設備では、物品搬送手段の合計運転時間を表示手段に表示させることで、作業者が物品搬送手段のメンテナンス時期を判別し易くなっている。
In such article transport equipment, when a transport request from the host controller is transmitted to the transport management means, the transport management means transmits transport command information based on the transport request to the transport control means, and transport control is performed based on the transport command information. The means controls the operation of the article conveying means, and the article conveying means conveys the article located at the supply source to the supply destination.
In such an article transport facility, there is conventionally a structure configured to calculate the total operation time that the article transport unit is operating and display the total operation time on the display unit (for example, , See Patent Document 1).
Incidentally, in the above-described conventional article transport facility, the operator can easily determine the maintenance time of the article transport means by displaying the total operation time of the article transport means on the display means.

特開平4−246704号公報JP-A-4-246704

ところで、物品搬送手段にて供給元から供給先に物品を搬送する場合に、物品搬送手段にて物品を搬送している途中において、他の物品の搬送が滞っているために物品搬送手段による物品の搬送を効率よく行えないことにより、供給元から供給先への物品の搬送に長い時間を要することがある。また、供給元に物品が存在するものの搬送管理手段の不具合等により搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができずに物品が供給元に長い時間待機することにより、供給元から供給先への物品の搬送に長い時間を要することがある。そして、物品搬送手段による物品の搬送を効率よく行えない場合には物品の搬送スケジュールを改善する、搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができない場合には管理手段に対して補修を行う等によって、物品の搬送効率の改善を図ることが考えられる。   By the way, when an article is transported from a supply source to a supply destination by the article transport means, an article by the article transport means is in the middle of transporting an article by the article transport means, so that the transport of other articles is delayed. In this case, it may take a long time to convey the article from the supply source to the supply destination. In addition, although the article exists at the supplier, the article cannot wait for a long time from the supplier without being able to promptly transmit the conveyance command information from the conveyance manager to the conveyance controller due to a defect in the conveyance manager. Therefore, it may take a long time to convey the article from the supply source to the supply destination. If the article transport means cannot efficiently transport the article, the article transport schedule is improved. If the transport management information cannot be quickly transmitted from the transport management means to the transport control means, the management is performed. It is conceivable to improve the conveyance efficiency of articles by repairing the means.

上記した従来の物品搬送設備では、表示手段に表示されている合計運転時間は物品搬送手段が運転していた合計時間であるため、作業者は表示手段に表示されている内容からは、物品搬送手段による物品の搬送を効率よく行えないことにより、供給元から供給先への物品の搬送に長い時間を要しているのか、搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができずに物品が供給元に長い時間待機することにより、供給元から供給先への物品の搬送に長い時間を要しているのかが判別できない。よって、物品の搬送に長い時間を要している場合にその原因となるサイクルを判別できないため、上述のような対策を進めて物品の搬送効率の改善を図ることができなかった。   In the above-described conventional article transport equipment, the total operation time displayed on the display means is the total time that the article transport means has been operated. Since the article cannot be efficiently conveyed by the means, it is necessary to quickly transmit the conveyance command information from the conveyance management means to the conveyance control means whether it takes a long time to convey the article from the supply source to the supply destination. If the article waits for a long time without being able to do so, it cannot be determined whether it takes a long time to carry the article from the supplier to the supplier. Therefore, when a long time is required for conveying an article, the cycle that causes the problem cannot be determined. Therefore, the above measures cannot be promoted to improve the article conveying efficiency.

本発明は、上記実状に鑑みて為されたものであって、その目的は、物品の搬送に長い時間を要している場合にその原因となるサイクルを判別することができ、物品の搬送効率の改善を図ることができる物品搬送設備を提供する点にある。   The present invention has been made in view of the above circumstances, and its purpose is to determine the cycle that causes a long time when transporting an article, and the efficiency of transporting the article. It is in the point which provides the article conveyance equipment which can aim at improvement.

本発明にかかる物品搬送設備は、供給元と供給先との間で物品を搬送する物品搬送手段と、前記物品搬送手段の作動を制御する搬送制御手段と、上位コントローラから搬送要求を受信して当該搬送要求に基づく搬送指令情報を送信可能となった場合に、当該搬送要求に基づいて物品を前記供給元から前記供給先まで前記物品搬送手段に搬送させるべく、前記搬送指令情報を前記搬送制御手段に送信する搬送管理手段とが設けられ、前記搬送制御手段が、前記搬送管理手段からの前記搬送指令情報に基づいて、物品を前記供給元から前記供給先に搬送するべく前記物品搬送手段の作動を制御するように構成されているものであって、その第1特徴構成は、
作業指令手段からの作業指令情報に基づいて前記上位コントローラが前記搬送要求を作成したとき、又は、前記上位コントローラが前記搬送管理手段に前記搬送要求を送信したとき、又は、前記搬送管理手段が前記搬送要求を受信したときの何れかを計時開始タイミングとし、当該計時開始タイミングから前記搬送管理手段が前記搬送制御手段に前記搬送指令情報を送信するまでの時間を送信前経過時間として計時し、その送信前経過時間を対応する前記搬送指令情報と関連付けて記憶する時間管理手段と、前記時間管理手段に記憶されている前記送信前経過時間を前記搬送指令情報に対応する形態で表示手段に表示する表示制御手段とが設けられている点にある。
The article conveying facility according to the present invention receives an article conveying means for conveying an article between a supply source and a destination, a conveying control means for controlling the operation of the article conveying means, and a conveying request from a host controller. when enabled transmits a transport command information based on the transport request, in order to transport the article transport means an article based on the transport request to said supply destination from the source, the transport controller controls the transport command information A conveyance management means for transmitting to the means, and the conveyance control means is configured to transfer the article from the supply source to the supply destination based on the conveyance command information from the conveyance management means. It is comprised so that an action | operation may be controlled, Comprising: The 1st characteristic structure is the following.
When the host controller creates the transport request based on work command information from the work command means, or when the host controller transmits the transport request to the transport management means, or the transport management means Any time when a transport request is received is set as a timing start timing, and the time from the timing start timing until the transport management means transmits the transport command information to the transport control means is counted as an elapsed time before transmission. Time management means for storing the elapsed time before transmission in association with the corresponding conveyance command information, and displaying the elapsed time before transmission stored in the time management means on the display means in a form corresponding to the conveyance command information. Display control means is provided.

すなわち、表示手段には、時間管理手段に記憶されている送信前経過時間に基づいて、作業指令手段からの作業指令情報に基づいて上位コントローラが搬送要求を作成したとき、又は、上位コントローラが搬送管理手段に搬送要求を送信したとき、又は、搬送管理手段が搬送要求を受信したときの何れかを計時開始タイミングとし、当該計時開始タイミングから搬送管理手段が搬送制御手段に搬送指令情報を送信するまでの時間が送信前経過時間として、搬送指令情報に対応する形態で表示されている。   In other words, the display means is configured such that when the host controller creates a transport request based on the work command information from the work command means based on the elapsed time before transmission stored in the time management means, or the host controller transports Either the time when the transport request is transmitted to the management means or the time when the transport management means receives the transport request is set as the timing start timing, and the transport management means transmits the transport command information to the transport control means from the timing start timing. Is displayed as a time before transmission in a form corresponding to the conveyance command information.

そのため、作業者は、表示手段に表示されている送信前経過時間から、搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができているか否かを判別することができる。
つまり、供給元から供給先への物品の搬送に長い時間を要している場合に、表示手段に表示されている送信前経過時間が長いときは、搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができずに物品が供給元に長い時間待機することにより、供給元から供給先への物品の搬送に時間がかかっていると判別できる。また、表示手段に表示されている送信前経過時間が短いにも関らず、供給元から供給先への物品の搬送に長い時間を要している場合は、例えば、物品搬送手段による物品の搬送を効率よく行えない等の他の原因により、供給元から供給先への物品の搬送に時間がかかっていると判別できる。
従って、物品の搬送に長い時間を要している場合にその原因となるサイクルを判別することができ、物品の搬送効率の改善を図ることができる。
Therefore, the operator can determine from the elapsed time before transmission displayed on the display means whether the transport command information can be quickly transmitted from the transport management means to the transport control means. .
In other words, when it takes a long time to transport the article from the supply source to the supply destination, if the elapsed time before transmission displayed on the display means is long, the transport management means transports the goods to the transport control means. It is possible to determine that it takes time to transport the article from the supply source to the supply destination by waiting for a long time at the supply source without sending the command information quickly. In addition, when it takes a long time to transport the article from the supplier to the supplier even though the pre-transmission elapsed time displayed on the display means is short, for example, It can be determined that it takes time to transport the article from the supply source to the supply destination due to other reasons such as inefficient conveyance.
Therefore, when it takes a long time to transport the article, it is possible to determine the cycle that causes it, and to improve the efficiency of conveying the article.

本発明にかかる物品搬送設備の第2特徴構成は、第1特徴構成において、前記時間管理手段が、前記搬送管理手段が前記搬送制御手段に前記搬送指令情報を送信してから物品が前記供給先に搬送されるまでの時間を搬送時間として計時し、その搬送時間及び前記送信前経過時間を対応する搬送指令情報と関連付けて記憶するように構成され、前記表示制御手段が、前記時間管理手段に記憶されている前記送信前経過時間及び前記搬送時間を前記搬送指令情報に対応する形態で前記表示手段に表示するように構成されている点にある。   A second feature configuration of the article transport facility according to the present invention is the first feature configuration, wherein the time management unit transmits the transport command information to the transport control unit after the time management unit transmits the transport command information to the supply destination. Time is measured as the transport time, and the transport time and the pre-transmission elapsed time are stored in association with the corresponding transport command information, and the display control means is stored in the time management means. The stored pre-transmission elapsed time and the transport time are displayed on the display unit in a form corresponding to the transport command information.

すなわち、表示手段には、時間管理手段に記憶されている送信前経過時間及び搬送時間に基づいて、送信前経過時間と搬送時間とが搬送指令情報に対応する形態で表示される。
そのため、作業者は、表示手段に表示される送信前経過時間が長い場合は、搬送管理手段から搬送制御手段に対して搬送指令情報を迅速に送信することができずに物品が供給元に長い時間待機することにより、供給元から供給先への物品の搬送に時間がかかっていると判別でき、表示手段に表示されている搬送時間が長い場合は、物品搬送手段による物品の搬送を効率よく行えないことにより、供給元から供給先への物品の搬送に長い時間を要していると判別できる。
従って、物品の搬送に長い時間を要している場合にその原因となるサイクルをより適確に判別することができ、物品の搬送効率の改善を図ることができる。
That is, the display means displays the pre-transmission elapsed time and the transport time in a form corresponding to the transport command information based on the pre-transmission elapsed time and the transport time stored in the time management means.
Therefore, when the elapsed time before transmission displayed on the display unit is long, the worker cannot quickly transmit the conveyance command information from the conveyance management unit to the conveyance control unit, and the article is long to the supplier. By waiting for the time, it can be determined that it takes time to transport the article from the supply source to the supply destination. If the transportation time displayed on the display means is long, the article transportation means efficiently transports the article. By not being able to do this, it can be determined that it takes a long time to transport the article from the supplier to the supplier.
Therefore, when it takes a long time to transport the article, the cycle that causes the problem can be determined more accurately, and the efficiency of transporting the article can be improved.

本発明にかかる物品搬送設備の第3特徴構成は、第1又は第2特徴構成において、前記物品搬送手段が、供給元と供給先との間で物品を搬送する搬送機器を複数備えて、前記複数の搬送機器にて物品を順次受け渡して前記供給元から前記供給先に搬送するように構成され、前記搬送制御手段が、前記複数の搬送機器の作動を各別に制御する複数の搬送制御装置にて構成され、前記時間管理手段が、前記計時開始タイミングから最も搬送上流側に位置する前記搬送機器の作動を制御する前記搬送制御装置に前記搬送管理手段が前記搬送指令情報を送信するまでの時間を前記送信前経過時間として記憶するように構成されている点にある。   The third feature configuration of the article transport facility according to the present invention is the first or second feature configuration, wherein the article transport means includes a plurality of transport devices that transport the article between a supply source and a supply destination, A plurality of transfer devices are configured to sequentially deliver and transfer articles from the supply source to the supply destination, and the transfer control unit controls a plurality of transfer control devices that individually control the operations of the plurality of transfer devices. The time until the conveyance management means transmits the conveyance command information to the conveyance control device that controls the operation of the conveyance apparatus located on the most upstream side of the conveyance from the timing start timing. Is stored as the pre-transmission elapsed time.

すなわち、複数の搬送制御装置にて複数の搬送機器の作動を各別に制御し、複数の搬送機器にて物品を順次受け渡して供給元から供給先に搬送するように構成されているため、搬送管理手段は、搬送指令情報を複数の搬送制御装置の夫々に送信する必要がある。
そして、搬送指令情報を複数の搬送制御装置の夫々に送信する方法として、例えば、搬送管理手段が、複数の搬送制御装置のうちの最も搬送上流側の搬送機器に対応するものに搬送指令情報を送信し、当該搬送機器による物品の搬送が完了すると次の搬送制御装置に搬送指令情報を送信するというように、複数の搬送機器に対して搬送指令情報を順次送信する方法があり、この方法の場合では、搬送管理手段が搬送制御装置に搬送指令情報を送信するタイミングは、搬送下流側に位置する搬送制御装置ほど搬送機器が要した搬送時間の影響が大きく、当該タイミングが大きく遅れることになる。
しかし、送信前経過時間を、計時開始タイミングから最も搬送上流側に位置する搬送機器の作動を制御する搬送制御装置に搬送指令情報を送信するまでの時間としているため、上述のような搬送指令情報を送信するタイミングの遅れが少なく、送信前経過時間について搬送機器が要した搬送時間の影響を小さくすることができる。
That is, it is configured to control the operation of a plurality of transfer devices separately by a plurality of transfer control devices, and sequentially transfer articles from a supply source to a supply destination by a plurality of transfer devices. The means needs to transmit the conveyance command information to each of the plurality of conveyance control devices.
Then, as a method of transmitting the conveyance command information to each of the plurality of conveyance control devices, for example, the conveyance management means sends the conveyance command information to the one corresponding to the conveyance device on the most upstream side of the plurality of conveyance control devices. There is a method of sequentially transmitting the conveyance command information to a plurality of conveyance devices, such as transmitting the conveyance command information to the next conveyance control device when the conveyance of the article by the conveyance device is completed. In this case, the timing at which the transport management unit transmits the transport command information to the transport control device is more influenced by the transport time required by the transport device in the transport control device located on the downstream side of the transport, and the timing is greatly delayed. .
However, since the pre-transmission elapsed time is the time from the start timing to the time when the transport command information is transmitted to the transport control device that controls the operation of the transport device located most upstream of the transport, the transport command information as described above Is less delayed, and the influence of the transport time required by the transport device on the elapsed time before transmission can be reduced.

本発明にかかる物品搬送設備の第4特徴構成は、第3特徴構成において、前記複数の搬送機器のうちの1つ又は複数が、前記搬送元との間及び前記搬送先との間で物品を移載する移載装置を備えて前記搬送元と前記搬送先との間で物品を搬送する自走台車にて構成され、前記時間管理手段が、前記搬送管理手段から前記自走台車の作動を制御する前記搬送制御装置に前記搬送指令情報が送信されてから前記移載装置を前記搬送元に位置させるまでの搬送元移動時間、前記搬送元から前記移載装置への物品の移載が開始されてから当該移載が完了するまでの搬送元移載時間、前記移載装置を前記搬送元から前記搬送先に位置させるまでの搬送先移動時間、前記移載装置から前記搬送先への物品の移載が開始されてから当該移載が完了するまでの搬送先移載時間のうちの何れか1つ又は複数を、対応する搬送指令情報と関連付けて記憶するように構成され、前記表示制御手段が、前記時間管理手段に記憶されている前記搬送元移動時間、前記搬送元移載時間、前記搬送先移動時間及び前記搬送先移載時間のうちの何れか1つ又は複数を前記搬送指令情報に対応する形態で前記表示手段に表示するように構成されている点にある。   According to a fourth feature configuration of the article transport facility according to the present invention, in the third feature configuration, one or more of the plurality of transport devices may transfer the article between the transport source and the transport destination. It is comprised by the self-propelled trolley | bogie which is provided with the transfer apparatus which transfers, and conveys articles | goods between the said conveyance origin and the said conveyance destination, The said time management means carries out the operation | movement of the said self-propelled trolley from the said conveyance management means. The transfer source movement time from when the transfer command information is transmitted to the transfer control device to be controlled until the transfer device is positioned at the transfer source, and transfer of articles from the transfer source to the transfer device is started. The transfer source transfer time from the transfer source to the transfer destination, the transfer destination transfer time from the transfer source to the transfer destination, the article from the transfer device to the transfer destination From the start of the transfer until the transfer is completed Any one or more of the destination transfer times are configured to be stored in association with the corresponding transfer command information, and the display control unit stores the transfer source movement stored in the time management unit Any one or more of the time, the transfer source transfer time, the transfer destination transfer time, and the transfer destination transfer time are displayed on the display unit in a form corresponding to the transfer command information. There is in point.

すなわち、表示手段には、時間管理手段に記憶されている搬送元移動時間、搬送元移載時間、搬送先移動時間、搬送先移載時間のうちの1つ又は複数が、搬送指令情報に対応する形態で表示される。
これにより、移載装置を搬送元に位置させるときに長い時間を要した場合は搬送元移動時間が長くなり、搬送元から移載装置に物品を移載するときに長い時間を要した場合は搬送元移載時間が長くなり、移載装置を搬送先に位置させるときに長い時間を要した場合は搬送先移動時間が長くなり、移載装置から搬送先に物品を移載するときに長い時間を要した場合は搬送先移載時間が長くなるというように、自走台車にて搬送元から搬送先に物品を搬送する場合において、長い時間を要した状況を細かいサイクルに切り分けて認識することができる。
In other words, one or more of the transfer source movement time, transfer source transfer time, transfer destination transfer time, transfer destination transfer time stored in the time management means corresponds to the transfer command information on the display means. To be displayed.
Thereby, when a long time is required when the transfer device is positioned at the transfer source, the transfer source movement time becomes long, and when a long time is required when the article is transferred from the transfer source to the transfer device. If the transfer time of the transfer source is long and it takes a long time to position the transfer device at the transfer destination, the transfer time of the transfer destination becomes long, and it is long when transferring an article from the transfer device to the transfer destination. When transporting articles from the transport source to the transport destination on a self-propelled carriage, the situation that took a long time is divided into fine cycles and recognized, such as when the transport time is longer when the transport time is required. be able to.

本発明にかかる物品搬送設備の第5特徴構成は、第4特徴構成において、前記自走台車の作動を制御する前記搬送制御装置が、前記移載装置が前記搬送元に位置するに伴って搬送元移動完了情報を前記搬送管理手段に送信し、前記搬送元から前記移載装置への物品の移載が完了するに伴って搬送元移載完了情報を前記搬送管理手段に送信し、前記移載装置が前記搬送先に位置するに伴って搬送先移動完了情報を前記搬送管理手段に送信し、前記移載装置から前記搬送先への物品の移載が完了するに伴って搬送先移載完了情報を前記搬送管理手段に送信するように構成され、前記時間管理手段が、前記搬送管理手段から前記自走台車の作動を制御する前記搬送制御装置に前記搬送指令情報が送信されてから前記搬送管理手段が前記搬送元移動完了情報を受信するまでの時間を前記搬送元移動時間として計時し、前記搬送管理手段が前記搬送元移動完了情報を受信してから前記搬送管理手段が前記搬送元移載完了情報を受信するまでの時間を前記搬送元移載時間として計時し、前記搬送管理手段が前記搬送元移載完了情報を受信してから前記搬送管理手段が前記搬送先移動完了情報を受信するまでの時間を前記搬送先移動時間として計時し、前記搬送管理手段が搬送先移動完了情報を受信してから前記搬送管理手段が前記搬送先移載完了情報を受信するまでの時間を前記搬送先移載時間として計時するように構成されている点にある。   A fifth feature configuration of the article transport facility according to the present invention is the fourth feature configuration, wherein the transport control device that controls the operation of the self-propelled carriage is transported as the transfer device is positioned at the transport source. The original movement completion information is transmitted to the conveyance management means, and as the transfer of the article from the conveyance source to the transfer device is completed, the conveyance source transfer completion information is transmitted to the conveyance management means. As the loading device is positioned at the transport destination, transport destination movement completion information is transmitted to the transport management means, and the transport destination is transferred as the transfer of the article from the transfer device to the transport destination is completed. Completion information is transmitted to the transport management means, and the time management means transmits the transport command information from the transport management means to the transport control device that controls the operation of the self-propelled carriage. The transfer management means completes the transfer source movement. The time until the information is received is counted as the transfer source movement time, and the transfer management unit receives the transfer source movement completion information until the transfer management unit receives the transfer source transfer completion information. Time is measured as the transfer source transfer time, and the time from when the transfer management unit receives the transfer source transfer completion information until the transfer management unit receives the transfer destination transfer completion information is set as the transfer destination. Time is measured as the movement time, and the time from when the conveyance management unit receives the conveyance destination movement completion information until the conveyance management unit receives the conveyance destination transfer completion information is counted as the conveyance destination transfer time. It is in the point which is comprised.

すなわち、搬送管理手段は、自走台車の作動を制御する搬送制御装置に対して搬送指令情報を送信し、搬送制御装置は、移載装置の搬送元に対応する停止位置への移動が完了するに伴って搬送元移動完了情報を搬送管理手段に送信し、搬送元から移載装置への物品の移載が完了するに伴って搬送元移載完了情報を搬送管理手段に送信し、移載装置の搬送先に対応する停止位置への移動が完了するに伴って搬送先移動完了情報を搬送管理手段に送信し、移載装置から搬送先への物品の移載が完了するに伴って搬送先移載完了情報を搬送管理手段に送信するように構成されている。   That is, the transfer management means transmits transfer command information to the transfer control device that controls the operation of the self-propelled carriage, and the transfer control device completes the movement of the transfer device to the stop position corresponding to the transfer source. The transfer source movement completion information is sent to the transfer management means, and the transfer source transfer completion information is sent to the transfer management means as the transfer of the article from the transfer source to the transfer device is completed. As the movement of the apparatus to the stop position corresponding to the conveyance destination is completed, conveyance destination movement completion information is transmitted to the conveyance management means, and conveyance is performed as the transfer of the article from the transfer apparatus to the conveyance destination is completed. The first transfer completion information is transmitted to the transport management means.

そして、搬送管理手段が搬送指令情報を送信するタイミング、並びに、搬送管理手段が搬送元移動完了情報、搬送元移載完了情報、搬送先移動完了情報及び搬送先移載完了情報を受信するタイミングから、時間管理手段は、搬送元移動時間、搬送元移載時間、搬送先移動時間、搬送先移載時間を計時するように構成されている。
このように、搬送管理手段が情報を送受信するタイミングにより時間管理手段は、搬送元移動時間、搬送元移載時間、搬送先移動時間、搬送先移載時間を一元的に計時することができるため、各時間を計時し易いものとなる。
From the timing at which the transport management means transmits the transport command information and the timing at which the transport management means receives the transport source movement completion information, the transport source transfer completion information, the transport destination movement completion information, and the transport destination transfer completion information. The time management means is configured to time the transfer source movement time, the transfer source transfer time, the transfer destination movement time, and the transfer destination transfer time.
As described above, the time management unit can centrally measure the transfer source movement time, the transfer source transfer time, the transfer destination transfer time, and the transfer destination transfer time according to the timing at which the transfer management unit transmits and receives information. It becomes easy to time each time.

物品搬送設備の平面図Top view of the goods transport facility 物品搬送台車及びその搬送元と搬送先とを示す平面図The top view which shows an article conveyance trolley, its conveyance origin, and a conveyance destination スタッカークレーン及びその搬送元と搬送先とを示す平面図Top view showing stacker crane and its source and destination 制御ブロック図Control block diagram 搬送履歴表示状態を示す図Diagram showing the transfer history display status サイクルタイム履歴表示状態を示す図Diagram showing cycle time history display status

以下、本発明の実施形態を図面に基づいて説明する。
図1に示すように、物品搬送設備には、物品を収納する自動倉庫1、外部から搬入されてきた物品を搬送する搬入用コンベヤ2、外部に搬出する物品を搬送する搬出用コンベヤ3、及び、床面上を走行移動して自動倉庫1と搬入用コンベヤ2と搬出用コンベヤ3との間で物品を搬送する物品搬送台車4が設けられている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
As shown in FIG. 1, the article transport facility includes an automatic warehouse 1 for storing articles, a carry-in conveyor 2 for carrying articles carried in from the outside, a carry-out conveyor 3 for carrying articles carried out to the outside, and There is provided an article transporting carriage 4 that travels on the floor and conveys articles among the automatic warehouse 1, the carry-in conveyor 2, and the carry-out conveyor 3.

そして、自動倉庫1には、物品を収納する収納部6を縦横に複数備えた物品収納棚7、自動倉庫1に入庫された物品を搬送する入庫用コンベヤ8、自動倉庫1から出庫する物品を搬送する出庫用コンベヤ9、及び、床面上を走行して物品収納棚7と入庫用コンベヤ8と出庫用コンベヤ9との間で物品を搬送するスタッカークレーン10が設けられている。   In the automatic warehouse 1, an article storage shelf 7 having a plurality of storage units 6 for storing articles vertically and horizontally, a warehousing conveyor 8 for transporting articles received in the automatic warehouse 1, and articles delivered from the automatic warehouse 1 are stored. There are provided a delivery conveyor 9 for transporting, and a stacker crane 10 that travels on the floor surface and transports articles among the article storage shelves 7, the storage conveyor 8, and the delivery conveyor 9.

搬入用コンベヤ2、搬出用コンベヤ3、入庫用コンベヤ8及び出庫用コンベヤ9の夫々は、搬送上流側端部aを搬送元とし、搬送下流側端部bを搬送先として、搬送元と搬送先との間で物品を搬送するように構成されている。尚、図1において、各コンベヤにおける搬送方向を矢印で図示している。
物品搬送台車4は、搬入用コンベヤ2の搬送下流側端部b又は出庫用コンベヤ9の搬送下流側端部bを搬送元とし、出庫用コンベヤ9の搬送上流側端部a又は搬出用コンベヤ3の搬送上流側端部aを搬送先として、搬送元と搬送先との間で物品を搬送するように構成されている。
スタッカークレーン10は、入庫用コンベヤ8の搬送下流側端部bを搬送元とし、物品収納棚7の収納部6を搬送先とする、或いは、物品収納棚7の収納部6を搬送元とし、出庫用コンベヤ9の搬送上流側端部aを搬送先として、搬送元と搬送先との間で物品を搬送するように構成されている。
Each of the carry-in conveyor 2, the carry-out conveyor 3, the warehousing conveyor 8 and the delivery conveyor 9 has a conveyance upstream end a as a conveyance source, a conveyance downstream end b as a conveyance destination, and a conveyance source and a conveyance destination. It is comprised so that articles | goods may be conveyed between. In addition, in FIG. 1, the conveyance direction in each conveyor is shown by the arrow.
The article transport carriage 4 has the transport downstream end b of the carry-in conveyor 2 or the transport downstream end b of the unloading conveyor 9 as a transport source, and the transport upstream end a of the unload conveyor 9 or the unloading conveyor 3. The transport upstream end a is a transport destination, and the article is transported between the transport source and the transport destination.
The stacker crane 10 uses the transport downstream end b of the warehousing conveyor 8 as a transport source and the storage unit 6 of the article storage shelf 7 as a transport destination, or uses the storage unit 6 of the article storage shelf 7 as a transport source. An article is conveyed between a conveyance source and a conveyance destination with the conveyance upstream side end a of the delivery conveyor 9 as a conveyance destination.

このように、搬入用コンベヤ2、搬出用コンベヤ3、物品搬送台車4、入庫用コンベヤ8、出庫用コンベヤ9及びスタッカークレーン10の複数の搬送機器11の夫々は、搬送元と搬送先との間で物品を搬送するように構成されており、複数の搬送機器11にて物品を順次受け渡して供給元としての搬送開始箇所Bから供給先としての搬送終了箇所Gに搬送するように構成されている。そして、搬送開始箇所Bと搬送終了箇所Gとの間で物品を搬送する物品搬送手段Aは、搬送機器11を複数備えて構成されている。   As described above, each of the plurality of transfer devices 11 such as the carry-in conveyor 2, the carry-out conveyor 3, the article transport carriage 4, the warehousing conveyor 8, the shed conveyor 9, and the stacker crane 10 is provided between the transport source and the transport destination. It is comprised so that an article | item may be conveyed, and it is comprised so that the articles | goods may be delivered in order by the some conveyance apparatus 11, and may be conveyed from the conveyance start location B as a supply source to the conveyance end location G as a supply destination. . And the article conveyance means A which conveys an article between the conveyance start location B and the conveyance end location G includes a plurality of conveyance devices 11.

上述の如く複数の搬送機器11のうちの2つは、物品搬送台車4及びスタッカークレーン10にて構成されており、これら2つの搬送機器11は、搬送元との間及び搬送先との間で物品を移載する移載装置24を備えて搬送元と搬送先との間で物品を搬送する自走台車にて構成されている。   As described above, two of the plurality of transport devices 11 are configured by the article transport cart 4 and the stacker crane 10, and these two transport devices 11 are between the transport source and the transport destination. It comprises a self-propelled carriage that includes a transfer device 24 for transferring an article and conveys the article between a conveyance source and a conveyance destination.

そして、外部から搬入された物品を物品収納棚7の収納部6に収納する場合では、外部から搬入された物品は、搬送開始箇所Bとなる搬入用コンベヤ2の搬送上流側端部aに載せられ、その載せられた物品は、搬入用コンベヤ2にてその搬送下流側端部bまで搬送される。そして、搬入用コンベヤ2の搬送下流側端部bに位置する物品が物品搬送台車4に載せられ、その載せられた物品は自動倉庫1における入庫用コンベヤ8の搬送上流側端部aに卸すように物品搬送台車4にて搬送されて、物品が自動倉庫1に搬送されるようになっている。   Then, in the case where the articles carried in from the outside are stored in the storage section 6 of the article storage shelf 7, the articles carried in from the outside are placed on the conveyance upstream end a of the carry-in conveyor 2 serving as the conveyance start location B. The article placed thereon is transported to the transport downstream end b by the carry-in conveyor 2. Then, the article located at the conveyance downstream end b of the carry-in conveyor 2 is placed on the article conveyance carriage 4 and the loaded article is wholesaled to the conveyance upstream end a of the warehousing conveyor 8 in the automatic warehouse 1. The articles are conveyed to the automatic warehouse 1 by being conveyed by the article conveying cart 4.

自動倉庫1に搬送された物品は、入庫用コンベヤ8にてその搬送下流側端部bまで搬送される。そして、搬入用コンベヤ2の搬送下流側端部bに位置する物品がスタッカークレーン10にて掬われ、その掬われた物品は、搬送終了箇所Gとなる物品収納棚7の収納部6に卸すようにスタッカークレーン10にて搬送されて、物品が収納部6に収納されるようになっている。
このように、外部から搬入された物品を物品収納棚7の収納部6に収納する場合では、搬入用コンベヤ2の搬送上流側端部aを搬送開始箇所Bをとし、物品収納棚7の収納部6を搬送終了箇所Gとして、搬入用コンベヤ2、物品搬送台車4、入庫用コンベヤ8、スタッカークレーン10の順に物品を順次受け渡して搬送するようになっている。
The articles conveyed to the automatic warehouse 1 are conveyed to the conveyance downstream end b by the warehousing conveyor 8. Then, an article located at the transport downstream end b of the carry-in conveyor 2 is scraped by the stacker crane 10, and the scraped article is wholesaled to the storage section 6 of the article storage shelf 7 that is the transfer end point G. The articles are transported by the stacker crane 10 and are stored in the storage unit 6.
As described above, when the articles carried in from the outside are stored in the storage section 6 of the article storage shelf 7, the upstream end a of the transfer conveyor 2 is defined as the transfer start location B, and the article storage shelf 7 is stored. With the part 6 as the conveyance end point G, the articles are sequentially delivered and conveyed in the order of the carry-in conveyor 2, the article conveyance carriage 4, the warehousing conveyor 8, and the stacker crane 10.

また、物品収納棚7の収納部6から取り出した物品を外部に搬出する場合では、収納部6から取り出して出庫用コンベヤ9の搬送上流側端部aに卸すようにスタッカークレーン10にて搬送され、出庫用コンベヤ9にてその搬送下流側端部bまで搬送される。そして、出庫用コンベヤ9の搬送下流側端部bに位置する物品が物品搬送台車4に載せられて、物品が自動倉庫1から搬送されるようになっている。   Further, when the articles taken out from the storage section 6 of the article storage shelf 7 are carried out to the outside, the articles are taken out from the storage section 6 and conveyed by the stacker crane 10 so as to be wholesaled to the conveyance upstream end a of the unloading conveyor 9. Then, it is transported to the transport downstream end b by the unloading conveyor 9. Then, an article located at the conveyance downstream end b of the delivery conveyor 9 is placed on the article conveyance carriage 4 so that the article is conveyed from the automatic warehouse 1.

自動倉庫1から搬送された物品は、搬出用コンベヤ3の搬送上流側端部aに卸すように物品搬送台車4にて搬送され、その卸された物品は、搬出用コンベヤ3にてその搬送下流側端部bまで搬送された後、外部に搬出されるようになっている。
このように、収納部6から取り出した物品を外部に搬出する場合では、スタッカークレーン10、出庫用コンベヤ9、物品搬送台車4、搬出用コンベヤ3の順に物品を順次受け渡して搬送するようになっている。
The articles conveyed from the automatic warehouse 1 are conveyed by the article conveying carriage 4 so as to be wholesaled to the conveyance upstream end a of the carry-out conveyor 3, and the wholesaled articles are conveyed downstream by the carry-out conveyor 3. After being transported to the side end b, it is transported to the outside.
As described above, when the article taken out from the storage unit 6 is carried out to the outside, the article is sequentially delivered and conveyed in the order of the stacker crane 10, the delivery conveyor 9, the article transport cart 4, and the carry-out conveyor 3. Yes.

また、これら外部から搬入された物品を物品収納棚7の収納部6に収納する場合や、物品収納棚7の収納部6から取り出した物品を外部に搬出する場合の他に、搬入用コンベヤ2、物品搬送台車4、搬出用コンベヤ3の順に物品を順次受け渡すように搬送して、外部から搬入された物品を収納部6に収納することなく外部に搬出する場合や、スタッカークレーン10、出庫用コンベヤ9、物品搬送台車4、入庫用コンベヤ8、スタッカークレーン10の順に物品を順次受け渡すように搬送して、収納部6から取り出した物品を別の自動倉庫1の収納部6に収納する場合がある。   Further, in addition to the case where the articles carried in from the outside are stored in the storage section 6 of the article storage shelf 7 and the case where the articles taken out from the storage section 6 of the article storage shelf 7 are carried out to the outside, the carry-in conveyor 2 When the articles are transported so as to be sequentially delivered in the order of the article transport cart 4 and the carry-out conveyor 3 and the articles carried in from the outside are carried out without being stored in the storage section 6, the stacker crane 10, Conveyor 9, article transport cart 4, warehousing conveyor 8, stacker crane 10 are sequentially conveyed so as to be delivered, and the article taken out from storage unit 6 is stored in storage unit 6 of another automatic warehouse 1. There is a case.

〔物品搬送台車〕
次に、図2に基づいて物品搬送台車4の搬送等について説明を加えるが、物品搬送台車4の搬送元については符号Fを付し、物品搬送台車4の搬送先については符号Tを付して説明する。
外部から搬入された物品を物品収納棚7の収納部6に収納する場合は、物品搬送台車4は、複数の搬入用コンベヤ2のいずれかの搬送下流側端部bを搬送元Fとし、複数の入庫用コンベヤ8のいずれかの搬送上流側端部aを搬送先Tとして、搬送元Fから搬送先Tに物品を搬送するように構成されている。
また、物品収納棚7の収納部6から取り出した物品を外部に搬出する場合は、物品搬送台車4は、複数の出庫用コンベヤ9のいずれかの搬送下流側端部bを搬送元Fとし、複数の搬出用コンベヤ3のいずれかの搬送上流側端部aを搬送先Tとして、搬送元Fから搬送先Tに物品を搬送するように構成されている。
[Goods carrier cart]
Next, the transport of the article transport cart 4 will be described based on FIG. 2, but the transport source of the article transport cart 4 is denoted by the symbol F, and the transport destination of the article transport cart 4 is denoted by the symbol T. I will explain.
When the articles carried from the outside are stored in the storage section 6 of the article storage shelf 7, the article transport carriage 4 uses the transport downstream side end b of any of the plurality of transport conveyors 2 as a transport source F, and An article is conveyed from the conveyance source F to the conveyance destination T, with the conveyance upstream end a of any of the warehousing conveyors 8 as the conveyance destination T.
Moreover, when carrying out the article taken out from the storage unit 6 of the article storage shelf 7 to the outside, the article transport cart 4 uses the transport downstream side end b of any of the plurality of unloading conveyors 9 as the transport source F, The transport upstream end a of any of the plurality of carry-out conveyors 3 is used as the transport destination T, and the article is transported from the transport source F to the transport destination T.

物品搬送台車4による搬送元Fから搬送先Tに物品を搬送について説明を加えると、まず、移載装置24を搬送元Fに位置させるように物品搬送台車4を走行移動させた後、搬送元Fに位置する物品を搬送元Fから移載装置24に移載する。次に、移載装置24を搬送先Tに位置させるように物品搬送台車4を走行移動させた後、移載装置24上に位置する物品を搬送先Tに移載する。   When the article is conveyed from the conveyance source F to the conveyance destination T by the article conveyance carriage 4, the article conveyance carriage 4 is first moved to move so that the transfer device 24 is positioned at the conveyance source F, and then the conveyance source The article located at F is transferred from the transfer source F to the transfer device 24. Next, after the article transport carriage 4 travels and moves so that the transfer device 24 is positioned at the transport destination T, the article positioned on the transfer device 24 is transferred to the transport destination T.

物品搬送設備には、物品搬送台車4の走行経路が直線状に設定されており、物品搬送台車4が走行経路を共有する形態で2台設けられており、全ての搬送元F及び搬送先Tに対して2台の物品搬送台車4のいずれでも移載可能に構成されている。そして、走行経路の両端部には、物品搬送台車4に対して充電を行う充電装置25が設けられており、物品搬送台車4は、充電装置25に対応する位置に走行移動することで接触状態又は非接触状態で充電可能に構成されている。   In the article transport facility, the travel route of the article transport cart 4 is set in a straight line, and the two article transport carts 4 are provided so as to share the travel route, and all the transport sources F and transport destinations T are provided. On the other hand, any of the two article transport carts 4 can be transferred. And the charging device 25 which charges with respect to the goods conveyance trolley | bogie 4 is provided in the both ends of the driving | running | working path | route, and the article conveyance trolley 4 is a contact state by running and moving to the position corresponding to the charging device 25. Or it is comprised so that charge is possible in a non-contact state.

〔スタッカークレーン〕
以下、図3に基づいて、スタッカークレーン10の搬送について説明を加えるが、上述の物品搬送台車4についての説明と同様に、スタッカークレーン10の搬送元については符号Fを付し、スタッカークレーン10の搬送先については符号Tを付して説明する。
外部から搬入された物品を物品収納棚7の収納部6に収納する場合は、スタッカークレーン10は、入庫用コンベヤ8の搬送下流側端部bを搬送元Fとし、一対の物品収納棚7における複数の収納部6のいずれか搬送先Tとして、搬送元Fから搬送先Tに物品を搬送するように構成されている。
また、物品収納棚7の収納部6から取り出した物品を外部に搬出する場合は、スタッカークレーン10は、一対の物品収納棚7における複数の収納部6のいずれかを搬送元Fとし、出庫用コンベヤ9の搬送上流側端部aを搬送先Tとして、搬送元Fから搬送先Tに物品を搬送するように構成されている。
[Stacker crane]
Hereinafter, the transport of the stacker crane 10 will be described based on FIG. 3, but the transport source of the stacker crane 10 is denoted by the reference symbol F in the same manner as the description of the article transport cart 4 described above. The transport destination will be described with reference numeral T.
When the articles carried from the outside are stored in the storage section 6 of the article storage shelf 7, the stacker crane 10 uses the downstream end b of the conveyor 8 of the warehousing conveyor 8 as the transfer source F and the pair of article storage shelves 7. As any one of the plurality of storage units 6, the article is conveyed from the conveyance source F to the conveyance destination T as the conveyance destination T.
Moreover, when carrying out the articles | goods taken out from the storage part 6 of the articles | goods storage shelf 7 outside, the stacker crane 10 uses either of the some storage parts 6 in a pair of article storage shelves 7 as the conveyance source F, The conveyance upstream end a of the conveyor 9 is a conveyance destination T, and the article is conveyed from the conveyance source F to the conveyance destination T.

スタッカークレーン10による搬送元Fから搬送先Tに物品を搬送について説明を加えると、まず、移載装置24を搬送元Fに位置させるように走行台車を走行移動させ且つ昇降台を昇降移動させた後、搬送元Fに位置する物品を搬送元Fから移載装置24に移載する。次に、移載装置24を搬送先Tに位置させるように走行台車を走行移動させ且つ昇降台を昇降移動させた後、移載装置24上に位置する物品を搬送先Tに移載する。   When the article is conveyed from the conveyance source F to the conveyance destination T by the stacker crane 10, first, the traveling carriage is moved and the lifting platform is moved up and down so that the transfer device 24 is positioned at the conveyance source F. Thereafter, the article located at the transport source F is transferred from the transport source F to the transfer device 24. Next, after the traveling carriage is moved and moved so that the transfer device 24 is positioned at the transport destination T and the lift is moved up and down, the article positioned on the transfer device 24 is transferred to the transport destination T.

尚、物品搬送台車4及びスタッカークレーン10が物品を搬送する場合において、移載装置24を搬送元Fに対応する停止位置に向けて移動を開始してから物品を搬送元Fから移載装置24に移載するまでのことを「すくいサイクル」と称し、移載装置24を搬送先Tに対応する停止位置にむけて移動を開始してから物品を移載装置24から搬送先Tに移載するまでのことを「おろしサイクル」と称する。
また、物品搬送台車4が、充電装置25に対応する走行位置に向けて走行を開始してから物品搬送台車4の充電が完了するまでを「充電サイクル」と称する。
In the case where the article transport carriage 4 and the stacker crane 10 transport an article, the article is transferred from the transfer source F to the transfer apparatus 24 after the transfer device 24 starts moving toward the stop position corresponding to the transfer source F. The process up to the transfer to the transfer destination is referred to as a “rake cycle”, and the article is transferred from the transfer apparatus 24 to the transfer destination T after the transfer apparatus 24 starts moving toward the stop position corresponding to the transfer destination T. The process up to this is referred to as a “grating cycle”.
The period from when the article transport cart 4 starts traveling toward the travel position corresponding to the charging device 25 until the charging of the article transport cart 4 is completed is referred to as a “charging cycle”.

搬入用コンベヤ2、搬出用コンベヤ3、入庫用コンベヤ8及び出庫用コンベヤ9の夫々には、搬送上流側端部aに物品が存在するか否かを検出する上流側存否検出センサ21と、搬送下流側端部bに物品が存在するか否かを検出する下流側存否検出センサ22とが設けられている。
そして、上流側存否検出センサ21にて、コンベヤの搬送上流側端部aに物品が載せられたこと及び搬送上流側端部aから搬送下流側に物品が搬送されたことを検出することができ、また、下流側存否検出センサ22にて、搬送下流側端部bに物品が搬送されたこと及びコンベヤの搬送下流側端部bから物品が卸されたことを検出することができるようになっている。
Each of the carry-in conveyor 2, the carry-out conveyor 3, the warehousing conveyor 8, and the warehousing conveyor 9 has an upstream presence / absence detection sensor 21 that detects whether or not an article is present at the conveyance upstream end a, A downstream presence / absence detection sensor 22 that detects whether or not an article is present at the downstream end b is provided.
The upstream presence / absence detection sensor 21 can detect that the article is placed on the conveyance upstream end a of the conveyor and that the article is conveyed from the conveyance upstream end a to the conveyance downstream. In addition, the downstream presence / absence detection sensor 22 can detect that the article has been conveyed to the conveyance downstream end b and that the article has been wholesaled from the conveyance downstream end b of the conveyor. ing.

図4に示すように、物品搬送台車4が物品を搬送する場合において、搬送先Tが物品を受け入れ可能か否かは、搬送先Tに物品が存在していれば、その搬送先Tは物品を受け入れ不可能な搬送先Tであり、搬送先Tに物品が存在していなければ、その搬送先Tは物品を受け入れ可能な搬送先Tである。そのため、搬送先Tの物品の存否を検出することができる複数の搬出用コンベヤ3に設けられている上流側存否検出センサ21や複数の入庫用コンベヤ8に設けられている上流側存否検出センサ21は、搬送先Tに物品が存在しているか否かを検出することができるようになっている。つまり、複数の搬出用コンベヤ3に設けられている上流側存否検出センサ21及び複数の入庫用コンベヤ8に設けられている上流側存否検出センサ21は、物品を搬送する搬送先Tが物品を受け入れ可能か否かを検出する状態検出手段に相当する。   As shown in FIG. 4, when the article transport cart 4 transports an article, whether or not the transport destination T can accept the article is determined by whether or not the article exists at the transport destination T. If there is no article at the transport destination T, the transport destination T is a transport destination T that can accept the article. Therefore, the upstream presence / absence detection sensors 21 provided on the plurality of carry-out conveyors 3 and the upstream presence / absence detection sensors 21 provided on the plurality of warehousing conveyors 8 that can detect the presence / absence of the article at the transport destination T. Is capable of detecting whether or not an article is present at the transport destination T. In other words, the upstream side presence / absence detection sensor 21 provided on the plurality of carry-out conveyors 3 and the upstream side presence / absence detection sensor 21 provided on the plurality of warehousing conveyors 8 accept the article by the transport destination T that transports the article. This corresponds to state detection means for detecting whether or not it is possible.

〔物品搬送設備の制御〕
図4に示すように、物品搬送設備には、自動倉庫1に収納されている物品の情報である物品収納情報を管理するとともに物品搬送設備に搬入された物品及び物品搬送設備から搬出する物品についての搬送指令情報を管理する管理手段Sと、図外の操作端末にて入力された搬入要求や搬出要求に基づいて物品の作業指令情報を管理手段Sに送信する作業指令装置ERと、管理手段Sからの搬送指令情報に基づいて、搬送機器11の作動を制御する搬送制御装置Cと、作業者の要求に応じて物品搬送設備の状態を表示する監視装置CDとが設けられている。
[Control of goods transport equipment]
As shown in FIG. 4, the article transport facility manages the article storage information that is information on the articles stored in the automatic warehouse 1, and the articles carried into the article transport facility and the articles carried out from the article transport facility. Management means S for managing the transport command information, a work command device ER for transmitting work command information of the article to the management means S based on a carry-in request or a carry-out request input at an operation terminal (not shown), and a management means On the basis of the conveyance command information from S, a conveyance control device C that controls the operation of the conveyance device 11 and a monitoring device CD that displays the state of the article conveyance facility in response to an operator's request are provided.

管理手段Sは、作業指令装置ERからの作業指令情報(搬入指令情報及び搬出指令情報)に基づいて搬送要求を作成する作業管理装置MSと、搬送指令情報に基づいて搬送指令情報を送信する搬送制御装置Cを選択し且つ送信対象の搬送制御装置Cに搬送指令情報を送信する搬送管理装置CSとを備えて構成されている。
ちなみに、作業指令装置ERが、作業管理装置MSに作業指令情報を送信する作業指令手段に相当し、作業管理装置MSが、作業指令装置ERからの作業指令情報に基づいて搬送要求を作成する上位コントローラに相当し、搬送管理装置CSが、搬送要求を作業管理装置MSから受信して、当該搬送要求に基づいて物品を搬送開始箇所Bから搬送終了箇所Gまで物品搬送手段Aに搬送させるべく、搬送要求に基づく搬送指令情報を搬送制御手段ACに送信する搬送管理手段に相当する。
尚、作業管理装置MSから搬送管理装置CSに送信される搬送要求は、搬送管理装置CSから搬送制御手段ACに送信される搬送指令情報と同じデータであるので、以下、搬送要求についても搬送指令情報と称して説明する。
The management means S includes a work management apparatus MS that creates a transport request based on work command information (carry-in command information and carry-out command information) from the work command apparatus ER, and a transport that transmits transport command information based on the transport command information. A transport management device CS that selects the control device C and transmits the transport command information to the transport control device C to be transmitted is configured.
Incidentally, the work command device ER corresponds to work command means for transmitting work command information to the work management device MS, and the work management device MS creates a transport request based on the work command information from the work command device ER. Corresponding to the controller, the conveyance management device CS receives a conveyance request from the work management device MS, and based on the conveyance request, the article conveyance means A conveys the article from the conveyance start point B to the conveyance end point G. This corresponds to a conveyance management unit that transmits conveyance command information based on the conveyance request to the conveyance control unit AC.
The transport request transmitted from the work management device MS to the transport management device CS is the same data as the transport command information transmitted from the transport management device CS to the transport control means AC. This will be described as information.

搬送制御装置Cは、複数の搬送機器11の作動を各別に制御するように複数設けられており、搬送制御装置Cとして、搬送管理装置CSからの搬送指令情報に基づいてスタッカークレーン10の作動を制御するクレーン制御装置RCと、搬送管理装置CSからの搬送指令情報に基づいて入庫用コンベヤ8及び出庫用コンベヤ9の作動を制御する入出庫制御装置WCと、搬送管理装置CSからの搬送指令情報に基づいて物品搬送台車4の作動を制御する台車制御装置SCと、搬送管理装置CSからの搬送指令情報に基づいて搬入用コンベヤ2及び搬出用コンベヤ3の作動を制御する搬入出制御装置DCとが設けられている。
尚、クレーン制御装置RCはスタッカークレーン10と同数の3台設けられ、入出庫制御装置WCは自動倉庫1の単位で設けられて自動倉庫1と同数の3台設けられ、台車制御装置SCは1台設けられ、搬入出制御装置DCは1台設けられている。
また、これら3台のクレーン制御装置RC、3台の入出庫制御装置WC、1台の台車制御装置SC及び1台の搬入出制御装置DCにて搬送制御手段ACが構成されており、複数の搬送制御装置Cにて搬送制御手段ACが構成されている。
A plurality of conveyance control devices C are provided so as to control the operations of the plurality of conveyance devices 11 separately. As the conveyance control device C, the operation of the stacker crane 10 is performed based on the conveyance command information from the conveyance management device CS. The crane control device RC to be controlled, the entry / exit control device WC for controlling the operation of the warehousing conveyor 8 and the delivery conveyor 9 based on the conveyance command information from the conveyance management device CS, and the conveyance command information from the conveyance management device CS A carriage controller SC for controlling the operation of the article carrier truck 4 based on the above, a carry-in / out controller DC for controlling the operations of the carry-in conveyor 2 and the carry-out conveyor 3 based on the conveyance command information from the conveyance management apparatus CS, Is provided.
The crane control device RC is provided in the same number as the stacker crane 10, the storage control device WC is provided in the unit of the automatic warehouse 1, and the same number as the automatic warehouse 1 is provided, and the cart control device SC is 1 A stand is provided, and one carry-in / out controller DC is provided.
The three crane control devices RC, three entry / exit control devices WC, one cart control device SC, and one carry-in / out control device DC constitute a transport control means AC, A conveyance control unit AC is configured by the conveyance control device C.

尚、搬送開始箇所Bと搬送終了箇所Gとが決まれば、各搬送機器11の搬送元と搬送先とは一義的に決まるものであるため、搬送指令情報を受信した搬送制御装置Cは、その搬送指令情報に基づいて、物品を搬送元から搬送先に搬送させるべく搬送機器11の作動を制御することができるようになっている。   If the transfer start point B and the transfer end point G are determined, the transfer source and transfer destination of each transfer device 11 are uniquely determined. Therefore, the transfer control device C that receives the transfer command information Based on the transport command information, the operation of the transport device 11 can be controlled to transport the article from the transport source to the transport destination.

そして、作業指令装置ER、作業管理装置MS、搬送管理装置CS、監視装置CD、クレーン制御装置RC、入出庫制御装置WC、台車制御装置SC及び搬入出制御装置DCは通信ラインLにて互いに情報を送受信可能に接続されている。   The work command device ER, the work management device MS, the conveyance management device CS, the monitoring device CD, the crane control device RC, the loading / unloading control device WC, the cart control device SC, and the loading / unloading control device DC communicate with each other on the communication line L. Is connected to send and receive.

作業管理装置MSについて説明を加える。
作業管理装置MSは、作業指令装置ERから作業指令情報(搬入指令情報及び搬出指令情報)が送信されると、送信された作業指令情報と物品収納情報を参照して搬送指令情報を作成する。
ちなみに、搬入指令情報には、物品が搬入される搬入用コンベヤ2を示す情報及び物品情報(荷姿、商品名及び商品個数を示す情報)が含まれている。搬出指令情報には、物品を搬出する搬出用コンベヤ3を示す情報及び物品情報が含まれている。また、搬送指令情報には、搬送開始箇所Bを示す情報、搬送終了箇所Gを示す情報及び物品情報が含まれている。
A description will be given of the work management apparatus MS.
When work command information (carry-in command information and carry-out command information) is transmitted from the work command device ER, the work management device MS creates transport command information with reference to the transmitted work command information and article storage information.
Incidentally, the carry-in command information includes information indicating the carry-in conveyor 2 into which the article is carried in and article information (information indicating the packing form, the product name, and the number of products). The carry-out command information includes information indicating the carry-out conveyor 3 for carrying out the article and article information. Further, the conveyance command information includes information indicating the conveyance start location B, information indicating the conveyance end location G, and article information.

つまり、作業管理装置MSは、作業指令装置ERから搬入指令情報を受信すると、搬入指令情報に基づいて物品が搬入される搬入用コンベヤ2(搬入用コンベヤ2の搬送上流側端部a)を搬送開始箇所Bに割り当て、搬送指令情報を参照して搬入された物品を収納する収納部6を搬送終了箇所Gに割り当てて搬送指令情報を生成し、その搬送指令情報を搬送管理装置CSに送信するように構成されている。
また、作業管理装置MSは、作業指令装置ERから搬出指令情報を受信すると、搬出する物品が収納されている収納部6を搬送開始箇所Bに割り当て、物品を搬出する搬出用コンベヤ3(搬出用コンベヤ3の搬送下流側端部b)を搬送終了箇所Gに割り当てて搬送指令情報を作成し、その搬送指令情報を搬送管理装置CSに送信するように構成されている。
In other words, when the work management device MS receives the carry-in command information from the work command device ER, the work management device MS carries the carry-in conveyor 2 (the upstream end a of the carry-in conveyor 2) on which the article is loaded based on the carry-in command information. The storage unit 6 that stores the articles that are assigned to the start location B and stores the articles carried in with reference to the conveyance command information is allocated to the conveyance end location G to generate conveyance command information, and the conveyance command information is transmitted to the conveyance management device CS. It is configured as follows.
Further, when the work management device MS receives the carry-out command information from the work command device ER, the work management device MS assigns the storage unit 6 storing the articles to be carried out to the conveyance start location B, and carries out the carry-out conveyor 3 (for carrying out). The conveyance downstream end portion b) of the conveyor 3 is assigned to the conveyance end point G to generate conveyance command information, and the conveyance command information is transmitted to the conveyance management device CS.

次に、搬送制御装置Cについて説明する。
複数の搬送制御装置Cの夫々は、対応する搬送機器11との間で情報を送受信することにより、対応する搬送機器11の搬送状態を管理し、対応する搬送機器11の搬送状態を示す情報を搬送管理装置CSに送信するように構成されている。
具体的には、搬入出制御装置DCや入出庫制御装置WCは、上流側存否検出センサ21や下流側存否検出センサ22の検出情報等に基づいて、搬送上流側端部aに物品が載せられたこと、搬送上流側端部aから搬送下流側に向けて搬送されたこと、搬送下流側端部bに物品が搬送されたこと、搬送下流側端部bから物品が降ろされたことを管理するように構成されている。そして、搬入出制御装置DCや入出庫制御装置WCは、物品が搬送上流側端部aに載せられるに伴って搬送元存在情報を搬送管理装置CSに送信し、物品が搬送上流側端部aから搬送されるに伴って搬送元非存在情報を搬送管理装置CSに送信し、物品が搬送下流側端部bに搬送されるに伴って搬送先存在情報(搬送完了情報)を搬送管理装置CSに送信し、物品が搬送下流側端部bから降ろされるに伴って搬送先非存在情報を搬送管理装置CSに送信するように構成されている。
Next, the conveyance control device C will be described.
Each of the plurality of transfer control devices C manages the transfer state of the corresponding transfer device 11 by transmitting and receiving information to and from the corresponding transfer device 11, and displays information indicating the transfer state of the corresponding transfer device 11. It is configured to transmit to the transport management device CS.
Specifically, the loading / unloading control device DC or the loading / unloading control device WC places articles on the upstream end a of conveyance based on the detection information of the upstream presence / absence detection sensor 21 and the downstream presence / absence detection sensor 22. It is managed that the product has been transported from the transport upstream end a toward the transport downstream, the product has been transported to the transport downstream end b, and the product has been unloaded from the transport downstream end b. Is configured to do. Then, the carry-in / out control device DC and the warehousing / controlling device WC transmit the transport source presence information to the transport management device CS as the article is placed on the transport upstream end a, and the product transports the upstream upstream end a. The transport source non-existence information is transmitted to the transport management device CS as it is transported from the transport destination, and the transport destination presence information (transport completion information) is transported to the transport management device CS as the article is transported to the transport downstream end b. And the destination information is transmitted to the transport management device CS as the article is lowered from the transport downstream end b.

また、台車制御装置SC及びクレーン制御装置RCは、物品搬送台車4及びスタッカークレーン10に備えられたセンサ(例えば状態検出センサ19)の検出情報等に基づいて、移載装置24が搬送元Fに対応する停止位置に移動したこと、搬送元Fから移載装置24への物品の移載が完了したこと、移載装置24が搬送先Tに対応する停止位置に移動したこと、移載装置24から搬送先Tへの物品の移載が完了したことを管理するように構成されている。そして、台車制御装置SC及びクレーン制御装置RCは、移載装置24の搬送元Fに対応する停止位置への移動が完了するに伴って搬送元移動完了情報を搬送管理装置CSに送信し、移載装置24への物品の移載が完了するに伴って搬送元移載完了情報を搬送管理装置CSに送信し、移載装置24の搬送先Tに対応する停止位置への移動が完了するに伴って搬送先移動完了情報を搬送管理装置CSに送信し、移載装置24から搬送先Tへの物品の移載が完了するに伴って搬送先移載完了情報(搬送完了情報)を搬送管理装置CSに送信するように構成されている。   Further, the carriage control device SC and the crane control device RC are configured so that the transfer device 24 is transferred to the transfer source F based on detection information of a sensor (for example, the state detection sensor 19) provided in the article transport cart 4 and the stacker crane 10. The movement to the corresponding stop position, the transfer of the article from the transfer source F to the transfer device 24 is completed, the transfer device 24 has moved to the stop position corresponding to the transfer destination T, the transfer device 24 It is configured to manage that the transfer of the article from the transport destination to the transport destination T is completed. Then, the carriage control device SC and the crane control device RC transmit the transfer source movement completion information to the transfer management device CS as the transfer of the transfer device 24 to the stop position corresponding to the transfer source F is completed. As the transfer of the article to the mounting apparatus 24 is completed, the transfer source transfer completion information is transmitted to the transfer management apparatus CS, and the movement of the transfer apparatus 24 to the stop position corresponding to the transfer destination T is completed. Accordingly, the transfer destination movement completion information is transmitted to the transfer management device CS, and the transfer destination transfer completion information (transfer completion information) is transferred and managed as the transfer of the article from the transfer device 24 to the transfer destination T is completed. It is configured to transmit to the device CS.

また、台車制御装置SC、物品搬送台車4に備えられたセンサの検出情報等に基づいて、物品搬送台車4が充電装置25に対応する停止位置に走行移動したこと、物品搬送台車4に対して充電が完了したこと、を管理するように構成されており、物品搬送台車4が充電装置25に対応する停止位置に走行移動するに伴って走行移動完了情報を搬送管理装置CSに送信し、充電が完了するに伴って充電完了情報を搬送管理装置CSに送信するように構成されている。   Further, based on the detection information of the sensors provided on the carriage control device SC and the article conveyance carriage 4, the article conveyance carriage 4 has traveled to the stop position corresponding to the charging device 25, and the article conveyance carriage 4 It is configured to manage that the charging is completed, and when the article transport carriage 4 travels to a stop position corresponding to the charging device 25, the travel movement completion information is transmitted to the transport management device CS, and charging is performed. Is completed, the charging completion information is transmitted to the transport management device CS.

次に、搬送管理装置CSについて説明を加える。
搬送管理装置CSは、作業管理装置MSから搬送指令情報が送信されると、搬送指令情報に含まれている搬送開始箇所Bを示す情報及び搬送終了箇所Gを示す情報に基づいて、搬送指令情報を送信する搬送制御装置Cを選択し、その選択された搬送制御装置Cに対して物品搬送指令情報を送信するように構成されている。このとき、まず選択された複数の搬送制御装置Cのうちの1つに搬送指令情報を送信し、この搬送指令情報を送信した搬送制御装置Cから搬送完了情報を受信すると、次の搬送制御装置Cに搬送指令情報を送信するというように、搬送上流側の搬送機器11の作動を制御する搬送制御装置Cから順に搬送指令情報を順次送信するように構成されている。
Next, the transport management device CS will be described.
When the conveyance command information is transmitted from the work management device MS, the conveyance management device CS performs conveyance command information based on the information indicating the conveyance start location B and the information indicating the conveyance end location G included in the conveyance command information. Is selected, and article conveyance command information is transmitted to the selected conveyance control device C. At this time, when the conveyance command information is first transmitted to one of the selected plurality of conveyance control devices C and the conveyance completion information is received from the conveyance control device C that has transmitted the conveyance command information, the next conveyance control device The conveyance command information is sequentially transmitted in order from the conveyance control device C that controls the operation of the conveyance device 11 on the upstream side of the conveyance such that the conveyance command information is transmitted to C.

具体例を挙げて説明すると、例えば、図1における最も左側に位置する物品収納棚7における収納部6が搬送開始箇所Bに割り当てられ、図1における最も右側に位置する搬出用コンベヤ3が搬送終了箇所Gに割り当てられている場合では、搬入出制御装置DC、台車制御装置SC、最も左側に位置する自動倉庫1における出庫用コンベヤ9の作動を制御する入出庫制御装置WC及びスタッカークレーン10の作動を制御するクレーン制御装置RCを、搬送指令情報を送信する搬送制御装置Cとして選択するように構成されている。   To explain with a specific example, for example, the storage unit 6 in the article storage shelf 7 located on the leftmost side in FIG. 1 is assigned to the conveyance start location B, and the carryout conveyor 3 located on the rightmost side in FIG. When assigned to the location G, the loading / unloading control device DC, the cart control device SC, the loading / unloading control device WC for controlling the loading conveyor 9 in the automatic warehouse 1 located on the leftmost side, and the operation of the stacker crane 10 Is configured to select the crane control device RC that controls the transport control device C that transmits the transport command information.

そして、搬送管理装置CSは、最も搬送上流側の搬送機器11となるスタッカークレーン10に対応するクレーン制御装置RCに対して搬送指令情報を送信する。このクレーン制御装置RCから搬送完了情報を受信すると、次の搬送機器11となる出庫用コンベヤ9に対応する入出庫制御装置WCに搬送指令情報を送信する。その後、同様に、台車制御装置SCや搬入出制御装置DCにも搬送指令情報を送信し、最も搬送下流側の搬送機器11となる搬出用コンベヤ3に対応する搬入出制御装置DCから搬送完了情報を受信すると、搬送管理装置CSは、当該搬送指令情報についての搬送が完了したことを示す搬送完了情報を作業管理装置MSに送信するように構成されている。   And the conveyance management apparatus CS transmits conveyance command information with respect to the crane control apparatus RC corresponding to the stacker crane 10 used as the conveyance apparatus 11 of the conveyance upstream most. When the transfer completion information is received from the crane control device RC, the transfer command information is transmitted to the loading / unloading control device WC corresponding to the unloading conveyor 9 which becomes the next transfer device 11. Thereafter, similarly, the conveyance command information is also transmitted to the cart control device SC and the carry-in / out control device DC, and the transfer completion information from the carry-in / out control device DC corresponding to the carry-out conveyor 3 serving as the transfer device 11 on the most downstream side of the transfer. Is received, the transfer management device CS is configured to transmit transfer completion information indicating that transfer of the transfer command information has been completed to the work management device MS.

また、搬送管理装置CSは、台車制御装置SCに対しては、複数の搬出用コンベヤ3に設けられている上流側存否検出センサ21及び複数の入庫用コンベヤ8に設けられている上流側存否検出センサ21の検出情報、並びに、複数の搬入用コンベヤ2に設けられている下流側存否検出センサ22及び複数の出庫用コンベヤ9に設けられている下流側存否検出センサ22の検出情報に基づいて、搬送元Fに搬送対象の物品が存在しない状態或いは搬送先Tが物品を受け入れ不可能な状態では台車制御装置SCに搬送指令情報を送信せず、搬送元Fに搬送対象の物品が存在し且つ搬送先Tが物品を受け入れ可能な状態で台車制御装置SCに搬送指令情報を送信するように構成されている。   Further, the transport management device CS detects the upstream presence / absence detection sensor 21 provided in the plurality of carry-out conveyors 3 and the upstream presence / absence detection sensors provided in the plurality of warehousing conveyors 8 with respect to the cart controller SC. Based on the detection information of the sensor 21, and the detection information of the downstream presence / absence detection sensor 22 provided in the plurality of carry-in conveyors 2 and the downstream presence / absence detection sensor 22 provided in the plurality of delivery conveyors 9, In a state where the article to be transported does not exist in the transport source F or in a state in which the transport destination T cannot accept the article, the transport command information is not transmitted to the cart controller SC, and there is an article to be transported in the transport source F. The transport command information is transmitted to the cart controller SC in a state where the transport destination T can accept the article.

搬送管理装置CSは、作業管理装置MSからの搬送指令情報を受信した時刻を当該搬送指令情報と関連付けて搬送ログとして記憶している。また、搬送管理装置CSは、搬送制御装置Cに搬送指令情報を送信した時刻を、当該搬送指令情報及び対象の搬送機器11を示す情報と関連付けて搬送ログとして記憶している。搬送管理装置CSは、台車制御装置SCに充電指令情報を送信した時刻を、当該充電指令情報を示す情報と関連付けて搬送ログとして記憶している。
また、搬送管理装置CSは、搬入出制御装置DCや入出庫制御装置WCからの搬送元存在情報、搬送元非存在情報、搬送先存在情報及び搬送先非存在情報の夫々を受信した時刻を対応する搬送指令情報と関連付けて搬送ログとして記憶している。また、搬送管理装置CSは、台車制御装置SCやクレーン制御装置RCから搬送元移動完了情報、搬送元移載完了情報、搬送先移動完了情報、搬送先移載完了情報、走行移動完了情報及び充電完了情報の夫々を受信した時刻を対応する搬送指令情報と関連付けて搬送ログとして記憶している。
そして、作業管理装置MSは、作業指令装置ERからの作業指令情報に基づいて搬送指令情報を作成したときの時刻を当該搬送指令情報と関連付けて搬送ログとして記憶している。
搬送管理装置CS及び作業管理装置MSは、監視装置CDからの要求或いは設定時間ごとに搬送ログを監視装置CDに送信するように構成されている。
The conveyance management device CS stores the time when the conveyance command information from the work management device MS is received as a conveyance log in association with the conveyance command information. Further, the transport management device CS stores the time when the transport command information is transmitted to the transport control device C in association with the transport command information and information indicating the target transport device 11 as a transport log. The conveyance management device CS stores the time when the charging command information is transmitted to the cart control device SC as a conveyance log in association with the information indicating the charging command information.
In addition, the transfer management device CS corresponds to the time when each of the transfer source presence information, the transfer source non-existence information, the transfer destination presence information, and the transfer destination non-existence information is received from the carry-in / out control device DC and the entry / exit control device WC. It is stored as a transport log in association with transport command information to be performed. Further, the transfer management device CS receives the transfer source movement completion information, the transfer source transfer completion information, the transfer destination movement completion information, the transfer destination transfer completion information, the travel movement completion information, and the charging from the cart control device SC and the crane control device RC. The time at which each of the completion information is received is stored as a transport log in association with the corresponding transport command information.
Then, the work management device MS stores the time when the transport command information is created based on the work command information from the work command device ER as a transport log in association with the transport command information.
The transport management device CS and the work management device MS are configured to transmit a transport log to the monitoring device CD at every request or set time from the monitoring device CD.

次に、監視装置CDについて説明を加える。
監視装置CDは、コンピュータ12と、表示手段としてもモニター13と、入力手段としてのキーボード14及びマウス15とを備えて構成されており、監視装置CDには、台車制御装置SCに送信される搬送指令情報と同じ搬送指令情報が搬送管理装置CSから送信されるように構成されている。
Next, the monitoring device CD will be described.
The monitoring device CD comprises a computer 12, a monitor 13 as a display means, a keyboard 14 and a mouse 15 as input means, and the monitoring device CD carries a carrier transmitted to the cart control device SC. The same transport command information as the command information is transmitted from the transport management device CS.

コンピュータ12には、時間管理手段16と表示制御手段17とがプログラム形式で備えられている。
時間管理手段16は、搬送管理装置CS及び作業管理装置MSからの搬送ログに基づいて、作業管理装置MSが作業指令情報を作成したときを計時開始タイミングとし、当該計時開始タイミングから搬送管理装置CSが搬送制御手段ACに搬送指令情報を送信するまでの時間を送信前経過時間として計時し、その送信前経過時間を対応する搬送指令情報と関連付けて記憶するように構成されている。
説明を加えると、時間管理手段16は、送信前経過時間として、計時開始タイミングから最も搬送上流側に位置する搬送機器11を対象とする搬送制御装置Cに搬送管理手段CSが搬送指令情報を送信するまでの時間が記憶されている。
The computer 12 includes time management means 16 and display control means 17 in a program format.
The time management means 16 uses the time when the work management device MS creates work command information based on the transport log from the transport management device CS and the work management device MS as the timing start timing, and from the timing start timing, the transport management device CS. Is configured to measure the time until transmission of the conveyance command information to the conveyance control means AC as an elapsed time before transmission, and store the elapsed time before transmission in association with the corresponding conveyance command information.
In addition, the time management unit 16 transmits the conveyance command information to the conveyance control apparatus C that targets the conveyance device 11 that is located on the most upstream side of the conveyance from the start timing of the timing as the elapsed time before transmission. Time to do is memorized.

また、時間管理手段16は、搬送管理装置CSからの搬送ログに基づいて、管理手段Sが最も搬送上流側に位置する搬送機器11の作動を制御する搬送制御装置Cに搬送指令情報を送信してから物品が搬送終了箇所Gに搬送されるまでの時間を搬送時間として計時し、その搬送時間及び送信前経過時間を対応する搬送指令情報と関連付けて記憶するように構成されている。   Further, the time management unit 16 transmits the conveyance command information to the conveyance control device C that controls the operation of the conveyance device 11 in which the management unit S is located on the most upstream side of the conveyance based on the conveyance log from the conveyance management device CS. The time from when the article is conveyed to the conveyance end point G is counted as the conveyance time, and the conveyance time and the elapsed time before transmission are stored in association with the corresponding conveyance command information.

また、時間管理手段16は、搬送管理装置CSからの搬送ログに基づいて、次のような時間を計時し、対応する搬送指令情報と関連付けて記憶するように構成されている。
つまり、時間管理手段16は、搬送管理装置CSから台車制御装置SCに搬送指令情報が送信されてから搬送管理装置CSが搬送元移動完了情報を受信するまで(搬送管理装置CSから台車制御装置SCに搬送指令情報が送信されてから移載装置24が搬送元Fに対応する位置に移動するまで)の時間を搬送元移動時間として計時するように構成されている。
また、時間管理手段16は、搬送管理装置CSが搬送元移動完了情報を受信してから搬送管理装置CSが搬送元移載完了情報を受信するまで(搬送元Fから移載装置24への物品の移載が開始されてから当該移載が完了するまで)の時間を搬送元移載時間として計時するように構成されている。
Further, the time management means 16 is configured to measure the following time based on the transport log from the transport management device CS and store it in association with the corresponding transport command information.
That is, the time management means 16 waits until the transfer management device CS receives the transfer source movement completion information after the transfer command information is transmitted from the transfer management device CS to the cart control device SC (from the transfer management device CS to the cart control device SC. The time from when the transfer command information is transmitted to when the transfer device 24 moves to a position corresponding to the transfer source F) is measured as the transfer source movement time.
Further, the time management unit 16 waits until the transfer management device CS receives the transfer source transfer completion information after the transfer management device CS receives the transfer source movement completion information (the article from the transfer source F to the transfer device 24). The time from the start of the transfer to the completion of the transfer) is measured as the transfer time of the transfer source.

また、時間管理手段16は、搬送管理装置CSが搬送元移載完了情報を受信してから搬送管理装置CSが搬送先移動完了情報を受信するまで(移載装置24が搬送元Fに対応する位置から搬送先Tに対応する位置に移動するまで)の時間を搬送先移動時間として計時するように構成されている。
また、時間管理手段16は、搬送管理装置CSが搬送先移動完了情報を受信してから搬送先移載完了情報を受信する(移載装置24から搬送先Tへの物品の移載が開始されてから当該移載が完了するまで)までの時間を搬送先移載時間として計時するように構成されている。
Further, the time management means 16 waits until the transfer management device CS receives the transfer destination movement completion information after the transfer management device CS receives the transfer source transfer completion information (the transfer device 24 corresponds to the transfer source F). Time from the position to the position corresponding to the transport destination T) is measured as the transport destination moving time.
The time management unit 16 receives the transfer destination transfer completion information after the transfer management device CS receives the transfer destination movement completion information (the transfer of the article from the transfer device 24 to the transfer destination T is started). Time until the transfer is completed) is measured as the transfer destination transfer time.

また、時間管理手段16は、搬送管理装置CSから台車制御装置SCに充電指令情報が送信されてから搬送管理装置CSが充電移動完了情報を受信するまで(搬送管理装置CSから台車制御装置SCに充電指令情報が送信されてから移載装置24が充電装置25に対応する位置に移動するまで)の時間を充電移動時間として計時するように構成されている。
また、時間管理手段16は、搬送管理装置CSが充電移動完了情報を受信してから搬送管理装置CSが充電完了情報を受信するまで(物品搬送台車4に対する充電が開始されてから充電が完了するまで)の時間を充電時間として計時するように構成されている。
In addition, the time management means 16 waits until the transfer management device CS receives the charge movement completion information after the charge command information is transmitted from the transfer management device CS to the cart control device SC (from the transfer management device CS to the cart control device SC). The time from when the charging command information is transmitted until the transfer device 24 moves to a position corresponding to the charging device 25) is measured as the charging movement time.
Further, the time management unit 16 waits until the conveyance management device CS receives the charging completion information after the conveyance management device CS receives the charging movement completion information (the charging is completed after the charging of the article conveyance carriage 4 is started). )) As the charging time.

表示制御手段17は、時間管理手段16に記憶されている送信前経過時間及び搬送時間を搬送指令情報に対応する形態でモニター13に表示するように構成されている。
また、表示制御手段17は、時間管理手段16に記憶されている搬送元移動時間、搬送元移載時間、搬送先移動時間及び搬送先移載時間を搬送指令情報に対応する形態でモニター13に表示するように構成されている。
The display control means 17 is configured to display the elapsed time before transmission and the transport time stored in the time management means 16 on the monitor 13 in a form corresponding to the transport command information.
Further, the display control means 17 displays the transfer source movement time, transfer source transfer time, transfer destination movement time, and transfer destination transfer time stored in the time management means 16 in the monitor 13 in a form corresponding to the transfer command information. It is configured to display.

そして、表示制御手段17は、送信前経過時間及び搬送時間を搬送指令情報に対応する形態でモニター13に表示させる搬送履歴表示状態と、搬送元移動時間と搬送元移載時間の組み合わせ、搬送先移動時間及び搬送先移載時間の組み合わせのいずれか一方又は両方の組み合わせを搬送指令情報に対応する形態でモニター13に表示させるサイクルタイム履歴表示状態とに、モニター13の表示状態を切り換え自在に構成されている。   Then, the display control means 17 includes a transport history display state in which the elapsed time before transmission and the transport time are displayed on the monitor 13 in a form corresponding to the transport command information, a combination of the transport source travel time and the transport source transfer time, The display state of the monitor 13 can be switched to the cycle time history display state in which one or both of the combination of the movement time and the transfer destination transfer time is displayed on the monitor 13 in a form corresponding to the transfer command information. Has been.

〔搬送履歴表示状態〕
図5に示すように、搬送履歴表示状態では、表示制御手段17は、モニター13に、搬送開始箇所Bを示す情報、搬送終了箇所Gを示す情報、搬送前経過時間を示す情報、搬送時間を示す情報、及び、搬送前経過時間に搬送時間を加えた送信搬送時間を示す情報を関連付けた表と、この表に表示させる表示対象期間及び表示対象を表わす文字列とを表示させるように構成されている。
[Transfer history display status]
As shown in FIG. 5, in the transfer history display state, the display control means 17 displays on the monitor 13 information indicating the transfer start location B, information indicating the transfer end location G, information indicating the elapsed time before transfer, and transfer time. And a table in which information indicating transmission transport time obtained by adding transport time to elapsed time before transport and a display target period to be displayed in this table and a character string representing the display target are displayed. ing.

表には、「完了日時」、「搬送区分」、「搬送元」、「搬送先」、「送信搬送時間」、「搬送前経過時間」、「搬送時間」の項目があり、これらの項目は同じ行に表示されている。そして、「完了日時」として、最も搬送下流側に位置する搬送機器11に対応した搬送制御装置Cからの搬送完了情報を搬送管理装置CSが受信した日時を表示し、「搬送区分」として、「入庫」又は「出庫」を表示し、「搬送元」及び「搬送先」として、入庫用コンベヤ8に割り当てられた4桁の数字、出庫用コンベヤ9に割り当てられた4桁の数字、又は、収納部6の位置を示すバンク、ベイ、レベルを表わす数字のいずれかを表示し、「送信搬送時間」、「搬送前経過時間」及び「搬送時間」として、それぞれの時間が数値で表示している。   In the table, there are items of “Completion Date / Time”, “Transportation Category”, “Transport Source”, “Transportation Destination”, “Transmission Transport Time”, “Elapsed Time Before Transport”, and “Transport Time”. Displayed on the same line. Then, as the “completion date and time”, the date and time when the transport management device CS received the transport completion information from the transport control device C corresponding to the transport device 11 located on the most downstream side of the transport is displayed. “Incoming” or “Outgoing” is displayed, and the “Transfer source” and “Transport destination” are 4 digits assigned to the entry conveyor 8, 4 digits assigned to the exit conveyor 9, or storage Any one of the numbers indicating the bank, bay, and level indicating the position of the unit 6 is displayed, and each time is displayed as a numerical value as “transmission transfer time”, “elapsed time before transfer”, and “transfer time”. .

ちなみに、図2に示すように、搬入用コンベヤ2については、搬入用コンベヤ2を示す数字11と複数のものを区別するために便宜上付した数字01〜03を組み合わせた4桁の数字が割り当てられている。また、搬出用コンベヤ3については、搬出用コンベヤ3を示す数字12と複数のものを区別するために便宜上付した数字01及び02を組み合わせた4桁の数字が割り当てられている。また、収納部6については、バンクを示す2桁の数字、ベイを示す3桁の数字、レベルを示す3桁の数字にて表わされている。   By the way, as shown in FIG. 2, for the carry-in conveyor 2, a four-digit number that is a combination of the number 11 indicating the carry-in conveyor 2 and the numbers 01 to 03 given for convenience in order to distinguish a plurality of items is assigned. ing. In addition, the carry-out conveyor 3 is assigned a 4-digit number that is a combination of numbers 01 and 02 added for the sake of convenience in order to distinguish the number 12 indicating the carry-out conveyor 3 and a plurality of items. The storage unit 6 is represented by a 2-digit number indicating a bank, a 3-digit number indicating a bay, and a 3-digit number indicating a level.

文字列として、「期間」の文字列と、表示対象期間の開始時期及び終了時期を示す日時を示す文字列とが示されている。そして、これにより表わされた表示対象期間において完了した搬送作業(最も搬送下流側に位置する搬送機器11に対応した搬送制御装置Cからの搬送完了情報を搬送管理装置CSが受信した搬送作業)についての情報が表に表示されるようになっている。
表示対象期間の開始時期及び終了時期の文字列は、キーボード14又はマウス15の操作により変更可能であり、この表示対象期間の開始時期及び終了時期の文字列を変更することで、表に表示する表示対象期間を変更自在となっている。
As the character string, a character string “period” and a character string indicating the date and time indicating the start time and end time of the display target period are shown. Then, the transfer work completed in the display target period represented thereby (the transfer work in which the transfer management device CS has received the transfer completion information from the transfer control device C corresponding to the transfer device 11 located on the most downstream side of the transfer) Information about is displayed in the table.
The character strings of the start time and end time of the display target period can be changed by operating the keyboard 14 or the mouse 15, and are displayed in the table by changing the character strings of the start time and end time of the display target period. The display target period can be changed freely.

また、文字列として、「搬送区分」の文字列と、表に表示する搬送区分を示す文字列が表示されている。この搬送区分を示す文字列として、「全体」、「入庫」、「出庫」等があり、「入庫」を表示させると、搬送開始箇所Bが搬入用コンベヤ2であり搬送終了箇所Gが収納部6である場合が表に表示され、「出庫」を表示させると、搬送開始箇所Bが収納部6であり搬送終了箇所Gが搬出用コンベヤ3である場合が表に表示され、「全体」を表示させると、これら両方の場合が表に表示されるようになっている。
また、文字列として、「搬送元」及び「搬送先」の文字列と、表に表示する搬送開始箇所B及び搬送終了箇所Gを示す文字列が表示されている。この「搬送元」や「搬送先」を示す情報として、「全体」や搬送開始箇所Bの夫々及び搬送終了箇所Gの夫々を示す各文字列がある。
In addition, as a character string, a character string “transport category” and a character string indicating the transport category displayed in the table are displayed. As the character string indicating this transport category, there are “whole”, “entry”, “outgoing” and the like. When “entry” is displayed, the transport start point B is the carry-in conveyor 2 and the transport end point G is the storage unit 6 is displayed in the table, and when “departure” is displayed, the case where the transfer start point B is the storage unit 6 and the transfer end point G is the carry-out conveyor 3 is displayed in the table. When displayed, both cases are displayed in the table.
In addition, as the character strings, character strings of “conveyance source” and “conveyance destination”, and character strings indicating the conveyance start point B and the conveyance end point G displayed in the table are displayed. As information indicating the “conveyance source” and “conveyance destination”, there are character strings indicating “the whole”, each of the conveyance start location B, and each of the conveyance end location G.

このように搬送時間表示状態に切り換えたモニター13には、送信前経過時間と搬送時間と送信搬送時間とが搬送指令情報に対応する形態で表示されている。そのため、作業者は、モニター13に表示されている送信前経過時間から、搬送指令情報が作成されてからその搬送指令情報が搬送制御手段ACに送信するまで長い時間を要していることを認識することができ、また、モニター13に表示されている搬送時間から物品搬送手段Aによる物品の搬送に長い時間を要していることを認識することができ、さらに、モニター13に表示されている搬送開始箇所Bを示す情報及び搬送終了箇所Gを示す情報から、長い時間を要しているときの搬送開始箇所B及び搬送終了箇所Gを認識することができる。   The monitor 13 thus switched to the transport time display state displays the elapsed time before transmission, the transport time, and the transmission transport time in a form corresponding to the transport command information. For this reason, the operator recognizes that it takes a long time from the generation of the conveyance command information displayed on the monitor 13 until the conveyance command information is transmitted to the conveyance control means AC. In addition, it can be recognized from the conveyance time displayed on the monitor 13 that it takes a long time to convey the article by the article conveyance means A, and is further displayed on the monitor 13. From the information indicating the transfer start point B and the information indicating the transfer end point G, the transfer start point B and the transfer end point G when a long time is required can be recognized.

〔サイクルタイム履歴表示状態〕
図6に示すように、サイクルタイム履歴表示状態では、表示制御手段17は、モニター13に、搬送元移動時間を示す情報、搬送元移載時間を示す情報、搬送先移動時間を示す情報、及び、搬送先移動時間を示す情報を関連付けた表と、この表に表示させる表示対象期間及び表示対象を表わす文字列とを表示させるように構成されている。
[Cycle time history display status]
As shown in FIG. 6, in the cycle time history display state, the display control unit 17 causes the monitor 13 to display information indicating the transfer source movement time, information indicating the transfer source transfer time, information indicating the transfer destination transfer time, and A table in which information indicating the transport destination moving time is associated with a display target period displayed on the table and a character string representing the display target are displayed.

表には、「完了日時」、「デバイスID」、「サイクル」、「行き先」、「移動時間」、「移載時間」、「充電時間」、「完了区分」の項目があり、これらの項目は同じ行に表示されている。そして、「完了日時」として、各サイクルにおける搬送元移動完了情報、搬送元移載完了情報、搬送先移動完了情報、搬送先移載完了情報、走行移動完了情報、又は、充電完了情報の各種完了情報を搬送管理装置CSが受信した時刻を表示している。デバイスIDとして、スタッカークレーン10では「RMA」の英字と複数のものを区別するために便宜上付した2桁の数字を組み合わせた文字列を表示し、物品搬送台車4では「MVA」の英字と複数のものを区別するために便宜上付した2桁の数字を組み合わせた文字列を表示している。また、「サイクル」として、「すくい」、「おろし」又は「充電」を表示し、「行き先」として、入庫用コンベヤ8に割り当てられた4桁の数字、出庫用コンベヤ9に割り当てられた4桁の数字、搬入用コンベヤ2に割り当てられた4桁の数字、搬出用コンベヤ3に割り当てられた4桁の数字、又は、収納部6の位置を示すバンク、ベイ、レベルを表わす数字のいずれかが表示されている。   In the table, there are items of “Completion Date / Time”, “Device ID”, “Cycle”, “Destination”, “Movement Time”, “Transfer Time”, “Charge Time”, and “Completion Category”. Are displayed on the same line. Then, as “completion date and time”, various completions of transfer source movement completion information, transfer source transfer completion information, transfer destination movement completion information, transfer destination transfer completion information, travel movement completion information, or charge completion information in each cycle The time when the transport management device CS received the information is displayed. As the device ID, the stacker crane 10 displays a character string combining two-digit numbers added for convenience in order to distinguish between the English letter “RMA” and a plurality of letters, and the article transport carriage 4 displays the letter “MVA” and a plurality of letters. A character string combining two-digit numbers attached for the sake of convenience is displayed. In addition, “Drake”, “Grated” or “Charge” is displayed as “Cycle”, and “Destination” is a four-digit number assigned to the entry conveyor 8 and a 4-digit assigned to the delivery conveyor 9. , A 4-digit number assigned to the carry-in conveyor 2, a 4-digit number assigned to the carry-out conveyor 3, or a number representing the bank, bay, and level indicating the position of the storage unit 6. It is displayed.

そして、「移動時間」として、すくいサイクルの行には搬送元移動時間が数値で表示され、おろしサイクルの行には搬送先移動時間が数値で表示され、充電サイクルの行には充電移動時間が数値で表示されている。また、「移載時間」として、すくいサイクルの行には搬送元移載時間が数値で表示され、おろしサイクルの行には搬送先移載時間が数値で表示されている。また、「充電時間」として、充電サイクルの行に充電時間が数値で表示されている。「完了区分」として、サイクルが正常に完了した「正常完了」、又は、サイクルの途中で異常により完了した「異常完了」が表示されている。   As the “travel time”, the transport source travel time is displayed as a numerical value in the rake cycle row, the transport destination travel time is displayed as a numerical value in the grater cycle row, and the charge travel time is displayed in the charge cycle row. It is displayed numerically. Further, as the “transfer time”, the transfer source transfer time is displayed as a numerical value in the row of the rake cycle, and the transfer destination transfer time is displayed as a numerical value in the row of the grater cycle. In addition, as “charging time”, the charging time is displayed numerically in the row of the charging cycle. As the “completion category”, “normal completion” in which the cycle has been normally completed or “abnormal completion” in which the cycle has been completed due to an abnormality is displayed.

文字列として、サイクルタイム履歴表示状態と同様に、「期間」の文字列と、表示対象期間の開始時期及び終了時期を示す日時を示す文字列とが示されている。
また、文字列として、「機種」の文字列と、表に表示する自走台車を示す文字列が表示されている。この機種を示す文字列として、「全体」、「物品搬送台車」、「スタッカークレーン」があり、「物品搬送台車」を表示させると、物品搬送台車4にて実行されたサイクルが表に表示され、「スタッカークレーン」を表示させると、スタッカークレーン10にて実行されたサイクルが表に表示され、「全体」を表示させると、これら両方の場合が表に表示されるようになっている。
また、同様に、「デバイスID」の文字列と、表に表示する搬送機器11を示す文字列が表示され、「サイクル」の文字列と、表に表示するサイクルを示す文字列が表示され、「行き先」の文字列と、表に表示する搬送元又は搬送先を示す文字列が表示され、「完了区分」の文字列と、表に表示する完了区分を示す文字列が表示されている。
Similar to the cycle time history display state, a character string “period” and a character string indicating the date and time indicating the start time and end time of the display target period are shown as character strings.
In addition, as a character string, a character string indicating a “model” and a self-propelled carriage displayed in the table are displayed. There are "Whole", "Goods transport cart", and "Stacker crane" as character strings indicating this model. When "Goods transport cart" is displayed, the cycle executed in the goods transport cart 4 is displayed in the table. When “stacker crane” is displayed, the cycle executed by the stacker crane 10 is displayed in the table, and when “whole” is displayed, both cases are displayed in the table.
Similarly, a character string of “device ID” and a character string indicating the transport device 11 displayed on the table are displayed, a character string of “cycle” and a character string indicating the cycle displayed on the table are displayed, A character string “Destination”, a character string indicating a transfer source or a transfer destination displayed on the table, and a character string “Completed category” and a character string indicating a completed category displayed on the table are displayed.

このようにサイクルタイム履歴表示状態に切り換えたモニター13には、搬送元移動時間、搬送元移載時間、搬送先移動時間及び搬送先移載時間が搬送指令情報に対応する形態で表示されている。そのため、作業者は、モニター13に表示されている各時間から、長い時間を要しているサイクルを認識することができ、また、モニター13に表示されている搬送元及び搬送先を示す情報から、長い時間を要しているときの搬送元及び搬送先を認識することができる。   The monitor 13 thus switched to the cycle time history display state is displayed in a form corresponding to the conveyance command information, the conveyance source movement time, the conveyance source transfer time, the conveyance destination movement time, and the conveyance destination transfer time. . Therefore, the operator can recognize a cycle that takes a long time from each time displayed on the monitor 13, and from the information indicating the transfer source and the transfer destination displayed on the monitor 13. It is possible to recognize the transport source and the transport destination when a long time is required.

〔別実施形態〕
(1) 上記実施形態では、計時開始タイミングを、作業指令手段からの作業指令情報に基づいて上位コントローラが搬送要求を作成したときとしたが、計時開始タイミングを、上位コントローラが搬送管理手段に搬送要求を送信したとき、又は、搬送管理手段が搬送要求を受信したときを計時開始タイミングとしてもよい。
[Another embodiment]
(1) In the above embodiment, the timing start timing is set when the upper controller creates a transport request based on the work command information from the work command means. However, the host controller transports the timing start timing to the transport management means. The time when the request is transmitted or the time when the transport management means receives the transport request may be set as the timing for starting timing.

(2) 上記実施形態では、送信前経過時間、搬送時間及び送信搬送時間を搬送指令情報に対応する形態で表示手段に表示したが、送信前経過時間及び搬送時間を搬送指令情報に対応する形態で表示手段に表示して、送信搬送時間を表示手段に表示しないようにする、又は、送信前経過時間を搬送指令情報に対応する形態で表示手段に表示して、送信搬送時間及び搬送時間を表示手段に表示しないようにしてもよい。 (2) In the above embodiment, the pre-transmission elapsed time, the conveyance time, and the transmission conveyance time are displayed on the display unit in a form corresponding to the conveyance command information. However, the pre-transmission elapsed time and the conveyance time are associated with the conveyance command information. In the display means, the transmission conveyance time is not displayed on the display means, or the transmission pre-transmission time is displayed on the display means in a form corresponding to the conveyance command information, and the transmission conveyance time and the conveyance time are displayed. You may make it not display on a display means.

(3) 上記実施形態では、物品搬送手段Aを複数の搬送機器11を備えて構成して、複数の搬送機器11にて物品を順次受け渡して供給元から供給先に搬送するようにしたが、物品搬送手段Aを物品搬送台車4やスタッカークレーン10等の単一の搬送機器11を備えて構成して、単一の搬送機器11にて物品を供給元から供給先に搬送するようにしてもよい。 (3) In the above embodiment, the article conveying means A is configured to include a plurality of conveying devices 11, and the articles are sequentially delivered and conveyed from the supply source to the supply destination by the plurality of conveying devices 11. The article conveying means A is configured to include a single conveying device 11 such as an article conveying cart 4 or a stacker crane 10, and the single conveying device 11 conveys an article from a supply source to a supply destination. Good.

(4) 上記実施形態では、計時開始タイミングから最も搬送上流側に位置する搬送機器11の作動を制御する搬送制御装置Cに管理手段Sが搬送指令情報を送信するまでの時間を送信前経過時間としたが、計時開始タイミングから他の搬送制御装置Cに管理手段Sが搬送指令情報を送信するまでの時間を送信前経過時間としてもよく、計時開始タイミングから複数の搬送制御装置Cの夫々に管理手段Sが搬送指令情報を送信するまでの各時間を送信前経過時間としてもよい。 (4) In the above embodiment, the elapsed time before transmission from the time measurement start timing until the management means S transmits the conveyance command information to the conveyance control device C that controls the operation of the conveyance device 11 located on the most upstream side of the conveyance. However, the time from when the timing is started until the management means S transmits the conveyance command information to another conveyance control device C may be the elapsed time before transmission, and each of the plurality of conveyance control devices C from the timing start timing. Each time until the management means S transmits the conveyance command information may be an elapsed time before transmission.

4 自走台車
10 自走台車
11 搬送機器
13 表示手段
16 時間管理手段
17 表示制御手段
A 物品搬送手段
AC 搬送制御手段
B 供給元
C 搬送制御装置
CS 搬送管理手段
ER 作業指令手段
F 搬送元
G 供給先
MS 上位コントローラ
T 搬送先
4 Self-propelled cart 10 Self-propelled cart 11 Transport equipment 13 Display means 16 Time management means 17 Display control means A Article transport means AC Transport control means B Supply source C Transport control device CS Transport control means ER Work command means F Transport source G Supply Destination MS host controller T destination

Claims (5)

供給元と供給先との間で物品を搬送する物品搬送手段と、
前記物品搬送手段の作動を制御する搬送制御手段と、
上位コントローラから搬送要求を受信して当該搬送要求に基づく搬送指令情報を送信可能となった場合に、当該搬送要求に基づいて物品を前記供給元から前記供給先まで前記物品搬送手段に搬送させるべく、前記搬送指令情報を前記搬送制御手段に送信する搬送管理手段とが設けられ、
前記搬送制御手段が、前記搬送管理手段からの前記搬送指令情報に基づいて、物品を前記供給元から前記供給先に搬送するべく前記物品搬送手段の作動を制御するように構成されている物品搬送設備であって、
作業指令手段からの作業指令情報に基づいて前記上位コントローラが前記搬送要求を作成したとき、又は、前記上位コントローラが前記搬送管理手段に前記搬送要求を送信したとき、又は、前記搬送管理手段が前記搬送要求を受信したときの何れかを計時開始タイミングとし、当該計時開始タイミングから前記搬送管理手段が前記搬送制御手段に前記搬送指令情報を送信するまでの時間を送信前経過時間として計時し、その送信前経過時間を対応する前記搬送指令情報と関連付けて記憶する時間管理手段と、
前記時間管理手段に記憶されている前記送信前経過時間を前記搬送指令情報に対応する形態で表示手段に表示する表示制御手段とが設けられている物品搬送設備。
Article conveying means for conveying articles between a supply source and a supply destination;
Transport control means for controlling the operation of the article transport means;
When the conveyance request information is received from the host controller and the conveyance command information based on the conveyance request can be transmitted , the article conveyance means is configured to convey the article from the supply source to the supply destination based on the conveyance request. a transport management unit that transmits the transport command information to the transport control means is provided,
Article conveyance configured such that the conveyance control means controls the operation of the article conveyance means to convey an article from the supply source to the supply destination based on the conveyance command information from the conveyance management means. Equipment,
When the host controller creates the transport request based on work command information from the work command means, or when the host controller transmits the transport request to the transport management means, or the transport management means Any time when a transport request is received is set as a timing start timing, and the time from the timing start timing until the transport management means transmits the transport command information to the transport control means is counted as an elapsed time before transmission. Time management means for storing the elapsed time before transmission in association with the corresponding conveyance command information;
Article conveying equipment provided with display control means for displaying the elapsed time before transmission stored in the time management means on a display means in a form corresponding to the conveyance command information.
前記時間管理手段が、前記搬送管理手段が前記搬送制御手段に前記搬送指令情報を送信してから物品が前記供給先に搬送されるまでの時間を搬送時間として計時し、その搬送時間及び前記送信前経過時間を対応する搬送指令情報と関連付けて記憶するように構成され、
前記表示制御手段が、前記時間管理手段に記憶されている前記送信前経過時間及び前記搬送時間を前記搬送指令情報に対応する形態で前記表示手段に表示するように構成されている請求項1記載の物品搬送設備。
The time management means counts the time from when the conveyance management means transmits the conveyance command information to the conveyance control means until the article is conveyed to the supply destination as the conveyance time, and the conveyance time and the transmission It is configured to store the previous elapsed time in association with the corresponding conveyance command information,
The display control means is configured to display the elapsed time before transmission and the transport time stored in the time management means on the display means in a form corresponding to the transport command information. Goods transport equipment.
前記物品搬送手段が、搬送元と搬送先との間で物品を搬送する搬送機器を複数備えて、前記複数の搬送機器にて物品を順次受け渡して前記供給元から前記供給先に搬送するように構成され、
前記搬送制御手段が、前記複数の搬送機器の作動を各別に制御する複数の搬送制御装置にて構成され、
前記時間管理手段が、前記計時開始タイミングから最も搬送上流側に位置する前記搬送機器の作動を制御する前記搬送制御装置に前記搬送管理手段が前記搬送指令情報を送信するまでの時間を前記送信前経過時間として記憶するように構成されている請求項1又は2記載の物品搬送設備。
The article conveying means includes a plurality of conveying devices that convey an article between a conveying source and a conveying destination, and sequentially transfers the articles by the plural conveying devices and conveys the articles from the supply source to the supply destination. Configured,
The transport control means is composed of a plurality of transport control devices that individually control the operations of the transport devices,
Before the transmission, the time management unit transmits a time until the conveyance management unit transmits the conveyance command information to the conveyance control device that controls the operation of the conveyance device located on the most upstream side of the conveyance from the timing to start timing. The article conveyance facility according to claim 1, wherein the article conveyance facility is configured to store the elapsed time.
前記複数の搬送機器のうちの1つ又は複数が、前記搬送元との間及び前記搬送先との間で物品を移載する移載装置を備えて前記搬送元と前記搬送先との間で物品を搬送する自走台車にて構成され、
前記時間管理手段が、前記搬送管理手段から前記自走台車の作動を制御する前記搬送制御装置に前記搬送指令情報が送信されてから前記移載装置を前記搬送元に位置させるまでの搬送元移動時間、前記搬送元から前記移載装置への物品の移載が開始されてから当該移載が完了するまでの搬送元移載時間、前記移載装置が前記搬送元から前記搬送先に位置させるまでの搬送先移動時間、前記移載装置から前記搬送先への物品の移載が開始されてから当該移載が完了するまでの搬送先移載時間のうちの何れか1つ又は複数を、対応する搬送指令情報と関連付けて記憶するように構成され、
前記表示制御手段が、前記時間管理手段に記憶されている前記搬送元移動時間、前記搬送元移載時間、前記搬送先移動時間及び前記搬送先移載時間のうちの何れか1つ又は複数を前記搬送指令情報に対応する形態で前記表示手段に表示するように構成されている請求項3記載の物品搬送設備。
One or more of the plurality of transport devices include a transfer device that transfers articles between the transport source and the transport destination, and between the transport source and the transport destination. It consists of a self-propelled carriage that transports goods,
The time management unit moves the transfer source from when the transfer command information is transmitted to the transfer control device that controls the operation of the self-propelled carriage from the transfer management unit until the transfer device is positioned at the transfer source. Time, transfer source transfer time from the start of transfer of the article from the transfer source to the transfer device to completion of the transfer, the transfer device is positioned from the transfer source to the transfer destination Any one or more of the transfer destination transfer time until the transfer is completed after the transfer of the article from the transfer device to the transfer destination is started, It is configured to store in association with the corresponding conveyance command information,
The display control unit is configured to select one or more of the transfer source movement time, the transfer source transfer time, the transfer destination transfer time, and the transfer destination transfer time stored in the time management unit. The article conveyance facility according to claim 3, configured to display on the display unit in a form corresponding to the conveyance command information.
前記自走台車の作動を制御する前記搬送制御装置が、前記移載装置が前記搬送元に位置するに伴って搬送元移動完了情報を前記搬送管理手段に送信し、前記搬送元から前記移載装置への物品の移載が完了するに伴って搬送元移載完了情報を前記搬送管理手段に送信し、前記移載装置が前記搬送先に位置するに伴って搬送先移動完了情報を前記搬送管理手段に送信し、前記移載装置から前記搬送先への物品の移載が完了するに伴って搬送先移載完了情報を前記搬送管理手段に送信するように構成され、
前記時間管理手段が、
前記搬送管理手段から前記自走台車の作動を制御する前記搬送制御装置に前記搬送指令情報が送信されてから前記搬送管理手段が前記搬送元移動完了情報を受信するまでの時間を前記搬送元移動時間として計時し、
前記搬送管理手段が前記搬送元移動完了情報を受信してから前記搬送管理手段が前記搬送元移載完了情報を受信するまでの時間を前記搬送元移載時間として計時し、
前記搬送管理手段が前記搬送元移載完了情報を受信してから前記搬送管理手段が前記搬送先移動完了情報を受信するまでの時間を前記搬送先移動時間として計時し、
前記搬送管理手段が前記搬送先移動完了情報を受信してから前記搬送管理手段が前記搬送先移載完了情報を受信するまでの時間を前記搬送先移載時間として計時するように構成されている請求項4記載の物品搬送設備。
The transfer control device that controls the operation of the self-propelled carriage transmits transfer source movement completion information to the transfer management means as the transfer device is positioned at the transfer source, and transfers the transfer from the transfer source. As the transfer of the article to the apparatus is completed, transfer source transfer completion information is transmitted to the transfer management means, and as the transfer apparatus is located at the transfer destination, the transfer destination movement completion information is transmitted to the transfer destination. Transmitted to the management means, and configured to transmit transfer destination transfer completion information to the transfer management means as the transfer of the article from the transfer device to the transfer destination is completed,
The time management means is
The transport source movement is the time from when the transport command information is transmitted from the transport management means to the transport control device that controls the operation of the self-propelled carriage until the transport management means receives the transport source movement completion information. Time as time,
The time from when the transport management means receives the transport source movement completion information to when the transport management means receives the transport source transfer completion information is counted as the transport source transfer time,
The time from when the transport management unit receives the transport source transfer completion information until the transport management unit receives the transport destination movement completion information is counted as the transport destination movement time,
A time from when the transport management unit receives the transport destination transfer completion information to when the transport management unit receives the transport destination transfer completion information is counted as the transport destination transfer time. The article conveyance facility according to claim 4.
JP2011194220A 2011-09-06 2011-09-06 Goods transport equipment Active JP5652662B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011194220A JP5652662B2 (en) 2011-09-06 2011-09-06 Goods transport equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011194220A JP5652662B2 (en) 2011-09-06 2011-09-06 Goods transport equipment

Publications (2)

Publication Number Publication Date
JP2013052993A JP2013052993A (en) 2013-03-21
JP5652662B2 true JP5652662B2 (en) 2015-01-14

Family

ID=48130346

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011194220A Active JP5652662B2 (en) 2011-09-06 2011-09-06 Goods transport equipment

Country Status (1)

Country Link
JP (1) JP5652662B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102625661B1 (en) * 2020-06-23 2024-01-16 세메스 주식회사 Articles storing device, method of calculating priority setting values of the articles storing device, and method of storing article using the same

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07315522A (en) * 1994-05-30 1995-12-05 Daifuku Co Ltd Automatic warehouse
JPH0920404A (en) * 1995-07-04 1997-01-21 Toyota Autom Loom Works Ltd Cargo warehousing control device in automatic warehouse
JPH0986611A (en) * 1995-09-26 1997-03-31 Mazda Motor Corp Trouble predicting device in automatic warehouse
JP2005162451A (en) * 2003-12-05 2005-06-23 Murata Mach Ltd Conveying system
JP2006059316A (en) * 2004-07-21 2006-03-02 Hitachi Kiden Kogyo Ltd Design support system of carrying device

Also Published As

Publication number Publication date
JP2013052993A (en) 2013-03-21

Similar Documents

Publication Publication Date Title
JP5825348B2 (en) Picking and sorting system
KR101096549B1 (en) Article transport facility
JP5776934B2 (en) Article processing equipment
JP5811040B2 (en) Operation method of article sorting equipment and article sorting equipment
JP5660391B2 (en) Goods transport equipment
JP6155970B2 (en) Goods storage facility
US20140178161A1 (en) Conveyor technology supported commissioning of articles
JP6040893B2 (en) Sequential transport system
JP2017128405A (en) Article storage facility
JP7084257B2 (en) Picking support system and support method
WO2023146940A1 (en) Systems and methods of merging retail products between containers to optimize storing capacity of retail storage facilities
JP2015040118A (en) Picking apparatus
JP5652662B2 (en) Goods transport equipment
JP2011157139A (en) Picking facility
JP2009280294A (en) Article transport system
JP4026468B2 (en) Material handling equipment
CN111133751B (en) Monitoring system
JP5776933B2 (en) Article processing equipment
JP5743152B2 (en) Goods transport equipment
JP2016210547A (en) Picking system
JP7271822B2 (en) Picking system by unmanned transfer vehicle
JP5641357B2 (en) Goods transport equipment
JP5578924B2 (en) Picking equipment
JP2006124048A (en) Delivery system and delivery method
JP6044486B2 (en) Picking equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131107

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140807

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140814

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141105

R150 Certificate of patent or registration of utility model

Ref document number: 5652662

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250