JP5703198B2 - スケジュール情報変換装置、スケジュール情報変換方法 - Google Patents
スケジュール情報変換装置、スケジュール情報変換方法 Download PDFInfo
- Publication number
- JP5703198B2 JP5703198B2 JP2011258920A JP2011258920A JP5703198B2 JP 5703198 B2 JP5703198 B2 JP 5703198B2 JP 2011258920 A JP2011258920 A JP 2011258920A JP 2011258920 A JP2011258920 A JP 2011258920A JP 5703198 B2 JP5703198 B2 JP 5703198B2
- Authority
- JP
- Japan
- Prior art keywords
- schedule information
- task
- ccpm
- period
- progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000006243 chemical reaction Methods 0.000 title claims description 43
- 238000000034 method Methods 0.000 title claims description 11
- 238000004364 calculation method Methods 0.000 description 30
- 238000010586 diagram Methods 0.000 description 12
- 238000007726 management method Methods 0.000 description 12
- 230000006870 function Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 230000008520 organization Effects 0.000 description 4
- 238000012360 testing method Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 241001315488 Inazuma Species 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
WFスケジュール情報が記憶されるWFスケジュール情報記憶部と、前記CCPMスケジュール情報記憶部に記憶されている前記CCPMスケジュール情報に基づいて、タスクの進捗率を含むWFスケジュール情報を、前記WFスケジュール情報におけるタスクの進捗率と前記CCPMスケジュール情報から得られるタスクの進捗とを対応付けて生成し、前記生成したWFスケジュール情報を前記WFスケジュール情報記憶部に記憶させるスケジュール情報変換部と、を備えることを特徴とする。
図1は、本実施形態によるスケジュール情報変換装置100の構成を示すブロック図である。スケジュール情報変換装置100は、CCPMスケジュール情報記憶部110と、WF(ウォーターフォール)スケジュール情報記憶部120と、入力部130と、スケジュール情報変換部140と、CCPM線表生成部150と、WF線表生成部160と、表示部170とを備えている。
WF線表生成部160は、WFスケジュール情報記憶部120に記憶されているWFスケジュール情報に基づいて、タスク毎の割当期間に対応する進捗率に基づく進捗点を図示したグラフである、図5に示したようなWF線表を生成する。ここで、WF線表生成部160は、各タスクの進捗点が現在日付からどの程度離れているかを示すイナズマ線を引くことにより、当初計画に応じた進捗を把握しやすくする。図10は、WF線表生成部160が生成するWF線表の例を示す図である。(a)は、図7に対応するWF線表であり、(b)は、図8に対応するWF線表であり、(c)は、図9に対応するWF線表である。
表示部170は、CCPM線表、WF線表等の各種情報を表示するディスプレイである。
スケジュール情報変換装置100は、プロジェクト管理者からの操作に応じて、プロジェクトを生成する(ステップS1)。ここで、入力部130は、CCPMにおけるタスク毎のCCPM割当期間の入力を受け付け(ステップS2)、プロジェクトバッファや合流バッファの入力を受け付けて(ステップS3)、CCPMスケジュール情報記憶部110に記憶させる。CCPM線表生成部150は、CCPMスケジュール情報記憶部110に記憶されたCCPMスケジュール情報に基づいてCCPM線表を生成し、表示部170に表示させるとともに、CCPMスケジュール情報記憶部110に記憶させる(ステップS4)。
図12のaは、このように生成されるCCPM線表の例を示し、図12のbは、aに対応してこのように生成されるWF線表の例を示している。
110 CCPMスケジュール情報記憶部
120 WFスケジュール情報記憶部
130 入力部
140 スケジュール情報変換部
141 スケジュール情報変換部
141 期間算出部
142 進捗率算出部
150 CCPM線表生成部
160 WF線表生成部
170 表示部
Claims (6)
- 管理対象であるプロジェクトに対して割り当てられたバッファのバッファ期間およびバッファ種別と、当該プロジェクトのタスク毎に、当該タスクに対して割り当てられた割当期間と、当該タスクが完了するまでの残存期間と、当該タスクがクリティカルチェーンであるか否かを示すタスク種別情報とが対応付けられたCCPMスケジュール情報が記憶されているCCPMスケジュール情報記憶部と、
WFスケジュール情報が記憶されるWFスケジュール情報記憶部と、
前記CCPMスケジュール情報記憶部に記憶されている前記CCPMスケジュール情報に基づいて、タスクの進捗率を含むWFスケジュール情報を、前記WFスケジュール情報におけるタスクの進捗率と前記CCPMスケジュール情報から得られるタスクの進捗とを対応付けて生成し、前記生成したWFスケジュール情報を前記WFスケジュール情報記憶部に記憶させるスケジュール情報変換部と、
を備えることを特徴とするスケジュール情報変換装置。 - 前記スケジュール情報変換部は、前記CCPMスケジュール情報記憶部に記憶されている前記CCPMスケジュール情報に含まれるバッファ期間を、当該CCPMスケジュール情報に含まれる前記タスク毎に対応付けられた複数の割当期間の比に応じて当該タスクに分配した期間を、前記WFスケジュール情報におけるタスク毎の割当期間として算出し、前記WFスケジュール情報に含まれるタスク毎の前記割当期間に対する前記残存期間の比に応じて、前記WFスケジュール情報の進捗率を算出し、
前記WFスケジュール情報を、前記プロジェクトの前記タスク毎に、当該タスクに割り当てられたバッファ期間が含まれる割当期間と、当該タスクの進捗率とが対応付けられたWFスケジュール情報として、前記WFスケジュール情報記憶部に記憶させる、
ことを特徴とする請求項1に記載のスケジュール情報変換装置。 - 前記スケジュール情報変換部は、現在日付が前記CCPMスケジュール情報に含まれる前記タスクに対応する前記割当期間内であれば、当該割当期間に前記進捗率を乗じた値を、当該タスクの進捗点として算出する、
ことを特徴とする請求項1または請求項2のいずれか1項に記載のスケジュール情報変換装置。 - 前記スケジュール情報変換部は、現在日付が前記CCPMスケジュール情報に含まれる前記タスクに対応する前記割当期間以降であって前記WFスケジュール情報に含まれる割当期間内であれば、当該WFスケジュール情報に含まれる割当期間の開始日から現在日付までの期間に前記進捗率を乗じた値を、当該タスクの進捗点として算出する、
ことを特徴とする請求項1から請求項3までのいずれか1項に記載のスケジュール情報変換装置。 - 前記WFスケジュール情報記憶部に記憶されている前記WFスケジュール情報に基づいて、前記タスク毎の前記割当期間に対応する前記進捗率に基づく進捗点を図示したグラフである線表を生成する線表生成部と、
を備えることを特徴とする請求項1から請求項4までのいずれか1項に記載のスケジュール情報変換装置。 - 管理対象であるプロジェクトに対して割り当てられたバッファのバッファ期間およびバッファ種別と、当該プロジェクトのタスク毎に、当該タスクに対して割り当てられた割当期間と、当該タスクが完了するまでの残存期間と、当該タスクがクリティカルチェーンであるか否かを示すタスク種別情報とが対応付けられたCCPMスケジュール情報が記憶されているCCPMスケジュール情報記憶部と、WFスケジュール情報が記憶されるWFスケジュール情報記憶部と、を備えたスケジュール情報変換装置が、
前記CCPMスケジュール情報記憶部に記憶されている前記CCPMスケジュール情報に基づいて、タスクの進捗率を含むWFスケジュール情報を、前記WFスケジュール情報におけるタスクの進捗率と前記CCPMスケジュール情報から得られるタスクの進捗とを対応付けて生成するステップと、前記生成したWFスケジュール情報を前記WFスケジュール情報記憶部に記憶させるステップと、
を備えることを特徴とするスケジュール情報変換方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011258920A JP5703198B2 (ja) | 2011-11-28 | 2011-11-28 | スケジュール情報変換装置、スケジュール情報変換方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011258920A JP5703198B2 (ja) | 2011-11-28 | 2011-11-28 | スケジュール情報変換装置、スケジュール情報変換方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2013114386A JP2013114386A (ja) | 2013-06-10 |
JP5703198B2 true JP5703198B2 (ja) | 2015-04-15 |
Family
ID=48709896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011258920A Active JP5703198B2 (ja) | 2011-11-28 | 2011-11-28 | スケジュール情報変換装置、スケジュール情報変換方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5703198B2 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7358913B2 (ja) * | 2019-10-29 | 2023-10-11 | 富士フイルムビジネスイノベーション株式会社 | 情報処理システム |
JP2024063313A (ja) * | 2022-10-26 | 2024-05-13 | Uniforce株式会社 | 処理装置、処理プログラム及び処理方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5384294B2 (ja) * | 2009-10-28 | 2014-01-08 | 株式会社ビーイング | プロジェクト進捗管理装置 |
-
2011
- 2011-11-28 JP JP2011258920A patent/JP5703198B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2013114386A (ja) | 2013-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8589203B1 (en) | Project pipeline risk management system and methods for updating project resource distributions based on risk exposure level changes | |
US8160911B2 (en) | Project management applications utilizing summary tasks for top-down project planning | |
Tessem et al. | Job satisfaction and motivation in a large agile team | |
US20160140473A1 (en) | Creating and displaying a work sequence | |
WO2013038785A1 (ja) | 保守計画システム、保守計画システムサーバ、及び保守計画システムクライアント端末 | |
JP5703198B2 (ja) | スケジュール情報変換装置、スケジュール情報変換方法 | |
Cvetković et al. | ENHANCING THE AGILITY AND PERFORMANCES OF A PROJECT WITH LEAN MANUFACTURING PRACTICES. | |
JP2015049710A (ja) | プロジェクト管理装置、プログラム、及び管理方法 | |
Van Oorschot et al. | Field studies into the dynamics of product development tasks | |
Maserang | Project management: Tools & techniques | |
Çulha et al. | Towards an agile methodology for business process development | |
Bopalia | Iterative Integrated Planning and Scheduling Model in Project Management | |
JP5802611B2 (ja) | シミュレーション装置、シミュレーション方法およびプログラム | |
CN113537952A (zh) | 针对多团队协作发布管理方法、系统、设备及介质 | |
Webb | Agile project management methodology for beginners: Scrum project management for beginners | |
CA2832806A1 (en) | Method for optimizing schedule compression in projects using accelerating and overlapping of activities | |
Yao | Application of the theory of constraints (TOC) to batch scheduling in process industry | |
JP2009122874A (ja) | プロセスシミュレーションシステム | |
Marinho et al. | Stochastic model for performance evaluation of test planning | |
Арье et al. | Superiority of Kanban management for projects in time completion | |
JP2005099906A (ja) | 仕事管理システム、その方法及びそのプログラム | |
Lee et al. | Agile Approach to Manage Projects in Ubiquitous Multi-Project Environment | |
JP2010198249A (ja) | 商品開発プロジェクト管理システム | |
JP2022092686A (ja) | 損益計算装置、損益計算方法およびプログラム | |
Cui | Organizational and project process definition: A lightweight framework, supporting tool, and industry experience |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20130516 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20130816 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140318 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20141024 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20141111 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150107 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20150127 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20150223 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5703198 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |