JP5451166B2 - Production improvement support system - Google Patents
Production improvement support system Download PDFInfo
- Publication number
- JP5451166B2 JP5451166B2 JP2009107669A JP2009107669A JP5451166B2 JP 5451166 B2 JP5451166 B2 JP 5451166B2 JP 2009107669 A JP2009107669 A JP 2009107669A JP 2009107669 A JP2009107669 A JP 2009107669A JP 5451166 B2 JP5451166 B2 JP 5451166B2
- Authority
- JP
- Japan
- Prior art keywords
- worker
- work
- equipment
- database
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 45
- 230000006872 improvement Effects 0.000 title claims description 31
- 238000000034 method Methods 0.000 claims description 13
- 230000008569 process Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 8
- 238000012545 processing Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000005856 abnormality Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- General Factory Administration (AREA)
Description
この発明は、多品種少量生産など人と設備によって生産を行なう生産ラインにおいて、人と設備の稼働状況を逐次把握し、改善につなげられるようにした生産改善支援システムに関するものである。 The present invention relates to a production improvement support system that can sequentially grasp the operation status of people and facilities in a production line that performs production by people and facilities, such as multi-product small-quantity production, and can lead to improvement.
従来、製造ラインにおける改善活動は、時間測定と作業研究の視点でじっくりと現状を観察した上で、改善に向けたアイデアをひねり出し、それを適用し、さらに、適用結果をじっくりと評価する、と言うPDCA(Plan Do Check Action)サイクルで成り立っていた。
昨今、従来の量産ラインは、中品種中量生産、多品種少量生産へと変化すると共に、製品ライフサイクルも短小化が進んでいる。
この環境変化により、従来の改善手法では、時間がかかり過ぎて生産形態の変化へ追随できず、手間がかかり過ぎて改善案を適用しにくいという弊害があった。
その結果、現場製造ラインにおける生産性向上や原価低減が進みにくくなり、改善活動は低調気味になっていた。
従来の生産性を向上させるための試みとして、特許文献1には、生産品を識別する識別情報と、工程ごとの生産品の到来と完了とを検出した検出信号と、これらに付加された時刻情報を用いて、作業時間を算出するものが記載されている。
また、特許文献2には、設備の稼働情報が、設備コントローラから所定の時間間隔及び予め設定された条件により、情報集約解析装置に伝送され、そこで、解析され、表示されるものが記載されている。
また、特許文献3には、加工機械、治具、人員などの生産に必要なパラメータをシミュレーションにより最適化させるものが記載されている。
Conventionally, improvement activities in production lines have been to carefully observe the current situation from the perspective of time measurement and work research, twist ideas for improvement, apply them, and then evaluate the application results thoroughly. The PDCA (Plan Do Check Action) cycle was established.
In recent years, the conventional mass production line has been changed to medium-medium-quantity production and multi-variety small-quantity production, and the product life cycle has been shortened.
Due to this environmental change, the conventional improvement method has a disadvantage that it takes too much time to follow the change in the production form, and it takes too much time and it is difficult to apply the improvement plan.
As a result, it was difficult to improve productivity and reduce costs in the field production line, and improvement activities were slow.
As an attempt to improve conventional productivity, Patent Document 1 discloses identification information for identifying a product, a detection signal for detecting the arrival and completion of a product for each process, and a time added thereto. The information is used to calculate the working time.
Further, Patent Document 2 describes what equipment operation information is transmitted from an equipment controller to an information aggregation analysis device according to a predetermined time interval and preset conditions, and is analyzed and displayed there. Yes.
Patent Document 3 describes a technique for optimizing parameters necessary for production of processing machines, jigs, personnel, and the like by simulation.
特許文献1のものでは、到来と完了の間の手待ち時間の把握や、一人が多台の設備を用いて作業する多台持ちの作業形態での作業時間の把握ができないという問題があった。
また、特許文献2のものでは、設備の稼働状況は確認できるものの、設備の稼働と人の動きを連合させて把握することはできなかった。
また、特許文献3のものでは、現場でのトラブル発生などの変動要因を考慮できない
という問題があった。
The thing of patent document 1 had the problem that grasping | ascertaining of the waiting time between arrival and completion, and the working time in the work form of the multi-car holding which one person works using many equipment cannot be grasped.
Moreover, in the thing of the patent document 2, although the operating condition of an installation was able to be confirmed, it was not able to grasp | ascertain the operation of an installation and a movement of a person in association.
Moreover, the thing of patent document 3 had the problem that variation factors, such as trouble occurrence on the spot, cannot be considered.
この発明は、上述のような課題を解決するためになされたものであり、多台持ちの場合でも設備の稼働状況と作業者の作業状況を連合させて把握できるようにした生産改善支援システムを得ることを目的にしている。 The present invention has been made to solve the above-described problems, and provides a production improvement support system that can grasp the operation status of equipment and the work status of workers even when there are multiple units. The purpose is to get.
この発明に係わる生産改善支援システムにおいては、一人の作業者が複数の設備を操作してワークの生産を行う生産ラインの生産状態の改善を支援する生産改善支援システムであって、設備とこの設備を操作する作業者を関連付けた作業者登録テーブルを予め格納したデータベースを有するサーバー、設備におけるワークの有無を検出する在荷センサ、設備ごとに作業者の在場を検出する在場センサ、設備を制御するように構成され、在荷センサ及び在場センサの出力が入力され、この入力された在荷センサの出力を含む設備の稼働情報及び在場センサの出力を含む作業者情報をサーバーに送信し、データベースに格納させるコントローラ、サーバーに接続され、データベースに格納された設備の稼働情報及び作業者情報を取得し、作業者登録テーブルを参照して、時間軸に沿って作業者の作業状況及びこの作業者の担当する複数の設備の稼働状況を連合した作業連合状況表を表示するクライアント端末を備えたものである。 The production improvement support system according to the present invention is a production improvement support system for supporting the improvement of the production state of a production line in which a single operator operates a plurality of facilities to produce workpieces. A server having a database pre-stored with a worker registration table that associates workers who operate the machine, a stock sensor that detects the presence or absence of work in the equipment, a presence sensor that detects the presence of the worker for each equipment, and equipment It is configured to control, and the output of the presence sensor and the presence sensor is input, and the operation information of the equipment including the input of the input presence sensor and the worker information including the output of the presence sensor are transmitted to the server. Connect to the controller and server to be stored in the database, acquire the operation information and worker information of the equipment stored in the database, and register the worker. Referring to the table, those having a client terminal to display a working coalition status tables conjointly working situation and operational status of a plurality of equipment in charge of the worker of the worker along the time axis.
この発明は、以上説明したように、一人の作業者が複数の設備を操作してワークの生産を行う生産ラインの生産状態の改善を支援する生産改善支援システムであって、設備とこの設備を操作する作業者を関連付けた作業者登録テーブルを予め格納したデータベースを有するサーバー、設備におけるワークの有無を検出する在荷センサ、設備ごとに作業者の在場を検出する在場センサ、設備を制御するように構成され、在荷センサ及び在場センサの出力が入力され、この入力された在荷センサの出力を含む設備の稼働情報及び在場センサの出力を含む作業者情報をサーバーに送信し、データベースに格納させるコントローラ、サーバーに接続され、データベースに格納された設備の稼働情報及び作業者情報を取得し、作業者登録テーブルを参照して、時間軸に沿って作業者の作業状況及びこの作業者の担当する複数の設備の稼働状況を連合した作業連合状況表を表示するクライアント端末を備えたので、多台持ちの場合でも設備の稼働状況と作業者の作業状況を連合させて把握することができる。 As described above, the present invention is a production improvement support system for supporting the improvement of the production state of a production line in which a single operator operates a plurality of facilities to produce workpieces. A server with a database that stores in advance a worker registration table that associates workers to be operated, a stock sensor that detects the presence or absence of workpieces in equipment, a presence sensor that detects the presence of workers for each equipment, and controls equipment The output of the presence sensor and the presence sensor is input, and the operation information of the equipment including the input of the input presence sensor and the worker information including the output of the presence sensor are transmitted to the server. , Controller to be stored in the database, connected to the server, obtain equipment operation information and worker information stored in the database, refer to the worker registration table Te, because with a client terminal to display the work Union situation table that was Union the work situation and operating status of the plurality of equipment which is in charge of the workers of the worker along the time axis, of the equipment even in the case of multi-platform retention It is possible to grasp the operation status and the work status of the worker in association.
実施の形態1.
図1は、この発明の実施の形態1による生産改善支援システムを示す構成図である。
図1において、生産を行う設備1は、シーケンサ2(コントローラ)により制御され、ワークが作業台3に載置されて加工される。シーケンサ2の制御状況は表示装置4に設備画面として表示されるようになっている。作業台3には、ワークが所定位置に載置されたのを検知する在荷センサ5が設けられ、ワークの有り無しを検知する。在荷センサ5は赤外線センサであり、ワークを固定する治具に配置されている。設備1で作業する人6の在場を検知する在場センサ7が、人6の作業する位置に配置されている。在場センサ7は、人6がマットの上に乗ったときの時間を計測する圧力センサにより構成されている。
シーケンサ2は、データベースを有するサーバー8にLAN9により接続され、サーバー8は、クライアント端末10にLAN9を介して接続されている。シーケンサ2には在
場センサ7からの情報及び在荷センサ5からの情報が入力され、これらはサーバー8のデータベースに格納される。
サーバー8は、記憶装置に形成されたデータベースを有し、このデータベースには、作業の改善を支援するための諸情報が格納されている。例えば、TS(標準時間)データや、後述する図3に示す作業者作業状況テーブル、設備テーブル、作業者登録テーブルを含む。
クライアント端末10は、表示画面を表示する表示部を有し、サーバー8のデータベースを読み書きすることができ、データベースに格納された情報を取得して、設備稼働状況の表示、作業者作業状況の表示、人―設備連合作業状態を示すマンマシンチャート(作業連合状況表)の表示、人/設備投入リソース計画の半自動策定などの処理を行う。
Embodiment 1 FIG.
FIG. 1 is a block diagram showing a production improvement support system according to Embodiment 1 of the present invention.
In FIG. 1, a production facility 1 is controlled by a sequencer 2 (controller), and a workpiece is placed on a work table 3 and processed. The control status of the sequencer 2 is displayed on the display device 4 as an equipment screen. The work table 3 is provided with a stock sensor 5 for detecting that the work is placed at a predetermined position, and detects the presence or absence of the work. The in-stock sensor 5 is an infrared sensor and is disposed on a jig for fixing the workpiece. A presence sensor 7 for detecting the presence of a person 6 working in the facility 1 is disposed at a position where the person 6 works. The presence sensor 7 includes a pressure sensor that measures the time when the person 6 gets on the mat.
The sequencer 2 is connected to a server 8 having a database via a
The server 8 has a database formed in a storage device, and various information for supporting improvement of work is stored in this database. For example, TS (standard time) data, an operator work situation table shown in FIG. 3 described later, an equipment table, and an operator registration table are included.
The
図2は、この発明の実施の形態1による生産改善支援システムのクライアント端末を示す構成図である。
図2において、クライアント端末10は、サーバー8のデータベースから作業状況のデータを取得するとともに、別途作成された生産計画11からも機種別の生産計画を取得するデータ取得手段12と、この取得したデータに基づきマンマシンチャートを表示部15に表示するマンマシンチャート表示手段13と、取得したデータに基づき、機種シリーズごと及び工程ごとに必要な作業者数及び設備台数を算出し、必要に応じて表示部15に表示するリソース算出手段14とを有している。
FIG. 2 is a block diagram showing a client terminal of the production improvement support system according to Embodiment 1 of the present invention.
In FIG. 2, the
図3は、この発明の実施の形態1による生産改善支援システムのサーバーのデータベース内容を示す図である。
図3(a)は、作業者作業状況テーブルを示す図で、作業者IDと、在場か不在かを示す作業内容と、作業内容の開始日時と、作業内容の終了日時とを含むものである。このテーブルは、作業者IDごとに作成されてもよい。
図3(b)は、設備テーブルを示す図で、設備IDと、設備稼働状況コードと、そのコードの開始日時と、終了日時とを含む。設備稼働状況コードとしては、例えば、0000(正常稼働)、0001(ワーク待ち)、0002(チャック異常)、0003(クーラント液不足)などを有する。設備テーブルは設備ごとに作成されてもよい。
図3(c)は、作業者と設備との時点ごとの対応を示す作業者登録テーブルで、どの作業者がいつの期間にどの設備を操作するのかが予め登録されている。その対応付けられた期間を開始日時と終了日時により示している。このテーブルにより、時刻と設備を指定すれば、作業者を特定することができる。
データベースには、この他、設備とその指名作業者を関連付けたマスタテーブルを有し、設備を指定すれば、指名作業者が一覧できるようになっている。また、全製造機種の形名をもつ機種形名テーブルを有し、機種の形名から機種シリーズが区分できるようになっている。また、機種ごとに作業1サイクルの時間(標準時間、TSデータ)を持っている。
FIG. 3 is a diagram showing the database contents of the server of the production improvement support system according to Embodiment 1 of the present invention.
FIG. 3A is a diagram showing a worker work status table, which includes a worker ID, work contents indicating presence or absence, start date and time of work contents, and end date and time of work contents. This table may be created for each worker ID.
FIG. 3B is a diagram showing an equipment table, which includes equipment ID, equipment operation status code, start date and time, and end date and time of the code. The equipment operation status code includes, for example, 0000 (normal operation), 0001 (work waiting), 0002 (chuck abnormality), 0003 (coolant liquid shortage), and the like. The equipment table may be created for each equipment.
FIG. 3C is an operator registration table showing correspondence between workers and equipment at each time point, and which operator operates which equipment in which period and which equipment is registered in advance. The associated period is indicated by a start date and time and an end date and time. By specifying the time and equipment from this table, the worker can be specified.
In addition to this, the database has a master table in which the equipment and the designated worker are associated with each other. If the equipment is designated, the designated worker can be listed. It also has a model name table with model names of all manufactured models, and the model series can be distinguished from the model name. In addition, each model has a work cycle time (standard time, TS data).
図4は、この発明の実施の形態1による生産改善支援システムのクライアント端末のマンマシンチャートの表示例を示す図である。
図4において、作業者Aが設備aと設備bと設備cで作業する状態を例にした場合の表示例を示している。
作業者Aの「在場」は、在場センサ7により検知された在場の時間であり、不在時間は「用足し」と表示される。「設備メンテ」は、設備aのトラブルにより発生したもの、また、「昼食」は、時間が予め定められたものである。
設備は、通常状態の「稼働中」と「ワーク待ち」が示され、これに加えて、異常時を示す「トラブル」が示されている。
FIG. 4 is a diagram showing a display example of a man-machine chart of the client terminal of the production improvement support system according to Embodiment 1 of the present invention.
In FIG. 4, the example of a display in case the worker A works with the equipment a, the equipment b, and the equipment c is shown as an example.
“Attendance” of worker A is the presence time detected by the presence sensor 7, and the absence time is displayed as “addition”. “Equipment maintenance” is caused by a trouble with the equipment “a”, and “lunch” is a predetermined time.
The equipment shows “in operation” and “waiting for work” in a normal state, and in addition to this, “trouble” indicating an abnormal time.
図5は、この発明の実施の形態1による生産改善支援システムのクライアント端末のリ
ソース算出手段の処理を示すフローチャートである。
FIG. 5 is a flowchart showing the processing of the resource calculation means of the client terminal in the production improvement support system according to Embodiment 1 of the present invention.
次に、動作について説明する。
図1では、一人の作業者が3台の設備を使用してワークを加工する、多台持ちの場合を示している。ワークが設備1の作業台3の所定位置に載置されると、加工が実施される。
この加工の実施は、サーバー8のデータベースに記憶されたTSデータに基づき、シーケンサ2により、設備付属の表示装置4の画面を用いて1ワークごとに作業着手指示と、タイマーによる完了タイミング指示が行われる。
ワークが作業台3の所定位置に載置されると、在荷センサ5がワークの載置を検知し、作業の開始と終了を確認する。このため、在荷センサ5は、ワークが設備1に投入され、加工されるポジション(所定位置)にあるかどうかを検知するように、例えば取付け治具に配置されている。
また、在場センサ7により作業者がどの設備1に係わったかを含む作業状況を検知する。在場センサ7で設備1ごとの作業時間を検出することによって、一人が複数の設備で作業する多台持ちにおける作業内容とそれぞれの時間を把握することができる。
これらの情報は、シーケンサ2に送信されて、シーケンサの記憶部に記憶される。なお、設備と作業者との関連は、図3(c)の作業者登録テーブルによって把握できる。
Next, the operation will be described.
FIG. 1 shows a case where a single worker processes a workpiece using three facilities and has multiple units. When the workpiece is placed at a predetermined position on the work table 3 of the equipment 1, processing is performed.
The execution of this processing is based on the TS data stored in the database of the server 8, and the sequencer 2 gives a work start instruction for each work and a completion timing instruction by a timer using the screen of the display device 4 attached to the equipment. Is called.
When the work is placed at a predetermined position on the work table 3, the stock sensor 5 detects the work placement and confirms the start and end of the work. For this reason, the in-stock sensor 5 is arranged, for example, on a mounting jig so as to detect whether or not the workpiece is placed in the facility 1 and is in a position (predetermined position) to be processed.
In addition, the presence sensor 7 detects a work situation including which equipment 1 the worker is involved in. By detecting the work time for each equipment 1 with the presence sensor 7, it is possible to grasp the work contents and the respective times when one person works with a plurality of equipment.
These pieces of information are transmitted to the sequencer 2 and stored in the storage unit of the sequencer. The relationship between the equipment and the worker can be grasped by the worker registration table in FIG.
シーケンサ2は、設備加工を制御し、在場センサ7や在荷センサ5によって検知された情報などを収集する。すなわち、シーケンサ2は、設備からは稼働情報(停止、待機、作業中、段取り替え、エラー)を、人6の動きは、在場センサ7を用いて在場情報(いつ、いずれの工程に居るか)を、それぞれリアルタイムで取得する。なお、在場センサ7で、不在の時間は、全て「用足し」と定義している。
シーケンサ2内に取り込んだ情報は、一定サイクルでサーバー8に送信されて、図3に示すデータ構造でデータベース化される。このサーバー8のデータベースには、シーケンサ2から読出し及び書込みができるようになっている。
The sequencer 2 controls equipment processing and collects information detected by the presence sensor 7 and the presence sensor 5. That is, the sequencer 2 uses operation information (stopping, waiting, working, setup change, error) from the equipment, and the movement of the person 6 using the presence sensor 7 is the presence information (when and in which process). Are acquired in real time. In the presence sensor 7, the absence time is defined as “addition”.
Information taken into the sequencer 2 is transmitted to the server 8 in a fixed cycle and is made into a database with the data structure shown in FIG. The database of the server 8 can be read and written from the sequencer 2.
クライアント端末10は、サーバー8のデータベースに読み書きできるようになっており、データベースから必要なデータを取得して、設備稼働状況の表示、作業者作業状況の表示、人―設備連合作業状態の表示、人/設備投入リソース計画の半自動策定などの処理を行う。
すなわち、データベースから特定期間(例えば、立上げ期間など)の設備情報及び人の移動/在場情報を抽出し、マンマシン表示手段13によるマンマシンチャートの表示、及びリソース算出手段14による人と設備の投入リソースの算出処理を行う。
The
That is, equipment information and person movement / location information for a specific period (for example, startup period) are extracted from the database, a man-machine chart is displayed by the man-machine display means 13, and a person and equipment by the resource calculation means 14 are extracted. The calculation process of the input resource is performed.
マンマシン表示手段13は、図4に示すようなマンマシンチャートを表示する。このマンマシンチャートでは、図4に示すように、人−設備双方の詳細な動きを表示する。これによって管理者は、人の作業状況と設備の稼働状況を連合して把握することができる。このマンマシンチャートは、自動作成し、表示することができるものである。 The man machine display means 13 displays a man machine chart as shown in FIG. In this man-machine chart, as shown in FIG. 4, detailed movements of both people and facilities are displayed. As a result, the manager can grasp the work status of the person and the operating status of the equipment in an integrated manner. This man-machine chart can be automatically created and displayed.
リソース算出手段14は、実績データに基づいて、投入リソース(人、設備)の評価・計画策定を行う。
サーバー8のデータベースから、データ取得手段12を介して、サイクルタイム(ワークが投入されて次のワークが投入されるまでの時間であり、TSデータから求められる。)、作業時間等のライン生産性管理データを自動収集する。
これらのデータに基づき、生産状況の変動に応じて、そのつど必要になる最低限の人数と設備の台数を算出するようにする。このとき、実績データを基にして、設備のメンテナンスや人の作業台から離れる時間などの変動要因を加味して、上記の最適な投入リソースを算出する。これにより、蓋然性の高いリソース計画を策定することができる。
The resource calculation means 14 evaluates / plans the input resources (people, equipment) based on the result data.
Line productivity from the database of the server 8 through the data acquisition means 12 such as cycle time (the time from when a workpiece is input until the next workpiece is input, which is obtained from TS data), working time, etc. Collect management data automatically.
Based on these data, the minimum necessary number of people and the number of facilities are calculated each time the production situation changes. At this time, based on the result data, the above optimal input resource is calculated in consideration of factors such as the maintenance of the equipment and the time for leaving the person's work table. Thereby, it is possible to formulate a resource plan with a high probability.
次に、リソース算出手段14の処理について、図5のフローチャートに基づき、さらに詳しく説明する。
図5のステップS1で、データ取得手段12は、別途作成された生産計画11から製造機種(以下、単に機種という。)ごとの生産計画を取得し、また、サーバー8のデータベースから、機種及び工程毎に、作業時間と設備稼働時間を取得する。
次に、ステップS2で、データベースの機種情報を参照して、機種を同一シリーズで括り、機種シリーズごと及び工程別に下記のデータを抽出する。
作業時間として、単位当りの正味作業時間(W)と、単位当りの正味非作業時間(W_σ)とを算出する。
設備時間として、単位当りの正味稼働時間バラつき(O)と、単位当りの正味非稼働時間バラつき(O_σ)とを算出する。
ここで、単位はワーク1個についての時間を示し、正味作業時間は、価値が認められる作業の時間を示している。本発明では、在場センサで在場を検知している時間であり、図4の在場の時間である。また、正味稼働時間は、価値が認められる設備の稼働時間を示し、本発明では、図4の稼働中の時間である。
Next, the processing of the
In step S 1 of FIG. 5, the
Next, in step S2, the model information in the database is referred to, the models are grouped in the same series, and the following data is extracted for each model series and for each process.
As the work time, a net work time (W) per unit and a net non-work time (W_σ) per unit are calculated.
As equipment time, a net operating time variation per unit (O) and a net non-operating time variation per unit (O_σ) are calculated.
Here, the unit indicates the time for one work, and the net work time indicates the work time for which value is recognized. In the present invention, it is the time when the presence sensor detects the presence, which is the presence time in FIG. Further, the net operation time indicates the operation time of the facility whose value is recognized, and in the present invention, it is the operation time in FIG.
次に、シリーズ別の生産計画に対し、上記データを下記の要領で引き当てて、工程別に必要な設備台数、投入人員を算出する。
このため、ステップS3で、式(1)により多台持ち係数sを算出する。
Next, the above-mentioned data is allocated to the production plan for each series in the following manner, and the necessary number of facilities and input personnel are calculated for each process.
For this reason, in step S3, the multi-carried coefficient s is calculated by the equation (1).
多台持ち係数(s)=Σ(Wk+α*W_σk)/ライン当り作業者割当可能数・・(1) Multi-hand holding coefficient (s) = Σ (W k + α * W_σ k ) / number of workers allocatable per line (1)
次に、ステップS4で、式(2)により、作業者数を算出する。ただし、式(2)中、i:機種シリーズ数、N:機種シリーズ別生産台数、α:作業能率安全係数である。 Next, in step S4, the number of workers is calculated by equation (2). In equation (2), i: number of model series, N: number of units produced by model series, and α: work efficiency safety factor.
作業者数=s*Σ(Wi+α*W_σi)*Ni/1日の作業時間・・(2) Number of workers = s * Σ (W i + α * W_σ i ) * N i / day working time (2)
次に、ステップS5で、式(3)により設備台数を算出する。
ただし、式(3)中、i:機種シリーズ数、N:機種シリーズ別生産台数、β:設備稼働安全係数である。
Next, in step S5, the number of facilities is calculated by equation (3).
In equation (3), i: number of model series, N: number of units produced by model series, and β: equipment operation safety factor.
設備台数=Σ(Oi+β*O_σi)*Ni/1日の稼働可能時間・・(3) Number of facilities = Σ (O i + β * O_σ i ) * N i / day of operation availability (3)
このように、多台持ちの場合の作業者数と設備台数を算出でき、実績データに基づいて、設備、人のリソースの評価、計画策定をサポートすることができる。 In this way, the number of workers and the number of facilities in the case of having multiple units can be calculated, and evaluation of facilities and human resources and planning can be supported based on the actual data.
実施の形態1によれば、クライアント端末の画面にマンマシンチャートを表示できるので、多台持ちの場合でも設備の稼働状況と作業者の作業状況を連合させて把握することができる。
また、設備加工時のサイクルタイムや作業時間などのライン生産性管理データを自動収集することができるので、このデータに基づいて、短期間で改善活動を進めることができる。
また、実績データに基づいて、設備、人のリソースの評価、計画策定をサポートすることができる。
According to the first embodiment, since the man-machine chart can be displayed on the screen of the client terminal, the operation status of the equipment and the worker's work status can be grasped in association even when there are multiple units.
In addition, since line productivity management data such as cycle time and work time during equipment processing can be automatically collected, improvement activities can be advanced in a short period of time based on this data.
In addition, it is possible to support the evaluation and planning of facilities and human resources based on the actual data.
1 設備
2 シーケンサ
3 作業台
4 表示装置
5 在荷センサ
6 人
7 在場センサ
8 サーバー
9 LAN
10 クライアント端末
11 生産計画
12 データ取得手段
13 マンマシンチャート表示手段
14 リソース算出手段
15 表示部
DESCRIPTION OF SYMBOLS 1 Equipment 2 Sequencer 3 Worktable 4 Display apparatus 5 Inventory sensor 6 Person 7 Existence sensor 8
DESCRIPTION OF
Claims (3)
上記設備とこの設備を操作する作業者を関連付けた作業者登録テーブルを予め格納したデータベースを有するサーバー、
上記設備におけるワークの有無を検出する在荷センサ、
上記設備ごとに作業者の在場を検出する在場センサ、
上記設備を制御するように構成され、上記在荷センサ及び上記在場センサの出力が入力され、この入力された上記在荷センサの出力を含む設備の稼働情報及び上記在場センサの出力を含む作業者情報を上記サーバーに送信し、上記データベースに格納させるコントローラ、
上記サーバーに接続され、上記データベースに格納された上記設備の稼働情報及び上記作業者情報を取得し、上記作業者登録テーブルを参照して、時間軸に沿って上記作業者の作業状況及びこの作業者の担当する複数の上記設備の稼働状況を連合した作業連合状況表を表示するクライアント端末を備えたことを特徴とする生産改善支援システム。 A production improvement support system for supporting the improvement of the production state of a production line in which one worker operates a plurality of facilities to produce workpieces,
A server having a database that stores in advance a worker registration table that associates the facility with a worker who operates the facility;
A stock sensor that detects the presence or absence of workpieces in the above equipment,
A presence sensor that detects the presence of the worker for each of the above facilities,
It is comprised so that the said equipment may be controlled, The output of the said presence sensor and the said presence sensor is input, The operation information of the installation including the output of this inputted said presence sensor and the output of the said presence sensor are included. A controller that sends worker information to the server and stores it in the database;
Connected to the server, it acquires the operation information and the operator information stored the facilities in the database, with reference to the worker registration table, working conditions and the work of the worker along the time axis A production improvement support system comprising a client terminal for displaying a work alliance status table in which operation statuses of a plurality of the facilities in charge of a person are associated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009107669A JP5451166B2 (en) | 2009-04-27 | 2009-04-27 | Production improvement support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009107669A JP5451166B2 (en) | 2009-04-27 | 2009-04-27 | Production improvement support system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010257296A JP2010257296A (en) | 2010-11-11 |
JP5451166B2 true JP5451166B2 (en) | 2014-03-26 |
Family
ID=43318112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009107669A Expired - Fee Related JP5451166B2 (en) | 2009-04-27 | 2009-04-27 | Production improvement support system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5451166B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101632855B1 (en) | 2013-12-11 | 2016-06-22 | 가부시키가이샤 고마쓰 세이사쿠쇼 | Work machine management method, management computer program, and management system |
JP5941123B2 (en) * | 2014-11-13 | 2016-06-29 | 株式会社小松製作所 | Work machine management method, management computer program, and management system |
CN108628264A (en) * | 2018-03-13 | 2018-10-09 | 深圳市矽赫科技有限公司 | A kind of commodity refine production operation system and method on a large scale |
WO2020162435A1 (en) * | 2019-02-08 | 2020-08-13 | 三菱電機株式会社 | Production improvement assistance system, method, and program |
JP7418290B2 (en) * | 2020-06-12 | 2024-01-19 | イビデン株式会社 | production analysis equipment |
JP7474152B2 (en) * | 2020-08-28 | 2024-04-24 | イビデン株式会社 | Production Planning System |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07152835A (en) * | 1993-12-01 | 1995-06-16 | Nec Software Kansai Ltd | Automatic collection system for production information |
JPH0985591A (en) * | 1995-09-26 | 1997-03-31 | Ricoh Co Ltd | Production line operation management system |
JP2000112504A (en) * | 1998-10-07 | 2000-04-21 | Mitsubishi Heavy Ind Ltd | System for optimizing parameter of production factory and its medium for calculation |
JP4116738B2 (en) * | 1999-07-26 | 2008-07-09 | 株式会社堀場製作所 | Work instruction method in production line and work instruction system in production line |
JP2005070883A (en) * | 2003-08-28 | 2005-03-17 | Toshiba Corp | Operator allocation program |
JP2007115134A (en) * | 2005-10-21 | 2007-05-10 | Sharp Corp | Operation record collection system |
JP2007323199A (en) * | 2006-05-30 | 2007-12-13 | Omron Corp | Production management apparatus, production management method, production management program and recording medium with the same recorded thereon, and production system |
-
2009
- 2009-04-27 JP JP2009107669A patent/JP5451166B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2010257296A (en) | 2010-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5451166B2 (en) | Production improvement support system | |
Kumar et al. | Implementing the Lean Sigma framework in an Indian SME: a case study | |
JP6412055B2 (en) | Injection molding machine management system | |
JP4911080B2 (en) | Quality improvement system | |
CN109784767B (en) | Standardized intelligent overhaul management control system for parts | |
JP2007031082A (en) | Inspection report preparing method and device for elevator | |
JP2007140625A (en) | Production management device, production management system, production management method, control program and recording medium | |
CN102024181A (en) | Artificial intelligence maintenance system and method | |
Brundage et al. | Developing maintenance key performance indicators from maintenance work order data | |
JP5938888B2 (en) | Server, equipment maintenance support system, method and program | |
JP2007091381A (en) | Device for preparing maintenance work report of building equipment | |
CN107390649B (en) | Project type product processing Internet of things support system | |
RU2007103326A (en) | METHOD OF REPAIR AND MAINTENANCE AND APPLICABLE IN THE METHOD OF HARDWARE-SOFTWARE COMPLEX FOR DIAGNOSTICS AND SYSTEM FOR CONTROL OF QUALITY OF REPAIR AND MAINTENANCE | |
CN104503362B (en) | Batch workpiece digital control processing progress automatic acquiring method based on Multi-information acquisition | |
JP2012022602A (en) | Operation improvement analysis system | |
CN110378273A (en) | A kind of method and apparatus of monitoring results process | |
JP5609600B2 (en) | Processing management display system and display method thereof | |
CN107256457A (en) | A kind of automatic calibration of electric energy meter workshop intelligent inspection system | |
JP2003140728A (en) | Work survey analyzing system, work analyzing device and work survey analyzing method | |
JP2005276003A (en) | Work instruction system | |
Prasetyo et al. | Design of an automatic production monitoring system on job shop manufacturing | |
CN109492780B (en) | Repair tracking method, device and system for repaired parts | |
US20050033469A1 (en) | Working time period grasping system and work instruction preparing system | |
CN114626954A (en) | Intelligent manufacturing cooperative system | |
CN114240211A (en) | Intelligent production management system and management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120424 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130416 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130418 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130614 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20131217 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20131226 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 5451166 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |