JP5450184B2 - Demand control apparatus, demand control method, and demand control program - Google Patents

Demand control apparatus, demand control method, and demand control program Download PDF

Info

Publication number
JP5450184B2
JP5450184B2 JP2010057847A JP2010057847A JP5450184B2 JP 5450184 B2 JP5450184 B2 JP 5450184B2 JP 2010057847 A JP2010057847 A JP 2010057847A JP 2010057847 A JP2010057847 A JP 2010057847A JP 5450184 B2 JP5450184 B2 JP 5450184B2
Authority
JP
Japan
Prior art keywords
information
demand
equipment
building
demand control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010057847A
Other languages
Japanese (ja)
Other versions
JP2011193639A (en
Inventor
信也 谷岡
雄貴 久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2010057847A priority Critical patent/JP5450184B2/en
Publication of JP2011193639A publication Critical patent/JP2011193639A/en
Application granted granted Critical
Publication of JP5450184B2 publication Critical patent/JP5450184B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、各種プラントやビル等におけるデマンド値を制御するデマンド制御装置デマンド制御方法、およびデマンド制御用プログラムに関する。 The present invention relates to a demand control device , a demand control method , and a demand control program for controlling demand values in various plants and buildings.

従来、高圧、特別高圧で電気を受けるビル、工場などの建物では、30分最大需要電力計(デマンド計)により30分間ごとの電気の使用量が計測され、平均使用電力であるデマンド値が算出される。   Conventionally, in buildings such as buildings and factories that receive electricity at a high voltage or extra high voltage, the amount of electricity used is measured every 30 minutes by a 30-minute maximum demand power meter (demand meter), and the demand value that is the average power consumption is calculated Is done.

そして、この算出されたデマンド値を基準として契約電力が決定され、さらにこの契約電力で決まる基本料金と電力使用量とにより電気料金が計算されるため、決定された契約電力を超えないようにデマンド制御を行う必要がある。   The contracted power is determined based on the calculated demand value, and the electricity charge is calculated based on the basic charge determined by the contracted power and the amount of power used, so the demanded power should not exceed the determined contracted power. It is necessary to control.

このデマンド制御に関する技術として、特許文献1に記載されたデマンド制御用支援方法がある。   As a technique related to this demand control, there is a demand control support method described in Patent Document 1.

このデマンド制御用支援方法では、取得した季節予報に合わせた適切な目標電力を設定し、この目標電力に基づいて最低限の環境維持と電力料金最小化とを両立することができる。   In this demand control support method, it is possible to set an appropriate target power according to the acquired seasonal forecast, and to achieve both minimum environmental maintenance and power charge minimization based on this target power.

特許第3564605号公報Japanese Patent No. 3564605

この特許文献1に記載のデマンド制御用支援方法により屋外環境に応じたデマンド制御を行うことができるようになるが、さらに精度の高いデマンド予測により該建物内の機器や在室者等への影響がなるべく少ない状態でデマンド制御を行うことが望まれていた。   Although the demand control according to the demand control described in Patent Document 1 can perform demand control according to the outdoor environment, the demand prediction with higher accuracy affects the equipment in the building and the people in the room. Therefore, it has been desired to perform demand control with as little as possible.

また、従来のデマンド予測は予測対象時間の直前に行われること多く、デマンド値が上限値を超過することが判定されてからこれに基づいて建物内の機器の制御対象を判定するまでの時間が短時間であるために効率良く機器の制御ができない場合があるという問題があった。   In addition, the conventional demand prediction is often performed immediately before the prediction target time, and the time from when it is determined that the demand value exceeds the upper limit value until the control target of the equipment in the building is determined based on the demand value is determined. There was a problem that the device could not be controlled efficiently because of the short time.

例えば、デマンド計測対象の30分間の中で契約電力が超過することが予測されるのが直前(数分前)であると、契約電力が超過しないようにどの機器の運転を停止させるかを判断する期間が数分間しかないため、停止の対象にし得る機器が限定されてしまい確実なデマンド制御を行うことが困難であるという問題があった。   For example, if it is predicted that the contract power will exceed the demand measurement target for 30 minutes immediately before (several minutes ago), it is determined which device is to be stopped so that the contract power does not exceed. Since there is only a few minutes to perform, there is a problem that it is difficult to perform reliable demand control because the devices that can be stopped are limited.

本発明は上記事情に鑑みてなされたものであり、高い精度でデマンド予測を行い、建物内の機器や在室者への影響を抑え、効率よく確実なデマンド制御を行うことが可能なデマンド制御装置デマンド制御方法、およびデマンド制御用プログラムを提供することを目的とする。 The present invention has been made in view of the above circumstances, demand control capable of performing demand prediction with high accuracy, suppressing the influence on equipment in the building and occupants, and performing efficient and reliable demand control. An object is to provide an apparatus , a demand control method , and a demand control program .

上記目的を達成するための本発明のデマンド制御装置は、監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置において、前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶部と、前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶部と、前記イベント情報記憶部で記憶されたイベント情報及び前記過去データ記憶部で記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出部と、前記デマンド予測算出部で算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成部とを備えることを特徴とする。 The demand control device of the present invention for achieving the above object is a demand control device that performs demand control on the equipment based on power consumption of a large number of equipment related to a building to be monitored. A past data storage unit that stores an operation status of the facility device when a past demand value related to power exceeds contract power, an event information storage unit that stores event information in a tenant of the building, and the event information Based on the event information stored in the storage unit and the past data stored in the past data storage unit, the demand prediction calculation unit that calculates demand prediction information, and the demand prediction information calculated by the demand prediction calculation unit Te, the equipment for the determining the equipment to be demand control of a number of the equipment, is provided information Characterized in that it comprises a facility device control information generation unit for generating information relating to the control content.

またこのデマンド制御装置は、更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得部と、当該建物に関する電力規制情報を取得する電力規制情報取得部との少なくとも1つを有し、前記デマンド予測算出部は、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出するようにしてもよい。 The demand control device further includes at least one of a weather information acquisition unit that acquires weather condition forecast information regarding the position of the building, and a power regulation information acquisition unit that acquires power regulation information about the building. The demand prediction calculation unit may calculate demand prediction information based on the event information and the past data, and at least one of the weather condition prediction information or the power regulation information .

また本発明のデマンド制御方法は、監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置が、前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶ステップと、前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶ステップと、前記イベント情報記憶ステップで記憶されたイベント情報及び前記過去データ記憶ステップで記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出ステップと、前記デマンド予測算出ステップで算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成ステップとを有することを特徴とする。 Further, the demand control method of the present invention is based on the power consumption of a large number of equipment related to the building to be monitored, and the demand control device that performs demand control on the equipment is a past demand related to the power consumption of the equipment. Stored in the past data storage step for storing the operation status of the equipment when the value exceeds contract power, the event information storage step for storing event information in the tenant of the building, and the event information storage step Based on event information and past data stored in the past data storage step, demand prediction calculation step for calculating demand prediction information, and on the basis of the demand prediction information calculated in the demand prediction calculation step, the large number of facilities Equipment that is subject to demand control is determined from the equipment, and information is provided. And having a facility appliance control information generating step of generating information relating to contents of control equipment.

またこのデマンド制御方法では、更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得ステップと、当該建物に関する電力規制情報を取得する電力規制情報取得ステップとの少なくとも1つを有し、前記デマンド予測算出ステップでは、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出するようにしてもよい。
また本発明のデマンド制御用プログラムは、監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置に、前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶機能と、前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶機能と、前記イベント情報記憶機能により記憶されたイベント情報及び前記過去データ記憶機能により記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出機能と、前記デマンド予測算出機能により算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成機能とを実行させることを特徴とする。
またこのデマンド制御用プログラムでは、更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得機能と、当該建物に関する電力規制情報を取得する電力規制情報取得機能との少なくとも1つを前記デマンド制御装置に実行させ、前記デマンド予測算出機能では、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出するようにしてもよい。
The demand control method further includes at least one of a weather information acquisition step of acquiring weather condition forecast information regarding the position of the building and a power regulation information acquisition step of acquiring power regulation information regarding the building. In the demand prediction calculation step, demand prediction information may be calculated based on the event information and the past data, and at least one of the weather condition prediction information or the power regulation information .
In addition, the demand control program of the present invention is based on the power consumption of a large number of equipment related to the building to be monitored, and the demand control device that performs demand control on the equipment is a past program related to the power consumption of the equipment. Stored by the past data storage function that stores the operation status of the equipment when the demand value exceeds contract power, the event information storage function that stores event information in the tenant of the building, and the event information storage function Demand prediction calculation function for calculating demand prediction information based on the event information and the past data stored by the past data storage function, and the demand prediction information calculated by the demand prediction calculation function, The equipment that is subject to demand control is determined from the equipment, and the information is provided. Characterized in that to execute the equipment control information generation function of generating information relating to contents of control equipment.
The demand control program further includes at least one of a weather information acquisition function for acquiring weather condition forecast information regarding the location of the building and a power regulation information acquisition function for acquiring power regulation information regarding the building. The demand forecast calculation function causes the demand control device to calculate demand forecast information based on the event information and the past data, and at least one of the weather condition forecast information or the power regulation information. Also good.

本発明のデマンド制御装置デマンド制御方法、およびデマンド制御用プログラムによれば、高い精度でデマンド予測を行い、建物内の機器や在室者への影響を抑え、効率よく確実なデマンド制御を行うことができる。 According to the demand control device , the demand control method , and the demand control program of the present invention, the demand prediction is performed with high accuracy, the influence on the equipment in the building and the people in the room is suppressed, and the reliable demand control is performed efficiently. be able to.

本発明の一実施形態によるデマンド制御装置を利用したデマンド制御システムの構成を示すブロック図である。It is a block diagram which shows the structure of the demand control system using the demand control apparatus by one Embodiment of this invention. 本発明の一実施形態によるデマンド制御装置を利用したデマンド制御システムの動作を示すシーケンス図である。It is a sequence diagram which shows operation | movement of the demand control system using the demand control apparatus by one Embodiment of this invention.

本発明の一実施形態として、監視対象の建物におけるデマンド制御に影響する様々な電力消費関連情報(イベント情報、気象情報、過去および現在のデマンド状況情報等)に基づいて、将来のデマンド値を予測してデマンド制御を行うデマンド制御システムについて説明する。   As one embodiment of the present invention, a future demand value is predicted based on various power consumption related information (event information, weather information, past and current demand status information, etc.) that affects demand control in a monitored building. A demand control system that performs demand control will be described.

〈一実施形態によるデマンド制御システムの構成〉
本発明の一実施形態によるデマンド制御システムの構成について、図1を参照して説明する。
<Configuration of demand control system according to one embodiment>
A configuration of a demand control system according to an embodiment of the present invention will be described with reference to FIG.

本実施形態によるデマンド制御システム1は、監視対象の建物内の設備機器10と、設備機器10に接続されたデマンド計20と、設備機器10およびデマンド計20に接続された入出力装置30と、入出力装置30に接続されるとともに外部のWebサーバである気象情報サーバ2A、電力管理サーバ2B、およびビル情報管理サーバ2Cにネットワーク3を介して接続されたデマンド制御装置としてのサーバ装置40とを有する。図1では、説明を簡略化するためサーバ装置40に接続された設備機器10および入出力装置30が1台の場合を示しているが、実際には監視対象の建物に設置された多数の設備機器が接続されている。   The demand control system 1 according to the present embodiment includes a facility device 10 in a building to be monitored, a demand meter 20 connected to the facility device 10, an input / output device 30 connected to the facility device 10 and the demand meter 20, A server device 40 as a demand control device connected to the input / output device 30 and connected to the weather information server 2A, the power management server 2B, and the building information management server 2C, which are external Web servers, via the network 3. Have. Although FIG. 1 shows a case where there is one facility device 10 and one input / output device 30 connected to the server device 40 in order to simplify the explanation, a large number of facilities actually installed in the building to be monitored are shown. The device is connected.

デマンド計20は、設備機器10で消費された電力量を取得し、この消費電力量に基づいて30分ごとのデマンド値を算出する。   The demand meter 20 acquires the amount of power consumed by the facility device 10, and calculates a demand value every 30 minutes based on this amount of power consumption.

入出力装置30は、デマンド計20で算出されたデマンド値を取得してサーバ装置40に送信するとともに、サーバ装置40から送出された設備機器10の動作指示を設備機器10に送信する。   The input / output device 30 acquires the demand value calculated by the demand meter 20 and transmits it to the server device 40, and transmits the operation instruction of the facility device 10 sent from the server device 40 to the facility device 10.

サーバ装置40は、イベント情報記憶部41と、過去データ記憶部42と、気象情報取得部43と、電力規制情報取得部44と、デマンド予測算出部45と、設備機器制御部46と、デマンド値取得部47とを有する。   The server device 40 includes an event information storage unit 41, a past data storage unit 42, a weather information acquisition unit 43, a power regulation information acquisition unit 44, a demand prediction calculation unit 45, an equipment device control unit 46, a demand value An acquisition unit 47.

イベント情報記憶部41は、監視対象の建物の電力消費量の増減が予測される、テナントのイベント情報を記憶する。   The event information storage unit 41 stores tenant event information in which an increase or decrease in the power consumption of the monitored building is predicted.

過去データ記憶部42は、過去にデマンド値が契約電力を超過したときの、気象条件、建物内の設備機器の運用状況等の環境情報を記憶する。   The past data storage unit 42 stores environmental information such as weather conditions and the operation status of equipment in the building when the demand value exceeds the contract power in the past.

気象情報取得部43は、ネットワーク3を介して接続された気象情報サーバ2Aから、当該建物の位置に関する気象条件の予報情報を取得する。   The weather information acquisition unit 43 acquires weather condition forecast information regarding the position of the building from the weather information server 2A connected via the network 3.

電力規制情報取得部44は、ネットワーク3を介して接続された電力管理サーバ2Bから、当該建物に関する電力規制情報を取得する。   The power regulation information acquisition unit 44 acquires power regulation information related to the building from the power management server 2 </ b> B connected via the network 3.

デマンド予測算出部45は、イベント情報記憶部41に記憶されたイベント情報、過去データ記憶部42に記憶された過去のデマンド値超過時の環境情報、気象情報取得部43で取得された気象条件の予報情報、および電力規制情報取得部44で取得された電力規制情報に基づいて、デマンド予測情報を算出する。   The demand prediction calculation unit 45 includes event information stored in the event information storage unit 41, environmental information when past demand values are exceeded stored in the past data storage unit 42, and weather conditions acquired by the weather information acquisition unit 43. Based on the forecast information and the power regulation information acquired by the power regulation information acquisition unit 44, demand prediction information is calculated.

設備機器制御部46は、デマンド予測算出部45で算出されたデマンド予測に基づいて当該ビルのテナントや在室者に予め通知すべき設備機器の動作内容を判定し、ネットワーク3を介して当該ビルの利用者であるテナントや在室者が閲覧する情報を提供するビル情報管理サーバ2Cに送信する。また設備機器制御部46は、テナントや在室者に通知した設備機器の動作内容および、後述するデマンド値取得部47で取得されたデマンド値に基づいて動作を制御する設備機器を判定し、制御対象とした設備機器の動作を停止または消費エネルギーを低減させるように変更させることにより消費エネルギーを低減させるように制御する。   The equipment control unit 46 determines the operation content of the equipment to be notified in advance to the tenant or occupant of the building based on the demand prediction calculated by the demand prediction calculation unit 45, and the building equipment via the network 3. The information is transmitted to the building information management server 2C that provides information viewed by the tenant or occupant who is the user. Further, the equipment control unit 46 determines the equipment that controls the operation based on the operation content of the equipment notified to the tenant or the occupant and the demand value acquired by the demand value acquisition unit 47 described later, and performs control. Control is performed to reduce the energy consumption by stopping the operation of the target equipment or changing the equipment to reduce the energy consumption.

デマンド値取得部47は、入出力装置30を介してデマンド計20で算出された最新のデマンド値を取得する。   The demand value acquisition unit 47 acquires the latest demand value calculated by the demand meter 20 via the input / output device 30.

〈一実施形態によるデマンド制御システムの動作〉
次に、本実施形態におけるデマンド制御システム1の動作について説明する。
<Operation of Demand Control System According to One Embodiment>
Next, the operation of the demand control system 1 in the present embodiment will be described.

本実施形態におけるデマンド制御システム1が稼働されると、サーバ装置40の気象情報取得部43において、ネットワーク3を介して接続された外部のWebサーバである気象情報サーバ2Aから気象条件の予報情報が取得される(S1)。また、サーバ装置40の電力規制情報取得部44において、ネットワーク3を介して接続された外部のWebサーバである電力管理サーバ2Bから電力規制情報が取得される(S2)。   When the demand control system 1 in this embodiment is operated, the weather information acquisition unit 43 of the server device 40 receives weather condition forecast information from the weather information server 2A, which is an external Web server connected via the network 3. Obtained (S1). Further, the power regulation information acquisition unit 44 of the server device 40 acquires power regulation information from the power management server 2B, which is an external Web server connected via the network 3 (S2).

そして、サーバ装置40のデマンド予測算出部45において、イベント情報記憶部41に記憶されたイベント情報、過去データ記憶部42に記憶された過去のデマンド値超過時の環境情報、気象情報取得部43で取得された気象条件の予報情報、および電力規制情報取得部44で取得された電力規制情報に基づいて、デマンド予測情報が算出される(S3)。   Then, in the demand prediction calculation unit 45 of the server device 40, the event information stored in the event information storage unit 41, the environmental information when the past demand value is exceeded stored in the past data storage unit 42, and the weather information acquisition unit 43 Based on the acquired weather condition forecast information and the power regulation information obtained by the power regulation information obtaining unit 44, demand prediction information is calculated (S3).

例えば、予測対象の日に電力消費量が増大すると予測されるイベントがあるときにはこれに基づいてデマンド値が高くなると予測し、予測対象の日や時間に気象条件の予報情報により外気が高くなると予測されるときにはこれに基づいて空調機の負荷が高くなりデマンド値が高くなると予測するデマンド予測情報を算出することが考えられる。   For example, when there is an event that power consumption is predicted to increase on the prediction target day, it is predicted that the demand value will increase based on this, and it is predicted that the outside air will increase due to the forecast information of the weather conditions on the prediction target day and time It is conceivable to calculate demand prediction information for predicting that the load on the air conditioner will increase and the demand value will increase based on this.

このデマンド予測情報は、上述したとおり予め記憶した情報やWebサーバから事前に取得可能な情報に基づいて算出されるため、予測対象の時間よりも数時間前、または数日前等の比較的早い時点で算出可能である。   Since this demand prediction information is calculated based on information stored in advance as described above or information that can be acquired in advance from a Web server, it is a relatively early time, such as several hours before or several days before the prediction target time. Can be calculated.

これにより、上述したとおりデマンド予測情報が比較的早い時点で算出されているため、急に動作を停止または変更しても影響の少ない設備機器のみでなく、予め当該建物のテナントや在室者に動作を停止または変更する予定時刻等を通知しておけば制御可能な設備機器についても、制御対象の設備機器として判定することができる。   As a result, demand prediction information is calculated at a relatively early point in time as described above, so that not only equipment that has little effect even if operation is suddenly stopped or changed, but also in advance for tenants and occupants of the building. By notifying the scheduled time or the like for stopping or changing the operation, controllable equipment can be determined as equipment to be controlled.

そこで設備機器制御部46において、この当該ビルのテナントや在室者に予め通知すべき設備機器の動作内容(停止または変更動作予定時刻等)が生成され、ネットワーク3を介してビル情報管理サーバ2Cに送信され、当該ビルのテナントや在室者に閲覧されることで提供される(S4)。   Therefore, in the equipment device control unit 46, the operation contents of the equipment to be notified in advance to the tenant or occupant of this building (stopped or changed operation scheduled time, etc.) are generated, and the building information management server 2C is connected via the network 3. And provided by being viewed by tenants or occupants of the building (S4).

上記のように、予め当該建物のテナントや在室者に、動作を停止または変更する設備機器の情報や予定時刻等を通知しておき、30分毎のデマンド制御では、デマンド計20において設備機器10で消費された電力量が取得され(S5)、この消費電力量に基づいて30分ごとのデマンド値が算出される(S6)。   As described above, the tenant or occupant of the building is notified in advance of the information on the equipment to be stopped or changed, the scheduled time, and the like. 10 is acquired (S5), and a demand value every 30 minutes is calculated based on this power consumption (S6).

次に、このデマンド計20で算出されたデマンド値が入出力装置30で取得され、サーバ装置40に送出される(S7)。   Next, the demand value calculated by the demand meter 20 is acquired by the input / output device 30 and sent to the server device 40 (S7).

そして、デマンド計20で算出されたデマンド値と、ステップS4で生成されテナントや在室者に通知された設備機器の動作内容に基づいて、動作を制御する設備機器が判定される(S8)。   Then, based on the demand value calculated by the demand meter 20 and the operation content of the facility device generated in step S4 and notified to the tenant or occupant, the facility device that controls the operation is determined (S8).

このようにして判定された設備機器について、動作を停止または消費エネルギーを低減させるように変更するための制御信号が生成され(S9)、入出力装置30を介して対象となる設備機器に10に送信されることによりデマンド制御が実行される(S10)。   For the equipment determined in this way, a control signal for changing the operation to stop or reduce the energy consumption is generated (S9), and the target equipment is set to 10 via the input / output device 30. The demand control is executed by the transmission (S10).

以上の本実施形態によれば、監視対象の建物のテナントのイベント情報、過去のデマンド超過情報、当該建物の位置に関する気象情報、および当該建物に関する電力規制情報に基づいて、予測対象の時間よりも比較的早い時点でデマンド予測情報の生成が可能であるため、例えば1日の中でテナントの始業前にデマンド予測情報を生成するとともにデマンド制御により動作を停止または変更する設備機器を判定してこの情報をテナントや在室者に通知することができ、直前に判定処理を行うよりもデマンド制御の対象とする設備機器を拡大することができる。   According to the above embodiment, based on the event information of the tenant of the building to be monitored, the past demand excess information, the weather information on the location of the building, and the power regulation information on the building, Since demand prediction information can be generated at a relatively early point in time, for example, demand prediction information is generated before the start of a tenant in one day, and equipment that stops or changes operation by demand control is determined and this is determined. Information can be notified to tenants and occupants, and the equipment to be subject to demand control can be expanded rather than performing the determination process immediately before.

尚、30分毎のデマンド制御においても、デマンド計により取得された電力量に加えて、監視対象の建物のテナントのイベント情報、過去のデマンド超過情報、当該建物の位置に関する気象情報、および当該建物に関する電力規制情報を用いてデマンド値を算出しても良い。例えば、デマンド値が高くなってきており過去のデマンド値超過時の環境情報と似ている状況にあると判定したときにはデマンド値が高くなると予測することができ、効率良く確実なデマンド制御を行うことができる。   In addition, in the demand control every 30 minutes, in addition to the amount of power acquired by the demand meter, event information of the tenant of the monitored building, past demand excess information, weather information on the location of the building, and the building The demand value may be calculated using the power regulation information regarding. For example, when demand values are increasing and it is determined that the situation is similar to environmental information when past demand values are exceeded, the demand value can be predicted to increase, and efficient and reliable demand control is performed. Can do.

1…デマンド制御システム
2A…気象情報サーバ
2B…ビル情報管理サーバ
3…ネットワーク
10…設備機器
20…デマンド計
30…入出力装置
40…サーバ装置
41…イベント情報記憶部
42…過去データ記憶部
43…気象情報取得部
44…電力規制情報取得部
45…デマンド値取得部
46…デマンド予測算出部
47…設備機器制御部
DESCRIPTION OF SYMBOLS 1 ... Demand control system 2A ... Weather information server 2B ... Building information management server 3 ... Network 10 ... Equipment 20 ... Demand meter 30 ... Input / output device 40 ... Server device 41 ... Event information storage part 42 ... Past data storage part 43 ... Weather information acquisition unit 44 ... Power regulation information acquisition unit 45 ... Demand value acquisition unit 46 ... Demand prediction calculation unit 47 ... Equipment control unit

Claims (6)

監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置において、
前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶部と、
前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶部と、
前記イベント情報記憶部で記憶されたイベント情報及び前記過去データ記憶部で記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出部と、
前記デマンド予測算出部で算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成部と
を備えることを特徴とするデマンド制御装置。
In the demand control device that performs demand control on the equipment based on the power consumption of a large number of equipment related to the building to be monitored,
A past data storage unit that stores an operation status of the facility device when a past demand value related to power consumption of the facility device exceeds contract power;
An event information storage unit for storing event information in the tenant of the building;
A demand prediction calculation unit that calculates demand prediction information based on the event information stored in the event information storage unit and the past data stored in the past data storage unit ;
Equipment that determines equipment equipment that is subject to demand control from the large number of equipment equipment based on the demand prediction information calculated by the demand prediction calculation section, and generates information related to the control content of the equipment equipment that is provided with information A demand control device comprising: a device control information generation unit .
更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得部と、当該建物に関する電力規制情報を取得する電力規制情報取得部との少なくとも1つを有し、
前記デマンド予測算出部は、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出する
ことを特徴とする請求項1に記載のデマンド制御装置。
Furthermore, it has at least one of the weather information acquisition part which acquires the forecast information of the weather conditions regarding the position of the building, and the power regulation information acquisition part which acquires the power regulation information about the building,
The demand prediction calculation unit calculates demand prediction information based on the event information and the past data, and at least one of the weather condition prediction information or the power regulation information. Item 2. The demand control device according to Item 1.
監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置が、
前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶ステップと、
前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶ステップと、
前記イベント情報記憶ステップで記憶されたイベント情報及び前記過去データ記憶ステップで記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出ステップと、
前記デマンド予測算出ステップで算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成ステップと
を有することを特徴とするデマンド制御方法。
Based on the power consumption of a large number of equipment related to the building to be monitored, a demand control device that performs demand control on the equipment,
A past data storage step for storing the operation status of the equipment when the past demand value related to the power consumption of the equipment exceeds the contract power;
An event information storage step for storing event information in the tenant of the building;
A demand prediction calculation step of calculating demand prediction information based on the event information stored in the event information storage step and the past data stored in the past data storage step ;
Equipment that determines equipment equipment that is subject to demand control from the many equipment equipment based on the demand prediction information calculated in the demand prediction calculation step, and generates information related to the control content of the equipment equipment that is provided with information A demand control method comprising: a device control information generation step .
更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得ステップと、当該建物に関する電力規制情報を取得する電力規制情報取得ステップとの少なくとも1つを有し、
前記デマンド予測算出ステップでは、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出する
ことを特徴とする請求項3に記載のデマンド制御方法。
Furthermore, it has at least one of a weather information acquisition step of acquiring weather condition forecast information regarding the position of the building, and a power regulation information acquisition step of acquiring power regulation information about the building,
The demand prediction calculation step calculates demand prediction information based on the event information and the past data, and at least one of the weather condition prediction information or the power regulation information. Item 4. The demand control method according to Item 3.
監視対象の建物に係る多数の設備機器の消費電力に基づき、前記設備機器に対しデマンド制御を行うデマンド制御装置に、
前記設備機器の消費電力に係る過去のデマンド値が契約電力を超過したときの、前記設備機器の運用状況を記憶する過去データ記憶機能と、
前記建物のテナントにおけるイベント情報を記憶するイベント情報記憶機能と、
前記イベント情報記憶機能により記憶されたイベント情報及び前記過去データ記憶機能により記憶された過去データとに基づいて、デマンド予測情報を算出するデマンド予測算出機能と、
前記デマンド予測算出機能により算出したデマンド予測情報に基づいて、前記多数の設備機器よりデマンド制御の対象となる設備機器を判定し、情報提供される当該設備機器の制御内容に係る情報を生成する設備機器制御情報生成機能と
を実行させるためのデマンド制御用プログラム
Based on the power consumption of a large number of equipment related to the building to be monitored, a demand control device that performs demand control on the equipment,
Past data storage function for storing the operation status of the equipment when the past demand value related to the power consumption of the equipment exceeds the contract power; and
An event information storage function for storing event information in the building tenant;
A demand prediction calculation function for calculating demand prediction information based on the event information stored by the event information storage function and the past data stored by the past data storage function;
Equipment that determines equipment equipment that is subject to demand control from the large number of equipment equipment based on demand prediction information calculated by the demand prediction calculation function, and generates information related to the control content of the equipment equipment that is provided with information Device control information generation function
Demand control program to execute
更に、前記建物の位置に関する気象条件の予報情報を取得する気象情報取得機能と、当該建物に関する電力規制情報を取得する電力規制情報取得機能との少なくとも1つを前記デマンド制御装置に実行させ、Further, the demand control device executes at least one of a weather information acquisition function for acquiring weather condition forecast information regarding the position of the building and a power regulation information acquisition function for acquiring power regulation information about the building,
前記デマンド予測算出機能では、前記イベント情報及び前記過去データと、前記気象条件の予報情報又は前記電力規制情報の少なくとも1つとに基づいてデマンド予測情報を算出する  The demand prediction calculation function calculates demand prediction information based on the event information and the past data, and at least one of the weather condition prediction information or the power regulation information.
ことを特徴とする請求項5に記載のデマンド制御用プログラム。The demand control program according to claim 5, wherein:
JP2010057847A 2010-03-15 2010-03-15 Demand control apparatus, demand control method, and demand control program Expired - Fee Related JP5450184B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010057847A JP5450184B2 (en) 2010-03-15 2010-03-15 Demand control apparatus, demand control method, and demand control program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010057847A JP5450184B2 (en) 2010-03-15 2010-03-15 Demand control apparatus, demand control method, and demand control program

Publications (2)

Publication Number Publication Date
JP2011193639A JP2011193639A (en) 2011-09-29
JP5450184B2 true JP5450184B2 (en) 2014-03-26

Family

ID=44797968

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010057847A Expired - Fee Related JP5450184B2 (en) 2010-03-15 2010-03-15 Demand control apparatus, demand control method, and demand control program

Country Status (1)

Country Link
JP (1) JP5450184B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7349907B2 (en) 2019-12-26 2023-09-25 ライオン株式会社 Microbial suppression method and microbial suppression system

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6072474B2 (en) * 2012-08-29 2017-02-01 京セラ株式会社 Power management apparatus, power control system, and power management method
JP6220556B2 (en) * 2013-05-28 2017-10-25 アズビル株式会社 Power suppression planning apparatus and method
US10620652B2 (en) 2013-05-30 2020-04-14 Toshiba Mitsubishi-Electric Industrial Systems Corporation Power management device
JP6063407B2 (en) * 2014-03-17 2017-01-18 アズビル株式会社 Demand adjustment planning system and demand adjustment planning method
JP7085069B1 (en) 2021-01-18 2022-06-15 株式会社Social Area Networks Demand control system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006349483A (en) * 2005-06-15 2006-12-28 Cosmo Life Kk Electric power consumption monitoring system
JP2008236913A (en) * 2007-03-20 2008-10-02 Sanyo Electric Co Ltd Power control system, demand controller, demand program, and power control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7349907B2 (en) 2019-12-26 2023-09-25 ライオン株式会社 Microbial suppression method and microbial suppression system

Also Published As

Publication number Publication date
JP2011193639A (en) 2011-09-29

Similar Documents

Publication Publication Date Title
JP6732116B2 (en) Simultaneous optimization of energy production and frequency regulation of power generation systems
JP5450184B2 (en) Demand control apparatus, demand control method, and demand control program
JP5914210B2 (en) Energy management system
US10180672B2 (en) Demand control device and computer readable medium
JP5578284B2 (en) Equipment equipment demand control device
EP2383864A2 (en) Power consumption management system, and power consumption manager, power consumption management method, power supply manager, and power supply management method, which are used for the power consumption management system
JP2010204833A (en) Energy management system and method
JP5889677B2 (en) Power demand control apparatus and power demand control method
JP2006342766A (en) Monitoring system of wind power generating facility
JP6722481B2 (en) Energy demand control device, energy demand control method, energy demand control system, and program
US20190024928A1 (en) Hvac system including energy analytics engine
JP2017535239A (en) How to optimize reactive power consumption
KR20190063198A (en) Dynamic management system of energy demand and operation method thereof
TW201810854A (en) Demand monitoring device, demand monitoring method, and demand monitoring program
US10205320B2 (en) Power management apparatus, power management system, and power management method
EP2698893A1 (en) System side control device and method
JP6753593B2 (en) Energy management system, guide server and energy management method
JP6796533B2 (en) Demand control system
JP2021516937A (en) Distribution network frequency adjustment system
JP5975276B2 (en) Operation management device, correction method of actual measured power when demand response control is activated
JP2018026912A (en) Power management system
JP2018026913A (en) Power management system
JP2021516936A (en) Distribution grid power control system
JP2014036564A (en) Forecast data management device, and forecast data management method
US20230243896A1 (en) Method and system for determining a characteristic variable

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120307

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130910

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131108

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131225

R151 Written notification of patent or utility model registration

Ref document number: 5450184

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees