JP2014036564A - Forecast data management device, and forecast data management method - Google Patents

Forecast data management device, and forecast data management method Download PDF

Info

Publication number
JP2014036564A
JP2014036564A JP2012178582A JP2012178582A JP2014036564A JP 2014036564 A JP2014036564 A JP 2014036564A JP 2012178582 A JP2012178582 A JP 2012178582A JP 2012178582 A JP2012178582 A JP 2012178582A JP 2014036564 A JP2014036564 A JP 2014036564A
Authority
JP
Japan
Prior art keywords
value
power
time
demand
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2012178582A
Other languages
Japanese (ja)
Inventor
Kei Furukawa
慧 古川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2012178582A priority Critical patent/JP2014036564A/en
Publication of JP2014036564A publication Critical patent/JP2014036564A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

PROBLEM TO BE SOLVED: To provide a forecast data management device capable of utilizing information on power consumption even when demand response control is activated.SOLUTION: A forecast data management device receives designation of a target period used for forecasting power demand and a reading request for forecast data as input; refers to DR activation information stored in a storage unit; determines whether or not a power actual value on a date in the target period is a value on a date when demand response control was activated; outputs the power actual value to an operation management device as forecast data, in the case where the power actual value on the date in the target period is the value at time when the demand response control was not activated; and outputs a value calculated with respect to power used in the case where the demand response control is not activated on the date to the operation management device as forecast data, in the case where the power actual value on the date in the target period is the value at time when the demand response control was activated.

Description

本発明は、予測データ管理装置、予測データ管理方法に関する。   The present invention relates to a prediction data management apparatus and a prediction data management method.

効果的な電力ピークカットを行う手法として、デマンドレスポンス(DR)がある。DRとは、電力網における需要に応答して、需給逼迫時に顧客が電力消費を低減させること、またはそのような制御技術である。このDRを効果的に実施するために、需要家単位で電力需要予測(以下、予測)をすることが求められている。
この電力需要予測を行う技術としては、例えば、下記の特許文献1の技術がある。この特許文献1の技術では、過去の同時刻における電力の平均需要量を算出し、この平均需要量と実際の需要量との偏差を算出し、平均需要量と偏差を基本とする予測式を推定して需要量を予測している。
このような予測を行う方法としては、過去の電力需要データを使って当日において予測をするのが一般的である。
There is a demand response (DR) as a method for performing an effective power peak cut. DR is a control technology in which a customer reduces power consumption in response to demand in the power network when supply and demand are tight. In order to effectively implement this DR, it is required to perform power demand prediction (hereinafter referred to as prediction) for each customer.
As a technique for performing the power demand prediction, for example, there is a technique disclosed in Patent Document 1 below. In the technology of this Patent Document 1, an average demand amount of power at the same time in the past is calculated, a deviation between the average demand amount and an actual demand amount is calculated, and a prediction formula based on the average demand amount and the deviation is calculated. The demand is estimated and estimated.
As a method for performing such prediction, it is common to make predictions on the day using past power demand data.

特開2009−251742号公報JP 2009-251742 A

しかしながら、DR制御を発動すると、その間の消費電力は強制的に削減されるため、本来の電力需要とかけ離れた値となってしまう。その場合、DR制御が発動された時の電力実測値を以後の予測にそのまま使用することは望ましくない。   However, when the DR control is activated, the power consumption during that time is forcibly reduced, and thus a value far from the original power demand. In that case, it is not desirable to use the measured power value when the DR control is activated as it is for the subsequent prediction.

本発明は、このような事情に鑑みてなされたもので、その目的は、デマンドレスポンス制御が発動された場合においても、消費電力に関する情報を活用することができる予測データ管理装置、予測データ管理方法を提供することにある。   The present invention has been made in view of such circumstances, and an object of the present invention is to provide a prediction data management apparatus and a prediction data management method that can utilize information on power consumption even when demand response control is activated. Is to provide.

上述した課題を解決するために、本発明は、施設において使用された電力の実測値である電力実測値に基づいて電力需要の予測を行う運転管理装置に対し、前記電力需要の予測に用いる予測用データを供給する予測データ管理装置であって、電力需要の予測に用いる対象期間の指定とともに前記運転管理装置からの予測用データの読み出し要求を入力する入力部と、デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、前記電力実測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶する記憶部と、前記記憶部に記憶されたDR発動情報を参照し、前記対象期間内の日時における前記電力実測値がデマンドレスポンス制御が発動された日時における値であるか否かを判定する判定部と、前記判定部の判定結果に基づいて、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われていない時間の電力実測値である場合には予測用データとして当該電力実測値を運転管理装置に出力し、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、当該日時においてデマンドレスポンス制御が行われなかった場合に使用される電力について算出された値を予測用データとして前記運転管理装置に出力する出力部と、
を有することを特徴とする。
In order to solve the above-described problem, the present invention provides a prediction used for prediction of power demand for an operation management apparatus that predicts power demand based on an actual power measurement value that is an actual power measurement value used in a facility. A prediction data management device for supplying data for use, wherein an input unit for inputting a read request for prediction data from the operation management device together with designation of a target period used for prediction of power demand, and demand response control were performed A storage unit that stores the measured power value and DR activation information indicating whether or not demand response control is performed in a predetermined period including a past date and time, and DR activation information stored in the storage unit A determination unit that determines whether or not the measured power value at the date and time within the target period is a value at the date and time when demand response control is activated; Based on the determination result of the determination unit, when the actual power value at the date and time of the target period is the actual power value during the time when demand response control is not performed, the actual power value is used as prediction data. When the actual power measurement value at the date and time of the target period is the actual power measurement value at the time when the demand response control is performed, the power used when the demand response control is not performed at the date and time An output unit that outputs the calculated value as prediction data to the operation management device;
It is characterized by having.

上述の発明において、予測用データとしては、例えば、記憶部に、デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、電力実測値と前記施設において使用される電力が予測された値である需要予測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶させ、補正係数算出部が、記憶部に記憶された日時のうち対象期間に含まれる日時であってデマンドレスポンス制御が行われた日時における需要予測値と電力実測値との比であるDR補正係数をデマンドレスポンス制御が行われた日時毎に算出し、デマンドレスポンス制御が行われた複数の日の同じ時間の前記DR補正係数の平均値であるDR補正係数平均値を算出し、実測値補正部が、算出されたDR補正係数平均値を前記デマンドレスポンス制御が行われた日時の電力実測値に乗じて電力実測値を補正する。そして、出力部が、対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、実測値補正部によって補正された電力実測値を運転管理装置に出力することができる。
また、予測用データとしては、上述の平均値を求める際に、DR補正係数平均値や電力需要推定値を算出したが、加重平均によって算出するようにしてもよい。
また、その他の方法によって電力実測値を補正することで、補正された電力実測値を得るようにしてもよい。
また、予測用データとしては、例えば、記憶部に、デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、前記電力実測値と前記施設において使用される電力が予測された値である需要予測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶させておき、出力部が、対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、電力実測値に対応づけて記憶された需要予測値を予測用データとして運転管理装置に出力することができる。
In the above-described invention, as the prediction data, for example, in the storage unit, the actual measured power value and the predicted power used in the facility in a predetermined period including the past date and time when demand response control was performed The demand forecast value and the DR activation information indicating whether or not demand response control is performed are stored for each time, and the correction coefficient calculation unit is a date and time included in the target period among the date and time stored in the storage unit. The DR correction coefficient, which is the ratio of the demand forecast value and the actual power measurement value at the date and time when demand response control is performed, is calculated for each date and time when demand response control is performed, and multiple days when demand response control is performed A DR correction coefficient average value, which is an average value of the DR correction coefficients for the same time, is calculated, and an actual value correction unit calculates the calculated DR correction coefficient average value as the demand level. By multiplying the power measured value of the date and time that Pons control is performed to correct the power measured values. The output unit outputs the actual power value corrected by the actual value correction unit to the operation management device when the actual power value at the date and time of the target period is the actual power value at the time when the demand response control is performed. can do.
In addition, as the prediction data, the DR correction coefficient average value and the power demand estimation value are calculated when the above-described average value is obtained, but may be calculated by a weighted average.
In addition, the corrected actual power value may be obtained by correcting the actual power value by another method.
In addition, as the prediction data, for example, the storage unit is a predicted value of the measured power value and the power used in the facility in a predetermined period including the past date and time when demand response control was performed. The demand forecast value and the DR activation information indicating whether or not demand response control is performed are stored for each time, and the output unit displays the actual power measurement value at the date and time of the target period at the time when the demand response control is performed. In the case of the actual power measurement value, the demand prediction value stored in association with the actual power measurement value can be output to the operation management apparatus as prediction data.

また、本発明は、上述の予測データ管理装置において、前記出力部は、前記電力実測値に基づいて電力需要の予測が行われるタイミングに応じて予測用データを出力することを特徴とする。   Moreover, the present invention is characterized in that, in the above-described prediction data management apparatus, the output unit outputs prediction data in accordance with a timing at which power demand is predicted based on the actual power measurement value.

また、本発明は、上述の予測データ管理装置において、前記記憶部は、前記対象期間内の日時に使用される電力を予測した値である需要予測値を、前記電力実測値と前記DR発動情報とともに記憶し、前記出力部は、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、前記記憶部に記憶された需要予測値に基づく予測用データを出力することを特徴とする。   Further, the present invention is the above-described prediction data management apparatus, wherein the storage unit calculates a demand prediction value, which is a value obtained by predicting power used at a date and time in the target period, as the measured power value and the DR activation information. And when the measured power value at the date and time of the target period is the measured power value at the time when the demand response control is performed, the output unit predicts based on the predicted demand value stored in the storage unit. It is characterized by outputting business data.

また、本発明は、上述の予測データ管理装置において、前記出力部は、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、前記記憶部に記憶された需要予測値と電力実測値とに基づく予測用データを出力することを特徴とする。   Further, the present invention is the above-described prediction data management device, wherein the output unit is configured to store the storage unit when the measured power value at the date and time of the target period is the measured power value at the time when the demand response control is performed. The data for prediction based on the demand forecast value memorize | stored in this and the electric power measured value are output, It is characterized by the above-mentioned.

また、本発明は、上述の予測データ管理装置において、施設において使用された電力の実測値である電力実測値に基づいて電力需要の予測を行う運転管理装置に対し、前記電力需要の予測に用いる予測用データを供給する予測データ管理装置における予測データ管理方法であって、入力部が、電力需要の予測に用いる対象期間の指定とともに前記運転管理装置からの予測用データの読み出し要求を入力し、判定部が、デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、前記電力実測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶する記憶部に記憶されたDR発動情報を参照し、前記対象期間内の日時における前記電力実測値がデマンドレスポンス制御が発動された日時における値であるか否かを判定し、出力部が、前記判定部の判定結果に基づいて、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われていない時間の電力実測値である場合には予測用データとして当該電力実測値を運転管理装置に出力し、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、当該日時においてデマンドレスポンス制御が行われなかった場合に使用される電力について算出された値を予測用データとして前記運転管理装置に出力することを特徴とする。   In addition, the present invention uses the prediction data management apparatus for predicting the power demand with respect to the operation management apparatus that predicts the power demand based on the actual power measurement value that is the actual power measurement value used in the facility. In the prediction data management method in the prediction data management device that supplies the prediction data, the input unit inputs a read request for the prediction data from the operation management device together with designation of a target period used for prediction of power demand, A determination unit stores, in a predetermined period including a past date and time when the demand response control is performed, the measured power value and DR activation information indicating whether or not the demand response control is performed for each time. With reference to the stored DR activation information, the measured power value at the date and time within the target period is the value at the date and time when demand response control is activated When the output unit is based on the determination result of the determination unit, the actual power measurement value at the date and time of the target period is the actual power measurement value during the time when demand response control is not performed. When the actual power measurement value is output to the operation management apparatus as prediction data, and the actual power measurement value at the date and time of the target period is the actual power measurement value at the time when the demand response control is performed, the demand response control is performed at the date and time. A value calculated for the electric power used when the operation is not performed is output as prediction data to the operation management device.

以上説明したように、この発明によれば、対象期間内の日時における電力実測値がデマンドレスポンス制御が発動された日時における値であるか否かを判定し、対象期間の日時における電力実測値がデマンドレスポンス制御が行われていない時間の電力実測値である場合には予測用データとして当該電力実測値を運転管理装置に出力し、デマンドレスポンス制御が行われた時間における電力実測値である場合には、当該日時においてデマンドレスポンス制御が行われなかった場合に使用される電力について算出された値を予測用データとして前記運転管理装置に出力するようにした。
これにより、DR制御の発動の有無に応じて電力実測値または補正された電力実測値を選択的に用いることが可能となり、DR制御が発動された場合における電力実測値も予測を行う際に活用することが可能となる。
As described above, according to the present invention, it is determined whether or not the measured power value at the date and time within the target period is the value at the date and time when the demand response control is activated, and the measured power value at the date and time of the target period is determined. When the measured power value during the time when the demand response control is not performed, the measured power value is output to the operation management device as prediction data, and when the measured power value is during the time when the demand response control is performed. Is configured to output the value calculated for the power used when the demand response control is not performed at the date and time as prediction data to the operation management apparatus.
This makes it possible to selectively use the actual measured power value or the corrected actual measured power value depending on whether or not the DR control is activated, and use the actual measured power value when the DR control is activated when performing the prediction. It becomes possible to do.

この発明の一実施形態による運転管理装置を含むスマートグリッドシステムの構成を示す概略ブロック図である。1 is a schematic block diagram showing a configuration of a smart grid system including an operation management device according to an embodiment of the present invention. 記憶部41に記憶される情報の一例を表す図である。4 is a diagram illustrating an example of information stored in a storage unit 41. FIG. 運転管理装置4の予測用データの管理を行う動作を説明するフローチャートである。It is a flowchart explaining the operation | movement which manages the data for prediction of the operation management apparatus 4. FIG. 需要予測値と電力実測値との関係を説明する図である。It is a figure explaining the relationship between a demand predicted value and an electric power actual measurement value.

以下、本発明の一実施形態による運転管理装置について図面を参照して説明する。
図1は、この発明の一実施形態による運転管理装置を含むスマートグリッドシステムの構成を示す概略ブロック図である。
スマートグリッドシステムとは、太陽光発電などの分散型電源と電力会社からの集中型電源とを組み合わせ、需要と供給のバランスをリアルタイムに調整することで効率的な電力供給を行うように構築された電力受給システムである。
また、図1に示すスマートグリッドシステムは、電力の需要家が所有する設備である。そのうえで、同図に示すスマートグリッドシステムの需要家は、電力会社から買電するにあたりデマンド契約を結んでいることを前提とする。つまり、定められた単位時間による計測期間(デマンド時限、例えば30分)あたりの設備等において使用される需要電力を計測し、計測した複数の需要電力のうち最も大きい需要電力に応じて契約電力(デマンド目標値)とこれに応じた料金が設定される。
このため、需要家は、デマンド時限ごとの買電電力がデマンド目標値を越えないようにする必要がある。本実施形態のスマートグリッドシステムは、デマンド時限ごとの買電電力がデマンド目標値を越えないように負荷および電源設備を制御するデマンドレスポンス制御(DR制御)機能を備える。
Hereinafter, an operation management apparatus according to an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is a schematic block diagram showing a configuration of a smart grid system including an operation management apparatus according to an embodiment of the present invention.
The smart grid system is a combination of a distributed power source such as photovoltaic power generation and a centralized power source from an electric power company, and is constructed to efficiently supply power by adjusting the balance between supply and demand in real time. It is a power receiving system.
The smart grid system shown in FIG. 1 is a facility owned by a power consumer. In addition, it is assumed that the customer of the smart grid system shown in the figure has a demand contract in order to purchase power from an electric power company. In other words, the demand power used in the facility or the like per a measurement period (demand time limit, for example, 30 minutes) by a predetermined unit time is measured, and the contract power (in accordance with the largest demand power among the measured demand powers) Demand target value) and a charge corresponding to this.
For this reason, the consumer needs to make sure that the purchased power for each demand period does not exceed the demand target value. The smart grid system of the present embodiment includes a demand response control (DR control) function for controlling the load and the power supply equipment so that the purchased power for each demand period does not exceed the demand target value.

この図において、スマートグリッドシステムは、空調熱源設備1と、作業設備2と、電源設備3と、運転管理装置4と、負荷出力制御装置5と、電源出力制御装置6とを有する。空調熱源設備1と作業設備2は、電源設備3により供給される電力を受けて運転・機能する負荷である。この空調熱源設備1と作業設備2は、以下、負荷設備とも称する。
運転管理装置4、負荷出力制御装置5および電源出力制御装置6は、DR制御に対応する機能を実現する装置である。
In this figure, the smart grid system includes an air conditioning heat source facility 1, a work facility 2, a power supply facility 3, an operation management device 4, a load output control device 5, and a power supply output control device 6. The air conditioning heat source facility 1 and the work facility 2 are loads that operate and function by receiving power supplied from the power supply facility 3. The air conditioning heat source facility 1 and the work facility 2 are hereinafter also referred to as load facilities.
The operation management device 4, the load output control device 5, and the power output control device 6 are devices that realize functions corresponding to DR control.

空調熱源設備1は、空調熱源機、空調システム、熱循環機構等を有しており、空調熱源機によって媒体の加熱や冷却を行い、パイプ等によって構成される熱循環機構によって空調システムに媒体を供給し、空調を行う対象の空間に対し空調システムによって冷房や暖房を行う。
作業設備2は、施設内に設けられる各種の作業用機器である。作業用機器には、例えば、コンピュータ、照明機器、OA(Office Automation)機器等がある。
電源設備3は、発電機や蓄電池、買電電源等を有しており、発電電力、蓄電電力および買電電力などによる電力を、負荷である空調熱源設備1や作業設備2に供給する。また、電源設備3は、供給電力に余裕がある状態においては、発電電力や買電電力を蓄電池に蓄積する。
The air-conditioning heat source facility 1 has an air-conditioning heat source unit, an air-conditioning system, a heat circulation mechanism, and the like. The medium is heated and cooled by the air-conditioning heat source unit, and the medium is supplied to the air-conditioning system by a heat circulation mechanism composed of pipes and the like. The air conditioning system cools and heats the space to be supplied and air-conditioned.
The work facility 2 is various work devices provided in the facility. Examples of the work equipment include a computer, a lighting equipment, an OA (Office Automation) equipment, and the like.
The power supply facility 3 includes a generator, a storage battery, a purchased power supply, and the like, and supplies power generated by the power generation, stored power, purchased power, and the like to the air conditioning heat source facility 1 and the work facility 2 that are loads. Moreover, the power supply equipment 3 accumulate | stores generated electric power and purchased electric power in a storage battery in the state with a margin in supply power.

運転管理装置4は、DR制御を行うことにより、施設(例えば、建築物)において使用された電力の実測値である電力実測値に基づいて電力需要の予測を行い、買電電力がデマンド目標値を超えないように負荷設備(空調熱源設備1、作業設備2等)と電源設備3の運転を管理する。   The operation management device 4 performs DR control to predict power demand based on an actual power measurement value that is an actual power measurement value used in a facility (for example, a building), and the purchased power is a demand target value. The operation of the load equipment (air conditioning heat source equipment 1, work equipment 2, etc.) and the power supply equipment 3 is managed so as not to exceed.

記憶部41は、予測を行うために用いられる各種の予測用データを記憶する。例えば、記憶部41は、DR制御が行われた過去の日時を含む所定の期間における、電力実測値と施設において使用される電力が予測された値である需要予測値とDR制御が行われたか否かを表すDR発動情報とを時間毎に記憶する。
また、記憶部41は、予測用データとして、天気予報データ、電力負荷パターンデータ等も記憶する。
The storage unit 41 stores various types of prediction data used for performing prediction. For example, in the storage unit 41, whether the actual power measurement value and the demand prediction value that is a predicted value of the power used in the facility and the DR control have been performed in a predetermined period including the past date and time when the DR control was performed. The DR activation information indicating whether or not is stored for each time.
The storage unit 41 also stores weather forecast data, power load pattern data, and the like as prediction data.

予測データ管理部42は、判定部421、補正部422を有しており、電力需要の予測に用いる対象期間の指定とともに予測部43からの予測用データの読み出し要求を受けると、この要求に応じて、記憶部41から予測部43に予測用データを供給する。予測用データは、予測部43が、予測対象の日における消費電力が予測された値である電力予測値を算出するために必要となるデータであり、電力実測値と、予測データ管理部42によって補正された電力実測値である電力需要推定値や、天気予報データ、電力負荷パターンデータ等が含まれる。
また、予測データ管理部42は、予測部43によって予測された需要予測値を記憶部41に記憶する。需要予測値とは、予測部43が予測することによって算出した結果である予測対象の日時毎の電力需要の予測値である。
The prediction data management unit 42 includes a determination unit 421 and a correction unit 422. Upon receiving a request for reading prediction data from the prediction unit 43 along with designation of a target period used for power demand prediction, the prediction data management unit 42 responds to this request. Thus, the prediction data is supplied from the storage unit 41 to the prediction unit 43. The prediction data is data that is necessary for the prediction unit 43 to calculate a power prediction value that is a predicted value of power consumption on the prediction target day. The power measurement value and the prediction data management unit 42 The power demand estimation value, which is a corrected actual power value, weather forecast data, power load pattern data, and the like are included.
Further, the prediction data management unit 42 stores the demand prediction value predicted by the prediction unit 43 in the storage unit 41. The demand prediction value is a prediction value of power demand for each date and time of the prediction target, which is a result calculated by the prediction unit 43 predicting.

判定部421は、記憶部41に記憶されたDR発動情報を参照し、対象期間内の日時における電力実測値がDR制御が発動された日時における値であるか否かを判定する。   The determination unit 421 refers to the DR activation information stored in the storage unit 41 and determines whether or not the actually measured power value at the date and time within the target period is the value at the date and time when the DR control is activated.

補正部422は、補正係数算出部423と、実測値補正部424とを有しており、判定部421の判定結果に応じて、DR制御が行われた日時における電力実測値について、補正を行い、電力需要推定値を算出する。   The correction unit 422 includes a correction coefficient calculation unit 423 and an actual measurement value correction unit 424, and corrects the actual power measurement value at the date and time when DR control was performed according to the determination result of the determination unit 421. Then, an estimated power demand value is calculated.

補正係数算出部423は、記憶部41に記憶された過去の日時であって電力需要の予測に用いる日である予測使用日(対象期間)のDR制御が行われた日時における需要予測値と電力実測値との比であるDR補正係数をDR制御が行われた日時毎に算出し、DR制御が行われた複数の日の同じ時間のDR補正係数の平均値であるDR補正係数平均値を算出する。   The correction coefficient calculation unit 423 is the past predicted date and time stored in the storage unit 41, and the demand predicted value and power at the date and time when DR control is performed on the predicted use date (target period) that is the date used for power demand prediction. A DR correction coefficient that is a ratio to the actual measurement value is calculated for each date and time when DR control is performed, and a DR correction coefficient average value that is an average value of DR correction coefficients at the same time on a plurality of days on which DR control is performed. calculate.

ここで、補正係数算出部423は、DR補正係数xijを、下記の(1)式に従って算出する。ここで、xijは、j日のi時におけるDR補正係数である。iは、一日のうちのある時間であり、例えば、一日を一定間隔の時間帯(例えばデマンド時限)で区分したうちのいずれかの時間であり、より具体的には、0時00分から23時59分をデマンド時間(例えば30分単位)で区切った時間のうちいずれかを用いることができる。jは、過去の日のうち予測使用日として用いる対象の期間に含まれる日であってDR制御が発動された日の日付である。PFijは、j日のi時における需要予測値である。PAijは、j日のi時における電力実測値である。DR補正係数xijは、j日のi日におけるDR補正係数を表す。 Here, the correction coefficient calculation unit 423 calculates the DR correction coefficient x ij according to the following equation (1). Here, x ij is a DR correction coefficient at j time on j day. i is a certain time of the day, for example, any one of the days divided by a fixed time period (for example, demand time period), more specifically, from 0:00 Any one of the times obtained by dividing 23:59 by demand time (for example, in units of 30 minutes) can be used. j is a date included in the target period to be used as the predicted use date among the past days, and is the date when the DR control is activated. PF ij is a demand forecast value at i time of j day. PA ij is a power actual measurement value at i time on j day. The DR correction coefficient x ij represents the DR correction coefficient for j day i day.

Figure 2014036564
Figure 2014036564

また、補正係数算出部423は、DR補正係数平均値Xを、下記の(2)式に従って算出する。Xは、i時におけるDR補正係数平均値である。このDR補正係数平均値Xは、DR補正係数平均値を求めるために用いる最初の日から最後の日までのうちDR制御が発動された各日のi時におけるDR補正係数xijの和をDDRで割ることによって求められる。ここで、DR補正係数平均値を求めるために用いる日は、予測使用日と異なっていてもよい。例えば、予測使用日は直近一週間分を用い、DR補正係数平均値を求めるために用いる日は、過去の1ヶ月分を用いることができる。DDRは、予測用データとして用いる対象となる期間においてDRを発動した日数、すなわち、過去の日のうち予測に用いる対象の期間に含まれる日であってDR制御が発動された日の日数である。 Further, the correction coefficient calculation unit 423 calculates the DR correction coefficient average value X i according to the following equation (2). X i is the DR correction coefficient average value at i time. This DR correction coefficient average value X i is the sum of the DR correction coefficients x ij at i time on each day when DR control is activated from the first day to the last day used for obtaining the DR correction coefficient average value. It is determined by dividing by D DR. Here, the date used for obtaining the DR correction coefficient average value may be different from the predicted use date. For example, the most recent one week can be used as the predicted use date, and the past one month can be used as the date used to obtain the DR correction coefficient average value. DDR is the number of days in which DR is activated in the period to be used as the prediction data, that is, the number of days in the past that is included in the period of the target to be used for prediction and in which DR control is activated. is there.

Figure 2014036564
Figure 2014036564

実測値補正部424は、算出されたDR補正係数平均値をDR制御が行われた日時の電力実測値に乗じて予測対象日の時間における電力実測値を補正し、この補正された電力実測値を、過去の日のうち予測に用いる対象の期間に含まれる日であってDR制御が発動された日数における平均値を算出することで、電力需要推定値を算出する。実測値補正部424は、DR制御が行われた時間毎に、電力実測値の補正をして電力需要推定値を算出する。   The actual measurement value correcting unit 424 multiplies the calculated actual value of the DR correction coefficient by the actual power measurement value at the date and time when the DR control is performed to correct the actual power measurement value at the time of the prediction target day, and the corrected actual power measurement value. Is calculated as an average value in the number of days included in the target period used for prediction among the past days and the DR control is activated, thereby calculating the power demand estimated value. The actual measurement value correcting unit 424 corrects the actual power measurement value and calculates the estimated power demand value every time when the DR control is performed.

実測値補正部424は、電力需要推定値Pikを、以下の(3)式に従って算出する。電力需要推定値Pikは、k日のi時における電力需要推定値である。kは、予測する日の日付である。Pijは、j日のi時における電力需要実測値である。このPijにおけるj日は、PAijにおけるj日と同じ日ではない場合でもよい。DFCは、予測に使う日の日数である。これは上述のjの日数の合計値と等しい。 The actual value correction unit 424 calculates the power demand estimated value P ik according to the following equation (3). The power demand estimated value P ik is a power demand estimated value at i time of k days. k is the date of the prediction date. P ij is an actual power demand value at j time on i. The j day in P ij may not be the same day as the j day in PA ij . D FC is the number of days of the date of use to predict. This is equal to the total number of days of j described above.

Figure 2014036564
Figure 2014036564

予測部43は、将来の一定期間における一定間隔の時間帯ごとに負荷設備(空調熱源設備1、作業設備2)に設けられた各種の機器によって消費される電力を予測した値である電力予測値を、記憶部41に記憶された各種データや予測データ管理部から得られる予測用データに基づいて算出する。例えば、予測部43は、将来の一定期間(例えば1日(24時間))における一定間隔の時間帯(例えばデマンド時限)ごとの予測値を算出する。
この予測値としては、例えば、将来の一定期間(例えば1日(24時間))における一定間隔の時間帯(例えばデマンド時限)ごとに空調熱源機が必要とする熱量である空調熱負荷予測値を空調熱負荷予測用データに基づいて予測する。空調熱負荷予測用データには、例えば、天気予報データや負荷電力パターンデータや電力実測値等がある。この電力実測値として、予測データ管理部42から供給される電力実測値や電力需要推定値や、天気予報データ、電力負荷パターンデータが用いられる。負荷電力パターンデータは、負荷設備(空調熱源設備1や作業設備2)における機器毎の消費電力について時間経過に応じたパターンである。負荷電力パターンは、利用する対象の設備(例えば部屋)、設備を利用する人数、そこで利用される負荷(コンピュータや照明、OA機器)、空調、季節、その日の気温、湿度、日当たり等の様々な状況に応じて決まる。
また、予測部43は、将来の一定期間における一定間隔の時間帯ごとに空調システムを形成する空調システム機器の各々が消費する電力である空調システム機器消費電力予測値を空調システム機器消費電力予測用データに基づいて予測する。
また、予測部43は、将来の一定期間における一定間隔の時間帯ごとに発電装置が出力する電力である発電電力予測値を発電電力予測用データに基づいて予測する。
The prediction unit 43 is a predicted power value that is a value obtained by predicting the power consumed by various devices provided in the load facility (air-conditioning heat source facility 1 and work facility 2) at regular intervals in a certain future period. Is calculated based on various data stored in the storage unit 41 and prediction data obtained from the prediction data management unit. For example, the prediction unit 43 calculates a predicted value for each fixed time period (for example, demand time period) in a certain period in the future (for example, one day (24 hours)).
As this predicted value, for example, an air conditioning heat load predicted value, which is the amount of heat required by the air conditioning heat source unit for each fixed time period (for example, demand time period) in a future fixed period (for example, one day (24 hours)), is used. Predict based on air conditioning heat load prediction data. The air-conditioning heat load prediction data includes, for example, weather forecast data, load power pattern data, actual power measurement values, and the like. As the actual measured power value, the actual measured power value, the estimated power demand value, the weather forecast data, and the power load pattern data supplied from the prediction data management unit 42 are used. The load power pattern data is a pattern according to the passage of time with respect to the power consumption of each device in the load facility (air conditioning heat source facility 1 or work facility 2). There are various load power patterns such as the equipment to be used (for example, a room), the number of people using the equipment, the load used there (computer, lighting, OA equipment), air conditioning, season, temperature of the day, humidity, sunlight, etc. It depends on the situation.
Further, the prediction unit 43 uses an air conditioning system device power consumption prediction value, which is the power consumed by each air conditioning system device forming the air conditioning system at regular intervals in a certain future period, for air conditioning system device power consumption prediction. Predict based on data.
In addition, the prediction unit 43 predicts a generated power predicted value, which is power output from the power generation apparatus, at a predetermined interval in a future fixed period based on the generated power prediction data.

運転計画作成部44は、予測部43を有しており、予測部43により予測された空調熱負荷予測値、空調システム機器消費電力予測値、発電電力予測値と、記憶部41に記憶される負荷電力パターンデータとに基づいて、少なくとも1日よりも前の日までに、1日分の運転計画を示す運転計画データを作成する。運転計画作成部44は、この運転計画として、最適化を行う専用プログラムを実行し、最適な空調熱源運転計画および電源設備運転計画を作成することができる。
運転計画作成部44は、運転計画として、空調熱源機運転計画と空調システム機器運転計画と電源設備運転計画を作成する。
空調熱源機運転計画は、1日における一定間隔の時間帯(デマンド時限)ごとに、空調熱負荷と加算熱量(空調熱源機が製造する製造熱量と蓄熱槽が放熱する放熱量の和)が等しくなるように空調熱源機の運転状態を表す情報である。
空調システム機器運転計画は、消費電力がピークであるとして予測された時間を基準とし、外調機、空調機、パッケージ空調機ごとに、停止期間やその直前の準備運転期間等を考慮した運転状態を表す情報である。準備運転期間は、外調機、空調機、パッケージ空調機等を消費電力低減のため一旦停止する場合、その停止期間において快適性が失われないように、予冷運転や予熱運転を行う期間である。
電源設備運転計画は、1日における一定間隔の時間帯ごとに負荷設備(空調熱源設備1と作業設備2)に電力を供給するにあたり、第1発電機、第2発電機、蓄電池および買電電源の各々から出力させる電力量の割り振りの内訳を表した情報である。
運転計画作成部44は、空調熱源機運転計画、空調システム機器運転計画および電源設備運転計画を作成するため、例えば数理計画法のアルゴリズムに従ってコンピュータ処理によって生成する。
The operation plan creation unit 44 includes a prediction unit 43, and is stored in the storage unit 41, the air conditioning thermal load prediction value predicted by the prediction unit 43, the air conditioning system device power consumption prediction value, and the generated power generation prediction value. Based on the load power pattern data, operation plan data indicating an operation plan for one day is created by at least a day before one day. As the operation plan, the operation plan creation unit 44 can execute a dedicated program for optimization and create an optimum air conditioning heat source operation plan and power supply facility operation plan.
The operation plan creation unit 44 creates an air conditioning heat source machine operation plan, an air conditioning system equipment operation plan, and a power supply facility operation plan as operation plans.
In the air conditioning heat source unit operation plan, the air conditioning heat load and the added heat amount (the sum of the production heat amount produced by the air conditioning heat source unit and the heat radiation amount radiated from the heat storage tank) are equal at regular time intervals (demand time period) in one day. It is the information showing the operation state of an air-conditioning heat-source machine.
The air conditioning system equipment operation plan is based on the predicted time of power consumption, and for each external air conditioner, air conditioner, and packaged air conditioner, considers the stop period and the preparatory operation period immediately before it. Is information. The preparatory operation period is a period in which precooling operation or preheating operation is performed so that comfort is not lost during the stop period when the external air conditioner, air conditioner, package air conditioner, etc. are temporarily stopped to reduce power consumption. .
The power supply facility operation plan includes the first generator, the second generator, the storage battery, and the purchased power supply for supplying power to the load facilities (air conditioning heat source facility 1 and work facility 2) at regular intervals in the day. It is the information showing the breakdown of allocation of the electric energy output from each.
The operation plan creation unit 44 generates the air conditioning heat source machine operation plan, the air conditioning system equipment operation plan, and the power supply facility operation plan, for example, by computer processing according to an algorithm of a mathematical programming method.

負荷出力制御装置5は、運転管理装置4が作成した空調熱源機運転計画に基づいて一定間隔の時間帯ごとに空調熱源機11の出力を制御し、空調システム機器運転計画に基づいて一定間隔の時間帯ごとに空調システムの出力を制御する。
電源出力制御装置6は、運転管理装置4が作成した空調熱源機運転計画に基づいて、一定間隔の時間帯ごとに、第1発電機31、第2発電機32、蓄電池33および買電電源34から負荷設備(空調熱源設備1、作業設備2)へ供給する電力を制御する。
The load output control device 5 controls the output of the air-conditioning heat source unit 11 at regular intervals based on the air-conditioning heat source unit operation plan created by the operation management device 4, and at regular intervals based on the air-conditioning system equipment operation plan. Controls the output of the air conditioning system for each time period.
Based on the air conditioning heat source unit operation plan created by the operation management device 4, the power output control device 6 has a first generator 31, a second generator 32, a storage battery 33, and a purchased power source 34 at regular intervals. To control the power supplied to the load equipment (air conditioning heat source equipment 1, work equipment 2).

上述のように、運転計画(空調熱源機運転計画、空調システム機器運転計画等)にしたがって、空調熱源機11と空調システム12の運転状態を制御するとともに、電源設備3における各電源から出力される電力を制御する。これにより、買電電源34から出力させる電力(買電電力)がデマンド目標値を越えないようにするDR制御を実現している。   As described above, the operation state of the air conditioning heat source unit 11 and the air conditioning system 12 is controlled according to the operation plan (air conditioning heat source unit operation plan, air conditioning system equipment operation plan, etc.), and output from each power source in the power source facility 3. Control power. Thus, DR control is implemented so that the power output from the power purchase power supply 34 (power purchase power) does not exceed the demand target value.

図2は、記憶部41に記憶される情報の一例であり、特に、記憶部41に記憶された情報のうちDR発動情報(DR発動フラグに対応)と電力実測値と需要予測値とが、日付及び時間毎に記憶された情報を図示している。また、この図では、これらの情報にさらに、DR補正係数平均値と電力需要推定値とが対応付けられて記憶されている。また、DR補正係数平均値、電力需要推定値が算出されない日時には、情報が記憶されていないことを表す「−」が図示されている。   FIG. 2 is an example of information stored in the storage unit 41. In particular, among the information stored in the storage unit 41, the DR activation information (corresponding to the DR activation flag), the actual power measurement value, and the demand prediction value are The information memorize | stored for every date and time is illustrated. Moreover, in this figure, the DR correction coefficient average value and the power demand estimated value are further stored in association with these pieces of information. In addition, “−” representing that no information is stored is shown on the date and time when the DR correction coefficient average value and the power demand estimated value are not calculated.

DR発動情報は、DR制御が発動されたか否かを表す情報である。このDR発動情報としては、例えばフラグで表され、「1」が発動されたことを表し、「0」が発動されていないことを表す。
日付は、電力実測値が測定された日であり、時間は、その測定された時間を表している。
The DR activation information is information indicating whether DR control is activated. The DR activation information is represented by a flag, for example, indicating that “1” has been activated, and that “0” has not been activated.
The date is the date when the actual power measurement value is measured, and the time represents the measured time.

例えば、8月3日11時においては、DR制御が発動しており、需要予測値がa1(kW)、電力実測値がb1(kW)、DR補正係数平均値がc1、電力需要推定値(電力実測値を補正した後の値)がd1(kW)である。
8月5日18時においては、DR制御が発動していなく、需要予測値がa8(kW)、電力実測値がb8(kW)、DR補正係数平均値がc1、電力需要推定値がd1(kW)である。
For example, at 11 o'clock on August 3, DR control is activated, the demand prediction value is a1 (kW), the actual power measurement value is b1 (kW), the DR correction coefficient average value is c1, the power demand estimation value ( The value after correcting the actual power measurement value) is d1 (kW).
At 18:00 on August 5, the DR control is not activated, the demand prediction value is a8 (kW), the actual power measurement value is b8 (kW), the DR correction coefficient average value is c1, and the power demand estimation value is d1 ( kW).

次に、運転管理装置4の動作を説明する。図3は、運転管理装置4の予測用データの管理を行う動作を説明するフローチャートである。
まず、予測データ管理部42の判定部421は、予測部43から、電力需要の予測に用いる対象期間が指定されるとともに、予測用データ取得の要求があると(ステップS10)、指定された期間に含まれる日時に対応する電力実測値を記憶部41から読み出す(ステップS11)。そして、判定部421は、読み出した各電力実績値に対応付けられたDR発動情報がDR制御が発動されたことを表しているか否かを判定する(ステップS13)。
DR発動情報がDR制御が発動されたことを表していない場合には、そのDR発動情報に対応付けられた電力実測値を予測用データとして予測部43へ出力する(ステップS18)。
一方、DR発動情報がDR制御が発動されたことを表している場合、補正部422は、その電力実測値にDR補正係数平均値が対応づけて記憶されているか否かを判定する(ステップS14)。
Next, the operation of the operation management device 4 will be described. FIG. 3 is a flowchart for explaining the operation of managing the prediction data of the operation management device 4.
First, the determination unit 421 of the prediction data management unit 42 designates a target period used for prediction of power demand from the prediction unit 43, and when there is a request for obtaining prediction data (step S10), the designated period. The power actual measurement value corresponding to the date and time included in is read from the storage unit 41 (step S11). Then, the determination unit 421 determines whether or not the DR activation information associated with each read actual power value indicates that the DR control has been activated (step S13).
If the DR activation information does not indicate that DR control has been activated, the actual power measurement value associated with the DR activation information is output to the prediction unit 43 as prediction data (step S18).
On the other hand, when the DR activation information indicates that DR control has been activated, the correction unit 422 determines whether or not the DR correction coefficient average value is stored in association with the actual power measurement value (step S14). ).

DR補正係数平均値が対応づけて記憶されている場合、補正部422は、実測値補正部424によって、電力実測値にDR補正係数平均値を乗じることで、電力需要推定値を算出し(ステップS17)、算出された電力需要推定値を予測用データとして予測部43へ供給する(ステップS18)。   When the DR correction coefficient average value is stored in association with each other, the correction unit 422 calculates the power demand estimated value by multiplying the actual power measurement value by the DR correction coefficient average value by the actual value correction unit 424 (step S42). S17), the calculated power demand estimation value is supplied as prediction data to the prediction unit 43 (step S18).

一方、補正部422は、電力実測値にDR補正係数平均値が対応づけされていない場合には、補正係数算出部423によって、DR補正係数を算出し(ステップS15)、同じ時間のDR補正係数の平均値を算出することで、DR補正係数平均値を算出し、対応する電力実測値に対応づけて記憶部41に記憶する(ステップS16)。そして、補正部422は、実測値補正部424によって、電力実測値に対し、得られたDR補正係数平均値を乗じることで、電力需要推定値を算出し(ステップS17)、算出された電力需要推定値を予測用データとして予測部43へ供給する(ステップS18)。   On the other hand, when the average power correction value is not associated with the average value of the DR correction coefficient, the correction unit 422 calculates the DR correction coefficient by the correction coefficient calculation unit 423 (step S15), and the DR correction coefficient at the same time. Is calculated, the DR correction coefficient average value is calculated and stored in the storage unit 41 in association with the corresponding actual power measurement value (step S16). Then, the correction unit 422 calculates the power demand estimated value by multiplying the actual power value measured by the actual value correction unit 424 by the obtained DR correction coefficient average value (step S17), and the calculated power demand The estimated value is supplied to the prediction unit 43 as prediction data (step S18).

次に、図2を参照してさらに説明する。電力需要の予測に用いる対象期間が8月3日0時から8月4日23時として指定され、予測用データ取得の要求があった場合、補正部422は、記憶部41に記憶された情報を参照し、電力実測値を読み出し、DR制御が発動された日時の電力実測値であるか否かを判定する。例えば、8月4日18時の電力実測値b5は、DR制御が行われていない時間における電力実測値であるため、予測用データとして予測部43へ供給される。8月3日11時、12時、8月4日11時、12時の電力実測値であるb1、b2、b3、b4は、DR制御が発動されている時間の電力実測値であるため、補正を行ってから予測部43へ供給する。   Next, further description will be given with reference to FIG. When the target period used for prediction of power demand is designated as 3:00 on August 3rd to 23:00 on August 4th and there is a request for obtaining prediction data, the correction unit 422 stores information stored in the storage unit 41. , The actual measured power value is read out, and it is determined whether or not the actual measured power value is the date and time when the DR control is activated. For example, the actual power measurement value b5 at 18:00 on August 4 is an actual power measurement value during the time when DR control is not performed, and thus is supplied to the prediction unit 43 as prediction data. Since power measurement values b1, b2, b3, and b4 on August 3, 11:00, 12:00, August 4, 11:00, and 12:00 are power measurement values during the time when DR control is activated, After the correction, it is supplied to the prediction unit 43.

補正係数算出部423は、DR補正係数を算出する場合、8月3日11時の需要予測値a1と電力実測値b1との比(a1/b1)であるDR補正係数を算出し、さらに、読み出しの対象期間内であって時間が同じである8月4日11時の需要予測値a3と電力実測値b3との比(a3/b3)であるDR補正係数を算出し、このDR補正係数の平均値(((a1/b1)+(a3/b3))/2)を算出し、この算出結果であるDR補正係数平均値C1を得る。そして補正係数算出部423は、得られたDR補正係数平均値c1を、8月3日11時と、8月4日11時のDR補正係数平均値として電力実測値に対応付けて記憶部41に記憶する。   When calculating the DR correction coefficient, the correction coefficient calculation unit 423 calculates a DR correction coefficient that is a ratio (a1 / b1) between the demand prediction value a1 and the actual power measurement value b1 at 11:00 on August 3, and A DR correction coefficient which is a ratio (a3 / b3) between the demand forecast value a3 and the actual power measurement value b3 at 11 o'clock on August 4, which is within the reading target period and the same time, is calculated, and this DR correction coefficient The average value (((a1 / b1) + (a3 / b3)) / 2) is calculated, and the DR correction coefficient average value C1 that is the calculation result is obtained. Then, the correction coefficient calculation unit 423 associates the obtained DR correction coefficient average value c1 with the actual power measurement value as the DR correction coefficient average value on August 3 at 11:00 and on August 4 at 11:00. To remember.

補正係数算出部423は、8月4日12時の需要予測値a2と電力実測値b2との比(a2/b2)であるDR補正係数を算出し、さらに、読み出しの対象期間内であって時間が同じである8月4日12時の需要予測値a4と電力実測値b4との比(a4/b4)であるDR補正係数を算出し、このDR補正係数の平均値(((a2/b2)+(a4/b4))/2)を算出し、この算出結果であるDR補正係数平均値c3を得る。そして補正係数算出部423は、得られたDR補正係数平均値c3を、8月3日12時と、8月4日12時のDR補正係数平均値として電力実測値に対応付けて記憶部41に記憶する。
このようにして、補正係数算出部423は、DR制御が行われた日時におけるDR補正係数平均値を算出し、記憶部41に記憶する。ここでは、11時と12時のDR補正係数平均値を算出したが、例えば、8月3日及び4日の13時、8月3日及び4日の14時においてもDR制御が行われていた場合には、同様に、DR補正係数平均値を算出し、記憶部41に記憶する。
The correction coefficient calculation unit 423 calculates a DR correction coefficient that is a ratio (a2 / b2) between the demand forecast value a2 and the actual power measurement value b2 at 12:00 on August 4, and is within the target period of reading. A DR correction coefficient that is a ratio (a4 / b4) of the demand predicted value a4 and the actual power measurement value b4 at 12:00 on August 4 at the same time is calculated, and an average value of the DR correction coefficients (((a2 / b2) + (a4 / b4)) / 2) is calculated, and the DR correction coefficient average value c3 which is the calculation result is obtained. Then, the correction coefficient calculation unit 423 associates the obtained DR correction coefficient average value c3 with the actual power measurement value as the DR correction coefficient average value on August 3 at 12:00 and August 4 at 12:00. To remember.
In this way, the correction coefficient calculation unit 423 calculates the DR correction coefficient average value at the date and time when the DR control is performed, and stores it in the storage unit 41. Here, the average value of the DR correction coefficient at 11:00 and 12:00 was calculated. However, for example, DR control is also performed at 13:00 on August 3rd and 4th, and at 14:00 on August 3rd and 4th. In the case where it is detected, the DR correction coefficient average value is similarly calculated and stored in the storage unit 41.

実測値補正部424は、DR制御が行われた8月3日11時の電力実測値b1に、DR補正係数平均値c1を乗じることで、補正された電力実測値を算出し、8月4日11時について、電力実測値b3にDR補正係数平均値c1を乗じて補正された電力実測値を算出する。そして、実測値補正部424は、8月3日11時の補正された電力実測値と8月4日11時の補正された電力実測値との平均値を算出することで、8月3日から8月4日における11時の電力需要推定値d1を算出し、記憶部41に記憶し、予測用データとして予測部43へ供給する。また、実測値補正部424は、8月3日12時について、電力実測値b2にDR補正係数平均値c3を乗じて補正された電力実測値を算出し、8月4日12時について、電力実測値b4にDR補正係数平均値c3を乗じて補正された電力実測値を算出し、これらの平均値を得ることで、8月3日から8月4日における12時の電力需要推定値d2を算出し、記憶部41に記憶し、予測用データとして予測部43へ供給する。
なお、次回の予測を行う場合には、記憶部41に記憶されたDR補正係数平均値と電力需要推定値を消去し、新たな予測使用日に応じて新たに算出する。
The actual measurement value correcting unit 424 calculates the corrected actual power measurement value by multiplying the actual power measurement value b1 at 11 o'clock on August 3 at which DR control is performed by the DR correction coefficient average value c1, and calculates the corrected power actual measurement value. For the day 11:00, the corrected power measurement value is calculated by multiplying the power measurement value b3 by the DR correction coefficient average value c1. Then, the actual measurement value correction unit 424 calculates the average value of the corrected power actual measurement value at 11:00 on August 3 and the corrected power actual measurement value at 11:00 on August 4 to thereby determine the August 3rd. The power demand estimated value d1 at 11:00 on August 4 is calculated, stored in the storage unit 41, and supplied to the prediction unit 43 as prediction data. In addition, the actual measurement value correction unit 424 calculates a power actual measurement value corrected by multiplying the power actual measurement value b2 by the DR correction coefficient average value c3 for August 3 at 12:00. By calculating the actual measured value corrected by multiplying the actual measured value b4 by the DR correction coefficient average value c3, and obtaining these average values, the estimated power demand d2 at 12 o'clock from August 3 to August 4 is obtained. Is stored in the storage unit 41 and supplied to the prediction unit 43 as prediction data.
In the case of performing the next prediction, the DR correction coefficient average value and the power demand estimated value stored in the storage unit 41 are deleted and newly calculated according to a new predicted use date.

図4は、需要予測値と電力実測値との関係を説明する図である。この図において横軸は時間を表しており、縦軸は電力を表している。ここでは、需要予測値と電力実測値とが時間毎に表されている。また、そのグラフの一部が符号100に示す領域に拡大して図示されている。例えば、13時における需要予測値(符号A)は、契約電力(デマンド目標値)(符号C)を超えているため、DR制御が発動された結果、電力実測値(符号B)がデマンド目標値を下回ることができている。この場合、電力実測値(符号B)については、DR補正係数平均値(x13)を乗じ、この日の前後の連続する日における同じ時間の電力実測値にDR補正係数平均値が乗じられた数と平均値を算出することで、予測用データとして用いることができる。 FIG. 4 is a diagram illustrating the relationship between the demand forecast value and the actual power measurement value. In this figure, the horizontal axis represents time, and the vertical axis represents power. Here, the demand forecast value and the actual power measurement value are represented for each time. Further, a part of the graph is enlarged and shown in an area indicated by reference numeral 100. For example, the demand forecast value (symbol A) at 13:00 exceeds the contract power (demand target value) (symbol C), and as a result of the DR control being activated, the actual power measurement value (symbol B) is the demand target value. Can be below. In this case, the actual power measurement value (symbol B) is multiplied by the DR correction coefficient average value (x 13 ), and the actual power measurement value at the same time on consecutive days before and after this day is multiplied by the DR correction coefficient average value. By calculating the number and the average value, it can be used as prediction data.

以上説明した実施形態において、運転管理装置4が予測データ管理部42を有する構成について説明したが、予測データ管理部42を運転管理装置4の外部に設けて独立の装置(予測データ管理装置)としてもよい。この場合、運転管理装置4が予測データ管理装置に、予測データの読み出し要求を送信し、予測データ管理装置が、この要求を受け、上述と同様の処理を行うことで、運転管理装置4の記憶部41にアクセスし、予測用データを読み出すようにしてもよい。この場合、記憶部41は、運転管理装置4や予測データ管理装置の外部に設けられてもよいし、予測データ管理装置の内部に設けられてもよい。また、この場合、予測データ管理装置には、運転管理装置4から情報を入力する入力部と、運転管理装置4へ情報を出力する出力部とが設けられる。   In the embodiment described above, the configuration in which the operation management device 4 includes the prediction data management unit 42 has been described. However, the prediction data management unit 42 is provided outside the operation management device 4 and is an independent device (prediction data management device). Also good. In this case, the operation management device 4 transmits a prediction data read request to the prediction data management device, and the prediction data management device receives this request and performs the same processing as described above, so that the operation management device 4 stores the request. The prediction data may be read by accessing the unit 41. In this case, the storage unit 41 may be provided outside the operation management device 4 or the prediction data management device, or may be provided inside the prediction data management device. In this case, the prediction data management device is provided with an input unit for inputting information from the operation management device 4 and an output unit for outputting information to the operation management device 4.

以上説明した実施形態においては、DR制御が発動された場合、電力実測値は、DR制御が仮に発動されなかったものとすると、発動された場合とされなかった場合とで値が異なる。すなわち、DR制御が発動されなかった場合、例えば1400kWの電力を消費するところ、DR制御が発動された場合には消費電力が抑えられるため、例えば、1100kW程度に低減される場合がある。そうすると、消費電力の予測値は、一般に、過去における電力実測値とその時の気温、湿度、風向き等の気候や施設内において活動する人の数等の関係を考慮して算出されるため、DR制御が発動することにより強制的に消費電力が抑えられるため、その時の気温、湿度、風向き等の気候や施設内において活動する人の数等の関係性が低減してしまい、DR制御を発動しなかった場合に実際に消費されたであろう電力実測値から離れた値となり、今後の予測用データとして用いることができなくなってしまう。   In the embodiment described above, when the DR control is activated, the actual power measurement value is different depending on whether the DR control is activated or not when the DR control is activated. That is, when DR control is not activated, power of 1400 kW, for example, is consumed. However, when DR control is activated, power consumption is suppressed, so that the power may be reduced to, for example, about 1100 kW. Then, since the predicted value of power consumption is generally calculated in consideration of the relationship between the actual measured power value in the past and the climate such as the temperature, humidity, and wind direction at that time, the number of people who are active in the facility, etc., the DR control Since the power consumption is forcibly suppressed by triggering, the relationship such as temperature, humidity, wind direction, etc. at that time and the number of people who are active in the facility will be reduced, and DR control will not be triggered. In this case, it becomes a value far from the actual power measurement value that would have been consumed, and cannot be used as future prediction data.

電力需要予測を行う場合、できれば、予測用データとして用いることができるデータは多いことが望まれているため、DR制御が発動された日時における電力実測値も利用したいという要望がある。しかし、DR制御を発動したことにより、このときの電力実測値を利用できないこととなった場合には、DR制御が発動されていない期間のデータを利用することとなる。そうすると、例えば、予測を行う対象日の1日前から3日前までのデータを利用したい場合であっても、DR制御が発動されていない期間として例えば2週間前のデータ等を利用すると、需要が変わってしまっている可能性が高くなるため(例えば、最近新たなコンピュータを設置したり、人事異動によって人の配置の変化や業務内容の変化による設備負荷への影響が生じる)、できるだけ直近のデータを利用したい場合がある。
そこで、できるだけ最近のデータを用いることで、予測対象日となるべく近い環境(状態、気象条件等)を反映した予測を行うことが望まれている。
When power demand prediction is performed, if possible, it is desired that there is a large amount of data that can be used as prediction data. Therefore, there is a desire to use an actual power measurement value at the date and time when DR control is activated. However, if the actual power measurement value at this time cannot be used due to the activation of the DR control, data in a period in which the DR control is not activated is used. Then, for example, even when it is desired to use data from 1 day to 3 days before the target date for prediction, if the data for 2 weeks before is used as a period when DR control is not activated, the demand changes. (For example, a new computer has recently been installed, or personnel changes have affected the equipment load due to changes in personnel placement or changes in work content) You may want to use it.
Therefore, it is desired to perform prediction reflecting the environment (state, weather condition, etc.) as close as possible to the prediction target date by using the latest data as much as possible.

そこで、上述した予測データ管理部420を適用した運転管理装置4によれば、DR制御が発動された日時における電力実測値に対し、DR補正係数平均値を算出して乗じることで、その日時においてDR制御が発動されなかった場合の電力実測値を推定することができ、これを予測に用いることが可能となる。   Therefore, according to the operation management device 4 to which the above-described prediction data management unit 420 is applied, by calculating and multiplying the actual measured power value at the date and time when the DR control is activated, by calculating and multiplying the DR correction coefficient average value, at that date and time. It is possible to estimate an actual power measurement value when DR control is not activated, and this can be used for prediction.

また、上述した実施形態において、単純平均によってDR補正係数平均値や電力需要推定値を算出したが、加重平均によって算出することで、電力需要推定値を得るようにしてもよい。また、上述以外の方法によって電力実測値を補正することで、算出して得られる値を予測用データとして運転管理装置4へ出力するようにしてもよい。また、予測用データとしては、例えば、記憶部に記憶された需要予測値を用いることもできる。   In the above-described embodiment, the DR correction coefficient average value and the power demand estimated value are calculated by simple averaging. However, the power demand estimated value may be obtained by calculating by weighted averaging. Moreover, you may make it output the value obtained by calculating to the driving | operation management apparatus 4 as prediction data by correct | amending an electric power measurement value by methods other than the above. In addition, as the prediction data, for example, a demand prediction value stored in the storage unit can be used.

また、上述した実施形態によれば、DR制御の対象となる機器の電力を測定しなくても電力実測値の推定をすることができるので、機器の電力を計測する計測装置を設置するコストを抑えることができる。   In addition, according to the above-described embodiment, it is possible to estimate the measured power value without measuring the power of the device that is the target of the DR control, so the cost of installing the measuring device that measures the power of the device can be reduced. Can be suppressed.

また、上述した実施形態によれば、DR制御の発動時に手動で電源を切断した機器の消費電力の削減分を考慮して電力実測値の推定をすることができる。   In addition, according to the above-described embodiment, it is possible to estimate a measured power value in consideration of a reduction in power consumption of a device that is manually turned off when the DR control is activated.

また、図1における運転管理装置4の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより運転管理や予測データ管理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。   In addition, a program for realizing the function of the operation management device 4 in FIG. 1 is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read into a computer system and executed to manage the operation. Or forecast data management may be performed. Here, the “computer system” includes an OS and hardware such as peripheral devices.

また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。
また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
Further, the “computer system” includes a homepage providing environment (or display environment) if a WWW system is used.
The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Further, the “computer-readable recording medium” refers to a volatile memory (RAM) in a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In addition, those holding programs for a certain period of time are also included. The program may be a program for realizing a part of the functions described above, and may be a program capable of realizing the functions described above in combination with a program already recorded in a computer system.

以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。   The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and includes designs and the like that do not depart from the gist of the present invention.

1 空調熱源設備
2 作業設備
3 電源設備
4 運転管理装置
5 負荷出力制御装置
6 電源出力制御装置
41 記憶部
42 予測データ管理部
43 予測部
44 運転計画作成部
421 判定部
423 補正係数算出部
424 実測値補正部
DESCRIPTION OF SYMBOLS 1 Air-conditioning heat source equipment 2 Work equipment 3 Power supply equipment 4 Operation management apparatus 5 Load output control apparatus 6 Power supply output control apparatus 41 Memory | storage part 42 Prediction data management part 43 Prediction part 44 Operation plan preparation part 421 Judgment part 423 Correction coefficient calculation part 424 Actual measurement Value correction unit

Claims (5)

施設において使用された電力の実測値である電力実測値に基づいて電力需要の予測を行う運転管理装置に対し、前記電力需要の予測に用いる予測用データを供給する予測データ管理装置であって、
電力需要の予測に用いる対象期間の指定とともに前記運転管理装置からの予測用データの読み出し要求を入力する入力部と、
デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、前記電力実測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶する記憶部と、
前記記憶部に記憶されたDR発動情報を参照し、前記対象期間内の日時における前記電力実測値がデマンドレスポンス制御が発動された日時における値であるか否かを判定する判定部と、
前記判定部の判定結果に基づいて、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われていない時間の電力実測値である場合には予測用データとして当該電力実測値を運転管理装置に出力し、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、当該日時においてデマンドレスポンス制御が行われなかった場合に使用される電力について算出された値を予測用データとして前記運転管理装置に出力する出力部と、
を有することを特徴とする予測データ管理装置。
A prediction data management device that supplies prediction data used for prediction of power demand to an operation management device that predicts power demand based on actual power measurement values that are actual power values used in a facility,
An input unit for inputting a read request for prediction data from the operation management device together with designation of a target period used for prediction of power demand;
A storage unit that stores the measured power value and DR activation information indicating whether or not demand response control has been performed in a predetermined period including a past date and time when demand response control is performed;
A determination unit that refers to the DR activation information stored in the storage unit and determines whether or not the measured power value at the date and time within the target period is a value at the date and time when the demand response control is activated;
Based on the determination result of the determination unit, when the measured power value at the date and time of the target period is the measured power value during the time when demand response control is not performed, the measured power value is used as prediction data. When the actual power measurement value at the date and time of the target period is the actual power measurement value at the time when the demand response control is performed, the power used when the demand response control is not performed at the date and time An output unit that outputs the calculated value as prediction data to the operation management device;
The prediction data management apparatus characterized by having.
前記出力部は、前記電力実測値に基づいて電力需要の予測が行われるタイミングに応じて予測用データを出力することを特徴とする請求項1記載の予測データ管理装置。   The prediction data management apparatus according to claim 1, wherein the output unit outputs prediction data in accordance with a timing at which power demand is predicted based on the actual power measurement value. 前記記憶部は、前記対象期間内の日時に使用される電力を予測した値である需要予測値を、前記電力実測値と前記DR発動情報とともに記憶し、
前記出力部は、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、前記記憶部に記憶された需要予測値に基づく予測用データを出力する
ことを特徴とする請求項1または請求項2に記載の予測データ管理装置。
The storage unit stores a predicted demand value, which is a predicted value of power used for the date and time within the target period, together with the actual power measurement value and the DR activation information,
The output unit outputs prediction data based on the demand prediction value stored in the storage unit when the actual power value at the date and time of the target period is the actual power value at the time when the demand response control is performed. The prediction data management apparatus according to claim 1, wherein:
前記出力部は、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、前記記憶部に記憶された需要予測値と電力実測値とに基づく予測用データを出力する
ことを特徴とする請求項1から請求項3のいずれか1項に記載の予測データ管理装置。
The output unit is based on the demand prediction value and the power measurement value stored in the storage unit when the power measurement value at the date and time of the target period is the power measurement value at the time when the demand response control is performed. The prediction data management apparatus according to any one of claims 1 to 3, wherein prediction data is output.
施設において使用された電力の実測値である電力実測値に基づいて電力需要の予測を行う運転管理装置に対し、前記電力需要の予測に用いる予測用データを供給する予測データ管理装置における予測データ管理方法であって、
入力部が、電力需要の予測に用いる対象期間の指定とともに前記運転管理装置からの予測用データの読み出し要求を入力し、
判定部が、デマンドレスポンス制御が行われた過去の日時を含む所定の期間における、前記電力実測値とデマンドレスポンス制御が行われたか否かを表すDR発動情報とを時間毎に記憶する記憶部に記憶されたDR発動情報を参照し、前記対象期間内の日時における前記電力実測値がデマンドレスポンス制御が発動された日時における値であるか否かを判定し、
出力部が、前記判定部の判定結果に基づいて、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われていない時間の電力実測値である場合には予測用データとして当該電力実測値を運転管理装置に出力し、前記対象期間の日時における電力実測値がデマンドレスポンス制御が行われた時間における電力実測値である場合には、当該日時においてデマンドレスポンス制御が行われなかった場合に使用される電力について算出された値を予測用データとして前記運転管理装置に出力する
ことを特徴とする予測データ管理方法。
Predictive data management in a predictive data management apparatus that supplies prediction data used for prediction of power demand to an operation management apparatus that predicts power demand based on the actual power value that is actually measured power used in a facility A method,
The input unit inputs a request for reading prediction data from the operation management device together with designation of a target period used for power demand prediction,
A determination unit stores, in a predetermined period including a past date and time when the demand response control is performed, the measured power value and DR activation information indicating whether or not the demand response control is performed for each time. With reference to the stored DR activation information, it is determined whether the measured power value at the date and time within the target period is a value at the date and time when demand response control is activated,
Based on the determination result of the determination unit, when the output actual measurement value at the date and time of the target period is the actual power measurement value during the time when demand response control is not performed, the actual power measurement value is used as prediction data. Is used when the demand response control is not performed at the date and time when the measured power value at the date and time of the target period is the actual power value at the time when the demand response control is performed. A predicted data management method, wherein a value calculated for the electric power to be output is output to the operation management device as prediction data.
JP2012178582A 2012-08-10 2012-08-10 Forecast data management device, and forecast data management method Pending JP2014036564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012178582A JP2014036564A (en) 2012-08-10 2012-08-10 Forecast data management device, and forecast data management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012178582A JP2014036564A (en) 2012-08-10 2012-08-10 Forecast data management device, and forecast data management method

Publications (1)

Publication Number Publication Date
JP2014036564A true JP2014036564A (en) 2014-02-24

Family

ID=50285211

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012178582A Pending JP2014036564A (en) 2012-08-10 2012-08-10 Forecast data management device, and forecast data management method

Country Status (1)

Country Link
JP (1) JP2014036564A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3236554A4 (en) * 2014-12-16 2018-06-20 Sekisui Chemical Co., Ltd. Demand power prediction device, demand power prediction method, and program
JP2018157649A (en) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 Negative watt calculation method and negative watt calculation program

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002165364A (en) * 2000-11-20 2002-06-07 Daikin Ind Ltd Demand control operation system and its device
JP2007014179A (en) * 2004-08-12 2007-01-18 Sanyo Electric Co Ltd Demand control unit, predicting method and program of consumed electric power
JP2009251742A (en) * 2008-04-02 2009-10-29 Central Res Inst Of Electric Power Ind Demand predicting device, demand predicting method and demand predicting program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002165364A (en) * 2000-11-20 2002-06-07 Daikin Ind Ltd Demand control operation system and its device
JP2007014179A (en) * 2004-08-12 2007-01-18 Sanyo Electric Co Ltd Demand control unit, predicting method and program of consumed electric power
JP2009251742A (en) * 2008-04-02 2009-10-29 Central Res Inst Of Electric Power Ind Demand predicting device, demand predicting method and demand predicting program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3236554A4 (en) * 2014-12-16 2018-06-20 Sekisui Chemical Co., Ltd. Demand power prediction device, demand power prediction method, and program
JP2018157649A (en) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 Negative watt calculation method and negative watt calculation program

Similar Documents

Publication Publication Date Title
Langer et al. An optimal home energy management system for modulating heat pumps and photovoltaic systems
JP6180826B2 (en) Energy management server, energy management method and program
JP5668970B2 (en) Operation management device, operation management method, and operation management program
EP3067840A1 (en) Energy control unit, energy control system, and energy management method
JP6605181B2 (en) Operation control device, air conditioning system, operation control method, and operation control program
CN104956280A (en) Social learning softthermostat for commercial buildings
JP5787162B2 (en) Operation management device, operation management method, program
Soler et al. Optimizing performance of a bank of chillers with thermal energy storage
JP5794531B2 (en) Power navigation device
JP5852949B2 (en) Power demand control system and method
JP5653487B2 (en) Energy management system and program
US20240085045A1 (en) A Method of Reducing Energy Consumption of Heating, Ventilation and Air Conditioning (HVAC) Equipment in a Multi-Room Building
Chandra et al. Transactive control of air-conditioning systems in buildings for participation in Singapore’s Demand Response market through load curtailment
JP5975276B2 (en) Operation management device, correction method of actual measured power when demand response control is activated
JP6315563B2 (en) Equipment operation system and equipment operation method
Thyer et al. Optimising energy use in an existing commercial building: a case study of Australia’s Reef HQ Aquarium
JP2014036564A (en) Forecast data management device, and forecast data management method
US10095256B2 (en) Power control device, method, and program based on evaluation functions regarding upper limit amount of power
KR102052247B1 (en) Method and Device to manage electric power estimating electric power consumption and providing demand response and energy saving actively
JP6226367B2 (en) Energy use support system, support method and support program
JPH07151369A (en) Heat load predicting apparatus and plant heat load predicting apparatus
JP6534038B2 (en) Demand power control apparatus and demand power control method
JP6606368B2 (en) Operation plan calculation method and operation plan calculation server for heat source power supply equipment
JP2022058209A (en) Power control system and heat pump system
JP2017103862A (en) Power estimating apparatus, power estimating method, and power estimating program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151006

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20160329