JP5668970B2 - Operation management device, operation management method, and operation management program - Google Patents

Operation management device, operation management method, and operation management program Download PDF

Info

Publication number
JP5668970B2
JP5668970B2 JP2010224130A JP2010224130A JP5668970B2 JP 5668970 B2 JP5668970 B2 JP 5668970B2 JP 2010224130 A JP2010224130 A JP 2010224130A JP 2010224130 A JP2010224130 A JP 2010224130A JP 5668970 B2 JP5668970 B2 JP 5668970B2
Authority
JP
Japan
Prior art keywords
power
value
demand
period
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010224130A
Other languages
Japanese (ja)
Other versions
JP2012080681A (en
Inventor
中村 卓司
卓司 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2010224130A priority Critical patent/JP5668970B2/en
Publication of JP2012080681A publication Critical patent/JP2012080681A/en
Priority to JP2012172346A priority patent/JP5709022B2/en
Application granted granted Critical
Publication of JP5668970B2 publication Critical patent/JP5668970B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Description

本発明は、負荷装置に需用電力を供給する電源装置と負荷装置について運転計画を管理する運転管理装置、運転管理方法、および運転管理プログラムに関する。   The present invention relates to a power supply device that supplies electric power for demand to a load device, an operation management device that manages an operation plan for the load device, an operation management method, and an operation management program.

商用の電力系統による電力供給者(以下、電力会社という)が供給する買電電力であって、蓄熱式空調システムや照明装置等の負荷装置を備える施設等の需要家に供給する買電電力をデマンド(需用電力)という。この電力会社は、供給対象の需要家の施設等において年間で最も多く使用する電力の量に応じた供給設備を用意する必要がある。そこで、複数の需要家の施設等に対する費用の負担を公平にするために、定められた単位時間である計測期間(以下、デマンド時限という)あたりの施設等において使用される需要電力を計測し、計測した複数の需要電力のうち最も大きい最大需要電力に応じて契約電力が決定されることがある。例えば、需要家の施設等におけるデマンド時限30分単位の平均需要電力の実績値を計測し、1ヶ月間のデマンド時限毎の平均需要電力の実績値のうち最大の値をその月の最大需要電力(デマンド最大値)とし、その月のデマンド最大値とその前11ヶ月のデマンド最大値のうちいずれか大きい値を超えないような値が契約電力として決定される。   Purchased power supplied by a power supplier (hereinafter referred to as a power company) using a commercial power system, which is supplied to a customer such as a facility equipped with a load storage device such as a thermal storage air conditioning system or a lighting device. This is called demand. This electric power company needs to prepare a supply facility according to the amount of electric power used most frequently in the facility of the customer to be supplied. Therefore, in order to make the burden of expenses for the facilities of a plurality of consumers fair, measure the demand power used in facilities per measurement period (hereinafter referred to as demand time limit) that is a set unit time, Contract power may be determined according to the largest maximum demand power among a plurality of measured demand powers. For example, the actual value of the average demand power at the demand time limit in 30 minutes unit at the customer's facility, etc. is measured, and the maximum value among the actual values of the average demand power for each demand time period for one month is the maximum demand power of the month (Demand maximum value), and a value that does not exceed the larger of the demand maximum value of the month and the demand maximum value of the previous 11 months is determined as the contract power.

また、近年、太陽光発電や風力発電等を利用した自家発電機による電力系統と、電力会社から電力を購入する電力系統とを組み合わせたスマートグリッドシステムに注目が集まっている。
この場合、デマンド最大値は同時に使用する負荷装置が多ければ多いほど大きくなるため、負荷装置の使用時間帯をずらすことなどによりデマンド最大値を減少させることができる。そこで、このようなデマンド最大値を減少させることを目的としたデマンドコントロール装置が提供されている(例えば、特許文献1、2)。
In recent years, attention has been focused on a smart grid system that combines a power system using a private generator using solar power generation, wind power generation, and the like and a power system for purchasing power from an electric power company.
In this case, since the demand maximum value increases as the number of load devices simultaneously used increases, the demand maximum value can be reduced by shifting the usage time zone of the load device. Therefore, a demand control device aimed at reducing the maximum demand value is provided (for example, Patent Documents 1 and 2).

この空調熱源機等の消費電力は、照明装置やコンピュータ等の作業設備機器に比べて消費電力の変動が激しく、天気や室内の利用環境に応じてその消費電力が変動しやすい。このため、この空調熱源機等の消費電力の変動に応じて、デマンド時限における買電電力の平均値が契約電力を超過するおそれがある場合、電力負荷を低減させて技術が求められている。   The power consumption of this air-conditioning heat source machine, etc., is more volatile than work equipment such as lighting devices and computers, and the power consumption tends to fluctuate depending on the weather and indoor usage environment. For this reason, when there is a possibility that the average value of the purchased power in the demand time period may exceed the contracted power in accordance with fluctuations in the power consumption of the air conditioning heat source unit or the like, there is a need for a technique that reduces the power load.

特開昭62−18926号公報JP-A-62-18926 特開平11−215700号公報JP 11-215700 A

しかしながら、デマンド時限における買電電力の平均値が契約電力を超過するおそれがある期間、空調熱源機に供給する電力を削減した場合、設定温度に合わせた温度調整ができない問題がある。   However, there is a problem that the temperature cannot be adjusted to the set temperature when the power supplied to the air-conditioning heat source unit is reduced during a period when the average value of the purchased power in the demand time period may exceed the contracted power.

本発明は、上記課題を解決するものであり、デマンド時限における平均電力を低減させる際に生じる設定温度とのズレによる室内環境への影響を低減させる運転管理装置、運転管理方法、および運転管理プログラムを提供することを目的とする。   The present invention solves the above-described problem, and an operation management device, an operation management method, and an operation management program that reduce the influence on the indoor environment due to a deviation from a set temperature that occurs when the average power in the demand time period is reduced The purpose is to provide.

上述の課題に鑑み、本発明に係る運転管理装置は、予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間(デマンド時限)当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定するデマンド超過判定部と、前記買電電力が目標値を超えることが前記デマンド超過判定部により判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更する計画変更部であって、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更する計画変更部と、を備えることを特徴とする。なお、電力負荷を低減させるには、設定温度の変更や空調機の停止等の手段を用いることができる。 In view of the above-described problems, the operation management device according to the present invention associates the power predicted in the operation plan with the time as the power supplied to the heat source load device that adjusts the temperature to the set temperature that is predetermined on the prediction date. Based on the predicted power load value, the purchased power supplied from the purchased power source of the commercial power system exceeds the target value out of the power per predetermined time (demand time period) indicated by the predicted power load value. When it is determined by the demand excess determination unit that determines what is electric power, and the demand excess determination unit determines that the purchased power exceeds the target value, the target excess period is a time during which the purchased power exceeds the target value. The power load applied to the heat source load device is reduced so that the purchased power is less than or equal to the target value, and the purchased power does not exceed the target value. The heat source load defined in the operation plan so as to increase the amount of power load applied to the heat source load device during the peak first period, which is a period before the target excess period, that is reduced in the target excess period. A plan change unit for changing a set temperature of the apparatus , wherein the second target is a period before the first peak immediately before the first target excess period and a period different from the first target excess period among the plurality of target excess periods. When the excess periods overlap, the maximum value of the purchased power of the predicted power load value in the first target excess period and the maximum value of the purchased power of the predicted power load value in the second target excess period Comparing, the plan exceeding part with the higher maximum value and the plan change part which changes the electric power purchased in the period before the 1st peak are provided, It is characterized by the above-mentioned. In order to reduce the power load, it is possible to use means such as changing the set temperature or stopping the air conditioner.

また、上述の運転管理装置は、前記目標超過期間が、前記電力負荷予測値のうち予め決められた一定時間(デマンド時限)当たりの買電電力の平均が最大となる期間を含むことを特徴とする。   In the operation management apparatus described above, the target excess period includes a period in which the average of purchased power per predetermined time (demand time period) is maximum among the predicted power load value. To do.

上述の課題に鑑み、本発明に係る運転管理方法は、運転管理装置が、予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間(デマンド時限)当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定し、前記買電電力が目標値を超えると判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更するときに、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更することを特徴とする。 In view of the above-described problems, the operation management method according to the present invention uses the power predicted by the operation management device as the power supplied to the heat source load device that adjusts the temperature to a preset temperature that is predetermined on the prediction date. Based on the predicted power load value associated with the time, the purchased power supplied from the purchased power source of the commercial power system out of the power per predetermined time (demand time period) indicated by the predicted power load value There determines what is power exceeding the target value, when the purchased electric power is Ru when determine constant exceeds the target value, the heat source load device to the target excess period the purchased electricity power is time to exceed the target value The power load is reduced so that the purchased power is less than or equal to the target value, and the time during which the purchased power does not exceed the target value is a period before the target excess period. To increase the amount that has been reduced in the target excess period for power load on the heat source load device over click previous period, when changing the set temperature of the heat source load device as defined in the operation plan, When the first pre-peak period immediately before the first target excess period among the plurality of target excess periods overlaps with the second target excess period, which is a period different from the first target excess period, in the first target excess period Comparing the maximum value of the purchased power of the predicted power load value and the maximum value of the purchased power of the predicted power load value in the second target excess period, the target excess of the higher maximum value is exceeded. The purchased power in the period and the period before the first peak is changed .

上述の課題に鑑み、本発明に係る運転管理プログラムは、運転管理装置の制御コンピュータに、予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間(デマンド時限)当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定させ、前記買電電力が目標値を超えると判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更するときに、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更させることを特徴とする。 In view of the above-described problems, an operation management program according to the present invention is predicted in an operation plan as electric power to be supplied to a control computer of an operation management apparatus and a heat source load apparatus that adjusts the temperature to a preset temperature that is predetermined on the prediction date. Based on the predicted power load value associated with the time, the power is supplied from the purchased power source of the commercial power system out of the power per predetermined time (demand time period) indicated by the predicted power load value. purchased electric power allowed is determined what a power exceeding the target value, when the purchased electric power is Ru when determine constant exceeds the target value, the target excess period is the time the purchased electric power exceeds the target value While reducing the power load applied to the heat source load device so that the purchased power is less than or equal to the target value, it is the time during which the purchased power does not exceed the target value and exceeds the target The setting of the heat source load device stipulated in the operation plan so as to increase the amount reduced in the target excess period for the power load applied to the heat source load device during the peak first period which is a past period than When the temperature is changed, when the first pre-peak period immediately before the first target excess period among the plurality of target excess periods overlaps with the second target excess period that is different from the first target excess period, Comparing the maximum value of the purchased power of the predicted power load value in the first target excess period with the maximum value of the purchased power of the predicted power load value in the second target excess period; The power purchase power in the higher target excess period and the period before the first peak is changed .

本発明によれば、需要電力の電力量の変動を小さくして需用電力の電力量を安定させることができる。   ADVANTAGE OF THE INVENTION According to this invention, the fluctuation | variation of the electric energy of demand electric power can be made small, and the electric energy of demand electric power can be stabilized.

本発明の第1実施形態に係るスマートグリッドシステムの構成の一例を示すブロック図である。It is a block diagram showing an example of composition of a smart grid system concerning a 1st embodiment of the present invention. 本発明の第1実施形態に係る運転管理装置の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the operation management apparatus which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る空調熱負荷予測結果データの一例を示す図である。It is a figure which shows an example of the air-conditioning thermal load prediction result data which concern on 1st Embodiment of this invention. 本発明の第1実施形態に係る発電出力予測結果データの一例を示す図である。It is a figure which shows an example of the electric power generation output prediction result data which concern on 1st Embodiment of this invention. 本発明の第1実施形態に係る運転計画の作成方法の一例を説明するための図である。It is a figure for demonstrating an example of the preparation method of the operation plan which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る運転計画処理により求められる電力負荷予測値の一例を説明するための図である。It is a figure for demonstrating an example of the electric power load predicted value calculated | required by the driving | operation plan process which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る運転計画処理と計画DR処理により求められる電力負荷予測値の一例を説明するための図である。It is a figure for demonstrating an example of the electric power load estimated value calculated | required by the driving | operation plan process and plan DR process which concern on 1st Embodiment of this invention. 本発明の第1実施形態に係るリアルタイムDR処理の一例を説明するための図である。It is a figure for demonstrating an example of the real-time DR process which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る運転計画管理方法の一例について説明するためのフローチャートである。It is a flowchart for demonstrating an example of the driving | running plan management method which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る計画DR作成部の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the plan DR preparation part which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る計画DR作成部の概略を説明するための図である。It is a figure for demonstrating the outline of the plan DR preparation part which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る計画DRの作成方法の一例について説明するためのフローチャートである。It is a flowchart for demonstrating an example of the production method of plan DR which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る需要電力の制御対象である施設の例を示す図である。It is a figure which shows the example of the plant | facility which is the control object of the demand power which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る負荷電力制御装置の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the load power control apparatus which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係るリアルタイムDR処理のタイミングの例を示す図である。It is a figure which shows the example of the timing of the real-time DR process which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る優先順位テーブルの一例を示す図である。It is a figure which shows an example of the priority table which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る予測モードのリアルタイムDR処理の一例を示すフローチャートである。It is a flowchart which shows an example of the real-time DR process of the prediction mode which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係る実績モードのリアルタイムDR処理の一例を示すフローチャートである。It is a flowchart which shows an example of the real-time DR process of the performance mode which concerns on 1st Embodiment of this invention. 本発明の第2実施形態に係るスマートグリッドシステムの構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the smart grid system which concerns on 2nd Embodiment of this invention.

<第1実施形態>
以下、本発明の一実施形態に係る運転スケジュール管理装置1を含むスマートグリッドシステムの一例について図1を参照して説明する。
図1は、本実施形態によるスマートグリッドシステムの一例を示す概略ブロック図である。
図1に示す通り、このスマートグリッドシステムは、運転管理装置1と、空調熱源設備機器3と、作業設備機器4と、電源機器6と、電源出力制御装置7と負荷電力制御装置8とを備える。
このスマートグリッドシステムは、負荷装置として、例えば、空調熱源設備機器3と作業設備機器4を含む。なお、空調熱源設備機器3は熱源を備えているため、作業設備機器4に比べて消費電力の変動が激しく、天気や室内の利用環境に応じてその消費電力が変動しやすい。
<First Embodiment>
Hereinafter, an example of a smart grid system including an operation schedule management device 1 according to an embodiment of the present invention will be described with reference to FIG.
FIG. 1 is a schematic block diagram illustrating an example of a smart grid system according to the present embodiment.
As shown in FIG. 1, the smart grid system includes an operation management device 1, an air conditioning heat source facility device 3, a work facility device 4, a power supply device 6, a power supply output control device 7, and a load power control device 8. .
This smart grid system includes, for example, an air conditioning heat source equipment 3 and a work equipment 4 as load devices. In addition, since the air-conditioning heat-source equipment 3 is provided with the heat source, the power consumption fluctuates more rapidly than the work equipment 4 and the power consumption tends to fluctuate depending on the weather and the indoor usage environment.

空調熱源設備機器3は、空調熱源機31と、外調機32と、空調機33と、熱循環機構34と、パッケージ空調機35とを含む。この空調熱源設備機器3は、熱循環機構34を介して循環する媒体(例えば水)の温度を調整して、例えば各部屋に設置された空調機33を介して室内の温度を調整する設備機器である。この空調熱源設備機器3は、熱循環機構34を利用して、負荷装置が必要とする熱量を、外調機32や空調機33に提供する。
この熱循環機構34は、例えば、各部屋に張り巡らされ、空調熱源機31によって与えられた熱量を保持する媒体(液体や気体)を充填したパイプ341と、この媒体を循環させるポンプ342と、熱量を保持する媒体を蓄える蓄熱槽343を含む。
空調熱源機31は、例えばヒートポンプやジェネリンク等を含み、パイプ341に充填された媒体の温度を上げる加熱処理、および、媒体の温度を下げる冷却処理を行う。
外調機32は、外気を取り込み、室内温度にあわせてある程度、外気温度を調整する。
空調機33は、空調熱源機31により加熱処理あるいは冷却処理された媒体の温度を利用して、外調機32が取り込んだ外気を室内温度に合わせて調整する。
パッケージ空調機35は、空調熱源機31により加熱・冷却処理された媒体の温度を利用せずに、外調機32が取り込んだ外気を室内温度に合わせて調整する。
The air conditioning heat source equipment 3 includes an air conditioning heat source unit 31, an external air conditioner 32, an air conditioner 33, a heat circulation mechanism 34, and a package air conditioner 35. The air conditioning heat source equipment 3 adjusts the temperature of a medium (for example, water) that circulates through the heat circulation mechanism 34, and adjusts the temperature of the room through the air conditioner 33 installed in each room, for example. It is. The air conditioning heat source equipment 3 uses the heat circulation mechanism 34 to provide the external air conditioner 32 and the air conditioner 33 with the amount of heat required by the load device.
This heat circulation mechanism 34 is, for example, a pipe 341 that is stretched around each room and filled with a medium (liquid or gas) that retains the amount of heat given by the air conditioning heat source unit 31, a pump 342 that circulates this medium, It includes a heat storage tank 343 that stores a medium that holds the amount of heat.
The air conditioning heat source unit 31 includes, for example, a heat pump, a gene link, and the like, and performs a heating process for increasing the temperature of the medium filled in the pipe 341 and a cooling process for decreasing the temperature of the medium.
The outside air conditioner 32 takes in outside air and adjusts the outside air temperature to some extent according to the room temperature.
The air conditioner 33 uses the temperature of the medium heat-treated or cooled by the air-conditioning heat source device 31 to adjust the outside air taken in by the external air conditioner 32 according to the room temperature.
The package air conditioner 35 adjusts the outside air taken in by the external air conditioner 32 according to the room temperature without using the temperature of the medium heated and cooled by the air conditioning heat source device 31.

作業設備機器4は、PC(Personal Computer)41と、照明機器42と、OA(Office Automation)機器43とを含む。
これらPC41、照明機器42、OA機器43は、オフィス等のビル内に多く設置されている作業設備機器であって、本発明に係る作業設備機器4の一例である。
The work equipment 4 includes a PC (Personal Computer) 41, a lighting device 42, and an OA (Office Automation) device 43.
The PC 41, the lighting device 42, and the OA device 43 are work facility devices that are often installed in buildings such as offices, and are examples of the work facility device 4 according to the present invention.

また、このスマートグリッドシステムは、これら負荷装置に電力を供給する電源機器6として、第1発電機61と、第2発電機62と、蓄電池63と、買電電源64を含む。
第1発電機61は、風力エネルギーや太陽光エネルギー等を利用して自家発電により電力を発電する。この第1発電機61の発電エネルギーは天候によって左右されるため、その出力電力は一定ではない。
第2発電機62は、例えばガスエンジン発電機やガスタービン発電機等の発電機である。この第2発電機62は、天候によって左右される発電エネルギーを使用していないため、出力電力を調整することができる。
蓄電池62は、第1発電機61および第2発電機62によって発電された発電電力、および買電電源64から出力される買電電力を蓄電する。
買電電源64は、例えば、使用者が電力会社から購入する電力(買電電力)を出力する。
なお、この電力会社からの買電については、使用者に応じて契約電力C[kw]が決まっており、使用した予め決められた一定時間(デマンド時限)あたりの平均電力が契約電力Cを超えた場合、予め契約電力Cに応じて決められている支払料金に違約金等の追加料金が課せられる。ここでは、契約電力のことを、以下、デマンド目標値Cということもある。以下、予め決められた一定時間当たりとはデマンド時限に相当し、任意に決められる一定の時間であって、例えば30分である。
In addition, the smart grid system includes a first generator 61, a second generator 62, a storage battery 63, and a power purchase power supply 64 as power supply devices 6 that supply power to these load devices.
The first generator 61 generates electric power by private power generation using wind energy, solar energy, or the like. Since the power generation energy of the first generator 61 depends on the weather, the output power is not constant.
The second generator 62 is a generator such as a gas engine generator or a gas turbine generator. Since the second generator 62 does not use the power generation energy that depends on the weather, the output power can be adjusted.
The storage battery 62 stores the generated power generated by the first generator 61 and the second generator 62 and the purchased power output from the purchased power source 64.
The power purchase power supply 64 outputs, for example, the power purchased by the user from the power company (power purchase power).
Regarding power purchase from this power company, the contract power C [kw] is determined according to the user, and the average power used for a predetermined time (demand time limit) exceeds the contract power C. In such a case, an additional fee such as a penalty is imposed on the payment fee determined in advance according to the contract power C. Here, the contract power may be hereinafter referred to as a demand target value C. Hereinafter, the predetermined fixed time corresponds to a demand time period, and is a fixed time arbitrarily determined, for example, 30 minutes.

運転管理装置1は、空調熱源運転計画と電源設備運転計画について管理する。
この空調熱源運転計画とは、空調熱源に相当する負荷装置が必要とする熱負荷をデマンド時限毎に割り振り、この割り振りを時刻毎に示す計画である。空調熱源運転計画は、例えば、予測日において予め決められている設定温度に温度調整するために予想される熱量を供給するため、一日の各時間帯において予測される空調熱源に相当する負荷装置が消費する放熱量と蓄熱槽に蓄熱される蓄熱量を示す。
電源設備運転計画とは、全ての負荷装置に供給する電力源(発電電力と買電電力)の割り振りを時刻毎に示す計画である。この電源設備運転計画は、電源機器6から給電されることが予想される電力負荷予測値を、電源機器6に含まれる各電源出力(第1発電機61と、第2発電機62と、蓄電池63と、買電電源64)毎の運転のスケジュールにより示すものである。例えば、電源設備運転計画は、一日の各時間帯において予測される供給電力を給電するため、電源機器6が、予め決められた一定時間(デマンド時限)毎に運転するための電力を示す。
なお、空調熱源運転計画と電源設備運転計画の詳細については後述する。
The operation management apparatus 1 manages the air conditioning heat source operation plan and the power supply facility operation plan.
This air conditioning heat source operation plan is a plan in which the thermal load required by the load device corresponding to the air conditioning heat source is allocated for each demand time period and this allocation is shown for each time. The air-conditioning heat source operation plan is, for example, a load device corresponding to an air-conditioning heat source predicted in each time zone of the day in order to supply an amount of heat expected to adjust the temperature to a preset temperature predetermined on the prediction date. Indicates the amount of heat dissipated and the amount of heat stored in the heat storage tank.
The power supply facility operation plan is a plan showing allocation of power sources (generated power and purchased power) to be supplied to all load devices at each time. This power supply facility operation plan is based on the predicted power load expected to be fed from the power supply device 6 for each power output (first generator 61, second generator 62, and storage battery included in the power supply device 6). 63 and the schedule of operation for each purchased power source 64). For example, the power supply facility operation plan indicates the power required for the power supply device 6 to operate every predetermined time (demand time limit) in order to supply the supply power predicted in each time zone of the day.
The details of the air conditioning heat source operation plan and the power supply facility operation plan will be described later.

運転管理装置1は、予め、空調熱源設備機器3、作業設備機器4および電源機器6の最適運転制御を行うために各種情報を収集し、その情報を基に空調熱負荷予測処理と発電出力予測処理を行う。この空調熱負荷予測処理では、予め決められている設定温度に温度調整するために必要と予測される熱量(空調熱負荷)を算出する処理を行う。発電出力予測処理は、第1発電機61が発電すると予測される電力を算出する処理を行う。
運転管理装置1は、空調熱負荷予測処理と発電出力予測処理の結果に基づき、運転計画作成処理を行う。この運転計画作成部105は、これらの予想結果に基づき、予測される空調熱負荷に応じて空調熱源運転計画の作成を行うとともに、予測される空調熱負荷に応じて、買電電源64からの買電電力が任意の目標値(例えば最小値)となる電源機器6の各電源(第1発電機61と、第2発電機62と、蓄電池63と、買電電源64)の電力負荷を示す電源設備運転計画を作成する。
この運転管理装置1の基本処理は、各種情報を収集して空調熱負荷予測処理と発電出力予測処理を行う処理行程1と、その結果に基づいて空調熱源運転計画と電源設備運転計画を作成するための運転計画作成処理を行う処理行程2と、の2つの処理工程である。
本実施形態に係る運転管理装置1は、この2つの処理工程に加え、計画DRを実行する処理と、リアルタイムDRを実行する処理を、場合に応じて行う。
なお詳細については後述する。
The operation management apparatus 1 collects various information in advance for optimal operation control of the air conditioning heat source equipment 3, work equipment 4, and power supply 6, and based on the information, air conditioning heat load prediction processing and power generation output prediction. Process. In this air conditioning thermal load prediction process, a process of calculating the amount of heat (air conditioning thermal load) predicted to be necessary to adjust the temperature to a predetermined set temperature is performed. In the power generation output prediction process, a process of calculating power predicted to be generated by the first generator 61 is performed.
The operation management device 1 performs an operation plan creation process based on the results of the air conditioning thermal load prediction process and the power generation output prediction process. The operation plan creation unit 105 creates an air-conditioning heat source operation plan according to the predicted air-conditioning heat load based on these prediction results, and from the purchased power source 64 according to the predicted air-conditioning heat load. Indicates the power load of each power source (the first generator 61, the second generator 62, the storage battery 63, and the purchased power source 64) of the power source device 6 at which the purchased power becomes an arbitrary target value (for example, the minimum value). Create a power plant operation plan.
The basic process of the operation management apparatus 1 is to collect a variety of information and create an air conditioning heat load prediction process and a power generation output prediction process, and a process step 1 to create an air conditioning heat source operation plan and a power supply facility operation plan based on the results. This is two processing steps, that is, a process step 2 for performing an operation plan creation process.
In addition to these two processing steps, the operation management apparatus 1 according to the present embodiment performs a process for executing the plan DR and a process for executing the real-time DR according to circumstances.
Details will be described later.

電源出力制御装置7は、運転管理装置1による運転計画、計画DR、リアルタイムDR処理に基づき、電源機器6から負荷装置である空調熱源設備機器3と作業設備機器4に対して電力を供給する電力源(第1発電機61、第2発電機62、蓄電機63、買電電源64)を指定するとともに、この電力源が出力する電力とそのタイミングとを制御する。具体的にいうと、この電源出力制御装置7は、電力源のうち第1発電機61、第2発電機62および蓄電機63が出力する電力を制御する。なお、買電電源64が出力する電力は、負荷装置(空調熱源設備機器3および作業設備機器4)のデマンドに対して、第1発電機61、第2発電機62および蓄電機63が出力する電力では不足する電力である。
負荷電力制御装置8は、運転管理装置1による運転計画、計画DR、リアルタイムDR処理に基づき、空調熱源設備機器3および作業設備機器4の運転を制御する。
The power output control device 7 supplies power from the power supply device 6 to the air conditioning heat source equipment device 3 and the work equipment device 4 that are load devices based on the operation plan, plan DR, and real-time DR processing by the operation management device 1. While specifying the source (the 1st generator 61, the 2nd generator 62, the electrical storage device 63, the power purchase power supply 64), the electric power which this electric power source outputs, and its timing are controlled. More specifically, the power supply output control device 7 controls the power output from the first generator 61, the second generator 62, and the power storage device 63 in the power source. In addition, the electric power which the electric power purchase power supply 64 outputs from the 1st generator 61, the 2nd generator 62, and the electrical storage device 63 with respect to the demand of a load apparatus (the air-conditioning heat-source equipment 3 and the work equipment 4). Electricity is insufficient for electric power.
The load power control device 8 controls the operation of the air conditioning heat source equipment 3 and the work equipment 4 based on the operation plan, plan DR, and real-time DR processing by the operation management device 1.

次に、図2を参照して、運転管理装置1の構成の一例について説明する。図2は、本実施形態に係る運転管理装置1の構成の一例を示すブロック図である。
図2に示す通り、運転管理装置1は、第1記憶部101と、空調熱負荷予測部102と、第2記憶部103と、発電出力予測処理部104と、運転計画作成部105と、電力負荷予測部106と、第3記憶部107と、デマンド超過判定部108と、計画DR作成部109と、リアルタイムDR実行指示部110と、出力部115と、データ管理処理部116と、プログラム管理処理部117と含む。
Next, an example of the configuration of the operation management device 1 will be described with reference to FIG. FIG. 2 is a block diagram illustrating an example of the configuration of the operation management apparatus 1 according to the present embodiment.
As shown in FIG. 2, the operation management apparatus 1 includes a first storage unit 101, an air conditioning thermal load prediction unit 102, a second storage unit 103, a power generation output prediction processing unit 104, an operation plan creation unit 105, and power Load prediction unit 106, third storage unit 107, demand excess determination unit 108, plan DR creation unit 109, real-time DR execution instruction unit 110, output unit 115, data management processing unit 116, program management processing Part 117.

第1記憶部101は、天気予報データ111と、電力負荷パターンデータ112と、実測データ113と、評価軸設定データ114と、を記憶する。
天気予報データ111は、一日の所定時刻における予想される天気を示す天気予報情報を、一定間隔の時間帯(あるいは時刻)に対応付けたデータである。この天気予報情報としては、対応付けられた時間帯において予想されている天候、気温、湿度、降水確率、日照時間等を示す情報である。
The first storage unit 101 stores weather forecast data 111, power load pattern data 112, actual measurement data 113, and evaluation axis setting data 114.
The weather forecast data 111 is data in which weather forecast information indicating the expected weather at a predetermined time of the day is associated with a time zone (or time) at regular intervals. This weather forecast information is information indicating the weather, temperature, humidity, precipitation probability, sunshine duration, and the like that are expected in the associated time zone.

電力負荷パターンデータ112は、例えば、一日の時間帯に応じて作業設備機器4が消費する消費電力のパターンを示す情報を含む。具体的に説明すると、一日のうち、多くの人が活動する9時〜20時の時間帯では、多くの人が就寝している24時〜5時の時間帯に比べて、その消費電力が多くなる。また、休日は平日に比べ、その消費電力が少なくなる。このように、人間の行動パターンに応じて、一日の時間帯における消費電力が異なる。この電力負荷パターンデータ112は、この違いを作業設備機器の数量や使用者に応じてパターン化したものである。   The power load pattern data 112 includes, for example, information indicating a pattern of power consumption consumed by the work facility device 4 according to the time zone of the day. More specifically, in the time zone from 9:00 to 20:00 when many people are active during the day, the power consumption is larger than the time zone from 24:00 to 5:00 when many people are sleeping. Will increase. Moreover, the power consumption on holidays is less than on weekdays. Thus, the power consumption in the time zone of the day differs according to the human behavior pattern. The power load pattern data 112 is obtained by patterning this difference in accordance with the number of work equipment and the user.

また、電力負荷パターンデータ112は、例えば、一日の時間帯に応じて空調熱源設備機器3が消費する消費電力の計算パターンを示す情報を含む。具体的に説明すると、同じ大きさの部屋に設置された空調機であっても、その部屋に入る人数、空調機の数、日当たり等によって、一日の室内の温度変化が異なる。例えば、一日中会議が行われている場合、人の出入りが多いため、室内の温度が一日中変化し、空調熱源設備機器3に対する電力負荷が増大する。一方、一日中会議等の予定がない場合、室内の温度を快適な温度に維持する必要性が少なく、夏であれば快適に過せる室内温度(快適温度)よりも高くてもよく、冬であれば快適温度よりも低くてもよく、また停止してもよい。この電力負荷パターンデータ112は、空調熱源設備機器3に対する電力負荷を計算により算出するため、空調機33が設置されている部屋の使用状況に応じて、その日1日の運転割合や温度調整をパターン化したものである。   Moreover, the power load pattern data 112 includes information indicating a calculation pattern of power consumption consumed by the air conditioning heat source equipment 3 according to, for example, a time zone of a day. More specifically, even in an air conditioner installed in a room of the same size, the temperature change in the room in a day varies depending on the number of people entering the room, the number of air conditioners, and the sun. For example, when a meeting is being held all day, there are many people going in and out, so the temperature in the room changes throughout the day and the power load on the air conditioning heat source equipment 3 increases. On the other hand, when there is no plan for a meeting all day, there is little need to maintain the room temperature at a comfortable temperature, and it may be higher than the room temperature (comfort temperature) that can be comfortably in summer, even in winter. The temperature may be lower than the comfortable temperature or may be stopped. Since the power load pattern data 112 is used to calculate the power load on the air conditioning heat source equipment 3 by calculation, the operation ratio and temperature adjustment of the day are patterned according to the usage status of the room where the air conditioner 33 is installed. It has become.

実測データ113は、空調熱源設備機器3と作業設備機器4の負荷装置が実際に消費した消費電力の実測値と、電源機器6から実際に供給を受けた供給電力の実測値を示す。この実測値は、例えば、一定時間間隔毎に、各機器において計測され、一日に時間帯に対応付けられている。
評価軸設定データ114は、省エネルギー等の評価の対処となる基準値を含む。
The actual measurement data 113 indicates actual measurement values of power consumption actually consumed by the load devices of the air conditioning heat source equipment 3 and the work equipment 4 and actual measurement values of supply power actually supplied from the power supply device 6. This actual measurement value is measured in each device at regular time intervals, for example, and is associated with a time zone per day.
The evaluation axis setting data 114 includes a reference value for dealing with evaluations such as energy saving.

空調熱負荷予測処理部102は、予想される天気を示す天気予報データおよび電力負荷パターンデータ112に基づき、室内の温度調整のために必要な熱量を予測する。言い換えると、空調熱負荷予測部102は、予め決められている設定温度に温度調整するために必要と予測される熱量(空調熱負荷)を示す空調熱負荷予測値を算出する。この空調熱負荷予測値は熱量であり、空調熱源機31の外気温や部分負荷率などの特性に基づいて電力に変換して空調熱源機31にかかる負荷電力と言い換えることができる。
この空調熱負荷予測値の一例を図3に示す。図3のグラフに示す通り、空調熱負荷予測値は、横軸に時刻、縦軸に空調熱負荷をとるグラフで示すことができる。図示の通り、日中の空調熱負荷の方が、夜間の空調熱負荷に比べて大きい。
図2に戻って、空調熱負荷予測部102の処理について具体的に説明する。空調熱負荷予測処理部102は、以下の(11)〜(15)の処理を行う。
The air conditioning heat load prediction processing unit 102 predicts the amount of heat required for indoor temperature adjustment based on the weather forecast data indicating the expected weather and the power load pattern data 112. In other words, the air-conditioning heat load prediction unit 102 calculates an air-conditioning heat load prediction value indicating the amount of heat (air-conditioning heat load) predicted to be necessary to adjust the temperature to a predetermined set temperature. This air conditioning heat load predicted value is the amount of heat, and can be rephrased as load power applied to the air conditioning heat source unit 31 by converting into electric power based on characteristics such as the outside air temperature and partial load factor of the air conditioning heat source unit 31.
An example of the predicted air conditioning heat load is shown in FIG. As shown in the graph of FIG. 3, the predicted air-conditioning heat load can be represented by a graph in which the horizontal axis represents time and the vertical axis represents the air-conditioning heat load. As illustrated, the air conditioning heat load during the day is greater than the air conditioning heat load during the night.
Returning to FIG. 2, the processing of the air conditioning thermal load prediction unit 102 will be specifically described. The air conditioning heat load prediction processing unit 102 performs the following processes (11) to (15).

(11)実測データ収集処理
空調熱負荷予測部102は、電源出力制御部7と負荷電力制御部8から、電源機器6、空調熱源設備機器3および作業設備機器4による実測データを一定時間間隔で取り込み、第1記憶部101の実測データ113に格納する。
(11) Measured data collection processing The air conditioning thermal load prediction unit 102 obtains measured data from the power supply device 6, the air conditioning heat source facility device 3 and the work facility device 4 from the power output control unit 7 and the load power control unit 8 at regular time intervals. Captured and stored in the actual measurement data 113 of the first storage unit 101.

(12)天気予報データ収集処理
空調熱負荷予測部102は、例えば、気象庁が発表する天気予報情報等を格納するインターネット上にサーバに接続して、予め設定されている時刻毎に、天気予報情報をダウンロードする。この空調熱負荷予測部102は、ダウンロードした天気予報情報を、一日の時間帯に対応付けて、天気予報データ111として第1記憶部101に格納する。
(12) Weather forecast data collection processing The air conditioning thermal load prediction unit 102 is connected to a server on the Internet that stores weather forecast information announced by the Japan Meteorological Agency, for example, and the weather forecast information is set for each preset time. Download. The air conditioning heat load prediction unit 102 stores the downloaded weather forecast information in the first storage unit 101 as the weather forecast data 111 in association with the time zone of the day.

(13)ANN負荷予測処理
空調熱負荷予測部102は、実測データや天気予報データに基づき予測用データを作成し、例えば、ニューラルネットワークを利用したANN( Artificial Neural Network )負荷予測プログラムを起動して負荷データの予測を行う。
つまり、空調熱負荷予測部102は、第1記憶部101から天気予報データ111と電力負荷パターンデータ112と実測データ113を読み出し、読み出したデータに基づき、予め決められている設定温度に温度調整するために必要と予測される熱量(空調熱負荷)を算出する。
この空調熱負荷予測部102は、生成した空調熱負荷予測値は、第1記憶部101に書き込む。
また、このANN負荷予測処理については、既存の技術(例えば、特開2006−78009号公報参照)を利用することができる。
この空調熱負荷予測部102は、上述の機能に限られず、ニューラルネットワーク以外の技術を利用して負荷データの予測することができる。
(13) ANN Load Prediction Processing The air conditioning thermal load prediction unit 102 creates prediction data based on actual measurement data and weather forecast data, and starts, for example, an ANN (Artificial Neural Network) load prediction program using a neural network. Predict load data.
That is, the air conditioning heat load prediction unit 102 reads the weather forecast data 111, the power load pattern data 112, and the actual measurement data 113 from the first storage unit 101, and adjusts the temperature to a predetermined set temperature based on the read data. Therefore, the amount of heat (air conditioning heat load) that is predicted to be necessary is calculated.
The air conditioning heat load prediction unit 102 writes the generated air conditioning heat load prediction value in the first storage unit 101.
For this ANN load prediction process, an existing technology (see, for example, JP-A-2006-78009) can be used.
The air-conditioning heat load prediction unit 102 is not limited to the above function, and can predict load data using a technique other than the neural network.

(14)予測修正処理
空調熱負荷予測部102は、ANN負荷予測処理によって運転制御を行った実際の負荷データと予測データとの差から負荷データの修正を行い、次の最適運転計画作成に反映させる。
つまり、空調熱負荷予測部102は、電源出力制御部7と負荷電力制御部8から、実測データを一定時間間隔で取り込み、この運転制御を行った時刻と一致する空調熱負荷予測値を第1記憶部101から読み出す。この空調熱負荷予測部102は、例えば、この実測データと空調熱負荷予測値とのずれを算出して、このずれに応じた補正値を作成する。
(14) Prediction correction process The air conditioning thermal load prediction unit 102 corrects the load data from the difference between the actual load data subjected to operation control by the ANN load prediction process and the prediction data, and reflects it in the creation of the next optimum operation plan. Let
That is, the air conditioning thermal load prediction unit 102 takes in measured data from the power output control unit 7 and the load power control unit 8 at regular time intervals, and sets the first predicted air conditioning thermal load value that coincides with the time when this operation control was performed. Read from the storage unit 101. The air conditioning thermal load prediction unit 102 calculates, for example, a deviation between the actual measurement data and the air conditioning thermal load prediction value, and creates a correction value corresponding to the deviation.

第2記憶部103は、発電出力パターンデータ131と、蓄電電力データ132と、天気予報データ133を記憶する。
発電出力パターンデータ131は、各電源(第1発電機61、第2発電機62、買電電源64)の最低出力値や最大出力値を示す情報を記憶する。
蓄電電力データ132は、蓄電池63の最低蓄電量や最大蓄電量を示す情報を記憶する。
天気予報データ133は、上述と同様に、一日の所定時刻における予想される天気を示す天気予報情報を、一定間隔の時間帯(あるいは時刻)に対応付けたデータである。この天気予報情報としては、対応付けられた時間帯において予想されている天候、気温、湿度、降水確率、日照時間等を示す情報である。
The second storage unit 103 stores power generation output pattern data 131, stored power data 132, and weather forecast data 133.
The power generation output pattern data 131 stores information indicating the minimum output value and the maximum output value of each power source (the first generator 61, the second generator 62, and the purchased power source 64).
The stored power data 132 stores information indicating the minimum storage amount and the maximum storage amount of the storage battery 63.
The weather forecast data 133 is data in which the weather forecast information indicating the forecasted weather at a predetermined time of day is associated with time zones (or times) at regular intervals, as described above. This weather forecast information is information indicating the weather, temperature, humidity, precipitation probability, sunshine duration, and the like that are expected in the associated time zone.

発電出力予測処理部104は、予想される天気を示す天気予報データに基づき、電源機器6による電力系統から給電される発電電力を算出し、発電出力予測結果データを出力する。
この発電出力予測結果データの一例を図4に示す。図4のグラフに示す通り、発電出力予測結果データは、横軸に時刻、縦軸に発電機61の出力電力をとる。例えば、図示の例では、出力電力が日中のみ取得でき、夜間では取得できていない。
図2に戻って、発電出力予測処理部104の処理について具体的に説明する。発電出力予測処理部104は、以下の(21)、(22)の処理を行う。
The power generation output prediction processing unit 104 calculates the generated power supplied from the power system by the power supply device 6 based on the weather forecast data indicating the expected weather, and outputs the power generation output prediction result data.
An example of this power generation output prediction result data is shown in FIG. As shown in the graph of FIG. 4, the power generation output prediction result data has time on the horizontal axis and output power of the generator 61 on the vertical axis. For example, in the illustrated example, the output power can be acquired only during the day and not at night.
Returning to FIG. 2, the processing of the power generation output prediction processing unit 104 will be specifically described. The power generation output prediction processing unit 104 performs the following processes (21) and (22).

(21)天気予報データ収集処理
発電出力予測処理部104は、上述の空調熱負荷予測部102による(12)天気予報データ収集処理と同様にして、天気予報情報を収集し、第1記憶部101の天気予報データ133に格納する。
(21) Weather forecast data collection process The power generation output prediction processing unit 104 collects weather forecast information in the same manner as the (12) weather forecast data collection process by the air conditioning thermal load prediction unit 102 described above, and the first storage unit 101 Are stored in the weather forecast data 133.

(22)発電出力予測処理
発電出力予測処理部104は、天気予報データに基づき予測用データを作成し、例えば、電力負荷パターンデータ112や天候補正係数を利用した太陽光発電予測プログラムを起動して、出力データの予測を行う。つまり、発電出力予測処理部104は、天気予報データ111を参照して、天気に応じて第1発電機61が発電できると予測される電力を算出する。
(22) Power Generation Output Prediction Processing The power generation output prediction processing unit 104 creates prediction data based on the weather forecast data, and starts, for example, a photovoltaic power generation prediction program using the power load pattern data 112 and the weather correction coefficient. The output data is predicted. That is, the power generation output prediction processing unit 104 refers to the weather forecast data 111 and calculates the power predicted that the first generator 61 can generate power according to the weather.

<運転計画作成を行う構成についての説明>
運転計画作成部105は、空調熱負荷予測値と発電出力予測結果データ、および第2記憶部の情報に基づき、少なくとも1日よりも前の日までに、1日分の運転計画(明細書中において運転計画は、空調熱源運転計画および電源設備運転計画を含む)を示す運転計画データを作成する。なお、運転計画作成部105は、この運転計画として、最適化を行う専用プログラムを実行し、最適な空調熱源運転計画および電源設備運転計画を作成することができる。
この運転計画作成部105による運転計画の作成方法の一例について、図5を参照して説明する。なお、図5は、運転計画作成部105により作成される空調熱源運転計画と電源設備運転計画を概念的に説明するための図であり、本実施形態に係る運転計画作成部105は、例えば、後述する数理計画法によりデマンドが最小となるように最適化を行うことで、以下のような処理を行う。なお、ここでは、空調熱源機31が複数の空調熱源機31Aと空調熱源機31Bとを含む例について説明する。
<Description of the configuration for creating the operation plan>
Based on the air conditioning thermal load prediction value, the power generation output prediction result data, and the information in the second storage unit, the operation plan creation unit 105 operates the operation plan for one day at least before the first day (in the specification) The operation plan includes operation plan data indicating an air conditioning heat source operation plan and a power supply facility operation plan. The operation plan creation unit 105 can execute a dedicated program for optimization as the operation plan, and can create an optimal air conditioning heat source operation plan and power supply facility operation plan.
An example of an operation plan creation method by the operation plan creation unit 105 will be described with reference to FIG. FIG. 5 is a diagram for conceptually explaining the air conditioning heat source operation plan and the power supply facility operation plan created by the operation plan creation unit 105. The operation plan creation unit 105 according to the present embodiment includes, for example, The following processing is performed by performing optimization so that the demand is minimized by mathematical programming described later. Here, an example in which the air conditioning heat source unit 31 includes a plurality of air conditioning heat source units 31A and an air conditioning heat source unit 31B will be described.

1)空調熱源運転計画の作成について
運転計画作成部105は、空調熱負荷予測部102により作成された空調熱負荷予測値に基づき、空調熱源機31と蓄熱槽343により生成できる熱量の割り当てを行い、空調熱源運転計画を作成する。つまり、運転計画作成部105は、空調熱負荷予測値に応じて、デマンド時限毎に空調熱源機31が生成する熱量と蓄熱槽343に蓄熱できる熱量を算出する。運転計画作成部105は、この算出した生成する熱量と蓄熱する熱量(つまり、空調熱負荷予測結果値が示す熱量)を生成する各空調熱源設備機器の運転について時刻毎(例えば、デマンド時限で示される時刻毎)の割り当てを示す空調熱源運転計画を作成する。これを図5(a)のグラフに示す。
図5(a)のグラフは、横軸に時刻、縦軸に空調熱源機31あるいは蓄熱槽343が放熱あるいは蓄熱できる熱量をとる。このグラフにおいて、縦軸の正の値は放熱を、負の値は蓄熱を意味している。図示の通り、運転計画作成部105は、デマンド時限毎に、空調熱源機31が製造する製造熱量と、放熱量(つまり、空調熱源機31と蓄熱槽343が放熱する熱量)の和がステップST100において求めた空調熱負荷予測値と等しくなるように空調熱源運転計画を作成する。
図5(a)に示すグラフは、0:00〜6:00の間に、空調熱源機31Aが熱量を生成するとともに、この熱量を蓄熱槽343に蓄熱することを示す。また、6:00〜8:00の間に、空調熱源機31Aが熱量を生成するとともに、蓄熱槽343の熱量を放熱することを示す。また、8:00〜16:00の間に、空調熱源機31Aと空調熱源機31Bが熱量を生成するとともに、蓄熱槽が放熱することを示す。また、16:00〜22:00の間に、空調熱源機31Aと空調熱源機31Bが熱量を生成することを示す。また22:00〜24:00の間に、空調熱源機31Aが熱量を生成するとともに、この熱量を蓄熱槽343に蓄熱することを示す。
1) About creation of air conditioning heat source operation plan The operation plan creation unit 105 assigns the amount of heat that can be generated by the air conditioning heat source unit 31 and the heat storage tank 343 based on the predicted air conditioning heat load value created by the air conditioning heat load prediction unit 102. Create an air conditioning heat source operation plan. That is, the operation plan creation unit 105 calculates the amount of heat generated by the air conditioning heat source unit 31 and the amount of heat that can be stored in the heat storage tank 343 for each demand period, according to the predicted air conditioning heat load. The operation plan creation unit 105 displays the calculated amount of heat and the amount of heat to be stored (that is, the amount of heat indicated by the air-conditioning heat load prediction result value) for each time of operation (for example, in a demand time limit). Create an air conditioning heat source operation plan that shows the allocation of This is shown in the graph of FIG.
In the graph of FIG. 5A, the horizontal axis represents time, and the vertical axis represents the amount of heat that can be radiated or stored by the air conditioning heat source device 31 or the heat storage tank 343. In this graph, a positive value on the vertical axis means heat release, and a negative value means heat storage. As shown in the figure, the operation plan creation unit 105 calculates the sum of the production heat amount produced by the air conditioning heat source unit 31 and the heat radiation amount (that is, the heat amount radiated by the air conditioning heat source unit 31 and the heat storage tank 343) for each demand time period in step ST100. The air-conditioning heat source operation plan is created so as to be equal to the air-conditioning heat load predicted value obtained in step.
The graph shown in FIG. 5A indicates that the air-conditioning heat source unit 31A generates heat and stores the amount of heat in the heat storage tank 343 between 0:00 and 6:00. Moreover, it shows that 31A of air-conditioning heat-source equipment produces | generates calorie | heat amount between 6: 00-8: 00, and thermally radiates the calorie | heat amount of the thermal storage tank 343. Moreover, between 8:00 to 16:00, while the air-conditioning heat-source equipment 31A and the air-conditioning heat-source equipment 31B produce | generate an amount of heat, it shows that a thermal storage tank radiates. Moreover, it shows that the air-conditioning heat source machine 31A and the air-conditioning heat source machine 31B generate heat during 16:00 to 22:00. Moreover, between 22:00 to 24:00, while the air-conditioning heat-source equipment 31A produces | generates calorie | heat amount, it shows storing this calorie | heat amount in the thermal storage tank 343. FIG.

2)空調熱負荷予測結果値に対応する電力負荷予測値の算出について
この運転計画作成部105は、上述により算出されたデマンド時限毎に、空調熱源機31が空調熱源運転計画の示す熱量を製造する際に必要な消費電力を、電力負荷パターンデータ112を参照して算出する。運転計画作成部105は、空調熱源機31の消費電力に加え、空調熱源設備機器3と作業設備機器4の全ての負荷装置に必要な電力(電力負荷)を、電力負荷パターンデータ112を参照して算出する。つまり、運転計画作成部105は、空調熱負荷予測値が示す熱負荷をまかなうために必要な消費電力と、予測される他の負荷装置に必要な消費電力とを算出する。このように、運転計画作成部105が空調熱負荷予測値に基づき算出する負荷装置の消費電力は、デマンド(需要家に供給する買電電力)と需要家に供給する発電電力によって示される電力であって、以下、電力負荷予測値という。この電力負荷予測値の一例を、図5(b)のグラフに示す。図5(b)のグラフは、横軸に時刻、縦軸に電力負荷を示す。
なお、本実施形態において、運転計画作成部105は、デマンドを任意の目標値とするように電源設備運転計画を作成することを特徴とするものであり、以下説明便宜のため、電力負荷予測値について説明する際には、需要電力のうち、需要家に供給する発電電力を除いたデマンドにのみ対応する予測値について説明する。
2) Calculation of predicted power load value corresponding to predicted air conditioning heat load result This operation plan creation unit 105 produces the amount of heat indicated by the air conditioning heat source operation plan by the air conditioning heat source unit 31 for each demand time period calculated as described above. The power consumption required for this is calculated with reference to the power load pattern data 112. The operation plan creation unit 105 refers to the power load pattern data 112 for the power (power load) necessary for all load devices of the air conditioning heat source equipment 3 and the work equipment 4 in addition to the power consumption of the air conditioning heat source machine 31. To calculate. That is, the operation plan creation unit 105 calculates the power consumption necessary to cover the thermal load indicated by the air conditioning thermal load predicted value and the power consumption necessary for another predicted load device. As described above, the power consumption of the load device calculated by the operation plan creation unit 105 based on the predicted air-conditioning heat load is the power indicated by the demand (power purchased to be supplied to the consumer) and the generated power supplied to the consumer. Therefore, hereinafter, it is referred to as a predicted power load value. An example of the predicted power load value is shown in the graph of FIG. In the graph of FIG. 5B, the horizontal axis indicates time, and the vertical axis indicates power load.
In the present embodiment, the operation plan creation unit 105 creates the power supply facility operation plan so that the demand is an arbitrary target value. For convenience of explanation, the power load predicted value is described below. In the explanation, the prediction value corresponding to only the demand excluding the generated power supplied to the consumer among the demand power will be explained.

3)電源設備運転計画の作成について
運転計画作成部105は、上述により算出された空調熱源設備機器3と作業設備機器4の電力負荷予測値に基づき、デマンドが任意の目標値(例えば最小値)となるように電源電力の割り当てを行う。この電源電力の割り当てをデマンド時限毎に示したものが電源設備運転計画である。
例えば、運転計画作成部105は、電力負荷予測値が契約電力Cであるデマンド目標値を下回っている場合、買電電力をこの電力負荷予測値以上に増やして、買電電力を蓄電池63に蓄電する電源設備運転計画とする。また、運転計画作成部105は、電力負荷予測値がデマンド目標値Cを上回っている場合、買電電力の最大値をデマンド目標値C以下に留めるとともに、不足分を第1発電機61および第2発電機62からの電力および蓄電池63からの電力で補うように電源設備運転計画を作成する。
図5(c)に示すとおり、0:00〜6:00の間は、電力負荷予測値がデマンド目標値Cを下回っている。このため、運転計画作成部105は、買電電力を電力負荷予測値以上に増やし、この買電電力を蓄電池62に蓄電する電源設備運転計画を作成する。一方、6:00〜18:00の間は、電力負荷予測値がデマンド目標値Cを上回っている。このため、運転計画作成部105は、買電電力の最大値をデマンド目標値C以下にして、デマンド目標値C以上の電力負荷を第1発電機61および第2発電機62からの電力および蓄電池63からの電力で補うように、デマンド時限毎に電源の割り振りを行う。この運転計画作成部105は、発電出力予測処理部104により予測される発電出力予測結果データが示す第1発電機61の出力予測を基準として、不足分を、0:00〜6:00の間に蓄電池63に蓄電しておいた買電電力や、第2発電機62からの発電電力を組み合わせて電源設備運転計画を作成する。
3) Creation of power supply facility operation plan The operation plan creation unit 105 is based on the predicted power load values of the air conditioning heat source facility device 3 and the work facility device 4 calculated as described above, and the demand is an arbitrary target value (for example, the minimum value). The power supply is allocated so that A power supply facility operation plan shows the allocation of the power supply for each demand period.
For example, when the predicted power load value is lower than the demand target value that is the contract power C, the operation plan creation unit 105 increases the purchased power to the predicted power load value or more and stores the purchased power in the storage battery 63. The power supply equipment operation plan to be used. When the predicted power load value exceeds the demand target value C, the operation plan creation unit 105 keeps the maximum value of the purchased power below the demand target value C and reduces the shortage to the first generator 61 and the first generator 61. The power supply facility operation plan is created so as to be supplemented with the electric power from the two generators 62 and the electric power from the storage battery 63.
As shown in FIG. 5 (c), the predicted power load value is lower than the demand target value C between 0:00 and 6:00. Therefore, the operation plan creation unit 105 creates a power supply facility operation plan for increasing the purchased power to a power load predicted value or more and storing the purchased power in the storage battery 62. On the other hand, the predicted power load value exceeds the demand target value C between 6:00 and 18:00. For this reason, the operation plan creation unit 105 sets the maximum value of the purchased power to the demand target value C or less, sets the power load equal to or higher than the demand target value C to the power from the first generator 61 and the second generator 62 and the storage battery. In order to make up for the power from 63, power is allocated for each demand period. The operation plan creation unit 105 sets the shortage between 0:00 and 6:00 based on the output prediction of the first generator 61 indicated by the power generation output prediction result data predicted by the power generation output prediction processing unit 104. The power supply facility operation plan is created by combining the purchased power stored in the storage battery 63 and the generated power from the second generator 62.

具体的に説明すると、運転計画作成部105は、以下に示す評価関数、変数、制約条件に基づき、数理計画法を用いて電源設備運転計画を作成する。   Specifically, the operation plan creation unit 105 creates a power supply facility operation plan using a mathematical programming method based on the following evaluation function, variable, and constraint conditions.

Figure 0005668970
Figure 0005668970

なお、数式に示す略字は、以下の通りである。
nt{nt=1,2,・・・}は、1日のスケジュールにおける時間帯をデマンド時限を示す情報である。なお、デマンド時限が30分である場合、ntの最大値(nt_max)=24[hour]/デマンド時限(0.5)[hour]=48である。
ng{ng=1,2,・・・}は、第1発電機61および第2発電機62の台数を示す。
nb{nb=1,2,・・・}は、蓄電池63の台数を示す。
nh{nh=1,2,・・・}は、空調熱源機31の台数を示す。
nhs{nhs=1,2,・・・}は、蓄熱槽343の台数を示す。
Pgは、第1発電機61および第2発電機62からの出力電力を示す。
Pbは、蓄電池63の出力電力を示す。なお、放電は正の数値で示す。
Qhは、空調熱源機31が製造する熱量である空調熱源製造熱量を示す。
Qhsは、蓄熱槽343が放電する熱量である蓄熱槽放蓄熱量を示す。
The abbreviations shown in the mathematical expressions are as follows.
nt {nt = 1, 2,...} is information indicating a demand time limit in a time zone in a daily schedule. When the demand time period is 30 minutes, the maximum value of nt (nt_max) = 24 [hour] / demand time period (0.5) [hour] = 48.
ng {ng = 1, 2,...} indicates the number of first generators 61 and second generators 62.
nb {nb = 1, 2,...} indicates the number of storage batteries 63.
nh {nh = 1, 2,...} indicates the number of air conditioning heat source units 31.
nhs {nhs = 1, 2,...} indicates the number of heat storage tanks 343.
Pg indicates output power from the first generator 61 and the second generator 62.
Pb indicates the output power of the storage battery 63. Discharge is indicated by a positive numerical value.
Qh indicates the amount of heat produced by the air conditioning heat source, which is the amount of heat produced by the air conditioning heat source unit 31.
Qhs indicates the amount of heat stored in the heat storage tank that is the amount of heat discharged from the heat storage tank 343.

Δgは、第1発電機61および第2発電機62が起動状態であるかあるいは停止状態であるか否かの発電機起動停止状態を示す。
Δbは、蓄電池63が起動状態であるかあるいは停止状態であるか否かの蓄電池起動停止状態を示す。
Δhは、空調熱源機31が起動状態であるかあるいは停止状態であるか否かの空調熱源起動停止状態を示す。
Ppは、買電電力64から出力される買電電力を示す。
Plは、予測負荷電力は、電力負荷予測値である。
Qlは、予測熱負荷は、空調熱負荷予測値である。
Pg_minは、第1発電機61および第2発電機62の出力電力の最低値である発電機最低出力を示す。
Pg_maxは、第1発電機61および第2発電機62の出力電力の最大値である発電機最大出力を示す。
Δg indicates a generator start / stop state in which the first generator 61 and the second generator 62 are in a start state or in a stop state.
Δb indicates a storage battery start / stop state indicating whether the storage battery 63 is in a start state or a stop state.
Δh indicates an air conditioning heat source start / stop state indicating whether the air conditioning heat source unit 31 is in the start state or in the stop state.
Pp represents the purchased power output from the purchased power 64.
Pl is the predicted load power, which is a predicted power load value.
Ql is the predicted heat load of the air conditioning heat load.
Pg_min indicates a generator minimum output that is a minimum value of output power of the first generator 61 and the second generator 62.
Pg_max indicates a generator maximum output that is the maximum value of the output power of the first generator 61 and the second generator 62.

Pb_minは、蓄電池63の蓄電電力の最低値である蓄電池最低出力を示す。
Pb_maxは、蓄電池63の蓄電電力の最大値である蓄電池最大出力を示す。
Qh_minは、空調熱源機31が製造する熱量の最低値を示す空調熱源最低製造熱量である。
Qh_maxは、空調熱源機31が製造する熱量の最大値を示す空調熱源最大製造熱量である。
Zbは、蓄電池63が蓄電している蓄電電力の残量を示す蓄電池残蓄電量である。
Zhsは、蓄熱槽343が蓄熱している蓄熱量の残量を示す蓄熱槽残蓄熱量である。
Zb_minは、蓄電池63が蓄電している蓄電電力の最低値を示す蓄電池最低蓄電量である。
Zb_maxは、蓄電池63が蓄電している蓄電電力の最大値を示す蓄電池最大蓄電量である。
Zhs_minは、蓄熱槽343が蓄熱している蓄熱量の最低値を示す蓄熱槽最低蓄熱量である。
Zhs_maxは、蓄熱槽343が蓄熱している蓄熱量の最大値を示す蓄熱槽最大蓄熱量である。
PEは、ペナルティである。
αは、ペナルティ係数である。
Pb_min indicates the storage battery minimum output that is the minimum value of the stored power of the storage battery 63.
Pb_max indicates the storage battery maximum output that is the maximum value of the stored power of the storage battery 63.
Qh_min is the air conditioning heat source minimum production heat quantity indicating the minimum value of the heat quantity produced by the air conditioning heat source unit 31.
Qh_max is an air conditioning heat source maximum production heat quantity indicating the maximum value of the heat quantity produced by the air conditioning heat source unit 31.
Zb is a storage battery remaining storage amount indicating the remaining amount of stored power stored in the storage battery 63.
Zhs is the heat storage tank residual heat storage amount indicating the remaining amount of heat storage amount stored in the heat storage tank 343.
Zb_min is a storage battery minimum storage amount indicating a minimum value of stored power stored in the storage battery 63.
Zb_max is a storage battery maximum storage amount indicating the maximum value of the storage power stored in the storage battery 63.
Zhs_min is a heat storage tank minimum heat storage amount indicating the minimum value of the heat storage amount stored in the heat storage tank 343.
Zhs_max is the heat storage tank maximum heat storage amount indicating the maximum value of the heat storage amount stored in the heat storage tank 343.
PE is a penalty.
α is a penalty coefficient.

なお、運転計画作成部105は、数理計画法により発電機、蓄電池、空調熱源機が最適となる1日の電源設備運転計画を決定する。この場合、この運転計画作成部105は、デマンドが小さい時期に、最適の目的を省エネや省コスト、CO2排出最小化等とすることで、省エネ、省コスト、C2排出最小化等の運用が可能となる。また、運転計画作成部105は、省エネ、省コストで予測した最大デマンド予測値がデマンド目標値を超える場合は、最適の目的をデマンド最小化として数理計画法を適用することでデマンドが最小となる発電機、蓄電池、空調熱源機の1日の電源設備運転計画を決定する。   In addition, the operation plan preparation part 105 determines the power supply equipment operation plan of the day when a generator, a storage battery, and an air-conditioning heat-source machine become optimal by mathematical programming. In this case, when the demand is low, the operation plan creation unit 105 can perform operations such as energy saving, cost saving, and C2 emission minimization by setting the optimum purpose to energy saving, cost saving and CO2 emission minimization. It becomes. In addition, when the maximum demand predicted value predicted by energy saving and cost saving exceeds the demand target value, the operation plan creation unit 105 minimizes demand by applying mathematical programming with the optimal purpose as demand minimization. Determine the daily power facility operation plan for the generator, storage battery, and air conditioning heat source.

<計画DRを行う構成についての説明>
電力負荷予測部106は、運転計画作成部105から運転計画データを入力し、デマンド時限当たりのデマンドの平均値(デマンド電力)の極大値(以下、デマンドピーク値)を検出する。具体的に説明すると、運転計画作成部105により空調熱源運転計画が作成されることで、図5(b)に示す電力負荷予測値に基づき、図5(c)のように電源電力の割り振りを示す電源設備運転計画が作成される。ここで、運転計画作成部105が作成する電源設備運運転計画は、デマンドを最小値に最適化するものであって、買電電力の割り当てがデマンド目標値C以下になるとは限らない。ここで、図6を参照して、運転計画作成部105が作成した電源設備運転計画における買電電源64のデマンドを電力量で示すデマンド電力の割合について説明する。図6には、デマンド電力の極大値であるデマンドピーク値が2箇所あり、いずれもがデマンド目標値Cを超えている場合についてのデマンドについての電源設備運転計画の例を示す。
図6は、横軸に時刻、縦軸にデマンド電力をとり、デマンド電力を示すグラフである。
図6には、運転計画実施前のデマンド電力を示すデータ1と、運転計画実施後のデマンド電力を示すデータ2とを示す。なお、データ1は、本願発明によらない場合の比較例であり、本願発明に係る運転計画作成部105は、データ2に示すようなデマンド電力を算出する。
図示の通り、データ2のデマンド電力は、11:00と15:00にデマンドピーク値を示し、10:30〜11:30間、および、14:30〜15:30間でデマンド目標値Cを超えている。なお、11:00のデマンドピーク値P1の方が、15:00のデマンドピーク値P2に比べて小さい。
電力負荷予測部106は、このデマンド電力のデマンドピーク値を検出するとともに、検出されたデマンドピーク値のうち最大のデマンドピーク値をデマンド最大値として検出する。図6に示す例では、電力負荷予測部106が、ピーク値P2をデマンド最大値として検出する。なお、デマンド最大値とは、上述の通り、需要家の施設等におけるデマンド電力の実績値を計測し、1ヶ月間のデマンド電力の実績値のうち最大の値を、その月のデマンド最大値という。
<Description of the configuration for performing the plan DR>
The power load prediction unit 106 inputs the operation plan data from the operation plan creation unit 105 and detects the maximum value (hereinafter, demand peak value) of the average value of demand per demand time period (demand power). More specifically, when the air conditioning heat source operation plan is created by the operation plan creation unit 105, the power supply allocation is performed as shown in FIG. 5C based on the predicted power load shown in FIG. The power supply operation plan shown is created. Here, the power supply facility operation plan created by the operation plan creation unit 105 optimizes the demand to the minimum value, and the allocation of purchased power is not necessarily equal to or less than the demand target value C. Here, with reference to FIG. 6, the ratio of the demand power which shows the demand of the power purchase power supply 64 in the power supply equipment operation plan which the operation plan preparation part 105 produced in the electric energy is demonstrated. FIG. 6 shows an example of a power supply facility operation plan for demand when there are two demand peak values, which are the maximum values of demand power, and both exceed the demand target value C.
FIG. 6 is a graph showing demand power with time on the horizontal axis and demand power on the vertical axis.
FIG. 6 shows data 1 indicating demand power before the operation plan is executed and data 2 indicating demand power after the operation plan is executed. Note that the data 1 is a comparative example when not according to the present invention, and the operation plan creation unit 105 according to the present invention calculates demand power as shown in the data 2.
As shown in the figure, the demand power of data 2 shows demand peak values at 11:00 and 15:00, and the demand target value C between 10:30 and 11:30 and between 14:30 and 15:30. Over. The demand peak value P1 at 11:00 is smaller than the demand peak value P2 at 15:00.
The power load prediction unit 106 detects the demand peak value of the demand power, and detects the maximum demand peak value among the detected demand peak values as the demand maximum value. In the example illustrated in FIG. 6, the power load prediction unit 106 detects the peak value P2 as the demand maximum value. The demand maximum value, as described above, measures the actual value of demand power at the customer's facility, etc., and the maximum value among the actual demand power values for one month is called the demand maximum value for the month. .

なお、データ2に示すデマンド電力は、通常、勤務時間帯において多くなる。その理由としては、作業設備機器4による電力消費量は比較的フラット(平滑)に変化する一方、空調熱源機13などの動力機器による電力消費量は気象状況の変化などに応じて大きく変化するからである。このデータ2は、データ1と比べて、デマンドピーク値が低くなっている。
電力負荷予測部106は、運転計画データに基づき、運転計画実施後のデータ2に示す時刻11時と時刻15時でピークとなっているデマンド電力を検出し、デマンド超過判定部108に出力する。なお、電力負荷予測部106は、検出したデマンド目標値を超えるデマンドピーク値に対応するデマンド電力が複数検出された場合、そのデマンド電力の値が大きい順にデマンド超過判定部108に出力するものであってもよい。
In addition, the demand power shown in the data 2 usually increases during working hours. The reason for this is that while the power consumption by the work equipment 4 changes relatively flat (smooth), the power consumption by the power equipment such as the air conditioning heat source 13 changes greatly according to changes in weather conditions and the like. It is. This data 2 has a lower demand peak value than data 1.
Based on the operation plan data, the power load prediction unit 106 detects the demand power that peaks at the time 11:00 and the time 15:00 shown in the data 2 after the operation plan is implemented, and outputs the demand power to the demand excess determination unit 108. When a plurality of demand powers corresponding to the demand peak value exceeding the detected demand target value are detected, the power load prediction unit 106 outputs the demand load value to the demand excess determination unit 108 in descending order of the demand power value. May be.

第3記憶部107は、設定値データ171を記憶する。
この設定値データ171は、デマンド目標値C、例えば、契約電力Cを示す情報である。
The third storage unit 107 stores setting value data 171.
The set value data 171 is information indicating a demand target value C, for example, contract power C.

デマンド超過判定部108は、電力負荷予測部106からデマンドピーク値のデマンド電力と運転計画データを入力し、電源設備運転計画に示されているデマンド時限に対応するデマンドの平均値のピーク値(極大値)が、契約電力量Cであるデマンド目標値を超えるか否かを判定する。
このデマンド超過判定部108は、少なくとも1つのデマンドピーク値がデマンド目標値Cを超えていると判定した場合、計画DR作成部109に対して、計画DRを作成するように制御するための制御信号を計画DR作成部109に出力する。
一方、全てのデマンドピーク値がデマンド目標値を超えていないと判定した場合、デマンド超過判定部108は、デマンドピーク値がデマンド目標値を超えてないことを示す判定結果とともに、運転計画作成部105により作成された運転計画データを出力部115に出力する。
The demand excess determination unit 108 receives the demand power of the demand peak value and the operation plan data from the power load prediction unit 106, and the peak value of the average value of the demand corresponding to the demand time limit indicated in the power supply facility operation plan (maximum) Value) exceeds the demand target value that is the contract power amount C.
When the demand excess determination unit 108 determines that at least one demand peak value exceeds the demand target value C, the control signal for controlling the plan DR creation unit 109 to create the plan DR. Is output to the plan DR creation unit 109.
On the other hand, when it is determined that all the demand peak values do not exceed the demand target value, the demand excess determination unit 108 together with the determination result indicating that the demand peak value does not exceed the demand target value, the operation plan creation unit 105 The operation plan data created by the above is output to the output unit 115.

また、デマンド超過判定部108は、計画DR作成部109によって作成された計画DRが入力された場合、この計画DRにおけるデマンド時限当たりのDR電力負荷予測値のうち、商用の電力系統である買電電源64から給電されるデマンド時限に対応するデマンドの平均値のピーク値が、デマンド目標値量Cを超えるか否かを判定する。
このデマンド超過判定部108は、少なくとも1つのデマンドピーク値がデマンド目標値を超えていると判定した場合、リアルタイムDR実行指示部110に対して、リアルタイムDRを実行するように指示するリアルタイムDR実行指示信号をリアルタイムDR実行指示部110に出力する。
一方、全てのデマンド時限に対応するデマンドの平均値のピーク値がデマンド目標値を超えていないと判定した場合、デマンド超過判定部108は、デマンドピーク値がデマンド目標値を超えてないことを示す判定結果とともに、運転計画作成部105により作成された運転計画データと計画DR作成部109により作成された計画DRを出力部115に出力する。
Further, when the plan DR created by the plan DR creation unit 109 is input, the demand excess determination unit 108 purchases power that is a commercial power system among the predicted DR power load per demand time limit in the plan DR. It is determined whether or not the peak value of the average demand corresponding to the demand time period supplied from the power supply 64 exceeds the demand target value amount C.
When the demand excess determination unit 108 determines that at least one demand peak value exceeds the demand target value, the demand excess determination unit 108 instructs the real-time DR execution instruction unit 110 to execute the real-time DR. The signal is output to the real-time DR execution instruction unit 110.
On the other hand, when it is determined that the peak value of the average demand corresponding to all demand time periods does not exceed the demand target value, the demand excess determination unit 108 indicates that the demand peak value does not exceed the demand target value. Together with the determination result, the operation plan data created by the operation plan creation unit 105 and the plan DR created by the plan DR creation unit 109 are output to the output unit 115.

計画DR作成部109は、デマンド超過判定部108により少なくとも1つのデマンドピーク値がデマンド目標値Cを超えていると判定された場合、電源設備運転計画においてデマンドピーク値がデマンド目標値を超えているデマンド時限当たりの電力負荷予測値を変更する運転計画を示す計画DRを作成する。
例えば、計画DR作成部109は、デマンド電力がデマンド目標値を超えているデマンド時限の電力負荷予測値を、デマンド電力がデマンド目標値を超えている分だけ減じたDR電力負荷予測値を算出する。この計画DR作成部109は、算出したDR電力負荷予測値に基づき、空調熱源設備機器3や作業設備機器4の電力負荷の割り当てを行い、計画DRを作成する。なお、計画DR作成部109によって変更されたデマンドをデマンド予測値という。
例えば、図6に示した通り、運転計画実施後のデータ2においてデマンド電力がデマンド目標値を超えているデマンド時限(n)は、10時30分からの30分間(n=21)と、11時00分からの30分間(n=22)と、14時30分からの30分間(n=29)と、15時00分からの30分間(n=30)である。
計画DR作成部109は、このデマンド電力がデマンド目標値を超えているデマンド時限(例えば、n=21、22、29、30)だけ、空調熱源設備機器3および作業設備機器4のうち、例えば一部エリアの外調機32や照明機器42の運転を停止もしくは出力を下げるように計画DRを作成する。計画DR作成部109は、例えば、図7に示すようにこのデマンドピーク値がデマンド目標値C以下となるように、運転計画を変更する。なお、外調機32は室内換気を行うことを主目的としており、十分な換気を行った後であれば暫く停止しても大きな問題は発生しない。
When the demand excess determination unit 108 determines that at least one demand peak value exceeds the demand target value C, the plan DR creation unit 109 has the demand peak value exceeding the demand target value in the power supply facility operation plan A plan DR indicating an operation plan for changing the predicted power load per demand time period is created.
For example, the plan DR creation unit 109 calculates a DR power load predicted value obtained by subtracting the power load predicted value for the demand time period in which the demand power exceeds the demand target value by the amount by which the demand power exceeds the demand target value. . The plan DR creation unit 109 assigns power loads of the air conditioning heat source equipment 3 and the work equipment 4 based on the calculated DR power load predicted value, and creates a plan DR. The demand changed by the plan DR creation unit 109 is referred to as a demand predicted value.
For example, as shown in FIG. 6, the demand time period (n) in which the demand power exceeds the demand target value in the data 2 after the operation plan is implemented is 30 minutes from 10:30 (n = 21) and 11:00. 30 minutes from 00 minutes (n = 22), 30 minutes from 14:30 (n = 29), and 30 minutes from 15:00 (n = 30).
The plan DR creation unit 109 selects, for example, one of the air conditioning heat source equipment 3 and the work equipment 4 for the demand time period (for example, n = 21, 22, 29, 30) when the demand power exceeds the demand target value. The plan DR is created so that the operation of the external air conditioner 32 and the lighting device 42 in the partial area is stopped or the output is reduced. For example, the plan DR creation unit 109 changes the operation plan so that the demand peak value is equal to or less than the demand target value C as shown in FIG. The main purpose of the external air conditioner 32 is to ventilate the room. After sufficient ventilation, no major problems will occur even if it is stopped for a while.

<リアルタイムDRを行う構成についての説明>
リアルタイムDR実行指示部110は、デマンド超過判定部108により少なくとも1つのデマンドピーク値がデマンド目標値を超えていると判定された場合、このデマンドピーク値がデマンド目標値を超えていないと判定される時間帯以外について、運転計画データおよび計画DRデータに基づき、電源出力制御装置7および負荷電力制御装置8に制御させる。
このリアルタイムDR実行指示部110は、デマンドピーク値がデマンド目標値を超えると予想される時間帯において、リアルタイムDR処理を実行する。リアルタイムDR実行指示部110は、空調熱源設備機器3および作業設備機器4に供給される電力量の実測値に応じて需要電力を制御するよう負荷電力制御部8に指示することを示す指示信号を出力部115に出力する。
図8を参照して説明すると、リアルタイムDR実行指示部110は、計画DR作成部109によってもデマンド電力がデマンド目標値以下に抑えられない場合、図8に示す通り、実測値がデマンド目標値を超過するおそれがある。リアルタイムDR実行指示部110は、このデマンド時限に対応するデマンドを予測して、デマンド目標値を超過すると判断された場合、リアルタイムDR処理を実行する。なお、リアルタイムDR処理については、後に詳細に説明する。
<Description of configuration for performing real-time DR>
The real-time DR execution instruction unit 110 determines that the demand peak value does not exceed the demand target value when the demand excess determination unit 108 determines that at least one demand peak value exceeds the demand target value. Except for the time zone, the power output control device 7 and the load power control device 8 are controlled based on the operation plan data and the plan DR data.
The real-time DR execution instructing unit 110 executes real-time DR processing in a time zone where the demand peak value is expected to exceed the demand target value. The real-time DR execution instructing unit 110 provides an instruction signal indicating that the load power control unit 8 is instructed to control the demand power according to the actual value of the amount of power supplied to the air conditioning heat source facility device 3 and the work facility device 4. Output to the output unit 115.
Referring to FIG. 8, if the demand power cannot be suppressed below the demand target value even by the plan DR creation unit 109, the real-time DR execution instructing unit 110 sets the actual measured value to the demand target value as shown in FIG. May exceed. The real-time DR execution instructing unit 110 predicts a demand corresponding to the demand time limit, and executes a real-time DR process when it is determined that the demand target value is exceeded. The real-time DR process will be described later in detail.

出力部115は、入力する運転計画作データ(空調熱源運転計画と電源設備運転計画を示す情報)を電源出力制御装置7および負荷電力制御装置8に出力する。
この出力部115は、入力する計画DRデータおよびリアルタイムDR実行指示信号を負荷電力制御部8に出力する。
The output unit 115 outputs the input operation plan data (information indicating the air conditioning heat source operation plan and the power supply facility operation plan) to the power output control device 7 and the load power control device 8.
The output unit 115 outputs the input planned DR data and the real-time DR execution instruction signal to the load power control unit 8.

データ管理処理部116は、収集した様々なデータの管理を行う。実測データ、天気予報データ、予測負荷データ、運転計画データなどの参照、ダウンロード機能、パターンデータなどの修正機能、スケジュールデータの修正機能、契約電力や最適化評価軸などのパラメータ設定機能を持つ。
プログラム管理処理部117は、最適運転計画を作成するための各処理をどのようなタイミングで起動するかといった最適運転制御のためのスケジュール管理を行う。スケジュール管理は一日の処理スケジュールデータを基に起動時刻にプログラムの制御を行う。
The data management processing unit 116 manages various collected data. It has reference functions such as actual measurement data, weather forecast data, predicted load data, and operation plan data, a download function, a correction function such as pattern data, a correction function for schedule data, and a parameter setting function such as contract power and optimization evaluation axis.
The program management processing unit 117 performs schedule management for optimal operation control such as at what timing each process for creating an optimal operation plan is started. In the schedule management, the program is controlled at the start time based on the daily processing schedule data.

次に、図9を参照して、本実施形態に係る運転計画管理方法の一例について説明する。図9は、本実施形態に係る運転計画管理方法の概略について説明するためのフローチャートである。
図9に示す通り、はじめに、空調熱負荷予測部102は、実測データ収集処理と天気予報データ収集処理をしておく。また、発電出力予測処理部104は、天気予報データ収集処理をしておく(ステップST1)。
ついで、発電出力予測処理部104は、発電出力予測処理を行う。つまり、発電出力予測処理部104は、発電出力パターンデータ131、蓄電電力データ132および天気予報データ133を参照して、天気に応じて発電機61が発電できると予測される電力を示す発電出力予測結果データを算出する(ステップST2)。
そして、空調熱負荷予測処理部102は、空調熱負荷予測処理を行う。つまり、空調熱負荷予測処理部102は、予め決められている設定温度に温度調整するために必要と予測される熱量(空調熱負荷)を示す空調熱負荷予測値を算出する(ステップST3)。この空調負荷予測は、気象予報データを用いるので、天気予報が更新されるタイミングで1日数回実行される。
Next, an example of the operation plan management method according to the present embodiment will be described with reference to FIG. FIG. 9 is a flowchart for explaining an outline of the operation plan management method according to the present embodiment.
As shown in FIG. 9, first, the air conditioning thermal load prediction unit 102 performs an actual measurement data collection process and a weather forecast data collection process. Further, the power generation output prediction processing unit 104 performs weather forecast data collection processing (step ST1).
Next, the power generation output prediction processing unit 104 performs power generation output prediction processing. That is, the power generation output prediction processing unit 104 refers to the power generation output pattern data 131, the stored power data 132, and the weather forecast data 133, and generates power output prediction that indicates the power predicted to be generated by the generator 61 according to the weather. Result data is calculated (step ST2).
The air conditioning thermal load prediction processing unit 102 performs an air conditioning thermal load prediction process. That is, the air-conditioning heat load prediction processing unit 102 calculates an air-conditioning heat load prediction value indicating the amount of heat (air-conditioning heat load) predicted to be necessary to adjust the temperature to a predetermined set temperature (step ST3). Since this air conditioning load prediction uses weather forecast data, it is executed several times a day at the timing when the weather forecast is updated.

ついで、運転計画作成部105は、運転計画作成処理を行う(ステップST4)。つまり、運転計画作成部105は、空調熱負荷予測値が示す熱量に対応する、空調熱源機31が製造する熱量と蓄熱槽343が蓄熱する熱量をデマンド時限毎に算出して、空調熱負荷予測結果値に対応する空調熱源運転計画を作成する。
また、運転計画作成部105は、算出された空調熱源運転計画に基づき、空調熱源機31が空調熱負荷予測結果値の示す熱量を製造する際に必要な電力負荷予測値を算出する。そして、運転計画作成部105は、この電力負荷予測値に基づき、デマンドが任意の目標値(例えば最小値)となるように電源電力の割り当てを行う。言い換えると、運転計画作成部105は、電源設備運転計画の最適化運転スケジュールを算出する。なお、運転計画作成部105は、電力負荷予測値を算出する際、熱負荷以外の負荷装置の電力負荷も合わせて算出する。この空調熱源以外の照明・OA機器の電力消費量は毎日ほぼ同じ変化をするのでパターン化して与える。
これにより、運転計画作成部105は、空調熱負荷予測値が示す空調熱負荷に基づき、空調熱源設備機器3および作業設備機器4の電力負荷の最適化を行うことができる。
Next, the operation plan creation unit 105 performs an operation plan creation process (step ST4). That is, the operation plan creation unit 105 calculates the amount of heat produced by the air-conditioning heat source unit 31 and the amount of heat stored in the heat storage tank 343 corresponding to the amount of heat indicated by the air-conditioning heat load prediction value for each demand time period, thereby predicting the air-conditioning heat load. Create an air conditioning heat source operation plan corresponding to the result value.
Further, the operation plan creation unit 105 calculates a predicted power load value required when the air conditioning heat source unit 31 manufactures the amount of heat indicated by the predicted air conditioning heat load result value based on the calculated air conditioning heat source operation plan. And the operation plan preparation part 105 allocates power supply power so that a demand may become arbitrary target values (for example, minimum value) based on this electric power load prediction value. In other words, the operation plan creation unit 105 calculates an optimized operation schedule for the power supply facility operation plan. The operation plan creation unit 105 calculates the power load of the load device other than the thermal load when calculating the predicted power load. Since the power consumption of lighting / OA equipment other than this air conditioning heat source changes almost the same every day, it is given as a pattern.
Thereby, the operation plan preparation part 105 can optimize the electric power load of the air-conditioning heat-source equipment apparatus 3 and the work equipment apparatus 4 based on the air-conditioning heat load which an air-conditioning heat load prediction value shows.

そして、電力負荷予測部106は、運転計画作成部105が作成した運転計画を示す運転計画データに基づき、デマンド時限当たりのデマンドピーク値を検出し、デマンド超過判定部108に出力する。
デマンド超過判定部108は、電力負荷予測部106から入力するデマンドピーク値が、契約電力であるデマンド目標値Cより大きいか否かを判定する(ステップST5)。
デマンドピーク値がデマンド目標値Cより大きい場合(デマンドピーク値>デマンド目標値C)、計画DR作成部109は、計画DRを作成させる(ステップST6)。一方、デマンドピーク値がデマンド目標値C以下である場合(デマンドピーク値≦デマンド目標値C)、計画DR作成部109は、計画DRを作成しない(ステップST7)。つまり、デマンド超過判定部108は、運転計画作成部105が作成した運転計画データ(空調熱源運転計画と電源設備運転計画)を、出力部115を介して電源出力制御装置7および負荷電力制御装置8に出力させる。
Then, based on the operation plan data indicating the operation plan created by the operation plan creation unit 105, the power load prediction unit 106 detects the demand peak value per demand time period and outputs it to the demand excess determination unit 108.
The demand excess determination unit 108 determines whether the demand peak value input from the power load prediction unit 106 is larger than the demand target value C, which is contract power (step ST5).
When the demand peak value is larger than the demand target value C (demand peak value> demand target value C), the plan DR creation unit 109 creates a plan DR (step ST6). On the other hand, when the demand peak value is equal to or less than the demand target value C (demand peak value ≦ demand target value C), the plan DR creation unit 109 does not create the plan DR (step ST7). That is, the demand excess determination unit 108 uses the operation plan data (the air-conditioning heat source operation plan and the power supply facility operation plan) created by the operation plan creation unit 105 via the output unit 115 and the power output control device 7 and the load power control device 8. To output.

ついで、デマンド超過判定部108は、計画DR作成部109によって作成された計画DRに基づき、計画DRにおいて変更されたデマンド予測値とデマンド目標値Cとを比較する。デマンド超過判定部108は、このデマンド予測値がデマンド目標値Cよりも大きいか否かを判定する(ステップST8)。
デマンド予測値がデマンド目標値Cよりも大きい場合(デマンド予測値>デマンド目標値C)、リアルタイムDR実行指示部110は、リアルタイムDRを実行する(ステップST9)。一方、デマンド予測値がデマンド目標値C以下である場合(デマンド予測値≦デマンド目標値C)、リアルタイムDR実行指示部110は、リアルタイムDRを実行しない(ステップST10)。つまり、デマンド超過判定部108は、運転計画作成部105が作成した運転計画データおよび計画DR作成部109が作成した計画DRを、出力部115を介して電源出力制御装置7および負荷電力制御装置8に出力させる。
Next, the demand excess determination unit 108 compares the demand predicted value changed in the plan DR with the demand target value C based on the plan DR created by the plan DR creation unit 109. The demand excess determination part 108 determines whether this demand predicted value is larger than the demand target value C (step ST8).
When the demand predicted value is larger than the demand target value C (demand predicted value> demand target value C), the real time DR execution instructing unit 110 executes the real time DR (step ST9). On the other hand, when the demand predicted value is less than or equal to the demand target value C (demand predicted value ≦ demand target value C), the real time DR execution instructing unit 110 does not execute the real time DR (step ST10). That is, the demand excess determination unit 108 uses the output unit 115 to output the operation plan data created by the operation plan creation unit 105 and the plan DR created by the plan DR creation unit 109 via the output unit 115. To output.

上述のように運転計画作成部105は、空調熱負荷予測値に基づき、空調熱源運転計画を作成するとともに、空調熱負荷を電力負荷に変換して電力負荷予測値を算出し、この電力負荷予測値に対応する電源電力の割り当てを示す電源設備運転計画を作成する。これにより、空調熱源運転計画と電源設備運転計画の整合を取ることができ、発電機や蓄電池等の電力機器と、熱源機や空調機等の空調熱源設備機器とを連携して制御して、任意の目標値にデマンドをコントロールするデマンドコントロールを実現することができる。   As described above, the operation plan creation unit 105 creates an air-conditioning heat source operation plan based on the predicted air-conditioning heat load, converts the air-conditioning heat load into an electric power load, and calculates an electric power load prediction value. Create a power facility operation plan that shows the allocation of power corresponding to the value. As a result, the air conditioning heat source operation plan and the power supply facility operation plan can be coordinated, and power devices such as generators and storage batteries and air conditioning heat source equipment devices such as heat source devices and air conditioners are controlled in cooperation, Demand control for controlling demand to an arbitrary target value can be realized.

また、上述のように、運転管理装置1は、運転計画作成部105による運転計画処理によってデマンドがデマンド目標値を超過してしまう場合、計画DR作成部109による計画DRを作成して、デマンド予測値を算出する。これにより、デマンドピーク値がデマンド目標値を超過して、デマンドが契約電力Cを超過することを防止することができる。これにより、使用したデマンド時限あたりの平均電力が契約電力Cを超えた場合、予め契約電力Cに応じて決められている支払料金に違約金等の追加料金が課せられる事態を回避することができる。これにより、経済的メリットを得られる。   Further, as described above, when the demand exceeds the demand target value by the operation plan process by the operation plan creation unit 105, the operation management apparatus 1 creates the plan DR by the plan DR creation unit 109 and performs the demand prediction. Calculate the value. As a result, it is possible to prevent the demand peak value from exceeding the demand target value and the demand from exceeding the contract power C. Thereby, when the average power per demand time limit used exceeds the contract power C, it is possible to avoid a situation in which an additional fee such as a penalty is imposed on the payment fee determined in advance according to the contract power C. . This provides economic benefits.

また、本発明を用いて以下のことも行うことができる。
例えば、運転計画作成部105の運転計画処理において、エネルギー単価のコストを時間別に変えて与えることで日本の電力会社が行っている時間帯別料金、ピーク時間調整契約や、米国の電力会社が行っている時間別料金を考慮してコスト最適化の運用を行うことができる。
また、リアルタイムDR処理を用いることで、将来スマートグリッドで想定されている自然エネルギーの変動などにより電力会社から需要家側に負荷調整の要請があった場合にリアルタイムに対応可能となる。
The following can also be performed using the present invention.
For example, in the operation plan process of the operation plan creation unit 105, the cost of the energy unit price is changed according to the time and given by the hourly charges, peak time adjustment contracts made by Japanese electric power companies, or performed by US electric power companies Cost optimization operation can be performed in consideration of the hourly charge.
In addition, by using real-time DR processing, it becomes possible to respond in real time when there is a demand for load adjustment from the power company to the customer side due to natural energy fluctuations assumed in the future smart grid.

<計画DR作成部109による計画DR作成処理の一例>
次に、計画DR作成部109による計画DR作成処理の一例について説明する。
図10は、計画DR作成部109の構成の一例を示すブロック図である。
図10に示す通り、計画DR作成部109は、記憶部190と、入力部191と、デマンドピーク値抽出部192と、デマンドピーク値判定部193と、運転計画変更部194と、出力部195をと備える。
記憶部190は、デマンド目標値である契約電力を示す契約電力データ196を記憶する。この記憶部190は、空調機計画DR設定温度データ197と、空調機計画DR継続時間データ198と、を記憶する。この空調機計画DR設定温度データ197は、計画DR作成において、変更する設定温度を示す情報を含む。空調機計画DR継続時間データ198は、計画DR作成において、設定温度を変更する期間を示す情報を含む。なお、この記憶部190は、外部の操作部200から入力される契約電力情報、設定温度情報、継続時間情報に基づき、契約電力データ196、空調機計画DR設定温度データ197と、空調機計画DR継続時間データ198を書き換えることができる。
<Example of Plan DR Creation Processing by Plan DR Creation Unit 109>
Next, an example of the plan DR creation process by the plan DR creation unit 109 will be described.
FIG. 10 is a block diagram illustrating an example of the configuration of the plan DR creation unit 109.
As shown in FIG. 10, the plan DR creation unit 109 includes a storage unit 190, an input unit 191, a demand peak value extraction unit 192, a demand peak value determination unit 193, an operation plan change unit 194, and an output unit 195. Prepare.
The storage unit 190 stores contract power data 196 indicating contract power that is a demand target value. The storage unit 190 stores air conditioner plan DR set temperature data 197 and air conditioner plan DR duration data 198. The air conditioner plan DR set temperature data 197 includes information indicating a set temperature to be changed in the plan DR creation. The air conditioner plan DR duration data 198 includes information indicating a period during which the set temperature is changed in the plan DR creation. The storage unit 190 is based on the contract power information, the set temperature information, and the duration information input from the external operation unit 200, and the contract power data 196, the air conditioner plan DR set temperature data 197, and the air conditioner plan DR. The duration data 198 can be rewritten.

入力部191は、運転計画作成部105あるいはデマンド超過判定部108から運転計画データ(空調熱源運転計画と電源設備運転計画)が示す電力負荷予測値を入力する。
デマンドピーク値抽出部192は、電力負荷予測値のうちデマンドを抽出し、このデマンド時限に対応するデマンドの平均値の極大値(デマンドピーク値)を抽出する。
The input unit 191 inputs the predicted power load value indicated by the operation plan data (the air conditioning heat source operation plan and the power supply facility operation plan) from the operation plan creation unit 105 or the demand excess determination unit 108.
The demand peak value extraction unit 192 extracts a demand from the predicted power load value, and extracts the maximum value (demand peak value) of the average value of the demand corresponding to the demand time limit.

デマンドピーク値判定部193は、入力するデマンドピーク値とデマンド目標値Cとを比較する。デマンドピーク値の方がデマンド目標値Cよりも大きい場合(デマンドピーク値>デマンド目標値C)、デマンドピーク値判定部193は、このデマンドピーク値がデマンド目標値Cを超過していることを示す情報を運転計画変更部194に出力する。また、デマンドピーク値判定部193は、このデマンド電力量がデマンド目標値Cを連続して超過している期間である連続目標超過期間Tbを算出し、運転計画変更部194に出力する。   The demand peak value determination unit 193 compares the input demand peak value with the demand target value C. When the demand peak value is larger than the demand target value C (demand peak value> demand target value C), the demand peak value determination unit 193 indicates that the demand peak value exceeds the demand target value C. The information is output to the operation plan change unit 194. Further, the demand peak value determination unit 193 calculates a continuous target excess period Tb in which the demand power amount continuously exceeds the demand target value C, and outputs it to the operation plan change unit 194.

ここで、図11を参照して具体的について説明する。図11は、図6に示した運転計画実施後の電力負荷予測値のグラフと、計画DR作成部109によって変更される空調機の設置温度と継続時間の関係を示す表を示す。
図11に示す通り、電力負荷予測値におけるデマンドピーク値は、デマンドピーク値P1とP2の2箇所があり、いずれもがデマンド目標値Cを超えている。また、電力負荷予測値は、11:00と15:00にデマンドピーク値を示し、10:30〜11:30間、および、14:30〜15:30間でデマンド目標値Cを超えている。なお、11:00のデマンドピーク値P1の方が、15:00のデマンドピーク値P2に比べて小さい。
デマンドピーク値判定部193は、デマンドピーク値抽出部192によって抽出されたデマンドピーク値P1とデマンドピーク値P2とを入力し、このデマンドピーク値P1とデマンドピーク値P2に対応するデマンド時限を連続目標超過期間Tbとして得る。この連続目標超過期間Tbの長さは、記憶部190の空調機計画DR継続時間データ198においてTqと規定されており、デマンドピーク値判定部193は、この空調機計画DR継続時間データ198を参照して、連続目標超過期間Tbの長さとして時間Tqを得る。ここでは、時間Tqがデマンド時限と同じ長さの時間であるため、デマンドピーク値判定部193は、このデマンドピーク値P1とデマンドピーク値P2に対応するデマンド時限を連続目標超過期間Tbとして得る。
Here, a specific description will be given with reference to FIG. FIG. 11 shows a graph of the predicted electric power load after the operation plan shown in FIG. 6 and a table showing the relationship between the installation temperature of the air conditioner changed by the plan DR creation unit 109 and the duration.
As shown in FIG. 11, there are two demand peak values in the predicted power load value, demand peak values P1 and P2, and both exceed the demand target value C. The predicted power load value shows demand peak values at 11:00 and 15:00, and exceeds the demand target value C between 10:30 and 11:30 and between 14:30 and 15:30. . The demand peak value P1 at 11:00 is smaller than the demand peak value P2 at 15:00.
The demand peak value determination unit 193 inputs the demand peak value P1 and the demand peak value P2 extracted by the demand peak value extraction unit 192, and continuously sets the demand time period corresponding to the demand peak value P1 and the demand peak value P2. Obtained as the excess period Tb. The length of the continuous target excess period Tb is defined as Tq in the air conditioner plan DR duration data 198 of the storage unit 190, and the demand peak value determination unit 193 refers to the air conditioner plan DR duration data 198. Then, the time Tq is obtained as the length of the continuous target excess period Tb. Here, since the time Tq is the same length as the demand time period, the demand peak value determination unit 193 obtains the demand time period corresponding to the demand peak value P1 and the demand peak value P2 as the continuous target excess period Tb.

運転計画変更部194は、デマンドピーク値判定部193から入力する情報に基づき、デマンド目標値Cをオーバーする時間帯である連続目標超過期間Tbに含まれるデマンド時限の電力負荷予測電力量のうち、電力負荷予測電力量の大きい順にデマンド時限の時間帯をN個抽出する。この運転計画変更部194は、抽出された時間帯のうち、それぞれ、最も早い時間帯の開始時刻よりもTp時間前のピーク前期間Taを得る。このピーク前期間Taの長さは、記憶部190の空調機計画DR継続時間データ198において時間Tpと規定されており、運転計画変更部194は、この空調機計画DR継続時間データ198を参照して、ピーク前期間Taの長さとして時間Tpを得る。   Based on the information input from the demand peak value determination unit 193, the operation plan change unit 194 includes a demand time limit power load predicted power amount included in the continuous target excess period Tb that is a time zone in which the demand target value C is exceeded. N demand time periods are extracted in descending order of predicted power load. The operation plan change unit 194 obtains a pre-peak period Ta that is Tp hours before the start time of the earliest time period among the extracted time periods. The length of the pre-peak period Ta is defined as the time Tp in the air conditioner plan DR duration data 198 of the storage unit 190, and the operation plan change unit 194 refers to the air conditioner plan DR duration data 198. Thus, the time Tp is obtained as the length of the pre-peak period Ta.

この運転計画変更部194は、記憶部190を参照して、ピーク前期間Taにおける空調機33の設定温度を温度Pに、運転計画(空調熱源運転計画と電源設備運転計画)上で変更する。つまり、ピーク前期間Taにおける設定温度は、記憶部190の空調機計画DR設定温度データ197において設定温度Pと規定されている。運転計画変更部194は、この空調機計画DR設定温度データ197を参照して、ピーク前期間Taにおける空調機33の設定温度として設定温度Pを得る。
また、運転計画変更部194は、記憶部190を参照して、連続目標超過期間Tbにおける空調機33の設定温度を温度Qに、運転計画(空調熱源運転計画と電源設備運転計画)上で変更する。つまり、連続目標超過期間Tbにおける設定温度は、記憶部190の空調機計画DR設定温度データ197において設定温度Qと規定されている。運転計画変更部194は、この空調機計画DR設定温度データ197を参照して、連続目標超過期間Tbにおける空調機33の設定温度として設定温度Qを得る。
運転計画変更部194は、このようにして、設定温度を変更した空調熱源運転計画と電源設備運転計画を計画DRとして出力部195を出力する。
出力部195は、入力する計画DRをデマンド超過判定部108に出力する。
The operation plan changing unit 194 refers to the storage unit 190 and changes the set temperature of the air conditioner 33 in the pre-peak period Ta to the temperature P on the operation plan (air conditioning heat source operation plan and power supply facility operation plan). That is, the set temperature in the pre-peak period Ta is defined as the set temperature P in the air conditioner plan DR set temperature data 197 in the storage unit 190. The operation plan changing unit 194 refers to the air conditioner plan DR set temperature data 197 to obtain the set temperature P as the set temperature of the air conditioner 33 in the pre-peak period Ta.
Further, the operation plan changing unit 194 changes the set temperature of the air conditioner 33 in the continuous target excess period Tb to the temperature Q on the operation plan (the air conditioning heat source operation plan and the power supply facility operation plan) with reference to the storage unit 190. To do. That is, the set temperature in the continuous target excess period Tb is defined as the set temperature Q in the air conditioner plan DR set temperature data 197 in the storage unit 190. The operation plan change unit 194 refers to the air conditioner plan DR set temperature data 197 to obtain the set temperature Q as the set temperature of the air conditioner 33 in the continuous target excess period Tb.
In this way, the operation plan changing unit 194 outputs the output unit 195 with the air conditioning heat source operation plan and the power supply facility operation plan in which the set temperature has been changed as the plan DR.
The output unit 195 outputs the input plan DR to the demand excess determination unit 108.

次に、図12を参照して、本実施形態に係る計画DRの作成方法の一例について説明する。
図12に示す通り、計画DR作成部109の入力部191は、運転計画作成部105あるいはデマンド超過判定部108から電力負荷予測値を入力し、デマンドピーク値抽出部192に出力する(ステップST21)。
Next, an example of a plan DR creation method according to the present embodiment will be described with reference to FIG.
As shown in FIG. 12, the input unit 191 of the plan DR creation unit 109 receives the power load predicted value from the operation plan creation unit 105 or the demand excess determination unit 108, and outputs it to the demand peak value extraction unit 192 (step ST21). .

ついで、デマンドピーク値抽出部192は、電力負荷予測値から電力値のデマンドピーク値を抽出する(ステップST22)。例えば、デマンドピーク値抽出部192は、図11に示す電力負荷予測値からデマンドピーク値P1を抽出する。このデマンドピーク値P1は、AM11:00〜11:30におけるデマンド時限(n=22)に対応する電力負荷予測値である。また、デマンドピーク値抽出部192は、電力負荷予測値からデマンドピーク値P2も抽出する。このデマンドピーク値P2は、AM15:00〜15:30におけるデマンド時限D(n=30)に対応する電力負荷予測値である。なお、デマンドピーク値P2の電力負荷予測値の電力量の方が、デマンドピーク値P1の電力負荷予測値の電力量に比べて大きい。   Next, the demand peak value extraction unit 192 extracts the demand peak value of the power value from the predicted power load value (step ST22). For example, the demand peak value extraction unit 192 extracts the demand peak value P1 from the predicted power load value shown in FIG. The demand peak value P1 is a predicted power load value corresponding to the demand time period (n = 22) in AM11: 0 to 11:30. The demand peak value extraction unit 192 also extracts the demand peak value P2 from the predicted power load value. The demand peak value P2 is a predicted power load value corresponding to the demand time period D (n = 30) in AM15: 0 to 15:30. Note that the power amount of the predicted power load value of the demand peak value P2 is larger than the power amount of the predicted power load value of the demand peak value P1.

そして、デマンドピーク値抽出部192は、抽出したデマンドピーク値が複数である場合、その電力負荷予測値の大きい順に符号K(K=1,2,・・・)を割り当てる。なお、抽出したデマンドピーク値が1つである場合、デマンドピーク値抽出部192は、このデマンドピーク値に符号K=1を割り当てる。   Then, when there are a plurality of extracted demand peak values, the demand peak value extraction unit 192 assigns a code K (K = 1, 2,...) In descending order of the predicted power load value. When there is one extracted demand peak value, the demand peak value extraction unit 192 assigns a code K = 1 to this demand peak value.

ついで、デマンドピーク値抽出部192は、符号Kの小さい順に、そのデマンドピーク値を選択してデマンドピーク値判定部193に出力する。
例えば、デマンドピーク値抽出部192は、符号K=1であるデマンドピーク値P2を選択し、デマンドピーク値判定部193に出力する。ついで、デマンドピーク値抽出部192は、符号K=2であるデマンドピーク値P1を選択し、デマンドピーク値判定部193に出力する。
Next, the demand peak value extraction unit 192 selects the demand peak values in ascending order of the code K and outputs them to the demand peak value determination unit 193.
For example, the demand peak value extraction unit 192 selects the demand peak value P2 with the code K = 1 and outputs it to the demand peak value determination unit 193. Next, the demand peak value extraction unit 192 selects the demand peak value P1 with the code K = 2, and outputs it to the demand peak value determination unit 193.

そして、デマンドピーク値判定部193は、入力するデマンドピーク値とデマンド目標値Cとを比較する。デマンドピーク値の方がデマンド目標値Cよりも大きい場合(デマンドピーク値>デマンド目標値C)、デマンドピーク値判定部193は、このデマンドピーク値がデマンド目標値Cを超過していることを示す情報を運転計画変更部194に出力する。
例えば、デマンドピーク値判定部193は、デマンドピーク値P2とデマンド目標値Cとを比較する。ここで、デマンドピーク値P2はデマンド目標値Cを超えているため、デマンドピーク値判定部193は、デマンドピーク値P2がデマンド目標値Cを超過していることを示す情報を運転計画変更部194に出力する。
また、デマンドピーク値判定部193は、空調機計画DR継続時間データ198を参照して、例えば、連続目標超過期間Tbの長さが時間Tpであることを得て、運転計画変更部194に出力する。つまり、デマンドピーク値判定部193は、デマンドピーク値P2を含む時間Tqが連続目標超過期間Tb1であることを示す情報を運転計画変更部194に出力する。また、デマンドピーク値判定部193は、同様にして、デマンドピーク値P1を含む時間Tqが連続目標超過期間Tb2であることを示す情報を運転計画変更部194に出力する。なお、ここで、時間Tqは、30分である。よって、連続目標超過期間Tb1は、15:00〜15:30の期間であり、連続目標超過期間Tb2は、11:00〜11:30の期間である。
Then, the demand peak value determination unit 193 compares the input demand peak value with the demand target value C. When the demand peak value is larger than the demand target value C (demand peak value> demand target value C), the demand peak value determination unit 193 indicates that the demand peak value exceeds the demand target value C. The information is output to the operation plan change unit 194.
For example, the demand peak value determination unit 193 compares the demand peak value P2 with the demand target value C. Here, since the demand peak value P2 exceeds the demand target value C, the demand peak value determination unit 193 displays information indicating that the demand peak value P2 exceeds the demand target value C as an operation plan change unit 194. Output to.
Further, the demand peak value determination unit 193 refers to the air conditioner plan DR duration data 198 and obtains, for example, that the length of the continuous target excess period Tb is the time Tp, and outputs it to the operation plan change unit 194. To do. That is, the demand peak value determination unit 193 outputs information indicating that the time Tq including the demand peak value P2 is the continuous target excess period Tb1 to the operation plan change unit 194. Similarly, the demand peak value determination unit 193 outputs information indicating that the time Tq including the demand peak value P1 is the continuous target excess period Tb2 to the operation plan change unit 194. Here, the time Tq is 30 minutes. Therefore, the continuous target excess period Tb1 is a period from 15:00 to 15:30, and the continuous target excess period Tb2 is a period from 11:00 to 11:30.

運転計画変更部194は、デマンドピーク値判定部193から入力する情報に基づき、契約電力Cをオーバーする時間帯である連続目標超過期間Tbに含まれるデマンド時限のデマンドピーク値のうち、対応する電力負荷予測値の電力量の大きい順に連続目標超過期間TbをN個抽出する。   Based on the information input from the demand peak value determination unit 193, the operation plan change unit 194 corresponds to the power corresponding to the demand peak value of the demand time limit included in the continuous target excess period Tb that is the time zone in which the contract power C is exceeded. N consecutive target excess periods Tb are extracted in descending order of the electric energy of the predicted load value.

ここで、運転計画変更部194は、N=2個の連続目標超過期間Tb1、Tb2を抽出する。はじめに、運転計画変更部194は、符号K=1であるデマンドピーク値P2の運転計画変更処理を先に行う。
つまり、運転計画変更部194は、空調機計画DR継続時間データ198を参照して、時間Tpのピーク前期間Taを得る。そして、運転計画変更部194は、デマンドピーク値P2に対応する連続目標超過期間Tbの開始時刻よりもTp時間前のピーク前期間Ta1を得る。ここで、Tpは、3時間である。よって、ピーク前期間Ta1は、12:00〜15:00の期間である。
次いで、運転計画変更部194は、空調機計画DR設定温度データ197を参照して、ピーク前期間Taにおける空調機33の設定温度として設定温度Pを得る。運転計画変更部194は、ピーク前期間Ta1における空調機33の設定温度を温度Pに、運転計画上で変更する(ステップST23)。
Here, the operation plan changing unit 194 extracts N = 2 continuous target excess periods Tb1 and Tb2. First, the operation plan change unit 194 first performs an operation plan change process for the demand peak value P2 with the sign K = 1.
That is, the operation plan change unit 194 refers to the air conditioner plan DR duration data 198 to obtain the pre-peak period Ta of the time Tp. Then, the operation plan changing unit 194 obtains a pre-peak period Ta1 that is Tp time before the start time of the continuous target excess period Tb corresponding to the demand peak value P2. Here, Tp is 3 hours. Therefore, the pre-peak period Ta1 is a period from 12:00 to 15:00.
Next, the operation plan changing unit 194 refers to the air conditioner plan DR set temperature data 197 to obtain the set temperature P as the set temperature of the air conditioner 33 in the pre-peak period Ta. The operation plan change unit 194 changes the set temperature of the air conditioner 33 in the pre-peak period Ta1 to the temperature P on the operation plan (step ST23).

そして、運転計画変更部194は、空調機計画DR設定温度データ197を参照して、連続目標超過期間Tbにおける空調機33の設定温度として設定温度Qを得る。運転計画変更部194は、連続目標超過期間Tb1における空調機33の設定温度を温度Qに、運転計画上で変更する(ステップST24)。   Then, the operation plan changing unit 194 refers to the air conditioner plan DR set temperature data 197 to obtain the set temperature Q as the set temperature of the air conditioner 33 in the continuous target excess period Tb. The operation plan changing unit 194 changes the set temperature of the air conditioner 33 in the continuous target excess period Tb1 to the temperature Q on the operation plan (step ST24).

ついで、運転計画変更部194は、符号K=2であるデマンドピーク値P1の運転計画変更処理を行う。このとき、運転計画変更部194は、符号K=2のデマンドピーク値P1の連続目標超過期間Tb2が、既に変更された運転計画の時間帯と重なるか否かを判定し、重複しない場合以下の処理を行うものであってもよい。この連続目標超過期間Tb2は、既に運転計画が変更されているピーク前期間Ta1および連続目標超過期間Tb1のいずれとも時間帯が重複していないため、以下の処理を行う。
つまり、運転計画変更部194は、ピーク前期間Ta2における空調機33の設定温度を温度Pに運転計画上で変更するとともに、連続目標超過期間Tb2における空調機33の設定温度を温度Qに運転計画上で変更する。
Next, the operation plan change unit 194 performs an operation plan change process for the demand peak value P1 with the sign K = 2. At this time, the operation plan change unit 194 determines whether or not the continuous target excess period Tb2 of the demand peak value P1 with the symbol K = 2 overlaps with the already changed operation plan time zone. Processing may be performed. In this continuous target excess period Tb2, since the time zone does not overlap with any of the pre-peak period Ta1 and the continuous target excess period Tb1 whose operation plan has already been changed, the following processing is performed.
That is, the operation plan change unit 194 changes the set temperature of the air conditioner 33 in the pre-peak period Ta2 to the temperature P on the operation plan, and sets the set temperature of the air conditioner 33 in the continuous target excess period Tb2 to the temperature Q. Change above.

上述の通り、計画DR作成部109は、運転計画作成部105が作成した運転計画が示すデマンドの電力負荷予測値に基づいて、空調機の1日の発停スケジュールを決定することにより、デマンドピーク値の値を低減させた計画DRを作成することができる。これにより、デマンドがデマンド目標値を超過して、デマンドの最大値が契約電力Cを超過することを防止することができる。これにより、使用したデマンド時限あたりの最大電力が契約電力Cを超えた場合、予め契約電力Cに応じて決められている支払料金に違約金等の追加料金が課せられる事態を回避することができる。これにより、経済的メリットを得られる。なお、計画DR作成部109は、電力負荷を低減させるために、例えば、設定温度の変更や空調機の停止等に変更した計画DRを作成する。   As described above, the plan DR creation unit 109 determines the demand peak by determining the daily start / stop schedule of the air conditioner based on the predicted power load value of the demand indicated by the operation plan created by the operation plan creation unit 105. A plan DR with a reduced value can be created. Thereby, it is possible to prevent the demand from exceeding the demand target value and the maximum value of the demand from exceeding the contract power C. Thereby, when the maximum power per demand time limit used exceeds the contract power C, it is possible to avoid a situation in which an additional fee such as a penalty is imposed on the payment fee determined in advance according to the contract power C. . This provides economic benefits. Note that the plan DR creation unit 109 creates a plan DR that is changed to, for example, a change in set temperature or a stop of an air conditioner in order to reduce the power load.

また、空調機33を冷房として利用している場合、ピーク前期間Taにおける設定温度Pを連続目標超過期間Tbにおける設定温度Qよりも低く設定しておくことで、ピーク値となる時間帯よりも先に電力負荷を上げた運転をすることができる。これにより、ピーク時の電力負荷の上昇を抑えるとともに、ピーク前期間Taから室内の設置温度を下げて冷房を強めにかけておくことにより、連続目標超過期間Tbにおける温度上昇を防止することができる。
一方、空調機33を暖房として利用している場合、ピーク前期間Taにおける設定温度Pを連続目標超過期間Tbにおける設定温度Qよりも高く設定しておくことで、ピーク値となる時間帯よりも先に電力負荷を上げた運転をすることができる。これにより、ピーク時の電力負荷の上昇を抑えるとともに、ピーク前期間Taから室内の設置温度を上げて暖房を強めにかけておくことにより、連続目標超過期間Tbにおける温度低下を防止することができる。
よって、人への不快感の低減に貢献し、室内環境悪化を緩和することができる。
Further, when the air conditioner 33 is used for cooling, by setting the set temperature P in the pre-peak period Ta lower than the set temperature Q in the continuous target excess period Tb, the time period when the peak value is reached. It is possible to operate with a higher power load first. Thereby, while suppressing the raise of the electric power load at the time of a peak, the temperature rise in the continuous target excess period Tb can be prevented by lowering the indoor installation temperature from the pre-peak period Ta to increase the cooling.
On the other hand, when the air conditioner 33 is used for heating, by setting the set temperature P in the pre-peak period Ta higher than the set temperature Q in the continuous target excess period Tb, the peak time period is exceeded. It is possible to operate with a higher power load first. Thereby, while suppressing the raise of the electric power load at the time of a peak, the temperature fall in the continuous target excess period Tb can be prevented by raising indoor installation temperature from the period before peak Ta, and making heating stronger.
Therefore, it contributes to the reduction of human discomfort and can mitigate the deterioration of the indoor environment.

なお、本発明は、空調機33の設定温度を運転計画(空調熱源運転計画と電源設備運転計画)上において変更する例を用いて説明した。しかし、本発明はこれに限られず、熱源の稼動量を低減可能な装置の運転計画を変更するものであって、例えば、空調機ファンや、ポンプ等であってもよい。   In addition, this invention demonstrated using the example which changes the preset temperature of the air conditioner 33 on an operation plan (an air-conditioning heat-source operation plan and a power supply equipment operation plan). However, the present invention is not limited to this, and the operation plan of the apparatus capable of reducing the operation amount of the heat source is changed. For example, an air conditioner fan or a pump may be used.

<空調熱源設備機器3の一例>
次に、空調熱源設備機器3の一例について説明する。
図13は、例えば、空調熱源設備機器3の例を示す図である。負荷電力制御装置8は、例えば夜間電力により室内を冷却する空調設備が備える複数の空調熱源設備機器3の需要電力を制御する。
図13では、空調熱源設備機器3のうち、空調熱源機31である冷凍機310と、熱循環機構34の蓄熱槽343と、空調機33−1〜33−4と、ポンプ342(1次ポンプ342−1および2次ポンプ342−2を含む)を例に説明する。制御対象の施設には、このような複数の動力装置を動作させる複数の制御対象機器が存在する。冷凍機310は、例えば、圧縮機36、1次ポンプ342−1を備えている。圧縮機には50kWの電力が供給され、1次ポンプ342−1には5kWの電力が供給される。2次ポンプ342−2は、蓄熱槽343に貯留された水を、複数の空調機33−1〜33−4に供給する。2次ポンプ342−2には、5kWの電力が供給される。複数の冷水バルブ37(冷水バルブ37−1、冷水バルブ37−2、冷水バルブ37−3、冷水バルブ37−4、・・・)は、2次ポンプ342−2から供給される冷水をそれぞれ空調機33−1〜33−4に供給する。空調機33−1〜33−4は、それぞれにファン(ファン38−1、ファン38−2、ファン38−3、ファン38−4、・・・)を備えており、ファンには2kWの電力が供給される。ここで、空調機33−1〜33−4は、供給される冷水に基づく冷風を、二重床内に給気した後、室内に吹き出す床吹き出し空調を行う。
<Example of air conditioning heat source equipment 3>
Next, an example of the air conditioning heat source equipment 3 will be described.
FIG. 13 is a diagram illustrating an example of the air conditioning heat source equipment 3. The load power control device 8 controls the power demand of the plurality of air conditioning heat source equipment 3 provided in the air conditioning equipment that cools the room with nighttime power, for example.
In FIG. 13, among the air-conditioning heat source equipment 3, the refrigerating machine 310 that is the air-conditioning heat source machine 31, the heat storage tank 343 of the heat circulation mechanism 34, the air-conditioners 33-1 to 33-4, and the pump 342 (primary pump 342-1 and secondary pump 342-2) will be described as an example. In the facility to be controlled, there are a plurality of control target devices that operate such a plurality of power units. The refrigerator 310 includes, for example, a compressor 36 and a primary pump 342-1. The compressor is supplied with 50 kW power, and the primary pump 342-1 is supplied with 5 kW power. The secondary pump 342-2 supplies the water stored in the heat storage tank 343 to the plurality of air conditioners 33-1 to 33-4. The secondary pump 342-2 is supplied with 5 kW of power. A plurality of chilled water valves 37 (a chilled water valve 37-1, a chilled water valve 37-2, a chilled water valve 37-3, a chilled water valve 37-4,...) Respectively air-condition the chilled water supplied from the secondary pump 342-2. Supply to machine 33-1 to 33-4. Each of the air conditioners 33-1 to 33-4 includes a fan (fan 38-1, fan 38-2, fan 38-3, fan 38-4,...), And the fan has a power of 2 kW. Is supplied. Here, the air conditioners 33-1 to 33-4 perform floor blowing air conditioning in which cold air based on supplied cold water is supplied into the double floor and then blown into the room.

<リアルタイムDR実行指示部110によるリアルタイムDR処理>
次に、リアルタイムDR実行指示部110によるリアルタイムDR処理の一例について説明する。
図14は、本実施形態による負荷電力制御装置8の構成を示すブロック図である。
図14に示す通り、負荷電力制御装置8は、目標値記憶部81と、計測部82と、予測値算出部83と、予測差算出部84と、実績差算出部85と、優先順位記憶部86と、電力制御部87と、入出力部88を備えている。
目標値記憶部81には、定められた複数の計測期間(デマンド時限)毎に計測される需要電力の実績値のうちで最大となる需要電力(最大需要電力)の目標値が予め定められて記憶される。つまり、デマンド目標値Cが記憶されている。
<Real-time DR processing by the real-time DR execution instruction unit 110>
Next, an example of real-time DR processing by the real-time DR execution instruction unit 110 will be described.
FIG. 14 is a block diagram illustrating a configuration of the load power control device 8 according to the present embodiment.
As shown in FIG. 14, the load power control device 8 includes a target value storage unit 81, a measurement unit 82, a predicted value calculation unit 83, a prediction difference calculation unit 84, a performance difference calculation unit 85, and a priority order storage unit. 86, a power control unit 87, and an input / output unit 88.
In the target value storage unit 81, a target value of demand power (maximum demand power) that is the maximum among the actual values of demand power measured for a plurality of predetermined measurement periods (demand time periods) is determined in advance. Remembered. That is, the demand target value C is stored.

計測部82は、計測対象期間であるデマンド時限において、需要電力の実績値を計測する。ここで、計測部82は、制御対象のフロアにおいて電力を使用する機器(冷凍機、ポンプ、ファン等)によって使用された電力を計測し、デマンド時限の終了時における平均需要電力の推定値を算出する。例えば、図15に示すように、T1、T2、T3、T4、・・・の時点をそれぞれデマンド時限の区切り時点とする。ここで、デマンド時限をX分(例えば、30分)とすると、T2はT1+X分であり、T3はT2+X分であり、T4はT3+X分である。
計測部82は、このようなデマンド時限内の定められた一定時間(例えば、3分)毎に、需要電力の実績値を計測し、平均需要電力の推定値を算出する。
また、計測部82は、計測した使用電力の実績値である運転データを、後述する優先順位記憶部86に記憶させる。
The measuring unit 82 measures the actual value of the demand power in the demand time period that is the measurement target period. Here, the measurement part 82 measures the electric power used by the equipment (refrigerator, pump, fan, etc.) that uses electric power on the floor to be controlled, and calculates an estimated value of the average demand electric power at the end of the demand period. To do. For example, as shown in FIG. 15, the time points T1, T2, T3, T4,. Here, if the demand time limit is X minutes (for example, 30 minutes), T2 is T1 + X minutes, T3 is T2 + X minutes, and T4 is T3 + X minutes.
The measuring unit 82 measures the actual value of the demand power every predetermined time (for example, 3 minutes) within the demand time period, and calculates the estimated value of the average demand power.
Moreover, the measurement part 82 memorize | stores the driving data which is the track record value of the measured electric power used in the priority order memory | storage part 86 mentioned later.

予測値算出部83は、連続する複数の計測期間のうち実績値の計測対象である計測対象期間における実績値の計測が開始される時点より前の時点で、計測対象期間における需要電力の予測値を算出する。例えば、図16において、予測値算出部83は、T1とT2との間のデマンド時限における計測が開始されるT1の時点より定められた時間(例えば、T1−T0−Y分)前の時点(T0+Y分)において、T1とT2との間のデマンド時限における平均需要電力の予測値を算出する。ここで、予測値の算出方法としては、たとえば特許文献(特開2006−78009号公報)に示されるようなニューラルネットワークモデルを使用した方法を適用することができる。例えば、外気温、湿度、風速、風量、空調運転時間、曜日、季節などに応じて需要電力をモデル化して予測値を算出する。予測値算出部83による予測差の算出処理は、例えば、連続する各デマンド時限のそれぞれ一定時間(例えば、3〜5分)前に実行される。このため、例えばデマンド時限が30分であれば、予測値算出部13による予測値の算出処理は1日に48回実行される。   The predicted value calculation unit 83 is a predicted value of demand power in the measurement target period at a time before the start of measurement of the actual value in the measurement target period that is the measurement target of the actual value among a plurality of consecutive measurement periods. Is calculated. For example, in FIG. 16, the predicted value calculation unit 83 has a time point (for example, T1−T0−Y minutes) before a time (for example, T1−T0−Y) determined from the time point T1 when measurement in the demand time period between T1 and T2 is started. In T0 + Y), a predicted value of average demand power in the demand time period between T1 and T2 is calculated. Here, as a prediction value calculation method, for example, a method using a neural network model as disclosed in a patent document (Japanese Patent Laid-Open No. 2006-78009) can be applied. For example, the predicted value is calculated by modeling demand power according to the outside air temperature, humidity, wind speed, air volume, air conditioning operation time, day of the week, season, and the like. The calculation process of the prediction difference by the predicted value calculation unit 83 is executed, for example, before each predetermined time period (for example, 3 to 5 minutes). For this reason, for example, if the demand time limit is 30 minutes, the predicted value calculation process by the predicted value calculation unit 13 is executed 48 times a day.

予測差算出部84は、予測値算出部83によって算出された予測値と、目標値記憶部11に記憶された目標値とを比較して、予測値が目標値を超える場合、予測値と目標値との差を算出する。予測差算出部14が算出した差は、電力制御処理(DR(デマンド・レスポンス)処理)により減少させることが必要な需要電力の量を示すDR必要量である。   The prediction difference calculation unit 84 compares the prediction value calculated by the prediction value calculation unit 83 with the target value stored in the target value storage unit 11, and if the prediction value exceeds the target value, the prediction value and the target The difference from the value is calculated. The difference calculated by the prediction difference calculation unit 14 is a DR requirement that indicates the amount of demand power that needs to be reduced by the power control process (DR (demand response) process).

実績差算出部85は、計測部82によって計測された実績値に基づく平均需要電力の推定値と、目標値記憶部81に記憶された目標値とを比較して、推定値が目標値を超える場合、推定値と目標値との差を算出する。実績差算出部85が算出した差は、DR処理により減少させることが必要な需要電力の量を示すDR必要量である。実績差算出部85は、デマンド時限内に、一定時間毎(例えば、3分)に実績差の算出処理を行う。   The actual difference calculation unit 85 compares the estimated value of average demand power based on the actual value measured by the measuring unit 82 with the target value stored in the target value storage unit 81, and the estimated value exceeds the target value. In this case, the difference between the estimated value and the target value is calculated. The difference calculated by the result difference calculation unit 85 is a DR required amount indicating the amount of demand power that needs to be reduced by the DR process. The performance difference calculation unit 85 performs a performance difference calculation process at regular time intervals (for example, 3 minutes) within the demand time period.

優先順位記憶部86には、予測差算出部84または実績差算出部85によって算出されたDR必要量に応じて予め定められた優先順位と、複数の負荷装置のうち供給電力を減少させる負荷装置である供給減少対象機器とが対応付けられた優先順位テーブルが予め記憶されている。
図16は、優先順位記憶部86に記憶されている優先順位テーブルのデータ例を示す図である。運転実績データは、動作している負荷装置の需要電力等の実績値が計測部82によって計測され記憶される情報である。例えば、圧縮機36、1次ポンプ342−1は、(50kW+5kW=)55kWの電力を使用している。2次ポンプ342−2は、5kWの電力を使用している。空調機30−1、30−2、・・・に設けられる複数のファン38−1、38−2、・・・は、(2kW×20台=)40kWの電力を使用している。なお、空調機30は、20台である例について、ここでは説明している。
合計動力は、供給減少対象機器の使用電力の合計値である。単体DR効果は、対応する優先順位における制御によって削減できる需要電力の量である。累計DR効果は、優先順位1からその優先順位までの制御によって削減できる需要電力の累計量である。
The priority order storage unit 86 includes a priority order that is determined in advance according to the DR requirement calculated by the prediction difference calculation unit 84 or the result difference calculation unit 85, and a load device that reduces supply power among a plurality of load devices. A priority order table that is associated with supply reduction target devices is stored in advance.
FIG. 16 is a diagram illustrating a data example of the priority order table stored in the priority order storage unit 86. The operation record data is information in which record values such as demand power of the operating load device are measured and stored by the measuring unit 82. For example, the compressor 36 and the primary pump 342-1 use (50 kW + 5 kW =) 55 kW of power. The secondary pump 342-2 uses 5 kW of power. The plurality of fans 38-1, 38-2,... Provided in the air conditioners 30-1, 30-2,... Use (2 kW × 20 units =) 40 kW of power. In addition, the example which is 20 air conditioners 30 is demonstrated here.
The total power is the total value of power used by the supply reduction target devices. The single DR effect is the amount of power demand that can be reduced by control in the corresponding priority order. The cumulative DR effect is the cumulative amount of power demand that can be reduced by control from priority 1 to that priority.

優先順位(1〜5)は、数が大きくなるほど、目標値と予測値または実績値との差が大きいことを示し、対応付けられた供給減少対象機器における需要電力の減少量は大きくなる。ここでは、優先順位毎に供給電力に変化のある項目には、「▼」の記号を付している。例えば、優先順位1においては、圧縮機、1次ポンプ342−1の需要電力を、100%から70%に減少させる。これにより、(55(kW)×30(%)=)16.5kWの需要電力が減少する。優先順位2においては、圧縮機、1次ポンプ342−1への需要電力を遮断し、70%から0%に減少させる。これにより、(55(kW)×70(%)=)38.5kWの需要電力が減少する。このように、圧縮機36の容量を削減しても、水槽343に冷熱が残っている間は、室内側の温熱環境には影響を及ぼさないと考えられる。   The priority (1-5) indicates that the larger the number, the larger the difference between the target value and the predicted value or the actual value, and the amount of reduction in demand power in the associated supply reduction target device increases. Here, a symbol “▼” is attached to an item whose supply power changes for each priority. For example, in the priority order 1, the power demand of the compressor and the primary pump 342-1 is reduced from 100% to 70%. Thereby, the demand power of (55 (kW) × 30 (%) =) 16.5 kW decreases. In the priority order 2, the power demand to the compressor and the primary pump 342-1 is cut off and reduced from 70% to 0%. Thereby, the demand power of (55 (kW) × 70 (%) =) 38.5 kW is reduced. Thus, even if the capacity of the compressor 36 is reduced, it is considered that while the cold heat remains in the water tank 343, the indoor thermal environment is not affected.

優先順位3においては、複数の冷水バルブの半数を閉じる。これにより、2次ポンプ342−2の負荷電力が半数になると考えられるため、(5kW×2=)2.5kWの需要電力が減少する。このように冷水バルブを閉じても、床吹き出し空調によるスラブが冷やされているため、ファンにより送風していれば室内環境の悪化を最低限に食い止められると考えられる。ここでは、千鳥配列の複数の空調機をローテーションさせるように冷水バルブの開閉を行う。優先順位4においては、全ての冷水バルブを閉じる。これにより、2次ポンプ342−2の負荷電力が0になるため、22.5kWの需要電力が減少する。優先順位5において、全てのファンを停止させると、20.0kWの需要電力が減少する。   In priority 3, half of the plurality of cold water valves are closed. Thereby, since it is thought that the load electric power of the secondary pump 342-2 becomes half, the demand electric power of (5 kW × 2 =) 2.5 kW decreases. Even if the cold water valve is closed in this manner, the slab by the floor blowing air conditioning is cooled, so that it is considered that the deterioration of the indoor environment can be kept to a minimum if air is blown by the fan. Here, the cold water valve is opened and closed so as to rotate a plurality of air conditioners in a staggered arrangement. In priority 4, all chilled water valves are closed. Thereby, since the load electric power of the secondary pump 342-2 becomes 0, the demand electric power of 22.5 kW decreases. If all the fans are stopped at priority 5, the demand power of 20.0 kW is reduced.

このように、電力の供給対象である負荷装置毎に、需要電力を減少させる優先順位を予め設定しておくことで、施設の室内環境に対して影響を与えないように需要電力を減少させることができる。例えば、DR処理の対象機器として、他の負荷装置への影響が少ない空調設備への電力供給を減少させる場合、室内に対する冷却能力をできるだけ下げないように、冷凍機における圧縮機やポンプ、空調機が連動して動作している空調設備における需要電力を系統立てて減少させることが可能となる。   In this way, by setting in advance a priority order for reducing demand power for each load device to which power is supplied, the demand power can be reduced so as not to affect the indoor environment of the facility. Can do. For example, when reducing power supply to an air conditioning facility that has little influence on other load devices as a target device for DR processing, a compressor, a pump, or an air conditioner in a refrigerator is used so as not to reduce the cooling capacity for the room as much as possible. It is possible to systematically reduce the power demand in an air conditioning facility operating in conjunction with each other.

電力制御部87は、入出力部88を介して、運転管理装置1からリアルタイムDRの実行指示を示す情報が入力された場合、以下のようにして、リアルタイムDR処理を実行する。
電力制御部87は、予測差算出部84によって算出されたDR必要量または実績差算出部15によって算出されたDR必要量に応じた優先順位に対応付けられて優先順位記憶部86に記憶されている供給減少対象機器を読み出し、デマンド時限における需要電力を減少させる警告を出力する。ここでは、例えば負荷電力制御装置8が、警告音を出力するブザーや情報を表示するディスプレイ(表示部)を備えるようにして、警告音にブザーを出力させるとともに、DR必要量に応じた供給減少対象機器の情報をディスプレイに表示させるようにしても良い。または、DR必要量に応じた供給減少対象機器である負荷装置に対して、需要電力を減少または停止する制御信号を送信するようにしても良い。
When the information indicating the execution instruction of the real time DR is input from the operation management device 1 via the input / output unit 88, the power control unit 87 executes the real time DR process as follows.
The power control unit 87 is stored in the priority order storage unit 86 in association with the priority order corresponding to the DR required amount calculated by the prediction difference calculation unit 84 or the DR required amount calculated by the performance difference calculation unit 15. The supply reduction target device is read, and a warning for reducing the power demand in the demand period is output. Here, for example, the load power control device 8 is provided with a buzzer for outputting a warning sound and a display (display unit) for displaying information so that the buzzer is output for the warning sound and the supply is reduced according to the required amount of DR. Information on the target device may be displayed on the display. Or you may make it transmit the control signal which reduces or stops demand power with respect to the load apparatus which is a supply reduction object apparatus according to DR required amount.

このように、電力制御部87は、従来のデマンドコントロール処理のように、デマンド時限中にのみ目標値の超過を判定して残時間にDR処理を実行するものではなく、デマンド時限以前に算出される予測値による予測モードのDR処理と、デマンド時限中に算出される推定値による実績モードのDR処理との双方を行うものである。すなわち、予測モードのDR処理により、デマンド時限の開始と同時にDR処理を開始することが可能になるとともに、予測値と実績値がずれた場合には、実績モードのDR処理により補正することができる。   Thus, unlike the conventional demand control process, the power control unit 87 does not determine that the target value is exceeded only during the demand time period and executes the DR process during the remaining time, but is calculated before the demand time period. Both the prediction mode DR process using the predicted value and the performance mode DR process using the estimated value calculated during the demand time period are performed. That is, the DR process in the prediction mode allows the DR process to be started simultaneously with the start of the demand time period, and can be corrected by the DR process in the result mode when the predicted value and the actual value deviate. .

次に、図面を参照して、負荷電力制御装置8の動作例を説明する。図17は、負荷電力制御装置8によるリアルタイムDR処理の動作例を示すフローチャートである。予測値算出部83は、デマンド時限(例えば、図15におえるT2とT3との間)が開始される時点(例えば、T2)より前の時点(例えば、T2−Y分)において、T2とT3(T2+X)分の間の平均需要電力の予測値を算出する(ステップST41)。予測差算出部84は、目標値記憶部81に記憶されている最大需要電力のデマンド目標値を読み出す(ステップST42)。そして、予測差算出部84は、予測値が、目標値を超えるか否かを判定する(ステップST43)。ここで、予測差算出部84が、予測値は目標値を超えないと判定すれば(ステップST43−NO)、電力制御部87はリアルタイムDR処理を実行しない。   Next, an operation example of the load power control device 8 will be described with reference to the drawings. FIG. 17 is a flowchart illustrating an operation example of real-time DR processing by the load power control device 8. The predicted value calculation unit 83 determines that T2 and T3 at a time (for example, T2-Y) before a time (for example, T2) when a demand time period (for example, between T2 and T3 in FIG. 15) is started. A predicted value of average demand power for (T2 + X) minutes is calculated (step ST41). The prediction difference calculation unit 84 reads the demand target value of the maximum demand power stored in the target value storage unit 81 (step ST42). Then, the prediction difference calculation unit 84 determines whether or not the predicted value exceeds the target value (step ST43). Here, if the prediction difference calculation unit 84 determines that the predicted value does not exceed the target value (step ST43—NO), the power control unit 87 does not execute the real-time DR process.

ステップS43において、予測差算出部284が、予測値は目標値を超えると判定すれば(ステップST43−YES)、予測値と目標値との差を、DR必要量として算出する(ステップST44)。そして、計測部82が、その時点での各負荷装置の運転実績データを取得し、優先順位記憶部86に記憶させる(ステップST45)。電力制御部87は、優先順位記憶部86に記憶された優先順位テーブルから、DR必要量に応じた優先順位に対応付けられた供給減少対象機器を読み出す(ステップST46)。そして、電力制御部87は、T2からT3(T2+X分)の間に、ステップST46において決定された供給減少対象機器に対するリアルタイムDR処理を実行する(ステップST47)。   In step S43, if the prediction difference calculation unit 284 determines that the predicted value exceeds the target value (step ST43-YES), the difference between the predicted value and the target value is calculated as the DR required amount (step ST44). And the measurement part 82 acquires the driving performance data of each load apparatus at the time, and memorize | stores it in the priority order memory | storage part 86 (step ST45). The power control unit 87 reads the supply reduction target device associated with the priority order corresponding to the DR required amount from the priority order table stored in the priority order storage unit 86 (step ST46). And the electric power control part 87 performs the real-time DR process with respect to the supply reduction object apparatus determined in step ST46 between T2 and T3 (T2 + X minutes) (step ST47).

図18は、負荷電力制御装置8による実績モードのリアルタイムDR処理の動作例を示すフローチャートである。負荷電力制御装置8は、実績値に基づくリアルタイムDR処理をデマンド開始時間以降に実行するが、電力の実績値が取得できるまでの一定時間である不感時間帯(m0分)の間はリアルタイムDR処理を実行しない(ステップST61)。実績差算出部85は、m分間隔で実績差を算出することとし(ステップST62)、自身の計時機能から取得する時間が、T+Y(Y=Y+m)分である場合に(ステップST63)、実績モードのリアルタイムDR処理を行う。まず、計測部82は、負荷装置の需要電力の実績値に基づく平均需要電力の推定値を算出する(ステップST64)。実績差算出部85は、目標値記憶部81に記憶されている最大需要電力の目標値を読み出す(ステップST65)。そして、実績差算出部85は、推定値が、目標値を超えるか否かを判定する(ステップST66)。ここで、実績差算出部85が、推定値は目標値を超えないと判定すれば(ステップST66−NO)、電力制御部87はリアルタイムDR処理を実行しない。   FIG. 18 is a flowchart illustrating an operation example of the real-time DR process in the performance mode by the load power control device 8. The load power control device 8 executes the real-time DR process based on the actual value after the demand start time, but the real-time DR process during the dead time period (m0 minutes) that is a fixed time until the actual power value can be acquired. Is not executed (step ST61). The performance difference calculation unit 85 calculates the performance difference at intervals of m minutes (step ST62), and when the time acquired from its own time measuring function is T + Y (Y = Y + m) minutes (step ST63). Performs real-time DR processing of the mode. First, the measurement part 82 calculates the estimated value of the average demand power based on the actual value of the demand power of the load device (step ST64). The performance difference calculation unit 85 reads the target value of the maximum demand power stored in the target value storage unit 81 (step ST65). And the performance difference calculation part 85 determines whether an estimated value exceeds target value (step ST66). Here, if the performance difference calculation unit 85 determines that the estimated value does not exceed the target value (step ST66—NO), the power control unit 87 does not execute the real-time DR process.

ステップST66において、実績差算出部85が、推定値は目標値を超えると判定すれば(ステップST66−YES)、電力制御部87は、推定値と目標値との差を、DR必要量として算出する(ステップST67)。そして、計測部82は、その時点での各負荷装置の運転実績データを取得し、優先順位記憶部86に記憶させる(ステップST68)。そして、電力制御部87は、優先順位記憶部86に記憶された優先順位テーブルから、DR必要量に応じた優先順位に対応付けられた供給減少対象機器を読み出す(ステップST69)。そして、電力制御部87は、T+YからT+X分の間に、ステップST69において決定された供給減少対象機器に対するDR処理を実行する(ステップST70)。   In step ST66, when the result difference calculation unit 85 determines that the estimated value exceeds the target value (step ST66-YES), the power control unit 87 calculates the difference between the estimated value and the target value as the DR required amount. (Step ST67). And the measurement part 82 acquires the driving performance data of each load apparatus in the time, and memorize | stores it in the priority memory | storage part 86 (step ST68). And the electric power control part 87 reads the supply reduction object apparatus matched with the priority according to DR required amount from the priority table memorize | stored in the priority memory | storage part 86 (step ST69). And the electric power control part 87 performs DR process with respect to the supply reduction object apparatus determined in step ST69 between T + Y and T + X minutes (step ST70).

以上説明したように、本実施形態によれば、デマンド時限内における需要電力の実績値が計測されるよりも前に、ニューラルネットワークモデルなどにより算出した平均需要電力の予測値に基づいてリアルタイムDR処理を行うことが可能になる。すなわち、従来のようにデマンド時限内における需要電力の実績値を計測した後に、平均需要電力の推定値を算出してDR処理を行うことに比べてDR処理時間を多く取れるため、需要電力の削減効果が大きくなる。例えば、従来はデマンド時限の開始時点(T1)から、需要電力の実測値が取得される一定時間(T1+m0)後からでなければDR処理を実行することができなかったが、本実施形態によれば、デマンド時限の開始時点(T1)からDR処理を精度良く開始することができる。   As described above, according to the present embodiment, the real-time DR process is performed based on the predicted value of average demand power calculated by a neural network model or the like before the actual value of demand power within the demand time period is measured. It becomes possible to do. That is, after measuring the actual value of the demand power within the demand time limit as in the past, the DR processing time can be increased compared with the case where the estimated value of the average demand power is calculated and the DR processing is performed. The effect is increased. For example, in the past, the DR process could not be executed until a certain time (T1 + m0) after the actual value of demand power was acquired from the start point (T1) of the demand time limit. For example, the DR process can be accurately started from the start time point (T1) of the demand time limit.

なお、本実施形態では、予測値算出部83は、デマンド時限の一定時間前毎に、ニューラルネットワークモデルによる予測値の算出処理を行う例を示したが、例えば、1日1回、デマンド時限間隔(X分)毎の24時間分の予測値を算出し、記憶しておくようにしても良い。
また、本実施形態では、負荷電力制御装置8が計測部82を備えるとして説明したが、計測部82は、負荷電力制御装置8の外部のコンピュータ装置に備えられるようにしても良い。あるいは、例えば需要電力の制御対象の施設に、需要電力を制御する既存の制御システムが備えられている場合、負荷電力制御装置8の電力制御部87が、既存の制御システムに供給減少対象機器の情報を送信し、制御システムによって需要電力を減少させるようにしても良い。
In the present embodiment, the prediction value calculation unit 83 performs the calculation process of the prediction value by the neural network model every predetermined time before the demand time limit. However, for example, once a day, the demand time interval A predicted value for 24 hours for each (X minutes) may be calculated and stored.
In the present embodiment, the load power control device 8 has been described as including the measurement unit 82, but the measurement unit 82 may be included in a computer device outside the load power control device 8. Alternatively, for example, when an existing control system for controlling demand power is provided in a facility targeted for demand power control, the power control unit 87 of the load power control device 8 supplies the existing control system to the supply reduction target device. Information may be transmitted to reduce the power demand by the control system.

<第2実施形態>
本発明は上記構成に限られず、例えば、図19に示すような構成であってもよい。図19は、第2実施形態に係るスマートグリッドシステムの一例を示す概略ブロック図である。なお、図1に示す構成と同様の機能を備える構成については、同一の符号を付して詳細な説明は省略する。
図19に示す通り、運転管理装置1´は、上述の運転管理装置1と比較して、通信部93をさらに備える。この通信部93は、中央管理装置92とネットワークを介して接続されている。
この中央管理装置92は、情報収集部92と、管理記憶部922と、管理制御部923と、通信部924と、出力部925と、電源出力制御装置7と、負荷電力制御装置8とを含む。
情報収集部92は、室内環境情報検出部91によって検出された実測値を入力し、この実測値が計測された時刻と対応付けて管理記憶部922に記憶する。
管理制御部923は、中央管理装置92を統括的に管理するコンピュータである。この管理制御部923は、情報収集部921が取得した室内環境情報検出部91からの実測値を通信部924を介して運転管理装置1´に送信する。また、管理制御部923は、管理記憶部922に記憶されている実測値を出力部925に出力する。
出力部925は、例えば表示装置や印刷装置等であって、管理制御装置923から入力する情報を表示あるいは印刷する。
室内環境情報検出部91は、例えば温度情報検出部911や湿度情報検出部912等の検出部を備え、検出した実測値を中央管理装置に出力する。
Second Embodiment
The present invention is not limited to the configuration described above, and may be configured as shown in FIG. 19, for example. FIG. 19 is a schematic block diagram illustrating an example of a smart grid system according to the second embodiment. In addition, about the structure provided with the function similar to the structure shown in FIG. 1, the same code | symbol is attached | subjected and detailed description is abbreviate | omitted.
As illustrated in FIG. 19, the operation management device 1 ′ further includes a communication unit 93 as compared with the operation management device 1 described above. The communication unit 93 is connected to the central management device 92 via a network.
The central management device 92 includes an information collection unit 92, a management storage unit 922, a management control unit 923, a communication unit 924, an output unit 925, a power output control device 7, and a load power control device 8. .
The information collection unit 92 inputs the actual measurement value detected by the indoor environment information detection unit 91 and stores it in the management storage unit 922 in association with the time when the actual measurement value was measured.
The management control unit 923 is a computer that centrally manages the central management device 92. The management control unit 923 transmits the actual measurement value acquired from the indoor environment information detection unit 91 acquired by the information collection unit 921 to the operation management apparatus 1 ′ via the communication unit 924. In addition, the management control unit 923 outputs the actual measurement value stored in the management storage unit 922 to the output unit 925.
The output unit 925 is, for example, a display device or a printing device, and displays or prints information input from the management control device 923.
The indoor environment information detection unit 91 includes detection units such as a temperature information detection unit 911 and a humidity information detection unit 912, and outputs the detected actual measurement values to the central management device.

この構成により、太陽光発電設備等を備えた建物の施設において、この発電電量と買電電力とを組み合わせて負荷装置に電力を供給する場合であっても、この電力供給を運転管理装置1´が管理することにより、施設へ安定した電力供給を実現することができる。
また、各建物の立地位置や施設の使用用途等に応じて熱負荷が変動する場合であっても、建物単位で買電電力のピーク値を抑えることができる。
With this configuration, even in the case of supplying power to the load device by combining the amount of generated power and the purchased power in a building facility equipped with solar power generation facilities or the like, this power supply is controlled by the operation management device 1 ′. Can manage the power supply to the facility.
Moreover, even if the heat load varies depending on the location of each building, the usage of the facility, etc., the peak value of purchased power can be suppressed on a building-by-building basis.

なお、本発明における処理部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより運転管理の制御および需要電力の制御を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
また、「コンピュータシステム」は、ホームページ提供環境(あるいは表示環境)を備えたWWWシステムも含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。
In addition, the program for realizing the function of the processing unit in the present invention is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read by the computer system and executed to control operation management. In addition, the demand power may be controlled. Here, the “computer system” includes an OS and hardware such as peripheral devices.
The “computer system” includes a WWW system having a homepage providing environment (or display environment). The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Further, the “computer-readable recording medium” refers to a volatile memory (RAM) in a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In addition, those holding programs for a certain period of time are also included.

また、上記プログラムは、このプログラムを記憶装置等に格納したコンピュータシステムから、伝送媒体を介して、あるいは、伝送媒体中の伝送波により他のコンピュータシステムに伝送されてもよい。ここで、プログラムを伝送する「伝送媒体」は、インターネット等のネットワーク(通信網)や電話回線等の通信回線(通信線)のように情報を伝送する機能を有する媒体のことをいう。また、上記プログラムは、前述した機能の一部を実現するためのものであっても良い。さらに、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であっても良い。   The program may be transmitted from a computer system storing the program in a storage device or the like to another computer system via a transmission medium or by a transmission wave in the transmission medium. Here, the “transmission medium” for transmitting the program refers to a medium having a function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line. The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, and what is called a difference file (difference program) may be sufficient.

1・・・運転管理装置、3・・・空調熱源設備機器、4・・・作業設備機器、6・・・電源機器、7・・・電源出力制御装置、8・・・負荷電力制御装置、31・・・空調熱源機、32・・・外調機、33・・・空調機、61・・・第1発電機、62・・・第2発電機、63・・・蓄電池、64・・・買電電源、102・・・空調熱負荷予測部、104・・・発電出力予測処理部、105・・・運転計画作成部、106・・・電力負荷予測部、108・・・デマンド超過判定部、109・・・計画DR作成部(計画変更部)、110・・・リアルタイムDR実行指示部(リアルタイム需要電力制御部)   DESCRIPTION OF SYMBOLS 1 ... Operation management apparatus, 3 ... Air-conditioning heat-source equipment equipment, 4 ... Work equipment equipment, 6 ... Power supply equipment, 7 ... Power supply output control apparatus, 8 ... Load power control apparatus, 31 ... Air-conditioning heat source machine, 32 ... External air conditioner, 33 ... Air conditioner, 61 ... First generator, 62 ... Second generator, 63 ... Storage battery, 64 ...・ Purchased power supply, 102 ... Air conditioning thermal load prediction unit, 104 ... Power generation output prediction processing unit, 105 ... Operation plan creation unit, 106 ... Power load prediction unit, 108 ... Demand excess determination , 109 ... Plan DR creation part (plan change part), 110 ... Real time DR execution instruction part (Real time demand power control part)

Claims (4)

予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定するデマンド超過判定部と、
前記買電電力が目標値を超えることが前記デマンド超過判定部により判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更する計画変更部であって、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更する計画変更部と、
を備えることを特徴とする運転管理装置。
Based on the predicted power load value indicating the power predicted in the operation plan as the power supplied to the heat source load device that adjusts the temperature to the preset temperature that is determined in advance on the predicted date, the power load predicted value indicates of power per fixed time predetermined, and determines the demand exceeds the determination unit what a power purchased electric power supplied from the power purchase power of the commercial power system exceeds the target value,
When the demand excess determination unit determines that the purchased power exceeds a target value, the power load applied to the heat source load device during the target excess period, which is a time during which the purchased power exceeds the target value, is purchased. The electric power is reduced so as to be equal to or less than the target value, and the power source load device is applied to the heat source load device during a peak first period which is a time period during which the purchased power does not exceed the target value and is in a period before the target excess period. A plan change unit for changing a set temperature of the heat source load device defined in the operation plan so as to increase a reduced amount in the target overperiod for the electric power load , and among the plurality of overtarget periods When the first pre-peak period immediately before the first target excess period overlaps with the second target excess period, which is a period different from the first target excess period, the first target excess period The maximum value of the purchased power in the predicted power load value and the maximum value of the purchased power in the predicted power load value in the second target excess period are compared, and the target having the higher maximum value is compared. A plan change unit for changing the purchased power in the excess period and the period before the first peak;
An operation management device comprising:
前記目標超過期間は、
前記電力負荷予測値のうち前記予め決められた一定時間当たりの買電電力の平均が最大
となる期間を含むことを特徴とする請求項1に記載の運転管理装置。
The target overage period is
The operation management apparatus according to claim 1, further comprising a period in which an average of the purchased power per predetermined time among the predicted power load values is a maximum.
運転管理装置が、
予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定し、
前記買電電力が目標値を超えると判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更するときに、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更する、
ことを特徴とする運転管理方法。
The operation management device
Based on the predicted power load value indicating the power predicted in the operation plan as the power supplied to the heat source load device that adjusts the temperature to the preset temperature that is determined in advance on the predicted date, the power load predicted value indicates of power per constant predetermined time, to determine what power purchase power supplied from the power purchase power of the commercial power system is a power greater than the target value,
If the purchased electric power is Ru When determine constant exceeds the target value, the power purchase target excess period to the heat source load device power load on the power purchase power said target value power is the time exceeding the target value The power load applied to the heat source load device during the first peak period that is a time during which the purchased power does not exceed the target value and is a period before the target excess period. When changing the set temperature of the heat source load device defined in the operation plan so as to increase the amount reduced in the excess period, the first immediately before the first target excess period among the plurality of target excess periods. When a period before one peak overlaps with a second target excess period that is a period different from the first target excess period, the maximum of the purchased power of the predicted power load value in the first target excess period. The power purchase predicted value in the second target excess period is compared with the maximum value of the purchased power, and the power purchase in the target excess period and the period before the first peak with the higher maximum value is compared. Change power,
An operation management method characterized by that.
運転管理装置の制御コンピュータに、
予測日において予め決められている設定温度に温度調整する熱源負荷装置に供給する電力として運転計画において予測される電力を時刻に対応付けて示す電力負荷予測値に基づき、当該電力負荷予測値が示す予め決められた一定時間当たりの電力のうち、商用電力系統の買電電源から供給される買電電力が目標値を超える電力であるものを判定させ、
前記買電電力が目標値を超えると判定された場合、当該買電電力が目標値を超える時間である目標超過期間に前記熱源負荷装置にかかる電力負荷を前記買電電力が前記目標値以下となるように低減させるとともに、当該買電電力が目標値を超えていない時間であって当該目標超過期間よりも過去の期間であるピーク前期間に前記熱源負荷装置にかかる電力負荷について前記目標超過期間において低減された分を増加させるように、前記運転計画において規定されている前記熱源負荷装置の設定温度を変更するときに、複数の目標超過期間のうち第1目標超過期間の直前の第1ピーク前期間と、前記第1目標超過期間と異なる期間である第2目標超過期間が重複する場合、前記第1目標超過期間における前記電力負荷予測値の前記買電電力の最大値と前記第2目標超過期間における前記電力負荷予測値の前記買電電力の最大値とを比較して、前記最大値が高い方の前記目標超過期間と前記第1ピーク前期間における前記買電電力を変更させる、
ことを特徴とする運転管理プログラム。
In the control computer of the operation management device,
Based on the predicted power load value indicating the power predicted in the operation plan as the power supplied to the heat source load device that adjusts the temperature to the preset temperature that is determined in advance on the predicted date, the power load predicted value indicates of power per fixed time predetermined, to determine what power purchase power supplied from the power purchase power of the commercial power system is a power greater than the target value,
If the purchased electric power is Ru When determine constant exceeds the target value, the power purchase target excess period to the heat source load device power load on the power purchase power said target value power is the time exceeding the target value The power load applied to the heat source load device during the first peak period that is a time during which the purchased power does not exceed the target value and is a period before the target excess period. When changing the set temperature of the heat source load device defined in the operation plan so as to increase the amount reduced in the excess period, the first immediately before the first target excess period among the plurality of target excess periods. When a period before one peak overlaps with a second target excess period that is a period different from the first target excess period, the maximum of the purchased power of the predicted power load value in the first target excess period. The power purchase predicted value in the second target excess period is compared with the maximum value of the purchased power, and the power purchase in the target excess period and the period before the first peak with the higher maximum value is compared. To change the power,
An operation management program characterized by that.
JP2010224130A 2010-10-01 2010-10-01 Operation management device, operation management method, and operation management program Active JP5668970B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2010224130A JP5668970B2 (en) 2010-10-01 2010-10-01 Operation management device, operation management method, and operation management program
JP2012172346A JP5709022B2 (en) 2010-10-01 2012-08-02 Operation management apparatus, operation management method, and operation management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010224130A JP5668970B2 (en) 2010-10-01 2010-10-01 Operation management device, operation management method, and operation management program

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2012172346A Division JP5709022B2 (en) 2010-10-01 2012-08-02 Operation management apparatus, operation management method, and operation management program

Publications (2)

Publication Number Publication Date
JP2012080681A JP2012080681A (en) 2012-04-19
JP5668970B2 true JP5668970B2 (en) 2015-02-12

Family

ID=46240276

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2010224130A Active JP5668970B2 (en) 2010-10-01 2010-10-01 Operation management device, operation management method, and operation management program
JP2012172346A Active JP5709022B2 (en) 2010-10-01 2012-08-02 Operation management apparatus, operation management method, and operation management program

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2012172346A Active JP5709022B2 (en) 2010-10-01 2012-08-02 Operation management apparatus, operation management method, and operation management program

Country Status (1)

Country Link
JP (2) JP5668970B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200070930A (en) * 2018-12-10 2020-06-18 삼성전자주식회사 Energy storage system and controlling method thereof

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2012253837A1 (en) 2011-05-06 2013-10-31 Opower, Inc. Method and system for selecting similar consumers
US10796346B2 (en) 2012-06-27 2020-10-06 Opower, Inc. Method and system for unusual usage reporting
JP5919116B2 (en) * 2012-07-19 2016-05-18 株式会社日立製作所 Thermal storage controller
US9547316B2 (en) 2012-09-07 2017-01-17 Opower, Inc. Thermostat classification method and system
US9633401B2 (en) * 2012-10-15 2017-04-25 Opower, Inc. Method to identify heating and cooling system power-demand
US10067516B2 (en) 2013-01-22 2018-09-04 Opower, Inc. Method and system to control thermostat using biofeedback
EP2966746A4 (en) * 2013-03-04 2016-10-19 Nec Corp Energy management system and energy management method
JP2014215844A (en) * 2013-04-26 2014-11-17 株式会社日立製作所 Energy management system
US10719797B2 (en) 2013-05-10 2020-07-21 Opower, Inc. Method of tracking and reporting energy performance for businesses
US10001792B1 (en) 2013-06-12 2018-06-19 Opower, Inc. System and method for determining occupancy schedule for controlling a thermostat
JP6282071B2 (en) * 2013-09-24 2018-02-21 株式会社日立製作所 Air conditioning control system and air conditioning control method
JP6196887B2 (en) * 2013-11-19 2017-09-13 大成建設株式会社 Heat source control system
US10885238B1 (en) 2014-01-09 2021-01-05 Opower, Inc. Predicting future indoor air temperature for building
US10037014B2 (en) 2014-02-07 2018-07-31 Opower, Inc. Behavioral demand response dispatch
US9852484B1 (en) 2014-02-07 2017-12-26 Opower, Inc. Providing demand response participation
US10031534B1 (en) 2014-02-07 2018-07-24 Opower, Inc. Providing set point comparison
US9947045B1 (en) 2014-02-07 2018-04-17 Opower, Inc. Selecting participants in a resource conservation program
US9835352B2 (en) 2014-03-19 2017-12-05 Opower, Inc. Method for saving energy efficient setpoints
US9727063B1 (en) 2014-04-01 2017-08-08 Opower, Inc. Thermostat set point identification
US10108973B2 (en) 2014-04-25 2018-10-23 Opower, Inc. Providing an energy target for high energy users
US10019739B1 (en) 2014-04-25 2018-07-10 Opower, Inc. Energy usage alerts for a climate control device
US10171603B2 (en) 2014-05-12 2019-01-01 Opower, Inc. User segmentation to provide motivation to perform a resource saving tip
US10235662B2 (en) 2014-07-01 2019-03-19 Opower, Inc. Unusual usage alerts
US10024564B2 (en) 2014-07-15 2018-07-17 Opower, Inc. Thermostat eco-mode
US10467249B2 (en) 2014-08-07 2019-11-05 Opower, Inc. Users campaign for peaking energy usage
US10410130B1 (en) 2014-08-07 2019-09-10 Opower, Inc. Inferring residential home characteristics based on energy data
US10572889B2 (en) 2014-08-07 2020-02-25 Opower, Inc. Advanced notification to enable usage reduction
US9576245B2 (en) 2014-08-22 2017-02-21 O Power, Inc. Identifying electric vehicle owners
US10033184B2 (en) 2014-11-13 2018-07-24 Opower, Inc. Demand response device configured to provide comparative consumption information relating to proximate users or consumers
JP6592454B2 (en) * 2014-12-02 2019-10-16 積水化学工業株式会社 Power control system, power control method and program
JP2016109353A (en) * 2014-12-05 2016-06-20 パナソニックIpマネジメント株式会社 Control device and control method
US10198483B2 (en) 2015-02-02 2019-02-05 Opower, Inc. Classification engine for identifying business hours
US11093950B2 (en) 2015-02-02 2021-08-17 Opower, Inc. Customer activity score
US10074097B2 (en) 2015-02-03 2018-09-11 Opower, Inc. Classification engine for classifying businesses based on power consumption
US10371861B2 (en) 2015-02-13 2019-08-06 Opower, Inc. Notification techniques for reducing energy usage
JP6420688B2 (en) * 2015-02-25 2018-11-07 京セラ株式会社 Power control device, control method for power control device, and power control system
JP6393215B2 (en) * 2015-03-04 2018-09-19 アズビル株式会社 Peak power expression prediction device and prediction method
JP2016192872A (en) * 2015-03-31 2016-11-10 パナソニックIpマネジメント株式会社 Gateway device, demand response system and program for gateway device
US10817789B2 (en) 2015-06-09 2020-10-27 Opower, Inc. Determination of optimal energy storage methods at electric customer service points
WO2017002153A1 (en) * 2015-06-29 2017-01-05 三菱電機株式会社 Information processing device, information processing method, and information processing program
US9958360B2 (en) 2015-08-05 2018-05-01 Opower, Inc. Energy audit device
US10559044B2 (en) 2015-11-20 2020-02-11 Opower, Inc. Identification of peak days
JP7154034B2 (en) * 2018-05-01 2022-10-17 三菱電機株式会社 Controller and refrigeration system
JP7042180B2 (en) * 2018-07-19 2022-03-25 旭化成ホームズ株式会社 Heat source controller and heat source control program
WO2023228937A1 (en) * 2022-05-23 2023-11-30 京セラ株式会社 Power management device, power management method, power management program, facility, and freezer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4115402B2 (en) * 2004-02-06 2008-07-09 三洋電機株式会社 Simulation apparatus, simulation method, and simulation system
JP5114026B2 (en) * 2006-06-28 2013-01-09 三洋電機株式会社 Demand control device
JP5363046B2 (en) * 2008-07-25 2013-12-11 サンテック株式会社 Power consumption control device, cooling system, and power consumption control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200070930A (en) * 2018-12-10 2020-06-18 삼성전자주식회사 Energy storage system and controlling method thereof
WO2020122475A1 (en) 2018-12-10 2020-06-18 Samsung Electronics Co., Ltd. Energy storage system and controlling method thereof
EP3871310A4 (en) * 2018-12-10 2021-12-29 Samsung Electronics Co., Ltd. Energy storage system and controlling method thereof
KR102612415B1 (en) * 2018-12-10 2023-12-12 삼성전자주식회사 Energy storage system and controlling method thereof

Also Published As

Publication number Publication date
JP5709022B2 (en) 2015-04-30
JP2012080681A (en) 2012-04-19
JP2012254015A (en) 2012-12-20

Similar Documents

Publication Publication Date Title
JP5668970B2 (en) Operation management device, operation management method, and operation management program
JP5696877B2 (en) Operation management device, operation management method, and operation management program
JP6108333B2 (en) Operation management device, operation management method, operation management program
JP5908302B2 (en) Storage energy storage optimization device, optimization method and optimization program
US8543248B2 (en) System for managing energy at loads
JP5981313B2 (en) Power suppression type storage energy storage optimization device, optimization method, and optimization program
CN102812303B (en) HVAC control system and method
WO2015151363A1 (en) Air-conditioning system and control method for air-conditioning equipment
US20150323921A1 (en) Operation schedule optimizing device, operation schedule optimizing method, and operation schedule optimizing program
JP4347602B2 (en) Heat source operation support control method, system and program
JP6404650B2 (en) Device operation set value determination device, device operation set value determination method, and device operation set value determination program
JP5787162B2 (en) Operation management device, operation management method, program
US10411475B2 (en) Cloud-based control for power distribution system
JP5725364B2 (en) Operation management device, operation management method, and operation management program
JP3719231B2 (en) Equipment control method and equipment management system
KR20220090202A (en) System for performing optimal managing of complex equipments based thermal energy demanding forcasting
JP2020190767A (en) Power demand forecasting device for target facility
Zhang Mitigating Peak Load and Heat Stress under Heat Waves by Scheduling Cooling and Energy Storage Systems
JPH06300344A (en) Method and apparatus for controlling cooling/heating system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130808

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140617

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140805

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141203

R150 Certificate of patent (=grant) or registration of utility model

Ref document number: 5668970

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150