JP5412895B2 - Path allocation program, path allocation apparatus, and path allocation method - Google Patents

Path allocation program, path allocation apparatus, and path allocation method Download PDF

Info

Publication number
JP5412895B2
JP5412895B2 JP2009059991A JP2009059991A JP5412895B2 JP 5412895 B2 JP5412895 B2 JP 5412895B2 JP 2009059991 A JP2009059991 A JP 2009059991A JP 2009059991 A JP2009059991 A JP 2009059991A JP 5412895 B2 JP5412895 B2 JP 5412895B2
Authority
JP
Japan
Prior art keywords
path
antenna
allocation
satellite
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009059991A
Other languages
Japanese (ja)
Other versions
JP2010208599A (en
Inventor
尋子 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2009059991A priority Critical patent/JP5412895B2/en
Publication of JP2010208599A publication Critical patent/JP2010208599A/en
Application granted granted Critical
Publication of JP5412895B2 publication Critical patent/JP5412895B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Radio Relay Systems (AREA)

Description

本発明は、パス割付プログラム、パス割付装置及びパス割付方法に係り、特に人工衛星追跡用アンテナのパス割付プログラム、パス割付装置及びパス割付方法に関する。   The present invention relates to a path allocation program, a path allocation apparatus, and a path allocation method, and more particularly to a path allocation program, a path allocation apparatus, and a path allocation method for an artificial satellite tracking antenna.

人工衛星の追跡管制運用では、地上局アンテナ設備により人工衛星(以下、単に衛星という)と地上局との間で情報やりとりを行う。人工衛星の追跡管制運用では、地上局と衛星と間に中継衛星(静止衛星)を配し、中継衛星を地上局アンテナ設備と同等に使用する場合もある。   In the tracking control operation of an artificial satellite, information is exchanged between the artificial satellite (hereinafter simply referred to as a satellite) and the ground station using the ground station antenna facility. In tracking control operation of an artificial satellite, a relay satellite (stationary satellite) is arranged between the ground station and the satellite, and the relay satellite may be used in the same manner as the ground station antenna equipment.

通常、1つの衛星の運用では複数個所の人工衛星追跡用アンテナ(以下、単にアンテナという)を使用する場合が多い。また、1つのアンテナは特定の衛星専用ではなく、複数の衛星の追跡管制運用に使用される。限られたアンテナ数で複数衛星の運用を効率的に行うためには、各アンテナから衛星が可視である可視時間帯を予め計算しておき、どのアンテナで、いつ、どの衛星の運用を行うか、アンテナ運用計画を作成する。   Usually, in one satellite operation, a plurality of satellite tracking antennas (hereinafter simply referred to as antennas) are often used. One antenna is not dedicated to a specific satellite but is used for tracking control operation of a plurality of satellites. In order to efficiently operate multiple satellites with a limited number of antennas, the visible time zone in which the satellites are visible from each antenna is calculated in advance, and which satellite is used when and which satellite is operated. Create an antenna operation plan.

アンテナ運用計画の作成は、複数の衛星と複数のアンテナに対して、アンテナ運用計画の源泉となる、可視時間帯に基づくパス割付を行う必要がある。パス割付とは、どのアンテナを、いつ、どの衛星に使わせるか、を決めることである。   To create an antenna operation plan, it is necessary to assign a path based on the visible time zone, which is the source of the antenna operation plan, to a plurality of satellites and a plurality of antennas. Path allocation is to determine which antenna is to be used for which satellite.

従来、衛星の運用計画立案に関する技術としては、前回の運用計画が存在することを前提とし、各衛星の要求競合をできるだけ少なくするように運用計画を改善する試行錯誤プロセスを自動化するものが知られている(例えば、特許文献1参照)。   Conventionally, as a technology related to satellite operation planning, there is a technology that automates a trial and error process that improves the operation plan so as to minimize the competition for each satellite as much as possible, assuming that the previous operation plan exists. (For example, refer to Patent Document 1).

特開2001−233300号公報JP 2001-233300 A

対象衛星数、アンテナ数がそれぞれ数個程度ならば、アンテナ運用計画の作成は人手でも対応できる。しかし、対象衛星数、アンテナ数がそれぞれ10個あるいはそれ以上の数になってくると、マニュアルでのアンテナ運用計画の作成は困難である。また、アンテナ運用計画は必ずしも絶対的な最適解が存在するという問題ではない。このため、複数のアンテナ運用計画案から、衛星運用側とアンテナ運用側とが調整しつつ最終案を選択するというプロセスは無視できない。   If the number of target satellites and the number of antennas are several, respectively, the creation of an antenna operation plan can be handled manually. However, when the number of target satellites and the number of antennas are 10 or more, it is difficult to manually create an antenna operation plan. Also, the antenna operation plan is not necessarily a problem that an absolute optimum solution exists. For this reason, the process of selecting the final plan from the plurality of antenna operation plans while the satellite operation side and the antenna operation side adjust is not negligible.

衛星運用側とアンテナ運用側とが調整しつつ最終案を選択する為には、複数のアンテナ運用計画案を作成する必要がある。しかし、上記したように、対象衛星数、アンテナ数が増えるとマニュアルでのアンテナ運用計画案の作成は困難となるという問題があった。   In order for the satellite operation side and the antenna operation side to coordinate and select the final plan, it is necessary to create a plurality of antenna operation plans. However, as described above, there has been a problem that it becomes difficult to manually create an antenna operation plan as the number of target satellites and the number of antennas increase.

なお、従来の衛星の運用計画立案に関する技術は、前回の運用計画をゼロベースからどのように作成するかについて言及していない。   In addition, the conventional technology related to the satellite operation plan does not mention how to create the previous operation plan from zero base.

本発明の一実施形態は、上記の点に鑑みなされたもので、複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を容易に行うことができるパス割付プログラム、パス割付装置及びパス割付方法を提供することを目的とする。   One embodiment of the present invention has been made in view of the above points, and a path allocation program capable of easily performing path allocation as a source of an antenna operation plan when tracking a plurality of satellites with a plurality of antennas, It is an object to provide a path allocation device and a path allocation method.

上記課題を解決するため、本発明の一実施形態は、複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うコンピュータを、アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成部と、アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成部と、前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付部として機能させるパス割付プログラムであることを特徴とする。   In order to solve the above-mentioned problem, in one embodiment of the present invention, a computer that performs path allocation, which is a source of an antenna operation plan when tracking a plurality of satellites with a plurality of antennas, sets the priority of the satellite for each antenna. A process for creating a processing order table in which the order of combinations of antennas and satellites for performing path allocation processing is set for each case based on the antenna priority table for each antenna and the antenna priority case table in which a plurality of antenna priorities are set. Based on the order table creation unit, the file that sets the satellite visible time zone for each antenna, and the target satellite table that sets the orbit type and operation time for each satellite, the path time, visible time, and A path time table that sets the initial value of the allocation flag that indicates the path allocation result. Based on the order of the combination of antenna and satellite for performing the path allocation processing for each case set in the processing order table and the time table default creation unit, for the combination of antenna, satellite and path set in the path time table A path allocation unit that performs path allocation so as not to overlap using path time and visible time, and creates a path time table for each case by updating the initial value of the allocation flag of the path time table based on the path allocation result It is a path allocation program that functions as

なお、本発明の一実施形態の構成要素、表現または構成要素の任意の組合せを、方法、装置、システム、コンピュータプログラム、記録媒体、データ構造などに適用したものも本発明の態様として有効である。   In addition, what applied the component, the expression, or arbitrary combinations of the component of one Embodiment of this invention to a method, an apparatus, a system, a computer program, a recording medium, a data structure, etc. is also effective as an aspect of this invention. .

上述の如く、本発明の一実施形態によれば、複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を容易に行うことができる。   As described above, according to an embodiment of the present invention, it is possible to easily perform path allocation as a source of an antenna operation plan when tracking a plurality of satellites with a plurality of antennas.

本実施例のパス割付装置の一例のハードウェア構成図である。It is a hardware block diagram of an example of the path allocation apparatus of a present Example. パス割付装置の処理イメージを表した一例の構成図である。It is a block diagram of an example showing the process image of the path allocation apparatus. パス割付のルールについて説明する為の一例の説明図である。It is explanatory drawing of an example for demonstrating the rule of path allocation. パス割付のルールについて説明する為の他の一例の説明図である。It is explanatory drawing of another example for demonstrating the rule of path allocation. パス割付結果チャートの一例のイメージ図である。It is an image figure of an example of a path allocation result chart. 対象衛星テーブルの一例の構成図である。It is a block diagram of an example of an object satellite table. アンテナ別衛星優先テーブルの一例の構成図である。It is a block diagram of an example of the satellite priority table classified by antenna. アンテナ優先ケーステーブルの一例の構成図である。It is a block diagram of an example of an antenna priority case table. パス要求テーブルの一例の構成図である。It is a block diagram of an example of a path | pass request table. 割付ステップについて説明する説明図である。It is explanatory drawing explaining an allocation step. 処理順序テーブルの作成手順を表したイメージ図である。It is an image figure showing the creation procedure of a processing order table. パス時間テーブルの一例の構成図である。It is a block diagram of an example of a path | pass time table. 本実施例のパス割付装置の一例の処理ブロック図である。It is a process block diagram of an example of the path allocation apparatus of a present Example. パス割付エンジンの処理手順を表したフローチャートである。It is a flowchart showing the processing procedure of the path allocation engine. パス時間テーブルデフォルト作成部の処理手順を表したフローチャートである。It is a flowchart showing the processing procedure of the pass time table default preparation part. アンテナ/衛星別パス割付部の処理手順を表したフローチャートである。It is the flowchart showing the process sequence of the path | route allocation part classified by antenna / satellite. パス別処理の手順を表したフローチャートである。It is a flowchart showing the procedure of the process according to path | pass. 重複判定部が行うパス重複判定処理の手順を表したフローチャートである。It is a flowchart showing the procedure of the path duplication judgment process which an duplication judgment part performs. パス割付表示部が出力装置に表示するパス割付結果チャートの一例のイメージ図である。It is an image figure of an example of the path allocation result chart which a path allocation display part displays on an output device.

次に、本発明を実施するための形態を、以下の実施例に基づき図面を参照しつつ説明していく。本実施例のパス割付装置は人工衛星の追跡管制運用に利用される。具体的に本実施例のパス割付装置は、複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の作成に適用できる。また、本実施例のパス割付装置は、アンテナを中継衛星に置き換えても適用可能である。   Next, modes for carrying out the present invention will be described based on the following embodiments with reference to the drawings. The path allocation device of this embodiment is used for tracking control operation of an artificial satellite. Specifically, the path allocation apparatus of the present embodiment can be applied to the creation of an antenna operation plan when tracking a plurality of satellites with a plurality of antennas. Further, the path allocation device of the present embodiment is applicable even if the antenna is replaced with a relay satellite.

図1は本実施例のパス割付装置の一例のハードウェア構成図である。図1のパス割付装置1は、それぞれバスBで相互に接続されている入力装置11,出力装置12,ドライブ装置13,補助記憶装置14,主記憶装置15,演算処理装置16及びインターフェース装置17を有する。   FIG. 1 is a hardware configuration diagram of an example of a path allocation device according to the present embodiment. 1 includes an input device 11, an output device 12, a drive device 13, an auxiliary storage device 14, a main storage device 15, an arithmetic processing device 16, and an interface device 17 that are mutually connected by a bus B. Have.

入力装置11はキーボードやマウス等である。入力装置11は、各種信号を入力するために用いられる。出力装置12はディスプレイ装置等である。出力装置12は各種ウインドウやデータ等を表示するために用いられる。インターフェース装置17はモデム,LANカード等である。インターフェース装置17はLAN等のネットワークに接続する為に用いられる。   The input device 11 is a keyboard or a mouse. The input device 11 is used for inputting various signals. The output device 12 is a display device or the like. The output device 12 is used for displaying various windows and data. The interface device 17 is a modem, a LAN card, or the like. The interface device 17 is used to connect to a network such as a LAN.

本実施例のパス割付プログラムは、パス割付装置1を制御する各種プログラムの少なくとも一部である。パス割付プログラムは例えば記録媒体18の配布やネットワークからのダウンロードなどによって提供される。パス割付プログラムを記録した記録媒体18はCD−ROM、フレキシブルディスク、光磁気ディスク等の様に情報を光学的,電気的或いは磁気的に記録する記録媒体、ROM、フラッシュメモリ等の様に情報を電気的に記録する半導体メモリ等、様々なタイプの記録媒体を用いることができる。   The path allocation program of the present embodiment is at least a part of various programs that control the path allocation apparatus 1. The path allocation program is provided, for example, by distributing the recording medium 18 or downloading from the network. The recording medium 18 on which the path allocation program is recorded is information such as a CD-ROM, a flexible disk, a magneto-optical disk, etc., a recording medium for recording information optically, electrically or magnetically, a ROM, a flash memory, etc. Various types of recording media such as a semiconductor memory for electrical recording can be used.

また、パス割付プログラムを記録した記録媒体18がドライブ装置13にセットされると、パス割付プログラムは記録媒体18からドライブ装置13を介して補助記憶装置14にインストールされる。ネットワークからダウンロードされたパス割付プログラムはインターフェース装置17を介して補助記憶装置14にインストールされる。   When the recording medium 18 on which the path allocation program is recorded is set in the drive device 13, the path allocation program is installed from the recording medium 18 to the auxiliary storage device 14 via the drive device 13. The path allocation program downloaded from the network is installed in the auxiliary storage device 14 via the interface device 17.

補助記憶装置14は、インストールされたパス割付プログラムを格納すると共に、必要なファイル,データ等を格納する。主記憶装置15は、パス割付プログラムの起動時に補助記憶装置14からパス割付プログラムを読み出して格納する。そして、演算処理装置16は主記憶装置15に格納されたパス割付プログラムに従って、後述するような各種処理を実現している。   The auxiliary storage device 14 stores the installed path allocation program and also stores necessary files, data, and the like. The main storage device 15 reads and stores the path allocation program from the auxiliary storage device 14 when the path allocation program is started. The arithmetic processing unit 16 implements various processes as will be described later in accordance with a path allocation program stored in the main storage unit 15.

図2はパス割付装置の処理イメージを表した一例の構成図である。パス割付装置1はパス割付の一次解を結果として出することができ、その結果を出力装置12にGUIとして表示することにより、運用者が画面上でパス割付を修正できる機能を実現する。パス割付装置1のパス割付エンジン21及びパス割付表示部22は演算処理装置16がパス割付プログラムを実行することにより実現される。   FIG. 2 is a configuration diagram of an example showing a processing image of the path allocation device. The path allocation device 1 can output a primary solution of path allocation as a result, and displays the result as a GUI on the output device 12, thereby realizing a function that allows the operator to correct the path allocation on the screen. The path allocation engine 21 and the path allocation display unit 22 of the path allocation device 1 are realized by the arithmetic processing device 16 executing a path allocation program.

パス割付エンジン21は、運用者が人手で行っていたパス割付操作を機械的に模擬するものである。したがって、パス割付エンジン21は、計画期間,プリパス/ポストパス時間,対象衛星テーブル,アンテナ別衛星優先テーブル,アンテナ優先ケーステーブル,パス要求テーブル,局イベントファイル23を入力されることで条件が指定される。   The path allocation engine 21 mechanically simulates a path allocation operation that has been performed manually by an operator. Therefore, the path allocation engine 21 is designated by inputting the plan period, prepass / postpath time, target satellite table, satellite priority table by antenna, antenna priority case table, path request table, and station event file 23. .

パス割付エンジン21は、アンテナ別衛星優先テーブルからアンテナ別の衛星優先順位が入力される。アンテナ別の衛星優先順位は、主局/従局の考え方にしたがって予め決められる。   The path allocation engine 21 receives the satellite priority for each antenna from the satellite priority table for each antenna. The satellite priority for each antenna is determined in advance according to the concept of the master station / slave station.

パス割付エンジン21は、アンテナ優先ケーステーブルからパスを割り付けていく時のアンテナの優先順位が入力される。パスを割り付けていく時のアンテナの優先順位は複数ケースを指定できるものとする。パスを割り付けていく時のアンテナの優先順位を指定したケース数は、作成されるアンテナ運用計画案の数に対応する。   The path allocation engine 21 receives the priority order of antennas when allocating paths from the antenna priority case table. It is assumed that a plurality of cases can be designated as the priority order of antennas when assigning paths. The number of cases that specify the priority order of antennas when assigning paths corresponds to the number of antenna operation plans to be created.

また、パス割付エンジン21はパス要求テーブルから計画期間中の要求パス数が入力される。パス割付エンジン21は、対象衛星テーブルから対象衛星及び軌道タイプが入力される。パス割付エンジン21は対象衛星数分の局イベントファイル23からアンテナの衛星可視時間帯が入力される。その他、パス割付エンジン21は計画期間,プリパス/ポストパス時間が入力される。   The path allocation engine 21 receives the number of requested paths during the planning period from the path request table. The path allocation engine 21 receives the target satellite and the orbit type from the target satellite table. The path allocation engine 21 receives the satellite satellite visible time zone from the station event file 23 corresponding to the number of target satellites. In addition, the path allocation engine 21 receives a plan period and a prepass / postpass time.

パス割付エンジン21は、入力されたアンテナ別の衛星優先順位と、パスを割り付けていく時のアンテナの優先順位とに基づき、後述の処理順序テーブル24を作成する。パス割付エンジン21は処理順序テーブル24を利用し、後述のアンテナ/衛星別のパス時間テーブル25を作成する。なお、パス時間テーブル25は、パスを割り付けていく時のアンテナの優先順位を指定したケース数分、作成される。   The path allocation engine 21 creates a processing order table 24 (to be described later) based on the input satellite priority for each antenna and the antenna priority when the path is allocated. The path allocation engine 21 uses the processing order table 24 and creates a path time table 25 for each antenna / satellite described later. The path time table 25 is created for the number of cases that specify the priority order of antennas when assigning paths.

パス割付表示部22は、パス時間テーブル25を読み込み、出力装置12に後述のパス割付結果チャートを表示する。さらに、パス割付表示部22はパス割付結果チャート上で運用者により割付が修正されると、修正された結果を反映させた改良後パス時間テーブル26を作成する。   The path allocation display unit 22 reads the path time table 25 and displays a later-described path allocation result chart on the output device 12. Further, when the allocation is corrected by the operator on the path allocation result chart, the path allocation display unit 22 creates an improved path time table 26 reflecting the corrected result.

ここでは、本実施例におけるパス時間の定義について説明する。中高度略円軌道(可視時間が10分前後)の場合、通常、パスは可視時間帯と同義に使われる。地上局アンテナ設備では、AOS(Acquisition of Signal:可視開始)前のプリパス運用、LOS(Loss of Signal:可視終了)後のポストパス運用がある。そこで、本実施例ではプリパス/ポストパス運用時間を含めてパス時間と定義する。プリパス/ポストパス運用時間はアンテナ毎に一定値が、設備条件として与えられているものとする。   Here, the definition of the pass time in the present embodiment will be described. In the case of a medium altitude substantially circular orbit (visible time around 10 minutes), the path is usually used synonymously with the visible time zone. In the ground station antenna equipment, there are a pre-pass operation before AOS (Acquisition of Signal) and a post-path operation after LOS (Loss of Signal). Therefore, in this embodiment, it is defined as a pass time including a prepass / postpass operation time. The pre-pass / post-pass operation time is assumed to be given as a facility condition for each antenna.

なお、パス時間で0時UTC(協定世界時)を跨ぐものは、パス開始時刻の日に繰り込むものとする。静止軌道の場合はずっと可視なので、UTC正時を区切りとする30分を1パス単位とする。1日は48パスに分割される。本実施例では、長楕円軌道、GPS衛星の軌道、準天頂軌道のように可視時間が数時間に及ぶ衛星についても、静止衛星と同じ30分を1パス単位とする定義を適用する。   In addition, what crosses 0:00 UTC (Coordinated Universal Time) in the pass time shall be carried over to the day of the pass start time. In the case of a geosynchronous orbit, it is always visible, so 30 minutes with UTC as a break is defined as one pass unit. A day is divided into 48 passes. In this embodiment, the same definition of 30 minutes as that of a geostationary satellite is applied to a satellite having a visible time of several hours such as an elliptical orbit, a GPS satellite orbit, and a quasi-zenith orbit.

次に、本実施例におけるハンドオーバの定義について説明する。ハンドオーバとは中高度略円軌道において、2つのアンテナA、Bの可視時間帯が重複する場合、アンテナAからアンテナBへ通信リンクを切り替えることにより連続パス運用を行うことである。このような連続パス運用は中高度略円軌道で、指定された衛星およびアンテナについて考慮すればよい。   Next, the definition of handover in the present embodiment will be described. Handover refers to continuous path operation by switching the communication link from antenna A to antenna B when the visible time zones of two antennas A and B overlap in a substantially altitude orbit at medium altitude. Such a continuous path operation is an approximately circular orbit at medium altitude, and it is sufficient to consider a designated satellite and antenna.

次に、本実施例におけるパス割付のルールについて説明する。アンテナ別の衛星優先順位に従ってパスを割り付けていく時は図3に示すようなルールを考慮する。図3はパス割付のルールについて説明する為の一例の説明図である。図3ではアンテナ(ANT)1で衛星(SAT)1の2番目のパス(2)を選択したら、パス(2)とパス時間が重複する他の衛星のパス(図3中の×印)の割付が不可となる。   Next, a path allocation rule in this embodiment will be described. When assigning paths according to the satellite priority for each antenna, the rules shown in FIG. 3 are considered. FIG. 3 is an explanatory diagram of an example for explaining the rules for path allocation. In FIG. 3, when the second path (2) of the satellite (SAT) 1 is selected by the antenna (ANT) 1, the path of another satellite whose path time overlaps with the path (2) (marked with x in FIG. 3). Assignment is impossible.

アンテナの優先順位に従ってパスを割り付けていく時は、図4に示すように以下の2つのルールを考慮する。図4はパス割付のルールについて説明する為の他の一例の説明図である。図4ではSAT1に対してANT1とANT2とにパス要求がある場合、ANT1の2番目のパス(2)とANT2の2番目のパス(4)とのようにパス時間が重複するものを同時に割り付けることができない。   When assigning paths according to the priority order of antennas, the following two rules are considered as shown in FIG. FIG. 4 is an explanatory diagram of another example for explaining the rules for path allocation. In FIG. 4, when there is a path request for ANT1 to ANT1 and ANT2, a path with overlapping path time is assigned simultaneously, such as the second path (2) of ANT1 and the second path (4) of ANT2. I can't.

また、図4ではハンドオーバ条件が指定されたSAT1かつANT1とANT2とのアンテナペアに対しては、可視時間(パス時間ではない)が重複した場合、ANT1の2番目のパス(2)とANT2の2番目のパス(4)とを同時に割り付けることができる。   Further, in FIG. 4, when the visible time (not the path time) overlaps for the antenna pair of SAT1 and ANT1 and ANT2 in which the handover condition is specified, the second path (2) of ANT1 and ANT2 The second pass (4) can be assigned at the same time.

図5はパス割付結果チャートの一例のイメージ図である。パス割付結果チャートはアンテナ別表示と衛星別表示とがある。図5のパス割付結果チャートはアンテナ別表示の例を表している。図5のパス割付結果チャートでは選択されていないパス,選択されたパス及びハンドオーバ割付されたパスが、視覚的に区別して表示されている。   FIG. 5 is an image diagram of an example of a path allocation result chart. The path allocation result chart has a display by antenna and a display by satellite. The path allocation result chart of FIG. 5 represents an example of display by antenna. In the path allocation result chart of FIG. 5, the unselected path, the selected path, and the path allocated with handover are visually distinguished and displayed.

次に、パス割付エンジン21の入出力となる各テーブルデータのイメージと、それに付随する処理とを説明する。   Next, the image of each table data that is input / output of the path allocation engine 21 and the processes associated therewith will be described.

図6は対象衛星テーブルの一例の構成図である。図6の対象衛星テーブルはパス割付エンジン21の入力となるテーブルデータである。図6の対象衛星テーブルは、処理する衛星名、軌道タイプ、運用開始時刻及び運用終了時刻をデータ項目として有する。運用開始時刻及び運用終了時刻は静止衛星の場合に与えられる。静止衛星は地上局から常に可視であるため、実際にアンテナを使用する時間帯(日勤帯の8時間など)を対象衛星テーブルの運用開始時刻及び運用終了時刻で指定する。静止衛星のパス割付は、対象衛星テーブルの運用開始時刻及び運用終了時刻で指定された時間帯に対して実施される。   FIG. 6 is a configuration diagram of an example of the target satellite table. The target satellite table in FIG. 6 is table data that is input to the path allocation engine 21. The target satellite table in FIG. 6 includes the names of satellites to be processed, orbit types, operation start times, and operation end times as data items. The operation start time and operation end time are given for geostationary satellites. Since the geostationary satellite is always visible from the ground station, the time zone in which the antenna is actually used (e.g., 8 hours in the day shift zone) is designated by the operation start time and operation end time in the target satellite table. Geostationary satellite path assignment is performed for the time zone specified by the operation start time and operation end time in the target satellite table.

図7はアンテナ別衛星優先テーブルの一例の構成図である。図7のアンテナ別衛星優先テーブルはパス割付エンジン21の入力となるテーブルデータである。図7のアンテナ別衛星優先テーブルは、処理するアンテナ名、アンテナを優先的に使用する衛星名をデータ項目として有する。図7のアンテナ別衛星優先テーブルでは、衛星名を優先度の高い順序に与えておくことで、衛星の優先度をアンテナ毎に指定できる。   FIG. 7 is a configuration diagram of an example of a satellite priority table for each antenna. The antenna priority table for each antenna in FIG. 7 is table data that is input to the path allocation engine 21. The satellite priority table for each antenna shown in FIG. 7 includes, as data items, the name of the antenna to be processed and the name of the satellite that preferentially uses the antenna. In the satellite priority table for each antenna shown in FIG. 7, the priority of the satellite can be designated for each antenna by assigning the satellite names in the order of priority.

なお、衛星が使用できるアンテナは、衛星及びアンテナの通信性能スペックで、ほぼ決まる。さらに、衛星運用には主局/従局という考え方がある。主局/従局は事前に取り決められる。したがって、アンテナ別の衛星優先順位は、アンテナ運用計画に対する与件として良い。   The antenna that can be used by the satellite is almost determined by the communication performance specifications of the satellite and the antenna. Furthermore, there is a concept of master / slave station in satellite operation. Master / slave stations are negotiated in advance. Therefore, the satellite priority for each antenna may be a requirement for the antenna operation plan.

図8はアンテナ優先ケーステーブルの一例の構成図である。図8のアンテナ優先ケーステーブルはパス割付エンジン21の入力となるテーブルデータである。図8のアンテナ優先ケーステーブルは、ケース番号、アンテナ名をデータ項目として有する。図8のアンテナ優先ケーステーブルではアンテナ名を処理優先度の高い順序に与えておくことで、パス割付処理を実施するアンテナの順序をケース毎に指定できる。   FIG. 8 is a configuration diagram of an example of the antenna priority case table. The antenna priority case table in FIG. 8 is table data that is input to the path allocation engine 21. The antenna priority case table of FIG. 8 has a case number and an antenna name as data items. In the antenna priority case table of FIG. 8, by assigning antenna names in order of high processing priority, the order of antennas for performing path allocation processing can be specified for each case.

アンテナ優先ケーステーブルはアンテナ運用計画に対する与件ではない。パス割付の結果はパス割付処理を実施するアンテナの順序を変えることにより異なるはずである。本実施例ではパス割付の結果がパス割付処理を実施するアンテナの順序を変えることにより異なることを利用し、パス割付処理を実施するアンテナの順序を「アンテナ優先ケース」として複数指定することにより、複数のアンテナ運用計画案を得ることができる。   The antenna priority case table is not a requirement for the antenna operation plan. The result of path allocation should be different by changing the order of antennas performing the path allocation process. In this embodiment, by using the fact that the result of path allocation differs by changing the order of antennas that perform path allocation processing, by specifying multiple antenna orders that perform path allocation processing as `` antenna priority cases '', Multiple antenna operation plans can be obtained.

図9はパス要求テーブルの一例の構成図である。図9のパス要求テーブルはパス割付エンジン21の入力となるテーブルデータである。パス要求テーブルは、アンテナ名、衛星名、要求パス数、割付ステップ、ハンドオーバ条件をデータ項目として有する。図9のパス要求テーブルでは、衛星別に、どのアンテナで幾つのパスを割り付けるかの要求数を要求パス数として指定できる。言い換えれば、パス要求テーブルは衛星及びアンテナの組み合わせ毎に、幾つのパスを割り付けるかの要求パス数を指定する。   FIG. 9 is a configuration diagram of an example of the path request table. The path request table in FIG. 9 is table data that is input to the path allocation engine 21. The path request table has an antenna name, a satellite name, the number of requested paths, an allocation step, and a handover condition as data items. In the path request table of FIG. 9, the number of requests for which number of paths can be allocated with which antenna can be designated as the number of requested paths for each satellite. In other words, the path request table specifies the number of required paths to be allocated for each combination of satellite and antenna.

ハンドオーバ条件はデータ項目として要求フラグ,要求パス数,ペアアンテナ数,ペアアンテナ名を有する。要求フラグは、ハンドオーバを考慮するか、ハンドオーバを考慮しないかを指定する。要求パス数はハンドオーバを行うパス数を指定する。ペアアンテナ数はハンドオーバを行うペアアンテナの数である。ペアアンテナ名はハンドオーバを行うペアアンテナの名である。   The handover condition has a request flag, a request path number, a pair antenna number, and a pair antenna name as data items. The request flag specifies whether or not to consider handover. The number of requested paths specifies the number of paths to be handed over. The number of pair antennas is the number of pair antennas that perform handover. The pair antenna name is the name of the pair antenna that performs handover.

パス割付は、他衛星との可視競合をチェックしながら、要求パス数が満たされるまでトライされる。なお、他衛星との可視競合および優先順位の状況によって、要求パス数が割り付けられないこともあるので、本実施例では結果として割り付けられたパス数をカウントし、GUIとしてのパス割付結果チャートに表示する。運用者はアンテナ運用計画案の有効性をパス割付結果チャートから判断できる。   The path allocation is tried until the required number of paths is satisfied while checking the visible competition with other satellites. Note that the number of requested paths may not be allocated depending on the visible contention with other satellites and the status of priorities. Therefore, in this embodiment, the number of paths allocated as a result is counted, and the path allocation result chart as a GUI is displayed. indicate. The operator can judge the effectiveness of the antenna operation plan from the path allocation result chart.

なお、パス割付は必ずしも時刻の早いものから順番に割り付けていくのが最良とは限らない。例えば中高度円軌道で、午前に2パス、午後に2パスあった場合は、できるだけ午前/午後にそれぞれ1パスを取りたいという要求がある。   Note that it is not always best to assign paths in order from the earliest time. For example, when there are two passes in the morning and two passes in the afternoon in a medium altitude circular orbit, there is a request to take one pass in the morning / afternoon as much as possible.

そこで、図9のパス要求テーブルは「割付ステップ:ISTEP」というデータ項目(パラメータ)を導入している。本実施例ではパス要求テーブルの割付ステップ間隔でパス割付が可能かトライする。   9 introduces a data item (parameter) “assignment step: ISTEP”. In this embodiment, it is tried whether path allocation is possible at the allocation step interval of the path request table.

図10は、割付ステップについて説明する説明図である。割付ステップは、指定されたアンテナと衛星との組み合わせ毎に、計画対象期間のパスへ割付アクセスする順番を規定する。例えば割付ステップ「1」の場合は、計画対象期間のパスへ割付アクセスする順番が時刻順になる。図10では計画対象期間中のパス数が「5」、割付ステップが「2」の場合のパスへ割付アクセスする順番を(1)〜(5)で表している。   FIG. 10 is an explanatory diagram for explaining the allocation step. The allocation step defines the order of allocation access to the path in the planning target period for each combination of the designated antenna and satellite. For example, in the case of the allocation step “1”, the order of allocation access to the paths in the planning target period is in time order. In FIG. 10, the order of allocation access to paths when the number of paths during the planning target period is “5” and the allocation step is “2” is represented by (1) to (5).

図11は処理順序テーブルの作成手順を表したイメージ図である。処理順序テーブル24はパス割付エンジン21がアンテナ優先ケーステーブルとアンテナ別衛星優先テーブルとから作成するテーブルデータである。処理順序テーブル24はパス割付処理を実施するアンテナ及び衛星の組合せの順序をアンテナ優先ケース毎に表したものである。   FIG. 11 is an image diagram showing a procedure for creating a processing order table. The processing order table 24 is table data created by the path allocation engine 21 from the antenna priority case table and the antenna priority table for each antenna. The processing order table 24 represents the order of combinations of antennas and satellites for which path allocation processing is performed for each antenna priority case.

パス割付エンジン21は、アンテナ優先ケーステーブルとアンテナ別衛星優先テーブルとから、処理順序テーブル24を次のように作成していく。パス割付エンジン21は例えば図11に示すようなアンテナ優先ケーステーブル及びアンテナ別衛星優先テーブルが与えられる。   The path allocation engine 21 creates the processing order table 24 from the antenna priority case table and the antenna priority table for each antenna as follows. The path allocation engine 21 is provided with, for example, an antenna priority case table and an antenna-specific satellite priority table as shown in FIG.

パス割付エンジン21はアンテナ優先ケーステーブルからケース番号「1」のアンテナの優先順位に従い、アンテナ名を優先順位に従って列方向に並べる。続いて、パス割付エンジン21はアンテナ名に対応した衛星名をアンテナ別衛星優先テーブルの順序に従って行方向に並べる。ここまでの処理により、パス割付エンジン21はテーブル31を作成できる。パス割付エンジン21はテーブル31の行列で与えられたアンテナ及び衛星の組み合わせを矢印の方向に読み取り、処理結果テーブル24のケース番号「1」の列方向に並べる。パス割付エンジン21はケース番号「2」,「3」についてもケース番号「1」と同様な処理を行うことにより、図11に表した処理順序テーブル24を作成できる。   The path allocation engine 21 arranges the antenna names in the column direction according to the priority order according to the priority order of the antenna of the case number “1” from the antenna priority case table. Subsequently, the path allocation engine 21 arranges the satellite names corresponding to the antenna names in the row direction according to the order of the antenna priority table for each antenna. Through the processing so far, the path allocation engine 21 can create the table 31. The path allocation engine 21 reads the antenna and satellite combinations given in the matrix of the table 31 in the direction of the arrow and arranges them in the column direction of the case number “1” in the processing result table 24. The path allocation engine 21 can create the processing order table 24 shown in FIG. 11 by performing the same processing for the case numbers “2” and “3” as for the case number “1”.

図12はパス時間テーブルの一例の構成図である。パス時間テーブル25はパス割付エンジン21が作成するテーブルデータである。パス時間テーブル25はパス割付の結果を格納する。パス時間テーブル25は、パス割付エンジン21とパス割付表示部22とのインターフェースファイルとなる。   FIG. 12 is a configuration diagram of an example of the path time table. The path time table 25 is table data created by the path allocation engine 21. The path time table 25 stores the result of path allocation. The path time table 25 is an interface file between the path allocation engine 21 and the path allocation display unit 22.

まず、パス割付エンジン21は衛星毎の局イベントファイルを読み込み、局ごとのAOS/LOS時刻を読み込んで、パス時間テーブル25の初期値を格納する。なお、パス時間テーブル25には、初期値として衛星名、アンテナ名、パス番号、パス開始時刻、パス終了時刻、パス時間、AOS時刻、LOS時刻、可視時間が格納される。   First, the path allocation engine 21 reads the station event file for each satellite, reads the AOS / LOS time for each station, and stores the initial values of the path time table 25. The path time table 25 stores satellite names, antenna names, path numbers, path start times, path end times, path times, AOS times, LOS times, and visible times as initial values.

衛星の軌道タイプが中高度略円軌道の場合、パス割付エンジン21はAOS時刻、LOS時刻にプリパス/ポストパス運用時間を考慮してパス開始/パス終了時刻及びパス時間を設定する。衛星の軌道タイプが静止軌道、楕円および高高度軌道の場合、パス割付エンジン21は30分、一区切りでパス開始/パス終了時刻(パス時刻)が設定される。   When the satellite orbit type is a medium altitude substantially circular orbit, the path allocation engine 21 sets the path start / path end time and path time in consideration of the pre-pass / post-path operation time for the AOS time and LOS time. When the orbit type of the satellite is a stationary orbit, an ellipse, and a high altitude orbit, the path allocation engine 21 sets the path start / path end time (path time) in 30 minutes.

パス時間テーブル25の「割付フラグ:IFGET」は、パスの割付状況を示すパラメータである。割付フラグは初期値「0」である。パス割付の結果が「割付済み」であるときパス割付エンジン21は、割付フラグに「1」を設定する。パス割付の結果が「他衛星に割付けられたパスとの重複により使用不可」であるときパス割付エンジン21は、割付フラグに「2」を設定する。パス割付の結果が「ハンドオーバのペアとして割付済み」であるときパス割付エンジン21は、割付フラグに「3」を設定する。   The “assignment flag: IFGET” in the path time table 25 is a parameter indicating a path assignment status. The allocation flag has an initial value “0”. When the path allocation result is “allocated”, the path allocation engine 21 sets “1” in the allocation flag. When the path allocation result is “unusable due to duplication with paths allocated to other satellites”, the path allocation engine 21 sets “2” in the allocation flag. When the path allocation result is “allocated as a handover pair”, the path allocation engine 21 sets “3” in the allocation flag.

パス割付エンジン21は、次のようにパス時間テーブル25の作成を行う。なお、パス時間テーブル25は「アンテナ優先ケース」の数だけ作成される。パス割付エンジン21は「アンテナ優先ケース」に対応するパス時間テーブル25毎に、処理順序テーブル24のパス割付処理を実施するアンテナ及び衛星の組合せの順序に従って、アンテナ及び衛星の組み合わせに対して以下の処理を行う。   The path allocation engine 21 creates the path time table 25 as follows. The path time tables 25 are created as many as the “antenna priority cases”. For each path time table 25 corresponding to the “antenna priority case”, the path allocation engine 21 performs the following for the combination of antennas and satellites according to the order of the combination of antennas and satellites that performs the path allocation process of the processing order table 24. Process.

1つのアンテナ及び衛星の組み合わせに対する処理は以下のように行われる。パス割付エンジン21は、図9のようなパス要求テーブルから、指定されたアンテナ及び衛星の組み合わせに対応する要求パス数、割付ステップ、ハンドオーバ条件を読込む。   Processing for one antenna and satellite combination is performed as follows. The path allocation engine 21 reads the number of requested paths, allocation steps, and handover conditions corresponding to the designated antenna and satellite combination from the path request table as shown in FIG.

パス割付エンジン21は、図12のようなパス時間テーブル25の1番目のパス(例えば衛星名「AAA」、アンテナ名「aaa」、パス番号「1」のパス)から順に読み込みながら、割付ステップに基づき、アクセスするパスを決める。   The path allocation engine 21 reads the first path (for example, satellite name “AAA”, antenna name “aaa”, and path number “1”) from the path time table 25 as shown in FIG. Based on this, the access path is determined.

アクセスしたパスの割付フラグが「0」以外ならば、そのパスを割り付けることができないので、パス割付エンジン21は次のパスに進む。また、アクセスしたパスの割付フラグが「0」ならば、そのパスを割り付けることができるので、パス割付エンジン21は割付フラグに「1」を設定する。   If the access path allocation flag is other than “0”, the path cannot be allocated, and the path allocation engine 21 proceeds to the next path. Further, if the access path allocation flag is “0”, the path can be allocated, so the path allocation engine 21 sets “1” in the allocation flag.

パス割付エンジン21は、同一のアンテナ及び異なる衛星の組み合わせのパス時刻、異なるアンテナ及び同一の衛星の組み合わせのパス時刻と、アクセスしたパスのパス時刻との重複をチェックする。重複ありならば、パス割付エンジン21はアクセスしたパスのパス時刻と重複する、同一のアンテナ及び異なる衛星の組み合わせのパス、異なるアンテナ及び同一の衛星の組み合わせのパスの割付フラグに「2」を設定する。   The path allocation engine 21 checks the overlap of the path time of the combination of the same antenna and different satellites, the path time of the combination of different antennas and the same satellite, and the path time of the accessed path. If there is an overlap, the path allocation engine 21 sets “2” in the allocation flag of the path of the combination of the same antenna and the different satellite and the path of the combination of the different antenna and the same satellite that overlaps the path time of the accessed path. To do.

また、パス割付エンジン21は、ハンドオーバ有りの場合、ペアアンテナ及び同一の衛星の組み合わせのパス時刻の重複をチェックする。重複ありならば、パス割付エンジン21はアクセスしたパス(自パス)と、ペアアンテナ及び同一の衛星の組み合わせのパス(相手パス)の割付フラグに「3」を設定する。パス割付エンジン21は、以上の処理をパス時間テーブル25の全てのパスに対して、又はパス要求テーブルの要求パス数を満たすまで繰り返す。   Further, the path allocation engine 21 checks for the overlap of path times of the combination of the pair antenna and the same satellite when there is a handover. If there is an overlap, the path allocation engine 21 sets “3” in the allocation flag of the accessed path (own path) and the path (partner path) of the combination of the pair antenna and the same satellite. The path allocation engine 21 repeats the above processing for all the paths in the path time table 25 or until the number of requested paths in the path request table is satisfied.

パス割付表示部22は図12のようなパス時間テーブル25を読み込んで、図5のようなパス割付結果チャートをGUIとして出力装置12に表示する。GUI上でパス割付結果を変更したい場合、運用者はパスが表示されている箇所(パス表示箇所)をクリックすることでパス時間テーブル25の割付フラグ0/1/2/3を変更できる。   The path allocation display unit 22 reads a path time table 25 as shown in FIG. 12, and displays a path allocation result chart as shown in FIG. 5 on the output device 12 as a GUI. When it is desired to change the path allocation result on the GUI, the operator can change the allocation flag 0/1/2/3 of the path time table 25 by clicking a location where the path is displayed (path display location).

割付フラグの変更により、パス時間テーブル25において割付フラグが変更されたパスと他のパスとの重複状況が変化するため、パス割付表示部22はパス割付エンジン21と同様な重複判定を行い、再度重複をチェックして、パス時間テーブル25の割付フラグを必要に応じて書き換える。その後、パス割付表示部22は、割付フラグを必要に応じて書き換えた改良後パス時間テーブル26を読み込んで、パス割付結果チャートを出力装置12に再表示する。   Due to the change of the allocation flag, the duplication status of the path whose allocation flag has been changed in the path time table 25 and other paths changes. Therefore, the path allocation display unit 22 performs the same duplication determination as the path allocation engine 21, and again The duplication is checked, and the allocation flag of the path time table 25 is rewritten as necessary. Thereafter, the path allocation display unit 22 reads the improved path time table 26 in which the allocation flag is rewritten as necessary, and redisplays the path allocation result chart on the output device 12.

図13は本実施例のパス割付装置の一例の処理ブロック図である。なお、図13では局イベントファイル23,対象衛星テーブル51,アンテナ優先ケーステーブル52,アンテナ別衛星優先テーブル53,パス要求テーブル54がパス割付装置1内に存在している例を表しているが、パス割付装置1の外部から取得するようにしてもよい。   FIG. 13 is a processing block diagram of an example of the path allocation device of this embodiment. FIG. 13 shows an example in which the station event file 23, the target satellite table 51, the antenna priority case table 52, the satellite priority table 53 for each antenna, and the path request table 54 exist in the path allocation device 1. You may make it acquire from the exterior of the path allocation apparatus 1. FIG.

図13のパス割付装置1はパス割付エンジン21,パス割付表示部22を有する。パス割付エンジン21は、パス時間テーブルデフォルト作成部61,処理順序テーブル作成部62,アンテナ/衛星別パス割付部63を有する。アンテナ/衛星別パス割付部63は重複判定部64を有する。また、パス割付表示部22は、チャート表示部71,パス割付変更部72,重複判定部73,ファイル再読込部74,ファイル保存部75を有する。   The path allocation device 1 in FIG. 13 includes a path allocation engine 21 and a path allocation display unit 22. The path allocation engine 21 includes a path time table default creation unit 61, a processing order table creation unit 62, and an antenna / satellite path allocation unit 63. The antenna / satellite path allocation unit 63 includes an overlap determination unit 64. The path allocation display unit 22 includes a chart display unit 71, a path allocation change unit 72, a duplication determination unit 73, a file reread unit 74, and a file storage unit 75.

以下、図13に示したパス割付装置1の処理手順についてフローチャートを参照しつつ説明していく。図14はパス割付エンジンの処理手順を表したフローチャートである。   Hereinafter, the processing procedure of the path allocation device 1 shown in FIG. 13 will be described with reference to a flowchart. FIG. 14 is a flowchart showing the processing procedure of the path allocation engine.

ステップS1に進み、パス割付エンジン21は入力データとして局イベントファイル23,対象衛星テーブル51,アンテナ優先ケーステーブル52,アンテナ別衛星優先テーブル53,パス要求テーブル54を読み込む。   In step S1, the path allocation engine 21 reads the station event file 23, the target satellite table 51, the antenna priority case table 52, the antenna priority table 53 for each antenna, and the path request table 54 as input data.

ステップS2に進み、処理順序テーブル作成部62は図11を用いて前述したようにアンテナ優先ケーステーブル52及びアンテナ別衛星優先テーブル53から処理順序テーブル24を作成する。   In step S2, the processing order table creation unit 62 creates the processing order table 24 from the antenna priority case table 52 and the antenna-specific satellite priority table 53 as described above with reference to FIG.

ステップS3に進み、パス時間テーブルデフォルト作成部61は後述するように局イベントファイル23及び対象衛星テーブル51から、初期値の格納されたデフォルトのパス時間テーブル25aを作成する。   In step S3, the path time table default creation unit 61 creates a default path time table 25a in which initial values are stored from the station event file 23 and the target satellite table 51 as described later.

ステップS4に進み、アンテナ/衛星別パス割付部63は処理順序テーブルのケース番号「i」の処理順序「j」のアンテナ「ANTj」及び衛星「SATj」の組み合わせを読み込む。ステップS5に進み、アンテナ/衛星別パス割付部63は後述するようにアンテナ/衛星別パス割付を行う。ステップS4,S5の処理は、処理順序テーブルのケース番号「i」のアンテナ「ANTj」及び衛星「SATj」の全ての組み合わせに対して繰り返し行われる。   In step S4, the antenna / satellite path allocation unit 63 reads the combination of the antenna “ANTj” and the satellite “SATj” in the processing order “j” of the case number “i” in the processing order table. In step S5, the antenna / satellite path allocation unit 63 performs antenna / satellite path allocation as described later. The processes in steps S4 and S5 are repeated for all combinations of the antenna “ANTj” and the satellite “SATj” of the case number “i” in the processing order table.

ステップS6に進み、アンテナ/衛星別パス割付部63はケース番号「i」のアンテナ優先ケースに対応したパス時間テーブル25を保存する。アンテナ/衛星別パス割付部63はステップS7に進み、パス時間テーブル25の割付フラグに「1」又は「3」が設定されている割付パスをアンテナ及び衛星の全ての組み合わせ毎にカウントする。ステップS4〜S7の処理は、処理順序テーブル24の全てのアンテナ優先ケースについて繰り返し行われる。   In step S6, the antenna / satellite path allocation unit 63 stores the path time table 25 corresponding to the antenna priority case of the case number “i”. The path allocation unit 63 for each antenna / satellite proceeds to step S7, and counts the allocation paths for which “1” or “3” is set in the allocation flag of the path time table 25 for every combination of antenna and satellite. The processes in steps S4 to S7 are repeated for all antenna priority cases in the processing order table 24.

図15は、パス時間テーブルデフォルト作成部の処理手順を表したフローチャートである。ここでは、パス時間テーブルデフォルト作成部61に、計画開始時刻Ts,計画終了時刻Te,プリパス時間Tpr,ポストパス時間Tpoが入力されているものとする。   FIG. 15 is a flowchart showing the processing procedure of the pass time table default creation unit. Here, it is assumed that the plan start time Ts, the plan end time Te, the prepass time Tpr, and the postpass time Tpo are input to the pass time table default creation unit 61.

ステップS11に進み、パス時間テーブルデフォルト作成部61は対象衛星テーブル51を読み込む。ステップS12に進み、パス時間テーブルデフォルト作成部61は対象衛星テーブル51から「i」番目の衛星の軌道タイプを判定する。   In step S 11, the path time table default creation unit 61 reads the target satellite table 51. In step S 12, the path time table default creation unit 61 determines the orbit type of the “i” -th satellite from the target satellite table 51.

「i」番目の衛星の軌道タイプが「中高度略円軌道」である場合、パス時間テーブルデフォルト作成部61はステップS13に進み、局イベントファイル23からAOS時刻Taos、LOS時刻Tlosを読み込む。ステップS14に進み、パス時間テーブルデフォルト作成部61は、Ts≦Taos≦Te+Tprとなるデータを選択する。   When the orbit type of the “i” -th satellite is “medium altitude approximately circular orbit”, the path time table default creation unit 61 proceeds to step S13 and reads the AOS time Taos and LOS time Tlos from the station event file 23. In step S14, the path time table default creation unit 61 selects data satisfying Ts ≦ Taos ≦ Te + Tpr.

パス時間テーブルデフォルト作成部61はパス開始時刻Tps、パス終了時刻Tpeを以下の式(1)、(2)によって算出する。   The path time table default creation unit 61 calculates a path start time Tps and a path end time Tpe by the following equations (1) and (2).

Tps=Taos−Tpr・・・(1)
Tpe=Tlos+Tpo・・・(2)
パス時間テーブルデフォルト作成部61は算出したパス開始時刻Tps、パス終了時刻Tpeをパス時間テーブルに書き込む。
Tps = Taos−Tpr (1)
Tpe = Tlos + Tpo (2)
The path time table default creation unit 61 writes the calculated path start time Tps and path end time Tpe in the path time table.

「i」番目の衛星の軌道タイプが「楕円または高高度軌道」である場合、パス時間テーブルデフォルト作成部61はステップS15に進み、局イベントファイル23からAOS時刻Taos、LOS時刻Tlosを読み込む。ステップS16に進み、パス時間テーブルデフォルト作成部61は、(Ts,Te)(Taos,Tlos)の大小判定を行う。   When the orbit type of the “i” th satellite is “ellipse or high altitude orbit”, the path time table default creating unit 61 proceeds to step S15 and reads the AOS time Taos and LOS time Tlos from the station event file 23. In step S16, the path time table default creation unit 61 determines whether (Ts, Te) (Taos, Tlos) is large or small.

Ts≦Taos≦Te&Te<Tlosの場合、パス時間テーブルデフォルト作成部61は(Taos−Tprに近いhh:00,hh:30の何れかの時刻)からTeまで30分刻みでパス開始時刻Tps、パス終了時刻Tpeをパス時間テーブルに書き込む。   In the case of Ts ≦ Taos ≦ Te & Te <Tlos, the path time table default creation unit 61 sets the path start time Tps and the path in increments of 30 minutes from (any time of hh: 00, hh: 30 close to Taos-Tpr) to Te. The end time Tpe is written in the pass time table.

Taos<Ts&Ts≦Tlos≦Teの場合、パス時間テーブルデフォルト作成部61はTsから(Tlos+Tpoに近いhh:00,hh:30の何れかの時刻)まで30分刻みでパス開始時刻Tps、パス終了時刻Tpeをパス時間テーブルに書き込む。   In the case of Taos <Ts & Ts ≦ Tlos ≦ Te, the path time table default creation unit 61 performs the path start time Tps and the path end time in steps of 30 minutes from Ts to (any time of hh: 00, hh: 30 close to Tlos + Tpo). Write Tpe to the path time table.

また、Ts≦Taos&Tlos≦Teの場合、パス時間テーブルデフォルト作成部61は(Taos−Tprに近いhh:00,hh:30の何れかの時刻)から(Tlos+Tpoに近いhh:00,hh:30の何れかの時刻)まで30分刻みでパス開始時刻Tps、パス終了時刻Tpeをパス時間テーブルに書き込む。   In the case of Ts ≦ Taos & Tlos ≦ Te, the path time table default creation unit 61 sets (from hh: 00, hh: 30 close to Taos-Tpr) to (hh: 00 close to Tlos + Tpo, hh: 30). The path start time Tps and the path end time Tpe are written in the path time table in increments of 30 minutes (any time).

「i」番目の衛星の軌道タイプが「静止軌道」である場合、パス時間テーブルデフォルト作成部61はステップS17に進み、対象衛星テーブル51から運用開始時刻Tops及び運用終了時刻Topeを読み込む。ステップS18に進み、パス時間テーブルデフォルト作成部61はTopsからTopeまで30分刻みでパス開始時刻Tps、パス終了時刻Tpeをパス時間テーブルに書き込む。   When the orbit type of the “i” -th satellite is “stationary orbit”, the path time table default creating unit 61 proceeds to step S17 and reads the operation start time Tops and the operation end time Tope from the target satellite table 51. In step S18, the path time table default creating unit 61 writes the path start time Tps and the path end time Tpe in the path time table in steps of 30 minutes from Tops to Tope.

パス時間テーブルデフォルト作成部61は、対象衛星テーブル51の全ての衛星についてステップS12〜S18の処理を繰り返し行う。   The path time table default creation unit 61 repeats the processes of steps S12 to S18 for all the satellites in the target satellite table 51.

図16は、アンテナ/衛星別パス割付部の処理手順を表したフローチャートである。ステップS21に進み、アンテナ/衛星別パス割付部63はステップS4で読み込んだアンテナ及び衛星の組み合わせに対応する要求パス数Rpass、割付ステップISTEP及びハンドオーバ条件(要求フラグIFHO、要求パス数Rho、ペアアンテナ名ANTho1、ペアアンテナ名ANTho2、・・・)をパス要求テーブル54から読み込む。   FIG. 16 is a flowchart showing the processing procedure of the antenna / satellite path allocation unit. Proceeding to step S21, the antenna / satellite path allocation unit 63 determines the requested path number Rpass, the allocation step ISTEP and the handover condition (request flag IFHO, requested path number Rho, pair antenna) corresponding to the combination of the antenna and satellite read in step S4. Name ANTho1, pair antenna name ANTho2,...) Are read from the path request table 54.

ステップS22に進み、アンテナ/衛星別パス割付部63は割付パス数初期設定としてGpass、Ghoに0を代入する。ステップS23に進み、アンテナ/衛星別パス割付部63はパス時間テーブル25aから、ステップS4で読み込んだアンテナ及び衛星の組み合わせに対応するパス数を読み込み、Npassに代入する。アンテナ/衛星別パス割付部63は、以降のステップS24〜S28の処理をi=0からi=Npassまで繰り返し行う。   In step S22, the antenna / satellite path allocation unit 63 substitutes 0 for Gpass and Gho as the initial setting of the number of allocated paths. In step S23, the antenna / satellite path allocation unit 63 reads the number of paths corresponding to the combination of the antenna and the satellite read in step S4 from the path time table 25a, and substitutes it for Npass. The antenna / satellite path allocation unit 63 repeatedly performs the processing of subsequent steps S24 to S28 from i = 0 to i = Npass.

ステップS24に進み、アンテナ/衛星別パス割付部63は、ステップS4で読み込んだアンテナ及び衛星の組み合わせに対応するパスの中からアクセスするパス番号を以下の式(3)によって計算する。式(3)はISTEPとびにパス番号を計算している。アンテナ/衛星別パス割付部63はIDPASS≦Npassになるまで以下の式(4)を繰り返し行う。   Proceeding to step S24, the antenna / satellite path allocation unit 63 calculates the path number to be accessed from the paths corresponding to the combination of the antenna and the satellite read in step S4 by the following equation (3). Equation (3) calculates the ISTEP and pass number. The antenna / satellite path allocation unit 63 repeatedly performs the following expression (4) until IDPASS ≦ Npass.

IDPASS=1+ISTEP×(i−1)・・・(3)
IDPASS=IDPASS−Npass・・・(4)
ステップS25に進み、アンテナ/衛星別パス割付部63はパス番号IDPASSのパス別処理を行う。ステップS25のパス別処理の詳細は後述する。パス別処理ではパス割付が成功すると、Gpassが1カウントアップして出力される。
IDPASS = 1 + ISTEP × (i−1) (3)
IDPASS = IDPASS-Npass (4)
In step S25, the antenna / satellite path allocation unit 63 performs path-specific processing of the path number IDPASS. Details of the processing for each path in step S25 will be described later. In the path-specific processing, when the path allocation is successful, Gpass is counted up and output.

ステップS26に進み、アンテナ/衛星別パス割付部63はGho=Rhoであるかを判定する。つまり、ステップS26において、アンテナ/衛星別パス割付部63はハンドオーバ割付を行ったパス(ハンドオーバパス)Ghoがハンドオーバ条件の要求パス数Rhoに達したか否かを判定する。   Proceeding to step S26, the antenna / satellite path allocation unit 63 determines whether or not Gho = Rho. That is, in step S26, the antenna / satellite path allocation unit 63 determines whether or not the path (handover path) Gho for which the handover allocation has been performed has reached the required path number Rho for the handover condition.

ハンドオーバパスGhoがハンドオーバ条件の要求パス数Rhoに達していれば、アンテナ/衛星別パス割付部63はステップS27に進み、ハンドオーバ条件の要求フラグIFHOを0としたあと、ステップS28に進む。一方、ハンドオーバパスGhoがハンドオーバ条件の要求パス数Rhoに達していなければ、アンテナ/衛星別パス割付部63はステップS27の処理を行わずにステップS28に進む。   If the handover path Gho has reached the request path number Rho for the handover condition, the antenna / satellite path allocation unit 63 proceeds to step S27, sets the handover condition request flag IFHO to 0, and then proceeds to step S28. On the other hand, if the handover path Gho has not reached the requested path number Rho of the handover condition, the antenna / satellite path allocation unit 63 proceeds to step S28 without performing the process of step S27.

ステップS28では、アンテナ/衛星別パス割付部63が、Gpass=Rpassであるかを判定する。つまり、ステップS28において、アンテナ/衛星別パス割付部63は割付を行ったパス数(割付パス数)が要求パス数Rpassに達したか否かを判定している。   In step S28, the antenna / satellite path allocation unit 63 determines whether Gpass = Rpass. That is, in step S28, the antenna / satellite path allocation unit 63 determines whether or not the number of allocated paths (number of allocated paths) has reached the required path number Rpass.

割付パス数Gpassが要求パス数Rpassに達していれば、アンテナ/衛星別パス割付部63は図16に示したアンテナ/衛星別パス割付の処理を終了する。割付パス数Gpassが要求パス数Rpassに達していなければ、アンテナ/衛星別パス割付部63はiを1カウントアップしてステップS24の処理に戻る。   If the allocated path number Gpass reaches the required path number Rpass, the antenna / satellite path allocation unit 63 ends the process of antenna / satellite path allocation shown in FIG. If the allocated path number Gpass does not reach the requested path number Rpass, the antenna / satellite path allocation unit 63 increments i by 1, and returns to the process of step S24.

図17はパス別処理の手順を表したフローチャートである。パス別処理は指定されたパス番号IDPASSのパス(指定パス)に対して行われる。ステップS31に進み、アンテナ/衛星別パス割付部63はパス時間テーブル25aから指定パスの割付フラグIFGETを読み込む。   FIG. 17 is a flowchart showing the procedure of the path-specific process. The path-specific processing is performed for the path (specified path) of the specified path number IDPASS. In step S31, the antenna / satellite path allocation unit 63 reads the allocation flag IFGET of the designated path from the path time table 25a.

ステップS32に進み、アンテナ/衛星別パス割付部63は割付フラグIFGET=0であるかを判定する。割付フラグIFGET=0でなければ、割付済みのパスか、使用不可のパスであるため、アンテナ/衛星別パス割付部63は何もせず、図17に示したパス別処理を終了する。   In step S32, the antenna / satellite path allocation unit 63 determines whether the allocation flag IFGET = 0. If the allocation flag IFGET = 0 is not satisfied, the path is an already allocated path or an unusable path, so the antenna / satellite path allocation section 63 does nothing and ends the path-specific process shown in FIG.

割付フラグIFGET=0であれば、アンテナ/衛星別パス割付部63はステップS33に進み、パス時間テーブル25aの指定パスの割付フラグIFGETを1に書き換えると共に、割付パス数Gpassを1カウントアップする。   If the allocation flag IFGET = 0, the antenna / satellite path allocation unit 63 proceeds to step S33, rewrites the allocation flag IFGET of the designated path in the path time table 25a to 1, and increments the allocation path number Gpass by 1.

アンテナ/衛星別パス割付部63は、以降のステップS34〜S43の処理をi=1からi=Nrec(パス時間テーブル25aのレコード数)まで繰り返し行う。   The antenna / satellite path allocation unit 63 repeats the processing of subsequent steps S34 to S43 from i = 1 to i = Nrec (the number of records in the path time table 25a).

ステップS34に進み、アンテナ/衛星別パス割付部63はパス時間テーブル25aのi番目のレコードから衛星名SATi、アンテナ名ANTi、割付フラグIFGETi、パス開始時刻Tpsi、パス終了時刻Tpei、AOS時刻Taosi、LOS時刻Tlosiを読み込む。   Proceeding to step S34, the antenna / satellite path allocation unit 63 determines the satellite name SATi, antenna name ANTi, allocation flag IFGETi, path start time Tpsi, path end time Tpei, AOS time Taosi, from the i-th record of the path time table 25a. Read LOS time Tlosi.

ステップS35に進み、アンテナ/衛星別パス割付部63はステップS4で読み込んだアンテナ及び衛星(対象アンテナ及び対象衛星)の組み合わせと、ステップS34で読み込んだ衛星名SATi及びアンテナ名ANTiの組み合わせとが同じであれば、iを1カウントアップしてステップS34に戻る。   Proceeding to step S35, the antenna / satellite path allocation unit 63 has the same combination of the antenna and satellite (target antenna and target satellite) read in step S4 as the combination of the satellite name SATi and antenna name ANTi read in step S34. If so, i is incremented by 1, and the process returns to step S34.

ステップS4で読み込んだアンテナ及び衛星(対象アンテナ及び対象衛星)の組み合わせと、ステップS34で読み込んだ衛星名SATi及びアンテナ名ANTiの組み合わせとが同じでなければ、アンテナ/衛星別パス割付部63はステップS36に進む。   If the combination of the antenna and satellite (target antenna and target satellite) read in step S4 is not the same as the combination of the satellite name SATi and antenna name ANTi read in step S34, the antenna / satellite path allocation unit 63 performs step Proceed to S36.

ステップS36に進み、アンテナ/衛星別パス割付部63は、ステップS34で読み込んだ割付フラグIFGETiが0であるかを判定する。ステップS34で読み込んだ割付フラグIFGETiが0でなければ、アンテナ/衛星別パス割付部63はiを1カウントアップしてステップS34に戻る。   In step S36, the antenna / satellite path allocation unit 63 determines whether the allocation flag IFGETi read in step S34 is zero. If the allocation flag IFGETi read in step S34 is not 0, the antenna / satellite path allocation unit 63 increments i by 1 and returns to step S34.

ステップS34で読み込んだ割付フラグIFGETiが0でなければ、アンテナ/衛星別パス割付部63はステップS37に進み、重複判定部64に後述のパス重複判定を行わせる。パス重複判定では重複ありと判定されるとIFOV=1が出力される。パス重複判定では重複なしと判定されるとIFOV=0が出力される。   If the allocation flag IFGETi read in step S34 is not 0, the antenna / satellite path allocation unit 63 proceeds to step S37 and causes the duplication determination unit 64 to perform path duplication determination described later. If it is determined that there is an overlap in the path duplication determination, IFOV = 1 is output. If it is determined that there is no duplication in the path duplication determination, IFOV = 0 is output.

パス重複判定のあと、アンテナ/衛星別パス割付部63はステップS38に進み、IFOV=1であるか否かを判定する。IFOV=1でなければ、アンテナ/衛星別パス割付部63は重複なしと判定した為、iを1カウントアップしてステップS34に戻る。IFOV=1であれば、アンテナ/衛星別パス割付部63は重複ありと判定した為、ステップS39に進み、パス時間テーブル25aの割付フラグIFGETiを2に書き換える。   After the path duplication determination, the antenna / satellite path allocation unit 63 proceeds to step S38, and determines whether IFOV = 1. If IFOV = 1 is not satisfied, the antenna / satellite path allocation unit 63 determines that there is no duplication. Therefore, i is incremented by 1, and the process returns to step S34. If IFOV = 1, the antenna / satellite path allocation unit 63 determines that there is duplication, and thus the process proceeds to step S39, where the allocation flag IFGETi of the path time table 25a is rewritten to 2.

ステップS40に進み、アンテナ/衛星別パス割付部63はパス要求テーブル54から対象アンテナ及び対象衛星の組み合わせのハンドオーバ条件の要求フラグIFHO、ペアアンテナ名を読み出し、IFHO=1であり、且つ、対象衛星とステップS34で読み込んだ衛星名SATiが同じであり、且つ、読み出したペアアンテナ名の何れかとステップS34で読み込んだアンテナ名ANTiとが同じでなければ、iを1カウントアップしてステップS34に戻る。   In step S40, the antenna / satellite path allocation unit 63 reads out the handover condition request flag IFHO and the pair antenna name of the combination of the target antenna and the target satellite from the path request table 54, IFHO = 1, and the target satellite. If the satellite name SATi read in step S34 is the same and if any of the read pair antenna names is not the same as the antenna name ANTi read in step S34, i is incremented by 1 and the process returns to step S34. .

IFHO=1であり、且つ、対象衛星とステップS34で読み込んだ衛星名SATiが同じであり、且つ、読み出したペアアンテナ名の何れかとステップS34で読み込んだアンテナ名ANTiとが同じであれば、アンテナ/衛星別パス割付部63はステップS41に進み、重複判定部64に後述のパス重複判定を行わせる。パス重複判定では可視重複ありと判定されるとIFOV=1が出力される。パス重複判定では可視重複なしと判定されるとIFOV=0が出力される。   If IFHO = 1, the target satellite and the satellite name SATi read in step S34 are the same, and if any of the read pair antenna names is the same as the antenna name ANTi read in step S34, the antenna / Satellite-specific path allocation unit 63 proceeds to step S41, and causes duplication determination unit 64 to perform path duplication determination described later. If it is determined that there is visible overlap in the path overlap determination, IFOV = 1 is output. If it is determined that there is no visible overlap in the path overlap determination, IFOV = 0 is output.

パス重複判定のあと、アンテナ/衛星別パス割付部63はステップS42に進み、IFOV=1であるか否かを判定する。IFOV=1でなければ、アンテナ/衛星別パス割付部63は可視重複なしのため、ハンドオーバ不可と判定し、iを1カウントアップしてステップS34に戻る。IFOV=1であれば、アンテナ/衛星別パス割付部63は可視重複ありのため、ハンドオーバ可と判定し、ステップS43に進み、パス時間テーブル25aの割付フラグIFGETiを3に書き換えると共に、ハンドオーバパスGhoを1カウントアップしたあと、iを1カウントアップしてステップS34に戻る。   After the path duplication determination, the antenna / satellite path allocation unit 63 proceeds to step S42 to determine whether IFOV = 1. If IFOV = 1, the antenna / satellite path allocation unit 63 determines that the handover is not possible because there is no visible overlap, increments i by 1, and returns to step S34. If IFOV = 1, the antenna / satellite path allocation unit 63 determines that the handover is possible because there is visible overlap, and proceeds to Step S43, rewrites the allocation flag IFGETi in the path time table 25a to 3, and at the same time the handover path Gho 1 is counted up, i is incremented by 1, and the process returns to step S34.

図18は重複判定部が行うパス重複判定処理の手順を表したフローチャートである。図18のフローチャートは図17のステップS37で行うパス重複判定に対応する。   FIG. 18 is a flowchart showing a path duplication determination process performed by the duplication determination unit. The flowchart in FIG. 18 corresponds to the path duplication determination performed in step S37 in FIG.

ステップS37で行うパス重複判定は、ステップS34で読み込んだパス開始時刻Tpsi、パス終了時刻Tpei、対象アンテナ及び対象衛星の組み合わせに対応するパス開始時刻Tps、パス終了時刻Tpeを用いて行う。図18のフローチャートではパス開始時刻Tps、パス終了時刻Tpe、パス開始時刻Tpsi、パス終了時刻Tpeiを、Tps1,Tpe1,Tps2,Tpe2と置き換えている。   The path duplication determination performed in step S37 is performed using the path start time Tpsi, the path end time Tpei, the path start time Tps corresponding to the combination of the target antenna and the target satellite, and the path end time Tpe read in step S34. In the flowchart of FIG. 18, the path start time Tps, the path end time Tpe, the path start time Tpsi, and the path end time Tpei are replaced with Tps1, Tpe1, Tps2, and Tpe2.

ステップS51に進み、重複判定部64はTps1<Tps2<Tpe1となるかを判定する。Tps1<Tps2<Tpe1となれば、重複判定部64は重複ありと判定してIFVO=1を出力したあと、図18のパス重複判定処理を終了する。Tps1<Tps2<Tpe1とならなければ、重複判定部64はステップS2に進み、Tps1<Tpe2<Tpe1となるかを判定する。   In step S51, the duplication determination unit 64 determines whether Tps1 <Tps2 <Tpe1 is satisfied. If Tps1 <Tps2 <Tpe1, the duplication determination unit 64 determines that there is duplication, outputs IFVO = 1, and then ends the path duplication determination process of FIG. If Tps1 <Tps2 <Tpe1, the duplication determination unit 64 proceeds to step S2 and determines whether Tps1 <Tpe2 <Tpe1 is satisfied.

Tps1<Tpe2<Tpe1となれば、重複判定部64は重複ありと判定してIFVO=1を出力したあと、図18のパス重複判定処理を終了する。Tps1<Tpe2<Tpe1とならなければ、重複判定部64は重複なしと判定してIFVO=0を出力したあと、図18のパス重複判定処理を終了する。   If Tps1 <Tpe2 <Tpe1, the duplication determination unit 64 determines that there is duplication, outputs IFVO = 1, and then ends the path duplication determination process of FIG. If Tps1 <Tpe2 <Tpe1 is not satisfied, the overlap determination unit 64 determines that there is no overlap and outputs IFVO = 0, and then ends the path overlap determination process of FIG.

なお、図17のステップS41で行うパス重複判定は、ステップS34で読み込んだAOS時刻Taosi、LOS時刻Tlosi、対象アンテナ及び対象衛星の組み合わせに対応するAOS時刻Taos、LOS時刻Tlosを用いて行う。   Note that the path overlap determination performed in step S41 in FIG. 17 is performed using the AOS time Taosi and LOS time Tlosi read in step S34, the AOS time Taos and LOS time Tlos corresponding to the combination of the target antenna and the target satellite.

例えばステップS41で行うパス重複判定は、図18のフローチャートのTps1,Tpe1,Tps2,Tpe2を、AOS時刻Taos、LOS時刻Tlos、AOS時刻Taosi、LOS時刻Tlosiに置き換えることで行うことができる。   For example, the path duplication determination performed in step S41 can be performed by replacing Tps1, Tpe1, Tps2, and Tpe2 in the flowchart of FIG. 18 with AOS time Taos, LOS time Tlos, AOS time Taosi, and LOS time Tlosi.

図14のフローチャートにより、パス割付エンジン21はパス時間テーブル25を作成できる。図13に戻り、パス割付表示部22の処理について説明する。パス割付表示部22のチャート表示部71は図19のようなパス割付結果チャート100を出力装置12に表示する。   The path allocation engine 21 can create a path time table 25 according to the flowchart of FIG. Returning to FIG. 13, the processing of the path allocation display unit 22 will be described. The chart display unit 71 of the path allocation display unit 22 displays a path allocation result chart 100 as shown in FIG.

図19はパス割付表示部が出力装置に表示するパス割付結果チャートの一例のイメージ図である。図19のパス割付結果チャート100はGUIとなる。入力欄101は表示するパス時間テーブル25を選択する為のものである。運用者が例えば選択ボタンを押下すると、パス割付表示部22はパス時間テーブル25のファイル一覧を表示して、1つのパス時間テーブル25を選択させる。1つのパス時間テーブル25が選択されると、パス割付表示部22にはパス時間テーブルをコピーしたローカル用パス時間テーブル27及び保存用パス時間テーブル28を作成する。   FIG. 19 is an image diagram of an example of a path allocation result chart displayed on the output device by the path allocation display unit. The path allocation result chart 100 in FIG. 19 is a GUI. The input field 101 is for selecting the path time table 25 to be displayed. When the operator presses a selection button, for example, the path allocation display unit 22 displays a file list of the path time table 25 and causes one path time table 25 to be selected. When one path time table 25 is selected, the path allocation display unit 22 creates a local path time table 27 and a storage path time table 28 in which the path time table is copied.

入力欄102は表示期間を入力する為のものである。運用者は入力欄102に表示期間を入力することにより、パス時間テーブル25に格納されたパスデータ全体期間の一部を切り出して表示できる。   The input field 102 is for inputting a display period. The operator can cut out and display a part of the entire path data period stored in the path time table 25 by inputting the display period in the input field 102.

表示ボタン103はチャート種別(表示パターン)をアンテナ別又は衛星別の何れかから運用者に選択させ、選択された表示パターンのパス割付結果チャート100を表示する為のものである。図19のパス割付結果チャート100は表示パターンとしてアンテナ別が選択された例である。   The display button 103 is for causing the operator to select the chart type (display pattern) from either antenna or satellite and displaying the path allocation result chart 100 of the selected display pattern. The path allocation result chart 100 of FIG. 19 is an example in which antenna-specific is selected as the display pattern.

表示ボタン103により表示パターンが選択されると、チャート表示部71はローカル用パス時間テーブル27に基づき、パス割付結果チャート100を出力装置12に表示できる。   When a display pattern is selected by the display button 103, the chart display unit 71 can display the path allocation result chart 100 on the output device 12 based on the local path time table 27.

パス割付結果チャート100上のパス104が入力装置11の一例としてのマウスでダブルクリックされると、チャート表示部71は「割付/ハンドオーバ割付/割付なし」のプルダウンを表示し、運用者に「割付/ハンドオーバ割付/割付なし」の何れかを選択させることでパス割付の状態を変更させることができる。   When the path 104 on the path allocation result chart 100 is double-clicked with the mouse as an example of the input device 11, the chart display unit 71 displays a pull-down menu of “assignment / handover assignment / no assignment” to the operator. By selecting any one of “/ handover assignment / no assignment”, the path assignment state can be changed.

運用者によって例えばパス104のパス割付の状態が変更されると、パス割付変更部72はローカル用パス時間テーブル27の割付フラグを変更されたパス割付の状態に書き換える。また、チャート表示部71はパス割付の状態が変更されたパス104の色を変化させる。   For example, when the state of the path allocation of the path 104 is changed by the operator, the path allocation changing unit 72 rewrites the allocation flag of the local path time table 27 to the changed path allocation state. In addition, the chart display unit 71 changes the color of the path 104 whose path allocation state has been changed.

重複チェックボタン105によりパス重複判定が選択されると、パス割付表示部22の重複判定部73はローカル用パス時間テーブル27を最初から最後までサーチし、割付パスと重複しているパスをチェックする。ここでは、パス割付結果チャート100上のパス106が重複しているものとする。新たに重複が発生した場合、重複判定部73は重複するパス106のローカル用パス時間テーブル27の割付フラグを4に書き換える。   When path duplication determination is selected by the duplication check button 105, the duplication judgment unit 73 of the path allocation display unit 22 searches the local path time table 27 from the beginning to the end, and checks the paths that overlap with the allocation path. . Here, it is assumed that the paths 106 on the path allocation result chart 100 overlap. When a new overlap occurs, the overlap determination unit 73 rewrites the allocation flag in the local path time table 27 for the overlapping path 106 to 4.

チャート表示部71はローカル用パス時間テーブル27に基づき、重複するパス106が別の色で表されているパス割付結果チャート100を出力装置12に表示することで運用者に注意を喚起する。   Based on the local path time table 27, the chart display unit 71 alerts the operator by displaying a path allocation result chart 100 in which the overlapping paths 106 are expressed in different colors on the output device 12.

修正を繰り返した結果、パス割付結果チャート100を元に戻したい場合、運用者は元に戻すボタン107をマウスでクリックすればよい。元に戻すボタン107がクリックされると、ファイル再読込部74は保存用パス時間テーブル28の内容でローカル用パス時間テーブル27を上書きする。そして、チャート表示部71はローカル用パス時間テーブル27に基づき、元のパス割付結果チャート100を表示できる。   As a result of repeating the correction, when it is desired to restore the path allocation result chart 100, the operator may click on the restore button 107 with the mouse. When the undo button 107 is clicked, the file reread unit 74 overwrites the local path time table 27 with the contents of the save path time table 28. The chart display unit 71 can display the original path allocation result chart 100 based on the local path time table 27.

また、パス割付結果チャート100を確定したい場合、運用者は確定ボタン108をマウスでクリックすればよい。確定ボタン108がクリックされると、ファイル保存部75はローカル用パス時間テーブル27の内容で保存用パス時間テーブル28を上書きしてもよいし、ローカル用パス時間テーブル27の内容を別のファイル名で保存してもよい。   If the operator wants to confirm the path assignment result chart 100, the operator may click on the confirm button 108 with the mouse. When the confirm button 108 is clicked, the file storage unit 75 may overwrite the storage path time table 28 with the contents of the local path time table 27, or the contents of the local path time table 27 may be changed to another file name. You may save it with.

(まとめ)
本実施例のパス割付装置1は、複数の衛星と複数のアンテナに対して、アンテナ運用計画の源泉となる、可視時間帯に基づくパス割付を、ゼロベースから自動で作成するものである。本実施例のパス割付装置1は、割付ステップを指定することにより、できるだけバラけたパス割付を実現する。また、本実施例のパス割付装置1は予めハンドオーバを実施する衛星とアンテナとの組を指定することにより、ハンドオーバに対応したパス割付を実現する。
(Summary)
The path allocation apparatus 1 according to the present embodiment automatically creates a path allocation based on a visible time zone, which is a source of an antenna operation plan, from a zero base for a plurality of satellites and a plurality of antennas. The path allocation device 1 according to the present embodiment implements path allocation as diverse as possible by designating allocation steps. Further, the path allocation device 1 according to the present embodiment realizes path allocation corresponding to handover by designating a pair of a satellite and an antenna that perform handover in advance.

本実施例のパス割付装置1は、複数のアンテナと複数の衛星とを対象にしたアンテナ運用計画について、要求条件を与えて、機械的にパス割付を行う。本実施例のパス割付装置1は、あらゆる要求条件に対して競合を完全に解消するようなアンテナ運用計画を算出するものではない。本実施例のパス割付装置1は、まず一次解を出し(要求条件が全て満たされている場合もいない場合もある)、その後、運用者の操作による修正ができるようにしている。本実施例のパス割付装置1は、パス割付操作条件(アンテナ優先ケース)を複数個与えることにより、複数個のアンテナ運用計画案の作成を容易に行うことができる。   The path allocation apparatus 1 according to the present embodiment mechanically performs path allocation by giving a required condition to an antenna operation plan for a plurality of antennas and a plurality of satellites. The path allocation device 1 according to the present embodiment does not calculate an antenna operation plan that completely eliminates contention for all required conditions. The path allocation device 1 according to the present embodiment first generates a primary solution (may or may not satisfy all the required conditions), and then allows correction by an operator's operation. The path allocation device 1 of the present embodiment can easily create a plurality of antenna operation plans by giving a plurality of path allocation operation conditions (antenna priority cases).

以上、本実施例のパス割付装置1によれば、複数のアンテナと複数の衛星を対象にしたアンテナ運用計画について、アンテナ数/衛星数が増加しても容易にアンテナ運用計画案となるパス割付が作成できるようになる。   As described above, according to the path allocation device 1 of the present embodiment, for an antenna operation plan for a plurality of antennas and a plurality of satellites, even if the number of antennas / the number of satellites is increased, the path allocation can be easily obtained Can be created.

また、本実施例のパス割付装置1によればパス割付操作の優先順位を変えて複数ケースのアンテナ運用計画案を作成するので、実際のアンテナ運用計画として確定する前に事前シミュレーションとしていろいろな可能性を見てみたいという場合に効果的である。   In addition, according to the path allocation device 1 of the present embodiment, a plurality of cases of antenna operation plans are created by changing the priority of the path allocation operation. It is effective when you want to see sex.

本発明は、以下に記載する付記のような構成が考えられる。
(付記1)
複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うコンピュータを、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成部と、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成部と、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付部と
して機能させるパス割付プログラム。
(付記2)
前記パス割付プログラムは、更に、アンテナ及び衛星の組み合わせ毎に、割り付けるパスの要求数である要求パス数を設定したパス要求テーブルに基づき、前記要求パス数を超えないようにパス割付を行う付記1記載のパス割付プログラム。
(付記3)
前記パス割付部は、更に、アンテナ及び衛星の組み合わせ毎に、割り付けるパスの間隔を設定したパス要求テーブルに基づき、前記割り付けるパスの間隔でパス割付を行う付記2記載のパス割付プログラム。
(付記4)
前記パス割付部は、更に、アンテナ及び衛星の組み合わせ毎に、通信リンクを切り替えて行う連続パス運用の実施有無と連続パス運用の条件とを設定したパス要求テーブルに基づき、連続パス運用に対応したパス割付を行う付記3記載のパス割付プログラム。
(付記5)
複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うパス割付装置であって、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成部と、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成部と、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付部と
を有するパス割付装置。
(付記6)
コンピュータによって実行される複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うパス割付方法であって、
前記コンピュータが、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成ステップと、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成ステップと、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付ステップと
を実行するパス割付方法。
The present invention may have the following configurations as described below.
(Appendix 1)
A computer that performs path assignment, which is the source of the antenna operation plan when tracking multiple satellites with multiple antennas,
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation unit for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation section for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation program that functions as a path allocation unit that creates a path time table for each case by performing path allocation so as not to overlap and updating an initial value of an allocation flag of the path time table based on a path allocation result.
(Appendix 2)
The path allocation program further performs path allocation so as not to exceed the required number of paths based on a path request table in which a required number of paths, which is the required number of paths to be allocated, is set for each combination of antenna and satellite. The described path assignment program.
(Appendix 3)
The path allocation program according to appendix 2, wherein the path allocation unit further performs path allocation at intervals of the allocated paths based on a path request table in which intervals of allocated paths are set for each combination of antenna and satellite.
(Appendix 4)
The path allocation unit further supports continuous path operation based on a path request table in which the presence / absence of continuous path operation performed by switching communication links and the conditions for continuous path operation are set for each combination of antenna and satellite. The path allocation program according to appendix 3, which performs path allocation.
(Appendix 5)
A path allocation device that performs path allocation as a source of an antenna operation plan when tracking multiple satellites with multiple antennas,
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation unit for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation section for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation apparatus comprising: a path allocation unit that generates a path time table for each case, wherein path allocation is performed so as to avoid duplication and update an initial value of an allocation flag of the path time table based on a path allocation result.
(Appendix 6)
A path allocation method for performing path allocation as a source of an antenna operation plan when tracking a plurality of satellites executed by a computer with a plurality of antennas,
The computer is
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation step for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation step for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation method for performing path allocation so as not to overlap each other by using the path allocation table, and generating a path time table in which an initial value of an allocation flag of the path time table is updated based on a path allocation result for each case. .

本発明は、具体的に開示された実施例に限定されるものではなく、特許請求の範囲から逸脱することなく、種々の変形や変更が可能である。   The present invention is not limited to the specifically disclosed embodiments, and various modifications and changes can be made without departing from the scope of the claims.

1 パス割付装置
11 入力装置
12 出力装置
13 ドライブ装置
14 補助記憶装置
15 主記憶装置
16 演算処理装置
17 インターフェース装置
21 パス割付エンジン
22 パス割付表示部
23 局イベントファイル
24 処理順序テーブル
25、25a パス時間テーブル
26 改良後パス時間テーブル
27 ローカル用パス時間テーブル
28 保存用パス時間テーブル
31〜33 テーブル
51 対象衛星テーブル
52 アンテナ優先ケーステーブル
53 アンテナ別衛星優先テーブル
54 パス要求テーブル
61 パス時間テーブルデフォルト作成部
62 処理順序テーブル作成部
63 アンテナ/衛星別パス割付部
64 重複判定部
71 チャート表示部
72 パス割付変更部
73 重複判定部
74 ファイル再読込部
75 ファイル保存部
100 パス割付結果チャート
101,102 入力欄
103 表示ボタン
104 パス
105 重複チェックボタン
106 重複するパス
107 元に戻すボタン
108 確定ボタン
DESCRIPTION OF SYMBOLS 1 Path allocation device 11 Input device 12 Output device 13 Drive device 14 Auxiliary storage device 15 Main storage device 16 Arithmetic processing device 17 Interface device 21 Path allocation engine 22 Path allocation display part 23 Station event file 24 Processing order table 25, 25a Path time Table 26 Improved path time table 27 Local path time table 28 Storage path time table 31-33 Table 51 Target satellite table 52 Antenna priority case table 53 Antenna-specific satellite priority table 54 Path request table 61 Path time table default creation unit 62 Processing order table creation unit 63 Path allocation unit for each antenna / satellite 64 Duplicate determination unit 71 Chart display unit 72 Path allocation change unit 73 Duplicate determination unit 74 File reread unit 75 File storage unit 00 Path allocation result back to the chart 101, 102 the input field 103 display button 104 path 105 overlap check button 106 duplicate path 107 yuan button 108 enter button

Claims (6)

複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うコンピュータを、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成部と、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成部と、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付部と
して機能させるパス割付プログラム。
A computer that performs path assignment, which is the source of the antenna operation plan when tracking multiple satellites with multiple antennas,
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation unit for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation section for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation program that functions as a path allocation unit that creates a path time table for each case by performing path allocation so as not to overlap and updating an initial value of an allocation flag of the path time table based on a path allocation result.
前記パス割付プログラムは、更に、アンテナ及び衛星の組み合わせ毎に、割り付けるパスの要求数である要求パス数を設定したパス要求テーブルに基づき、前記要求パス数を超えないようにパス割付を行う請求項1記載のパス割付プログラム。   The path allocation program further performs path allocation so as not to exceed the requested path number based on a path request table in which a requested path number that is the requested number of paths to be allocated is set for each combination of antenna and satellite. 1. The path allocation program according to 1. 前記パス割付部は、更に、アンテナ及び衛星の組み合わせ毎に、割り付けるパスの間隔を設定したパス要求テーブルに基づき、前記割り付けるパスの間隔でパス割付を行う請求項2記載のパス割付プログラム。   The path allocation program according to claim 2, wherein the path allocation unit further performs path allocation at the allocated path interval based on a path request table in which an allocated path interval is set for each combination of antenna and satellite. 前記パス割付部は、更に、アンテナ及び衛星の組み合わせ毎に、通信リンクを切り替えて行う連続パス運用の実施有無と連続パス運用の条件とを設定したパス要求テーブルに基づき、連続パス運用に対応したパス割付を行う請求項3記載のパス割付プログラム。   The path allocation unit further supports continuous path operation based on a path request table in which the presence / absence of continuous path operation performed by switching communication links and the conditions for continuous path operation are set for each combination of antenna and satellite. The path allocation program according to claim 3, which performs path allocation. 複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うパス割付装置であって、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成部と、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成部と、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付部と
を有するパス割付装置。
A path allocation device that performs path allocation as a source of an antenna operation plan when tracking multiple satellites with multiple antennas,
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation unit for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation section for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation apparatus comprising: a path allocation unit that generates a path time table for each case, wherein path allocation is performed so as to avoid duplication and update an initial value of an allocation flag of the path time table based on a path allocation result.
コンピュータによって実行される複数の衛星を複数のアンテナで追跡する場合のアンテナ運用計画の源泉となるパス割付を行うパス割付方法であって、
前記コンピュータが、
アンテナ別に衛星の優先度を設定したアンテナ別衛星優先テーブルとアンテナの優先順位を複数ケース設定したアンテナ優先ケーステーブルとに基づき、前記ケース毎にパス割付処理を実施するアンテナ及び衛星の組み合わせの順序を設定した処理順序テーブルを作成する処理順序テーブル作成ステップと、
アンテナ別に衛星の可視時間帯を設定したファイルと衛星別に軌道タイプ及び運用時刻を設定した対象衛星テーブルとに基づき、アンテナ,衛星及びパスの組み合わせ毎にパス時刻、可視時刻及びパス割付結果を表す割付フラグの初期値を設定したパス時間テーブルを作成するパス時間テーブルデフォルト作成ステップと、
前記処理順序テーブルに設定した前記ケース毎のパス割付処理を実施するアンテナ及び衛星の組み合わせの順序に基づき、前記パス時間テーブルに設定したアンテナ,衛星及びパスの組み合わせに対し、パス時刻及び可視時刻を使用して重複しないようにパス割付を行い、パス割付結果に基づき前記パス時間テーブルの割付フラグの初期値を更新したパス時間テーブルを前記ケース毎に作成するパス割付ステップと
を実行するパス割付方法。
A path allocation method for performing path allocation as a source of an antenna operation plan when tracking a plurality of satellites executed by a computer with a plurality of antennas,
The computer is
Based on the antenna priority table for each antenna in which the priority of each satellite is set and the antenna priority case table in which a plurality of antenna priorities are set, the order of combinations of antennas and satellites for which path allocation processing is performed for each case is described. A processing order table creation step for creating the set processing order table;
Allocation indicating path time, visible time, and path allocation result for each combination of antenna, satellite, and path based on a file that sets the visible time zone of the satellite for each antenna and the target satellite table that sets the orbit type and operation time for each satellite. A path time table default creation step for creating a path time table in which initial values of flags are set;
Based on the combination order of antennas and satellites for performing the path allocation processing for each case set in the processing order table, the path time and the visible time are set for the antenna, satellite and path combinations set in the path time table. A path allocation method for performing path allocation so as not to overlap each other by using the path allocation table, and generating a path time table in which an initial value of an allocation flag of the path time table is updated based on a path allocation result for each case. .
JP2009059991A 2009-03-12 2009-03-12 Path allocation program, path allocation apparatus, and path allocation method Expired - Fee Related JP5412895B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009059991A JP5412895B2 (en) 2009-03-12 2009-03-12 Path allocation program, path allocation apparatus, and path allocation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009059991A JP5412895B2 (en) 2009-03-12 2009-03-12 Path allocation program, path allocation apparatus, and path allocation method

Publications (2)

Publication Number Publication Date
JP2010208599A JP2010208599A (en) 2010-09-24
JP5412895B2 true JP5412895B2 (en) 2014-02-12

Family

ID=42969259

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009059991A Expired - Fee Related JP5412895B2 (en) 2009-03-12 2009-03-12 Path allocation program, path allocation apparatus, and path allocation method

Country Status (1)

Country Link
JP (1) JP5412895B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5737056B2 (en) * 2011-08-18 2015-06-17 三菱電機株式会社 Satellite operation planning equipment
JP6337684B2 (en) * 2014-08-20 2018-06-06 三菱電機株式会社 Observation plan creation device and observation device
JP6388511B2 (en) * 2014-08-26 2018-09-12 三菱電機株式会社 Space flying object monitoring apparatus, space flying object monitoring method, and program
US10530751B2 (en) 2017-03-06 2020-01-07 The Boeing Company Virtual transponder utilizing inband telemetry
US11101879B2 (en) * 2017-03-06 2021-08-24 The Boeing Company Virtual transponder
US10419403B2 (en) 2017-03-06 2019-09-17 The Boeing Company Virtual transponder utilizing inband commanding
US11394458B2 (en) 2017-03-06 2022-07-19 The Boeing Company Inband telemetry for a virtual transponder
US11742936B2 (en) 2018-12-27 2023-08-29 Infostellar Inc. Information processing device, information processing method, and program
JP6797243B2 (en) * 2018-12-27 2020-12-09 株式会社インフォステラ Information processing equipment, information processing methods, programs
JP7123269B2 (en) * 2019-09-26 2022-08-22 三菱電機株式会社 Visible satellite allocation device, satellite operation system, visible allocation method and program

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58101900A (en) * 1981-12-11 1983-06-17 宇宙開発事業団 Working control system
JP2001233300A (en) * 2000-02-25 2001-08-28 Mitsubishi Electric Corp Operation plan making system and method of artificial satellite
JP2002175353A (en) * 2000-12-08 2002-06-21 Mitsubishi Electric Corp Operation plan planning method and operation plan planning device using the method
JP2002318889A (en) * 2001-04-19 2002-10-31 Mitsubishi Electric Corp Scheduling system
JP2003226298A (en) * 2002-02-07 2003-08-12 Nef:Kk Autonomous command operating method
JP2004272427A (en) * 2003-03-06 2004-09-30 Fujitsu Ltd Observation operation planning processing method, observation operation planning device, and observation operation planning processing program
JP4409336B2 (en) * 2004-03-31 2010-02-03 富士通株式会社 Satellite diagnostic program and satellite diagnostic device
JP2007261554A (en) * 2006-03-30 2007-10-11 Nec Engineering Ltd Mission data test pattern production method and device

Also Published As

Publication number Publication date
JP2010208599A (en) 2010-09-24

Similar Documents

Publication Publication Date Title
JP5412895B2 (en) Path allocation program, path allocation apparatus, and path allocation method
US9009585B1 (en) Software wizard interface
US8700700B2 (en) Screen shot display control apparatus, screen shot display control method, integrated circuit for screen shot display control, and server apparatus
US7712065B2 (en) Automatic layout method and automatic layout device
JP7426140B2 (en) Information processing system, information processing program, and information processing method
US20050160168A1 (en) Information delivery and display system and information delivery method
US7746413B2 (en) Operation screen controlling method, operation screen controlling program, and display device
US20110161850A1 (en) Graphical approach to setup data sharing between two controllers
US20080004925A1 (en) Multi-site project management
US20060101346A1 (en) Device and method for designing and planning an operating interface
US7263680B2 (en) Graphical user interface for a cell router usable by both novice and advanced users
JP4585150B2 (en) Schedule data editing program, storage medium, and diamond data editing apparatus for train schedule creation
US20120194843A1 (en) Method of changing position of menu in image forming apparatus and image forming apparatus configured to change position of menu
US8769488B2 (en) Component composing apparatus and method using virtual components in component-based robot software development
US7847270B2 (en) Semiconductor manufacturing apparatus and method thereof
Pedoto et al. Innovative development of a cross-center timeline planning tool
JP2004325818A (en) Menu display device, program and recording medium
US20090198726A1 (en) Method and apparatus for organizing contents
CN113609149A (en) Material replacement method and device, storage medium and electronic equipment
EP4277160A1 (en) Data transfer management
JP2018092521A (en) Operation time adjustment system accompanied with power failure work
JP2023012676A (en) On-vehicle terminal device, on-vehicle software update management system, and device control method
Lad et al. Complexity-Based Link Assignment for NASA’s Deep Space Network for Follow-the-Sun Operations
Weiss et al. TMT observatory software construction update
WO2010084570A1 (en) Project management support device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130205

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131015

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131028

R150 Certificate of patent or registration of utility model

Ref document number: 5412895

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees