JP2002175353A - Operation plan planning method and operation plan planning device using the method - Google Patents

Operation plan planning method and operation plan planning device using the method

Info

Publication number
JP2002175353A
JP2002175353A JP2000373878A JP2000373878A JP2002175353A JP 2002175353 A JP2002175353 A JP 2002175353A JP 2000373878 A JP2000373878 A JP 2000373878A JP 2000373878 A JP2000373878 A JP 2000373878A JP 2002175353 A JP2002175353 A JP 2002175353A
Authority
JP
Japan
Prior art keywords
time
plan
data
request
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000373878A
Other languages
Japanese (ja)
Inventor
Tetsuo Yamazaki
哲男 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2000373878A priority Critical patent/JP2002175353A/en
Publication of JP2002175353A publication Critical patent/JP2002175353A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a planning device of an operation plan of a satellite, by which a work to recreate an operation plan so as not to impede an operation is performed efficiently, when causes which disable implementation of the plan, such as fluctuation of visible time is generated. SOLUTION: The latest data of the visible time 91 is inputted from a visible time input part 140 with a prescribed timing. An operation plan creating part 120 compares it with the previously inputted visible time, and when a time lag over prescribed time is generated between both, notifies an operation requesting origin of a fact that the implementation of the previously planned operation schedule is disabled due to the time lag. Thus, formation of the operation plan conforming to he visible time after fluctuation is realized, so as to be in time for the operation by promoting recreation of an operation request.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は通信衛星や天体観測
衛星などの運用計画立案装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an operation planning device for a communication satellite or an astronomical observation satellite.

【0002】[0002]

【従来の技術】通信衛星や天体観測衛星などの利用可能
な時間(衛星が通信基地局と通信可能な位置にある時
間)は限られているので、利用可能な時間内を効率よく
利用する必要がある。そこで、衛星の運用管制のために
使用する衛星追跡管制設備の運用計画は、衛星毎に前記
設備の運用可能な時間を指定して、複数の運用案が立案
作成(これを運用要求という)された後、複数の運用要
求案間の運用時間等の競合を調整して作成される。前記
運用可能な時間は衛星を運用管制する際に使用する衛星
追跡管制設備が衛星と通信可能であると予測される時間
(以下、可視時間と呼ぶ)をもとにして指定する。(勿
論、衛星の目的によっては、通信不可能な位置にあって
も、予めプログラムされた予定にしたがって、自動的に
天体観測などの作業を行うものもあるが、ここで言う運
用とは基地局との間での通信を前提とした運用にかぎる
ものである。)
2. Description of the Related Art Since the available time of a communication satellite or an astronomical observation satellite (the time when a satellite is at a position where it can communicate with a communication base station) is limited, it is necessary to efficiently use the available time. There is. Therefore, in the operation plan of the satellite tracking control equipment used for the operation control of the satellite, a plurality of operation plans are drafted and created (this is called an operation request) by designating the operable time of the equipment for each satellite. Then, it is created by adjusting the competition such as the operation time between a plurality of operation request plans. The operable time is specified based on a time (hereinafter, referred to as a visible time) in which it is predicted that the satellite tracking control equipment used for operation control of the satellite can communicate with the satellite. (Of course, depending on the purpose of the satellite, even if it is in a position where communication is not possible, there are those that automatically perform astronomical observation work etc. according to a pre-programmed schedule, but the operation referred to here is a base station It is limited to the operation assuming the communication between.)

【0003】図4は、例えば特開昭58−101900
号公報に開示されたものと類似の従来の衛星運用計画立
案装置の構成を示すものである。この公報中ではこの装
置は運用管制設備と呼ばれている。図に於いて、1は運
用管制卓、2は運用計画入力部、3は運用監視制御部、
4は運用スケジューリング部、5はパラメータ設定部、
6はn個の設備単位運用制御部、7は入出力制御部、8
は運用状態モニタ部、10は運用計画立案装置、11は
局内各被運用設備である。
FIG. 4 shows, for example, Japanese Patent Application Laid-Open No. 58-101900.
1 shows a configuration of a conventional satellite operation planning device similar to that disclosed in Japanese Patent Application Laid-Open Publication No. H10-110,026. In this publication, this device is called operation control equipment. In the figure, 1 is an operation control console, 2 is an operation plan input unit, 3 is an operation monitoring control unit,
4 is an operation scheduling unit, 5 is a parameter setting unit,
6 is an n unit operation control unit, 7 is an input / output control unit, 8
Denotes an operation state monitor unit, 10 denotes an operation planning device, and 11 denotes each operated facility in the station.

【0004】次に動作について説明する。まず、運用計
画立案装置10中の運用管制卓1の運用計画入力部2か
ら運用対象となる人工衛星名、運用作業項目、運用時
間、各種運用モードを入力し、運用スケジューリング部
4へ通知する。この通知を受けた運用スケジューリング
部4は、その衛星運用に必要な設備をn個の設備単位運
用制御部6から選びだし、運用スケジュールを決定し、
時刻をキーにして運用管制制御を行う。各被運用設備1
1の制御は、あらかじめパラメータ設定部5で定義付け
られたパラメータ値を使って、各被運用設備11に対応
した設備単位運用制御部6内モジュールにより、入出力
制御部7を介して行われる。各被運用設備11の運用状
態の監視は、状態データが入出力制御部7を介して運用
状態モニタ部8へ送られ、その状態を監視されるととも
に運用管制卓1の運用監視制御部3へ出力される。この
ようにして衛星運用に使用される全設備の制御および運
用状態監視を自動的に実行する。
Next, the operation will be described. First, the name of an artificial satellite to be operated, an operation work item, an operation time, and various operation modes are input from the operation plan input unit 2 of the operation control console 1 in the operation plan drafting apparatus 10 and notified to the operation scheduling unit 4. Upon receiving this notification, the operation scheduling unit 4 selects equipment necessary for the satellite operation from the n equipment unit operation control units 6, determines an operation schedule,
Operation control is performed using the time as a key. Each operated facility 1
The control 1 is performed via the input / output control unit 7 by the module in the facility unit operation control unit 6 corresponding to each operated facility 11 using the parameter value defined in advance by the parameter setting unit 5. The operation status of each operated facility 11 is monitored by sending status data to the operation status monitoring unit 8 via the input / output control unit 7, monitoring the status, and sending the status data to the operation monitoring control unit 3 of the operation control console 1. Is output. In this way, control of all equipment used for satellite operation and operation state monitoring are automatically executed.

【0005】したがって、この運用管制方式によれば、
各人工衛星に応じて、使用する設備を設備単位で自由に
組み合わせてスケジューリングできること、各設備の設
定パラメータ値も自由に衛星に応じて変更出来ることを
利用し、運用管制すべき衛星が追加されても短期間で安
価に対応することができる。また、運用対象となる全設
備にわたり、運用管制することにより衛星運用の省力
化、正確化、迅速化が図られる。
Therefore, according to this operation control system,
Satellites to be operated and controlled are added using the fact that the equipment to be used can be freely combined and scheduled for each equipment according to each artificial satellite, and the setting parameter values of each equipment can be freely changed according to the satellite. Can be dealt with in a short period of time at low cost. In addition, by controlling the operation of all equipment to be operated, labor saving, accuracy, and speeding up of satellite operation can be achieved.

【0006】このように、運用時間の変更を含めた運用
計画変更が容易にできるとはいうものの、運用計画の時
間は、運用案を立案する側の希望する運用時間によって
決定されている。ところが、衛星の軌道予測はある程度
の誤差を含むものなので、可視時間が予測したものから
徐々にずれ、そのずれは日増しに大きくなって、運用可
能な時間がずれてくるものである。その結果、例えば、
図5に示すように、現実の衛星運用では最初に立案した
計画では役に立たなくなるということが、しばしば発生
する。
As described above, although it is possible to easily change the operation plan including the change of the operation time, the time of the operation plan is determined by the operation time desired by the side drafting the operation plan. However, the orbit prediction of a satellite includes a certain degree of error, so that the visibility time gradually deviates from the predicted one, and the deviation increases daily and the operable time deviates. As a result, for example,
As shown in FIG. 5, it is often the case that in a real satellite operation, a plan initially planned becomes useless.

【0007】理解を助けるため、以上をタイムスケジュ
ールの例を使って説明する。図5(a)は時刻t0にお
いて計画された最初の計画を示すタイムスケジュールで
211a,211b,211c,211dは可視時間
で、時間の経過とともに通信可能となったり、通信不可
能となったりする様子を示している。231a〜231
dは、可視時間211a〜211dに対応して計画し決
定された運用計画時間を示している(両者は常に一致し
ていると言うものではなく、231Xに示すように利用
計画がなく時間に空きが出る場合も当然あり得る。)
[0007] To facilitate understanding, the above will be described using an example of a time schedule. FIG. 5A is a time schedule showing an initial plan planned at time t0, where 211a, 211b, 211c, and 211d are visible times, with which communication becomes possible or communication becomes impossible over time. Is shown. 231a to 231
d indicates an operation plan time planned and determined corresponding to the visible times 211a to 211d (they are not always coincident, and as shown by 231X, there is no use plan and the time is empty. May occur.)

【0008】図5(b)は、その後、時刻t1におい
て、更新された可視時間情報により、可視時間231a
〜231dが変化した様子を示している。すでに可視時
間211aはなかば過ぎとなり、運用計画時間231a
はほぼ終了間近であるが、可視時間211a,211b
までは計画どおりで、運用計画時間も計画どおりに実行
される。しかし可視時間211c,211dはそれぞれ
212c,212dのように、最初に予定した時刻より
も後にずれるようになっている。このようなずれが生じ
るときは、少なくともその数時間乃至数日間前にはずれ
とその程度が判明する。
[0008] FIG. 5B shows that, at time t1, the visible time 231a is updated based on the updated visible time information.
231d has changed. The visible time 211a has already passed, and the operation planning time 231a
Is almost finished, but the visible time 211a, 211b
Up to the plan, and the operation planning time is also executed as planned. However, the visible times 211c and 211d are shifted after the first scheduled time, as indicated by 212c and 212d, respectively. When such a shift occurs, the shift and its degree are known at least several hours to several days before.

【0009】このような場合、時間さえずらして運用す
れば目的を達成できるものもあるが、例えばある種の天
体観測のように、あまり大きく時間を変更すると意味が
なくなるものや、突然発生して最初に予定した観測日程
を変更しなければならないというものもある。
[0009] In such a case, some objects can be achieved if they are operated with a delay in time. However, for example, as in certain types of astronomical observations, changing the time too much does not make sense, In some cases, the initial observation schedule must be changed.

【0010】ここでは可視時間の変動を運用計画変更の
理由として説明したが、その外にも、例えば計画立案側
の機器の故障により、計画を見直さざるを得なくなる場
合もある。要するに、種々の理由による運用計画の変更
は、単なる時間のやり繰りだけでは変更できず、運用計
画の内容ごとに備わっている種々の条件を勘案して決定
する必要があるため、極めて複雑で膨大な手間のかかる
作業となるのである。
Although the change in the visible time has been described as a reason for changing the operation plan, the plan may be forced to be reviewed due to, for example, a failure of the equipment on the planning side. In short, the change of the operation plan for various reasons cannot be changed only by mere passing of time, but must be determined in consideration of various conditions provided for each content of the operation plan. This is a laborious task.

【0011】[0011]

【発明が解決しようとする課題】衛星の軌道計算にはあ
る程度の誤差がつきものなので、運用要求の運用時間を
指定するもととなる可視時間(衛星追跡管制設備が衛星
と通信可能であると予測される時間)は、計画立案後、
日が経つにつれ変動していく。また、計画立案側にも計
画立案後に種々の理由、例えば機器の故障などで立案ず
みの計画をそのまま実施することが不可能となる理由が
生じる場合がある。理由が、可視時間のずれか、計画立
案側の理由であるかなど、その原因のいかんにかかわら
ず、変更となれば、その都度、極めて複雑な再計画立案
作業を、膨大な手間をかけて行わなければならないとい
う問題があった。
Since the orbit calculation of a satellite involves some error, the visible time (which predicts that the satellite tracking and control equipment can communicate with the satellite, which is the basis for specifying the operation time of the operation request) Time), after planning,
It fluctuates over time. In addition, the planning side may have various reasons after the planning, for example, a reason that it becomes impossible to execute the planned plan as it is due to equipment failure or the like. Regardless of the cause, such as the difference in the visible time or the reason for the planning side, every time a change is made, extremely complicated re-planning work takes a lot of time and effort. There was a problem that had to be done.

【0012】本発明は、上記のような問題を解消するた
めに、可視時間が変動するなど、計画を実施することが
不可能となる理由が生じた場合、運用に支障を与えない
ように運用計画を再作成する作業を効率的に行うことが
できる衛星の運用計画立案装置を提供することを目的と
する。
According to the present invention, in order to solve the above-mentioned problems, in the event that there is a reason that it becomes impossible to carry out a plan, for example, when the visibility time fluctuates, the operation is performed so as not to hinder the operation. An object of the present invention is to provide a satellite operation plan drafting device capable of efficiently performing a task of re-creating a plan.

【0013】[0013]

【課題を解決するための手段】この発明の運用計画立案
方法は、人工衛星の運用計画を、当該人工衛星の利用を
希望する運用要求者の要求と、当該人工衛星の運用可能
時間とに合わせて立案する運用計画立案方法であって、
運用可能時間のデータを該データが更新される都度、入
力して記憶する手順、運用要求者が立案した運用要求案
を入力する手順、運用要求案の中から、運用可能時間に
実施可能なものを選択し、運用スケジュールとして記憶
する手順、記憶した運用スケジュールを運用可能時間の
最新のデータと比較し、運用スケジュールが最新の運用
可能時間で実施可能か否かを判定し、実施不可能であれ
ば運用要求者に対してその旨を通知する通知信号を出力
する手順とを含むものである。
According to the operation plan planning method of the present invention, an operation plan of an artificial satellite is adjusted in accordance with a request of an operation requester who wants to use the artificial satellite and a operable time of the artificial satellite. An operation planning method for planning
From the procedure for inputting and storing the operable time data each time the data is updated, the procedure for inputting the operation request plan prepared by the operation requester, and the operation request plan, those that can be executed during the operable time Select the procedure to store as the operation schedule, compare the stored operation schedule with the latest data of the operable time, determine whether the operation schedule can be executed at the latest operable time, For example, a procedure for outputting a notification signal notifying the operation requester to that effect is included.

【0014】この発明の運用計画立案装置は、人工衛星
の運用計画を、当該人工衛星の運用可能時間に合わせて
立案するための運用計画立案装置であって、運用可能時
間のデータを外部から入力する運用可能時間入力部、運
用要求者が立案した運用要求案を入力するための運用要
求案入力部、運用要求案の中から、運用可能時間に実施
可能なものを選択し、運用可能時間のデータとともに運
用スケジュールとして記憶する運用計画作成部、運用可
能時間の最新のデータを、運用計画作成部に記憶してい
る前回の運用可能時間データと比較し、両者の間に予め
定めた所定の時間以上の差があれば、運用要求者に前記
運用スケジュールが実施不可能であることを通知する通
知信号を出力する通知出力部とを備えたものである。
An operation plan drafting apparatus according to the present invention is an operation plan drafting apparatus for drafting an operation plan of an artificial satellite in accordance with the operable time of the artificial satellite, and inputs data of the operable time from outside. From the operable time input part, the operation request input part for inputting the operation request draft made by the operation requester, and the operation request An operation plan creation unit that stores the operation schedule together with the data, compares the latest data of the operable time with the previous operable time data stored in the operation plan creation unit, and sets a predetermined time between them. If there is the above difference, a notification output unit that outputs a notification signal for notifying the operation requester that the operation schedule is not executable is provided.

【0015】また、通知出力部は、運用可能時間の最新
のデータを、運用計画作成部に記憶している前回の運用
可能時間データと比較し、両者の間に予め定めた所定の
時間以上の差があれば、所定の時間以上の差のある運用
スケジュールを運用計画作成部の記憶から削除するもの
である。
Further, the notification output unit compares the latest data of the operable time with the previous operable time data stored in the operation plan creating unit, and compares the latest data of the operable time with a predetermined time which is longer than a predetermined time. If there is a difference, an operation schedule having a difference of a predetermined time or more is deleted from the storage of the operation plan creation unit.

【0016】また、人工衛星の運用計画を、当該人工衛
星の運用可能時間に合わせて立案するための運用計画立
案装置であって、運用可能時間の最新のデータを入力す
る運用可能時間入力部、運用要求者が立案した運用要求
案を入力する運用要求案入力部、運用要求案の中から、
運用可能時間に関する最新のデータに一致するものを選
択し、運用可能時間のデータとともに運用スケジュール
として記憶する運用計画作成部、運用可能時間の最新の
データを、運用計画作成部に記憶している運用スケジュ
ールと比較し、運用スケジュールが最新の運用可能時間
で実施可能か否かを判定し、実施不可能であればその旨
を運用要求者に通知する通知信号を出力する通知出力部
とを備えたものである。
An operation plan drafting device for drafting an operation plan of an artificial satellite in accordance with the operational time of the artificial satellite, comprising an operational time input unit for inputting the latest data of the operational time, From the operation request draft input section for inputting the operation request draft created by the operation requestor, from the operation request draft,
An operation plan creator that selects the data that matches the latest operable time data and stores it as an operation schedule together with the operable time data, and an operation that stores the latest operable time data in the operation plan creator A notification output unit for determining whether or not the operation schedule can be executed in the latest operable time by comparing with the schedule, and outputting a notification signal for notifying the operation requester if the operation can not be executed. Things.

【0017】また、通知出力部は、運用可能時間の最新
のデータを、運用計画作成部に記憶している運用スケジ
ュールと比較し、運用スケジュールが最新の運用可能時
間で実施可能か否かを判定し、実施不可能であれば、実
施不可能な運用スケジュールを運用計画作成部の記憶か
ら削除するものである。
The notification output unit compares the latest data of the operable time with the operation schedule stored in the operation plan creation unit, and determines whether the operation schedule can be executed in the latest operable time. If the operation schedule cannot be executed, the operation schedule that cannot be executed is deleted from the storage of the operation plan creation unit.

【0018】また、前記運用可能時間に代えて人工衛星
の可視時間を用いたものである。
In addition, the visible time of an artificial satellite is used instead of the operable time.

【0019】[0019]

【発明の実施の形態】発明の実施の形態1.以下、図面
により本発明を詳細に説明する。図1は、本発明の実施
の形態1の運用計画立案装置の構成図であって、100
は運用計画立案装置で以下に説明するものを含んでい
る。まず、図示しない別の装置により衛星の可視時間デ
ータ91が作成される。この可視時間データ91は適当
な時間間隔(例えば数日ごと)で更新されている。92
は衛星の運用要求時間(運用要求案)であり、図示しな
い複数の要求もと(要求者)から複数の要求が提出され
る。これには可視時間データ91に一致するものもあれ
ば、一致しないものも含まれる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 of the Invention Hereinafter, the present invention will be described in detail with reference to the drawings. FIG. 1 is a configuration diagram of an operation planning device according to a first embodiment of the present invention.
Includes an operation planning device described below. First, the visible time data 91 of the satellite is created by another device (not shown). The visible time data 91 is updated at appropriate time intervals (for example, every several days). 92
Is a satellite operation request time (operation request plan), and a plurality of requests are submitted from a plurality of request sources (requesters) not shown. This includes some that match the visible time data 91 and those that do not.

【0020】110は運用要求入力部で運用要求案92
が入力される。140は前述の可視時間データ91が入
力される可視時間入力部であり、可視時間データ91が
更新される度に入力される。120は運用要求入力部1
10の出力に接続された運用計画作成部でその動作の詳
細は後述するが、可視時間データ91に一致する運用要
求を運用要求案92の中から選択して運用計画を作成
し、可視時間データ91とともに記憶する。130は運
用計画作成部120が作成し記憶した運用計画を出力す
る運用計画出力部、150は運用計画作成部120の後
述する通知信号を出力する通知出力部である。
Reference numeral 110 denotes an operation request input unit.
Is entered. Reference numeral 140 denotes a visible time input unit to which the above-described visible time data 91 is input, and is input every time the visible time data 91 is updated. 120 is an operation request input unit 1
The operation plan creation unit connected to the output 10 outputs an operation request, which will be described later in detail, selects an operation request that matches the visible time data 91 from the operation request plan 92 and creates an operation plan. Stored together with 91. An operation plan output unit 130 outputs the operation plan created and stored by the operation plan creation unit 120, and a notification output unit 150 outputs a notification signal of the operation plan creation unit 120 described later.

【0021】可視時間データ91は前述のとおり、一度
入力されると固定してしまうものではなく、ときどき更
新されるので、時間の経過とともに変化してくるもので
ある。 図2は、可視時間と運用計画時間の関係を説明
するためのタイムチャートであって、図(a)は最初の
計画立案時の状態、(b)はその後、可視時間が変動し
た状態、(c)は更にその後、本実施の形態の運用計画
立案装置により計画が再作成された後の状態を示してい
る。211c,211dは最初の計画時に予測されてい
た第1の可視時間、212dはその後、変化してしまっ
た第2の可視時間を示している。221c,221dは
最初の計画時点に於ける第1の運用要求時間(運用要求
案)、223dは再計画時点に於ける第2の運用要求時
間、231c,dは最初の計画で決定した第1の運用計
画時間、233dはその後の再計画時点で決定した第2
の運用計画時間である。
As described above, the visible time data 91 is not fixed once inputted, but is updated from time to time, and thus changes with time. FIG. 2 is a time chart for explaining the relationship between the visible time and the operation planning time. FIG. 2 (a) shows the state at the time of the initial planning, FIG. Further, c) shows a state after the plan is re-created by the operation plan drafting apparatus of the present embodiment. 211c and 211d indicate the first visible time predicted at the time of the first planning, and 212d indicates the second visible time that has changed thereafter. Reference numerals 221c and 221d denote a first operation request time (proposed operation request) at the time of the first plan, 223d denotes a second operation request time at the time of replanning, and 231c and d denote the first operation time determined by the first plan. 233d is the second planning time determined at the time of subsequent re-planning.
Is the operation planning time.

【0022】次に動作について説明する。可視時間のデ
ータ91は衛星の最新の観測データに基づいて、図示し
ない軌道計算装置などにより、例えば数日ごとに更新さ
れている。そして更新された可視時間データ91は、可
視時間入力部140から入力される。まず、最初の運用
計画立案時点(図2の(a))から説明する。運用対象
の衛星の第1の可視時間211c,dをもとに、利用希
望者から要求のあった複数の運用要求時間(運用要求
案)例えば、第1の運用要求時間221c,d…を運用
要求入力部110から入力する。図が複雑になるので、
ここでは要求案が221c,dしか記載していないが、
もっと多くてもよい。
Next, the operation will be described. The visible time data 91 is updated, for example, every few days by an orbit calculator or the like (not shown) based on the latest observation data of the satellite. The updated visible time data 91 is input from the visible time input unit 140. First, a description will be given from the time of the first operation planning (FIG. 2A). Based on the first visible time 211c, d of the satellite to be operated, a plurality of operation request times (operation request plans) requested by the user, for example, the first operation request times 221c, d. Input from the request input unit 110. Since the diagram becomes complicated,
Here, only 221c and 221d are listed as the draft requirements,
May be more.

【0023】運用計画作成部120において、前記入力
された複数の第1の運用要求時間221c,d,e…間
で運用時間が重複している場合に、重複している運用要
求時間の調整をおこなっていずれを選択するか決定し、
選択した運用要求スケジュールを第1の運用計画時間2
31c,dとして作成する。
When the operation times overlap among the plurality of input first operation request times 221c, d, e,..., The operation plan creation unit 120 adjusts the overlapped operation request times. To decide which one to choose,
The selected operation request schedule is converted to the first operation plan time 2
31c and d.

【0024】その後、図(b)に示すように、可視時間
が変動して第1の可視時間211dが第2の可視時間2
12dとなった場合、変動した第2の可視時間212d
は、第1の運用計画時間231dからずれ、このままで
は実施することができないことになる。まず、可視時間
入力部140から第2の可視時間212dが入力される
と、運用計画作成部120において入力された第2の可
視時間212dと第1の運用計画時間231dとを比較
する。ここで予め定めた所定の時間以上のずれがあった
場合、通知出力部150から第1の運用計画時間231
dに対応する第1の運用要求時間221dの要求もと
(要求者)へ、ずれが生じてしまって実施不可能である
ことを通知する通知信号を出力する。
Thereafter, as shown in FIG. 2B, the visible time fluctuates and the first visible time 211d is changed to the second visible time 2d.
When it becomes 12d, the changed second visible time 212d
Deviates from the first operation planning time 231d, and cannot be executed as it is. First, when the second visible time 212d is input from the visible time input unit 140, the second visible time 212d input by the operation plan creation unit 120 is compared with the first operation plan time 231d. Here, if there is a deviation of a predetermined time or more, the notification output unit 150 sends the first operation plan time 231
A notification signal is output to the request source (requester) of the first operation request time 221d corresponding to the notification that the error has occurred and cannot be performed.

【0025】この通知を受けた要求もとは、第1の運用
要求221dを削除(要求を撤回)し、第2の可視時間
212dをもとに作成した第2の運用要求時間223d
を、運用要求入力部110から入力し、運用計画作成部
120にて運用計画を再作成し、更新された可視時間に
対応する第2の運用計画時間233dを作成する。この
ときもとの第1の運用時間231dは当然削除される。
The request source receiving this notification deletes the first operation request 221d (retracts the request) and creates a second operation request time 223d created based on the second visible time 212d.
Is input from the operation request input unit 110, the operation plan creation unit 120 re-creates the operation plan, and creates a second operation plan time 233d corresponding to the updated visible time. At this time, the original first operation time 231d is naturally deleted.

【0026】前記通知信号の出力に際し、要求もとの判
断を仰ぐまでもなく、実施不可能となった運用計画時間
231dを運用計画作成部120において削除してもよ
い。なお、本実施の形態では、運用要求を選択する基準
として、可視時間に一致するか否かを用いて説明を行な
ったが、運用時間を選択するもととなる基準は、これに
限らず、例えば計画立案側の都合(計画にミスがあった
など)により、決定した時間での実行が不可能となつた
場合や、より権威のある上部管理者からの指示により計
画を作成しなおす場合などにも適用できる。
When the notification signal is output, the operation plan creation unit 120 may delete the operation plan time 231d that has become infeasible, without asking the source of the request. In the present embodiment, the description has been made using whether or not the operation request matches the visible time as a criterion for selecting the operation request. However, the criterion from which the operation time is selected is not limited to this. For example, when it is impossible to execute at the determined time due to the planning side (for example, when there is a mistake in the plan), or when the plan is re-created under the direction of a more authoritative upper management Also applicable to

【0027】また、本実施の形態では、可視時間と運用
要求時間と運用計画時間は、開始時点も、終了時点もほ
ぼ一致しているかのように説明しているが、これは一例
として一致している場合について説明したのであって、
必ずしも完全に一致している必要はない。可視時間がず
れると説明したものは、時間のずれそのものを言うので
はなく、これらの間の関係が満たされなくなることを意
味する。
Further, in the present embodiment, the visible time, the operation request time, and the operation planning time are described as if the start time and the end time are almost the same, but this is an example. Was explained.
They do not need to be exactly the same. The description that the visible time is shifted does not mean the time shift itself, but means that the relationship between them is not satisfied.

【0028】可視時間はこの発明に言う運用可能時間で
ある。可視時間入力部140はこの発明に言う運用可能
時間入力部である。運用要求入力部110はこの発明に
言う運用要求案入力部である。運用要求時間及び運用要
求時間(案)はともにこの発明に言う運用要求案であ
る。運用計画および運用計画時間はともにこの発明に言
う運用スケジュールである。
The visible time is the operable time referred to in the present invention. The visible time input unit 140 is the operable time input unit according to the present invention. The operation request input unit 110 is an operation request plan input unit according to the present invention. The operation request time and the operation request time (draft) are both operation request plans referred to in the present invention. The operation plan and the operation plan time are both operation schedules according to the present invention.

【0029】実施の形態2.実施の形態1の運用計画立
案装置に用いられている運用計画立案方法について図3
により、詳細に説明する。図3はこの発明の運用計画立
案方法を示すフローチャートである。図に於いて、ステ
ップS301で可視時間データが入力される。いうまで
もなくこのデータはこの時点で最新のデータである。こ
のデータは一般に観測によつて提供されるので定期的に
更新される場合もあれば、不定期となる場合もある。ま
た、大きな変化が観測された場合だけ入力される場合も
ある。次にステップS302で以前に計画し記憶してい
る運用計画があるかどうか確認する。ここで記憶してい
る計画がなければステップS303へ飛び、複数の運用
要求時間(案)を入力する。次にステップS304で、
先に入力された可視時間に対応可能な運用要求時間
(案)を選択して、運用計画を作成し、ステップS30
5で可視時間とともに記憶し、ステップS306で前記
計画を出力して、実行に供する。
Embodiment 2 FIG. 3 shows an operation planning method used in the operation planning apparatus according to the first embodiment.
Will be described in detail. FIG. 3 is a flowchart showing the operation planning method of the present invention. In the figure, visible time data is input in step S301. Needless to say, this data is the latest data at this point. This data is generally provided by observation and may be updated regularly or irregularly. In some cases, the input is performed only when a large change is observed. Next, in step S302, it is checked whether there is an operation plan that has been previously planned and stored. If there is no plan stored here, the process jumps to step S303 and inputs a plurality of operation request times (drafts). Next, in step S304,
An operation request time (draft) that can correspond to the previously input visible time is selected, an operation plan is created, and step S30 is performed.
In step S306, the plan is stored together with the visible time, and in step S306, the plan is output and provided for execution.

【0030】また、ステップS302で既に計画済の運
用計画が有る場合には、ステップS311で、記憶して
いる運用計画が、今回入力された新しい可視時間データ
で実施可能か否かを判定する。(この判定作業は、例え
ば運用の内容に立ち入って判断するやり方のものでも、
また、単に可視時間がずれたかどうかで判断する程度の
ものでもよい)。ステップS311で運用が不可能と判
断したらステップS312で、更新された可視時間で運
用が出来ないことを運用要求もとに連絡し、運用要求時
間(案)を再検討するよう要請する。
If there is already a planned operation plan in step S302, it is determined in step S311 whether or not the stored operation plan can be implemented with the newly input visible time data. (This judgment work may be, for example, a method of judging the contents of operation,
Alternatively, the determination may simply be based on whether the visible time has shifted.) If it is determined in step S311 that the operation is impossible, in step S312, the fact that the operation is not possible in the updated visible time is notified based on the operation request, and a request is made to review the operation request time (draft).

【0031】ステップS301はこの発明に言う運用可
能時間のデータを入力して記憶する手順である。ステッ
プS303は運用要求もとにより計画された運用要求案
を入力する手順である。ステップS304とS305は
運用要求案の中から、運用可能時間の最新のデータに一
致するものを選択し、運用スケジュールとして記憶する
手順である。ステップS311とS312は、運用可能
時間の最新のデータを、前回入力された運用可能時間の
データと比較し、運用スケジュールが最新の運用可能時
間で実施可能か否かを判定し、実施不可能であれば通知
信号を前記運用要求もとに対して出力する手順である。
Step S301 is a procedure for inputting and storing the data of the operable time referred to in the present invention. Step S303 is a procedure for inputting an operation request plan planned based on the operation request. Steps S304 and S305 are procedures for selecting, from among the operation request proposals, the one that matches the latest data of the operable time, and storing it as an operation schedule. In steps S311 and S312, the latest data of the operable time is compared with the data of the operable time input last time, and it is determined whether or not the operation schedule can be executed at the latest operable time. If there is, the procedure is to output a notification signal to the operation request source.

【0032】[0032]

【発明の効果】以上説明したように、本発明の運用計画
立案方法によれば、運用可能時間に変化があったとき、
運用スケジュールが実施可能か否かを判定し、実施でき
なければ運用要求もとへ通知するので、運用計画の見直
しが容易に実施できる。
As described above, according to the operation planning method of the present invention, when the operable time changes,
Since it is determined whether or not the operation schedule can be implemented, and if the operation schedule cannot be implemented, the operation schedule is notified to the source of the operation request, so that the operation plan can be easily reviewed.

【0033】また、本発明の運用計画立案装置によれ
ば、可視時間が所定の値以上に変動した場合、運用要求
もとに通知出力部から通知がなされ、要求もとが運用計
画の再検討ができるので、運用に支障を与えない。
Further, according to the operation plan drafting apparatus of the present invention, when the visible time fluctuates beyond a predetermined value, a notification is issued from the notification output unit based on the operation request, and the request source is reconsidered of the operation plan. It does not hinder operation.

【0034】また、運用スケジュールの内、可視時間が
変化した運用スケジュールは削除されるので、要求もと
の作業性が向上するなどの効果がある。
In addition, since the operation schedule whose visible time has been changed is deleted from the operation schedule, the workability at the request source is improved.

【0035】また、可視時間が所定の値以上に変動した
結果、運用スケジュールが実施不可能となった場合、運
用要求もとに通知出力部から通知がなされ、要求もとが
運用計画の再検討ができるので、運用に支障を与えな
い。
If the operation schedule becomes infeasible as a result of the visible time fluctuating beyond a predetermined value, a notification is issued from the notification output unit based on the operation request, and the request source is reconsidered the operation plan. It does not hinder operation.

【0036】また、運用スケジュールの内、可視時間が
変化した結果、実施不可能となった運用スケジュールは
削除されるので、要求もとの作業性が向上するなどの効
果がある。
In addition, since the operation schedule that cannot be implemented as a result of the change of the visible time in the operation schedule is deleted, there is an effect that the workability at the request is improved.

【0037】運用可能時間は衛星の可視時間としたの
で、衛星を効率よく運用できる。
Since the operable time is the visible time of the satellite, the satellite can be operated efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施の形態1に係る運用計画立案装
置の構成ブロック図である。
FIG. 1 is a configuration block diagram of an operation planning device according to a first embodiment of the present invention.

【図2】 図1の装置で立案する運用計画の可視時間と
運用要求時間と運用計画時間の関係を示す図である。
FIG. 2 is a diagram showing a relationship between a visible time of an operation plan, an operation request time, and an operation plan time of an operation plan created by the apparatus of FIG.

【図3】 本発明の運用計画立案方法を示すフローチャ
ートである。
FIG. 3 is a flowchart showing an operation planning method according to the present invention.

【図4】 従来の運用計画立案装置の構成図である。FIG. 4 is a configuration diagram of a conventional operation planning device.

【図5】 図4の動作を説明するタイムチャートであ
る。
FIG. 5 is a time chart for explaining the operation of FIG. 4;

【符号の説明】[Explanation of symbols]

91 可視時間データ、 92 運用要求時間
(案)、100 運用計画立案装置、110 運用要求
入力部、 120 運用計画作成部、130 運用計
画出力部、 140 可視時間入力部、150 通知
出力部、 211、212 可視時間、221、
223 運用要求時間、 231、233 運用計画
時間。
91 visible time data, 92 operation request time (draft), 100 operation plan drafting device, 110 operation request input unit, 120 operation plan creation unit, 130 operation plan output unit, 140 visible time input unit, 150 notification output unit, 211, 212 visible time, 221,
223 Operation request time, 231, 233 Operation plan time.

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 人工衛星の運用計画を、当該人工衛星の
利用を希望する運用要求者の要求と、当該人工衛星の運
用可能時間とに合わせて立案する運用計画立案方法であ
って、 前記運用可能時間のデータを該データが更新される都
度、入力して記憶する手順、 運用要求者が立案した運用要求案を入力する手順、 前記運用要求案の中から、前記運用可能時間に実施可能
なものを選択し、運用スケジュールとして記憶する手
順、 前記記憶した運用スケジュールを前記運用可能時間の最
新のデータと比較し、前記運用スケジュールが前記最新
の運用可能時間で実施可能か否かを判定し、実施不可能
であればその旨を通知する通知信号を前記運用要求者に
対して出力する手順とを含むことを特徴とする運用計画
立案方法。
1. An operation planning method for planning an operation plan of an artificial satellite in accordance with a request of an operation requester who wants to use the artificial satellite and an operable time of the artificial satellite, A procedure for inputting and storing possible time data every time the data is updated, a procedure for inputting an operation request draft prepared by the operation requester, and a procedure for performing the operation possible time from the operation request plan Selecting a thing and storing it as an operation schedule, comparing the stored operation schedule with the latest data of the operable time, and determining whether or not the operation schedule can be implemented at the latest operable time, Outputting to the operation requester a notification signal notifying that the operation is impossible, the operation planning method.
【請求項2】 人工衛星の運用計画を、当該人工衛星の
運用可能時間に合わせて立案するための運用計画立案装
置であって、 前記運用可能時間のデータを該データが更新される都
度、入力する運用可能時間入力部、 運用要求者が立案した運用要求案を外部から入力するた
めの運用要求案入力部、 前記運用要求案の中から、前記運用可能時間に実施可能
なものを選択し、前記運用可能時間のデータとともに運
用スケジュールとして記憶する運用計画作成部、 前記運用可能時間の最新のデータを、前記運用計画作成
部に記憶している前回の運用可能時間のデータと比較
し、両者の間に予め定めた所定の時間以上の差があれ
ば、前記運用要求者に対して前記運用スケジュールが実
施不可能であることを通知する通知信号を出力する通知
出力部とを備えたことを特徴とする運用計画立案装置。
2. An operation plan drafting apparatus for drafting an operation plan of an artificial satellite in accordance with the operable time of the artificial satellite, wherein the operable time data is input each time the data is updated. Operable time input unit to perform, an operation request draft input unit for externally inputting the operation request draft prepared by the operation requester, and selecting an executable one during the operable time from the operation request draft, An operation plan creation unit that stores the operation time together with the operation time data, and compares the latest data of the operation time with the previous operation time data that is stored in the operation plan creation unit. And a notification output unit that outputs a notification signal notifying the operation requester that the operation schedule is not executable, if there is a difference equal to or longer than a predetermined time predetermined. Operational planning apparatus according to claim that there were example.
【請求項3】 通知出力部は、運用可能時間の最新のデ
ータを、運用計画作成部に記憶している前回の運用可能
時間データと比較し、両者の間に予め定めた所定の時間
以上の差があれば、前記所定の時間以上の差のある前記
運用スケジュールを前記運用計画作成部の記憶から削除
することを特徴とする請求項2に記載の運用計画立案装
置。
3. The notification output unit compares the latest data of the operable time with the previous operable time data stored in the operation plan creating unit, and determines whether or not the latest data of the operable time is equal to or longer than a predetermined time set between the two. 3. The operation plan drafting apparatus according to claim 2, wherein if there is a difference, the operation schedule having a difference of the predetermined time or more is deleted from the storage of the operation plan creation unit.
【請求項4】 人工衛星の運用計画を、当該人工衛星の
運用可能時間に合わせて立案するための運用計画立案装
置であって、 前記運用可能時間の最新のデータを該データが更新され
る都度、入力する運用可能時間入力部、 運用要求者が立案した運用要求案を入力する運用要求案
入力部、 前記運用要求案の中から、前記運用可能時間に実施可能
なものを選択し、前記運用可能時間のデータとともに運
用スケジュールとして記憶する運用計画作成部、 前記運用可能時間の最新のデータを、前記運用計画作成
部に記憶している前記運用スケジュールと比較し、前記
運用スケジュールが前記最新の運用可能時間で実施可能
か否かを判定し、実施不可能であればその旨を通知する
通知信号を前記運用要求者に対して出力する通知出力部
とを備えたことを特徴とする運用計画立案装置。
4. An operation plan drafting apparatus for drafting an operation plan of an artificial satellite in accordance with the operable time of the artificial satellite, wherein the latest data of the operable time is updated each time the data is updated. Operable time input unit for inputting, an operation request proposal input unit for inputting an operation request draft prepared by an operation requester, and selecting an operation request plan that can be executed during the operable time from the operation request plan, An operation plan creating unit that stores as an operation schedule together with possible time data, compares the latest data of the available operation time with the operation schedule stored in the operation plan creation unit, and determines that the operation schedule is the latest operation A notification output unit that determines whether or not the operation can be performed within a possible time, and outputs a notification signal notifying that to the operation requester if the operation cannot be performed; Operational planning apparatus according to claim.
【請求項5】 通知出力部は、運用可能時間の最新のデ
ータを、運用計画作成部に記憶している運用スケジュー
ルと比較し、前記運用スケジュールが前記最新の運用可
能時間で実施可能か否かを判定し、実施不可能であれ
ば、前記実施不可能な運用スケジュールを前記運用計画
作成部の記憶から削除することを特徴とする請求項4に
記載の運用計画立案装置。
5. The notification output unit compares the latest data of the operable time with an operation schedule stored in an operation plan creation unit, and determines whether the operation schedule can be executed at the latest operable time. 5. The operation planning device according to claim 4, wherein if the execution is impossible, the operation schedule that cannot be performed is deleted from the storage of the operation plan creation unit.
【請求項6】 人工衛星の運用可能時間に代えて前記人
工衛星の可視時間を用いたことを特徴とする請求項2乃
至5のいずれか一項に記載の運用計画立案装置。
6. The operation planning device according to claim 2, wherein the visible time of the artificial satellite is used instead of the operable time of the artificial satellite.
JP2000373878A 2000-12-08 2000-12-08 Operation plan planning method and operation plan planning device using the method Pending JP2002175353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000373878A JP2002175353A (en) 2000-12-08 2000-12-08 Operation plan planning method and operation plan planning device using the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000373878A JP2002175353A (en) 2000-12-08 2000-12-08 Operation plan planning method and operation plan planning device using the method

Publications (1)

Publication Number Publication Date
JP2002175353A true JP2002175353A (en) 2002-06-21

Family

ID=18843172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000373878A Pending JP2002175353A (en) 2000-12-08 2000-12-08 Operation plan planning method and operation plan planning device using the method

Country Status (1)

Country Link
JP (1) JP2002175353A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010208599A (en) * 2009-03-12 2010-09-24 Fujitsu Ltd Path allocation program, path allocation device, and path allocation method
JP2011183911A (en) * 2010-03-08 2011-09-22 Fujitsu Ltd Observation plan device, observation plan method, and observation plan program
CN114928403A (en) * 2022-06-10 2022-08-19 西安中科天塔科技股份有限公司 Satellite load instruction execution judging system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010208599A (en) * 2009-03-12 2010-09-24 Fujitsu Ltd Path allocation program, path allocation device, and path allocation method
JP2011183911A (en) * 2010-03-08 2011-09-22 Fujitsu Ltd Observation plan device, observation plan method, and observation plan program
CN114928403A (en) * 2022-06-10 2022-08-19 西安中科天塔科技股份有限公司 Satellite load instruction execution judging system and method

Similar Documents

Publication Publication Date Title
Howell et al. Implementing lean construction: Reducing inflow variation
US20090112645A1 (en) Multi objective national airspace collaborative optimization
US6597773B2 (en) System for managing telecommunications infrastructure
JPH0830686A (en) Scheduling system
CN110852623A (en) BPMN-based command control process design method
JP2002175353A (en) Operation plan planning method and operation plan planning device using the method
JPS59214964A (en) Conversational scheduling system
CN105069567A (en) Method and device for controlling engineering design process
US20210383298A1 (en) Optimization apparatus, optimization method, and optimization program
JPH01257553A (en) Scheduling/managing system
US20180240210A1 (en) System and method for transportation scheduling and planning
JP2005055964A (en) Schedule management device, operating method of schedule management device, schedule management program and computer-readable recording medium to which schedule management program is recorded
JPH10185768A (en) Periodic maintenance scheduling system, and periodic maintenance scheduling device using it
Stottler Satellite communication scheduling, optimization, and deconfliction using artificial intelligence techniques
JP4658525B2 (en) Production planning program
JPH07168881A (en) Work control system
US7653521B2 (en) Method for projecting and/or configuring a project
JP2007302431A (en) Delivery control system, delivery control server apparatus, delivery control method, delivery control program, and recording medium
CN116029500A (en) Task scheduling method and device
JP4679091B2 (en) Production management system for resetting production plan and program for executing the system
JPH06348713A (en) Project management assisting device
JPH07282149A (en) Automatic operation diagram preparation device for traffic means
JP2006048275A (en) Job schedule management device, job schedule management method and program therefor
JP4478532B2 (en) Program and crew operation change plan creation device
JPH07234898A (en) Method and apparatus for decision of initial time limit

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040614

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040622

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040818

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041019

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041203

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050125