JPH07168881A - Work control system - Google Patents

Work control system

Info

Publication number
JPH07168881A
JPH07168881A JP34375493A JP34375493A JPH07168881A JP H07168881 A JPH07168881 A JP H07168881A JP 34375493 A JP34375493 A JP 34375493A JP 34375493 A JP34375493 A JP 34375493A JP H07168881 A JPH07168881 A JP H07168881A
Authority
JP
Japan
Prior art keywords
work
instruction information
progress
information
status
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34375493A
Other languages
Japanese (ja)
Other versions
JP3012448B2 (en
Inventor
Hiroyuki Saotome
博幸 五月女
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP34375493A priority Critical patent/JP3012448B2/en
Publication of JPH07168881A publication Critical patent/JPH07168881A/en
Application granted granted Critical
Publication of JP3012448B2 publication Critical patent/JP3012448B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE:To provide a work control system which calculates the priority of the work pointing information by feeding back and referring to such dynamic conditions as the progress state of the work precedent the work related to the work pointing information and the load state of the work subsequent to the work related to the work pointing information. CONSTITUTION:A work control system comprises a process evolution processing part 21 which evolves the received work pointing information into the pointing information on the work of each process, an evolved information control part 22 which stores the work pointing information on each process, a progress state control part 23 which detects the progress state of the work precedent the work related to the work pointing information, a load state control part 24 which detects the load state based on the starting state of the work subsequent to the work related to the work pointing information and the working capability of process of the work site 30 and a work pointing control part 25 which compares the work pointing information on each process with the progress state of the work precedent the work related to the work pointing information and the load state of the work subsequent to said work respectively and outputs the work pointing information on each process to the site 30 together with the priority. Thus such dynamic conditions are fed back and referred to for calculation of the priority of the work pointing information.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、複数の工程からなる作
業についての作業指示を受け付けて各工程毎の作業指示
に展開し作業優先度を付加して作業現場へ出力する作業
管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work management system which receives a work instruction for a work consisting of a plurality of processes, expands the work instruction for each process, adds a work priority, and outputs the work priority to a work site.

【0002】[0002]

【従来の技術】一般に、複数の工程からなる作業(例え
ば製造作業等)では、作業現場の各工程において一定期
間に実施すべき作業を指示し、作業実績を収集、管理す
る必要があるため、これらの作業指示、作業実績管理等
を行う作業管理システムが構築される。また、このよう
な作業管理システムにおいては、作業現場の効率的な運
営、さらに、工場もしくは企業組織全体としても効率的
な運営が実現されるよう支援することを強く要求され
る。したがって、作業管理システムは、係る要請に応え
るべく各工程毎の作業に優先度を付加した作業指示を作
業現場へ送る必要がある。
2. Description of the Related Art Generally, in a work consisting of a plurality of processes (such as a manufacturing work), it is necessary to instruct a work to be carried out in each process of a work site for a certain period of time, and collect and manage work results. A work management system for constructing these work instructions and work results management is constructed. Further, in such a work management system, it is strongly required to support efficient operation of the work site and also effective operation of the factory or the entire corporate organization. Therefore, the work management system needs to send a work instruction in which priority is added to the work of each process to the work site in order to meet the request.

【0003】従来、この種の作業管理システムは、作業
指示に付加する作業優先度を算定する手段として、工程
の納期が早い順番、工程のリードタイムが長い順番、最
終納期が早い順番、次工程の工程数が多い順番等、作業
指示立案時に把握できる条件(静的条件)を基準に作業
優先度を算定するものであった。
Conventionally, this type of work management system is a means for calculating the work priority to be added to a work instruction, in the order of the earliest delivery date of the process, the longest lead time of the process, the earliest of the last delivery date, and the next process. The work priority was calculated based on the conditions (static conditions) that can be grasped at the time of work instruction planning, such as the order in which the number of processes is large.

【0004】すなわち、従来の作業管理システムは、作
業優先度の算定基準として上述した静的条件のみを参酌
しており、実際の作業現場における作業の進度の変化、
例えば、所定の工程における所定の作業の前関係の作業
(当該所定の作業と同じ工程で行われ、かつ当該所定の
作業よりも先に行われている作業)の遅れ、後関係の作
業(当該所定の作業と同じ工程で行われ、かつ当該所定
の作業よりも先に行われている作業)の仕掛状態(着手
待ちの状態)あるいは負荷状況(当該作業を完了するた
めに必要な対応する工程の実施時間)といった条件(動
的条件)を参酌していなかった。
That is, the conventional work management system takes into consideration only the above-mentioned static condition as the calculation standard of the work priority, and changes in the progress of the work at the actual work site,
For example, a work related to a predetermined work in a predetermined process (a work performed in the same process as the predetermined work and performed before the predetermined work) is delayed, and a work related to the post work is concerned. Work in progress (waiting for start) or load status (corresponding process necessary to complete the work) that is performed in the same process as the predetermined work and is performed prior to the predetermined work The implementation time) was not taken into consideration.

【0005】また、従来の作業現場における実際の運用
としては、現場作業者および監督者が実行中の作業の前
後関係の作業進捗状況、作業仕掛状態、負荷状況を見回
り状況判断をくだした上で、すなわち、静的条件により
付けられた作業優先度に加えて、現場作業者および監督
者が動的条件を判断した上で作業優先度を修正すること
が行われていた。
Further, in the actual operation at the conventional work site, the site worker and the supervisor look at the work progress status, the work in progress status, and the load status in relation to the work being executed, and make a situation judgment. That is, in addition to the work priority assigned by the static condition, the work site worker and the supervisor have modified the work priority after determining the dynamic condition.

【0006】[0006]

【発明が解決しようとする課題】しかし、実際の製造現
場においては、様々な要因により作業の進度が当初の作
業予定よりも遅れたり、進み過ぎたりすることがある。
これに対し、上述したように従来の作業管理システムで
は、かかる作業の遅れや進み過ぎに対する対応が一切な
されていない。
However, in an actual manufacturing site, due to various factors, the progress of the work may be delayed or too advanced from the original work schedule.
On the other hand, as described above, the conventional work management system does not take any measures against the delay or excessive progress of the work.

【0007】そのため、実作業において作業管理システ
ムにより与えられた作業指示をもとに単純に作業順序を
確定すると、ある作業について、前関係の作業の進度が
作業予定よりも遅れており当該作業を着手できない状況
下にあるにも関わらず、当該作業の実施の段取りに着手
してしまう場合があり、無駄な工数を浪費するという欠
点があった。
Therefore, if the work order is simply decided based on the work instructions given by the work management system in the actual work, the progress of the work of the pre-relationship is delayed for the work and the work is Although there is a situation in which it is not possible to start work, there are cases where the work set-up for the work is started, and there is the disadvantage of wasting man-hours.

【0008】また、ある作業の後関係の作業の進度が作
業予定よりも遅れており仕掛状態となっている作業が多
数発生しているにも関わらず、当該作業の実施を継続す
ることにより、仕掛状態となる後関係の作業をさらに増
加させてしまう場合があり、作業効率の低下を招くとい
う欠点があった。
[0008] Further, even if a certain work is delayed in progress of the related work behind the work schedule and a large number of works in a work-in-progress are generated, by continuing the execution of the work, There is a case in which the work related to the work in progress may be further increased, resulting in a decrease in work efficiency.

【0009】本発明は、前記従来の欠点を解消し、作業
指示情報に係る作業の前関係にある作業の進捗状況、及
び後関係にある作業の負荷状況といった動的条件をフィ
ードバックして参照し、当該作業指示情報の優先度を算
出する作業管理システムを提供し、作業現場において効
率的な作業ができ、工場および企業組織全体としても効
率的な運営が実現されるようにすることを目的とする。
The present invention eliminates the above-mentioned conventional drawbacks and feeds back and refers to dynamic conditions such as a progress status of a work related to the work instruction information and a load status of the work related to the work instruction information. The purpose is to provide a work management system that calculates the priority of the work instruction information so that efficient work can be performed at the work site and efficient operation can be realized as a factory and the entire corporate organization. To do.

【0010】[0010]

【課題を解決するための手段】前記の目的を達成するた
め、本発明は、複数の工程からなる作業についての作業
指示情報を受け付けて各工程毎の作業指示情報に展開し
作業優先度を付加して作業現場へ出力する作業管理シス
テムにおいて、受け付けた作業指示情報を工程毎の作業
についての作業指示情報に展開する工程展開処理部と、
工程展開処理部が展開した工程毎の作業指示情報を格納
し蓄積する展開情報管理部と、前記作業現場から各工程
毎の作業の進捗状況を示す作業実績情報を入力し前記工
程展開処理部が展開した工程毎の作業指示情報を参照し
て各工程毎に該作業指示情報に係る作業の前関係の作業
の進捗状況を検出する進捗状況管理部と、前記工程展開
処理部が展開した作業指示情報と前記進捗状況管理部が
検出した工程毎の作業指示情報に係る作業の前関係の作
業の進捗状況とを比較して各工程毎の作業指示情報に優
先順位を付加して前記作業現場へ出力する作業指示管理
部とを備える構成としている。
In order to achieve the above object, the present invention accepts work instruction information about a work consisting of a plurality of steps, expands the work instruction information for each step, and adds a work priority. In the work management system that outputs the work instruction to the work site, a process development processing unit that develops the received work instruction information into work instruction information about the work of each process,
The development information management unit that stores and accumulates the work instruction information for each process developed by the process development processing unit, and the work result information indicating the progress status of the work for each process from the work site are input to the process development processing unit. A progress status management unit that refers to the work instruction information for each expanded process and detects the progress status of the work related to the work instruction information for each process, and the work instruction expanded by the process expansion processing unit The information is compared with the progress status of the work related to the work related to the work instruction information for each process detected by the progress management unit, and priority is added to the work instruction information for each process to the work site. A work instruction management unit for outputting is provided.

【0011】前記目的を達成する他の作業管理システム
では、受け付けた作業指示情報を工程毎の作業について
の作業指示情報に展開する工程展開処理部と、工程展開
処理部が展開した工程毎の作業指示情報を格納し蓄積す
る展開情報管理部と、前記作業現場から各工程毎の作業
の進捗状況を示す作業実績情報を入力し前記工程展開処
理部が展開した工程毎の作業指示情報を参照して各工程
毎に該作業指示情報に係る作業の後関係の作業の仕掛状
況及び作業現場における当該工程の稼働能力とからなる
負荷状況を検出する負荷状況管理部と、前記工程展開処
理部が展開した作業指示情報と前記負荷状況管理部が検
出した工程毎の作業指示情報に係る作業の後関係の作業
の負荷状況とを比較して各工程毎の作業指示情報に優先
順位を付加して前記作業現場へ出力する作業指示管理部
とを備える構成としている。
In another work management system that achieves the above-mentioned object, a process development processing unit that develops the received work instruction information into work instruction information about the work for each process, and the work for each process developed by the process development processing unit. A deployment information management unit that stores and accumulates instruction information and work record information indicating the progress status of the work for each process are input from the work site, and the work instruction information for each process developed by the process deployment processing unit is referred to. The load status management unit that detects the load status consisting of the work in progress status of the post-related work related to the work instruction information and the operating capacity of the process at the work site for each process, and the process expansion processing unit Before comparing the work instruction information for each process with the load condition of the related work after the work related to the work instruction information for each process detected by the load status management unit, and prioritizing the work instruction information for each process. It has a configuration and a work instruction management unit for outputting to the work site.

【0012】前記目的を達成する他の作業管理システム
では、受け付けた作業指示情報を工程毎の作業について
の作業指示情報に展開する工程展開処理部と、工程展開
処理部が展開した工程毎の作業指示情報を格納し蓄積す
る展開情報管理部と、前記作業現場から各工程毎の作業
の進捗状況を示す作業実績情報を入力し前記工程展開処
理部が展開した工程毎の作業指示情報を参照して各工程
毎に該作業指示情報に係る作業の前関係の作業の進捗状
況を検出する進捗状況管理部と、前記作業現場から各工
程毎の作業の進捗状況を示す作業実績情報を入力し前記
工程展開処理部が展開した工程毎の作業指示情報を参照
して各工程毎に該作業指示情報に係る作業の後関係の作
業の仕掛状況及び作業現場における当該工程の稼働能力
とからなる負荷状況を検出する負荷状況管理部と、前記
工程展開処理部が展開した作業指示情報と前記進捗状況
管理部が検出した工程毎の作業指示情報に係る作業の前
関係の作業の進捗状況及び前記負荷状況管理部が検出し
た工程毎の作業指示情報に係る作業の後関係の作業の負
荷状況とを比較して各工程毎の作業指示情報に優先順位
を付加して前記作業現場へ出力する作業指示管理部とを
備える構成としている。
In another work management system that achieves the above-mentioned object, a process development processing unit that develops the received work instruction information into work instruction information about the work for each process, and the work for each process developed by the process development processing unit. A deployment information management unit that stores and accumulates instruction information and work record information indicating the progress status of the work for each process are input from the work site, and the work instruction information for each process developed by the process deployment processing unit is referred to. The progress status management unit that detects the progress status of the work related to the work related to the work instruction information for each process, and the work record information indicating the progress status of the work for each process from the work site are input. With reference to the work instruction information for each process expanded by the process expansion processing unit, a load state including the work-in-progress status of the post-related work related to the work instruction information for each process and the operating capacity of the process at the work site The load status management unit that detects the work status, the work instruction information expanded by the process expansion processing unit, and the work progress status and the load status related to the work related to the work instruction information for each process detected by the progress status management unit. Work instruction management that compares the work load status of post-related work related to the work instruction information for each process detected by the management unit, adds priority to the work instruction information for each process, and outputs the work instruction information to the work site And a part.

【0013】また、他の態様では、前記進捗状況管理部
が、作業指示情報に係る作業の前関係の作業の進捗状況
を、当該作業の進度に応じて仕掛状態(未着手)、着
手、停滞、完了の別に分けて検出する構成としている。
Further, in another aspect, the progress status management unit indicates the progress status of the work related to the work instruction information in the in-progress state (not started), start, and stall according to the progress of the work. The detection is performed separately for each completion.

【0014】また、他の態様では、前記進捗状況管理部
が、作業指示情報に係る作業の前関係の作業の進捗状況
を、当該作業の進度に応じて未着手状態を0%、完了状
態を100%とする百分率で検出する構成としている。
Further, in another aspect, the progress status management unit indicates the progress status of the work related to the work instruction information as 0% for the unstarted status and the completed status for the work according to the progress of the work. The configuration is such that the percentage is 100%.

【0015】[0015]

【実施例】以下、本発明の実施例について図面を参照し
て説明する。図1は、本発明の一実施例に係る作業管理
システムの構成を示すブロック図である。図2は、作業
現場での作業の流れおよび作業指示の対応状態のイメー
ジ、各作業指示の関係、各工程の関係を示すブロック図
である。なお、本実施例では、管理すべき複数の工程か
らなる作業として製造作業行う場合を例として説明す
る。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing the configuration of a work management system according to an embodiment of the present invention. FIG. 2 is a block diagram showing an image of a work flow at a work site and a corresponding state of work instructions, a relationship between work instructions, and a relationship between processes. In addition, in this embodiment, a case where a manufacturing operation is performed as an operation including a plurality of processes to be managed will be described as an example.

【0016】図1に示すように、本実施例の作業管理シ
ステム20は、生産計画に基づいて計算し作成された製
造指示情報を製造指示管理システム10から受け取り、
当該生産指示情報を工程別に展開して各工程毎の作業指
示情報とし、各作業指示情報に作業優先度を付加して製
造現場30に渡す。工程毎の作業指示情報に付加される
作業優先度は、製造現場30から渡される作業実績情報
に基づき、所定の基準情報を参照して算定する。
As shown in FIG. 1, the work management system 20 of the present embodiment receives the manufacturing instruction information calculated and created based on the production plan from the manufacturing instruction management system 10,
The production instruction information is developed for each process to obtain work instruction information for each process, the work priority is added to each work instruction information, and the work instruction information is passed to the manufacturing site 30. The work priority added to the work instruction information for each process is calculated based on the work record information passed from the manufacturing site 30 with reference to predetermined reference information.

【0017】製造現場30は、作業管理システムから入
力した作業優先度の付加された作業指示情報にしたがっ
て作業を各工程毎に実施し、その結果及び進度を作業実
績情報として所定の形式で作業管理システム20に渡
す。
The manufacturing site 30 carries out the work for each process according to the work instruction information added with the work priority inputted from the work management system, and manages the result and the progress as work record information in a predetermined format. Pass to system 20.

【0018】図示のように、作業管理システム20は、
製造管理システム10から受け付けた製造指示情報を工
程毎の作業についての作業指示情報に展開する工程展開
処理部21と、工程展開処理部21が展開した工程毎の
作業指示情報を格納し蓄積する展開情報管理部22と、
当該作業指示情報に係る作業の前関係の作業の進捗状況
を検出する進捗状況管理部23と、当該作業指示情報に
係る作業の後関係の作業の負荷状況を検出する負荷状況
管理部24と、各工程毎の作業指示情報に優先順位を付
加して作業現場30へ出力する作業指示管理部25とを
備える。また、作業管理システム20は、図示しない記
憶部を有し、製造指示情報の展開及び作業優先度の算定
に必要な基準情報として、工程系列基準情報26、工程
能力基準情報27、作業負荷基準情報28を格納してあ
る。
As shown, the work management system 20 is
A process expansion processing unit 21 that expands the manufacturing instruction information received from the manufacturing management system 10 into the work instruction information for the work for each process, and the expansion that stores and accumulates the work instruction information for each process expanded by the process expansion processing unit 21. An information management unit 22,
A progress status management unit 23 that detects a progress status of a pre-work related work related to the work instruction information, a load status management unit 24 that detects a load status of a post-related work related to the work instruction information, A work instruction management unit 25 that adds a priority to the work instruction information for each process and outputs the work instruction information to the work site 30. Further, the work management system 20 has a storage unit (not shown), and as the reference information necessary for developing the manufacturing instruction information and calculating the work priority, the process sequence reference information 26, the process capability reference information 27, the work load reference information. 28 is stored.

【0019】ここで、工程系列基準情報26としては、
製造指示情報によって指示される製造作業を実施するた
めに必要な工程及びその順番を、各製造作業毎に格納し
てある。工程能力基準情報27としては、作業現場30
における各工程の稼働能力を工程毎に格納してある。作
業負荷基準情報28としては、工程毎に展開された作業
指示情報によって指示される作業ついての仕掛状況、す
なわち、当該作業を完了するために必要な当該工程の実
施時間を作業毎に格納してある。
Here, as the process sequence reference information 26,
The steps necessary for performing the manufacturing work instructed by the manufacturing instruction information and the order thereof are stored for each manufacturing work. As the process capability standard information 27, the work site 30
The operating capacity of each process is stored for each process. The work load standard information 28 stores, for each work, the in-process status of the work instructed by the work instruction information developed for each process, that is, the execution time of the process required to complete the work. is there.

【0020】工程展開処理部21は、製造管理システム
10から受け付けた製造指示情報を工程毎の作業につい
ての作業指示情報に展開し、すべての作業指示情報を展
開情報管理部22と進捗状況管理部23と、負荷状況管
理部24とに送る。
The process expansion processing unit 21 expands the manufacturing instruction information received from the manufacturing management system 10 into the work instruction information about the work for each process, and all the work instruction information is expanded information management unit 22 and progress status management unit. 23 and the load status management unit 24.

【0021】展開情報管理部22は、工程展開処理部2
1が展開した工程毎の作業指示情報を蓄積して、作業指
示管理部25の要求に応じて必要な作業指示情報を送
る。
The development information management unit 22 includes a process development processing unit 2
1 accumulates work instruction information for each process, and sends necessary work instruction information in response to a request from the work instruction management unit 25.

【0022】進捗状況管理部23は、作業指示情報に当
該作業の作業現場30における実施状態を示すステータ
スを付加し、これを適宜更新することにより各作業の進
捗状況を管理する。作業指示情報のステータスは、当該
作業の進度に応じて「仕掛状態」、「着手」、「停
滞」、「完了」の各段階からなる。進捗状況管理部23
は、製造現場30から各工程毎の作業の進捗状況を示す
作業実績情報を入力し、工程展開処理部21から工程毎
に展開した作業指示情報を入力して比較し、各作業指示
情報の進捗状況を示すステイタスを当該作業についての
作業実績情報の内容に応じて「着手」、「停滞」、「完
了」とする。そして、ステイタスが「完了」となった作
業指示情報に係る作業の後関係の作業についての作業指
示情報のステイタスを「仕掛状態」とする。
The progress management unit 23 manages the progress of each work by adding to the work instruction information a status indicating the implementation state of the work at the work site 30 and updating it appropriately. The status of the work instruction information includes each stage of “work in progress”, “start”, “stagnation”, and “completion” according to the progress of the work. Progress management unit 23
Is input from the manufacturing site 30 the work result information indicating the progress of the work for each process, the work instruction information expanded for each process is input from the process development processing unit 21 and compared, and the progress of each work instruction information is input. The status indicating the status is set to “start”, “stagnation”, or “completion” according to the content of the work result information about the work. Then, the status of the work instruction information regarding the work related to the work related to the work instruction information whose status is “completed” is set to “work in progress”.

【0023】負荷状況管理部24は、製造現場30から
各工程毎の作業の進捗状況を示す作業実績情報を入力
し、工程展開処理部21から工程毎に展開した作業指示
情報を入力して比較し、作業指示情報のステイタスが
「仕掛状態」、「着手」、「停滞」であるものを抽出す
る。そして、作業負荷基準情報28を参照して、抽出し
た各作業指示情報に係る作業についての仕掛状況を算定
し、各工程毎の仕掛状況(当該工程を要する作業をすべ
て完了するために必要な当該工程の実施時間)を加算す
る。また、工程能力基準情報27を参照して、各工程の
仕掛状況と作業現場30における当該工程の稼働能力と
を比較し、各工程毎の負荷状況(当該工程を要する作業
をすべて完了するために必要な各工程の稼働時間)を算
定する。
The load status management unit 24 inputs work record information indicating the progress status of work for each process from the manufacturing site 30, and inputs work instruction information expanded for each process from the process expansion processing unit 21 for comparison. Then, the work instruction information whose status is “work in progress”, “start”, and “stagnation” is extracted. Then, with reference to the work load standard information 28, the work in progress status of the work related to each extracted work instruction information is calculated, and the work in progress status of each process (the work necessary for completing all the work requiring the process is calculated). Process implementation time). Further, with reference to the process capability reference information 27, the in-process status of each process is compared with the operating capacity of the process at the work site 30, and the load status of each process (in order to complete all the work requiring the process) Calculate the required operating time of each process).

【0024】作業指示管理部25は、工程展開処理部2
1及び展開情報管理部22から送られた工程毎の作業指
示情報と、進捗状況管理部23から送られた当該作業指
示情報に係る作業の前関係の作業の進捗状況及び負荷状
況管理部24から送られた当該作業指示情報に係る作業
の後関係の作業の負荷状況とを比較し、あらかじめ定め
た所定の規則にしたがって各作業指示情報に作業優先度
を付加する。作業優先度を付加するための規則は、生産
計画や製造指示情報、作業現場30における稼働能力等
に基づいて適宜定め得る。
The work instruction management unit 25 includes the process development processing unit 2
1 and the work instruction information for each process sent from the deployment information management unit 22 and the work progress status and the work load status management unit 24 of the pre-work related to the work instruction information sent from the progress management unit 23. The work related to the sent work instruction information is compared with the load status of the related work, and the work priority is added to each work instruction information according to a predetermined rule. The rule for adding the work priority can be appropriately determined based on the production plan, the manufacturing instruction information, the operating capacity at the work site 30, and the like.

【0025】次に、本実施例の処理動作について図3乃
至図6のフローチャートを参照して説明する。図3は工
程展開処理部21の動作を、図4は進捗状況管理部23
の動作を、図5は負荷状況管理部24の動作を、図6は
作業指示管理部25の動作を示す図である。
Next, the processing operation of this embodiment will be described with reference to the flow charts of FIGS. 3 shows the operation of the process development processing section 21, and FIG. 4 shows the progress status management section 23.
5 is an operation of the load status management unit 24, and FIG. 6 is an operation of the work instruction management unit 25.

【0026】工程展開処理部21は、図3に示すよう
に、製造指示管理システムから製造指示情報を受け取る
と、工程系列基準情報26を参照して、受け取った製造
指示情報を工程毎に展開し、工程別の作業指示情報を作
成する(すてっぷ301)。そして、作成した作業指示
情報を展開情報管理部22に格納すると共に(ステップ
302)、進捗状況管理部23及び作業指示管理部25
に渡す(ステップ303、304)。
As shown in FIG. 3, when the process development processing section 21 receives manufacturing instruction information from the manufacturing instruction management system, it refers to the process sequence reference information 26 and develops the received manufacturing instruction information for each process. , Create work instruction information for each process (step 301). Then, the created work instruction information is stored in the development information management unit 22 (step 302), and the progress status management unit 23 and the work instruction management unit 25 are stored.
(Steps 303 and 304).

【0027】進捗状況管理部23は、図4に示すよう
に、工程展開処理部21から工程別の作業指示情報を受
け取ると、製造現場30から受け取る作業実績情報のう
ち当該作業指示情報に係る作業についての情報を抽出
し、かかる作業実績情報が示す作業進度に応じて当該作
業指示情報のステイタスを適宜更新する(すてっぷ40
1)。次に、特定の作業指示情報についてステイタスが
「完了」となった場合(ステップ402)、進捗状況管
理部23は、展開情報管理部22から当該作業指示情報
に係る作業の後関係の作業についての作業指示情報を検
索する(ステップ403)。そして、検索した作業指示
情報のステイタスを「仕掛状態」として前記と同様に管
理し、そのステイタスを適宜更新する(ステップ40
4)。
As shown in FIG. 4, when the progress management unit 23 receives the work instruction information for each process from the process development processing unit 21, the work related to the work instruction information in the work record information received from the manufacturing site 30. Is extracted, and the status of the work instruction information is appropriately updated according to the work progress indicated by the work performance information (step 40).
1). Next, when the status of the specific work instruction information is “completed” (step 402), the progress management unit 23 determines from the development information management unit 22 about the post-related work related to the work instruction information. The work instruction information is searched (step 403). Then, the status of the retrieved work instruction information is managed as a “work-in-progress state” in the same manner as described above, and the status is updated appropriately (step 40).
4).

【0028】負荷状況管理部24は、図5に示すよう
に、まず進捗状況管理部23が管理する作業指示情報の
うち、ステイタスが「仕掛状態」、「着手」、「停滞」
のいずれかであるものを抽出する(ステップ501)。
そして、作業負荷基準情報28を参照し、抽出した個々
の作業指示情報についてその仕掛状況を算定し、各工程
毎に仕掛情報を加算する(ステップ502)。これによ
って、当該工程をすべて完了するために必要な当該工程
の実施時間が算出される。次に、負荷状況管理部24
は、工程能力基準情報27を参照し(ステップ50
3)、仕掛状況が算定された各工程の負荷状況を算定す
る(すてっぷ504)。
As shown in FIG. 5, the load status management unit 24 firstly, in the work instruction information managed by the progress status management unit 23, the status is "work in progress", "start", "stagnation".
One of the two is extracted (step 501).
Then, referring to the work load standard information 28, the in-process status is calculated for each of the extracted work instruction information, and the in-process information is added for each process (step 502). By this, the execution time of the process required to complete all the process is calculated. Next, the load status management unit 24
Refers to the process capability reference information 27 (step 50
3) The load status of each process for which the in-process status is calculated is calculated (step 504).

【0029】作業指示管理部25は、図6に示すよう
に、工程展開処理部21から工程別の作業指示情報を受
け取ると、これを各工程毎にソートする(ステップ60
1)。そして、展開情報管理部22から、当該作業指示
情報に係る作業の前関係の作業及び後関係の作業の作業
情報を検索する(ステップ602、603)。次に、作
業指示管理部25は、進捗状況管理部23から当該作業
指示情報に係る作業の前関係の作業の進捗状況を検索す
る(ステップ604)。また、負荷状況管理部24から
当該作業指示情報に係る作業の後関係の作業の負荷状況
を検索する(ステップ605)。最後に、これらの進捗
状況及び負荷状況を考慮して所定の規則にしたがって作
業指示情報毎に優先度を算定し、算定した優先度を作業
指示情報に付加して作業指示情報を作業現場30に渡
す。
As shown in FIG. 6, when the work instruction management unit 25 receives the work instruction information for each process from the process development processing unit 21, the work instruction management unit 25 sorts the work instruction information for each process (step 60).
1). Then, the development information management unit 22 retrieves the work information of the pre-related work and the post-related work of the work related to the work instruction information (steps 602 and 603). Next, the work instruction management unit 25 searches the progress management unit 23 for the progress status of the work related to the work instruction information (step 604). Further, the load status management unit 24 retrieves the load status of the post-related work related to the work instruction information (step 605). Finally, considering the progress status and load status, the priority is calculated for each work instruction information according to a predetermined rule, the calculated priority is added to the work instruction information, and the work instruction information is sent to the work site 30. hand over.

【0030】以上のようにして、工程別に展開され優先
度を付加された作業指示情報が作業現場30に渡される
こととなる。かかる作業実施情報に付加された優先度
は、上述したように、当該作業実施情報に係る作業の前
関係の作業の進捗状況、及び後関係の作業の負荷状況と
いった動的条件を考慮して算定されているため、作業現
場30において作業が様々な理由により作業予定より遅
れたり進み過ぎたりした場合でも、かかる状況を作業管
理システム20にフィードバックし、作業指示情報に付
加する優先度に反映させることができる。
As described above, the work instruction information, which has been expanded according to the process and added with the priority, is delivered to the work site 30. As described above, the priority added to the work performance information is calculated in consideration of dynamic conditions such as the progress status of the work related to the work related to the work performance information and the load status of the work related to the post work. Therefore, even if the work at the work site 30 is delayed or too advanced from the work schedule due to various reasons, the situation is fed back to the work management system 20 and reflected in the priority added to the work instruction information. You can

【0031】以上好ましい実施例をあげて本発明を説明
したが、本発明は必ずしも前記実施例に限定されるもの
ではない。例えば、本実施例では、進捗状況管理部23
が各作業の進捗状況を管理するために作業指示情報に付
加するステイタスを当該作業の進度に応じて「仕掛状
態」、「着手」、「停滞」、「完了」の4段階で表現し
たが、かかる表現の変わりに、当該作業の進度に応じて
未着手状態を0%、完了状態を100%とする百分率で
表現するようにしてもよい。この場合、進捗状況管理部
23は、作業情報のステータスが100%に至るまで当
該作業の進度に応じて順次ステータスを更新することと
なり、ある作業指示情報についてステータスが100%
に至った場合に、当該作業の後関係の作業についての作
業指示情報のステータスを0%として新たに管理する。
また、負荷状況管理部24は、ステータスが100%未
満の作業指示情報を抽出して負荷状況を算定する。
Although the present invention has been described with reference to the preferred embodiments, the present invention is not necessarily limited to the above embodiments. For example, in this embodiment, the progress management unit 23
The status added to the work instruction information for managing the progress of each work is expressed in four stages of “work in progress”, “start”, “stagnation”, and “completion” according to the progress of the work. Instead of such an expression, it may be expressed as a percentage in which the unstarted state is 0% and the completed state is 100% according to the progress of the work. In this case, the progress management unit 23 sequentially updates the status according to the progress of the work until the status of the work information reaches 100%, and the status of certain work instruction information is 100%.
In case of, the status of the work instruction information regarding the post-related work concerned is newly managed as 0%.
The load status management unit 24 also extracts work instruction information whose status is less than 100% to calculate the load status.

【0032】また、作業指示管理部25は、作業指示情
報の優先度を算定する際、かならずしも当該作業指示情
報に係る作業の前関係の作業の進捗状況及び後関係の作
業の負荷状況の両方を考慮しなくてもよい。すなわち、
当該作業指示情報に係る作業の前関係の作業の進捗状況
又は後関係の作業の負荷状況のいずれかを考慮して作業
指示情報の優先度を算定することができる。この場合で
あっても、いずれの動的条件も考慮せずに作業情報の優
先度を決定していた従来の場合に比べ、実際の作業現場
30における作業の進度を十分に反映させることができ
る。
Further, when calculating the priority of the work instruction information, the work instruction management unit 25 always checks both the progress status of the pre-related work and the load status of the post-related work related to the work instruction information. You don't have to consider it. That is,
The priority of the work instruction information can be calculated in consideration of either the progress status of the work related to the work related to the work instruction information or the load status of the related work. Even in this case, the progress of the work at the actual work site 30 can be sufficiently reflected as compared with the conventional case in which the priority of work information is determined without considering any dynamic condition. .

【0033】なお、本実施例では、作業管理システム2
0が管理する複数の工程からなる作業として製造作業を
例として説明したが、その他の複数の工程からなる作業
についても同様に本発明を利用することができるのは言
うまでもない。
In this embodiment, the work management system 2
Although the manufacturing work has been described as an example of the work consisting of a plurality of processes managed by 0, it goes without saying that the present invention can be similarly applied to the work consisting of a plurality of other processes.

【0034】[0034]

【発明の効果】以上説明したように、本発明によれば、
動的条件である作業指示情報に係る作業の前関係にある
作業の進捗状況をフィードバックして参照し、作業指示
情報の優先度の算定に反映させることができる。このた
め、ある作業について、前関係の作業の進度が作業予定
よりも遅れており当該作業を着手できない状況下にある
場合には、当該作業の実施の段取りに着手せず、無駄な
工数を浪費する事態を回避することができる。したがっ
て、作業現場において効率的な作業ができ、工場および
企業組織全体としても効率的な運営の実現を図ることが
できるという効果がある。
As described above, according to the present invention,
It is possible to feed back and refer to the progress status of the work in the pre-relationship of the work related to the work instruction information, which is a dynamic condition, and refer to it to reflect it in the calculation of the priority of the work instruction information. For this reason, when the progress of the pre-related work is behind the scheduled work and the work cannot be started, the setup of the work is not started and wasteful man-hours are wasted. It is possible to avoid the situation. Therefore, there is an effect that efficient work can be performed on the work site, and efficient operation can be achieved as a whole of the factory and the corporate organization.

【0035】また、本発明に係る他の作業管理システム
によれば、動的条件である作業指示情報に係る作業の後
関係にある作業の負荷状況をフィードバックして参照
し、作業指示情報の行鮮度の算定に反映させることがで
きる。このため、ある作業の後関係の作業の進度が作業
予定よりも遅れており仕掛状態となっている作業が多数
発生している場合には、当該作業の実施を中断し、他の
作業を優先させることによって、仕掛状態となる後関係
の作業を減少させることができる。したがって、作業現
場において効率的な作業ができ、工場および企業組織全
体としても効率的な運営の実現を図ることができるとい
う効果がある。
Further, according to another work management system of the present invention, the load status of the work related to the work related to the work instruction information which is a dynamic condition is fed back and referred to, and the line of the work instruction information is displayed. It can be reflected in the calculation of freshness. Therefore, when the progress of related work after a certain work is behind the work schedule and there are many work in progress, the execution of the work is interrupted and the other work is given priority. By doing so, it is possible to reduce the work related to the post-working state. Therefore, there is an effect that efficient work can be performed on the work site, and efficient operation can be achieved as a whole of the factory and the corporate organization.

【0036】さらに、本発明の他の作業管理システムに
よれば、動的条件である作業指示情報に係る作業の前関
係にある作業の進捗状況及び後関係にある作業の負荷状
況の両方をフィードバックして参照し、作業指示情報の
優先度の算定に反映させることができる。このため、作
業現場においてより一層効率的な作業ができ、工場およ
び企業組織全体としてもさらに効率的な運営の実現を図
ることができるという効果がある。
Further, according to another work management system of the present invention, both the progress status of the work in the pre-relationship and the load status of the work in the post-relationship related to the work instruction information which is the dynamic condition are fed back. Can be referred to and reflected in the calculation of the priority of the work instruction information. Therefore, there is an effect that more efficient work can be performed on the work site, and more efficient operation can be realized as a factory and a corporate organization as a whole.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施例に係る作業管理システムの
構成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of a work management system according to an embodiment of the present invention.

【図2】 作業現場での作業の流れおよび作業指示の対
応状態のイメージ、各作業指示の関係、各工程の関係を
示すブロック図である。
FIG. 2 is a block diagram showing an image of a work flow at a work site and a corresponding state of work instructions, a relationship between work instructions, and a relationship between processes.

【図3】 図1の工程展開処理部の動作を示すフローチ
ャートである。
FIG. 3 is a flowchart showing an operation of a process development processing unit in FIG.

【図4】 図1の進捗状況管理部の動作を示すフローチ
ャートである。
FIG. 4 is a flowchart showing an operation of a progress status management unit of FIG.

【図5】 図1の負荷状況管理部の動作を示すフローチ
ャートである。
5 is a flowchart showing the operation of the load status management unit of FIG.

【図6】 図1の作業指示管理部の動作を示すフローチ
ャートである。
FIG. 6 is a flowchart showing the operation of the work instruction management unit in FIG.

【符号の説明】[Explanation of symbols]

10 製造指示管理システム 20 作業指示管理システム 21 工程展開処理部 22 展開情報管理部 23 進捗状況管理部 24 負荷状況管理部 25 作業指示管理部 30 製造現場 10 Manufacturing Instruction Management System 20 Work Instruction Management System 21 Process Development Processing Section 22 Deployment Information Management Section 23 Progress Status Management Section 24 Load Status Management Section 25 Work Instruction Management Section 30 Manufacturing Site

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 複数の工程からなる作業についての作業
指示情報を受け付けて各工程毎の作業指示情報に展開し
作業優先度を付加して作業現場へ出力する作業管理シス
テムにおいて、 受け付けた作業指示情報を工程毎の作業についての作業
指示情報に展開する工程展開処理部と、 工程展開処理部が展開した工程毎の作業指示情報を格納
し蓄積する展開情報管理部と、 前記作業現場から各工程毎の作業の進捗状況を示す作業
実績情報を入力し前記工程展開処理部が展開した工程毎
の作業指示情報を参照して各工程毎に該作業指示情報に
係る作業の前関係の作業の進捗状況を検出する進捗状況
管理部と、 前記工程展開処理部が展開した作業指示情報と前記進捗
状況管理部が検出した工程毎の作業指示情報に係る作業
の前関係の作業の進捗状況とを比較して各工程毎の作業
指示情報に優先順位を付加して前記作業現場へ出力する
作業指示管理部とを備えることを特徴とする作業管理シ
ステム。
1. A work management system that receives work instruction information about a work consisting of a plurality of processes, expands the work instruction information for each process, adds a work priority and outputs the work instruction to a work site. A process development processing unit that develops information into work instruction information about work for each process, a development information management unit that stores and accumulates work instruction information for each process developed by the process development processing unit, and each process from the work site The work result information indicating the progress status of each work is input, and the work instruction information for each process expanded by the process expansion processing unit is referred to, and the progress of the work related to the work related to the work instruction information is performed for each process. A progress management unit that detects a situation, work instruction information developed by the process development processing unit, and a progress state of a work related to the work related to the work instruction information for each process detected by the progress management unit, Work management systems; and a work instruction management unit compared with the work instruction information for each process by adding a priority to output to the work site.
【請求項2】 複数の工程からなる作業についての作業
指示情報を受け付けて各工程毎の作業指示情報に展開し
作業優先度を付加して作業現場へ出力する作業管理シス
テムにおいて、 受け付けた作業指示情報を工程毎の作業についての作業
指示情報に展開する工程展開処理部と、 工程展開処理部が展開した工程毎の作業指示情報を格納
し蓄積する展開情報管理部と、 前記作業現場から各工程毎の作業の進捗状況を示す作業
実績情報を入力し前記工程展開処理部が展開した工程毎
の作業指示情報を参照して各工程毎に該作業指示情報に
係る作業の後関係の作業の仕掛状況及び作業現場におけ
る当該工程の稼働能力とからなる負荷状況を検出する負
荷状況管理部と、 前記工程展開処理部が展開した作業指示情報と前記負荷
状況管理部が検出した工程毎の作業指示情報に係る作業
の後関係の作業の負荷状況とを比較して各工程毎の作業
指示情報に優先順位を付加して前記作業現場へ出力する
作業指示管理部とを備えることを特徴とする作業管理シ
ステム。
2. A received work instruction in a work management system that receives work instruction information about a work consisting of a plurality of processes, expands the work instruction information for each process, adds a work priority, and outputs to the work site. A process development processing unit that develops information into work instruction information about work for each process, a development information management unit that stores and accumulates work instruction information for each process developed by the process development processing unit, and each process from the work site Work record information indicating the progress status of each work is input, and the work instruction information for each process expanded by the process expansion processing unit is referred to, and the work related work after the work related to the work instruction information is processed for each process. The load status management unit that detects the load status consisting of the status and the operating capacity of the process at the work site, the work instruction information developed by the process development processing unit, and the load status management unit And a work instruction management unit that compares the work related to the work instruction information for each process with the load status of the related work and adds a priority to the work instruction information for each process and outputs the work instruction information to the work site. Work management system characterized by.
【請求項3】 数の工程からなる作業についての作業指
示情報を受け付けて各工程毎の作業指示情報に展開し作
業優先度を付加して作業現場へ出力する作業管理システ
ムにおいて、 受け付けた作業指示情報を工程毎の作業についての作業
指示情報に展開する工程展開処理部と、 工程展開処理部が展開した工程毎の作業指示情報を格納
し蓄積する展開情報管理部と、 前記作業現場から各工程毎の作業の進捗状況を示す作業
実績情報を入力し前記工程展開処理部が展開した工程毎
の作業指示情報を参照して各工程毎に該作業指示情報に
係る作業の前関係の作業の進捗状況を検出する進捗状況
管理部と、 前記作業現場から各工程毎の作業の進捗状況を示す作業
実績情報を入力し前記工程展開処理部が展開した工程毎
の作業指示情報を参照して各工程毎に該作業指示情報に
係る作業の後関係の作業の仕掛状況及び作業現場におけ
る当該工程の稼働能力とからなる負荷状況を検出する負
荷状況管理部と、 前記工程展開処理部が展開した作業指示情報と前記進捗
状況管理部が検出した工程毎の作業指示情報に係る作業
の前関係の作業の進捗状況及び前記負荷状況管理部が検
出した工程毎の作業指示情報に係る作業の後関係の作業
の負荷状況とを比較して各工程毎の作業指示情報に優先
順位を付加して前記作業現場へ出力する作業指示管理部
とを備えることを特徴とする作業管理システム。
3. A work management system that receives work instruction information about a work consisting of several steps, expands the work instruction information for each step, adds a work priority and outputs the work instruction to a work site. A process development processing unit that develops information into work instruction information about work for each process, a development information management unit that stores and accumulates work instruction information for each process developed by the process development processing unit, and each process from the work site The work result information indicating the progress status of each work is input, and the work instruction information for each process expanded by the process expansion processing unit is referred to, and the progress of the work related to the work related to the work instruction information is performed for each process. A progress status management unit that detects the status and work record information indicating the progress status of the work for each process are input from the work site, and the work instruction information for each process expanded by the process expansion processing unit is referred to for each process. A load status management unit that detects a load status consisting of a work-in-progress status of related work and the operating capacity of the process at the work site for each work related to the work instruction information, and a work instruction expanded by the process expansion processing unit Information and work related status before work related to work instruction information for each process detected by the progress management unit and work related status after work related to work instruction information for each process detected by the load status management unit The work management system further includes a work instruction management unit that compares the load status of the work instruction information with the work instruction information for each process and outputs the work instruction information to the work site.
【請求項4】 前記進捗状況管理部が、作業指示情報に
係る作業の前関係の作業の進捗状況を、当該作業の進度
に応じて仕掛状態(未着手)、着手、停滞、完了の別に
分けて検出することを特徴とする請求工1又は3に記載
の作業管理システム。
4. The progress status management unit divides the progress status of a work related to the work related to the work instruction information into work-in-progress (not started), start, stall, and completion according to the progress of the work. The work management system according to claim 1 or 3, characterized in that
【請求項5】 前記進捗状況管理部が、作業指示情報に
係る作業の前関係の作業の進捗状況を、当該作業の進度
に応じて未着手状態を0%、完了状態を100%とする
百分率で検出することを特徴とする請求項1又は3に記
載の作業管理システム。
5. The percentage of the progress status of the work related to the work related to the work instruction information, wherein the progress status of the work is 0% in the unstarted state and 100% in the completed state according to the progress of the work. The work management system according to claim 1 or 3, characterized in that
JP34375493A 1993-12-15 1993-12-15 Work management system Expired - Lifetime JP3012448B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34375493A JP3012448B2 (en) 1993-12-15 1993-12-15 Work management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34375493A JP3012448B2 (en) 1993-12-15 1993-12-15 Work management system

Publications (2)

Publication Number Publication Date
JPH07168881A true JPH07168881A (en) 1995-07-04
JP3012448B2 JP3012448B2 (en) 2000-02-21

Family

ID=18363985

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34375493A Expired - Lifetime JP3012448B2 (en) 1993-12-15 1993-12-15 Work management system

Country Status (1)

Country Link
JP (1) JP3012448B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6317725B1 (en) 1998-02-16 2001-11-13 Nec Corporation Production management system
JP2008135054A (en) * 2001-05-10 2008-06-12 Hitachi Ltd Workflow managing method, and its execution system
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6083858B2 (en) * 2012-01-06 2017-02-22 株式会社ナノテム Film peeling device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04270459A (en) * 1991-01-21 1992-09-25 Nec Corp Production controller
JPH0512300A (en) * 1990-12-18 1993-01-22 Nec Yamaguchi Ltd Result display method for semiconductor equipment production

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0512300A (en) * 1990-12-18 1993-01-22 Nec Yamaguchi Ltd Result display method for semiconductor equipment production
JPH04270459A (en) * 1991-01-21 1992-09-25 Nec Corp Production controller

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6317725B1 (en) 1998-02-16 2001-11-13 Nec Corporation Production management system
JP2008135054A (en) * 2001-05-10 2008-06-12 Hitachi Ltd Workflow managing method, and its execution system
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method

Also Published As

Publication number Publication date
JP3012448B2 (en) 2000-02-21

Similar Documents

Publication Publication Date Title
JPH09153090A (en) Method and device for forming working process production plan
US6349320B1 (en) Computer executable workflow management and control system
JPS59214964A (en) Conversational scheduling system
JPH07168881A (en) Work control system
US6917843B2 (en) System and method for scheduling production of molds
JPH10507289A (en) Method and apparatus for controlling an electric discharge machine
CN113609563B (en) Template building method, system, equipment and storage medium based on BIM technology
JPH11156679A (en) Production scheduling device and recording medium recording production scheduling program
JPH10135096A (en) Scheduling method in semiconductor manufacture
JP2003241819A (en) Production progress management system, production progress management method, and production progress management program
JP2921991B2 (en) Unmanned operation scheduling system
JP2005092896A (en) Workflow system, and work segmentation method in workflow system
JPS61136161A (en) Working process planning systsem for individual production
JPH06332909A (en) Plan managing system
JP2000148451A (en) Batch job load decentralization method and system therefor
JPH036535B2 (en)
JPH11282923A (en) Circulation type production process schedule planning method
JP2847990B2 (en) Business process execution control system
JPH05108116A (en) Process control device
JP2953223B2 (en) Scheduling planning equipment
JPH08147366A (en) Production planning device
JPH10263995A (en) Production scheduling system
JPH0778208A (en) Production control system
JPH05108138A (en) Producing plan preparing device
JP2002175353A (en) Operation plan planning method and operation plan planning device using the method

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19970506