JP2001233300A - Operation plan making system and method of artificial satellite - Google Patents

Operation plan making system and method of artificial satellite

Info

Publication number
JP2001233300A
JP2001233300A JP2000049307A JP2000049307A JP2001233300A JP 2001233300 A JP2001233300 A JP 2001233300A JP 2000049307 A JP2000049307 A JP 2000049307A JP 2000049307 A JP2000049307 A JP 2000049307A JP 2001233300 A JP2001233300 A JP 2001233300A
Authority
JP
Japan
Prior art keywords
operation plan
plan
evaluation
request
requests
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000049307A
Other languages
Japanese (ja)
Inventor
Isao Aoyama
功 青山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2000049307A priority Critical patent/JP2001233300A/en
Publication of JP2001233300A publication Critical patent/JP2001233300A/en
Pending legal-status Critical Current

Links

Landscapes

  • Radio Relay Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve a problem of increasing the number of operation demands reserved when competition of the mutual operation demands is caused in large numbers in a cenventional plan making method. SOLUTION: This operation plan making system is provided with an operation plan making means 6 for making a new operation plan on the basis of operation plans obtained by plan making processing of the last time, an operation plan evaluating means 7 for determining an evaluation value of the new operation plan, an operation plan holding means 8 for holding plural operation plans, an operation plan selecting means 9 for renewing the operation plan holding means by selecting the operation plans by the decided number on the basis of evaluation values of the respective operation plans from the operation plan holding means and an operation plan selecting means 10 for selecting the operation plans being the basis in the next plan making processing from the operation plan holding means. The new operation plan is repeatedly made and selected, and when there is no change in the reserving number of operation demands, an evaluation reference of the operation plans is changed so as to reduce a difference between evaluation points imparted in respective orders of precedence such as an operation day to thus automatically make the operation plans for minimizing the number of reserving operation demands.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、人工衛星の追跡
管制において、人工衛星の運用計画を自動立案する運用
計画の立案システムおよび立案方法に係り、特に、保留
される運用要求の数が最小となる運用計画を自動立案
し、保留された運用要求の見直し回数や、運用計画の立
案に要する時間を効果的に削減することができる人工衛
星の運用計画立案システム及び方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an operation planning system and method for automatically planning an operation plan of an artificial satellite in tracking control of the artificial satellite. The present invention relates to an artificial satellite operation plan planning system and method capable of automatically drafting an operation plan, and effectively reducing the number of times of pending operation requests and the time required for operation plan drafting.

【0002】[0002]

【従来の技術】人工衛星の追跡管制における運用計画と
は、各人工衛星運用者から出される運用要求に基づき、
各人工衛星が利用する地上局(運用局)と、その日時
(運用日および運用開始時刻)を示すものである。
2. Description of the Related Art An operation plan in tracking control of an artificial satellite is based on an operation request issued from each artificial satellite operator.
It shows the ground station (operation station) used by each artificial satellite and the date and time (operation day and operation start time).

【0003】この運用要求では、人工衛星が希望する運
用日、運用開始時刻、運用局がそれぞれ優先順位が付け
られて1つ以上指定される。運用計画を立案する際に
は、各人工衛星に対してできるだけ運用要求における優
先順位の高い運用日、運用開始時刻、運用局を割り当て
ることが望ましい。
[0003] In this operation request, one or more operation dates, operation start times, and operation stations desired by the artificial satellite are assigned priorities and specified. When drafting an operation plan, it is desirable to assign an operation date, operation start time, and operation station having the highest priority in operation requests to each satellite.

【0004】従来の立案方法は、各人工衛星に優先順位
を付け、優先順位の高い人工衛星から順番に運用日、運
用開始時刻、運用局を割り当てて行くというものであ
る。運用日、運用開始時刻、運用局の割り当て方法は、
既に運用日、運用開始時刻、運用局が割り当てられてい
る人工衛星と重複せず、且つ、最も優先順位が高い運用
日、運用開始時刻、運用局を割り当てるというものであ
る。
In the conventional planning method, priorities are assigned to artificial satellites, and an operation date, an operation start time, and an operation station are assigned in order from the artificial satellite having the highest priority. The operation day, operation start time, and operation station assignment method
The operation date, the operation start time, and the artificial satellite to which the operation station is already assigned do not overlap, and the operation date, the operation start time, and the operation station having the highest priority are assigned.

【0005】運用日、運用開始時刻、運用局のいずれか
で、希望するもの全てがより優先順位の高い人工衛星の
割り当てと重複する場合は、その人工衛星の運用要求を
保留とする。
[0005] If any one of the operation date, operation start time, and operation station overlaps with the assignment of a higher priority artificial satellite, the operation request of the artificial satellite is suspended.

【0006】各人工衛星の運用要求は他の人工衛星の運
用を考慮していないので、全ての運用要求の運用日、運
用開始時刻および運用局に最も優先順位の高い希望を割
り当てようとすると、運用要求の競合が発生する。
[0006] Since the operation request of each artificial satellite does not take into account the operation of other artificial satellites, if the operation date, operation start time, and operation station of all operation requests are to be assigned the highest priority requests, Operation request conflict occurs.

【0007】競合とは異なる人工衛星が同じ日時に同じ
局を運用しようとすることである。実際には異なる人工
衛星が同時に同じ局を運用することは不可能のなので、
運用計画の立案において競合が発生する場合は1つの運
用要求を残して他はすべて保留という扱いとする。保留
となった運用要求には、運用日、運用開始時刻および運
用局の割り当てが行われない。
[0007] A conflict is when different satellites try to operate the same station at the same date and time. In fact, it is impossible for different satellites to operate the same station at the same time,
When a conflict occurs in the operation plan formulation, one operation request is left and all others are held. The operation date, operation start time, and operation station are not assigned to the suspended operation request.

【0008】[0008]

【発明が解決しようとする課題】各運用要求は、運用
日、運用開始時刻および運用局に関して複数の希望を出
すので、運用日、運用開始時刻、運用局の組み合わせが
異なる様々な運用計画が考えられ、運用要求の競合を避
け、保留される運用要求の数を最小にする運用計画が存
在する。しかし、従来の立案方法では、常に同じ運用計
画が1つ求まるだけであり、運用要求同士の競合が多数
発生するような場合には保留される運用要求の数も多く
なるという問題点があった。
Since each operation request gives a plurality of requests regarding the operation date, operation start time, and operation station, various operation plans having different combinations of operation day, operation start time, and operation station are considered. Therefore, there is an operation plan that avoids conflict of operation requests and minimizes the number of operation requests to be suspended. However, in the conventional planning method, there is a problem that only one identical operation plan is always obtained, and in a case where many competitions between operation requests occur, the number of operation requests to be suspended increases. .

【0009】例えば、人工衛星がα、β、γの3つあ
り、それぞれの運用要求を、以下のようにする。 人工衛星α{運用時間帯10:00〜10:30、運用局[第1希望:A局] [第2希望:C局]} 人工衛星β{運用時間帯10:20〜10:40、運用局[第1希望:B局] [第2希望:A局]} 人工衛星γ{運用時間帯10:00〜10:30、運用局[第1希望:A局] [第2希望:B局]} 実際の運用要求では運用日や運用時間帯にも複数の希望
があるが、ここでは説明を簡単にするために運用局のみ
複数の希望としている。
For example, there are three artificial satellites, α, β, and γ, and the operation requirements for each are as follows. Artificial satellite α {Operating time zone 10:00 to 10:30, operation station [first request: station A] [Second request: station C]} Artificial satellite β {operation time zone 10:20 to 10:40, operation Station [First choice: Station B] [Second choice: Station A]} Artificial satellite γ {Operating hours 10:00 to 10:30, Operation station [First choice: Station A] [Second choice: Station B ]} In the actual operation request, there are multiple requests for the operation date and operation time zone, but here, for the sake of simplicity, only the operation station has multiple requests.

【0010】人工衛星の優先順位の高い順にα、β、γ
とすると、まず人工衛星αの割り当てを行なう。人工衛
星αは、優先順位が一番高いので必ず第1希望が割り当
てられる。つまり、人工衛星αには、10:00〜1
0:30にA局が割り当てられる。
[0010] α, β, γ in descending order of the priorities of the artificial satellites
Then, first, the artificial satellite α is assigned. Since the artificial satellite α has the highest priority, the first request is always assigned. That is, for the artificial satellite α, 10:00 to 1
Station A is assigned at 0:30.

【0011】次に、優先順位が2番目の人工衛星βの割
り当てを行なう。人工衛星βの第1希望は優先順位が上
である人工衛星αの割り当て結果と競合しないので、人
工衛星βには、10:20〜10:40にB局が割り当
てられる。
Next, an artificial satellite β having the second priority is assigned. The first request of the artificial satellite β does not compete with the allocation result of the artificial satellite α having the higher priority, so the station B is allocated to the artificial satellite β from 10:20 to 10:40.

【0012】最後に、最も優先順位の低い人工衛星γの
割り当てを行なう。人工衛星γの第1希望は優先順位が
上である人工衛星αの割り当て結果と競合する。そこ
で、人工衛星γの第2希望を見ると、優先順位が上であ
る人工衛星βの割り当て結果と競合する。このため、人
工衛星γの運用要求は、どの希望も優先順位が上の人工
衛星と競合するため保留となってしまう。
Finally, an artificial satellite γ having the lowest priority is assigned. The first request for the artificial satellite γ competes with the assignment result of the artificial satellite α having the higher priority. Therefore, looking at the second hope of the artificial satellite γ, it competes with the allocation result of the artificial satellite β having the higher priority. Therefore, the operation request of the artificial satellite γ is suspended because any request conflicts with the artificial satellite having a higher priority.

【0013】人工衛星αの割り当てを第2希望のC局と
すれば、全ての運用要求に対して局の割り当てが行われ
運用要求の保留が発生しないが、従来の立案方法ではこ
の様なことは行なわないので保留を解消することができ
ない。
Assuming that the assignment of the artificial satellite α is the second desired station C, station assignment is performed for all operation requests and no operation request is suspended, but this is the case with the conventional planning method. Is not performed, so the hold cannot be canceled.

【0014】この発明は、前述した問題点を解決するた
めになされたもので、人工衛星の追跡管制における運用
計画を立案する際に利用し、保留される運用要求の数が
最小となる運用計画を立案することができる人工衛星の
運用計画立案システム及び方法を得ることを目的とす
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and is used when an operation plan for tracking control of an artificial satellite is to be prepared. It is an object of the present invention to obtain a system and a method for planning an operation plan of an artificial satellite capable of drafting a satellite.

【0015】[0015]

【課題を解決するための手段】この発明の請求項1に係
る人工衛星の運用計画立案システムは、人工衛星の運用
要求を格納する運用要求格納手段と、人工衛星の設備専
有要求を格納する設備専有要求格納手段と、地上局のネ
ットワーク制限要求を格納するNW制限要求格納手段
と、人工衛星における地上局別の可視時間帯情報を格納
する可視情報格納手段と、前回の立案処理により得られ
た運用計画に基いて人工衛星の新規運用計画を生成する
運用計画生成手段と、新規運用計画の評価値を求める運
用計画評価手段と、複数の運用計画を保持する運用計画
保持手段と、前記運用計画保持手段に格納されている運
用計画を決められた個数だけ各運用計画の評価値に基づ
いて選別し、前記運用計画保持手段の保持する運用計画
を更新する運用計画選別手段と、前記運用計画保持手段
に格納されている運用計画の中で、次の立案処理におい
て生成される新規運用計画の基となる運用計画を選択す
る運用計画選択手段とを備え、前回の立案結果を基にし
た新規運用計画の生成と運用計画の選別を繰り返し行
い、前記運用計画保持手段は、保持している運用計画の
中で最良評価値を取る計画における運用要求の保留数の
変化を監視し、保留数が一定期間減少しなければ前記運
用計画評価手段に保留数に変化が無いことを通知し、前
記運用計画評価手段は、前記運用計画保持手段から運用
要求の保留数に変化が無い旨の通知を受けると、運用
日、運用開始時刻及び運用局の各優先順位に与える評価
点の差が小さくなるように運用計画の評価基準を変更す
るものである。
According to a first aspect of the present invention, there is provided an artificial satellite operation plan planning system, comprising: an operation request storage unit for storing an operation request for an artificial satellite; Occupancy request storage means, NW restriction request storage means for storing a network restriction request of a ground station, visible information storage means for storing visible time zone information for each ground station in an artificial satellite, obtained by the previous planning process An operation plan generating means for generating a new operation plan of an artificial satellite based on an operation plan, an operation plan evaluation means for obtaining an evaluation value of the new operation plan, an operation plan holding means for holding a plurality of operation plans, and the operation plan An operation plan for selecting the determined number of operation plans stored in the holding unit based on the evaluation value of each operation plan and updating the operation plan held by the operation plan holding unit. Another means and an operation plan selection means for selecting an operation plan based on a new operation plan generated in the next planning process among the operation plans stored in the operation plan holding means, The generation of the new operation plan and the selection of the operation plan based on the planning result are repeatedly performed, and the operation plan holding unit changes the number of pending operation requests in the plan that takes the best evaluation value among the held operation plans. If the number of suspensions does not decrease for a certain period, the operation plan evaluation unit is notified that there is no change in the number of suspensions, and the operation plan evaluation unit changes from the operation plan holding unit to the number of suspensions of operation requests. Upon receiving the notification that there is no operation schedule, the evaluation standard of the operation plan is changed so that the difference between the evaluation dates given to the operation days, the operation start times, and the priorities of the operation stations is reduced.

【0016】この発明の請求項2に係る人工衛星の運用
計画立案システムは、前記運用計画評価手段が、前記運
用計画保持手段から運用要求の保留数に変化が無い旨の
通知を受けると、前記各優先順位に与える評価点を用い
る代わりに、全運用要求の中で優先度の高い運用日、運
用開始時刻または運用局が割り当てられる運用要求が全
体に占める割合の目標値を下げ、優先度の低い運用日、
運用開始時刻または運用局が割り当てられる運用要求が
全体に占める割合の目標値を上げ、優先度の低い運用
日、運用時刻または運用局が割り当てられる運用要求の
数が多いほど良い評価値が得られるように運用計画の評
価基準を変更するものである。
According to a second aspect of the present invention, in the artificial satellite operation plan planning system, when the operation plan evaluation unit receives a notification from the operation plan holding unit that there is no change in the number of pending operation requests, Instead of using the evaluation score given to each priority, lower the target value of the percentage of the total of the operation requests assigned to the higher priority operation days, operation start times, or operation stations among all the operation requests, and Low working days,
Increase the target value of the operation start time or the ratio of the operation requests to which the operation station is allocated to the whole, and obtain a better evaluation value as the number of operation requests with lower priority operation days, operation time or operation station is increased. In this way, the evaluation criteria of the operation plan are changed.

【0017】この発明の請求項3に係る人工衛星の運用
計画立案方法は、人工衛星の運用要求、人工衛星の設備
専有要求、地上局のネットワーク制限要求、及び人工衛
星における可視時間帯の各情報を参照し、前回の立案処
理により得られた運用計画を部分的に変更することで新
規の運用計画を生成する運用計画生成ステップと、前回
の立案処理で得られた運用計画と今回の新規運用計画を
合わせた中から決められた数の運用計画を各運用計画の
評価値に基づいて選別する運用計画評価選別ステップ
と、前記選別された運用計画の中から次の立案処理にお
いて生成される新規運用計画の基となる運用計画を選択
する運用計画選択ステップと、前記運用計画生成ステッ
プから前記運用計画選択ステップまでの処理を繰り返し
行ない、運用計画選別後の最も評価値の良い運用計画に
おける運用要求の保留数に変化が無くなると、運用日、
運用開始時刻及び運用局の各希望順位に与える評価点の
差が小さくなるように運用計画の評価基準を変更する評
価基準変更ステップとを含むものである。
According to a third aspect of the present invention, there is provided an artificial satellite operation planning method, comprising: an operation request for an artificial satellite; a request for exclusive use of an artificial satellite; a request for limiting the network of a ground station; The operation plan generation step of generating a new operation plan by partially changing the operation plan obtained by the previous planning process, and the operation plan obtained by the previous planning process and this new operation An operation plan evaluation selection step of selecting a predetermined number of operation plans from the combined plans based on the evaluation value of each operation plan, and a new plan generated in the next planning process from the selected operation plans. An operation plan selection step of selecting an operation plan on which an operation plan is based; and a process from the operation plan generation step to the operation plan selection step is repeatedly performed to select an operation plan. After and most change pending the number of operations required in the evaluation value of good management plan is eliminated, operation date,
An evaluation criterion changing step of changing an evaluation criterion of an operation plan so as to reduce a difference between an operation start time and an evaluation point given to each desired rank of the operation bureau.

【0018】この発明の請求項4に係る人工衛星の運用
計画立案方法は、前記評価基準変更ステップでは、運用
計画選別後の最も評価値の良い運用計画における運用要
求の保留数の変化が無くなると、前記各希望順位に与え
る評価点を用いる代わりに、全運用要求の中で優先順位
の高い運用日、運用開始時刻または運用局が割り当てら
れる運用要求が全体に占める割合の目標値を下げ、優先
順位の低い運用日、運用開始時刻または運用局が割り当
てられる運用要求が全体に占める割合の目標値を上げ、
優先順位の低い運用日、運用開始時刻または運用局が割
り当てられる運用要求の数が多いほど良い評価値が得ら
れるように運用計画の評価基準を変更するものである。
According to a fourth aspect of the present invention, in the artificial satellite operation plan planning method, in the evaluation criterion changing step, the change in the number of pending operation requests in the operation plan having the highest evaluation value after the operation plan selection is eliminated. Instead of using the evaluation points given to the respective desired rankings, the operation date with the highest priority among all the operation requests, the operation start time or the target value of the ratio of the operation requests to which the operation station is allocated to the entire target value is reduced, and the priority value is reduced. Raise the target value of the percentage of the total of the operation requests assigned to the lower operation days, operation start times or operation stations,
The evaluation criterion of the operation plan is changed so that the higher the number of operation days to which the priority order is lower, the operation start time, or the operation request to which the operation station is assigned, the better the evaluation value.

【0019】[0019]

【発明の実施の形態】実施の形態1.この発明の実施の
形態1に係る人工衛星の運用計画立案システムについて
図面を参照しながら説明する。図1は、この発明の実施
の形態1に係る人工衛星の運用計画立案システムの構成
を示すブロック図である。なお、各図中、同一符号は同
一又は相当部分を示す。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 An artificial satellite operation planning system according to Embodiment 1 of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing the configuration of the artificial satellite operation planning system according to Embodiment 1 of the present invention. In the drawings, the same reference numerals indicate the same or corresponding parts.

【0020】図1において、1は利用を希望する運用
局、運用日および運用開始時刻など各人工衛星の運用要
求が格納されている運用要求格納手段、2は1つの人工
衛星が専有して利用する運用局と運用日とその時間帯に
関する情報である設備専有要求が格納されている設備専
有要求格納手段、3は各運用局毎に人工衛星が利用でき
ない日にちおよび時間帯に関する情報であるネットワー
ク(NW)制限要求が格納されているNW制限要求格納
手段、4は各人工衛星における日にち別、運用局別の可
視時間帯(人工衛星が運用局と通信できる時間帯)情報
を格納する可視情報格納手段である。
In FIG. 1, reference numeral 1 denotes operation request storage means for storing operation requests for each artificial satellite, such as an operation station desired to be used, an operation date and an operation start time, and 2 denotes a single artificial satellite used exclusively. The equipment occupancy request storage means for storing the equipment occupation request and the equipment occupation request, which is information on the operation date and the time zone, is connected to the network (3), which is information on the date and time zone for which the satellite cannot be used for each operation station. NW) NW restriction request storage means in which restriction requests are stored, and 4 is visible information storage for storing visible time zone (time zone in which the artificial satellite can communicate with the operation station) information for each artificial satellite by day and by operating station. Means.

【0021】また、同図において、5は予め全ての人工
衛星に対して優先順位付けを行なう衛星順位付け手段、
6は運用要求格納手段1、設備専有要求格納手段2、N
W制限要求格納手段3及び可視情報格納手段4にそれぞ
れ格納されている情報を基に前回の立案処理により得ら
れた運用計画を部分的に変更することで新規の運用計画
を複数生成する運用計画生成手段、7は運用計画の評価
値を算出する運用計画評価手段である。
In FIG. 1, reference numeral 5 denotes satellite ranking means for prioritizing all artificial satellites in advance.
6 is an operation request storage means 1, an equipment occupation request storage means 2, N
An operation plan that generates a plurality of new operation plans by partially changing the operation plan obtained by the previous planning process based on the information stored in the W restriction request storage unit 3 and the visible information storage unit 4, respectively. The generation unit 7 is an operation plan evaluation unit that calculates an evaluation value of the operation plan.

【0022】また、同図において、8は前回の立案処理
時に残された運用計画および今回の立案処理で新規に生
成された運用計画を保持する運用計画保持手段、9は運
用計画保持手段8が保持する運用計画のうち決められた
数だけ運用計画を選別し、選別された運用計画以外を運
用計画保持手段8から削除する運用計画選別手段、10
は運用計画保持手段8に保持されている運用計画の中か
ら次の立案処理において運用計画生成手段6で生成され
る新規運用計画の基となる運用計画を選択する運用計画
選択手段である。
In FIG. 2, reference numeral 8 denotes an operation plan holding means for holding the operation plan left in the previous planning processing and an operation plan newly generated in the current planning processing; Operation plan selection means for selecting a predetermined number of operation plans from the operation plans to be retained and deleting other than the selected operation plans from the operation plan holding means 8;
Is an operation plan selection means for selecting an operation plan serving as a basis for a new operation plan generated by the operation plan generation means 6 in the next planning process from among the operation plans stored in the operation plan storage means 8.

【0023】さらに、同図において、11は最終的に得
られた運用計画を表示する運用計画表示手段、12は最
終的に得られた運用計画を格納する運用計画格納手段で
ある。
Further, in the figure, 11 is an operation plan display means for displaying the finally obtained operation plan, and 12 is an operation plan storage means for storing the finally obtained operation plan.

【0024】なお、上記各手段1〜12とハード構成の
対応関係は、次の通りである。まず、運用計画生成手段
6、運用計画評価手段7、運用計画保持手段8、運用計
画選別手段9、及び運用計画選択手段10は、パソコン
上で動作するソフトウエアに相当する。また、運用要求
格納手段1、設備専有要求格納手段2、NW制限要求格
納手段3、可視情報格納手段4、衛星順位付け手段5、
及び運用計画格納手段12は、例えば、上記パソコンと
ネットワークを通じて接続されたファイルサーバー(ハ
ードデイスク装置等)上のデータベースに相当する。さ
らに、運用計画表示手段11は、上記パソコンの液晶等
の表示画面を含む表示装置に相当する。なお、ハード上
の構成は、上記の構成に限られず、単体のコンピュータ
や複数のコンピュータシステム、コンピュータネットワ
ークシステムでも構わない。
The correspondence between the means 1 to 12 and the hardware configuration is as follows. First, the operation plan generation unit 6, the operation plan evaluation unit 7, the operation plan holding unit 8, the operation plan selection unit 9, and the operation plan selection unit 10 correspond to software running on a personal computer. In addition, operation request storage means 1, equipment occupation request storage means 2, NW restriction request storage means 3, visible information storage means 4, satellite ranking means 5,
The operation plan storage means 12 corresponds to, for example, a database on a file server (hard disk device or the like) connected to the personal computer through a network. Further, the operation plan display means 11 corresponds to a display device including a display screen such as a liquid crystal of the personal computer. The configuration on hardware is not limited to the above configuration, and may be a single computer, a plurality of computer systems, or a computer network system.

【0025】この運用計画立案システムは、各人工衛星
の運用者から出される運用要求に基づき、各人工衛星が
利用する運用局とその日時を表わす運用計画を立案する
際に用いられるものである。
This operation plan formulation system is used when an operation plan indicating the operation station used by each artificial satellite and the date and time is prepared based on the operation request issued by the operator of each artificial satellite.

【0026】つぎに、この実施の形態1に係る人工衛星
の運用計画立案システムの動作について図面を参照しな
がら説明する。図2は、この発明の実施の形態1に係る
人工衛星の運用計画立案システムの動作を示すフローチ
ャートである。
Next, the operation of the artificial satellite operation planning system according to the first embodiment will be described with reference to the drawings. FIG. 2 is a flowchart showing the operation of the artificial satellite operation planning system according to Embodiment 1 of the present invention.

【0027】まず、図2のフローチャートを用いて本実
施の形態1における人工衛星の運用計画の立案処理の流
れについて説明した後、図1の各手段について説明す
る。
First, the flow of the processing for drafting the operation plan of the artificial satellite in the first embodiment will be described with reference to the flowchart of FIG. 2, and then each means of FIG. 1 will be described.

【0028】本実施の形態1における人工衛星の運用計
画の立案は、運用計画の生成と選別を繰り返し行なうこ
とにより運用計画の立案を進めていく。
The operation plan of the artificial satellite according to the first embodiment is prepared by repeatedly generating and selecting the operation plan.

【0029】図2におけるステップS1からステップS
8までの一連の処理を1回の立案処理とする。
Steps S1 to S1 in FIG.
A series of processes up to 8 is defined as one planning process.

【0030】図2のステップS1において、システムは
新規運用計画の生成を行なう。i回目の立案処理におけ
る新規運用計画の生成においては、運用要求、設備専有
要求、ネットワーク制限要求、及び可視時間帯情報に基
づいて、i−1回目の立案処理で得られた運用計画の中
から選ばれたいくつかの運用計画の一部を変更すること
で新規運用計画を生成する。ただし、i=0、即ち第1
回目の立案処理では前回の立案結果は存在しないので、
運用要求、設備専有要求、ネットワーク制限要求、及び
可視時間帯情報に基づいてランダムに運用計画を生成す
る。
In step S1 of FIG. 2, the system generates a new operation plan. In generating a new operation plan in the i-th planning process, based on the operation request, the facility occupation request, the network restriction request, and the visible time zone information, the operation plan obtained from the (i-1) -th planning process is selected. A new operation plan is generated by changing some of the selected operation plans. Here, i = 0, that is, the first
Since there is no previous planning result in the second planning process,
An operation plan is randomly generated based on an operation request, a facility occupation request, a network restriction request, and visible time zone information.

【0031】次に、ステップS2において、生成された
新規運用計画の評価値を求める(算出方法は後述)。
Next, in step S2, an evaluation value of the generated new operation plan is obtained (the calculation method will be described later).

【0032】次に、ステップS3において、i−1回目
の立案処理で残された運用計画と、i回目に新規に生成
された運用計画を合わせた中で、評価値が良いものほど
選ばれる確率を高くして予め決められた数の運用計画を
選び出す。選ばれなかった運用計画は全て破棄される。
Next, in step S3, the probability that the higher the evaluation value is selected from among the operation plan left in the (i-1) th planning process and the operation plan newly generated in the i-th time is combined. And select a predetermined number of operation plans. All operation plans not selected will be discarded.

【0033】次に、ステップS4において、終了判定を
行なう(例えば、ステップS3で選別された運用計画に
おける最良評価値が1000回立案処理を繰り返しても
変化しない、或いは、立案開始から30分経過した
等)。判定結果がYESならば立案処理を終了し、NO
ならばステップS5に進む。
Next, in step S4, an end determination is made (for example, the best evaluation value in the operation plan selected in step S3 does not change even after repeating the planning process 1000 times, or 30 minutes have passed since the start of planning. etc). If the determination result is YES, the planning process ends, and NO
If so, the process proceeds to step S5.

【0034】次に、ステップS5において、上記ステッ
プ3で選別された運用計画の中で最良評価値を有する運
用計画における保留された運用要求の数が一定回数立案
処理を繰り返しても予め決められた基準を超えているか
どうか(例えば、立案処理を100回繰り返しても、最
良評価値を有する運用計画での運用要求保留数が20個
以下にならない等)を判定する。判定結果がYESなら
ばステップS6に進み、NOならばステップS8に進
む。
Next, in step S5, the number of suspended operation requests in the operation plan having the best evaluation value among the operation plans selected in step 3 is determined in advance even if the planning process is repeated a certain number of times. It is determined whether or not the standard is exceeded (for example, even if the planning process is repeated 100 times, the number of pending operation requests in the operation plan having the best evaluation value does not become 20 or less). If the determination is YES, the process proceeds to step S6, and if NO, the process proceeds to step S8.

【0035】次に、ステップS6において、保留される
運用要求数を削減するために、上記ステップS2におけ
る運用計画の評価基準を変更する(詳細は後述)。
Next, in step S6, the evaluation standard of the operation plan in step S2 is changed in order to reduce the number of suspended operation requests (details will be described later).

【0036】次に、ステップS7において、上記ステッ
プS6で変更された評価基準に基づき、上記ステップS
3で選別された運用計画の評価値を再計算する。
Next, in step S7, based on the evaluation criteria changed in step S6,
Recalculate the evaluation value of the operation plan selected in 3.

【0037】次に、ステップS8において、i+1回目
の立案処理においてステップS1で生成される新規運用
計画の基となる運用計画を、ステップS3で選別された
運用計画の中からランダムに1つ以上選ぶ。
Next, in step S8, one or more operation plans which are the basis of the new operation plan generated in step S1 in the (i + 1) th planning process are randomly selected from the operation plans selected in step S3. .

【0038】以下、図1の各手段について説明する。Hereinafter, each means of FIG. 1 will be described.

【0039】運用要求格納手段1には、各人工衛星の運
用者から出される人工衛星の運用要求が格納される。こ
の運用要求の内容としては、運用を希望する日、運用開
始を希望する時刻、運用を希望する運用局、運用に必要
な運用局数、運用時間などが含まれる。更に、日、時
刻、運用局に関しては、それぞれ1つ以上優先順位を付
けて指定される。運用要求例を以下に示す。
The operation request storage means 1 stores an operation request of an artificial satellite issued from an operator of each artificial satellite. The contents of the operation request include a desired operation date, a desired operation start time, an operation station desired to operate, the number of operation stations required for operation, an operation time, and the like. Furthermore, the date, time, and operation station are designated with one or more priorities. An example of an operation request is shown below.

【0040】[運用要求例] 運用日…第1希望:12月6日、第2希望:12月8
日、第3希望:12月10日、 運用開始時刻…第1希望:1時、第2希望:2時、第3
希望:3時、第4希望:10時、第5希望:11時、 運用局…第1希望:A局、第2希望:C局、第3希望:
B局、 運用局数…2、 運用時間…1時間。
[Example of operation request] Operation day: First request: December 6th, second request: December 8th
Day, 3rd hope: December 10th, operation start time ... 1st hope: 1:00, 2nd hope: 2:00, 3rd
Hope: 3 o'clock, 4th hope: 10 o'clock, 5th hope: 11 o'clock, operation station ... 1st hope: A station, 2nd hope: C station, 3rd hope:
Station B, number of operating stations: 2, operating time: 1 hour.

【0041】設備専有要求格納手段2には、特定の人工
衛星が特定の運用局を専有する期間を示す設備専有要求
が格納される。この設備専有要求には、専有する人工衛
星ID、専有される運用局ID、専有開始日時、専有終
了日時などが含まれる。
The equipment occupation request storage means 2 stores an equipment occupation request indicating a period during which a specific artificial satellite occupies a specific operation station. The equipment occupation request includes the exclusive artificial satellite ID, the exclusive operation station ID, the exclusive start date and time, the exclusive end date and time, and the like.

【0042】NW制限要求格納手段3には、メンテナン
スなどで運用が不可能な運用局とその時間帯を示すネッ
トワーク制限要求が格納される。このネットワーク制限
要求には、運用が不可能な運用局ID、制限開始日時、
制限終了日時などが含まれる。
The NW restriction request storage means 3 stores an operation station which cannot be operated due to maintenance or the like, and a network restriction request indicating its time zone. This network restriction request includes an operation station ID that cannot be operated, a restriction start date and time,
Includes the restriction end date and time.

【0043】可視情報格納手段4には、各人工衛星にお
ける、日にち別、運用局別の可視時間帯に関する情報が
格納される。この可視時間帯とは、人工衛星が運用局と
通信できる(運用が行なえる)時間帯のことであり、同
じ人工衛星であっても日にちが違えば同じ運用局に対す
る可視時間帯は異なる場合もあり、また、1日に複数回
地球を周回衛星の場合は1日の中で同じ運用局に対して
複数の可視時間帯が存在する。以下に可視時間帯の例を
示す。
The visible information storage means 4 stores information on the visible time zone of each artificial satellite by day and by operating station. The visible time zone is the time zone in which the satellite can communicate (operate) with the operating station. Even if the same satellite is on a different date, the visible time zone for the same operating station may be different. In the case of a satellite orbiting the earth more than once a day, there are a plurality of visible time zones for the same operation station in one day. An example of the visible time zone is shown below.

【0044】[可視時間帯の例(1)] 衛星1…12月1日10時〜20時。[Example of Visible Time Zone (1)] Satellite 1 ... December 1 from 10:00 to 20:00.

【0045】[可視時間帯の例(2)] 衛星2…12月1日1時〜1時10分、2時40分〜2
時50分、4時10分〜4時20分、…。
[Example of Visible Time Zone (2)] Satellite 2: December 1 at 1:00 to 1:10, 2:40 to 2
Hour 50: 4: 10-4: 20 ...

【0046】衛星順位付け手段5は、同じ順位が複数存
在しない様に全ての人工衛星に対して予め優先順位を設
定する。
The satellite ranking means 5 sets priorities for all artificial satellites in advance so that a plurality of identical rankings do not exist.

【0047】運用計画生成手段6は、運用要求格納手段
1と設備専有要求格納手段2とNW制限要求格納手段3
と可視情報格納手段4とに格納されている情報を基に、
運用計画選択手段10より与えられる前回の立案処理時
に得られた運用計画の一部分を変更することで新規の運
用計画を立案する。この運用計画生成手段6の処理は、
図2のステップS1に相当する。
The operation plan generation means 6 includes the operation request storage means 1, the equipment occupation request storage means 2, and the NW restriction request storage means 3.
And the information stored in the visible information storage means 4
A new operation plan is created by changing a part of the operation plan obtained at the time of the previous planning process given by the operation plan selection means 10. The processing of the operation plan generating means 6 is as follows.
This corresponds to step S1 in FIG.

【0048】図3に運用計画の例を示す。図3では、人
工衛星1は、12月1日には10時から10時30分ま
での間A局を、12月2日には11時から11時30分
までの間A局を運用することを表わしている。
FIG. 3 shows an example of an operation plan. In FIG. 3, the artificial satellite 1 operates the station A from 10:00 to 10:30 on December 1 and the station A from 11:00 to 11:30 on December 2. It represents that.

【0049】また、同図に示すように、人工衛星2は、
12月1日には11時から12時30分までの間A局と
B局を、12月2日には11時から12時30分までの
間B局とC局を運用することを表わしている。
Also, as shown in FIG.
On December 1, stations A and B are operated from 11:00 to 12:30, and on December 2, stations B and C are operated from 11:00 to 12:30. ing.

【0050】さらに、同図に示すように、人工衛星3
は、12月1日には13時から13時10分までの間と
15時15分から15時25分までの間にC局を、12
月2日には13時から13時10分までの間と15時1
5分から15時25分までの間にC局を運用することを
表わしている。
Further, as shown in FIG.
On December 1 from 13:00 to 13:10 and from 15:15 to 15:25, station C,
On March 2 from 13:00 to 13:10 and at 15: 1
It indicates that the station C is operated from 5 minutes to 15:25.

【0051】図4を用いて、i回目の立案処理における
運用計画生成手段6での新規運用計画の生成手順につい
て説明する。同図(a)に示すP1は、i−1回目の立
案処理において求まった運用計画の中で運用計画選択手
段10より提示された運用計画である。また、同図
(b)に示すP2は、運用計画生成手段6により運用計
画P1の一部を変更して生成された新規運用計画であ
る。さらに、同図(c)に示すP3は、運用計画P2に
おいて競合が発生または解消した場合の処理を行なった
運用計画である。以下、運用計画P2、P3の生成につ
いて詳細に述べる。
A procedure for generating a new operation plan by the operation plan generation means 6 in the i-th planning process will be described with reference to FIG. P1 shown in FIG. 7A is an operation plan presented by the operation plan selection means 10 in the operation plan obtained in the (i-1) th planning process. P2 shown in FIG. 3B is a new operation plan generated by changing a part of the operation plan P1 by the operation plan generation means 6. Further, P3 shown in FIG. 3 (c) is an operation plan in which processing is performed when a conflict occurs or is resolved in the operation plan P2. Hereinafter, generation of the operation plans P2 and P3 will be described in detail.

【0052】運用計画選択手段10より前回の立案処理
で得られた運用計画の1つである運用計画P1を受け取
ると、運用計画生成手段6は、運用計画P1の一部を変
更し新たな運用計画P2を生成する。
When receiving the operation plan P1, which is one of the operation plans obtained in the previous planning process, from the operation plan selection means 10, the operation plan generation means 6 changes a part of the operation plan P1 and performs a new operation. Generate the plan P2.

【0053】図4(b)に示す例では、運用計画P1に
おける衛星2の12月2日の運用局をB局とC局からA
局とC局に変更し、更に、衛星3の12月1日の運用局
を2つともB局に変更し、新規運用計画P2を生成して
いる。
In the example shown in FIG. 4B, the operation stations of the satellite 2 on December 2 in the operation plan P1 are changed from the B station and the C station to the A operation stations.
The operation stations are changed to the stations C and C, and both the operation stations of the satellite 3 on December 1 are changed to the stations B to generate the new operation plan P2.

【0054】尚、新しく割り当てる運用局は必ずその運
用要求が希望している運用局の中から選ぶものとする。
また、ここでは運用局の変更について示したが、運用
日、運用開始時刻の変更も同様にして行なう。
It is assumed that the newly assigned operation station is always selected from the operation stations desired by the operation request.
Although the change of the operation station has been described here, the change of the operation day and the operation start time is similarly performed.

【0055】しかし、運用計画P2では、12月2日に
衛星1と衛星2でA局の運用時間帯が競合している。こ
の競合が発生した場合は、例えば人工衛星間に予めつけ
られる優先順位(衛星順位付け手段5)など何らかの基
準に基づいて1つの運用要求のみ残しその他の運用要求
を保留とする。この保留された運用要求は、運用日、運
用開始時刻、運用局の割り当てが行われない。
However, in the operation plan P2, the operation time zone of the station A is competing between the satellites 1 and 2 on December 2. When this conflict occurs, only one operation request is left based on some criteria such as a priority order (satellite ranking means 5) previously set between artificial satellites, and other operation requests are put on hold. The operation date, the operation start time, and the operation station are not assigned to the suspended operation request.

【0056】運用計画P3は、運用計画P2において競
合した運用要求の1つである衛星2の12月2日の運用
要求を保留扱いとしている。
In the operation plan P3, the operation request of the satellite 2 on December 2, which is one of the operation requests competing in the operation plan P2, is put on hold.

【0057】更に、運用計画P1において衛星4の12
月1日の運用要求が衛星3の運用要求と競合し、保留さ
れているとする。運用計画P2では衛星3の12月1日
の運用局が変更されたことにより衛星4との競合が解消
されるので、運用計画生成手段6は、運用計画P3にお
いて衛星4の12月1日の運用要求の保留扱いを解除す
る。
Further, in the operation plan P1, 12
It is assumed that the operation request of the month 1 conflicts with the operation request of the satellite 3 and is suspended. In the operation plan P2, the conflict with the satellite 4 is resolved by the change of the operation station of the satellite 3 on December 1, so the operation plan generation means 6 sets the operation plan P3 to Release the hold of the operation request.

【0058】このように、運用計画生成手段6では、前
回の立案処理において得られた運用計画の一部を変更す
ることで新規の運用計画を生成し、更に運用要求間の競
合が発生する場合はいくつかの運用要求を保留扱いと
し、競合が解消された場合は保留されている運用要求の
保留扱いを解除するという処理を行なう。
As described above, the operation plan generating means 6 generates a new operation plan by changing a part of the operation plan obtained in the previous planning process, and furthermore, when there is a conflict between operation requests. Puts some operation requests on hold, and if the conflict is resolved, cancels the hold on the held operation requests.

【0059】運用計画評価手段7では、運用計画生成手
段6により生成された新規運用計画の評価値を計算す
る。運用計画の立案に際しては、各運用要求に割り当て
る運用日、運用開始時刻および運用局をできる限り優先
順位の高いものとするという条件と、保留される運用要
求の数を最小にするという条件を考慮しなければならな
い。運用計画の評価値は、優先順位に関する評価値と保
留された運用要求数に関する評価値を合わせたものとす
る。この運用計画評価手段7の処理は、図2におけるス
テップS2に相当する。
The operation plan evaluation means 7 calculates an evaluation value of the new operation plan generated by the operation plan generation means 6. When formulating an operation plan, consider the conditions that the operation date, operation start time, and operation station assigned to each operation request have the highest priority, and the condition that the number of operation requests to be suspended is minimized. Must. The evaluation value of the operation plan is a combination of the evaluation value regarding the priority and the evaluation value regarding the number of suspended operation requests. The processing of the operation plan evaluation means 7 corresponds to step S2 in FIG.

【0060】以下に評価値の算出手順を示す。尚、本実
施の形態1における運用計画立案システムでは評価値が
小さいほど良い運用計画とする。
The procedure for calculating the evaluation value will be described below. In the operation planning system according to the first embodiment, the smaller the evaluation value, the better the operation plan.

【0061】(1)優先順位に関する評価値の算出 (a)運用日、運用開始時刻、及び運用局の希望候補に
対して、例えば、第1希望は1点、第2希望は5点、第
3希望は10点、…の様に点数を設定する。この点数を
優先順位点と呼ぶ。
(1) Calculation of evaluation value related to priority order (a) For operation day, operation start time, and operation station desired candidates, for example, the first request is 1 point, the second request is 5 points, and the second point is 5 points. 3 If you want, set the score like 10 points. This point is called a priority point.

【0062】(b)保留となっていないi番目の運用要
求に割り当てられた運用日と運用開始時刻と運用局の優
先順位点の合計を求める。優先順位nの優先順位点をs
(n)、i番目の運用要求に割り当てられた運用日の優
先順位をn1i、運用開始時刻の優先順位をn2i、運
用局の優先順位をn3iとすると、i番目の運用要求の
優先順位点の合計T(i)を以下の式1に示す。
(B) The sum of the operation date, the operation start time, and the priority point of the operation station assigned to the i-th operation request that is not suspended is obtained. S is the priority point of priority n
(N), assuming that the priority of the operation day assigned to the i-th operation request is n1i, the priority of the operation start time is n2i, and the priority of the operation station is n3i, the priority point of the i-th operation request is The total T (i) is shown in Equation 1 below.

【0063】 T(i)=s(n1i)+s(n2i)+s(n3i) ・・・式1T (i) = s (n1i) + s (n2i) + s (n3i) Equation 1

【0064】(c)全ての保留となっていない運用要求
に対して(b)の処理を行ない、1運用要求あたりの平
均優先順位点合計を優先順位に関する評価値とする。優
先順位に関する評価値をf1、保留となっていない運用
要求の数をKとし、f1を以下の式2に示す。
(C) The processing of (b) is performed for all the operation requests that are not on hold, and the total of the average priority points per operation request is used as the evaluation value regarding the priority. The evaluation value regarding the priority is f1, and the number of operation requests that are not suspended is K, and f1 is expressed by the following equation 2.

【0065】 f1=ΣT(i)/K ・・・式2F1 = ΣT (i) / K Equation 2

【0066】(2)運用要求の保留数に関する評価値の
算出 保留された運用要求の数を評価値とする。運用要求の保
留数に関する評価値をf2、全運用要求数をDとし、f
2を以下の式3に示す。
(2) Calculation of Evaluation Value Regarding the Number of Suspended Operation Requests The number of suspended operation requests is used as the evaluation value. The evaluation value relating to the number of pending operation requests is f2, the total number of operation requests is D, and f
2 is shown in Equation 3 below.

【0067】 f2=D−K ・・・式3F2 = DK (Equation 3)

【0068】(3)運用計画の評価値 優先順位に関する評価値と保留された運用要求に関する
評価値は、算出の基準が異なるのでそのまま足し合わせ
ることはできない。そこで、希求水準法(オペレーショ
ンズ・リサーチ Vol.41、No.6)を用いて運
用計画の評価値を求める。運用計画の評価値の計算式を
下記の式4に示す。
(3) Evaluation value of operation plan The evaluation value of the priority and the evaluation value of the suspended operation request cannot be added as they are because the calculation criteria are different. Therefore, the evaluation value of the operation plan is obtained using the demand level method (Operations Research Vol. 41, No. 6). Formula 4 for calculating the evaluation value of the operation plan is shown below.

【0069】 F=max{(f1−G1)/(G1−E1),(f2−G2)/(G2−E2)} +α×{f1/(G1−E1)+f2/(G2−E2)} ・・・式4F = max {(f1-G1) / (G1-E1), (f2-G2) / (G2-E2)} + α × {f1 / (G1-E1) + f2 / (G2-E2)} ..Equation 4

【0070】上記式4において、Fは運用計画の評価
値、f1は運用計画の優先順位に関する評価値、G1は
優先順位に関する評価値の希求水準(この程度であれば
望ましいという値)、E1は優先順位に関する評価値の
理想値(例えば、優先順位に関する評価値が取り得る最
小値よりも小さい値)、f2は運用要求の保留数に関す
る評価値、G2は運用要求の保留数に関する評価値の希
求水準、E2は運用要求の保留数に関する評価値の理想
値であり、αは係数で、十分小さな値を設定する。
In the above equation (4), F is the evaluation value of the operation plan, f1 is the evaluation value of the priority of the operation plan, G1 is the desired level of the evaluation value of the priority (a value that is desirable if it is at this level), and E1 is An ideal value of the evaluation value related to the priority (for example, a value smaller than the minimum value that the evaluation value related to the priority can take), f2 is an evaluation value related to the number of pending operation requests, and G2 is a request for an evaluation value related to the number of reserved operation requests. The level E2 is an ideal value of the evaluation value relating to the number of pending operation requests, and α is a coefficient, which is set to a sufficiently small value.

【0071】運用計画保持手段8は、前回の立案処理に
おいて運用計画選別手段9により選別された運用計画
と、今回の立案処理において運用計画生成手段6により
生成された新規運用計画を保持する。
The operation plan holding unit 8 holds the operation plan selected by the operation plan selection unit 9 in the previous planning process and the new operation plan generated by the operation plan generation unit 6 in the current planning process.

【0072】運用計画選別手段9は、運用計画保持手段
8に保持されている運用計画の中から評価値の良いもの
ほど選別される確率を高くして確率的に予め決められた
数の運用計画を選び出し、選ばれなかった運用計画を運
用計画保持手段8から削除する。この運用計画選別手段
9の処理は、図2におけるステップS3に相当する。更
に、運用計画選別手段9は、選別後に立案処理の終了判
定を行なう。これは図2におけるステップ4に相当す
る。
The operation plan selection means 9 increases the probability of being selected from among the operation plans held in the operation plan holding means 8 with a higher evaluation value, and sets a predetermined number of operation plans stochastically. And deletes the operation plan not selected from the operation plan holding means 8. The processing of the operation plan selection means 9 corresponds to step S3 in FIG. Further, the operation plan selection means 9 determines the end of the planning process after the selection. This corresponds to step 4 in FIG.

【0073】運用計画選択手段10は、運用計画選別手
段9による選別処理後に運用計画保持手段8に保持され
ている運用計画の中からランダムに1つ以上の運用計画
を選択し、選択した運用計画を運用計画生成手段6に渡
す。この運用計画選択手段10の処理は、図2における
ステップS8に相当する。
The operation plan selection means 10 randomly selects one or more operation plans from the operation plans held in the operation plan holding means 8 after the selection processing by the operation plan selection means 9, and selects the selected operation plan. Is passed to the operation plan generation means 6. The processing of the operation plan selecting means 10 corresponds to step S8 in FIG.

【0074】以上に示した運用計画生成手段6による処
理から運用計画選択手段10による処理までを繰り返し
行ない、前回の立案処理において得られた評価値の良い
運用計画を基に新規運用計画を生成することにより、評
価値の改善が図られやすいという特徴がある。
The processing from the operation plan generation means 6 to the processing by the operation plan selection means 10 described above is repeated, and a new operation plan is generated based on the operation plan with a good evaluation value obtained in the previous planning processing. Thus, there is a feature that the evaluation value can be easily improved.

【0075】運用計画表示手段11は、最終的に得られ
た最も評価値の良い運用計画を表示し、運用計画格納手
段12は、運用計画表示手段11に表示された運用計画
を保持する。
The operation plan display means 11 displays the finally obtained operation plan with the best evaluation value, and the operation plan storage means 12 holds the operation plan displayed on the operation plan display means 11.

【0076】更に、運用計画保持手段8は、運用計画選
別手段9の選別処理により残された運用計画の中で最も
評価値の良い運用計画における保留された運用要求の数
が、立案処理を繰り返しても一定回数続けて変化が無
く、且つ、保留数が予め決めておいた基準を超えていれ
ば、運用要求の保留数が改善されていないことを運用計
画評価手段7に通知する。
Further, the operation plan holding means 8 determines whether the number of suspended operation requests in the operation plan having the highest evaluation value among the operation plans left by the selection processing of the operation plan selection means 9 repeats the planning processing. However, if there is no change continuously for a certain number of times and the number of reservations exceeds a predetermined reference, the operation plan evaluation unit 7 is notified that the number of reservations of the operation request has not been improved.

【0077】運用計画保持手段8から通知を受けた運用
計画評価手段7は、前述した運用要求における運用日、
運用開始時刻、運用局の割り当て候補の優先順位に対す
る優先順位点s(n)を、優先順位間でその差が小さく
なるように変更し(例えば{s(1)=1,s(2)=
5,s(3)=10}を{s(1)=1,s(2)=
3,s(3)=6}のように変更)、運用計画保持手段
8に格納されている運用計画全ての評価値を再計算す
る。この運用計画保持手段8の処理は、図2におけるス
テップS5に相当し、また、運用計画評価手段7の処理
は、図2におけるステップS6およびステップS7に相
当する。
The operation plan evaluation means 7 having received the notification from the operation plan holding means 8 sets the operation date in the operation request described above,
The operation start time and the priority point s (n) with respect to the priority of the assignment candidate of the operation station are changed so that the difference between the priorities becomes small (for example, {s (1) = 1, s (2) =
5, s (3) = 10} to {s (1) = 1, s (2) =
3, s (3) = 6}), and recalculate the evaluation values of all the operation plans stored in the operation plan holding means 8. The processing of the operation plan holding means 8 corresponds to step S5 in FIG. 2, and the processing of the operation plan evaluation means 7 corresponds to steps S6 and S7 in FIG.

【0078】運用計画生成手段6で生成された新規運用
計画において、いくつかの運用要求に優先順位の低い運
用日または運用開始時刻または運用局を割り当てること
でこれまでに得られている運用計画よりも保留された運
用要求の数が少なくなったとする。この新規運用計画の
評価値を求める時に、優先順位間の点数の差が大きい
と、保留された運用要求の数が削減されたことによる評
価値の改善幅よりも優先順位の低い運用日、運用開始時
刻、運用局が割り当てられたことによる評価値の悪化幅
の方が大きくなり、結果的に上記式4で求める評価値F
の値が悪化する場合が考えられる。この様な場合は、運
用計画選別手段9における運用計画の選別処理において
この新規運用計画が残される確率は低くなり運用要求の
保留数の削減が進みにくくなってしまう。
In the new operation plan generated by the operation plan generating means 6, some operation requests are assigned an operation day, operation start time, or operation station having a low priority order, and the operation plan obtained so far is assigned. It is also assumed that the number of pending operation requests has decreased. When calculating the evaluation value of this new operation plan, if the score difference between the priorities is large, the operation days and operation times that are lower in priority than the improvement in the evaluation value due to the reduction in the number of suspended operation requests The start time and the degree of deterioration of the evaluation value due to the assignment of the operation station become larger, and as a result, the evaluation value F obtained by the above equation (4)
May be degraded. In such a case, the probability that this new operation plan will be left in the operation plan selection processing by the operation plan selection means 9 is low, and it becomes difficult to reduce the number of pending operation requests.

【0079】一方、優先順位間の点数の差が小さいと、
優先順位の低い運用日、運用開始時刻、運用局が割り当
てられたことによる評価値の悪化幅が小さくなり、運用
要求の保留数の削減による評価値の改善幅の方が大きく
なり上記式4で求める評価値Fの値も改善される。この
様な場合は、運用計画選別手段9における運用計画の選
別処理においてこの新規運用計画が残される確率は高く
なり運用要求の保留数の削減を進めることができる。
On the other hand, if the difference in scores between priorities is small,
The deterioration of the evaluation value due to the operation days, the operation start times, and the operation stations assigned with low priorities becomes smaller, and the improvement of the evaluation value by the reduction of the number of pending operation requests becomes larger. The required evaluation value F is also improved. In such a case, the probability that this new operation plan is left in the operation plan selection processing in the operation plan selection means 9 is increased, and the number of pending operation requests can be reduced.

【0080】以上の様な運用計画立案システムおよび方
法により、保留される運用要求の数を最小にする運用計
画を自動立案でき、保留された運用要求の見直しの手間
を削減できると共に運用計画の立案時間を短縮できると
いう効果がある。
With the above-described operation planning system and method, an operation plan for minimizing the number of suspended operation requests can be automatically prepared, the work of reviewing the suspended operation requests can be reduced, and the operation plan can be prepared. The effect is that the time can be reduced.

【0081】なお、運用計画評価手段7は、評価対象の
運用計画における運用日、運用開始時刻および運用局の
優先順位に関する評価値として、前述の優先順位点s
(n)を用いる代わりに、第1希望、第2希望、第3希
望、…の割合を用いてもよい。
The operation plan evaluation means 7 calculates, as an evaluation value relating to the operation day, operation start time, and operation station priority in the operation plan to be evaluated, the above-mentioned priority point s.
Instead of using (n), the ratio of the first request, the second request, the third request,... May be used.

【0082】以下に優先順位に関する評価値の算出手順
を示す。 (a):第1希望、第2希望、第3希望、…がそれぞれ
占める割合の目標値を設定する。 (b):評価対象の運用計画において第1希望、第2希
望、第3希望、…がそれぞれ占める割合と(a)で設定
した目標値との差を求める。 (c):(b)で求めた各優先順位における値の平均値
を優先順位に関する評価値とする。
The calculation procedure of the evaluation value regarding the priority order will be described below. (A): Set the target value of the ratio occupied by the first request, the second request, the third request,... (B): The difference between the ratio occupied by the first request, the second request, the third request,... In the operation plan to be evaluated and the target value set in (a) is obtained. (C): The average value of the values in each priority determined in (b) is set as the evaluation value related to the priority.

【0083】(a)で設定する第n希望が占める割合の
目標値をo(n)、(b)で求める評価対象の運用計画
における第n希望が占める割合をr(n)、最大第H希
望まで指定されたとすると、優先順位に関する評価値f
1を以下の式5に示す。
The target value of the ratio occupied by the n-th hope set in (a) is o (n), the ratio occupied by the n-th hope in the operation plan to be evaluated obtained in (b) is r (n), and the maximum H-th. If it is specified as desired, the evaluation value f for the priority order
1 is shown in Equation 5 below.

【0084】 f1=Σ|r(n)−o(n)|/H ・・・式5F1 = Σ | r (n) −o (n) | / H Equation 5

【0085】更に、運用計画評価手段7は、運用計画保
持手段8から運用要求の保留数の改善が進んでいないこ
とを通知されると、上記(a)の処理において、優先順
位が高い運用日、運用開始時刻、運用局が占める割合の
目標値を下げ、優先順位が低い運用日、運用開始時刻、
運用局が占める割合の目標値を上げ(例えば、{o
(1)=80,o(2)=15,o(3)=5}を{o
(1)=60,o(2)=25,o(3)=15}に変
更する)、運用計画保持手段8に格納されている運用計
画全ての評価値を再計算する。
Further, when the operation plan evaluation means 7 is notified from the operation plan holding means 8 that the improvement of the number of pending operation requests has not been advanced, in the processing of (a), the operation plan , Operation start time, lower the target value of the percentage occupied by the operation bureau, lower operation days, operation start time,
Increase the target value for the percentage occupied by the operation bureau (for example,
(1) = 80, o (2) = 15, o (3) = 5} to {o
(1) = 60, o (2) = 25, o (3) = 15), and the evaluation values of all the operation plans stored in the operation plan holding means 8 are recalculated.

【0086】これにより第2希望以下の運用日、運用開
始時刻、運用局が割り当てられる運用要求の割合が大き
く、保留される運用要求の数が少ない運用計画ほど良い
評価値が得られ、運用計画選別手段9における選別処理
において残される確率が高くなる。
As a result, a better evaluation value can be obtained for an operation plan in which the operation date, operation start time, and operation station to which the second station or less is assigned have a higher ratio of operation requests to be allocated and a smaller number of operation requests to be suspended. The probability of being left in the sorting process in the sorting means 9 increases.

【0087】これにより、保留される運用要求の数を最
小にする運用計画を自動立案でき、保留された運用要求
の見直しの手間を削減できると共に運用計画の立案時間
を短縮できるという効果がある。
As a result, an operation plan for minimizing the number of operation requests to be suspended can be automatically drafted, so that it is possible to reduce the time and effort for reviewing the suspended operation requests and to reduce the time required to formulate the operation plan.

【0088】[0088]

【発明の効果】この発明の請求項1に係る人工衛星の運
用計画立案システムは、以上説明したとおり、人工衛星
の運用要求を格納する運用要求格納手段と、人工衛星の
設備専有要求を格納する設備専有要求格納手段と、地上
局のネットワーク制限要求を格納するNW制限要求格納
手段と、人工衛星における地上局別の可視時間帯情報を
格納する可視情報格納手段と、前回の立案処理により得
られた運用計画に基いて人工衛星の新規運用計画を生成
する運用計画生成手段と、新規運用計画の評価値を求め
る運用計画評価手段と、複数の運用計画を保持する運用
計画保持手段と、前記運用計画保持手段に格納されてい
る運用計画を決められた個数だけ各運用計画の評価値に
基づいて選別し、前記運用計画保持手段の保持する運用
計画を更新する運用計画選別手段と、前記運用計画保持
手段に格納されている運用計画の中で、次の立案処理に
おいて生成される新規運用計画の基となる運用計画を選
択する運用計画選択手段とを備え、前回の立案結果を基
にした新規運用計画の生成と運用計画の選別を繰り返し
行い、前記運用計画保持手段は、保持している運用計画
の中で最良評価値を取る計画における運用要求の保留数
の変化を監視し、保留数が一定期間減少しなければ前記
運用計画評価手段に保留数に変化が無いことを通知し、
前記運用計画評価手段は、前記運用計画保持手段から運
用要求の保留数に変化が無い旨の通知を受けると、運用
日、運用開始時刻及び運用局の各優先順位に与える評価
点の差が小さくなるように運用計画の評価基準を変更す
るので、保留される運用要求の数を最小にする運用計画
を自動立案でき、保留された運用要求の見直しの手間を
削減できると共に運用計画の立案時間を短縮できるとい
う効果を奏する。
As described above, the operation planning system for artificial satellites according to claim 1 of the present invention stores operation request storage means for storing operation requests for artificial satellites and requests for exclusive use of equipment for artificial satellites. Equipment occupancy request storage means, NW restriction request storage means for storing network restriction requests of ground stations, visible information storage means for storing visible time zone information for each ground station in artificial satellites, obtained by the previous planning process Operation plan generation means for generating a new operation plan of an artificial satellite based on an operation plan obtained, operation plan evaluation means for obtaining an evaluation value of the new operation plan, operation plan holding means for holding a plurality of operation plans, The operation plan stored in the plan holding means is selected based on the evaluation value of each operation plan by the determined number, and the operation plan held by the operation plan holding means is updated. A plan selection unit, and an operation plan selection unit that selects an operation plan based on a new operation plan generated in the next planning process among operation plans stored in the operation plan holding unit, The generation of the new operation plan and the selection of the operation plan based on the planning result are repeatedly performed, and the operation plan holding unit determines the number of pending operation requests in the plan that takes the best evaluation value among the held operation plans. Monitor the change, if the number of holds does not decrease for a certain period, notify the operation plan evaluation means that the number of holds has not changed,
The operation plan evaluation means, when receiving a notification from the operation plan holding means that there is no change in the number of pending operation requests, the difference between the evaluation points given to the operation days, the operation start times, and the respective priorities of the operation stations is small. The evaluation criteria of the operation plan are changed so that the operation plan that minimizes the number of suspended operation requests can be automatically drafted, the work of reviewing the suspended operation requests can be reduced, and the operation plan drafting time can be reduced. This has the effect of being shortened.

【0089】この発明の請求項2に係る人工衛星の運用
計画立案システムは、以上説明したとおり、前記運用計
画評価手段が、前記運用計画保持手段から運用要求の保
留数に変化が無い旨の通知を受けると、前記各優先順位
に与える評価点を用いる代わりに、全運用要求の中で優
先度の高い運用日、運用開始時刻または運用局が割り当
てられる運用要求が全体に占める割合の目標値を下げ、
優先度の低い運用日、運用開始時刻または運用局が割り
当てられる運用要求が全体に占める割合の目標値を上
げ、優先度の低い運用日、運用時刻または運用局が割り
当てられる運用要求の数が多いほど良い評価値が得られ
るように運用計画の評価基準を変更するので、保留され
る運用要求の数を最小にする運用計画を自動立案でき、
保留された運用要求の見直しの手間を削減できると共に
運用計画の立案時間を短縮できるという効果を奏する。
According to a second aspect of the present invention, in the artificial satellite operation plan planning system, as described above, the operation plan evaluation unit notifies the operation plan holding unit that there is no change in the number of pending operation requests. Received, instead of using the evaluation points given to each of the priorities, the target value of the ratio of the operation requests assigned to the operation days with the highest priority, the operation start time or the operation station among all the operation requests to the entire operation request is set. Lower,
Raise the target value of the ratio of low-priority operation days, operation start times or operation requests to which the operation station is allocated to the total, and increase the number of low-priority operation days, operation times or operation requests to which the operation station is allocated Since the evaluation criteria of the operation plan are changed to obtain a better evaluation value, the operation plan that minimizes the number of pending operation requests can be automatically drafted,
This has the effect of reducing the time and effort for reviewing the suspended operation request and shortening the operation planning time.

【0090】この発明の請求項3に係る人工衛星の運用
計画立案方法は、以上説明したとおり、人工衛星の運用
要求、人工衛星の設備専有要求、地上局のネットワーク
制限要求、及び人工衛星における可視時間帯の各情報を
参照し、前回の立案処理により得られた運用計画を部分
的に変更することで新規の運用計画を生成する運用計画
生成ステップと、前回の立案処理で得られた運用計画と
今回の新規運用計画を合わせた中から決められた数の運
用計画を各運用計画の評価値に基づいて選別する運用計
画評価選別ステップと、前記選別された運用計画の中か
ら次の立案処理において生成される新規運用計画の基と
なる運用計画を選択する運用計画選択ステップと、前記
運用計画生成ステップから前記運用計画選択ステップま
での処理を繰り返し行ない、運用計画選別後の最も評価
値の良い運用計画における運用要求の保留数に変化が無
くなると、運用日、運用開始時刻及び運用局の各希望順
位に与える評価点の差が小さくなるように運用計画の評
価基準を変更する評価基準変更ステップとを含むので、
保留される運用要求の数を最小にする運用計画を自動立
案でき、保留された運用要求の見直しの手間を削減でき
ると共に運用計画の立案時間を短縮できるという効果を
奏する。
As described above, the artificial satellite operation planning method according to the third aspect of the present invention provides a request for operation of an artificial satellite, a request for exclusive use of an artificial satellite, a request for limiting the network of a terrestrial station, and a request for visual restriction on an artificial satellite. An operation plan generation step of generating a new operation plan by partially changing the operation plan obtained by the previous planning process with reference to each information of the time zone, and an operation plan obtained by the previous planning process And an operation plan evaluation selection step of selecting a predetermined number of operation plans based on the evaluation value of each operation plan from the combination of the new operation plan and the current operation plan; and An operation plan selection step of selecting an operation plan based on a new operation plan generated in the above, and a process from the operation plan generation step to the operation plan selection step is repeated. When there is no change in the number of pending operation requests in the operation plan with the highest evaluation value after the operation plan selection, the difference between the evaluation points given to the operation date, operation start time, and each desired rank of the operation station is reduced. And an evaluation standard change step of changing the evaluation standard of the operation plan.
An operation plan that minimizes the number of operation requests to be suspended can be automatically drafted, so that it is possible to reduce the trouble of reviewing the suspended operation requests and to shorten the operation planning time.

【0091】この発明の請求項4に係る人工衛星の運用
計画立案方法は、以上説明したとおり、前記評価基準変
更ステップでは、運用計画選別後の最も評価値の良い運
用計画における運用要求の保留数の変化が無くなると、
前記各希望順位に与える評価点を用いる代わりに、全運
用要求の中で優先順位の高い運用日、運用開始時刻また
は運用局が割り当てられる運用要求が全体に占める割合
の目標値を下げ、優先順位の低い運用日、運用開始時刻
または運用局が割り当てられる運用要求が全体に占める
割合の目標値を上げ、優先順位の低い運用日、運用開始
時刻または運用局が割り当てられる運用要求の数が多い
ほど良い評価値が得られるように運用計画の評価基準を
変更するので、保留される運用要求の数を最小にする運
用計画を自動立案でき、保留された運用要求の見直しの
手間を削減できると共に運用計画の立案時間を短縮でき
るという効果を奏する。
According to a fourth aspect of the present invention, as described above, in the evaluation criterion changing step, the number of pending operation requests in the operation plan having the best evaluation value after the operation plan selection is determined. When the change of
Instead of using the evaluation points given to the respective desired ranks, lower the target value of the ratio of the operation requests assigned to the operation days with the highest priority, the operation start time or the operation station to the entire operation request, and The lower the operating day, the operation start time or the operation request to which the operation station is assigned, the target value of the proportion of the entire operation is increased, and the lower the operation day, the operation start time, or the number of operation requests to which the operation station is assigned the lower the priority Since the evaluation criteria of the operation plan are changed so that a good evaluation value can be obtained, an operation plan that minimizes the number of suspended operation requests can be automatically drafted, and the work of reviewing the suspended operation requests can be reduced and operation can be performed. This has the effect of shortening the planning time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1に係る人工衛星の運
用計画立案システムの構成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of an artificial satellite operation planning system according to Embodiment 1 of the present invention.

【図2】 この発明の実施の形態1に係る人工衛星の運
用計画立案システムの動作を示すフローチャートであ
る。
FIG. 2 is a flowchart showing an operation of the artificial satellite operation planning system according to Embodiment 1 of the present invention.

【図3】 この発明の実施の形態1に係る人工衛星の運
用計画立案システムの運用計画例を示す図である。
FIG. 3 is a diagram showing an example of an operation plan of the operation plan drafting system for the artificial satellite according to the first embodiment of the present invention.

【図4】 この発明の実施の形態1に係る人工衛星の運
用計画立案システムの運用計画例を示す図である。
FIG. 4 is a diagram showing an example of an operation plan of the operation plan drafting system for the artificial satellite according to the first embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 運用要求格納手段、2 設備専有要求格納手段、3
NW制限要求格納手段、4 可視情報格納手段、5
衛星順位付け手段、6 運用計画生成手段、7運用計画
評価手段、8 運用計画保持手段、9 運用計画選別手
段、10 運用計画選択手段、11 運用計画表示手
段、12 運用計画格納手段。
1 Operation request storage means, 2 Equipment exclusive request storage means, 3
NW restriction request storage means, 4 visible information storage means, 5
Satellite ranking means, 6 operation plan generation means, 7 operation plan evaluation means, 8 operation plan holding means, 9 operation plan selection means, 10 operation plan selection means, 11 operation plan display means, 12 operation plan storage means.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 人工衛星の運用要求を格納する運用要求
格納手段と、 人工衛星の設備専有要求を格納する設備専有要求格納手
段と、 地上局のネットワーク制限要求を格納するNW制限要求
格納手段と、 人工衛星における地上局別の可視時間帯情報を格納する
可視情報格納手段と、 前回の立案処理により得られた運用計画に基いて人工衛
星の新規運用計画を生成する運用計画生成手段と、 新規運用計画の評価値を求める運用計画評価手段と、 複数の運用計画を保持する運用計画保持手段と、 前記運用計画保持手段に格納されている運用計画を決め
られた個数だけ各運用計画の評価値に基づいて選別し、
前記運用計画保持手段の保持する運用計画を更新する運
用計画選別手段と、 前記運用計画保持手段に格納されている運用計画の中
で、次の立案処理において生成される新規運用計画の基
となる運用計画を選択する運用計画選択手段とを備え、 前回の立案結果を基にした新規運用計画の生成と運用計
画の選別を繰り返し行い、 前記運用計画保持手段は、保持している運用計画の中で
最良評価値を取る計画における運用要求の保留数の変化
を監視し、保留数が一定期間減少しなければ前記運用計
画評価手段に保留数に変化が無いことを通知し、 前記運用計画評価手段は、前記運用計画保持手段から運
用要求の保留数に変化が無い旨の通知を受けると、運用
日、運用開始時刻及び運用局の各優先順位に与える評価
点の差が小さくなるように運用計画の評価基準を変更す
ることを特徴とする人工衛星の運用計画立案システム。
1. An operation request storage means for storing an operation request of an artificial satellite, an equipment occupation request storage means for storing an occupancy request for an artificial satellite, and an NW restriction request storage means for storing a network restriction request for a ground station. A visible information storage means for storing visible time zone information for each ground station in an artificial satellite; an operation plan generating means for generating a new operational plan for an artificial satellite based on an operation plan obtained by the previous planning process; An operation plan evaluation means for obtaining an evaluation value of an operation plan; an operation plan holding means for holding a plurality of operation plans; and an evaluation value of each operation plan for a predetermined number of operation plans stored in the operation plan holding means. Sorting based on
An operation plan selection unit that updates an operation plan held by the operation plan holding unit, and a new operation plan generated in the next planning process among operation plans stored in the operation plan holding unit. Operation plan selection means for selecting an operation plan, and repeatedly generates a new operation plan and selects an operation plan based on the results of the previous planning, and the operation plan holding means includes: Monitoring the change in the number of pending operation requests in the plan that takes the best evaluation value, and if the number of pending requests does not decrease for a certain period, notifies the operation plan evaluating means that there is no change in the number of pending requests; When receiving from the operation plan holding means that there is no change in the number of pending operation requests, the operation plan is set so that the difference between the operation date, the operation start time, and the evaluation points given to the respective priorities of the operation stations is reduced. An operation planning system for artificial satellites, characterized by changing image evaluation criteria.
【請求項2】 前記運用計画評価手段は、前記運用計画
保持手段から運用要求の保留数に変化が無い旨の通知を
受けると、前記各優先順位に与える評価点を用いる代わ
りに、全運用要求の中で優先度の高い運用日、運用開始
時刻または運用局が割り当てられる運用要求が全体に占
める割合の目標値を下げ、優先度の低い運用日、運用開
始時刻または運用局が割り当てられる運用要求が全体に
占める割合の目標値を上げ、優先度の低い運用日、運用
時刻または運用局が割り当てられる運用要求の数が多い
ほど良い評価値が得られるように運用計画の評価基準を
変更することを特徴とする請求項1記載の人工衛星の運
用計画立案システム。
2. When the operation plan evaluation unit receives a notification from the operation plan holding unit that there is no change in the number of pending operation requests, instead of using the evaluation points given to the respective priorities, the operation plan evaluation unit Lower the target value of the percentage of the total of the operation requests to which the higher priority operation days, operation start times, or operation stations are allocated, and lower the operation days, operation start times, or operation requests to which the operation stations are allocated. Increase the target value of the percentage of the total, and change the evaluation criteria of the operation plan so that the higher the number of operation days, operation times, or operation requests assigned to lower priority, the better the evaluation value. The operation planning system for an artificial satellite according to claim 1, wherein:
【請求項3】 人工衛星の運用要求、人工衛星の設備専
有要求、地上局のネットワーク制限要求、及び人工衛星
における可視時間帯の各情報を参照し、前回の立案処理
により得られた運用計画を部分的に変更することで新規
の運用計画を生成する運用計画生成ステップと、 前回の立案処理で得られた運用計画と今回の新規運用計
画を合わせた中から決められた数の運用計画を各運用計
画の評価値に基づいて選別する運用計画評価選別ステッ
プと、 前記選別された運用計画の中から次の立案処理において
生成される新規運用計画の基となる運用計画を選択する
運用計画選択ステップと、 前記運用計画生成ステップから前記運用計画選択ステッ
プまでの処理を繰り返し行ない、運用計画選別後の最も
評価値の良い運用計画における運用要求の保留数に変化
が無くなると、運用日、運用開始時刻及び運用局の各希
望順位に与える評価点の差が小さくなるように運用計画
の評価基準を変更する評価基準変更ステップとを含むこ
とを特徴とする人工衛星の運用計画立案方法。
3. An operation plan obtained by the previous planning process is referred to by referring to each information of an operation request of an artificial satellite, a request for exclusive use of an artificial satellite, a request for limiting a network of a ground station, and a visible time zone of the artificial satellite. The operation plan generation step of generating a new operation plan by partially changing the operation plan, and the number of operation plans determined from the combination of the operation plan obtained in the previous planning process and the current operation plan An operation plan evaluation selection step of selecting based on the evaluation value of the operation plan; and an operation plan selection step of selecting an operation plan based on a new operation plan generated in the next planning process from the selected operation plans. And repeating the processing from the operation plan generation step to the operation plan selection step to suspend the operation request in the operation plan with the best evaluation value after the operation plan selection. An evaluation criterion changing step of changing the evaluation criterion of the operation plan such that the difference between the evaluation points given to the operation day, the operation start time, and each desired rank of the operation bureau becomes smaller when the number is no longer changed. How to formulate a satellite operation plan.
【請求項4】 前記評価基準変更ステップでは、運用計
画選別後の最も評価値の良い運用計画における運用要求
の保留数の変化が無くなると、前記各希望順位に与える
評価点を用いる代わりに、全運用要求の中で優先順位の
高い運用日、運用開始時刻または運用局が割り当てられ
る運用要求が全体に占める割合の目標値を下げ、優先順
位の低い運用日、運用開始時刻または運用局が割り当て
られる運用要求が全体に占める割合の目標値を上げ、優
先順位の低い運用日、運用開始時刻または運用局が割り
当てられる運用要求の数が多いほど良い評価値が得られ
るように運用計画の評価基準を変更することを特徴とす
る請求項3記載の人工衛星の運用計画立案方法。
4. In the evaluation criterion changing step, when there is no change in the number of pending operation requests in the operation plan with the best evaluation value after the operation plan selection, all evaluation points assigned to the respective desired ranks are used instead of using the evaluation points given to the desired ranks. Among the operation requests, the operation date with the highest priority, the operation start time, or the operation station is assigned. The target value of the ratio of the operation request to the entire operation request is lowered, and the operation day with a low priority, the operation start time, or the operation station is assigned. Raise the target value of the ratio of operation requests to the total, and adjust the evaluation criteria of the operation plan so that the higher the number of operation requests with lower priority, the operation start time, or the operation station assigned, the better the evaluation value. 4. The method according to claim 3, wherein the operation plan is changed.
JP2000049307A 2000-02-25 2000-02-25 Operation plan making system and method of artificial satellite Pending JP2001233300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000049307A JP2001233300A (en) 2000-02-25 2000-02-25 Operation plan making system and method of artificial satellite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000049307A JP2001233300A (en) 2000-02-25 2000-02-25 Operation plan making system and method of artificial satellite

Publications (1)

Publication Number Publication Date
JP2001233300A true JP2001233300A (en) 2001-08-28

Family

ID=18571271

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000049307A Pending JP2001233300A (en) 2000-02-25 2000-02-25 Operation plan making system and method of artificial satellite

Country Status (1)

Country Link
JP (1) JP2001233300A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010208599A (en) * 2009-03-12 2010-09-24 Fujitsu Ltd Path allocation program, path allocation device, and path allocation method
JP2012144137A (en) * 2011-01-12 2012-08-02 Mitsubishi Electric Corp Observation operation planning system
JP2013042409A (en) * 2011-08-18 2013-02-28 Mitsubishi Electric Corp Satellite operation planning device
US11939088B2 (en) 2019-09-26 2024-03-26 Mitsubishi Electric Corporation Satellite visibility assignment device, satellite operation system, visibility assignment method, and recording medium storing program

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010208599A (en) * 2009-03-12 2010-09-24 Fujitsu Ltd Path allocation program, path allocation device, and path allocation method
JP2012144137A (en) * 2011-01-12 2012-08-02 Mitsubishi Electric Corp Observation operation planning system
JP2013042409A (en) * 2011-08-18 2013-02-28 Mitsubishi Electric Corp Satellite operation planning device
US11939088B2 (en) 2019-09-26 2024-03-26 Mitsubishi Electric Corporation Satellite visibility assignment device, satellite operation system, visibility assignment method, and recording medium storing program

Similar Documents

Publication Publication Date Title
EP0797164A1 (en) Appointment booking and scheduling system
Magerlein et al. Surgical demand scheduling: a review.
US6578005B1 (en) Method and apparatus for resource allocation when schedule changes are incorporated in real time
Durán et al. Solving the operating room scheduling problem with prioritized lists of patients
Persson et al. Health economic modeling to support surgery management at a Swedish hospital
WO2017062769A1 (en) Dynamic capacity ranges for workforce routing
Spratt et al. Waiting list management through master surgical schedules: A case study
Hosseini et al. Allocating operating room block time using historical caseload variability
Akbarzadeh et al. The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
Min et al. Managing a patient waiting list with time-dependent priority and adverse events
US20160350499A1 (en) System and method for optimizing allocation of medical units for patient treatment
Izady Appointment capacity planning in specialty clinics: A queueing approach
Britt et al. A stochastic hierarchical approach for the master surgical scheduling problem
JP2001233300A (en) Operation plan making system and method of artificial satellite
JP2001067413A (en) Device and method for generating schedule and schedule generation system using the same
Mazier et al. Real-time patients assignment: A method for improving emergency department flow
Mashkani et al. Minimizing total clinical deterioration in operating theatres
JPH10291144A (en) Production planning making device
JPH09244706A (en) Method and device for plan correction
JP4478532B2 (en) Program and crew operation change plan creation device
Choudhary et al. A Comprehensive Review of Patient Scheduling Techniques with Uncertainty
Geng Stochastic and Dynamic Programming for Improving the Reservation Process of MRI Examinations
Adams et al. Application of a risk-averse objective function for scheduling surgeries
US11640585B2 (en) Method for customizable priority wait list notification for appointments
Beliën et al. Building cyclic master surgery schedules with leveled resulting bed occupancy: A case study