JP5374256B2 - Manufacturing method of band-shaped member bundle - Google Patents
Manufacturing method of band-shaped member bundle Download PDFInfo
- Publication number
- JP5374256B2 JP5374256B2 JP2009157022A JP2009157022A JP5374256B2 JP 5374256 B2 JP5374256 B2 JP 5374256B2 JP 2009157022 A JP2009157022 A JP 2009157022A JP 2009157022 A JP2009157022 A JP 2009157022A JP 5374256 B2 JP5374256 B2 JP 5374256B2
- Authority
- JP
- Japan
- Prior art keywords
- shaped member
- band
- belt
- bundle
- winding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Packaging Of Machine Parts And Wound Products (AREA)
Description
本発明は、螺旋状に巻回されて更生管とされる長尺の帯状部材を輸送するために中空円筒状に巻き重ねた帯状部材結束体の製造方法に関するものである。 The present invention relates to a method for manufacturing a band-shaped member bundle that is wound in a hollow cylindrical shape in order to transport a long band-shaped member that is wound spirally to form a rehabilitation pipe.
老朽化した既設管では、帯状部材を螺旋状に巻回して更生管を製管し、製管された更生管によって内周面をライニングすることが行われている。このような既設管のライニング工法では、既設管の内部に帯状部材を送り込むため、施工現場まで長尺の帯状部材を輸送する必要がある。 In existing pipes that have deteriorated, a belt-shaped member is spirally wound to produce a rehabilitation pipe, and the inner peripheral surface is lined by the renovation pipe that has been produced. In such an existing pipe lining method, since the belt-shaped member is fed into the existing pipe, it is necessary to transport the long belt-shaped member to the construction site.
帯状部材は、通常、輸送用ドラムに巻き重ねられた状態で現場まで輸送される。帯状部材が巻き重ねられる輸送用ドラムは、円板状の一対の側板の中央部間に円筒状の胴体が連結されて構成されており、胴体に長尺の帯状部材が巻き重ねられ、設定された長さの帯状部材が巻き重ねられると、帯状部材が巻き重ねられた状態で胴体が側板から引き抜かれるようになっている。そして、帯状部材が巻き重ねられた輸送用ドラムは施工現場まで輸送されて仮置きされ、帯状部材が輸送用ドラムの内周側から繰り出されて既設管内に送り込まれ、既設管内にて螺旋状に巻回されることにより、更生管が順次製管される(例えば、特許文献1参照)。 The belt-shaped member is usually transported to the site while being wound around a transport drum. The transport drum around which the belt-shaped member is wound is configured by connecting a cylindrical body between the center portions of a pair of disk-shaped side plates, and a long belt-shaped member is wound around the body and set. When the belt-shaped member having a certain length is wound, the body is pulled out from the side plate in a state where the belt-shaped member is wound. The transport drum on which the belt-like member is wound is transported to the construction site and temporarily placed, and the belt-like member is drawn out from the inner peripheral side of the transport drum and fed into the existing pipe, and spirally formed in the existing pipe. By being wound, rehabilitation pipes are sequentially manufactured (see, for example, Patent Document 1).
輸送用ドラムに巻き重ねられる帯状部材の長さは、一般的には、500m〜2000m程度であり、この長さの帯状部材で形成される更生管の長さは、更生管の直径を約2m程度とすれば、約5m〜12m程度となる。したがって、老朽化した既設管のライニング長さが長い場合は、多数の輸送用ドラムを施工現場に持ち込む必要がある。 The length of the belt-like member wound around the transport drum is generally about 500 m to 2000 m, and the length of the rehabilitation pipe formed by the belt-like member of this length is about 2 m in diameter of the rehabilitation pipe. If it is about, it will be about 5-12 m. Therefore, when the lining length of the existing pipes is long, it is necessary to bring a large number of transport drums to the construction site.
輸送用ドラムは、一度で輸送できる帯状部材長さを長く、かつ、トラックなどで輸送可能な最大の大きさに形成される。具体的には、通常、側板の外径3000mm、胴体の長さ1200mm程度の輸送用ドラムが多用される。したがって、このようなサイズの輸送用ドラムが多数施工現場に持ち込まれて仮置きされると、仮置き期間中、施工現場周辺の交通が渋滞したり、歩行者の通路を塞いだりするという問題がある。 The transport drum is formed in a maximum length that can be transported by a truck or the like with a long strip-shaped member that can be transported at one time. Specifically, a transport drum having a side plate outer diameter of 3000 mm and a body length of about 1200 mm is often used. Therefore, if a large number of transport drums of this size are brought to the construction site and temporarily placed, traffic around the construction site may be congested or the pedestrian's passage may be blocked during the temporary placement period. is there.
このような問題を避けるために、輸送用ドラムを1個ずつ施工現場に持ち込むようにすると、輸送用ドラムを一時的に保管しておく場所として、別の場所に広大な空間が必要となる。また、帯状部材を製造し、輸送用ドラムに巻き付ける工場では、必要が生じるまでの間多数の輸送用ドラムを保管しておかねばならなくなるが、その保管可能数には限度があり、帯状部材の製造可能長さ以上に消費があれば、時には一時的な帯状部材の供給量不足が発生する可能性も出てくる。 In order to avoid such a problem, if the transport drums are brought into the construction site one by one, a large space is required in another place as a place for temporarily storing the transport drums. In addition, in a factory where a belt-shaped member is manufactured and wound around a transport drum, it is necessary to store a large number of transport drums until it becomes necessary. If there is more consumption than the manufacturable length, there is a possibility that a shortage of the supply amount of the belt-shaped member may sometimes occur.
このような問題に対応して、出願人は、輸送用ドラムを用いることなく中空円筒状帯状部材をその解け出しを確実に防止しつつ安定して保管し、輸送することのできる帯状部材結束体を提案するとともに、製造ドラムや巻取り装置を用いて帯状部材結束体を製造する製造方法を提案している(例えば、特許文献2参照)。 In response to such a problem, the applicant is able to stably store and transport the hollow cylindrical belt-like member while reliably preventing the unrolling of the hollow cylindrical belt-like member without using a transport drum. And a manufacturing method for manufacturing a band-shaped member bundle using a manufacturing drum or a winding device is proposed (see, for example, Patent Document 2).
なお、帯状部材10は、図5に示すように、可撓性を有する合成樹脂、例えば、硬質塩化ビニル、ポリエチレン、ポリプロピレンなどを押出成形して形成される。そして、帯状部材10は、帯板状の基板11の裏面に複数本の断面T字状の補強リブ12が設けられる一方、基板11の一側縁部の裏面に接合凸部13が立設され、また、その他側縁部に、接合凸部13が設けられた基板11の側縁部が配置されるように、基板11の厚みだけ裏面側に段落ちした段落ち部14が形成されるとともに、その段落ち部14に接合凸部13が嵌入し得る接合凹部15が設けられ、さらに、この接合凹部15に、基板11から離れるにつれて接合凹部15の突出側に位置するように傾斜された傾斜リブ16が形成されている。このような帯状部材10は、幅wおよび高さhを有している。
In addition, as shown in FIG. 5, the strip | belt-
ところで、引用文献2に記載された帯状部材結束体の施工用治具は、外周リングおよび内周リング間に複数本の補強桟が周方向に間隔をおいて放射状に連結されて形成された左右の回転体に、周方向に間隔をおいて複数本の連結ロッドを着脱自在に連結して構成されている。そして、左右の回転体間に中空円筒部を左右方向に向けた帯状部材結束体を収容し、その外周側に位置して左右の回転体にわたって複数本の連結ロッドを周方向に間隔をおいて連結するようにしている。
By the way, the jig | tool for construction of the strip | belt-shaped member binding body described in the cited
したがって、施工用治具に対して帯状部材結束体を収容し、支持するためには、左右の回転体に半周にわたって複数本の連結ロッドを連結した後、帯状部材結束体を吊り上げて左右の回転体間および複数本の連結ロッドによって形成された空間に落とし込み、左右の回転体に収容された帯状部材結束体の外周面に合わせて、左右の回転体に残りの半周にわたって複数本の連結ロッドを固定する必要がある。 Therefore, in order to accommodate and support the band-shaped member bundle with respect to the construction jig, after connecting a plurality of connecting rods to the left and right rotating bodies over a half circumference, the band-shaped member bundle is lifted to rotate left and right. Drop into the space formed between the bodies and the multiple connecting rods, and align the multiple connecting rods on the left and right rotating bodies over the remaining half circumference to match the outer peripheral surface of the band-shaped member bundle housed in the left and right rotating bodies Need to be fixed.
ここで、帯状部材は、更生する既設管の管径に対応して幅および高さの異なるものが使用される。また、工場において、帯状部材を設定された巻き長さ、例えば、1.0kmや0.5km巻き重ねて結束することにより帯状部材結束体が製造される。 Here, as the belt-like member, ones having different widths and heights corresponding to the diameters of the existing pipes to be rehabilitated are used. Further, in the factory, the band-shaped member bundle is manufactured by winding and bundling the band-shaped member with a set winding length, for example, 1.0 km or 0.5 km.
したがって、製造ドラムや巻取り装置を用いて帯状部材結束体を製造するとき、帯状部材の種類および巻き長さによって帯状部材結束体の外径が変化するものとなる。このため、帯状部材結束体を施工用治具に収容する際、予め帯状部材結束体の外径を計測し、その外径に対応して左右の回転体間に複数本の連結ロッドを調整しつつ連結する必要があることから、作業が煩雑になるとともに、収容作業に多くの時間を必要とするものである。すなわち、施工区間にわたって更生管を製管するには、多数の帯状部材結束体が必要であることから、限定された1日の作業時間に対して、施工用治具に1個の帯状部材結束体を収容支持するのに要する時間および必要とする帯状部材結束体の個数との積によって決定される収容作業に要する時間の割合が大きくなり、製管に割り当てられる作業時間が相対的に減少し、設定された施工区間の製管作業が遅延するおそれがある。 Therefore, when a band-shaped member bundle is manufactured using a production drum or a winding device, the outer diameter of the band-shaped member bundle varies depending on the type and winding length of the band-shaped member. For this reason, when the band-shaped member bundle is accommodated in the construction jig, the outer diameter of the band-shaped member bundle is measured in advance, and a plurality of connecting rods are adjusted between the left and right rotating bodies corresponding to the outer diameter. However, since it is necessary to connect them, the operation becomes complicated, and a lot of time is required for the accommodation operation. That is, in order to produce a rehabilitated pipe over a construction section, a large number of strip-shaped member bundles are required, so that one strip-shaped member is bound to a construction jig for a limited working time of one day. The ratio of the time required for the housing operation determined by the product of the time required to accommodate and support the body and the number of the band-like member bundles required increases, and the work time allocated to the pipe making is relatively reduced. There is a possibility that the pipe making work in the set construction section will be delayed.
本発明は、このような問題に鑑みてなされたもので、施工現場において施工用治具に帯状部材結束体を収容支持するのに要する作業時間を削減することのできる帯状部材結束体の製造方法を提供するものである。 The present invention has been made in view of such problems, and a method for manufacturing a band-shaped member bundle that can reduce the work time required to accommodate and support the band-shaped member bundle in a construction jig at a construction site. Is to provide.
本発明の帯状部材結束体の製造法は、施工用治具に収容され、支持される帯状部材結束体の製造方法において、帯状部材の巻き長さの長短に関係なく帯状部材結束体の外径が一定となるように、帯状部材の幅および高さ、その巻き長さ、帯状部材結束体の幅から帯状部材結束体の内径を算出するとともに、算出された内径に対応するように巻き芯の外径を調整した後、巻き芯に帯状部材を設定された巻き長さだけ順に巻き重ね、巻き重ねられた中空円筒状帯状部材を結束材によって結束して外径が一定の帯状部材結束体を製造することを特徴とするものである。 Preparation of the belt-shaped member bundles of the present invention is accommodated in construction jig, outside the manufacturing method of the belt-shaped member bundling body supported, regardless of the length of the winding length of the belt-shaped member strip bundles The inner diameter of the band-shaped member bundle is calculated from the width and height of the band-shaped member, its winding length, and the width of the band-shaped member bundle so that the diameter is constant, and the winding core corresponds to the calculated inner diameter. After the outer diameter of the belt is adjusted , the belt-shaped member is wound around the winding core in order by the set winding length , and the wound hollow cylindrical belt-shaped member is bundled with a binding material to bind the belt-shaped member bundle having a constant outer diameter. It is characterized by manufacturing.
本発明によれば、帯状部材の巻き長さの長短に関係なく帯状部材結束体の外径が一定となるように、帯状部材の幅および高さ、その巻き長さ、帯状部材結束体の幅から、帯状部材結束体を設定された外径に形成するための内径を算出する。そして、算出された内径に対応して巻き芯の外径を調整した後、その巻き芯に帯状部材を設定された巻き長さだけ順に巻き重ねて一定外径の帯状部材結束体を製造する。 According to the present invention, the width and height of the band-shaped member, the winding length thereof, the width of the band- shaped member bundle so that the outer diameter of the band-shaped member bundle is constant regardless of the length of the belt-shaped member. From this, the inner diameter for forming the band-shaped member bundle with the set outer diameter is calculated. Then, after adjusting the outer diameter of the winding core in accordance with the calculated inner diameter, the band-shaped member is wound around the winding core in order by a set winding length to manufacture a band-shaped member bundle having a constant outer diameter.
この結果、帯状部材の巻き長さの長短に関係なく一定外径の帯状部材結束体を製造することができ、施工用治具を構成する左右の回転体に対して連結ロッドを連結する際、帯状部材結束体の外径に対応する位置に予め連結しておくことが可能となり、施工用治具に帯状部材結束体を収容し、支持するのに要する作業時間を短縮することができる。 As a result, regardless of the winding length of the belt-like member, it is possible to produce a belt-like member bundle with a constant outer diameter, and when connecting the connecting rod to the left and right rotating bodies constituting the construction jig, It becomes possible to connect in advance to a position corresponding to the outer diameter of the band-shaped member bundle, and it is possible to shorten the work time required to house and support the band-shaped member bundle in the construction jig.
本発明の帯状部材結束体の製造方法によれば、施工現場において施工用治具に帯状部材結束体を収容支持するのに要する作業時間を削減することのできる帯状部材結束体を既存の設備を利用して製造することができる。 According to the method for manufacturing a band-shaped member bundle of the present invention, an existing facility is used for a band-shaped member bundle that can reduce the work time required to accommodate and support the band-shaped member bundle in a construction jig at a construction site. It can be manufactured using.
以下、本発明の実施の形態を図面に基づいて説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.
図1には、本発明の帯状部材結束体1の一実施形態が施工用治具5とともに示されている。
FIG. 1 shows an embodiment of a band-
この帯状部材結束体1は、老朽化した既設管をライニングする更生管を製管する帯状部材10が巻き重ねられて中空円筒状に形成され、図4に示すように、中空円筒状帯状部材の外周面、内周面および左右の側面にわたってダンボールなどの緩衝材2が周方向に間隔をおいて複数箇所(実施例においては90度の間隔をおいて4カ所)に巻き回されるとともに、各緩衝材2の周囲に紐や帯などの結束材3が巻き回されて結束されることにより形成されている。
This band-
これにより、帯状部材結束体1は、帯状部材10が巻き重ねられた中空円筒状帯状部材の巻き重ね方向に対して交差する方向に結束材3によって複数箇所が結束されているため、帯状部材10の解き出しを確実に防止することができる。また、中空円筒部を水平方向に向けて帯状部材結束体1を縦置きして保管する際、直立状態に安定して保管することができる。
Thereby, since the strip | belt-shaped
なお、帯状部材結束体10は、結束材2による結束が終了すると、帯状部材結束体1の外周面に保護材としてのダンボールを巻き回して止着した後、ダンボールの雨水などによる破損を防止するためフィルムを積層するとともに、帯状部材結束体1の外周面および左右の側面に遮光シートを被せて紫外線による帯状部材10の劣化を防止した後、中空円筒部を水平方向に向けて縦置きして保管される
一方、帯状部材結束体1の施工用治具5は、図1乃至図3に示すように、左右一対の回転体6,6と、これらの回転体6,6間に着脱自在に連結可能な複数本の連結ロッド7とから構成されている。
When the band-
各回転体6は、内周リング61、外周リング62およびこれらの内周リング61および外周リング62間に周方向に間隔おいて放射状に連結された複数本の補強桟63(図面では8本)からなり、補強桟63には、外周リング62に近接して取付穴63aが形成されている。
Each
連結ロッド7は、両端にナット(図示せず)が固定された同一構造の棒状体であって、ボルト8を回転体6における補強桟63の取付穴63aを通して連結ロッド7のナットにねじ込むことにより、回転体6に連結ロッド7を着脱自在に連結することができる。
The connecting
ここで、連結ロッド7の取付穴63aは、後述するように、予め設定された帯状部材結束体1の外径に対応する位置に形成されている。
Here, the mounting
このように構成された施工用治具5は、左右の回転体6,6における対応する補強桟63の取付穴63aを通してボルト8を差し込み、左右の回転体6,6間に配置された複数本の連結ロッド7のナットにそれぞれねじ込み、各連結ロッド7を左右の回転体6,6にわたって順に連結することにより組み立てられる。
The
すなわち、施工用治具5に帯状部材結束体1を収容し、支持する場合は、左右の回転体6,6に周方向に間隔をおいて半周にわたって複数本の連結ロッド7を順に連結し、左右の回転体6,6が周方向に間隔おいて複数本の連結ロッド7によって半周だけ連結された施工用治具1を組み立てる。
That is, when the band-shaped
この場合、左右の回転体6,6が自立するとともに、帯状部材結束体1を支持する強度が確保されるならば、必ずしも半周にわたって複数本の連結ロッド7を左右の回転体6,6に連結する必要はなく、半周未満の範囲にわたって複数本の連結ロッド7を周方向に間隔をおいて連結するようにしてもよい。
In this case, if the right and left
次いで、施工現場に輸送され、中空円筒部を水平方向に向けて地上に荷卸しされた帯状部材結束体1(帯状部材結束体1は、輸送に先立って遮光シート、フィルムおよびダンボールが除去されている。)に対して、組み立てられた施工用治具5を帯状部材結束体1に接近させ、その左右の回転体6,6を帯状部材結束体1の左右の側面に略連続するように対向させた後、施工用治具5を回転させ、連結ロッド7が連結されていない半周部分を通して帯状部材結束体1に被せる。次いで、施工用治具5を帯状結束体1とともに回転させ、帯状部材結束体1を収容するとともに、複数本の連結ロッド7にわたって支持した状態に施工用治具5を保持する。そして、回転体6,6に連結された複数本の連結ロッド7のうちの半周を隔てた連結ロッド7間において、左右の回転体6,6における対応する補強桟63の取付穴63aを通してボルト8を差し込み、左右の回転体6,6間に配置された複数本の連結ロッド7のナットにねじ込み、連結ロッド7を左右の回転体6,6にわたって順に連結する。これにより、帯状部材結束体1を施工用治具5に軸芯をほぼ一致させて収容するとともに、その外周面を複数本の連結ロッド7によって支持し、さらに、その左右の側面を左右の回転体6,6によって支持するものである。
Next, the band-shaped
次いで、帯状部材結束体1を収容支持した施工用治具5の左右の回転体6,6を図示しない回転台に載置するとともに、結束材3を切断し、帯状部材10の巻き重ね方向に交差する方向の固定を解除した後、中空円筒状帯状部材の内周側から帯状部材10の巻き始め端部を引き出し、一方の回転体6の内周リング61を経て外方に引き出す。これにより、帯状部材10の一端部を図示しないマンホールを経て既設管内に導くことができる。
Next, the left and right
ところで、前述した帯状部材結束体1は、詳細には図示しないが、製造ドラムや巻取り装置を利用して製造される。
By the way, although the band-shaped
この帯状部材結束体1の製造に際して、次の式から求められる内径に巻き芯の外径を調整した後、調整した外径の巻き芯に帯状部材10を設定された巻き長さに達するまで順に巻き重ねるものである。具体的には、
W:帯状部材結束体1の幅
Ri:帯状部材結束体1の内径
Ro:帯状部材結束体1の外径
h:帯状部材10の高さ
w:帯状部材10の幅
L:帯状部材10の巻き長さ
P:巻回ピッチ(帯状部材10の幅w+隣接する帯状部材10,10間の隙間p)
N:巻き重ねられる層の総数
とすると、
L(N):最内層(第1層)から数えてN層目の巻き重ね長さ
=2π・(Ri−h/2+Nh)・W/(w+p)
L(1〜N):最内層(第1層)から数えて第N層までの巻き長さ合計
=2π・(Ri+h/2)・W/(w+p)+・・・+2π・(Ri−h/2+Nh)・W/(w+p)
となる。そして、N層巻き重ねて帯状部材10が全て巻き重ねられることから、L(N−1)<L<L(N)である。
In manufacturing the band-shaped
W: Width Ri of band-shaped
N: If the total number of layers to be rolled up is
L (N): the winding length of the Nth layer counted from the innermost layer (first layer) = 2π · (Ri−h / 2 + Nh) · W / (w + p)
L (1 to N): Total winding length from the innermost layer (first layer) to the Nth layer = 2π · (Ri + h / 2) · W / (w + p) +... + 2π · (Ri−h) / 2 + Nh) ・ W / (w + p)
It becomes. And since all the strip | belt-shaped
また、
L(N)=2π(Ro−h/2)・W/(w+p)であるから、
このときの帯状部材結束体1の内径Riは、
Ri=Ro−Nhとなる。
Also,
Since L (N) = 2π (Ro−h / 2) · W / (w + p),
The inner diameter Ri of the band-shaped
Ri = Ro-Nh.
具体的には、帯状部材10の巻き長さL=500m、帯状部材10の幅w=100mm、帯状部材10の高さh=20mm、帯状部材結束体1の幅W=1200mm、帯状部材結束体1の外径R=1000mm、巻回ピッチP=120mmの場合、巻き重ねられる帯状部材10の層の数は9となり、そのときの内径は820mmとなる。
Specifically, the winding length L of the band-shaped
したがって、詳細には図示しないが、巻取り装置のように、拡径縮径可能な巻取りドラムに帯状部材10を巻き重ねて帯状部材結束体1を製造する場合は、拡径位置と縮径位置との間において、求められた内径に対応する外径まで巻取りドラムを縮径させて巻き取りを開始すればよい。
Therefore, although not shown in detail, when the belt-shaped
また、製造ドラムのように、左右の回転体に、周方向に間隔をおいて複数本の連結ロッドを連結して巻き芯を形成し、この巻き芯に帯状部材10を巻き重ねて帯状部材結束体1を製造する場合は、求められた内径に対応する位置に連結ロッドが位置するように、連結ロッドを左右の回転体間に連結すればよい。すなわち、左右の回転体における外周リングおよび内周リング間に周方向に間隔をおいて放射状に連結された複数本の補強桟にそれぞれスリットが形成されていることから、補強桟のスリットの範囲内において、求められた内径に対応する外径に連結ロッドが位置するように、連結ロッドを左右の回転体間に連結し、巻き取りを開始すればよい。
Further, like a manufacturing drum, a plurality of connecting rods are connected to the left and right rotating bodies at intervals in the circumferential direction to form a winding core, and the band-shaped
1 帯状部材結束体
2 緩衝材
3 結束材
5 施工用治具
10 帯状部材
DESCRIPTION OF
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009157022A JP5374256B2 (en) | 2009-07-01 | 2009-07-01 | Manufacturing method of band-shaped member bundle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009157022A JP5374256B2 (en) | 2009-07-01 | 2009-07-01 | Manufacturing method of band-shaped member bundle |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2011011792A JP2011011792A (en) | 2011-01-20 |
JP5374256B2 true JP5374256B2 (en) | 2013-12-25 |
Family
ID=43591076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009157022A Active JP5374256B2 (en) | 2009-07-01 | 2009-07-01 | Manufacturing method of band-shaped member bundle |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5374256B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5688329B2 (en) * | 2011-05-20 | 2015-03-25 | 積水化学工業株式会社 | Construction method using a jig for constructing a band-shaped member bundle |
KR20210010660A (en) | 2012-08-03 | 2021-01-27 | 데쿠세리아루즈 가부시키가이샤 | Reel member, film container, and method for manufacturing film container |
JP2015086029A (en) | 2013-10-29 | 2015-05-07 | デクセリアルズ株式会社 | Reel member, and film storage body |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0822716B2 (en) * | 1985-10-11 | 1996-03-06 | 株式会社寺岡製作所 | Tape winding method |
JPH0622311Y2 (en) * | 1986-08-27 | 1994-06-15 | 株式会社清水製作所 | Coreless toilet paper roll |
JP2005145626A (en) * | 2003-11-14 | 2005-06-09 | Sumitomo Electric Ind Ltd | Method and device for manufacturing wire element |
JP4414779B2 (en) * | 2004-02-06 | 2010-02-10 | 株式会社ブリヂストン | Winding method of wire |
JP2008308294A (en) * | 2007-06-14 | 2008-12-25 | Sekisui Chem Co Ltd | Construction device for beltlike member bundle body |
JP5301207B2 (en) * | 2007-06-14 | 2013-09-25 | 積水化学工業株式会社 | Jig for construction of band-shaped member bundle |
-
2009
- 2009-07-01 JP JP2009157022A patent/JP5374256B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2011011792A (en) | 2011-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5301207B2 (en) | Jig for construction of band-shaped member bundle | |
SE505888C2 (en) | Production of coil of flexible object and core therefore | |
JP5374256B2 (en) | Manufacturing method of band-shaped member bundle | |
US7896160B2 (en) | System for supplying tubular geotextile material for perforated drain pipes | |
JP4371969B2 (en) | Method for forming strip plate bundle and method for unrolling strip plate bundle | |
US8333341B2 (en) | Reel with drum center support ring | |
US7874540B2 (en) | Concrete form for pouring non-round columns, and method of making same | |
US10808412B2 (en) | Spacers for repair of columns and piles | |
JP5688329B2 (en) | Construction method using a jig for constructing a band-shaped member bundle | |
JP5596425B2 (en) | Manufacturing method of band-shaped member bundle | |
EP1567735B1 (en) | Fabric column and pad concrete form | |
US7213784B2 (en) | Plastic bobbin and a method of manufacturing such a bobbin | |
US20220049509A1 (en) | On-Site Construction and Repair of Structural Elements and Pipes of any Desired Diameter with Reusable Materials | |
JP2011020718A (en) | Package of hollow and cylindrical belt member and method for installing the hollow and cylindrical belt member | |
JP5588216B2 (en) | Manufacturing method of band member with reinforcing material for pipe made of rehabilitation pipe | |
JP5374255B2 (en) | Jig for construction of band-shaped member bundle, and method for housing band-shaped member bundle for construction jig | |
US10106367B2 (en) | Reinforced cable spool | |
JP2008308294A (en) | Construction device for beltlike member bundle body | |
JP7328814B2 (en) | Rolled band holding device and method for using the same | |
JP2024072622A (en) | Method for post-processing of wound piles after pipe rehabilitation work | |
US20220064967A1 (en) | Standoff Device for Repair of Structural Elements | |
JP4195356B2 (en) | Tube winding drum | |
RU2220353C2 (en) | Reinforced polymer pipe, method and device for manufacture of such pipe | |
US11795020B2 (en) | Method of producing a fabric roll and roll thus made | |
KR200250564Y1 (en) | Rolled Rebar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120514 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130610 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130625 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130805 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130827 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130920 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 5374256 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |