JP5307492B2 - プロセスモデルの履歴管理方法および選択方法 - Google Patents
プロセスモデルの履歴管理方法および選択方法 Download PDFInfo
- Publication number
- JP5307492B2 JP5307492B2 JP2008250576A JP2008250576A JP5307492B2 JP 5307492 B2 JP5307492 B2 JP 5307492B2 JP 2008250576 A JP2008250576 A JP 2008250576A JP 2008250576 A JP2008250576 A JP 2008250576A JP 5307492 B2 JP5307492 B2 JP 5307492B2
- Authority
- JP
- Japan
- Prior art keywords
- model
- control
- process model
- models
- identified
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/283—Multi-dimensional databases or data warehouses, e.g. MOLAP or ROLAP
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/048—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Databases & Information Systems (AREA)
- Artificial Intelligence (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US97634607P | 2007-09-28 | 2007-09-28 | |
| US60/976,346 | 2007-09-28 | ||
| US12/238,773 | 2008-09-26 | ||
| US12/238,773 US8065251B2 (en) | 2007-09-28 | 2008-09-26 | Dynamic management of a process model repository for a process control system |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2009087349A JP2009087349A (ja) | 2009-04-23 |
| JP2009087349A5 JP2009087349A5 (enExample) | 2011-11-17 |
| JP5307492B2 true JP5307492B2 (ja) | 2013-10-02 |
Family
ID=39926489
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008250576A Expired - Fee Related JP5307492B2 (ja) | 2007-09-28 | 2008-09-29 | プロセスモデルの履歴管理方法および選択方法 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US8065251B2 (enExample) |
| EP (1) | EP2045675B1 (enExample) |
| JP (1) | JP5307492B2 (enExample) |
| CN (1) | CN101533273B (enExample) |
| GB (1) | GB2453262B (enExample) |
Families Citing this family (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8280533B2 (en) * | 2000-06-20 | 2012-10-02 | Fisher-Rosemount Systems, Inc. | Continuously scheduled model parameter based adaptive controller |
| US7738975B2 (en) * | 2005-10-04 | 2010-06-15 | Fisher-Rosemount Systems, Inc. | Analytical server integrated in a process control network |
| US7444191B2 (en) | 2005-10-04 | 2008-10-28 | Fisher-Rosemount Systems, Inc. | Process model identification in a process control system |
| US8036760B2 (en) * | 2005-10-04 | 2011-10-11 | Fisher-Rosemount Systems, Inc. | Method and apparatus for intelligent control and monitoring in a process control system |
| US8761909B2 (en) * | 2007-11-30 | 2014-06-24 | Honeywell International Inc. | Batch process monitoring using local multivariate trajectories |
| JP5290026B2 (ja) * | 2009-03-31 | 2013-09-18 | 日立建機株式会社 | 作業機械の学習診断システム、状態診断装置及び状態学習装置 |
| US9557735B2 (en) * | 2009-12-10 | 2017-01-31 | Fisher-Rosemount Systems, Inc. | Methods and apparatus to manage process control status rollups |
| US9305271B2 (en) * | 2009-12-17 | 2016-04-05 | Siemens Aktiengesellschaft | Method and an apparatus for automatically providing a common modelling pattern |
| US8880203B2 (en) * | 2010-05-21 | 2014-11-04 | Fisher-Rosemount Systems, Inc. | On-line alignment of a process analytical model with actual process operation |
| US20120035749A1 (en) * | 2010-08-04 | 2012-02-09 | Fisher-Rosemount Systems, Inc. | Seamless integration of process control devices in a process control environment |
| EP2689409A4 (en) * | 2011-03-25 | 2015-08-12 | Exxonmobil Upstream Res Co | IMMERSIVE TRAINING ENVIRONMENT |
| BR112014004047A2 (pt) * | 2011-08-30 | 2017-03-07 | Toyota Motor Co Ltd | sistema de gerenciamento de histórico de comportamento e método de gerenciamento de histórico de comportamento |
| US20140067443A1 (en) * | 2012-08-28 | 2014-03-06 | International Business Machines Corporation | Business process transformation recommendation generation |
| US9002617B2 (en) * | 2013-07-10 | 2015-04-07 | General Electric Company | Gas turbine engine controller with event trigger |
| US9563184B2 (en) * | 2013-10-17 | 2017-02-07 | Allan G Kern | Rate-based multivariable control with stability assurance |
| US20150170067A1 (en) * | 2013-12-17 | 2015-06-18 | International Business Machines Corporation | Determining analysis recommendations based on data analysis context |
| US9777937B2 (en) | 2014-04-22 | 2017-10-03 | Honeywell International Inc. | Controller and loop performance monitoring in a heating, ventilating, and air conditioning system |
| EP3268825B1 (de) | 2015-05-12 | 2020-10-21 | Siemens Aktiengesellschaft | Steuereinrichtung für ein produktionsmodul, produktionsmodul mit steuereinrichtung sowie verfahren zum betreiben der steuereinrichtung |
| DE102015212264A1 (de) | 2015-07-01 | 2017-01-05 | Siemens Aktiengesellschaft | Steuereinrichtung für ein Produktionsmodul, Produktionsmodul mit Steuereinrichtung sowie Verfahren zum Betreiben der Steuereinrichtung |
| US20170017229A1 (en) * | 2015-07-17 | 2017-01-19 | General Electric Company | Systems and methods for analyzing control logic |
| US10216523B2 (en) | 2015-07-17 | 2019-02-26 | General Electric Company | Systems and methods for implementing control logic |
| US9989950B2 (en) | 2015-07-17 | 2018-06-05 | General Electric Company | Systems and methods for generating control logic |
| CN105446778B (zh) * | 2015-11-24 | 2018-07-20 | 天脉聚源(北京)传媒科技有限公司 | 一种进程处理方法及装置 |
| US10311009B2 (en) | 2016-10-24 | 2019-06-04 | Fisher-Rosemount Systems, Inc. | Apparatus and methods for communicatively coupling field devices to controllers in a process control system using a distributed marshaling architecture |
| DE102018100424A1 (de) * | 2018-01-10 | 2019-07-11 | Schuler Pressen Gmbh | Verfahren und Vorrichtung zur Steuerung und/oder Überwachung eines sich wiederholenden Prozessablaufs |
| US11879656B2 (en) | 2018-04-04 | 2024-01-23 | International Business Machines Corporation | Initialization of radial base function neural network nodes for reinforcement learning incremental control system |
| KR102139716B1 (ko) * | 2018-12-20 | 2020-07-30 | 한국건설기술연구원 | Tbm 운용 시뮬레이션 장비 및 이를 이용하여 tbm 기기 운용 능력을 측정하는 방법 |
| JP6777174B2 (ja) * | 2019-01-31 | 2020-10-28 | 株式会社富士通ゼネラル | サーバ装置、アダプタおよび空気調和システム |
| JP7396117B2 (ja) * | 2020-02-27 | 2023-12-12 | オムロン株式会社 | モデル更新装置、方法、及びプログラム |
| WO2021197796A1 (en) * | 2020-03-31 | 2021-10-07 | Abb Schweiz Ag | Method and apparatus for monitoring machine learning models |
| US12162056B2 (en) * | 2020-06-22 | 2024-12-10 | Ford Global Technologies, Llc | Method and system for forming a stamped component using a stamping simulation model |
| US11493901B2 (en) | 2020-09-24 | 2022-11-08 | International Business Machines Corporation | Detection of defect in edge device manufacturing by artificial intelligence |
| CN118769249B (zh) * | 2024-07-16 | 2025-05-13 | 哈尔滨理工大学 | 一种基于混杂触发机制镇定单臂机器人系统的控制方法 |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1074188A (ja) * | 1996-05-23 | 1998-03-17 | Hitachi Ltd | データ学習装置およびプラント制御装置 |
| US7113834B2 (en) | 2000-06-20 | 2006-09-26 | Fisher-Rosemount Systems, Inc. | State based adaptive feedback feedforward PID controller |
| US6577908B1 (en) | 2000-06-20 | 2003-06-10 | Fisher Rosemount Systems, Inc | Adaptive feedback/feedforward PID controller |
| DE10341764B4 (de) * | 2002-09-11 | 2019-01-10 | Fisher-Rosemount Systems, Inc. | Integrierte Modell-Vorhersagesteuerung und -Optimierung innerhalb eines Prozesssteuerungssystems |
| US7194320B2 (en) | 2003-06-05 | 2007-03-20 | Neuco, Inc. | Method for implementing indirect controller |
| KR100660861B1 (ko) * | 2005-02-23 | 2006-12-26 | 삼성전자주식회사 | 반도체 공정 결과를 예측하고 제어하는 반도체 공정 제어장치 |
| US7640145B2 (en) | 2005-04-25 | 2009-12-29 | Smartsignal Corporation | Automated model configuration and deployment system for equipment health monitoring |
| US7444191B2 (en) | 2005-10-04 | 2008-10-28 | Fisher-Rosemount Systems, Inc. | Process model identification in a process control system |
| US20070234278A1 (en) | 2006-03-02 | 2007-10-04 | Microsoft Corporation | Managing source code in a model-based development environment |
| US8221122B2 (en) * | 2006-04-26 | 2012-07-17 | Analytical Graphics, Inc. | System and method for aircraft mission modeling |
| US7865874B2 (en) | 2006-08-28 | 2011-01-04 | Oracle America, Inc. | System and method for information collection for an adaptive software dependency model |
-
2008
- 2008-09-26 US US12/238,773 patent/US8065251B2/en not_active Expired - Fee Related
- 2008-09-28 CN CN2008101659720A patent/CN101533273B/zh not_active Expired - Fee Related
- 2008-09-29 JP JP2008250576A patent/JP5307492B2/ja not_active Expired - Fee Related
- 2008-09-29 GB GB0817814.7A patent/GB2453262B/en not_active Expired - Fee Related
- 2008-09-29 EP EP08165433.7A patent/EP2045675B1/en not_active Not-in-force
Also Published As
| Publication number | Publication date |
|---|---|
| JP2009087349A (ja) | 2009-04-23 |
| CN101533273A (zh) | 2009-09-16 |
| EP2045675A1 (en) | 2009-04-08 |
| GB2453262A (en) | 2009-04-01 |
| US8065251B2 (en) | 2011-11-22 |
| GB0817814D0 (en) | 2008-11-05 |
| GB2453262B (en) | 2013-01-09 |
| US20090105855A1 (en) | 2009-04-23 |
| EP2045675B1 (en) | 2016-02-10 |
| CN101533273B (zh) | 2013-10-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5307492B2 (ja) | プロセスモデルの履歴管理方法および選択方法 | |
| US11487252B2 (en) | Process model identification in a process control system | |
| JP5765873B2 (ja) | 適応プロセス制御ループ制御装置、プロセス制御システム、およびプロセス制御システム制御方法 | |
| US7738975B2 (en) | Analytical server integrated in a process control network | |
| CN102520717B (zh) | 用于在加工厂中预防异常状况的数据呈现系统 | |
| CN100555136C (zh) | 加工厂中的异常状况预防方法和系统 | |
| US11334061B2 (en) | Method to detect skill gap of operators making frequent inadvertent changes to the process variables |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110927 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110927 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121113 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130130 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130604 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130627 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |