JP5198329B2 - Flow rate setting method and coating apparatus - Google Patents

Flow rate setting method and coating apparatus Download PDF

Info

Publication number
JP5198329B2
JP5198329B2 JP2009048364A JP2009048364A JP5198329B2 JP 5198329 B2 JP5198329 B2 JP 5198329B2 JP 2009048364 A JP2009048364 A JP 2009048364A JP 2009048364 A JP2009048364 A JP 2009048364A JP 5198329 B2 JP5198329 B2 JP 5198329B2
Authority
JP
Japan
Prior art keywords
flow rate
branch
coating liquid
pipe
measuring means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009048364A
Other languages
Japanese (ja)
Other versions
JP2010201318A (en
Inventor
毅 松家
幹雄 増市
幸宏 高村
理史 川越
秀一 相良
隆介 伊藤
宗明 大宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Screen Holdings Co Ltd
Dainippon Screen Manufacturing Co Ltd
Original Assignee
Screen Holdings Co Ltd
Dainippon Screen Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Screen Holdings Co Ltd, Dainippon Screen Manufacturing Co Ltd filed Critical Screen Holdings Co Ltd
Priority to JP2009048364A priority Critical patent/JP5198329B2/en
Publication of JP2010201318A publication Critical patent/JP2010201318A/en
Application granted granted Critical
Publication of JP5198329B2 publication Critical patent/JP5198329B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electroluminescent Light Sources (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Coating Apparatus (AREA)

Description

本発明は、流量設定方法および塗布装置に関し、より特定的には、複数のノズルから塗布液を吐出して塗布する塗布装置の流量設定方法および塗布装置に関する。   The present invention relates to a flow rate setting method and a coating apparatus, and more particularly to a flow rate setting method and a coating apparatus for a coating apparatus that applies a coating liquid by discharging a coating liquid from a plurality of nozzles.

従来、基板等の被処理体に塗布液を塗布する塗布装置が各種開発されている。例えば、有機EL(Electro Luminescence)表示装置を製造する装置では、ステージ上に載置されたガラス基板等の基板の主面に所定のパターン形状で正孔輸送材料や有機EL材料をノズル塗布する塗布装置が用いられる(例えば、特許文献1参照)。この塗布装置では、ノズルから塗布液(有機EL材料や正孔輸送材料)が所定の圧力で吐出される。具体的には、塗布装置に備えられたタンク等の供給源に塗布液が貯留され、供給源から供給される塗布液をポンプで増圧して、ノズルから吐出される。   2. Description of the Related Art Conventionally, various coating apparatuses that apply a coating liquid to a target object such as a substrate have been developed. For example, in an apparatus for manufacturing an organic EL (Electro Luminescence) display device, coating is performed by applying a hole transport material or an organic EL material in a predetermined pattern shape to the main surface of a substrate such as a glass substrate placed on a stage. An apparatus is used (for example, refer to Patent Document 1). In this coating apparatus, a coating liquid (organic EL material or hole transport material) is discharged from a nozzle at a predetermined pressure. Specifically, the coating liquid is stored in a supply source such as a tank provided in the coating apparatus, the coating liquid supplied from the supply source is increased by a pump, and is discharged from the nozzle.

上記塗布装置では、赤、緑、および青色の有機EL材料の塗布する場合、製造効率を上げるために、赤色、緑色、および青色の何れか1つの有機EL材料を同時に複数のノズルから吐出して塗布することが一般的である。例えば、上記特許文献1で開示された塗布装置を用いて単色の有機EL材料を同時に複数のノズルから吐出する場合、単一の供給源に貯留された塗布液(例えば、赤色の有機EL材料)を複数のノズルへ分岐して供給し、それぞれのノズルから基板上に同時に塗布することによって、複数の位置に同時に塗布液を塗布する方法がある。   In the coating apparatus, when red, green, and blue organic EL materials are applied, any one of red, green, and blue organic EL materials is simultaneously ejected from a plurality of nozzles in order to increase manufacturing efficiency. It is common to apply. For example, when a monochromatic organic EL material is simultaneously ejected from a plurality of nozzles using the coating apparatus disclosed in Patent Document 1, a coating solution stored in a single supply source (for example, a red organic EL material) There is a method in which a coating liquid is applied to a plurality of positions simultaneously by branching and supplying to a plurality of nozzles, and simultaneously applying the nozzles onto the substrate from each nozzle.

図14は、単一の供給源101から複数のノズル108a〜108nへ分岐して供給する塗布装置の一例を示すブロック図である。図14において、供給源101に貯留された塗布液は、ポンプ102で増圧され、フィルタ103を介してマニホールド(分岐管)104に供給される。マニホールド104は、複数のノズル系統(a系統〜n系統とする)の配管が接続されており、供給された塗布液をa系統〜n系統の配管へそれぞれ流動させる。   FIG. 14 is a block diagram illustrating an example of a coating apparatus that branches and supplies a plurality of nozzles 108 a to 108 n from a single supply source 101. In FIG. 14, the coating liquid stored in the supply source 101 is increased in pressure by the pump 102 and supplied to the manifold (branch pipe) 104 through the filter 103. The manifold 104 is connected to piping of a plurality of nozzle systems (a system to n system), and flows the supplied coating liquid to the piping of the a system to n system.

マニホールド104からa系統に分岐して流動する塗布液は、流量制御バルブ105aによってa系統を流動する流量が制御され、その流量が流量計106aによって監視される。そして、a系統に分岐して流動する塗布液は、ノズル108aに内蔵されたフィルタ109aを介して当該ノズル108aの先端部から吐出される。また、マニホールド104から他のb系統〜n系統にそれぞれ分岐して流動する塗布液についても、a系統と同様に流動する。すなわち、マニホールド104からb系統〜n系統にそれぞれ分岐して流動する塗布液は、流量制御バルブ105b〜105nによってb系統〜n系統を流動する流量がそれぞれ制御され、それらの流量が流量計106b〜106nによってそれぞれ監視される。そして、b系統〜n系統に分岐して流動するそれぞれの塗布液は、ノズル108b〜108nに内蔵されたフィルタ109b〜109nを介して当該ノズル108b〜108nの先端部からそれぞれ吐出される。   The flow rate of the coating solution flowing from the manifold 104 to the system a is controlled by the flow rate control valve 105a, and the flow rate is monitored by the flow meter 106a. Then, the coating liquid that branches and flows into the system a is discharged from the tip of the nozzle 108a through the filter 109a built in the nozzle 108a. In addition, the coating liquid that branches from the manifold 104 to the other b-line to n-line flows similarly to the a-line. In other words, the flow rate of the coating liquid that branches and flows from the manifold 104 to the b system to the n system is controlled by the flow rate control valves 105b to 105n, respectively. 106n, respectively. And each coating liquid which branches and flows into b system -n system is discharged from the tip part of the nozzles 108b-108n through filters 109b-109n built in nozzles 108b-108n, respectively.

特開2006−205024号公報JP 2006-205024 A

ここで、ノズルから正確な流量の塗布液を吐出するためには、ノズルから吐出される塗布液の実吐出流量を計測して管理する必要がある。例えば、ノズルから吐出される塗布液の実吐出流量は、当該ノズルから所定の容器内に塗布液を吐出させ、単位吐出時間に対する当該容器内の塗布液重量(例えば、ミリグラム/分)によって秤量される。そして、実流量計測時の流量計の値と実吐出流量計測結果との関係を用いて、以降の塗布作業中の塗布流量が管理される。例えば、ノズルから塗布液を吐出させている時の流量計の値がX1、X2、およびX3であり、その実吐出流量がそれぞれY1、Y2、およびY3であるとする。このとき、図15に示すような流量計の値と実吐出流量との関係式が導かれる。そして、塗布作業において実吐出流量Ypでノズルから塗布液を塗布させたい場合、導かれた関係式に基づいて実吐出流量Ypに対応する流量計の値Xpを算出し、流量計が当該値Xpを維持するようにノズルへの流量を制御する。   Here, in order to discharge the coating liquid at an accurate flow rate from the nozzle, it is necessary to measure and manage the actual discharge flow rate of the coating liquid discharged from the nozzle. For example, the actual discharge flow rate of the coating liquid discharged from the nozzle is measured by the weight of the coating liquid in the container (for example, milligram / minute) with respect to the unit discharge time by discharging the coating liquid from the nozzle into a predetermined container. The And the application | coating flow volume in subsequent application | coating operations is managed using the relationship between the value of the flowmeter at the time of an actual flow measurement, and an actual discharge flow measurement result. For example, it is assumed that the values of the flowmeter when the coating liquid is discharged from the nozzle are X1, X2, and X3, and the actual discharge flow rates are Y1, Y2, and Y3, respectively. At this time, a relational expression between the value of the flow meter and the actual discharge flow rate as shown in FIG. 15 is derived. When it is desired to apply the application liquid from the nozzle at the actual discharge flow rate Yp in the application operation, the flow meter value Xp corresponding to the actual discharge flow rate Yp is calculated based on the derived relational expression, and the flow meter indicates the value Xp. To control the flow rate to the nozzle.

しかしながら、図14に示したような複数のノズル108a〜108nから同時に塗布液を吐出する塗布装置の場合、ノズル系統毎に上述した実吐出流量の計測を行って上記関係式をそれぞれ導くことが必要となる。また、高精度な関係式を導き出す場合、1つのノズル系統に対して流量が異なる複数ポイントの実吐出流量の計測を行う必要がある。また、当該塗布装置において塗布する塗布液を変更(例えば、赤色の有機EL材料から緑色の有機EL材料に変更)する場合、当該塗布液変更後にも実吐出流量の秤量が必要となるため、塗布装置の流量管理工数が増大する。また、塗布装置の実吐出流量計測時間が長くなると、容器内に吐出した塗布液中の溶媒が蒸発することによって実吐出流量が変動することがあり、正確な実吐出流量の計測が困難となることがある。   However, in the case of a coating apparatus that simultaneously discharges coating liquid from a plurality of nozzles 108a to 108n as shown in FIG. 14, it is necessary to measure the actual discharge flow rate for each nozzle system and derive the above relational expressions, respectively. It becomes. Moreover, when deriving a highly accurate relational expression, it is necessary to measure actual discharge flow rates at a plurality of points with different flow rates for one nozzle system. In addition, when changing the coating liquid to be applied in the coating apparatus (for example, changing from a red organic EL material to a green organic EL material), it is necessary to measure the actual discharge flow rate even after the coating liquid is changed. The number of man-hours for managing the flow rate of the device increases. In addition, if the actual discharge flow rate measurement time of the coating apparatus becomes longer, the actual discharge flow rate may fluctuate due to evaporation of the solvent in the coating liquid discharged into the container, making it difficult to accurately measure the actual discharge flow rate. Sometimes.

それ故に、本発明の目的は、各ノズルから吐出される塗布液の流量管理が容易となる塗布装置の流量設定方法および塗布装置を提供することである。   SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a flow rate setting method for a coating apparatus and a coating apparatus that make it easy to manage the flow rate of the coating liquid discharged from each nozzle.

上記目的を達成するために、本発明は、以下に述べるような特徴を有している。
第1の発明は、単一の供給源から本管を介して供給される塗布液を複数の支管に分流し、当該支管にそれぞれ設けられた支管流量計測手段によって当該支管を流動する塗布液流量を計測して、当該支管に接続されたノズルから塗布液をそれぞれ吐出する塗布装置における塗布液の流量設定方法である。流量設定方法は、直列供給工程および流量計測調整工程を含む。直列供給工程は、支管流量計測手段をそれぞれ直列に接続し、供給源から当該直列に接続された支管流量計測手段に塗布液を供給して、当該供給された塗布液をノズルの1つから吐出させる。流量計測調整工程は、直列供給工程が直列に接続された支管流量計測手段に塗布液を供給している状態において、当該支管流量計測手段におけるそれぞれの塗布液流量の計測結果を調整する。
In order to achieve the above object, the present invention has the following features.
In the first aspect of the present invention, the coating liquid supplied from a single supply source via the main pipe is divided into a plurality of branch pipes, and the flow rate of the coating liquid flows through the branch pipes by the branch pipe flow rate measuring means provided in the branch pipes. Is a flow rate setting method of a coating liquid in a coating apparatus that discharges the coating liquid from a nozzle connected to the branch pipe. The flow rate setting method includes a series supply step and a flow rate measurement adjustment step. In the serial supply step, the branch flow rate measuring means are connected in series, the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating liquid is discharged from one of the nozzles. Let The flow rate measurement adjusting step adjusts the measurement result of each coating liquid flow rate in the branch flow rate measuring unit in a state where the coating liquid is supplied to the branch flow rate measuring unit connected in series in the serial supply step.

第2の発明は、上記第1の発明において、選択供給工程および実流量計測工程を、さらに含む。選択供給工程は、供給源から本管へ供給された塗布液を、複数の支管から選択された1つの選択支管にのみ供給し、他の支管への当該塗布液の供給を閉止する。実流量計測工程は、選択供給工程で選択支管にのみ塗布液を供給している状態において、当該選択支管に設けられた支管流量計測手段による計測結果と当該選択支管のノズルから吐出される塗布液の実吐出量との間の関係を計測する。流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段に塗布液を供給している状態において、選択支管に設けられた支管流量計測手段が計測する塗布液流量を基準として、他の支管流量計測手段における塗布液流量の計測結果が調整される。   A second invention further includes a selective supply step and an actual flow rate measurement step in the first invention. In the selective supply step, the coating liquid supplied from the supply source to the main pipe is supplied only to one selected branch pipe selected from the plurality of branch pipes, and the supply of the coating liquid to the other branch pipes is closed. In the actual flow rate measurement process, in the state where the coating liquid is supplied only to the selected branch pipe in the selective supply process, the measurement result by the branch flow rate measuring means provided in the selected branch pipe and the coating liquid discharged from the nozzle of the selected branch pipe Measure the relationship between the actual discharge amount. In the flow measurement adjustment process, in the state where the supply liquid is supplied to the branch flow rate measuring means connected in series in the serial supply process, the flow rate of the application liquid measured by the branch flow rate measurement means provided in the selected branch pipe is used as a reference. The measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted.

第3の発明は、上記第1の発明において、支管流量計測手段のうち、少なくとも1つは、支管を流動する塗布液の質量流量を計測する。流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段に塗布液を供給している状態において、質量流量を計測する支管流量計測手段が計測する塗布液流量を基準として、他の支管流量計測手段における塗布液流量の計測結果が調整される。   In a third aspect based on the first aspect, at least one of the branch pipe flow rate measuring means measures the mass flow rate of the coating liquid flowing through the branch pipe. In the flow measurement adjustment process, in the state where the coating liquid is supplied to the branch flow rate measuring means connected in series in the series supply process, the flow rate of the coating liquid measured by the branch flow rate measuring means for measuring the mass flow is used as a reference. The measurement result of the coating liquid flow rate in the branch pipe flow rate measuring means is adjusted.

第4の発明は、上記第1の発明において、選択供給工程および実流量計測工程を、さらに含む。選択供給工程は、供給源から本管へ供給された塗布液を、複数の支管から選択された1つの選択支管にのみ供給し、他の支管への当該塗布液の供給を閉止する。実流量計測工程は、選択供給工程で選択支管にのみ塗布液を供給している状態において、本管を流動する塗布液流量を計測する本管流量計測手段による計測結果と当該選択支管のノズルから吐出される塗布液の実吐出量との間の関係を計測する。流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段に塗布液を供給している状態において、本管流量計測手段が計測する塗布液流量を基準として、支管流量計測手段におけるそれぞれの塗布液流量の計測結果が調整される。   The fourth invention further includes a selective supply step and an actual flow rate measurement step in the first invention. In the selective supply step, the coating liquid supplied from the supply source to the main pipe is supplied only to one selected branch pipe selected from the plurality of branch pipes, and the supply of the coating liquid to the other branch pipes is closed. The actual flow rate measurement process is based on the measurement result by the main flow rate measuring means for measuring the flow rate of the coating liquid flowing through the main pipe and the nozzle of the selected branch pipe in the state where the coating liquid is supplied only to the selected branch pipe in the selective supply process The relationship between the actual discharge amount of the discharged coating liquid is measured. In the flow rate measurement adjustment process, in the state where the supply liquid is supplied to the branch flow rate measuring means connected in series in the serial supply process, the flow rate in the branch flow measurement means is based on the coating liquid flow rate measured by the main flow rate measurement means. The measurement result of each coating liquid flow rate is adjusted.

第5の発明は、上記第1の発明において、本管には、当該本管を流動する塗布液の質量流量を計測する本管流量計測手段が設けられる。流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段に塗布液を供給している状態において、本管流量計測手段が計測する塗布液流量を基準として、支管流量計測手段におけるそれぞれの塗布液流量の計測結果が調整される。   In a fifth aspect based on the first aspect, the main pipe is provided with main pipe flow rate measuring means for measuring the mass flow rate of the coating liquid flowing through the main pipe. In the flow rate measurement adjustment process, in the state where the supply liquid is supplied to the branch flow rate measuring means connected in series in the serial supply process, the flow rate in the branch flow measurement means is based on the coating liquid flow rate measured by the main flow rate measurement means. The measurement result of each coating liquid flow rate is adjusted.

第6の発明は、上記第1〜第5の発明の何れか1つにおいて、支管流量計測手段による塗布液流量の計測結果に応じて当該支管を流動する塗布液流量を所定の流量に調節する支管流量調節手段が、複数の支管それぞれに設けられる。直列供給工程では、支管流量計測手段および支管流量調整手段をそれぞれ直列に接続し、供給源から当該直列に接続された支管流量計測手段および支管流量調整手段に塗布液を供給して、当該供給された塗布液をノズルの1つから吐出させる。流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段および支管流量調整手段に塗布液を供給している状態において、支管流量計測手段におけるそれぞれの塗布液流量の計測結果に基づいて、所定の流量に対応した支管流量調整手段の調節目標となる目標流量値がそれぞれ設定される。   According to a sixth invention, in any one of the first to fifth inventions, the flow rate of the coating liquid flowing through the branch pipe is adjusted to a predetermined flow rate according to the measurement result of the flow rate of the coating liquid by the branch pipe flow rate measuring means. A branch pipe flow rate adjusting means is provided in each of the plurality of branch pipes. In the serial supply step, the branch flow rate measuring means and the branch flow rate adjusting means are respectively connected in series, and the supply liquid is supplied from the supply source to the branch flow rate measuring means and the branch flow rate adjusting means connected in series. The applied coating liquid is discharged from one of the nozzles. In the flow rate measurement adjustment step, in the state where the series supply step supplies the coating liquid to the branch flow rate measurement means and the branch flow rate adjustment means connected in series, based on the measurement result of each coating liquid flow rate in the branch flow rate measurement means. Thus, a target flow rate value that is an adjustment target of the branch flow rate adjusting means corresponding to the predetermined flow rate is set.

第7の発明は、上記第6の発明において、流量計測調整工程では、直列供給工程が直列に接続された支管流量計測手段および支管流量調整手段に塗布液を供給している状態において、基準となる基準流量値と支管流量計測手段が示す流量値との間の関係式がそれぞれ導かれ、当該関係式に基づいて所定の流量を示す当該基準流量値に対応する当該支管流量計測手段の流量値が目標流量値に設定される。   In a seventh aspect of the present invention based on the sixth aspect, in the flow measurement adjustment step, the serial supply step supplies the coating liquid to the branch flow rate measurement means and the branch flow rate adjustment means connected in series. A relational expression between the reference flow rate value and the flow rate value indicated by the branch pipe flow rate measurement means is derived, and the flow rate value of the branch flow rate measurement means corresponding to the reference flow rate value indicating a predetermined flow rate based on the relational expression. Is set to the target flow rate value.

第8の発明は、上記第7の発明において、流量計測調整工程では、塗布装置で使用する塗布液の種別毎に関係式が導かれて目標流量値が設定される。   In an eighth aspect based on the seventh aspect, in the flow rate measurement adjustment step, a relational expression is derived for each type of coating liquid used in the coating apparatus, and a target flow rate value is set.

第9の発明は、上記第6の発明において、直列供給工程では、供給する塗布液流量が直列に接続された支管流量調整手段の何れか1つによって基準流量値が所定の流量となるように調節され、他の支管流量調整手段による流量調節が全開にされる。流量計測調整工程では、供給する塗布液流量を支管流量調整手段の何れか1つが基準流量値を所定の流量に調節した状態で支管流量計測手段がそれぞれ示す流量値がそれぞれの目標流量値に設定される。   In a ninth aspect based on the sixth aspect, in the serial supply step, the reference flow rate value is set to a predetermined flow rate by any one of the branch flow rate adjusting means connected in series. The flow rate adjustment by the other branch flow rate adjustment means is fully opened. In the flow rate measurement adjustment step, the flow rate value indicated by each branch flow rate measurement unit is set to the respective target flow rate value while any one of the branch flow rate adjustment units adjusts the reference flow rate value to a predetermined flow rate. Is done.

第10の発明は、上記第9の発明において、流量計測調整工程では、塗布装置で使用する塗布液の種別毎に目標流量値が設定される。   In a tenth aspect based on the ninth aspect, a target flow rate value is set for each type of coating liquid used in the coating apparatus in the flow rate measurement adjustment step.

第11の発明は、上記第1の発明において、複数の支管には、当該支管の間をそれぞれ連結する連結管が設けられる。直列供給工程では、複数の支管のうちの1つに供給源から塗布液を供給し、連結管を介して他の支管に当該供給液を順次流動させた後に、当該塗布液の流動において最も下流となる支管に設けられたノズルから当該塗布液を吐出させる。   In an eleventh aspect based on the first aspect, the plurality of branch pipes are provided with connecting pipes for connecting the branch pipes. In the serial supply step, the coating liquid is supplied from one supply source to one of the plurality of branch pipes, and the supply liquid is sequentially flowed to the other branch pipes via the connecting pipe, and then the most downstream in the flow of the coating liquid. The coating liquid is discharged from a nozzle provided in the branch pipe.

第12の発明は、複数のノズルから塗布液をそれぞれ吐出する塗布装置である。塗布装置は、単一の供給源、複数のノズル、本管、複数の支管、複数の支管流量計測手段、連結管、および制御部を備える。単一の供給源は、塗布液を貯留する。複数のノズルは、塗布液を吐出する。本管は、供給源から塗布液を供給する。複数の支管は、本管から供給される塗布液を分流して、複数のノズルへそれぞれ供給する。複数の支管流量計測手段は、支管にそれぞれ設けられ、当該支管を流動する塗布液流量を計測する。連結管は、支管における支管流量計測手段の下流側と他の支管における支管流量計測手段の上流側とを連結する。制御部は、支管流量計測手段がそれぞれ計測した塗布液流量の計測結果を調整する。制御部は、支管および連結管を介して複数の支管流量計測手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、当該支管流量計測手段におけるそれぞれの塗布液流量の計測結果を調整する。   A twelfth aspect of the invention is a coating apparatus that discharges coating liquid from a plurality of nozzles. The coating apparatus includes a single supply source, a plurality of nozzles, a main pipe, a plurality of branch pipes, a plurality of branch pipe flow rate measuring means, a connecting pipe, and a control unit. A single source stores the coating liquid. The plurality of nozzles discharge the coating liquid. The main pipe supplies the coating liquid from a supply source. The plurality of branch pipes divide the coating liquid supplied from the main pipe and supply the divided liquids to the plurality of nozzles. A plurality of branch pipe flow rate measuring means are provided in each branch pipe and measure the flow rate of the coating liquid flowing through the branch pipe. The connecting pipe connects the downstream side of the branch flow rate measuring means in the branch pipe and the upstream side of the branch pipe flow rate measuring means in another branch pipe. A control part adjusts the measurement result of the coating liquid flow volume which each branch pipe flow measurement means measured. The control unit includes a plurality of branch flow rate measuring means connected in series via the branch pipe and the connecting pipe, and a coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating is applied. In a state where the liquid is discharged from one of the nozzles, the measurement result of each coating liquid flow rate in the branch flow rate measuring unit is adjusted.

第13の発明は、上記第12の発明において、制御部は、供給源から本管へ供給された塗布液が複数の支管から選択された1つの選択支管にのみ供給され、他の支管への当該塗布液の供給が閉止された状態において、当該選択支管に設けられた支管流量計測手段による計測結果と当該選択支管のノズルから吐出される塗布液の実吐出量との間の関係を計測する。制御部は、支管および連結管を介して複数の支管流量計測手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、選択支管に設けられた支管流量計測手段が計測する塗布液流量を基準として、他の支管流量計測手段における塗布液流量の計測結果を調整する。   In a thirteenth aspect based on the twelfth aspect, the control unit supplies the coating liquid supplied from the supply source to the main pipe only to one selected branch pipe selected from the plurality of branch pipes, and supplies it to the other branch pipes. In a state where the supply of the coating liquid is closed, the relationship between the measurement result by the branch flow rate measuring means provided in the selected branch pipe and the actual discharge amount of the coating liquid discharged from the nozzle of the selected branch pipe is measured. . The control unit includes a plurality of branch flow rate measuring means connected in series via the branch pipe and the connecting pipe, and a coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating is applied. In the state in which the liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted based on the coating liquid flow rate measured by the branch flow rate measuring means provided in the selected branch pipe.

第14の発明は、上記第12の発明において、複数の支管流量計測手段のうち、少なくとも1つは、支管を流動する塗布液の質量流量を計測する質量流量計である。制御部は、支管および連結管を介して複数の支管流量計測手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、質量流量計が計測する塗布液流量を基準として、他の支管流量計測手段における塗布液流量の計測結果を調整する。   In a fourteenth aspect based on the twelfth aspect, at least one of the plurality of branch pipe flow rate measuring means is a mass flow meter for measuring a mass flow rate of the coating liquid flowing through the branch pipe. The control unit includes a plurality of branch flow rate measuring means connected in series via the branch pipe and the connecting pipe, and a coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating is applied. In a state where the liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted with reference to the coating liquid flow rate measured by the mass flow meter.

第15の発明は、上記第12の発明において、本管流量計測手段を、さらに備える。本管流量計測手段は、本管に設けられ、当該本管を流動する塗布液流量を計測する。制御部は、供給源から本管へ供給された塗布液が複数の支管から選択された1つの選択支管にのみ供給され、他の支管への当該塗布液の供給が閉止された状態において、本管流量計測手段による計測結果と当該選択支管のノズルから吐出される塗布液の実吐出量との間の関係を計測する。制御部は、支管および連結管を介して複数の支管流量計測手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、本管流量計測手段が計測する塗布液流量を基準として、支管流量計測手段における塗布液流量の計測結果を調整する。   In a fifteenth aspect based on the twelfth aspect, the main flow rate measuring means is further provided. The main pipe flow rate measuring means is provided in the main pipe and measures the flow rate of the coating liquid flowing through the main pipe. The control unit supplies the coating liquid supplied from the supply source to the main pipe only to one selected branch pipe selected from a plurality of branch pipes, and in a state where the supply of the coating liquid to the other branch pipes is closed. The relationship between the measurement result by the pipe flow rate measuring means and the actual discharge amount of the coating liquid discharged from the nozzle of the selected branch pipe is measured. The control unit includes a plurality of branch flow rate measuring means connected in series via the branch pipe and the connecting pipe, and a coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating is applied. In a state where the liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the branch flow rate measuring unit is adjusted based on the coating liquid flow rate measured by the main flow rate measuring unit.

第16の発明は、上記第12の発明において、質量流量計を、さらに備える。質量流量計は、本管に設けられ、当該本管を流動する塗布液の質量流量を計測する。制御部は、支管および連結管を介して複数の支管流量計測手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、質量流量計が計測する塗布液流量を基準として、支管流量計測手段における塗布液流量の計測結果を調整する。   In a sixteenth aspect based on the twelfth aspect, a mass flow meter is further provided. The mass flow meter is provided in the main pipe and measures the mass flow rate of the coating liquid flowing through the main pipe. The control unit includes a plurality of branch flow rate measuring means connected in series via the branch pipe and the connecting pipe, and a coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series, and the supplied coating is applied. In a state where the liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the branch flow rate measuring unit is adjusted based on the coating liquid flow rate measured by the mass flow meter.

第17の発明は、上記第12〜第16の発明の何れか1つにおいて、複数の支管流量調節手段を、さらに備える。複数の支管流量調節手段は、支管にそれぞれ設けられ、支管流量計測手段による塗布液流量の計測結果に応じて当該支管を流動する塗布液流量を所定の流量に調節する。制御部は、支管および連結管を介して複数の支管流量計測手段および支管流量調節手段がそれぞれ直列に接続され、供給源から当該直列に接続された支管流量計測手段および支管流量調節手段に塗布液が供給されて、当該供給された塗布液がノズルの1つから吐出される状態において、支管流量計測手段におけるそれぞれの塗布液流量の計測結果に基づいて、所定の流量に対応した支管流量調整手段の調節目標となる目標流量値をそれぞれ設定する。   In a seventeenth aspect according to any one of the twelfth to sixteenth aspects, a plurality of branch pipe flow rate adjusting means is further provided. The plurality of branch pipe flow rate adjusting means are respectively provided in the branch pipes and adjust the flow rate of the coating liquid flowing through the branch pipes to a predetermined flow rate according to the measurement result of the coating liquid flow rate by the branch pipe flow rate measuring means. The control unit includes a plurality of branch flow rate measuring means and branch flow rate adjusting means connected in series via the branch pipe and the connecting pipe, respectively, and the application liquid is supplied from the supply source to the branch flow rate measuring means and the branch flow rate adjusting means connected in series. In the state where the supplied coating liquid is discharged from one of the nozzles, the branch flow rate adjusting means corresponding to the predetermined flow rate is determined based on the measurement result of each coating liquid flow rate in the branch flow rate measuring means. Set the target flow rate value to be the adjustment target.

第18の発明は、上記第12の発明において、バルブを、さらに備える。バルブは、支管にそれぞれ設けられ、制御部の制御に応じて支管を流動する塗布液を連結管へ流動させるか当該支管のノズルへ流動させるかを切り替える。制御部は、複数の支管のうちの1つに供給源から塗布液を供給し、バルブを切り替えて連結管を介して他の支管に当該供給液を順次流動させた後に、当該塗布液の流動において最も下流となる支管に設けられたノズルから当該塗布液を吐出させることによって、複数の支管流量計測手段をそれぞれ直列に接続する。   In an eighteenth aspect based on the twelfth aspect, a valve is further provided. The valve is provided in each branch pipe, and switches between application liquid flowing through the branch pipe to the connection pipe or the nozzle of the branch pipe according to control of the control unit. The control unit supplies the coating liquid from a supply source to one of the plurality of branch pipes, switches the valve and sequentially flows the supply liquid to the other branch pipes via the connection pipe, and then flows the coating liquid. A plurality of branch flow rate measuring means are respectively connected in series by discharging the coating liquid from a nozzle provided on the most downstream branch.

上記第1の発明によれば、並列に接続された複数の支管流量計測手段が直列に接続されることによって、1回の塗布液の流動によって全ての支管流量計測手段の調整が可能となる。例えば、複数系統にそれぞれ設けられた支管流量計測手段毎に行っていた調整作業の時間が1系統分の時間に短縮することができ、調整作業のために塗布液を流動させる量も大幅に削減することができる。   According to the first aspect of the present invention, a plurality of branch pipe flow rate measuring means connected in parallel are connected in series, whereby all the branch pipe flow rate measuring means can be adjusted by one flow of the coating liquid. For example, the time required for adjustment work performed for each branch flow rate measuring means provided in each of the multiple systems can be reduced to the time for one system, and the amount of flow of the coating liquid for the adjustment work can be greatly reduced. can do.

上記第2の発明によれば、並列に接続された複数の支管流量計測手段のうち、1つの支管流量計測手段の流量計測値を基準として他の支管の支管流量計測手段が校正される。したがって、ノズル系統毎に実吐出流量を秤量して校正することが不要となる。例えば、塗布する塗布液を変更する場合、当該塗布液変更後であっても基準となる支管流量計測手段の流量計測値に基づいて他の支管の支管流量計測手段が校正されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて支管流量計測手段の校正が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の校正が可能であり、換算作業等も不要となる。また、従来のように実吐出流量計測時間が長くなることによって実吐出流量が変動することに起因する流量管理の不安定要素を排除することができるため、正確な実吐出流量の設定が可能となる。   According to the second aspect, among the plurality of branch flow rate measuring means connected in parallel, the branch flow rate measuring means of the other branch is calibrated on the basis of the flow rate measurement value of one branch flow rate measuring means. Therefore, it is not necessary to weigh and calibrate the actual discharge flow rate for each nozzle system. For example, when the coating liquid to be applied is changed, the branch flow rate measuring means of other branch pipes are calibrated based on the flow rate measurement value of the reference branch pipe flow rate measuring means even after the change of the coating liquid. The number of man-hours for managing flow rate is drastically reduced In addition, since it is possible to calibrate the branch flow rate measuring means using the coating liquid used in the actual coating operation, it is possible to calibrate with high accuracy that matches the actual work compared to the flow rate setting using the alternative coating liquid. No conversion work is required. In addition, it is possible to eliminate unstable elements of flow rate management due to fluctuations in the actual discharge flow rate due to the increase in the actual discharge flow rate measurement time as in the past, making it possible to set an accurate actual discharge flow rate. Become.

上記第3の発明によれば、並列に接続された複数の支管流量計測手段のうち、質量流量を計測する支管流量計測手段の流量計測値を基準として他の支管の支管流量計測手段が校正される。したがって、実吐出流量を秤量して校正する作業が不要となる。また、塗布する塗布液を変更する場合、当該塗布液変更後であっても質量流量を計測する支管流量計測手段の流量計測値に基づいて他の支管の支管流量計測手段が校正されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて支管流量計測手段の校正が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の校正が可能であり、換算作業等も不要となる。   According to the third aspect, among the plurality of branch flow rate measuring means connected in parallel, the branch flow rate measuring means of other branch pipes are calibrated on the basis of the flow rate measurement value of the branch flow rate measuring means for measuring the mass flow rate. The Therefore, the work of weighing and calibrating the actual discharge flow rate becomes unnecessary. Also, when changing the coating liquid to be applied, since the branch flow rate measuring means of other branch pipes are calibrated based on the flow rate measurement value of the branch flow rate measuring means for measuring the mass flow rate even after the change of the coating liquid, The flow control man-hours of the coating device are drastically reduced. In addition, since it is possible to calibrate the branch flow rate measuring means using the coating liquid used in the actual coating operation, it is possible to calibrate with high accuracy that matches the actual work compared to the flow rate setting using the alternative coating liquid. No conversion work is required.

上記第4の発明によれば、本管に設けられた本管流量計測手段の流量計測値を基準として支管流量計測手段が校正される。したがって、ノズル系統毎に実吐出流量を秤量して校正することが不要となる。例えば、塗布する塗布液を変更する場合、当該塗布液変更後であっても基準となる本管流量計測手段の流量計測値に基づいて支管流量計測手段が校正されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて支管流量計測手段の校正が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の校正が可能であり、換算作業等も不要となる。また、従来のように実吐出流量計測時間が長くなることによって実吐出流量が変動することに起因する流量管理の不安定要素を排除することができるため、正確な実吐出流量の設定が可能となる。   According to the fourth aspect of the invention, the branch flow rate measuring means is calibrated on the basis of the flow rate measurement value of the main flow rate measuring means provided on the main pipe. Therefore, it is not necessary to weigh and calibrate the actual discharge flow rate for each nozzle system. For example, when changing the coating liquid to be applied, the branch flow rate measuring means is calibrated based on the flow rate measurement value of the main main flow rate measuring means even after the change of the coating liquid. Man-hours are drastically reduced. In addition, since it is possible to calibrate the branch flow rate measuring means using the coating liquid used in the actual coating operation, it is possible to calibrate with high accuracy that matches the actual work compared to the flow rate setting using the alternative coating liquid. No conversion work is required. In addition, it is possible to eliminate unstable elements of flow rate management due to fluctuations in the actual discharge flow rate due to the increase in the actual discharge flow rate measurement time as in the past, making it possible to set an accurate actual discharge flow rate. Become.

上記第5の発明によれば、本管を流動する塗布液の質量流量を計測する本管流量計測手段の流量計測値を基準として支管流量計測手段が校正される。したがって、実吐出流量を秤量して校正する作業が不要となる。また、塗布する塗布液を変更する場合、当該塗布液変更後であっても質量流量を計測する本管流量計測手段の流量計測値に基づいて支管流量計測手段が校正されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて支管流量計測手段の校正が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の校正が可能であり、換算作業等も不要となる。   According to the fifth aspect, the branch flow rate measuring means is calibrated with reference to the flow rate measurement value of the main flow rate measuring means for measuring the mass flow rate of the coating liquid flowing through the main pipe. Therefore, the work of weighing and calibrating the actual discharge flow rate becomes unnecessary. Further, when changing the coating liquid to be applied, the branch flow rate measuring means is calibrated based on the flow rate measurement value of the main flow rate measuring means for measuring the mass flow rate even after the change of the coating liquid. The flow management man-hours are drastically reduced. In addition, since it is possible to calibrate the branch flow rate measuring means using the coating liquid used in the actual coating operation, it is possible to calibrate with high accuracy that matches the actual work compared to the flow rate setting using the alternative coating liquid. No conversion work is required.

上記第6の発明によれば、並列に接続された複数の支管流量計測手段および支管流量調整手段の組が直列に接続されることによって、1回の塗布液の流動によって支管それぞれの目標流量値をそれぞれ設定することができる。例えば、複数系統にそれぞれ設けられた支管流量計測手段および支管流量調整手段毎に行っていた調整作業の時間が1系統分の時間に短縮することができ、調整作業のために塗布液を流動させる量も大幅に削減することができる。   According to the sixth invention, a set of a plurality of branch pipe flow rate measuring means and branch pipe flow rate adjusting means connected in parallel is connected in series, so that the target flow rate value of each branch pipe can be obtained by the flow of the coating liquid once. Can be set individually. For example, it is possible to reduce the time of adjustment work performed for each branch pipe flow rate measuring means and branch pipe flow rate adjustment means provided in each of the multiple systems to one system time, and to flow the coating liquid for the adjustment work The amount can also be greatly reduced.

上記第7の発明によれば、ノズル系統毎に実吐出流量を秤量して関係式をそれぞれ導くことが不要となる。例えば、塗布装置において塗布する塗布液を変更する場合、当該塗布液変更後であっても基準流量値に基づいて支管の目標流量値が設定されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて目標流量値の設定が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の目標流量値の設定が可能であり、換算作業等も不要となる。   According to the seventh aspect, it is not necessary to measure the actual discharge flow rate for each nozzle system and derive the relational expressions. For example, when changing the coating liquid to be applied in the coating apparatus, the target flow rate value of the branch pipe is set based on the reference flow rate value even after the change of the coating liquid, and the flow management man-hour of the coating apparatus is drastically reduced. In addition, since it is possible to set the target flow rate using the coating liquid used in the actual coating operation, compared to the flow setting using the alternative coating liquid, the target flow rate setting with high accuracy that matches the actual work can be achieved. This is possible, and conversion work is not necessary.

上記第8の発明によれば、特性の異なる塗布液を使用する場合においても、使用する塗布液に応じた関係式が設定されるため、使用する塗布液に応じた正確な目標流量値が設定可能となる。   According to the eighth aspect of the invention, even when a coating liquid having different characteristics is used, a relational expression corresponding to the coating liquid to be used is set, so that an accurate target flow rate value is set according to the coating liquid to be used. It becomes possible.

上記第9の発明によれば、塗布液の流量を実際の塗布作業において吐出する吐出流量に合致させて目標流量値の設定が可能であるため、実作業に合わせたピンポイントの流量管理が可能となり、さらに流量管理工数が削減される。   According to the ninth aspect of the invention, the target flow rate can be set by matching the flow rate of the coating liquid with the discharge flow rate discharged in the actual coating operation, so that pinpoint flow rate management in accordance with the actual operation is possible. In addition, the man-hour for flow rate management is further reduced.

上記第10の発明によれば、特性の異なる塗布液を使用する場合においても、使用する塗布液に応じた正確な目標流量値が設定可能となる。   According to the tenth aspect, even when a coating liquid having different characteristics is used, an accurate target flow rate value can be set according to the coating liquid to be used.

上記第11の発明によれば、複数の支管を連結管で接続することによって、並列に接続された複数の支管流量計測手段を容易に直列に接続することができる。   According to the eleventh aspect, by connecting a plurality of branch pipes with connecting pipes, a plurality of branch pipe flow rate measuring means connected in parallel can be easily connected in series.

また、本発明の塗布装置によれば、上述した流量設定方法と同様の効果を得ることができる。   Moreover, according to the coating apparatus of this invention, the effect similar to the flow volume setting method mentioned above can be acquired.

本発明の一実施形態に係る塗布装置1の要部概略構成を示す平面図および正面図The top view and front view which show the principal part schematic structure of the coating device 1 which concerns on one Embodiment of this invention. 本発明の一実施形態に係る供給部54の概略構成を示すブロック図The block diagram which shows schematic structure of the supply part 54 which concerns on one Embodiment of this invention. 図1の塗布装置1の制御機能を示すブロック図The block diagram which shows the control function of the coating device 1 of FIG. 図1の塗布装置1における流量設定手順の一例を示すフローチャートThe flowchart which shows an example of the flow volume setting procedure in the coating device 1 of FIG. 図4のステップS82における実流量計測モード処理の動作の一例を示すサブルーチンSubroutine showing an example of operation of actual flow rate measurement mode processing in step S82 of FIG. 図4のステップS83における支管流量設定モード処理の動作の一例を示すサブルーチンSubroutine showing an example of the operation of the branch flow rate setting mode processing in step S83 of FIG. 実流量計測モード処理における配管の接続状態の一例を示す図The figure which shows an example of the connection state of piping in an actual flow measurement mode process 支管流量設定モード処理における配管の接続状態の一例を示す図The figure which shows an example of the connection state of the piping in branch flow rate setting mode processing 塗布処理における配管の接続状態の一例を示す図The figure which shows an example of the connection state of piping in a coating process 実吐出流量Rと流量計測値Fとの関係式の一例を示すグラフA graph showing an example of a relational expression between the actual discharge flow rate R and the flow rate measurement value F 流量計測値Fと流量計測値fとの関係式の一例を示すグラフThe graph which shows an example of the relational expression of the flow measurement value F and the flow measurement value f 使用する塗布液の種別に応じてそれぞれ設定された関係式の一例を示す図The figure which shows an example of the relational expression each set according to the kind of coating liquid to be used 支管流量設定モード中と塗布作業中とにおける各流量制御バルブ546および支管流量計547の状態の一例を示す図The figure which shows an example of the state of each flow control valve 546 and the branch flow meter 547 in the branch flow rate setting mode and during the coating operation 従来の単一の供給源101から複数のノズル108a〜108nへ分岐して供給する塗布装置の一例を示すブロック図The block diagram which shows an example of the coating device which branches and supplies to the several nozzles 108a-108n from the conventional single supply source 101 従来の流量計の値と実吐出流量との関係式の一例を示す図The figure which shows an example of the relational expression of the value of the conventional flowmeter, and an actual discharge flow rate

以下、図面を参照して、本発明の一実施形態に係る塗布装置1について説明する。説明を具体的にするために、塗布装置1が有機EL材料を溶解した溶液を塗布液として用いる有機ELデバイスを製造する塗布装置に適用された例を用いて、以下の説明を行う。なお、本明細書における有機EL材料は、有機層(発光層、電荷輸送層、および電荷注入層等のうちで有機物を含む層)を形成する材料であり、例えば、有機層を形成する材料のうちで溶媒に可溶な材料である。塗布装置1は、有機EL材料を含む塗布液を、ステージ上に載置された被塗布体(例えば、ガラス基板)上に所定のパターン形状で塗布することによって有機層を形成して有機ELデバイスを製造するものである。図1(a)は、塗布装置1の要部概略構成を示す平面図である。図1(b)は、塗布装置1の要部概略構成を示す正面図である。なお、塗布装置1は、上述したように有機EL材料を含む塗布液を複数種類用いるが、それらの代表として発光層を形成する有機EL材料を溶解した溶液を塗布液(以下、有機EL材料を含む塗布液と記載することがある)として用いる例として説明する。   Hereinafter, a coating apparatus 1 according to an embodiment of the present invention will be described with reference to the drawings. In order to make the description concrete, the following description will be given using an example in which the coating apparatus 1 is applied to a coating apparatus that manufactures an organic EL device that uses a solution in which an organic EL material is dissolved as a coating liquid. Note that the organic EL material in this specification is a material for forming an organic layer (a layer containing an organic substance among a light emitting layer, a charge transport layer, a charge injection layer, and the like). It is a material that is soluble in solvents. The coating apparatus 1 forms an organic layer by applying a coating solution containing an organic EL material in a predetermined pattern shape on an object to be coated (for example, a glass substrate) placed on a stage, thereby forming an organic EL device. Is to be manufactured. FIG. 1A is a plan view showing a schematic configuration of a main part of the coating apparatus 1. FIG. 1B is a front view illustrating a schematic configuration of a main part of the coating apparatus 1. As described above, the coating apparatus 1 uses a plurality of types of coating liquid containing an organic EL material. As a representative of these, a coating solution (hereinafter referred to as an organic EL material) is used as a representative solution. It will be described as an example of use as a coating liquid that may be described.

図1(a)および図1(b)において、塗布装置1は、大略的に、基板載置装置2および有機EL塗布機構5を備えている。有機EL塗布機構5は、ノズル移動機構部51と、ノズルユニット50と、液受部53Lおよび53Rとを有している。ノズル移動機構部51は、ガイド部材511が図示X軸方向に延設されており、ノズルユニット50をガイド部材511に沿って図示X軸方向に移動させる。ノズルユニット50は、例えば赤、緑、および青色の何れか1色の有機EL材料を含む塗布液を吐出する複数のノズル52(図1では、3本のノズル52a、52b、および52cのみ図示)を並設した状態で保持する。なお、図1においては、3本のノズル52a、52b、および52cのみを図示した塗布装置1を示したが、塗布装置1にはさらに多くのノズル52を並設してノズルユニット50で保持することが可能である。塗布装置1には、n本(例えば、10〜20本)のノズル52(以下、ノズル52a〜52nとする)を並設することが可能であり、この場合、赤、緑、および青色の何れか1色の有機EL材料を含む塗布液をノズル52a〜52nから吐出する。また、各ノズル52a〜52nへは、単一の供給源541(図2参照)から赤、緑、および青色の何れか1色の有機EL材料を含む塗布液が供給される。このように、複数のノズル52から同じ色の有機EL材料を含む塗布液が吐出されるが、説明を具体的にするために赤色の有機EL材料を含む塗布液がノズル52a〜52nから吐出される例を用いる。   In FIG. 1A and FIG. 1B, the coating apparatus 1 generally includes a substrate mounting device 2 and an organic EL coating mechanism 5. The organic EL coating mechanism 5 includes a nozzle moving mechanism 51, a nozzle unit 50, and liquid receivers 53L and 53R. The nozzle moving mechanism 51 has a guide member 511 extending in the X-axis direction in the figure, and moves the nozzle unit 50 in the X-axis direction in the figure along the guide member 511. The nozzle unit 50 includes, for example, a plurality of nozzles 52 that discharge a coating liquid containing an organic EL material of any one of red, green, and blue (in FIG. 1, only three nozzles 52a, 52b, and 52c are shown). Are held side by side. In FIG. 1, the coating apparatus 1 showing only the three nozzles 52 a, 52 b, and 52 c is shown, but in the coating apparatus 1, more nozzles 52 are arranged in parallel and held by the nozzle unit 50. It is possible. In the coating apparatus 1, n (for example, 10 to 20) nozzles 52 (hereinafter referred to as nozzles 52a to 52n) can be arranged in parallel. In this case, any of red, green, and blue A coating liquid containing one color organic EL material is discharged from the nozzles 52a to 52n. In addition, each nozzle 52a to 52n is supplied with a coating liquid containing an organic EL material of any one of red, green, and blue from a single supply source 541 (see FIG. 2). As described above, the coating liquid containing the organic EL material of the same color is ejected from the plurality of nozzles 52, but the coating liquid containing the red organic EL material is ejected from the nozzles 52a to 52n for specific description. An example is used.

基板載置装置2は、ステージ21、旋回部22、平行移動テーブル23、ガイド受け部24、およびガイド部材25を有している。ステージ21は、被塗布体となるガラス基板等の基板Pをそのステージ上面に載置する。ステージ21の下部は、旋回部22によって支持されており、旋回部22の回動動作によって図示θ方向にステージ21が回動可能に構成されている。また、ステージ21の内部には、有機EL材料を含む塗布液が塗布された基板Pをステージ面上で予備加熱処理するための加熱機構や基板Pの吸着機構や受け渡しピン機構等が設けられている。   The substrate mounting apparatus 2 includes a stage 21, a turning unit 22, a parallel movement table 23, a guide receiving unit 24, and a guide member 25. The stage 21 places a substrate P such as a glass substrate to be coated on the upper surface of the stage. The lower part of the stage 21 is supported by the turning unit 22, and the stage 21 is configured to be rotatable in the θ direction shown in the figure by the turning operation of the turning unit 22. The stage 21 is provided with a heating mechanism for preheating the substrate P coated with a coating solution containing an organic EL material on the stage surface, a suction mechanism for the substrate P, a delivery pin mechanism, and the like. Yes.

有機EL塗布機構5の下方を通るように、ガイド部材25が上記X軸方向と垂直の図示Y軸方向に延設されて水平に固定される。平行移動テーブル23の下面には、ガイド部材25と当接してガイド部材25上を滑動するガイド受け部24が固設されている。また、平行移動テーブル23の上面には、旋回部22が固設される。これによって、平行移動テーブル23が、例えばリニアモータ(図示せず)からの駆動力を受けてガイド部材25に沿った図示Y軸方向に移動可能になり、旋回部22に支持されたステージ21の水平移動も可能になる。   The guide member 25 extends in the Y-axis direction perpendicular to the X-axis direction and is fixed horizontally so as to pass under the organic EL coating mechanism 5. A guide receiving portion 24 that abuts on the guide member 25 and slides on the guide member 25 is fixed to the lower surface of the translation table 23. In addition, the swivel unit 22 is fixed on the upper surface of the translation table 23. Accordingly, the parallel movement table 23 can be moved in the Y-axis direction along the guide member 25 by receiving a driving force from, for example, a linear motor (not shown), and the stage 21 supported by the turning unit 22 can be moved. Horizontal movement is also possible.

受け渡しピン機構を介してステージ21上に基板Pを載置し、当該基板Pを吸着固定して、平行移動テーブル23が有機EL塗布機構5の下方まで移動したとき、当該基板Pが赤色の有機EL材料を含む塗布液の塗布をノズル52a〜52nから受ける位置となる。そして、制御部3(図3参照)がノズルユニット50をX軸方向に往復移動させるようにノズル移動機構部51を制御し、ステージ21をY軸方向へ当該直線移動毎に所定ピッチだけ移動させるように平行移動テーブル23を制御し、ノズル52a〜52nから所定流量の有機EL材料を含む塗布液を吐出させる。また、ノズル52a〜52nのX軸方向吐出位置において、ステージ21に載置された基板Pから逸脱する両サイド空間には、基板Pから外れて吐出された有機EL材料を含む塗布液を受ける液受部53Lおよび53Rがそれぞれ固設されている。ノズル移動機構部51は、基板Pの一方サイド外側に配設されている液受部53(例えば、液受部53L)の上部空間から、基板Pを横断して基板Pの他方サイド外側に配設されている液受部53(例えば、液受部53R)の上部空間まで、ノズルユニット50を往復移動させる。また、平行移動テーブル23は、ノズルユニット50が液受部53の上部空間に配置されている際、ノズル往復移動方向とは垂直の所定方向(図示Y軸方向)に所定ピッチだけステージ21を移動させる。このようなノズル移動機構部51および平行移動テーブル23の動作と同時にノズル52a〜52nから有機EL材料を含む塗布液を液柱状態で吐出することによって、赤色の有機EL材料を含む塗布液が基板P上にストライプ状の塗布列として形成される。   When the substrate P is placed on the stage 21 via the delivery pin mechanism, the substrate P is sucked and fixed, and the parallel movement table 23 moves to the lower side of the organic EL coating mechanism 5, the substrate P becomes red organic. This is the position where the coating liquid containing the EL material is applied from the nozzles 52a to 52n. Then, the control unit 3 (see FIG. 3) controls the nozzle moving mechanism unit 51 so as to reciprocate the nozzle unit 50 in the X-axis direction, and moves the stage 21 by a predetermined pitch in the Y-axis direction every linear movement. Thus, the translation table 23 is controlled so that the coating liquid containing the organic EL material at a predetermined flow rate is discharged from the nozzles 52a to 52n. Further, at the discharge positions in the X-axis direction of the nozzles 52a to 52n, the liquid that receives the coating liquid containing the organic EL material discharged out of the substrate P is disposed in both side spaces deviating from the substrate P placed on the stage 21. Receiving portions 53L and 53R are fixed. The nozzle moving mechanism 51 is disposed outside the other side of the substrate P from the upper space of the liquid receiving portion 53 (for example, the liquid receiving portion 53L) disposed outside the one side of the substrate P across the substrate P. The nozzle unit 50 is reciprocated to the upper space of the liquid receiver 53 (for example, the liquid receiver 53R) provided. The translation table 23 moves the stage 21 by a predetermined pitch in a predetermined direction (Y-axis direction in the drawing) perpendicular to the nozzle reciprocating direction when the nozzle unit 50 is disposed in the upper space of the liquid receiving portion 53. Let Simultaneously with the operation of the nozzle moving mechanism 51 and the parallel movement table 23, the coating liquid containing the organic EL material is ejected from the nozzles 52a to 52n in a liquid column state, so that the coating liquid containing the red organic EL material becomes the substrate. A stripe-shaped coating row is formed on P.

次に、図2を参照して、塗布装置1における塗布液の供給部54の概略構成について説明する。なお、図2は、塗布装置1の供給部54の概略構成を示すブロック図である。   Next, a schematic configuration of the coating liquid supply unit 54 in the coating apparatus 1 will be described with reference to FIG. FIG. 2 is a block diagram illustrating a schematic configuration of the supply unit 54 of the coating apparatus 1.

図2において、塗布装置1は、供給部54を備えている。供給部54は、単一の供給源541から供給される塗布液(例えば、赤色の有機EL材料を含む塗布液)を供給途中(マニホールド544)で複数に分岐させて複数のノズル52a〜52n(ノズルユニット50)に供給する。ここで、供給部54において、供給源541から塗布液を複数に分岐するまでの供給配管を本管と記載し、塗布液を複数に分岐してからノズル52a〜52nに供給するまでの供給配管をそれぞれ支管と記載し、各支管間を連結する配管を連結管と記載する。   In FIG. 2, the coating apparatus 1 includes a supply unit 54. The supply unit 54 divides a coating solution (for example, a coating solution containing a red organic EL material) supplied from a single supply source 541 into a plurality of nozzles 52 a to 52 n (a plurality of nozzles 52 a to 52 n (in the manifold 544). To the nozzle unit 50). Here, in the supply unit 54, a supply pipe from the supply source 541 until the coating liquid is branched into a plurality of pipes is referred to as a main pipe, and the supply pipe from the branching of the coating liquid to a plurality of nozzles is supplied to the nozzles 52a to 52n. Are described as branch pipes, and the pipes connecting the branch pipes are referred to as connection pipes.

供給部54は、供給源541、加圧部542、フィルタ543、マニホールド544、複数の第1の開閉バルブ545a〜545n、複数の流量制御バルブ546a〜546n、複数の支管流量計547a〜547n、および複数の第2の開閉バルブ548a〜548nを備えている。また、供給部54は、支管間をそれぞれ連結する連結管に第3の開閉バルブ549ab〜549mnを備えている。供給源541は、塗布装置1で塗布する有機EL材料を含む塗布液を貯留しており、例えば、柔軟性を有するパック内に当該有機EL材料を含む塗布液を貯留している。加圧部542は、制御部3から出力される動作信号Cp(図3参照)に応じて、供給源541を加圧することによって、供給源541に貯留された有機EL材料を含む塗布液を取り出して本管中へ流動させる。フィルタ543は、本管中を流動する有機EL材料を含む塗布液中の異物を除去する。そして、本管を流動した有機EL材料を含む塗布液は、マニホールド(多岐管)544に供給される。   The supply unit 54 includes a supply source 541, a pressurization unit 542, a filter 543, a manifold 544, a plurality of first on-off valves 545a to 545n, a plurality of flow control valves 546a to 546n, a plurality of branch flow meters 547a to 547n, and A plurality of second on-off valves 548a to 548n are provided. The supply unit 54 includes third open / close valves 549ab to 549mn in connection pipes that connect the branch pipes. The supply source 541 stores a coating liquid containing an organic EL material to be applied by the coating apparatus 1, and stores, for example, a coating liquid containing the organic EL material in a flexible pack. The pressurizing unit 542 takes out the coating liquid containing the organic EL material stored in the supply source 541 by pressurizing the supply source 541 in accordance with the operation signal Cp (see FIG. 3) output from the control unit 3. Flow into the main. The filter 543 removes foreign matters in the coating liquid containing the organic EL material that flows in the main pipe. Then, the coating liquid containing the organic EL material flowing through the main pipe is supplied to the manifold (manifold pipe) 544.

マニホールド544は、本管から供給された有機EL材料を含む塗布液を複数(例えば、10〜20本)の支管に分岐する。ここで、マニホールド544が分岐する複数の支管は、それぞれノズル52a〜52nに接続されており、以下の説明においてはノズル52a〜52nに接続されるそれぞれの支管をa系統支管〜n系統支管として記載する。   The manifold 544 branches the coating liquid containing the organic EL material supplied from the main pipe into a plurality of (for example, 10 to 20) branch pipes. Here, the plurality of branch pipes from which the manifold 544 branches are connected to the nozzles 52a to 52n, respectively, and in the following description, the branch pipes connected to the nozzles 52a to 52n are described as a-system branch pipes to n-system branch pipes. To do.

第1の開閉バルブ545aは、制御部3から出力される動作信号Cv1a(図3参照)に応じて、マニホールド544からa系統支管への流路を開閉して有機EL材料を含む塗布液をa系統支管へ供給または停止する。流量制御バルブ546aは、制御部3から出力される動作信号Cfa(図3参照)に応じて、a系統支管を流動する有機EL材料を含む塗布液の流量を制御する。支管流量計547aは、a系統支管における有機EL材料を含む塗布液の流量を検出して、流量情報Ifa(図3参照)を制御部3へ出力する。なお、後述により明らかとなるが、制御部3が流量情報Ifaに基づいて目標流量値facとなるように動作信号Cfaを生成して流量制御バルブ546aの動作を制御するため、制御部3、流量制御バルブ546a、および支管流量計547aを合わせてマスフローコントローラとして機能する。そして、目標流量値facは、塗布作業における流量制御バルブ546aの調節目標となる。   The first opening / closing valve 545a opens and closes the flow path from the manifold 544 to the a-system branch pipe in accordance with an operation signal Cv1a (see FIG. 3) output from the control unit 3, and applies a coating liquid containing an organic EL material to a Supply or stop the system branch. The flow rate control valve 546a controls the flow rate of the coating liquid containing the organic EL material flowing through the a system branch pipe in accordance with the operation signal Cfa (see FIG. 3) output from the control unit 3. The branch pipe flow meter 547a detects the flow rate of the coating liquid containing the organic EL material in the a system branch pipe, and outputs the flow rate information Ifa (see FIG. 3) to the control unit 3. As will be apparent from the description below, the control unit 3 generates the operation signal Cfa to control the operation of the flow rate control valve 546a based on the flow rate information Ifa, and controls the operation of the flow rate control valve 546a. The control valve 546a and the branch flow meter 547a together function as a mass flow controller. The target flow rate value fac becomes an adjustment target of the flow rate control valve 546a in the coating operation.

第2の開閉バルブ548aは、制御部3から出力される動作信号Cv2a(図3参照)に応じて、a系統支管からノズル52aへの流路を開閉して有機EL材料を含む塗布液をノズル52aへ供給または停止する。そして、ノズル52aは、第2の開閉バルブ548aを介してa系統支管から有機EL材料を含む塗布液の供給を受けて、その先端部から液柱状態の有機EL材料を含む塗布液を吐出する。なお、ノズル52aは、a系統支管から供給された有機EL材料を含む塗布液中の異物を除去するためのフィルタ521a(図示せず)を有している。   The second opening / closing valve 548a opens and closes the flow path from the system a branch pipe to the nozzle 52a in accordance with the operation signal Cv2a (see FIG. 3) output from the control unit 3, and the coating liquid containing the organic EL material is nozzled. Supply to 52a or stop. The nozzle 52a receives the supply of the coating liquid containing the organic EL material from the a-system branch pipe via the second opening / closing valve 548a, and discharges the coating liquid containing the organic EL material in the liquid column state from the tip. . The nozzle 52a has a filter 521a (not shown) for removing foreign substances in the coating liquid containing the organic EL material supplied from the a-system branch pipe.

他のb系統支管〜n系統支管も、a系統支管と同様の構成部を有している。すなわち、第1の開閉バルブ545b〜545nは、制御部3から出力される動作信号Cv1b〜Cv1nに応じて、それぞれマニホールド544からb系統支管〜n系統支管への流路を開閉して有機EL材料を含む塗布液をb系統支管〜n系統支管へ供給または停止する。また、流量制御バルブ546b〜546nは、それぞれ制御部3から出力される動作信号Cfb〜Cfnに応じて、それぞれb系統支管〜n系統支管を流動する有機EL材料を含む塗布液の流量を制御する。支管流量計547b〜547nは、それぞれb系統支管〜n系統支管における有機EL材料を含む塗布液の流量を検出して、それぞれ流量情報Ifb〜Ifnを制御部3へ出力する。したがって、他のb系統支管〜n系統支管についても、制御部3が流量情報Ifb〜Ifnに基づいてそれぞれ目標流量値fbc〜fncとなるように動作信号Cfb〜Cfnを生成して流量制御バルブ546b〜546nの動作を制御するため、制御部3、流量制御バルブ546b〜546n、および支管流量計547b〜547nをそれぞれ合わせてそれぞれマスフローコントローラとして機能する。そして、目標流量値fbc〜fncも、それぞれ塗布作業における流量制御バルブ546b〜546nの調節目標となる。   Other b system branch pipes-n system branch pipes also have the same components as the a system branch pipes. That is, the first open / close valves 545b to 545n open and close the flow paths from the manifold 544 to the b system branch pipe to the n system branch pipe according to the operation signals Cv1b to Cv1n output from the control unit 3, respectively. Is supplied to or stopped from the b-system branch pipe to the n-system branch pipe. Further, the flow rate control valves 546b to 546n control the flow rate of the coating liquid containing the organic EL material flowing through the b system branch pipe to the n system branch pipe, respectively, according to the operation signals Cfb to Cfn output from the control unit 3, respectively. . The branch pipe flow meters 547b to 547n detect the flow rate of the coating liquid containing the organic EL material in the b system branch pipe to the n system branch pipe, respectively, and output the flow rate information Ifb to Ifn to the control unit 3, respectively. Accordingly, the control unit 3 also generates the operation signals Cfb to Cfn so that the target flow rate values fbc to fnc are obtained based on the flow rate information Ifb to Ifn, and the flow rate control valve 546b for the other b system branches to the n system branches. In order to control the operation of ˜546n, the control unit 3, the flow rate control valves 546b to 546n, and the branch flow meters 547b to 547n respectively function as mass flow controllers. The target flow rate values fbc to fnc are also adjustment targets for the flow rate control valves 546b to 546n in the application work, respectively.

また、第2の開閉バルブ548b〜548nは、それぞれ制御部3から出力される動作信号Cv2b〜Cv2nに応じて、それぞれb系統支管〜n系統支管を開閉して有機EL材料を含む塗布液をノズル52b〜52nへ供給または停止する。そして、ノズル52b〜52nは、それぞれ第2の開閉バルブ548b〜548nを介してb系統支管〜n系統支管から有機EL材料を含む塗布液の供給を受けて、それらの先端部から液柱状態の有機EL材料を含む塗布液を吐出する。なお、ノズル52b〜52nも、それぞれb系統支管〜n系統支管から供給された有機EL材料を含む塗布液中の異物を除去するためのフィルタ521b〜521n(図示せず)を有している。なお、供給源541からノズル52a〜52nに至るそれぞれの配管は、PE(ポリエチレン)、PP(ポリプロピレン)、テフロン(登録商標)等を材料とする管部材が用いられる。   Further, the second on-off valves 548b to 548n respectively open and close the b-system branch pipes to the n-system branch pipes according to the operation signals Cv2b to Cv2n output from the control unit 3, respectively, and apply the coating liquid containing the organic EL material to the nozzles. Supply or stop to 52b to 52n. The nozzles 52b to 52n receive the supply of the coating liquid containing the organic EL material from the b system branch pipe to the n system branch pipe through the second opening / closing valves 548b to 548n, respectively, A coating solution containing an organic EL material is discharged. The nozzles 52b to 52n also have filters 521b to 521n (not shown) for removing foreign substances in the coating liquid containing the organic EL material supplied from the b system branch pipe to the n system branch pipe, respectively. In addition, each piping from the supply source 541 to the nozzles 52a to 52n uses a pipe member made of PE (polyethylene), PP (polypropylene), Teflon (registered trademark), or the like.

また、a系統支管〜n系統支管には、それぞれの支管間を連結する連結管が設けられている。具体的には、支管流量計547aおよび第2の開閉バルブ548aの間となるa系統支管と、第1の開閉バルブ545bおよび流量制御バルブ546bの間となるb系統支管とを連結するa−b系統支管連結管が設けられている。そして、a−b系統支管連結管には、第3の開閉バルブ549abが設けられる。第3の開閉バルブ549abは、制御部3から出力される動作信号Cv3ab(図3参照)に応じて、a系統支管からb系統支管への連結管を開閉して有機EL材料を含む塗布液をa系統支管からb系統支管へ供給または停止する。   Moreover, the a system branch pipe-n system branch pipe is provided with the connection pipe which connects between each branch pipe. Specifically, a-b connecting the a-system branch pipe between the branch flow meter 547a and the second on-off valve 548a and the b-system branch pipe between the first on-off valve 545b and the flow control valve 546b. A system branch connection pipe is provided. The ab system branch pipe connection pipe is provided with a third on-off valve 549ab. The third on-off valve 549ab opens and closes the connection pipe from the a-system branch pipe to the b-system branch pipe in accordance with an operation signal Cv3ab (see FIG. 3) output from the control unit 3, and applies a coating liquid containing an organic EL material. Supply or stop from the a system branch pipe to the b system branch pipe.

他のb系統支管〜n系統支管も、a−b系統支管連結管と同様の連結管を有している。すなわち、支管流量計547bおよび第2の開閉バルブ548bの間となるb系統支管と、第1の開閉バルブ545cおよび流量制御バルブ546cの間となるc系統支管とを連結するb−c系統支管連結管が設けられている。そして、b−c系統支管連結管には、第3の開閉バルブ549bcが設けられる。第3の開閉バルブ549bcは、制御部3から出力される動作信号Cv3bcに応じて、b系統支管からc系統支管への連結管を開閉して有機EL材料を含む塗布液をb系統支管からc系統支管へ供給または停止する。また、支管流量計547cおよび第2の開閉バルブ548cの間となるc系統支管と、第1の開閉バルブ545dおよび流量制御バルブ546dの間となるd系統支管とを連結するc−d系統支管連結管が設けられている。そして、c−d系統支管連結管には、第3の開閉バルブ549cdが設けられる。第3の開閉バルブ549cdは、制御部3から出力される動作信号Cv3cdに応じて、c系統支管からd系統支管への連結管を開閉して有機EL材料を含む塗布液をc系統支管からd系統支管へ供給または停止する。そして、d系統支管〜m系統支管の間にも同様の連結管および第3の開閉バルブ549de〜549lmが設けられ、支管流量計547mおよび第2の開閉バルブ548mの間となるm系統支管と、第1の開閉バルブ545nおよび流量制御バルブ546nの間となるn系統支管とを連結するm−n系統支管連結管が設けられている。そして、m−n系統支管連結管には、第3の開閉バルブ549mnが設けられる。第3の開閉バルブ549mnは、制御部3から出力される動作信号Cv3mnに応じて、m系統支管からn系統支管への連結管を開閉して有機EL材料を含む塗布液をm系統支管からn系統支管へ供給または停止する。なお、n系統支管とa系統支管とを連結する連結管は、本実施形態の塗布装置1では設けられていない。   The other b system branch pipes-n system branch pipes also have connection pipes similar to the ab system branch connection pipes. That is, a bc system branch connection that connects a b system branch between the branch flow meter 547b and the second on-off valve 548b and a c system branch between the first on-off valve 545c and the flow control valve 546c. A tube is provided. The bc system branch pipe connection pipe is provided with a third on-off valve 549bc. The third opening / closing valve 549bc opens and closes the connection pipe from the b-system branch pipe to the c-system branch pipe in accordance with the operation signal Cv3bc output from the control unit 3, and allows the application liquid containing the organic EL material to be transferred from the b-system branch pipe to the c-system branch pipe. Supply or stop the system branch. Also, a cd system branch connection that connects the c system branch pipe between the branch flow meter 547c and the second on-off valve 548c and the d system branch pipe between the first on-off valve 545d and the flow control valve 546d. A tube is provided. The cd system branch pipe connection pipe is provided with a third on-off valve 549cd. The third on-off valve 549 cd opens and closes the connection pipe from the c-system branch pipe to the d-system branch pipe in accordance with the operation signal Cv3cd output from the control unit 3, and applies the coating liquid containing the organic EL material from the c-system branch pipe to d. Supply or stop the system branch. A similar connecting pipe and third on-off valves 549de to 549lm are provided between the d-system branch pipe and the m-system branch pipe, and the m-system branch pipe between the branch flow meter 547m and the second on-off valve 548m, An mn system branch pipe connection pipe that connects the n system branch pipe between the first opening / closing valve 545n and the flow rate control valve 546n is provided. The mn system branch pipe connection pipe is provided with a third opening / closing valve 549mn. The third on-off valve 549 mn opens and closes the connection pipe from the m-system branch to the n-system branch in accordance with the operation signal Cv3mn output from the control unit 3, and allows the coating liquid containing the organic EL material to Supply or stop the system branch. In addition, the connection pipe which connects n system branch pipe and a system branch pipe is not provided in the coating device 1 of this embodiment.

次に、図3を参照して、塗布装置1における制御機能の概略構成について説明する。なお、図3は、塗布装置1の制御機能を示すブロック図である。   Next, with reference to FIG. 3, a schematic configuration of the control function in the coating apparatus 1 will be described. FIG. 3 is a block diagram showing a control function of the coating apparatus 1.

図3において、塗布装置1は、上述した各構成部を制御する制御部3を備えている。例えば、制御部3は、一般的なコンピュータシステムで構成され、内蔵されるコンピュータが用いるハードディスクやメモリ等の記憶媒体やユーザが計測結果等を入力する入力装置を有している。制御部3は、加圧部542、第1の開閉バルブ545a〜545n、流量制御バルブ546a〜546n、第2の開閉バルブ548a〜548n、第3の開閉バルブ549ab〜549mn、旋回部22、平行移動テーブル23、およびノズル移動機構部51のそれぞれの動作を制御する。特に、制御部3は、動作信号Cpを出力することによって、加圧部542の動作を制御する。制御部3は、動作信号Cv1a〜Cv1nをそれぞれ出力することによって、第1の開閉バルブ545a〜545nの動作を制御する。制御部3は、動作信号Cfa〜Cfnをそれぞれ出力することによって、流量制御バルブ546a〜546nの動作を制御する。制御部3は、動作信号Cv2a〜Cv2nをそれぞれ出力することによって、第2の開閉バルブ548a〜548nの動作を制御する。そして、制御部3は、動作信号Cv3ab〜Cv3mnをそれぞれ出力することによって、第3の開閉バルブ549ab〜549mnの動作を制御する。   In FIG. 3, the coating apparatus 1 includes a control unit 3 that controls each component described above. For example, the control unit 3 is configured by a general computer system, and includes a storage medium such as a hard disk and a memory used by a built-in computer, and an input device through which a user inputs measurement results and the like. The control unit 3 includes a pressurizing unit 542, first on-off valves 545a to 545n, flow rate control valves 546a to 546n, second on-off valves 548a to 548n, third on-off valves 549ab to 549mn, swivel unit 22, and parallel movement. The operations of the table 23 and the nozzle moving mechanism unit 51 are controlled. In particular, the control unit 3 controls the operation of the pressurizing unit 542 by outputting the operation signal Cp. The controller 3 controls the operations of the first on-off valves 545a to 545n by outputting the operation signals Cv1a to Cv1n, respectively. The controller 3 controls the operations of the flow control valves 546a to 546n by outputting the operation signals Cfa to Cfn, respectively. The controller 3 controls the operations of the second on-off valves 548a to 548n by outputting the operation signals Cv2a to Cv2n, respectively. And the control part 3 controls operation | movement of 3rd on-off valve 549ab-549mn by outputting the operation signals Cv3ab-Cv3mn, respectively.

また、制御部3は、支管流量計547b〜547nがそれぞれ出力する支管流量を示す流量情報Ifa〜Ifnをそれぞれ取得する。そして、a系統支管〜n系統支管それぞれに設定された目標流量(目標流量値fac〜fnc)となるように、流量情報Ifa〜Ifnに応じて流量制御バルブ546a〜546nの動作を制御する。   In addition, the control unit 3 acquires flow rate information Ifa to Ifn indicating the branch flow rates output from the branch flow meters 547b to 547n, respectively. The operation of the flow rate control valves 546a to 546n is controlled according to the flow rate information Ifa to Ifn so that the target flow rate (target flow rate value fac to fnc) set for each of the a system branch pipe to the n system branch pipe is obtained.

ここで、一例として、赤色の有機EL材料を含む塗布液の塗布を受ける基板Pの表面には、有機EL材料を含む塗布液を塗布すべき所定のパターン形状に応じたストライプ状の溝が複数本並設されるように形成されていることがある。この場合、有機EL材料を含む塗布液としては、例えば、基板P上の溝内に拡がるように流動する程度の粘性を有する有機性のEL材料が用いられ、具体的には各色毎の高分子タイプの有機EL材料を含む塗布液が用いられる。   Here, as an example, a plurality of stripe-shaped grooves corresponding to a predetermined pattern shape to which the coating liquid containing the organic EL material is to be applied are formed on the surface of the substrate P that receives the coating liquid containing the red organic EL material. It may be formed so as to be arranged side by side. In this case, as the coating liquid containing the organic EL material, for example, an organic EL material having a viscosity enough to flow so as to spread in the groove on the substrate P is used, and specifically, a polymer for each color. A coating solution containing a type of organic EL material is used.

ノズルユニット50は、各ノズル52a〜52nの塗布ピッチ間隔を調整することができる。ノズルユニット50には、各ノズル52a〜52nが、図1中のX軸方向に関して略直線状に離れて配列されるとともに図1中のY軸方向に僅かにずれて配置される。隣接する2本のノズル52間のY軸方向に対する距離は、所望する塗布列の間隔に対応するように調整される。例えば、基板Pの表面に予め形成されているストライプ状の溝間ピッチの数倍(例えば、3倍など)に等しくされる。また、このような溝がない場合も、所望するストライプ状の塗布列の間隔に対応するように、ノズル52のY軸方向ピッチが同様に調整される。   The nozzle unit 50 can adjust the coating pitch interval of the nozzles 52a to 52n. In the nozzle unit 50, the nozzles 52a to 52n are arranged substantially linearly apart with respect to the X-axis direction in FIG. 1 and are slightly shifted in the Y-axis direction in FIG. The distance between the adjacent two nozzles 52 in the Y-axis direction is adjusted so as to correspond to the desired interval between the application rows. For example, it is set to be equal to several times (for example, 3 times, etc.) the stripe-shaped groove pitch formed in advance on the surface of the substrate P. Further, even when there is no such groove, the Y-axis direction pitch of the nozzles 52 is similarly adjusted so as to correspond to a desired stripe-shaped application row interval.

上述したノズル52のY軸方向ピッチを調整する構成は、様々考えられる。例えば、ノズル52a〜52nがそれぞれY軸方向(副走査方向)へ移動可能に構成することによって、各ノズル52のY軸方向ピッチを調整することが可能となる。他の例として、ノズルユニット50を所定の鉛直方向支持軸周りに回動自在に支持し、制御部3の制御によって当該支持軸周りにノズルユニット50を回動させることで、塗布ピッチ間隔を調整することができる。   Various configurations for adjusting the pitch in the Y-axis direction of the nozzle 52 described above are conceivable. For example, by configuring the nozzles 52a to 52n to be movable in the Y-axis direction (sub-scanning direction), the Y-axis direction pitch of each nozzle 52 can be adjusted. As another example, the nozzle unit 50 is supported so as to be rotatable around a predetermined vertical support shaft, and the coating pitch interval is adjusted by rotating the nozzle unit 50 around the support shaft under the control of the control unit 3. can do.

制御部3は、ステージ21に載置された基板Pの位置や方向に基づいて、基板Pに塗布列を形成する方向(例えば、基板Pに上記溝が形成されている場合、当該溝の方向)が上記X軸方向になるように旋回部22の角度を調整し、塗布のスタートポイント、すなわち、基板Pに塗布列を形成する一方の端部側で塗布を開始する塗布開始位置を算出する。なお、上記塗布開始位置は、一方の液受部53の上部空間となる。そして、制御部3は、上述したように平行移動テーブル23およびノズル移動機構部51を駆動させる。   Based on the position and direction of the substrate P placed on the stage 21, the control unit 3 is configured to form a coating row on the substrate P (for example, when the groove is formed on the substrate P, the direction of the groove). ) Is adjusted so as to be in the X-axis direction, and a coating start point, that is, a coating start position at which coating is started at one end side forming the coating row on the substrate P is calculated. . The application start position is an upper space of one liquid receiving portion 53. Then, the control unit 3 drives the parallel movement table 23 and the nozzle movement mechanism unit 51 as described above.

上記塗布開始位置において、制御部3は、各ノズル52a〜52nから有機EL材料を含む塗布液の吐出開始を供給部54に指示する。このとき、制御部3は、ストライプ状の塗布列の各ポイントにおける有機EL材料を含む塗布液の塗布量が均一となり、液柱状態で有機EL材料を含む塗布液が吐出されるように、ノズル52a〜52nの移動速度に応じてその塗布量を制御しており、支管流量計547a〜547nからの流量情報Ifa〜Ifnをそれぞれフィードバックして制御する。そして、制御部3は、基板P上に有機EL材料を含む塗布液の塗布列を形成するために、有機EL材料を含む塗布液を基板P上に吐出しながらノズルユニット50をガイド部材511に沿わせて移動させるように制御する。この動作によって、液柱状態で各ノズル52a〜52nから吐出される赤色の有機EL材料を含む塗布液が同時に基板P上に吐出され、赤色の有機EL材料を含む塗布液の塗布列が形成されていく。   At the application start position, the control unit 3 instructs the supply unit 54 to start discharging the application liquid containing the organic EL material from the nozzles 52a to 52n. At this time, the control unit 3 makes the nozzle so that the coating amount of the coating liquid containing the organic EL material becomes uniform at each point of the striped coating row, and the coating liquid containing the organic EL material is discharged in a liquid column state. The application amount is controlled according to the moving speed of 52a to 52n, and the flow rate information Ifa to Ifn from the branch pipe flow meters 547a to 547n is fed back and controlled. Then, the control unit 3 causes the nozzle unit 50 to move to the guide member 511 while discharging the coating liquid containing the organic EL material onto the substrate P in order to form a coating row of the coating liquid containing the organic EL material on the substrate P. Control to move along. By this operation, the application liquid containing the red organic EL material discharged from the nozzles 52a to 52n in the liquid column state is simultaneously discharged onto the substrate P, and the application row of the application liquid containing the red organic EL material is formed. To go.

制御部3は、基板P上をノズルユニット50が横断して基板Pの他方端部の外側に固設されている他方の液受部53上に位置すると、ノズル52a〜52nからの有機EL材料を含む塗布液の吐出を継続したまま、ノズル移動機構部51によるノズルユニット50の移動を停止する。この1回の移動によって、有機EL材料を含む塗布液の塗布が複数の塗布列(例えば、10〜20列分の塗布列)に対して同時に行われる。具体的には、同色の有機EL材料を含む塗布液を各ノズル52a〜52nから吐出しているので、3列毎に1列の塗布列を塗布対象とした例えば合計10〜20列分の塗布列に有機EL材料を含む塗布液が塗布される。   When the control unit 3 is positioned on the other liquid receiving portion 53 fixed on the outside of the other end portion of the substrate P across the substrate P, the organic EL material from the nozzles 52a to 52n. The movement of the nozzle unit 50 by the nozzle moving mechanism unit 51 is stopped while the discharge of the coating liquid containing is continued. By this one movement, the application liquid containing the organic EL material is applied simultaneously to a plurality of application rows (for example, 10 to 20 application rows). Specifically, since the coating liquid containing the organic EL material of the same color is discharged from each of the nozzles 52a to 52n, for example, a total of 10 to 20 rows of coatings with one row of coatings being applied every 3 rows. A coating liquid containing an organic EL material is applied to the columns.

次に、制御部3は、平行移動テーブル23をY軸正方向に所定距離だけピッチ送りして、次に塗布対象となる塗布列への有機EL材料を含む塗布液の塗布を行えるようにする。そして、制御部3は、他方の液受部53の上部空間からノズルユニット50を逆の方向へ基板P上を横断させて一方の液受部53上に位置すると、ノズル52a〜52nからの有機EL材料を含む塗布液の吐出を継続したまま、ノズル移動機構部51によるノズルユニット50の移動を停止する。この2回目の移動によって、次の塗布列への有機EL材料を含む塗布液の塗布が完了する。このような動作を繰り返すことによって、赤色の有機EL材料を含む塗布液が塗布された塗布列が形成される。   Next, the control unit 3 pitches the parallel movement table 23 by a predetermined distance in the positive direction of the Y axis so that the application liquid containing the organic EL material can be applied to the application row to be applied next. . Then, when the control unit 3 positions the nozzle unit 50 across the substrate P in the opposite direction from the upper space of the other liquid receiving unit 53 and is positioned on the one liquid receiving unit 53, the organic material from the nozzles 52a to 52n. While the discharge of the coating liquid containing the EL material is continued, the movement of the nozzle unit 50 by the nozzle moving mechanism 51 is stopped. By this second movement, the application of the application liquid containing the organic EL material to the next application row is completed. By repeating such an operation, a coating row coated with a coating liquid containing a red organic EL material is formed.

次に、図4〜図9を参照して、一実施形態に係る塗布装置1の流量設定手順の一例について説明する。なお、図4は、当該塗布装置1の流量設定手順の一例を示すフローチャートである。図5は、図4のステップS82における実流量計測モード処理の動作の一例を示すサブルーチンである。図6は、図4のステップS83における支管流量設定モード処理の動作の一例を示すサブルーチンである。図7は、実流量計測モード処理における配管の接続状態の一例を示す図である。図8は、支管流量設定モード処理における配管の接続状態の一例を示す図である。図9は、塗布処理における配管の接続状態の一例を示す図である。   Next, an example of a flow rate setting procedure of the coating apparatus 1 according to an embodiment will be described with reference to FIGS. FIG. 4 is a flowchart showing an example of the flow rate setting procedure of the coating apparatus 1. FIG. 5 is a subroutine showing an example of the actual flow rate measurement mode processing in step S82 of FIG. FIG. 6 is a subroutine showing an example of the operation of the branch pipe flow rate setting mode process in step S83 of FIG. FIG. 7 is a diagram illustrating an example of a pipe connection state in the actual flow rate measurement mode process. FIG. 8 is a diagram illustrating an example of a pipe connection state in the branch pipe flow rate setting mode process. FIG. 9 is a diagram illustrating an example of a pipe connection state in the coating process.

図4において、制御部3は、加圧部542を動作させて供給源541に貯留された有機EL材料を含む塗布液を本管中へ流動させ(ステップS80)、処理を次のステップに進める。例えば、制御部3は、加圧部542を作動させる動作信号Cpを加圧部542へ出力して、当該加圧部542を加圧動作させる。   In FIG. 4, the control unit 3 operates the pressurizing unit 542 to cause the coating liquid containing the organic EL material stored in the supply source 541 to flow into the main pipe (step S80), and the process proceeds to the next step. . For example, the control unit 3 outputs an operation signal Cp for operating the pressurizing unit 542 to the pressurizing unit 542 to cause the pressurizing unit 542 to perform a pressurizing operation.

次に、制御部3は、実流量Rと基準となる支管流量計547(例えば、複数の支管流量計547のうち、a系統支管の支管流量計547a)の流量計測値Fとの間の関係式が設定済みか否かを判断する(ステップS81)。例えば、制御部3は、塗布装置1が使用する塗布液の種別毎に、実流量Rと基準となる支管流量計547の流量計測値Fとの間の関係式を設定し、搭載された記憶媒体に当該関係式を記憶している。そして、制御部3は、塗布装置1で塗布する塗布液に対して上記関係式が設定されていない場合、次のステップS82に処理を進める。一方、制御部3は、塗布装置1で塗布する塗布液に対して上記関係式が設定されている場合、次のステップS83に処理を進める。   Next, the control unit 3 determines the relationship between the actual flow rate R and the flow measurement value F of the reference branch flow meter 547 (for example, the branch flow meter 547a of the a system branch pipe among the plurality of branch flow meters 547). It is determined whether the formula has been set (step S81). For example, the control unit 3 sets a relational expression between the actual flow rate R and the flow rate measurement value F of the branch flow meter 547 serving as a reference for each type of coating liquid used by the coating device 1, and is installed in the memory. The relational expression is stored in the medium. And the control part 3 advances a process to following step S82, when the said relational expression is not set with respect to the coating liquid apply | coated with the coating device 1. FIG. On the other hand, when the above relational expression is set for the coating liquid applied by the coating apparatus 1, the control unit 3 advances the process to the next step S83.

ステップS82において、制御部3は、実流量計測モード処理を行い、次のステップに処理を進める。以下、図5を参照して、実流量計測モード処理の詳細な動作について説明する。   In step S82, the control unit 3 performs an actual flow rate measurement mode process and proceeds to the next step. The detailed operation of the actual flow rate measurement mode process will be described below with reference to FIG.

図5において、制御部3は、実流量(実吐出流量)を計測する支管、すなわち基準となる支管流量計547が接続された支管(例えば、a系統支管)を選択し、吐出流量範囲を設定して(ステップS91)、処理を次のステップに進める。ここで、上記吐出流量範囲とは、塗布装置1がこれから使用する塗布液を塗布する際に可能性がある吐出流量の範囲を示している。   In FIG. 5, the control unit 3 selects a branch pipe that measures an actual flow rate (actual discharge flow rate), that is, a branch pipe (for example, a system branch pipe) to which a reference branch flow meter 547 is connected, and sets a discharge flow rate range. Then (step S91), the process proceeds to the next step. Here, the discharge flow rate range indicates a range of discharge flow rate that may be applied when the coating apparatus 1 applies a coating liquid to be used in the future.

次に、制御部3は、上記ステップS91で選択された対象の支管に直列に設けられた第1の開閉バルブ545(例えば、a系統の第1の開閉バルブ545a)および第2の開閉バルブ548(例えば、a系統の第2の開閉バルブ548a)を全開にして、他の開閉バルブを全閉にし(ステップS92)、処理を次のステップに進める。   Next, the control unit 3 includes a first on-off valve 545 (for example, a first on-off valve 545a) and a second on-off valve 548 provided in series with the target branch pipe selected in step S91. (For example, the second open / close valve 548a of the a system) is fully opened, the other open / close valves are fully closed (step S92), and the process proceeds to the next step.

次に、制御部3は、基準となる支管流量計547(例えば、a系統の支管流量計547a)の流量計測値Fが上記吐出流量範囲内の任意の値となるように、基準となる支管流量計547と同じ支管の流量制御バルブ546(例えば、a系統の流量制御バルブ546a)を動作させ(ステップS93)、処理を次のステップに進める。このステップS93の動作によって、本管中へ流動する有機EL材料を含む塗布液が上記ステップS91で選択された対象の支管(例えば、a系統の支管)のみに流動して1つのノズル52(例えば、ノズル52a)から吐出される状態となる。具体的には、上記ステップS91でa系統支管が選択されている場合、有機EL材料を含む塗布液は、図7の太線で示すように流動する。すなわち、供給源541からマニホールド544に流動した有機EL材料を含む塗布液は、第1の開閉バルブ545aを介して、流量制御バルブ546aおよび支管流量計547aへ流動し、第2の開閉バルブ548aを介してノズル52aへ流動する流路が形成される。なお、図7では、実流量計測モード処理において有機EL材料を含む塗布液が流動しない支管や連結管については、破線で記載している。   Next, the control unit 3 sets the reference branch pipe so that the flow rate measurement value F of the reference branch flow meter 547 (for example, the a-system branch pipe flow meter 547a) becomes an arbitrary value within the discharge flow rate range. The flow control valve 546 (for example, the a system flow control valve 546a) of the same branch as the flow meter 547 is operated (step S93), and the process proceeds to the next step. By the operation of step S93, the coating liquid containing the organic EL material that flows into the main pipe flows only to the target branch pipe (for example, a branch pipe of system a) selected in step S91, so that one nozzle 52 (for example, , The nozzle 52a) is discharged. Specifically, when the system a branch pipe is selected in step S91, the coating liquid containing the organic EL material flows as shown by the thick line in FIG. That is, the coating liquid containing the organic EL material that has flowed from the supply source 541 to the manifold 544 flows to the flow rate control valve 546a and the branch flow meter 547a via the first opening / closing valve 545a, and the second opening / closing valve 548a. A flow path that flows to the nozzle 52a is formed. In FIG. 7, the branch pipes and connection pipes in which the coating liquid containing the organic EL material does not flow in the actual flow rate measurement mode process are indicated by broken lines.

次に、制御部3は、秤量によって計測された実吐出流量Rおよびそのときの基準となる支管流量計547の流量計測値F(例えば、支管流量計547aの流量計測値fa)を取得し(ステップS94)、処理を次のステップに進める。例えば、塗布装置1のユーザは、上記ステップS93の動作状態において、塗布液を吐出しているノズル52から吐出している塗布液を秤量し、実吐出流量Rを計測する。例えば、ノズル52から吐出される塗布液の実吐出流量Rは、当該ノズル52から所定の容器内に塗布液を吐出させ、単位吐出時間に対する当該容器内の塗布液重量(例えば、ミリグラム/分)によって秤量される。そして、ユーザは、制御部3の入力装置を介して、計測した実吐出流量Rを入力する。なお、そのときの基準となる支管流量計547の流量計測値Fについては、当該支管流量計547から出力される流量情報Ifを用いて自動的に制御部3が取得してもいいし、ユーザが入力装置を介して入力してもかまわない。   Next, the control unit 3 acquires the actual discharge flow rate R measured by weighing and the flow rate measurement value F of the branch flow meter 547 serving as a reference at that time (for example, the flow rate measurement value fa of the branch flow meter 547a) ( Step S94), the process proceeds to the next step. For example, the user of the coating apparatus 1 measures the actual discharge flow rate R by weighing the coating liquid discharged from the nozzle 52 discharging the coating liquid in the operation state of step S93. For example, the actual discharge flow rate R of the coating liquid discharged from the nozzle 52 is such that the coating liquid is discharged from the nozzle 52 into a predetermined container, and the weight of the coating liquid in the container with respect to the unit discharge time (for example, milligram / minute). Weighed by Then, the user inputs the measured actual discharge flow rate R via the input device of the control unit 3. Note that the flow rate measurement value F of the branch flow meter 547 serving as a reference at that time may be automatically acquired by the control unit 3 using the flow rate information If output from the branch flow meter 547, or the user May be input via an input device.

次に、制御部3は、実流量計測が終了したか否かを判断する(ステップS95)。例えば、上記ステップS93およびステップS94で行う実吐出流量Rの秤量は、上記吐出流量範囲内における複数ポイント(例えば、3〜5ポイント)に対応して行われる。上記ステップS95において、制御部3は、実吐出流量Rの秤量が上記複数ポイント全てに対応して行われた場合、次のステップS96に処理を進める。一方、制御部3は、実吐出流量Rの秤量が上記複数ポイントの何れかに対して行われていない場合、上記ステップS93に戻って、上記吐出流量範囲内における他の値に対する処理を行う。   Next, the control unit 3 determines whether or not the actual flow rate measurement has been completed (step S95). For example, the weighing of the actual discharge flow rate R performed in step S93 and step S94 is performed corresponding to a plurality of points (for example, 3 to 5 points) in the discharge flow rate range. In step S95, when the weighing of the actual discharge flow rate R is performed corresponding to all the plurality of points, the control unit 3 proceeds to the next step S96. On the other hand, when the weighing of the actual discharge flow rate R is not performed on any of the plurality of points, the control unit 3 returns to step S93 and performs processing for other values within the discharge flow rate range.

ステップS96において、制御部3は、実吐出流量Rと基準となる支管流量計547の流量計測値Fとの関係式を設定して記憶媒体に記憶して、当該サブルーチンによる処理を終了する。以下、図10を参照して、実吐出流量Rと基準となる支管流量計547の流量計測値Fとの関係式について説明する。なお、図10は、実吐出流量Rの秤量結果から得られる上記関係式の一例を示すグラフである。   In step S <b> 96, the control unit 3 sets a relational expression between the actual discharge flow rate R and the flow rate measurement value F of the reference branch flow meter 547 and stores it in the storage medium, and ends the processing by the subroutine. Hereinafter, a relational expression between the actual discharge flow rate R and the flow rate measurement value F of the branch pipe flow meter 547 serving as a reference will be described with reference to FIG. FIG. 10 is a graph showing an example of the relational expression obtained from the result of weighing the actual discharge flow rate R.

図10は、横軸を基準となる支管流量計547の流量計測値Fおよび縦軸を実吐出流量Rとし、実吐出流量Rの秤量結果をプロットしている。具体的には、上記ステップS93およびステップS94の処理によって、基準となる支管流量計547の流量計測値がF1のときに秤量された実吐出流量がR1である。また、基準となる支管流量計547の流量計測値がF2のときに秤量された実吐出流量がR2である。また、基準となる支管流量計547の流量計測値がF3のときに秤量された実吐出流量がR3である。そして、これら3つのプロット点(点F1−R1、点F2−R2、点F3−R3)を通る近似曲線(例えば、直線)が、実吐出流量Rと基準となる支管流量計547の流量計測値Fとの関係式として導かれる。例えば、上記関係式は、
R=A*F+B
で示される。ここで、AおよびBは、それぞれ上記プロット点から導かれる定数である。塗布装置1では、このような関係式が使用する塗布液の種別毎にそれぞれ設定されて記憶される。
In FIG. 10, the measurement result of the actual discharge flow rate R is plotted with the flow rate measurement value F of the branch flow meter 547 on the horizontal axis and the actual discharge flow rate R as the vertical axis. Specifically, the actual discharge flow rate weighed when the flow rate measurement value of the reference branch flow meter 547 is F1 by the processing of step S93 and step S94 is R1. The actual discharge flow rate weighed when the flow rate measurement value of the reference branch flow meter 547 is F2 is R2. The actual discharge flow rate weighed when the flow rate measurement value of the reference branch flow meter 547 is F3 is R3. An approximate curve (for example, a straight line) passing through these three plot points (point F1-R1, point F2-R2, and point F3-R3) is the actual discharge flow rate R and the flow rate measurement value of the branch flow meter 547 serving as a reference. It is derived as a relational expression with F. For example, the above relational expression is
R = A * F + B
Indicated by Here, A and B are constants derived from the plot points, respectively. In the coating apparatus 1, such a relational expression is set and stored for each type of coating liquid used.

図4に戻り、上記ステップS82の実流量計測モード処理の後、制御部3は、支管流量設定モード処理を行い(ステップS83)、次のステップに処理を進める。以下、図6を参照して、支管流量設定モード処理の詳細な動作について説明する。   Returning to FIG. 4, after the actual flow rate measurement mode process of step S82, the controller 3 performs a branch flow rate setting mode process (step S83), and proceeds to the next step. The detailed operation of the branch flow rate setting mode process will be described below with reference to FIG.

図6において、制御部3は、支管流量を設定する吐出流量範囲を設定して(ステップS101)、処理を次のステップに進める。ここで、上記吐出流量範囲とは、上記ステップS91で説明した範囲と同様であり、各支管を介して、塗布装置1がこれから使用する塗布液を塗布する際に可能性がある吐出流量の範囲を示している。   In FIG. 6, the control unit 3 sets a discharge flow rate range for setting the branch pipe flow rate (step S101), and advances the processing to the next step. Here, the range of the discharge flow rate is the same as the range described in step S91, and the range of the discharge flow rate that can be applied when the coating apparatus 1 applies a coating liquid to be used from now on through each branch pipe. Is shown.

次に、制御部3は、第1の開閉バルブ545a、第2の開閉バルブ548n、および全ての第3の開閉バルブ(すなわち、第3の開閉バルブ549ab〜549mn)を全開にし、他の開閉バルブ(すなわち、第1の開閉バルブ545b〜545n、第2の開閉バルブ548a〜548m)を全閉にし(ステップS102)、処理を次のステップに進める。   Next, the control unit 3 fully opens the first opening / closing valve 545a, the second opening / closing valve 548n, and all the third opening / closing valves (that is, the third opening / closing valves 549ab to 549mn), and then opens the other opening / closing valves. (That is, the first opening / closing valves 545b to 545n and the second opening / closing valves 548a to 548m) are fully closed (step S102), and the process proceeds to the next step.

次に、制御部3は、上記ステップS82の実流量計測モード処理において基準となった支管以外の支管に設けられている流量制御バルブ546(例えば、b系統〜n系統の流量制御バルブ546b〜546n)をそれぞれ全開にして(ステップS103)、処理を次のステップに進める。   Next, the control unit 3 controls the flow rate control valves 546 (for example, the flow rate control valves 546b to 546n of the b system to the n system) provided in the branch pipes other than the branch pipe used as a reference in the actual flow rate measurement mode processing in the step S82. ) Are fully opened (step S103), and the process proceeds to the next step.

次に、制御部3は、基準となる支管流量計547の流量計測値F(例えば、支管流量計547aの流量計測値fa)が上記吐出流量範囲内の任意の値となるように、当該支管の流量制御バルブ546(例えば、a系統の流量制御バルブ546a)を動作させ(ステップS104)、処理を次のステップに進める。このステップS104の動作によって、本管中に流動している有機EL材料を含む塗布液は、各支管に設けられている流量制御バルブ546a〜546nおよび支管流量計547a〜547nを全て通った後に、n系統支管に接続されたノズル52nから吐出される。具体的には、上記ステップS102〜ステップS104のバルブ開閉処理によって、有機EL材料を含む塗布液は、図8の太線で示すように流動する。すなわち、供給源541からマニホールド544に流動した有機EL材料を含む塗布液は、第1の開閉バルブ545aを介して、流量制御バルブ546aおよび支管流量計547aへ流動し、a系統支管とb系統支管とを連結する連結管を介してb系統支管へ流動する。そして、b系統支管へ流動した有機EL材料を含む塗布液は、流量制御バルブ546bおよび支管流量計547bへ流動し、b系統支管とc系統支管とを連結する連結管を介してc系統支管へ流動する。その後、有機EL材料を含む塗布液は、c〜m系統支管に設けられた流量制御バルブ546c〜546mおよび支管流量計547c〜547mにも同様に流動した後、m系統支管とn系統支管とを連結する連結管を介してn系統支管へ流動する。そして、最終的にn系統支管へ流動した有機EL材料を含む塗布液は、流量制御バルブ546nおよび支管流量計547nを介して、ノズル52nへ流動する流路が形成される。なお、図8においても、支管流量設定モード処理において有機EL材料を含む塗布液が流動しない支管や連結管については、破線で記載している。   Next, the control unit 3 controls the branch pipe so that the flow rate measurement value F of the reference branch flow meter 547 (for example, the flow rate measurement value fa of the branch flow meter 547a) becomes an arbitrary value within the discharge flow rate range. The flow control valve 546 (for example, the a-system flow control valve 546a) is operated (step S104), and the process proceeds to the next step. By the operation of step S104, the coating liquid containing the organic EL material flowing in the main pipe passes through all the flow control valves 546a to 546n and the branch pipe flow meters 547a to 547n provided in each branch pipe. It discharges from the nozzle 52n connected to the n system branch pipe. Specifically, the coating liquid containing the organic EL material flows as shown by the thick line in FIG. 8 by the valve opening / closing process in steps S102 to S104. That is, the coating liquid containing the organic EL material that has flowed from the supply source 541 to the manifold 544 flows to the flow control valve 546a and the branch flow meter 547a via the first opening / closing valve 545a, and the a system branch pipe and the b system branch pipe It flows to the b system branch pipe through the connecting pipe connecting the two. Then, the coating liquid containing the organic EL material that has flowed to the b system branch flows to the flow control valve 546b and the branch flow meter 547b, and to the c system branch through the connecting pipe that connects the b system branch and the c system branch. To flow. Thereafter, the coating liquid containing the organic EL material flows in the same manner to the flow control valves 546c to 546m and the branch flow meters 547c to 547m provided in the c to m system branch pipes, and then the m system branch pipes and the n system branch pipes. It flows to the n system branch pipe through the connecting pipe to be connected. Then, a flow path is formed in which the coating liquid containing the organic EL material that finally flows to the n-system branch pipe flows to the nozzle 52n via the flow rate control valve 546n and the branch flow meter 547n. In FIG. 8 as well, the branch pipes and connection pipes in which the coating liquid containing the organic EL material does not flow in the branch pipe flow rate setting mode process are indicated by broken lines.

次に、制御部3は、基準となる支管流量計547の流量計測値Fおよび他の支管流量計547の流量計測値fをそれぞれ取得し(ステップS105)、処理を次のステップに進める。例えば、制御部3は、ステップS104の状態で出力される基準となる支管流量計547aの流量情報Ifaを用いて流量計測値Fを取得し、他の支管流量計547b〜547nの流量情報Ifb〜Ifnを用いて流量計測値fb〜fnをそれぞれ取得する。   Next, the control unit 3 acquires the flow rate measurement value F of the reference branch flow meter 547 and the flow rate measurement value f of another branch flow meter 547 (step S105), and advances the processing to the next step. For example, the control unit 3 acquires the flow rate measurement value F using the flow rate information Ifa of the branch pipe flow meter 547a that is the reference output in the state of step S104, and the flow rate information Ifb of the other branch flow meters 547b to 547n. The flow rate measurement values fb to fn are acquired using Ifn, respectively.

次に、制御部3は、支管流量設定が終了したか否かを判断する(ステップS106)。例えば、上記ステップS104およびステップS105で行う支管流量設定も、上述した実吐出流量Rの秤量と同様に、上記吐出流量範囲内における複数ポイント(例えば、3〜5ポイント)に対応して行われる。上記ステップS106において、制御部3は、支管流量設定が上記複数ポイント全てに対応して行われた場合、次のステップS107に処理を進める。一方、制御部3は、支管流量設定が上記複数ポイントの何れかに対して行われていない場合、上記ステップS104に戻って、上記吐出流量範囲内における他の値に対する処理を行う。   Next, the control unit 3 determines whether or not the branch pipe flow rate setting has been completed (step S106). For example, the branch pipe flow rate setting performed in step S104 and step S105 is also performed corresponding to a plurality of points (for example, 3 to 5 points) in the discharge flow rate range, similarly to the weighing of the actual discharge flow rate R described above. In step S106, when the branch pipe flow rate setting is performed corresponding to all the plurality of points, the control unit 3 advances the processing to the next step S107. On the other hand, when the branch pipe flow rate setting is not performed for any of the plurality of points, the control unit 3 returns to step S104 and performs processing for other values within the discharge flow rate range.

ステップS107において、制御部3は、全ての開閉バルブを全閉にし、処理を次のステップに進める。   In step S107, the control unit 3 fully closes all the open / close valves and advances the process to the next step.

次に、制御部3は、基準となる支管流量計547の流量計測値Fと他の支管流量計547の流量計測値fとの関係式をそれぞれ設定して記憶媒体に記憶して(ステップS108)、当該サブルーチンによる処理を終了する。以下、図11を参照して、基準となる支管流量計547の流量計測値Fと他の支管流量計547の流量計測値fとの関係式について説明する。なお、図11は、上記ステップS104およびステップS105の測定結果からそれぞれ得られる上記関係式の一例を示すグラフである。   Next, the control unit 3 sets a relational expression between the flow rate measurement value F of the branch flow meter 547 serving as a reference and the flow rate measurement value f of another branch flow meter 547, and stores it in the storage medium (step S108). ), The process by the subroutine is terminated. Hereinafter, a relational expression between the flow rate measurement value F of the branch pipe flow meter 547 and the flow rate measurement value f of another branch flow meter 547 will be described with reference to FIG. FIG. 11 is a graph showing an example of the relational expression obtained from the measurement results of step S104 and step S105.

図8は、横軸を他の支管流量計547の一例である支管流量計547bの流量計測値fbおよび縦軸を基準となる支管流量計547の流量計測値Fとし、上記ステップS104およびステップS105の測定結果をプロットしている。具体的には、上記ステップS104およびステップS105の処理によって、支管流量計547bの流量計測値がfb1のときに基準となる支管流量計547の流量計測値がF1である。また、支管流量計547bの流量計測値がfb2のときに基準となる支管流量計547の流量計測値がF2である。また、支管流量計547bの流量計測値がfb3のときに基準となる支管流量計547の流量計測値がF3である。そして、これら3つのプロット点(点fb1−F1、点fb2−F2、点fb3−F3)を通る近似曲線(例えば、直線)が、基準となる支管流量計547の流量計測値Fと支管流量計547bの流量計測値fbとの関係式として導かれる。例えば、上記関係式は、
F=Cb*fb+Db
で示される。ここで、CbおよびDbは、それぞれ上記プロット点から導かれるb系統の定数である。塗布装置1では、このような関係式が他の支管流量計547毎に、使用する塗布液の種別に応じてそれぞれ設定されて記憶される。
In FIG. 8, the horizontal axis is a flow rate measurement value fb of a branch flow meter 547b which is an example of another branch flow meter 547, and the vertical axis is a flow rate measurement value F of a branch flow meter 547 serving as a reference. The measurement results are plotted. Specifically, the flow rate measurement value of the branch flow meter 547 serving as a reference when the flow rate measurement value of the branch flow meter 547b is fb1 is F1 by the processing of Step S104 and Step S105. Further, the flow rate measurement value of the branch flow meter 547 serving as a reference when the flow rate measurement value of the branch flow meter 547b is fb2 is F2. Further, the flow rate measurement value of the branch flow meter 547 serving as a reference when the flow rate measurement value of the branch flow meter 547b is fb3 is F3. An approximate curve (for example, a straight line) passing through these three plot points (point fb1-F1, point fb2-F2, and point fb3-F3) is a reference flow rate measurement value F of the branch flow meter 547 and a branch flow meter. It is derived as a relational expression with the flow rate measurement value fb of 547b. For example, the above relational expression is
F = Cb * fb + Db
Indicated by Here, Cb and Db are constants of the b system derived from the plot points, respectively. In the coating apparatus 1, such a relational expression is set and stored for each other branch flow meter 547 according to the type of coating liquid to be used.

図4に戻り、上記ステップS83の支管流量設定モード処理の後、制御部3は、後述する塗布作業(ステップS85)で用いる吐出流量に対する各支管の目標流量値fcを設定し(ステップS84)、処理を次のステップに進める。以下、図10〜図12を参照して、目標流量値fcについて説明する。なお、図12は、使用する塗布液の種別に応じてそれぞれ設定された関係式の一例を示す図である。   Returning to FIG. 4, after the branch flow rate setting mode processing in step S83, the control unit 3 sets a target flow rate value fc of each branch for a discharge flow rate used in a coating operation (step S85) described later (step S84). The process proceeds to the next step. Hereinafter, the target flow rate value fc will be described with reference to FIGS. In addition, FIG. 12 is a figure which shows an example of the relational expression each set according to the classification of the coating liquid to be used.

制御部3は、上記ステップS80〜ステップS83の処理によって、図12に示すような関係式を設定している。図12では、制御部3が使用する塗布液q〜tに対してそれぞれ設定して記憶した関係式の一例を示している。例えば、塗布液qに対して、実吐出流量Rと基準となる支管流量計547(図12では、一例として支管流量計547a)の流量計測値Fとの関係式は、
R=Aq*F+Bq
で設定されている。ここで、AqおよびBqは、それぞれ塗布液qに対して設定された上記定数AおよびBを示している。また、塗布液qに対して、支管流量計547aの流量計測値Fと支管流量計547bの流量計測値fbとの関係式は、
F=Cbq*fb+Dbq
で設定されている。ここで、CbqおよびDbqは、それぞれ塗布液qに対して設定されたb系統の定数である。また、塗布液qに対して、支管流量計547aの流量計測値Fと支管流量計547cの流量計測値fcとの関係式は、
F=Ccq*fc+Dcq
で設定されている。ここで、CcqおよびDcqは、それぞれ塗布液qに対して設定されたc系統の定数である。また、他のd系統〜n系統における支管流量計547d〜547nの流量計測値fd〜fnについてもb系統およびc系統と同様に、塗布液qにおける支管流量計547aの流量計測値Fとの関係式が設定されている。
The control unit 3 sets a relational expression as shown in FIG. 12 by the processing in steps S80 to S83. FIG. 12 shows an example of a relational expression set and stored for each of the coating liquids q to t used by the control unit 3. For example, with respect to the coating liquid q, the relational expression between the actual discharge flow rate R and the flow rate measurement value F of the reference branch flow meter 547 (in FIG. 12, a branch flow meter 547a as an example) is
R = Aq * F + Bq
Is set in Here, Aq and Bq indicate the constants A and B set for the coating solution q, respectively. For the coating liquid q, the relational expression between the flow rate measurement value F of the branch flow meter 547a and the flow rate measurement value fb of the branch flow meter 547b is:
F = Cbq * fb + Dbq
Is set in Here, Cbq and Dbq are constants of the b system set for the coating liquid q, respectively. For the coating liquid q, the relational expression between the flow rate measurement value F of the branch flow meter 547a and the flow rate measurement value fc of the branch flow meter 547c is:
F = Ccq * fc + Dcq
Is set in Here, Ccq and Dcq are constants of the c system set for the coating solution q, respectively. The flow rate measurement values fd to fn of the branch flow meters 547d to 547n in the other d systems to n systems are also related to the flow measurement value F of the branch flow meter 547a in the coating liquid q in the same manner as the b system and c system. An expression is set.

制御部3は、上述した関係式を適宜組み合わせて上記吐出流量に対する各支管の目標流量値fcを設定する。説明を具体的にするために、塗布作業におけるb系統のノズル52bからの吐出流量が実吐出流量Rpとした場合の目標流量値fcについて説明する。例えば、図10に示すように、実吐出流量Rと基準となる支管流量計547の流量計測値Fとの関係式R=A*F+Bを用いて、実吐出流量Rpに対応する基準となる支管流量計547の流量計測値Fpが導かれる。そして、図11に示すように、基準となる支管流量計547の流量計測値Fと支管流量計547bの流量計測値fbとの関係式F=Cb*fb+Dbを用いて、流量計測値Fpに対応する支管流量計547bの流量計測値fbpが導かれる。つまり、これらの関係式から明らかなように、b系統のノズル52bから実吐出流量Rpで塗布液を吐出したい場合、b系統を流動する当該塗布液の目標流量値fbcを上記流量計測値fbpに設定すればいいことになる。したがって、吐出流量Rpで吐出する場合のb系統の目標流量値fbcは、

Figure 0005198329
で設定される。また、上述したように各関係式が塗布液の種別毎に設定されている。したがって、塗布液qを吐出流量Rpで吐出する場合のb系統の目標流量値fbcqは、
Figure 0005198329
で設定される。 The control unit 3 sets the target flow rate value fc of each branch for the discharge flow rate by appropriately combining the above-described relational expressions. In order to make the description more specific, the target flow rate value fc when the discharge flow rate from the b-system nozzle 52b in the coating operation is the actual discharge flow rate Rp will be described. For example, as shown in FIG. 10, using a relational expression R = A * F + B between the actual discharge flow rate R and the flow measurement value F of the reference branch flow meter 547, the reference branch corresponding to the actual discharge flow rate Rp. A flow rate measurement value Fp of the flow meter 547 is derived. Then, as shown in FIG. 11, using the relational expression F = Cb * fb + Db between the flow rate measurement value F of the branch flow meter 547 serving as a reference and the flow rate measurement value fb of the branch flow meter 547b, it corresponds to the flow rate measurement value Fp. The flow rate measurement value fbp of the branch pipe flow meter 547b is derived. That is, as is clear from these relational expressions, when it is desired to discharge the coating liquid at the actual discharge flow rate Rp from the b-system nozzle 52b, the target flow value fbc of the coating liquid flowing through the b-system is set to the flow measurement value fbp. You can set it. Therefore, the target flow rate value fbc of the b system when discharging at the discharge flow rate Rp is
Figure 0005198329
Set by. Further, as described above, each relational expression is set for each type of coating liquid. Therefore, the target flow rate value fbcq of the b system when the coating liquid q is discharged at the discharge flow rate Rp is:
Figure 0005198329
Set by.

図4に戻り、上記ステップS84の各支管の目標流量値fcを設定した後、制御部3は、当該目標流量値fcを用いて被塗布体(例えば、ガラス基板)に対する塗布作業を行う(ステップS85)。この塗布作業において、制御部3は、全ての第1の開閉バルブ545a〜545nおよび全ての第2の開閉バルブ548a〜548nを全開にし、全ての第3の開閉バルブ549ab〜549mnを全閉にする。また、制御部3は、a系統の支管流量計547aから出力される流量情報Ifaを用いて、当該支管流量計547aが示す流量計測値faが目標流量値facとなるように、流量制御バルブ546aを制御する。このように目標流量値facは、流量制御バルブ546aの流量調節目標となる。また、制御部3は、b系統の支管流量計547bから出力される流量情報Ifbを用いて、当該支管流量計547bが示す流量計測値fbが目標流量値fbcとなるように、流量制御バルブ546bを制御する。このように目標流量値fbcは、流量制御バルブ546bの流量調節目標となる。さらに、制御部は他の系統の支管も同様に、支管流量計547c〜547nから出力される流量情報Ifc〜Ifnを用いて、当該支管流量計547c〜547nが示す流量計測値fc〜fnがそれぞれの目標流量値fcc〜fncとなるように、流量制御バルブ546c〜546nを制御する。このように目標流量値fcc〜fncは、それぞれ流量制御バルブ546c〜546nの流量調節目標となる。   Returning to FIG. 4, after setting the target flow rate value fc of each branch pipe in step S <b> 84, the control unit 3 performs a coating operation on an object to be coated (for example, a glass substrate) using the target flow rate value fc. S85). In this coating operation, the control unit 3 fully opens all the first opening / closing valves 545a to 545n and all the second opening / closing valves 548a to 548n, and fully closes all the third opening / closing valves 549ab to 549mn. . Further, the control unit 3 uses the flow rate information Ifa output from the branch pipe flow meter 547a of the a system so that the flow rate measurement value fa indicated by the branch flow meter 547a becomes the target flow rate value fac. To control. Thus, the target flow rate value fac becomes a flow rate adjustment target of the flow rate control valve 546a. Further, the control unit 3 uses the flow rate information Ifb output from the b-system branch flow meter 547b so that the flow rate measurement value fb indicated by the branch flow meter 547b becomes the target flow rate value fbc. To control. Thus, the target flow rate value fbc becomes a flow rate adjustment target of the flow rate control valve 546b. Further, the control unit similarly uses the flow rate information Ifc to Ifn output from the branch flowmeters 547c to 547n to measure the flow rate measurement values fc to fn indicated by the branch flowmeters 547c to 547n, respectively. The flow rate control valves 546c to 546n are controlled so that the target flow rate values fcc to fnc are obtained. In this manner, the target flow rate values fcc to fnc are flow rate adjustment targets of the flow rate control valves 546c to 546n, respectively.

そして、当該塗布作業中において、制御部3は、支管流量の再設定の要否(ステップS86)および塗布作業を終了するか否か(ステップS87)を判断する。例えば、制御部3は、塗布装置1で使用する塗布液を交換する場合や支管流量を確認する定期管理(例えば、日常管理)時期が到来した場合等において、支管流量の再設定が必要であると判断する(ステップS86でYes)。そして、制御部3は、支管流量の再設定が必要と判断した場合、上記ステップS81に戻って処理を繰り返す。また、制御部3は、支管流量の再設定が不要で塗布作業を継続する場合(ステップS86およびステップS87が何れもNo)、上記ステップS85に戻って処理を繰り返す。一方、制御部3は、塗布作業を終了する場合(ステップS87でYes)、加圧部542による加圧を停止させて(ステップS88)、当該フローチャートによる処理を終了する。   During the application work, the control unit 3 determines whether or not the branch flow rate needs to be reset (step S86) and whether or not the application work is to be ended (step S87). For example, the control unit 3 needs to reset the branch flow rate when the coating liquid used in the coating apparatus 1 is replaced or when a periodical management (for example, daily management) time for checking the branch flow rate comes. (Yes in step S86). And when it is judged that the reset of the branch pipe flow rate is required, the control part 3 returns to said step S81, and repeats a process. Moreover, the control part 3 returns to the said step S85, and repeats a process, when resetting of a branch pipe flow rate is unnecessary and continues an application | coating operation | work (both step S86 and step S87 are No). On the other hand, when ending the application work (Yes in Step S87), the control unit 3 stops the pressurization by the pressurizing unit 542 (Step S88), and ends the process according to the flowchart.

上述した実施形態に係る流量設定方法では、実吐出流量の秤量計測を用いて基準となる支管流量計547(例えば、支管流量計547a)を測定し、その値付けを行うことによって校正して、基準となる支管流量計547を塗布装置1内の標準器として取り扱っている。そして、この標準器(例えば、支管流量計547a)を用いて他の支管流量計547をさらに校正することによって、段階的な校正体系を確立して、塗布装置1内に設置された多数の流量計の流量管理を行っている。   In the flow rate setting method according to the above-described embodiment, the branch flow meter 547 (for example, the branch flow meter 547a) serving as a reference is measured using the measurement of the actual discharge flow rate, and calibrated by performing the pricing, The reference branch flow meter 547 is handled as a standard device in the coating apparatus 1. Then, by further calibrating another branch flow meter 547 using this standard device (for example, branch flow meter 547a), a stepwise calibration system is established, and a number of flow rates installed in the coating apparatus 1 are established. The flow of the meter is managed.

このように、上述した実施形態に係る塗布装置は、並列に接続された複数の支管流量計が連結管を介して直列に接続されることによって、1回の塗布液の流動によって全ての支管流量計の校正が可能となる。具体的には、複数系統にそれぞれ設けられた支管流量計毎に行っていた校正作業の時間が1系統分の時間に短縮することができ、校正作業のために塗布液を流動させる量も大幅に削減することができる。また、上述した実施形態においては、並列に接続された複数の支管流量計のうち、1つの支管流量計の流量計測値を基準として他の支管の目標流量値が設定される。したがって、ノズル系統毎に実吐出流量を秤量して関係式をそれぞれ導くことが不要となる。例えば、当該塗布装置において塗布する塗布液を変更(例えば、赤色の有機EL材料を含む塗布液から緑色の有機EL材料を含む塗布液に変更)する場合、当該塗布液変更後であっても基準となる支管流量計の流量計測値に基づいて他の支管の目標流量値が設定されるため、塗布装置の流量管理工数が激減する。また、実際の塗布作業に用いる塗布液を用いて目標流量値の設定が可能であるため、代替え塗布液を用いた流量設定と比較すると、実作業に合致した高精度の目標流量値の設定が可能であり、換算作業等も不要となる。また、従来のように塗布装置の実吐出流量計測時間が長くなることによって実吐出流量が変動することに起因する流量管理の不安定要素を排除することができるため、正確な実吐出流量の設定が可能となる。   As described above, in the coating apparatus according to the above-described embodiment, a plurality of branch flow meters connected in parallel are connected in series via the connecting pipe, whereby all branch flow rates are obtained by one flow of the coating liquid. Calibration of the meter becomes possible. Specifically, the time required for calibration work for each branch flow meter provided in each of the multiple systems can be shortened to one system time, and the amount of flow of the coating liquid for calibration work is also greatly increased. Can be reduced. In the above-described embodiment, the target flow rate values of the other branch pipes are set based on the flow rate measurement value of one branch flow meter among the plurality of branch pipe flow meters connected in parallel. Therefore, it is not necessary to weigh the actual discharge flow rate for each nozzle system and derive the relational expressions. For example, when changing the coating liquid to be applied in the coating apparatus (for example, changing from a coating liquid containing a red organic EL material to a coating liquid containing a green organic EL material), even after the change of the coating liquid Since the target flow rate value of the other branch pipes is set based on the flow rate measurement value of the branch pipe flow meter, the flow management man-hour of the coating apparatus is drastically reduced. In addition, since it is possible to set the target flow rate using the coating liquid used in the actual coating operation, compared to the flow setting using the alternative coating liquid, the target flow rate setting with high accuracy that matches the actual work can be achieved. This is possible, and conversion work is not necessary. In addition, since the actual discharge flow rate measurement time of the coating device becomes longer as in the past, unstable elements of flow management caused by fluctuations in the actual discharge flow rate can be eliminated, so accurate actual discharge flow rate setting Is possible.

なお、上述した実施形態では、吐出流量範囲内における複数ポイント(例えば、3〜5ポイント)をプロットして各種関係式を導いているが、1つのポイントのみをプロットして関係式を導いてもかまわない。例えば、導く関係式が必ず所定の原点(例えば、(0,0))を通る直線となることを仮定すれば、1つのポイントをプロットするだけで関係式を導くことが可能となる。この場合、関係式を導くための実吐出流量Rの秤量や支管流量設定が1つのポイントに対応して行うだけとなるため、さらに塗布装置の流量管理工数が削減される。   In the above-described embodiment, a plurality of points (for example, 3 to 5 points) in the discharge flow rate range are plotted to derive various relational expressions, but only one point may be plotted to derive a relational expression. It doesn't matter. For example, assuming that the relational expression to be derived is always a straight line passing through a predetermined origin (for example, (0, 0)), the relational expression can be derived by plotting one point. In this case, since the measurement of the actual discharge flow rate R and the branch pipe flow rate setting for deriving the relational expression are performed corresponding to one point, the flow rate management man-hour of the coating apparatus is further reduced.

また、上述した実施形態では、実流量Rと基準となる支管流量計547の流量計測値Fとの間の関係式が未設定の場合に、実流量計測モード処理を行う例を示したが、他の態様によって実流量計測モード処理を行ってもかまわない。例えば、実流量Rと基準となる支管流量計547の流量計測値Fとの間の関係式が設定済みであっても、定期的に当該関係式を再設定するために実流量計測モード処理を行ってもかまわない。これによって、実流量計測モード処理によって設定される関係式の信頼性が高まり、より正確な流量管理を行うことが可能となる。   In the above-described embodiment, the example in which the actual flow rate measurement mode process is performed when the relational expression between the actual flow rate R and the flow rate measurement value F of the reference branch flow meter 547 is not set has been described. The actual flow rate measurement mode process may be performed according to other modes. For example, even if the relational expression between the actual flow rate R and the flow rate measurement value F of the reference branch flowmeter 547 has been set, the actual flow rate measurement mode process is performed to periodically reset the relational expression. You can go. Thereby, the reliability of the relational expression set by the actual flow rate measurement mode processing is increased, and more accurate flow rate management can be performed.

上述した実施形態では、実流量Rと基準となる支管流量計547の流量計測値Fとの間の関係式を塗布液毎に設定する一例を示したが、当該関係式を設定せずに上述した実流量計測モード処理を行わなくてもかまわない。この場合、基準となる支管流量計547の流量計測値Fを基準として他の支管流量計547が値付けされることになるが、実吐出流量の秤量計測値を基準とした値付けではないために、厳密には一般的な校正とは異なる管理となる。したがって、各支管流量計547には、上述した流量設定方法のような絶対評価ではなく、流量計測値Fを基準とした相対評価が行われることになる。しかしながら、このような相対評価であっても、流量計測値Fを基準とした各支管流量計547の流量計測値fのバラツキや変動を検出することは可能であり、これらの要因を排除した目標流量値を設定することによって各ノズル52a〜52nで均一な吐出流量での塗布作業が可能となる。   In the above-described embodiment, an example in which the relational expression between the actual flow rate R and the flow rate measurement value F of the branch flowmeter 547 serving as a reference is set for each coating solution is described. The actual flow rate measurement mode process may not be performed. In this case, the other branch flowmeter 547 is priced based on the flow rate measurement value F of the reference branch flowmeter 547, but is not a price based on the measured measurement value of the actual discharge flow rate. Strictly speaking, the management is different from general calibration. Therefore, each branch flow meter 547 is subjected to relative evaluation based on the flow rate measurement value F instead of absolute evaluation as in the flow rate setting method described above. However, even with such a relative evaluation, it is possible to detect variations and fluctuations in the flow rate measurement value f of each branch flow meter 547 with reference to the flow rate measurement value F, and a target that eliminates these factors. By setting the flow rate value, each nozzle 52a to 52n can perform a coating operation with a uniform discharge flow rate.

また、基準となる支管流量計547が質量流量計等で構成される場合も、上述した実流量計測モード処理が不要となる。例えば、基準となる支管流量計547(例えば、支管流量計547a)がコリオリ式質量流量計等で構成される場合は、上述した実流量計測モード処理による実吐出流量の秤量計測値を基準とした値付けが不要となる。したがって、基準となる支管流量計547が質量流量計等で構成される場合は、上述した実流量計測モード処理を行うことなく、他の支管流量計547に対して、上述した流量設定方法のような絶対評価が可能となる。   Further, when the branch pipe flow meter 547 serving as a reference is constituted by a mass flow meter or the like, the above-described actual flow measurement mode processing is not necessary. For example, when the reference branch flow meter 547 (for example, the branch flow meter 547a) is composed of a Coriolis mass flow meter or the like, the measurement value of the actual discharge flow rate by the actual flow measurement mode processing described above is used as a reference. No pricing is required. Therefore, when the reference branch flow meter 547 is composed of a mass flow meter or the like, the flow rate setting method described above is applied to other branch flow meters 547 without performing the actual flow measurement mode processing described above. Absolute evaluation is possible.

また、上述した支管流量設定においては、塗布作業において用いられる吐出流量範囲内における複数ポイントに対応して行われたが、他のポイントを用いて支管流量の設定を行ってもかまわない。例えば、上記ステップS85における塗布作業における各系統のノズル52からの吐出流量が全て同じ実吐出流量Rpに予め決定されている場合は、塗布作業における吐出流量(すなわち、実吐出流量Rp)に応じて支管流量設定を行ってもかまわない。以下、支管流量設定における他の例について説明する。   Further, the branch flow rate setting described above is performed corresponding to a plurality of points in the discharge flow rate range used in the application work, but the branch flow rate may be set using other points. For example, when the discharge flow rates from the nozzles 52 of each system in the application operation in step S85 are all determined to be the same actual discharge flow rate Rp, the discharge flow rate in the application operation (that is, the actual discharge flow rate Rp) is determined. You can set the branch flow rate. Hereinafter, another example in the branch flow rate setting will be described.

この場合、上記ステップS93における処理において、制御部3は、基準となる支管流量計547の流量計測値F(例えば、支管流量計547aの流量計測値fa)が塗布作業における吐出流量(すなわち、実吐出流量Rp)に応じた値となるように、当該支管流量計547が設けられた支管の流量制御バルブ546(例えば、a系統の流量制御バルブ546a)を動作させる。   In this case, in the process in step S93, the control unit 3 determines that the flow rate measurement value F of the branch pipe flow meter 547 serving as a reference (for example, the flow rate measurement value fa of the branch flow meter 547a) is the discharge flow rate (ie, the actual flow rate). The branch flow control valve 546 (for example, the a system flow control valve 546a) provided with the branch pipe flowmeter 547 is operated so as to have a value corresponding to the discharge flow rate Rp).

ここで、基準となる支管流量計547の流量計測値Fと塗布作業における吐出流量との関係について説明する。上述したステップS82の実流量計測モード処理において、実吐出流量Rと基準となる支管流量計547の流量計測値Fとの関係式が設定されている。この関係式が図10で示した一例であり、塗布作業における各系統のノズル52からの吐出流量が実吐出流量Rpであるとする。この場合、塗布作業における吐出流量(すなわち、実吐出流量Rp)に応じた基準となる支管流量計547の流量計測値はFpとなる。したがって、制御部3は、上記関係式を用いて、塗布作業における吐出流量に応じた基準となる支管流量計547の流量計測値Fpを設定し、当該流量計測値Fpを支管流量設定時の目標流量値として流量制御バルブ546(例えば、a系統の流量制御バルブ546a)を動作させる。つまり、この動作によって、本管中へ流動する有機EL材料を含む塗布液が、連結管を介して直列に接続された各支管に流動して1つのノズル52(例えば、ノズル52n)から吐出される状態となり、その塗布液および吐出流量が実際の塗布作業で用いられる塗布液および実吐出流量となる。そして、制御部3は、各支管の支管流量計547の流量計測値fを取得して、得られた流量計測値fを実際の塗布作業における各支管の目標流量値fcにそれぞれ設定する。   Here, the relationship between the flow rate measurement value F of the reference branch flow meter 547 and the discharge flow rate in the coating operation will be described. In the actual flow rate measurement mode processing in step S82 described above, a relational expression between the actual discharge flow rate R and the flow rate measurement value F of the branch pipe flow meter 547 is set. This relational expression is an example shown in FIG. 10, and it is assumed that the discharge flow rate from the nozzles 52 of each system in the coating operation is the actual discharge flow rate Rp. In this case, the flow rate measurement value of the branch flow meter 547 serving as a reference corresponding to the discharge flow rate (that is, the actual discharge flow rate Rp) in the coating operation is Fp. Therefore, the control unit 3 sets the flow rate measurement value Fp of the branch flow meter 547 serving as a reference according to the discharge flow rate in the coating operation using the above relational expression, and sets the flow rate measurement value Fp as a target when setting the branch flow rate. The flow rate control valve 546 (for example, the a-system flow rate control valve 546a) is operated as the flow rate value. That is, by this operation, the coating liquid containing the organic EL material that flows into the main pipe flows to each branch pipe connected in series via the connecting pipe and is discharged from one nozzle 52 (for example, the nozzle 52n). The coating liquid and the discharge flow rate become the coating liquid and the actual discharge flow rate used in the actual coating operation. And the control part 3 acquires the flow measurement value f of the branch flow meter 547 of each branch, and sets the obtained flow measurement value f to the target flow value fc of each branch in an actual application | coating operation, respectively.

図13を参照して、上述した動作中における各流量制御バルブ546および支管流量計547の状態について説明する。なお、図13は、上述した支管流量設定モード中と塗布作業中とにおける、各流量制御バルブ546および支管流量計547の状態の一例を示す図である。   With reference to FIG. 13, the state of each flow control valve 546 and branch pipe flowmeter 547 during the above-described operation will be described. FIG. 13 is a diagram illustrating an example of the state of each flow control valve 546 and the branch flow meter 547 during the above-described branch flow rate setting mode and during the coating operation.

図13において、上述した支管流量設定モード処理で各支管の流量を設定しているとき、基準となる支管流量計547(図13では、a系統支管の支管流量計547a)の流量計測値FがFp(すなわち、実吐出流量Rpに相当する値)になるように、当該支管流量計547が設けられた支管の流量制御バルブ546(図13では、a系統の流量制御バルブ546a)が制御動作している。また、他の系統支管の流量制御バルブ546(すなわち、流量制御バルブ546b〜546n)が全開状態にある。そのとき、基準となる支管流量計547における流量計測値がFpを示し、他の系統支管の支管流量計547b〜547nにおける流量計測値fb〜fnがそれぞれfbp〜fnpを示している。これら流量計測値fbp〜fnpが、それぞれb系統〜n系統支管における目標流量値fbc〜fncに設定される。また、a系統の支管流量計547aの流量計測値Fpは、そのままa系統支管における目標流量値facに設定される。   In FIG. 13, when the flow rate of each branch pipe is set in the branch flow rate setting mode process described above, the flow rate measurement value F of the reference branch flow meter 547 (in FIG. 13, the branch flow meter 547a of the a-system branch pipe) is The branch flow control valve 546 provided with the branch flow meter 547 (in FIG. 13, the a-system flow control valve 546a) is controlled to operate at Fp (that is, a value corresponding to the actual discharge flow rate Rp). ing. Further, the flow rate control valve 546 (that is, the flow rate control valves 546b to 546n) of the other system branch pipes is fully opened. At that time, the flow rate measurement value in the reference branch flowmeter 547 indicates Fp, and the flow rate measurement values fb to fn in the branch flowmeters 547b to 547n of the other system branch lines indicate fbp to fnp, respectively. These flow rate measurement values fbp to fnp are set to target flow rate values fbc to fnc in the b system to n system branch pipes, respectively. In addition, the flow rate measurement value Fp of the a-system branch pipe flowmeter 547a is set to the target flow rate value fac in the a-system branch pipe as it is.

一方、塗布作業においてa系統〜n系統支管全てから塗布液を吐出するとき、a系統支管の支管流量計547aの流量計測値faが目標流量値fac(すなわち、実吐出流量Rpに相当する値)になるように、a系統支管の流量制御バルブ546aが制御動作している。また、b系統支管の支管流量計547bの流量計測値fbが目標流量値fbc(すなわち、実吐出流量Rpに相当する値)になるように、b系統支管の流量制御バルブ546bが制御動作している。さらに、c〜n系統支管の支管流量計547c〜547nの流量計測値fc〜fnがそれぞれ目標流量値fcc〜fnc(すなわち、それぞれ実吐出流量Rpに相当する値)になるように、c系統〜n系統支管の流量制御バルブ546c〜546nが制御動作している。   On the other hand, when the coating liquid is discharged from all the a-system to n-system branch pipes in the application operation, the flow rate measurement value fa of the branch-flow meter 547a of the a-system branch pipe is the target flow value fac (that is, a value corresponding to the actual discharge flow rate Rp). Thus, the flow control valve 546a of the a system branch pipe is controlled. Further, the flow control valve 546b of the b system branch is controlled so that the measured flow value fb of the branch flow meter 547b of the b system branch becomes the target flow value fbc (that is, a value corresponding to the actual discharge flow rate Rp). Yes. Further, the flow rate measurement values fc to fn of the branch flow meters 547c to 547n of the c to n system branch pipes are respectively the target flow rate values fcc to fnc (that is, values corresponding to the actual discharge flow rate Rp), respectively. The flow control valves 546c to 546n of the n system branch pipes are in control operation.

このように、支管流量設定における他の例の塗布装置は、支管流量の調整作業をピンポイントの流量(すなわち、塗布作業で用いる塗布流量)を狙って行うことができるため、さらに塗布装置の流量管理工数が削減される。また、当該他の例の塗布装置は、基準となる支管流量計の流量計測値と他の支管流量計の流量計測値との間の関係式も不要となる。   As described above, the coating apparatus of another example in setting the branch flow rate can perform the adjustment work of the branch pipe flow aiming at the pinpoint flow rate (that is, the coating flow rate used in the coating operation). Management man-hours are reduced. In addition, the coating apparatus of the other example does not require a relational expression between the flow rate measurement value of the reference branch flow meter and the flow rate measurement value of another branch flow meter.

また、上述した説明では、基準となる支管流量計547の一例として、a系統支管に設けられた支管流量計547aを用いた。これは、並列に接続された複数の支管流量計547が連結管を介して直列に接続された場合に、有機EL材料を含む塗布液の流動に対して先頭となる支管流量計547を基準に設定した一例であるが、他の支管流量計547を基準としてもかまわない。例えば、連結管を介して複数の支管流量計547が直列に接続された場合に、有機EL材料を含む塗布液の流動に対して先頭とはならない支管流量計547(例えば、b系統支管に設けられた支管流量計547b)を基準に設定しても、同様の支管流量設定が可能となる。   In the above description, the branch flow meter 547a provided in the a-system branch pipe is used as an example of the reference branch flow meter 547. This is based on the branch flow meter 547 that is the head for the flow of the coating liquid containing the organic EL material when a plurality of branch flow meters 547 connected in parallel are connected in series via a connecting tube. Although it is an example set, other branch flowmeters 547 may be used as a reference. For example, when a plurality of branch flow meters 547 are connected in series via a connecting pipe, a branch flow meter 547 (for example, provided in the b-system branch pipe) that does not lead to the flow of the coating liquid containing the organic EL material. Even if the branch pipe flowmeter 547b) is set as a reference, the same branch pipe flow rate can be set.

具体的には、支管流量計547bを基準に設定する場合、上記ステップS103(図6)において、基準となった支管以外の支管に設けられている流量制御バルブ546(すなわち、a系統の流量制御バルブ546aおよびc系統〜n系統の流量制御バルブ546c〜546n)をそれぞれ全開にする。そして、上記ステップS104において、基準となる支管流量計547bの流量計測値fbを基準となる流量計測値Fとして取り扱って、当該b系統支管の流量制御バルブ546bを動作させる。このようなバルブ開閉動作であっても、本管中に流動している有機EL材料を含む塗布液は、各支管に設けられている流量制御バルブ546a〜546nおよび支管流量計547a〜547nを全て通った後に、n系統支管に接続されたノズル52nから吐出され、同様の支管流量設定が可能となる。   Specifically, when setting the branch pipe flowmeter 547b as a reference, in step S103 (FIG. 6), the flow control valve 546 (that is, the flow control of the a system) provided in the branch pipe other than the reference branch pipe. Valves 546a and c-n flow control valves 546c-546n) are each fully opened. In step S104, the flow rate measurement value fb of the reference branch flow meter 547b is handled as the reference flow rate measurement value F, and the flow control valve 546b of the b system branch is operated. Even in such a valve opening / closing operation, the coating liquid containing the organic EL material flowing in the main pipe is completely supplied to the flow control valves 546a to 546n and the branch pipe flow meters 547a to 547n provided in the respective branch pipes. After passing, it is discharged from the nozzle 52n connected to the n-system branch pipe, and the same branch pipe flow rate setting is possible.

また、上述した支管流量設定モード処理においては、基準となる支管流量計547が設けられている支管の流量制御バルブ546が流量制御動作を行い、当該支管以外の支管に設けられている流量制御バルブ546をそれぞれ全開にしている。しかしながら、上述した支管流量設定モード処理において流量制御動作を行う流量制御バルブ546は、基準となる支管流量計547が設けられている支管以外の支管に設けられている流量制御バルブ546のうちの1つであってもかまわない。   In the branch flow rate setting mode process described above, the flow control valve 546 of the branch pipe provided with the reference branch flow meter 547 performs a flow control operation, and the flow control valve provided in a branch pipe other than the branch pipe. Each of 546 is fully open. However, the flow rate control valve 546 that performs the flow rate control operation in the above-described branch flow rate setting mode process is one of the flow rate control valves 546 provided in the branch pipes other than the branch pipe in which the reference branch flow meter 547 is provided. It does not matter if there is one.

また、上述した塗布装置1において、2つの第2の開閉バルブ548と第3の開閉バルブ549とを、1つの3方弁バルブで構成してもかまわない。具体的には、第2の開閉バルブ548および第3の開閉バルブ549の代わりに、各支管に設けられている支管流量計547の下流で連結管が接続されている部位に、制御部3によって流路が制御される3方弁バルブをそれぞれ設置する。そして、制御部3は、実流量計測モード処理中および塗布作業中においては、支管中を流動する塗布液を、そのまま当該支管に接続されているノズル52へ流動させる。一方、制御部3は、支管流量計測モード処理中においては、各支管中を流動する塗布液を、それぞれ当該支管の支管流量計547の下流から分岐している連結管へ流動させることによって、他の支管へ流動させる。このように、第2の開閉バルブ548および第3の開閉バルブ549の代わりに、3方弁バルブで構成した場合、塗布装置1に設けるバルブ数を少なくすることができると共に、同様の校正作業が可能となる。   In the coating apparatus 1 described above, the two second opening / closing valves 548 and the third opening / closing valve 549 may be configured by one three-way valve valve. Specifically, instead of the second on-off valve 548 and the third on-off valve 549, the control unit 3 connects the connecting pipe connected to the downstream of the branch flow meter 547 provided in each branch pipe. A three-way valve that controls the flow path is installed. Then, during the actual flow rate measurement mode process and the coating operation, the control unit 3 causes the coating liquid flowing in the branch pipe to flow as it is to the nozzle 52 connected to the branch pipe. On the other hand, during the branch pipe flow rate measurement mode process, the control unit 3 causes the coating liquid flowing in each branch pipe to flow into the connecting pipe branched from the downstream of the branch pipe flowmeter 547 of the branch pipe. Flow to the branch pipe. As described above, when the three-way valve valve is used instead of the second on-off valve 548 and the third on-off valve 549, the number of valves provided in the coating apparatus 1 can be reduced and the same calibration work can be performed. It becomes possible.

また、上述した実施形態では、赤、緑、および青色のうち、一例として赤色の有機EL材料を含む塗布液を複数のノズル52a〜52nを用いて基板Pに塗布列を形成しているが、他の有機EL材料を含む塗布液を同時に基板Pに塗布してもかまわない。具体的には、赤、緑、および青色の有機EL材料を含む塗布液を、各色それぞれ複数のノズルを用いて同時に基板Pに塗布してもかまわない。この場合、塗布する塗布液の種類毎に本管および当該本管に接続する支管の組が設けられるため、各組毎(すなわち、塗布する塗布液の種類毎)に上述した連結管を設けて同様の校正作業をすれば、上述と同様の効果が得られることは言うまでもない。   Moreover, in embodiment mentioned above, although the coating liquid which contains red organic EL material as an example among red, green, and blue is formed in the board | substrate P using several nozzle 52a-52n, A coating solution containing another organic EL material may be applied to the substrate P at the same time. Specifically, a coating solution containing red, green, and blue organic EL materials may be simultaneously applied to the substrate P using a plurality of nozzles for each color. In this case, since a set of a main pipe and a branch pipe connected to the main pipe is provided for each type of coating liquid to be applied, the connecting pipe described above is provided for each set (that is, for each type of coating liquid to be applied). It goes without saying that the same effects as described above can be obtained by performing the same calibration work.

また、上述した塗布装置1に、支管流量計547とは異なる基準流量計を設けてもかまわない。この場合、例えば、基準流量計をフィルタ543とマニホールド544との間の本管上に設置する。そして、基準流量計に対して、実流量計測モード処理において実吐出流量の秤量計測値を基準とした値付けを行い、以降の支管流量設定モード処理においては、基準流量計が示す値を基準となる流量計測値Fとして取り扱う。このように、本管に塗布液流量の基準となる基準流量計を設けても、同様の校正作業が可能となる。   Further, a reference flow meter different from the branch flow meter 547 may be provided in the coating apparatus 1 described above. In this case, for example, a reference flow meter is installed on the main pipe between the filter 543 and the manifold 544. Then, the reference flow meter is priced based on the measured value of the actual discharge flow rate in the actual flow rate measurement mode process. In the subsequent branch flow rate setting mode process, the value indicated by the reference flow meter is used as a reference. It is handled as a flow rate measurement value F. Thus, even if the main pipe is provided with a reference flow meter serving as a reference for the flow rate of the coating liquid, the same calibration work can be performed.

また、上記基準流量計を質量流量計等で構成することによって、上述した実流量計測モード処理が不要となる。例えば、上記基準流量計がコリオリ式質量流量計等で構成される場合は、上述した実流量計測モード処理による実吐出流量の秤量計測値を基準とした上記基準流量計の値付けが不要となる。したがって、上記基準流量計が質量流量計等で構成される場合は、上述した実流量計測モード処理を行うことなく、支管流量計547に対して、上述した流量設定方法のような絶対評価が可能となる。   Further, by configuring the reference flow meter with a mass flow meter or the like, the above-described actual flow rate measurement mode process is not necessary. For example, when the reference flow meter is composed of a Coriolis mass flow meter or the like, it is not necessary to price the reference flow meter based on the measurement value of the actual discharge flow rate by the actual flow measurement mode processing described above. . Therefore, when the reference flow meter is composed of a mass flow meter or the like, an absolute evaluation like the flow rate setting method described above can be performed on the branch flow meter 547 without performing the actual flow rate measurement mode process described above. It becomes.

また、上述した実施形態では、ノズルユニット50がX軸方向に直線移動する毎に、ステージ21をY軸方向へ所定ピッチだけ移動させて、ノズルユニット50とステージ21との当該Y軸方向に対する相対的な位置関係を変化させているが、本発明はこれに限らない。例えば、ノズルユニット50がX軸方向に直線移動する毎に、当該ノズルユニット50をY軸方向へ所定ピッチだけ移動(つまり、有機EL塗布機構5がY軸方向へ移動)させて、ノズルユニット50とステージ21との当該Y軸方向に対する相対的な位置関係を変化させてもかまわない。この場合、液受部53は、有機EL塗布機構5と共にY軸方向へ所定ピッチだけ移動する。   In the above-described embodiment, each time the nozzle unit 50 linearly moves in the X-axis direction, the stage 21 is moved by a predetermined pitch in the Y-axis direction, so that the nozzle unit 50 and the stage 21 are relative to the Y-axis direction. However, the present invention is not limited to this. For example, each time the nozzle unit 50 linearly moves in the X-axis direction, the nozzle unit 50 is moved by a predetermined pitch in the Y-axis direction (that is, the organic EL coating mechanism 5 moves in the Y-axis direction). The relative positional relationship between the stage 21 and the stage 21 in the Y-axis direction may be changed. In this case, the liquid receiver 53 moves with the organic EL coating mechanism 5 by a predetermined pitch in the Y-axis direction.

なお、上述した実施形態においては、発光層を形成する有機EL材料を含む塗布液を塗布装置1が基板Pに塗布する例を用いたが、赤色発光の高分子有機EL材料、緑色発光の高分子有機EL材料、および青色発光の高分子有機EL材料を含む塗布液をそれぞれ塗布できることは言うまでもない。また、本発明の塗布装置は、有機発光層材料の他に、正孔輸送層材料、正孔注入層材料、電子輸送層材料、および電子注入層材料等の他の有機EL材料を含む塗布液を塗布する場合にも用いることができる。   In the above-described embodiment, the example in which the coating apparatus 1 applies the coating liquid containing the organic EL material for forming the light emitting layer to the substrate P is used. It goes without saying that a coating liquid containing a molecular organic EL material and a polymer organic EL material emitting blue light can be applied. In addition, the coating apparatus of the present invention includes a coating solution containing, in addition to the organic light emitting layer material, other organic EL materials such as a hole transport layer material, a hole injection layer material, an electron transport layer material, and an electron injection layer material. It can also be used when coating.

具体的には、上述した実施形態における塗布装置1が、赤、緑、および青色発光のうち、赤色発光の高分子有機EL材料を含む塗布液を塗布する場合、この塗布工程は、有機ELデバイスを製造する途中工程である。有機ELデバイスを製造する場合、正孔注入層材料塗布、正孔輸送材料(例えば、PEDOT等)塗布、赤色発光の有機EL材料塗布、緑色発光の有機EL材料塗布、青色発光の有機EL材料塗布、電子輸送材料塗布、電子注入層材料塗布等の塗布工程があるが、本発明の塗布装置は、何れの塗布工程でも用いることができる。   Specifically, when the coating apparatus 1 in the above-described embodiment applies a coating liquid containing a polymer organic EL material that emits red light out of red, green, and blue light, this coating process includes an organic EL device. It is an intermediate process of manufacturing. When manufacturing an organic EL device, a hole injection layer material coating, a hole transport material (for example, PEDOT) coating, a red light emitting organic EL material coating, a green light emitting organic EL material coating, a blue light emitting organic EL material coating There are coating processes such as application of an electron transport material and coating of an electron injection layer material, and the coating apparatus of the present invention can be used in any coating process.

また、上述した塗布装置1の各構成要素の形状、数、および設置位置等は、単なる一例に過ぎず他の形状、数、および設置位置であっても、本発明を実現できることは言うまでもない。   In addition, the shape, number, installation position, and the like of each component of the coating apparatus 1 described above are merely examples, and it goes without saying that the present invention can be realized even with other shapes, numbers, and installation positions.

また、上述した実施形態では、被塗布体の一例としてガラス基板を用いたが、他の部材を被塗布体にすることもできる。例えば、ポリエチレンテレフタレート(PET)やポリカーボネート(PC)等で構成される柔軟性を有した基板を、塗布装置1の被塗布体にしてもかまわない。   Moreover, in embodiment mentioned above, although the glass substrate was used as an example of a to-be-coated body, another member can also be used as a to-be-coated body. For example, a flexible substrate made of polyethylene terephthalate (PET), polycarbonate (PC), or the like may be used as the coating object of the coating apparatus 1.

また、上述した実施形態では、塗布液として有機EL材料を含む塗布液等を塗布する有機EL表示装置の製造装置を一例にして説明したが、本発明は他の塗布装置にも適用できる。例えば、レジスト液やSOG(Spin On Glass)液やPDP(プラズマディスプレイパネル)を製造するのに使用される蛍光材料を塗布する装置にも適用することができる。また、液晶カラーディスプレイをカラー表示するために液晶セル内に構成されるカラーフィルタを製造するために使用される色材を塗布する装置にも適用することができる。   In the above-described embodiment, the manufacturing apparatus of an organic EL display device that applies a coating liquid containing an organic EL material as a coating liquid has been described as an example. However, the present invention can also be applied to other coating apparatuses. For example, the present invention can be applied to an apparatus for applying a fluorescent material used to manufacture a resist solution, a SOG (Spin On Glass) solution, or a PDP (plasma display panel). Further, the present invention can also be applied to an apparatus for applying a color material used for manufacturing a color filter configured in a liquid crystal cell in order to perform color display on a liquid crystal color display.

以上、本発明を詳細に説明してきたが、上述の説明はあらゆる点において本発明の例示にすぎず、その範囲を限定しようとするものではない。本発明の範囲を逸脱することなく種々の改良や変形を行うことができることは言うまでもない。   Although the present invention has been described in detail above, the above description is merely illustrative of the present invention in all respects and is not intended to limit the scope thereof. It goes without saying that various improvements and modifications can be made without departing from the scope of the present invention.

本発明に係る流量設定方法および塗布装置は、塗布装置の流量管理を容易にすることができ、複数のノズルからそれぞれ塗布液を吐出する装置や当該装置の流量管理方法等として有用である。   The flow rate setting method and the coating apparatus according to the present invention can facilitate the flow management of the coating apparatus, and are useful as a device for discharging a coating liquid from a plurality of nozzles, a flow management method for the device, and the like.

1…塗布装置
2…基板載置装置
21…ステージ
22…旋回部
23…平行移動テーブル
24…ガイド受け部
25、511…ガイド部材
3…制御部
5…有機EL塗布機構
50…ノズルユニット
51…ノズル移動機構部
52…ノズル
521、543…フィルタ
53…液受部
54…供給部
541…供給源
542…加圧部
544…マニホールド
545…第1の開閉バルブ
546…流量制御バルブ
547…支管流量計
548…第2の開閉バルブ
549…第3の開閉バルブ
DESCRIPTION OF SYMBOLS 1 ... Coating apparatus 2 ... Substrate mounting apparatus 21 ... Stage 22 ... Turning part 23 ... Parallel movement table 24 ... Guide receiving part 25, 511 ... Guide member 3 ... Control part 5 ... Organic EL coating mechanism 50 ... Nozzle unit 51 ... Nozzle Moving mechanism 52 ... Nozzles 521 and 543 ... Filter 53 ... Liquid receiving part 54 ... Supply part 541 ... Supply source 542 ... Pressurizing part 544 ... Manifold 545 ... First on-off valve 546 ... Flow control valve 547 ... Branch pipe flow meter 548 ... second on-off valve 549 ... third on-off valve

Claims (18)

単一の供給源から本管を介して供給される塗布液を複数の支管に分流し、当該支管にそれぞれ設けられた支管流量計測手段によって当該支管を流動する塗布液流量を計測して、当該支管に接続されたノズルから塗布液をそれぞれ吐出する塗布装置における塗布液の流量設定方法であって、
前記支管における前記支管流量計測手段の下流側と他の前記支管における前記支管流量計測手段の上流側とを連結する連結管を用いて、前記支管流量計測手段を直列に接続し、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液を供給して、当該供給された塗布液を前記ノズルの1つから吐出させる直列供給工程と、
前記直列供給工程が前記直列に接続された支管流量計測手段に前記塗布液を供給している状態において、当該支管流量計測手段におけるそれぞれの塗布液流量の計測結果を調整する流量計測調整工程とを含む、流量設定方法。
The coating liquid supplied from the single supply source through the main pipe is divided into a plurality of branch pipes, and the flow rate of the coating liquid flowing through the branch pipes is measured by the branch pipe flow rate measuring means respectively provided in the branch pipes. A method for setting a flow rate of a coating liquid in a coating apparatus that discharges the coating liquid from a nozzle connected to a branch pipe,
Using a connection pipe for connecting the upstream side of the branch pipe flow rate measuring means on the downstream side and the other of the branch pipes of the branch pipe flow rate measuring means in the branch pipe, and connecting the branch pipe flow measurement means in series, the source Supplying the coating liquid to the branch flow rate measuring means connected in series from the series supply step of discharging the supplied coating liquid from one of the nozzles;
In the state where the coating liquid is supplied to the branch flow rate measuring means connected in series in the serial supply step, a flow rate measurement adjusting step for adjusting the measurement result of each coating liquid flow rate in the branch pipe flow rate measuring means, Including flow rate setting method.
前記供給源から前記本管へ供給された塗布液を、前記複数の支管から選択された1つの選択支管にのみ供給し、他の支管への当該塗布液の供給を閉止する選択供給工程と、
前記選択供給工程で前記選択支管にのみ塗布液を供給している状態において、当該選択支管に設けられた前記支管流量計測手段による計測結果と当該選択支管の前記ノズルから吐出される塗布液の実吐出量との間の関係を計測する実流量計測工程とを、さらに含み、
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段に前記塗布液を供給している状態において、前記選択支管に設けられた前記支管流量計測手段が計測する塗布液流量を基準として、他の前記支管流量計測手段における塗布液流量の計測結果が調整される、請求項1に記載の流量設定方法。
A selective supply step of supplying the coating liquid supplied from the supply source to the main pipe only to one selected branch pipe selected from the plurality of branch pipes, and closing the supply of the coating liquid to the other branch pipes;
In a state where the coating liquid is supplied only to the selected branch pipe in the selective supply step, the measurement result by the branch pipe flow rate measuring means provided in the selected branch pipe and the actual result of the coating liquid discharged from the nozzle of the selected branch pipe. An actual flow rate measuring step for measuring the relationship between the discharge amount and
In the flow measurement adjustment step, the application of the branch flow rate measuring means provided in the selected branch pipe is measured in the state where the serial supply step supplies the coating liquid to the branch flow rate measurement means connected in series. The flow rate setting method according to claim 1, wherein the measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted with the liquid flow rate as a reference.
前記支管流量計測手段のうち、少なくとも1つは、前記支管を流動する塗布液の質量流量を計測し、
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段に前記塗布液を供給している状態において、前記質量流量を計測する前記支管流量計測手段が計測する塗布液流量を基準として、他の前記支管流量計測手段における塗布液流量の計測結果が調整される、請求項1に記載の流量設定方法。
At least one of the branch pipe flow rate measuring means measures the mass flow rate of the coating liquid flowing through the branch pipe,
In the flow measurement adjustment step, the coating liquid measured by the branch flow rate measuring unit that measures the mass flow rate in a state where the coating liquid is supplied to the branch flow rate measuring unit connected in series in the serial supply step. The flow rate setting method according to claim 1, wherein the measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted with reference to the flow rate.
前記供給源から前記本管へ供給された塗布液を、前記複数の支管から選択された1つの選択支管にのみ供給し、他の支管への当該塗布液の供給を閉止する選択供給工程と、
前記選択供給工程で前記選択支管にのみ塗布液を供給している状態において、前記本管を流動する塗布液流量を計測する本管流量計測手段による計測結果と当該選択支管の前記ノズルから吐出される塗布液の実吐出量との間の関係を計測する実流量計測工程とを、さらに含み、
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段に前記塗布液を供給している状態において、前記本管流量計測手段が計測する塗布液流量を基準として、前記支管流量計測手段におけるそれぞれの塗布液流量の計測結果が調整される、請求項1に記載の流量設定方法。
A selective supply step of supplying the coating liquid supplied from the supply source to the main pipe only to one selected branch pipe selected from the plurality of branch pipes, and closing the supply of the coating liquid to the other branch pipes;
In the state where the coating liquid is supplied only to the selected branch pipe in the selective supply step, the measurement result by the main flow rate measuring means for measuring the flow rate of the coating liquid flowing through the main pipe and the nozzle of the selected branch pipe are discharged. And an actual flow rate measuring step for measuring a relationship between the actual discharge amount of the coating liquid and
In the flow measurement adjustment step, in the state in which the serial supply step supplies the coating liquid to the branch flow rate measurement means connected in series, the coating liquid flow rate measured by the main flow rate measurement means is used as a reference. The flow rate setting method according to claim 1, wherein a measurement result of each coating liquid flow rate in the branch flow rate measuring unit is adjusted.
前記本管には、当該本管を流動する塗布液の質量流量を計測する本管流量計測手段が設けられ、
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段に前記塗布液を供給している状態において、前記本管流量計測手段が計測する塗布液流量を基準として、前記支管流量計測手段におけるそれぞれの塗布液流量の計測結果が調整される、請求項1に記載の流量設定方法。
The main pipe is provided with main flow rate measuring means for measuring the mass flow rate of the coating liquid flowing through the main pipe,
In the flow measurement adjustment step, in the state in which the serial supply step supplies the coating liquid to the branch flow rate measurement means connected in series, the coating liquid flow rate measured by the main flow rate measurement means is used as a reference. The flow rate setting method according to claim 1, wherein a measurement result of each coating liquid flow rate in the branch flow rate measuring unit is adjusted.
前記支管流量計測手段による塗布液流量の計測結果に応じて当該支管を流動する塗布液流量を所定の流量に調節する支管流量調節手段が、前記複数の支管それぞれに設けられ、
前記直列供給工程では、前記支管流量計測手段および前記支管流量調整手段をそれぞれ直列に接続し、前記供給源から当該直列に接続された支管流量計測手段および支管流量調整手段に前記塗布液を供給して、当該供給された塗布液を前記ノズルの1つから吐出させ、
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段および支管流量調整手段に前記塗布液を供給している状態において、前記支管流量計測手段におけるそれぞれの塗布液流量の計測結果に基づいて、前記所定の流量に対応した前記支管流量調整手段の調節目標となる目標流量値がそれぞれ設定される、請求項1乃至5の何れか1つに記載の流量設定方法。
Branch pipe flow rate adjusting means for adjusting the flow rate of the coating liquid flowing through the branch pipe to a predetermined flow rate according to the measurement result of the coating liquid flow rate by the branch pipe flow rate measuring means is provided in each of the plurality of branch pipes,
In the serial supply step, the branch flow rate measuring means and the branch flow rate adjusting means are connected in series, respectively, and the coating liquid is supplied from the supply source to the branch flow rate measuring means and the branch flow rate adjusting means connected in series. And discharging the supplied coating liquid from one of the nozzles,
In the flow rate measurement adjustment step, in the state where the serial supply step supplies the coating liquid to the branch flow rate measurement unit and the branch flow rate adjustment unit connected in series, the respective coating liquid flow rates in the branch flow rate measurement unit 6. The flow rate setting method according to claim 1, wherein a target flow rate value, which is an adjustment target of the branch flow rate adjusting means corresponding to the predetermined flow rate, is set based on the measurement result.
前記流量計測調整工程では、前記直列供給工程が前記直列に接続された支管流量計測手段および支管流量調整手段に前記塗布液を供給している状態において、基準となる基準流量値と前記支管流量計測手段が示す流量値との間の関係式がそれぞれ導かれ、当該関係式に基づいて前記所定の流量を示す当該基準流量値に対応する当該支管流量計測手段の流量値が前記目標流量値に設定される、請求項6に記載の流量設定方法。   In the flow rate measurement adjustment step, a reference flow rate value serving as a reference and the branch flow rate measurement in the state where the series supply step supplies the coating liquid to the branch flow rate measurement unit and the branch flow rate adjustment unit connected in series. Relational expressions between the flow rate values indicated by the means are respectively derived, and based on the relational expressions, the flow rate value of the branch flow rate measuring means corresponding to the reference flow rate value indicating the predetermined flow rate is set as the target flow rate value. The flow rate setting method according to claim 6. 前記流量計測調整工程では、前記塗布装置で使用する塗布液の種別毎に前記関係式が導かれて前記目標流量値が設定される、請求項7に記載の流量設定方法。   The flow rate setting method according to claim 7, wherein in the flow rate measurement adjustment step, the relational expression is derived for each type of coating liquid used in the coating apparatus, and the target flow rate value is set. 前記直列供給工程では、供給する塗布液流量が直列に接続された前記支管流量調整手段の何れか1つによって前記基準流量値が前記所定の流量となるように調節され、他の前記支管流量調整手段による流量調節が全開にされ、
前記流量計測調整工程では、供給する塗布液流量を前記支管流量調整手段の何れか1つが前記基準流量値を前記所定の流量に調節した状態で前記支管流量計測手段がそれぞれ示す流量値がそれぞれの前記目標流量値に設定される、請求項6に記載の流量設定方法。
In the series supply step, the reference flow rate is adjusted to be the predetermined flow rate by any one of the branch flow rate adjusting means connected in series so that the supplied coating solution flow rate becomes the predetermined flow rate. The flow control by means is fully opened,
In the flow rate measurement adjustment step, the flow rate value indicated by each of the branch flow rate measurement units in a state in which any one of the branch flow rate adjustment units adjusts the reference flow rate value to the predetermined flow rate. The flow rate setting method according to claim 6, wherein the flow rate setting method is set to the target flow rate value.
前記流量計測調整工程では、前記塗布装置で使用する塗布液の種別毎に前記目標流量値が設定される、請求項9に記載の流量設定方法。   The flow rate setting method according to claim 9, wherein in the flow rate measurement adjustment step, the target flow rate value is set for each type of coating liquid used in the coating apparatus. 記直列供給工程では、前記複数の支管のうちの1つに前記供給源から前記塗布液を供給し、前記連結管を介して他の支管に当該供給液を順次流動させた後に、当該塗布液の流動において最も下流となる支管に設けられた前記ノズルから当該塗布液を吐出させる、請求項1に記載の流量設定方法。 Prior SL series supply step, after said plurality of supplying the coating liquid from said source to one of the branch pipes were the feed is sequentially flow to another branch pipe via the connecting pipe, the coating The flow rate setting method according to claim 1, wherein the coating liquid is discharged from the nozzle provided in a branch pipe that is the most downstream in the flow of the liquid. 複数のノズルから塗布液をそれぞれ吐出する塗布装置であって、
前記塗布液を貯留する単一の供給源と、
前記塗布液を吐出する複数のノズルと、
前記供給源から塗布液を供給する本管と、
前記本管から供給される塗布液を分流して、前記複数のノズルへそれぞれ供給する複数の支管と、
前記支管にそれぞれ設けられ、当該支管を流動する塗布液流量を計測する複数の支管流量計測手段と、
前記支管における前記支管流量計測手段の下流側と他の前記支管における前記支管流量計測手段の上流側とを連結する連結管と、
前記支管流量計測手段がそれぞれ計測した塗布液流量の計測結果を調整する制御部とを備え、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、当該支管流量計測手段におけるそれぞれの塗布液流量の計測結果を調整する、塗布装置。
A coating apparatus that discharges coating liquid from a plurality of nozzles,
A single source for storing the coating liquid;
A plurality of nozzles for discharging the coating liquid;
A main for supplying the coating liquid from the supply source;
A plurality of branch pipes for diverting the coating liquid supplied from the main pipe and respectively supplying the plurality of nozzles;
A plurality of branch pipe flow rate measuring means provided on each of the branch pipes to measure the flow rate of the coating liquid flowing through the branch pipe;
A connecting pipe connecting the downstream side of the branch pipe flow rate measuring means in the branch pipe and the upstream side of the branch pipe flow rate measuring means in the other branch pipes;
A control unit for adjusting the measurement result of the coating liquid flow rate measured by the branch flow rate measuring means,
The control unit is configured such that the plurality of branch flow rate measuring means are connected in series via the branch pipe and the connecting pipe, and the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series. A coating apparatus that adjusts the measurement result of each coating liquid flow rate in the branch flow rate measuring means in a state where the supplied coating liquid is discharged from one of the nozzles.
前記制御部は、前記供給源から前記本管へ供給された塗布液が前記複数の支管から選択された1つの選択支管にのみ供給され、他の支管への当該塗布液の供給が閉止された状態において、当該選択支管に設けられた前記支管流量計測手段による計測結果と当該選択支管の前記ノズルから吐出される塗布液の実吐出量との間の関係を計測し、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、前記選択支管に設けられた前記支管流量計測手段が計測する塗布液流量を基準として、他の前記支管流量計測手段における塗布液流量の計測結果を調整する、請求項12に記載の塗布装置。
In the control unit, the coating liquid supplied from the supply source to the main pipe is supplied only to one selected branch pipe selected from the plurality of branch pipes, and the supply of the coating liquid to the other branch pipes is closed. In the state, measure the relationship between the measurement result by the branch flow rate measuring means provided in the selected branch and the actual discharge amount of the coating liquid discharged from the nozzle of the selected branch,
The control unit is configured such that the plurality of branch flow rate measuring means are connected in series via the branch pipe and the connecting pipe, and the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series. In the state where the supplied coating liquid is discharged from one of the nozzles, the other branch flow rate measuring means is based on the coating liquid flow rate measured by the branch flow rate measuring means provided in the selected branch pipe. The coating apparatus of Claim 12 which adjusts the measurement result of a coating liquid flow volume.
前記複数の支管流量計測手段のうち、少なくとも1つは、前記支管を流動する塗布液の質量流量を計測する質量流量計であり、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、前記質量流量計が計測する塗布液流量を基準として、他の前記支管流量計測手段における塗布液流量の計測結果を調整する、請求項12に記載の塗布装置。
Of the plurality of branch pipe flow rate measuring means, at least one is a mass flow meter that measures the mass flow rate of the coating liquid flowing through the branch pipe,
The control unit is configured such that the plurality of branch flow rate measuring means are connected in series via the branch pipe and the connecting pipe, and the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series. In the state where the supplied coating liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the other branch flow rate measuring means is adjusted based on the coating liquid flow rate measured by the mass flow meter. The coating apparatus according to claim 12.
前記本管に設けられ、当該本管を流動する塗布液流量を計測する本管流量計測手段を、さらに備え、
前記制御部は、前記供給源から前記本管へ供給された塗布液が前記複数の支管から選択された1つの選択支管にのみ供給され、他の支管への当該塗布液の供給が閉止された状態において、前記本管流量計測手段による計測結果と当該選択支管の前記ノズルから吐出される塗布液の実吐出量との間の関係を計測し、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、前記本管流量計測手段が計測する塗布液流量を基準として、前記支管流量計測手段における塗布液流量の計測結果を調整する、請求項12に記載の塗布装置。
A main flow rate measuring means for measuring the flow rate of the coating liquid that is provided in the main pipe and flows through the main pipe is further provided,
In the control unit, the coating liquid supplied from the supply source to the main pipe is supplied only to one selected branch pipe selected from the plurality of branch pipes, and the supply of the coating liquid to the other branch pipes is closed. In the state, measure the relationship between the measurement result by the main flow rate measuring means and the actual discharge amount of the coating liquid discharged from the nozzle of the selected branch pipe,
The control unit is configured such that the plurality of branch flow rate measuring means are connected in series via the branch pipe and the connecting pipe, and the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series. In the state where the supplied coating liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the branch flow rate measuring unit is adjusted based on the coating liquid flow rate measured by the main flow rate measuring unit. The coating apparatus according to claim 12.
前記本管に設けられ、当該本管を流動する塗布液の質量流量を計測する質量流量計を、さらに備え、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、前記質量流量計が計測する塗布液流量を基準として、前記支管流量計測手段における塗布液流量の計測結果を調整する、請求項12に記載の塗布装置。
A mass flow meter that is provided in the main pipe and measures the mass flow rate of the coating liquid flowing through the main pipe,
The control unit is configured such that the plurality of branch flow rate measuring means are connected in series via the branch pipe and the connecting pipe, and the coating liquid is supplied from the supply source to the branch flow rate measuring means connected in series. In the state where the supplied coating liquid is discharged from one of the nozzles, the measurement result of the coating liquid flow rate in the branch flow rate measuring unit is adjusted with reference to the coating liquid flow rate measured by the mass flow meter. The coating device according to claim 12.
前記支管にそれぞれ設けられ、前記支管流量計測手段による塗布液流量の計測結果に応じて当該支管を流動する塗布液流量を所定の流量に調節する複数の支管流量調節手段を、さらに備え、
前記制御部は、前記支管および前記連結管を介して前記複数の支管流量計測手段および支管流量調節手段がそれぞれ直列に接続され、前記供給源から当該直列に接続された支管流量計測手段および支管流量調節手段に前記塗布液が供給されて、当該供給された塗布液が前記ノズルの1つから吐出される状態において、前記支管流量計測手段におけるそれぞれの塗布液流量の計測結果に基づいて、前記所定の流量に対応した前記支管流量調整手段の調節目標となる目標流量値をそれぞれ設定する、請求項12乃至16の何れか1つに記載の塗布装置。
A plurality of branch pipe flow rate adjusting means each provided in the branch pipe, for adjusting the flow rate of the coating liquid flowing through the branch pipe to a predetermined flow rate according to the measurement result of the flow rate of the coating liquid by the branch pipe flow rate measuring means,
In the control unit, the plurality of branch flow rate measuring means and the branch flow rate adjusting means are respectively connected in series via the branch pipe and the connecting pipe, and the branch flow rate measuring means and the branch flow rate connected in series from the supply source. In a state where the coating liquid is supplied to the adjusting means and the supplied coating liquid is discharged from one of the nozzles, the predetermined liquid flow rate is measured based on the measurement result of each coating liquid flow rate in the branch flow rate measuring means. The coating apparatus according to any one of claims 12 to 16, wherein a target flow rate value that is an adjustment target of the branch pipe flow rate adjusting unit corresponding to the flow rate of each is set.
前記支管にそれぞれ設けられ、前記制御部の制御に応じて前記支管を流動する塗布液を前記連結管へ流動させるか当該支管の前記ノズルへ流動させるかを切り替えるバルブを、さらに備え、
前記制御部は、前記複数の支管のうちの1つに前記供給源から前記塗布液を供給し、前記バルブを切り替えて前記連結管を介して他の支管に当該供給液を順次流動させた後に、当該塗布液の流動において最も下流となる支管に設けられた前記ノズルから当該塗布液を吐出させることによって、前記複数の支管流量計測手段をそれぞれ直列に接続する、請求項12に記載の塗布装置。
A valve provided on each of the branch pipes for switching whether to flow the coating liquid flowing through the branch pipe to the connection pipe or to the nozzle of the branch pipe according to the control of the control unit;
The control unit supplies the coating liquid from the supply source to one of the plurality of branch pipes, switches the valve, and sequentially flows the supply liquid to other branch pipes via the connection pipe. The coating apparatus according to claim 12, wherein the plurality of branch flow rate measuring units are respectively connected in series by discharging the coating liquid from the nozzle provided in the branch pipe that is most downstream in the flow of the coating liquid. .
JP2009048364A 2009-03-02 2009-03-02 Flow rate setting method and coating apparatus Expired - Fee Related JP5198329B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009048364A JP5198329B2 (en) 2009-03-02 2009-03-02 Flow rate setting method and coating apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009048364A JP5198329B2 (en) 2009-03-02 2009-03-02 Flow rate setting method and coating apparatus

Publications (2)

Publication Number Publication Date
JP2010201318A JP2010201318A (en) 2010-09-16
JP5198329B2 true JP5198329B2 (en) 2013-05-15

Family

ID=42963358

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009048364A Expired - Fee Related JP5198329B2 (en) 2009-03-02 2009-03-02 Flow rate setting method and coating apparatus

Country Status (1)

Country Link
JP (1) JP5198329B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5575598B2 (en) * 2010-09-29 2014-08-20 大日本スクリーン製造株式会社 Coating apparatus and coating method
JP2012206020A (en) * 2011-03-30 2012-10-25 Dainippon Screen Mfg Co Ltd Method and device for applying application liquid
JP6035090B2 (en) * 2012-09-19 2016-11-30 株式会社Screenホールディングス Coating device and method of operating coating device
JP5961509B2 (en) 2012-09-28 2016-08-02 株式会社Screenホールディングス Method for adjusting flow rate of coating liquid and coating apparatus
JP6801545B2 (en) * 2017-03-23 2020-12-16 コニカミノルタ株式会社 Manufacturing method of electrophotographic photosensitive member

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0832314B2 (en) * 1988-12-29 1996-03-29 トリニティ工業株式会社 Paint circulation equipment
JP2002157958A (en) * 2001-09-04 2002-05-31 Matsushita Electric Ind Co Ltd Display panel and method of manufacture
JP4552683B2 (en) * 2005-02-16 2010-09-29 セイコーエプソン株式会社 Functional liquid supply device control method, functional liquid supply device, droplet discharge device, electro-optical device manufacturing method, electro-optical device, and electronic apparatus
JP4828287B2 (en) * 2006-04-10 2011-11-30 リコープリンティングシステムズ株式会社 Droplet discharge device and operation method thereof

Also Published As

Publication number Publication date
JP2010201318A (en) 2010-09-16

Similar Documents

Publication Publication Date Title
JP5198329B2 (en) Flow rate setting method and coating apparatus
JP2020024943A (en) Technique for printing ink droplet measurement and control of fluid deposition within tight tolerances
US11167302B2 (en) Coating device and associated operating method
JP5118415B2 (en) Flow rate setting method and coating apparatus
EP2805777B1 (en) Coating method and device
JP6659532B2 (en) Techniques for printing ink droplet measurement and control of fluid deposition within tight tolerances
JP6626153B2 (en) Automated multiple head cleaner and related method of dispensing system
CN101444773B (en) Position detection equipment and method for detecting jet hole of coater and light spot of laser displacement sensor
KR20200059325A (en) Fast measurement of droplet parameters in industrial printing system
CN102671823B (en) Paste coating device and paste coating method
CN101641457A (en) Evaporation source, vapor deposition apparatus and method of film formation
US10686133B2 (en) Display panel manufacturing system and method of manufacturing a display panel using the same
US20060170733A1 (en) Ink-jet printing device and method for fabricating LCD device using the same
US9327312B2 (en) Resin coating apparatus and a method for forming a resin layer using the same
US20100279575A1 (en) Method and system for dynamic in-situ phosphor mixing and jetting
US20080093390A1 (en) Glue dispenser and dispensing process using the same
JP5961509B2 (en) Method for adjusting flow rate of coating liquid and coating apparatus
US20140318210A1 (en) Method for calibrating mass flow controllers in a printing apparatus for dispensing a liquid composition on a backplane
KR101214721B1 (en) Proportional apparatus for plural component coating pump
JP2016101580A (en) Coating device
CN102053617A (en) On-line calibrating method for FRC (Flow Ratio Controller), system and plasma treatment equipment
US8561627B1 (en) Calibration of a chemical dispense system
KR100811647B1 (en) Coating liquid supplying apparatus
JPH0534191A (en) Apparauts and method for weighing viscous liquid
TW201226062A (en) Dispensing apparatus

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20110830

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121108

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130206

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160215

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees