Elevator installation method and installation jig used therefor Download PDF

Info

Publication number
JP5104404B2
JP5104404B2 JP2008050416A JP2008050416A JP5104404B2 JP 5104404 B2 JP5104404 B2 JP 5104404B2 JP 2008050416 A JP2008050416 A JP 2008050416A JP 2008050416 A JP2008050416 A JP 2008050416A JP 5104404 B2 JP5104404 B2 JP 5104404B2
Authority
JP
Japan
Prior art keywords
ruler
hoistway
swing line
drum
downward swing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008050416A
Other languages
Japanese (ja)
Other versions
JP2009208851A (en
JP2009208851A5 (en
Inventor
勝 門村
義男 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Building Techno-Service Co Ltd
Priority to JP2008050416A priority Critical patent/JP5104404B2/en
Publication of JP2009208851A publication Critical patent/JP2009208851A/en
Publication of JP2009208851A5 publication Critical patent/JP2009208851A5/ja
Application granted granted Critical
Publication of JP5104404B2 publication Critical patent/JP5104404B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

この発明は、エレベータ昇降路の頂部から下げ振り線を垂下させて、各種位置決めを行うエレベータの据付方法、並びに、その据付方法において使用される据付治具に関するものである。   The present invention relates to an elevator installation method for performing various positionings by dropping down a swing line from the top of an elevator hoistway, and an installation jig used in the installation method.

エレベータの据付に際しては、各種芯出し、例えば、ガイドレールや各乗場装置の位置決めを行うために、下げ振りが利用されている。   In installing the elevator, a downward swing is used for various centering, for example, for positioning the guide rail and each landing device.

図7は従来のエレベータの据付方法を説明するための図である。図7において、17は昇降路1の上方に設けられたエレベータ機械室、18は機械室17に設置された、例えばガイドレール芯出し用の上部型板、19は下げ振り線からなるピアノ線、20はピアノ線19の下端部に連結された下げ振り錘である。
従来、エレベータの据付において芯出し作業を行う場合、据付作業員は、上部型板18の降ろし口18aにピアノ線19を通してから昇降路1内に垂下させ、そのピアノ線19を建物の基準墨に合わせて昇降路1内の適切な位置に配置させていた。
FIG. 7 is a diagram for explaining a conventional elevator installation method. In FIG. 7, 17 is an elevator machine room provided above the hoistway 1, 18 is an upper mold plate for centering a guide rail, for example, 19 is installed in the machine room 17, 19 is a piano wire comprising a downward swing line, Reference numeral 20 denotes a downward swing weight connected to the lower end portion of the piano wire 19.
Conventionally, when centering work is performed in elevator installation, an installation worker drops the piano wire 19 into the hoistway 1 through the piano wire 19 to the lowering opening 18a of the upper template 18 and uses the piano wire 19 as a reference ink for the building. In addition, they were arranged at appropriate positions in the hoistway 1.

一方、近年主流となっている機械室レスエレベータでは、エレベータの据付作業員が、上記芯出し作業を機械室で行うことができない。このため、機械室レスエレベータで芯出し作業を行う場合、従来では、昇降路の頂部に芯出し用の定規を設置し、この定規から昇降路内にピアノ線を垂下させていた(例えば、特許文献1参照)。   On the other hand, in machine room-less elevators that have become mainstream in recent years, elevator installation workers cannot perform the above-described centering work in the machine room. For this reason, when performing a centering operation in a machine room-less elevator, conventionally, a ruler for centering is installed at the top of the hoistway, and a piano wire is suspended from the ruler into the hoistway (for example, patents) Reference 1).

特開2004−35218号公報JP 2004-35218 A

機械室レスエレベータにおいて芯出し作業を行う場合、据付作業員は、定規の設置等といった多くの作業を、昇降路の頂部付近に設けられた作業足場の上で行わなければならない。しかし、一般に、作業足場上には十分な作業スペースが確保されておらず、作業効率が大幅に低下するといった問題があった。
特に、特許文献1記載のもののように、昇降路の頂部に設置された定規の孔(降ろし孔)にピアノ線を通してから昇降路内に垂下させる場合、据付作業者は、ピアノ線の束を抱えながら定規の孔の方向(上方)にピアノ線を順次繰り出す作業が必要となり、据付作業者に掛かる負担は大きなものとなっていた。
When performing a centering operation in a machine room-less elevator, an installation worker must perform many operations such as setting a ruler on a work scaffold provided near the top of the hoistway. However, in general, there is a problem that a sufficient work space is not secured on the work scaffold, and the work efficiency is greatly reduced.
In particular, as in the case described in Patent Document 1, when the piano wire is passed through the hole of the ruler (lowering hole) installed at the top of the hoistway and then suspended in the hoistway, the installation operator holds a bundle of piano wires. However, it was necessary to sequentially draw out the piano wire in the direction of the ruler hole (upward), and the burden on the installation worker was large.

また、据付作業者は、上記ピアノ線の繰り出し作業を狭い作業スペース内で行わなければならず、その作業中に、昇降路内への落下物が発生し易いといった問題もあった。特に、作業に必要不可欠な部材(例えば、ピアノ線等)を昇降路内に落としてしまうと、昇降路のピット部まで拾いに行く時間が余分に掛かり、作業が大幅に遅延することとなっていた。   In addition, the installation operator has to perform the above-described operation of feeding out the piano wire in a narrow work space, and there is a problem that falling objects into the hoistway are easily generated during the work. In particular, if a member indispensable for work (for example, a piano wire) is dropped into the hoistway, it takes extra time to pick up the pit part of the hoistway, and the work is greatly delayed. It was.

この発明は、上述のような課題を解決するためになされたもので、その目的は、機械室レスエレベータの据付に際し、ガイドレールや乗場装置等の芯出し作業に必要な負担を低減させることができ、且つ、その作業時間を大幅に短縮させることができるエレベータの据付方法、並びに、その据付方法において使用されるエレベータの据付治具を提供することである。   The present invention has been made to solve the above-described problems. The purpose of the present invention is to reduce the burden required for centering work such as guide rails and landing devices when installing a machine room-less elevator. It is possible to provide an elevator installation method capable of greatly reducing the working time, and an elevator installation jig used in the installation method.

この発明に係るエレベータの据付方法は、エレベータの昇降路の頂部付近に、作業足場を組み立てるステップと、昇降路の頂部に、作業足場から芯出し用の定規を設置するステップと、昇降路の頂部に設置された定規の所定位置に、コイル状の下げ振り線が回動自在に支持されたドラム装置を取り付けるステップと、ドラム装置を定規に取り付けた後、下げ振り線の端部に取り付けられた下げ振り錘を昇降路内に落下させ、下げ振り線を昇降路の上下に渡って配置するステップと、下げ振り線を昇降路内に適切に配置した後、昇降路の頂部において下げ振り線を切断し、下げ振り線の昇降路の上下に渡って配置した部分をドラム装置から切り離すステップと、下げ振り線の切断後、昇降路に配置された下げ振り線の上端部を、定規に固定するステップと、下げ振り線の切断後、下げ振り線を昇降路の上下に渡って配置した状態のまま、ドラム装置を定規から取り外すステップと、を備えたものである。 The elevator installation method according to the present invention includes a step of assembling a work scaffold near the top of the elevator hoistway, a step of installing a ruler for centering from the work scaffold at the top of the hoistway, and a top of the hoistway A step of attaching a drum device in which a coiled downward swing line is rotatably supported at a predetermined position of a ruler installed on the ruler, and after attaching the drum device to the ruler, the drum device was attached to the end of the downward swing line The step of dropping the lower swing weight into the hoistway and placing the lower swing line over the hoistway, and the proper placement of the lower swing line in the hoistway, then the lower swing line at the top of the hoistway The step of cutting and cutting off the part of the down swing line that is arranged above and below the hoistway from the drum device, and after cutting the down swing line, fix the upper end of the down swing line placed on the hoistway to the ruler. And step, after cleavage of the plumb line, remain placed over the plumb line above and below the hoistway, those having the steps of removing the drum unit from the ruler, the.

この発明に係るエレベータの据付治具は、エレベータ昇降路の頂部に設けられ、下げ振り線を通すための降ろし孔が形成された定規と、定規に設けられ、降ろし孔に近接して配置されたドラム支持手段と、ドラム支持手段によって定規に着脱自在に設けられ、コイル状に巻かれた下げ振り線が回動自在に支持されたドラム装置と、定規の降ろし孔に近接した位置に設けられ、ドラム装置から切り離された下げ振り線の端部を定規に固定するための固定手段と、を備え、ドラム装置は、昇降路の上下に渡って配置された下げ振り線の上端部が固定手段に固定された状態で、定規から取り外し可能なものである。 The elevator installation jig according to the present invention is provided at the top of the elevator hoistway, and is provided with a ruler in which a lowering hole for passing a downward swing line is formed, and is provided in the ruler, and is disposed in the vicinity of the lowering hole. A drum support means, a drum device that is detachably provided on the ruler by the drum support means, and is provided at a position close to a lowering hole of the ruler, and a drum device in which a downward swing line wound in a coil shape is rotatably supported; Fixing means for fixing an end portion of the downward swing line separated from the drum device to a ruler, and the drum device has an upper end portion of the downward swing line arranged above and below the hoistway as the fixing means. It is fixed and removable from the ruler .

この発明によれば、機械室レスエレベータの据付に際し、ガイドレールや乗場装置等の芯出し作業に必要な負担を低減させることができ、且つ、その作業時間を大幅に短縮させることができるようになる。   According to this invention, when installing a machine room-less elevator, it is possible to reduce the burden required for centering work such as guide rails and landing devices, and to greatly shorten the work time. Become.

この発明をより詳細に説明するため、添付の図面に従ってこれを説明する。なお、各図中、同一又は相当する部分には同一の符号を付しており、その重複説明は適宜に簡略化ないし省略する。   In order to explain the present invention in more detail, it will be described with reference to the accompanying drawings. In addition, in each figure, the same code | symbol is attached | subjected to the part which is the same or it corresponds, The duplication description is simplified or abbreviate | omitted suitably.

実施の形態1.
図1はこの発明の実施の形態1におけるエレベータの据付方法を説明するための図である。図1において、1は建物に形成された機械室レスエレベータの昇降路である。即ち、図1は機械室レスエレベータの据付において各種芯出し作業を行う場合の状態を示している。
Embodiment 1 FIG.
FIG. 1 is a diagram for explaining an elevator installation method according to Embodiment 1 of the present invention. In FIG. 1, reference numeral 1 denotes a hoistway of a machine room-less elevator formed in a building. That is, FIG. 1 shows a state where various centering operations are performed in the installation of the machine room-less elevator.

2は昇降路1の頂部付近に設置された三角足場(作業足場)である。この三角足場2は、エレベータの据付及び製品に必要な各種部材を昇降路1の頂部に設置するために組まれたものである。エレベータの据付作業者は、例えば、最上階に設けられたエレベータ乗場から、三角足場2の上に移動する。なお、三角足場2は作業足場としての上記機能を有していれば良く、その構成は如何なるものであっても構わない。図1の三角足場2は、作業足場の一例として示したものである。   Reference numeral 2 denotes a triangular scaffold (working scaffold) installed near the top of the hoistway 1. This triangular scaffold 2 is assembled in order to install various members necessary for elevator installation and products on the top of the hoistway 1. The elevator installation worker moves from the elevator hall provided on the uppermost floor onto the triangular scaffolding 2, for example. The triangular scaffold 2 may have any function as long as it has the above function as a work scaffold. The triangular scaffold 2 in FIG. 1 is shown as an example of a work scaffold.

3は昇降路1の頂部に設けられた型板設定装置である。型板設定装置3は、エレベータの据付において各種芯出しを行うために設けられている。即ち、ガイドレールや各乗場装置等の位置決め(芯出し)は、型板設定装置3から垂下された下げ振り線を利用して行われる。具体的には、型板設定装置3から昇降路1内に垂下された下げ振り線を、建物の基準墨に合わせて昇降路1内の適切な位置に配置することにより、昇降路1の上下に張られた下げ振り線を基準にして各型板が設置される。
以下、図2乃至図4に基づき、上記型板設定装置3の具体的構成について説明する。図2は図1に示す型板設定装置の平面図、図3は図2に示す型板設定装置の要部拡大図、図4は図2に示す型板設定装置の要部側面図である。
3 is a template setting device provided at the top of the hoistway 1. The template setting device 3 is provided for performing various types of centering during elevator installation. That is, positioning (centering) of the guide rails and the landing devices is performed by using the downward swing line hanging from the template setting device 3. Specifically, by placing a downward swing line suspended from the template setting device 3 into the hoistway 1 at an appropriate position in the hoistway 1 according to the reference ink of the building, Each template is installed on the basis of the downward swing line stretched on.
Hereinafter, based on FIG. 2 thru | or FIG. 4, the specific structure of the said template setting apparatus 3 is demonstrated. 2 is a plan view of the template setting apparatus shown in FIG. 1, FIG. 3 is an enlarged view of the main part of the template setting apparatus shown in FIG. 2, and FIG. 4 is a side view of the main part of the template setting apparatus shown in FIG. .

型板設定装置3は、例えば、昇降路1の頂部に配置された定規4乃至6と、この定規4乃至6を支持する支持棒7とを備えている。上記定規4乃至6には、下げ振り線を通すための降ろし孔4a乃至6aが形成されている。この降ろし孔4a乃至6aは、芯出しされる対象(ガイドレールや乗場装置等)に合わせてその配置が定められている。   The template setting device 3 includes, for example, rulers 4 to 6 disposed on the top of the hoistway 1 and a support bar 7 that supports the rulers 4 to 6. The rulers 4 to 6 are formed with lowering holes 4a to 6a for passing the downward swing lines. The positions of the lowering holes 4a to 6a are determined in accordance with the object to be centered (guide rail, landing device, etc.).

本実施の形態においては、一例として、型板設定装置3から6本の下げ振り線を昇降路1内に垂下させる場合を示している。即ち、定規4は乗場装置用の定規であり、乗場装置の配置に合わせた降ろし孔4aが両端部に形成されている。同様に、定規5はかごを案内するガイドレール用の定規であり、かご用ガイドレールの配置に合わせた降ろし孔5aが、定規6は釣合い重りを案内するガイドレール用の定規であり、釣合い重り用ガイドレールの配置に合わせた降ろし孔6aが各両端部に形成されている。   In the present embodiment, as an example, a case is shown in which six downward swing lines are suspended from the template setting device 3 in the hoistway 1. In other words, the ruler 4 is a ruler for the landing device, and the lowering holes 4a that match the arrangement of the landing device are formed at both ends. Similarly, the ruler 5 is a ruler for a guide rail that guides the car, and a lowering hole 5a that matches the arrangement of the guide rail for the car is provided. The ruler 6 is a ruler for the guide rail that guides the counterweight, and the counterweight Lowering holes 6a that match the arrangement of the guide rails are formed at both ends.

また、定規4乃至6の各両端部には、降ろし孔4a乃至6aに近接した位置に、ドラム支持手段8が設けられている。このドラム支持手段8には、後述のドラム装置9(図2乃至図4において図示せず)が着脱自在に設けられる。即ち、ドラム支持手段8は、ドラム装置9を定規4乃至6の所定の位置に着脱自在に設けることができる機能を有していれば良い。上記ドラム支持手段8は、例えば、定規4乃至6の降ろし孔4a乃至6aに近接した位置に設けられた板状のドラム載置台10と、各ドラム載置台10上に所定の間隔を有して立設された2本の支持ピン11とにより構成される。   Also, drum support means 8 is provided at each end of the rulers 4 to 6 at positions close to the lowering holes 4a to 6a. A drum device 9 (not shown in FIGS. 2 to 4), which will be described later, is detachably provided on the drum support means 8. That is, the drum support means 8 only needs to have a function that allows the drum device 9 to be detachably provided at predetermined positions of the rulers 4 to 6. The drum support means 8 has, for example, a plate-like drum mounting table 10 provided at a position close to the lowering holes 4a to 6a of the rulers 4 to 6, and a predetermined interval on each drum mounting table 10. The two support pins 11 are erected.

次に、図1乃至図6を参照して、上記型板設定装置3を使用したエレベータの据付方法について説明する。図5及び図6はこの発明の実施の形態1におけるエレベータの据付方法を説明するための図である。   Next, with reference to FIG. 1 thru | or FIG. 6, the installation method of the elevator which uses the said template setting apparatus 3 is demonstrated. 5 and 6 are diagrams for explaining an elevator installation method according to Embodiment 1 of the present invention.

機械室レスエレベータの据付において芯出し作業を行う場合、据付作業者は、先ず、昇降路1の頂部付近に三角足場2を組み立てる。三角足場2の設置が完了した後、据付作業者は三角足場2の上に移動し、この三角足場2から昇降路1の頂部に支持棒7を固定する。また、芯出し用の各定規4乃至6を昇降路1内の適切な位置に配置し、支持棒7に固定する。   When centering work is performed in the installation of the machine room-less elevator, the installation operator first assembles the triangular scaffold 2 near the top of the hoistway 1. After the installation of the triangular scaffolding 2 is completed, the installation operator moves onto the triangular scaffolding 2 and fixes the support rod 7 from the triangular scaffolding 2 to the top of the hoistway 1. The centering rulers 4 to 6 are arranged at appropriate positions in the hoistway 1 and fixed to the support rod 7.

型板設定装置3を三角足場2の上方に適切に設置した後、据付作業者は、昇降路1の頂部に設けられた定規4の一端部側のドラム支持手段8に、ドラム装置9を取り付ける。
ドラム装置9には、コイル状に巻かれた下げ振り線12(例えば、ピアノ線)が回動自在に支持されており、例えば、図5に示すように、下げ振り線12を支持するU字状の支持金13と、支持金13の両側に設けられたL字状の取付金14とを備えている。ここで、支持金13及び取付金14の各底面は、ドラム載置台10の上面に合わせて面一に形成されている。また、各取付金14には、支持ピン11に対応する貫通孔(図示せず)が形成されている。即ち、上記構成のドラム装置9を定規4のドラム支持手段8に取り付ける場合には、取付金14の貫通孔内に対応の支持ピン11をそれぞれ配置した状態でドラム装置9をドラム載置台10の上面に載置すれば良い。
After the template setting device 3 is properly installed above the triangular scaffolding 2, the installation operator attaches the drum device 9 to the drum support means 8 on one end side of the ruler 4 provided at the top of the hoistway 1. .
The drum device 9 rotatably supports a downward swing wire 12 (for example, a piano wire) wound in a coil shape. For example, as shown in FIG. 5, a U-shape that supports the downward swing wire 12 is supported. And a L-shaped attachment 14 provided on both sides of the support 13. Here, the bottom surfaces of the support metal 13 and the mounting metal 14 are formed flush with the top surface of the drum mounting table 10. Each attachment 14 is formed with a through hole (not shown) corresponding to the support pin 11. That is, when the drum device 9 having the above configuration is attached to the drum support means 8 of the ruler 4, the drum device 9 is attached to the drum mounting table 10 with the corresponding support pins 11 disposed in the through holes of the attachment metal 14. What is necessary is just to mount on an upper surface.

次に、据付作業者は、定規4の一端部に取り付けられたドラム装置9から下げ振り線12の端部を引き出すとともに、近接の降ろし孔4aに上記端部を上方から通した後、上記定規4の下方において、下げ振り線12の端部に下げ振り錘15を取り付ける。図5は上述の手順によって下げ振り錘15が下げ振り線12の端部に取り付けられた状態を示したものである。   Next, the installation operator pulls out the end portion of the downward swing line 12 from the drum device 9 attached to one end portion of the ruler 4 and passes the end portion from above to the adjacent lowering hole 4a. A lower swing weight 15 is attached to the end of the lower swing line 12 below 4. FIG. 5 shows a state in which the lower swing weight 15 is attached to the end of the lower swing wire 12 by the above-described procedure.

下げ振り錘15を下げ振り線12に取り付けた後、据付作業者は、上記下げ振り錘15を自重で昇降路1内に落下させ、下げ振り線12を昇降路1の上下に渡って配置する。ここで、下げ振り線12は、上述のように、コイル状に巻かれた状態で支持金13に回動自在に支持されている。このため、下げ振り錘15が昇降路1内に落下すると、下げ振り線12は、支持金13に支持された部分が回転し、ドラム装置9から下方に順次繰り出されることになる。即ち、据付作業員は、三角足場2の上において、下げ振り線12の繰り出し作業を全く行う必要がない。なお、ドラム載置台10上に載置されたドラム装置9は、支持ピン11によって支持されている。このため、下げ振り線12を昇降路1の上下に渡って配置する上記工程中に、据付作業者がドラム装置9を保持するといった動作も不要になる。   After attaching the lower swing weight 15 to the lower swing line 12, the installation operator drops the lower swing weight 15 into the hoistway 1 by its own weight, and arranges the lower swing line 12 over the hoistway 1. . Here, the lower swing wire 12 is rotatably supported by the support metal 13 in a coiled state as described above. For this reason, when the lower swing weight 15 falls into the hoistway 1, the part of the lower swing wire 12 supported by the support metal 13 rotates and is sequentially drawn downward from the drum device 9. That is, it is not necessary for the installation worker to carry out the downward swing line 12 on the triangular scaffold 2 at all. The drum device 9 placed on the drum placement table 10 is supported by support pins 11. For this reason, the operation | work which an installation operator hold | maintains the drum apparatus 9 becomes unnecessary during the said process which arrange | positions the downward swing line 12 over the hoistway 1 up and down.

下げ振り線12を昇降路1の上下に渡って適切な位置に配置した後、据付作業者は、三角足場2上において、下げ振り線12のうち、降ろし孔4aよりも上方の部分を切断する。そして、昇降路1の上下に渡って配置された下げ振り線12の上端部を、定規4の一端部に固定し、ドラム装置9を定規4のドラム支持手段8から取り外す。かかる状態を示したものが図6である。なお、図中、16は固定ボルトを示している。この固定ボルト16は、昇降路1の上下に渡って配置された下げ振り線12の上端部を定規4に固定するために使用され、例えば、降ろし孔4a近傍の、定規4の両側面に設けられる。   After arranging the downward swing line 12 at an appropriate position over the upper and lower sides of the hoistway 1, the installation operator cuts a part of the downward swing line 12 above the lowering hole 4 a on the triangular scaffold 2. . Then, the upper end portion of the downward swing line 12 arranged over the hoistway 1 is fixed to one end portion of the ruler 4, and the drum device 9 is removed from the drum support means 8 of the ruler 4. FIG. 6 shows such a state. In the figure, reference numeral 16 denotes a fixing bolt. The fixing bolt 16 is used to fix the upper end portion of the downward swing line 12 arranged over the hoistway 1 to the ruler 4, and is provided, for example, on both sides of the ruler 4 in the vicinity of the lowering hole 4 a. It is done.

上記作業手順により、下げ振り線12を、定規4の一方の降ろし孔4aの位置から昇降路1内に垂下させることができる。昇降路1内の他の位置、例えば、定規4の他方の降ろし孔4aの位置に、下げ振り線12を垂下させる必要がある場合、据付作業者は、定規4の他端部に設けられたドラム支持手段8にドラム装置9を取り付け、上記と同様の手順によって下げ振り線12を昇降路1内に垂下させる。また、定規5や定規6に対しても、同様の手順によって、降ろし孔5a及び6aの位置から下げ振り線12を垂下させることができる。   By the above operation procedure, the downward swing line 12 can be suspended in the hoistway 1 from the position of one lowering hole 4a of the ruler 4. When it is necessary to hang down the lower swing line 12 at another position in the hoistway 1, for example, at the position of the other lowering hole 4 a of the ruler 4, the installation operator is provided at the other end of the ruler 4. A drum device 9 is attached to the drum support means 8, and the downward swing line 12 is suspended in the hoistway 1 by the same procedure as described above. In addition, with respect to the ruler 5 and the ruler 6, the downward swing line 12 can be suspended from the positions of the lowering holes 5a and 6a by the same procedure.

この発明の実施の形態1によれば、機械室レスエレベータの据付に際し、ガイドレールや乗場装置等の芯出し作業に必要な負担を低減させることができ、且つ、その作業時間を大幅に短縮させることができるようになる。   According to the first embodiment of the present invention, when installing a machine room-less elevator, it is possible to reduce the burden required for centering work such as guide rails and landing devices, and to greatly shorten the work time. Will be able to.

また、ドラム装置9は、ドラム支持手段8への取付時に、支持ピン11によって支持されるため、下げ振り線12を昇降路1に配置する際に、ドラム装置9の位置がずれたり、ドラム支持手段8から外れたりすることはない。このため、作業中に落下物が生じることはなく、落下物の発生によって作業が一時中断される恐れもない。
なお、ドラム支持手段8を本実施の形態のように構成することにより、工具を使用することなく、ドラム装置9の着脱を行うことができる。また、構成が簡素化されており、据付治具を短時間で且つ安価に製作することも可能である。
Further, since the drum device 9 is supported by the support pins 11 when attached to the drum support means 8, the position of the drum device 9 may be shifted or the drum support may be shifted when the downward swing line 12 is disposed in the hoistway 1. There is no departure from the means 8. For this reason, falling objects do not occur during the work, and there is no possibility that the work is temporarily interrupted by the occurrence of the falling objects.
The drum support means 8 is configured as in the present embodiment, so that the drum device 9 can be attached and detached without using a tool. In addition, the configuration is simplified, and the installation jig can be manufactured in a short time and at a low cost.

この発明の実施の形態1におけるエレベータの据付方法を説明するための図である。It is a figure for demonstrating the installation method of the elevator in Embodiment 1 of this invention. 図1に示す型板設定装置の平面図である。It is a top view of the template setting apparatus shown in FIG. 図2に示す型板設定装置の要部拡大図である。It is a principal part enlarged view of the template setting apparatus shown in FIG. 図2に示す型板設定装置の要部側面図である。It is a principal part side view of the template setting apparatus shown in FIG. この発明の実施の形態1におけるエレベータの据付方法を説明するための図である。It is a figure for demonstrating the installation method of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベータの据付方法を説明するための図である。It is a figure for demonstrating the installation method of the elevator in Embodiment 1 of this invention. 従来のエレベータの据付方法を説明するための図である。It is a figure for demonstrating the installation method of the conventional elevator.

符号の説明Explanation of symbols

1 昇降路、 2 三角足場、 3 型板設定装置、 4〜6 定規、
4a〜6a 降ろし孔、 7 支持棒、 8 ドラム支持手段、 9 ドラム装置、
10 ドラム載置台、 11 支持ピン、 12 下げ振り線、 13 支持金、
14 取付金、 15 下げ振り錘、 16 固定ボルト、 17 機械室、
18 上部型板、 18a 降ろし口、 19 ピアノ線、 20 下げ振り錘
1 hoistway, 2 triangular scaffolding, 3 template setting device, 4-6 ruler,
4a-6a Lowering hole, 7 Support rod, 8 Drum support means, 9 Drum device,
10 Drum mounting table, 11 Support pin, 12 Lower swing line, 13 Support metal,
14 Mounting bracket, 15 Lower swing weight, 16 Fixing bolt, 17 Machine room,
18 Upper template, 18a Lowering port, 19 Piano wire, 20 Lower swing weight

Claims (4)

エレベータの昇降路の頂部付近に、作業足場を組み立てるステップと、
前記昇降路の頂部に、前記作業足場から芯出し用の定規を設置するステップと、
前記昇降路の頂部に設置された前記定規の所定位置に、コイル状の下げ振り線が回動自在に支持されたドラム装置を取り付けるステップと、
前記ドラム装置を前記定規に取り付けた後、前記下げ振り線の端部に取り付けられた下げ振り錘を前記昇降路内に落下させ、前記下げ振り線を前記昇降路の上下に渡って配置するステップと、
前記下げ振り線を前記昇降路内に適切に配置した後、前記昇降路の頂部において前記下げ振り線を切断し、前記下げ振り線の前記昇降路の上下に渡って配置した部分を前記ドラム装置から切り離すステップと、
前記下げ振り線の切断後、前記昇降路に配置された前記下げ振り線の上端部を、前記定規に固定するステップと、
前記下げ振り線の切断後、前記下げ振り線を前記昇降路の上下に渡って配置した状態のまま、前記ドラム装置を前記定規から取り外すステップと、
を備えたことを特徴とするエレベータの据付方法。
Assembling a work platform near the top of the elevator hoistway;
Installing a ruler for centering from the working scaffold at the top of the hoistway;
Attaching a drum device in which a coiled swing line is rotatably supported at a predetermined position of the ruler installed at the top of the hoistway;
After the drum device is attached to the ruler, a step of dropping a downward swing weight attached to an end of the downward swing line into the hoistway and disposing the downward swing line over and under the hoistway When,
After appropriately arranging the downward swing line in the hoistway, the lower swing line is cut at the top of the hoistway, and the portion of the downward swing line that is disposed above and below the hoistway is disposed in the drum device. A step of separating from the
After cutting the downward swing line, fixing the upper end portion of the downward swing line disposed in the hoistway to the ruler;
Removing the drum device from the ruler in a state where the lower swing line is disposed over the hoistway after cutting the lower swing line ; and
An elevator installation method characterized by comprising:
前記下げ振り線を切断して前記ドラム装置を前記定規から取り外した後、前記昇降路内の他の位置に下げ振り線を垂下させるため、前記定規又は他の定規に、前記ドラム装置を取り付けるステップと、
を更に備えたことを特徴とする請求項1に記載のエレベータの据付方法。
The step of attaching the drum device to the ruler or another ruler in order to hang the downward swing line to another position in the hoistway after cutting the downward swing line and removing the drum device from the ruler. When,
The elevator installation method according to claim 1, further comprising:
エレベータ昇降路の頂部に設けられ、下げ振り線を通すための降ろし孔が形成された定規と、
前記定規に設けられ、前記降ろし孔に近接して配置されたドラム支持手段と、
前記ドラム支持手段によって前記定規に着脱自在に設けられ、コイル状に巻かれた下げ振り線が回動自在に支持されたドラム装置と、
前記定規の前記降ろし孔に近接した位置に設けられ、前記ドラム装置から切り離された下げ振り線の端部を前記定規に固定するための固定手段と、
を備え
前記ドラム装置は、前記昇降路の上下に渡って配置された前記下げ振り線の上端部が前記固定手段に固定された状態で、前記定規から取り外し可能なことを特徴とするエレベータの据付治具。
A ruler provided at the top of the elevator hoistway and having a lowering hole for passing a downward swing line;
A drum support means provided on the ruler and disposed in proximity to the lowering hole;
A drum device that is detachably attached to the ruler by the drum support means, and a downward swing line wound in a coil shape is rotatably supported;
A fixing means for fixing an end portion of a downward swing line, which is provided at a position close to the lowering hole of the ruler and separated from the drum device, to the ruler;
Equipped with a,
An elevator installation jig characterized in that the drum device is removable from the ruler in a state in which an upper end portion of the downward swing line arranged over the hoistway is fixed to the fixing means. .
前記ドラム支持手段は、
前記定規の前記降ろし孔に近接した位置に設けられた板状のドラム載置台と、
前記ドラム載置台に立設された複数の支持ピンと、
を備え、
前記ドラム装置は、前記支持ピンに対応する貫通孔が形成され、前記ドラム載置台に載置された際に、前記貫通孔内に、対応の前記支持ピンがそれぞれ配置されることを特徴とする請求項3に記載のエレベータの据付治具。
The drum support means is
A plate-like drum mounting table provided at a position close to the lowering hole of the ruler;
A plurality of support pins erected on the drum mounting table;
With
In the drum device, a through hole corresponding to the support pin is formed, and when the drum device is placed on the drum mounting table, the corresponding support pin is disposed in the through hole. The elevator installation jig according to claim 3.
JP2008050416A 2008-02-29 2008-02-29 Elevator installation method and installation jig used therefor Active JP5104404B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008050416A JP5104404B2 (en) 2008-02-29 2008-02-29 Elevator installation method and installation jig used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008050416A JP5104404B2 (en) 2008-02-29 2008-02-29 Elevator installation method and installation jig used therefor

Publications (3)

Publication Number Publication Date
JP2009208851A JP2009208851A (en) 2009-09-17
JP2009208851A5 JP2009208851A5 (en) 2010-04-22
JP5104404B2 true JP5104404B2 (en) 2012-12-19

Family

ID=41182397

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008050416A Active JP5104404B2 (en) 2008-02-29 2008-02-29 Elevator installation method and installation jig used therefor

Country Status (1)

Country Link
JP (1) JP5104404B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107934838A (en) * 2017-11-26 2018-04-20 江苏沪越机械设备有限公司 A kind of building hoist

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2606054B2 (en) * 1992-08-25 1997-04-30 三菱電機株式会社 Upper die plate device for elevator installation
JPH08133623A (en) * 1994-11-07 1996-05-28 Mitsubishi Electric Corp Template device, main ruler member and plumb line fixture for elevator installation
JPH09196679A (en) * 1996-01-19 1997-07-31 Sumitomo Forestry Co Ltd Device for suspending plumb bob
JP3193609B2 (en) * 1996-01-29 2001-07-30 株式会社日立ビルシステム Elevator installation method

Also Published As

Publication number Publication date
JP2009208851A (en) 2009-09-17

Similar Documents

Publication Publication Date Title
JP2013151364A (en) Main rope replacement jig for elevator
JP5104404B2 (en) Elevator installation method and installation jig used therefor
JP2005138917A (en) Method for changing main rope on carrier, and main rope changing device
JP4957287B2 (en) Elevator control cable fixing method
JP4935465B2 (en) Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor
JP2012046296A (en) Method of mounting elevator hoist
JP6409915B1 (en) Adjusting weight take-out method and adjusting weight support device
JP5748558B2 (en) Elevator basket fixing device
JP2009208851A5 (en)
JP4454100B2 (en) Elevator guide rail centering template and elevator guide rail centering method
JP5003539B2 (en) Elevator installation method, installation jig used therefor, and method of manufacturing the installation jig
JP5706228B2 (en) Elevator equipment inspection workbench
JP6950458B2 (en) Elevator weight removal device and weight removal method
JP4978218B2 (en) Elevator installation apparatus and installation method
JP5571708B2 (en) How to replace the main rope of the elevator
WO2023175881A1 (en) Installation method for hoisting machine
JP2939064B2 (en) Elevator installation template
JP3336231B2 (en) How to replace the main rope of the hydraulic lift
JP5831366B2 (en) Elevator scaffolding equipment
JP5191958B2 (en) Elevator equipment centering reference line installation method
WO2023175880A1 (en) Guide device for installation of hoisting machine, and hoisting machine installation method
JP2007186274A (en) Method for installing elevator hoistway top part equipment
JP4037604B2 (en) Elevator rope replacement method
JP6020735B2 (en) Elevator equipment
JP2009184757A (en) Elevator device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100310

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120223

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120904

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120917

R150 Certificate of patent or registration of utility model

Ref document number: 5104404

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151012

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250