JP4994984B2 - Construction method for wooden buildings - Google Patents

Construction method for wooden buildings Download PDF

Info

Publication number
JP4994984B2
JP4994984B2 JP2007191573A JP2007191573A JP4994984B2 JP 4994984 B2 JP4994984 B2 JP 4994984B2 JP 2007191573 A JP2007191573 A JP 2007191573A JP 2007191573 A JP2007191573 A JP 2007191573A JP 4994984 B2 JP4994984 B2 JP 4994984B2
Authority
JP
Japan
Prior art keywords
floor
panel
wall panel
construction method
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007191573A
Other languages
Japanese (ja)
Other versions
JP2009024461A (en
Inventor
和典 藤本
Original Assignee
エス・バイ・エル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by エス・バイ・エル株式会社 filed Critical エス・バイ・エル株式会社
Priority to JP2007191573A priority Critical patent/JP4994984B2/en
Publication of JP2009024461A publication Critical patent/JP2009024461A/en
Application granted granted Critical
Publication of JP4994984B2 publication Critical patent/JP4994984B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Building Environments (AREA)

Description

この発明は、木質系建物の建築工法に関し、さらに詳しくは木造軸組工法、木質プレハブ工法、枠組壁工法、パネル工法などにより建築される木質系建物の建築に際し、土台、壁パネルや床パネル等の連結作業を簡単に行えて、棟上までのスピーディー化、工期の短縮化を図ることができる技術に係るものである。   The present invention relates to a construction method of a wooden building, and more particularly, in the construction of a wooden building constructed by a wooden frame construction method, a wooden prefabrication method, a frame wall construction method, a panel construction method, etc., a base, a wall panel, a floor panel, etc. It is related to a technology that can easily perform the connecting operation of the building, speeding up the building, and shortening the construction period.

従来、木質系建物の建築に際し、例えば土台と床パネル、あるいは床パネルと壁パネルの連結を行うには、ボルトナットによりこれら部材同士を締結し、あるいは釘などの締結具で締結して、順次、土台から上を建て上げていく工法がとられていた(例えば、特許文献1,2参照)。
特開平8−165725号公報 特開2004−232209号公報
Conventionally, when building a wooden building, for example, in order to connect a base and a floor panel, or a floor panel and a wall panel, these members are fastened with bolts and nuts, or fastened with fasteners such as nails, sequentially. The construction method of building the top from the foundation was taken (for example, refer to Patent Documents 1 and 2).
JP-A-8-165725 JP 2004-232209 A

すなわち、特許文献1は、いわゆるパネル工法により組み立てられる複数階の建屋における壁パネルの組み付け構造に係り、所定位置に立設された1階壁パネル上に、胴差の側面と床パネルの外面を当接させて敷き込み、しかる後に1階壁パネルの連通孔内にボルトを胴差側から差し込み、下側ねじ部をナット付き座金のナットに螺合させて1階壁パネルと床パネルとを連結し、次に2階壁パネルを、胴差上面より突出するボルトを連通孔内に挿通させて、1階壁パネル及び床パネルの上面にわたって載置し、1階壁パネル上に2階壁パネルを載置させた状態で、連通孔と連通孔は互いに連通し、面材に設けられた開口部を利用して、ボルトの上側ねじ部に座金を介してナットを螺合させて、1階壁パネルと2階壁パネルとを床パネルを介して連結するものである(段落0030,0031、図1,2参照)。   That is, Patent Document 1 relates to a structure for assembling wall panels in a multi-storey building assembled by a so-called panel method. On the first floor wall panel erected at a predetermined position, the side surface of the trunk difference and the outer surface of the floor panel are arranged. After that, the bolts are inserted into the communication holes of the first floor wall panel from the trunk difference side, and the lower threaded portion is screwed onto the nut of the washer with the nut to connect the first floor wall panel and the floor panel. Next, the second floor wall panel is placed over the first floor wall panel and the upper surface of the floor panel by inserting a bolt protruding from the upper surface of the body difference into the communication hole, and the second floor wall is placed on the first floor wall panel. With the panel placed, the communication hole and the communication hole communicate with each other, and using the opening provided in the face material, the nut is screwed onto the upper screw portion of the bolt via the washer. The floor wall panel and the second floor wall panel are connected via the floor panel. Is for connecting (see paragraph 0030,0031, Figures 1 and 2).

特許文献2は、パネル工法による建物の壁パネルと床パネルの接合構造に係り、所定位置に建て込んだ1階壁パネル上に2階床パネルの端部を載せ、該端部の前方に形成される隙間に胴差を配置し、床パネルに釘等で固定し、床パネルを壁パネルに固定した後、その胴差と床パネル上に2階の壁パネルを建て込み、床パネルに固定するものである(段落0020,0003、図1,4参照)。   Patent document 2 relates to a joint structure of a wall panel and a floor panel of a building by a panel construction method. An end portion of a second-floor floor panel is placed on a first-floor wall panel built in a predetermined position and formed in front of the end portion. Place the torso gap in the gap, fix it to the floor panel with nails, etc., fix the floor panel to the wall panel, then build the second floor wall panel on the torso difference and floor panel and fix it to the floor panel (See paragraphs 0020 and 0003, FIGS. 1 and 4).

しかしながら、特許文献1,2のような建物の建て方の場合、ボルトナットを用いて部材同士を連結し、あるいは釘と多くの金物を用いて部材同士を固定しながら建て上げるため、棟上までの作業量が膨大となり、作業に多くの日数を要するものとなっていた。そのため、屋根を載せるまでの工期がかかり、途中で雨が降った場合、養生が十分にできないという問題点があった。   However, in the case of building a building such as Patent Documents 1 and 2, to connect the members using bolts and nuts, or to build up while fixing the members using nails and many hardware, up to the ridge The amount of work has become enormous, requiring a lot of work days. Therefore, it took a work period until the roof was placed, and when it rained on the way, there was a problem that curing could not be performed sufficiently.

そこでこの発明は、前記従来のものが有する問題点を解決し、棟上までをスピーディーに行えて、工期の短縮化を図ることができる木質系建物の建築工法を提供することを目的とする。   Accordingly, an object of the present invention is to provide a construction method for a wooden building that solves the problems of the conventional ones and can speed up the building and shorten the construction period.

前記目的を達成するため、請求項1に記載の発明は、土台の上に1階床パネルを載せ、該床パネルと土台にわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、1階床パネルの上に1階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、さらに1階壁パネルの上に2階床パネルを載せ、該床パネルと壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、2階床パネルの上に2階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピン打ち込んで連結し、必要に応じてこれら床パネルと壁パネルの載置と連結を繰り返した後、最上階の壁パネルの上に桁を載せ、該桁と壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、屋根のある棟まで建て上げることを特徴とする。   In order to achieve the above object, according to the first aspect of the present invention, a first floor panel is placed on a base, and a drift pin is driven into and connected to a drift pin hole provided over the floor panel and the base. The first floor wall panel is placed on the floor panel, the drift pin is driven and connected to the drift pin hole provided between the wall panel and the floor panel, and the second floor floor panel is placed on the first floor wall panel. A drift pin is driven into and connected to the drift pin hole provided between the panel and the wall panel, and the second floor wall panel is mounted on the second floor panel, and the drift pin is driven into the drift pin hole provided between the wall panel and the floor panel. The floor panel and the wall panel are repeatedly placed and connected as necessary, and then a girder is placed on the top floor wall panel, and the door is placed over the girder and wall panel. Connected by implanting drift pin to Futopin hole, characterized in that built up until ridge with roof.

請求項2に記載の発明は、請求項1に記載の木質系建物の建築工法において、棟まで建て上げた後、縦方向に隣接する壁パネルと床パネル間、壁パネルと桁間、横方向に隣接する壁パネル同士、床パネル同士、をそれぞれ釘打ちすることを特徴とする。請求項3に記載の発明は、請求項1又は2に記載の木質系建物の建築工法において、土台、1階床パネル、1階壁パネル、2階床パネル、2階壁パネル、必要とする数の床パネルと壁パネル、及び桁に設けられるドリフトピン穴は予め工場で加工されることを特徴とする。   The invention according to claim 2 is the construction method of the wooden building according to claim 1, wherein after the building is built up to the ridge, between the wall panel and the floor panel adjacent in the vertical direction, between the wall panel and the girder, and in the lateral direction It is characterized by nailing the wall panels adjacent to each other and the floor panels. The invention according to claim 3 requires the foundation, the first floor panel, the first floor panel, the second floor panel, the second floor panel in the construction method of the wooden building according to claim 1 or 2. A number of floor and wall panels and drift pin holes provided in the girders are pre-fabricated in the factory.

請求項4に記載の発明は、請求項1ないし3のいずれかに記載の木質系建物の建築工法において、1階床パネルの端部を土台の上面中間部に位置するように載せることにより、その外側に第1凹所を形成するとともに、該凹所を埋めるように第1埋入部材を取り外し可能に嵌入することを特徴とする。請求項5に記載の発明は、請求項4に記載の木質系建物の建築工法において、2階床パネルの端部を1階壁パネルの上面中間部に位置するように載せることにより、その外側に第2凹所を形成するとともに、該凹所を埋めるように第2埋入部材を取り外し可能に嵌入することを特徴とする。請求項6に記載の発明は、請求項4又は5に記載の木質系建物の建築工法において、第1及び第2埋入部材がそれぞれ通気路を有し、第1埋入部材の通気路によって縦方向に隣接する土台と1階壁パネルにそれぞれ設けた通気路を連通可能とし、第2埋入部材の通気路によって第1壁パネルと2階壁パネルにそれぞれ設けた通気路を連通可能にしていることを特徴とする。   The invention according to claim 4 is the construction method of the wooden building according to any one of claims 1 to 3, by placing the end portion of the first floor panel so as to be located in the upper surface middle portion of the foundation, A first recess is formed on the outer side, and the first embedding member is removably inserted so as to fill the recess. The invention according to claim 5 is the construction method of the wooden building according to claim 4, wherein the end of the second floor panel is placed so as to be positioned in the upper surface middle part of the first floor wall panel, and the outside thereof is placed. And a second recessed member is detachably inserted so as to fill the recessed portion. The invention according to claim 6 is the construction method of the wooden building according to claim 4 or 5, wherein each of the first and second embedded members has an air passage, and the air passage of the first embedded member The ventilation paths provided in the first floor panel and the first floor wall panel can be communicated with each other in the vertical direction, and the ventilation paths provided in the first wall panel and the second floor wall panel can be communicated by the ventilation path of the second embedding member. It is characterized by.

この発明は前記のように、土台の上に1階床パネルを載せ、該床パネルと土台にわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、1階床パネルの上に1階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、さらに1階壁パネルの上に2階床パネルを載せ、該床パネルと壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、2階床パネルの上に2階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、必要に応じてこれら床パネルと壁パネルの載置と連結を繰り返した後、最上階の壁パネルの上に桁を載せ、該桁と壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、屋根のある棟まで建て上げるので、少ない作業量、少ない日数でスピーディーに棟上まで行うことが可能となる。すなわち、ドリフトピンを仮止めに使用しながら淡々と野地施工まで組立を進行することができ、工期の短縮化を図ることができる。そのため、従来のように雨による養生のための日数をとる必要も少なくて済む。しかも、施工に用いるものはドリフトピン穴に打ち込むドリフトピンだけであり、コストを従来に比べて安価に抑えることができるという優れた効果が期待できる。   As described above, according to the present invention, a first floor panel is placed on a base, and a drift pin is driven into and connected to a drift pin hole provided over the floor panel and the base. Place the panel, drive the drift pin into the drift pin hole provided between the wall panel and the floor panel, connect it, and place the second floor floor panel on the first floor wall panel. A drift pin is driven into and connected to the pin hole, and a second-floor wall panel is placed on the second-floor floor panel, and a drift pin is driven into and connected to the drift pin hole provided across the wall panel and the floor panel. After repeatedly placing and connecting these floor and wall panels, place a girder on the top floor wall panel and drift into the drift pin hole provided across the girder and wall panel. Connected by implanting down, so built up until ridge with roof small amount of work, it is possible to perform up on the ridge speedily in fewer days. In other words, the assembly can be proceeded to the field construction while using the drift pin for temporary fixing, and the construction period can be shortened. Therefore, it is less necessary to take days for curing due to rain as in the past. In addition, only the drift pin that is driven into the drift pin hole is used for the construction, and an excellent effect that the cost can be suppressed at a lower cost than the conventional one can be expected.

この発明の一実施の形態を、添付図面を参照して説明する。   An embodiment of the present invention will be described with reference to the accompanying drawings.

図1は、基礎上から桁までの壁に沿った木質系建物の一部分を示す概略正面図、図2は、図1のA−A線に沿う高さ方向の長さを一部省略した拡大縦断側面図である。また、図3は、図1のB部の拡大概略斜視図であり、図4は、図1のC部の拡大概略斜視図であり、図5は、図1のD部の拡大概略斜視図である。ここに示すような建物を構築するには、まず、基礎1上に加圧注入処理材からなり、通常の土台の半分程度の高さに形成された土台2をその間に換気パッキン3を介在させて載置する。換気パッキン3には外気が床下に流入可能な通気溝4と、床下から土台2の壁側に設けた後述する通気路と連通する通気溝5が設けられている。次に、土台2上に1階床パネル6を、該床パネルの端部(面材6aとともに床パネル6を構成する桟6bのある部分)が土台2の上面中間部に位置するように載せるとともに、該端部の桟6bと土台2にわたり設けたドリフトピン穴7にドリフトピン8を打ち込んで連結する。ドリフトピン8は以下に説明するドリフトピンもそうであるが仮止め用のピンで、鋼材からなる接合具の一種である。   FIG. 1 is a schematic front view showing a part of a wooden building along the wall from the foundation to the girder, and FIG. 2 is an enlarged view in which the length in the height direction along the line AA in FIG. 1 is partially omitted. It is a vertical side view. 3 is an enlarged schematic perspective view of part B of FIG. 1, FIG. 4 is an enlarged schematic perspective view of part C of FIG. 1, and FIG. 5 is an enlarged schematic perspective view of part D of FIG. It is. In order to construct a building as shown here, first, a foundation 2 made of a pressure-injection treatment material on the foundation 1 and having a height about half that of a normal foundation is interposed between the ventilation packing 3 therebetween. To place. The ventilation packing 3 is provided with a ventilation groove 4 through which outside air can flow under the floor and a ventilation groove 5 that communicates with a later-described ventilation path provided on the wall side of the base 2 from under the floor. Next, the first-floor floor panel 6 is placed on the base 2 so that the end of the floor panel (the part where the crosspiece 6b that constitutes the floor panel 6 together with the face material 6a) is located in the upper surface middle part of the base 2. At the same time, a drift pin 8 is driven into and connected to the drift pin hole 7 provided across the crosspiece 6b and the base 2 at the end. The drift pin 8 is a pin for temporary fixing, as is the case with the drift pin described below, and is a kind of joint made of steel.

土台2と1階床パネル6を連結すると、その外側に凹所9が形成されるので、該凹所を埋めるように凹所9の形状に合わせて製作した第1埋入部材としての床側部材10を取り外し可能に嵌入する。床側部材10の凹所9への嵌入後、床側部材10と1階床パネル6の端部上に1階壁パネル12を載せるとともに、該壁パネルの下桟12bと床側部材10及び床パネル6の桟6bにわたり設けたドリフトピン穴13,14にドリフトピン15,16をパネル内部側から打ち込んで連結する。17は床側部材10の前面に貼り付けられた面材、12aは1階壁パネル12を構成する面材であり、12cは1階壁パネル12を構成する中桟である。なお、図2ではドリフトピン16とドリフトピン8が干渉しているように見えるが、実際は、該図で前後方向に位置がずれていて干渉はしていない。   When the base 2 and the first floor panel 6 are connected, a recess 9 is formed on the outside thereof, so that the floor side as the first embedding member manufactured according to the shape of the recess 9 so as to fill the recess The member 10 is removably inserted. After the floor-side member 10 is inserted into the recess 9, the first-floor wall panel 12 is placed on the ends of the floor-side member 10 and the first-floor floor panel 6, and the lower rail 12b of the wall panel, the floor-side member 10, and Drift pins 15 and 16 are driven and connected to drift pin holes 13 and 14 provided over the crosspiece 6b of the floor panel 6 from the inside of the panel. Reference numeral 17 denotes a face material affixed to the front surface of the floor-side member 10, reference numeral 12 a denotes a face material constituting the first floor wall panel 12, and reference numeral 12 c denotes an intermediate rail constituting the first floor wall panel 12. In FIG. 2, it seems that the drift pin 16 and the drift pin 8 interfere with each other, but actually, the position is shifted in the front-rear direction in FIG.

次に、1階壁パネル12の上に2階床パネル18を、該床パネルの端部が1階壁パネル12の上面中間部に位置するように載せるとともに、端部の桟18bと1階壁パネル12の上桟12bにわたり設けたドリフトピン穴19にドリフトピン20をパネル内部側から打ち込んで連結する。   Next, the second-floor floor panel 18 is placed on the first-floor wall panel 12 so that the end of the floor panel is located in the middle of the upper surface of the first-floor wall panel 12, and the crosspiece 18b and the first-floor 18 A drift pin 20 is driven into and connected to a drift pin hole 19 provided over the upper rail 12b of the wall panel 12 from the inside of the panel.

1階壁パネル12と2階床パネル18を連結すると、その外側に凹所21が形成されるので、該凹所を埋めるように凹所21の形状に合わせて製作した第2埋入部材としての胴差側部材22を取り外し可能に嵌入する。胴差側部材22の凹所21への嵌入後、胴差側部材22と1階壁パネル12の上桟12bにわたり設けたドリフトピン穴23にドリフトピン24をパネル内部側から打ち込んで連結する。次に、胴差側部材22と2階床パネル18の端部上に2階壁パネル26を載せるとともに、該壁パネルの下桟26bと胴差側部材22及び床パネル18桟18bにわたり設けたドリフトピン穴27,28にドリフトピン29,30をパネル内部側から打ち込んで連結する。31は胴差側部材22の前面に貼り付けられた面材、26aは2階壁パネル26を構成する面材であり、26cは2階壁パネル26を構成する中桟である。   When the first-floor wall panel 12 and the second-floor floor panel 18 are connected, a recess 21 is formed on the outer side thereof. As a second embedding member manufactured according to the shape of the recess 21 so as to fill the recess. The torso difference side member 22 is removably inserted. After fitting the trunk difference side member 22 into the recess 21, the drift pin 24 is driven into the drift pin hole 23 provided over the trunk difference side member 22 and the upper rail 12 b of the first floor wall panel 12 from the inside of the panel and connected. Next, the second floor wall panel 26 is placed on the end of the trunk difference side member 22 and the second floor floor panel 18, and is provided across the lower rail 26b of the wall panel, the trunk difference side member 22 and the floor panel 18 rail 18b. Drift pins 29 and 30 are driven into and connected to the drift pin holes 27 and 28 from the inside of the panel. Reference numeral 31 denotes a face material affixed to the front surface of the trunk difference side member 22, reference numeral 26 a denotes a face material constituting the second floor wall panel 26, and reference numeral 26 c denotes an intermediate rail constituting the second floor wall panel 26.

次に、2階壁パネル26の上桟26bの上に換気頭つなぎとしての桁32を載せるとともに、桁32と2階壁パネル26の上桟26bにわたり設けたドリフトピン穴33にドリフトピン34をパネル内部側から打ち込んで連結する。前記においては、壁パネル12,26等の連結について縦方向の連結についてのみ説明したが、必要により横方向も同時に連結して、同時進行的に建て上げてもよいことは勿論である。その場合、横方向の壁パネルの連結は4,5連程度が好ましい。また、この連結に際しては、予め平面状態の壁パネルを4,5連程度連結して一体化した壁パネル体を一挙に立ち上げて載置するようにしてもよい。このようにして壁パネルからなる壁を全周囲にわたり立ち上げ、隣接する互いの壁パネルの出隅部、入隅部に図示しない補助材等による処理した後、桁32の上に棟木、垂木等を組上げて屋根(図示せず)を載せると棟まで建て上がることになる。このように建て上がった建物は、釘打ち等の最終的な工事前の状態ではあるが、せん断力はドリフトピンを含んだものとなるため、安定した強度を保つことができる。   Next, a girder 32 as a ventilation head connection is placed on the upper beam 26b of the second floor wall panel 26, and a drift pin 34 is inserted into the drift pin hole 33 provided between the beam 32 and the upper beam 26b of the second floor wall panel 26. Connect from the inside of the panel. In the above description, only the connection in the vertical direction has been described with respect to the connection of the wall panels 12, 26, etc., but it is of course possible to connect the horizontal direction at the same time and build them up simultaneously. In that case, the connection of the lateral wall panels is preferably about 4 or 5 stations. In this connection, a wall panel body in which about 4 or 5 plane wall panels are connected in advance and integrated may be raised and placed at once. In this way, the wall made up of the wall panels is raised over the entire periphery, and after processing with auxiliary materials (not shown) at the corners and corners of adjacent wall panels, purlins, rafters, etc. If you assemble and put a roof (not shown), it will be built up to the ridge. The building thus constructed is in a state before final construction such as nailing, but since the shearing force includes the drift pin, it can maintain a stable strength.

ここまではドリフトピンによる仮止めだけであり、釘を一切使用しない。そして、この仮止め用のドリフトピンによる棟上後、1階壁パネル12と床パネル6、1階壁パネル12同士、2階壁パネル26同士、2階壁パネル26と桁32、等に、図1に一部示すようにドリフトピン76,77や釘78,79を打って連結するとともに、図示していないが内装工事としてパネル内部の面材と反対側に断熱材を面材側に通気空間を形成して配置し、この断熱材を覆うように内装下地材を貼り付ける等を行うと、建物が完成することになる。   Up to this point, only temporary fixing with drift pins is used, and no nails are used. Then, after the building with the drift pin for temporary fixing, the first floor wall panel 12 and floor panel 6, the first floor wall panel 12, the second floor wall panel 26, the second floor wall panel 26 and the girder 32, etc. As shown in FIG. 1, the drift pins 76 and 77 and the nails 78 and 79 are connected by hitting them, and although not shown, a heat insulating material is vented to the face material side on the side opposite to the face material inside the panel as an interior work. When a space is formed and arranged, and an interior base material is attached so as to cover the heat insulating material, the building is completed.

前記の施工においては、土台2、床パネル6,18、壁パネル12,26、床側部材10、胴差側部材22、及び桁32に設けたドリフトピン穴7,13,14,19,23,27,28,33は現場で加工するのではなく、予め工場で加工してある。したがって、現場作業は土台2をはじめとする各部材を適正位置に載せて配置した後に、各部材を仮止め用のドリフトピン8,15,16,20,24,29,30,34を打ち込んで連結していくだけでよいので、作業性のよいものとなり、従来の工法に比べてきわめてスピーディーに棟上まで建て上げることができる。そのため、従来のように作業日数が多くかかることがなく、屋根を載せるまでの工期を大幅に短縮することが可能となり、雨による養生のための日数をとる必要も少なくて済む。棟上までの作業は、通常に比べ45%の省施工となり、大幅な短縮が可能である。   In the above construction, drift pin holes 7, 13, 14, 19, 23 provided in the base 2, the floor panels 6, 18, the wall panels 12, 26, the floor side member 10, the trunk difference side member 22, and the girder 32. , 27, 28, 33 are processed in advance in the factory, not on site. Therefore, in the field work, after each member including the base 2 is placed and placed at an appropriate position, the drift pins 8, 15, 16, 20, 24, 29, 30, and 34 for temporary fixing are driven into each member. Since it is only necessary to connect them, the workability is improved, and it is possible to build up the building very quickly compared to the conventional method. For this reason, the number of work days is not increased as in the prior art, the construction period until the roof is placed can be greatly shortened, and the number of days for curing due to rain can be reduced. The work up to the ridge is 45% less than usual and can be significantly shortened.

前記において、土台2の壁側には換気パッキン3の通気溝5と連通する通気路36が水平方向を向いて設けられ、該通気路と連通する通気路37が垂直方向を向いて設けられている。両通気路36,37の外側(前面側)は開放されているが、これは仕上げ工事に防水紙等が貼られて塞がれる。また、床側部材10の面材17側には土台2の通気路37と連通する通気路38が水平方向を向いて設けられ、該通気路と連通する通気路39が垂直方向を向いて設けられ、かつ該通気路と連通する通気路40が水平方向を向いて設けられている。また、1階壁パネル12の下桟12bの面材12a側には床側部材10の通気路40とパネル内部とを連通する通気路41が垂直方向を向いて設けられているとともに、上桟12bの面材12a側にも同様な通気路43が垂直方向を向いて設けられている。   In the above, the ventilation path 36 communicating with the ventilation groove 5 of the ventilation packing 3 is provided on the wall side of the base 2 in the horizontal direction, and the ventilation path 37 communicating with the ventilation path is provided in the vertical direction. Yes. The outside (front side) of the air passages 36 and 37 is open, but this is covered with waterproof paper or the like for finishing work. Further, an air passage 38 communicating with the air passage 37 of the base 2 is provided in the horizontal direction on the face material 17 side of the floor member 10, and an air passage 39 communicating with the air passage is provided in the vertical direction. In addition, an air passage 40 communicating with the air passage is provided in the horizontal direction. In addition, an air passage 41 that communicates the air passage 40 of the floor member 10 and the inside of the panel is provided in the vertical direction on the side surface 12a side of the lower rail 12b of the first floor panel 12, and the upper rail. A similar ventilation path 43 is also provided on the 12b face material 12a side in the vertical direction.

また、胴差側部材22の面材31側には1階壁パネル12の通気路43と連通する通気路45が水平方向を向いて設けられ、該通気路と連通する通気路46が垂直方向を向いて設けられ、かつ該通気路と連通する通気路47が水平方向を向いて設けられている。また、2階壁パネル26の下桟26bの面材26a側には胴差側部材22の通気路47とパネル内部とを連通する通気路48が垂直方向を向いて設けられているとともに、上桟26bの面材26a側の壁側にも同様な通気路49が垂直方向を向いて設けられている。そして、この通気路49と連通する通気路51が桁32にその外側に開放して水平方向を向いて設けられている。したがって、これら各部材に連続して連通可能に設けられた通気溝4,5と通気路36,37,38,39,40,41,43,45,46,47,48,49,51を通じて外気を床下に取り入れ、かつ取り入れた外気を土台2下から壁沿いに伝って桁32の上の天井裏まで通気することが可能となり、1階壁パネル12内は勿論、2階壁パネル26内でも除湿の効果が大きいものとすることができる。   Further, an air passage 45 communicating with the air passage 43 of the first floor panel 12 is provided in the horizontal direction on the face member 31 side of the trunk difference side member 22, and the air passage 46 communicating with the air passage is in the vertical direction. An air passage 47 that faces the air passage and communicates with the air passage is provided facing the horizontal direction. In addition, an air passage 48 that communicates the air passage 47 of the trunk difference side member 22 and the inside of the panel is provided on the side material 26a side of the lower rail 26b of the second floor wall panel 26 so as to face the vertical direction. A similar air passage 49 is provided in the vertical direction on the wall side of the crosspiece 26b on the face material 26a side. An air passage 51 communicating with the air passage 49 is provided in the girder 32 so as to open to the outside and face the horizontal direction. Accordingly, the outside air is provided through the ventilation grooves 4 and 5 and the ventilation paths 36, 37, 38, 39, 40, 41, 43, 45, 46, 47, 48, 49, 51 provided so as to be continuously communicated with these members. It is possible to take the outside air under the floor and vent the outside air that has taken in along the wall from the bottom of the base 2 to the back of the ceiling above the girder 32, not only in the first floor wall panel 12 but also in the second floor wall panel 26. The effect of dehumidification can be great.

床側部材10と胴差側部材22の一例としては、図6(A),(B)に示すようなものであり、その長さは図1からわかるように壁パネル12,26の2連分にしている。ただ、これは一例であって、適宜その長さは設定することができる。また、床側部材10と胴差側部材22に設けられる通気路38,39,40,45,46,47も、任意の数、それも所定の間隔で設けたり、あるいは無くしたり種々の変更が可能である。このような部材を用いると増改築のときにプラン変更があっても可能な範囲で対応することができる。   An example of the floor side member 10 and the trunk difference side member 22 is as shown in FIGS. 6 (A) and 6 (B), and the length thereof is two series of wall panels 12 and 26 as can be seen from FIG. I'm on the minute. However, this is only an example, and the length can be set as appropriate. In addition, the air passages 38, 39, 40, 45, 46, and 47 provided in the floor side member 10 and the trunk side member 22 may be provided with an arbitrary number of them at predetermined intervals, or may be variously changed. Is possible. If such a member is used, even if there is a plan change at the time of extension and renovation, it can be dealt with as much as possible.

すなわち、例えば図7に示すように新築時にランマ壁パネル55と腰壁パネル56の間に形成した中連開口の窓(腰高窓)57を増改築のときに、それまでの腰高窓からその下方の腰壁パネル56を開放して図8に示すような掃き出し開口の窓(掃き出し窓)58にするプラン変更を希望する場合がある。このような場合でも腰高窓のときの通気路を形成していた床側部材10と胴差側部材22を凹所9,21から取り外し、別途用意した通気路の無い床側部材10’と、胴差側部材22’を新たに凹所9,21に取り付けることにより、簡単に取り替えることができる。胴差側部材22’は1階の上部にランマ壁パネル55が設けられているため、該パネルの通気路43と連通する通気路のみ設けられている。勿論、前記とは逆に掃き出し窓58を腰高窓57に変更する場合でも、通気路の無い床側部材10’と、胴差側部材22’を通気路の有る床側部材10と胴差側部材22に簡単に取り替えることができる。しかも、この場合には腰高窓の形態によっては別途用意する種々の通気路の有る床側部材と胴差側部材を選定することができる。なお、図7,8で60はランマ受け材、61は隅材である。   That is, for example, as shown in FIG. 7, when a reconstructed window (waist high window) 57 formed between the luma wall panel 55 and the waist wall panel 56 is newly constructed, There is a case where it is desired to change the plan to open the waist wall panel 56 to a window (sweep window) 58 of the sweep opening as shown in FIG. Even in such a case, the floor side member 10 and the torso difference side member 22 that formed the ventilation path at the waist high window are removed from the recesses 9 and 21, and a floor side member 10 ′ without a ventilation path separately prepared, The trunk difference side member 22 ′ can be easily replaced by newly attaching it to the recesses 9 and 21. Since the trunk difference side member 22 ′ is provided with the rammer wall panel 55 at the upper part of the first floor, only the air passage communicating with the air passage 43 of the panel is provided. Of course, even when the sweep window 58 is changed to the waist high window 57, the floor side member 10 'without the air passage and the trunk side member 22' are replaced with the floor side member 10 with the air passage and the trunk side. The member 22 can be easily replaced. In addition, in this case, depending on the form of the waist high window, a floor side member and a torso difference side member having various ventilation paths prepared separately can be selected. In FIGS. 7 and 8, reference numeral 60 denotes a hammer receiving material, and 61 denotes a corner material.

本実施の形態では2階建ての建物を例にしたが、必要により3階建て以上の建物についても床パネルと胴差側部材、壁パネルの連結を繰り返すことによって同様に建て上げることができる。また、本実施の形態では1階床パネル6を土台2の上面中間部に、2階床パネル18を1階壁パネル12の上面中間部に位置するように載せ、それぞれその外側に形成される凹所9,21に床側部材10,胴差側部材22を埋めるように配置したが、このような床側部材と胴差側部材の配置を止めて土台2や1階壁パネル12の上面全面にわたり載せるような建て方でもよい。また、本実施の形態は、あくまで好ましい一例を示したにすぎず、構成各部材の細部の設計的な事項は、その実施に際して種々に変更、修正することができるものである。   In the present embodiment, a two-story building is taken as an example, but a three-story or more building can be similarly constructed by repeating the connection of the floor panel, the body difference side member, and the wall panel if necessary. In the present embodiment, the first floor panel 6 is placed on the upper surface middle part of the base 2 so that the second floor panel 18 is located on the upper surface middle part of the first floor wall panel 12, and each is formed outside thereof. Although it arrange | positioned so that the floor side member 10 and the trunk | drum difference side member 22 may be filled in the recessed parts 9 and 21, arrangement | positioning of such a floor side member and a trunk | drum difference side member is stopped, and the upper surface of the base 2 or the 1st floor wall panel 12 It may be built on the entire surface. In addition, the present embodiment is merely a preferable example, and the detailed design matters of the constituent members can be variously changed and modified in the implementation.

この発明の一実施の形態に係る、基礎上から桁までの壁に沿った木質系建物の一部分を示す正面図である。It is a front view which shows a part of wooden system building along the wall from the foundation to a girder based on one embodiment of this invention. 図1のA−A線に沿う高さ方向の長さを一部省略した拡大縦断側面図である。FIG. 2 is an enlarged longitudinal sectional side view in which a length in the height direction along the line AA in FIG. 1 is partially omitted. 図1のB部の拡大概略斜視図である。It is an expansion schematic perspective view of the B section of FIG. 図1のC部の拡大概略斜視図である。It is an expansion schematic perspective view of the C section of FIG. 図1のD部の拡大概略斜視図である。It is an expansion schematic perspective view of the D section of FIG. (A)は床側部材、(B)は胴差側部材のそれぞれ一例を示す図面である。(A) is a drawing which shows an example of a floor side member, and (B) is an example of a trunk difference side member, respectively. プラン変更前の建物の一部分を示す正面図である。It is a front view which shows a part of building before plan change. プラン変更後の建物の一部分を示す正面図である。It is a front view which shows a part of building after plan change.

符号の説明Explanation of symbols

1 基礎
2 土台
3 換気パッキン
6 1階床パネル
7,13,14,19,23,27,28,33 ドリフトピン穴
8,15,16,20,24,29,30,34,76,77 ドリフトピン
9,21 凹所
10 床側部材(第1埋入部材)
12 1階壁パネル
18 2階床パネル
22 胴差側部材(第2埋入部材)
32 桁
1 Foundation 2 Base 3 Ventilation Packing 6 1st Floor Panel 7, 13, 14, 19, 23, 27, 28, 33 Drift Pin Holes 8, 15, 16, 20, 24, 29, 30, 34, 76, 77 Drift Pins 9 and 21 Recess 10 Floor side member (first embedded member)
12 First-floor wall panel 18 Second-floor floor panel 22 Body difference side member (second embedding member)
32 digits

Claims (6)

土台の上に1階床パネルを載せ、該床パネルと土台にわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、1階床パネルの上に1階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、さらに1階壁パネルの上に2階床パネルを載せ、該床パネルと壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結するとともに、2階床パネルの上に2階壁パネルを載せ、該壁パネルと床パネルにわたり設けたドリフトピン穴にドリフトピン打ち込んで連結し、必要に応じてこれら床パネルと壁パネルの載置と連結を繰り返した後、最上階の壁パネルの上に桁を載せ、該桁と壁パネルにわたり設けたドリフトピン穴にドリフトピンを打ち込んで連結し、屋根のある棟まで建て上げることを特徴とする木質系建物の建築工法。   A first floor panel is placed on the base, and a drift pin is driven into and connected to the drift pin hole provided between the floor panel and the base, and the first floor wall panel is placed on the first floor panel. Drift pins are driven into and connected to the drift pin holes provided over the floor panel, and the second floor panel is placed on the first floor wall panel, and the drift pins are driven into the drift pin holes provided over the floor panel and the wall panel. At the same time, place the second-floor wall panel on the second-floor floor panel, drive the drift pin into the drift pin hole provided across the wall panel and the floor panel, and connect the floor panel and wall panel as necessary. After repeated installation and connection, place a girder on the wall panel on the top floor and drive the drift pin into the drift pin hole provided between the girder and the wall panel. Wood-based construction methods of the building, characterized in that it built up until the building with. 請求項1に記載の木質系建物の建築工法において、棟まで建て上げた後、縦方向に隣接する壁パネルと床パネル間、壁パネルと桁間、横方向に隣接する壁パネル同士、床パネル同士、をそれぞれ釘打ちすることを特徴とする木質系建物の建築工法。   2. The construction method of a wooden building according to claim 1, wherein after building up to the building, between the wall panels and floor panels adjacent in the vertical direction, between the wall panels and girders, between the wall panels adjacent in the horizontal direction, and the floor panels A construction method for wooden buildings, characterized by nailing each other. 請求項1又は2に記載の木質系建物の建築工法において、土台、1階床パネル、1階壁パネル、2階床パネル、2階壁パネル、必要とする数の床パネルと壁パネル、及び桁に設けられるドリフトピン穴は予め工場で加工されることを特徴とする木質系建物の建築工法。   In the construction method of the wooden building according to claim 1 or 2, the foundation, the first floor panel, the first floor panel, the second floor panel, the second floor panel, the required number of floor panels and wall panels, and A construction method for wooden buildings, characterized in that the drift pin holes provided in the girders are processed in advance at the factory. 請求項1ないし3のいずれかに記載の木質系建物の建築工法において、1階床パネルの端部を土台の上面中間部に位置するように載せることにより、その外側に第1凹所を形成するとともに、該凹所を埋めるように第1埋入部材を取り外し可能に嵌入することを特徴とする木質系建物の建築工法。   4. The construction method for a wooden building according to any one of claims 1 to 3, wherein an end of the first floor panel is placed so as to be positioned at an intermediate portion of the upper surface of the base, thereby forming a first recess on the outside thereof. In addition, a construction method for a wooden building, wherein the first embedding member is removably inserted so as to fill the recess. 請求項4に記載の木質系建物の建築工法において、2階床パネルの端部を1階壁パネルの上面中間部に位置するように載せることにより、その外側に第2凹所を形成するとともに、該凹所を埋めるように第2埋入部材を取り外し可能に嵌入することを特徴とする木質系建物の建築工法。   In the construction method of the wooden building of Claim 4, while mounting the edge part of a 2nd floor floor panel so that it may be located in the upper surface intermediate part of a 1st floor wall panel, while forming a 2nd recess in the outer side A construction method for a wooden building, wherein the second embedding member is detachably inserted so as to fill the recess. 請求項4又は5に記載の木質系建物の建築工法において、第1及び第2埋入部材がそれぞれ通気路を有し、第1埋入部材の通気路によって縦方向に隣接する土台と1階壁パネルにそれぞれ設けた通気路を連通可能とし、第2埋入部材の通気路によって第1壁パネルと2階壁パネルにそれぞれ設けた通気路を連通可能にしていることを特徴とする木質系建物の建築工法。   6. The construction method of a wooden building according to claim 4 or 5, wherein each of the first and second embedding members has an air passage, and the base and the first floor vertically adjacent to each other by the air passage of the first embedding member. A wood system characterized in that the air passages provided in the wall panels can communicate with each other, and the air passages provided in the first wall panel and the second floor wall panel can communicate with each other by the air passage of the second embedding member. Building construction method.
JP2007191573A 2007-07-24 2007-07-24 Construction method for wooden buildings Expired - Fee Related JP4994984B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007191573A JP4994984B2 (en) 2007-07-24 2007-07-24 Construction method for wooden buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007191573A JP4994984B2 (en) 2007-07-24 2007-07-24 Construction method for wooden buildings

Publications (2)

Publication Number Publication Date
JP2009024461A JP2009024461A (en) 2009-02-05
JP4994984B2 true JP4994984B2 (en) 2012-08-08

Family

ID=40396526

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007191573A Expired - Fee Related JP4994984B2 (en) 2007-07-24 2007-07-24 Construction method for wooden buildings

Country Status (1)

Country Link
JP (1) JP4994984B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5008358B2 (en) * 2006-08-10 2012-08-22 東日本旅客鉄道株式会社 Unit panel set and unit panel method

Also Published As

Publication number Publication date
JP2009024461A (en) 2009-02-05

Similar Documents

Publication Publication Date Title
KR100643075B1 (en) A modular type prefabricated building and its construction method
AU2015201461B2 (en) Construction System
JP2012241482A (en) Built-up house and method for building up the sane
JP3581426B2 (en) Structural materials and floor and roof structures of wooden buildings and construction methods using them
US20080148678A1 (en) Frames For Buildings
KR102079203B1 (en) wooden panel for prefabricated wooden buildings and wall formation method using it
US11021866B2 (en) Building and construction method for same
CN106988452A (en) A kind of and supporting industrialization EPS modular wall panel systems of assembled steel framework
WO2006095266A1 (en) Method of constructing structures using prefabricated materials
KR101213504B1 (en) Tailor-Made Type Korean House Manufacturing Method for Furniture-style Buildings and Tailor-Made Type Korean House Structure
JPH0960107A (en) Wooden frame-built-in wood frame construction two-by-four system
JP4748637B2 (en) Building unit joint structure
JP7071802B2 (en) How to adjust the seismic shelter installation structure
CN103827410B (en) Masonry building thing and the construction method of masonry building thing
JP4994984B2 (en) Construction method for wooden buildings
KR101902097B1 (en) Module type building structure
JP2006322205A (en) Wall type wooden building
JP2008223358A (en) Building construction method
RU88696U1 (en) WOODEN BAR FOR ESTABLISHING WALLS
AU2012238289B2 (en) Sandwiched panel construction and a method of manufacturing thereof
JP3943438B2 (en) building
JP4137763B2 (en) Wall panel construction method for wooden houses
JP6963247B2 (en) Bearing wall and building structure
JP6697763B2 (en) Building unit manufacturing method
JP2024131937A (en) building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100204

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120424

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120509

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150518

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4994984

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees