JP4937828B2 - Blowing method of molten steel - Google Patents

Blowing method of molten steel Download PDF

Info

Publication number
JP4937828B2
JP4937828B2 JP2007124762A JP2007124762A JP4937828B2 JP 4937828 B2 JP4937828 B2 JP 4937828B2 JP 2007124762 A JP2007124762 A JP 2007124762A JP 2007124762 A JP2007124762 A JP 2007124762A JP 4937828 B2 JP4937828 B2 JP 4937828B2
Authority
JP
Japan
Prior art keywords
cao
charge
amount
slag
blowing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007124762A
Other languages
Japanese (ja)
Other versions
JP2008280572A (en
Inventor
康介 久米
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2007124762A priority Critical patent/JP4937828B2/en
Publication of JP2008280572A publication Critical patent/JP2008280572A/en
Application granted granted Critical
Publication of JP4937828B2 publication Critical patent/JP4937828B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y02W30/54

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Description

本発明は、転炉における脱炭処理により生成されたスラグを再利用する溶鋼の吹錬方法に関する。   The present invention relates to a molten steel blowing method for reusing slag generated by decarburization processing in a converter.

転炉における溶鋼の吹錬方法として、脱炭処理により生成されたスラグを次チャージの脱燐処理に再利用することにより、鋼の純度を高めるとともに、スラグの排出量を抑制する方法がある。この脱炭スラグを再利用する方法では、転炉での溶銑予備処理後、燐濃度が高くなったスラグを1度転炉外に排出し(中間排滓)、脱珪・脱燐済みの溶銑を転炉内に残し、新たなスラグを追加し、わずかに残った燐の除去(仕上げ脱燐)及び脱炭吹錬を行う。脱炭吹錬後、溶鋼のみを出鋼し、転炉内に残った燐濃度が低いスラグを、次チャージの溶銑予備処理に再利用する。   As a method for blowing molten steel in a converter, there is a method of increasing the purity of steel and suppressing the amount of slag discharged by reusing slag produced by decarburization for dephosphorization of the next charge. In this method of reusing decarburized slag, after the hot metal pretreatment in the converter, the slag with high phosphorus concentration is discharged once out of the converter (intermediate waste), and the desiliconized and dephosphorized hot metal is removed. Is left in the converter, new slag is added, and the remaining phosphorus is removed (finish dephosphorization) and decarburized and blown. After decarburization blowing, only molten steel is produced, and slag with low phosphorus concentration remaining in the converter is reused for hot metal pretreatment for the next charge.

脱炭スラグを再利用する方法においては、脱炭吹錬時に仕上げ脱燐に必要な量のCaOを添加するが、高炉から出銑される溶銑中のSi濃度が高い場合、溶銑予備処理時に必要な塩基度を確保するためには、脱炭後のスラグ中に含まれるCaOだけでは足りず、スラグ中にCaOを新たに添加する必要が生じる。   In the method of reusing decarburized slag, the amount of CaO required for final dephosphorization is added during decarburization blowing, but it is necessary during hot metal pretreatment if the Si concentration in the hot metal discharged from the blast furnace is high In order to ensure basicity, only CaO contained in the slag after decarburization is not sufficient, and it is necessary to newly add CaO to the slag.

ところが、溶銑予備処理時に新たにCaOを添加すると、溶銑予備処理の処理時間、すなわち、脱珪・脱燐の吹錬時間が短いため、スラグ中に添加したCaOが完全に溶解せず、一部のCaOが未滓化CaOとしてスラグ中に残存してしまう。スラグ中に残存した未滓化CaOは水和反応を起こすため、スラグの体積膨張の原因となり、スラグ品質が低下する、という問題がある。   However, when CaO is newly added during the hot metal pretreatment, the treatment time of the hot metal pretreatment, that is, the blowing time of desiliconization and dephosphorization is short, so the CaO added to the slag is not completely dissolved, and some Of CaO remains in the slag as undehydrated CaO. Since the undehydrated CaO remaining in the slag causes a hydration reaction, there is a problem that the volume of the slag is expanded and the quality of the slag is lowered.

このような問題を解決するために、前回の転炉吹錬での脱炭滓を転炉内に残留させ、脱炭滓を次チャージの脱燐処理に再利用するに際し、脱炭滓中に存在する有効CaO量に応じ、転炉に装入する溶銑のSi量を調整することを特徴とする脱炭滓(以下、脱炭スラグとも称する)を再利用する転炉製鋼法が提案されている(例えば、特許文献1を参照)。この特許文献1の製鋼法は、脱燐吹錬時に、前チャージの脱炭スラグを用いる際に、新規に塊状のCaO分を添加することなく所定の塩基度となるよう、事前に、転炉に装入される溶銑を脱珪しておく、という技術である。   In order to solve such problems, the decarburized soot from the previous converter blowing is left in the converter, and the decarburized soot is reused for the dephosphorization treatment of the next charge. A converter steelmaking method for reusing a decarburization slag (hereinafter also referred to as decarburization slag) characterized by adjusting the amount of Si in the hot metal charged into the converter according to the amount of effective CaO present has been proposed. (For example, refer to Patent Document 1). In the steelmaking method of Patent Document 1, when using decharged decarburized slag at the time of dephosphorization, a converter is previously provided so that a predetermined basicity can be obtained without newly adding massive CaO. This is a technique of desiliconizing the hot metal to be charged in the steel.

特開2001−123214号公報JP 2001-123214 A

しかしながら、特許文献1の製鋼法のように、事前に溶銑を脱珪するためには、脱珪処理設備を新たに設置しなければならず、設備投資のためのコストが増大する、という問題があった。また、脱珪が行われる反応容器によっては、脱珪用の酸素源として、酸化鉄などの固体酸素分を使用する必要があり、酸化鉄などの還元熱による熱の損失が発生する、という問題もあった。   However, as in the steelmaking method of Patent Document 1, in order to desiliconize the hot metal in advance, a desiliconization treatment facility must be newly installed, which increases the cost for capital investment. there were. In addition, depending on the reaction vessel in which desiliconization is performed, it is necessary to use a solid oxygen component such as iron oxide as an oxygen source for desiliconization, and heat loss due to reduction heat such as iron oxide occurs. There was also.

そこで、本発明は、このような問題に鑑みてなされたもので、転炉における脱炭処理により生成されたスラグを再利用する溶鋼の吹錬方法において、コスト増大や熱の損失などを生じることなく、溶銑予備処理時の新たなCaO添加に伴う未滓化CaOの発生を抑制することを目的とする。   Therefore, the present invention has been made in view of such problems, and in a molten steel blowing method for reusing slag generated by decarburization processing in a converter, an increase in cost, loss of heat, and the like occur. It aims at suppressing generation | occurrence | production of the non-deoxidized CaO accompanying new CaO addition at the time of hot metal preliminary processing.

本発明者らは、上記課題を解決するために鋭意研究を重ねた結果、あるチャージの脱炭吹錬を行う際に、次チャージの溶銑のSi濃度や塩基度等の条件を考慮し、次チャージの溶銑予備処理で追加することが必要と予想されるCaOの量を求めておき、求めた量のCaOを、そのチャージの脱炭吹錬時に予め転炉に添加しておくことにより、次チャージの溶銑予備処理時に新たなCaOを添加する必要がなくなり、未滓化CaOの発生を抑制できることを見出し、この知見に基づいて本発明を完成するに至った。   As a result of intensive research in order to solve the above problems, the present inventors considered conditions such as the Si concentration and basicity of the molten iron in the next charge when performing decarburization blowing of a certain charge. By calculating the amount of CaO that is expected to be added in the hot metal pretreatment of the charge, and adding the determined amount of CaO to the converter in advance during the decarburization blowing of the charge, It has been found that it is not necessary to add new CaO during the hot metal pretreatment of the charge, and the generation of undehydrated CaO can be suppressed, and the present invention has been completed based on this finding.

すなわち、本発明がその要旨とするところは、以下の通りである。
(1) スラグの塩基度を目標塩基度となる量のCaOを装入している転炉内で、溶銑を吹錬することにより脱珪及び脱燐を行う溶銑予備処理工程と、前記溶銑予備処理工程後のスラグを前記転炉から排出する中間排滓工程と、前記転炉内にCaOを添加して吹錬することにより脱炭及び仕上げ脱燐を行う脱炭処理工程と、を順に繰り返し行い、nチャージ目の前記脱炭処理工程後のスラグを(n+1)チャージ目の前記溶銑予備処理工程に再利用する溶鋼の吹錬方法であって、前記nチャージ目の前記脱炭処理工程で添加するCaO量を、少なくとも前記(n+1)チャージ目の溶銑予備処理工程での前記目標塩基度を確保可能なCaO量とすることを特徴とする、溶鋼の吹錬方法。
(2) 前記nチャージ目の脱炭処理工程で添加するCaO量が、該nチャージ目の脱炭処理工程の仕上げ脱燐に必要なCaO量と前記(n+1)チャージ目の溶銑予備処理工程で目標塩基度を得るために必要なCaO量をいずれも満足する量であることを特徴とする、(1)に記載の溶鋼の吹錬方法。
(3) 前記nチャージ目の中間排滓工程でのスラグ排出量を、該nチャージ目の前記脱炭処理工程の仕上げ脱燐に必要なCaOの添加量と前記(n+1)チャージ目の溶銑予備処理工程で目標塩基度を得るために必要なCaOの添加量が同等となるようにすることを特徴とする、(1)または(2)に記載の溶鋼の吹錬方法。
(4) 前記nチャージ目の脱炭処理工程におけるCaOの添加量は、下記(I)式または(II)式で計算されるCaO量のうち多い方のCaO量であることを特徴とする、(1)〜(3)のいずれに記載の溶鋼の吹錬方法。
P,CaO = 1000/Lp<n>×(B2[P]i<n>/目標[P]f<n>+1)×(%CaO)B2<n>−RB1,CaO<n> ・・・(I)
Si,CaO = (HM[Si]<n+1>×60/28×10+RSiO2<n>)×(B1C/S<n+1>)−R’CaO<n> ・・・(II)
ただし、前記式(I)、(II)中の各パラメータは以下の通りである。
P,CaO ・・・nチャージ目の第4工程で、脱燐に必要なCaO量
Lp<n> ・・・nチャージ目の第4工程における推定燐分配
B2[P]i<n> ・・・nチャージ目の第4工程に持ち越される燐濃度(溶鉄中の燐濃度に換算したもの)
目標[P]f<n> ・・・nチャージ目の第4工程処理後の目標燐濃度
(%CaO)B2<n> ・・・nチャージ目の第4工程処理後のスラグ中のCaOの推定濃度
B1,CaO<n> ・・・nチャージ目の第2工程から、第3工程を経て、第4工程に持ち越されるCaO量
Si,CaO ・・・(n+1)チャージ目の第2工程で塩基度目標値を確保するために必要な、nチャージ目の第4工程で添加すべきCaO量
HM[Si]<n+1> ・・・(n+1)チャージ目で転炉に装入する溶銑中のSiの濃度
SiO2<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるSiO
B1C/S<n+1> ・・・(n+1)チャージ目の第2工程での塩基度目標値
R’CaO<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるCaO量のうち、nチャージ目の第4工程で添加する分を除いたCaO量
That is, the gist of the present invention is as follows.
(1) A hot metal preliminary treatment step in which desiliconization and dephosphorization are performed by blowing hot metal in a converter charged with CaO in an amount that makes the basicity of slag the target basicity, and the hot metal preliminary treatment An intermediate waste process for discharging the slag after the treatment process from the converter, and a decarburization process process for performing decarburization and final dephosphorization by adding CaO into the converter and blowing it are repeated in order. Performing a slag after the decarburization process at the nth charge, and reusing the slag for the hot metal pretreatment process at the (n + 1) th charge, in the decarburization process at the nth charge A method for blowing molten steel, characterized in that the amount of CaO to be added is set to a CaO amount capable of ensuring the target basicity in at least the (n + 1) charge hot metal preliminary treatment step.
(2) The amount of CaO added in the decarburization process step of the n-th charge is the amount of CaO necessary for the final dephosphorization in the decarburization process step of the n-charge and the hot metal pretreatment step of the (n + 1) -th charge The method for blowing molten steel according to (1), characterized in that it is an amount satisfying any CaO amount necessary for obtaining the target basicity.
(3) The amount of slag discharged in the intermediate discharge step of the n-th charge is determined based on the addition amount of CaO necessary for the final dephosphorization in the decarburization processing step of the n-charge and the hot metal reserve of the (n + 1) -th charge The molten steel blowing method according to (1) or (2), characterized in that the addition amount of CaO necessary for obtaining the target basicity in the treatment step is equivalent.
(4) The addition amount of CaO in the decarburization process step of the n-th charge is characterized by being the CaO amount of the larger of the CaO amounts calculated by the following formula (I) or (II): The method for blowing molten steel according to any one of (1) to (3).
W P, CaO = 1000 / Lp <n> × (B2 [P] i <n> / target [P] f <n> +1) × (% CaO) B2 <n> −R B1, CaO <n>. .. (I)
W Si, CaO = (HM [Si] <n + 1> × 60/28 × 10 + R SiO2 <n> ) × (B1C / S <n + 1>) − R′CaO <n> (II)
However, each parameter in the formulas (I) and (II) is as follows.
WP , CaO: The amount of CaO necessary for dephosphorization in the fourth step of the n-th charge Lp <n>... Estimated phosphorus distribution in the fourth step of the n-th charge B2 [P] i <n> ..Phosphorus concentration carried over to the 4th step of the n-th charge (converted to phosphorus concentration in molten iron)
Target [P] f <n> ... target phosphorus concentration after the fourth charge of the n-th charge (% CaO) B2 <n> ... CaO in the slag after the fourth charge of the n-charge Estimated concentration R B1, CaO <n> ... The amount of CaO carried over from the second step of the n-th charge to the fourth step through the third step W Si, CaO . The amount of CaO to be added in the fourth step of the n-th charge necessary to secure the basicity target value in the step HM [Si] <n + 1> (n + 1) hot metal charged into the converter at the charge point from the density R SiO2 <n> ··· n charge th Si in, at (n + 1) SiO 2 amount is recycled to the charge th B1C / S <n + 1> ··· (n + 1) charge th second step basicity target value R 'CaO <n> ··· n or charge th , (N + 1) of the amount of CaO to be recycled to the charge eyes, CaO amount excluding the amount to be added by n charge th fourth step

本発明によれば、転炉における脱炭処理により生成されたスラグを再利用する溶鋼の吹錬方法において、次チャージの溶銑のSi濃度や塩基度等の条件を考慮し、次チャージの溶銑予備処理で追加することが必要と予想されるCaOの量を求めておき、求めた量のCaOを、前のチャージの脱炭吹錬時に予め転炉に添加しておくことにより、次チャージの溶銑予備処理時に新たなCaOを添加する必要がなくなるので、未滓化CaOの発生を抑制することが可能である。したがって、本発明によれば、スラグ中の未滓化CaOの水和反応も抑制でき、スラグの品質を向上させることができる。   According to the present invention, in the molten steel blowing method for reusing the slag generated by the decarburization process in the converter, conditions such as the Si concentration and the basicity of the hot metal of the next charge are taken into account, and the hot metal reserve of the next charge is considered. The amount of CaO that is expected to be added in the process is determined, and the determined amount of CaO is added to the converter in advance during decarburization blowing of the previous charge, so that the hot metal for the next charge is added. Since it is not necessary to add new CaO during the preliminary treatment, it is possible to suppress the generation of undehydrated CaO. Therefore, according to the present invention, the hydration reaction of undehydrated CaO in the slag can also be suppressed, and the quality of the slag can be improved.

以下に添付図面を参照しながら、本発明の好適な実施の形態について詳細に説明する。なお、本明細書及び図面において、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複説明を省略する。   Exemplary embodiments of the present invention will be described below in detail with reference to the accompanying drawings. In addition, in this specification and drawing, about the component which has the substantially same function structure, duplication description is abbreviate | omitted by attaching | subjecting the same code | symbol.

まず、本発明の一実施形態に係る溶鋼の吹錬方法を説明するに先立ち、その前提となるいわゆる脱炭スラグを再利用する方法による転炉の操業方法の概要について説明する。なお、図1は、脱炭スラグを再利用する方法による転炉の操業方法の概要を示す説明図である。   First, prior to explaining a method for blowing molten steel according to an embodiment of the present invention, an outline of a method for operating a converter by a method of reusing so-called decarburized slag as a premise thereof will be described. In addition, FIG. 1 is explanatory drawing which shows the outline | summary of the operating method of the converter by the method of reusing decarburization slag.

図1に示すように、脱炭スラグを再利用する方法による転炉の操業方法では、脱硫処理を施した高炉溶銑を吹錬して溶鋼を製造する際に、以下に説明する第1工程〜第6工程を、順に繰り返し行う。以下では、着目するチャージをnチャージ目(nは、自然数)、その次のチャージを(n+1)チャージ目として説明する。   As shown in FIG. 1, in the converter operating method by the method of reusing decarburized slag, when producing molten steel by blowing blast furnace hot metal subjected to desulfurization treatment, the first step described below The sixth step is repeated in order. In the following description, it is assumed that the charge of interest is the nth charge (n is a natural number), and the next charge is the (n + 1) th charge.

第1工程(nチャージ目)では、例えば、鉄スクラップ120が装入された転炉10に、取鍋20から脱硫処理を施した溶銑110を装入する。使用される転炉10としては、現在では、上底吹き転炉が一般的である。   In the first step (n-th charge), for example, the molten iron 110 subjected to the desulfurization treatment from the ladle 20 is charged into the converter 10 in which the iron scrap 120 is charged. As the converter 10 to be used, an upper-bottom converter is generally used.

第2工程(nチャージ目)では、溶銑110が装入された転炉10内にCaO等のフラックスを添加し、低塩基度(例えば、塩基度2以下)のスラグ130を用いて低温条件(例えば、1250〜1400℃)で、上吹きランス30等から酸素または空気を吹き込みながら、短時間(例えば、3〜8分程度)で脱珪・脱燐吹錬(溶銑予備処理)を行う(Blow1)。この溶銑予備処理により、溶銑110中のSiは完全にスラグ130中に除去されるが、Pの一部は溶銑110中に残留する。   In the second step (n-th charge), a flux such as CaO is added into the converter 10 charged with the molten iron 110, and a low basicity (for example, basicity 2 or less) slag 130 is used at low temperature conditions ( For example, desiliconization / dephosphorization blowing (hot metal pretreatment) is performed in a short time (for example, about 3 to 8 minutes) while blowing oxygen or air from the top blowing lance 30 or the like at 1250 to 1400 ° C. (Blow 1 ). By this hot metal preliminary treatment, Si in the hot metal 110 is completely removed in the slag 130, but a part of P remains in the hot metal 110.

第3工程(nチャージ目)では、第2工程の溶銑予備処理により発生したスラグ130を、転炉10から、台車50に設置された排滓鍋40等に排出する(中間排滓)。このとき、溶銑110を転炉10内に残したまま、転炉10を傾動させることによりスラグ130のみを排出するため、転炉10からスラグ130を完全に排出することは困難であるが、転炉10内のスラグ130の70〜80%程度を炉外に排出することができる(以下、溶銑予備処理後のスラグ量に対する中間排滓時に排出したスラグ量の比を「排滓率(%)」という場合がある)。ここで、転炉10内に残留したスラグ130は、次の第4工程に持ち越される。   In the third step (nth charge), the slag 130 generated by the hot metal preliminary treatment in the second step is discharged from the converter 10 to the discharge pan 40 or the like installed in the cart 50 (intermediate discharge). At this time, since only the slag 130 is discharged by tilting the converter 10 while the hot metal 110 remains in the converter 10, it is difficult to completely discharge the slag 130 from the converter 10. About 70 to 80% of the slag 130 in the furnace 10 can be discharged outside the furnace (hereinafter, the ratio of the amount of slag discharged at the time of intermediate discharge to the amount of slag after the hot metal pretreatment is expressed as “rejection rate (%) ”). Here, the slag 130 remaining in the converter 10 is carried over to the next fourth step.

第4工程(nチャージ目)では、転炉10内にフラックスを新たに添加し、溶鋼110中のC濃度が所望の濃度となるように、所定の温度(例えば、1600〜1700℃)で、上吹きランス30及び底吹ノズル(図示せず)から酸素を吹き込みながら、脱炭吹錬を行う(Blow2)。この際、溶鋼110中のP濃度が所望の濃度(例えば、0.01〜0.03質量%程度)となるように、CaO等のフラックスを転炉10に添加して仕上げ脱燐(溶鋼110中に残留したわずかなPの除去)も行う。   In the fourth step (n-th charge), flux is newly added into the converter 10, and at a predetermined temperature (for example, 1600 to 1700 ° C.) so that the C concentration in the molten steel 110 becomes a desired concentration. Decarburization blowing is performed while blowing oxygen from the top blowing lance 30 and the bottom blowing nozzle (not shown) (Blow 2). At this time, a flux such as CaO is added to the converter 10 so that the P concentration in the molten steel 110 becomes a desired concentration (for example, about 0.01 to 0.03 mass%), and finish dephosphorization (molten steel 110). (Removal of a slight amount of P remaining therein).

ここで、上記第3工程で残留したスラグ130中のP分(主にPとして存在)は、脱炭吹錬中に溶鋼110に復燐する。よって、第3工程で残留するスラグ130の量を低下、すなわち、中間排滓時のスラグ130の排滓量を増加させることで、復燐するPの量が減るので、CaO等のフラックスの添加量を低減することが可能となる。ただし、第2工程の脱炭・脱燐吹錬での温度条件と比較して、第4工程の脱炭吹錬の温度条件は、脱燐に不利な高温の条件であるため、CaOを多量に添加してスラグ130の塩基度を高くする必要がある。 Here, the P content (mainly present as P 2 O 5 ) in the slag 130 remaining in the third step is restored to the molten steel 110 during decarburization blowing. Therefore, by reducing the amount of slag 130 remaining in the third step, that is, by increasing the amount of slag 130 discharged during intermediate evacuation, the amount of P to be recovered decreases, so the addition of a flux such as CaO The amount can be reduced. However, compared with the temperature condition in the decarburization / dephosphorization blowing in the second step, the temperature condition in the decarburization blowing in the fourth step is a high temperature condition unfavorable for dephosphorization. It is necessary to increase the basicity of the slag 130.

第5工程(nチャージ目)では、第4工程の脱炭吹錬で生成した脱炭スラグ130を転炉10内に残留させたまま、転炉10を傾動させることにより溶鋼110の出鋼を行う。   In the fifth step (n-th charge), the decarburized slag 130 generated by the decarburization blowing in the fourth step is left in the converter 10, and the converter 10 is tilted to remove the molten steel 110. Do.

第6工程(nチャージ目)では、第5工程で傾動させた転炉10を正立させた後に、第4工程で生成した脱炭スラグ130を転炉10内で固化させてリサイクルする。なお、スラグ130の固化の際に鉄スクラップを転炉10に装入してもよい。   In the sixth step (nth charge), after the converter 10 tilted in the fifth step is set upright, the decarburized slag 130 generated in the fourth step is solidified in the converter 10 and recycled. Note that iron scrap may be charged into the converter 10 when the slag 130 is solidified.

このようにしてスラグ130を固化させた後に、再び第1工程((n+1)チャージ目)に戻って、固化したスラグ130が残留した転炉10内に溶銑110を装入し、nチャージ目の第4工程で生成し第6工程で転炉10内で固化されたスラグ130の全量を、(n+1)チャージ目の第2工程における脱珪・脱燐用のフラックスとして再利用する。第4工程の脱炭スラグは、脱燐吹錬の条件においては更なる脱燐能を有していることから、脱燐吹錬時に使用するCaO等のフラックスの量を削減することができる。   After solidifying the slag 130 in this way, the process returns again to the first step ((n + 1) charge), and the hot metal 110 is charged into the converter 10 where the solidified slag 130 remains, and the nth charge The entire amount of slag 130 generated in the fourth step and solidified in the converter 10 in the sixth step is reused as a flux for desiliconization / dephosphorization in the second step of the (n + 1) charge. Since the decarburization slag in the fourth step has further dephosphorization ability under the dephosphorization blowing conditions, the amount of flux such as CaO used at the dephosphorization blowing can be reduced.

次に、図2〜図4に基づき、本発明の第1及び第2の実施形態に係る溶鋼の吹錬方法を説明する。なお、図2は、第3工程の中間排滓時におけるスラグ排滓率(%)と第4工程における脱炭吹錬(Blow2)時におけるCaO添加量(kg/t)との関係の一例を示すグラフであり、横軸がスラグ排滓率(%)、縦軸が脱炭吹錬時におけるCaO添加量(kg/t)を示している。また、図3は、本発明の第1の実施形態に係る溶鋼の吹錬方法のフローを示す説明図である。また、図4は、本発明の第2の実施形態に係る溶鋼の吹錬方法のフローを示す説明図である。   Next, based on FIGS. 2-4, the molten steel blowing method which concerns on the 1st and 2nd embodiment of this invention is demonstrated. In addition, FIG. 2 shows an example of the relationship between the slag rejection rate (%) during the intermediate rejection in the third step and the CaO addition amount (kg / t) during the decarburization blowing (Blow 2) in the fourth step. The horizontal axis represents the slag removal rate (%), and the vertical axis represents the CaO addition amount (kg / t) during decarburization blowing. Moreover, FIG. 3 is explanatory drawing which shows the flow of the blowing method of the molten steel which concerns on the 1st Embodiment of this invention. Moreover, FIG. 4 is explanatory drawing which shows the flow of the blowing method of the molten steel which concerns on the 2nd Embodiment of this invention.

ここで、図2における実験条件は以下のようにして行った。すなわち、nチャージ目の第4工程における目標P濃度を20×0.001質量%、同工程における吹止P濃度の分配を86、同工程における処理後のCaO濃度を47%、(n+1)チャージ目における第2工程の目標塩基度を1.4、溶銑中のSi濃度を41×0.01質量%として行った。また、第2工程から持ち越したCaO量及び第4工程で装入するP濃度は排滓率により変動し、リサイクルしたSiO量が3.7kg/t、第4工程で添加した分を除いたリサイクルしたCaO量が1kg/tであった。 Here, the experimental conditions in FIG. 2 were performed as follows. That is, the target P concentration in the fourth step of the n-th charge is 20 × 0.001 mass%, the distribution of the blow-off P concentration in the same step is 86, the CaO concentration after the processing in the same step is 47%, (n + 1) charge The target basicity of the second step in the eye was 1.4, and the Si concentration in the hot metal was 41 × 0.01 mass%. In addition, the amount of CaO carried over from the second step and the P concentration charged in the fourth step fluctuate depending on the rejection rate, and the amount of recycled SiO 2 was 3.7 kg / t, excluding the amount added in the fourth step. The amount of recycled CaO was 1 kg / t.

(第1の実施形態に係る溶鋼の吹錬方法)
上述したような脱炭スラグを再利用する方法において、脱珪や脱燐用のフラックスとして用いられるCaOは、一般的には、以下のようにして転炉に添加している。すなわち、nチャージ目の第3工程における中間排滓時のスラグの排滓率を例えば70%とすると、図2の[1]で示したプロットのように、nチャージ目の第4工程においては、仕上げ脱燐に必要な分のCaO量(約15.7kg/t)のみを添加する。このnチャージ目の第4工程で生成されたスラグは、(n+1)チャージ目の第2工程において、脱珪・脱燐用のフラックスとして再利用される。ここで、通常は、再利用されたnチャージ目の第4工程で生成された脱炭スラグのみでは、(n+1)チャージ目の第2工程における脱珪・脱燐で必要とされる塩基度に達せず、図2の[2]で示したプロットのように、(n+1)チャージ目の第2工程で必要なCaO量(約16.5kg/t)に達するように、新たにCaOを添加する必要がある。
(Method for blowing molten steel according to the first embodiment)
In the method of reusing decarburized slag as described above, CaO used as a flux for desiliconization or dephosphorization is generally added to a converter as follows. That is, assuming that the slag rejection rate during the intermediate rejection in the third process of the n charge is 70%, for example, in the fourth process of the n charge as shown in the plot of [1] in FIG. Add only the amount of CaO (about 15.7 kg / t) necessary for the final dephosphorization. The slag generated in the fourth process of the n-th charge is reused as a flux for desiliconization / dephosphorization in the second process of the (n + 1) -th charge. Here, in general, only the decarburized slag generated in the fourth process of the reused n charge has the basicity required for the desiliconization / dephosphorization in the second process of the (n + 1) charge. As shown in the plot of [2] in FIG. 2, CaO is newly added so that the amount of CaO necessary for the second step of the (n + 1) charge (about 16.5 kg / t) is reached. There is a need.

しかし、このような操業では、第2工程の脱珪・脱燐が短時間で行われるため、新たに添加したCaOがスラグ中に完全に溶解せず、未滓化CaOとしてスラグ中に残存してしまう。すると、この未滓化CaOが水和反応を起こしてスラグが体積膨張し、スラグの品質が低下してしまう。   However, in such an operation, since the desiliconization / dephosphorization in the second step is performed in a short time, the newly added CaO is not completely dissolved in the slag and remains in the slag as undehydrated CaO. End up. As a result, the undehydrated CaO undergoes a hydration reaction, and the slag expands in volume, resulting in a deterioration in the quality of the slag.

そこで、本発明の第1の実施形態に係る溶鋼の吹錬方法においては、図3に示すように、(n+1)チャージ目の溶銑中のSi濃度や目標とする塩基度等の条件を考慮し、(n+1)チャージ目の第2工程で必要となることが予想されるCaOの量を予め算出しておき、算出された量のCaOを、nチャージ目の第4工程で必要な量のCaOと併せて同時に添加している。   Therefore, in the molten steel blowing method according to the first embodiment of the present invention, as shown in FIG. 3, the conditions such as the Si concentration in the hot metal of the (n + 1) charge and the target basicity are taken into consideration. The amount of CaO expected to be required in the second step of the (n + 1) charge is calculated in advance, and the calculated amount of CaO is converted into the amount of CaO required in the fourth step of the n charge. Are added at the same time.

ここで、CaO量の算出方法の具体例について説明する。本実施形態に係る溶鋼の吹錬方法においては、例えば、nチャージ目の第4工程におけるCaOの添加量は、下記(I)式または(II)式で計算されるCaO量のうち多い方のCaO量とすることができる。
P,CaO = 1000/Lp<n>×(B2[P]i<n>/目標[P]f<n>+1)×(%CaO)B2<n>−RB1,CaO<n> ・・・(I)
Si,CaO = (HM[Si]<n+1>×60/28×10+RSiO2<n>)×(B1C/S<n+1>)−R’CaO<n> ・・・(II)
Here, a specific example of a method for calculating the CaO amount will be described. In the molten steel blowing method according to the present embodiment, for example, the addition amount of CaO in the fourth step of the n-th charge is the larger of the CaO amounts calculated by the following formula (I) or (II): It can be the amount of CaO.
W P, CaO = 1000 / Lp <n> × (B2 [P] i <n> / target [P] f <n> +1) × (% CaO) B2 <n> −R B1, CaO <n>. .. (I)
W Si, CaO = (HM [Si] <n + 1> × 60/28 × 10 + R SiO2 <n> ) × (B1C / S <n + 1>) − R′CaO <n> (II)

ここで、上記式(I)、(II)中の各パラメータの意味は以下の通りである。
P,CaO ・・・nチャージ目の第4工程で、脱燐に必要なCaO量
Lp<n> ・・・nチャージ目の第4工程における推定燐分配
B2[P]i<n> ・・・nチャージ目の第4工程に持ち越される燐濃度(溶鉄中の燐濃度に換算したもの)
目標[P]f<n> ・・・nチャージ目の第4工程処理後の目標燐濃度
(%CaO)B2<n> ・・・nチャージ目の第4工程処理後のスラグ中のCaOの推定濃度
B1,CaO<n> ・・・nチャージ目の第2工程から、第3工程を経て、第4工程に持ち越されるCaO量
Si,CaO ・・・(n+1)チャージ目の第2工程で塩基度目標値を確保するために必要な、nチャージ目の第4工程で添加すべきCaO量
HM[Si]<n+1> ・・・(n+1)チャージ目で転炉に装入する溶銑中のSiの濃度
SiO2<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるSiO
B1C/S<n+1> ・・・(n+1)チャージ目の第2工程での塩基度目標値
R’CaO<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるCaO量のうち、nチャージ目の第4工程で添加する分を除いたCaO量
Here, the meaning of each parameter in the above formulas (I) and (II) is as follows.
WP , CaO: The amount of CaO necessary for dephosphorization in the fourth step of the n-th charge Lp <n>... Estimated phosphorus distribution in the fourth step of the n-th charge B2 [P] i <n> ..Phosphorus concentration carried over to the 4th step of the n-th charge (converted to phosphorus concentration in molten iron)
Target [P] f <n> ... target phosphorus concentration after the fourth charge of the n-th charge (% CaO) B2 <n> ... CaO in the slag after the fourth charge of the n-charge Estimated concentration R B1, CaO <n> ... The amount of CaO carried over from the second step of the n-th charge to the fourth step through the third step W Si, CaO . The amount of CaO to be added in the fourth step of the n-th charge necessary to secure the basicity target value in the step HM [Si] <n + 1> (n + 1) hot metal charged into the converter at the charge point from the density R SiO2 <n> ··· n charge th Si in, at (n + 1) SiO 2 amount is recycled to the charge th B1C / S <n + 1> ··· (n + 1) charge th second step basicity target value R 'CaO <n> ··· n or charge th , (N + 1) of the amount of CaO to be recycled to the charge eyes, CaO amount excluding the amount to be added by n charge th fourth step

図2の例では、排滓率が70%であるので、nチャージ目の第4工程に先立って[2]のCaO量を添加することになる。これにより、nチャージ目の第4工程と(n+1)チャージ目の第2工程で転炉内に装入されるCaOの合計量を変化させることなく、(n+1)チャージ目の第2工程では新たにCaOを添加しないようにすることができる。すなわち、本実施形態に係る溶鋼の吹錬方法では、nチャージ目の第4工程における脱炭吹錬では、該脱炭吹錬で生成されたスラグ中に含まれるCaO量が(n+1)チャージ目の第2工程における溶銑予備処理工程で使用するCaO量を確保可能なように、CaOの添加量を予め決定しておき、決定された量のCaOをnチャージ目の第4工程で添加する点が従来と大きく異なる点である。   In the example of FIG. 2, since the rejection rate is 70%, the CaO amount [2] is added prior to the fourth step of the n-th charge. Thus, the total amount of CaO charged in the converter is not changed in the fourth step of the nth charge and the second step of the (n + 1) th charge, and the second step of the (n + 1) th charge is newly changed. It is possible to prevent CaO from being added. That is, in the molten steel blowing method according to the present embodiment, in the decarburization blowing in the fourth step of the nth charge, the amount of CaO contained in the slag generated by the decarburization blowing is the (n + 1) th charge. The addition amount of CaO is determined in advance so that the amount of CaO used in the hot metal preliminary treatment step in the second step can be secured, and the determined amount of CaO is added in the fourth step of the n charge. There is a big difference from the conventional method.

次に、図3に基づいて、本実施形態に係る溶鋼の吹錬方法について、より具体的に説明する。まず、具体的な説明をする前に、図3で用いられている略号について説明する。「BI」、「BII」は、Blow1(脱珪・脱燐吹錬)、Blow2(脱炭吹錬)のことを意味する。「W1CaO」「W2CaO」は、それぞれ、Blow1(脱珪・脱燐吹錬)で添加されるCaO量、Blow2(脱炭吹錬)で添加されるCaO量を示す。HM[Si]は溶銑中のSi濃度を指し、C/Sは塩基度(CaO/SiO)を指し、[P]fは吹錬終了時における溶鋼中のP濃度の目標値を指す。また、〈1〉、〈2〉等は、1チャージ目、2チャージ目等であることを示す。 Next, the molten steel blowing method according to the present embodiment will be described more specifically based on FIG. First, the abbreviations used in FIG. 3 will be described before a specific description. “BI” and “BII” mean Blow 1 (desiliconization / dephosphorization blowing) and Blow 2 (decarburization blowing). “W1CaO” and “W2CaO” indicate the amount of CaO added by Blow 1 (desiliconization / dephosphorization blowing) and the amount of CaO added by Blow 2 (decarburization blowing), respectively. HM [Si] indicates the Si concentration in the hot metal, C / S indicates the basicity (CaO / SiO 2 ), and [P] f indicates the target value of the P concentration in the molten steel at the end of blowing. <1>, <2>, etc. indicate the first charge, the second charge, and the like.

1チャージ目の脱珪・脱燐吹錬(BI)を開始する際には、1チャージ目の脱珪・脱燐吹錬に必要な量のCaOが添加するアクションがなされる(W1CaO〈1〉)。この脱珪・脱燐吹錬の結果、その実績が判明情報として得られ、また、この時点で2チャージ目の高炉溶銑中のSi濃度(HM[Si]〈2〉)も判明情報として得られていることから、これらの情報と、2チャージ目の脱珪・脱燐吹錬で目標とするスラグの塩基度(BI C/S〈2〉)の情報等から、2チャージ目の脱珪・脱燐吹錬で必要なCaO量も含めた1チャージ目の脱炭吹錬で添加するCaOの量(次ch必要W2CaO〈1〉)を算出する。この計算は、ともに中間排滓の前に行われる。   When desiliconization / dephosphorization blowing (BI) of the first charge is started, an action of adding an amount of CaO necessary for desiliconization / dephosphorization blowing of the first charge is performed (W1CaO <1>). ). As a result of this desiliconization and dephosphorization, the actual results are obtained as clarified information, and at this point, the Si concentration (HM [Si] <2>) in the second charge blast furnace hot metal is also obtained as clarified information. Therefore, based on this information and information on the basicity of slag (BIC / S <2>) targeted for desiliconization and dephosphorization blowing at the second charge, etc. The amount of CaO to be added in the first charge decarburization blowing including the amount of CaO required in the dephosphorization blowing (next channel required W2CaO <1>) is calculated. Both of these calculations are performed before intermediate rejection.

次に、1チャージ目の中間排滓が行われる。この中間排滓により、1チャージ目の排滓率(排滓率〈1〉)の情報が判明する。   Next, the intermediate charge of the first charge is performed. By this intermediate rejection, information on the rejection rate (rejection rate <1>) of the first charge is found.

中間排滓終了後、脱炭吹錬(BII)が開始されるが、このとき添加されるCaO量は、上述したようにして算出された次ch必要W2CaO〈1〉と、脱炭吹錬終了時のP濃度の目標値や吹止温度の目標値等から算出することができる。脱炭吹錬での脱燐を担保するために必要なCaO量(当該ch必要W2CaO<1>)との比較により、決定することができる。脱炭吹錬(BII)終了後、生成された脱炭スラグは炉内でリサイクルされる。その際に、2チャージ目の脱珪・脱燐に再利用するスラグ量(リサイクル量)及びそのスラグの成分の情報が判明する。   Decarburization blowing (BII) is started after the end of the intermediate waste, and the amount of CaO added at this time is the next channel required W2CaO <1> calculated as described above and the end of decarburization blowing. It can be calculated from the target value of the P concentration at the time, the target value of the blow-off temperature, and the like. It can be determined by comparison with the amount of CaO necessary to ensure dephosphorization in decarburization blowing (the ch required W2CaO <1>). After the decarburization blowing (BII) is completed, the generated decarburized slag is recycled in the furnace. At that time, information on the amount of slag (recycled amount) to be reused for desiliconization / dephosphorization at the second charge and the components of the slag are found.

次いで、この1チャージ目の脱炭スラグを再利用して、2チャージ目の脱珪・脱燐吹錬(BI)が開始される。このときに必要なCaOは、すでに、1チャージ目の脱炭吹錬の際に添加されているので、2チャージ目の脱珪・脱燐吹錬時に添加するCaO量(W1CaO〈2〉)をゼロとすることができる。また、この時点で、2チャージ目の脱珪・脱燐吹錬の実績、3チャージ目の高炉溶銑中のSi濃度(HM[Si]〈3〉)、及び3チャージ目の脱珪・脱燐吹錬目標とするスラグの塩基度(BI C/S〈3〉)の情報等から、3チャージ目の脱珪・脱燐吹錬で必要なCaO量も含めた2チャージ目の脱炭吹錬で添加するCaOの量(次ch必要W2CaO〈2〉)を算出することは1チャージ目の場合と同様である。このようにして、脱珪・脱燐処理〜リサイクルまでの工程を繰り返すことにより、未滓化CaOの発生を抑制しつつ、スラグを有効利用することができる。   Next, decarburization slag of the first charge is reused, and desiliconization / dephosphorization blowing (BI) of the second charge is started. Since the CaO necessary at this time has already been added during the decarburization blowing of the first charge, the amount of CaO (W1CaO <2>) added during the desiliconization / dephosphorization blowing of the second charge Can be zero. At this time, the results of desiliconization / dephosphorization blowing at the second charge, Si concentration (HM [Si] <3>) in the blast furnace hot metal at the third charge, and desiliconization / dephosphorization at the third charge Decarburization blowing of the second charge including the amount of CaO required for desiliconization and dephosphorization blowing of the third charge from information such as basicity of slag (BIC / S <3>) Calculating the amount of CaO to be added at (the next channel required W2CaO <2>) is the same as in the first charge. In this way, by repeating the steps from desiliconization / dephosphorization treatment to recycling, it is possible to effectively utilize slag while suppressing the generation of undehydrated CaO.

なお、本実施形態に係る溶鋼の吹錬方法においては、中間排滓時のスラグ排滓量を調整する際に、排滓鍋40を載量する台車50に秤量器を設けて、スラグの排出量の秤量を行ってその実績値を利用することで、中間排滓したスラグの未滓化CaOの発生抑制の精度をさらに向上させることができる。   In the molten steel blowing method according to the present embodiment, when adjusting the amount of slag discharged at the time of intermediate discharge, a weighing machine is provided on the carriage 50 on which the discharge pan 40 is loaded, and slag discharge is performed. By measuring the amount and using the actual value, it is possible to further improve the accuracy of suppressing the generation of unfogged CaO in the intermediate slag.

このように、従来とは異なり、長時間を要する第4工程の脱炭吹錬時からCaOを添加しておくことにより、転炉に添加されたCaOを完全にスラグ中に溶解させることができ、(n+1)チャージ目の第2工程時には、スラグ中に完全に溶解したCaOを用いて脱珪・脱燐処理を行うことができ、未滓化CaOの発生を抑制することができる。   Thus, unlike the conventional case, CaO added to the converter can be completely dissolved in the slag by adding CaO from the time of decarburization blowing in the fourth step, which takes a long time. In the second step of the (n + 1) th charge, the desiliconization / dephosphorization treatment can be performed using CaO completely dissolved in the slag, and the generation of undenitrated CaO can be suppressed.

(第2の実施形態に係る溶鋼の吹錬方法)
ただし、上記のような操業は、(n+1)チャージ目の第2工程で新たにCaOを添加する必要がなく、未滓化CaOの発生を抑制できる点では優れているが、nチャージ目の第4工程で添加されるCaOの量は、該第4工程における脱燐処理に対しては、過剰に添加されていることとなり、過脱燐が起こる可能性もある。
(Method for blowing molten steel according to the second embodiment)
However, the operation as described above is excellent in that it is not necessary to newly add CaO in the second step of the (n + 1) th charge and the generation of undeoxidized CaO can be suppressed. The amount of CaO added in the four steps is excessively added to the dephosphorization treatment in the fourth step, and excessive dephosphorization may occur.

そこで、本発明の第2の実施形態に係る溶鋼の吹錬方法においては、(n+1)チャージ目の第2工程における溶銑予備処理(脱珪・脱燐)に必要なCaO量とnチャージ目の第4工程における仕上げ脱燐に必要なCaO量とが等しくなるように、nチャージ目の第3工程における中間排滓のスラグ排滓率を決定している。図2の例では、同図の[3]に示すように、nチャージ目の第3工程における中間排滓のスラグ排滓率を、(n+1)チャージ目の第2工程における脱珪・脱燐に必要なCaO量とnチャージ目の第4工程における脱燐に必要なCaO量とが一致する条件を満たすスラグ排滓率である55%としている。これにより、nチャージ目の第4工程においても仕上げ脱燐に必要なCaO量と一致するので、過脱燐が起こることもない。   Therefore, in the molten steel blowing method according to the second embodiment of the present invention, the amount of CaO required for the hot metal pretreatment (desiliconization / dephosphorization) in the second step of (n + 1) charge and the nth charge. The slag rejection rate of the intermediate rejection in the third step of the n-th charge is determined so that the amount of CaO necessary for the final dephosphorization in the fourth step becomes equal. In the example of FIG. 2, as shown in [3] of FIG. 2, the slag rejection rate of the intermediate rejection in the third step of the n-th charge is the desiliconization / dephosphorization rate in the second step of the (n + 1) -th charge. The slag rejection rate that satisfies the condition that the amount of CaO necessary for the dephosphorization and the amount of CaO necessary for dephosphorization in the fourth step of the n-th charge is 55%. Thereby, even in the fourth step of the n-th charge, the amount of CaO required for the final dephosphorization coincides, so that no excessive dephosphorization occurs.

また、このように、中間排滓のスラグ排滓率を決定することで、通常は、上述した第1の実施形態の場合よりも排滓率が低下する、すなわち、スラグの排出量が少なくなるため、第3工程における中間排滓時間も大きく短縮することができる。すなわち、本実施形態に係る溶鋼の吹錬方法によれば、nチャージ目の第4工程と(n+1)チャージ目の第2工程で転炉内に装入されるCaOの合計量を変化させることなく、未滓化CaOの発生を抑制しつつ、さらに、排滓率の低下により、中間排滓時間も大きく短縮することができる。   Further, by determining the slag evacuation rate of the intermediate evacuation in this manner, the evacuation rate is usually lower than that in the case of the first embodiment described above, that is, the slag discharge amount is reduced. Therefore, the intermediate elimination time in the third step can also be greatly shortened. That is, according to the molten steel blowing method according to the present embodiment, changing the total amount of CaO charged into the converter in the fourth step of the n charge and the second step of the (n + 1) charge. In addition, while suppressing the generation of undehydrated CaO, the intermediate evacuation time can be greatly shortened due to the decrease in the evacuation rate.

ここで、図5に基づいて、上述した第1の実施形態に係る溶鋼の吹錬方法による場合と、本実施形態に係る溶鋼の吹錬方法による場合との中間排滓時における排滓時間を比較した結果について説明する。なお、図5は、中間排滓時におけるスラグ排滓量(ton)とスラグ排滓時間(分)との関係の一例を示すグラフであり、縦軸がスラグ排滓量(ton)、横軸がスラグ排滓時間(分)を示している。なお、図5においては、第2工程での炉内スラグ量は約17t/チャージであった。   Here, based on FIG. 5, the waste time at the time of intermediate waste between the case of the molten steel blowing method according to the first embodiment and the case of the molten steel blow method according to the present embodiment. The comparison result will be described. FIG. 5 is a graph showing an example of the relationship between the slag evacuation amount (ton) and the slag evacuation time (min) at the time of intermediate evacuation, and the vertical axis represents the slag evacuation amount (ton) and the horizontal axis Indicates the slag evacuation time (minutes). In FIG. 5, the amount of slag in the furnace in the second step was about 17 t / charge.

図5においては、●が第1実施形態の場合を示し、▲が本実施形態の場合を示しているが、これからわかるように、(n+1)チャージ目の第2工程における脱珪・脱燐に必要なCaO量とnチャージ目の第4工程における脱燐に必要なCaO量とが一致するように、nチャージ目の第3工程における中間排滓のスラグ排滓率を決定することにより、スラグ排滓時間が約4分から約1分30秒へと大きく短縮されていることがわかる。   In FIG. 5, ● represents the case of the first embodiment, and ▲ represents the case of the present embodiment. As can be seen, the desiliconization / dephosphorization in the second step of the (n + 1) charge is shown. By determining the slag rejection rate of the intermediate rejection in the third step of the n charge so that the required CaO amount and the CaO amount necessary for dephosphorization in the fourth step of the n charge coincide with each other. It can be seen that the excretion time is greatly reduced from about 4 minutes to about 1 minute 30 seconds.

次に、図4に基づいて、本実施形態に係る溶鋼の吹錬方法について、より具体的に説明する。図4で用いられている略号は、上記図3で用いられているものと同様である。   Next, the molten steel blowing method according to the present embodiment will be described more specifically based on FIG. The abbreviations used in FIG. 4 are the same as those used in FIG.

1チャージ目の脱珪・脱燐吹錬(BI)を開始する際には、1チャージ目の脱珪・脱燐吹錬に必要な量のCaOが添加するアクションがなされる(W1CaO〈1〉)。この脱珪・脱燐吹錬の結果、その実績が判明情報として得られ、また、この時点で2チャージ目の高炉溶銑中のSi濃度(HM[Si]〈2〉)も判明情報として得られていることから、これらの情報と、2チャージ目の脱珪・脱燐吹錬で目標とするスラグ塩基度(BI C/S〈2〉)の情報等から、2チャージ目の脱珪・脱燐吹錬で必要なCaO量も含めた1チャージ目の脱炭吹錬で添加するCaOの量(次ch必要W2CaO〈1〉)を算出する。この計算とともに、1チャージ目の溶鋼中のP濃度の目標値([P]f〈1〉)と1チャージ目の吹き止め温度目標等の情報から、1チャージ目の中間排滓において排滓すべき排滓量(必要排滓量〈1〉)を算出しておく。この必要排滓量〈1〉は、2チャージ目の脱珪・脱燐に必要なCaO量と1チャージ目の脱炭吹錬時の脱燐に必要なCaO量とが一致するような条件を満たすように算出される。これらの計算は、ともに中間排滓の前に行われる。   When desiliconization / dephosphorization blowing (BI) of the first charge is started, an action of adding an amount of CaO necessary for desiliconization / dephosphorization blowing of the first charge is performed (W1CaO <1>). ). As a result of this desiliconization and dephosphorization, the actual results are obtained as clarified information, and at this point, the Si concentration (HM [Si] <2>) in the second charge blast furnace hot metal is also obtained as clarified information. Therefore, based on this information and information on the target slag basicity (BIC / S <2>) for desiliconization / dephosphorization blowing at the second charge, etc. The amount of CaO to be added in the first charge decarburization blowing including the amount of CaO required in phosphorus blowing (next channel required W2CaO <1>) is calculated. Along with this calculation, from the information such as the target value of P concentration in the molten steel of the first charge ([P] f <1>) and the blowout temperature target of the first charge, it is eliminated in the intermediate rejection of the first charge. The power removal amount (necessary waste amount <1>) is calculated. This required amount of waste <1> is such that the amount of CaO required for desiliconization / dephosphorization of the second charge and the amount of CaO required for dephosphorization during decarburization blowing of the first charge are the same. Calculated to satisfy. Both of these calculations are performed before intermediate exclusion.

次に、1チャージ目の中間排滓が行われる。このときの排滓量(排滓量〈1〉)は、上記のようにして算出された必要排滓量〈1〉と一致するように調整される。この中間排滓により、1チャージ目の排滓率(排滓率〈1〉)の情報が判明する。   Next, the intermediate charge of the first charge is performed. The amount of waste (the amount of waste <1>) at this time is adjusted to match the required amount of waste <1> calculated as described above. By this intermediate rejection, information on the rejection rate (rejection rate <1>) of the first charge is found.

中間排滓終了後、脱炭吹錬(BII)が開始されるが、このとき添加されるCaO量(W2CaO〈1〉)は、上述したようにして算出された次ch必要W2CaO〈1〉に基づいて決定される。脱炭吹錬(BII)終了後、2チャージ目の脱珪・脱燐に再利用するスラグ量(リサイクル量)及びそのスラグの成分の情報が判明する。   After completion of the intermediate waste, decarburization blowing (BII) is started, but the amount of CaO added at this time (W2CaO <1>) is the next ch required W2CaO <1> calculated as described above. To be determined. After completion of decarburization blowing (BII), information on the amount of slag (recycled amount) to be reused for desiliconization / dephosphorization of the second charge and the components of the slag are revealed.

次いで、この1チャージ目の脱炭スラグを再利用して、2チャージ目の脱珪・脱燐吹錬(BI)が開始される。このときに必要なCaOは、すでに、1チャージ目の脱炭吹錬の際に添加されているので、2チャージ目の脱珪・脱燐吹錬時に添加するCaO量(W1CaO〈2〉)をゼロとすることができる。また、この時点で、2チャージ目の脱珪・脱燐吹錬の実績、3チャージ目の高炉溶銑中のSi濃度(HM[Si]〈3〉)、及び3チャージ目の脱珪・脱燐吹錬で目標とするスラグの塩基度(BI C/S〈3〉)の情報等から、3チャージ目の脱珪・脱燐吹錬で必要なCaO量も含めた2チャージ目の脱炭吹錬で添加するCaOの量(次ch必要W2CaO〈2〉)を算出することは1チャージ目の場合と同様である。このようにして、脱珪・脱燐処理〜スラグ固化までの工程を繰り返すことにより、未滓化CaOの発生を抑制しつつ、スラグを有効利用することができる。   Next, decarburization slag of the first charge is reused, and desiliconization / dephosphorization blowing (BI) of the second charge is started. Since the CaO necessary at this time has already been added during the decarburization blowing of the first charge, the amount of CaO (W1CaO <2>) added during the desiliconization / dephosphorization blowing of the second charge Can be zero. At this time, the results of desiliconization / dephosphorization blowing at the second charge, Si concentration (HM [Si] <3>) in the blast furnace hot metal at the third charge, and desiliconization / dephosphorization at the third charge Decarburization blowing for the second charge including the amount of CaO required for desiliconization and dephosphorization blowing for the third charge based on information on the basicity of slag (BIC / S <3>) that is the target for blowing. Calculating the amount of CaO added by smelting (next channel required W2CaO <2>) is the same as in the first charge. In this way, by repeating the steps from desiliconization / dephosphorization treatment to slag solidification, slag can be effectively used while suppressing the generation of undehydrated CaO.

なお、本実施形態に係る溶鋼の吹錬方法においては、中間排滓時のスラグ排滓量を調整する際に、スラグの排出量のその場秤量を利用することで、未滓化CaOの発生抑制の精度をさらに向上させることができる点については、上述した第1の実施形態の場合と同様である。   In addition, in the molten steel blowing method according to the present embodiment, when adjusting the amount of slag discharged at the time of intermediate discharge, by using the in-situ weighing of the amount of discharged slag, the generation of un-enriched CaO About the point which can further improve the precision of suppression, it is the same as that of the case of 1st Embodiment mentioned above.

次に、図6に基づいて、本実施形態に係る溶鋼の吹錬方法が奏する効果について説明する。なお、図6は、脱珪・脱燐吹錬時に新たなCaOの添加の有無による当該吹錬後のスラグ中の未滓化CaO分の含有率(%)の例を示すグラフであり、縦軸に未滓化CaO分の含有率(%)をとり、横軸に塩基度(CaO/SiO)をとってこれらの関係を調べたものである。 Next, the effect which the molten steel blowing method which concerns on this embodiment has based on FIG. 6 is demonstrated. In addition, FIG. 6 is a graph showing an example of the content (%) of undehydrated CaO content in the slag after blowing depending on whether or not new CaO is added during desiliconization / dephosphorization blowing. The relationship is examined by taking the content (%) of the unhatched CaO content on the axis and the basicity (CaO / SiO 2 ) on the horizontal axis.

一般に、スラグを路盤材として使用する場合には、スラグの膨張率が2.5%以下であることが必要とされるが、2.5%以下の膨張率を確保するためには、スラグ中の未滓化CaO分は1%程度であることが必要であるとされている。これに対して、図6に示すように、脱珪・脱燐吹錬時で通常必要条件とされる1.0〜2.0の塩基度の範囲内のおいては、脱珪・脱燐吹錬時に新たなCaOの添加が無い場合に関しては、いずれも未滓化CaO分が1%未満となり、路盤材として使用することができるほどスラグの品質が優れることがわかった。一方、脱珪・脱燐吹錬時に新たなCaOの添加が有る場合に関しては、ほとんどの場合において、スラグ中の未滓化CaO分が1%を超えており、スラグの品質が低下することがわかった。これらの結果から、脱珪・脱燐吹錬時に、新たにCaOを添加しないようにすることで、脱燐スラグ中の未滓化CaOを低減することができ、これにより、スラグの品質を向上させることができることが示唆された。   In general, when slag is used as a roadbed material, the expansion rate of slag is required to be 2.5% or less. In order to secure an expansion rate of 2.5% or less, It is said that it is necessary that the non-catalyzed CaO content is about 1%. On the other hand, as shown in FIG. 6, in the range of 1.0 to 2.0 basicity, which is usually a necessary condition at the time of desiliconization / dephosphorization, desiliconization / dephosphorization is performed. In the case where no new CaO was added at the time of blowing, it was found that in all cases, the undehydrated CaO content was less than 1%, and the slag quality was excellent enough to be used as a roadbed material. On the other hand, when there is a new addition of CaO at the time of desiliconization / dephosphorization, in most cases, the undehydrated CaO content in the slag exceeds 1%, and the quality of the slag may deteriorate. all right. From these results, it is possible to reduce the undehydrated CaO in the dephosphorized slag by not adding new CaO during desiliconization and dephosphorization blowing, thereby improving the quality of the slag. It was suggested that it can be made.

下記の表1に示す操業条件で、nチャージ目の第3工程における排滓率及び第4工程における添加CaO量を変化させて、排滓スラグ中の未溶解CaOの量を調べた。その結果を表1に示す。なお、必要CaO量は、上述した式(I)、(II)で算出した量のうち多い方の値を採用して、nチャージ目の第4工程におけるCaOの添加量とした。   Under the operating conditions shown in Table 1 below, the amount of undissolved CaO in the waste slag was examined by changing the rejection rate in the third step of the n-th charge and the amount of added CaO in the fourth step. The results are shown in Table 1. The necessary CaO amount was determined as the amount of CaO added in the fourth step of the n-th charge by adopting the larger value of the amounts calculated by the above formulas (I) and (II).

Figure 0004937828
Figure 0004937828

表1に示すように、本発明例1〜4については、(n+1)チャージ目の排滓スラグ中の未溶解CaOを0.5質量%以下にすることができた。   As shown in Table 1, about the present invention examples 1-4, undissolved CaO in the waste slag of the (n + 1) charge was able to be 0.5 mass% or less.

以上、添付図面を参照しながら本発明の好適な実施形態について説明したが、本発明はかかる例に限定されないことは言うまでもない。当業者であれば、特許請求の範囲に記載された範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although preferred embodiment of this invention was described referring an accompanying drawing, it cannot be overemphasized that this invention is not limited to this example. It will be apparent to those skilled in the art that various changes and modifications can be made within the scope of the claims, and these are naturally within the technical scope of the present invention. Understood.

脱炭スラグを再利用する方法による転炉の操業方法の概要を示す説明図である。It is explanatory drawing which shows the outline | summary of the operating method of the converter by the method of reusing decarburization slag. 中間排滓時におけるスラグ排滓率(%)と脱炭吹錬時におけるCaO添加量(kg/t)との関係の一例を示すグラフである。It is a graph which shows an example of the relationship between the slag rejection rate (%) at the time of intermediate rejection, and the CaO addition amount (kg / t) at the time of decarburization blowing. 本発明の第1の実施形態に係る溶鋼の吹錬方法のフローを示す説明図である。It is explanatory drawing which shows the flow of the blowing method of the molten steel which concerns on the 1st Embodiment of this invention. 本発明の第2の実施形態に係る溶鋼の吹錬方法のフローを示す説明図である。It is explanatory drawing which shows the flow of the blowing method of the molten steel which concerns on the 2nd Embodiment of this invention. 中間排滓時におけるスラグ排滓量(ton)とスラグ排滓時間(分)との関係の一例を示すグラフである。It is a graph which shows an example of the relationship between the amount of slag evacuation (ton) at the time of an intermediate evacuation, and slag evacuation time (minutes). 脱珪・脱燐吹錬時に新たなCaOの添加の有無による当該吹錬後のスラグ中の未滓化CaO分の含有率(%)の例を示すグラフである。It is a graph which shows the example of the content rate (%) of the non-catalyzed CaO content in the slag after the said blowing by the presence or absence of addition of new CaO at the time of desiliconization and dephosphorization blowing.

符号の説明Explanation of symbols

10 転炉
20 取鍋
30 上吹きランス
40 排滓鍋
50 台車
110 溶銑(溶鋼)
130 スラグ
DESCRIPTION OF SYMBOLS 10 Converter 20 Ladle 30 Top blowing lance 40 Waste ladle 50 Carriage 110 Hot metal (molten steel)
130 slug

Claims (4)

スラグの塩基度を目標塩基度となる量のCaOを装入している転炉内で、溶銑を吹錬することにより脱珪及び脱燐を行う溶銑予備処理工程と、前記溶銑予備処理工程後のスラグを前記転炉から排出する中間排滓工程と、前記転炉内にCaOを添加して吹錬することにより脱炭及び仕上げ脱燐を行う脱炭処理工程と、を順に繰り返し行い、nチャージ目の前記脱炭処理工程後のスラグを(n+1)チャージ目の前記溶銑予備処理工程に再利用する溶鋼の吹錬方法であって、
前記nチャージ目の前記脱炭処理工程で添加するCaO量を、少なくとも前記(n+1)チャージ目の溶銑予備処理工程での前記目標塩基度を確保可能なCaO量とすることを特徴とする、溶鋼の吹錬方法。
A hot metal preliminary treatment step in which desiliconization and dephosphorization are carried out by blowing hot metal in a converter charged with CaO in an amount that makes the basicity of slag the target basicity, and after the hot metal preliminary treatment step An intermediate waste discharging process for discharging the slag from the converter, and a decarburizing treatment process for performing decarburization and final dephosphorization by adding CaO to the converter and blowing it, are repeated in order, n A slag after the decarburization treatment step of the charge is a molten steel blowing method for reusing the slag in the hot metal pretreatment step of the (n + 1) charge,
The amount of CaO added in the decarburization process step of the n charge is set to a CaO amount that can secure at least the target basicity in the hot metal pretreatment step of the (n + 1) charge. Blowing method.
前記nチャージ目の脱炭処理工程で添加するCaO量が、該nチャージ目の脱炭処理工程の仕上げ脱燐に必要なCaO量と前記(n+1)チャージ目の溶銑予備処理工程で目標塩基度を得るために必要なCaO量をいずれも満足する量であることを特徴とする、請求項1に記載の溶鋼の吹錬方法。   The amount of CaO added in the n-th charge decarburization treatment step is the amount of CaO necessary for the final dephosphorization in the n-th charge decarburization treatment step and the target basicity in the (n + 1) charge hot metal pretreatment step. The molten steel blowing method according to claim 1, wherein the amount of CaO required to obtain a sufficient amount is sufficient. 前記nチャージ目の中間排滓工程でのスラグ排出量を、該nチャージ目の前記脱炭処理工程の仕上げ脱燐に必要なCaOの添加量と前記(n+1)チャージ目の溶銑予備処理工程で目標塩基度を得るために必要なCaOの添加量が同等となるようにすることを特徴とする、請求項1または2に記載の溶鋼の吹錬方法。   The amount of slag discharged in the intermediate discharge step of the n-th charge is determined by the addition amount of CaO necessary for the final dephosphorization in the decarburization step of the n-charge and the hot metal pretreatment step of the (n + 1) -th charge. The method for blown molten steel according to claim 1 or 2, wherein the addition amount of CaO necessary for obtaining the target basicity is made equal. 前記nチャージ目の脱炭処理工程におけるCaOの添加量は、下記(I)式または(II)式で計算されるCaO量のうち多い方のCaO量であることを特徴とする、請求項1〜3のいずれか1項に記載の溶鋼の吹錬方法。
P,CaO = 1000/Lp<n>×(B2[P]i<n>/目標[P]f<n>+1)×(%CaO)B2<n>−RB1,CaO<n> ・・・(I)
Si,CaO = (HM[Si]<n+1>×60/28×10+RSiO2<n>)×(B1C/S<n+1>)−R’CaO<n> ・・・(II)
ただし、前記式(I)、(II)中の各パラメータは以下の通りである。
P,CaO ・・・nチャージ目の第4工程で、脱燐に必要なCaO量
Lp<n> ・・・nチャージ目の第4工程における推定燐分配
B2[P]i<n> ・・・nチャージ目の第4工程に持ち越される燐濃度(溶鉄中の燐濃度に換算したもの)
目標[P]f<n> ・・・nチャージ目の第4工程処理後の目標燐濃度
(%CaO)B2<n> ・・・nチャージ目の第4工程処理後のスラグ中のCaOの推定濃度
B1,CaO<n> ・・・nチャージ目の第2工程から、第3工程を経て、第4工程に持ち越されるCaO量
Si,CaO ・・・(n+1)チャージ目の第2工程で塩基度目標値を確保するために必要な、nチャージ目の第4工程で添加すべきCaO量
HM[Si]<n+1> ・・・(n+1)チャージ目で転炉に装入する溶銑中のSiの濃度
SiO2<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるSiO
B1C/S<n+1> ・・・(n+1)チャージ目の第2工程での塩基度目標値
R’CaO<n> ・・・nチャージ目から、(n+1)チャージ目へリサイクルされるCaO量のうち、nチャージ目の第4工程で添加する分を除いたCaO量
The amount of CaO added in the n-th charge decarburization process is the larger amount of CaO calculated from the following formula (I) or (II): The molten steel blowing method of any one of -3.
W P, CaO = 1000 / Lp <n> × (B2 [P] i <n> / target [P] f <n> +1) × (% CaO) B2 <n> −R B1, CaO <n>. .. (I)
W Si, CaO = (HM [Si] <n + 1> × 60/28 × 10 + R SiO2 <n> ) × (B1C / S <n + 1>) − R′CaO <n> (II)
However, each parameter in the formulas (I) and (II) is as follows.
WP , CaO: The amount of CaO necessary for dephosphorization in the fourth step of the n-th charge Lp <n>... Estimated phosphorus distribution in the fourth step of the n-th charge B2 [P] i <n> ..Phosphorus concentration carried over to the 4th step of the n-th charge (converted to phosphorus concentration in molten iron)
Target [P] f <n> ... target phosphorus concentration after the fourth charge of the n-th charge (% CaO) B2 <n> ... CaO in the slag after the fourth charge of the n-charge Estimated concentration R B1, CaO <n> ... The amount of CaO carried over from the second step of the n-th charge to the fourth step through the third step W Si, CaO . The amount of CaO to be added in the fourth step of the n-th charge necessary to secure the basicity target value in the step HM [Si] <n + 1> (n + 1) hot metal charged into the converter at the charge point from the density R SiO2 <n> ··· n charge th Si in, at (n + 1) SiO 2 amount is recycled to the charge th B1C / S <n + 1> ··· (n + 1) charge th second step basicity target value R 'CaO <n> ··· n or charge th , (N + 1) of the amount of CaO to be recycled to the charge eyes, CaO amount excluding the amount to be added by n charge th fourth step
JP2007124762A 2007-05-09 2007-05-09 Blowing method of molten steel Active JP4937828B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007124762A JP4937828B2 (en) 2007-05-09 2007-05-09 Blowing method of molten steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007124762A JP4937828B2 (en) 2007-05-09 2007-05-09 Blowing method of molten steel

Publications (2)

Publication Number Publication Date
JP2008280572A JP2008280572A (en) 2008-11-20
JP4937828B2 true JP4937828B2 (en) 2012-05-23

Family

ID=40141642

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007124762A Active JP4937828B2 (en) 2007-05-09 2007-05-09 Blowing method of molten steel

Country Status (1)

Country Link
JP (1) JP4937828B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5396834B2 (en) * 2008-11-28 2014-01-22 新日鐵住金株式会社 Converter refining method
JP2014055315A (en) * 2012-09-11 2014-03-27 Jfe Steel Corp Monitoring method of slag stream discharged from throat and converter operation method
CN107002154A (en) * 2014-12-16 2017-08-01 杰富意钢铁株式会社 The preprocess method of iron liquid
CN108699613A (en) * 2016-07-27 2018-10-23 新日铁住金株式会社 The manufacturing method of molten steel
CN106987676B (en) * 2017-02-13 2018-11-13 唐山不锈钢有限责任公司 A kind of converter basicity dynamic control method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2582692B2 (en) * 1991-11-16 1997-02-19 新日本製鐵株式会社 Converter steelmaking method
JP2000212623A (en) * 1999-01-20 2000-08-02 Nippon Steel Corp Dephosphorization of molten iron low in lime
JP4353818B2 (en) * 2004-01-23 2009-10-28 株式会社神戸製鋼所 Converter operation method

Also Published As

Publication number Publication date
JP2008280572A (en) 2008-11-20

Similar Documents

Publication Publication Date Title
JP5396834B2 (en) Converter refining method
JP4937828B2 (en) Blowing method of molten steel
JP4701727B2 (en) Melting method of high carbon ultra low phosphorus steel
JP2013064188A (en) Method for recycling steelmaking slag as resource
CN109280740B (en) Process method for in-place yellow and white slag of LF (ladle furnace) refining furnace
JP2007308773A (en) Converter process
JP2008063645A (en) Steelmaking method
JP2019194350A (en) Recycling method of converter slag
JP3885499B2 (en) Converter steelmaking method
JP2002020816A (en) Method for producing low nitrogen-containing chromium steel
JP5286892B2 (en) Dephosphorization method of hot metal
JP2653301B2 (en) Reusing method of low P converter slag
JPH07310110A (en) Production of stainless steel
JP4025751B2 (en) Hot metal refining method
JP5157228B2 (en) Desulfurization method for molten steel
JP4411934B2 (en) Method for producing low phosphorus hot metal
JPH08104911A (en) Method for melting phosphorus-containing steel
JP2007119837A (en) Method for producing molten steel containing chromium and extremely little sulfur
JP7477797B2 (en) Converter refining method
JP4421314B2 (en) Determination of slag amount in hot metal refining
JP7508022B2 (en) Refining Method
JP2023001041A (en) Refining method
KR20060035274A (en) Method for manufacturing molten steel for galvanized steel plate
JP2002069518A (en) Method for dephosphorizing molten iron developing little slag quantity
JP6627433B2 (en) Cold recycling method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090916

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120131

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120222

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150302

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4937828

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150302

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150302

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150302

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350