JP4806131B2 - Railway management information providing apparatus and providing method thereof - Google Patents
Railway management information providing apparatus and providing method thereof Download PDFInfo
- Publication number
- JP4806131B2 JP4806131B2 JP2001080776A JP2001080776A JP4806131B2 JP 4806131 B2 JP4806131 B2 JP 4806131B2 JP 2001080776 A JP2001080776 A JP 2001080776A JP 2001080776 A JP2001080776 A JP 2001080776A JP 4806131 B2 JP4806131 B2 JP 4806131B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- communication terminal
- received
- maintenance work
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 36
- 238000012423 maintenance Methods 0.000 claims description 112
- 230000006854 communication Effects 0.000 claims description 57
- 238000004891 communication Methods 0.000 claims description 56
- 230000005856 abnormality Effects 0.000 claims description 40
- 238000000605 extraction Methods 0.000 claims description 25
- 230000005540 biological transmission Effects 0.000 claims description 21
- 239000000284 extract Substances 0.000 claims description 9
- 230000002159 abnormal effect Effects 0.000 claims description 4
- 238000012806 monitoring device Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 230000015556 catabolic process Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鉄道に関する管理情報を提供する鉄道管理情報提供装置、及びその提供方法に関する。
【0002】
【従来の技術】
近時、多数の列車の効率よい運行のため、長大な路線全区間の列車の運行状況をリアルタイムで一括して制御するCTC(Centralized Traffic Control:列車集中制御)装置を用いた運行管理システムが、鉄道各社で利用されている。このシステムにより、全列車の運行状況が把握できるだけでなく、各駅(停車場)の信号機や転てつ機等の現場機器の動作状態を監視することができる。
【0003】
【発明が解決しようとする課題】
しかしながら、上述した従来の運行管理システムでは、保守作業や、信号機等の現場機器の状態に関する情報などが、各現場にいる保守担当者にリアルタイムで通知されていなかったため、保守作業を円滑に行うことができない上に、現場機器の故障のような予期せぬ事態が発生した場合、これらの対応に遅れてしまうという問題があった。
【0004】
本発明の課題は、鉄道の現場機器及び保守作業に関する情報をリアルタイムで各作業現場にいる保守担当者に通知することにより、鉄道現場作業の効率化を図ることである。
【0005】
【課題を解決するための手段】
本発明は、このような課題を解決するために、次のような特徴を備えている。なお、次に示す手段の説明中、括弧書きにより実施の形態に対応する構成を例示する。符号等は、後述する図面参照符号等である。
【0006】
請求項1記載の発明は、
列車運行管理制御装置(例えば、図1の運行管理システム3内の運行管理装置、CTC中央装置)及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信する受信手段(例えば、図2の伝送制御部14)と、
現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶する記憶手段(例えば、図2の記憶装置16)と、
前記受信手段により、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末(例えば、図1の携帯電話2)のアドレス情報を、前記記憶手段から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶手段から抽出する抽出手段(例えば、図2のCPU11)と、
前記受信手段により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信手段により受信した前記列車運行管理制御装置の異常情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する送信手段(例えば、図2の伝送制御部14)と、
を備えることを特徴としている。
【0007】
この請求項1記載によれば、受信手段が、列車運行管理制御装置及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信し、記憶手段が、現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶し、抽出手段が、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末のアドレス情報を、前記記憶手段から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶手段から抽出し、送信手段が、前記受信手段により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信手段により受信した前記列車運行管理制御装置の異常情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する。
【0008】
請求項5記載の発明は、
列車運行管理制御装置及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信する受信工程(例えば、図4のステップS1)と、
現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶する記憶工程と、
前記受信工程により、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末のアドレス情報を、前記記憶工程から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶工程から抽出する抽出工程(例えば、図4のステップS3)と、
前記受信工程により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信工程により受信した前記列車運行管理制御装置の異常情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する送信工程(例えば、図4のステップS4)と、
を含むことを特徴としている。
【0009】
この請求項5記載の発明によれば、列車運行管理制御装置及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信する受信工程と、現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶する記憶工程と、前記受信工程により、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末のアドレス情報を、前記記憶工程から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶工程から抽出する抽出工程と、前記受信工程により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信工程により受信した前記列車運行管理制御装置の異常情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する送信工程と、を含む。
【0010】
したがって、請求項1あるいは5記載の発明によって、列車運行管理制御装置及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信した際に、当該情報に関連する作業区域の現場担当者にこれらの情報を提供できることにより、現場担当者は、予期せぬ事態が発生した場合にも迅速に対応でき、現場作業効率が向上する。
【0016】
請求項2記載の発明は、請求項1記載の鉄道管理情報提供装置において、
前記受信手段により受信される保守作業情報は、保守作業に伴う線路閉鎖の設定、又は解除情報を含むことを特徴としている。
【0017】
この請求項2記載の発明によれば、前記受信手段により受信される保守作業情報は、保守作業に伴う線路閉鎖の設定、又は解除情報を含む。
【0018】
請求項6記載の発明は、請求項5記載の鉄道管理情報提供方法において、
前記受信工程により受信される保守作業情報は、保守作業に伴う線路閉鎖の設定、又は解除情報を含むことを特徴としている。
【0019】
この請求項6記載の発明によれば、前記受信工程により受信される保守作業情報は、保守作業に伴う線路閉鎖の設定、又は解除情報を含む。
【0020】
したがって、請求項2あるいは6記載の発明によって、各現場作業担当者は、保守作業に伴う線路閉鎖の設定、又は解除情報を把握できる。
【0021】
請求項3記載の発明は、請求項1又は2記載の鉄道管理情報提供装置において、
前記受信手段により受信される保守作業情報は、作業区域毎に決められた各担当者の保守作業計画情報を更に含むことを特徴としている。
【0022】
この請求項3記載の発明によれば、前記受信手段により受信される保守作業情報は、作業区域毎に決められた各担当者の保守作業計画情報を更に含む。
【0023】
請求項7記載の発明は、請求項5又は6記載の鉄道管理情報提供方法において、
前記受信工程により受信される保守作業情報は、作業区域毎に決められた各担当者の保守作業計画情報を更に含むことを特徴としている。
【0024】
この請求項7記載の発明によれば、前記受信工程により受信される保守作業情報は、作業区域毎に決められた各担当者の保守作業計画情報を更に含む。
【0025】
したがって、請求項3あるいは7記載の発明によって、各現場作業担当者は、保守作業計画を確認できる。
【0026】
請求項4記載の発明は、請求項1から3の何れかに記載の鉄道管理情報提供装置において、
前記記憶手段は、前記受信手段による受信情報に基づいて、前記管理制御装置及び各種現場機器の状態と、前記保守作業情報とを更に記憶し、
前記受信手段は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、
前記抽出手段は、前記記憶手段に記憶された各種情報の中から、前記受信手段により受信した要求内容に対応する情報を更に抽出し、
前記送信手段は、前記抽出手段により抽出された情報を、前記通知要求をした通信端末に更に送信することを特徴としている。
【0027】
この請求項4記載の発明によれば、前記記憶手段は、前記受信手段による受信情報に基づいて、前記管理制御装置及び各種現場機器の状態と、前記保守作業情報とを更に記憶し、前記受信手段は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、前記抽出手段は、前記記憶手段に記憶された各種情報の中から、前記受信手段により受信した要求内容に対応する情報を更に抽出し、前記送信手段は、前記抽出手段により抽出された情報を、前記通知要求をした通信端末に更に送信する。
【0028】
請求項8記載の発明は、請求項5から7の何れかに記載の鉄道管理情報提供方法において、
前記記憶工程は、前記受信工程による受信情報に基づいて、前記管理制御装置及び各種現場機器の状態と、前記保守作業情報とを更に記憶し、
前記受信工程(例えば、図5のステップS11)は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、
前記抽出工程(例えば、図5のステップS12)は、前記記憶工程に記憶された各種情報の中から、前記受信工程により受信した要求内容に対応する情報を更に抽出し、
前記送信工程(例えば、図5のステップS13)は、前記抽出工程により抽出された情報を、前記通知要求をした通信端末に更に送信することを特徴としている。
【0029】
この請求項8記載の発明によれば、前記記憶工程は、前記受信工程による受信情報に基づいて、前記管理制御装置及び各種現場機器の状態と、前記保守作業情報とを更に記憶し、前記受信工程は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、前記抽出工程は、前記記憶工程に記憶された各種情報の中から、前記受信工程により受信した要求内容に対応する情報を更に抽出し、前記送信工程は、前記抽出工程により抽出された情報を、前記通知要求をした通信端末に更に送信する。
【0030】
したがって、請求項4あるいは8記載の発明によって、各現場作業担当者は、所望の鉄道管理情報を好きなときに知ることができる。
【0031】
【発明の実施の形態】
以下、図1〜図5を参照して本発明の実施の形態を詳細に説明する。
まず、構成を説明する。
【0032】
図1は、携帯電話2を所有する保守担当者に、鉄道に関する管理情報を提供する鉄道管理情報提供システム100のシステム構成を示す図である。
この図1において、鉄道管理情報提供システム100は、情報配信サーバ1、携帯電話2、運行管理システム3、集中監視装置4、保守作業管理システム5により構成されている。
【0033】
情報配信サーバ1は、鉄道会社が保有するサーバで、インターネットNにより、無線基地局(図示せず)を介して携帯電話2に接続されるとともに、LAN等のネットワークを介して、運行管理システム3、集中監視装置4、保守作業管理システム5に接続されている。
【0034】
携帯電話2は、上記鉄道会社の保守担当者が所有する携帯電話であり、情報配信サーバ1が提供する鉄道管理情報提供サイト等へのアクセス機能(例えば、Webブラウザ)、及びメールの送受信機能等を備えている。また、この携帯電話2は、情報配信サーバ1から鉄道管理情報を自動受信する端末として、情報配信サーバ1に登録されており、例えば、信号機器、CTC中央装置、運行管理装置等における故障発生時や、保守作業に伴う線路閉鎖の設定・解除時に、これらの故障情報や、線路閉鎖情報等を、情報配信サーバ1からリアルタイムでメール受信する。また、上記保守担当者のキー操作によって、各種信号機器の状態や、保守作業関係の情報、線路閉鎖の状態等の通知要求があると、これらの通知要求メールを、情報配信サーバ1に送信する。
【0035】
運行管理システム3は、中央制御所と各駅から構成され、中央制御所と各駅はCTC回線で接続されている。中央制御所は、運行管理装置、CTC中央装置を備え、各駅は、CTC駅装置、連動装置等を備える。
【0036】
CTC中央装置は、管轄区間内の列車の運行状況をリアルタイムで一括して制御する。運行管理装置は、CTC中央装置に接続され、列車の運行状況を表示する列車運行状況表示装置(Train Information Display)の情報(TID情報)として、列車番号や列車位置等を示す列車位置情報、及び列車の遅れ時分等を示す遅延情報等を管理している。これらCTC中央装置、及び運行管理装置は、各々の装置で故障が生じると、その故障情報を情報配信サーバ1に送信する。
【0037】
各駅に設置されているCTC駅装置は、中央制御所から、自駅の信号機や転てつ機等を制御するための符号電流を受信すると、その符号電流を解読して連動装置に伝達する。また、CTC駅装置は、連動装置から入力された信号機の現示状態、列車の在線状況、線路閉鎖などの情報を符号化し、中央制御所内のCTC中央装置に伝送する。さらに、CTC駅装置は、保守作業の際に、連動装置から受信した線路閉鎖情報を情報配信サーバ1に送信する。
【0038】
連動装置は、CTC駅装置で解読された電流に応じて、転てつ機を転換して進路を構成したり、信号機と転てつ機、及び信号機相互間に所定の連鎖等を行う。また、連動装置は、信号機の現示状態、列車の在線状況、レール交換や信号機器交換等の保守作業に伴う線路閉鎖等の情報をCTC駅装置に出力する。
【0039】
集中監視装置4は、各種信号機器の動作状況を監視し、信号機器に故障が発生した際、信号機器故障情報を情報配信サーバ1に送信する。
【0040】
保守作業管理システム5は、保守作業が実施される作業個所、作業予定日時、作業目的、及び作業情報登録者(例えば、保守担当者名)等の保守作業計画データを管理しており、この保守作業計画データを情報配信サーバ1に提供する。
【0041】
なお、図1の鉄道管理情報提供システム100において、情報配信サーバ1は、運行管理システム3、集中監視装置4、及び保守作業管理システム5から管理情報が提供されることにしたが、この情報を提供するシステム及び装置の数は特に限定されず、例えば、1つの管理システムにより上述の管理システム及び装置3、4、5で管理されている全ての情報を管理し、その情報を情報配信サーバ1に対して提供することにしてもよい。
【0042】
また、インターネットNは、電話回線網、ISDN回線網、専用線、移動体通信網、通信衛星回線、CATV回線網等の各種通信回線網と、それらを接続するインターネットサービスプロバイダや無線基地局等を含む。さらに、インターネットNに無線基地局を介して接続される携帯電話の台数は特に限定されない。
【0043】
次に、図1に示した鉄道管理情報提供システム100を構成する情報配信サーバ1の各制御機能の概要について、図2を参照して説明する。
【0044】
図2は、情報配信サーバ1の内部構成を示すブロック図である。
図2において、情報配信サーバ1は、CPU11、表示部12、入力部13、伝送制御部14、RAM15、記憶装置16、及び記録媒体17によって構成されており、記録媒体17を除く各部はバス18によって接続されている。
【0045】
CPU(Central Processing Unit)11は、記憶装置16の記録媒体17内に記憶されているシステムプログラム及び情報配信サーバ1に対応する各種アプリケーションプログラムの中から指定されたアプリケーションプログラムをRAM15内に展開し、入力部13から入力される各種指示あるいはそれに応じた各種データをRAM15内に一時的に格納し、この入力指示及び入力データに応じて記憶装置16内に格納されたアプリケーションプログラムに従って各種処理を実行し、その処理結果をRAM15内に格納するとともに、表示部12に表示する。そして、RAM15内に一時格納した処理結果を入力部13から入力指示される記憶装置16内の記録媒体17の保存先に保存する。
【0046】
例えば、CPU11は、運行管理装置、及びCTC中央装置に故障が発生した際に、運行管理システム3からこれらの故障情報をリアルタイムで受信すると、直ちに各現場にいる保守担当者全員の携帯電話に、該故障情報をEメールで送信する。また、CPU11は、記憶装置に16に格納された保守作業計画テーブル(図3(b))を参照して、各現場にいる保守担当者の携帯電話に、保守作業の開始時刻、及び終了時刻情報をEメールで通知する。
【0047】
さらに、CPU11は、保守作業に伴う線路閉鎖設定・解除時や、各種信号機器の故障発生時、これらの情報を、それぞれ、運行管理システム3、集中監視装置4からリアルタイムで受信し、後述する鉄道管理情報通知処理Aを実行する(図4参照)。また、CPU11は、携帯電話2から、信号機器状態、保守作業関係情報、線路閉鎖状態等の通知要求メールを受信すると、後述する鉄道管理情報通知処理Bを実行する(図5参照)。
【0048】
表示部12は、液晶表示装置、CRT(Cathode Ray Tube)表示装置等により構成され、CPU11から入力される表示データを表示する。
【0049】
入力部13は、カーソルキー、数字入力キー及び各種機能キー等を備えたキーボードと、ポインティングデバイスであるマウスとを備え、キーボードで押下された押下信号をCPU11に出力するとともに、マウスによる操作信号をCPU11に出力する。
【0050】
伝送制御部14は、モデム(MODEM:MOdulator/DEModulator)、ターミナルアダプタ(TA:Terminal Adapter)、又はルータ等によって構成され、インターネットNを介して接続された携帯電話2、或いはLAN等のネットワークを介して接続された運行管理システム3、集中監視装置4、及び保守作業管理システム5のそれぞれとの通信を行うための通信制御を行う。
【0051】
RAM(Random Access Memory)15は、CPU11により実行される上記処理プログラムや各種アプリケーションプログラムを、RAM15内の図示しないプログラム格納領域に展開するとともに、入力指示、入力データ、及び上記処理プログラムが実行される際に生じる処理結果等を、図示しないワークメモリエリアに一時的に格納する。
【0052】
記憶装置16は、プログラムやデータ等が予め記憶された記録媒体17を有しており、記録媒体17は磁気的、光学的記録媒体、若しくは半導体等の不揮発性メモリで構成されている。この記録媒体17は記憶装置16に固定的に設けたもの、若しくは着脱自在に装着するものであり、この記録媒体17には、情報配信サーバ1のシステムプログラム、鉄道管理情報通知処理プログラム、及びこれらのプログラムで処理されたデータ等を記憶する。
【0053】
また、記録媒体17に記憶されたプログラム、データ等は、その一部若しくは全部をサーバやクライアント等の外部機器から、ネットワーク回線等の伝送媒体を介して伝送制御部14から受信して記憶する構成にしてもよく、また、記録媒体17はネットワーク上に構築されたサーバの記録媒体であってもよい。更に、上記プログラムをネットワーク回線等の伝送媒体を介してサーバやクライアントへ伝送してこれらの機器にインストールするように構成してもよい。
【0054】
また、記憶装置16は、運行管理システム3から受信したTID情報、運行管理装置やCTC中央装置の故障情報、及び線路閉鎖情報、集中監視装置4から受信した信号機器故障情報等を記憶している。
【0055】
さらに、この記憶装置16は、図3(a)に示すように、作業員テーブルを記憶する。この作業員テーブルは、作業員名、Eメールアドレス、ID、作業区域・個所の各項目から構成され、作業員名としては、保守作業等の現場監督を行う作業員(保守担当者)の名前、Eメールアドレスとしては、各作業員が所有する携帯電話に設定されたEメールアドレス、IDとしては、各作業員の社員番号、作業区域・個所としては、各作業員が保守作業を実施する作業個所が記憶されている。
【0056】
また、記憶装置16は、保守作業管理システム5から受信した保守作業計画データに基づいて、図3(b)に示すように、保守作業計画テーブルを記憶する。この保守作業計画テーブルは、作業番号、作業個所、作業予定時間、作業員名の各項目から構成され、作業予定時間としては、保守作業年月日、作業開始時刻、及び終了時刻が記憶されている。
【0057】
さらに、この記憶装置16は、各保守担当者が所有する携帯電話に、各種信号機器状態、保守作業関係情報、線路閉鎖状態、CTC中央装置故障情報等を通知する際に使用する定型文を記憶する。
【0058】
次に、本実施の形態の動作を説明する。
後述する各フローチャートに記述されている各機能を実現するためのプログラムは、読み取り可能なプログラムコードの形態で情報配信サーバ1の記録媒体17に格納されており、情報配信サーバ1のCPU11は該プログラムコードに従った動作を逐次実行する。また、CPU11は伝送媒体を介して伝送される上記プログラムコードに従った動作を逐次実行することもできる。すなわち、記録媒体の他、伝送媒体を介して外部供給されたプログラム/データを利用して本実施の形態特有の動作を実行することもできる。
【0059】
まず、CPU11によって実行される鉄道管理情報通知処理Aについて、図4のフローチャートに基づいて説明する。
【0060】
CPU11は、運行管理システム3、集中管理装置4から、それぞれ、保守作業に伴う線路閉鎖設定・解除情報、信号機器故障情報等の管理情報が受信されたか否かを常時確認しており(ステップS1)、該管理情報が受信されると(ステップS1;YES)、記憶装置16に格納された作業員テーブル(図3(a))中の「作業区域・個所」項目に記憶されたデータから、受信された管理情報に対応、又は関係する作業区域・地域を検索し(ステップS2)、「作業員名」項目に記憶されたデータから、当該作業区域・個所で現場作業に従事している保守担当者名を抽出する(ステップS3)。
【0061】
次いで、CPU11は、上記作業員テーブル中の「Eメールアドレス」項目に記憶されたデータから、ステップS3で抽出された保守担当者が所有する携帯電話2に設定されたEメールアドレスを抽出する。そして、CPU11は、上記管理情報通知に使用する定型文データを記憶装置16から読み出し、ステップS1で受信された管理情報データを、対応する定型文データとともに、携帯電話2に送信し(ステップS4)、本鉄道管理情報通知処理Aを終了する。
【0062】
例えば、集中監視装置4から、軽井沢駅での信号機器の故障情報を受信すると、CPU11は、図3(a)に示した、記憶装置16に格納された作業員テーブル中の「作業区域・個所」項目に記憶されたデータから、軽井沢を含む作業区域データを検索し、該作業区域データとして「軽井沢〜小諸」を抽出する。
【0063】
次いで、CPU11は、上記作業員テーブルから、「軽井沢〜小諸」で現場作業に従事している作業員(保守担当者)名である「京三太郎」を抽出し、作業員テーブル中の「Eメールアドレス」項目に記憶されたデータから、保守担当者「京三太郎」が所有する携帯電話2に設定されたEメールアドレス「kyosan-taro@xxx.yy.ne.jp」を抽出する。
【0064】
次いで、CPU11は、信号機器の故障情報通知に使用する定型文データを記憶装置16から読み出し、上記故障情報データを、対応する定型文データとともに、「京三太郎」の携帯電話2に設定されたEメールアドレス「kyosan-taro@xxx.yy.ne.jp」宛てに送信する。
【0065】
運行管理装置、及びCTC中央装置に故障が発生した際は、CPU11は、運行管理システム3からこれらの故障情報をリアルタイムで受信すると、緊急事態として、直ちに各現場にいる保守担当者全員の携帯電話に、該故障情報データを送信する。
【0066】
次に、CPU11によって実行される鉄道管理情報通知処理Bについて、図5のフローチャートに基づいて説明する。
【0067】
CPU11は、各現場で作業に従事している保守担当者の携帯電話2から、信号機器状態、保守作業関係情報、線路閉鎖状態等の管理情報の通知要求メールが受信されたか否かを常時確認しており(ステップS11)、携帯電話2から該管理情報の通知要求メールを受信すると(ステップS11;YES)、記憶装置16に格納された管理情報の検索を開始し、該通知要求に対応する管理情報データを抽出する(ステップS12)。次いで、CPU11は、抽出された管理情報データを、通知要求を指示した携帯電話2に対して送信し(ステップS13)、本鉄道管理情報通知処理Bを終了する。
【0068】
例えば、CPU11は、携帯電話2から、保守作業関係情報の通知要求メールを受信すると、記憶装置16に格納された管理情報の中から、図3(b)に示した保守作業計画テーブルを抽出する。そして、CPU11は、「作業予定時間」項目に記憶されたデータから、現在時刻に対応するデータを抽出し、「作業個所」項目に記憶されたデータから、現在、保守作業が実施されている作業個所(例えば、田中)を抽出し、これらの保守作業データを、通知要求を指示した携帯電話2に対して送信する。
【0069】
以上のように、本実施の形態における鉄道管理情報提供システム100によれば、情報配信サーバ1は、運行管理システム3、集中監視装置4から受信したリアルタイムな各種管理情報(運行管理装置・CTC中央装置故障情報、線路閉鎖情報、信号機器故障情報等)を、各作業現場にいる保守担当者所有の携帯電話2に対してリアルタイムに送信することにより、携帯電話2を所有する各現場の保守担当者は、該管理情報をリアルタイムで確認できるとともに、信号機器故障等の予期せぬ事態が発生した場合にも迅速に対応でき、現場作業効率が向上する。
【0070】
また、情報配信サーバ1は、鉄道管理情報の自動通知登録がなされた携帯電話2から、信号機器状態、保守作業関係情報、線路閉鎖状態等の管理情報通知要求メールを受信すると、要求された管理情報を直ちに携帯電話2に送信することにより、携帯電話2を所有する各現場の保守担当者は、所望の鉄道管理情報を好きなときに知ることができる。
【0071】
なお、本実施の形態における記述内容は、本発明の趣旨を逸脱しない範囲で適宜変更可能である。例えば、本実施の形態においては、各現場にいる保守担当者と情報配信サーバ1との通信手段として携帯電話2を用いたが、PDA(Personal Digital Assistants)等の携帯情報端末であってもよい。
【0072】
【発明の効果】
請求項1記載の発明の鉄道管理情報提供装置、及び請求項5記載の発明の鉄道管理情報提供方法によれば、列車運行管理制御装置及び各種現場機器の異常情報と、鉄道の保守作業情報とを受信した際に、当該情報に関連する作業区域の現場担当者にこれらの情報を提供できることにより、現場担当者は、予期せぬ事態が発生した場合にも迅速に対応でき、現場作業効率が向上する。
【0074】
請求項2記載の発明の鉄道管理情報提供装置、及び請求項6記載の発明の鉄道管理情報提供方法によれば、各現場作業担当者は、保守作業に伴う線路閉鎖の設定、又は解除情報を把握できる。
【0075】
請求項3記載の発明の鉄道管理情報提供装置、及び請求項7記載の発明の鉄道管理情報提供方法によれば、各現場作業担当者は、保守作業計画を確認できる。
【0076】
請求項4記載の発明の鉄道管理情報提供装置、及び請求項8記載の発明の鉄道管理情報提供方法によれば、各現場作業担当者は、所望の鉄道管理情報を好きなときに知ることができる。
【図面の簡単な説明】
【図1】本発明を適用した鉄道管理情報提供システム100のシステム構成を示す図である。
【図2】図1の情報配信サーバ1の内部構成を示すブロック図である。
【図3】図2の記憶装置16に格納されている作業員テーブル(同図(a))と、保守作業計画テーブル(同図(b))の例を示す図である。
【図4】情報配信サーバ1において実行される鉄道管理情報通知処理Aを示すフローチャートである。
【図5】情報配信サーバ1において実行される鉄道管理情報通知処理Bを示すフローチャートである。
【符号の説明】
1 情報配信サーバ
11 CPU
12 表示部
13 入力部
14 伝送制御部
15 RAM
16 記憶装置
17 記録媒体
18 バス
2 携帯電話
3 運行管理システム
4 集中監視装置
5 保守作業管理システム
100 鉄道管理情報提供システム
N インターネット[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a railway management information providing apparatus that provides management information about a railway, and a method for providing the railway management information providing apparatus.
[0002]
[Prior art]
In recent years, for efficient operation of many trains, an operation management system using a CTC (Centralized Traffic Control) system that controls the operation status of trains in all sections of a long and large route in real time, Used by railway companies. With this system, it is possible not only to grasp the operation status of all trains, but also to monitor the operating state of field devices such as traffic lights and switchboards at each station (stop).
[0003]
[Problems to be solved by the invention]
However, in the conventional operation management system described above, maintenance work and information on the state of field equipment such as traffic lights were not notified in real time to maintenance personnel at each work site, so maintenance work should be performed smoothly. In addition, when an unexpected situation such as a breakdown of field equipment occurs, there is a problem that it is delayed in response to these.
[0004]
An object of the present invention is to improve the efficiency of railway site work by notifying information on railway site equipment and maintenance work to maintenance personnel at each work site in real time.
[0005]
[Means for Solving the Problems]
In order to solve such a problem, the present invention has the following features. In the following description of the means, the configuration corresponding to the embodiment is illustrated in parentheses. Reference numerals and the like are reference numerals for drawings to be described later.
[0006]
The invention described in
Receiving means (for example, FIG. 2) for receiving the train operation management control device (for example, the operation management device in the
Storage means (for example,
When abnormality information or maintenance work information of the various field devices is received by the receiving means, the address of a communication terminal (for example, the
The communication terminal corresponding to the address information extracted by the extraction means, the abnormality information and maintenance work information of the various field devices received by the receiving means, and related to the abnormality information and maintenance work information of the various field devices The communication terminal corresponding to the address information extracted by the extracting means, the abnormality information of the train operation management control device transmitted to the communication terminal owned by the person in charge in the work area and received by the receiving means, and the train A transmission means (for example, the
It is characterized by having.
[0007]
According to the first aspect, the receiving means receives the train operation management control apparatus and various on-site equipment abnormality information and railway maintenance work information, and the storage means is in charge determined for each on-site work area. The communication terminal owned by the person in charge of the work area related to the received information when the extraction means receives the abnormality information and maintenance work information of the various field devices. Address information is extracted from the storage means, and when the abnormality information of the train operation management control device is received, the address information of the communication terminals owned by all persons in charge at each site work area at the time of reception is received. , extracted from the storage means, transmitting means, the various field abnormality information and maintenance information of the device received by the receiving unit, the communication terminal corresponding to the address information extracted by said extraction means The person in charge of the various field work area associated with abnormal information and maintenance information of a device owned transmitted to the communication terminal I, the abnormality information of the train operation management control device received by the receiving means, said extracting means Is transmitted to a communication terminal corresponding to the address information extracted by the communication terminal owned by all the persons in charge in each field work area when receiving the abnormality information of the train operation management control device.
[0008]
The invention according to
A reception process (for example, step S1 in FIG. 4) for receiving the train operation management control device and abnormality information on various field devices and railway maintenance work information;
A storage step for storing address information of a communication terminal owned by a person in charge determined for each field work area;
When the abnormality information and maintenance work information of the various field devices are received by the reception process, the address information of the communication terminal owned by the person in charge of the work area related to the reception information is extracted from the storage process , When the abnormality information of the train operation management control device is received, the extraction step (for example, extracting the address information of the communication terminal owned by all the persons in charge at each work site at the time of the reception from the storage step (for example, Step S3) of FIG.
The communication terminal corresponding to the address information extracted by the extraction process, the abnormality information and maintenance work information of the various field devices received by the reception process, and related to the abnormality information and maintenance work information of the various field devices Abnormal information of the train operation management control device transmitted to the communication terminal owned by the person in charge in the work area and received by the reception step is a communication terminal corresponding to the address information extracted by the extraction step, and the train A transmission process (for example, step S4 in FIG. 4) for transmission to a communication terminal owned by all persons in charge at each site work area upon reception of abnormality information of the operation management control device ;
It is characterized by including.
[0009]
According to the invention described in
[0010]
Therefore, according to the invention according to
[0016]
The invention described in
The maintenance work information received by the receiving means includes setting or releasing information of the track closure accompanying the maintenance work.
[0017]
According to the second aspect of the present invention, the maintenance work information received by the receiving means includes information on setting or canceling the line closure accompanying the maintenance work.
[0018]
The invention described in claim 6 is the railway management information providing method according to
The maintenance work information received by the receiving step includes setting or releasing information of the track closure accompanying the maintenance work.
[0019]
According to the sixth aspect of the present invention, the maintenance work information received by the receiving step includes setting or releasing information of the line closure accompanying the maintenance work.
[0020]
Therefore, according to the invention described in
[0021]
The invention according to
The maintenance work information received by the receiving means further includes maintenance work plan information of each person in charge determined for each work area.
[0022]
According to the third aspect of the present invention, the maintenance work information received by the receiving means further includes maintenance work plan information of each person in charge determined for each work area.
[0023]
The invention according to claim 7 is the railway management information providing method according to
The maintenance work information received by the receiving step further includes maintenance work plan information of each person in charge determined for each work area.
[0024]
According to the seventh aspect of the present invention, the maintenance work information received by the receiving step further includes maintenance work plan information of each person in charge determined for each work area.
[0025]
Therefore, according to the invention described in
[0026]
The invention according to
The storage means further stores the status of the management control device and various field devices, and the maintenance work information based on information received by the receiving means,
The receiving means further receives a notification request for various types of railway management information from the communication terminal owned by the person in charge,
The extraction means further extracts information corresponding to the request content received by the receiving means from various information stored in the storage means,
The transmitting means further transmits the information extracted by the extracting means to the communication terminal that has made the notification request.
[0027]
According to the fourth aspect of the present invention, the storage means further stores the status of the management control device and various field devices and the maintenance work information based on information received by the receiving means, and receives the reception information. The means further receives a notification request for various types of railway management information from the communication terminal owned by the person in charge, and the extracting means uses the information received by the receiving means from among the various information stored in the storage means. Corresponding information is further extracted, and the transmission means further transmits the information extracted by the extraction means to the communication terminal that has made the notification request.
[0028]
The invention according to claim 8 is the railway management information providing method according to any one of
The storage step further stores the status of the management control device and various field devices, and the maintenance work information, based on the reception information from the reception step,
The receiving step (for example, step S11 in FIG. 5) further receives notification requests for various types of railway management information from the communication terminal owned by the person in charge.
The extraction step (for example, step S12 in FIG. 5) further extracts information corresponding to the request content received by the reception step from various information stored in the storage step,
The transmission step (for example, step S13 in FIG. 5) is characterized in that the information extracted in the extraction step is further transmitted to the communication terminal that made the notification request.
[0029]
According to the eighth aspect of the present invention, the storage step further stores the state of the management control device and various field devices and the maintenance work information based on the reception information obtained by the reception step, and receives the reception. The process further receives a notification request for various types of railway management information from the communication terminal owned by the person in charge, and the extraction process uses the information received in the reception process from the various information stored in the storage process. Corresponding information is further extracted, and the transmission step further transmits the information extracted by the extraction step to the communication terminal that has made the notification request.
[0030]
Therefore, according to the invention described in
[0031]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to FIGS.
First, the configuration will be described.
[0032]
FIG. 1 is a diagram showing a system configuration of a railway management
In FIG. 1, a railway management
[0033]
The
[0034]
The
[0035]
The
[0036]
The CTC central device collectively controls the operation status of trains in the jurisdiction section in real time. The operation management device is connected to the CTC central device, and train position information indicating the train number, train position, etc. as information (TID information) of the train operation status display device (Train Information Display) that displays the train operation status, and It manages delay information that shows the time delay of trains. When a failure occurs in each device, the CTC central device and the operation management device transmit the failure information to the
[0037]
When the CTC station apparatus installed at each station receives a code current for controlling the traffic signal or the switch of the station from the central control station, the CTC station apparatus decodes the code current and transmits it to the interlocking device. Also, the CTC station device encodes information such as the current signal status, train presence status, track closure, etc., input from the interlocking device, and transmits the encoded information to the CTC central device in the central control station. Furthermore, the CTC station device transmits the line closing information received from the interlocking device to the
[0038]
The interlocking device changes the turning point to configure the course according to the current decoded by the CTC station device, or performs a predetermined chain between the traffic light, the turning point, and the traffic light. In addition, the interlocking device outputs information such as the current state of the traffic lights, the status of the train line, and the closing of the track accompanying maintenance work such as rail exchange and signal equipment exchange to the CTC station device.
[0039]
The
[0040]
The maintenance
[0041]
In the railway management
[0042]
The Internet N includes various types of communication line networks such as a telephone line network, ISDN line network, dedicated line, mobile communication network, communication satellite line, CATV line network, and Internet service providers and wireless base stations that connect them. Including. Furthermore, the number of mobile phones connected to the Internet N via wireless base stations is not particularly limited.
[0043]
Next, an overview of each control function of the
[0044]
FIG. 2 is a block diagram showing an internal configuration of the
In FIG. 2, the
[0045]
A CPU (Central Processing Unit) 11 expands a system program stored in the
[0046]
For example, when a failure occurs in the operation management device and the CTC central device, the
[0047]
Further, the
[0048]
The
[0049]
The
[0050]
The
[0051]
A RAM (Random Access Memory) 15 expands the processing program and various application programs executed by the
[0052]
The
[0053]
A part of or all of the programs, data, and the like stored in the
[0054]
The
[0055]
Further, the
[0056]
Further, the
[0057]
Further, the
[0058]
Next, the operation of this embodiment will be described.
A program for realizing each function described in each flowchart described later is stored in the
[0059]
First, the railway management information notification process A executed by the
[0060]
The
[0061]
Next, the
[0062]
For example, when the failure information of the signal device at Karuizawa station is received from the
[0063]
Next, the
[0064]
Next, the
[0065]
When a failure occurs in the operation management device and the CTC central device, the
[0066]
Next, the railway management information notification process B executed by the
[0067]
The
[0068]
For example, when the
[0069]
As described above, according to the railway management
[0070]
In addition, when the
[0071]
Note that the description in this embodiment can be changed as appropriate without departing from the spirit of the present invention. For example, in the present embodiment, the
[0072]
【The invention's effect】
According to the railway management information providing device of the invention described in
[0074]
According to the railway management information providing apparatus of the invention described in
[0075]
According to the railway management information providing apparatus of the invention described in
[0076]
According to the railway management information providing device of the invention described in
[Brief description of the drawings]
FIG. 1 is a diagram showing a system configuration of a railway management
2 is a block diagram showing an internal configuration of the
FIG. 3 is a diagram showing an example of a worker table (FIG. 3A) and a maintenance work plan table (FIG. 3B) stored in the
FIG. 4 is a flowchart showing a railway management information notification process A executed in the
FIG. 5 is a flowchart showing a railway management information notification process B executed in the
[Explanation of symbols]
1
12
16
Claims (8)
現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶する記憶手段と、
前記受信手段により、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末のアドレス情報を、前記記憶手段から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶手段から抽出する抽出手段と、
前記受信手段により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信手段により受信した前記列車運行管理制御装置の異常情報を、前記抽出手段により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する送信手段と、
を備えることを特徴とする鉄道管理情報提供装置。Receiving means for receiving train operation management control device and abnormality information on various field devices, and railway maintenance work information,
Storage means for storing address information of a communication terminal owned by a person in charge determined for each field work area;
When receiving the abnormality information and maintenance work information of the various field devices by the receiving means, the address information of the communication terminal owned by the person in charge of the work area related to the received information is extracted from the storage means , When the abnormality information of the train operation management control device is received, the extraction means for extracting from the storage means the address information of the communication terminal owned by all the personnel in each field work area at the time of the reception ,
The communication terminal corresponding to the address information extracted by the extraction means, the abnormality information and maintenance work information of the various field devices received by the receiving means, and related to the abnormality information and maintenance work information of the various field devices The communication terminal corresponding to the address information extracted by the extracting means, the abnormality information of the train operation management control device transmitted to the communication terminal owned by the person in charge in the work area and received by the receiving means, and the train A transmission means for transmitting to a communication terminal owned by all persons in charge at each work site when receiving abnormality information of the operation management control device ;
A railway management information providing apparatus comprising:
前記受信手段は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、
前記抽出手段は、前記記憶手段に記憶された各種情報の中から、前記受信手段により受信した要求内容に対応する情報を更に抽出し、
前記送信手段は、前記抽出手段により抽出された情報を、前記通知要求をした通信端末に更に送信することを特徴とする請求項1から3の何れかに記載の鉄道管理情報提供装置。The storage means further stores the status of the management control device and various field devices, and the maintenance work information based on information received by the receiving means,
The receiving means further receives a notification request for various types of railway management information from the communication terminal owned by the person in charge,
The extraction means further extracts information corresponding to the request content received by the receiving means from various information stored in the storage means,
The transmission unit, the information extracted by the extraction unit, railroad management information providing apparatus according to any one of claims 1 to 3, characterized by further transmitted to the communication terminal the notification request.
現場作業区域毎に決められた担当者が所有する通信端末のアドレス情報を記憶する記憶工程と、
前記受信工程により、前記各種現場機器の異常情報や保守作業情報が受信された際、当該受信情報に関連する作業区域の担当者が所有する通信端末のアドレス情報を、前記記憶工程から抽出し、前記列車運行管理制御装置の異常情報が受信された際、当該受信の際に各現場作業区域にいる担当者全員が所有する通信端末のアドレス情報を、前記記憶工程から抽出する抽出工程と、
前記受信工程により受信した前記各種現場機器の異常情報や保守作業情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記各種現場機器の異常情報や保守作業情報に関連する作業区域の担当者が所有する通信端末に送信し、前記受信工程により受信した前記列車運行管理制御装置の異常情報を、前記抽出工程により抽出されたアドレス情報に対応する通信端末であって前記列車運行管理制御装置の異常情報の受信の際に各現場作業区域にいる担当者全員が所有する通信端末に送信する送信工程と、
を含むことを特徴とする鉄道管理情報提供方法。A receiving process for receiving the train operation management control device and abnormality information of various field devices, and railway maintenance work information;
A storage step for storing address information of a communication terminal owned by a person in charge determined for each field work area;
When the abnormality information and maintenance work information of the various field devices are received by the reception process, the address information of the communication terminal owned by the person in charge of the work area related to the reception information is extracted from the storage process , When the abnormality information of the train operation management control device is received, the extraction step of extracting from the storage step the address information of the communication terminal owned by all the personnel in each field work area at the time of the reception ,
The communication terminal corresponding to the address information extracted by the extraction process, the abnormality information and maintenance work information of the various field devices received by the reception process, and related to the abnormality information and maintenance work information of the various field devices Abnormal information of the train operation management control device transmitted to the communication terminal owned by the person in charge in the work area and received by the reception step is a communication terminal corresponding to the address information extracted by the extraction step, and the train A transmission process for transmitting to the communication terminal owned by all the personnel in each field work area when receiving the abnormality information of the operation management control device ;
Railway management information provision method characterized by including.
前記受信工程は、前記担当者所有の通信端末から各種鉄道管理情報の通知要求を更に受信し、
前記抽出工程は、前記記憶工程に記憶された各種情報の中から、前記受信工程により受信した要求内容に対応する情報を更に抽出し、
前記送信工程は、前記抽出工程により抽出された情報を、前記通知要求をした通信端末に更に送信することを特徴とする請求項5から7の何れかに記載の鉄道管理情報提供方法。The storage step further stores the status of the management control device and various field devices, and the maintenance work information, based on the reception information from the reception step,
The receiving step further receives a notification request for various types of railway management information from the communication terminal owned by the person in charge,
The extraction step further extracts information corresponding to the request content received by the reception step from various information stored in the storage step,
The railroad management information providing method according to any one of claims 5 to 7 , wherein the transmission step further transmits the information extracted in the extraction step to a communication terminal that has made the notification request.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001080776A JP4806131B2 (en) | 2001-03-21 | 2001-03-21 | Railway management information providing apparatus and providing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001080776A JP4806131B2 (en) | 2001-03-21 | 2001-03-21 | Railway management information providing apparatus and providing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2002274379A JP2002274379A (en) | 2002-09-25 |
JP4806131B2 true JP4806131B2 (en) | 2011-11-02 |
Family
ID=18936998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001080776A Expired - Lifetime JP4806131B2 (en) | 2001-03-21 | 2001-03-21 | Railway management information providing apparatus and providing method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4806131B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008217221A (en) * | 2007-03-01 | 2008-09-18 | Hitachi Ltd | Railroad maintenance work management system |
JP6480833B2 (en) * | 2015-08-31 | 2019-03-13 | 東日本旅客鉄道株式会社 | Train approach warning system |
CN107933621A (en) * | 2017-11-20 | 2018-04-20 | 北京万相融通科技股份有限公司 | A kind of track traffic production operation command system |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0780460B2 (en) * | 1988-03-18 | 1995-08-30 | 三菱電機株式会社 | Train operation management method |
JPH08154134A (en) * | 1994-11-28 | 1996-06-11 | Hitachi Ltd | Automatic equipment monitoring information communication equipment |
JPH08272855A (en) * | 1995-03-29 | 1996-10-18 | Hitachi Ltd | Safety management system for railroad maintenance person |
JP3194469B2 (en) * | 1996-07-02 | 2001-07-30 | 株式会社ビーエムシー | Bridge maintenance management system and bridge maintenance management method |
JPH11348788A (en) * | 1998-06-15 | 1999-12-21 | Nippon Signal Co Ltd:The | Signal facility control device |
JP2000182084A (en) * | 1998-12-16 | 2000-06-30 | Toshiba Corp | Station business unit fault notice system, and notice method for the station business unit fault notice system |
-
2001
- 2001-03-21 JP JP2001080776A patent/JP4806131B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2002274379A (en) | 2002-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109606432B (en) | Method and device for realizing station operation post linkage by using CTC3.0 | |
CN102571920A (en) | Online customer service implementation method and online customer service system | |
JP4806131B2 (en) | Railway management information providing apparatus and providing method thereof | |
JP2004038881A (en) | Emergency report system and method for the same | |
JP2002205646A (en) | Maintenance work management system | |
CN1773924A (en) | System and method for doing office work using mobile terminal | |
JP2008234488A (en) | Safety-confirming system | |
JP4833427B2 (en) | Train information providing device | |
CN109344979A (en) | Power communication access path alarm method and system | |
JP4863337B2 (en) | Railway control information transmission system and railway control information transmission method | |
JP2007094895A (en) | Disaster time information distribution support method, disaster time information distribution support center device, and portable terminal | |
KR100920028B1 (en) | Method for providing total information in relation to a train | |
CN102547607A (en) | Message interaction control method and system, message interaction system and mobile terminal | |
JP2002288287A (en) | (public) transportation information transmitting system | |
KR20070048010A (en) | System and method for remote controlling of elevator | |
CN209142157U (en) | A kind of railway station shipment control system | |
JP5507717B1 (en) | Attendance management system and attendance management method | |
JP2004051087A (en) | Maintenance support system | |
JP6592779B2 (en) | Safety confirmation system | |
JP2007011542A (en) | Network management system, network management device, and network management method | |
JP3105852B2 (en) | Mobile communication system and channel switching method thereof | |
JP2004334516A (en) | System for email notification service about installation state information | |
KR100752924B1 (en) | Method for Access Network Management using Wireless Communication Network | |
JP2003285741A (en) | Operation information providing system | |
JP6596038B2 (en) | Mobile communication system, area registration server, command board, mobile station, and area information registration method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080109 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100809 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100928 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101125 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110802 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110812 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4806131 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140819 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140819 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |