JP4774970B2 - Quality control method, quality control program and quality control system - Google Patents

Quality control method, quality control program and quality control system Download PDF

Info

Publication number
JP4774970B2
JP4774970B2 JP2005357968A JP2005357968A JP4774970B2 JP 4774970 B2 JP4774970 B2 JP 4774970B2 JP 2005357968 A JP2005357968 A JP 2005357968A JP 2005357968 A JP2005357968 A JP 2005357968A JP 4774970 B2 JP4774970 B2 JP 4774970B2
Authority
JP
Japan
Prior art keywords
management
quality
cost
quality control
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005357968A
Other languages
Japanese (ja)
Other versions
JP2007164357A (en
Inventor
康雄 森谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2005357968A priority Critical patent/JP4774970B2/en
Publication of JP2007164357A publication Critical patent/JP2007164357A/en
Application granted granted Critical
Publication of JP4774970B2 publication Critical patent/JP4774970B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、品質管理に関し、より詳細には製品の製造工程において得られた品質管理データを基に工程管理能力指数を求め、その値が所定値以下の場合に工程の損失コストを算出してランク付けし提示する品質管理方法、品質管理プログラム及び品質管理システムに関する。   The present invention relates to quality control, and more specifically, calculates a process control capability index based on quality control data obtained in a product manufacturing process, and calculates a process loss cost when the value is equal to or less than a predetermined value. The present invention relates to a quality control method, a quality control program, and a quality control system that are ranked and presented.

製品の製造においては、製造工程全体を対象として品質特性を計測し、計測したデータを統計的に捉えて管理を行う統計的管理手法が一般的である。Xbar−R管理図やP管理図、工程能力指数等は統計的な管理手法として良く知られており、これらの品質特性に対する管理基準を設定して、その設定値を基に合格または不合格を判定することが行われている。そして不良率が高い工程を中心に不良原因を予測し、その不良原因に対して適切な対処を施すことにより管理状態に戻すことを行っている。   In manufacturing a product, a statistical management method is generally used in which quality characteristics are measured for the entire manufacturing process, and the measured data is statistically captured and managed. Xbar-R control charts, P control charts, process capability indexes, etc. are well known as statistical control methods. Set control standards for these quality characteristics and pass or fail based on the set values. Judgment is made. Then, the cause of the failure is predicted centering on the process having a high failure rate, and the management state is restored by taking an appropriate measure against the cause of the failure.

例えば、図11と図12は従来の管理方法の一例を示すもので、製造工程の各工程に対して管理項目を設定し、計測したデータから工程能力指数(Cp値)を求める。そして、工程能力指数が所定の値以下となる工程を抽出し、小さな値から重要度としてのランクを付け、ランクの高いものから(即ち、Cp値の小さなものから)その原因への対処を施してきた(即ち、工程能力指数は製品を生産できる能力を示すものであるから、能力の低いものからその原因に対し対処を行ってきた)。図11は大工程における中工程、その中の管理項目における工程能力指数を取得した品質管理データから求めたものである。図12は、図11のCp値の中からCp値が1.33以下のものを抽出したもので、Cp値の小さなのからランク付けしたものである。ここでは、部品A製造ラインの穴あけ1のCp値が0.67と最も小さな値を示してランク1位になっており、穴あけ1の加工速度において品質管理上の問題があること示している。次にCp値の低いものは(ランク2位のもの)、部品B製造ラインの薬液洗浄1である。   For example, FIG. 11 and FIG. 12 show an example of a conventional management method. A management item is set for each process of the manufacturing process, and a process capability index (Cp value) is obtained from the measured data. Then, the process whose process capability index is below a predetermined value is extracted, the rank is assigned as the importance from the small value, and the cause is dealt with from the highest rank (ie, from the smallest Cp value). (In other words, since the process capability index indicates the ability to produce a product, the cause of the problem has been dealt with from the lowest ability). FIG. 11 is obtained from the quality control data obtained for the middle process in the large process and the process capability index in the management item in the middle process. FIG. 12 shows the Cp value of 1.33 or less extracted from the Cp values of FIG. 11, and is ranked because the Cp value is small. Here, the Cp value of drilling 1 in the part A production line is 0.67, which is the smallest value and ranks first, indicating that there is a problem in quality control at the drilling 1 processing speed. Next, the one with the lowest Cp value (rank 2) is the chemical cleaning 1 of the part B production line.

精度よく不良原因を予測して、迅速に改善を行う方法が提案されている。この方法は、管理項目に管理基準を設定するとともに、管理項目毎に重要度を設定しておき、管理項目のチェックを実施してそのチェック結果と管理項目および重要度とを表示するものである。不良に対する影響の大きさに従って管理項目を表示するので、効率的に不良の改善を行うことができる効果を有している(例えば、特許文献1)。
特開2002−202807号公報
There has been proposed a method for accurately predicting the cause of a defect and improving it quickly. In this method, management criteria are set for management items, importance is set for each management item, management items are checked, and the check results, management items, and importance are displayed. . Since the management items are displayed according to the magnitude of the influence on the defect, the defect can be efficiently improved (for example, Patent Document 1).
Japanese Patent Laid-Open No. 2002-202807

上記に示したように品質管理においては、統計的管理手法が一般的に用いられており、例えば工程能力指数が所定の値以下となったとき、その値の低いものから重要度が高いと判断してランク付けして表示し、不良の改善を行うことが行われてきた。   As shown above, statistical management methods are generally used in quality control. For example, when the process capability index falls below a predetermined value, it is judged that the importance is high from the low value. Then, it has been performed to rank and display and improve defects.

この方法は確かに生産能力の低い工程に対してその原因への対処がなされるものあるが、品質特性が管理目標値に戻るように修正する場合の損失コストと言うものを考えたとき、その損失コストが最も高いものであるとは限らない。例えば、工程能力指数が3位のランクのものが損失コストで見ると最もコストが高い場合がある。即ち、工程能力指数が低くてもその工程の製造コストや製造量が小さいものであれば損失コストは低いものとなり、むしろ工程能力指数が多少大きくても損失コストの大きなものから改善を図った方が有利である。このように、工程能力指数で工程の改善を図ることには問題がある。単純に不良率を求めた場合も同様である。   This method can certainly cope with the cause of a process with low production capacity, but when considering the loss cost when the quality characteristics are corrected to return to the control target value, The loss cost is not necessarily the highest. For example, the cost with the third highest rank of the process capability index may be the highest in terms of loss cost. In other words, even if the process capability index is low, the loss cost is low if the manufacturing cost or production volume of the process is small. Rather, even if the process capability index is somewhat large, the loss cost is low. Is advantageous. Thus, there is a problem in improving the process with the process capability index. The same applies when the defect rate is simply obtained.

また、上記に示した特許文献1は、予め設定した重要度に応じて不良に対する影響度が定まるものと思われるが、その重要度を定める根拠に対する開示が成されておらず、重要度の決定が経験値によるものであるとすれば人によって判断が異なることが考えられ、問題がある。   Moreover, although the patent document 1 shown above is considered that the influence degree with respect to a defect is decided according to the preset importance, the disclosure on the basis for determining the importance is not made, and the importance is determined. If it is based on experience values, it can be considered that judgments differ depending on the person, and there is a problem.

本発明は、品質管理のデータから修復に要する損失コスト(即ち、管理目標値になるように修正する場合のコスト)を求め、これらをランク付けして提示する品質管理方法、品質管理プログラム及び品質管理システムを提供することを目的とする。   The present invention obtains a loss cost required for restoration from quality management data (that is, a cost when correction is made so as to become a management target value), ranks and presents them, a quality management method, a quality management program, and quality The purpose is to provide a management system.

本発明の品質管理方法、品質管理プログラム及び品質管理システムは以下のように構成される。
(1)第1の発明
第1の発明は、各工程の工程能力指数が所定値以下であった場合に、その工程の管理目標値になるよう修正した場合の損失コストを求め、ランク付けを行って提示する品質管理方法である。
The quality control method, quality control program, and quality control system of the present invention are configured as follows.
(1) 1st invention 1st invention calculates | requires the loss cost at the time of correcting so that it may become the management target value of the process when the process capability index of each process is below a predetermined value, and ranks it. It is a quality control method to go and present.

その原理を図1を用いて説明する。第1の発明は、製造コスト記憶手順10、管理基準値記憶手順20、品質管理データ記憶手順30、工程能力指数算出手順40、損失コスト算出手順50および損失コスト提示手順60で構成する。これらの個々の構成要素について説明する。   The principle will be described with reference to FIG. The first invention includes a manufacturing cost storage procedure 10, a management reference value storage procedure 20, a quality control data storage procedure 30, a process capability index calculation procedure 40, a loss cost calculation procedure 50, and a loss cost presentation procedure 60. These individual components will be described.

製造コスト記憶手順10は、各製造工程毎の製造コストを記憶する。例えば、その工程で発生する材料費や人件費、動力費等である。   The manufacturing cost storage procedure 10 stores the manufacturing cost for each manufacturing process. For example, material costs, labor costs, power costs, etc., generated in the process.

管理基準値記憶手順20は、各工程において予め定めた管理項目とその管理項目に対する設定値とを記憶する。設定値には管理項目の目標値を含む。   The management reference value storage procedure 20 stores a management item predetermined in each process and a set value for the management item. The set value includes the target value of the management item.

品質管理データ記憶手順30は、各工程の管理項目に対する品質管理データを計測し、記憶する。   The quality management data storage procedure 30 measures and stores quality management data for the management items of each process.

工程能力指数算出手順40は、管理基準値記憶手順20で記憶している管理基準値と品質管理データ記憶手順30で記憶している品質管理データとを基に、工程能力指数を算出する。   The process capability index calculation procedure 40 calculates a process capability index based on the management reference value stored in the management reference value storage procedure 20 and the quality management data stored in the quality management data storage procedure 30.

損失コスト算出手順50は、工程能力指数算出手順40で求めた工程能力指数が所定値以下となった管理項目を抽出し、この管理項目の工程に於ける損失コストを、品質管理データのバラツキと製造コストおよび製品の生産量とを基に所定の損失関数を用いて求める。、
損失コスト提示手順60は、求めた工程に対する損失コストを、損失額の大きさでランク付けして提示する。
(2)第2の発明
第2の発明は、第1の発明の損失コストが、品質管理データの値を管理項目に設定した目標値に成るように修正する場合にかかるとした場合のコストと管理項目の目標値からの差を修正しない場合のバラツキにかかるコストである。
(3)第3の発明
第3の発明は、制御因子に対する誤差因子と信号因子とのデータを予め記憶しておき、そのデータを用いて工程能力指数が所定値以下となった管理項目の制御因子に対する補正値を求め提示するものである。第1の発明の品質管理方法に品質工学データ記憶手順をさらに有している。
The loss cost calculation procedure 50 extracts a management item in which the process capability index obtained in the process capability index calculation procedure 40 is equal to or less than a predetermined value, and determines the loss cost in the process of this management item as a variation in quality control data. It is determined using a predetermined loss function based on the manufacturing cost and the production amount of the product. ,
The loss cost presentation procedure 60 ranks and presents the loss cost for the obtained process according to the magnitude of the loss amount.
(2) Second invention The second invention is the cost when it is assumed that the loss cost of the first invention is corrected so that the value of the quality control data becomes the target value set in the management item. This is the cost of variation when the difference from the target value of the management item is not corrected.
(3) Third invention In the third invention, data of an error factor and a signal factor for a control factor is stored in advance, and the control of a management item whose process capability index is equal to or less than a predetermined value using the data. The correction value for the factor is obtained and presented. The quality control method of the first invention further includes a quality engineering data storage procedure.

その原理を図2を用いて説明する。第4の発明は、製造コスト記憶手順10、管理基準値記憶手順20、品質管理データ記憶手順30、工程能力指数算出手順40、損失コスト算出手順50、損失コスト提示手順61および品質工学データ記憶手順70で構成する。この内製造コスト記憶手順10〜損失コスト算出手順50は第1の発明と同一であるので説明は省略する。   The principle will be described with reference to FIG. The fourth invention includes a manufacturing cost storage procedure 10, a management reference value storage procedure 20, a quality control data storage procedure 30, a process capability index calculation procedure 40, a loss cost calculation procedure 50, a loss cost presentation procedure 61, and a quality engineering data storage procedure. 70. Among these, the manufacturing cost storage procedure 10 to the loss cost calculation procedure 50 are the same as those in the first invention, so that the description thereof is omitted.

品質工学データ記憶手順70は、管理項目の制御因子に対するのバラツキの要因である誤差因子と制御因子の値を変化させる要因である信号因子との品質工学上のデータを記憶する。   The quality engineering data storage procedure 70 stores quality engineering data of an error factor that is a factor of variation of the control items with respect to the control factor and a signal factor that is a factor that changes the value of the control factor.

損失コスト提示手順61は、第1の発明で求めたランク付けした損失コストと、そのランク付けされた損失コストの工程で得られた品質管理データと品質工学上のデータとからその該当する管理項目の設定値に対する補正値を求めて、ランク付けした損失コストと補正値とを提示する。
(4)第4の発明
第4の発明は、第1の発明の品質管理プログラムである。
(5)第5の発明
第5の発明は、第1の発明の品質管理システムである。
The loss cost presentation procedure 61 is a management item corresponding to the ranked loss cost obtained in the first invention and the quality control data and quality engineering data obtained in the ranked loss cost process. A correction value for the set value is obtained, and the ranked loss cost and correction value are presented.
(4) Fourth invention The fourth invention is the quality control program of the first invention.
(5) Fifth Invention The fifth invention is the quality management system of the first invention.

第1の発明により、管理基準から外れた管理項目に対する損失コストが提示されるので、最も損失の大きいものから改善の処置を図ることが可能な品質管理方法の提供ができる。   According to the first invention, the loss cost for the management item that deviates from the management standard is presented. Therefore, it is possible to provide a quality control method capable of taking measures for improvement from the item with the largest loss.

第2の発明により、生産者としての損失コストが明確になると共に、品質管理データの平均値を調整しない場合のバラツキにかかる損失コストと平均値を調整するためのコストを比較することにより、平均値の調整方法の妥当性が検討可能な品質管理方法の提供ができる。   According to the second invention, the loss cost as a producer is clarified, and by comparing the loss cost for variation when the average value of quality control data is not adjusted with the cost for adjusting the average value, the average It is possible to provide a quality control method capable of examining the validity of the value adjustment method.

第3の発明により、品質工学上のデータを基に管理基準に対する補正値が得られることから、迅速に適正な管理基準とすることが可能な品質管理方法の提供ができる。   According to the third aspect of the invention, since a correction value for the management standard can be obtained based on quality engineering data, it is possible to provide a quality management method capable of quickly setting an appropriate management standard.

第4〜第5の発明により、効率的な改善の処置を図ることが可能な品質管理プログラムと品質管理システムの提供ができる。   According to the fourth to fifth inventions, it is possible to provide a quality management program and a quality management system capable of achieving an efficient improvement procedure.

本発明の実施例について図3から図10を用いて説明する。   An embodiment of the present invention will be described with reference to FIGS.

まず最初に全体の品質管理システムの構成例を図3を用いて説明する。図3はメッキ処理の製造工程を例に示すもので、各製造工程(前処理工程301、水洗1工程302、メッキ工程303、水洗2工程304、乾燥工程305、検査工程306)の製造装置に付けられたセンサ200で品質管理データを取得し、サーバ100に品質管理データを送る。各製造工程に付けられたセンサ200は工程名の下部に示す管理項目の値を検知し、検知したデータを品質管理データとして送信する。例えば、前処理工程301では、薬液濃度、液温、処理時間、薬液の液循環量をそれぞれのセンサ200で予め決められた時間毎に検知し、デジタル量に変換して送信する。   First, a configuration example of the entire quality management system will be described with reference to FIG. FIG. 3 shows an example of the manufacturing process of the plating process. In the manufacturing apparatus of each manufacturing process (pretreatment process 301, water washing 1 process 302, plating process 303, water washing 2 process 304, drying process 305, inspection process 306). The attached sensor 200 acquires quality management data and sends the quality management data to the server 100. The sensor 200 attached to each manufacturing process detects the value of the management item shown at the bottom of the process name, and transmits the detected data as quality management data. For example, in the pretreatment step 301, the chemical concentration, the liquid temperature, the processing time, and the liquid circulation amount of the chemical liquid are detected at predetermined times by the respective sensors 200, converted into digital amounts, and transmitted.

サーバ100はセンサ200から送られた品質管理データを受信すると、これらのデータを所定の記憶場所に記憶するとともに、一定時間蓄えられたデータをもとに予め設定された管理基準値とで工程能力指数を計算し、さらに損失コストを計算して次に述べるディスプレイに表示を行う。   When the server 100 receives the quality control data sent from the sensor 200, the server 100 stores these data in a predetermined storage location, and at the same time the process capability with a management reference value set in advance based on the data stored for a certain period of time. The index is calculated, and the loss cost is calculated and displayed on the display described below.

図4は、品質管理システムの全体を管理するコンピュータの構成例である。プログラムやデータを制御する制御部110、工程の管理者に損失コスト等の表示を行うディスプレイ120、管理基準値等の設定のためにデータの入力を行うKB(キーボード)130、メッキ処理の生産計画のデータを記憶する生産計画記憶部140、各工程毎の製造コストを記憶する製造コスト記憶部150、品質管理上の管理項目とその管理基準値を記憶する管理基準値記憶部160、センサ200から送られた品質管理データを記憶する品質管理データ記憶部170、制御因子に対する誤差因子、信号因子の品質工学上のデータを記憶する品質工学データ記憶部180および品質管理プログラムを実行する主記憶190で構成する。   FIG. 4 is a configuration example of a computer that manages the entire quality management system. A control unit 110 for controlling programs and data, a display 120 for displaying a loss cost to a process manager, a KB (keyboard) 130 for inputting data for setting a management reference value, a production plan for plating processing From the production plan storage unit 140 for storing the data, the manufacturing cost storage unit 150 for storing the manufacturing cost for each process, the management reference value storage unit 160 for storing the management items and their management reference values for quality control, and the sensor 200 A quality control data storage unit 170 for storing the transmitted quality control data, an error factor for the control factor, a quality engineering data storage unit 180 for storing the signal factor quality engineering data, and a main memory 190 for executing the quality control program Constitute.

品質管理プログラムはさらに、管理基準設定部191、品質管理データ取得部192、工程能力指数算出部193、損失コスト算出部194、補正値算出部195および損失コスト提示部196で構成する。これらの品質管理プログラムの各部の機能を次に説明する。   The quality management program further includes a management standard setting unit 191, a quality management data acquisition unit 192, a process capability index calculation unit 193, a loss cost calculation unit 194, a correction value calculation unit 195, and a loss cost presentation unit 196. The function of each part of these quality control programs will be described next.

管理基準設定部191は、例えば工程管理者によって入力された管理項目に対する目標値(中央値)、上限値、下限値を管理基準値記憶部160に記憶することの処理を行う。   For example, the management reference setting unit 191 performs a process of storing the target value (median value), the upper limit value, and the lower limit value for the management item input by the process manager in the management reference value storage unit 160.

品質管理データ取得部192は、一定の時間毎にセンサ200から送られる品質管理データを品質管理データ記憶部170に記憶することを行う。   The quality management data acquisition unit 192 stores the quality management data sent from the sensor 200 at regular time intervals in the quality management data storage unit 170.

工程能力指数算出部193は、一定の時間毎に品質管理データ記憶部170に記憶した品質管理データと管理基準値記憶部160に記憶した管理基準値を基に工程能力指数を算出する。そして、算出した工程能力指数は品質管理データの平均値、最大値、最小値、バラツキとともに管理基準値記憶部160に記憶しておく。   The process capability index calculation unit 193 calculates a process capability index based on the quality management data stored in the quality management data storage unit 170 and the management reference value stored in the management reference value storage unit 160 at regular intervals. The calculated process capability index is stored in the management reference value storage unit 160 together with the average value, maximum value, minimum value, and variation of the quality control data.

損失コスト算出部194は、工程能力指数算出部193で算出した工程能力指数が所定値以下のものについて、生産計画記憶部140に記憶している年間生産計画数、製造コスト記憶部150に記憶している工程毎のコスト、品質管理データ記憶部170に記憶している品質管理データを基に年間の損失コストを算出する。   The loss cost calculation unit 194 stores the number of annual production plans stored in the production plan storage unit 140 and the manufacturing cost storage unit 150 for those whose process capability index calculated by the process capability index calculation unit 193 is equal to or less than a predetermined value. The annual loss cost is calculated based on the cost for each process and the quality control data stored in the quality control data storage unit 170.

補正値算出部195は、工程能力指数算出部193で算出した工程能力指数が所定値以下の管理項目について、品質工学データ記憶部180を参照して管理項目の管理基準に対する補正値を算出する。   The correction value calculation unit 195 calculates a correction value for the management criteria of the management item for the management item whose process capability index calculated by the process capability index calculation unit 193 is a predetermined value or less with reference to the quality engineering data storage unit 180.

損失コスト提示部196は、算出した損失コストを損失額の大きい順に並べ、求めた補正値とともにディスプレイ120に表示する。   The loss cost presentation unit 196 arranges the calculated loss costs in descending order of the amount of loss and displays the calculated correction values on the display 120 together with the calculated correction values.

次に、製造コスト記憶部150と管理基準値記憶部160および品質工学データ記憶部180のデータ例について説明する。   Next, data examples of the manufacturing cost storage unit 150, the management reference value storage unit 160, and the quality engineering data storage unit 180 will be described.

図5は、製造コスト記憶部150に記憶されるデータ例を示すもので、大工程と中工程があり、各中工程に対して材料費、人件費、動力費、それらの費用の小計、その中工程で修復する場合にかかるコストである修復費用からなる。図5では、大工程は部品A製造ライン、部品B製造ラインおよびA/B部品組立ラインの3つの大工程からなり、それぞれの大工程は図5に示す複数の中工程があることを示している。   FIG. 5 shows an example of data stored in the manufacturing cost storage unit 150. There are large processes and intermediate processes. For each intermediate process, material costs, labor costs, power costs, subtotals of those costs, It consists of repair costs, which are costs for repairing in the middle process. In FIG. 5, the major process is composed of three major processes, the part A production line, the part B production line, and the A / B part assembly line, and each large process has a plurality of middle processes shown in FIG. Yes.

例えば、部品A製造ラインの4番目目の中工程である穴あけ1は、材料費が1,000円、人件費は200円、動力費は30円でその小計はこれらの費用を合わせて1,230円となり、修復する場合は材料費を不要とするので230円である。部品A製造ラインの全体の工程を終了するとそれに要する費用は5,850円であり、修復費用は2,910円である。同様に部品B製造ラインの全体の工程にかかる費用の小計は7,120円、お修復費用は5,790であり、A/B部品組立ラインではそれぞれ14,820円、3,200円であることを示している。   For example, drilling 1, which is the fourth middle process of the part A production line, has a material cost of 1,000 yen, a labor cost of 200 yen, and a power cost of 30 yen. It costs 230 yen, and it costs 230 yen because no material costs are required for restoration. When the entire process of the part A production line is completed, the cost required for it is 5,850 yen, and the repair cost is 2,910 yen. Similarly, the total cost of the entire process of the part B production line is 7,120 yen, the repair cost is 5,790, and the A / B parts assembly line is 14,820 yen and 3,200 yen, respectively. It is shown that.

図6は、管理基準値記憶部160のデータ例を示すもので、各中工程に対する一つ以上の管理項目と、その管理項目に対する管理基準値および品質特性からなる。管理基準値は目標値である中心と上限、下限とからなり、それぞれには予め基準値が設定される。品質特性は、平均値、最大値、最小値、バラツキおよびCp値で、取得した品質管理データを基に算出される値である。ここでのバラツキは標準偏差(σ)であり、Cp値は工程能力指数の値で次に示される値である。   FIG. 6 shows an example of data stored in the management reference value storage unit 160. The management reference value storage unit 160 includes one or more management items for each intermediate process, and management reference values and quality characteristics for the management items. The management reference value includes a center, which is a target value, an upper limit, and a lower limit, and a reference value is set in advance for each. The quality characteristic is an average value, maximum value, minimum value, variation, and Cp value, and is a value calculated based on the acquired quality control data. The variation here is the standard deviation (σ), and the Cp value is the value of the process capability index as shown below.

Cp=(規格上限−規格下限)/6σ
一般に工程能力指数はCpkの記号で表されることが多く、Cp値が規格幅に対するバラツキσの関数になっているのに対し、Cpkは平均値の偏りの関数である。平均値の偏りがなければCp=Cpkとなり、ここでは平均値の調整を行っているのでCp値を用いている。なお、Cpkの値はCpk=(1−k)*Cpで示され、kの値は次式である。
Cp = (standard upper limit−standard lower limit) / 6σ
In general, the process capability index is often represented by the symbol Cpk, and the Cp value is a function of variation σ with respect to the standard width, whereas Cpk is a function of the bias of the average value. If there is no bias in the average value, Cp = Cpk. Here, since the average value is adjusted, the Cp value is used. Note that the value of Cpk is represented by Cpk = (1-k) * Cp, and the value of k is the following equation.

k=((規格上限+規格下限)/2−平均値)/(規格上限−規格下限)/2
例えば、穴あけ1の工程の管理項目であるドリル回転数の場合は、管理基準の中心は800、上限850、下限750である。図に単位を表示してないがrpm(revolution per minute)である。そして、計測して得られたデータから平均値822、最大値835、最小値810、バラツキ8.77、Cp値は1.90である。
k = ((standard upper limit + standard lower limit) / 2−average value) / (standard upper limit−standard lower limit) / 2
For example, in the case of drill rotation speed, which is a management item of the drilling 1 process, the center of the management standard is 800, an upper limit 850, and a lower limit 750. Although the unit is not shown in the figure, it is rpm (revolution per minute). And the average value 822, the maximum value 835, the minimum value 810, the variation 8.77, and the Cp value are 1.90 from the data obtained by measurement.

図7は、品質工学データ記憶部180のデータ例を示すもので、図7(a)は制御因子に対する誤差因子および信号因子の関係を示すものである。例えば、制御因子である接着粘度は誤差因子として塗布温度があり、信号因子として塗布圧力と関係していることを示している。   FIG. 7 shows an example of data in the quality engineering data storage unit 180, and FIG. 7 (a) shows the relationship between the error factor and the signal factor with respect to the control factor. For example, the adhesive viscosity, which is a control factor, has a coating temperature as an error factor, and is related to the coating pressure as a signal factor.

図7(b)は基本機能を示すもので、例えば塗布圧力と接着剤重量の関係は図に示される二つの直線で挟まれる範囲の値の関係にあることを示している。この線形の関数は理想状態(誤差が存在しない)であれば一つの直線で示すことができるが、塗布圧力と接着剤重量との関数の傾きを変化させる誤差として、温度や溶剤濃度の変化によって粘度が変化すれば、管理範囲内でも正側最悪状態、負側最悪状態での傾きの幅を持つことになる。これらの傾きの幅が狭い程、理想状態に近いことを示している。   FIG. 7B shows the basic function. For example, the relationship between the coating pressure and the adhesive weight is in the range of values between the two straight lines shown in the figure. This linear function can be shown as a single straight line in the ideal state (no error exists), but as an error that changes the slope of the function between the application pressure and the adhesive weight, it varies depending on changes in temperature and solvent concentration. If the viscosity changes, even within the control range, there will be a range of slopes in the positive worst case and the negative worst case. The narrower the slope, the closer to the ideal state.

また、接着における荷重と変位との関係も同様に温度や湿度などの誤差により傾きが変り、この変動幅が小さい程理想状態に近いことを意味している。   Similarly, the relationship between the load and displacement in bonding changes in inclination due to errors such as temperature and humidity, and the smaller the fluctuation range, the closer to the ideal state.

図7(c)は、品質(または特性)に対する各要因(A、B・・・H)の効果を示しており、SN比(点線で示される)は環境や使用条件などの誤差(管理困難な要因)に対する安定性を示し、値が大きい程安定性が良いことを意味する。感度は応答特性である。SN比と感度は以下の式で表せれる。   FIG. 7C shows the effect of each factor (A, B... H) on the quality (or characteristics), and the SN ratio (indicated by a dotted line) is an error (difficult to manage) such as the environment or use conditions. The higher the value, the better the stability. Sensitivity is a response characteristic. The S / N ratio and sensitivity can be expressed by the following equations.

Figure 0004774970
Figure 0004774970

Figure 0004774970
ここで、β :比例定数
r :入力の大きさ(信号の大きさ)
Ve:誤差分散
Sβ:比例定数の変動
この式から分かるように、SN比の大きさは誤差分散Veに対する感度の安定性を示している。
Figure 0004774970
Where β: proportionality constant
r: input size (signal size)
Ve: error variance
Sβ: Fluctuation of proportionality constant As can be seen from this equation, the magnitude of the SN ratio indicates the stability of sensitivity to the error variance Ve.

次に、本発明で用いる損失コストについて説明する。損失コストは図8に示す損失関数を用いて目標値からの差を修正しない場合の損失コストL1、および目標値になるように修正した場合の損失コストL2を算出する。図8に示す損失関数は一般的に知られているので説明は省略するが、具体例で算出の方法を述べる。   Next, the loss cost used in the present invention will be described. The loss cost is calculated using a loss function shown in FIG. 8 as a loss cost L1 when the difference from the target value is not corrected and a loss cost L2 when the difference is corrected to the target value. Since the loss function shown in FIG. 8 is generally known, a description thereof will be omitted, but a calculation method will be described using a specific example.

図5の部品A製造ラインにおいて、穴あけ2の工程において、穴径が機能限界Δ0の70μmを越えると組立できなくなり破棄するとした場合に、そのコストA0(図8の消費者損失に等しい)は5,850円、穴径が小さくて修復可能な場合の手直しのコストA(図8のメーカ損失に等しい)は2,450である(図5の全体の修復コスト2,910から穴あけ1と穴あけ3の230円×2が引かれた値となる)。許容差は、図5の許容差Δを求める式にA、A0、Δ0の値を入れて45.3μmとなり、損失コストL1とL2はそれぞれ578円、306円が求まる(VTは図示しないが22μm、Veは図6の品質特性の穴径2のバラツキ16μmである)。ここで求めたL1とL2の値は、部品1個当りの損失コストであるので、部品生産個数を年間1万個とすれば、年間の損失コストL1とL2はそれぞれ578万円と306万円になる。損失コストは、このように生産数を考慮した値を求める。   In the part A manufacturing line of FIG. 5, when the hole diameter exceeds the functional limit Δ0 of 70 μm in the drilling 2 process and the assembly is discarded, the cost A0 (equal to the consumer loss of FIG. 8) is 5 , 850 yen, the repair cost A when the hole diameter is small and repairable (equal to the manufacturer's loss in FIG. 8) is 2,450 (from the overall repair cost 2,910 in FIG. 5, drilling 1 and drilling 3 230 yen x 2 is subtracted). The tolerance is 45.3 μm by adding the values of A, A0, and Δ0 to the equation for obtaining the tolerance Δ in FIG. 5, and the loss costs L1 and L2 are 578 yen and 306 yen, respectively (VT is not shown but 22 μm) , Ve is the variation of the hole diameter 2 of the quality characteristic of FIG. 6 is 16 μm). Since the values of L1 and L2 obtained here are loss costs per part, if the number of parts produced is 10,000 per year, the annual loss costs L1 and L2 are 5.78 million yen and 3.60 million yen, respectively. become. Thus, the loss cost is determined in consideration of the production number.

次に品質管理システムのコンピュータ100の処理フロー例を図9を用いて説明する。まず、コンピュータは各工程のセンサ200から送られてくる品質管理データを取得する。このデータを品質管理データ記憶部170に蓄積し、定められたタイミングで平均値、最大値、最小値、バラツキおよびCp値(Cp値は、先に示した式で求める)を求め、管理基準値記憶部160に書き込む(S110、S120)。   Next, a processing flow example of the computer 100 of the quality management system will be described with reference to FIG. First, the computer acquires quality control data sent from the sensor 200 in each process. This data is accumulated in the quality control data storage unit 170, and an average value, maximum value, minimum value, variation, and Cp value (Cp value is obtained by the above-described formula) are obtained at a predetermined timing, and a management reference value is obtained. Write to the storage unit 160 (S110, S120).

管理基準値記憶部160の全てのCp値の値が1.33を越えていればこのまま終了するが(S130でNoの場合)、Cp値の値が1.33以下のものがある場合(S130でYesの場合)には、それらに対して上述した方法で年間の生産数を考慮した損失コストのL1とL2を算出する。算出した損失コストの額の大きい順にランク付けを行う。(S130〜S150)。   If all the Cp values in the management reference value storage unit 160 exceed 1.33, the process ends as it is (No in S130), but there are cases where the Cp value is 1.33 or less (S130). In the case of Yes), the loss costs L1 and L2 are calculated in consideration of the annual production number by the method described above. Ranking is performed in descending order of the calculated loss cost. (S130-S150).

次に、上位にランクされた3つの管理項目の制御因子について、図7に示す品質工学データ記憶部180を参照して補正値を求める(S160)。   Next, with respect to the control factors of the three management items ranked higher, correction values are obtained with reference to the quality engineering data storage unit 180 shown in FIG. 7 (S160).

S150でランク付けしたL1とL2の損失コストとS160で求めた補正値とをディスプレイ120に表示する。そして、求めた補正値を基に管理基準値や製造装置の設定の修正を行う(S170、S180)。   The loss costs of L1 and L2 ranked in S150 and the correction value obtained in S160 are displayed on the display 120. Then, the management reference value and the setting of the manufacturing apparatus are corrected based on the obtained correction value (S170, S180).

図10にS150で求めた損失コストL2とランク付けした例を示す。図10は、図5および図6のデータ例に対応している。この図10のランクと図12の従来のCp値によるランクを比較すると全く異なることが判る。   FIG. 10 shows an example ranked with the loss cost L2 obtained in S150. FIG. 10 corresponds to the data examples of FIG. 5 and FIG. Comparing the rank of FIG. 10 with the conventional Cp value rank of FIG. 12, it can be seen that they are completely different.

第1の発明の原理図である。It is a principle diagram of the first invention. 第2の発明の原理図である。It is a principle diagram of the second invention. 品質管理システムの構成例である。It is a structural example of a quality control system. 品質管理システムのコンピュータの構成例である。It is a structural example of the computer of a quality control system. 製造コスト記憶部のデータ例ある。It is an example of data of a manufacturing cost storage part. 管理基準値記憶部のデータ例である。It is an example of data of a management standard value storage part. 品質工学データ記憶部のデータ例である。It is an example of data of a quality engineering data storage part. 品質コストの算出式である。It is a formula for calculating the quality cost. コンピュータの処理フロー例である。It is an example of the processing flow of a computer. 年間の損失コストによるランク付けの例である。An example of ranking by annual loss cost. 品質管理データから算出したCp値の例である。It is an example of the Cp value calculated from quality control data. 従来のCp値によるランク付けの例である。It is an example of the ranking by the conventional Cp value.

符号の説明Explanation of symbols

10 製造コスト記憶手順
20 管理基準値記憶手順
30 品質管理データ記憶手順
40 工程能力指数算出手順
50 損失コスト算出手順
60 損失コスト提示手順
61 損失コスト提示手順
70 品質工学データ記憶手順
100 コンピュータ
110 制御部
120 ディスプレイ
130 キーボード
140 生産計画記憶部
150 製造コスト記憶部
160 管理基準値記憶部
170 品質管理データ記憶部
180 品質工学データ記憶部
190 主記憶
191 管理基準設定部
192 品質管理データ取得部
193 工程能力指数算出部
194 損失コスト算出部
195 補正値算出部
196 損失コスト提示部
200 センサ
301 前処理工程
302 水洗1工程
303 メッキ工程
304 水洗2工程
305 乾燥工程
306 検査工程
DESCRIPTION OF SYMBOLS 10 Manufacturing cost storage procedure 20 Management reference value storage procedure 30 Quality control data storage procedure 40 Process capability index calculation procedure 50 Loss cost calculation procedure 60 Loss cost presentation procedure 61 Loss cost presentation procedure 70 Quality engineering data storage procedure 100 Computer 110 Control unit 120 Display 130 Keyboard 140 Production plan storage unit 150 Manufacturing cost storage unit 160 Management standard value storage unit 170 Quality management data storage unit 180 Quality engineering data storage unit 190 Main memory 191 Management standard setting unit 192 Quality management data acquisition unit 193 Process capability index calculation Section 194 Loss cost calculation section 195 Correction value calculation section 196 Loss cost presentation section 200 Sensor 301 Pretreatment process 302 Water washing 1 process 303 Plating process 304 Water washing 2 process 305 Drying process 306 Inspection process

Claims (5)

コンピュータが、
製造する製品の工程毎の製造コストを記憶する製造コスト記憶手順と、
前記工程毎に予め定めた品質管理の管理項目と該管理項目に対する目標値を含む管理基準値とを記憶する管理基準値記憶手順と、
前記管理項目に対する品質管理データを計測し、得られた品質管理データを記憶する品質管理データ記憶手順と、
前記管理基準値と記憶された前記品質管理データとを基に、工程能力指数を求める工程能力指数算出手順と、
求めた前記工程能力指数が所定の値以下となった管理項目を抽出し、抽出した管理項目の工程における損失コストを、前記品質管理データのバラツキと前記製造コストおよび前記製品の生産量とを基に所定の損失関数を用いて損失コストを求める損失コスト算出手順と、
前記求めた工程に対する損失コストを、額の大きさでランク付けして提示する損失コスト提示手順と、
を有することを特徴とする品質管理方法。
Computer
A manufacturing cost storage procedure for storing the manufacturing cost for each process of the product to be manufactured;
Management reference value storage procedure for storing quality control management items predetermined for each process and management reference values including target values for the management items;
Quality management data storage procedure for measuring quality management data for the management items and storing the obtained quality management data;
A process capability index calculation procedure for determining a process capability index based on the control reference value and the stored quality control data;
The management item whose calculated process capability index is equal to or less than a predetermined value is extracted, and the loss cost in the process of the extracted management item is calculated based on the variation in the quality control data, the manufacturing cost, and the production amount of the product. A loss cost calculation procedure for determining a loss cost using a predetermined loss function for
Loss cost presentation procedure for ranking and presenting the loss cost for the determined process by the size of the amount;
The quality control method characterized by having.
前記損失コストは、
前記品質管理データの値が前記管理項目の目標値に成るように修正する場合のコストと、前記管理項目の目標値からの差を修正しない場合のコストである、
ことを特徴とする請求項1記載の品質管理方法。
The loss cost is
A cost in which the value of the quality control data is corrected to be a target value of the management item and a cost in a case where a difference from the target value of the management item is not corrected.
The quality control method according to claim 1, wherein:
前記品質管理方法は、さらに
前記管理項目の制御因子に対し、品質のバラツキの要因である誤差因子と品質を変化させる要因である信号因子との品質工学上のデータを記憶した品質工学データ記憶手順を有し、
前記損失コスト提示手順は、前記損失コスト算出手順で求めた工程に対する損失コストを額の大きさでランク付けするとともに、ランク付けされた該損失コストの品質管理データと前記品質工学上のデータとから該当する管理項目の設定値に対する補正値を求め、該ランク付けした損失コストと該補正値とを提示する
ことを特徴とする請求項1記載の品質管理方法。
The quality management method further includes a quality engineering data storage procedure for storing quality engineering data of an error factor that is a factor of quality variation and a signal factor that is a factor that changes quality with respect to the control factor of the management item. Have
The loss cost presentation procedure ranks the loss cost for the process obtained in the loss cost calculation procedure by the amount of the amount, and from the ranked quality control data of the loss cost and the quality engineering data The quality control method according to claim 1, wherein a correction value for the set value of the corresponding management item is obtained, and the ranked loss cost and the correction value are presented.
コンピュータに、
製造する製品の工程毎の製造コストを記憶する製造コスト記憶手順と、
前記工程毎に予め定めた品質管理の管理項目と該管理項目に対する目標値を含む管理基準値とを記憶する管理基準値記憶手順と、
前記管理項目に対する品質管理データを計測し、得られた品質管理データを記憶する品質管理データ記憶手順と、
前記管理基準値と記憶された前記品質管理データとを基に、工程能力指数を求める工程能力指数算出手順と、
求めた前記工程能力指数が所定の値以下となった管理項目を抽出し、抽出した管理項目の工程における損失コストを、前記品質管理データのバラツキと前記製造コストおよび前記製品の生産量とを基に所定の損失関数を用いて損失コストを求める損失コスト算出手順と、
前記求めた工程に対する損失コストを、額の大きさでランク付けして提示する損失コスト提示手順と、
を実行させるための品質管理プログラム。
On the computer,
A manufacturing cost storage procedure for storing the manufacturing cost for each process of the product to be manufactured;
Management reference value storage procedure for storing quality control management items predetermined for each process and management reference values including target values for the management items;
Quality management data storage procedure for measuring quality management data for the management items and storing the obtained quality management data;
A process capability index calculation procedure for determining a process capability index based on the control reference value and the stored quality control data;
The management item whose calculated process capability index is equal to or less than a predetermined value is extracted, and the loss cost in the process of the extracted management item is calculated based on the variation in the quality control data, the manufacturing cost, and the production amount of the product. A loss cost calculation procedure for determining a loss cost using a predetermined loss function for
Loss cost presentation procedure for ranking and presenting the loss cost for the determined process by the size of the amount;
Quality control program to execute.
製造する製品の工程毎の製造コストを記憶する製造コスト記憶手段と、
前記工程毎に予め定めた品質管理の管理項目と該管理項目に対する目標値を含む管理基準値とを記憶する管理基準値記憶手段と、
前記管理項目に対する品質管理データを計測し、得られた品質管理データを記憶する品質管理データ記憶手段と、
前記管理基準値と記憶された前記品質管理データとを基に、工程能力指数を求める工程能力指数算出手段と、
求めた前記工程能力指数が所定の値以下となった管理項目を抽出し、抽出した管理項目の工程における損失コストを、前記品質管理データのバラツキと前記製造コストおよび前記製品の生産量とを基に所定の損失関数を用いて損失コストを求める損失コスト算出手段と、
前記求めた工程に対する損失コストを、額の大きさでランク付けして提示する損失コスト提示手段と、
を有することを特徴とする品質管理システム。
Manufacturing cost storage means for storing the manufacturing cost for each process of the product to be manufactured;
Management reference value storage means for storing a quality control management item predetermined for each process and a management reference value including a target value for the management item;
Quality management data storage means for measuring quality management data for the management items and storing the obtained quality management data;
Based on the management reference value and the stored quality control data, a process capability index calculating means for obtaining a process capability index;
The management item whose calculated process capability index is equal to or less than a predetermined value is extracted, and the loss cost in the process of the extracted management item is calculated based on the variation in the quality control data, the manufacturing cost, and the production amount of the product. A loss cost calculating means for determining a loss cost using a predetermined loss function for
Loss cost presenting means for ranking and presenting the loss cost for the determined process by the size of the amount;
A quality control system characterized by comprising:
JP2005357968A 2005-12-12 2005-12-12 Quality control method, quality control program and quality control system Expired - Fee Related JP4774970B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005357968A JP4774970B2 (en) 2005-12-12 2005-12-12 Quality control method, quality control program and quality control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005357968A JP4774970B2 (en) 2005-12-12 2005-12-12 Quality control method, quality control program and quality control system

Publications (2)

Publication Number Publication Date
JP2007164357A JP2007164357A (en) 2007-06-28
JP4774970B2 true JP4774970B2 (en) 2011-09-21

Family

ID=38247194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005357968A Expired - Fee Related JP4774970B2 (en) 2005-12-12 2005-12-12 Quality control method, quality control program and quality control system

Country Status (1)

Country Link
JP (1) JP4774970B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105045220A (en) * 2015-05-08 2015-11-11 上海质晟生物科技有限公司 Quality control method based on Z-score quality control chart for multiple variables
KR101801897B1 (en) * 2016-06-23 2017-12-20 한국항공우주산업 주식회사 Process management system and method for quality control of aviation parts industry

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5118471B2 (en) * 2007-12-20 2013-01-16 株式会社クラステクノロジー Integrated bill of materials creation system and integrated bill of materials creation method
CN103454984B (en) * 2012-05-31 2016-01-13 沈阳铝镁设计研究院有限公司 Raw-anode carbon block quality influence analysis process control method
CN113539397A (en) * 2021-05-27 2021-10-22 内蒙古卫数数据科技有限公司 Real-time quality control system only using patient sample
KR102431107B1 (en) * 2021-12-01 2022-08-11 주식회사 시제 A method of calculating a production volume of the production line using artificial intelligence

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06195402A (en) * 1992-10-26 1994-07-15 Hitachi Ltd Optimal design supporting system for product development
JPH08157926A (en) * 1994-12-05 1996-06-18 Nippon Steel Corp Decision of carbon quantity at blowing off in converter
JP3400661B2 (en) * 1996-11-26 2003-04-28 松下電工株式会社 Production control method
JPH10261019A (en) * 1997-03-18 1998-09-29 Hitachi Ltd Device and method for quality control of products by more than one manufacture processes
JP3695152B2 (en) * 1998-06-23 2005-09-14 株式会社日立製作所 Cost index calculation device
JP2001273025A (en) * 2000-03-23 2001-10-05 Hitachi Ltd Method for estimating generation rate of inferiority of work, and method and device for estimating probability of inferiority in production workshop
JP2003162310A (en) * 2001-11-22 2003-06-06 Denso Corp Loss cost analytical system for manufacturing process
JP2004078716A (en) * 2002-08-21 2004-03-11 Fujitsu Ltd Quality management system and its method
JP3693177B2 (en) * 2003-06-24 2005-09-07 オムロン株式会社 Improvement support system
JP2005173911A (en) * 2003-12-10 2005-06-30 Trecenti Technologies Inc Process control system and process control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105045220A (en) * 2015-05-08 2015-11-11 上海质晟生物科技有限公司 Quality control method based on Z-score quality control chart for multiple variables
CN105045220B (en) * 2015-05-08 2018-03-23 上海质晟生物科技有限公司 A kind of method of quality control based on multivariable Z score quality control chart for being used for laboratory diagnosis field or field of industrial production
KR101801897B1 (en) * 2016-06-23 2017-12-20 한국항공우주산업 주식회사 Process management system and method for quality control of aviation parts industry

Also Published As

Publication number Publication date
JP2007164357A (en) 2007-06-28

Similar Documents

Publication Publication Date Title
JP4774970B2 (en) Quality control method, quality control program and quality control system
AU2020239630B2 (en) Weighing scale diagnostics method
US7640126B2 (en) Combine-information processing apparatus, method for processing combine-information, program, and recording medium
CA2843157C (en) Extrapolation of interpolated sensor data to increase sample throughput
JP2020035407A (en) Abnormal sign diagnostic device and abnormal sign diagnostic method
JP6637625B2 (en) How to estimate the remaining life of a structure
TW202013104A (en) Data processing method, data processing device, and computer-readable recording medium
US20060106469A1 (en) Systems and methods for statistical process control
CN110099089B (en) Online self-correction of multiple data streams in a sensor network
JP7075771B2 (en) Data processing methods, data processing equipment, data processing systems, and data processing programs
CN110137103B (en) Data processing method, data processing device, data processing system, and recording medium
JP2011065337A (en) Traceability system and manufacturing process failure detecting method
CN109145250B (en) Sensor service prediction
CN116609642A (en) Chip test error compensation method and device, electronic equipment and storage medium
Carter-Journet et al. Estimating probability of failure for drilling tools with life prediction
CN103733041A (en) Management device, management method, program, and recording media
CN104318129B (en) Method for estimating service life of server product
KR20220085866A (en) Device and method for anomaly detection of gas sensor
US11988545B2 (en) Method for proposing installation environment and metering device therefor
WO2023243232A1 (en) Data analysis device, data analysis method, and program
JP7314969B2 (en) Zirconia oxygen concentration meter maintenance method, maintenance system, and zirconia oxygen concentration meter
EP4201534A1 (en) Method for optimizing the dispensing of an adhesive
US7013237B2 (en) Apparatus and method for monitoring a running process
JP5358441B2 (en) Automatic dynamic baseline generation and adjustment
JP7457601B2 (en) Factor estimation device, factor estimation system and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110330

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110531

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110613

R150 Certificate of patent or registration of utility model

Ref document number: 4774970

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140708

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees