JP4769024B2 - Construction method of structure - Google Patents
Construction method of structure Download PDFInfo
- Publication number
- JP4769024B2 JP4769024B2 JP2005171902A JP2005171902A JP4769024B2 JP 4769024 B2 JP4769024 B2 JP 4769024B2 JP 2005171902 A JP2005171902 A JP 2005171902A JP 2005171902 A JP2005171902 A JP 2005171902A JP 4769024 B2 JP4769024 B2 JP 4769024B2
- Authority
- JP
- Japan
- Prior art keywords
- filler
- strength
- liquid
- tunnel
- natural ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/24—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing alkyl, ammonium or metal silicates; containing silica sols
- C04B28/26—Silicates of the alkali metals
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/70—Grouts, e.g. injection mixtures for cables for prestressed concrete
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Structural Engineering (AREA)
- Organic Chemistry (AREA)
- Lining And Supports For Tunnels (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Sealing Material Composition (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
本発明は、構造物の構築方法に関する。 The present invention relates to a method for the construction of structure creation.
従来、構造物と地山との間に形成された空隙部に充填される充填材としては、セメント系の材料が使用されていた。このようなセメント系充填材は、ゲル化までに時間がかかり、充填材が地山に浸透してしまうために、注入量が増大する場合があった。また、初期強度の発現までの時間が長いことから、空隙部の安定化を図る点でも問題点を有していた。 Conventionally, a cement-based material has been used as a filler that fills a gap formed between a structure and a natural ground. Such cement-based fillers take time until gelation, and the fillers penetrate into the natural grounds, which may increase the amount of injection. In addition, since the time until the initial strength is developed is long, there is also a problem in terms of stabilizing the void portion.
そのため、特許文献1には、ケイ酸カルシウム水和物とセメントと水とからなるA液と、水ガラスからなるB液とを混合することにより、ゲルタイムを短縮し、初期強度を早期に発現する充填材が開示されている。この従来の充填材は、A液のケイ酸カルシウム水和物から溶出されたカルシウムイオンと水ガラス中のSiO2イオンとの反応によりゲルタイムの短縮、ゲルの強度増加を図り、また、セメントから徐々に溶出されたカルシウムイオンと水ガラスのSiO2イオンとの反応により長期強度の増加を図っている。なお、前記充填材においてケイ酸カルシウム水和物は、A液1m3当り40〜300kg添加されており、セメントは、A液1m3当り250kg以上投入されている。
ところが、前記従来の充填材は、ケイ酸カルシウム水和物と水ガラスとの反応により、早期のゲル化が実現されるものの、充填材の強度はセメントにより発現されるため、時間経過とともに強度が増加する性質を有している。そのため、必要以上の強度を発現し、当該充填材の充填後の作業に支障をきたす場合があった。
つまり、例えば、前記従来の充填材をトンネル工事等において、小口径のシールドトンネルにより先進トンネルを掘進した後、大口径の後進トンネルを構築する施工手順による大断面トンネル施工に適用した場合、先進トンネルの充填材の強度が周辺の地山よりも大きいため、後進トンネルの掘削機の掘削能力を上げる必要があるとともに、作業時間が増大する場合があった。
However, although the conventional filler realizes early gelation by the reaction of calcium silicate hydrate and water glass, the strength of the filler is expressed by the cement, so that the strength increases with time. It has an increasing property. Therefore, the strength more than necessary is expressed, and there are cases where the work after filling with the filler is hindered.
That is, for example, when the conventional filler is applied to a large section tunnel construction by a construction procedure for constructing a large diameter backward tunnel after excavating the advanced tunnel with a small diameter shield tunnel in tunnel construction etc. Because the strength of the filler is larger than the surrounding ground, it is necessary to increase the excavating capacity of the excavator in the reverse tunnel, and the work time may increase.
また、前記従来の充填材は、セメントの硬化により付着強度が強いため、前記のように先進トンネルの裏込め材として適用した場合、後進トンネルの構築の際にセグメントの解体が困難となる場合があった。
また、掘進機や躯体との付着強度により、掘進中は別途滑材を充填する必要があり、滑材の空隙への充填および滑材と充填材との置換により二度手間となるため、作業時間の短縮に支障をきたすという問題点を有していた。
In addition, since the conventional filler has high adhesion strength due to hardening of the cement, when applied as a backfill material for advanced tunnels as described above, it may be difficult to disassemble the segments when constructing a reverse tunnel. there were.
In addition, due to the adhesion strength with the excavator and the frame, it is necessary to fill the lubricant separately during the excavation, and it will be troublesome twice by filling the gap in the lubricant and replacing the lubricant with the filler. The problem was that it would hinder time reduction.
本発明は、前記の問題点を解決するためになされたものであり、ゲルタイムが短く、短時間で必要強度が得られ、かつ、その後の強度増加が小さく、また、躯体等との付着強度が低い充填材を使用した構造物の構築方法を提案することを課題とする。 The present invention has been made in order to solve the above-mentioned problems, the gel time is short, the required strength can be obtained in a short time, and the subsequent increase in strength is small, and the adhesion strength with the casing and the like is also low. it is an object to propose a method for constructing a structure using the low filler.
前記課題を解決するために、請求項1に記載の発明は、掘削機により地山を掘削するとともに、前記掘削機と前記地山の掘削面との間に形成された空隙に滑材として充填材を充填する工程と、前記地山の掘削により形成された空間の内部において躯体を形成する工程と、前記滑材と前記躯体との間に形成された空隙に裏込め材として充填材を充填する工程と、を含む構造物の構築方法であって、前記充填材が、水ガラスと水とからなるA液と、水酸化カルシウムおよび潜在水硬性のある材料を含む懸濁液であるB液と、の混合体であり、前記水酸化カルシウムが、前記混合体1m3に対して50kg以上200kg以下の範囲内で添加され、前記潜在水硬性のある材料が、前記混合体1m 3 に対して100kg以下添加されることを特徴としている。 In order to solve the above-mentioned problem, the invention according to claim 1 is characterized in that a ground is excavated by an excavator and a gap formed between the excavator and the excavation surface of the natural ground is filled as a lubricant. A step of filling a material, a step of forming a housing inside a space formed by excavation of the natural ground, and a space formed between the sliding material and the housing is filled with a filler as a backfill material And a process for constructing a structure, wherein the filler is a liquid A composed of water glass and water, and a suspension B containing calcium hydroxide and a material having a latent hydraulic property. And the calcium hydroxide is added in a range of 50 kg to 200 kg with respect to the mixture 1m 3 , and the latent hydraulic material is added to the mixture 1m 3 . and characterized in that 100kg added following To have.
また、水ガラスとして、SiO2/Na2Oのモル比nが0.5〜4.2、SiO2の濃度が9.5〜38.0重量%の範囲内のものを使用してもよい。 Water glass having a SiO 2 / Na 2 O molar ratio n of 0.5 to 4.2 and a SiO 2 concentration of 9.5 to 38.0% by weight may be used. .
充填材は、水ガラスと水酸化カルシウム懸濁液または水酸化カルシウムとスラグを含む懸濁液とを反応させることにより、ゲルタイムが60秒以内、初期強度を1〜7日後に発現し、その後の強度発現が30%以内という性質を有している。そのため、従来の充填材と比べて、必要以上の強度を発現することが無く、また、地山空隙に漏出することが無いため、充填に要する材料費を必要最小限に抑えることが可能となるとともに、充填後の作業がある場合にも、その作業に支障をきたすことがない。 Charging Hamazai, by reacting a suspension comprising water glass and calcium suspension or calcium hydroxide and slag hydroxide, gel time within 60 seconds, to express initial strength after 1-7 days, then Has a property that the strength expression is within 30%. Therefore, compared to conventional fillers, it does not exhibit an unnecessarily strong strength and does not leak into the natural space, so that it is possible to minimize the material cost required for filling. In addition, even when there is work after filling, the work is not hindered.
また、従来のセメント系の充填材と比べて付着強度が低いため、例えば、シールドトンネルや推進トンネル等の滑材としての使用も可能である。 Moreover, since the adhesive strength is lower than that of a conventional cement-based filler, it can be used as a sliding material such as a shield tunnel or a propulsion tunnel.
また、従来のセメント系の充填材は、六価クロムの溶出等による、環境面での問題点が懸念されていたが、本実施形態に係る充填材は、六価クロムを含んでおらず、環境面に関して安全なものである。 In addition, the conventional cement-based filler was concerned about environmental problems due to elution of hexavalent chromium, but the filler according to this embodiment does not contain hexavalent chromium, It is environmentally safe.
また、本発明の構造物の構築方法は、前記躯体を撤去して、前記掘削面を拡幅する工程を含んでいてもよい。 Moreover , the construction method of the structure of the present invention may include a step of removing the casing and widening the excavation surface.
かかる構造物の構築方法は、地山と躯体との間に形成された空隙に、ゲルタイムが60秒以内、初期強度を1〜7日後に発現し、その後の強度発現が30%以内という性質を有した充填材を充填することにより、必要最小限の注入量により地山の崩壊を防止するため、経済的かつ安全な施工を可能となる。また、周辺地山と同等の強度を発現し、躯体との付着強度の小さい充填材を使用しているため、当該構築方法により構築された構造物と隣接して新たな構造物を構築する際に支障をきたすことがない。 The construction method of such a structure has such properties that the gel time is within 60 seconds, the initial strength is developed after 1 to 7 days, and the subsequent strength development is within 30% in the void formed between the natural ground and the frame. By filling the filler, the ground is prevented from collapsing with the minimum required injection amount, so that economical and safe construction is possible. In addition, because it uses a filler that expresses the same strength as the surrounding natural ground and has low adhesion strength to the frame, when constructing a new structure adjacent to the structure constructed by the construction method Will not be disturbed.
ゲルタイムが短く、短時間で必要強度が得られ、かつ、その後の強度増加が小さく、また、躯体等との付着強度が低い充填材を使用した本発明の構造物の構築方法により、安全かつ経済的な施工が可能となる。 Short gate-time, a short time to obtain necessary strength, and the subsequent increase in the strength is small, also the method for constructing a structure of the present invention which bond strength of the building frame or the like using a low ITakashi Hamazai, Safe and economical construction is possible.
本発明の好適な実施の形態について、図面を参照して説明する。なお、説明において、同一要素には同一の符号を用い、重複する説明は省略する。
ここで、図1は、本実施形態に係る構造物の構築方法を示す図であって、(a)は横断面図、(b)は(a)のA−A断面図である。
Preferred embodiments of the present invention will be described with reference to the drawings. In the description, the same reference numerals are used for the same elements, and duplicate descriptions are omitted.
Here, FIG. 1 is a figure which shows the construction method of the structure based on this embodiment, Comprising: (a) is a cross-sectional view, (b) is AA sectional drawing of (a).
本実施形態では、図1に示すように、シールド工法によりトンネル(構造物)1を構築する際に、地山Gの崩落を防止することを目的として、セグメント(躯体)20またはシールド機30と掘削面K1との間に形成された空隙K2またはK3に充填材10の充填を行っている。 In the present embodiment, as shown in FIG. 1, when the tunnel (structure) 1 is constructed by the shield method, for the purpose of preventing the collapse of the natural ground G, Filling material 10 is filled into gap K2 or K3 formed between excavation surface K1.
トンネル1の構築は、シールド機30により地山Gを掘削する掘削工程と、地山Gの掘削より形成された空間の内部にセグメント20を配置する躯体構築工程と、空間内において地山Gとセグメント20との間に形成された空隙K2に裏込め材11(充填材10)を充填する裏込め工程とを含んでいる。 The tunnel 1 is constructed by an excavation process for excavating the natural ground G by the shield machine 30, an enclosure construction process for disposing the segment 20 in the space formed by excavation of the natural ground G, and the natural ground G in the space. A backfilling step of filling the backfilling material 11 (filler 10) into the gap K2 formed between the segment 20 and the segment 20.
なお、本実施形態では、シールド工法により導坑であるトンネル1を構築し、このトンネル1を利用して計画された大断面トンネルの外周囲に止水やグランドアーチの形成等を目的とした補助工法を施した後、トンネル1を拡幅して大断面トンネルを構築する場合について説明する。 In the present embodiment, the tunnel 1 that is a guide shaft is constructed by the shield method, and the purpose is to provide water stoppage and formation of a ground arch around the outer circumference of the large section tunnel planned using the tunnel 1. A case where a tunnel with a large cross section is constructed by expanding the tunnel 1 after the construction method will be described.
空隙K2に充填される裏込め材11(充填材10)は、水ガラス(珪酸ナトリウムまたは珪酸ソーダともいう)と水とからなるA液と、水酸化カルシウムおよびスラグ(潜在水硬性のある材料)を含む懸濁液であるB液とを反応させてなる充填材(混合体)であって、水酸化カルシウムが混合体1m3に対して50〜200kgの範囲内で添加されて、スラグが混合体1m3に対して100kg以下添加されたものを使用する。 The backfilling material 11 (filling material 10) filled in the gap K2 is a liquid A composed of water glass (also referred to as sodium silicate or sodium silicate) and water, calcium hydroxide and slag (a material with latent hydraulic properties). A filler (mixture) obtained by reacting with the liquid B, which is a suspension containing slag, and calcium hydroxide is added within a range of 50 to 200 kg with respect to 1 m 3 of the mixture to mix the slag. Use 100kg or less added to 1m 3 body.
ここで、水酸化カルシウムは、限定されるものではないが、水に極僅かしか溶けない難溶性物質で、水ガラスの存在下では十分な量が溶解して水ガラスとの反応によるゲルタイムが安定しているものが好ましい。 Here, although calcium hydroxide is not limited, it is a poorly soluble substance that is only slightly soluble in water. In the presence of water glass, a sufficient amount dissolves and the gel time due to reaction with water glass is stable. What is doing is preferable.
また、本実施形態では、スラグとして、高炉水砕スラグを使用するが、スラグは、潜在水硬性を有するものであれば前記のものに限定されるものではない。また、スラグの粒度は、懸濁液として圧送可能な程度であればよく、好ましくはブレーン値3200cm2/g以上、さらに好ましくは5000cm2/g以上のものであればよい。 In this embodiment, blast furnace granulated slag is used as the slag, but the slag is not limited to the above as long as it has latent hydraulic properties. The particle size of the slag is not limited as long as it can be pumped as a suspension, preferably a brane value of 3200 cm 2 / g or more, more preferably 5000 cm 2 / g or more.
また、本実施形態では、水ガラスとして、JISK1408の3号珪酸ソーダ(比重(15℃B’e)40以上、二酸化珪素28〜30%、酸化ナトリウム9〜10%、鉄0.02%以下、水不溶分0.2%以下)を使用する。なお、水ガラスは前記のものに限定されるものではなく、分子式がNa2O:nSiO2(nはモル比)で表されるもので、モル比n(=SiO2のモル数/Na2Oのモル数)0.5〜4.2、SiO2の濃度が9.5〜38.0重量%の範囲内のものを適宜選択して使用すればよい。 Moreover, in this embodiment, as water glass, JISK1408 No. 3 sodium silicate (specific gravity (15 ° C. B′e) 40 or more, silicon dioxide 28 to 30%, sodium oxide 9 to 10%, iron 0.02% or less, Water insoluble content 0.2% or less) is used. The water glass is not limited to the above, but the molecular formula is represented by Na 2 O: nSiO 2 (n is a molar ratio), and the molar ratio n (= number of moles of SiO 2 / Na 2 The number of moles of O) in the range of 0.5 to 4.2 and the SiO 2 concentration in the range of 9.5 to 38.0% by weight may be appropriately selected and used.
なお、本実施形態では、A液とB液との混合を図示しないタンクにおいて行った後、注入管13により圧送して、空隙K2,K3に充填する。なお、A液とB液との混合のタイミングは前記の方法に限定されるものではなく、例えば、A液とB液とをそれぞれ個別の配管により注入箇所まで圧送した後、注入直前に混合して注入するなど、充填材のゲルタイムや注入箇所までの距離、注入箇所の形状等に応じて、適宜設定すればよい。
ここで、本実施形態では、A液とB液との混合比率を1:1として、比率の変動を抑えるものとするが、A液とB液との混合比率は、適宜変更可能であることはいうまでもない。
In the present embodiment, the liquid A and the liquid B are mixed in a tank (not shown), and then pumped by the injection pipe 13 to fill the gaps K2 and K3. The mixing timing of the A liquid and the B liquid is not limited to the above method. For example, after the A liquid and the B liquid are respectively pumped to the injection point through individual pipes, they are mixed immediately before the injection. It may be set as appropriate according to the gel time of the filler, the distance to the injection site, the shape of the injection site, and the like.
Here, in this embodiment, the mixing ratio of the A liquid and the B liquid is set to 1: 1 to suppress the fluctuation of the ratio, but the mixing ratio of the A liquid and the B liquid can be changed as appropriate. Needless to say.
B液の懸濁液に添加されるスラグは、地山の状況(原地盤の強度等)に応じて省略することが可能であり、充填材10として、水ガラスと水とからなるA液と、水酸化カルシウムを含む懸濁液であるB液と、の混合体である充填材であって、前記水酸化カルシウムが、前記混合体1m3に対して50kg〜200kgの範囲内で添加されたものを使用してもよい。 The slag added to the suspension of the B liquid can be omitted depending on the condition of the natural ground (strength of the original ground, etc.). As the filler 10, the A liquid consisting of water glass and water The filler is a mixture of liquid B, which is a suspension containing calcium hydroxide, and the calcium hydroxide is added in a range of 50 kg to 200 kg with respect to 1 m 3 of the mixture. Things may be used.
掘削工程は、シールド機30により地山Gを切削する工程である。シールド機30は、図1(a)に示すように、主に、地山Gの切削を行うカッターヘッド31とシールド機30の内部を保護する鋼製部材からなるシールド部32とから構成されている。
本実施形態では、図1(b)に示すように掘削断面が円形断面となるように構成されたシールド機30を使用するが、シールド機30の形状は限定されるものではなく、例えば、矩形断面のものを使用してもよい。
The excavation process is a process of cutting the natural ground G with the shield machine 30. As shown in FIG. 1A, the shield machine 30 is mainly composed of a cutter head 31 that cuts the natural ground G and a
In the present embodiment, a shield machine 30 configured to have a circular cross section as shown in FIG. 1B is used. However, the shape of the shield machine 30 is not limited and is, for example, rectangular. You may use the thing of a cross section.
ここで、シールド機30のカッターヘッド31の外径は、シールド部32の外径よりも大きく形成されており、シールド機30による切削に伴い、シールド部32と掘削面K1との間には空隙K3が形成される。そして、この空隙K3には、地山Gの崩落の防止を目的として、充填材10(滑材12)を充填する。
Here, the outer diameter of the cutter head 31 of the shield machine 30 is formed larger than the outer diameter of the
空隙K3への滑材12の充填は、シールド部32に形成された注入孔34から行うものとし、注入孔34には、充填材10を圧送するための注入管13が取り付け部材14を介して取り付けられている。
The gap 12 is filled with the lubricant 12 from the injection hole 34 formed in the
躯体構築工程では、シールド機30のシールド部32内において、地山Gの掘進に伴い随時組み立てられたセグメント20を、地中(掘削工程において形成された空間の内部)に配置する。なお、シールド機30の推進は、推進ジャッキ35により、シールド部32内において組み立てられたセグメント20から反力を取って行う。
In the frame construction process, the segment 20 assembled as needed with the excavation of the natural ground G is placed in the ground (inside the space formed in the excavation process) in the
裏込め工程では、シールド部32とセグメント20との形状差により生じた空隙K2に、裏込め材11(充填材10)を充填する。ここで、空隙K2への裏込め材11の充填は、セグメント20の所定の位置に形成された図示しない注入孔に注入管13を介して行う。なお、図1(a)における符号36は、シールド機30内への充填材10(裏込め材11または滑材12)の流入を防止するテールシールである。
In the backfilling step, the backfilling material 11 (filler 10) is filled into the gap K2 generated by the shape difference between the
ここで、何らかの原因により、シールド機30による掘進を中断する場合には、カッターヘッド31と切羽面K4との間に形成された空隙K5にも、充填材10を充填することにより、切羽の崩壊を防止する構成としてもよい。 Here, when the excavation by the shield machine 30 is interrupted for some reason, the gap is collapsed by filling the gap K5 formed between the cutter head 31 and the face K4 with the filler 10 as well. It is good also as a structure which prevents.
本実施形態に係る充填材10は、前記の配合により、ゲルタイムが60秒以内となるように構成されているため、空隙K2,K3への充填直後にゲル化して、地山G内に漏出することがないため、必要最小限の充填量による充填が可能となるため、経済的な施工が可能となる。
また、充填材10は、前記の配合により、地山と同等程度の強度(0.5N/mm2〜1.0N/mm2)を発現するため、地山の崩壊を抑止して、安全な施工が可能となる。
The filler 10 according to the present embodiment is configured so that the gel time is within 60 seconds due to the above-described blending. Therefore, the filler 10 gels immediately after filling the gaps K2 and K3 and leaks into the natural ground G. Therefore, it is possible to perform filling with a minimum necessary filling amount, so that economical construction is possible.
Moreover, since the filler 10 expresses the same strength (0.5 N / mm 2 to 1.0 N / mm 2 ) as that of the natural ground by the above-described composition, it is safe to suppress the collapse of the natural ground. Construction is possible.
また、充填材10は、付着強度が低く、シールド機30に付着して、掘進の妨げとなることがなく、滑材として安全、かつ、効率的な施工を提供することを可能としている。また、トンネル1を拡幅して大断面トンネルを施工する際も、その付着強度が低いため、容易にセグメント(躯体)20を撤去することを可能としており、施工を効率的に行うことが可能となる。 In addition, the filler 10 has low adhesion strength, adheres to the shield machine 30, and does not hinder digging, and can provide safe and efficient construction as a lubricant. Also, when the tunnel 1 is widened to construct a large cross-section tunnel, its adhesion strength is low, so it is possible to easily remove the segment (frame) 20 and to perform the construction efficiently. Become.
また、充填材10は、初期強度からの強度増加が30%以下となるように構成されているため、周囲の地山Gと比較して充填材10が強固となることで、大断面トンネルの施工時に支障をきたすことがない。 In addition, since the filler 10 is configured so that the strength increase from the initial strength is 30% or less, the filler 10 becomes stronger than the surrounding natural ground G, so that There will be no hindrance during construction.
また、掘進の中断時において、切羽面K4とカッターヘッド31との間の空隙K5に充填材10を充填すれば、切羽面K4の崩壊を抑えることが可能となる。さらに、掘進が再開しても、充填材10は、地山Gと同等の強度に構成されているため、掘進の妨げとなることがなく、さらに、付着強度が低いため、チャンバ33内や土砂搬送手段(図示省略)に付着することがなく、施工の妨げとなることがない。 In addition, when the excavation is interrupted, if the gap 10 between the face surface K4 and the cutter head 31 is filled with the filler 10, the collapse of the face surface K4 can be suppressed. Furthermore, even if the excavation is resumed, the filler 10 is configured to have the same strength as the natural ground G, so that the excavation is not hindered and the adhesion strength is low. It does not adhere to the conveying means (not shown) and does not hinder construction.
また、本実施形態の充填材10は、スラグが添加されていることにより、アルカリ刺激剤(水酸化カルシウム)と潜在水硬性反応を起こし、早期に硬化反応を引き起こし、固結強度が増加されている。 In addition, the filler 10 of the present embodiment causes a latent hydraulic reaction with the alkaline stimulant (calcium hydroxide) due to the addition of slag, causes a curing reaction at an early stage, and increases the consolidation strength. Yes.
以上、本発明について、好適な実施形態について説明した。しかし、本発明は、前述の各実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜設計変更が可能であることはいうまでもない。
例えば、前記実施形態では、構造物の構築方法として、シールド工法により行うものとしたが、例えば推進工法により行ってもよく、施工方法は限定されるものではない。
The preferred embodiments of the present invention have been described above. However, the present invention is not limited to the above-described embodiments, and it goes without saying that the above-described constituent elements can be appropriately changed in design without departing from the spirit of the present invention.
For example, in the above-described embodiment, the structure construction method is performed by a shield method, but may be performed by a propulsion method, for example, and the construction method is not limited.
また、前記実施形態では、トンネル工法により地下構造物を構築する場合について説明したが、本発明の構造物の構築方法により構築が可能な構造物はトンネルに限定されるものではなく、さまざまな空隙への充填が可能であることはいうまでもない。
また、前記実施形態では、トンネルを構築した後、このトンネルを拡幅して大断面トンネルを構築する場合について説明したが、複数のトンネルを並設させて連結することにより大断面トンネルを構築する場合や、完成形状として構造物(トンネル)を構築する場合等に本発明の構造物の構築方法を採用してもよいことはいうまでもない。
Further, in the above embodiment, the case where the underground structure is constructed by the tunnel construction method has been described. However, the structure that can be constructed by the structure construction method of the present invention is not limited to the tunnel, and various voids can be formed. Needless to say, it can be filled.
In the above embodiment, a case where a large-section tunnel is constructed by widening the tunnel after the tunnel has been constructed has been described. However, when a large-section tunnel is constructed by connecting a plurality of tunnels in parallel. Needless to say, the structure construction method of the present invention may be adopted when a structure (tunnel) is constructed as a completed shape.
また、前記実施形態では、充填材の強度増加を目的として、スラグを添加するものとしたが、スラグのほかに、ベントナイト等を添加してもよい。 In the embodiment, slag is added for the purpose of increasing the strength of the filler, but bentonite or the like may be added in addition to slag.
また、前記実施形態では、円形断面形状のトンネルを構築する場合について説明したが、トンネルの断面形状は限定されるものではなく、例えば、矩形状の断面を有したトンネルに対して使用してもよい。つまり、掘削機による形成された掘削孔(空間)が矩形状なため、グランドアーチが形成されにくく、地山の崩落が予想される場合に、前記充填材を充填すれば、掘削面の崩落を抑止するため、好適である。
また、同様に、欠円形断面の函体を使用した推進工法の滑材兼裏込め材として前記充填材を使用してもよい。つまり、掘削機により断面円形に形成された掘削孔(空間)に欠円形の函体を配置すると、欠円部の地山保持が困難となるため、前記充填材を充填することにより、欠円部の地山の保持を行う。この時、充填材は、付着強度が小さいため、函体の推進のための滑材としての機能を果たし、好適である。
In the above embodiment, the case where a tunnel having a circular cross section is constructed has been described. However, the cross section of the tunnel is not limited. For example, the tunnel may be used for a tunnel having a rectangular cross section. Good. That is, the borehole formed by the drilling machine (space) is rectangular, hardly ground arch is formed, when the collapse of the natural ground is expected, if filling the filling material, the collapse of the excavation face This is preferable because it suppresses.
Similarly, one may use the filler as skids and back-filling material of jacking method using a box of missing circular cross-section. That is, when placing a missing round a box body drilled hole which is circular in cross section by the excavator (space), since the natural ground holding the segmental portion is difficult, by filling the filler, segmental Keep the natural ground of the club. At this time, the filler is suitable because it has a low adhesion strength and thus functions as a sliding material for propelling the box.
次に、本発明で使用する充填材の性質に係る実証実験を行った結果を示す。 Next, the results of a demonstration experiment relating to the properties of the filler used in the present invention will be shown.
まず、水ガラス(JISK1408の3号珪酸ソーダ)と水との混合体であるA液と水酸化カルシウムと水または水酸化カルシウムと水砕スラグと水の懸濁液であるB液とを1:1で混合した充填材および従来のセメント系充填材について、ゲルタイムと1,3,7,28日経過後の一軸圧縮強度の測定を行った。 First, liquid A (mixture of JISK1408 No. 3 sodium silicate) and water, liquid A, calcium hydroxide and water, or calcium hydroxide, granulated slag, and liquid B, which is a suspension of water, 1: With respect to the filler mixed in 1 and the conventional cement-based filler, gel time and uniaxial compressive strength after 1, 3, 7, 28 days elapsed were measured.
表1に示すように、本実証実験では、B液として懸濁液500lに対して水酸化カルシウムの量を20kg〜225kgの範囲内で添加した充填材(試料1〜8)、B液として懸濁液500lに対して水酸化カルシウムを50kgと水砕スラグを50kg〜100kgの範囲内で添加した充填材(試料9〜11)と、表2に示すように、従来のセメント系充填材であるポルトランドセメントとベントナイトと水ガラスと水との混合体(試料12)を採用した。 As shown in Table 1, in this demonstration experiment, a filler (samples 1 to 8) in which the amount of calcium hydroxide was added in the range of 20 kg to 225 kg with respect to 500 l of suspension as B liquid, suspended as B liquid. A filler (samples 9 to 11) in which 50 kg of calcium hydroxide and 50 g of granulated slag are added in a range of 50 kg to 100 kg with respect to 500 l of the turbid liquid, and a conventional cement-based filler as shown in Table 2. A mixture (Sample 12) of Portland cement, bentonite, water glass and water was employed.
前記の各配合の充填材について、ゲルタイムと一軸圧縮強度の測定結果を表3に示す。 Table 3 shows the measurement results of gel time and uniaxial compressive strength with respect to the fillers of the respective blends.
表3に示すように、試料1のように水酸化カルシウムも添加量が混合体1m3あたり20kgと少ない場合には、ゲルタイムが250秒と、長くなるため、地盤内に浸透することで、充填量が増加して不経済となることから、充填材に適さない。また、強度発現も、7日後まで発現することがなく、その強度も、0.01N/mm2と小さいため、地山の安定化にも適していない。 As shown in Table 3, when the amount of calcium hydroxide added is as small as 20 kg per 1 m 3 of the mixture as in Sample 1, the gel time is as long as 250 seconds, so it can be filled by penetrating into the ground. The amount increases, making it uneconomical. Further, the strength does not develop until after 7 days, and the strength is as small as 0.01 N / mm 2 , which is not suitable for stabilization of natural ground.
また、試料2のように、水酸化カルシウムの添加量を混合体1m3あたり40kgとした場合は、強度発現まで3日かかり、その初期強度が0.01N/mm2、28日強度が0.02N/mm2と小さいため、地山の安定化の面で、その機能を果たさない恐れがあるという問題点を有している。
さらに、試料8に示すように、水酸化カルシウムの量を225kgと多くすれば、適切な強度を発現するが、ゲル化が瞬時に行われて、注入作業に支障をきたす恐れがある。
Further, when the amount of calcium hydroxide added is 40 kg per 1 m 3 of the mixture as in Sample 2, it takes 3 days to develop the strength, the initial strength is 0.01 N / mm 2 , and the 28-day strength is 0.00. Since it is as small as 02 N / mm 2 , there is a problem that the function may not be performed in terms of stabilization of natural ground.
Furthermore, as shown in Sample 8, if the amount of calcium hydroxide is increased to 225 kg, an appropriate strength is exhibited, but gelation may occur instantaneously, which may hinder the injection operation.
また、試料12に示すように、モルタルからなる従来のセメント系充填材は、28日強度で2.2N/mm2となり、必要以上に強度が発現される。 Also, as shown in Sample 12, the conventional cement-based filler made of mortar has a strength of 28 N / mm 2 at 28 days, and the strength is more than necessary.
一方、試料3〜7に示すように、水酸化カルシウムを50kg〜200kgの間で添加すれば、ゲルタイムが60秒以内で、初期強度も早期に発現するため、地山に漏出することなく、地山の崩壊を防止して、充填材としての機能を果たすことが証明された。また、試料3の一軸圧縮強度と試料9〜11の一軸圧縮強度を比較すれば、水砕スラグをB液に添加することにより一軸圧縮強度が増加することがわかる。特に、混合体1m3に対して、水酸化カルシウムを50kg、水砕スラグを75〜100kg添加すれば、充填材の一軸圧縮強度が地山の強度(0.5〜1.0N/mm2)と同等以上の強度を示すため、好適である。なお、試料11の結果から、水砕スラグを100kg添加すると、充填材の28日強度が1.01N/mm2となるため、水砕スラグの投入量が100kgを超えると、地山の強度(0.5〜1.0N/mm2)に対して充填材の一軸圧縮強度が高くなり、過剰となることが証明された。 On the other hand, as shown in Samples 3 to 7, if calcium hydroxide is added between 50 kg and 200 kg, the gel time is within 60 seconds and the initial strength develops early, so that the ground does not leak into the ground. It has been proved that it prevents the mountain from collapsing and functions as a filler. Moreover, if the uniaxial compressive strength of the sample 3 and the uniaxial compressive strength of the samples 9-11 are compared, it turns out that uniaxial compressive strength increases by adding granulated slag to B liquid. In particular, if 50 kg of calcium hydroxide and 75-100 kg of granulated slag are added to 1 m 3 of the mixture, the uniaxial compressive strength of the filler becomes the strength of the natural ground (0.5-1.0 N / mm 2 ). Is preferable because it exhibits a strength equal to or higher than. From the results of Sample 11, when 100 kg of granulated slag is added, the 28-day strength of the filler becomes 1.01 N / mm 2. Therefore, when the amount of granulated slag input exceeds 100 kg, the strength of the natural ground ( It has been proved that the uniaxial compressive strength of the filler is high and excessive with respect to 0.5 to 1.0 N / mm 2 ).
以上の結果から、混合体1m3に対して、水酸化カルシウムが50〜200kgの範囲内で添加されれば、早期のゲル化、および早期の強度発現が実現される、望ましい充填材が生成されることが実証された。また、混合体1m3に対して50〜200kgの範囲内の水酸化カルシウムと100kg以下のスラグを投入すれば、充填材の強度増加が可能となり、好適である。 From the above results, if calcium hydroxide is added within a range of 50 to 200 kg to 1 m 3 of the mixture, a desirable filler is generated that realizes early gelation and early strength development. It was proved that Moreover, if calcium hydroxide in the range of 50 to 200 kg and 100 kg or less of slag are added to 1 m 3 of the mixture, the strength of the filler can be increased, which is preferable.
また、本発明で使用する充填材の付着強度について、検証することを目的として、幅100×長さ100×高さ50mmでその上下面の中心に45×45mmの挿通孔が形成された型枠に、40×40×160mmに形成されたコンクリート部材を挿通孔に相通させた後、このコンクリート部材と型枠との隙間にグラウトを充填し、一定時間後にコンクリート部材の上部から圧力を付加して、コンクリート部材の移動時の付着強度を測定した。この結果を表4に示す。 In addition, for the purpose of verifying the adhesive strength of the filler used in the present invention , a mold having a width of 100 × length of 100 × height of 50 mm and a 45 × 45 mm insertion hole formed at the center of the upper and lower surfaces thereof In addition, after a concrete member formed in 40 × 40 × 160 mm is made to pass through the insertion hole, a grout is filled in the gap between the concrete member and the formwork, and pressure is applied from above the concrete member after a certain time. The adhesion strength during the movement of the concrete member was measured. The results are shown in Table 4.
表4に示すように、本発明で使用する充填材(試料4および試料11)は、セメント系充填材(試料12)に比べてその付着強度がはるかに小さいことが実証された。そのため、当該充填材を滑材として使用しても、摩擦抵抗が少なく、地山の掘進の妨げとなることがなく、さらに、所定の強度を有していることから、地山の崩壊を抑止するため、好適である。 As shown in Table 4, it was demonstrated that the filler used in the present invention (Sample 4 and Sample 11) has much lower adhesion strength than the cement-based filler (Sample 12). Therefore, even if the filler is used as a lubricant, there is little frictional resistance, it does not interfere with the excavation of the natural ground, and it has a predetermined strength, so it suppresses the collapse of the natural ground Therefore, it is preferable.
1 トンネル(構造物)
10 充填材
11 裏込め材
12 滑材
20 セグメント(躯体)
30 シールド機
K1 掘削面
K2,K3 空隙
G 地山
1 Tunnel (structure)
10 Filling material 11 Backfilling material 12 Lubricant 20 Segment (frame)
30 Shield Machine K1 Excavation Surface K2, K3 Gap G Ground
Claims (3)
前記地山の掘削により形成された空間の内部において躯体を形成する工程と、
前記滑材と前記躯体との間に形成された空隙に裏込め材として充填材を充填する工程と、を含む構造物の構築方法であって、
前記充填材が、水ガラスと水とからなるA液と、
水酸化カルシウムおよび潜在水硬性のある材料を含む懸濁液であるB液と、の混合体であり、
前記水酸化カルシウムが、前記混合体1m3に対して50kg以上200kg以下の範囲内で添加され、
前記潜在水硬性のある材料が、前記混合体1m3に対して100kg以下添加されることを特徴とする、構造物の構築方法。 A step of excavating a natural ground by an excavator and filling a gap formed between the excavator and the natural excavation surface with a filler as a lubricant;
Forming a skeleton inside the space formed by excavation of the natural ground;
Filling a gap formed between the sliding material and the housing as a backfilling material, and a method for constructing a structure,
The filler is a liquid A composed of water glass and water,
A mixture of calcium hydroxide and a liquid B which is a suspension containing a latent hydraulic material,
The calcium hydroxide is added within a range of 50 kg or more and 200 kg or less with respect to the mixture 1 m 3 ,
The method for constructing a structure, wherein the latent hydraulic material is added in an amount of 100 kg or less to 1 m 3 of the mixture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005171902A JP4769024B2 (en) | 2005-06-13 | 2005-06-13 | Construction method of structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005171902A JP4769024B2 (en) | 2005-06-13 | 2005-06-13 | Construction method of structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006347777A JP2006347777A (en) | 2006-12-28 |
JP4769024B2 true JP4769024B2 (en) | 2011-09-07 |
Family
ID=37644010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005171902A Expired - Fee Related JP4769024B2 (en) | 2005-06-13 | 2005-06-13 | Construction method of structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4769024B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252878B8 (en) * | 2018-11-20 | 2020-10-20 | 广州市泰利斯固结补强工程有限公司 | Single slurry and tunnel stabilizing method using same |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0721136B2 (en) * | 1984-09-04 | 1995-03-08 | 株式会社シモダ技術研究所 | Grout |
JP3686441B2 (en) * | 1995-01-09 | 2005-08-24 | 株式会社テルナイト | One-pack type backfill additive and construction method using the additive |
JP3639054B2 (en) * | 1996-07-03 | 2005-04-13 | 太平洋セメント株式会社 | Backfill injection material |
JP2002338326A (en) * | 2001-05-23 | 2002-11-27 | Taisei Corp | Void filling material and void filling method |
JP2003213665A (en) * | 2002-01-21 | 2003-07-30 | Shimoda Gijutsu Kenkyusho:Kk | Double composite injection method |
JP2003278144A (en) * | 2002-03-22 | 2003-10-02 | Sankoo Chemical Kk | Impregnation method |
JP4180938B2 (en) * | 2003-02-12 | 2008-11-12 | 住友大阪セメント株式会社 | Self-hardening void filler and void filling method |
-
2005
- 2005-06-13 JP JP2005171902A patent/JP4769024B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2006347777A (en) | 2006-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pelizza et al. | Analysis of the performance of two component back-filling grout in tunnel boring machines operating under face pressure | |
US3759044A (en) | Method of earth wall construction using cementitious bentonitic mud | |
JPH07291703A (en) | Backfillgrouting material | |
WO2005095300A1 (en) | Concrete composition, process for producing the same, method of regulating viscosity, and method of constructing cast-in-place concrete pile from the concrete composition | |
BR112017020361B1 (en) | METHOD TO FORM AN UNDERGROUND GAS STORAGE CONTAINER | |
Sharghi et al. | An experimental study of the performance of two-component backfilling grout used behind the segmental lining of a tunnel-boring machine | |
CN110630293A (en) | Double-liquid and method for grouting wall | |
US9976272B2 (en) | Method for manufacturing an element in the ground by in-situ soil mixing with a geopolymer | |
JP2015172319A (en) | Underground impervious wall construction material | |
JP4180938B2 (en) | Self-hardening void filler and void filling method | |
Pelizza et al. | Back-fill grout with two component mix in EPB tunneling to minimize surface settlements: Rome Metro—Line C case history | |
JP2018204269A (en) | Method for injecting flash setting hardened grout | |
JP4769024B2 (en) | Construction method of structure | |
CN109439303A (en) | A kind of shield zig zag inert fill material and preparation method thereof | |
JP3639054B2 (en) | Backfill injection material | |
JP5354373B2 (en) | Grout material and grout injection method | |
JP2001241288A (en) | Composition for grout composition and auxiliary construction method of mountain tunnel construction method using grout composition | |
JP6474180B1 (en) | Method of pouring groundwater ground board into hardened grout | |
JP3461635B2 (en) | Injection method | |
JP5002896B2 (en) | Gap filler and manufacturing method thereof | |
JP3686441B2 (en) | One-pack type backfill additive and construction method using the additive | |
JP6034530B1 (en) | Method for producing adhesive grout and grout injection method | |
JP2001214687A (en) | Auxiliary method for mountain tunneling method | |
JP5865575B2 (en) | Backfilling material, permeable layer formation method, permeable layer | |
JP5695300B2 (en) | Ready-made pile rooting solution and embedding method of ready-made pile using this root-setting solution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080207 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100624 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100629 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100825 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20101130 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110121 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110524 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110617 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4769024 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140624 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |